FR2644192A1 - Method for construction of structures and walls using formwork elements made of precast concrete integrated in the constructions - Google Patents
Method for construction of structures and walls using formwork elements made of precast concrete integrated in the constructions Download PDFInfo
- Publication number
- FR2644192A1 FR2644192A1 FR8902959A FR8902959A FR2644192A1 FR 2644192 A1 FR2644192 A1 FR 2644192A1 FR 8902959 A FR8902959 A FR 8902959A FR 8902959 A FR8902959 A FR 8902959A FR 2644192 A1 FR2644192 A1 FR 2644192A1
- Authority
- FR
- France
- Prior art keywords
- grooves
- walls
- structures
- construction
- elements
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
- E04B2/8652—Walls made by casting, pouring, or tamping in situ made in permanent forms with ties located in the joints of the forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
- E04B2002/867—Corner details
Abstract
Description
La présente invention concerne un procédé de construction destiné à
réaliser de petites structures et des murs en utilisant des éléments préfabriqués en béton manufacturé portables à bras d'hommes.The present invention relates to a construction method for
make small structures and walls using prefabricated elements in portable manufactured concrete with male arms.
Il existe déjà un grand nombre de procédés de préfabrication, mais chacun présente un ou plusieurs inconvénients majeurs qui nuisent a leur développement. There are already a large number of prefabrication processes, but each has one or more major drawbacks which hinder their development.
Parmi ces inconvénients, nous pouvons citer * Poids élevé, d'où manutention difficile et transport onéreux. Among these disadvantages, we can cite * High weight, hence difficult handling and expensive transport.
* Utilisation de coffrage sur site, d'où dépenses supplémentaires en main
d'oeuvre et matière.* Use of formwork on site, hence additional expenses on hand
of work and matter.
* Utilisation de profilés métalliques et de boulons pour réaliser des
liaisons permanentes, d'où risque d'oxydation souvent incontrôlable.* Use of metal profiles and bolts to make
permanent bonds, hence the risk of oxidation which is often uncontrollable.
* Grande difficulté, voire impossibilité de réaliser des extensions de
construction.* Great difficulty, even impossibility of carrying out extensions of
construction.
* Utilisation de materiaux isolant correctement, mais offrant une faible
régulation thermique à l'intérieur des constructions.* Use of properly insulating materials, but offering a low
thermal regulation inside constructions.
* Liaison médiocre des structures, d'où une faible résistance aux séismes.* Poor connection of structures, resulting in low earthquake resistance.
* Mise en oeuvre nécessitant un personnel hautement qualifié.* Implementation requiring highly qualified personnel.
* Faible faculté de création et d'adaptation bien que le nombre d'éléments
différents soit en général relativement élevé.* Weak faculty of creation and adaptation although the number of elements
in general is relatively high.
La présente invention a pour objet de pallier ces divers inconvénients. Conformément à l'invention, le procédé proposé est tel qu'il permet de réaliser des constructions vraiment évolutives à partir d'éléments préfabriqués en béton armé constituant les coffrages perdus et les parements des structures et des murs. The object of the present invention is to overcome these various drawbacks. In accordance with the invention, the proposed method is such that it allows real scalable constructions to be made from prefabricated reinforced concrete elements constituting the lost formwork and the facing of structures and walls.
Les structures en béton armé sont composées de poteaux et de poutres continues (chainages) solidaires des dalles. Reinforced concrete structures are composed of posts and continuous beams (chaining) integral with the slabs.
Les poteaux sont construits en remplissant de béton armé des éléments creux et superposés (semblables à des boisseaux). The posts are constructed by filling with reinforced concrete hollow and superimposed elements (similar to bushels).
La poutre chainage est réalisée en remplissant localement l'interparoi située entre deux panneaux verticaux avec du béton armé. The chaining beam is made by locally filling the interwall located between two vertical panels with reinforced concrete.
Les dessins annexés illustrent l'invention * La figure 1 représente une perspective éclatée et partielle de la partie
basse d'un mur illustrant le procédé selon l'invention.The accompanying drawings illustrate the invention * Figure 1 shows an exploded and partial perspective of the part
low of a wall illustrating the process according to the invention.
~* La figure 2 représente une perspective illustrant les échancrures qu'il
convient de faire dans les éléments creux pour permettre la connection
des poutres avec les poteaux.~ * Figure 2 shows a perspective illustrating the notches it
should be made in the hollow elements to allow connection
beams with posts.
* La figure 3 représente l'elévation partielle d'une construction réalisée
selon l'invention.* Figure 3 represents the partial elevation of a construction carried out
according to the invention.
* La figure 4 représente en coupe verticale l'intégration des éléments haut
et bas d'un encadrement d'ouverture avec les panneaux.* Figure 4 shows in vertical section the integration of the top elements
and bottom of an opening frame with panels.
* La figure 5 représente en coupe horizontale l'intégration des éléments
verticaux d'un encadrement d'ouverture avec les éléments creux
(boisseaux).* Figure 5 shows in horizontal section the integration of the elements
vertical of an opening frame with hollow elements
(bushels).
* La figure 6 représente en coupe verticale un mur en section courante avec
détail en partie basse et liaison avec un plancher.* Figure 6 represents in vertical section a wall in current section with
detail in the lower part and connection with a floor.
* La figure 7 représente en coupe horizontale un détail de mur illustrant
certaines possibilités offertes par l'invention.* Figure 7 shows in horizontal section a wall detail illustrating
certain possibilities offered by the invention.
* La figure 8 représente une coupe horizontale sur un chainage illustrant
la continuité des structures en béton armé selon l'invention. * Figure 8 represents a horizontal section on a chain illustrating
the continuity of the reinforced concrete structures according to the invention.
Les boisseaux (1) ont sur chaque face trois rainures verticales (2). The plugs (1) have on each face three vertical grooves (2).
Chaque rainure peut assurer le passage d'une extrémité de panneau préfabriqué en téton armé (3).. Each groove can ensure the passage of one end of a prefabricated reinforced nipple panel (3).
Deux boisseaux correctement espacés peuvent contenir les extrémités d'un même panneau (4). Two correctly spaced bushels can contain the ends of the same panel (4).
La superposition de panneaux dans une paire de rainures face a face permet de construire une cloison (6). The superposition of panels in a pair of face to face grooves makes it possible to construct a partition (6).
La superposition de panneaux dans deux paires de rainures en face à face permet de réaliser les parements d'un mur. The overlapping of panels in two pairs of grooves facing each other allows the facing of a wall to be made.
L'épaisseur d'un mur peut etre plus ou moins importante, selon que l'on utilise les rainures extrêmes (7) ou une rainure extreme et la rainure centrale (8). The thickness of a wall can be more or less important, depending on whether one uses the extreme grooves (7) or an extreme groove and the central groove (8).
Chaque panneau a un parement lisse (9) et un parement alveole (lQ)qui est généralement la face cachée. Each panel has a smooth facing (9) and a honeycomb facing (lQ) which is generally the hidden side.
Le principe de conception des corps creux avec des rainures sur les quatre faces permet de réaliser facilement, avec des éléments standards, deux épaisseurs de mur différentes, des angles de murs, des cloisons et, éventuellement, des extensions (18) rendant ainsi les constructions évolutives. The design principle of the hollow bodies with grooves on the four sides makes it possible to easily realize, with standard elements, two different wall thicknesses, wall angles, partitions and, optionally, extensions (18) thus making the constructions evolutionary.
Les interparois sont généralement remplies de matériaux isolants (ll) à l'exception des emplacements de poutres (chainage) ou l'on coule du béton armé (12).Les boisseaux situés au niveau des poutres sont échancrés (13) sur au moins deux faces, afin de permettre la création de structures continues et monolithiques. The interparois are generally filled with insulating materials (ll) except for the beam locations (chaining) where reinforced concrete is poured (12). The bushels located at the beams are notched (13) on at least two faces, to allow the creation of continuous and monolithic structures.
Les panneaux sont de faible hauteur, afin d'être suffisamment légers pour être mis en place a bras d'homme, leurs longueurs correspondent aux modules standards d'entr'axes des poteaux. The panels are of low height, in order to be light enough to be put in place with human arms, their lengths correspond to the standard modules of the axis of the posts.
A titre d'exemple, on pourrait construire des ouvrages avec des éléments ayant les caractéristiques suivantes * Panneaux
Hauteur : 0,45 m, épaisseur : 0,04 m (voile de 0.02 m),
Longueur : 1,00 m à 2,00 m.As an example, we could build structures with elements having the following characteristics * Panels
Height: 0.45 m, thickness: 0.04 m (0.02 m sail),
Length: 1.00 m to 2.00 m.
* Boisseaux
Hauteur : 0,45 m, épaisseur : 0,35 m, cotes : 0,30 x 0,30 m extérieur.* Bushels
Height: 0.45 m, thickness: 0.35 m, dimensions: 0.30 x 0.30 m outside.
* Interparoi
En sections courantes : mousse de polyuréthane, pouzzolane, sable, argile, latérite... à noter que ces deux derniers matériaux ont un bon coefficient de conductibilité thermique (LAMDA = 0,0062). L'abondance et la quasi gratuité de ces produits permet de les employer en quantité relativement importante et d'obtenir une excellente régulation thermique à l'intérieur des constructions en dépit de leur chaleur spécifique modeste (Cs - 0,06).* Interwall
In common sections: polyurethane foam, pozzolan, sand, clay, laterite ... note that these last two materials have a good coefficient of thermal conductivity (LAMDA = 0.0062). The abundance and almost free of these products allows them to be used in relatively large quantities and to obtain excellent thermal regulation inside buildings despite their modest specific heat (Cs - 0.06).
* Structures
On les réalise, en remplissant de béton armé les interparois au niveau de la poutre chainage (12) et à l'intérieur des corps creux (14).* Structures
They are made by filling the interparois with reinforced concrete at the chaining beam (12) and inside the hollow bodies (14).
Des constructions économiques à un niveau peuvent être construites dans des régions à faible coefficient sismique en ne remplissant de béton armé que les poteaux d'angles et qu'un poteau sur deux en sections courantes. Les autres poteaux étant traités comme des murs. Dans tous les cas la poutre/chainage devra être continue. One-level economic constructions can be built in regions with low seismic coefficient by filling with reinforced concrete only the corner posts and only one post in two in common sections. The other posts are treated like walls. In all cases the beam / chaining must be continuous.
Le panneau intérieur situé sous un -plancher est moins haut (15) que panneau standard (4) de façade en vis-à-vis, afin de permettre l'appui et la pénétration de la dalle (5). The interior panel located under a floor is lower (15) than the standard panel (4) facing opposite, to allow support and penetration of the slab (5).
* Murs
Les épaisseurs des murs peuvent être de 0,215 m ou de 0,127 m, suivant qu'on utilise les rainures extrêmes (7) ou une rainure extrême et la rainure centrale (8) des faces concernées des corps creux. Des poutres chainages supplémentaires peuvent être facilement réalisées pour améliorer la résistance au séisme ; pour cela, il suffit de couler localement du béton armé dans l'interparoi et d'échancrer les faces correspondantes des corps creux.* Walls
The thicknesses of the walls can be 0.215 m or 0.127 m, depending on whether the extreme grooves (7) or an extreme groove and the central groove (8) of the faces concerned of the hollow bodies are used. Additional chaining beams can be easily made to improve earthquake resistance; for this, it suffices to locally pour reinforced concrete into the interwall and to cut out the corresponding faces of the hollow bodies.
* Encadrements d'ouvertures
Le problème posé par ces parties d'ouvrage peut être facilement résolu avec quatre éléments préfabriqués en béton armé. Les hauteurs totales des éléments verticaux (16) sont des multiples de la hauteur des panneaux alors que les longueurs des éléments horizontaux (17) sont étudiées pour être intégrées entre deux poteaux
Les éléments horizontaux et verticaux possèdent un profil rainuré et/ou des saillies sur une ou plusieurs faces, de façon à permettre une intégration harmonieuse, rapide et aisée entre les panneaux et les poteaux. L'étanchéité poteaux/éléments verticaux peut être obtenue en remplissant le joint (19) avec un matériau approprié.* Opening frames
The problem posed by these parts of the structure can be easily solved with four prefabricated reinforced concrete elements. The total heights of the vertical elements (16) are multiples of the height of the panels while the lengths of the horizontal elements (17) are designed to be integrated between two posts.
The horizontal and vertical elements have a grooved profile and / or protrusions on one or more faces, so as to allow a harmonious, rapid and easy integration between the panels and the posts. The tightness of the posts / vertical elements can be obtained by filling the joint (19) with an appropriate material.
Les éléments creux (boisseaux) peuvent être préfabriqués de façon industrielle, en changeant le moule d'une machine couramment utilisée pour fabriquer des parpings creux en béton, alors que la préfabrication industrielle de panneaux de mur et d'éléments d'encadrement d'ouverture nécessite l'utilisation de machines polyvalentes semi-automatiques. Hollow elements (bushels) can be prefabricated industrially, by changing the mold of a machine commonly used to make hollow concrete parpings, while the industrial prefabrication of wall panels and opening framing elements requires the use of semi-automatic multipurpose machines.
Le procédé selon l'invention s'applique particulièrement à la construction de maisons de un à deux niveaux de qualité et de cout modeste dans des pays où l'on désire réduire la part en main d'oeuvre hautement qualifiée au profit d'une main d'oeuvre plus abondante et moins qualifiée. The method according to the invention is particularly applicable to the construction of houses of one to two levels of quality and modest cost in countries where it is desired to reduce the share of highly qualified labor in favor of one hand. more abundant and less qualified work.
La conception de ce procédé permet d'élargir son utilisation à la réalisation de coffrages perdus et à la construction de structures et de divers ouvrages de génie civil, tels que : murs de soutènement, regards de drainage, clôtures, supports de tuyauteries, digues, galeries, trémies... The design of this process allows its use to be extended to the production of lost formwork and the construction of structures and various civil engineering works, such as: retaining walls, manholes, fences, pipe supports, dikes, galleries, hoppers ...
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8902959A FR2644192B1 (en) | 1989-03-07 | 1989-03-07 | METHOD FOR CONSTRUCTING STRUCTURES AND WALLS FROM MANUFACTURED CONCRETE FORMWORK ELEMENTS INTEGRATED IN THE WORKS |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8902959A FR2644192B1 (en) | 1989-03-07 | 1989-03-07 | METHOD FOR CONSTRUCTING STRUCTURES AND WALLS FROM MANUFACTURED CONCRETE FORMWORK ELEMENTS INTEGRATED IN THE WORKS |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2644192A1 true FR2644192A1 (en) | 1990-09-14 |
FR2644192B1 FR2644192B1 (en) | 1991-07-19 |
Family
ID=9379445
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR8902959A Expired - Lifetime FR2644192B1 (en) | 1989-03-07 | 1989-03-07 | METHOD FOR CONSTRUCTING STRUCTURES AND WALLS FROM MANUFACTURED CONCRETE FORMWORK ELEMENTS INTEGRATED IN THE WORKS |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR2644192B1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2699950A1 (en) * | 1992-12-30 | 1994-07-01 | Rossi Jean Louis | Method of fabricating pillar construction elements |
WO1994028263A2 (en) * | 1993-05-28 | 1994-12-08 | Rossi Jean Louis | Method for fabricating construction elements for the erection of pillars and elements obtained according to such method |
FR2727708A1 (en) * | 1994-12-02 | 1996-06-07 | Arnault Dominique | Building construction method with prefabricated double concrete walls |
ES2590529A1 (en) * | 2015-05-22 | 2016-11-22 | Primitivo PUIG MORATAL | Constructive ceramic system of a single leaf and elements that compose it (Machine-translation by Google Translate, not legally binding) |
CN108331198A (en) * | 2018-03-05 | 2018-07-27 | 西南科技大学 | A kind of novel fabricated reinforced concrete circle beam-constructional column method of construction |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1343926A (en) * | 1919-09-22 | 1920-06-22 | Viggo J Madsen | Reinforced-concrete wall structure |
US1729293A (en) * | 1925-07-13 | 1929-09-24 | Charles E Mccartney | Concrete wall construction |
FR867104A (en) * | 1940-09-11 | 1941-10-01 | Quick construction process for buildings in general, but with new profiled elements |
-
1989
- 1989-03-07 FR FR8902959A patent/FR2644192B1/en not_active Expired - Lifetime
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1343926A (en) * | 1919-09-22 | 1920-06-22 | Viggo J Madsen | Reinforced-concrete wall structure |
US1729293A (en) * | 1925-07-13 | 1929-09-24 | Charles E Mccartney | Concrete wall construction |
FR867104A (en) * | 1940-09-11 | 1941-10-01 | Quick construction process for buildings in general, but with new profiled elements |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2699950A1 (en) * | 1992-12-30 | 1994-07-01 | Rossi Jean Louis | Method of fabricating pillar construction elements |
WO1994028263A2 (en) * | 1993-05-28 | 1994-12-08 | Rossi Jean Louis | Method for fabricating construction elements for the erection of pillars and elements obtained according to such method |
WO1994028263A3 (en) * | 1993-05-28 | 1996-10-10 | Rossi Jean Louis | Method for fabricating construction elements for the erection of pillars and elements obtained according to such method |
FR2727708A1 (en) * | 1994-12-02 | 1996-06-07 | Arnault Dominique | Building construction method with prefabricated double concrete walls |
ES2590529A1 (en) * | 2015-05-22 | 2016-11-22 | Primitivo PUIG MORATAL | Constructive ceramic system of a single leaf and elements that compose it (Machine-translation by Google Translate, not legally binding) |
CN108331198A (en) * | 2018-03-05 | 2018-07-27 | 西南科技大学 | A kind of novel fabricated reinforced concrete circle beam-constructional column method of construction |
Also Published As
Publication number | Publication date |
---|---|
FR2644192B1 (en) | 1991-07-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9523201B2 (en) | Construction components having embedded internal support structures to provide enhanced structural reinforcement for, and improved ease in construction of, walls comprising same | |
US5216863A (en) | Formwork comprising a plurality of interconnectable formwork elements | |
CA2392733C (en) | A building structure utilising modular building elements | |
FR2467269A1 (en) | CONSTRUCTION BLOCK, WALL STRUCTURE CARRIED OUT USING THE BLOCK AND METHOD OF MAKING THE SAME | |
LV14137B (en) | Double walled wooden block and method of wall construction using the same | |
US3296758A (en) | Superimposed building blocks with vertically spaced flat bars interfitted therewith connected by threaded stud members | |
US10787810B2 (en) | Building block system of prefabricated non-masonry mortarless interlocking building blocks with cap attachments | |
FR2644192A1 (en) | Method for construction of structures and walls using formwork elements made of precast concrete integrated in the constructions | |
US5090884A (en) | Apparatus for manufacturing hollow concrete structures | |
GB2144463A (en) | A building element and a construction method using such an element | |
EP0013543B1 (en) | A construction member for building inner and/or bearing walls or the like | |
WO1997008402A1 (en) | Set of structural elements for constructions made of 'durref' material and space self supported module realized with this | |
US3759003A (en) | Pinned joint | |
EP1054114A2 (en) | Modular construction system for masonry with bricks for facades, walls, pillars, lintels and interior vertical or horizontal conduits | |
CA2298319C (en) | Extruded permanent form-work for concrete | |
FR2545863A1 (en) | Modular construction element precast out of insulating lightweight reinforced concrete, its method of manufacture and the means for implementing this method | |
US5186881A (en) | Method for manufacturing hollow concrete structures | |
DE4444921C2 (en) | Room block system for the erection of buildings | |
EP3447207B1 (en) | Blocks and modular building system | |
NZ503003A (en) | Building module consisting of panels spaced by framing members that project out and interlock with adjacent members when panels assembled | |
RU2260096C1 (en) | Light-weight laminated wall structure formed of different materials | |
FR2634238A1 (en) | Prefabricated construction elements, and method for the economical construction of an isothermal wall | |
KR19980019399A (en) | Architecture wall formwork assembly | |
GB1559579A (en) | Prefabricated blocks for the construction of walls and a methodof constructing walls from such blocks | |
CH442676A (en) | Method of constructing a building using prefabricated elements |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ST | Notification of lapse |