CN100501003C - 一种复合式垫层的施工方法 - Google Patents

一种复合式垫层的施工方法 Download PDF

Info

Publication number
CN100501003C
CN100501003C CNB2007100490161A CN200710049016A CN100501003C CN 100501003 C CN100501003 C CN 100501003C CN B2007100490161 A CNB2007100490161 A CN B2007100490161A CN 200710049016 A CN200710049016 A CN 200710049016A CN 100501003 C CN100501003 C CN 100501003C
Authority
CN
China
Prior art keywords
stone flour
layer
macadam
composite type
type cushion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2007100490161A
Other languages
English (en)
Other versions
CN101050618A (zh
Inventor
赵双林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 8 Engineering Group Co Ltd
Original Assignee
China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 8 Engineering Group Co Ltd filed Critical China Railway No 8 Engineering Group Co Ltd
Priority to CNB2007100490161A priority Critical patent/CN100501003C/zh
Publication of CN101050618A publication Critical patent/CN101050618A/zh
Application granted granted Critical
Publication of CN100501003C publication Critical patent/CN100501003C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

本发明公开了一种复合式垫层的施工方法,属于路基垫层施工技术领域,该垫层自上而下包括有上石粉碎石层、砂层、土工格栅层、以及下石粉碎石层,该复合式垫层的施工方法包括上述每层的铺设步骤及其检测标准;本发明可以大大提高垫层的整体性、刚度和良好的使用性能,而且使用寿命长,本发明尤其适用于高速铁路的路基垫层施工中。

Description

一种复合式垫层的施工方法
技术领域
本发明涉及一种地基加固处理后上部垫层的施工工艺,尤其是其相关检测指标的控制。
背景技术
随着高速铁路的快速发展,为了适应高速铁路的高平稳性、高耐久性、舒适性的要求,路基的施工要求尤为严格。为了控制工后沉降,就必须对软弱地基进行加固处理,然后在其上铺设垫层,因而垫层必须具备良好的整体性和刚度。
发明内容
为了满足客运专线高速铁路发展的需求,本发明的目的在于:提供一种满足垫层上部核载的传递均匀性,增强垫层的整体性和刚度,保持基底完整连续,约束地基地侧向变形的复合式垫层的施工方法。
本发明的技术方案包括如下步骤:
A、先铺设下石粉碎石层,在粒径为5~40mm的碎石中掺入重量百分比为6%~15%的石粉,拌合后进行现场摊铺并碾压,当复合式垫层所处部位为基床底层时,该下石粉碎石层满足空隙率n≤28%、压实系数K≥0.95、动态弹性模量Evd≥40MPa;当复合式垫层所处部位为基床以下路基时,该下石粉碎石层满足空隙率n≤31%、压实系数K≥0.92、动态弹性模量Evd≥40MPa;
B、在检测合格的下石粉碎石层上面铺设土工格栅层;
C、在土工格栅层上铺设5cm~10cm的砂层,进行静载碾压以轮迹进行控制;
D、在砂层上面铺设20cm~30cm的上石粉碎石层,在粒径为5~40mm的碎石中掺入重量百分比为6%~15%的石粉,拌合后进行现场摊铺并碾压,当复合式垫层所处部位为基床底层时,该上石粉碎石层满足空隙率n≤28%、压实系数K≥0.95、动态弹性模量Evd≥40MPa;当复合式垫层所处部位为基床以下路基时,该上石粉碎石层满足空隙率n≤31%、压实系数K≥0.92、动态弹性模量Evd≥40MPa。
在所述A步骤和D步骤中的石粉重量百分比含量优选为10%~12%。
本发明上述复合式垫层的施工方法,在所述A步骤和B步骤之间还铺设有5cm~10cm的砂层,进行静载碾压以轮迹进行控制。
所述的砂层轮迹进行控制即是采用压路机静压,通过两次压过的轮痕控制砂层的压实程度。
土工格栅是一种加筋材料,在土体工程中起加固增强作用,设计成网格状结构是为了不完全隔离土层,土石之间产生咬合,增加土体的整体性和承受应力强度。高强纤维格栅具有塑料格栅不可比拟的优点,塑料产品因其原料分子结构的先天局限和热挤压而成,强度远不及纤维格栅,且门幅窄、柔性差、成卷短,增加施工搭接损耗。涤纶纤维土工格栅强度极高,右“纤维软钢筋”之称,置在土地中充当拉力元件,约束土体分散位移和不匀称沉降,提高土体的整体性和承力负荷。适用于加筋土挡墙、加筋土垫层、加筋土斜坡、桥台填土、路堤膨胀土、软地基处理。
本发明的有益效果是:在个别地基缺乏砂砾石的情况下,采用本发明的复合垫层施工方法可以大大提高垫层的整体性、刚度和良好的使用性能,使用寿命长。
下面结合附图和具体实施方式对本发明进一步说明。
附图说明
图1为本发明复合垫层实施例1的横断面结构示意图;
图2为本发明复合垫层实施例2的横断面结构示意图;
其中,附图标记为:1为上石粉碎石层,2为砂层,3为土工格栅层,4为下石粉碎石层。
具体实施方式
实施例1
一种复合式垫层,该垫层自上而下包括有20cm~30cm的上石粉碎石层1、5cm~10cm的砂层2、土工格栅层3、以及20cm~30cm的下石粉碎石层4。所述上石粉碎石层1和下石粉碎石层4均主要由粒径为5~40mm的碎石和0~5mm的石粉组成,其中石粉的重量百分比为6%~15%。该垫层所处部位为基床底层时,所述上石粉碎石层1和下石粉碎石层4的检测指标均满足空隙率n≤28%、压实系数K≥0.95、动态弹性模量Evd≥40MPa;该垫层所处部位为基床以下路基时,所述上石粉碎石层1和下石粉碎石层4的检测指标均满足空隙率n≤31%、压实系数K≥0.92、动态弹性模量Evd≥40MPa。
上述复合式垫层的施工方法,包括如下步骤:
A、先铺设下石粉碎石层4,在粒径为5~40mm的碎石中掺入重量百分比为6%~15%的石粉,拌合后进行现场摊铺并碾压,当复合式垫层所处部位为基床底层时,该下石粉碎石层4满足空隙率n≤28%、压实系数K≥0.95、动态弹性模量Evd≥40MPa;当复合式垫层所处部位为基床以下路基时,该下石粉碎石层4满足空隙率n≤31%、压实系数K≥0.92、动态弹性模量Evd≥40MPa;
B、在检测合格的下石粉碎石层4上面铺设土工格栅层3;
C、在土工格栅层3上铺设5cm~10cm的砂层2,进行静载碾压以轮迹进行控制;即采用工艺检测法,用17吨以上的压路机静压砂层,直到满足两次压过的轮痕高度差0.8~1.2cm;
D、在砂层2上面铺设20cm~30cm的上石粉碎石层1,在粒径为5~40mm的碎石中掺入重量百分比为6%~15%的石粉,拌合后进行现场摊铺并碾压,当复合式垫层所处部位为基床底层时,该上石粉碎石层1满足空隙率n≤28%、压实系数K≥0.95、动态弹性模量Evd≥40MPa;当复合式垫层所处部位为基床以下路基时,该上石粉碎石层1满足空隙率n≤31%、压实系数K≥0.92、动态弹性模量Evd≥40MPa。
实施例2
一种复合式垫层,该垫层自上而下包括有20cm~30cm的上石粉碎石层1、5cm~10cm的砂层2、土工格栅层3、砂层2以及20cm~30cm的下石粉碎石层4。所述上石粉碎石层1和下石粉碎石层4均主要由粒径为5~40mm的碎石和0~5mm的石粉组成,其中石粉的重量百分比为10%~12%。该垫层所处部位为基床底层时,所述上石粉碎石层1和下石粉碎石层4的检测指标均满足空隙率n≤28%、压实系数K≥0.95、动态弹性模量Evd≥40MPa;该垫层所处部位为基床以下路基时,所述上石粉碎石层1和下石粉碎石层4的检测指标均满足空隙率n≤31%、压实系数K≥0.92、动态弹性模量Evd≥40MPa。
上述复合式垫层的施工方法,包括如下步骤:
A、先铺设下石粉碎石层4,在粒径为5~40mm的碎石中掺入重量百分比6%~15%的石粉,拌合后进行现场摊铺并碾压,当复合式垫层所处部位为基床底层时,该下石粉碎石层4满足空隙率n≤28%、压实系数K≥0.95、动态弹性模量Evd≥40MPa;当复合式垫层所处部位为基床以下路基时,该下石粉碎石层4满足空隙率n≤31%、压实系数K≥0.92、动态弹性模量Evd≥40MPa;
B、在下石粉碎石层4上铺设5cm~10cm的砂层2,进行静载碾压以轮迹进行控制;即采用工艺检测法,用18吨的压路机静压砂层,直到满足两次压过的轮痕高度差1cm;
C、在检测合格的砂层2上面铺设土工格栅层3;
D、在土工格栅层3上铺设5cm~10cm的砂层2,进行静载碾压以轮迹进行控制;用18吨的压路机静压砂层,直到满足两次压过的轮痕高度差1cm;
E、在D步骤的砂层2上面铺设20cm~30cm的上石粉碎石层1,在粒径为5~40mm的碎石中掺入重量百分比为6%~15%的石粉,拌合后进行现场摊铺并碾压,当复合式垫层所处部位为基床底层时,该上石粉碎石层1满足空隙率n≤28%、压实系数K≥0.95、动态弹性模量Evd≥40MPa;当复合式垫层所处部位为基床以下路基时,该上石粉碎石层1满足空隙率n≤31%、压实系数K≥0.92、动态弹性模量Evd≥40MPa。

Claims (4)

1、一种复合式垫层的施工方法,其特征在于:包括如下步骤:
A、先铺设下石粉碎石层(4),在粒径为5~40mm的碎石中掺入重量百分比为6%~15%的石粉,拌合后进行现场摊铺并碾压,当复合式垫层所处部位为基床底层时,该下石粉碎石层(4)满足空隙率n≤28%、压实系数K≥0.95、动态弹性模量Evd≥40MPa;当复合式垫层所处部位为基床以下路基时,该下石粉碎石层(4)满足空隙率n≤31%、压实系数K≥0.92、动态弹性模量Evd≥40MPa;
B、在检测合格的下石粉碎石层(4)上面铺设土工格栅层(3);
C、在土工格栅层(3)上铺设5cm~10cm的砂层(2),进行静载碾压以轮迹进行控制;
D、在砂层(2)上面铺设20cm~30cm的上石粉碎石层(1),在粒径为5~40mm的碎石中掺入重量百分比为6%~15%的石粉,拌合后进行现场摊铺并碾压,当复合式垫层所处部位为基床底层时,该上石粉碎石层(1)满足空隙率n≤28%、压实系数K≥0.95、动态弹性模量Evd≥40MPa;当复合式垫层所处部位为基床以下路基时,该上石粉碎石层(1)满足空隙率n≤31%、压实系数K≥0.92、动态弹性模量Evd≥40MPa。
2、权利要求1所述的复合式垫层的施工方法,其特征在于:在所述A步骤和D步骤中的石粉重量百分比含量为10%~12%。
3、权利要求1所述的复合式垫层的施工方法,其特征在于:在所述A步骤和B步骤之间还铺设有5cm~10cm的砂层(2),进行静载碾压以轮迹进行控制。
4、权利要求2所述的复合式垫层的施工方法,其特征在于:在所述A步骤和B步骤之间还铺设有5cm~10cm的砂层(2),进行静载碾压以轮迹进行控制。
CNB2007100490161A 2007-04-30 2007-04-30 一种复合式垫层的施工方法 Expired - Fee Related CN100501003C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100490161A CN100501003C (zh) 2007-04-30 2007-04-30 一种复合式垫层的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100490161A CN100501003C (zh) 2007-04-30 2007-04-30 一种复合式垫层的施工方法

Publications (2)

Publication Number Publication Date
CN101050618A CN101050618A (zh) 2007-10-10
CN100501003C true CN100501003C (zh) 2009-06-17

Family

ID=38782199

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100490161A Expired - Fee Related CN100501003C (zh) 2007-04-30 2007-04-30 一种复合式垫层的施工方法

Country Status (1)

Country Link
CN (1) CN100501003C (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956460A (zh) * 2010-09-27 2011-01-26 徐州建筑职业技术学院 干硬性混凝土的施工方法
CN102966097A (zh) * 2012-11-30 2013-03-13 华侨大学 一种新型竖向承载桩复合地基
CN107542016A (zh) * 2017-08-09 2018-01-05 中铁四局集团第工程有限公司 一种控制路基差异沉降的填筑方法
CN110593243B (zh) * 2019-09-06 2020-11-24 河海大学 一种防毛细屏障的加筋复合土工垫层及其制作方法
CN110983888A (zh) * 2019-11-04 2020-04-10 中国科学院武汉岩土力学研究所 应用土工格室加固软岩路基的施工方法及其加固效果测试方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
土工格栅加筋砂石垫层的施工. 付志前,王广月.建筑技术,第34卷第8期. 2003
土工格栅加筋砂石垫层的施工. 付志前,王广月.建筑技术,第34卷第8期. 2003 *
砂石垫层及土工格栅在秦沈线软基处理中的应用. 成爱民.铁道建筑,第2006年卷第2期. 2006
砂石垫层及土工格栅在秦沈线软基处理中的应用. 成爱民.铁道建筑,第2006年卷第2期. 2006 *
秦沈线软基处理砂石垫层及土工格栅的应用与施工. 谢一振.路基工程,第2001年卷第4期. 2001
秦沈线软基处理砂石垫层及土工格栅的应用与施工. 谢一振.路基工程,第2001年卷第4期. 2001 *

Also Published As

Publication number Publication date
CN101050618A (zh) 2007-10-10

Similar Documents

Publication Publication Date Title
Sol-Sánchez et al. Review of the design and maintenance technologies used to decelerate the deterioration of ballasted railway tracks
CN100501003C (zh) 一种复合式垫层的施工方法
CN105239483B (zh) 一种码头混凝土道路结构及其施工方法
CN101691724A (zh) 高速铁路无砟轨道液化土地基抗震路桥过渡段构造
CN204370297U (zh) 一种吸纳无缝桥梁搭板端部应力的结构
CN102561132B (zh) 高等级公路深厚软土地基工后沉降控制板承式路堤结构
CN201095716Y (zh) 无碴轨道钢筋混凝土桩网结构路基
CN103233406B (zh) 一种长期耐久稳定使用的道路堆场铺面结构层及其施工方法
CN101962929B (zh) 一种新型桩承式加筋技术处理软土路基的方法
CN104631251A (zh) 一种用于桥头处理的土工格室轻质混合土加筋结构
CN101608421A (zh) 土工织物散体桩加固软土路基的方法
CN107761501A (zh) 一种道路施工方法
CN201530961U (zh) 高速铁路无砟轨道液化土地基抗震路桥过渡段构造
AU2018214448B2 (en) Track foundation
CN204982575U (zh) 一种连续配筋混凝土板复合式路面
CN203383117U (zh) 路桥过渡段自适应膨胀路基
CN101575835A (zh) 隐式支挡路基结构
CN104499425A (zh) 一种降低无缝桥梁台后动力冲击响应的结构及其施工工艺
CN203383116U (zh) 路桥连接段变刚度路基
CN102677584B (zh) 一种桥台搭板的安装结构
CN202610700U (zh) 一种桥台搭板的安装结构
CN109881547A (zh) 高铁隧道下穿机场道面路基不均匀沉降控制结构及施工工艺
CN204715136U (zh) 一种路桥过渡段路基结构
KR102282132B1 (ko) 고기능성 자갈을 이용한 자갈궤도 및 그 시공방법
CN203866814U (zh) 一种高速铁路中等压缩性土地基加固结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090617