CH442676A - Method of constructing a building using prefabricated elements - Google Patents

Method of constructing a building using prefabricated elements

Info

Publication number
CH442676A
CH442676A CH867166A CH867166A CH442676A CH 442676 A CH442676 A CH 442676A CH 867166 A CH867166 A CH 867166A CH 867166 A CH867166 A CH 867166A CH 442676 A CH442676 A CH 442676A
Authority
CH
Switzerland
Prior art keywords
concrete
elements
panels
building
construction method
Prior art date
Application number
CH867166A
Other languages
French (fr)
Inventor
Esq Julio Capua
Original Assignee
Esq Julio Capua
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Esq Julio Capua filed Critical Esq Julio Capua
Priority to CH867166A priority Critical patent/CH442676A/en
Publication of CH442676A publication Critical patent/CH442676A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Panels For Use In Building Construction (AREA)

Description

  

  Procédé de     construction    d'un     bâtiment    à l'aide d'éléments préfabriqués    Depuis quelques années, on     assiste    dans l'industrie  de la     construction    à une évolution     tendant    à perfection  ner les techniques et     les    systèmes de préfabrication en  vue d'atteindre un triple but<B>:</B> diminuer le prix de revient,  réduire le temps d'exécution et améliorer les standards  de finition.

   Ces trois buts ont été     partiellement    atteints  à la fois par la     fabrication    d'éléments préfabriqués en  usine, dans des conditions de travail beaucoup plus avan  cées que dans les chantiers de construction convention  nels, et par la substitution de petits éléments tradition  nels,     tels    que briques, tuiles., etc., par des panneaux et  des     dalles    préfabriquées de grandes dimensions, suscep  tibles d'épargner un .travail considérable sur le lieu  d'érection.  



  Les systèmes développés jusqu'ici ont cependant  montré qu'un grand nombre de difficultés doivent encore  être surmontées,     déterminées    à la fois par l'industrialisa  tion elle-même qui limite le champ de     planing    archi  tectural, et par les conditions de travail inhérentes à la       fabrication    en usine, en     particulier    la     nécessité    de char  ger et de transporter les panneaux terminés sur le lieu  d'érection du bâtiment.

   Le coût élevé et les problèmes  posés par le     transport    de     panneaux    en béton a conduit  une partie de l'industrie a adopter les panneaux préfa  briqués dits<B> </B>en     béton    léger<B> ,</B> bien que ce choix signi  fie finalement une perte de certaines qualités     essentielles     des éléments préfabriqués, tel que l'isolation thermique  et acoustique que l'on obtient en utilisant des panneaux       lourds        susceptibles    de mieux résister aux intempéries,  ainsi que la plus grande stabilité, la résistance aux chocs  et la longévité supérieure.  



  La présente invention a précisément pour but d'ap  porter une solution satisfaisante à ces problèmes.  



  Elle a pour objet un     procédé    de construction d'un bâ  timent à l'aide d'éléments préfabriqués,     caractérisé    en ce  que l'on fabrique par moulage horizontal à proximité de  l'endroit où l'on veut ériger le bâtiment des éléments    constitués par un béton cellulaire     isotherr#i        ii"éânà_zôre     et à haute résistance au feu, et de     dimensions        sttffisantes     pour constituer une paroi complète de chambre du son  plafond ou plancher complet, que l'on dispose simulta  nément     dans    une partie de ces éléments des conduites  pour l'eau,

   l'électricité et l'égout ainsi que les fenêtres  et les portes et que l'on démoule et assemble ensuite les       différents    éléments au moyen d'un engin de levage.  



  Le     procédé    selon l'invention présente donc les avan  tages suivants  a) les travaux exécutés jusqu'ici en usine peuvent être  transférés dans un atelier en plein air parfaitement       organisé    et mécanisé ;  b) la situation de cet atelier, à proximité du lieu d'érec  tion du bâtiment, peut réduire les transports à un  minimum et permettre une organisation parfaite et       rationnelle    du travail, éliminant les     désaccords    entre  les délais de livraison et le rythme de la construction<B>;

  </B>  c) l'introduction d'une     chaine    de fabrication peut per  mettre d'obtenir une production continue et réguliè  re,     sans    qu'il soit pour autant nécessaire de disposer  d'un lourd équipement industriel, d'où il résulte une       forte    réduction des investissements.  



  d) L'utilisation de matériaux coulés à froid peut élimi  ner le besoin de machines lourdes, de sources de  chauffage et de chambre de traitement par le vide ou  par un courant de vapeur, rendant possible la fabrica  tion de panneaux de dimensions quelconques adaptés  au projet architectural et     limitées    uniquement par la  puissance des grues de levage.  



  e) L'équipement noyé dans les panneaux durant le mou  lage peut être également complètement assemblé dans  des ateliers mobiles stationnés à     proximité    des mou  les.  



  Le dessin annexé représente, à titre d'exemple, une  forme de mise en     oeuvre    du procédé selon l'invention.      Les fi-. 1, la, lb,<B>le</B> et     1-d,    illustrent la fabrication  de la fondation suivant les vues en perspective et en  coupe.  



  Les<U>fi-.</U> 2, 2a et 2b montrent un panneau constituant  un mur extérieur en élévation et en coupe.  



  Les fi.-. 3, 3a et 3b montrent un panneau constituant  une paroi intérieure en élévation et en coupe.  



  Les<U>fi-.</U> 4a, 4b, 4c et 4d illustrent différentes métho  des d'assemblage des panneaux.  



  Les     fig.    5 et 5a montrent la fixation des dalles, dans  le cas particulier des dalles constituant le toit.  



  Les fondations, comme représentées aux fi-. 1 à     1d,     sont faites en trois parties en béton superposé ou davan  <I>tage.</I> La partie 1 est une dalle armée du centre de la  quelle s'élèvent verticalement des barres de renforcement  2 qui     saront    utilisées lors de la fixation des     panneaux    mu  raux à la fondation. Les deuxièmes et troisièmes parties  sont constituées par des blocs de béton 3 ou 4  de formes carrées comme la dalle 1, et présentant une       ouverture    centrale à travers laquelle passent les barres  2.

   Après mise en place des blocs 3 et 4, l'ouverture cen  trale est remplie de     mortier.    Le bloc supérieur 4 présen  te dans sa partie supérieure, des dégagements 6 dans les  quels viennent se loger les murs 7 et 8. D'autres techni  ques peuvent être utilisées pour réaliser des fondations,  selon la nature du sol. Les parois sont constituées par  des panneaux en béton armé assez grands pour consti  tuer une paroi complète d'une chambre.  



  Un élément du mur extérieur est représenté aux fi-.  2, 2a, 2b. Le panneau constituant cet élément coulé  d'une     pièce    horizontalement, à froid, a une épaisseur de  15 cm. Il est composé de trois couches : une couche in  termédiaire 9 constituée par un béton léger cellulaire,  c'est-à-dire non compacte mais contenant une multitude  de minuscules cellules se formant lors de la prise du  béton et attribuant à la couche intermédiaire des qualités       isothermiques    élevées ainsi qu'un excellent pouvoir d'in  sonorisation, et de deux couches extérieures de béton  armé 10a et 10b de 4 cm d'épaisseur chacune et cons  tituées par un béton prompt de grande résistance et par  faitement étanche.

   La couche intérieure de béton cellu  laire 9 est divisée en plusieurs parties par des     colonnes     11 de béton armé reliant les deux couches extérieures  10a et 10b en ce point. Chacune des couches extérieures  possède une armature préfabriquée 12 constituée par un  grillage     spécial    en acier. Le fini de la face inférieure du  panneau est lors du     démoulage    tout à fait satisfaisant et  ne nécessite aucun travail de finition ultérieure. Le mou  le sera de préférence en matière plastique, mais il peut  être également en bois ou en métal.

   L'autre côté du pan  neau, qui regardera en général vers l'extérieur du bâ  timent, pourra recevoir un matériel de finition particulier  tel que tuiles, carreaux de céramique ou de verre, pier  re, bois ou plastique, etc., ces matériaux étant disposés  dans le béton avant la prise de celui-ci. Des éléments  décoratifs peuvent être également disposés sur la face  inférieure du panneau constituant la paroi de la cham  bre, après démoulage. Les portes en bois ou en métal,  les cadres de fenêtres. les conduites d'eau et d'électri  cité et la plomberie sont noyés dans les panneaux et ne  nécessitent ainsi aucune installation ultérieure.  



  Les panneaux présentent en outre sur leur bord ver  tical un dégagement 17 qui, lorsqu'un     panneau    est assem  blé à un panneau voisin, forme avec le dégagement de ce    panneau voisin un logement rectangulaire     (fig.    4a) que  l'on remplit ensuite de mortier 15. Dans les dégagements  17 sortent les extrémités de barre d'armature 14 dispo  sées de manière à assurer une stabilité parfaite à l'as  semblage. Dans les angles du     bâtiment,    les dégagements  17 de deux panneaux disposés à l'angle droit forment  une cheminée rectangulaire 15 dans laquelle les barres  14 rejoignent les barres verticales 2 des fondations.  



  Les parois intérieures dont un élément est représenté  aux     fig.    3, 3a, 3b, sont constituées par des panneaux  moulés de 8     à-10    cm d'épaisseur en béton prompt de  haute     résistance    présentant une double armature consti  tuée par des grilles 13.  



  Les parois intérieures ne     nécessitant    pas une résis  tance mécanique aussi grande que les murs ou le toit,  peuvent être également constituées par une seule épais  seur de béton cellulaire sur les faces de laquelle on pul  vérise du ciment qui peut être coloré de manière à don  ner le fini désiré à la paroi.  



  Les fi-. 4a à 4d représentent quatre variantes d'as  semblage de panneaux entre eux. Les fi-. 4a et 4b ont  été décrites ci-dessus. A la     fig.    4c on a représenté la liai  son entre deux panneaux en un point quelconque de  l'un des panneaux. A cet effet, il est nécessaire de pré  voir lors du moulage une rainure dans la face de l'un  des     panneaux    et une rainure correspondante sur la tran  che de l'autre panneau de manière à pouvoir couler  dans la cheminée formée par la juxtaposition des pan  neaux un mortier 15 reliant les deux panneaux. Les  deux panneaux représentés sont des murs intérieurs,  ainsi que dans la     fig.    4d, qui représente la jonction d'un  panneau 18 avec un panneau 19 en un point intermé  diaire de ce dernier panneau.

   Le panneau 19 présente  à cet     effet    un canal rectangulaire vertical 20 dans lequel  débouchent des fers d'armature 21 et 22 des     panneaux     19 et 18, venant constituer l'armature du canal 20 dans  lequel on coule du mortier 15.  



  Les dalles de plafond et de plancher sont moulées  de la même manière que les panneaux des murs et des  parois intérieures. La     fig.    5 montre que ces dalles 23  ont une structure semblable à celle des murs extérieurs.  On retrouve la couche intermédiaire 9 de béton cellu  laire et les couches extérieures munies de leur     grille    d'ar  mature 12, ainsi que les montants armés 11 qui sont ici  en position horizontale. L'assemblage de deux dalles est  effectué de la manière suivante : en leur point de jonc  tion, les parties 11 ne sont qu'à moitié moulées selon  leurs diagonales. de manière à former, lors de l'assem  blage des deux dalles bout à bout, un canal en forme  de V que l'on remplit avec du mortier 16 après avoir  disposé une armature métallique.

   En outre, les fers d'ar  mature que l'on aura laissé dépasser de la partie supé  rieure des murs sera également noyée     dans    le mortier  16 reliant solidement les dalles au mur. Les panneaux  constituant la toiture peuvent avoir des dimensions  variées correspondant aux dimensions de la chambre  recouverte.  



  L'utilisation     de,    ciment prompt étanche pour la fabri  cation des panneaux préfabriqués permet d'obtenir des  éléments résistant aux intempéries et permettent un dé  moulage dans les 24 heures et une érection dans les  36 heures.  



  La seconde partie du procédé de fabrication est cons  tituée par l'érection des panneaux terminés au moyen  de grues mécaniques ou hydrauliques, montées ou non  sur des véhicules. De manière à permettre le relevage,  les panneaux sont pourvus de trous à proximité de leur      côté supérieur, à travers lesquels les câbles de soutien  sont introduits.  



  Il est judicieux de lever simultanément le panneau  et son moule de manière à réduire les tensions dans le  panneau durant le levage.  



  L'invention peut être appliquée     également    à la fabri  cation de maisons     semi-fabriquées,    dans lesquelles la  chambre de bain, la cuisine, les caves et le toit sont pré  fabriqués comme décrit ci-dessus, tout l'équipement sani  taire étant noyé dans les parois,     tandis    que d'autres murs  sont construits au moyen de blocs de ciment produits  en usine au moyen de machines électriques       Besser       et transportés par     camion    sur le     lieu    d'érection.



  Method of constructing a building using prefabricated elements In recent years, the construction industry has witnessed an evolution tending to improve prefabrication techniques and systems with a view to achieving a triple goal <B>: </B> decrease the cost price, reduce the execution time and improve the finishing standards.

   These three goals have been partially achieved both by the manufacture of prefabricated elements in the factory, under much more advanced working conditions than in conventional construction sites, and by the substitution of small traditional elements, such as bricks, tiles, etc., by panels and prefabricated slabs of large dimensions, liable to save considerable labor on the site of erection.



  The systems developed so far have, however, shown that a large number of difficulties still have to be overcome, determined both by the industrialization itself, which limits the field of architectural planning, and by the working conditions inherent in it. factory manufacture, in particular the need to load and transport the finished panels to the building site.

   The high cost and the problems posed by the transport of concrete panels has led part of the industry to adopt the so-called <B> </B> prefabricated panels in lightweight concrete <B>, </B> although this choice ultimately means a loss of certain essential qualities of the prefabricated elements, such as the thermal and acoustic insulation obtained by using heavy panels capable of withstanding better weathering, as well as greater stability, impact resistance and superior durability.



  The object of the present invention is precisely to provide a satisfactory solution to these problems.



  It relates to a process for constructing a building using prefabricated elements, characterized in that the elements made up by horizontal molding are produced near the place where the building is to be erected. by an isothermal cellular concrete # i ii "éânà_zôre and high resistance to fire, and of sufficient dimensions to constitute a complete wall of its chamber of its complete ceiling or floor, which one has simultaneously in part of these elements of the pipes for water,

   electricity and sewer as well as windows and doors, which are then demolded and then assembled by means of a lifting device.



  The method according to the invention therefore has the following advantages: a) the work carried out so far in the factory can be transferred to a perfectly organized and mechanized open-air workshop; b) the location of this workshop, close to the place of erection of the building, can reduce transport to a minimum and allow a perfect and rational organization of work, eliminating disagreements between delivery times and the pace of construction <B>;

  </B> c) the introduction of a production line can make it possible to obtain a continuous and regular production, without necessarily having to have heavy industrial equipment, from which it results a sharp reduction in investments.



  d) The use of cold cast materials can eliminate the need for heavy machinery, heating sources and vacuum or steam flow treatment chamber, making it possible to fabricate panels of any size suitable for the architectural project and limited only by the power of the lifting cranes.



  e) The equipment embedded in the panels during the mooring can also be completely assembled in mobile workshops parked near the moorings.



  The appended drawing represents, by way of example, one embodiment of the method according to the invention. The fi-. 1, la, lb, <B> le </B> and 1-d, illustrate the fabrication of the foundation in perspective and in section.



  The <U> fi-. </U> 2, 2a and 2b show a panel constituting an exterior wall in elevation and in section.



  The fi.-. 3, 3a and 3b show a panel constituting an interior wall in elevation and in section.



  The <U> fi-. </U> 4a, 4b, 4c and 4d illustrate different methods of assembling the panels.



  Figs. 5 and 5a show the fixing of the slabs, in the particular case of the slabs constituting the roof.



  The foundations, as shown in fi-. 1 to 1d, are made in three parts of superimposed concrete or more <I> floor. </I> Part 1 is a reinforced slab from the center of which rise vertically from the reinforcing bars 2 which will be used during the fixing wall panels to the foundation. The second and third parts are constituted by concrete blocks 3 or 4 of square shapes like the slab 1, and having a central opening through which the bars 2 pass.

   After placing blocks 3 and 4, the central opening is filled with mortar. The upper block 4 has in its upper part, clearances 6 in which the walls 7 and 8 are housed. Other techniques can be used to make foundations, depending on the nature of the soil. The walls are made of reinforced concrete panels large enough to form a complete wall of a chamber.



  An element of the exterior wall is shown in fig. 2, 2a, 2b. The panel constituting this element cast in one piece horizontally, cold, has a thickness of 15 cm. It is composed of three layers: an intermediate layer 9 constituted by a lightweight cellular concrete, that is to say not compact but containing a multitude of tiny cells forming during the setting of the concrete and attributing to the intermediate layer high isothermal qualities as well as excellent soundproofing power, and two outer layers of reinforced concrete 10a and 10b, each 4 cm thick and made up of high resistance prompt concrete and completely waterproof.

   The inner layer of cellular concrete 9 is divided into several parts by columns 11 of reinforced concrete connecting the two outer layers 10a and 10b at this point. Each of the outer layers has a prefabricated frame 12 formed by a special steel mesh. The finish of the underside of the panel is quite satisfactory during demolding and does not require any subsequent finishing work. The slack will preferably be made of plastic, but it can also be made of wood or metal.

   The other side of the panel, which will generally look towards the outside of the building, may receive a specific finishing material such as tiles, ceramic or glass tiles, stone, wood or plastic, etc., these materials. being placed in the concrete before setting thereof. Decorative elements can also be placed on the underside of the panel constituting the wall of the chamber, after demoulding. Wooden or metal doors, window frames. the water and electricity pipes and the plumbing are embedded in the panels and do not require any subsequent installation.



  The panels also have on their vertical edge a clearance 17 which, when a panel is assembled with a neighboring panel, forms with the clearance of this neighboring panel a rectangular housing (fig. 4a) which is then filled with mortar 15. In the clearances 17 come out the ends of the reinforcing bar 14 arranged so as to ensure perfect stability to the assembly. In the corners of the building, the clearances 17 of two panels arranged at the right angle form a rectangular chimney 15 in which the bars 14 join the vertical bars 2 of the foundations.



  The interior walls, one element of which is shown in FIGS. 3, 3a, 3b, are formed by molded panels 8 to-10 cm thick in high-strength speedy concrete with a double reinforcement constituted by grids 13.



  The interior walls not requiring a mechanical resistance as great as the walls or the roof, can also be constituted by a single thickness of cellular concrete on the faces of which cement is pulverized which can be colored so as to give the desired finish to the wall.



  The fi-. 4a to 4d represent four variants of assembling panels together. The fi-. 4a and 4b have been described above. In fig. 4c is shown the link between two panels at any point of one of the panels. For this purpose, it is necessary to provide during molding a groove in the face of one of the panels and a corresponding groove on the cut of the other panel so as to be able to flow into the chimney formed by the juxtaposition of the panels. panels a mortar 15 connecting the two panels. The two panels shown are interior walls, as in fig. 4d, which shows the junction of a panel 18 with a panel 19 at an intermediate point of the latter panel.

   The panel 19 has for this purpose a vertical rectangular channel 20 into which the reinforcing bars 21 and 22 of the panels 19 and 18 emerge, constituting the reinforcement of the channel 20 in which mortar 15 is poured.



  Ceiling and floor tiles are molded in the same way as wall and interior wall panels. Fig. 5 shows that these slabs 23 have a structure similar to that of the exterior walls. We find the intermediate layer 9 of cellular concrete and the outer layers provided with their mature arch grid 12, as well as the reinforced uprights 11 which are here in a horizontal position. The assembly of two slabs is carried out as follows: at their junction point, the parts 11 are only half molded along their diagonals. so as to form, when the two slabs are assembled end to end, a V-shaped channel which is filled with mortar 16 after having placed a metal frame.

   In addition, the mature arrays that have been left to protrude from the upper part of the walls will also be embedded in the mortar 16 firmly connecting the slabs to the wall. The panels constituting the roof can have various dimensions corresponding to the dimensions of the covered chamber.



  The use of waterproof speedy cement for the manufacture of prefabricated panels makes it possible to obtain elements resistant to bad weather and allow molding within 24 hours and erection within 36 hours.



  The second part of the manufacturing process consists of erecting the finished panels by means of mechanical or hydraulic cranes, whether or not mounted on vehicles. In order to allow lifting, the panels are provided with holes near their upper side, through which the support cables are introduced.



  It is a good idea to simultaneously lift the panel and its mold so as to reduce tensions in the panel during lifting.



  The invention can also be applied to the manufacture of semi-manufactured houses, in which the bathroom, the kitchen, the cellars and the roof are pre-manufactured as described above, all the sanitary equipment being embedded in it. the walls, while other walls are constructed using cement blocks produced in the factory using Besser electric machines and transported by truck to the site of erection.

 

Claims (1)

REVENDICATION Procédé de construction d'un bâtiment à l'aide d'élé ments préfabriqués, caractérisé en ce que l'on fabrique par moulage horizontal à proximité de l'endroit où l'on veut ériger le bâtiment, des éléments constitués par un béton cellulaire isothermique, insonore et à haute résis tance au feu, et de dimensions suffisantes pour consti tuer une paroi complète de chambre ou son plafond ou plancher complet, que l'on dispose simultanément dans une partie de ces éléments des conduites pour l'eau, l'électricité et l'égout, ainsi que les fenêtres et les portes et que l'on démoule et assemble ensuite les différents éléments au moyen d'un engin de levage. SOUS-REVENDICATIONS 1. CLAIM A method of constructing a building using prefabricated elements, characterized in that elements consisting of concrete are manufactured by horizontal molding near the place where the building is to be erected. isothermal cell, soundproof and with high resistance to fire, and of sufficient dimensions to constitute a complete wall of the room or its complete ceiling or floor, which are simultaneously placed in some of these elements of pipes for water, electricity and sewerage, as well as windows and doors, which are removed from the mold and then assembled by means of a lifting device. SUB-CLAIMS 1. Procédé de construction selon la revendication, caractérisé en ce que les parois extérieures sont formées par une première couche externe en béton armé com pact, sur laquelle on coule le béton cellulaire, une deuxième couche externe semblable à la première étant coulée sur la couche de béton cellulaire. 2. Procédé de construction selon la revendication, caractérisé en ce que les parois intérieures sont coulées en béton cellulaire uniquement. Construction method according to claim, characterized in that the outer walls are formed by a first outer layer of compact reinforced concrete, on which the cellular concrete is poured, a second outer layer similar to the first being cast on the concrete layer. cellular. 2. Construction method according to claim, characterized in that the inner walls are cast in cellular concrete only. 3. Procédé de construction selon la sous-revendica- tion 1, caractérisé en ce que la surface de l'une des cou ches externes est moulée de manière à pouvoir recevoir un revêtement en pierre, en bois, en verre ou en matière plastique. 4. Procédé selon la revendication, caractérisé par le fait que les éléments sont reliés entre eux par du mortier coulé dans une cheminée formée par k juxtaposition des éléments. 3. Construction method according to sub-claim 1, characterized in that the surface of one of the outer layers is molded so as to be able to receive a coating of stone, wood, glass or plastic. 4. Method according to claim, characterized in that the elements are interconnected by mortar poured into a chimney formed by k juxtaposition of the elements.
CH867166A 1966-06-15 1966-06-15 Method of constructing a building using prefabricated elements CH442676A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CH867166A CH442676A (en) 1966-06-15 1966-06-15 Method of constructing a building using prefabricated elements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH867166A CH442676A (en) 1966-06-15 1966-06-15 Method of constructing a building using prefabricated elements

Publications (1)

Publication Number Publication Date
CH442676A true CH442676A (en) 1967-08-31

Family

ID=4343328

Family Applications (1)

Application Number Title Priority Date Filing Date
CH867166A CH442676A (en) 1966-06-15 1966-06-15 Method of constructing a building using prefabricated elements

Country Status (1)

Country Link
CH (1) CH442676A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2569739A1 (en) * 1984-08-29 1986-03-07 Labrue Jean Marie Raft on posts for the foundation of lightweight buildings, method and device for its construction.
EP0186337A2 (en) * 1984-12-21 1986-07-02 Penguin Swimming Pools Limited Foundation arrangement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2569739A1 (en) * 1984-08-29 1986-03-07 Labrue Jean Marie Raft on posts for the foundation of lightweight buildings, method and device for its construction.
EP0186337A2 (en) * 1984-12-21 1986-07-02 Penguin Swimming Pools Limited Foundation arrangement
EP0186337A3 (en) * 1984-12-21 1987-11-11 Penguin Swimming Pools Limited Foundation arrangement

Similar Documents

Publication Publication Date Title
FR2892736A1 (en) NEW TYPE OF BUILDING AND MEANS FOR ITS ACHIEVEMENT.
FR2961538A1 (en) METHOD FOR MANUFACTURING AN EDIFICE FROM BOILING BRICKS WITH DRY JOINTS
FR2950638A1 (en) Constructive system for building, has wall elements equipped with two concrete strips spaced and connected together by vertical spacers, where parts of strips blades external to spacers form walls of slide boxes of framework of building
FR3017889A1 (en) COMPOSITE BUILDING PANEL
FR2908801A1 (en) Absorptive form construction block for vertical wall, has plates connected by separating structure, and including conical shaped ribs and grooves on respective sides for assembling block and sides that are independent from one another
FR2556387A1 (en) Construction element of the type made of expanded polystyrene, intended for building a wall
CH442676A (en) Method of constructing a building using prefabricated elements
BE1028666B1 (en) Prefabricated three-dimensional constructive module
BE1010092A6 (en) Method of manufacturing and assembly of an element construction concrete.
FR2486986A1 (en) PREFABRICATED BUILDING ELEMENT AND BUILDING CONSTRUCTION CARRIED OUT BY MEANS OF A PLURALITY OF THESE ELEMENTS
EP1198647B1 (en) Dismountable prefabricated structure, in particular for a house, and method for making same
EP2495374A1 (en) Construction with bearing walls and floors made from pre-fabricated concrete panels and production moulds
FR2885624A1 (en) Base unit`s e.g. ground floor, lateral wall constructing method for prefabricated building, involves pouring and hardening cement material in molds delimited by panels, where material is penetrated into perforations and is solidified
FR2912163A1 (en) Construction block for e.g. wall, has vertical cavities and horizontal cavities permitting binder material to cross and to connect block, where block is fabricated with natural or synthetic rubber
FR2545863A1 (en) Modular construction element precast out of insulating lightweight reinforced concrete, its method of manufacture and the means for implementing this method
FR2644192A1 (en) Method for construction of structures and walls using formwork elements made of precast concrete integrated in the constructions
FR2716689A1 (en) Construction system to form walls, ceilings, floors, partitions
FR2586736A1 (en) Rhoma method
FR2699206A1 (en) Two part non-flammable concrete construction block - has natural stone facing fixed to concrete block made in two parts of light aggregate with hollow centre part with top of each part being grooved for horizontal reinforcing bars
BE541742A (en)
FR2650012A1 (en) Method for construction of detached houses using a hoisting means, and prefabricated elements for implementing the said method
FR3126234A1 (en) WALL PANEL AND METHOD FOR MAKING SUCH A WALL PANEL
BE519102A (en)
FR2765905A1 (en) CONSTRUCTION METHOD FOR SINGLE-FAMILY HOUSES USING MODULAR PANELS IN SYNTHETIC COMPOSITE MATERIALS SERVING AS A BULK STRUCTURE AND WATERPROOF AND AESTHETIC FINISH
FR2744471A1 (en) Prefabricated hollow brick modules for cladding, load bearing walls, acoustic insulation, low walls and other construction