CH539502A - Cement-bonded chipboard prodn - of uniform density and strength - Google Patents

Cement-bonded chipboard prodn - of uniform density and strength

Info

Publication number
CH539502A
CH539502A CH1723271A CH1723271A CH539502A CH 539502 A CH539502 A CH 539502A CH 1723271 A CH1723271 A CH 1723271A CH 1723271 A CH1723271 A CH 1723271A CH 539502 A CH539502 A CH 539502A
Authority
CH
Switzerland
Prior art keywords
belt
roller
height
conveyor belt
layer
Prior art date
Application number
CH1723271A
Other languages
German (de)
Inventor
Meier Karl
Original Assignee
Branko Simunic
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Branko Simunic filed Critical Branko Simunic
Priority to CH1723271A priority Critical patent/CH539502A/en
Publication of CH539502A publication Critical patent/CH539502A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27NMANUFACTURE BY DRY PROCESSES OF ARTICLES, WITH OR WITHOUT ORGANIC BINDING AGENTS, MADE FROM PARTICLES OR FIBRES CONSISTING OF WOOD OR OTHER LIGNOCELLULOSIC OR LIKE ORGANIC MATERIAL
    • B27N3/00Manufacture of substantially flat articles, e.g. boards, from particles or fibres
    • B27N3/08Moulding or pressing
    • B27N3/10Moulding of mats
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27NMANUFACTURE BY DRY PROCESSES OF ARTICLES, WITH OR WITHOUT ORGANIC BINDING AGENTS, MADE FROM PARTICLES OR FIBRES CONSISTING OF WOOD OR OTHER LIGNOCELLULOSIC OR LIKE ORGANIC MATERIAL
    • B27N3/00Manufacture of substantially flat articles, e.g. boards, from particles or fibres
    • B27N3/08Moulding or pressing
    • B27N3/10Moulding of mats
    • B27N3/14Distributing or orienting the particles or fibres
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/52Producing shaped prefabricated articles from the material specially adapted for producing articles from mixtures containing fibres, e.g. asbestos cement
    • B28B1/526Producing shaped prefabricated articles from the material specially adapted for producing articles from mixtures containing fibres, e.g. asbestos cement by delivering the materials on a conveyor of the endless-belt type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B3/00Producing shaped articles from the material by using presses; Presses specially adapted therefor
    • B28B3/12Producing shaped articles from the material by using presses; Presses specially adapted therefor wherein one or more rollers exert pressure on the material
    • B28B3/123Producing shaped articles from the material by using presses; Presses specially adapted therefor wherein one or more rollers exert pressure on the material on material in moulds or on moulding surfaces moving continuously underneath or between the rollers, e.g. on an endless belt

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Forests & Forestry (AREA)
  • Press-Shaping Or Shaping Using Conveyers (AREA)

Abstract

In the mfr of sheets for building construction from wood chips, bagasse, flax or similar wood-type fibres, in which the bulk feed material consisting of a mixt of chips or fibres with cement and water is spread on a forming substrate and subsequently pressed and dried to give the finished sheet, the bulk material, prior to such spreading is first metered volumetrically into a layer which is then subjected to pre-pressing at a press. at least approaching that to which the pre-form is subjected in the formation of the finished sheet, the dimensions of the compacted, volumetrically pre-metered layer being used as the control magnitude for the speed of the discharge conveyor belt. Esp. the speed of advance of the conveyor belt is increased as the degree of pre-compression of the volumetrically pre-metered layer of bulk material is increased and vice versa.

Description

  

  
 



   Die Erfindung betrifft ein Verfahren zur Herstellung zementgebundener Span- oder Faser-Platten, insbesondere Bauplatten aus Holzspänen, Bagasse-, Flachs- oder anderen holzähnlichen Fasern, bei dem das aus einer Mischung von Spänen bzw. Fasern mit Zement und Wasser bestehende Schüttgut auf eine Formungsunterlage gestreut und anschliessend zur fertigen Platte gepresst und getrocknet wird. Zur Durchführung des Verfahrens dient eine Einrichtung mit einem das Schüttgut aufnehmenden Transportband und einem diesem nachgeordneten Formband.



   Bei der Herstellung zementgebundener Bauplatten wird im wesentlichen eine Rohstoffmischung aus Holzspänen, Zement und Wasser verarbeitet. Anstelle von Holzspänen können auch andere Späne, beispielsweise Bagasse-, Flachs- oder Hanfspäne usw. verwendet werden. Bei der üblichen Verwendung von Holzspänen beträgt der Anteil der Holzspäne etwa 20% des Gesamtgewichtes der Rohstoffmischung. Diese Rohstoffmischung muss jedoch zur Schüttung und Pressung möglichst gleichmässig auf Förderbänder oder andere Formungsunterlagen gebracht und dann in Schichten von wenigstens annähernd der Breite der fertigen Platten gepresst werden. Aus diesen Schichten werden dann die zumeist wenige Meter langen und etwa 1 bis 2 m breiten Platten gebildet.

  Bei der üblichen Beschaffenheit der Späne, die aus verschiedenen Gründen nach Form, Grösse und Gewicht verschieden sind, lässt es sich in der Praxis, ohne dass besonders aufwendige Massnahmen getroffen werden müssen, kaum vermeiden, dass die Dichte und damit auch die Festigkeit der fertigen Platten bis zu   20 So    schwanken.



   Diese Nachteile stehen einer wirtschaftlichen Herstellung solcher Platten beim sogenannten Fliessverfahren, also beim kontinuierlichen Schütten der Späne auf die Formlingsunterlagen zu einem pressfertigen Formling entgegen.



   Mit der Erfindung wird die Aufgabe verfolgt, ein Verfahren sowie eine Einrichtung zur Durchführung des Verfahrens zu schaffen, das eine in der Praxis einfache und wirtschaftli che kontinuierliche Herstellung von pressfertigen Formlingen sowie fertiger, zementgebundener Platten ermöglicht, die über den gesamten Querschnitt von gleichmässiger Dichte und gleichmässig hoher Festigkeit sind.



   An sich ist es bei der Herstellung kunstharzgebundener Spanplatten bekannt, das zu schüttende Spänegut volume trisch und/oder gewichtsmässig zu dosieren. Diese bei der
Herstellung kunstharzgebundener Spanplatten bekannten
Massnahmen sind aber auf die kontinuierliche Herstellung von zementgebundenen Platten nicht ohne weitere anwend bar, weil beim Herstellen solcher zementgebundener Platten, die Anteile des Zementes und vor allem des Wassers bei der
Rohstoffmischung viel zu sehr schwanken und das Mischgut ein gänzlich anderes Verhalten bei der Schüttung zeigt.



   Die erwähnte Aufgabe wird bei einem Verfahren zur
Herstellung zementgebundener Platten erfindungsgemäss da durch gelöst, dass vor dem Streuen des Schüttgutes auf die
Formungsunterlage dieses Schüttgut zunächst volumetrisch in der Schicht vordosiert wird und diese volumetrisch do sierte Schicht vorübergehend einem Vorpressdruck ausge setzt wird, der wenigstens annähernd dem Druck entspricht, welchem der Formling zur Formung der fertigen Platte unter worfen wird und dass das Mass der Zusammenpressung der volumetrisch vordosierten Schicht als Grösse für die Steue rung der Vorschubgeschwindigkeit des Abwurfbandes be nutzt wird.



   Der Lösungsgedanke der Erfindung besteht demgemäss darin, zunächst das fertig gemischte Rohmaterial, also die
Holzspäne, mit Zement und Wasser vermischt, volumetrisch vorzudosieren und die so gebildete Schicht, die wenigstens annähernd die Breite der endgültigen Platte hat, vorüber gehend einem Pressdruck auszusetzen, der wenigstens angenähert dem Druck entspricht, wie ihn das Rohmaterial am Ende des Fliessvorganges in der Press- und Trockenvorrichtung erfährt.

  Wenn nun in der so volumetrisch vordosierten Schicht das Schüttgut, also das Rohmaterial aus groben und damit locker gehäuften Spänen besteht, dann wird es während des Vorpressens stärker zusammengepresst; umgekehrt findet eine weniger starke Zusammenpressung statt, wenn das zu schüttende Späne-Zement-Wassergemisch aus feinen Spänen besteht, weil diese bereits bei der volumetrischen Vordosierung viel dichter zusammenliegen als gröbere Späne.



  Man kann nun das unterschiedliche Mass des Zusammendrükkens als Steuergrösse für die Vorschubgeschwindigkeit des   Abwurfbandes benutzen.   



   Vorteilhaft wird die Vorschubgeschwindigkeit des Abwurfbandes um so grösser gehalten, je stärker die volumetrisch vordosierte Schüttgutschicht vorübergehend zusammengepresst wird und umgekehrt.



   Bei diesem Regelvorgang ist es vorteilhaft, wenn die Geschwindigkeit des Transportbandes, an dessen Ende das zu schüttende Gut abgeworfen wird, mit einer gewissen Verzögerung geändert wird, die sich in ihrer Grössenordnung nach der Zeit bestimmt, die das zu schüttende Gut auf seinem Wege von der Vorpresseinrichtung bis zur Abwurfstelle des Bandes benötigt.



   Das Mass der Zusammenpressung der volumetrisch vordosierten Schicht und damit die Grösse für die Steuerung der Vorschubgeschwindigkeit des Abwurfbandes lässt sich in einfacher Weise ermitteln, wenn die jeweilige Höhenlage der Vorpresseinrichtung gegenüber einer festen Bezugsgrösse gemessen wird. Dies kann in einfacher Weise beispielsweise dadurch erfolgen, dass als Vorpresseinrichtung eine Pressrolle vorgesehen wird, deren Höhenlage gegenüber dem eigentlichen Transportband, welches das Schüttgut der Pressrolle zuführt, gemessen wird.



   Eine im Aufbau einfache und wirtschaftliche Einrichtung zur Durchführung dieses Verfahrens besteht erfindungsgemäss darin, dass dem Transportband, auf welchem das zu schüttende Gut in Richtung zur Abwurfstelle transportiert wird, eine volumetrische Vordosiereinrichtung zugeordnet ist, der mindestens eine gegenüber dem Transportband höhenverstellbare Vorpresseinrichtung nachgeordnet ist und wobei Mittel zur Messung der Höhenlage der Vorpresseinrichtung gegenüber dem Transportband oder einem anderen festen Bezugspunkt sowie Mittel zur Steuerung der Geschwindigkeit des Transportbandes in Abhängigkeit der jeweiligen Höhenlage der Vorpresseinrichtung gegenüber dem Transportband vorgesehen sind.



   Die volumetrische Vordosiereinrichtung kann in zweckmässiger Weise aus mindestens einem an sich bekannten Rückstreifband bestehen, das dem Transportband höhenverstellbar zugeordnet ist. Dem Transportband kann unterhalb der Abwurfstelle ein Formband zugeordnet sein, auf welches das abgeworfene Schüttgut gelangt und welches zweckmässig mit gleichmässiger Geschwindigkeit in Richtung zur Presseinrichtung bewegt wird.

 

   Die Erfindung wird nachstehend an zwei Ausführungsbeispielen beschrieben, wobei auch weitere Einzelheiten der Erfindung erläutert werden:
Fig. 1 zeigt in Seitenansicht und in schematischer Darstellung ein Ausführungsbeispiel einer erfindungsgemässen Einrichtung.



   Fig. 2 zeigt eine erweiterte Ausführungsform der in Fig. 1 prinzipiell dargestellten Ausführungsform.



   Fig. 3 zeigt ein Ausführungsbeispiel für die Breitenverteileinrichtung.



   Das Schüttgut, wie beispielsweise eine Mischung von Holzspänen, Zement und Wasser oder einer Mischung anderer Späne, wie Bagasse, Hanf, Flachs od. dgl. Späne, eben  falls mit Wasser und Zement gemischt, werden auf das Transportband 1 aufgebracht. Das Schüttgut ist in den Figuren mit 2 bezeichnet. Dem Transportband 1 zugeordnet ist die Einrichtung 3 zur volumetrischen Dosierung des Schüttgutes auf dem Transportband 1. Sie besteht im Ausführungsbeispiel aus dem Rückstreifband 3, welches in Pfeilrichtung 3a das Schüttgut 2 nach oben hin zurückstreift und an einem weiteren Rückstreifband 3' zuführt, das sich in Pfeilrichtung 3b, entgegengesetzt der Vorschubrichtung 4 des Transportbandes 1, bewegt. Die Rückstreifbänder 3, 3' bewirken die volumetrische Vordosierung des Schüttgutes und legen dies in einer der eingestellten Höhe des Rückstreifbandes 3 entsprechenden Schichthöhe.

  Die Breite der volumetrisch dosierten Schüttgutschicht 2' entspricht mindestens der Breite der später zu pressenden fertigen zementgebundenen Platte.



   Der volumetrischen Vordosiereinrichtung 3, 3' ist eine Vorpresseinrichtung, bestehend aus einer Pressrolle 5, nachgeordnet. Das in volumetrisch vordosierter Schichthöhe 2' ankommende Schüttgut wird durch die Pressrolle 5 vorübergehend einem Pressdruck ausgesetzt, der wenigstens angenähert dem endgültigen Pressdruck in der eigentlichen Pressund Trockenvorrichtung entspricht. Wenn die Schicht 2' aus groben Spänen besteht, dann wird sie von der Pressrolle 5 stärker zusammengepresst, während eine Schicht 2' aus feinen Spänen weniger stark zusammengepresst wird.

  Die Pressrolle 5 nimmt also gegenüber dem ortsfesten Maschinengestell, beispielsweise der Höhe des Transportbandes 1 bei lokker vorgeschütteter Schicht 2' eine tiefere Lage gegenüber einem maschinenfesten Punkt, beispielsweise dem Mittelpunkt der Gegenrolle 5' ein, als bei einer Schicht 2' aus feineren Spänen, da sich diese weniger zusammendrücken lassen.



   Diese unterschiedliche Höhenlage der Pressrolle 5 in Abahängigkeit von der Dichte der volumetrisch vordosierten Schicht 2' wird als Steuergrösse für die Antriebsvorrichtung des Transportbandes 1 benutzt. Diese Bandantriebsvorrichtung wird demgemäss so beeinflusst, dass bei geringer werdender Höhe, also einem kleineren Abstand der Pressrolle 5 gegenüber dem Transportband 1 oder einem anderen ortsfesten Bezugspunkt, die Bandgeschwindigkeit vergrössert wird, weil das in der Schicht 2' liegende Material locker ist.



  Die höhere Bandgeschwindigkeit bewirkt, dass am Ende des   Bandes    1 an der Abwurfstelle mittels einer Abwurfwalze 6 mehr Material in der Zeiteinheit auf die unterhalb des Transportbandes 1 in Pfeilrichtung 7a gleichförmig bewegte Formungsunterlage 7 abgeworfen wird. Bei feineren Spänen in der vordosierten Schicht 2' wird die Pressrolle 5 gegenüber dem Transportband 1 eine höhere Lage einnehmen, demgemäss gelangt mehr vorgepresstes Schüttgut an die Abwurfstelle und damit in den Bereich der Abwurfwalze 6, so dass die Geschwindigkeit des Transportbandes 1 verlangsamt werden kann, damit in der Zeiteinheit an der Abwurfstelle die gleiche Menge Schüttgut auf die Formlingsunterlage 7 aufgestreut wird, wie wenn gröberes Material bei entsprechend gesteuerter Bandgeschwindigkeit abgeworfen wird.



   Die Anordnung einer besonderen Wurfwalze 6 an der Abwurfstelle des Transportbandes 1 ist deshalb zweckmässig, weil das an die Abwurfstelle des Transportbandes 1 gelangende Gut infolge der Vorpressung durch die Pressrolle 5 zusammengepresst ist und damit zur Vermeidung eines ungleichmässigen Abwurfes infolge Klumpenbildung durch die Wurfwalze 6 aufgelockert wird. Das durch die Wurfwalze 6 abgeworfene Gut gelangt entsprechend der Geschwindigkeit des von der Pressrolle 5   beeinflussten    Transportbandes 1 wesentlich gleichmässiger verteilt als unmittelbar nach der volumetrischen Dosierung der Schicht 2' auf das Formband 7, auf welchem einzelne Transportbleche 9 liegen können. Der Abwurf des Gutes erfolgt in weitem Bogen 8, wobei die schwereren Teilchen in der Regel weiter fliegen als die leichteren.

  Der auf die einzelnen Bleche 9 geschüttete Formling gelangt schliesslich in Pfeilrichtung 7a auf dem unteren Band 7 zu einer nicht dargestellten Abhebestation, wo sie anschliessend aufeinandergestapelt und in eine Pressvorrichtung gebracht werden, in welcher die zementgebundenen Holzspanplatten zu fertigen Platten gepresst und abgebunden werden.



   Es hat sich gezeigt, dass die nach dem erfindungsgemässen Verfahren hergestellten zementgebundenen Holzspanplatten eine überraschend gleichmässige Dichte und damit eine wesentlich höhere Festigkeit als die nach den bekannten Verfahren hergestellten Platten aufweisen.



   Man kann das erfindungsgemässe Verfahren noch dadurch verbessern, wenn beim unteren Formband 7 zur Vergleichmässigung der Höhe des geschütteten Formlings 10 eine Egalisierwalze 11 vorgesehen wird. Die Höhe dieser Egalisierwalze 11 über dem Formband 7 mit Blechen 9 ist vorteilhaft so gewählt, dass überschüssiges Material seitlich ausgebreitet und schliesslich abgestreift wird. Diese Zusatzeinrichtung ist insbesondere dann zweckmässig, wenn grössere Plattenbreiten hergestellt werden sollen, bei welchen infolge der grossen Breite der Platten gewisse Unregelmässigkeiten in der Materialhöhe leichter entstehen als bei schmäleren Platten.



   Bei der Einstellung der Höhe dieser Egalisierwalze 11 ist jedoch zu beachten, dass diese höhenverstellbar ausgebildet sein muss. Wird entsprechend der geschilderten Steuerung von der Wurfwalze 6 nur grobes und daher lockeres Material auf das Formband 7 geworfen, dann hat der geschüttete Formling 10 eine entsprechend grössere Schütthöhe, als wenn nur feineres Schüttgut auf das Formband gestreut wird. In diesem Falle muss die Höhenlage der Egalisierwalze 11a entsprechend vergrössert werden, damit diese Egalisierwalze 11 nicht in unerwünschter Weise das höher liegende Schüttgut aus gröberen Spänen seitlich abführt, wodurch die fertige Platte in unerwünschter Weise ungleichmässige Dichte aufweisen würde.

  Umgekehrt muss die Egalisierwalze 11 eine tiefere Höhenlage gegenüber dem Formband 7 bzw. den Blechen 9 erhalten, wenn nur feineres Material abgeworfen wird und die Höhe des Formlings 10 entsprechend kleiner ist.



   Bei der Regulierung der Höhenlage der Egalisierwalze 11 muss ebenso wie bei der Steuerung der Bandgeschwindigkeit des Transportbandes 1 in Abhängigkeit von der jeweiligen Höhenlage der Pressrolle 5 berücksichtigt werden, dass die Höhenlage der Egalisierwalze 11 erst dann geändert wird, wenn das von der Abwurfwalze 6 abgeworfene, beispielsweise lockere Material tatsächlich die Egalisierwalze erreicht hat.



   Bei der Ausführungsform gemäss der Fig. 2 ist eine weitere Verbesserung der erfindungsgemässen Einrichtung vorgesehen. Hier ist zwischen der volumetrischen Dosiervorrichtung 3 und der Pressrolle 5 eine Stachelwalze 12 vorgesehen, der vorzugsweise eine Schneckenwalze 13 nachgeordnet ist.



  Durch die Stachelwalze 12 wird das volumetrisch vordosierte Material zunächst aufgelockert und dann durch die Schnekkenwalze 13 zusätzlich in der Breitenrichtung vergleichmässigt. Diese zusätzliche Einrichtung 12, 13 ist besonders zweckmässig, wenn grössere Plattenbreiten hergestellt werden sollen.

 

   In Fig. 3 ist schematisch eine zweckmässige Ausführung der Breitenverstelleinrichtung dargestellt. Sie ist als Schnecke mit auf einer Achse liegenden gegenläufigen Schnecken 13a, 13b ausgebildet. Die beiden Schnecken 13a, 13b fördern überschüssiges Gut nach links bzw. rechts ab, so dass eine genau gleiche Schütthöhe über die ganze Breite des Bandes 1 erzielt wird. Das etwa links und rechts des Transportbandes 1 abgeworfene Überschussgut kann dort aufgefangen und wieder zum Speicher zurückgeführt werden. Die Breitenverteileinrichtung 13 ist erforderlich, weil zweckmässig das Rückstreifband 3 so eingestellt wird, dass ständig mit geringem   Überschuss    an Schüttgut gefahren wird.  



   Das erfindungsgemässe Verfahren lässt sich bei der Herstellung von ein- oder mehrschichtigen Platten anwenden; es ist jedoch so, dass in der Regel die Aussenschichten von z. B.



  dreischichtigen Platten weniger dick sind als die Mittelschicht; demgemäss bestehen die dünneren Aussenschichten aus gleichmässigerem Rohmaterial, so dass in der Regel im wesentlichen die Mittelschicht nach dem erfindungsgemässen Verfahren vergleichmässigt werden muss.



   PATENTANSPRUCH I
Verfahren zur Herstellung zementgebundener Span- oder Faser-Platten, insbesondere Bauplatten aus Holzspänen, Bagasse-, Flachs- oder anderen holzähnlichen Fasern, bei dem das aus einer Mischung von Spänen bzw. Fasern mit Zement und Wasser bestehende Schüttgut auf eine Formungsunterlage gestreut und anschliessend zur fertigen Platte gepresst und getrocknet wird, dadurch gekennzeichnet, dass vor dem Streuen des Schüttgutes auf die Formungsunterlage dieses zunächst volumetrisch in der Schicht (2') vordosiert wird und die so gebildete volumetrisch dosierte Schicht (2') vorübergehend einem Vorpressdruck ausgesetzt wird, der wenigstens annähernd dem Druck entspricht, welchem der Formling zur Formung der fertigen Platte unterworfen wird,

   und dass das Mass der Zusammenpressung der volumetrisch vordosierten Schicht (2') als Grösse für die Steuerung der Geschwindigkeit des Abwurfbandes (1) benutzt wird.



   UNTERANSPRÜCHE
1. Verfahren nach Patentanspruch I, dadurch gekennzeichnet dass die Vorschubgeschwindigkeit des Abwurfbandes (1) um so grösser gehalten wird, je stärker die volumetrisch vordosierte Schüttgutschicht (2') vorübergehend zusammengepresst wird und umgekehrt.



   2. Verfahren nach Patentanspruch I, dadurch gekennzeichnet, dass die Höhe des geschütteten Formlings (10) vorzugsweise in Abhängigkeit von der Geschwindigkeit des Abwurfbandes (1) vergleichmässigt wird.



   3. Verfahren nach Patentanspruch I, dadurch gekennzeichnet, dass die Bandgeschwindigkeit des Abwurfbandes   (1)    mit einer Verzögerung gehindert wird, die sich in ihrer   Gösse    nach der Zeit bestimmt, die das zu schüttende Gut auf seinem Wege von der Vorpresseinrichtung (5, 5') bis zur Abwurfstelle (6) des Bandes (1) benötigt.



   4. Verfahren nach Patentanspruch I, dadurch gekennzeichnet, dass die Höhenlage einer Egalisierwalze (11) erst dann geändert wird, wenn das von einer Abwurfwalze (6) abgeworfene, beispielsweise lockere Material die Egalisierwalze erreicht hat.



   PATENTANSPRUCH II
Einrichtung zur Durchführung des Verfahrens nach Patentanspruch I mit einem das Schüttgut aufnehmenden Transportband und einem diesem nachgeordneten Formband, dadurch gekennzeichnet, dass dem Transportband eine volumetrische Vordosiereinrichtung (3, 3') zugeordnet ist, der mindestens eine gegenüber dem Transportband (1) höhenverstellbare Vorpresseinrichtung (5) nachgeordnet ist und dass Mittel zur Messung der Höhenlage der Vorpresseinrichtung (5) gegenüber dem Transportband (1) oder einem andern festen Bezugspunkt und Mittel zur Steuerung der Geschwindigkeit des Transportbandes in Abhängigkeit der jeweiligen Höhenlage der Vorpresseinrichtung (5) gegen über dem Transportband (1) vorgesehen sind.



   UNTERANSPRÜCHE
5. Einrichtung nach Patentanspruch II, dadurch gekennzeichnet, dass die volumetrische Vordosiereinrichtung (3, 3') aus mindestens einem Rückstreifband (3) besteht, das dem Transportband (1) höhenverstellbar zugeordnet ist.



   6. Einrichtung nach Patentanspruch II, dadurch gekennzeichnet, dass die Vorpresseinrichtung aus einer Pressrolle (5) und einer ihr zugeordneten maschinenfesten Rolle (5') besteht.



   7. Einrichtung nach Patentanspruch II, dadurch gekennzeichnet, dass an der Abwurfstelle des Transportbandes (1) eine Wurfeinrichtung, beispielsweise eine Wurfwalze (6) und unterhalb dieser Wurfwalze (6) ein Formband (7) vorgesehen ist, wobei mindestens eine höhenverstellbare Egalisierwalze (11) zugeordnet sein kann.

 

   8. Einrichtung nach Unteranspruch 7, dadurch gekennzeichnet, dass die Höhenlage der Egalisierwalze (11) bei dem Formband (7) in Abhängigkeit von der Höhe des geschütteten Formlings (10) und/oder in Abhängigkeit von der Höhenlage der Vorpressrolle (5) steuerbar ist.



   9. Einrichtung nach Patentanspruch II, dadurch gekennzeichnet, dass zwischen der volumetrischen Dosiereinrichtung (3) und der Vorpresseinrichtung (5) eine Auflockerungsvorrichtung für das Schüttgut, beispielsweise eine Stachelwalze (12) und/oder eine Breitenverteilvorrichtung für das Schüttgut, z. B. eine Schneckenwalze (13) vorgesehen ist.



  die mittels gegenläufiger Schnecken (13a, 13b) Gut nach der linken und rechten Seite des Transportbandes (1) abführt.

**WARNUNG** Ende DESC Feld konnte Anfang CLMS uberlappen**.



   



  
 



   The invention relates to a method for the production of cement-bonded chipboard or fiber boards, in particular building boards from wood chips, bagasse, flax or other wood-like fibers, in which the bulk material consisting of a mixture of chips or fibers with cement and water is placed on a molding base sprinkled and then pressed and dried to form the finished plate. A device with a conveyor belt receiving the bulk material and a shaping belt downstream of the latter is used to carry out the method.



   In the manufacture of cement-bonded building boards, a raw material mixture of wood chips, cement and water is essentially processed. Instead of wood chips, other chips, for example bagasse, flax or hemp chips, etc., can also be used. With the usual use of wood chips, the proportion of wood chips is around 20% of the total weight of the raw material mixture. For pouring and pressing this raw material mixture, however, it must be brought as evenly as possible onto conveyor belts or other forming substrates and then pressed in layers of at least approximately the width of the finished panels. From these layers, the panels are usually a few meters long and about 1 to 2 m wide.

  Given the usual nature of the chips, which differ in shape, size and weight for various reasons, it can hardly be avoided in practice that the density and thus also the strength of the finished panels without having to take particularly complex measures up to 20 so fluctuate.



   These disadvantages stand in the way of economical production of such panels using the so-called flow process, that is, with the continuous pouring of the chips onto the molding supports to form a molding ready for press.



   With the invention, the object is to create a method and a device for performing the method, which enables a simple and economical in practice, continuous production of ready-to-press moldings as well as finished, cement-bonded panels, which over the entire cross-section of uniform density and consistently high strength.



   It is known per se in the production of synthetic resin-bonded chipboard to dose the swarf to be poured in terms of volume and / or weight. This at the
Production of resin-bonded chipboard known
However, measures are not applicable to the continuous production of cement-bound panels without further bar, because when producing such cement-bound panels, the proportions of the cement and especially the water in the
Raw material mix fluctuates far too much and the mix shows a completely different behavior when pouring.



   The mentioned task is in a method for
According to the invention, the production of cement-bound panels is solved by the fact that before the bulk material is scattered on the
Forming pad this bulk material is initially pre-dosed volumetrically in the layer and this volumetrically dosed layer is temporarily subjected to a pre-pressing pressure which at least approximately corresponds to the pressure to which the molding is subjected to form the finished plate and that the degree of compression of the volumetrically pre-dosed Layer is used as a variable for controlling the feed speed of the discharge belt.



   The idea of the solution of the invention is accordingly to first use the ready mixed raw material, that is to say the
Wood chips, mixed with cement and water, are volumetrically pre-metered and the layer thus formed, which has at least approximately the width of the final plate, is temporarily exposed to a pressing pressure which at least approximately corresponds to the pressure of the raw material at the end of the flow process in the press - and drying device experiences.

  If the bulk material, ie the raw material, consists of coarse and thus loosely heaped chips in the volumetrically pre-dosed layer, then it is more strongly compressed during the pre-pressing; conversely, there is less compression when the chip-cement-water mixture to be poured consists of fine chips, because these are already much closer together than coarser chips during the volumetric pre-metering.



  You can now use the different degree of compression as a control variable for the feed speed of the discharge belt.



   The speed of advance of the discharge belt is advantageously kept higher the more the volumetrically pre-metered bulk material layer is temporarily compressed and vice versa.



   In this control process, it is advantageous if the speed of the conveyor belt, at the end of which the material to be poured is thrown off, is changed with a certain delay, the magnitude of which is determined by the time that the material to be poured on its way from the Pre-pressing device required up to the discharge point of the tape.



   The degree of compression of the volumetrically pre-dosed layer and thus the size for controlling the feed speed of the discharge belt can be determined in a simple manner if the respective height of the pre-pressing device is measured against a fixed reference value. This can be done in a simple manner, for example, in that a press roller is provided as the pre-pressing device, the height of which is measured in relation to the actual conveyor belt which feeds the bulk material to the press roller.



   According to the invention, a structurally simple and economical device for carrying out this method consists in that the conveyor belt on which the material to be poured is transported in the direction of the discharge point is assigned a volumetric predosing device, which is followed by at least one pre-pressing device that is height-adjustable compared to the conveyor belt and where Means for measuring the height of the pre-pressing device with respect to the conveyor belt or another fixed reference point as well as means for controlling the speed of the conveyor belt as a function of the respective height position of the pre-pressing device with respect to the transport belt are provided.



   The volumetric pre-metering device can expediently consist of at least one return strip known per se, which is assigned to the conveyor belt in a height-adjustable manner. A forming belt can be assigned to the conveyor belt below the discharge point, onto which the discharged bulk material arrives and which is expediently moved at a constant speed in the direction of the pressing device.

 

   The invention is described below using two exemplary embodiments, with further details of the invention also being explained:
Fig. 1 shows in side view and in a schematic representation an embodiment of a device according to the invention.



   FIG. 2 shows an expanded embodiment of the embodiment shown in principle in FIG. 1.



   Fig. 3 shows an embodiment for the width distribution device.



   The bulk material, such as a mixture of wood chips, cement and water or a mixture of other chips such as bagasse, hemp, flax or the like. Shavings, also mixed with water and cement, are applied to the conveyor belt 1. The bulk material is denoted by 2 in the figures. The device 3 for volumetric dosing of the bulk material on the conveyor belt 1 is assigned to the conveyor belt 1. In the exemplary embodiment, it consists of the return belt 3, which pushes the bulk material 2 back upwards in the direction of arrow 3a and feeds it to another return belt 3 ', which is in Arrow direction 3b, opposite to the feed direction 4 of the conveyor belt 1, moved. The return strips 3, 3 'effect the volumetric predosing of the bulk material and place this at a layer height corresponding to the set height of the return strip 3.

  The width of the volumetrically metered bulk material layer 2 'corresponds at least to the width of the finished cement-bound plate to be pressed later.



   The volumetric pre-metering device 3, 3 'is followed by a pre-pressing device consisting of a press roller 5. The bulk material arriving at a volumetrically pre-dosed layer height 2 'is temporarily subjected to a pressing pressure by the pressing roller 5 which corresponds at least approximately to the final pressing pressure in the actual pressing and drying device. If the layer 2 'consists of coarse chips, then it is pressed together more strongly by the press roller 5, while a layer 2' made of fine chips is pressed together less strongly.

  The press roller 5 therefore occupies a lower position compared to the stationary machine frame, for example the height of the conveyor belt 1 with a loosely pre-poured layer 2 ', compared to a machine-fixed point, for example the center of the counter roller 5', than in a layer 2 'made of finer chips, there these can be less squeezed.



   This different height position of the press roller 5 as a function of the density of the volumetrically predosed layer 2 'is used as a control variable for the drive device of the conveyor belt 1. This belt drive device is accordingly influenced in such a way that as the height decreases, i.e. a smaller distance between the press roller 5 and the conveyor belt 1 or another fixed reference point, the belt speed is increased because the material lying in the layer 2 'is loose.



  The higher belt speed has the effect that at the end of the belt 1 at the discharge point, by means of a discharge roller 6, more material is thrown in the unit of time onto the forming substrate 7, which is moved uniformly in the direction of arrow 7a below the conveyor belt 1. In the case of finer chips in the pre-metered layer 2 ', the press roller 5 will occupy a higher position compared to the conveyor belt 1, accordingly more pre-pressed bulk material reaches the discharge point and thus in the area of the discharge roller 6, so that the speed of the conveyor belt 1 can be slowed down, so that in the unit of time the same amount of bulk material is sprinkled onto the molding pad 7 at the discharge point as when coarser material is discharged at a correspondingly controlled belt speed.



   The arrangement of a special throwing roller 6 at the discharge point of the conveyor belt 1 is expedient because the material reaching the discharge point of the conveyor belt 1 is compressed as a result of the pre-pressing by the pressure roller 5 and is thus loosened up by the throwing roller 6 in order to avoid uneven discharge due to the formation of clumps . According to the speed of the conveyor belt 1 influenced by the press roller 5, the material thrown by the throwing roller 6 is distributed much more evenly than immediately after the volumetric metering of the layer 2 'onto the forming belt 7, on which individual conveyor plates 9 can lie. The material is dropped in a wide arc 8, with the heavier particles generally flying further than the lighter ones.

  The molding poured onto the individual sheets 9 finally arrives in the direction of arrow 7a on the lower belt 7 to a lifting station (not shown), where they are then stacked on top of one another and brought into a pressing device in which the cement-bonded chipboard is pressed and tied into finished panels.



   It has been shown that the cement-bonded wood chipboard produced by the process according to the invention has a surprisingly uniform density and thus a significantly higher strength than the boards produced by the known processes.



   The method according to the invention can be further improved if a leveling roller 11 is provided on the lower molding belt 7 to even out the height of the poured molding 10. The height of this leveling roller 11 above the shaping belt 7 with metal sheets 9 is advantageously chosen so that excess material is spread out laterally and finally wiped off. This additional device is particularly useful when larger panel widths are to be produced in which, due to the large width of the panels, certain irregularities in the height of the material occur more easily than with narrower panels.



   When adjusting the height of this equalizing roller 11, however, it should be noted that it must be designed to be height-adjustable. If only coarse and therefore loose material is thrown onto the forming belt 7 by the throwing roller 6 according to the control described, then the poured molding 10 has a correspondingly greater bulk height than if only finer bulk material is scattered onto the molding belt. In this case, the height of the leveling roller 11a must be increased accordingly, so that this leveling roller 11 does not undesirably remove the bulk material from the side of coarser chips, whereby the finished board would have an undesirably uneven density.

  Conversely, the leveling roller 11 must be at a lower height than the forming belt 7 or the metal sheets 9 if only finer material is thrown off and the height of the molding 10 is correspondingly smaller.



   When regulating the height of the equalizing roller 11, as well as when controlling the belt speed of the conveyor belt 1, depending on the respective height of the pressure roller 5, it must be taken into account that the height of the equalizing roller 11 is only changed when the material dropped by the discharge roller 6, For example, loose material has actually reached the leveling roller.



   In the embodiment according to FIG. 2, a further improvement of the device according to the invention is provided. Here, a spiked roller 12 is provided between the volumetric metering device 3 and the press roller 5, which is preferably followed by a screw roller 13.



  The spiked roller 12 loosens the volumetrically pre-dosed material and then the screw roller 13 also makes it even in the width direction. This additional device 12, 13 is particularly useful when larger plate widths are to be produced.

 

   In Fig. 3, an expedient embodiment of the width adjustment device is shown schematically. It is designed as a screw with counter-rotating screws 13a, 13b lying on an axis. The two screws 13a, 13b convey excess material to the left and right, respectively, so that exactly the same bulk height is achieved over the entire width of the belt 1. The excess material thrown off to the left and right of the conveyor belt 1 can be collected there and returned to the store. The width distribution device 13 is necessary because the return strip 3 is expediently set in such a way that it is constantly driven with a small excess of bulk material.



   The method according to the invention can be used in the production of single or multi-layer panels; however, it is usually the case that the outer layers of z. B.



  three-layer panels are less thick than the middle layer; accordingly, the thinner outer layers consist of more uniform raw material, so that, as a rule, it is essentially the middle layer that has to be made uniform by the method according to the invention.



   PATENT CLAIM I
Process for the production of cement-bonded chipboard or fiber boards, in particular building boards made of wood chips, bagasse, flax or other wood-like fibers, in which the bulk material consisting of a mixture of chips or fibers with cement and water is scattered on a molding base and then for finished plate is pressed and dried, characterized in that before the bulk material is sprinkled onto the forming substrate, it is initially pre-dosed volumetrically in the layer (2 ') and the volumetrically dosed layer (2') thus formed is temporarily subjected to a pre-pressing pressure of at least approximately corresponds to the pressure to which the molding is subjected to form the finished panel,

   and that the degree of compression of the volumetrically pre-metered layer (2 ') is used as a variable for controlling the speed of the discharge belt (1).



   SUBCLAIMS
1. The method according to claim I, characterized in that the feed speed of the discharge belt (1) is kept higher, the more the volumetrically pre-metered bulk material layer (2 ') is temporarily compressed and vice versa.



   2. The method according to claim I, characterized in that the height of the poured molding (10) is preferably evened out as a function of the speed of the discharge belt (1).



   3. The method according to claim I, characterized in that the belt speed of the discharge belt (1) is prevented with a delay, which is determined in its size according to the time that the material to be poured on its way from the pre-pressing device (5, 5 ' ) up to the discharge point (6) of the belt (1).



   4. The method according to claim I, characterized in that the height of a leveling roller (11) is only changed when the loose material dropped by a discharge roller (6) has reached the leveling roller, for example.



   PATENT CLAIM II
Device for carrying out the method according to claim I with a conveyor belt receiving the bulk material and a shaping belt arranged downstream of this, characterized in that the conveyor belt is assigned a volumetric pre-metering device (3, 3 ') which has at least one pre-pressing device (1) which is adjustable in height relative to the conveyor belt (1). 5) and that means for measuring the height of the pre-pressing device (5) with respect to the conveyor belt (1) or another fixed reference point and means for controlling the speed of the conveyor belt as a function of the respective height of the pre-pressing device (5) with respect to the conveyor belt ( 1) are provided.



   SUBCLAIMS
5. Device according to claim II, characterized in that the volumetric pre-metering device (3, 3 ') consists of at least one return strip (3) which is assigned to the conveyor belt (1) so as to be adjustable in height.



   6. Device according to claim II, characterized in that the pre-pressing device consists of a press roller (5) and a machine-fixed roller (5 ') assigned to it.



   7. Device according to claim II, characterized in that a throwing device, for example a throwing roller (6) and below this throwing roller (6) a forming belt (7) is provided at the discharge point of the conveyor belt (1), with at least one height-adjustable equalizing roller (11 ) can be assigned.

 

   8. Device according to dependent claim 7, characterized in that the height of the leveling roller (11) on the molding belt (7) can be controlled depending on the height of the poured molding (10) and / or depending on the height of the pre-press roller (5) .



   9. Device according to claim II, characterized in that between the volumetric metering device (3) and the pre-pressing device (5) a loosening device for the bulk material, for example a spiked roller (12) and / or a width distribution device for the bulk material, e.g. B. a screw roller (13) is provided.



  which by means of counter-rotating screws (13a, 13b) removes material to the left and right side of the conveyor belt (1).

** WARNING ** End of DESC field could overlap beginning of CLMS **.



   

 

Claims (1)

**WARNUNG** Anfang CLMS Feld konnte Ende DESC uberlappen **. ** WARNING ** Beginning of CLMS field could overlap end of DESC **. Das erfindungsgemässe Verfahren lässt sich bei der Herstellung von ein- oder mehrschichtigen Platten anwenden; es ist jedoch so, dass in der Regel die Aussenschichten von z. B. The method according to the invention can be used in the production of single or multi-layer panels; however, it is usually the case that the outer layers of z. B. dreischichtigen Platten weniger dick sind als die Mittelschicht; demgemäss bestehen die dünneren Aussenschichten aus gleichmässigerem Rohmaterial, so dass in der Regel im wesentlichen die Mittelschicht nach dem erfindungsgemässen Verfahren vergleichmässigt werden muss. three-layer panels are less thick than the middle layer; accordingly, the thinner outer layers consist of more uniform raw material, so that, as a rule, it is essentially the middle layer that has to be made uniform by the method according to the invention. PATENTANSPRUCH I Verfahren zur Herstellung zementgebundener Span- oder Faser-Platten, insbesondere Bauplatten aus Holzspänen, Bagasse-, Flachs- oder anderen holzähnlichen Fasern, bei dem das aus einer Mischung von Spänen bzw. Fasern mit Zement und Wasser bestehende Schüttgut auf eine Formungsunterlage gestreut und anschliessend zur fertigen Platte gepresst und getrocknet wird, dadurch gekennzeichnet, dass vor dem Streuen des Schüttgutes auf die Formungsunterlage dieses zunächst volumetrisch in der Schicht (2') vordosiert wird und die so gebildete volumetrisch dosierte Schicht (2') vorübergehend einem Vorpressdruck ausgesetzt wird, der wenigstens annähernd dem Druck entspricht, welchem der Formling zur Formung der fertigen Platte unterworfen wird, PATENT CLAIM I Process for the production of cement-bonded chipboard or fiber boards, in particular building boards made of wood chips, bagasse, flax or other wood-like fibers, in which the bulk material consisting of a mixture of chips or fibers with cement and water is scattered on a molding base and then for finished plate is pressed and dried, characterized in that before the bulk material is sprinkled onto the forming substrate, it is initially pre-dosed volumetrically in the layer (2 ') and the volumetrically dosed layer (2') thus formed is temporarily subjected to a pre-pressing pressure of at least approximately corresponds to the pressure to which the molding is subjected to form the finished panel, und dass das Mass der Zusammenpressung der volumetrisch vordosierten Schicht (2') als Grösse für die Steuerung der Geschwindigkeit des Abwurfbandes (1) benutzt wird. and that the degree of compression of the volumetrically pre-metered layer (2 ') is used as a variable for controlling the speed of the discharge belt (1). UNTERANSPRÜCHE 1. Verfahren nach Patentanspruch I, dadurch gekennzeichnet dass die Vorschubgeschwindigkeit des Abwurfbandes (1) um so grösser gehalten wird, je stärker die volumetrisch vordosierte Schüttgutschicht (2') vorübergehend zusammengepresst wird und umgekehrt. SUBCLAIMS 1. The method according to claim I, characterized in that the feed speed of the discharge belt (1) is kept higher, the more the volumetrically pre-metered bulk material layer (2 ') is temporarily compressed and vice versa. 2. Verfahren nach Patentanspruch I, dadurch gekennzeichnet, dass die Höhe des geschütteten Formlings (10) vorzugsweise in Abhängigkeit von der Geschwindigkeit des Abwurfbandes (1) vergleichmässigt wird. 2. The method according to claim I, characterized in that the height of the poured molding (10) is preferably evened out as a function of the speed of the discharge belt (1). 3. Verfahren nach Patentanspruch I, dadurch gekennzeichnet, dass die Bandgeschwindigkeit des Abwurfbandes (1) mit einer Verzögerung gehindert wird, die sich in ihrer Gösse nach der Zeit bestimmt, die das zu schüttende Gut auf seinem Wege von der Vorpresseinrichtung (5, 5') bis zur Abwurfstelle (6) des Bandes (1) benötigt. 3. The method according to claim I, characterized in that the belt speed of the discharge belt (1) is prevented with a delay, which is determined in its size according to the time that the material to be poured on its way from the pre-pressing device (5, 5 ' ) up to the discharge point (6) of the belt (1). 4. Verfahren nach Patentanspruch I, dadurch gekennzeichnet, dass die Höhenlage einer Egalisierwalze (11) erst dann geändert wird, wenn das von einer Abwurfwalze (6) abgeworfene, beispielsweise lockere Material die Egalisierwalze erreicht hat. 4. The method according to claim I, characterized in that the height of a leveling roller (11) is only changed when the loose material dropped by a discharge roller (6) has reached the leveling roller, for example. PATENTANSPRUCH II Einrichtung zur Durchführung des Verfahrens nach Patentanspruch I mit einem das Schüttgut aufnehmenden Transportband und einem diesem nachgeordneten Formband, dadurch gekennzeichnet, dass dem Transportband eine volumetrische Vordosiereinrichtung (3, 3') zugeordnet ist, der mindestens eine gegenüber dem Transportband (1) höhenverstellbare Vorpresseinrichtung (5) nachgeordnet ist und dass Mittel zur Messung der Höhenlage der Vorpresseinrichtung (5) gegenüber dem Transportband (1) oder einem andern festen Bezugspunkt und Mittel zur Steuerung der Geschwindigkeit des Transportbandes in Abhängigkeit der jeweiligen Höhenlage der Vorpresseinrichtung (5) gegen über dem Transportband (1) vorgesehen sind. PATENT CLAIM II Device for carrying out the method according to claim I with a conveyor belt receiving the bulk material and a shaping belt arranged downstream of this, characterized in that the conveyor belt is assigned a volumetric pre-metering device (3, 3 ') which has at least one pre-pressing device (1) which is adjustable in height relative to the conveyor belt (1). 5) and that means for measuring the height of the pre-pressing device (5) with respect to the conveyor belt (1) or another fixed reference point and means for controlling the speed of the conveyor belt as a function of the respective height of the pre-pressing device (5) with respect to the conveyor belt ( 1) are provided. UNTERANSPRÜCHE 5. Einrichtung nach Patentanspruch II, dadurch gekennzeichnet, dass die volumetrische Vordosiereinrichtung (3, 3') aus mindestens einem Rückstreifband (3) besteht, das dem Transportband (1) höhenverstellbar zugeordnet ist. SUBCLAIMS 5. Device according to claim II, characterized in that the volumetric pre-metering device (3, 3 ') consists of at least one return strip (3) which is assigned to the conveyor belt (1) so as to be adjustable in height. 6. Einrichtung nach Patentanspruch II, dadurch gekennzeichnet, dass die Vorpresseinrichtung aus einer Pressrolle (5) und einer ihr zugeordneten maschinenfesten Rolle (5') besteht. 6. Device according to claim II, characterized in that the pre-pressing device consists of a press roller (5) and a machine-fixed roller (5 ') assigned to it. 7. Einrichtung nach Patentanspruch II, dadurch gekennzeichnet, dass an der Abwurfstelle des Transportbandes (1) eine Wurfeinrichtung, beispielsweise eine Wurfwalze (6) und unterhalb dieser Wurfwalze (6) ein Formband (7) vorgesehen ist, wobei mindestens eine höhenverstellbare Egalisierwalze (11) zugeordnet sein kann. 7. Device according to claim II, characterized in that a throwing device, for example a throwing roller (6) and below this throwing roller (6) a forming belt (7) is provided at the discharge point of the conveyor belt (1), with at least one height-adjustable equalizing roller (11 ) can be assigned. 8. Einrichtung nach Unteranspruch 7, dadurch gekennzeichnet, dass die Höhenlage der Egalisierwalze (11) bei dem Formband (7) in Abhängigkeit von der Höhe des geschütteten Formlings (10) und/oder in Abhängigkeit von der Höhenlage der Vorpressrolle (5) steuerbar ist. 8. Device according to dependent claim 7, characterized in that the height of the leveling roller (11) on the molding belt (7) can be controlled depending on the height of the poured molding (10) and / or depending on the height of the pre-press roller (5) . 9. Einrichtung nach Patentanspruch II, dadurch gekennzeichnet, dass zwischen der volumetrischen Dosiereinrichtung (3) und der Vorpresseinrichtung (5) eine Auflockerungsvorrichtung für das Schüttgut, beispielsweise eine Stachelwalze (12) und/oder eine Breitenverteilvorrichtung für das Schüttgut, z. B. eine Schneckenwalze (13) vorgesehen ist. 9. Device according to claim II, characterized in that between the volumetric metering device (3) and the pre-pressing device (5) a loosening device for the bulk material, for example a spiked roller (12) and / or a width distribution device for the bulk material, e.g. B. a screw roller (13) is provided. die mittels gegenläufiger Schnecken (13a, 13b) Gut nach der linken und rechten Seite des Transportbandes (1) abführt. which by means of counter-rotating screws (13a, 13b) removes material to the left and right side of the conveyor belt (1).
CH1723271A 1971-11-26 1971-11-26 Cement-bonded chipboard prodn - of uniform density and strength CH539502A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CH1723271A CH539502A (en) 1971-11-26 1971-11-26 Cement-bonded chipboard prodn - of uniform density and strength

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH1723271A CH539502A (en) 1971-11-26 1971-11-26 Cement-bonded chipboard prodn - of uniform density and strength

Publications (1)

Publication Number Publication Date
CH539502A true CH539502A (en) 1973-07-31

Family

ID=4423803

Family Applications (1)

Application Number Title Priority Date Filing Date
CH1723271A CH539502A (en) 1971-11-26 1971-11-26 Cement-bonded chipboard prodn - of uniform density and strength

Country Status (1)

Country Link
CH (1) CH539502A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3708322A4 (en) * 2017-12-27 2021-08-25 Nichiha Corporation Building material production apparatus and building material production method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3708322A4 (en) * 2017-12-27 2021-08-25 Nichiha Corporation Building material production apparatus and building material production method
US11541571B2 (en) 2017-12-27 2023-01-03 Nichiha Corporation Building material manufacturing apparatus and building material manufacturing method

Similar Documents

Publication Publication Date Title
DE102007049947A1 (en) Three-layer grit mat manufacturing method for manufacturing oriented strand board chip board, involves providing dividing device below breaking device for dividing falling chipping to transverse and longitudinal orientation devices
DE3309744C2 (en)
DE19712440A1 (en) Chipboard/fibreboard manufacturing appliance
DE69401274T2 (en) IMPROVEMENTS FOR A TILE PRODUCTION DEVICE
DE10122971A1 (en) Spreading material system for spreading spreading material, in particular wood chips, wood fibers or the like on a spreading belt conveyor
DE3216886C2 (en)
DE2307526A1 (en) DEVICE FOR THE PRODUCTION OF SLABS FROM CONCRETE
EP1171268B1 (en) Scattering station for fibre plates
DE2551735C3 (en) Device for equalizing wood-wool mass coming from a planing system for subsequent deformation into lightweight panels
DE3404658C2 (en)
DE4326148B4 (en) Device for scattering fibers, in particular chips
EP0230483A1 (en) Process for uniforming spread particles and device for performing the process
DE2506016B2 (en) METHOD AND DEVICE FOR PLACING GRUENPELLETS ON THE TRAILING GRATING OF A PRE-TREATMENT OVEN
CH539502A (en) Cement-bonded chipboard prodn - of uniform density and strength
DE102017007067A1 (en) Method and device for producing mineral-bonded boards
DE952565C (en) Device for the formation of even piles of wood chips or other material that can be shed
DE2158644A1 (en) Process for the production of cement-bonded building boards from wood or the like. PARTICLES AND FACILITY
DE2257827A1 (en) PROCESS AND INSTALLATION FOR THE PRODUCTION OF PANELS FROM FIBERS, IN PARTICULAR PAPER FIBERS, AND A HYDRAULIC BINDING AGENT, IN PARTICULAR PLASTER
DE2158653C3 (en) Method and device for the production of building boards from cement-bound wood fibers or the like, e.g. wood chips or wood wool
DE1653224C3 (en) Spreading device for the production of chip fleece for the subsequent pressing into wood chipboard or the like
DE1109585B (en) Device for the production of lightweight panels
DE3126853C2 (en)
DE19824604C1 (en) Device for the production of building boards
DE2152124A1 (en) Process and machine for the production of elongated concrete components
AT350245B (en) CONTINUOUS PROCESS FOR CONTINUOUS SPREADING OF A WEIGHT-CONTROLLED FLEECE