CH690446A5 - Construction method for a multi-storey apartment house. - Google Patents
Construction method for a multi-storey apartment house. Download PDFInfo
- Publication number
- CH690446A5 CH690446A5 CH00939/96A CH93996A CH690446A5 CH 690446 A5 CH690446 A5 CH 690446A5 CH 00939/96 A CH00939/96 A CH 00939/96A CH 93996 A CH93996 A CH 93996A CH 690446 A5 CH690446 A5 CH 690446A5
- Authority
- CH
- Switzerland
- Prior art keywords
- floor
- construction method
- supporting structure
- apartment house
- storey apartment
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
Description
Mehrfamilienhäuser werden bisher so gebaut, dass zunächst die Tragstruktur mit den Aussenwänden, den Böden, dem Treppenhaus und dem Dach erstellt wird. Anschliessend werden die Bauteile für den Innenausbau entweder über das Baugerüst oder über das Treppenhaus auf die einzelnen Stockwerke gebracht und eingebaut.
Der vorliegenden Erfindung liegt die Aufgabe zugrunde, ein Bauverfahren anzugeben, mit welchem ein mehrstöckiges Mehrfamilienhaus rationeller gebaut werden kann. Diese Aufgabe wird dadurch gelöst, dass jeweils die Tragkonstruktion und der Boden eines Stockwerks fertiggestellt, anschliessend die für den Innenausbau dieses Stockwerks vorgesehenen Elemente als Einheiten verpackt auf den Boden abgestellt werden, und dass anschliessend die Tragkonstruktion und der Boden des nächsten Stockwerks bzw. die Decke des obersten Stockwerks fertiggestellt wird. Durch das erfindungsgemässe Verfahren entfällt das zeitaufwändige Einbringen von Einzelteilen des Innenausbaus über Gerüste oder Treppenhäuser. Dadurch kann der Einbau erheblich rationalisiert werden. Bei geeigneter Konstruktion der Tragstruktur kann auch auf ein Gerüst verzichtet werden, was zu weiteren Einsparungen führt.
Vorzugsweise werden die Einheiten jeweils mittels eines Krans auf die betreffenden Stockwerke gehoben. Wenn die Tragstruktur aus vorgefertigten Einheiten besteht, kann das Haus sehr rasch z.B. mittels eines Mobilkrans aufgestellt werden.
Die Elemente für den Innenausbau, z.B. Trennwände und Türen, heruntergehängte Decken, Nasszellen, Kücheneinrichtung, Wandschränke, Bodenbeläge usw. können dann auf allen Stockwerken simultan eingebaut werden, was bei herkömmlichen Bauverfahren wegen der Engpässe in Treppenhäusern nicht möglich ist. Dadurch kann die Bauzeit weiter verkürzt werden.
Multi-family houses have so far been built in such a way that the supporting structure with the outer walls, the floors, the staircase and the roof is first created. The components for the interior are then brought and installed on the individual floors either via the scaffolding or the staircase.
The present invention has for its object to provide a construction method with which a multi-storey apartment building can be built more efficiently. This task is solved in that the supporting structure and the floor of one floor are completed, then the elements intended for the interior of this floor are packed onto the floor as units, and then the supporting structure and the floor of the next floor or the ceiling of the top floor is completed. The method according to the invention eliminates the time-consuming introduction of individual parts of the interior construction via scaffolding or stairwells. This means that the installation can be considerably rationalized. With a suitable construction of the supporting structure, a scaffold can also be dispensed with, which leads to further savings.
The units are preferably lifted onto the respective floors by means of a crane. If the supporting structure consists of prefabricated units, the house can very quickly e.g. be erected using a mobile crane.
The elements for the interior, e.g. Partitions and doors, suspended ceilings, wet rooms, kitchen equipment, wall cupboards, flooring, etc. can then be installed simultaneously on all floors, which is not possible with conventional construction methods due to the bottlenecks in stairwells. This can further shorten the construction time.
Claims (3)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CH00939/96A CH690446A5 (en) | 1996-04-12 | 1996-04-12 | Construction method for a multi-storey apartment house. |
DE1997114336 DE19714336A1 (en) | 1996-04-12 | 1997-04-08 | Method of building of multi-storey family house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CH00939/96A CH690446A5 (en) | 1996-04-12 | 1996-04-12 | Construction method for a multi-storey apartment house. |
Publications (1)
Publication Number | Publication Date |
---|---|
CH690446A5 true CH690446A5 (en) | 2000-09-15 |
Family
ID=4198701
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CH00939/96A CH690446A5 (en) | 1996-04-12 | 1996-04-12 | Construction method for a multi-storey apartment house. |
Country Status (2)
Country | Link |
---|---|
CH (1) | CH690446A5 (en) |
DE (1) | DE19714336A1 (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4464877A (en) * | 1981-11-12 | 1984-08-14 | Ryan Homes, Inc. | Method of assembling multi-unit, party wall residential buildings and fire-resistant party wall structure |
DE8420152U1 (en) * | 1984-07-05 | 1991-05-16 | Beenken, Hans Heinrich, Dipl.-Ing., 2942 Jever, De |
-
1996
- 1996-04-12 CH CH00939/96A patent/CH690446A5/en not_active IP Right Cessation
-
1997
- 1997-04-08 DE DE1997114336 patent/DE19714336A1/en not_active Withdrawn
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4464877A (en) * | 1981-11-12 | 1984-08-14 | Ryan Homes, Inc. | Method of assembling multi-unit, party wall residential buildings and fire-resistant party wall structure |
DE8420152U1 (en) * | 1984-07-05 | 1991-05-16 | Beenken, Hans Heinrich, Dipl.-Ing., 2942 Jever, De |
Also Published As
Publication number | Publication date |
---|---|
DE19714336A1 (en) | 1997-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1733100B9 (en) | A transportable modular building and method of constructing thereof | |
US4513545A (en) | Apparatus for and method of constructing, transporting and erecting a structure of two or more stories comprised of a plurality of prefabricated core modules and panelized room elements | |
EP1971727B1 (en) | Construction of buildings | |
US11505939B2 (en) | Reinforcing structure for modular building construction | |
US10487493B2 (en) | Building design and construction using prefabricated components | |
US3810335A (en) | Fire barrier system for multi-family dwellings | |
US3724143A (en) | Industrialized building construction | |
US2795014A (en) | Complete factory produced dwelling | |
US3855743A (en) | Building construction | |
CH690446A5 (en) | Construction method for a multi-storey apartment house. | |
US2058543A (en) | Prefabricated dwelling | |
US3877187A (en) | Dwelling construction system | |
DE2603361A1 (en) | Standardised component for building renovation sanitary units - has prefabricated framework and block with interlocking attachment and auxiliary elements | |
RU2036291C1 (en) | Method for reconstructing buildings | |
DE19720554C1 (en) | Buildings with up to four floors, in particular for residential purposes, and processes for their construction | |
RU2114960C1 (en) | Method for reconstruction of dwelling building | |
DE19700302A1 (en) | House from prefabricated elements with wet cells | |
DE1293436B (en) | Hanging house and process for its manufacture | |
JP3190059B2 (en) | How to build a building | |
JPH1171918A (en) | Building and construction thereof | |
DE202004018780U1 (en) | Prefabricated cell for building place of detention is manufactured with factory-provided built-in doors, windows, complete sanitary and electrical installations and equipment, and ready-for-use floor coverings and wall linings | |
DE102021128446A1 (en) | SYMMETRICAL WOOD-MINERAL FOAM MONOLITH COMPOSITE BUILDING SYSTEM | |
DE2151314A1 (en) | PROCESS FOR ERECTING BUILDINGS FROM PRE-FABRICATED UNITS | |
DE20303135U1 (en) | House of especially wood and with two floor levels has first infrastructure container with services room and house connection for power and water supply, and infrastructure containers have technical plane adjacent to sidewall | |
JP2500827B2 (en) | housing complex |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUE | Assignment |
Owner name: GOEHNER MERKUR AG TRANSFER- UBS AG |
|
PUE | Assignment |
Owner name: UBS AG TRANSFER- COMPARO AG |
|
PL | Patent ceased |