CH84147A - Locking device for platforms that can be raised and lowered - Google Patents

Locking device for platforms that can be raised and lowered

Info

Publication number
CH84147A
CH84147A CH84147A CH84147DA CH84147A CH 84147 A CH84147 A CH 84147A CH 84147 A CH84147 A CH 84147A CH 84147D A CH84147D A CH 84147DA CH 84147 A CH84147 A CH 84147A
Authority
CH
Switzerland
Prior art keywords
platform
bolt
drive
pressure
locking device
Prior art date
Application number
CH84147A
Other languages
German (de)
Inventor
Adolph Saurer
Original Assignee
Adolph Saurer
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Adolph Saurer filed Critical Adolph Saurer
Publication of CH84147A publication Critical patent/CH84147A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Details Of Reciprocating Pumps (AREA)

Description

  

      Verriegelungsvorriclitung    bei     lieh-        und        senkbaren    Plattformen.    Die Erfindung bezieht sich auf lieb- und       seulibare    Plattformen, die durch irgendeinen  Antrieb, zum Beispiel einen     Druckflüssig-          keitsa.ntrieb,    gehoben werden, und in     ver-          scii;iedenen    Höhenlagen     mittelst    eines Rie  gels festgestellt werden können, auf den ,sich       der    heb- und senkbare Träger der Plattform  stützt.

   Der Antrieb, beispielsweise die       Druckflüssigkeitspumpe,    kann dann     aus-          gesehaltet    werden, solange diese Höhenlage       beibehalten    wird. Soll .aber die Plattform  eine andere Höhenlage     einnehmen,    so muss  der     Antrieb    vor der     Entriegelung    eingeschal  tet     werden.    um ein     Herabstürzen    der     Platt-          forni    zu verhüten.  



  Bei     -Verwendung    der     üblichen    Riegel,     dir-          ohne    weiteres unter dem Plattformträger weg  gezogen     werden    können, besteht die Gefahr,  dass     ]).ei        Unaehtsamheit    des Wärters die     Ent-          riegelung    vor der     Einsehaltung        .des        Antriebes     erfolgt.

   Dies ist nach der Erfindung da  durch ausgeschlossen, dass ein quer zur     Hub-          riclitung        verschjiebbarer    Eiegel verwendet       wird,    der mit einer in der     Hubriehtung    vor  springenden Nase versehen ist, mit der er  hei durch den     Antrieb    gehobener Plattform    hinter einen Anschlag des Plattformträgers       gehraclii;    werden kann.

   Der nach Ausschal  tung des Antriebes sich auf den     Eiegel    stüt  zende     Anschlag    verhindert .dann das Ent  riegeln ohne vorherige Einschaltung des  Antriebes, da die Plattform erst um die Höhe  der     Nase    gehoben werden muss, um den Rie  gel unter .dein Anschlage wegziehen zu kön  nen. Der     Wärter    ist     hierdurch    gezwungen,  den Antrieb vor dem Entriegeln     einzuselial-          ten,    so dass die Plattform bei     ausgeschalte-          tem        ;Antrieb    gegen ein Herabstürzen     ge-          sichert    ist.

    



  Auf der     Zeichmung    ist eine     beispielsweise          Ausführungsform    der     Verriegelungsvorrieh-          tung    nach der Erfindung dargestellt.  



       hig.    1 bis 4 sind teilweise     schematische          Lä        n,gssehnitte    durch die Tragsäule der  Plattform bei.     Druckfliissigkeitsantrieb    in     ver-          scbiedenen    Betriebslagen der     Verriegelungs-          vorricht.ung.     



       Fig.    5 ist ein     Längsschnitt    durch die       Verrie--elungsvorrichtung    in ,grösserem     Mass-          aabe.     



  Die.     dargestellte    Plattform 1 eines Turm  wagens zur     Ausbesserung    elektrischer Hoch-           leitungen    wird von einer     tele@skopartig    aus  ziehbaren     Säule    getragen, deren feststehende  Grundsäule 2 auf dem Wagenrahmen 3 be  festigt ist, während im ausziehbaren Rohr  teil 4 die Plattform 1 drehbar gelagert ist.

    Die Plattform ist zu diesem Zweck auf einem  Tragrohre     ;5        an;ebracht.    das in einem Hals  lager 6     mittelst    des     Zahnradgetriebe;    7. 8       0-edrelit        werden        kann.     



       Das    Rohr 5 kann zusammen mit dem       Roliie    4 durch     Drucköl    gehoben     werden,    das  von einer     Druckpumpe    9 erzeugt wird. Der  Rohrteil 4 ist in seiner     Längsmitte        mit-    dem       Diuckzvlinder    10     versehen.    der einen kleine  ren     Durchmesser    als das Rohr     lial,    so     dass     ein     Ringraum    11     verlileil>t.    in den     durch     Bodenöffnungen 12 .das Öl eintreten kann.

    Die Druckleitung 13 der Pumpe 9 ist     durch     den Boden der     G=rundsäule    2 und in deren  Längsmitte     emporgeführt    und ragt bei ge  hobener     Plattform    1 noch etwas in den       Druckzylinder    10 hinein; in dem sie sieh,       mtigliclist    genau     eingepasst,    wie ein     Kolben          führt        (Fig'.    2).

   Am     obern    Ende hat die Lei  tung 13 eine     Auslassöffnung    14, die so an  geordnet ist, dass sie bei der höchsten Stel  lung der Plattform 1 vom Druckzylinder 10  freigegeben     wird.    Das Innere der Grund  säule 2 steht in einer gewissen Höhe     über     dem Rohrboden durch eine Öffnung 15 mit  der Aussenluft     in        Verbindung.    Der unter  lialb dieser Öffnung liegende Teil der Grund  säule 2 dient als     0lsammelbehälter,    aus dem  die Druckpumpe 9 mittelst der     Saugleitung     16 saugt.

   In die Druckleitung 13 ist ein     Rück-          schlagventil    17 mit einer     ständig    offenen.       engen    Öffnung eingeschaltet., durch     welche     das durch die Leitung     zurückgedrückte    Öl       stark    gedrosselt wird.  



  Zur Verriegelung der Plattform 1 in     ver-          seliiedenen    Höhenlagen     sind    im ausziehbaren  Rohrteil 4 in     gewissen    Abständen     Öffnun-          gen    18 vorgesehen. in die ein an der     fest-          stehenden    Grundsäule 2 angebrachter Rie  gel 19 selbsttätig einfallen kann.

   Der Riegel  ist hierzu in einem Gehäuse ?0 quer zur     Hub-          rielitung    der Plattform 1 geführt und     wird     durch eine Feder 21 nach dem Rohrteil 4    hin     gedrückt.    Am vordern Ende ist der Rie  gel 19 mit einer     Abschrägung    22 versehen,  die heim Heben des Rohrteils 4 mit dessen  Wandung so zusammenwirkt.

   dass der Rie  gel     selbsttätig    aus den     Öffnungen    18 heraus  geschoben     wird.        Das    Auslösen des Riegels  19 erfolgt von Hand mit Hilfe des um die       Achse    23     an    der     Grundsäule    2 drehbar     ge-          lag-erten        -N\'inl:elhebls    24. 25. dessen Arm 25  gelenkig mit dem -Riegel verbunden ist.  



  Der Riegel 19 ist. nun am vordern Ende  noch mit einer in der     Hubrichtung    der Platt  form 1     vorspringenden        -Nase    26 versehen.       Da.    die     Öffnungen    18 höher sind als die       Bauhöhe    des Riegels 19 von der Unterkante  bis zur     Oberkante    der     'Nase    26. so kann der       Rie < ,-(,i    bei geeigneter Stellung des Rohr  teils 4 durch die Öffnungen 18 hindurch  treten und sich     finit    der     'Nase    26 hinter die       Rohrwandung    legen.  



  Soll die Plattform 1 aus der gesenkten  Lage nach     Fig.    1 gehoben werden, so wird  die Druckpumpe 9 in     Gang    gesetzt und da  durch Drucköl in     deii        Druckzylinder    10 ge  trieben. Bei der höchsten     Si-ellung    der Platt  form wird die     Auslassöffining    14 der Druck  leitung 13 vom Druckzylinder 10 freigegeben.  so     dass        Drucköl'    aus dem     Druckzylinder    in  die     Grunds < i.ule    2 übertritt.

   Diese Ölmenge       sammelt    sich am Boden der Grundsäule 2,  von wo sie durch die Druckpumpe 9 abge  saugt     wird'.    Solange die Pumpe arbeitet,       bleibt    die     Höchstlage    der Plattform erhalten;  da die     Ausla.ssöffnung    14 so bemessen ist.  dass der     Ö1ch-tick    der Belastung des     @ruck-          zylinclers    10 das Gleichgewicht     bä.lt        (Fig.    2).  



  Beim Heben der Plattform 1 gleitet der  Riegel 19 auf der Aussenwandung des Rohr  teils 4 und schnappt unter dem Drucke der  Feder 21 in jede     Öffnung    18 ein,     @sobald    der  obere     Rand    der Öffnung in gleiche Flucht  mit der     Oberkante    der Nase 26 gekommen  ist.

   Trifft bei der weiteren     Aufwärtsbewe-          gung    der Plattform.     wie        Fig.    5 mit gestrichel  ten     Linien    zeigt. der untere Rand der     Off-          nung    18 auf die     Alisclirä.gung    22. so wird       cler    Riegel 19     zuriiclzgeclriicl:t.    bis er in die  folgende Öffnung 18 einfällt. In jeder Hö-           benlage,    bei welcher der Riegel 19 in eine  Öffnung 18 einfällt, kann man die Platt  form 1 dadurch verriegeln., dass man die  Pumpe 9     stillsetzt    und kurzschliesst.

   Das  01 wird dann unter der Belastung durch den  Rohrteil 4 und die Plattform aus dem  Druckzylinder 10 durch die Druckleitung 13       zurückgedrückt,    strömt durch die Druck  pumpe 9 und die Saugleitung 16 in die       Grundsäule    2, wobei es auf seinem Wege  durch das     Rückschlagventil    17 so stark ge  drosselt wird, dass sich der Rohrteil 4 nur  langsam senkt.

   Gleitet beispielsweise der  Riegel 19 beim Kurzschliessen der Pumpe 9  auf der     Wandung    des Rohrteils 4, so senkt  sich dieser, bis der Riegel 19 in die nächste       höhere        Öffnung    18 einschnappt und deren  oberer Rand sich auf den Riegel      < aufsetzt          (Fig.    3).

   Die Nase 26 ist dadurch hinter die  als Anschlag     wirkende        Wa.ndung    des Rohr  teils 4 gekommen. so dass eine     Entriegelung          durch        Zurückziehen    des Riegels 19 mittelst  des     Handwinkelliebels    24 erst     möollich    ist,       wenn    der Rohrteil 4 um die Höhe der Nase 26  gehoben wird.  



  Diese     Sicherung    ist von wesentlicher Be  deutung, da das 01 infolge des Kurzschlusses  der Druckpumpe 9 zum Teil aus dem     Druck-          zylinder    10 und der Druckleitung 13 aus  läuft und somit beim Zurückziehen des Rie  gels ohne Anlassen der Pumpe der Rohr  teil 4 mit der Plattform 1 eine gewisse     Streche     herabstürzen würde     (Fig.    3).

   Zum Senken  der Plattform 1 muss daher der Wärter vor  der     Entriegelung    des Rohrteils 4 unter       Aufhebung        des    Kurzschlusses der Druck  pumpe 9 diese in Gang setzen. so dass Druck  öl durch die     Druckleitung    13 in den Druck  zylinder 10 tritt und die Plattform 1 um  die Höhe der Nase 26 des Riegels 19 hebt.

    Bei der     Entricgelung    kann der Riegel     dann     mit Hilfe des     Handwinkelliebels    24. 25 aus    dem Rohrteil 4 herausgezogen werden     (Fig.     4) und ist der Druckzylinder 10 sicher mit  01 angefüllt, wodurch ein Herabstürzen der  Plattform bei einem     niedrigen        Ölstande    ver  mieden wird. -Wird nunmehr die Druckpumpe  9 wieder stillgesetzt, so senkt sich der Rohr  teil 4 mit der Plattform 1     allmä.hlichl,,    bis  er sich auf den Boden der     Grundsäule    2  sanft aufsetzt.

   Das 01 wird währenddessen  durch die Leitung 13 zur Pumpe 9, durch       diese    hindurch, in die Saugleitung 16 und  somit in die Grundsäule 2     zurückgedrückt,     wie     Fig.    2 mit gestrichelten Pfeilen andeutet.  Das in der Grundsäule 2 befindliche 01 kann  am Ende .des Senkens durch die     Bodenöffnun-          :;-en    12 in das Rohr 4 eintreten. Ein vorzeitiges  Entriegeln ist durch diese Sicherung     aus-          trreschlossen.     



  Die Hebevorrichtung für die Plattform,  welche. nach erfolgter     Entriegelung    ausge  schaltet     wird.    kann verschieden ausgebildet  sein und mit verschiedenen Druckmitteln  arbeiten.



      Locking device for borrowable and lowerable platforms. The invention relates to platforms that can be loved and felt, which are lifted by any drive, for example a hydraulic fluid drive, and which can be fixed at different heights by means of a bolt on which the lift is located - and lowerable platform supports.

   The drive, for example the hydraulic fluid pump, can then be switched off as long as this altitude is maintained. If, however, the platform is to be at a different height, the drive must be switched on before unlocking. to prevent the platform from falling.



  When using the usual bolts, which can be easily pulled away from under the platform carrier, there is a risk that if the guard is inadvertent, the unlocking will take place before the drive is switched on.

   According to the invention, this is ruled out by using a bar which can be displaced transversely to the lifting direction and which is provided with a nose protruding in front of the lifting direction, with which it gehraclii behind a stop of the platform carrier when the platform is raised by the drive; can be.

   The stop, which rests on the bolt after the drive has been switched off, prevents the bolt from being unlocked without the drive being switched on beforehand, as the platform must first be raised by the height of the nose in order to be able to pull the bolt away from under your stop . This forces the attendant to activate the drive before unlocking, so that the platform is secured against falling when the drive is switched off.

    



  The drawing shows an example embodiment of the locking device according to the invention.



       hig. 1 to 4 are partially schematic longitudinal sections through the support column of the platform. Pressurized fluid drive in different operating positions of the locking device.



       5 is a longitudinal section through the locking device on a larger scale.



  The. Platform 1 of a tower car shown for the repair of electrical cables is supported by a telescope-like pull-out column whose fixed base column 2 is fastened to the carriage frame 3, while the platform 1 is rotatably mounted in the extendable tube part 4.

    For this purpose, the platform is attached to a support tube; 5. in a neck bearing 6 by means of the gear transmission; 7. 8 0-edrelit can be.



       The tube 5 can be lifted together with the roll 4 by pressure oil that is generated by a pressure pump 9. The pipe part 4 is provided with the Diuckzvlinder 10 in its longitudinal center. the one smaller diameter than the tube lial, so that an annular space 11 is lost. into which the oil can enter through bottom openings 12.

    The pressure line 13 of the pump 9 is led up through the bottom of the G = round column 2 and in the longitudinal center thereof and protrudes slightly into the pressure cylinder 10 when the platform 1 is raised; in which you can see, mtigliclist fitted exactly how a piston leads (Fig '. 2).

   At the upper end, the line 13 has an outlet opening 14 which is arranged in such a way that it is released by the pressure cylinder 10 at the highest position of the platform 1. The interior of the base column 2 is at a certain height above the tube sheet through an opening 15 with the outside air. The part of the base column 2 located below this opening serves as an oil collecting container from which the pressure pump 9 sucks by means of the suction line 16.

   In the pressure line 13 there is a check valve 17 with a continuously open one. narrow opening switched on., through which the oil pushed back through the line is strongly throttled.



  To lock the platform 1 in different heights, openings 18 are provided in the extendable tubular part 4 at certain intervals. into which a bolt 19 attached to the fixed base pillar 2 can automatically fall.

   For this purpose, the bolt is guided in a housing? 0 transversely to the lifting line of the platform 1 and is pressed towards the tubular part 4 by a spring 21. At the front end of the Rie gel 19 is provided with a bevel 22, the Heim lifting of the tubular part 4 cooperates with the wall.

   that the Rie gel is automatically pushed out of the openings 18. The latch 19 is released by hand with the aid of the -N \ 'inl: elhebls 24.25 rotatably supported about the axis 23 on the base column 2, the arm 25 of which is articulated to the latch.



  The latch 19 is. now at the front end with a protruding nose 26 in the lifting direction of the platform 1. There. the openings 18 are higher than the overall height of the bolt 19 from the lower edge to the upper edge of the 'nose 26. so the Rie <, - (, i with a suitable position of the pipe part 4 through the openings 18 and finite the' Place nose 26 behind the pipe wall.



  If the platform 1 is to be raised from the lowered position according to FIG. 1, the pressure pump 9 is set in motion and driven by pressure oil in the pressure cylinder 10 ge. At the highest position of the platform, the outlet opening 14 of the pressure line 13 is released from the pressure cylinder 10. so that pressure oil flows from the pressure cylinder into the basic <i.ule 2.

   This amount of oil collects at the bottom of the base column 2, from where it is sucked abge by the pressure pump 9 '. As long as the pump is working, the platform remains in the highest position; because the outlet opening 14 is so dimensioned. that the eye-tick of the load on the back cylinder 10 is in equilibrium (Fig. 2).



  When the platform 1 is lifted, the bolt 19 slides on the outer wall of the tube part 4 and snaps into each opening 18 under the pressure of the spring 21, as soon as the upper edge of the opening has come into alignment with the upper edge of the nose 26.

   Strikes when the platform continues to move upwards. as FIG. 5 shows with dashed lines. the lower edge of the opening 18 on the Alisclirä.gung 22. so the bolt 19 is closed back. until it falls into the following opening 18. The platform 1 can be locked in any elevated position in which the bolt 19 falls into an opening 18 by stopping the pump 9 and short-circuiting it.

   The 01 is then pushed back under the load by the pipe part 4 and the platform from the pressure cylinder 10 through the pressure line 13, flows through the pressure pump 9 and the suction line 16 into the base column 2, where it is so strong on its way through the check valve 17 ge is throttled that the pipe part 4 lowers only slowly.

   If, for example, the bolt 19 slides on the wall of the pipe part 4 when the pump 9 is short-circuited, it lowers until the bolt 19 snaps into the next higher opening 18 and its upper edge rests on the bolt (Fig. 3).

   The nose 26 has come behind the wall of the pipe part 4, which acts as a stop. so that unlocking by pulling back the bolt 19 by means of the hand angle lever 24 is only possible when the tubular part 4 is raised by the height of the nose 26.



  This securing is of essential importance, since the 01 partly runs out of the pressure cylinder 10 and the pressure line 13 due to the short circuit of the pressure pump 9 and thus the pipe part 4 with the platform 1 when the bolt is withdrawn without starting the pump a certain stretch would fall down (Fig. 3).

   To lower the platform 1, the attendant must therefore set the pressure pump 9 in motion before unlocking the pipe part 4, removing the short circuit of the pressure pump. so that pressure oil enters the pressure cylinder 10 through the pressure line 13 and the platform 1 is raised by the height of the nose 26 of the bolt 19.

    When unlocking, the bolt can then be pulled out of the tubular part 4 with the help of the hand angle lever 24. 25 (Fig. 4) and the pressure cylinder 10 is safely filled with 01, which prevents the platform from falling when the oil level is low. If the pressure pump 9 is now stopped again, the pipe part 4 with the platform 1 gradually lowers until it gently touches the bottom of the base column 2.

   The 01 is meanwhile pushed back through the line 13 to the pump 9, through this, into the suction line 16 and thus into the base column 2, as FIG. 2 indicates with dashed arrows. The 01 located in the base column 2 can enter the tube 4 at the end of the lowering through the bottom openings 12. Premature unlocking is ruled out by this safety device.



  The lifting device for the platform, which. is switched off after unlocking. can be designed differently and work with different pressure media.

 

Claims (1)

PATENTAN <B>SPRUCH</B> Verriegelungsvorrichtung bei lieb- und senkbaren Plattformen, gekennzeichnet durch einen quer zur Hubrichtung verschiebbaren Riegel,., der mit einer in der Hubrichtung vorspringenden Nase versehen ist, mit der er bei durch den Antrieb gehobener Platt form hinter einen Anschlag des Plattform trägers .gebracht werden kann, so dass der nach Ausschaltung des Antriebes sich auf den Riegel stützende Anschlag das Ent riegeln ohne vorherige Einschaltung des An triebes verhindert, PATENTAN <B> SPRUCH </B> Locking device for lovable and lowerable platforms, characterized by a bolt which can be moved transversely to the lifting direction and which is provided with a protruding nose in the lifting direction with which it is behind when the platform is lifted by the drive a stop of the platform carrier .can be brought, so that the stop, which is supported on the bolt after the drive has been switched off, prevents unlocking without first switching on the drive, um die Plattform bei aus alt e.tein Antriebe gegen ein Heralistiirzen zli sichern. to secure the platform at aus alt e.tein drives against heralist zli.
CH84147A 1918-10-26 1918-10-26 Locking device for platforms that can be raised and lowered CH84147A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH84147T 1918-10-26

Publications (1)

Publication Number Publication Date
CH84147A true CH84147A (en) 1920-02-16

Family

ID=4339962

Family Applications (1)

Application Number Title Priority Date Filing Date
CH84147A CH84147A (en) 1918-10-26 1918-10-26 Locking device for platforms that can be raised and lowered

Country Status (1)

Country Link
CH (1) CH84147A (en)

Similar Documents

Publication Publication Date Title
DE2552095A1 (en) METHOD AND DEVICE FOR INSERTING PIPES INTO A PRESSURIZED DRILL HOLE AND FOR EXTRACTING THE SAME
DE2658292A1 (en) HYDRAULIC SUPPORT WITH MECHANICAL LOCKING DEVICE
DE3730071C2 (en)
DE1580264B2 (en) Lifting mast of a lift truck to be taken on a truck
DE1147014B (en) Device for erecting tower cranes consisting of stacked elements
DE2637213A1 (en) TWO-MAST LIFTING EQUIPMENT
DE341663C (en) Tower car with a platform that can be raised and lowered using pressurized fluid
CH84147A (en) Locking device for platforms that can be raised and lowered
DE327099C (en) Locking device for lifting and lowering platforms of tower wagons or the like.
AT86524B (en) Tower car with a platform that can be raised and lowered using hydraulic fluid.
DE2203865C3 (en) Sludge scraper for clarifiers with weight-loaded scraper blade
DE102016207529A1 (en) Lifter for an airplane
DE202014000758U1 (en) Mobile high seat
DE1126093B (en) Mobile crane, especially construction crane
DE2742045B2 (en) Loading platform for trucks
CN215949396U (en) Oil pipe anti-channeling chuck
DE634311C (en) Retractable landing gear for aircraft
DE2943370A1 (en) HYDRAULIC LIFT
DE2247491A1 (en) TELESCOPIC CRANE JIB WITH DOUBLE LIFT
DE669743C (en) Casting trolleys, especially for converter systems
AT299726B (en) MOBILE LIFTING JACK FOR MAINTENANCE AND REPAIR OF MOTOR VEHICLES
DE353604C (en) Hydraulic tipping device for motor vehicles
DE2617630B2 (en) Swivel platform for conveyor cage or elevator loading devices
DE2550192C3 (en) Round trip with a support arm hinged on one side of a frame
DE919202C (en) Hydraulic jack