The replacing method of belt of adhesive tape machine
Technical field
The present invention relates to a kind of replacing method of belt of adhesive tape machine, relate in particular to a kind of replacing method that in mine, is used to transport the belt of adhesive tape machine of coal.
Background technology
At present, in the coal in China industry, all rely on sealing-tape machine that coal is transported basically.
Yet through running all the year round, glue face catabiosis can appear in adhesive tape on the sealing-tape machine, adhesive tape wearing and tearing and damage of steel cable are serious, thereby make the tape surface Tension Distribution change, cause adhesive tape operation deflection, and the tape edge of operation deflection is under wearing and tearing constantly, steel rope is come off automatically, and cause the tearing tape phenomenon, thereby further enlarge damaged scope, make the operation shift phenomenon more serious, form vicious circle, causing can't ordinary production.
Therefore, in order to guarantee the coal normal transport, need change the whole piece belt of sealing-tape machine.Yet the replacing method efficient of existing belt of adhesive tape machine is low, the engineering time is longer, is not suitable for the production needs of high-yield and high-efficiency.
So, be necessary to design a kind of replacing method of new belt of adhesive tape machine, to overcome above-mentioned various defectives.
Summary of the invention
The object of the present invention is to provide a kind of belt of sealing-tape machine to change efficient height, short belt of adhesive tape machine replacing method of engineering time.
To achieve these goals, the replacing method of belt of adhesive tape machine of the present invention is such design-calculated:
(1) outside mine, vulcanize the new adhesive tape that connects certain-length, and with its folding in proper order putting, interim tail section is with and is vulcanized and connects under mine to putting of tail belt, the back tensioning that puts in place, band is played clamping plate up and down;
(2) go out to be with direction to install on ground and assist out the band facility, ground forward (FWD) direction from main drive unloading portion to new adhesive tape install with putting assist entrust frame, swing to cylinder, carrying roller, and will newly be with and cause main driving machine door mouth;
(3) shut down after, back, weight hole tail band, on be with each to play a width of cloth clamping plate, weight is mentioned a high position, the mouth disconnected band of going up in monkey car chamber will be gone up band and be withdrawn into pithead then;
(4) old the taking the lead of stripping will newly be taken the lead steel rope with wire line shoe and be divided into some groups and be connected with the old steel rope of taking the lead, and every group is provided with some clamps, takes the lead necessary smooth after the clamping;
(5) end with a steel rope connects old taking the lead, and the other end is fixed in the unwheeling, prepares traction;
(6) discharge clamping plate;
(7) put in order with the old band that props up the dilatory old band of unwheeling and will haul out;
(8) after old band has been dragged, will newly take the lead to bring to head sulfuration point place, last band is played clamping plate and is fixed;
(9) discharge the new and old belt connector, utilize the pulley guiding on doorway, monkey car chamber, new last head of band is drawn in correct and tensioning, play clamping plate and fix, before the interim tail up and down band play clamping plate and fix, carry out broken belt after definite then broken belt size;
(10) be with in head one place, interim tail is with each place to begin vulcanized joint up and down, removes interim tail;
(11) after sulfuration finishes, recover interim tail belt frame, a sulfuration point belt roller frame, unclamp then and take down all clamping plate;
(12) head is put weight, and the tail tightening belt opens weight to correct position;
(13) trail run belt is adjusted belt operation skew place, and is normal until the belt operation.
By adopting technique scheme, improve belt of adhesive tape machine and changed efficient, save the engineering time that belt of adhesive tape machine is changed, thereby guaranteed the normal transport of coal.
Description of drawings
Below in conjunction with accompanying drawing, specifically describe the present invention, wherein:
Fig. 1 is the diagram of circuit of the replacing method of belt of adhesive tape machine of the present invention.
The specific embodiment
See also Fig. 1, the replacing method of belt of adhesive tape machine of the present invention comprises the steps:
(1) outside mine, vulcanize the some rice of connection adhesive tapes newly, and with its folding in proper order putting, interim tail section to putting of tail belt is with and the sulfuration connection under mine, the back tensioning that puts in place, upper and lower band is played clamping plate;
(2) go out to be with direction to install on ground and assist out the band facility, ground forward (FWD) direction from main drive unloading portion to new adhesive tape install with putting assist entrust frame, swing to cylinder, carrying roller, and will newly be with and cause main driving machine door mouth;
(3) shut down after, back, weight hole tail band, on be with each to play a width of cloth clamping plate, weight is mentioned a high position, the mouth disconnected band of going up in monkey car chamber will be gone up band and be withdrawn into pithead then;
(4) old the taking the lead of stripping will newly be taken the lead steel rope with wire line shoe and be divided into some groups and be connected with the old steel rope of taking the lead, and every group is provided with some clamps, takes the lead necessary smooth after the clamping;
(5) end with a steel rope connects old taking the lead, and the other end is fixed in the unwheeling, prepares traction;
(6) discharge clamping plate;
(7) put in order with the old band that props up the dilatory old band of unwheeling and will haul out, and adopt auxiliary drive to assist traction at a slow speed;
(8) after old band has been dragged, will newly take the lead to bring to head sulfuration point place, last band is played clamping plate and is fixed;
(9) discharge the new and old belt connector, utilize the pulley guiding on doorway, monkey car chamber, new last head of band is drawn in correct and tensioning, play clamping plate and fix, before the interim tail up and down band play clamping plate and fix, carry out broken belt after definite then broken belt size;
(10) be with in head one place, interim tail is with each place to begin vulcanized joint up and down, removes interim tail;
(11) after sulfuration finishes, recover interim tail belt frame, a sulfuration point belt roller frame, unclamp then and take down all clamping plate;
(12) head is put weight, and the tail tightening belt is opened weight to correct position and cleared up belt feeder various obstacles along the line;
(13) trail run belt, at first the staff to be arranged along the line at sealing-tape machine, adopt manually cycling start operation at a slow speed, carry out then beginning the full speed running sealing-tape machine after the operation of cycling start at a slow speed, carry out at last after the full speed running sealing-tape machine being carried out run with load, in said process, need to adjust belt operation skew place, normal until the belt operation.
By adopting said method, improved belt of adhesive tape machine and changed efficient, by test, only just can finish more changing jobs of total length 9251.55 rice glue bands with 5 days, save nearly 20 days time than traditional approach, guaranteed the normal transport of coal, obtained good economic benefit.