CH620496A5 - Method of anchoring a tube, arrangement for carrying out the method, and slack anchor produced according to the method - Google Patents

Method of anchoring a tube, arrangement for carrying out the method, and slack anchor produced according to the method Download PDF

Info

Publication number
CH620496A5
CH620496A5 CH114380A CH114380A CH620496A5 CH 620496 A5 CH620496 A5 CH 620496A5 CH 114380 A CH114380 A CH 114380A CH 114380 A CH114380 A CH 114380A CH 620496 A5 CH620496 A5 CH 620496A5
Authority
CH
Switzerland
Prior art keywords
tube
borehole
anchor
diameter
pipe
Prior art date
Application number
CH114380A
Other languages
German (de)
Inventor
Rudolf Amberg
Original Assignee
Amberg Ingenieurbuero Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to CH114380A priority Critical patent/CH620496A5/en
Application filed by Amberg Ingenieurbuero Ag filed Critical Amberg Ingenieurbuero Ag
Publication of CH620496A5 publication Critical patent/CH620496A5/en
Priority to DE19813100730 priority patent/DE3100730A1/en
Priority to ZA00810621A priority patent/ZA81621B/en
Priority to GB8103365A priority patent/GB2073283A/en
Priority to AU66918/81A priority patent/AU6691881A/en
Priority to IT12431/81A priority patent/IT1168421B/en
Priority to ES499249A priority patent/ES499249A0/en
Priority to FI810362A priority patent/FI810362L/en
Priority to JP1705581A priority patent/JPS56139399A/en
Priority to SE8100922A priority patent/SE8100922L/en
Priority to FR8102680A priority patent/FR2478193A1/en
Priority to NO810460A priority patent/NO810460L/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/808Ground anchors anchored by using exclusively a bonding material
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0006Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by the bolt material
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0093Accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Rock Bolts (AREA)

Abstract

In the method of anchoring a tube (11) in a borehole (10), the tube is held concentrically in the borehole (10) by a helical spring (20) as a retaining device and at least one helical spring (30) as a centring device. A two-component adhesive which is mixed in a static mixer (13) at the tube start (11a) is forced through the tube (11). Adhesive is forced into the tube (11) until the intermediate space between the tube (11) and the wall of the borehole (10) is filled completely and over the entire length. Thus the tube (11) is also filled with adhesive, and a slack anchor is formed which can also be inserted overhead and into vertically running boreholes. Due to the complete encasement of the tube (11) on both the inside and outside, metal cannot corrode. <IMAGE>

Description

       

  
 

**WARNUNG** Anfang DESC Feld konnte Ende CLMS uberlappen **.

 



   PATENTANSPRÜCHE
1. Verfahren zur Verankerung eines Rohres im Boden zur
Stützung und/oder Verfestigung von Gestein und Erdreich, dadurch gekennzeichnet, dass ein Rohr (11) zentrisch in ein Bohrloch (10) und im Abstand von dessen Wand eingesetzt und am Rohrende   (alb)    im Bohrloch (10) gehaltert wird, dass dann ein Zweikomponenten-Klebstoff durch das Rohr (11) gepresst wird, bis der Zwischenraum zwischen der Aussenwand des Rohres (11) und der Wand des Bohrlochs (10) vollständig ausgefüllt ist.



   2. Verfahren nach Patentanspruch 1, dadurch gekennzeichnet, dass der Zweikomponenten-Klebstoff beim Rohranfang   (1 la)    gemischt wird.



   3. Verfahren nach Patentanspruch 2, dadurch gekennnzeichnet, dass die Mischung im Rohr (11) durchgeführt wird.



   4. Vorrichtung zur Durchführung des Verfahrens nach Patentanspruch 1, dadurch gekennzeichnet, dass ein statischer Mischer (13) in das Rohr (11) eingesetzt ist, um den in Form von zwei getrennten Zuflüssen in das Rohr (11) gepressten Zweikomponenten-Kleber durchzumischen.



   5. Vorrichtung nach Patentanspruch 4, dadurch gekennzeichnet, dass der Mischer (13) ein Hohlzylinder (14) mit in dessen Hohlraum gegeneinander versetzt angeordneten Stegen (15) ist.



   6. Schlaffanker, hergestellt nach dem Verfahren nach Patentanspruch 1, dadurch gekennzeichnet, dass ein mit an seinem Umfang mit Mitteln (20, 30) zur Abstandhalterung zwecks Zentrierung und/oder Fixierung versehenes Rohr (11) in das Bohrloch (10) eingesetzt ist und dass der Zwischenraum zwischen Bohrloch (10) und Rohr (11) sowie das Innere des Rohres (11) auf der gesamten Länge des Bohrlochs (10) bzw. des Rohres (11) mit einem Zweikomponentenklebstoff gefüllt ist.



   7. Schlaffanker nach Patentanspruch 6, dadurch gekennzeichnet, dass das Rohr (11) ein Glasfaserrohr ist.



   8. Schlaffanker nach Patentanspruch 6, dadurch gekennzeichnet, dass zur Erzeugung einer kraftschlüssigen Verbindung zwischen den Mitteln (20, 30) zur Abstandhalterung und dem Rohr (11) ein Gewinde in den Mantel des Rohres (11) geschnitten ist.



   9. Schlaffanker nach Patentanspruch 6, dadurch gekennzeichnet, dass die Mittel (20, 30) zur Abstandhalterung je als Schraubenfeder ausgebildet sind, bei der die Wendel kegelstumpfförmig angeordnet sind.



   In Bergwerken, im Tunnel- und Stollenbau ist es bekannt, Zuganker zur Verfestigung von lockeren Gesteinspartien oder bei gebrächem Fels einzubauen. Diese Zuganker sind meistens Einzelstäbe und reichen bis zum Ende des Bohrlochs. An diesem Ende des Bohrlochs wird der Anker fixiert und auf einer Ankerplatte an der Aussenseite des Bohrlochs mittels Schraubenmuttern festgeschraubt. Man spricht von einem schlaffen Anker, wenn keine oder nur eine unwesentliche Spannung im Ankerstab vorhanden ist; mit einer erheblichen Spannung belastet, handelt es sich dann um einen vorgespannten Anker.



  Ueblicherweise ist bei einem vorgespannten Anker der Ankerstab nur am Ende des Bohrlochs fixiert und er liegt auf seiner gesamten Länge frei im Bohrloch. Im Tunnelbau, wo solche Anker über Jahrzehnte hinweg ihren Dienst erfüllen müssen, können derartige Anker aus Gründen der Korrosionsanfälligkeit nicht verwendet werden. Man verwendet hier deshalb bevorzugterweise schlaffe Anker, die auf der gesamten Länge des Bohrlochs eingebettet sind. Ein Bohrloch wird dabei mit Zementmörtel gefüllt und dann wird der Ankerstab eingetrieben. Nachteilig an einem solchen Anker ist, dass der Mörtel, um an den Rippen des Rippenstahls gut zu haften, relativ flüssig sein sollte. Damit kann ein solcher Anker nicht in Ueberkopfmontage und bei ansteigendem oder sogar vertikalem Bohrloch eingesetzt werden.



   Gemäss einem andern Vorschlag werden Patronen mit den beiden Stoffen, dem Kleber und dem Härter eines Zweikomponenten-Klebstoffes in das Bohrloch eingeführt und durch Eindrehen des Stabes werden die beiden Stoffe durchgemischt.



  Diese Befestigungsart wird heute zur Hauptsache für vorgespannte Anker benützt, bei denen lediglich das hintere Ende des Ankerstabes festgehalten wird. Es wäre denkbar, diese Befestigungsart auch bei schlaffen Ankern anzuwenden. Diese Lösung käme jedoch teuer zu stehen, weil zuerst eine grosse Anzahl solcher Patronen eingesetzt werden müsste.



   Es ist deshalb eine Aufgabe der Erfindung, bei einem Verfahren zum Verankern eines Rohres gemäss der Gegenstandsbezeichnung im Oberbegnff des unabhängigen Patentanspruchs 1 den Einbau auch Ueberkopf und in beliebiger Richtung zu ermöglichen, wobei die Haltekraft wenigstens die Bruchfestigkeit von Stahl übertrifft und der Ankerstab auf seiner gesamten Länge innerhalb des Bodenmaterials vor Korrosion geschützt ist.



   Erfindungsgemäss erfüllt ein Verfahren gemäss dem kennzeichnenden Teil des unabhängigen Patentanspruchs 1 diese Aufgabe. Die Erfindung betrifft zudem noch eine Vorrichtung zur Durchführung des Verfahrens sowie einen Schlaffanker, hergestellt nach dem Verfahren.



   Nachfolgend wird ein Ausführungsbeispiel der Erfindung beschrieben. Es zeigen:
Fig. 1 einen Schlaffanker nach der Erfindung,
Fig. 2 eine   Rückhaltevorrichtung    und
Fig. 3 eine   Zentriervonrichtung.   



   Der Schlaffanker besteht aus einem Rohr 11 aus einem beliebigen zugfesten Material wie Stahl, Glasfasem oder dgl.



  Im Bohrloch 10 wird das Rohr 11 beim Ende 10b des Bohrlochs und wenigstens auch am Anfang 10a desselben zentriert.



  Im dargestellten Auführungsbeispiel sind zur Zentrierung Schraubenfedern 30 gemäss Fig. 3 vorgesehen, deren kleinster Durchmesser am unteren Ende 31 höchstens gleich ist, wie der Rohrdurchmesser, aber vorteilhafterweise um etwas kleiner sein sollte, damit sich die Schraubfeder 30 zur Zentrierung auf dem Rohr 11 festklemmt. Am   andem    Ende 32 ist der Durchmesser wenigstens gleich wie der Durchmesser des Bohrlochs 10.

  Wenn derartige Schraubenfedern so als Zen   triervorrichtung    auf das Roh 11 derart aufgesetzt werden, dass das untere Ende 31, also dasjenige mit geringerem Durchmesser, bei dem in das Bohrloch 10 eingesetzten Rohr 11 gegen das Bohrlochende 10b hin zeigt, so ist leicht einzusehen, dass infolge von Reibungskräften auf dem Rohr 11 und an der Wand des Bohrlochs 10 die Schraubenfeder 30 als Zentriervorrichtung in die Länge gezogen wird und zwischen den Windungen Durchgänge entstehen. Eine solche Schraubenfeder 30 als   Zentriervorrichtung    kann beispielsweise aus Federstahldraht mit einem Durchmesser von 2,5 mm bestehen. 

  Am Bohrlochende 10b ist eine Vorrichtung vorhanden, die neben der Zentrierung des Rohres 11 noch die Aufgabe erfüllt, das Rohr 11 im Bohrloch 10 zu fixieren, wenn im eingesetzten Zustand eine Kraft auf das Rohr 11 einwirkt, durch die dasselbe aus dem Bohrloch 10 herausgleiten könnte. Gemäss Fig.



  2 besteht eine solche Vorrichtung aus einer Schraubenfeder 20 als Rückhaltevorrichtung, die an ihrem einen Ende 21 einen Durchmesser aufweist, der höchstens gleich gross ist wie der Durchmesser des Rohres 11 und an ihrem andern Ende 22 einen solchen, der wenigstens gleich gross ist wie der Durchmesser des Bohrlochs 10. Das Ende 22 der Schraubenfeder 20 als Rückhaltevorrichtung ist auf dem letzten Teil 23 in der  



  Grössenordnung von etwa 5 mm nach aussen abgebogen. Die Wendel hat am untern Ende 21 einen geringen Abstand und am oberen Ende 22 einen grossen Abstand. Damit wird beim Einbringen des Stabes die untere Hälfte der Schraubenfeder gezogen und bildet   Öffnungen.    Eine Kraft auf das Rohr 11 in Richtung aus dem Bohrloch 10 heraus bewirkt, dass die mit dem umgebogenen Ende sich im Gestein festkrallende Schraubenfeder 20 als Rückhaltevorrichtung im oberen Teil zusammengepresst wird und so eine Fixierung des Rohres 11 im Bohrloch 10 bewirkt.



   Am Rohrende 11a ist eine Mischvorrichtung 13 in das Rohr 11 eingesetzt. Diese Mischvorrichtung 13 besteht aus einem Hohlzylinder 14 ausgebildet, der in seinem Innern Stege 15 aufweist, die versetzt angeordnet sind. Wenn nun am Rohrende 11a ein Zweikomponenten-Klebstoff in getrennter Form als Binder B und Kleber K hineingepresst wird, so vermischen sich die beiden Komponenten infolge der durch die Stege 15 bewirkten Turbulenzen. Der Klebstoff wird so lange in das Rohr 11 hineingepresst, bis der Zwischenraum zwischen dem Bohrloch 10 und der Aussenwand des Rohres 11 vollständig gefüllt ist.



   Es ist bekannt, dass Zweikomponenten-Klebstoffe heute praktisch mit jeder beliebigen Viskosität herstellbar sind, so dass auch bei senkrecht nach oben gerichteten Bohrlöchern kein Klebstoff herabtropfen kann. Bei Versuchen wurde ein Bohrloch von 41 mm Durchmesser und in der üblichen Länge in der Grössenordnung 1,6 bis 4 m in Fels gebohrt. In dieses Bohrloch wurde ein Rohr aus verfestigtem Glasfaserstoff mit längsverlaufenden Fasern eingesetzt, nachdem an dem nach hinten im Bohrloch gerichteten Rohrende eine Schraubenfeder 20 als Rückhaltevorrichtung nach Fig. 2 und vorne eine Schraubenfeder 30 als Zentriervorrichtung nach Fig. 3 aufgesetzt wurden. In das Rohr 11 wurde ein zylindrischer statischer Mischer 13 eingesetzt und die beiden Komponenten des Klebstoffes einzeln injiziert.

  Als Klebstoff wurde der unter dem Handelsnamen  Stucarit  der Firma Epple in Stuttgart käufliche Klebstoff verwendet. Es wurde pro Meter Rohrlänge 1 Liter Klebstoffmischung mit einem Druck von etwa 120 bar injiziert. Dabei konnte festgestellt werden, dass pro Minute bis etwa 5 Liter Material injiziert werden konnte.

 

   Nach einer üblichen Aushärtzeit wurde eine Zugkraft von 37 Tonnen an das Rohr angesetzt, also eine Kraft, die weit über der Bruchfestigkeit eines entsprechenden Rohres aus Stahl liegt, und es konnte keine Veränderung der Verankerung festgestellt werden.



   Die Mischvorrichtung 13 besteht vorteilhafterweise aus einem Kunststoff und ist als verlorenes Ausrüstungsteil konzipiert. Anstelle der in Fig. 2 dargestellten Schraubenfeder 20 als Rückhaltevorrichtung könnte auch eine Blattfeder in Form einer Spreizfeder verwendet werden. Sie muss lediglich garantieren, dass die Rohrachse wenigstens angenähert im Zentrum des Bohrlochs ist und dass der Fluss des Klebstoffs von hinten nach vorn nicht gehemmt wird und ferner noch, dass das Rohr durch den Druck des Klebstoffs am Ende des Bohrlochs nicht herausgepresst werden kann. 



  
 

** WARNING ** beginning of DESC field could overlap end of CLMS **.

 



   PATENT CLAIMS
1. Procedure for anchoring a pipe in the ground
Support and / or consolidation of rock and soil, characterized in that a pipe (11) is inserted centrally into a borehole (10) and at a distance from its wall and is held in the borehole (10) at the pipe end (alb), that then Two-component adhesive is pressed through the tube (11) until the space between the outer wall of the tube (11) and the wall of the borehole (10) is completely filled.



   2. The method according to claim 1, characterized in that the two-component adhesive is mixed at the beginning of the tube (1 la).



   3. The method according to claim 2, characterized in that the mixing is carried out in the tube (11).



   4. Apparatus for performing the method according to claim 1, characterized in that a static mixer (13) is inserted into the tube (11) to mix the two-component adhesive pressed into the tube (11) in the form of two separate inflows.



   5. The device according to claim 4, characterized in that the mixer (13) is a hollow cylinder (14) with webs (15) arranged offset in relation to one another in its cavity.



   6. Sleep anchor, produced by the method according to claim 1, characterized in that a with its circumference with means (20, 30) for spacing for centering and / or fixing tube (11) is inserted into the borehole (10) and that the space between the borehole (10) and the tube (11) and the interior of the tube (11) is filled with a two-component adhesive over the entire length of the borehole (10) or the tube (11).



   7. Sleep anchor according to claim 6, characterized in that the tube (11) is a glass fiber tube.



   8. Sleep anchor according to claim 6, characterized in that a thread is cut into the jacket of the tube (11) to produce a non-positive connection between the means (20, 30) for spacing and the tube (11).



   9. sleep anchor according to claim 6, characterized in that the means (20, 30) for spacing are each designed as a helical spring, in which the helix are arranged in the shape of a truncated cone.



   In mines, in tunnel and tunnel construction, it is known to install tie rods for the consolidation of loose rock sections or when the rock is broken. These tie rods are mostly single rods and extend to the end of the borehole. The anchor is fixed at this end of the borehole and screwed onto an anchor plate on the outside of the borehole by means of screw nuts. One speaks of a slack anchor when there is no or only insignificant tension in the anchor rod; loaded with considerable tension, it is then a prestressed anchor.



  Usually, in the case of a prestressed anchor, the anchor rod is only fixed at the end of the borehole and lies freely in the borehole over its entire length. In tunnels, where such anchors have been used for decades, such anchors cannot be used due to their susceptibility to corrosion. Sagging anchors, which are embedded along the entire length of the borehole, are therefore preferably used here. A borehole is filled with cement mortar and the anchor rod is then driven in. A disadvantage of such an anchor is that the mortar should be relatively fluid in order to adhere well to the ribs of the rib steel. This means that such an anchor cannot be used in overhead installation and with an upward or even vertical borehole.



   According to another proposal, cartridges with the two substances, the adhesive and the hardener of a two-component adhesive, are introduced into the borehole and the two substances are mixed by screwing in the rod.



  This type of fastening is mainly used today for prestressed anchors, in which only the rear end of the anchor rod is held. It would be conceivable to use this type of fastening even with slack anchors. However, this solution would be expensive because a large number of such cartridges would have to be used first.



   It is therefore an object of the invention, in a method for anchoring a pipe according to the object designation in the upper part of independent claim 1, to enable installation also overhead and in any direction, the holding force at least exceeding the breaking strength of steel and the anchor rod over its entire length Length within the soil material is protected from corrosion.



   According to the invention, a method according to the characterizing part of independent claim 1 fulfills this task. The invention also relates to a device for carrying out the method and a sleep anchor manufactured by the method.



   An exemplary embodiment of the invention is described below. Show it:
1 shows a sleep anchor according to the invention,
Fig. 2 is a restraint and
Fig. 3 shows a centering device.



   The sleep anchor consists of a tube 11 made of any tensile material such as steel, glass fiber or the like.



  In the borehole 10, the pipe 11 is centered at the end 10b of the borehole and at least also at the beginning 10a thereof.



  In the exemplary embodiment shown, helical springs 30 according to FIG. 3 are provided for centering, the smallest diameter of which at the lower end 31 is at most the same as the pipe diameter, but should advantageously be somewhat smaller so that the helical spring 30 clamps on the pipe 11 for centering. At the other end 32, the diameter is at least the same as the diameter of the borehole 10.

  If such helical springs are placed as a centering device on the tube 11 in such a way that the lower end 31, i.e. the one with a smaller diameter, points towards the tube end 10b in the tube 11 inserted into the bore hole 10, it is easy to see that as a result of frictional forces on the tube 11 and on the wall of the borehole 10, the helical spring 30 is pulled out as a centering device and passages arise between the turns. Such a helical spring 30 as a centering device can consist, for example, of spring steel wire with a diameter of 2.5 mm.

  At the end of the borehole 10b there is a device which, in addition to the centering of the tube 11, also fulfills the task of fixing the tube 11 in the borehole 10 when a force acts on the tube 11 in the inserted state, through which the tube 11 could slide out of the borehole 10 . According to Fig.



  2, such a device consists of a helical spring 20 as a retaining device, which has at its one end 21 a diameter that is at most the same size as the diameter of the tube 11 and at its other end 22 one that is at least as large as the diameter of the borehole 10. The end 22 of the coil spring 20 as a retaining device is on the last part 23 in the



  Size of about 5 mm bent outwards. The helix has a small distance at the lower end 21 and a large distance at the upper end 22. So that the lower half of the coil spring is pulled when inserting the rod and forms openings. A force on the pipe 11 in the direction out of the borehole 10 has the effect that the helical spring 20 clawing into the rock with the bent end is pressed together as a retaining device in the upper part and thus fixes the pipe 11 in the borehole 10.



   A mixing device 13 is inserted into the pipe 11 at the pipe end 11a. This mixing device 13 consists of a hollow cylinder 14 which has webs 15 in its interior, which are arranged offset. If a two-component adhesive in separate form as binder B and adhesive K is now pressed in at the tube end 11a, the two components mix due to the turbulence caused by the webs 15. The adhesive is pressed into the tube 11 until the space between the borehole 10 and the outer wall of the tube 11 is completely filled.



   It is known that two-component adhesives can today be produced with virtually any viscosity, so that no adhesive can drip down even when the drill holes are directed vertically upwards. In experiments, a 41 mm diameter borehole was drilled in the usual length on the order of 1.6 to 4 m in rock. A tube made of solidified glass fiber material with longitudinal fibers was inserted into this borehole after a coil spring 20 as a retaining device according to FIG. 2 and a coil spring 30 as a centering device according to FIG. 3 were placed at the rear of the tube end in the borehole. A cylindrical static mixer 13 was inserted into the tube 11 and the two components of the adhesive were injected individually.

  The adhesive sold under the trade name Stucarit from Epple in Stuttgart was used. 1 liter of adhesive mixture at a pressure of about 120 bar was injected per meter of pipe length. It was found that up to about 5 liters of material could be injected per minute.

 

   After a normal hardening time, a tensile force of 37 tons was applied to the pipe, i.e. a force that is far above the breaking strength of a corresponding steel pipe, and no change in the anchoring was found.



   The mixing device 13 advantageously consists of a plastic and is designed as a lost piece of equipment. Instead of the coil spring 20 shown in FIG. 2 as a retaining device, a leaf spring in the form of an expansion spring could also be used. It only has to guarantee that the pipe axis is at least approximately in the center of the borehole and that the flow of the adhesive from the back to the front is not inhibited and furthermore that the pipe cannot be pressed out by the pressure of the adhesive at the end of the borehole.


    

Claims (10)

PATENTANSPRÜCHE 1. Verfahren zur Verankerung eines Rohres im Boden zur Stützung und/oder Verfestigung von Gestein und Erdreich, dadurch gekennzeichnet, dass ein Rohr (11) zentrisch in ein Bohrloch (10) und im Abstand von dessen Wand eingesetzt und am Rohrende (alb) im Bohrloch (10) gehaltert wird, dass dann ein Zweikomponenten-Klebstoff durch das Rohr (11) gepresst wird, bis der Zwischenraum zwischen der Aussenwand des Rohres (11) und der Wand des Bohrlochs (10) vollständig ausgefüllt ist. PATENT CLAIMS 1. Procedure for anchoring a pipe in the ground Support and / or consolidation of rock and soil, characterized in that a pipe (11) is inserted centrally into a borehole (10) and at a distance from its wall and is held in the borehole (10) at the pipe end (alb), that then Two-component adhesive is pressed through the tube (11) until the space between the outer wall of the tube (11) and the wall of the borehole (10) is completely filled. 2. Verfahren nach Patentanspruch 1, dadurch gekennzeichnet, dass der Zweikomponenten-Klebstoff beim Rohranfang (1 la) gemischt wird. 2. The method according to claim 1, characterized in that the two-component adhesive is mixed at the beginning of the tube (1 la). 3. Verfahren nach Patentanspruch 2, dadurch gekennnzeichnet, dass die Mischung im Rohr (11) durchgeführt wird. 3. The method according to claim 2, characterized in that the mixing is carried out in the tube (11). 4. Vorrichtung zur Durchführung des Verfahrens nach Patentanspruch 1, dadurch gekennzeichnet, dass ein statischer Mischer (13) in das Rohr (11) eingesetzt ist, um den in Form von zwei getrennten Zuflüssen in das Rohr (11) gepressten Zweikomponenten-Kleber durchzumischen. 4. Apparatus for performing the method according to claim 1, characterized in that a static mixer (13) is inserted into the tube (11) to mix the two-component adhesive pressed into the tube (11) in the form of two separate inflows. 5. Vorrichtung nach Patentanspruch 4, dadurch gekennzeichnet, dass der Mischer (13) ein Hohlzylinder (14) mit in dessen Hohlraum gegeneinander versetzt angeordneten Stegen (15) ist. 5. The device according to claim 4, characterized in that the mixer (13) is a hollow cylinder (14) with webs (15) arranged offset in relation to one another in its cavity. 6. Schlaffanker, hergestellt nach dem Verfahren nach Patentanspruch 1, dadurch gekennzeichnet, dass ein mit an seinem Umfang mit Mitteln (20, 30) zur Abstandhalterung zwecks Zentrierung und/oder Fixierung versehenes Rohr (11) in das Bohrloch (10) eingesetzt ist und dass der Zwischenraum zwischen Bohrloch (10) und Rohr (11) sowie das Innere des Rohres (11) auf der gesamten Länge des Bohrlochs (10) bzw. des Rohres (11) mit einem Zweikomponentenklebstoff gefüllt ist. 6. Sleep anchor, produced by the method according to claim 1, characterized in that a with its circumference with means (20, 30) for spacing for centering and / or fixing tube (11) is inserted into the borehole (10) and that the space between the borehole (10) and the tube (11) and the interior of the tube (11) is filled with a two-component adhesive over the entire length of the borehole (10) or the tube (11). 7. Schlaffanker nach Patentanspruch 6, dadurch gekennzeichnet, dass das Rohr (11) ein Glasfaserrohr ist. 7. Sleep anchor according to claim 6, characterized in that the tube (11) is a glass fiber tube. 8. Schlaffanker nach Patentanspruch 6, dadurch gekennzeichnet, dass zur Erzeugung einer kraftschlüssigen Verbindung zwischen den Mitteln (20, 30) zur Abstandhalterung und dem Rohr (11) ein Gewinde in den Mantel des Rohres (11) geschnitten ist. 8. Sleep anchor according to claim 6, characterized in that a thread is cut into the jacket of the tube (11) to produce a non-positive connection between the means (20, 30) for spacing and the tube (11). 9. Schlaffanker nach Patentanspruch 6, dadurch gekennzeichnet, dass die Mittel (20, 30) zur Abstandhalterung je als Schraubenfeder ausgebildet sind, bei der die Wendel kegelstumpfförmig angeordnet sind. 9. sleep anchor according to claim 6, characterized in that the means (20, 30) for spacing are each designed as a helical spring, in which the helix are arranged in the shape of a truncated cone. In Bergwerken, im Tunnel- und Stollenbau ist es bekannt, Zuganker zur Verfestigung von lockeren Gesteinspartien oder bei gebrächem Fels einzubauen. Diese Zuganker sind meistens Einzelstäbe und reichen bis zum Ende des Bohrlochs. An diesem Ende des Bohrlochs wird der Anker fixiert und auf einer Ankerplatte an der Aussenseite des Bohrlochs mittels Schraubenmuttern festgeschraubt. Man spricht von einem schlaffen Anker, wenn keine oder nur eine unwesentliche Spannung im Ankerstab vorhanden ist; mit einer erheblichen Spannung belastet, handelt es sich dann um einen vorgespannten Anker. In mines, in tunnel and tunnel construction, it is known to install tie rods for the consolidation of loose rock sections or when the rock is broken. These tie rods are mostly single rods and extend to the end of the borehole. The anchor is fixed at this end of the borehole and screwed onto an anchor plate on the outside of the borehole by means of screw nuts. One speaks of a slack anchor when there is no or only insignificant tension in the anchor rod; loaded with considerable tension, it is then a prestressed anchor. Ueblicherweise ist bei einem vorgespannten Anker der Ankerstab nur am Ende des Bohrlochs fixiert und er liegt auf seiner gesamten Länge frei im Bohrloch. Im Tunnelbau, wo solche Anker über Jahrzehnte hinweg ihren Dienst erfüllen müssen, können derartige Anker aus Gründen der Korrosionsanfälligkeit nicht verwendet werden. Man verwendet hier deshalb bevorzugterweise schlaffe Anker, die auf der gesamten Länge des Bohrlochs eingebettet sind. Ein Bohrloch wird dabei mit Zementmörtel gefüllt und dann wird der Ankerstab eingetrieben. Nachteilig an einem solchen Anker ist, dass der Mörtel, um an den Rippen des Rippenstahls gut zu haften, relativ flüssig sein sollte. Damit kann ein solcher Anker nicht in Ueberkopfmontage und bei ansteigendem oder sogar vertikalem Bohrloch eingesetzt werden. Usually, in the case of a prestressed anchor, the anchor rod is only fixed at the end of the borehole and lies freely in the borehole over its entire length. In tunnels, where such anchors have been used for decades, such anchors cannot be used due to their susceptibility to corrosion. Sagging anchors, which are embedded along the entire length of the borehole, are therefore preferably used here. A borehole is filled with cement mortar and the anchor rod is then driven in. A disadvantage of such an anchor is that the mortar should be relatively fluid in order to adhere well to the ribs of the rib steel. This means that such an anchor cannot be used in overhead installation and with an upward or even vertical borehole. Gemäss einem andern Vorschlag werden Patronen mit den beiden Stoffen, dem Kleber und dem Härter eines Zweikomponenten-Klebstoffes in das Bohrloch eingeführt und durch Eindrehen des Stabes werden die beiden Stoffe durchgemischt. According to another proposal, cartridges with the two substances, the adhesive and the hardener of a two-component adhesive, are introduced into the borehole and the two substances are mixed by screwing in the rod. Diese Befestigungsart wird heute zur Hauptsache für vorgespannte Anker benützt, bei denen lediglich das hintere Ende des Ankerstabes festgehalten wird. Es wäre denkbar, diese Befestigungsart auch bei schlaffen Ankern anzuwenden. Diese Lösung käme jedoch teuer zu stehen, weil zuerst eine grosse Anzahl solcher Patronen eingesetzt werden müsste. This type of fastening is mainly used today for prestressed anchors, in which only the rear end of the anchor rod is held. It would be conceivable to use this type of fastening even with slack anchors. However, this solution would be expensive because a large number of such cartridges would have to be used first. Es ist deshalb eine Aufgabe der Erfindung, bei einem Verfahren zum Verankern eines Rohres gemäss der Gegenstandsbezeichnung im Oberbegnff des unabhängigen Patentanspruchs 1 den Einbau auch Ueberkopf und in beliebiger Richtung zu ermöglichen, wobei die Haltekraft wenigstens die Bruchfestigkeit von Stahl übertrifft und der Ankerstab auf seiner gesamten Länge innerhalb des Bodenmaterials vor Korrosion geschützt ist. It is therefore an object of the invention, in a method for anchoring a pipe according to the object designation in the upper part of independent claim 1, to enable installation also overhead and in any direction, the holding force at least exceeding the breaking strength of steel and the anchor rod over its entire length Length within the soil material is protected from corrosion. Erfindungsgemäss erfüllt ein Verfahren gemäss dem kennzeichnenden Teil des unabhängigen Patentanspruchs 1 diese Aufgabe. Die Erfindung betrifft zudem noch eine Vorrichtung zur Durchführung des Verfahrens sowie einen Schlaffanker, hergestellt nach dem Verfahren. According to the invention, a method according to the characterizing part of independent claim 1 fulfills this task. The invention also relates to a device for carrying out the method and a sleep anchor manufactured by the method. Nachfolgend wird ein Ausführungsbeispiel der Erfindung beschrieben. Es zeigen: Fig. 1 einen Schlaffanker nach der Erfindung, Fig. 2 eine Rückhaltevorrichtung und Fig. 3 eine Zentriervonrichtung. An exemplary embodiment of the invention is described below. Show it: 1 shows a sleep anchor according to the invention, Fig. 2 is a restraint and Fig. 3 shows a centering device. Der Schlaffanker besteht aus einem Rohr 11 aus einem beliebigen zugfesten Material wie Stahl, Glasfasem oder dgl. The sleep anchor consists of a tube 11 made of any tensile material such as steel, glass fiber or the like. Im Bohrloch 10 wird das Rohr 11 beim Ende 10b des Bohrlochs und wenigstens auch am Anfang 10a desselben zentriert. In the borehole 10, the pipe 11 is centered at the end 10b of the borehole and at least also at the beginning 10a thereof. Im dargestellten Auführungsbeispiel sind zur Zentrierung Schraubenfedern 30 gemäss Fig. 3 vorgesehen, deren kleinster Durchmesser am unteren Ende 31 höchstens gleich ist, wie der Rohrdurchmesser, aber vorteilhafterweise um etwas kleiner sein sollte, damit sich die Schraubfeder 30 zur Zentrierung auf dem Rohr 11 festklemmt. Am andem Ende 32 ist der Durchmesser wenigstens gleich wie der Durchmesser des Bohrlochs In the exemplary embodiment shown, helical springs 30 according to FIG. 3 are provided for centering, the smallest diameter of which at the lower end 31 is at most the same as the pipe diameter, but should advantageously be somewhat smaller so that the helical spring 30 clamps on the pipe 11 for centering. At the other end 32, the diameter is at least the same as the diameter of the borehole 10. 10th Wenn derartige Schraubenfedern so als Zen triervorrichtung auf das Roh 11 derart aufgesetzt werden, dass das untere Ende 31, also dasjenige mit geringerem Durchmesser, bei dem in das Bohrloch 10 eingesetzten Rohr 11 gegen das Bohrlochende 10b hin zeigt, so ist leicht einzusehen, dass infolge von Reibungskräften auf dem Rohr 11 und an der Wand des Bohrlochs 10 die Schraubenfeder 30 als Zentriervorrichtung in die Länge gezogen wird und zwischen den Windungen Durchgänge entstehen. Eine solche Schraubenfeder 30 als Zentriervorrichtung kann beispielsweise aus Federstahldraht mit einem Durchmesser von 2,5 mm bestehen. If such helical springs are placed as a centering device on the tube 11 in such a way that the lower end 31, i.e. the one with a smaller diameter, points towards the tube end 10b in the tube 11 inserted into the bore hole 10, it is easy to see that as a result of frictional forces on the tube 11 and on the wall of the borehole 10, the helical spring 30 is pulled out as a centering device and passages arise between the turns. Such a helical spring 30 as a centering device can consist, for example, of spring steel wire with a diameter of 2.5 mm. Am Bohrlochende 10b ist eine Vorrichtung vorhanden, die neben der Zentrierung des Rohres 11 noch die Aufgabe erfüllt, das Rohr 11 im Bohrloch 10 zu fixieren, wenn im eingesetzten Zustand eine Kraft auf das Rohr 11 einwirkt, durch die dasselbe aus dem Bohrloch 10 herausgleiten könnte. Gemäss Fig. At the end of the borehole 10b there is a device which, in addition to the centering of the tube 11, also fulfills the task of fixing the tube 11 in the borehole 10 when a force acts on the tube 11 in the inserted state, through which the tube 11 could slide out of the borehole 10 . According to Fig. 2 besteht eine solche Vorrichtung aus einer Schraubenfeder 20 als Rückhaltevorrichtung, die an ihrem einen Ende 21 einen Durchmesser aufweist, der höchstens gleich gross ist wie der Durchmesser des Rohres 11 und an ihrem andern Ende 22 einen solchen, der wenigstens gleich gross ist wie der Durchmesser des Bohrlochs 10. Das Ende 22 der Schraubenfeder 20 als Rückhaltevorrichtung ist auf dem letzten Teil 23 in der **WARNUNG** Ende CLMS Feld konnte Anfang DESC uberlappen**. 2, such a device consists of a helical spring 20 as a retaining device, which has at its one end 21 a diameter that is at most the same size as the diameter of the tube 11 and at its other end 22 one that is at least as large as the diameter of the borehole 10. The end 22 of the coil spring 20 as a retaining device is on the last part 23 in the ** WARNING ** End of CLMS field could overlap beginning of DESC **.
CH114380A 1980-02-12 1980-02-12 Method of anchoring a tube, arrangement for carrying out the method, and slack anchor produced according to the method CH620496A5 (en)

Priority Applications (12)

Application Number Priority Date Filing Date Title
CH114380A CH620496A5 (en) 1980-02-12 1980-02-12 Method of anchoring a tube, arrangement for carrying out the method, and slack anchor produced according to the method
DE19813100730 DE3100730A1 (en) 1980-02-12 1981-01-13 Method of supporting and/or stabilising excavation walls in civil engineering, mining and tunnelling, apparatus for carrying out the method, and stabilising anchor sitting in a borehole in the excavation wall
ZA00810621A ZA81621B (en) 1980-02-12 1981-01-29 Rock bolts for strengthening the walls of underground workings
GB8103365A GB2073283A (en) 1980-02-12 1981-02-04 Rock bolting
AU66918/81A AU6691881A (en) 1980-02-12 1981-02-05 Rock bolting
IT12431/81A IT1168421B (en) 1980-02-12 1981-02-09 PROCEDURE FOR PROPERTY OR CONSOLIDATION OF INTERCAPEASE WALLS UNDER CONSTRUCTION UNDER THE SOIL LEVEL IN MINES AND CONSTRUCTION OF GALLERIES DEVICE FOR IMPLEMENTATION OF THE PROCEDURE AND CONSOLIDATION ANCHORING IN A DRILLED HOLE IN THE INTERCAPED WALL
JP1705581A JPS56139399A (en) 1980-02-12 1981-02-09 Method of anchoring lock bolt in rock wall of underground working site
ES499249A ES499249A0 (en) 1980-02-12 1981-02-09 PROCEDURE FOR ATTACHING THE ROCK CONSOLIDATION LONG BOLTS TO THE ROCK OF AN UNDERGROUND WORK
FI810362A FI810362L (en) 1980-02-12 1981-02-09 FOERFARANDE FOER ATT STOETTA OCH / ELLER FOERSTAERKA SCHAKTVAEGGAR I GRUV- BERGS- OCH TUNNELBYGGE ANORDNING FOER ATT GENOMFOERA FOERFARANDET OCH ETT I ETT BORRHAOL I SCHAKTVAEGGEN INFOERT FAO
SE8100922A SE8100922L (en) 1980-02-12 1981-02-10 PROCEDURE AND DEVICE FOR FIXING HOLY WALLS IN DRILL
FR8102680A FR2478193A1 (en) 1980-02-12 1981-02-11 METHOD FOR ETAYING AND / OR CONSOLIDATING UNDERGROUND BUILDING CAVITIES, MINES AND TUNNELS, DEVICE FOR EXECUTING THE METHOD, AND ANCHORING ANCHOR BOLT IN A FORK-IN HOLE IN A CAVITY WALL
NO810460A NO810460L (en) 1980-02-12 1981-02-11 ANCHORING DEVICE FOR VACUUM WALLS FOR MINING, TUNNEL AND SHAKING WORK, PROCEDURE FOR MANUFACTURING THE DEVICE AND DEVICE FOR PERFORMING THE PROCEDURE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH114380A CH620496A5 (en) 1980-02-12 1980-02-12 Method of anchoring a tube, arrangement for carrying out the method, and slack anchor produced according to the method

Publications (1)

Publication Number Publication Date
CH620496A5 true CH620496A5 (en) 1980-11-28

Family

ID=4203494

Family Applications (1)

Application Number Title Priority Date Filing Date
CH114380A CH620496A5 (en) 1980-02-12 1980-02-12 Method of anchoring a tube, arrangement for carrying out the method, and slack anchor produced according to the method

Country Status (4)

Country Link
JP (1) JPS56139399A (en)
CH (1) CH620496A5 (en)
DE (1) DE3100730A1 (en)
ZA (1) ZA81621B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017108664B4 (en) 2017-04-24 2022-11-10 Bochumer Eisenhütte GmbH & Co. KG Expansion sleeve anchor with lost drill bit

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3204516A1 (en) * 1981-09-26 1983-04-14 Bilfinger + Berger Bauaktiengesellschaft, 6800 Mannheim Device for mechanically protecting the rust-prevention pipe or the anchor steel and for guaranteeing the hardened cement paste covering in the force-introduction region of permanent soil anchors
DE3204417C2 (en) * 1982-02-09 1986-01-02 Dyckerhoff & Widmann AG, 8000 München Arrangement for setting a rock nail
JPS6036500U (en) * 1983-08-12 1985-03-13 三菱電線工業株式会社 Fiber reinforced plastic anchor bolt
JPH0330480Y2 (en) * 1984-11-30 1991-06-27
ES2004779A6 (en) * 1987-08-05 1989-02-01 Trueba Guemes Angel Double action anchor.
JPH01136600U (en) * 1988-02-23 1989-09-19
JP3272840B2 (en) * 1993-10-30 2002-04-08 株式会社豊夢 Connector, connector unit, and connector connecting them
DE10017750B4 (en) * 2000-04-10 2008-11-20 Hilti Aktiengesellschaft rock bolts
DE10017751B4 (en) * 2000-04-10 2008-11-20 Hilti Aktiengesellschaft rock bolts
EP1805395B1 (en) * 2004-10-21 2010-09-08 Minova International Limited Method for embedding rock anchors
DE102006011652B4 (en) * 2006-02-12 2010-10-21 Berwald, Werner Paul, Dipl.-Ing. Two-step hollow-bar composite anchor for adhesive cartridges and adhesive granules
DE102006058458A1 (en) 2006-12-12 2008-06-26 Uli Dipl.-Ing. Geldermann Testing device consists of workpiece carrier which has a chamber and temperate system for heating and cooling of chamber
DE102006060638A1 (en) 2006-12-12 2008-07-17 Uli Dipl.-Ing. Geldermann Dynamic anchoring adhesive, especially for fixing anchor bars in rock for mining and tunnel-building, comprises a one- or two-component system chemically adjusted to eliminate shrinkage on hardening
DE102009056089A1 (en) 2009-11-30 2011-06-01 Werner P. Dipl.-Ing. Berwald Rotatable impact-resistance single phase self drilling mixer anchor and two phase cartridge spiral mixer anchor i.e. hollow bar anchor, has solid rods provided in extruded cartridge pipe at heavy duty anchor for double anchor load
DE102010014612A1 (en) 2010-04-10 2011-10-13 Werner P. Berwald Hollow rod shear connector e.g. two-phase anchor, for use in e.g. inclined roadway construction, has armature tube coated with addition mixed filling material, where clamping path is affiliated with anchor member through clamping sleeve
DE102011018241A1 (en) 2011-04-20 2012-10-25 Werner Berwald Method for manufacturing anchor setting process with capsule-sleeve mill, involves pushing capsule pipe together with capsule-sleeve mill on anchor head, with rotation movement of anchor head into anchor bore
DE102011078769A1 (en) 2011-07-07 2013-01-10 Hilti Aktiengesellschaft rock bolt
DE102014005773A1 (en) 2014-04-23 2015-10-29 Werner Paul Berwald Single- and two-phase self-drilling coat heavy-duty anchor as cartridge or injection anchor in turn-key design. Production and setting process
JP7195114B2 (en) * 2017-11-14 2022-12-23 青木あすなろ建設株式会社 Anchor bolt fixing member, anchor bolt set using the same, and anchor bolt fixing member fixture
AU2019202151A1 (en) 2018-08-31 2020-03-19 Jusand Nominees Pty Ltd Retainer device for a rock anchor, rock anchor system and associated installation method
CA3206488A1 (en) * 2020-05-12 2021-11-18 Innovative Mining Products (Pty) Ltd Two-part resin input nozzle

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017108664B4 (en) 2017-04-24 2022-11-10 Bochumer Eisenhütte GmbH & Co. KG Expansion sleeve anchor with lost drill bit

Also Published As

Publication number Publication date
ZA81621B (en) 1982-03-31
DE3100730A1 (en) 1981-12-24
JPS56139399A (en) 1981-10-30

Similar Documents

Publication Publication Date Title
CH620496A5 (en) Method of anchoring a tube, arrangement for carrying out the method, and slack anchor produced according to the method
DE2041526C3 (en) Tension member for a grouting anchor
DE2624559C2 (en) Mountain anchor
DE102007005540B4 (en) Method and injection anchor with fixed static mixer
EP2257690A1 (en) Corrosion-protected self-drilling anchor and anchor subunit and method for the production thereof
DE2707238A1 (en) CORROSION-PROOF TENSION LINK FOR A PRELETCHABLE ANCHOR IN THE SOLID STONE
DE2835559A1 (en) ANCHORINGS
DE3004276C2 (en)
DE2432708A1 (en) TUBULAR PILE AND PROCEDURE FOR ITS GROUND IN A DRILLED HOLE
DE3838880C1 (en) Method of producing a grouted anchor, and grouted anchor for carrying out the method
DE2615316A1 (en) Screwed anchor bolt for insertion in masonry - is located by plastic sleeve and reaction adhesive
DE3322198C2 (en)
DE1759561C3 (en) Method for producing grouting anchors and device for carrying out the method
EP0044272A2 (en) Device for pressing a two-component adhesive into a pipe in order to produce a non-prestressed anchor
DE8016539U1 (en) Isolation plate dowels
DE3902727A1 (en) Glass-fibre-reinforced, resin-bedded roof bolt
DE3529850C2 (en)
DE2350298A1 (en) FASTENING CARTRIDGE FOR ANCHOR
DE2412667A1 (en) ANCHORS FOR STRENGTHENING THE MOUNTAIN OF STOLLEN, TUNNEL AND DGL
DE2201950A1 (en) TIE ANCHORS FOR ANCHORING COMPONENTS IN EARTH OR ROCKY GROUND
DE10303801A1 (en) Injection-securable anchor
DE2158627C2 (en) Device for anchoring curtain façade panels firmly against pressure and tension
EP1688545A1 (en) Injection or prestressed anchor for open-air and subsoil constructions
DE2424553A1 (en) TENSION ANCHORS, IN PARTICULAR MOUNTAIN ANCHORS FOR MINING
DE2037061A1 (en) Tension member for the production of a prestressed rock anchor

Legal Events

Date Code Title Description
PK Correction

Free format text: NACHTRAEGLICH WURDE EIN WEITERER ERFINDER GENANNT

PL Patent ceased