CH423589A - Easily transportable concreting plant that can be set up without a crane - Google Patents

Easily transportable concreting plant that can be set up without a crane

Info

Publication number
CH423589A
CH423589A CH1558864A CH1558864A CH423589A CH 423589 A CH423589 A CH 423589A CH 1558864 A CH1558864 A CH 1558864A CH 1558864 A CH1558864 A CH 1558864A CH 423589 A CH423589 A CH 423589A
Authority
CH
Switzerland
Prior art keywords
frame
swivel
unit
plant according
concreting
Prior art date
Application number
CH1558864A
Other languages
German (de)
Original Assignee
Techag Anstalt Fuer Maschinen
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Techag Anstalt Fuer Maschinen filed Critical Techag Anstalt Fuer Maschinen
Priority to CH1558864A priority Critical patent/CH423589A/en
Priority to AT1081665A priority patent/AT252083B/en
Publication of CH423589A publication Critical patent/CH423589A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C9/00General arrangement or layout of plant
    • B28C9/04General arrangement or layout of plant the plant being mobile, e.g. mounted on a carriage or a set of carriages
    • B28C9/0409General arrangement or layout of plant the plant being mobile, e.g. mounted on a carriage or a set of carriages and broken-down for transport
    • B28C9/0418General arrangement or layout of plant the plant being mobile, e.g. mounted on a carriage or a set of carriages and broken-down for transport with a storage silo movable between a horizontal transport position and a vertical working position

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

  

  Leicht transportable, ohne     Kran        anfstellbare        Betonieranlage       Die Erfindung     betrifft    eine leicht     transportable,     ohne Kran     aufstellbare        Betonieranlage    mit einem un  teren Aggregat, das einen Betonmischer umfasst, und  einem auf diesem unteren Aggregat lösbar befestig  ten oberen Aggregat, das ein Zementsilo umfasst und  mittels eines am unteren Aggregat     montierbaren    Sei  les auf letzteres hinauf- bzw.

   von letzterem herunter  geschwenkt werden kann, wobei das obere Aggregat  für den     Transport    auf einem Lastkraftwagen verla  den werden kann, der das auf Rädern montierte un  tere Aggregat nach sich zieht. Bei einer bekannten  Anlage dieser Art sind die zum Transport des un  teren Aggregates dienenden Räder so vorgesehen,  dass dieses Aggregat für den     Transport    um 90  ge  genüber seiner Betriebslage geschwenkt werden  muss, was natürlich ein entsprechendes Aufrichten  desselben am Aufstellungsort     erforderlich    macht.  Ferner sind beim Transport besondere Sicherungs  vorrichtungen für den Betonmischer erforderlich, der  meistens eine im Betrieb horizontale Mischtrommel  aufweist, die nicht ohne weiteres     vertikal    stehen  kann.

   Nach dem Aufrichten des unteren Aggregates  wird das obere Aggregat bei einer oberen Kante des  unteren Aggregates an letzteres     angelenkt    und mittels  des Seiles von der Brücke des Lastwagens nach oben  geschwenkt. Hierbei wird das Seil vom Lastwagen  selbst gezogen. Dies erfordert einen sehr geschickten  Fahrer und geht in der Praxis nur mit einem der rela  tiv seltenen, weil teuren Lastwagen mit Allradantrieb.  Auch muss das obere Aggregat, wenn sein Schwer  punkt hinter die Schwenkachse kommt, mit Hilfe von  Stützwinden abgefangen werden, die von Arbeitern  bedient werden, die sich in gefährlicher     Kletterlage     auf dem unteren Aggregat befinden.  



  Zur Behebung dieser und anderer, später erläu  terter Nachteile zeichnet sich die     Betonieranlage    nach    der Erfindung dadurch aus, dass das Gestell des un  teren Aggregates aus einem Grundgestell und einem  an demselben     angelenkten    Schwenkgestell mit in  Bodennähe befindlicher Schwenkachse besteht, wobei  der Betonmischer am Grundgestell montiert ist, wäh  rend das obere, den Zementsilo umfassende Aggregat  auf dem Schwenkgestell lösbar befestigt ist;

   und dass  für das am unteren Aggregat     montierbare    Seil zwei  Montagelagen vorgesehen sind, wobei es in der einen  Montagelage am oberen Ende des auf dem Schwenk  gestell befestigten, oberen Aggregates     angreift,    wäh  rend es bei vom Schwenkgestell gelöstem oberen  Aggregat     in    der anderen Montagelage zu benützen  ist, in welcher es am oberen Ende des Schwenkge  stelles angreift.  



  In der Zeichnung ist ein Ausführungsbeispiel des  Erfindungsgegenstandes dargestellt. Es ist:       Fig.l    eine Seitenansicht einer     Betonieranlage          beim    Transport;       Fig.    2 eine Seitenansicht derselben Anlage in Be  triebsstellung;       Fig.3    eine Seitenansicht der Anlage bei     ihrer     Demontage;       Fig.    4 einen Seilzug in zu     Fig.    3 passender Drauf  sicht;       Fig.    5 eine     Hintenansicht    des unteren Aggregates  in der Lage von     Fig.    3;

         Fig.6    eine Seitenansicht der Anlage bei der  Montage, in grösserem     Massstabe,    wobei das un  tere Aggregat gemäss Linie     VI        VI    von     Fig.7    ge  schnitten ist;       Fig.    7 ein Schnitt des unteren Aggregates     gemäss     Linie     VII-VII    von     Fig.    7;       Fig.    8 ein Horizontalschnitt durch zwei hintere  Füsse in grösserem Masstab; und           Fig.    9 ein entsprechender     Schnitt    durch zwei vor  dere Füsse.  



  Die dargestellte     Betonieranlage    weist ein unteres  Aggregat 1 auf, das hauptsächlich aus folgenden Tei  len besteht: einem     Grundgestell    2, auf dem eine     Be,          tonmischtrommel    3 mit horizontaler Achse und eine  Zementwaage 4 sowie eine     Kiesaufzugsvorrichtung    5  fest montiert sind; einem schwenkbaren Gestell 6, das  um eine untere,     horizontale,    ideelle Achse 7 schwenk  bar ist, welche durch zwei in     Fig.    7 ebenfalls mit 7 be  zeichnete Gelenke     realisiert    ist;

   und aus einem Fahr  rahmen 8, der mittels Schrauben 9 (siehe     Fig.    7) an  unteren Traversen 10 des     Grundgestelles    2 lösbar  befestigt und mit     einer    zwei Räder 11 tragenden Fahr  achse 12 versehen     ist.    Der Fahrrahmen 8, der in der  Betriebsstellung der     Anlage    von dem unteren Aggre  gat 1 abmontiert wird (siehe     Fig.2),    bildet eine  Deichsel 13, die an ihrem vorderen Ende mit einer  Anhängeöse 14 versehen ist, um das untere Aggregat  1 an einem Lastwagen 15 anzuhängen, wie in     Fig.    1  gezeigt ist.

   In     Fig.    1 ist ferner ein oberes Aggregat 16  der Anlage in seiner waagrechten     Transportstellung     auf einer Kippbrücke 17 des Lastwagens 15 darge  stellt. Das obere Aggregat 16 besteht     hauptsächlich     aus     einem    vierbeinigen Gestell 18 für ein Zementsilo  19, mit einem Auslauftrichter 20, an dessen unterem  Ende ein Schieber 21, ein     Zellenrad    22 und ein An  schlusskanal 23 vorgesehen sind, der in der Betriebs  stellung mittels einer nicht dargestellten Gummiman  schette an die Waage 4 angeschlossen wird. Das  obere Aggregat 16 ist in der Betriebsstellung auf dem  Schwenkgestell 6 des unteren Aggregates 1 befestigt,  während letzteres auf zwei vorderen Füssen 24 und  zwei hinteren Füssen 25 befestigt ist.

    



  Bevor auf die Montage und Demontage der An  lage eingegangen werden kann, sind     zunächst    noch  weitere     Einzelheiten    derselben zu erläutern, insbe  sondere anhand von     Fig.    6 und 7. Die Deichsel 13 ist  vorne mit einem Schwenkrad 26 versehen, das mit  tels einer Kurbel 27 in     bekannter    Weise höhenver  stellbar ist. Ferner ist unter der Deichsel 13 ein  Stützbock 28 befestigt, der zwei Füsse 29 hat.

   Die  Lage dieses Stützbockes 28 ist so gewählt, dass der  gemeinsame Schwerpunkt der Aggregate 1 und 15 in  der Lage nach     Fig.    6 - und somit auch in derjenigen  nach     Fig.    3 - hinter dem Stützbock 28 liegt, also       links    desselben in den genannten Figuren.  



  Das     Grundgestell    2 weist zwei     Längsträger    30  auf, auf deren hinteren Enden zwei Säulen 31 stehen,  deren obere Enden durch geneigte Streben 32 mit  den vorderen Enden der Längsträger 30 verbunden  sind, wo auch die Gelenke 7 angebracht sind. Das  Schwenkgestell 6 weist zwei Säulen 33 und zwei ge  neigte Streben 34 auf, die in der Nähe der Gelenke 7  miteinander verbunden sind und einen viereckigen  Rahmen 35 tragen, an dessen Ecken zwei vordere  und zwei hintere Befestigungsköpfe 36, bzw. 37, vor  gesehen sind.

   Auf den Köpfen 36 und 37 können vier  Füsse 38 des Gestelles 18 des oberen Aggregates 16  mittels nicht dargestellter Schrauben befestigt wer-    den, während die hinteren Köpfe 37 ihrerseits an  zwei Kopfstücken 39 des     Grundgestelles    2 an  schraubbar sind, die sich an den oberen     Enden    der  Säulen 31 und Streben 32 befinden und durch     eine     Traverse 40 (siehe auch     Fig.    5) miteinander verbun  den sind.  



  Die Zementwaage 4 ist durch einen Kanal 41 in  üblicher Weise mit dem feststehenden Einlauf 42 der  Mischtrommel 3 verbunden. Die     Aufzugsvorrichtung     5 weist zwei steile Führungsschienen 43 für den übli  chen     Aufzugskübel    44 (siehe     Fig.    1 und 3) auf. Diese  Führungsschienen 43 werden in der Betriebsstellung  durch für den Transport     abmontierbare    Verlänge  rungsschienen 45 nach unten verlängert, wie in     Fig.    2  dargestellt ist, in welcher der Aufzugskübel bei 44' in  seiner untersten Betriebslage punktiert angedeutet ist.  



  An den Säulen 31 des Grundgestelles 2 werden zu  Montage- und Demontagezwecken zwei Pfosten 46  mit     Hilfe    von     Briden    47 befestigt. Im oberen,     gega-          belten    Ende des linken Pfostens 46 ist eine Seilrolle  48 angebracht, wie in     Fig.    5 schematisch angedeutet  ist. An der linken Säule 31 ist unten eine selbsthem  mende Seilwinde 49 leicht lösbar     montiert,    die     mit     einer Handkurbel 50 versehen ist.

   Mittels der Seil  winde 49, an deren     Stelle    auch ein     Seilzugapparat     vorgesehen     sein    kann, kann ein Seil 51 auf- bzw. ab  gerollt werden, das in der Lage von     Fig.    6 und 7 von  der Seilwinde 49 zunächst     vertikal        aufwärts    zur Rolle  48 geführt ist, dann schräg abwärts zu einer ersten  Rolle 52, dann horizontal zu einer zweiten Rolle 52  und schliesslich schräg aufwärts zu einem Befesti  gungspunkt 53 am oberen Ende des rechten Pfostens  46 geht.

   Stattdessen kann am oberen Ende des rech  ten Pfostens 46 ebenfalls eine nicht dargestellte Rolle  48 vorgesehen, und das Ende des Seiles 51 über die  selbe zu einem unten am     Grundgestell    vorgesehenen  Befestigungspunkt geführt sein, um beide Pfosten 46  in gleicher Weise zu belasten. Die beiden Rollen 52  sind am Schwenkgestell 6 in der Nähe der oberen  Enden von dessen Säulen 33 am Rahmen 35 befe  stigt.  



  In der in     Fig.    3 und 4 dargestellten Lage geht das  Seil 51 dagegen von der Seilwinde 49 über die     Rolle     48 zu einer Rolle 54, die zentral an der Rückseite des  oberen Endes des Zementsilos 19 angebracht ist und  von da zum Befestigungspunkt 53.  



  An jeder der beiden Streben 32 des Grundgestel  les 2 ist etwa in     Brusthöhe    eines neben dem unteren  Aggregat 1 stehenden Mannes ein quer nach aussen  ragender Zapfen 55 vorgesehen, auf den das eine,     mit     einer entsprechenden     Bohrung    versehene Ende einer  Stützwinde 56 aufgeschoben werden kann, die bei 56'  gestrichelt gezeichnet ist. An jeder der Säulen 33 des  Schwenkgestells 6 ist ferner eine     Stützpfanne    57 zur  Aufnahme des anderen Endes der Stützwinde 56,  deren beide Enden in bekannter Weise mittels einer  Handkurbel 58 voneinander entfernt oder einander  genähert werden können.

   Die Stützpfanne 57 ist nur  bei einer in     Fig.    6 gestrichelt angedeuteten Lage 33'  der Säule 33 dargestellt, wobei die entsprechende      Lage der Strebe 34 mit 34' bezeichnet ist. Die Stütz  winde 56 ist in     Fig.    6 auch in vollen Linien darge  stellt, und zwar zwischen einem Zapfen 59, der am  Rahmen 35 vorgesehen ist, und dem Erdboden.  Selbstverständlich sind zwei Stützwinden 56 vorhan  den, eine für jede Seite des unteren Aggregates 1.  



  Die beiden hinteren     Füsse    25 sind     mit    oberen und  unteren Platten 60, bzw. 61 versehen, wobei auf er  steren entsprechende Fussplatten 62 des Grundge  stells 2 festgeschraubt werden können. Die beiden  unteren Platten 61 sind durch aus Flacheisen beste  hende, angeschweisste Traversen 63 miteinander ver  bunden und je mit einem vorderen Einschnitt 64 ver  sehen, der von hinten auf einen Schraubenbolzen 65  aufgeschoben werden kann. Der     Schraubenbolzen    ist  in     einem        Fundamentsockel    66 verankert, der am  Aufstellungsort der     Betonieranlage    auf einer geeigne  ten Kies- oder Steinunterlage im Boden vergraben  wird.

   Die beiden vorderen Füsse 24 sind analog mit  oberen und unteren Platten 67 und 68 versehen.  Letztere sind ebenfalls durch Traversen 69 verbun  den aber mit hinteren Einschnitten 70 versehen, um  von vorne auf die Schraubenbolzen 64 von entspre  chenden     Fundamintsockeln    66 aufgeschoben werden  zu können.  



  Es wird nun zunächst von der Betriebsstellung  nach     Fig.    2 ausgehend die Demontage der Anlage  erläutert:  Zunächst wird der Aufzugskübel 44 in eine obere  Lage gebracht (siehe     Fig.    1) und in derselben gesi  chert. Die Verlängerungsschienen 45 werden abmon  tiert. Die beiden Pfosten 46 werden mittels der Bri  ten 47 oben an den Säulen 31 montiert. Die Seil  winde 49 wird unten an der linken Säule 31 montiert.  Die Fahrachse 12 mit den Fahrrädern 11 und der  Fahrrahmen 8 werden voneinander getrennt unter die  Anlage gebracht, mittels Schrauben 71 aneinander,  und mittels der Schrauben 9 an den Traversen 10 des  Grundgestells 2 befestigt. Die Füsse 24 und 25 sind  so hoch, dass die Fahrräder 11 und die Füsse 29 des  Stützbockes 28 den Boden nicht berühren.

   Nun wird  eine starke Unterlage 72 aus Balken, Bohlen oder  dgl. unter die Füsse 29 des Stützbockes 28 gescho  ben, wozu die Deichsel 13 mittels der Kurbel 27  eventuell etwas angehoben werden kann, nach Lösen  der Schrauben, die das Grundgestell 2 auf den Füssen  24, 25 festhalten. Das Seil 51 wird in die Lage von       Fig.    3 und 4 gebracht. Die Schrauben, welche zur  Befestigung der beiden hinteren Befestigungsköpfe 37  des Schwenkgestells 6 an den Kopfstücken 39 des  Grundgestells 2 dienen, werden gelöst.  



  Nach diesen Vorbereitungen werden die beiden  Stützwinden 56 auf beiden Seiten der Anlage zwi  schen den Zapfen 55 und den Stützpfannen 57 der  noch vertikalen     Schwenkgestellsäulen    33 nahezu  horizontal eingesetzt und mittels derselben das  Schwenkgestell 6 vom Grundgestell 2 weggedrückt,  während zugleich das Seil 51 von der Seilwinde 49  durch Drehen von deren Kurbel 50 entsprechend ab  gerollt wird. In einer gewissen Zwischenlage, z. B.    etwas rechts von der Lage 33', 34', kommt der  Schwenkpunkt des oberen Aggregates 16 und des  Schwenkgestelles 6 vor die ideelle Achse 7 zu liegen,  so dass sich das Seil 51 spannt und ein Kippen des  Schwenkgestelles 6 nach vorne verhindert, während  die Stützwinden 56 weggenommen werden können.

    Nun wird mittels der Seilwinde 49 das     Seil    51 verlän  gert, bis das obere     Aggregat    16 schliesslich auf die  Kippbrücke 17 des Lastwagens 15 zu liegen kommt,  worauf die Füsse 38 des oberen Gestelles 18 von den  Befestigungsköpfen 36 und 37 des Schwenkgestelles  6 gelöst werden und die     Kippbrücke    17 horizontal       gestellt    wird.

   Es ist hervorzuheben, dass beim<B>Ab-</B>  wärtsschwenken des oberen Aggregates 16 der ge  meinsame Schwenkpunkt der beiden Aggregate 1 und  16 sich von hinten der vertikalen Querebene durch  den Stützbock 28 nähert, aber stets hinter dieser  Ebene bleibt; wäre dies nicht der     Fall,    so könnte man  die Verbindungen des Grundgestelles 2 mit den     Füs-          sen    24 und 25 nicht lösen und müsste man unter  Umständen ein Losreissen der Füsse 24 und 25 von  den     Fundamentsockeln    66 oder gar ein Herausreissen  dieser Sockel 66 aus dem Boden befürchten.  



  Nach dem beschriebenen Verladen des oberen       Aggregates    16 muss nun das Schwenkgestell 6 wieder  aufgerichtet werden. Hierzu wird das Seil 51 in die  Lage von     Fig.    6 und 7 gebracht und mittels der     Seil-          wind--    49 aufgerollt.     Kurz    bevor das Schwenkgestell  in die bei 33', 34' angedeutete Lage kommt, werden  die Stützwinden 56 wieder zwischen den Bolzen 55  und den Stützpfannen 57 eingesetzt, um ein Zurück  kippen des Schwenkgestelles 6 in seine     vertikale     Lage zu vermeiden, in die es mittels der Stützwinden  56 sanft abgesenkt wird. Hierauf wird das Schwenk  gestell 6 wieder am Grundgestell 2 befestigt.  



  Nun wird mittels der Kurbel 27 die Deichsel 13  gehoben, so dass man die Unterlage 72 und die vor  deren Füsse 24 wegnehmen kann, nach Lösung der  auf dem     Schraubenbolz::n    64 sitzenden, nicht darge  stellten Muttern. Wenn man hierauf die Deichsel 13  mittels der Kurbel 27 senkt, kommen die Fahrräder  11 auf den Boden. Montiert man die Pfosten 46 und  die Winde 49 ab, so liegt der Schwerpunkt des un  teren Aggregates leicht vor den Rädern 11, so dass  sich das Grundgestell 2 von den hinteren Füssen 25  abhebt und letztere weggenommen werden können.  Nun kann die Öse 14 der Deichsel 13 am Lastwagen  15     eingehängt    werden und die Anlage ist transport  bereit. Zur Montage der Anlage geht man im wesent  lichen im umgekehrten Sinne vor, wie bei der  Demontage.

   Von besonderem Vorteil ist es, dass der  Lastwagen für die Montage nicht benötigt wird, in  dem man das obere Aggregat 16 auf dem Boden,  bzw. auf Rundhölzern 73 (siehe     Fig.    6)     lagern    kann,  wenn der Lastwagen sofort nach dem Transport der  Anlage zur Baustelle wieder wegfahren muss. Nach  dem Lösen der Deichsel 13 vom Lastwagen 15 lässt  man die Deichsel 13 mittels der Kurbel 27 so weit  nach unten, dass die hinteren Fussplatten 62 etwas  höher liegen als die oberen Platten 60 der hinteren      Füsse 25, welche bereits auf ihren     Sockeln    66 ange  ordnet worden sind (siehe     Fig.    1).

   Nun stösst man das  untere Aggregat 1 von Hand an seinen Montageplatz,  was ohne Schwierigkeiten möglich ist, weil die Räder  11 und das Schwenkrad 26 sehr reibungsarm auf  nicht dargestellten Kugellagern gelagert sind. Durch  Heben der Deichsel 13 stellt man zunächst die hin  teren Fussplatten 62 auf den Platten 60 ab und hebt  man hierauf die Räder 11 vom Boden ab und damit  auch die vorderen Fussplatten 62 so hoch, dass man  die Füsse 24 unter dieselben auf ihre Sockel 66  schieben kann. Werden die vorderen Fussplatten 62  nun auf die oberen Platten 67 der vorderen Füsse 24  abgesenkt, so bleiben die Räder 11 in einem kleinen  Abstand vom Boden, so dass sie mit ihrer Achse 12,  und dem Fahrrahmen 8 abmontiert werden können.

    Nach Montage der Pfosten 46 und der Seilwinde 49  wird das Schwenkgestell 6     unter        Benützung    der Stütz  winden 56 in der Lage 56' und des über die     Rollen     52 gelegten Seiles 51 in die Lage von     Fig.    6     herun-          tergeschwenkt,    worauf das obere Aggregat 16 am       Schwenkgestell    6 befestigt wird, wobei man zum  Ausrichten des     Schwenkgestelles    6 auf die Füsse 38  die Stützwinden 56     zwischen    dem Boden und den  Zapfen 59 ansetzen kann.

   Nun wird das obere  Aggregat 16     mittels    des über die Rolle 54 (siehe       Fig.3    und 4) nach oben geschwenkt und das       Schwenkgestell    6 am Grundgestell 1 befestigt. Ferner  wird nun auch das Grundgestell 2 auf den Füssen 24  und 25 befestigt, was mit Rücksicht auf den mögli  chen Winddruck notwendig ist. Nach Anbringen der  Verlängerungsschienen 45 und Verbindung des An  schlusskanals 23     mit    der Waage 4     ist    dann die An  lage betriebsbereit.  



  Gegenüber der     eingangs        erwähnten    bekannten       Betonieranlage    weist die beschriebene Anlage sehr  grosse     Vorteile    auf:  Das Aufrichten des oberen Aggregates 16 erfolgt       mit    viel geringerem     Seilzug,    weil die Schwenkachse 7  sich in     Bodennähe    befindet und nicht am oberen  Rand des unteren Aggregates.

   Das Abfangen des  oberen Aggregates beim     Durchgang    durch die     labile     Gleichgewichtslage     ist        vollkommen    gefahrlos, weil  die die Stützwinden 56 bedienenden Arbeiter auf  dem Boden stehen können, statt auf dem unteren  Aggregat herumzuklettern.

   Bei der Fahrt befindet  sich die Mischtrommel 3     in        ihrer    Normallage, so dass  sie keiner     Sicherung        bedarf.    Das untere Aggregat  braucht nicht als Ganzes um 90  gekippt zu werden,  wozu bei der bekannten Anlage die hinteren Füsse  des unteren Aggregates an mit Scharnieren     versehe-          nen    Bodenverankerungen     angelenkt    und mittels eines  auch zum Ziehen des     Seiles    benötigten Allradlastwa  gens aufgerichtet werden musste, was besonders auf  engen Bauplätzen sehr schwierig war.

   Die ganze  Montage kann vielmehr ohne jegliche     Hilfe    des Last  wagens     durchgeführt    werden und braucht nur etwa  die Hälfte der Zeit wie bei der bekannten Anlage. Es  ist auch keine Spezialvorrichtung auf der Brücke des  Lastkraftwagens nötig, wie dies zum Verladen des    oberen Aggregates der bekannten Anlage     in    der Pra  xis nötig ist.  



  Gegenüber einer anderen bekannten     Betonieran-          lage,    die nicht aus zwei trennbaren Aggregaten be  steht, sondern ein     einziges    Gestell aufweist, in dem  der Zementsilo über dem Betonmischer fest ange  bracht ist und das infolge besonderer Massnahmen  mit Hilfe des unter Anwendung einer Anhängeachse  zum Transport     verwendeten    Allradlastwagens aufge  stellt werden kann, weist die beschriebene Anlage  ebenfalls sehr grosse     Vorteile    auf. Insbesondere ist  die Länge des ganzen Lastzuges und das auf dem An  hänger nachgezogene Gewicht viel geringer, was  wegen der Strassenverkehrsvorschriften von grosser  Bedeutung ist.

   Sobald der     ganze    Lastzug eine gewisse       Grenzlänge,    z. B. 18 m überschreitet, ist     nämlich    eine  besondere Fahrbewilligung für jede     einzelne        Fahrt     nötig, und wenn das Gewicht des Anhängers eine ge  wisse Grenze; z. B. 1500 kg überschreitet, muss der  selbe     mit    vom Lastwagen aus     gesteuerten    Druckluft  bremsen versehen werden, was sehr erhebliche  Kosten verursacht. Dass im Gegensatz zu einer be  kannten Anlage gleicher Leistung, z.

   B. mit einer  Mischtrommel für     350-1-Chargen,    bei der beschriebe  nen Anlage im Fahrzeugzustand beide oben erwähnten  Grenzen nicht erreicht werden,     ist    ein sehr     grosser          Vorteil.    Ein weiterer     Vorteil    besteht in der     Benütz-          barkeit    eines     üblichen        Zementsilogestells    für das  obere Aggregat, d. h.

   es können als oberes Aggregat  bereits     standartisierte    Baueinheiten verwendet wer  den, die bisher auf dem Boden aufgestellt oder mit       Hilfe    von Kränen über dem Mischer     montiert    wer  den. Die     Manövrierfähigkeit    auf engen Bauplätzen ist  ebenfalls viel grösser, und man braucht wiederum  keine     einbetonierten        Scharniere    im Fundament, kei  nen     Allradkraftwagen    zum Aufrichten, keine Spezial  sicherung des Mischers auf der     Fahrt,    keinen sehr  geschickten Fahrer usw.

   Die meisten der oben     er-          wähnten        Vorteile    sowie weitere     Vorteile    werden  auch gegenüber anderen bekannten, relativ leicht       transportierbaren    und ohne Kran     aufstellbaren        Beto-          nieranlagen    erzielt, die sich aber     konstruktiv    von der  beschriebenen Anlage noch stärker unterscheiden als  die Anlagen der     eingangs    erwähnten Art.



  Easily transportable concreting plant that can be started without a crane The invention relates to an easily transportable concreting plant that can be set up without a crane with an un direct unit, which comprises a concrete mixer, and an upper unit which is releasably fastened to this lower unit and which includes a cement silo and a lower unit The unit can be mounted on or off the latter.

   can be pivoted down from the latter, whereby the upper unit can be loaded for transport on a truck, which entails the lower unit mounted on wheels. In a known system of this type, the wheels used to transport the lower unit are provided so that this unit must be pivoted for transport by 90 ge compared to its operating position, which of course makes it necessary to erect it accordingly at the installation site. Furthermore, special safety devices are required for the concrete mixer during transport, which usually has a mixing drum that is horizontal in operation and cannot easily stand vertically.

   After the lower unit has been erected, the upper unit is hinged to the lower unit at an upper edge of the lower unit and swiveled upwards from the bridge of the truck by means of the rope. Here the rope is pulled by the truck itself. This requires a very skilled driver and is only possible in practice with one of the relatively rare, because expensive, four-wheel drive trucks. If its center of gravity is behind the swivel axis, the upper unit must also be intercepted with the help of support jacks, which are operated by workers who are in a dangerous climbing position on the lower unit.



  To remedy this and other disadvantages explained later, the concreting system according to the invention is characterized in that the frame of the lower unit consists of a base frame and a swivel frame articulated on the same with a swivel axis located near the ground, the concrete mixer being mounted on the base frame , while rend the upper, the cement silo comprehensive unit is releasably attached to the swivel frame;

   and that two mounting positions are provided for the cable that can be mounted on the lower unit, in which case it engages in one mounting position at the upper end of the upper unit attached to the swivel frame, while it is to be used in the other mounting position when the upper unit is detached from the swivel frame , in which it attacks at the upper end of the Schwenkge stelles.



  An exemplary embodiment of the subject matter of the invention is shown in the drawing. It is: Fig.l a side view of a concreting plant during transport; Fig. 2 is a side view of the same system in Be operating position; 3 shows a side view of the installation during its dismantling; FIG. 4 shows a cable pull in a plan view matching FIG. 3; FIG. 5 shows a rear view of the lower unit in the position of FIG. 3;

         6 shows a side view of the system during assembly, on a larger scale, with the lower unit being cut along line VI VI of FIG. 7; 7 shows a section of the lower unit along line VII-VII of FIG. 7; 8 shows a horizontal section through two rear feet on a larger scale; and FIG. 9 is a corresponding section through two before more feet.



  The concreting plant shown has a lower unit 1, which consists mainly of the following Tei len: a base frame 2 on which a loading, clay mixing drum 3 with a horizontal axis and a cement scale 4 and a gravel elevator 5 are firmly mounted; a pivotable frame 6, which is pivotable about a lower, horizontal, ideal axis 7, which is realized by two joints also shown in FIG. 7 with 7 be;

   and from a driving frame 8, which by means of screws 9 (see Fig. 7) is releasably attached to the lower cross member 10 of the base frame 2 and is provided with a driving axis 12 carrying two wheels 11. The driving frame 8, which is dismantled in the operating position of the system from the lower aggregate gat 1 (see Figure 2), forms a drawbar 13, which is provided at its front end with a hitch 14 to the lower aggregate 1 on a truck 15 as shown in FIG.

   In Fig. 1, an upper unit 16 of the system is also in its horizontal transport position on a tipping bridge 17 of the truck 15 provides Darge. The upper unit 16 consists mainly of a four-legged frame 18 for a cement silo 19, with an outlet funnel 20, at the lower end of which a slide 21, a cellular wheel 22 and a connection channel 23 are provided, which is in the operating position by means of a rubber man, not shown cuff is connected to the scale 4. In the operating position, the upper unit 16 is fastened on the swivel frame 6 of the lower unit 1, while the latter is fastened to two front feet 24 and two rear feet 25.

    



  Before the assembly and disassembly of the system can be dealt with, further details of the same are first to be explained, in particular special with reference to FIGS. 6 and 7. The drawbar 13 is provided at the front with a swivel wheel 26, which with means of a crank 27 in known way is height adjustment adjustable. Furthermore, a support frame 28, which has two feet 29, is fastened under the drawbar 13.

   The position of this support frame 28 is chosen so that the common center of gravity of the units 1 and 15 in the position according to FIG. 6 - and thus also in that according to FIG. 3 - lies behind the support frame 28, i.e. to the left of it in the figures mentioned.



  The base frame 2 has two longitudinal beams 30, on the rear ends of which stand two columns 31, the upper ends of which are connected by inclined struts 32 to the front ends of the longitudinal beams 30, where the joints 7 are also attached. The pivot frame 6 has two columns 33 and two GE inclined struts 34 which are connected to each other in the vicinity of the joints 7 and carry a square frame 35, at the corners of which two front and two rear mounting heads 36, and 37 are seen in front .

   On the heads 36 and 37, four feet 38 of the frame 18 of the upper unit 16 can be attached by means of screws, not shown, while the rear heads 37 can be screwed to two head pieces 39 of the base frame 2, which are attached to the upper ends of the Columns 31 and struts 32 are located and are connected to each other by a cross member 40 (see also Fig. 5).



  The cement scale 4 is connected in the usual way to the fixed inlet 42 of the mixing drum 3 by a channel 41. The elevator device 5 has two steep guide rails 43 for the übli chen elevator bucket 44 (see FIGS. 1 and 3). These guide rails 43 are extended downward in the operating position by extension rails 45 which can be removed for transport, as shown in FIG. 2, in which the elevator bucket is indicated by dotted lines at 44 'in its lowest operating position.



  Two posts 46 are fastened to the columns 31 of the base frame 2 with the aid of clamps 47 for assembly and disassembly purposes. In the upper, forked end of the left post 46, a rope pulley 48 is attached, as indicated schematically in FIG. On the left column 31, a self-locking cable winch 49 is easily detachably mounted, which is provided with a hand crank 50.

   A cable 51 can be rolled up or down by means of the cable winch 49, instead of which a cable apparatus can be provided, which in the position of FIGS. 6 and 7 is initially guided vertically upwards to the roller 48 by the cable winch 49 , then obliquely downwards to a first roller 52, then horizontally to a second roller 52 and finally obliquely upwards to a fastening point 53 at the upper end of the right post 46 goes.

   Instead, a roller 48, not shown, can also be provided at the upper end of the right post 46, and the end of the rope 51 can be guided over the same to a fastening point provided below on the base frame in order to load both posts 46 in the same way. The two rollers 52 are on the swivel frame 6 in the vicinity of the upper ends of the columns 33 on the frame 35 BEFE Stigt.



  In the position shown in FIGS. 3 and 4, on the other hand, the cable 51 goes from the cable winch 49 via the roller 48 to a roller 54 which is attached centrally to the rear side of the upper end of the cement silo 19 and from there to the fastening point 53.



  On each of the two struts 32 of the Grundgestel les 2 a transversely outwardly projecting pin 55 is provided approximately at chest height of a man standing next to the lower unit 1, onto which the one end of a support winch 56 provided with a corresponding bore can be pushed is drawn in dashed lines at 56 '. On each of the columns 33 of the swivel frame 6 there is also a support socket 57 for receiving the other end of the support winch 56, the two ends of which can be removed from or brought closer together in a known manner by means of a hand crank 58.

   The support socket 57 is shown only in a position 33 'of the column 33, indicated by dashed lines in FIG. 6, the corresponding position of the strut 34 being denoted by 34'. The support winch 56 is shown in Fig. 6 in full lines Darge provides, between a pin 59 which is provided on the frame 35, and the ground. Of course, there are two support jacks 56, one for each side of the lower unit 1.



  The two rear feet 25 are provided with upper and lower plates 60 and 61, respectively, where on he stere corresponding foot plates 62 of the Grundge stell 2 can be screwed. The two lower plates 61 are connected to each other by existing flat iron, welded cross members 63 and each see ver with a front incision 64 which can be pushed onto a bolt 65 from behind. The screw bolt is anchored in a foundation base 66, which is buried in the ground at the installation site of the concreting plant on a suitable gravel or stone base.

   The two front feet 24 are similarly provided with upper and lower plates 67 and 68. The latter are also verbun by crossbars 69 but provided with rear notches 70 in order to be pushed onto the screw bolts 64 of corresponding foundation sockets 66 from the front.



  The dismantling of the system will now be explained first starting from the operating position according to FIG. 2: First, the elevator bucket 44 is brought into an upper position (see FIG. 1) and secured in the same. The extension rails 45 are abmon benefits. The two posts 46 are mounted on top of the columns 31 by means of the Bri th 47. The winch 49 is mounted at the bottom of the left column 31. The travel axis 12 with the bicycles 11 and the travel frame 8 are brought under the system separately from one another, are attached to one another by means of screws 71, and are fastened to the cross members 10 of the base frame 2 by means of the screws 9. The feet 24 and 25 are so high that the bicycles 11 and the feet 29 of the support frame 28 do not touch the ground.

   Now a strong pad 72 made of beams, planks or the like is pushed under the feet 29 of the support frame 28, for which the drawbar 13 can possibly be raised a little by means of the crank 27, after loosening the screws that hold the base frame 2 on the feet 24 , 25 hold tight. The rope 51 is brought into the position of FIGS. 3 and 4. The screws which are used to fasten the two rear fastening heads 37 of the swivel frame 6 to the head pieces 39 of the base frame 2 are loosened.



  After these preparations, the two support winches 56 on both sides of the system between tween the pins 55 and the support sockets 57 of the still vertical swivel frame columns 33 are used almost horizontally and the swivel frame 6 is pushed away from the base frame 2 by means of the same, while at the same time the rope 51 is removed from the winch 49 is rolled down accordingly by turning the crank 50. In a certain intermediate position, e.g. B. slightly to the right of the position 33 ', 34', the pivot point of the upper unit 16 and the pivot frame 6 comes to lie in front of the ideal axis 7, so that the rope 51 is tensioned and prevents tilting of the pivot frame 6 forwards, while the support winches 56 can be removed.

    Now the rope 51 is extended by means of the winch 49 until the upper unit 16 finally comes to rest on the tipping bridge 17 of the truck 15, whereupon the feet 38 of the upper frame 18 are released from the fastening heads 36 and 37 of the swivel frame 6 and the Tipping bridge 17 is placed horizontally.

   It should be emphasized that when the upper unit 16 is pivoted downward, the common pivot point of the two units 1 and 16 approaches the vertical transverse plane through the support frame 28 from behind, but always remains behind this plane; if this were not the case, the connections between the base frame 2 and the feet 24 and 25 could not be released and, under certain circumstances, the feet 24 and 25 would have to be torn away from the foundation bases 66 or even these bases 66 would have to be torn out of the ground fear.



  After the described loading of the upper assembly 16, the swivel frame 6 must now be erected again. For this purpose, the rope 51 is brought into the position of FIGS. 6 and 7 and rolled up by means of the rope winch 49. Shortly before the swivel frame comes into the position indicated at 33 ', 34', the support winches 56 are inserted again between the bolts 55 and the support sockets 57 in order to avoid tilting the swivel frame 6 back into its vertical position, in which it is by means of the Landing jacks 56 is gently lowered. Then the swivel frame 6 is attached to the base frame 2 again.



  Now the drawbar 13 is raised by means of the crank 27, so that the pad 72 and the one in front of its feet 24 can be removed after loosening the nuts (not shown) sitting on the screw bolt 64. If you then lower the drawbar 13 by means of the crank 27, the bicycles 11 come to the ground. Assembling the post 46 and the winch 49, the focus of the un direct unit is slightly in front of the wheels 11, so that the base frame 2 lifts from the rear feet 25 and the latter can be removed. Now the eyelet 14 of the drawbar 13 can be hung on the truck 15 and the system is ready for transport. To assemble the system you go in the wesent union in the opposite direction to dismantling.

   It is of particular advantage that the truck is not required for the assembly, in which the upper unit 16 can be stored on the floor or on logs 73 (see FIG. 6) if the truck is immediately after transporting the system has to drive away to the construction site. After releasing the drawbar 13 from the truck 15, the drawbar 13 is lowered by means of the crank 27 so far that the rear footplates 62 are slightly higher than the upper plates 60 of the rear feet 25, which have already been arranged on their sockets 66 are (see Fig. 1).

   Now you push the lower unit 1 by hand to its assembly area, which is possible without difficulty because the wheels 11 and the swivel wheel 26 are mounted on ball bearings, not shown, with very little friction. By lifting the drawbar 13 you first put the rear foot plates 62 on the plates 60 and then lift the wheels 11 from the ground and thus the front foot plates 62 so high that you push the feet 24 under the same on their base 66 can. If the front foot plates 62 are now lowered onto the upper plates 67 of the front feet 24, the wheels 11 remain at a small distance from the ground so that they can be dismantled with their axis 12 and the driving frame 8.

    After assembly of the posts 46 and the cable winch 49, the swivel frame 6 is swiveled down into the position of FIG. 6 using the support 56 'and the cable 51 laid over the rollers 52, whereupon the upper unit 16 on Swivel frame 6 is fastened, whereby you can attach the support winches 56 between the ground and the pin 59 to align the swivel frame 6 on the feet 38.

   The upper unit 16 is now pivoted upwards by means of the roller 54 (see FIGS. 3 and 4) and the pivot frame 6 is attached to the base frame 1. Furthermore, the base frame 2 is now also attached to the feet 24 and 25, which is necessary with regard to the possible wind pressure. After attaching the extension rails 45 and connecting the connection channel 23 to the balance 4, the system is ready for use.



  Compared to the known concreting system mentioned at the beginning, the system described has very great advantages: The upper unit 16 is erected with a much lower cable pull because the pivot axis 7 is close to the ground and not at the upper edge of the lower unit.

   Catching the upper unit when passing through the unstable equilibrium position is completely safe because the workers operating the support winches 56 can stand on the ground instead of climbing around on the lower unit.

   When driving, the mixing drum 3 is in its normal position, so that it does not require any security. The lower unit does not need to be tilted by 90 as a whole, for which purpose the rear feet of the lower unit in the known system had to be linked to hinged floor anchors and raised using an all-wheel-drive truck that was also required to pull the rope, which was especially important tight construction sites was very difficult.

   Rather, the whole assembly can be carried out without any help from the truck and only takes about half the time as with the known system. There is also no special device on the bridge of the truck necessary, as is necessary for loading the upper unit of the known system in practice.



  Compared to another known concreting plant, which does not consist of two separable units, but has a single frame in which the cement silo is firmly attached above the concrete mixer and that as a result of special measures with the help of the all-wheel-drive truck used for transport using a trailer axle can be set up, the system described also has very great advantages. In particular, the length of the entire lorry and the weight trailed on the trailer is much less, which is of great importance because of the road traffic regulations.

   As soon as the whole lorry has a certain limit length, e.g. B. exceeds 18 m, namely a special driving permit is required for each individual trip, and if the weight of the trailer a certain ge limit; z. B. exceeds 1500 kg, the same must be provided with compressed air brakes controlled by the truck, which causes very significant costs. That in contrast to a known system of the same performance, z.

   B. with a mixing drum for 350-1 batches, in the descriptive system in the vehicle state, both of the above-mentioned limits are not reached, is a very big advantage. Another advantage is the usability of a conventional cement log frame for the upper unit, i. H.

   it can be used as the upper unit already standardized units who previously set up on the floor or mounted with the help of cranes above the mixer who the. The maneuverability in tight construction sites is also much greater, and you don't need any hinges set in concrete in the foundation, no four-wheel drive vehicle to erect, no special securing of the mixer on the way, no very skilled driver, etc.

   Most of the above-mentioned advantages as well as further advantages are also achieved compared to other known, relatively easily transportable and erectable without a crane concreting systems, but which differ structurally from the system described even more than the systems of the type mentioned.

 

Claims (1)

PATENTANSPRUCH Leicht transportable, ohne Kran aufstellbare Be- tonieranlage mit einem unteren Aggregat, das einen Betonmischer umfasst, und einem auf diesem unteren Aggregat lösbar befestigten oberen Aggregat, das ein Zementsilo umfasst und mittels eines am unteren Aggregat montierbaren Seiles auf letzteres hinauf bzw. PATENT CLAIM Easily transportable concreting plant that can be set up without a crane, with a lower unit, which includes a concrete mixer, and an upper unit which is releasably fastened to this lower unit and which includes a cement silo and which can be mounted on the lower unit by means of a rope that can be mounted on the latter. von letzterem heruntergeschwenkt werden kann, wobei das obere Aggregat für den Transport auf einem Lastkraftwagen verladen werden kann, der das auf Rädern montierte untere Aggregat nach sich zieht, dadurch gekennzeichnet, dass das Gestell des unteren Aggregates (1) aus einem Grundgestell (2) und einem an demselben anaelenkten Schwenkgestell (6) mit in Bodennähe befindlicher Schwenkachse (7) besteht, wobei der Betonmischer (3) am Grundgestell (2) montiert ist, während das obere, den Zementsilo (19) umfassende Aggregat auf dem Schwenkgestell (6) lösbar befestigt ist; can be swiveled down from the latter, the upper unit can be loaded for transport on a truck, which entails the lower unit mounted on wheels, characterized in that the frame of the lower unit (1) consists of a base frame (2) and one on the same articulated swivel frame (6) with a swivel axis (7) located near the ground, the concrete mixer (3) being mounted on the base frame (2), while the upper unit, comprising the cement silo (19), is detachable on the swivel frame (6) is attached; und dass für das am unteren Aggregat (1) montierbare Seil (51) zwei Montagela gen vorgesehen sind, wobei es in der einen Montage lage am oberen Ende des auf dem Schwenkgestell (6) befestigten, oberen Aggregates (16) angreift, während es bei vom Schwenkgestell (6) gelöstem oberem Aggregat (16) in der anderen Montagelage zu benüt zen ist, in welcher es am oberen Ende des Schwenk gestelles (6) angreift. and that for the cable (51) that can be mounted on the lower unit (1) two Montagela conditions are provided, wherein it engages in one mounting position at the upper end of the upper unit (16) attached to the swivel frame (6), while it engages from the swivel frame (6) detached upper unit (16) in the other mounting position is to be benüt zen, in which it engages the upper end of the swivel frame (6). UNTERANSPRÜCHE 1. Betonieranlage nach Patentanspruch, dadurch gekennzeichnet, dass das untere Aggregat (1) eine Deichsel (13) umfasst, mittels welcher es am Lastwa gen (15) angehängt werden kann; dass am vorderen Ende dieser Deichsel (13) ein Schwenkrad (26) mit einer Einrichtung (27) zu Höhenverstellung derselben vorgesehen ist; dass die Deichsel (13) hinter diesem Schwenkrad (26) mit einem Stützbock (28) versehen ist; und dass der gemeinsame Schwerpunkt der bei den Aggregate (1, 16) sich auch bei auf den Boden herabgeschwenktem oberem Aggregat noch hinter diesem Stützbock (28) befindet. SUBClaims 1. Concreting plant according to claim, characterized in that the lower unit (1) comprises a drawbar (13) by means of which it can be attached to the truck (15); that at the front end of this drawbar (13) a swivel wheel (26) with a device (27) for adjusting the height thereof is provided; that the drawbar (13) is provided with a support frame (28) behind this swivel wheel (26); and that the common center of gravity of the units (1, 16) is still behind this support frame (28) even when the upper unit is pivoted down to the floor. z. Betonieranlage nach Unteranspruch 1, dadurch gekennzeichnet, dass die Deichsel (13) von einem Fahrrahmen (8) gebildet ist, der eine mit zwei Rädern (11) versehene Fahrachse (12) aufweist und lösbar am Grundgestell (2) befestigt ist. 3. Betonieranlage nach Unteranspruch 1, dadurch gekennzeichnet, dass das Grundgestell (2) in der Be triebslage auf Füssen (24, 25) ruht, die unter Sinken und Anheben der Deichsel (13) mittels der Höhen verstellvorrichtung (27) des Schwenkrades (26) unter das Grundgestell (2) geschoben worden sind, bzw. z. Concreting plant according to dependent claim 1, characterized in that the drawbar (13) is formed by a traveling frame (8) which has a traveling axis (12) provided with two wheels (11) and is detachably attached to the base frame (2). 3. Concreting plant according to dependent claim 1, characterized in that the base frame (2) in the loading operating position rests on feet (24, 25), the lowering and raising of the drawbar (13) by means of the height adjustment device (27) of the swivel wheel (26 ) have been pushed under the base frame (2) or unter demselben weggenommen werden können. 4. Betonieranlage nach Unteranspruch 3, dadurch gekennzeichnet, dass zwei vordere Füsse (24) und zwei hintere Füsse (25) vorgesehen sind, die je durch Traversen (69, bzw. 63) miteinander verbunden sind und Fussplatten (68, bzw. 61) aufweisen, die mit hin teren, bzw. vorderen Einschnitten (70, bzw. 64) ver sehen sind, zwecks Aufschieben auf Verankerungs- schraubenbolzen (64). 5. Betonieranlage nach Patentanspruch, dadurch gekennzeichnet, dass das Grundgestell (2) und das Schwenkgestell (6) Streben (32, bzw. 34) aufweisen, die bei aufgerichtetem Schwenkgestell (6) nebenein ander liegen. under the same can be taken away. 4. Concreting plant according to dependent claim 3, characterized in that two front feet (24) and two rear feet (25) are provided, which are each connected to one another by cross members (69, or 63) and foot plates (68, or 61) have, which are seen with back or front notches (70, or 64) ver, for the purpose of pushing on anchoring screw bolts (64). 5. Concreting plant according to claim, characterized in that the base frame (2) and the swivel frame (6) have struts (32, or 34) which are next to each other when the swivel frame (6) is erected. 6. Betonieranlage nach Patentanspruch, dadurch gekennzeichnet, dass zwei Pfosten (46) und eine Seil winde (49) vorgesehen sind, die am Grundgestell (2) montierbar sind, so dass die Pfosten von demselben nach oben vorragen; und dass das Seil (51) in seinen beiden Montagelagen von der Seilwinde (49) über eine am oberen Ende des einen Pfostens (46) ange brachte Rolle (48) und mindestens eine weitere am oberen Aggregat (16) bzw. am Schwenkgestell (6) be festigte Rolle (54, bzw. 52) zum oberen Ende des an deren Pfostens (46) geführt ist. 6. Concreting plant according to claim, characterized in that two posts (46) and a rope winch (49) are provided which can be mounted on the base frame (2) so that the posts protrude upward from the same; and that the cable (51) in its two assembly positions from the cable winch (49) via a roller (48) attached to the upper end of one post (46) and at least one other roller (48) on the upper unit (16) or on the swivel frame (6 ) be solidified role (54, or 52) is guided to the upper end of the post (46). 7. Betonieranlage nach Patentanspruch, dadurch gekennzeichnet, dass am Grundgestell (2) und am Schwenkgestell (6) in vom Boden aus bequem er reichbarer Höhe je zwei Paare von zum Ansetzen zweier Stützwinden (56) dienender Organe (55, 57) vorgesehen sind, wobei diese Stützwinden (56) zur Bewegung des Schwenkgestelles (6) dienen, solange es bei der Montage oder Demontage die Neigung hat, sich unter dem Einfluss der Schwerkraft nach hinten zu verschwenken. B. 7. Concreting plant according to claim, characterized in that two pairs of organs (55, 57) serving to attach two support jacks (56) are provided on the base frame (2) and on the swivel frame (6) at a height that is easily accessible from the ground, these support winches (56) serving to move the swivel frame (6) as long as it has a tendency during assembly or disassembly to pivot backwards under the influence of gravity. B. Betonieranlage nach Unteranspruch 7, dadurch gekennzeichnet, dass am oberen Ende des Schwenk gestelles (6) zwei Organe (59) vorgesehen sind, die zum Aufsetzen derselben Stützwinden (56) zwischen dem Boden und dem Schwenkgestell (6) benützbar sind, wenn letzteres nach unten geschwenkt ist. Concreting plant according to dependent claim 7, characterized in that two organs (59) are provided at the upper end of the swivel frame (6) which can be used to place the same support winches (56) between the ground and the swivel frame (6) when the latter is down is pivoted.
CH1558864A 1964-12-02 1964-12-02 Easily transportable concreting plant that can be set up without a crane CH423589A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CH1558864A CH423589A (en) 1964-12-02 1964-12-02 Easily transportable concreting plant that can be set up without a crane
AT1081665A AT252083B (en) 1964-12-02 1965-12-01 Easily transportable concreting plant that can be set up without a crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH1558864A CH423589A (en) 1964-12-02 1964-12-02 Easily transportable concreting plant that can be set up without a crane

Publications (1)

Publication Number Publication Date
CH423589A true CH423589A (en) 1966-10-31

Family

ID=4410353

Family Applications (1)

Application Number Title Priority Date Filing Date
CH1558864A CH423589A (en) 1964-12-02 1964-12-02 Easily transportable concreting plant that can be set up without a crane

Country Status (2)

Country Link
AT (1) AT252083B (en)
CH (1) CH423589A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0004695A2 (en) * 1978-04-11 1979-10-17 N.V. Mulder's Fabriek van Rollend Materieel A transportable installation for mixing concrete
WO2013123699A1 (en) * 2012-02-23 2013-08-29 湖南三一智能控制设备有限公司 Split-type mobile mixing station capable of being mounted fast

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1684052B1 (en) * 1966-10-15 1971-04-15 Luigi S Caterina Zaccaron Mobile concrete preparation plant
KR101211944B1 (en) 2007-09-21 2012-12-13 생-고벵 아브라시프 Phenolic resin formulation and coatings for abrasive products

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0004695A2 (en) * 1978-04-11 1979-10-17 N.V. Mulder's Fabriek van Rollend Materieel A transportable installation for mixing concrete
EP0004695A3 (en) * 1978-04-11 1979-10-31 N.V. Mulder's Fabriek van Rollend Materieel A transportable installation for mixing concrete
WO2013123699A1 (en) * 2012-02-23 2013-08-29 湖南三一智能控制设备有限公司 Split-type mobile mixing station capable of being mounted fast

Also Published As

Publication number Publication date
AT252083B (en) 1967-02-10

Similar Documents

Publication Publication Date Title
DE68915599T2 (en) Hydraulic scaffold.
WO2006058751A2 (en) Vehicle crane
EP0038954B1 (en) Self-propelled concrete pump
EP0283542B1 (en) Noise barrier
DE8911634U1 (en) Amusement device that can be transported in parts for fairs or the like, especially a Ferris wheel
EP2366518A2 (en) Mobile concrete mixer and method for transport and assembly thereof
DE3106140A1 (en) Bridge-laying unit for dismantlable, transportable bridges
DE1255902B (en) Process for erecting buildings from prefabricated space boxes
DE102008061334B4 (en) Device for handling heavy objects
CH423589A (en) Easily transportable concreting plant that can be set up without a crane
DE3911868A1 (en) TOWER TURNING CRANE, PREFERABLY TURNING TURN TURNING CRANE
DE4021948C2 (en) Transportable mixing plant for construction sites
DE69810981T2 (en) Technique for erecting the mast for a telescopic crane
DE3739645C2 (en) Portable plant for the production of concrete
DE3042287A1 (en) Heavy-duty telescopic crane jib - has fly jib attached by pivot pins to main jib and gantry
DE19704967C2 (en) Gantry crane, in particular for the construction of buildings
DE19820074C2 (en) Floor support for changing between high and low positions of goods to be transported and for using them
DE3546036A1 (en) Building machine
DE3915090A1 (en) Portal-like erection crane for erecting and dismantling panel and large-area formwork for round reinforced-concrete tanks
DE4126768C2 (en) Method for moving a construction elevator into a ready-to-move transport position
DE702409C (en) Foldable gantry crane
DE2106334A1 (en) Movable ^ concrete manure plant
AT215631B (en) Tower crane
DE1284344B (en) Mobile concrete preparation plant
DE2360755C2 (en) Working platform