The syndeton and the job practices thereof of each cavern of a kind of underground power house Download PDFInfo
- Publication number
- CN100560941C CN100560941C CN 200810059698 CN200810059698A CN100560941C CN 100560941 C CN100560941 C CN 100560941C CN 200810059698 CN200810059698 CN 200810059698 CN 200810059698 A CN200810059698 A CN 200810059698A CN 100560941 C CN100560941 C CN 100560941C
- Authority
- CN
- China
- Prior art keywords
- cavern
- profiled beam
- attached
- side column
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The present invention relates to the syndeton and the job practices thereof of each cavern of a kind of underground power house.Technical problem to be solved by this invention provides a kind of syndeton and job practices thereof simple, reasonable, each cavern of underground power house reliably.The technical scheme that addresses this problem is: be connected the both sides, fork in main cavern with attached cavern and be close to crag concrete spray coating layout side column, the edge of side column flushes with concrete lining and damp-proofing wall outer edge, be the prolate type, arrange a profiled beam in attached cavern crown elevation in that two side columns are upper, the top edge of this beam or lower limb are optimized for the shaped form with attached cavern's crown lining cutting inward flange unanimity, the deck-siding of profiled beam equals the distance between main cavern crag concrete spray coating and damp-proofing wall outer edge, top at profiled beam is provided with the gutter, and the interface that is in the combination of side column and profiled beam and attached cavern between the concrete lining of gateway opening type is laid the border waterstop.The present invention can be used for the underground power house of Hydraulic and Hydro-Power Engineering.
Description
Technical field
The present invention relates to the syndeton and the job practices thereof of each cavern of a kind of underground power house.Be applicable to the underground power house of Hydraulic and Hydro-Power Engineering.
Background technology
The underground power house cavity group is made up of several main caverns and attached cavern usually, connects by attached cavern between each main cavern.Main cavern abutment wall scarcely adopts concrete lining, but adopt flexible support methods such as spraying anchor, for requirements such as the ventilation that guarantees the long-time running of main cavern, heating, later stage adopts damp-proofing wall to separate with crag, prevents that crag from producing the service efficiency that malaria influences the ventilation and air conditioning system of main cavern.In damp-proofing wall, utilize Vierendeel girder to establish outrigger base in addition and solve the crag leakage problem as the gutter.Attached connection cavern generally all adopts the concrete lining structure because of electromechanical equipment layout, traffic and needs attractive in appearance.The lining construction of attached connection cavern is generally built prior to the floor of main cavern, and its lining cutting is extended from structure design to construction all difficulty to main hole direction, makes the lining cutting of attached cavern to flush with crag spray-up line.Correlation sectional view such as Fig. 1, Fig. 2 of floor layer represent in attached connection cavern and the main cavern, and two kinds of situations all show between the gateway opening type concrete lining of the slab and girder of main cavern and attached cavern can't form the interface that can supply to be provided with sealing.Attached cavern mostly is apparatus arrangement passage or traffic aisle, so waterproof, the sealing of connecting portion between each cavern are had relatively high expectations, because the crag of underground chamber can't be accomplished watertight (oozing) because of its characteristic, the crag water body can be along oozing the safe operation that influences the connecting portion electromechanical equipment under the crag and having a good transport service.Simultaneously since the lining cutting of attached cavern be the gateway opening type and only flush with crag spray-up line, bring difficulty for smooth-going linking of the building finishing in the linkage section later stage between attached cavern and damp-proofing wall, influence attractive in appearance.Connection therefore main, attached cavern all seems from aspects such as structure, waterproof, construction and finishings and is even more important.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of simple, rationally, the syndeton and the job practices thereof of each cavern of underground power house reliably, be intended to make connected structure between each cavern can accomplish smooth-going, waterproof, be convenient to the later stage building finishing.
The technical solution adopted in the present invention is: the syndeton of each cavern of a kind of underground power house, have main cavern and attached cavern, on the crag of main cavern concrete spray coating is arranged, between main cavern and concrete spray coating damp-proofing wall is set, in the attached cavern concrete lining is arranged, it is characterized in that: be connected the both sides, fork in main cavern with attached cavern and be close to crag concrete spray coating layout side column, the edge of side column flushes with concrete lining and damp-proofing wall outer edge, be the prolate type, arrange a profiled beam in attached cavern crown elevation in that two side columns are upper, the top edge of this beam or lower limb are optimized for the shaped form with attached cavern's crown lining cutting inward flange unanimity, the deck-siding of profiled beam equals the distance between main cavern crag concrete spray coating and damp-proofing wall outer edge, top at profiled beam is provided with the gutter, and the interface that is in the combination of side column and profiled beam and attached cavern between the concrete lining of gateway opening type is laid the border waterstop.
The edge of described profiled beam is optimized for the shaped form with attached cavern's crown lining cutting inward flange unanimity, utilizes the combination of side column and profiled beam to lay the border waterstop with the abundant interface between the gateway opening type concrete lining in the attached cavern.
The job practices of each cavern's syndeton of a kind of underground power house is characterized in that may further comprise the steps:
1) be connected the both sides, fork with attached cavern in main cavern and be close to crag concrete spray coating layout side column, the edge of side column flushes with concrete lining and damp-proofing wall outer edge, and side column is the prolate type;
2) arrange a profiled beam in attached cavern crown elevation in that two side columns are upper, this profiled beam is that local increasing of the damp-proofing wall underbeam of main cavern formed, and the local deck-molding that strengthens section should be able to realize that profiled beam and attached cavern's lining cutting crown have sufficient interface;
3) interface that is in the combination of side column and profiled beam and attached cavern between the concrete lining of gateway opening type is laid the border waterstop;
4) at the top of profiled beam the gutter is set.
The job practices of another kind of each the cavern's syndeton of underground power house of the present invention is characterized in that may further comprise the steps:
1) be connected the both sides, fork with attached cavern in main cavern and be close to crag concrete spray coating layout side column, the edge of side column flushes with concrete lining and damp-proofing wall outer edge, and side column is the prolate type;
2) arrange a profiled beam in attached cavern crown elevation in that two side columns are upper, this profiled beam arranges that independently the section of profiled beam and side column has the sufficient interface except that satisfying with the inner concrete lining cutting of attached cavern, also should be able to bear the load of damp-proofing wall above the profiled beam;
3) interface that is in the combination of side column and profiled beam and attached cavern between the concrete lining of gateway opening type is laid the border waterstop;
4) at the top of profiled beam the gutter is set.
The invention has the beneficial effects as follows: the technical program is main in conjunction with utilizing, the design of attached cavern structural configuration, engineering measure is simple, easy construction, syndeton rationally, simply, reliably make the connection of each cavern realize smooth-going linking, waterproof sealing, are convenient to the later stage building finishing.
Description of drawings
Fig. 1 is the vertical cross section figure of a kind of syndeton of background technology of the present invention.
Fig. 2 is the vertical cross section figure of the another kind of syndeton of background technology of the present invention.
Fig. 3 is a plan view of the present invention.
Fig. 4 makes improvements background technology shown in Figure 1, for the A-A of Fig. 3 to sectional drawing.
Fig. 5 is that the B-B of Fig. 4 is to sectional drawing.
Fig. 6 makes improvements background technology shown in Figure 2, for the A-A of Fig. 3 to sectional drawing.
Fig. 7 is that the B-B of Fig. 6 is to sectional drawing.
The specific embodiment
Embodiment one, as Fig. 3, Fig. 4, shown in Figure 5, this example is the improvement of having done corresponding to structure shown in Figure 1, have main cavern 1 and attached cavern 2, concrete spray coating 3 on the crag of main cavern, main cavern 1 and 3 of crag concrete spray coatings are provided with damp-proofing wall 5, and concrete lining 4 is arranged in the attached cavern.Be connected the both sides, fork in main cavern 1 with attached cavern 2 and be close to crag concrete spray coating 3 layout side columns 6, the edge of side column 6 flushes with concrete lining 4 and damp-proofing wall 5 outer edges, is the prolate type.This example is positioned at attached cavern 2 crown elevations and arranges a profiled beam 7 on two side columns 6, this profiled beam is that local increasing of damp-proofing wall 5 underbeams of main cavern 1 formed, the local deck-molding that strengthens section should be able to realize that profiled beam 7 and attached cavern 2 lining cutting crowns have sufficient interface, the profiled beam 7 of shaped form and two side columns, the 6 common gateway opening types that constitute smooth-going transition.The interface that is 4 of gateway opening type concrete linings in the combination of side column 6 and profiled beam 7 and attached cavern is laid border waterstop 8.
The job practices of present embodiment may further comprise the steps:
1) be connected the both sides, fork with attached cavern 2 in main cavern 1 and be close to crag concrete spray coating 3 layout side columns 6, the edge of side column flushes with concrete lining 4 and damp-proofing wall 5 outer edges, and side column is the prolate type.If side column 6 is not as the structural column of main cavern 1, and its height is consistent with the corresponding structure floor height, if the double as structural column, its cross dimensions should satisfy the structure design needs, and the high TV structure of post needs and decides.
2) on two side columns 6, be positioned at attached cavern 2 crown elevations and arrange a profiled beam 7, this profiled beam is that local increasing of damp-proofing wall 5 underbeams of main cavern 1 formed, and the local deck-molding that strengthens section should be able to realize that profiled beam 7 and attached cavern 2 lining cutting crowns have sufficient interface.
3) interface that is 4 of gateway opening type concrete linings in the combination of side column 6 and profiled beam 7 and attached cavern 2 is laid border waterstop 8.
4) at the top of profiled beam 7 gutter 9 is set.
Embodiment two, as Fig. 3, Fig. 6, shown in Figure 7, this example is the improvement of having done corresponding to structure shown in Figure 2, this routine basic structure is identical with embodiment one, difference is that profiled beam 7 is independent layouts, profiled beam 7 has the sufficient interface except that satisfying with the 2 inner concrete lining cutting 4 of attached cavern with side column 6 sections, also should be able to bear the load of damp-proofing wall 5 above the profiled beam 7.
The job practices of present embodiment may further comprise the steps:
1) be connected the both sides, fork with attached cavern 2 in main cavern 1 and be close to crag concrete spray coating 3 layout side columns 6, the edge of side column flushes with concrete lining 4 and damp-proofing wall 5 outer edges, and side column is the prolate type.If side column 6 is not as the structural column of main cavern 1, and its height flushes with special-shaped back, if the double as structural column, its cross dimensions should satisfy the structure design needs, and the high TV structure of post needs and decides.
2) on two side columns 6, be positioned at attached cavern 2 crown elevations and arrange a profiled beam 7, this profiled beam is independently arranged, profiled beam 7 has the sufficient interface except that satisfying with the 2 inner concrete lining cutting 4 of attached cavern with side column 6 sections, also should be able to bear the load of damp-proofing wall 5 above the profiled beam 7.
3) interface that is 4 of gateway opening type concrete linings in the combination of side column 6 and profiled beam 7 and attached cavern 2 is laid border waterstop 8.
4) at the top of profiled beam 7 gutter 9 is set.
Claims (4)
1, the syndeton of each cavern of a kind of underground power house, underground power house has main cavern (1) and attached cavern (2), on the crag of main cavern concrete spray coating (3) is arranged, between main cavern (1) and concrete spray coating (3) damp-proofing wall (5) is set, concrete lining (4) is arranged in the attached cavern, it is characterized in that: be connected the both sides, fork in main cavern (1) with attached cavern (2) and be close to crag concrete spray coating (3) layout side column (6), the edge of side column (6) flushes with concrete lining (4) and damp-proofing wall (5) outer edge, be the prolate type, on two side columns (6), be positioned at attached cavern (2) crown elevation and arrange a profiled beam (7), the top edge of this beam or lower limb are optimized for the shaped form with attached cavern's crown lining cutting inward flange unanimity, the deck-siding of profiled beam (7) equals the distance between main cavern (1) crag concrete spray coating (3) and damp-proofing wall (5) outer edge, gutter (9) is set at the top of profiled beam, and the interface that is in the combination of side column (6) and profiled beam (7) and attached cavern (2) between gateway opening type concrete lining (4) is laid border waterstop (8).
2, the syndeton of each cavern of underground power house according to claim 1, it is characterized in that: the edge of described profiled beam (7) is optimized for the shaped form with attached cavern (2) crown lining cutting inward flange unanimity, utilizes the combination of side column (6) and profiled beam (7) to lay border waterstop (8) with the abundant interface between the gateway opening type concrete lining (4) in attached cavern (2).
3, the job practices of each cavern's syndeton of a kind of underground power house is characterized in that may further comprise the steps:
1) be connected the both sides, fork with attached cavern (2) in main cavern (1) and be close to crag concrete spray coating (3) layout side column (6), the edge of side column flushes with concrete lining (4) and damp-proofing wall (5) outer edge, and side column (6) is the prolate type;
2) on two side columns (6), be positioned at attached cavern (2) crown elevation and arrange a profiled beam (7), this profiled beam is that local increasing of the damp-proofing wall of main cavern (1) (5) underbeam formed, and the local deck-molding that strengthens section should be able to realize that profiled beam (7) and attached cavern (2) lining cutting crown have sufficient interface;
3) interface that is in the combination of side column (6) and profiled beam (7) and attached cavern (2) between gateway opening type concrete lining (4) is laid border waterstop (8);
4) at the top of profiled beam (7) gutter (9) is set.
4, the job practices of each cavern's syndeton of a kind of underground power house is characterized in that may further comprise the steps:
1) be connected the both sides, fork with attached cavern (2) in main cavern (1) and be close to crag concrete spray coating (3) layout side column (6), the edge of side column flushes with concrete lining (4) and damp-proofing wall (5) outer edge, and side column (6) is the prolate type;
2) on two side columns (6), be positioned at attached cavern (2) crown elevation and arrange a profiled beam (7), this profiled beam is independently arranged, profiled beam (7) has the sufficient interface except that satisfying with attached cavern (2) inner concrete lining cutting (4) with the section of side column (6), also should be able to bear the load of damp-proofing wall (5) above the profiled beam (7);
3) interface that is in the combination of side column (6) and profiled beam (7) and attached cavern (2) between gateway opening type concrete lining (4) is laid border waterstop (8);
4) at the top of profiled beam (7) gutter (9) is set.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810059698 CN100560941C (en) | 2008-02-04 | 2008-02-04 | The syndeton and the job practices thereof of each cavern of a kind of underground power house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200810059698 CN100560941C (en) | 2008-02-04 | 2008-02-04 | The syndeton and the job practices thereof of each cavern of a kind of underground power house |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101230581A CN101230581A (en) | 2008-07-30 |
CN100560941C true CN100560941C (en) | 2009-11-18 |
Family
ID=39897364
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200810059698 Active CN100560941C (en) | 2008-02-04 | 2008-02-04 | The syndeton and the job practices thereof of each cavern of a kind of underground power house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100560941C (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104074177B (en) * | 2013-03-26 | 2016-08-17 | 中国水电顾问集团贵阳勘测设计研究院 | Factory Building abutment wall and stiling basin are led method and the structure that wall unites two into one |
CN103291331B (en) * | 2013-06-14 | 2015-09-16 | 中国电建集团成都勘测设计研究院有限公司 | Underground cavern group layout method |
CN103452315B (en) * | 2013-08-23 | 2015-09-09 | 中国人民解放军63926部队 | A kind of high-precision section thin-walled concrete hole body structure construction method |
-
2008
- 2008-02-04 CN CN 200810059698 patent/CN100560941C/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN101230581A (en) | 2008-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105040812B (en) | Aluminium alloy house | |
CN208531965U (en) | The installation steel structure lift shaft of portable installation and transport | |
CN2921130Y (en) | Dismounting light steel structure movable storied building | |
CN106320521A (en) | Pure part plate combined industrialized house assembling structure which can be rapidly erected | |
CN103015572A (en) | Connecting method for wall body and floor slab and special connecting structure as well as quick-assembled house | |
CN100560941C (en) | The syndeton and the job practices thereof of each cavern of a kind of underground power house | |
CN204919801U (en) | Aluminum alloy house | |
CN101769032B (en) | Long-span suspended ceiling structure of underground plant and construction technology thereof | |
CN206319427U (en) | Prefabricated reinforced concrete composite thermal-insulation external wall panel | |
CN206157903U (en) | Pure part plate combination industrialization house assembly structure that can build fast | |
CN205677114U (en) | Installation node for assembled inside casing light partition wall | |
CN209384432U (en) | A kind of prefabricated gable and its connecting structure that can be recycled | |
CN206299015U (en) | Assembled composite floor | |
CN201588302U (en) | Suspended ceiling structure of long-span underground power house | |
CN205637139U (en) | Support flat push formula multicavity steel pipe -concrete composite post braced frame system | |
CN204238193U (en) | Underground Hydro-electric Power Station fitting structure | |
CN101225683B (en) | Method for connecting and installing unit curtain walls | |
CN209457200U (en) | A kind of water proof type lightgage steel joist wall | |
CN108708454B (en) | Assembled sunshine room | |
CN105133770A (en) | Roof structure of underpass inlet | |
CN207063312U (en) | A kind of arc wallboard and its attachment structure, building | |
CN205637141U (en) | Support insert the installation's multicavity steel pipe -concrete composite post braced frame system | |
CN205637140U (en) | Support multicavity steel pipe -concrete composite post braced frame system of flat push assembly | |
CN110259200A (en) | A kind of umbrella pavilion corridor and integrated module type gluing Wood construction | |
CN202627187U (en) | Combined building made of prefabricated concrete hollow slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |