CH363603A - concrete mixer - Google Patents

concrete mixer

Info

Publication number
CH363603A
CH363603A CH6599858A CH6599858A CH363603A CH 363603 A CH363603 A CH 363603A CH 6599858 A CH6599858 A CH 6599858A CH 6599858 A CH6599858 A CH 6599858A CH 363603 A CH363603 A CH 363603A
Authority
CH
Switzerland
Prior art keywords
concrete mixer
mixer according
dependent
drum
motor
Prior art date
Application number
CH6599858A
Other languages
German (de)
Inventor
Duerst Felix
Original Assignee
Duerst Felix
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Duerst Felix filed Critical Duerst Felix
Priority to CH6599858A priority Critical patent/CH363603A/en
Priority to CH6724658A priority patent/CH368407A/en
Priority to DED30423A priority patent/DE1147521B/en
Priority to BE584483A priority patent/BE584483A/en
Priority to GB38081/59A priority patent/GB882783A/en
Publication of CH363603A publication Critical patent/CH363603A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/08Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions using driven mechanical means affecting the mixing
    • B28C5/18Mixing in containers to which motion is imparted to effect the mixing
    • B28C5/1825Mixers of the tilted-drum type, e.g. mixers pivotable about an axis perpendicular to the axis of rotation for emptying
    • B28C5/185Mixers of the tilted-drum type, e.g. mixers pivotable about an axis perpendicular to the axis of rotation for emptying having driven stirrers, e.g. driven from underneath
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01FMIXING, e.g. DISSOLVING, EMULSIFYING OR DISPERSING
    • B01F35/00Accessories for mixers; Auxiliary operations or auxiliary devices; Parts or details of general application
    • B01F35/30Driving arrangements; Transmissions; Couplings; Brakes
    • B01F35/32Driving arrangements
    • B01F35/321Disposition of the drive
    • B01F35/3213Disposition of the drive at the lower side of the axis, e.g. driving the stirrer from the bottom of a receptacle

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Description

  

      Betonmischer       Die Erfindung     betrifft    einen Betonmischer mit  rotierender Mischtrommel und in derselben angeord  netem Rührwerk. Derartige Betonmischer werden  auch als Zwangsmischer bezeichnet und haben gegen  über den     Fallmischern    den Vorteil,     eine    bessere       Durchmischung    des Mischgutes zu     gewährleisten,    so  dass u. a. zur Erzielung der gleichen Betongüte ge  ringere Zementdosen nötig sind.

   Bekannte Zwangs  mischer haben den Nachteil, dass vor dem Entleeren  der Mischtrommel das Rührwerk aus letzterer her  ausgezogen und     ferner    die Mischtrommel von dem  zu ihrem Antrieb dienenden Motor abgekuppelt wer  den muss, was die Konstruktion     erheblich    kompli  ziert und die Arbeit verzögert. Der Betonmischer  nach der Erfindung, durch welchen diese Nachteile  behoben werden, zeichnet sich dadurch aus, dass  mindestens die     Mischtrommel    und das in     letzterer     ortsfest     montierte    Rührwerk gemeinsam um eine  mindestens angenähert horizontale Achse schwenkbar  sind und dass die Mischtrommel ständig in Antriebs  verbindung mit einem zu ihrem Antrieb dienenden  Motor ist.  



  Eine bevorzugte Ausführungsform des     erfin-          dungsgemässen    Betonmischers zeichnet sich aus  durch ein die Mischtrommel, den zu deren Antrieb  dienenden Motor und das Rührwerk umfassendes  Mischaggregat, das als Ganzes um die genannte  Achse schwenkbar ist, wobei die Mischtrommel, die  von oben zu füllen ist, sich in ihrer Arbeitslage ober  halb, in ihrer Entleerungslage dagegen unterhalb des  Motors befindet.  



  In der     Zeichnung    sind zwei Ausführungsbeispiele  des Erfindungsgegenstandes schematisch dargestellt.       Fig.    1 zeigt einen ersten Betonmischer im Schnitt  gemäss Linie 1-I von     Fig.    2, unter Weglassung eini  ger Einzelheiten ;         Fig.    2 ist eine Ansicht in Richtung des Pfeiles     II     von     Fig.    1, jedoch bei senkrecht gestellter Trommel ;       Fig.    3 ist eine Seitenansicht eines zweiten Be  tonmischers, bei senkrecht stehender Trommel ;

         Fig.    4 ist ein Schnitt gemäss der Linie     IV-IV     von     Fig.    3, aber bei etwas geneigter Trommel ; und       Fig.    5 ist ein Schema zur Erläuterung der Spei  sung eines im Betonmischer nach     Fig.    3     und    4 vor  gesehenen     Dosierbehälters.     



  Der Betonmischer nach     Fig.    1 und 2 weist ein  Gestell 1 auf, das schwenkbar auf einer Achse 2  gelagert ist, an deren Enden zwei Räder 3 montiert  sind. Das Gestell 1 weist eine Deichsel 4 auf und  zwei auf derselben senkrechte Streben 5, an deren  oberen Ende eine horizontale Achse 6     mittels    zweier  Schrauben 7 befestigt ist. An die Streben 5 sind bei  8     zwei    Beine 9     angelenkt,    die     beim    Fahren nach  oben geschwenkt werden und beim Betrieb des Be  tonmischers auf nicht näher dargestellte Weise in der  dargestellten Lage festgestellt werden, in welcher sie  sich auf dem Boden abstützen.

   Um im Betrieb eine  Schwenkung des Gestells 1 im     Gegenuhrzeigersinne     von     Fig.    1 zu     verhindern,    wird irgend ein     Holzklotz     10 oder dergleichen unter die Deichsel 4 gelegt.  



  Auf der Achse 6 ist ein Rohr 11 drehbar gela  gert, an welches eine Grundplatte 12 angeschweisst  ist. Auf der unteren Seite der Grundplatte 12 ist ein  Reduktionsgetriebe 13 montiert, an welches ein Elek  tromotor 14 angeflanscht ist. Auf der kurzen Aus  gangswelle 15 des Reduktionsgetriebes 13, die durch  die Grundplatte 12 hindurch geht, ist der Boden 17  der Mischtrommel 18 zentral befestigt.  



  Die Trommel 18 ist oben teilweise durch eine  im wesentlichen rechteckige Montageplatte 19 abge  deckt, die jedoch nicht am oberen Rande des Trom  melmantels 20 befestigt ist, sondern drei Arme 21,  22 und 23     aufweist,    die sich über den Mantel 20      nach aussen erstrecken, wobei die äusseren Enden der  Arme 21-23 mittels Schrauben 24-26 an den oberen  Enden dreier Streben 27-29     befestigt    sind. Die Strebe  27 ist um 900 abgewinkelt und an der Grundplatte'  12     angeschweisst,        während    die Streben 28     und    29  gerade und unmittelbar auf das Rohr 11     aufge-          schweisst    sind.

   An die Strebe 29 ist ein nach oben  ragender     Griff    30 angeschweisst, der in     Fig.    1 nicht  dargestellt ist und zum Kippen der Trommel 18 und  der mit ihr verbundenen Teile um die Achse 6 dient.  



  An der Montageplatte 19 ist unten ein an sich  bekanntes Rührwerk 31     ortsfest    montiert. Das Rühr  werk 31 weist zwei um eine Achse 32 drehbare Schau  feln 33 und 34 auf, die starr miteinander verbunden  sind und einander in bezug auf die Achse 32 diame  tral gegenüberliegen.

   Das Rührwerk 31 weist fer  ner noch zwei     Schaufeln    35 und 36 auf, wobei die  Schaufel 35 über einen Haltestab 37 fest an der  Montageplatte 19     montiert    ist, während die Schaufel  36 mittels der Achse 38 schwenkbar an dieser Platte  montiert ist und als Abstreifer dient.     In        Fig.    1 sind  die     Schaufeln    35 und 36 weggelassen und die Schau  feln 33 und 34 in einer um     90o    gegenüber     Fig.    2  gedrehten Lage dargestellt.  



  An den Längsrändern der Montageplatte 19 sind  zwei     kreissegmentförmige,    geneigte Bleche 39 und 40  angeschweisst. Neben der Montageplatte 19 ist die  Trommel 18 offen. Die beiden durch die Platte 19  frei gelassenen,     kreissegmentförmigen    Öffnungen, die  zum     Füllen,    respektive Entleeren der Trommel 18  dienen, sind mit 41 und 42 bezeichnet. Eine kleine  mittlere Zone der Öffnung 41 ist zwar durch den  Arm 21 abgedeckt, der bei 43 leicht     abgekröpft    ist;  da der Arm 21 sehr schmal ist, wird der     Einfüllvor-          gang    dadurch aber nicht beeinträchtigt.  



  Das die Trommel 18, den Motor 14, das Reduk  tionsgetriebe 13 und das Rührwerk 31 umfassende,  um die Achse 6 schwenkbare Mischaggregat hat in  der in     Fig.    1 gezeigten Arbeitslage die Neigung, sich  im     Gegenuhrzeigersinne    zu     verschwenken,    weil die  Achse 6     seitlich    zur Trommelachse versetzt ist. Eine       Verschwenkung    in diesem Sinne wird aber durch  zwei Anschläge 44     verhindert,    die am Rohr 11 be  festigt     sind    und auf zwei Gegenanschlägen 45 ruhen,  die von den Streben 5 nach innen ragen.  



  Der beschriebene Betonmischer wird auf fol  gende Weise bedient  Der Arbeiter schaufelt das Mischgut,     also    Sand,  Zement und Kies, durch die Öffnung 41 in die  Trommel 18, wobei zu hoch geworfenes Material  vom Blech 39 aufgefangen wird und an demselben  herab in die Öffnung 41 rutscht. Eventuell kann  auch die Öffnung 42 zum Einfüllen des Mischgutes  verwendet werden, weshalb das Blech 40 vorgesehen  ist. Das gewünschte Quantum Wasser wird z. B.  mittels eines nicht dargestellten Schlauches in die  Trommel 18 eingefüllt. Der Motor 14 wird normaler  weise während des     Einfüllens    gar     nicht    abgeschaltet,  so dass sich die Trommel 18     dauernd    dreht und das    Material schon während des Einfüllens gemischt wird.

    Das an der Montageplatte 19 montierte Mischwerk  31 arbeitet in an sich bekannter Weise so, dass die       Schaufeln    33 und 34 durch das in der Trommel 18  befindliche Material in Drehung um ihre Achse 32  versetzt wird, wobei diese Achse 32 sich aber lang  samer dreht als die Trommel 18. Die Schaufel 36  pendelt unter der variablen     Einwirkung    des mit ihr  in Berührung kommenden Materials etwas um ihre  Achse 38, während die Schaufel 35 das Material von  der Trommelwand 20 abstreift und nach der Mitte  der Trommel hin bewegt. Auf diese     Art    wird das  Material sehr rasch und gut gemischt.

   Die Mischung  mittels Rührwerks wird üblicherweise als   Zwangs  mischung   bezeichnet, während die Mischung in ho  rizontalachsigen Trommeln, bei welchen das Mate  rial durch an der Trommel befestigte Schaufeln je  weils ein Stück weit mitgenommen wird und dann  von denselben herab fällt, als      < :    Fallmischung   be  zeichnet wird.  



  Wenn die Trommel 18 voll und das Material  genügend gemischt ist, was z. B. etwa 2 Minuten  nach Füllung der Trommel 18 der Fall sein kann,  fasst der Arbeiter den Griff 30 und kippt die Trom  mel um die Achse 6 im     Uhrzeigersinne    von     Fig.    1,  so dass die Trommel sich durch die Öffnung 42 ent  leert. In der Entleerungslage befindet sich der Motor  14 oberhalb der Trommel 18 und dient als Gegen  gewicht für letztere, so dass nicht dargestellte Gegen  anschläge, auf welche die Anschläge 44 in der Ent  leerungslage zu liegen kommen, nicht zu stark be  lastet werden.  



  Der grosse     Vorteil    des beschriebenen     Beton-          Zwangsmischers    gegenüber bekannten Zwangsmi  schern besteht darin, dass es nicht nötig ist, das  Rührwerk aus der Trommel herauszunehmen und  den Motor, bzw. das Reduktionsgetriebe von der  Trommel abzukuppeln, um letztere kippen und ent  leeren zu können. Nach dem Entleeren der Trom  mel 18 wird dieselbe mittels des Griffes 30 in die  Lage nach     Fig.    1 zurückgeschwenkt, worauf ohne  weiteres mit dem Mischen eines neuen Betonquan  tums begonnen werden kann, ohne das Rührwerk in  die Trommel einbringen und die Trommel wieder  mit dem Motor     kuppeln    zu müssen.

   Bei gleichem       Trommelinhalt    ist die Tagesleistung des beschriebe  nen Mischers somit bedeutend höher als diejenige  der bekannten Mischer.  



  Ein weiterer     Vorteil    des beschriebenen Betonmi  schers ist der, dass die Montageplatte 19 mit dem  daran angebrachten Rührwerk 31 sehr leicht demon  tiert werden kann, indem hierzu lediglich die drei  Schrauben 24-26 zu lösen sind. Die Montageplatte  19 ist somit lediglich in drei Punkten mit den nicht  rotierenden Teilen des Mischaggregates verbunden.  



  Es sei noch hervorgehoben, dass die Trommel  achse in der Arbeitslage um einen spitzen Winkel  von z. B.     10-20o    zur     Vertikalen    geneigt ist, um das       Einschaufeln    des Materials in die Öffnung 41 zu       erleichtern.    Ausserdem wird durch die Schräglage      der Mischtrommel die     Durchmischung    des Materials       gefördert,    wie die Erfahrung zeigt.  



  Im Ausführungsbeispiel nach     Fig.    3-5 sind ent  sprechende Teile mit den gleichen Bezugszeichen  versehen wie in den     Fig.    1 und 2. Diese Teile wer  den in Folgendem nur noch soweit erwähnt, als es  zum Verständnis ihres Zusammenwirkens mit den  übrigen Teilen     erforderlich    ist.  



  Auf dem Gestell 1 ist ein     quaderförmiger    Behäl  ter 46     montiert,    der durch Zwischenwände 47 und  48 hauptsächlich in drei Abteilungen 49-51 unter  teilt ist. Die Abteilung 49 dient als Zementsilo, wo  bei die Zwischenwand 47 den Boden dieses Silos  bildet und so geneigt ist, dass der Zement einem  Auslaufstutzen 52 zustrebt, der sich über die ganze  Breite des Silos 49 erstreckt. Eine Klappe 53 ist an  zwei Laschen 54 befestigt, die um eine Achse 55  schwenkbar sind, welche von zwei am Behälter 46  befestigten     Lagerböckchen    56 getragen wird.

   Die  beiden Laschen 54 sind unten durch einen Stab 57  verbunden, dessen über die Laschen 54 nach aussen  ragende Enden 58 als Handgriffe zur Bedienung der  Klappe 53 dienen, die in der dargestellten Lage den  Auslaufstutzen 52 verschliesst.  



  Unterhalb des Auslaufstutzens 52 befindet sich  ein oben offener     Dosierkasten    59, der mit zwei Hand  griffen 60 versehen ist und auf einem der Räder 3,  sowie auf einer kleinen, am Behälter 46 vorgesehenen  Konsole 61 abgestellt ist. Der Kasten 59 dient     dazu,     dem Silo 49 Zement zu entnehmen und durch die  Öffnung 41 in die Trommel 18 einzuschütten. Das  Zementsilo 49 ist oben durch einen aufklappbaren  Deckel 62 abgeschlossen, der mit einem Handgriff  63 versehen ist und dessen Scharniere mit 64 be  zeichnet sind.  



  Die Abteilung 50 des Behälters 46 bildet einen  Tank, in welchem sich eine Vergütungsflüssigkeit  befindet, die aus Wasser und in demselben gelösten,  bzw. suspendierten Chemikalien besteht und durch  deren Beimischung die Qualität des Betons in be  kannter Weise     verbessert    wird. Jedesmal, wenn die  Trommel 18 mit Mischmaterial gefüllt wird, wird  eine bestimmte Dosis der Vergütungsflüssigkeit bei  gemischt. Zu diesem Zwecke ist auf der Montage  platte 19 ein     Dosierbehälter    65 vorgesehen, der auf  einer Seite durch das Auffangblech 39 begrenzt wird.  



  Der     Dosierbehälter    65 ist mit dem Tank 50 über  eine Leitung 66 (s.     Fig.    5), einen     Dreiweghahn    67,  eine     Vorlaufleitung    68 mit einer Pumpe 69 und einer       Rücklaufleitung    70 verbunden. Der     Bedienungsgriff     71 des     Dreiweghahnes    67 ist durch eine Zugfeder  72 mit einem Ventilteller 73 verbunden, der in der  in     Fig.    5 in vollen Linien gezeichneten Lage eine im  Boden des     Dosierbehälters    65 vorgesehene     Öffnung     74 schliesst, deren Rand den Ventilsitz bildet.

   Am       Dosierbehälter    65 ist ein     Flüssigkeitsstand-Anzeiger     75 vorgesehen, der, ebenso wie andere     Einzelheiten     von     Fig.    5 in den     Fig.    3 und 4 weggelassen ist. Die  Vorlauf- und die     Rücklaufleitung    68, bzw. 70 wer  den durch Schläuche gebildet, die genügend lang    sind, um bei     Verschwenkung    des Mischaggregates  in die Entleerungslage der Bewegung des am Dosier  behälter 65 angebrachten     Dreiweghahns    67 folgen zu  können.  



  Die Abteilung 51 des Behälters 46 bildet eben  falls einen Tank, der aber Wasser ohne Chemikalien  zusatz enthält. Der Tank 51 steht über eine Pumpe  76 und eine Leitung 77 mit der Trommel 18 in  Verbindung. In die Leitung 77 ist ein     regulierbares     Drosselventil 78 eingebaut.  



  Die Achse 6, auf welcher das Mischaggregat  schwenkbar gelagert ist, ist einerseits an zwei ein  ander gegenüberliegenden Wänden 79 und 80 des  Behälters 46 befestigt und anderseits auf einem Bein  9a abgestützt, so dass sie praktisch horizontal ist.  Das Bein 9a ist bei 81 auf der Achse 6 schwenkbar       gelagert    und mittels eines Stiftes 82 auf derselben  gesichert. Zum Fahren wird das Bein 9a um 1800       verschwenkt    und durch einen nicht dargestellten     Stift     gesichert. Wie aus     Fig.    4 hervorgeht, wird der Hand  griff 30 durch einen zu einer Schlaufe 83 gebogenen  Eisenstab gebildet, der am Rohr 11 angeschweisst  ist und einen unteren     Fortsatz    84 hat, an dessen  freiem Ende ein Pedal 84' angebracht ist.

   Quer zur  Schlaufe 83 ist an derselben eine Traverse 84"     an-          geschweisst,    die horizontal ist, wenn die Trommel in  ihrer Arbeitslage ist, und die sich dann mindestens       angenähert    in gleicher Höhe befindet wie der Deckel  62. Während der     Fahrt    kann man allerlei Geräte,  z. B.     Schaufeln    oder dergleichen, einerseits auf dem  Deckel 62 und anderseits auf der Traverse 84" ab  stützen. Der     Stabfortsatz    84 ist so lang, dass im  Falle eines     Kippens    des Gestells 1 um die Radachse  2 (bei hochgeklapptem Bein 9a) das Pedal 84' sich  auf dem Boden abstützt, bevor der Motor 14 auf  letzteren fallen und dadurch beschädigt werden kann.  



  Im Behälter 46 ist ausser den Abteilungen 49-51  noch eine Nische 85 vorgesehen, die mit einem     Dek-          kel    86 zugedeckt ist. In dieser Nische 85 befinden  sich elektrische Apparaturen, wie z. B. Schaltschüt  zen für die Stromkreise des Motors 14 und der mit  den Pumpen 69 und 76     zusammengebauten,    nicht  besonders dargestellten Motoren zum Antrieb dieser  Pumpen. Ferner befindet sich in der Nische 85 ein  Zeitschalter, der in den Schaltstromkreis des Motors  14 und des     zum    Antrieb der Pumpe 76 dienenden  Motors eingeschaltet und mit einem Druckknopf  schalter 87 verbunden ist. In der Nische 85 befin  den sich auch eine Steckdose zum Anschluss eines       Stromzuführungskabels,    Sicherungen und dergleichen.  



  Zum Einfüllen von Vergütungslösung     bzw.    Was  ser in die Tanks 50 und 51 sind     zwei    verschliessbare       Einfüllstutzen    88 vorgesehen, die in     Fig.    3 hinter  einander liegen.  



  In seiner dargestellten Arbeitslage wird das  schwenkbare Mischaggregat wiederum durch den  Anschlägen 44 und 45 von     Fig.    2 entsprechende  Anschläge an einer weiteren     Verschwenkung    im     Ge-          genuhrzeigersinne    von     Fig.    4     verhindert.    Diese An  schläge sowie entsprechende Anschläge für die Ent-           leerungslage    sind in der Zeichnung nicht dargestellt.

    Mit 89 ist ein am     Behälter    46 befestigter Druck  knopfschalter bezeichnet, der in der Entleerungslage  der Trommel von einem an seinem Ende entspre  chend geformten     Schaltann    90 betätigt wird, der  am Rohr 11 befestigt ist. Der Schalter 89 weist einen  Ruhekontakt auf, der sich im Schaltstromkreis des  zum Antrieb der Pumpe 76 dienenden Motors be  findet, und einen Arbeitskontakt, der zum Einschal  ten des     Trommelmotors    14 dient. Wenn die Trom  mel     entleert    wird, wird also über den     erwähnten     Arbeitskontakt der Motor 14 eingeschaltet, während  ein Antrieb der Pumpe 76     verhindert    wird.  



  Es sei noch erwähnt, dass auf der Deichsel 4,  neben dem Behälter 46, eine kleine Tritt- und     Ab-          stellbrücke    91 vorgesehen ist. Wenn der Arbeiter  Zement in das Silo 49 einfüllen will, kann er auf  diese Brücke 91 hinauf treten, die im übrigen wäh  rend der     Fahrt    zum Abstellen von allerlei Gerät  schaften benützt werden kann.  



  Der Betonmischer nach     Fig.    3-5 arbeitet wie  folgt  Sand und Kies werden wie im Falle von     Fig.    1  und 2 durch die Öffnung 41 in die Trommel 18  geschaufelt. Der Zement wird dem Silo 49 durch  Öffnen der Klappe 53 entnommen und mittels des  Kastens 59 in die Trommel 18 eingefüllt. Je nach  der gewünschten Zementdosis pro     Trommelfüllung     können Kasten 59 von verschiedener Grösse verwen  det werden.  



  Der zum Antrieb der Pumpe 69 dienende Motor  bleibt während des Betriebes des Mischers dauernd  eingeschaltet. In der in     Fig.    5     dargestellten    Lage  des     Dreiweghahnes    67     fördert    die Pumpe 69 Ver  gütungsflüssigkeit in den     Dosierbehälter    65. Wenn  am     Flüssigkeitsstand-Anzeiger    75 ersichtlich ist, dass  die gewünschte Dosis Vergütungsflüssigkeit in den       Dosierbehälter    gepumpt worden ist,     verschwenkt    der  Arbeiter den Bedienungsgriff 71 des     Dreiweghahnes     67 im     Uhrzeigersinne    von     Fig.    5 um 900.

   Dadurch  wird die Leitung 68 von der Leitung 66 abgeschaltet  und mit der Leitung 70 verbunden;     ferner    wird die  Öffnung 74 im Boden des     Dosierbehälters    geöffnet,  da die Feder 72 nun nicht mehr gespannt und der  Ventilteller 73 in die gestrichelt dargestellte Lage 73'  kommt.

   Der     Dosierbehälter    65 entleert sich daher  in die Trommel 18, während die Pumpe 69 die dem  Tank 50 entnommene Flüssigkeit über die Vorlauf  leitung 68, den     Dreiweghahn    67 und die     Rücklauf-          leitung    70 wieder in den Tank     zurückbefördert.    Diese       Umwälzung    der     Vergütungsflüssigkeit    ist deshalb er  wünscht,     weil    es sich meistens nicht um eine reine  Lösung, sondern um eine Suspension handelt, so dass  bei längerer Ruhe eine     Entmischung    von deren Be  standteilen     stattfinden    könnte.  



  Der zum Antrieb der     Trommel    18 dienende Mo  tor 14 und der zum Antrieb der Pumpe 76 dienende  Motor werden bei Betätigung des Druckknopfschal-         ters    87 über den früher erwähnten Zeitschalter ein  geschaltet, so dass die Trommel 18 sich dreht und  das Rührwerk 31 arbeitet, während die Pumpe 76  über die Leitung 77 und das Drosselventil 78 Was  ser in die Trommel 18 fördert. Nach Ablauf einer  vorbestimmten Zeit, z. B. von etwa 2 Minuten, schal  tet der Zeitschalter die beiden Motoren ab. Das  Drosselventil 78 wird so eingestellt, dass während  dieser Zeit gerade die für eine     Trommelfüllung    vor  geschriebene     Wassermenge    in die Trommel     fliesst.     



  Nach erfolgter Mischung kippt der Arbeiter das  Mischaggregat um die Achse 6 im     Uhrzeigersinne     von     Fig.    4, wobei er den Griff 30 mit der Hand  fasst und mit dem Fuss auf das Pedal 84' tritt. In  der     Entleerungslage    wird der Schalter 89 durch den  Schaltarm 90     betätigt,    so dass der Motor 14 wieder  eingeschaltet wird, ohne dass die Pumpe 76 Wasser       fördert.    Durch die Drehung der Trommel 18 wird  eine rasche Entleerung derselben bewirkt.

   Wenn der  Arbeiter die Trommel 18 wieder in die Arbeitslage  bringt, kehrt der Schalter 89 in seine Normallage zu  rück, so dass der Motor 14 wieder stillsteht, um  erst durch Betätigung des     Druckknopfschalters    87  wieder in Betrieb gesetzt zu werden.  



  Der Mischer nach     Fig.    3-5 eignet sich besonders  für sehr hochwertige Betonmischungen mit genau  vorgeschriebenen Dosierungen von Zement und Ver  gütungsflüssigkeit. Solche Mischungen werden u. a.  für die Herstellung von besonders verschleissfesten  Fussbodenbelägen benützt.



      Concrete mixer The invention relates to a concrete mixer with a rotating mixing drum and an agitator arranged in the same. Such concrete mixers are also referred to as compulsory mixers and have the advantage over drop mixers that they ensure better mixing of the mix so that u. a. lower cement doses are required to achieve the same concrete quality.

   Known compulsory mixers have the disadvantage that before emptying the mixing drum, the agitator is pulled out of the latter and the mixing drum must also be uncoupled from the motor used to drive it, which complicates the construction considerably and delays the work. The concrete mixer according to the invention, by means of which these disadvantages are eliminated, is characterized in that at least the mixing drum and the agitator fixedly mounted in the latter can be pivoted together around an at least approximately horizontal axis and that the mixing drum is constantly in drive connection with one of its The engine serving the drive is.



  A preferred embodiment of the concrete mixer according to the invention is characterized by a mixing unit comprising the mixing drum, the motor used to drive it and the agitator, which can be pivoted as a whole about the axis mentioned, the mixing drum, which is to be filled from above in their working position above half, in their emptying position, however, is below the engine.



  In the drawing, two exemplary embodiments of the subject matter of the invention are shown schematically. Fig. 1 shows a first concrete mixer in section along line 1-I of FIG. 2, omitting some details; Fig. 2 is a view in the direction of arrow II of Fig. 1, but with the drum in an upright position; Fig. 3 is a side view of a second Be clay mixer, with the drum standing upright;

         FIG. 4 is a section along the line IV-IV of FIG. 3, but with the drum slightly inclined; and Fig. 5 is a diagram for explaining the Spei solution of a dosing container seen in the concrete mixer of FIGS. 3 and 4.



  The concrete mixer according to FIGS. 1 and 2 has a frame 1 which is pivotably mounted on an axle 2, at the ends of which two wheels 3 are mounted. The frame 1 has a drawbar 4 and two struts 5 perpendicular to the same, at the upper end of which a horizontal axis 6 is fastened by means of two screws 7. At the struts 5, two legs 9 are hinged at 8, which are pivoted upwards when driving and are found in the position shown in the operation of the Be tonmischers in a manner not shown in which they are supported on the ground.

   In order to prevent the frame 1 from pivoting in the counterclockwise direction of FIG. 1 during operation, any block of wood 10 or the like is placed under the drawbar 4.



  On the axis 6, a tube 11 is rotatably Gela Gert, to which a base plate 12 is welded. On the lower side of the base plate 12, a reduction gear 13 is mounted to which an electric motor 14 is flanged. On the short output shaft 15 of the reduction gear 13, which goes through the base plate 12, the bottom 17 of the mixing drum 18 is attached centrally.



  The drum 18 is partially covered at the top by a substantially rectangular mounting plate 19, which is not attached to the upper edge of the Trom melmantels 20, but three arms 21, 22 and 23 which extend over the jacket 20 to the outside, wherein the outer ends of the arms 21-23 are attached by means of screws 24-26 to the upper ends of three struts 27-29. The strut 27 is angled by 900 and welded to the base plate 12, while the struts 28 and 29 are straight and welded directly onto the tube 11.

   An upwardly projecting handle 30, which is not shown in FIG. 1 and which is used to tilt the drum 18 and the parts connected to it about the axis 6, is welded to the strut 29.



  An agitator 31, known per se, is fixedly mounted at the bottom of the mounting plate 19. The agitator 31 has two rotatable about an axis 32 show blades 33 and 34, which are rigidly connected to each other and opposite each other with respect to the axis 32 diametrically opposite.

   The agitator 31 further has two blades 35 and 36, the blade 35 being fixedly mounted on the mounting plate 19 via a holding rod 37, while the blade 36 is pivotably mounted on this plate by means of the axis 38 and serves as a scraper. In Fig. 1, the blades 35 and 36 are omitted and the show blades 33 and 34 shown in a position rotated by 90o with respect to FIG.



  Two inclined metal sheets 39 and 40 in the shape of a segment of a circle are welded to the longitudinal edges of the mounting plate 19. In addition to the mounting plate 19, the drum 18 is open. The two circular segment-shaped openings left free by the plate 19, which are used for filling and emptying the drum 18, respectively, are denoted by 41 and 42. A small central zone of the opening 41 is covered by the arm 21, which is slightly bent at 43; however, since the arm 21 is very narrow, the filling process is not impaired.



  The drum 18, the motor 14, the reduc tion gear 13 and the agitator 31 comprehensive, pivotable about the axis 6 mixing unit has in the working position shown in Fig. 1, the tendency to pivot counterclockwise because the axis 6 is laterally to the drum axis is offset. Pivoting in this sense is prevented by two stops 44 which are fastened to the tube 11 and rest on two counter stops 45 which protrude from the struts 5 inward.



  The concrete mixer described is operated in the fol lowing manner.The worker shovels the mix, i.e. sand, cement and gravel, through the opening 41 into the drum 18, whereby material thrown too high is caught by the sheet 39 and slides down the same into the opening 41 . The opening 42 can possibly also be used for filling in the mixture, which is why the sheet metal 40 is provided. The desired amount of water is z. B. is filled into the drum 18 by means of a hose not shown. The motor 14 is normally not switched off at all during the filling process, so that the drum 18 rotates continuously and the material is already mixed during the filling process.

    The mixer 31 mounted on the mounting plate 19 works in a manner known per se so that the blades 33 and 34 are set in rotation about their axis 32 by the material in the drum 18, but this axis 32 rotates more slowly than the Drum 18. The blade 36 oscillates slightly about its axis 38 under the variable action of the material coming into contact with it, while the blade 35 scrapes the material from the drum wall 20 and moves it towards the center of the drum. In this way the material is mixed very quickly and well.

   Mixing by means of a stirrer is usually referred to as forced mixing, while the mixture in horizontal-axis drums, in which the material is carried along a little by blades attached to the drum and then falls down from the same, is referred to as <: falling mixture becomes.



  When the drum 18 is full and the material is mixed enough, what e.g. B. about 2 minutes after filling the drum 18 may be the case, the worker grabs the handle 30 and tilts the Trom mel about the axis 6 in the clockwise direction of FIG. 1, so that the drum empties through the opening 42 ent. In the emptying position, the motor 14 is above the drum 18 and serves as a counterweight for the latter, so that counter stops, not shown, on which the stops 44 come to rest in the Ent empty position, are not burdened too much.



  The big advantage of the concrete compulsory mixer described over known Zwangsmi shear is that it is not necessary to remove the agitator from the drum and disconnect the motor or the reduction gear from the drum to tilt the latter and empty can. After emptying the Trom mel 18 the same is pivoted back by means of the handle 30 in the position of FIG. 1, whereupon the mixing of a new concrete quantity can easily be started without introducing the agitator into the drum and the drum again with the motor to have to couple.

   With the same drum content, the daily output of the mixer described is thus significantly higher than that of the known mixer.



  Another advantage of the concrete mixer described is that the mounting plate 19 with the agitator 31 attached to it can be very easily dismantled by simply loosening the three screws 24-26. The mounting plate 19 is thus only connected to the non-rotating parts of the mixing unit in three points.



  It should be emphasized that the drum axis in the working position at an acute angle of z. B. is inclined 10-20o to the vertical in order to facilitate the shoveling of the material into the opening 41. In addition, the inclined position of the mixing drum promotes the mixing of the material, as experience shows.



  In the embodiment of Fig. 3-5, ent speaking parts are provided with the same reference numerals as in Figs. 1 and 2. These parts who only mentioned in the following, as it is necessary to understand their interaction with the other parts.



  On the frame 1, a rectangular Behäl ter 46 is mounted, which is divided by partitions 47 and 48 mainly in three departments 49-51 under. The department 49 serves as a cement silo, where the partition 47 forms the bottom of this silo and is inclined so that the cement tends towards an outlet nozzle 52 which extends over the entire width of the silo 49. A flap 53 is attached to two brackets 54 which can be pivoted about an axis 55 which is supported by two bearing blocks 56 attached to the container 46.

   The two tabs 54 are connected at the bottom by a rod 57, the ends 58 of which protrude outward over the tabs 54 serve as handles for operating the flap 53, which closes the outlet nozzle 52 in the position shown.



  Below the outlet spout 52 there is an open top dosing box 59, which is provided with two handles 60 and is placed on one of the wheels 3 and on a small bracket 61 provided on the container 46. The box 59 serves to remove cement from the silo 49 and pour it into the drum 18 through the opening 41. The cement silo 49 is closed at the top by a hinged lid 62 which is provided with a handle 63 and the hinges with 64 be recorded.



  The department 50 of the container 46 forms a tank in which there is a tempering liquid, which consists of water and chemicals dissolved or suspended in the same, and by adding them the quality of the concrete is improved in a known manner. Each time the drum 18 is filled with mixed material, a certain dose of the hardening liquid is mixed at. For this purpose, a metering container 65 is provided on the mounting plate 19, which is limited on one side by the collecting plate 39.



  The metering container 65 is connected to the tank 50 via a line 66 (see FIG. 5), a three-way valve 67, a feed line 68 with a pump 69 and a return line 70. The operating handle 71 of the three-way valve 67 is connected by a tension spring 72 to a valve plate 73 which, in the position shown in full lines in FIG. 5, closes an opening 74 provided in the bottom of the dosing container 65, the edge of which forms the valve seat.

   A liquid level indicator 75 is provided on the dosing container 65, which, like other details of FIG. 5, is omitted in FIGS. 3 and 4. The flow and return lines 68 and 70 who are formed by hoses that are long enough to follow the movement of the three-way valve 67 attached to the dosing container 65 when the mixer is pivoted into the emptying position.



  The department 51 of the container 46 also forms a tank, but it contains water without chemicals. The tank 51 is connected to the drum 18 via a pump 76 and a line 77. An adjustable throttle valve 78 is built into the line 77.



  The axis 6, on which the mixing unit is pivotably mounted, is attached on the one hand to two opposite walls 79 and 80 of the container 46 and on the other hand supported on a leg 9a so that it is practically horizontal. The leg 9a is pivotably mounted at 81 on the axis 6 and secured on the same by means of a pin 82. For driving, the leg 9a is pivoted through 1800 and secured by a pin, not shown. As can be seen from Fig. 4, the hand grip 30 is formed by an iron rod bent to form a loop 83, which is welded to the tube 11 and has a lower extension 84, at the free end of which a pedal 84 'is attached.

   A traverse 84 ″ is welded to it transversely to the loop 83, which is horizontal when the drum is in its working position and which is then at least approximately at the same height as the cover 62. All sorts of devices can be used while driving, For example, support blades or the like on the one hand on the cover 62 and on the other hand on the cross member 84 ″. The rod extension 84 is so long that if the frame 1 tilts about the wheel axis 2 (with the leg 9a folded up), the pedal 84 'is supported on the floor before the motor 14 can fall on the latter and be damaged as a result.



  In addition to the compartments 49-51, a niche 85 is provided in the container 46, which is covered with a lid 86. In this niche 85 there are electrical equipment such. B. Schaltschüt zen for the circuits of the motor 14 and assembled with the pumps 69 and 76, not particularly shown motors for driving these pumps. There is also a time switch in the niche 85, which is switched into the circuit of the motor 14 and the motor used to drive the pump 76 and is connected to a push-button switch 87. In the niche 85 there is also a socket for connecting a power supply cable, fuses and the like.



  To fill the compensation solution or what water in the tanks 50 and 51, two closable filler neck 88 are provided, which are in Fig. 3 behind each other.



  In its working position shown, the pivotable mixing unit is in turn prevented from further pivoting in the counterclockwise direction of FIG. 4 by the stops 44 and 45 of FIG. These stops and corresponding stops for the emptying position are not shown in the drawing.

    89 with a push button switch attached to the container 46 is designated, which is actuated in the emptying position of the drum by a correspondingly shaped Schaltann 90 which is attached to the tube 11 at its end. The switch 89 has a normally closed contact which is located in the circuit of the motor used to drive the pump 76, and a normally open contact which is used to switch the drum motor 14 on. When the drum is emptied, so the motor 14 is switched on via the aforementioned normally open contact, while a drive of the pump 76 is prevented.



  It should also be mentioned that a small step and parking bridge 91 is provided on the drawbar 4, next to the container 46. If the worker wants to pour cement into the silo 49, he can step up on this bridge 91, which can be used for the rest of the drive to park all kinds of equipment.



  The concrete mixer according to FIGS. 3-5 operates as follows. Sand and gravel are shoveled into the drum 18 through the opening 41 as in the case of FIGS. 1 and 2. The cement is removed from the silo 49 by opening the flap 53 and filled into the drum 18 by means of the box 59. Depending on the desired cement dose per drum filling, boxes 59 of various sizes can be used.



  The motor used to drive the pump 69 remains switched on continuously while the mixer is in operation. In the position of the three-way valve 67 shown in Fig. 5, the pump 69 conveys compensation liquid into the dosing container 65. When the liquid level indicator 75 shows that the desired dose of compensation liquid has been pumped into the dosing container, the worker swivels the operating handle 71 of the Three-way cock 67 clockwise from Fig. 5 to 900.

   This disconnects line 68 from line 66 and connects it to line 70; Furthermore, the opening 74 in the bottom of the dosing container is opened, since the spring 72 is no longer tensioned and the valve disk 73 comes into the position 73 'shown in dashed lines.

   The dosing container 65 is therefore emptied into the drum 18, while the pump 69 conveys the liquid removed from the tank 50 via the flow line 68, the three-way valve 67 and the return line 70 back into the tank. This circulation of the tempering liquid is so he wants, because it is usually not a pure solution, but a suspension, so that a separation of its constituents could take place in the event of prolonged rest.



  The motor 14 used to drive the drum 18 and the motor used to drive the pump 76 are switched on when the push-button switch 87 is actuated via the timer switch mentioned earlier, so that the drum 18 rotates and the agitator 31 works while the Pump 76 via line 77 and the throttle valve 78 What water into the drum 18 promotes. After a predetermined time, e.g. B. of about 2 minutes, the timer switches off the two motors. The throttle valve 78 is set so that during this time just the amount of water prescribed for filling the drum flows into the drum.



  After mixing has taken place, the worker tilts the mixing unit around the axis 6 in the clockwise direction of FIG. 4, grasping the handle 30 with his hand and stepping on the pedal 84 'with his foot. In the emptying position, the switch 89 is actuated by the switching arm 90, so that the motor 14 is switched on again without the pump 76 conveying water. The rotation of the drum 18 causes it to be emptied rapidly.

   When the worker brings the drum 18 back into the working position, the switch 89 returns to its normal position, so that the motor 14 comes to a standstill again, only to be put back into operation by pressing the pushbutton switch 87.



  The mixer according to Fig. 3-5 is particularly suitable for very high-quality concrete mixtures with precisely prescribed dosages of cement and coating liquid. Such mixtures are u. a. Used for the production of particularly wear-resistant floor coverings.

 

Claims (1)

PATENTANSPRUCH Betonmischer mit rotierender Mischtrommel und in derselben angeordnetem Rührwerk, dadurch ge kennzeichnet, dass mindestens die Mischtrommel (18) und das in letzterer ortsfest montierte Rührwerk (31) gemeinsam um eine mindestens angenähert horizon tale Achse (6) schwenkbar sind und dass die Misch trommel ständig in Antriebsverbindung mit einem zu ihrem Antrieb dienenden Motor (14) ist. UNTERANSPRÜCHE 1. PATENT CLAIM Concrete mixer with rotating mixing drum and agitator arranged in the same, characterized in that at least the mixing drum (18) and the agitator (31) fixedly mounted in the latter can be pivoted together about an at least approximately horizontal axis (6) and that the mixing drum is constantly in drive connection with a motor (14) serving to drive it. SUBCLAIMS 1. Betonmischer nach Patentanspruch, gekenn zeichnet durch ein die Mischtrommel (18), den zu deren Antrieb dienenden Motor (14) und das Rühr werk (31) umfassendes Mischaggregat, das als Gan zes um die genannte Achse (6) schwenkbar ist, wo bei die Mischtrommel, die von oben zu füllen ist, sich in ihrer Arbeitslage oberhalb, in ihrer Entlee rungslage dagegen unterhalb des Motors befindet. z. Betonmischer nach Unteranspruch 1, dadurch gekennzeichnet, dass das Mischaggregat auch ein Reduktionsgetriebe (13) aufweist, welches zwischen der Mischtrommel (18) und dem Motor (14) ange ordnet ist und an welches der Motor angeflanscht ist. Concrete mixer according to claim, characterized by a mixing drum (18), the motor (14) serving to drive it and the agitator (31) comprehensive mixing unit, which can be pivoted as a whole about said axis (6), where the Mixing drum, which is to be filled from above, is in its working position above, in contrast, in its emptying position below the engine. z. Concrete mixer according to dependent claim 1, characterized in that the mixing unit also has a reduction gear (13) which is arranged between the mixing drum (18) and the motor (14) and to which the motor is flanged. 3. Betonmischer nach Unteranspruch 2, dadurch gekennzeichnet, dass das Rührwerk (31) an einer Montageplatte (19) montiert ist, die in nur drei Punkten leicht lösbar an nicht rotierenden Teilen (27-29) des Mischaggregates befestigt ist. 4. Betonmischer nach Unteranspruch 3, dadurch gekennzeichnet, dass das Mischaggregat ein auf der Achse (6) gelagertes Rohr (11) umfasst, an welchem eine Grundplatte (12) befestigt ist, an der das Re duktionsgetriebe (13) angebracht ist, und dass die Montageplatte (19) mittels dreier Schrauben (24-26) an drei Streben (27-29) befestigt ist, die mit dem Rohr starr verbunden sind. 5. 3. Concrete mixer according to dependent claim 2, characterized in that the agitator (31) is mounted on a mounting plate (19) which is easily detachable in only three points attached to non-rotating parts (27-29) of the mixing unit. 4. Concrete mixer according to dependent claim 3, characterized in that the mixing unit comprises a tube (11) mounted on the axis (6), to which a base plate (12) is attached to which the reduction gear (13) is attached, and that the mounting plate (19) is attached to three struts (27-29) by means of three screws (24-26), which are rigidly connected to the tube. 5. Betonmischer nach Unteranspruch 3, gekenn zeichnet durch mindestens ein schräg an der Mon tageplatte (19) angebrachtes Auffangblech (39, 40), das dazu bestimmt ist, beim Einschaufeln von Misch gut in die Mischtrommel (18) zu hoch geworfenes Mischgut in die Trommel rutschen zu lassen. 6. Betonmischer nach Unteranspruch 1, gekenn zeichnet durch ein auf zwei Rädern (3) fahrbares Ge stell (1), das mit mindestens einem zum Abstützen desselben bestimmten, schwenkbaren Bein (9, 9a) versehen ist. 7. Concrete mixer according to dependent claim 3, characterized by at least one inclined on the Mon day plate (19) attached collecting plate (39, 40), which is intended to slip into the drum when mixing is shoveled into the mixing drum (18) too high allow. 6. Concrete mixer according to dependent claim 1, marked by a two-wheeled (3) mobile Ge alternate (1), which is provided with at least one for supporting the same specific, pivotable leg (9, 9a). 7th Betonmischer nach Unteranspruch 6, dadurch gekennzeichnet, dass auf dem Gestell ein Behälter (46) montiert ist, der drei Abteilungen (49-50) auf weist, von denen die erste als Zementsilo (49), die zweite als Tank (50) für eine Vergütungsflüssigkeit und die dritte als Wassertank (51) bestimmt ist. B. Betonmischer nach Unteranspruch 7, dadurch gekennzeichnet, dass das Zementsilo (49) einen ge neigten Boden (47) aufweist, um den Zement einem verschliessbaren Auslaufstutzen (52) zuzuführen, und dass ein Dosierkasten (59) vorgesehen ist, der unter diesem Auslaufstutzen abgestellt ist. 9. Concrete mixer according to dependent claim 6, characterized in that a container (46) is mounted on the frame, which has three compartments (49-50), of which the first as a cement silo (49), the second as a tank (50) for one Compensation liquid and the third is intended as a water tank (51). B. concrete mixer according to dependent claim 7, characterized in that the cement silo (49) has a ge inclined bottom (47) to supply the cement to a closable outlet nozzle (52), and that a metering box (59) is provided, which is below this outlet nozzle is turned off. 9. Betonmischer nach den Unteransprüchen 3 und 7, dadurch gekenzeichnet, dass auf der Montage platte (19) ein Dosierbehälter (65) vorgesehen ist, in welchen mittels einer Pumpe (69) Vergütungsflüssig keit aus dem betreffenden Tank (50) über einen Dreiweghahn (67) gefördert werden kann, wobei die ser Dreiweghahn über eine Rücklaufleitung (70) mit dem Tank verbunden ist, so dass über den Dreiweg hahn die Vergütungsflüssigkeit auch lediglich umge wälzt werden kann. 10. Concrete mixer according to the dependent claims 3 and 7, characterized in that a metering container (65) is provided on the mounting plate (19), in which a pump (69) can dispense liquid from the relevant tank (50) via a three-way valve (67). can be promoted, the water three-way valve is connected to the tank via a return line (70) so that the remuneration liquid can only be circulated via the three-way valve. 10. Betonmischer nach Unteranspruch 9, dadurch gekennzeichnet, dass der Bedienungsgriff (71) des Dreiweghahnes (67) kinematisch mit einem Ab- schlussorgan (73) des Dosierbehälters (65) derart gekuppelt ist, dass wenn der Dreiweghahn in die Umwälzstellung gebracht wird, das Abschlussorgan automatisch das Auslaufen der im Dosierbehälter befindlichen Flüssigkeit in die Mischtrommel (18) gestattet. 11. Concrete mixer according to dependent claim 9, characterized in that the operating handle (71) of the three-way tap (67) is kinematically coupled to a closing element (73) of the dosing container (65) in such a way that when the three-way tap is brought into the circulation position, the closing element is automatically allows the liquid in the dosing tank to run out into the mixing drum (18). 11. Betonmischer nach Unteranspruch 7, dadurch gekennzeichnet, dass eine Pumpe (76) vorgesehen ist, mittels welcher über eine Leitung (77) und ein in derselben angeordnetes Regulierorgan (78) Wasser aus dem Wassertank (51) in die Mischtrommel (18) gepumpt werden kann. 12. Betonmischer nach Unteranspruch 11, da durch gekennzeichnet, dass ein Schalter (87) vorge sehen ist, bei dessen Betätigung der zum Antrieb der Mischtrommel (18) dienende Motor (14) und ein zum Antrieb der Wasserpumpe (76) dienender Motor über einen Zeitschalter eingeschaltet werden, der diese Motoren nach einer vorbestimmten Zeit wieder abschaltet. 13. Concrete mixer according to dependent claim 7, characterized in that a pump (76) is provided by means of which water can be pumped from the water tank (51) into the mixing drum (18) via a line (77) and a regulating element (78) arranged in the same . 12. Concrete mixer according to dependent claim 11, characterized in that a switch (87) is provided, upon actuation of which the motor (14) serving to drive the mixing drum (18) and a motor (14) serving to drive the water pump (76) via a motor Timer are switched on, which switches off these motors again after a predetermined time. 13th Betonmischer nach Unteranspruch 12, da durch gekennzeichnet, dass ein Schalter (89) so an geordnet ist, dass er in der Entleerungslage der Mischtrommel (18) betätigt wird und dann den zum Antrieb dieser Trommel dienenden Motor (14) wie der einschaltet, zugleich aber ein Wiedereinschalten des zum Antrieb der Wasserpumpe (76) dienenden Motors verhindert. 14. Betonmischer nach Unteranspruch 7, dadurch gekennzeichnet, dass die Achse (6), um welche das Mischaggregat schwenkbar ist, einerseits am Behäl ter (46) befestigt und anderseits mit dem schwenk baren Bein (9a) versehen ist. Concrete mixer according to dependent claim 12, characterized in that a switch (89) is arranged so that it is actuated in the emptying position of the mixing drum (18) and then switches on the motor (14) used to drive this drum, but at the same time prevents the motor used to drive the water pump (76) from being switched on again. 14. Concrete mixer according to dependent claim 7, characterized in that the axis (6) about which the mixing unit is pivotable, on the one hand attached to the Behäl ter (46) and on the other hand with the pivot ble leg (9a) is provided. 15. Betonmischer nach Patentanspruch, dadurch gekennzeichnet, dass das Mischaggregat Anschläge (44) aufweist, die in der Arbeitslage unter dem Ein fluss des Eigengewichtes des Aggregates auf gestell- festen Gegenanschlägen (45) ruhen. 16. Betonmischer nach Unteranspruch 15, da durch gekennzeichnet, dass das Mischaggregat auch Anschläge aufweist, die in der Entleerungslage unter dem Einfluss des Eigengewichtes des Aggregates auf gestenfesten Gegenanschlägen ruhen. 17. 15. Concrete mixer according to claim, characterized in that the mixing unit has stops (44) which, in the working position, rest on counter-stops (45) fixed to the frame under the influence of the unit's own weight. 16. Concrete mixer according to dependent claim 15, characterized in that the mixing unit also has stops which, in the emptying position, rest on counter-stops that are fixed by gestures under the influence of the unit's own weight. 17th Betonmischer nach Unternspruch 1, dadurch gekennzeichnet, dass die Trommelachse in der Ar beitslage unter einem spitzen Winkel zur Vertikalen geneigt ist, um das Enifüllen des Mischgutes in die Trommel zu erleichtern. 18. Betonmischer nach Unteranspruch 1, dadurch gekennzeichnet, dass das Mischaggregat zu seiner Verschwenkung mit einem Griff (30) versehen ist, der durch einen zu einer Schlaufe (83) gebogenen Stab gebildet ist, der einen unteren Fortsatz (84) hat, an dessen freiem Ende ein Pedal (84') ange bracht ist. 19. Concrete mixer according to sub-claim 1, characterized in that the drum axis in the working position is inclined at an acute angle to the vertical in order to facilitate the filling of the mix into the drum. 18. Concrete mixer according to dependent claim 1, characterized in that the mixing unit is provided for its pivoting with a handle (30) which is formed by a rod which is bent into a loop (83) and has a lower extension (84) on which a pedal (84 ') is attached to the free end. 19th Betonmischer nach den Unteransprüchen 7 und 18, dadurch gekennzeichnet, dass an der Schlaufe (83) eine Traverse (84") angebracht ist, die horizontal ist, wenn die Mischtrommel (18) sich in ihrer Arbeitslage befindet, und die dann mindestens angenähert in gleicher Höhe liegt wie ein auf dem Behälter (46) vorgesehener Deckel (62). 20. Betonmischer nach den Unteransprüchen 14 und 18, dadurch gekennzeichnet, dass der Fortsatz (84) so lang ist, dass bei hochgeklapptem Bein (9a) das Pedal (84') sich im Falle eines Kippens des Ge stells (1) um die Radachse (2) auf dem Boden ab stützt und dadurch eine Berührung des Trommelmo tors (14) mit dem Boden verhindert. 21. Concrete mixer according to the dependent claims 7 and 18, characterized in that a cross member (84 ") is attached to the loop (83), which is horizontal when the mixing drum (18) is in its working position and which is then at least approximately in the same position Height is like a lid (62) provided on the container (46). 20. Concrete mixer according to dependent claims 14 and 18, characterized in that the extension (84) is so long that when the leg (9a) is folded up, the pedal (84 ') is supported on the floor in the event of the frame (1) tipping about the wheel axle (2), thereby preventing the drum motor (14) from touching the floor. Betonmischer nach Unteranspruch 7, dadurch gekennzeichnet, dass das Gestell (1) eine Deichsel (4) aufweist, auf welcher neben dem Behälter (46) eine Tritt- und Abstellbrücke (91) vorgesehen ist. 22. Betonmischer nach Unteranspruch 2, dadurch gekennzeichnet, dass die Mischtrommel (18) unmittel bar auf der Ausgangswelle (15) des Reduktionsge triebes (13) befestigt ist. Concrete mixer according to dependent claim 7, characterized in that the frame (1) has a drawbar (4) on which a step and parking bridge (91) is provided next to the container (46). 22. Concrete mixer according to dependent claim 2, characterized in that the mixing drum (18) is attached immediacy bar on the output shaft (15) of the Reduktionsge drive (13).
CH6599858A 1958-11-10 1958-11-10 concrete mixer CH363603A (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CH6599858A CH363603A (en) 1958-11-10 1958-11-10 concrete mixer
CH6724658A CH368407A (en) 1958-11-10 1958-12-12 concrete mixer
DED30423A DE1147521B (en) 1958-11-10 1959-04-14 Concrete mixer with rotating mixing drum and fixed agitator arranged in the same
BE584483A BE584483A (en) 1958-11-10 1959-11-10 Concrete mixer.
GB38081/59A GB882783A (en) 1958-11-10 1959-11-10 Improvements in and relating to concrete mixers

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CH882783X 1958-11-10
CH1243564X 1958-11-10
CH6599858A CH363603A (en) 1958-11-10 1958-11-10 concrete mixer

Publications (1)

Publication Number Publication Date
CH363603A true CH363603A (en) 1962-07-31

Family

ID=27178519

Family Applications (1)

Application Number Title Priority Date Filing Date
CH6599858A CH363603A (en) 1958-11-10 1958-11-10 concrete mixer

Country Status (1)

Country Link
CH (1) CH363603A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4429244A1 (en) * 1994-08-18 1996-02-22 Laeis & Bucher Gmbh Programmable mechanical treatment of free-flowing materials

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4429244A1 (en) * 1994-08-18 1996-02-22 Laeis & Bucher Gmbh Programmable mechanical treatment of free-flowing materials

Similar Documents

Publication Publication Date Title
DE2937469C2 (en)
DE2226605A1 (en) MIXING UNIT FOR THINNING AGENT
DE1916351A1 (en) Gypsum mortar producing and conveying machine
DE1783081B1 (en) CONTINUOUSLY OPERATING MIXING CONTAINER FOR FOUNDRY SAND
CH363603A (en) concrete mixer
DE2946658A1 (en) Mobile concrete-mixing equipment - comprises fixed upright cylindrical vessel with stirring arms on vertical shaft extending from top
DE1684044C3 (en) Vehicle with containers for holding concrete components
DE1147521B (en) Concrete mixer with rotating mixing drum and fixed agitator arranged in the same
DE1812574U (en) CONCRETE MIXER.
DE2420023A1 (en) Continuous mixer for mortar or plaster - uses relatively small mixing paddles in container passing to screw bladed mixing shaft
DE3247233A1 (en) Process and device for preparing a mixture of sand, binders, water and, if appropriate, further additives for processing to form screed, in particular fluidised screed
DE2043608C2 (en) Pan mixer
EP1731425A1 (en) Method and device for dosing bulk material
DE2831740C2 (en) Device for separating a concrete mix into its various components
DE969787C (en) Easily transportable concrete mixer
DE3939426A1 (en) METHOD AND DEVICE FOR SEPARATING SOLIDS FROM A LIQUID, OR SEPARATING SEDIMENTS PREPARED FROM EMULSIONS
CH341107A (en) Weight dosing device for cement
CH339550A (en) Concrete preparation plant
DE3335852A1 (en) Machine for mixing mortar
EP0178530B1 (en) Device for mixing a building material with water and/or for pumping
DE395487C (en) Wet mixer, especially for mixtures of asbestos and cement
CH232589A (en) Device for mixing powdery substances.
AT248931B (en) Mixing machine for mixing granular and powdery materials, especially concrete, mortar, asphalt, etc.
AT37492B (en) Concrete mixer with rotating mixing drum.
CH433086A (en) Mixing machine for mixing granular and powdery materials, especially for concrete, mortar and asphalt