CN100535264C - 一种钢套箱围堰及其回收方法 - Google Patents
一种钢套箱围堰及其回收方法 Download PDFInfo
- Publication number
- CN100535264C CN100535264C CNB2008100140995A CN200810014099A CN100535264C CN 100535264 C CN100535264 C CN 100535264C CN B2008100140995 A CNB2008100140995 A CN B2008100140995A CN 200810014099 A CN200810014099 A CN 200810014099A CN 100535264 C CN100535264 C CN 100535264C
- Authority
- CN
- China
- Prior art keywords
- steel
- panel
- coxopodite
- boxed cofferdam
- section plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Revetment (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2008100140995A CN100535264C (zh) | 2008-01-31 | 2008-01-31 | 一种钢套箱围堰及其回收方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2008100140995A CN100535264C (zh) | 2008-01-31 | 2008-01-31 | 一种钢套箱围堰及其回收方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101225663A CN101225663A (zh) | 2008-07-23 |
CN100535264C true CN100535264C (zh) | 2009-09-02 |
Family
ID=39857843
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2008100140995A Active CN100535264C (zh) | 2008-01-31 | 2008-01-31 | 一种钢套箱围堰及其回收方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100535264C (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103758141B (zh) * | 2013-12-31 | 2017-01-04 | 中铁大桥局股份有限公司 | 双壁钢围堰的平衡分体方法 |
CN103758143B (zh) * | 2014-02-14 | 2015-06-24 | 湖南省建筑工程集团总公司 | 一种桥梁基础水下混凝土连续墙围堰的模板结构 |
CN103835301B (zh) * | 2014-03-10 | 2015-08-19 | 中铁大桥局集团第五工程有限公司 | 海中借助水头差快速拆除锁口钢围堰施工方法 |
CN105625449B (zh) * | 2015-12-31 | 2017-12-08 | 中铁大桥勘测设计院集团有限公司 | 混凝土沉井与钢沉井的连接构造方法 |
CN108797348A (zh) * | 2018-04-26 | 2018-11-13 | 安徽省公路桥梁工程有限公司 | 复合式单壁钢套箱装置及其施工方法 |
CN114482565B (zh) * | 2022-03-02 | 2022-09-02 | 中国建筑第二工程局有限公司 | 一种带有室内冰场的毗邻式多层体育馆修建方法 |
CN115075273B (zh) * | 2022-07-15 | 2023-09-26 | 中交第二航务工程局有限公司 | 钢筋混凝土预制套箱围堰及施工方法 |
CN116005699B (zh) * | 2023-02-02 | 2024-06-28 | 中建八局第二建设有限公司 | 一种深水大体积基础浮态接高双壁钢套箱 |
-
2008
- 2008-01-31 CN CNB2008100140995A patent/CN100535264C/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN101225663A (zh) | 2008-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100535264C (zh) | 一种钢套箱围堰及其回收方法 | |
US9567720B2 (en) | Offshore platform for a marine environment | |
US20100232878A1 (en) | Universal Framed Cofferdam | |
CN106223355A (zh) | 一种深水高桩承台抱箍法有底钢套箱的装置及施工方法 | |
CN102561371A (zh) | 岛遂结合部钢沉箱围护结构 | |
KR100768031B1 (ko) | 프리스트레스가 도입된 콘크리트 합성파일에 강재파일을일체로 연결한 복합파일 및 이를 이용한 파일시공방법 | |
KR100937740B1 (ko) | 수중 피씨 하우스 케이슨 공법 | |
CN103122642B (zh) | 一种竖向支柱换撑的施工方法 | |
KR100383409B1 (ko) | 강재 가물막이를 이용한 직접기초 시공방법 | |
US11920559B2 (en) | Floating platform for high-power wind turbines | |
CN201158821Y (zh) | 一种钢套箱围堰 | |
AU2012313196B2 (en) | Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method | |
CN212104151U (zh) | 一种装配式钢筋混凝土沉箱 | |
CN106400814A (zh) | 一种基坑支护方法 | |
JP5562715B2 (ja) | 水中基礎の構築方法および外殻部構造 | |
CN210887256U (zh) | 挡水围堰平直组合板桩地连墙式框架 | |
CN211873283U (zh) | 软土地基泵站钢壳式钢筋混凝土集水井结构 | |
CN113882361A (zh) | 一种钢管-钢筋混凝土组合桩 | |
JP4381855B2 (ja) | 水中既設構造物の仮締切り構造及び仮締切り工法 | |
KR100609732B1 (ko) | 수중 교각 공사용 수밀케이션 및 이를 이용한 수중 교각기초의 건식 시공방법 | |
KR200404677Y1 (ko) | 자중 저감방법에 의한 우물통의 시공방법 및 그 우물통 | |
KR100525355B1 (ko) | 교각 시공용 케이슨 | |
CN113700004B (zh) | 深基坑组合支护施工装置及其方法 | |
CN216156596U (zh) | 一种用于桥梁基础施工的组合围堰 | |
CN215977232U (zh) | 一种钢管-钢筋混凝土组合桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Fan Xiaobin Inventor after: Wang Shuming Inventor after: Hu Xin Inventor after: Hou Fujin Inventor after: Dan Xuemin Inventor before: Fan Xiaobin Inventor before: Wang Shuming Inventor before: Hu Xin Inventor before: Hou Jinfu Inventor before: Dan Xuemin |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: FAN XIAOBIN WANG SHUMING HU XIN HOU JINFU DAN XUEMIN TO: FAN XIAOBIN WANG SHUMING HU XIN HOU FUJIN DAN XUEMIN |