wall elements
winches
support
unit
trench
Prior art date
Application number
Other languages
German (de)
Inventor
Zuercher-Gutzwiller Josef
Original Assignee
Zuercher Gutzwiller Josef
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zuercher Gutzwiller Josef filed Critical Zuercher Gutzwiller Josef
Publication of CH330395A publication Critical patent/CH330395A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • E02D17/086Travelling trench shores

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

  

  Verfahren und Vorrichtung zur Einsturzsicherung von einander gegenüberliegenden     Wänden     bei Erdaushebungen    Erdaushebungen, wie Baugruben,     Wasser-          leitungs-    und Kanalisationsgräben und der  gleichen, benötigen bei grösserer Tiefe     Sprie-          ssunggen,    um die Erdwände gegen Einstürzen       ztt    sichern. Hierfür hat man in der Regel  Rund- und Kantholz,     Flecklinge    und derglei  chen verwendet.

   Die Herstellung der     Sprie-          ssungen    aus ihren Einzelteilen beansprucht       jedoch        einen    verhältnismässig grossen     Arbeits-          und    Zeitaufwand, wobei die Arbeiter in die       tingesieherte    Erdaushebung hinuntersteigen       müssen.    Die Arbeiter sind hierbei ständig        egen    der Einsturzgefahr der .ungesicherten       Erdwände    gefährdet..

   Mit     Rüeksieht    hierauf  sind     aueli    von der     Unfallversicherung    bereits       weitgehende    Beschränkungen der     Aushubtiefe     mit ungesicherten Wänden erlassen worden,  die jedoch von den Unternehmern weitgehend       (lesavotiiei-t    werden, weil es mit, den bisherigen  Methoden nicht möglich ist,

   in     wirtsehaftlieher     Weise ohne     Gefährdung        der    Arbeiter     Sprie-          13un        gen    tiefer     Erdaushebungen        vorzunehmen.     Besonders ungünstig liegen die Verhältnisse  bei den neuerdings durch     Bagger    ausgehobenen       Gräben    bis     ztt    einer Tiefe von 5 m,

   die eine       stufenweise        Spriel3ung@    von oben nach unten  mit den bisherigen Methoden nicht gestatten  und ausserdem \ wegen des verhältnismässig       Yrossen        Leistungsvermögens    von     Grabenba.g-          -ern    einen so,     schnellen    Arbeitsfortschritt  ergeben,     da13    die Arbeiter nach den bisherigen  Methoden     gar    nicht in der Lage sind, mit der         Spriessung    dem Bagger unmittelbar folgen zu  können.

   Je länger jedoch der ungesicherte Ab  stand zwischen der Arbeitsfront des Baggers  und der     Spriessung    ausfällt, desto grösser ge  staltet sich auch die     Einsturzgefahr    der noch  ungesicherten Erdwände.  



  Die vorliegende     Erfindung    beseitigt nun  die Unzulänglichkeit der bisherigen Verfahren  und Mittel. Sie betrifft ein Verfahren und  eine Vorrichtung zur Einsturzsicherung von  einander gegenüberliegenden Wänden bei Erd  aushebungen, insbesondere in ihrer Anwen  dung zum Abstützen der Wände eines Gra  bens. Das Verfahren ist gemäss der vorliegen  den Erfindung dadurch gekennzeichnet, dass  paarweise mittels     Spriesswinden    in einem der  Weite der Erdaushebung angepassten ge  genseitigen Abstand gehaltene     Stützwandele-          mente    in die     Erdaushebung    abgesenkt und  durch Betätigung der Winden an die     zn    stüt  zenden Erdwände gepresst werden.

   Die     Vor-          rielitung    zur     Ausübung    dieses Verfahrens ist.  gemäss der Erfindung dadurch gekennzeich  net, dass sie     Stützwandelemente    und eine An  zahl zum paarweisen lösbaren Abstützen der  selben in einem Abstand voneinander be  stimmte     Spriesswinden    aufweist. Hierdurch  ist es möglich, ohne in die Erdaushebung hin  unterzusteigen, -die einander gegenüberliegen  den Erdwände bis in die vorbestimmte Tiefe  mit     Stiitzwandelementen    zu bedecken und die  einander     jegenüberliegenden    Stützwandele-           mente    paarweise abzustützen.

   Diese Stütz  wandelemente können in passenden, zweck  mässig normalisierten Grössen vorrätig gehal  ten bzw. vorab     angefertigt    werden, wobei in  vertikaler und in horizontaler     Richteng    je  zwei oder mehr     Stützwandelementenpaare    an  einandergereiht werden können. Die Wand  bauelemente können bei zweckentsprechender  Ausbildung verhältnismässig leicht und hand  lich gehalten werden und bestehen zweckmässig  ans je einem Gitterrost mit durch Draht  geflecht, Blech oder anderswie gefüllten Fel  dern, wobei die Gitterroste durch nach der  Innenseite vorspringende Längsträger ver  steift sind, an welchen die     Spriesswinden    lös  bar angebracht werden können.  



  Das Verfahren gemäss der vorliegenden Er  findung ist beispielsweise an Hand der     Zeieli-          nung    erläutert, welche ein Ausführungsbei  spiel der erfindungsgemässen Vorrichtung in  eingebautem Zustande veranschaulicht.  



       Fig.    1     zeigt.    einen vertikalen Längsschnitt.  nach der Linie     I-I    in     Fig.    2.  



       Fig.2    zeigt in grösserem Massstab einen  Querschnitt nach der Linie     II-II    in     Fig.    1.  Wie aus     Fig.    1 hervorgeht, ist ein auf dein  Terrain     verfahrbarer        Tieflöffelbagger    1 vor  gesehen, der einen Graben 2 aushebt.

   Der  bereits ausgehobene     Crrabenteil    ist bis in den  unmittelbaren Arbeitsbereich des Baggerlöf  fels mit einer     Spriessung    versehen, die, wie  aus     Fig.    2 ersichtlich ist, aus an jeder Graben  wand lückenlos untereinander und     hinterein-          andergereihten        Stützwandelementen    3, die  paarweise durch     Spriesswinden    4 gegeneinan  der abgestützt sind, besteht,

   wobei die     Stüt.z-          wandelemente    3 eines jeden Paares an je einer  der einander gegenüberliegenden Graben  wände satt     anliegen    und durch die Spriess  winden 4 gegen diese Erdwand gepresst sind.  Die     Stützwandelemente    3 sind untereinander  gleich gestaltet und weisen. je einen Gitterrost  aus vertikalen und horizontalen, zweckmässig  rohrförmigen Stäben aus Metall auf, dessen  Felder durch Verspannung mittels eines  Drahtgeflechtes 5 ausgefüllt sind. Dieses  Drahtgeflecht ist in der Maschengrösse so ge  halten, dass es einen genügenden Halt zum    Abstützen des     Erdreiches    ergibt.

   Teile der       Graben-wand,    bei denen Flüssigkeitsmaterial  oder reiner Sand in     erheblielien    Mengen vor  liegt, können auch     durch    speziell angefertigte  Holztafeln oder dergleichen, die zwischen  das     Drahto-efleelit    5 und die     Grabenwand     eingelegt worden sind, gegen Austreten durch  die Maschen gesichert     sein.     



  Jeder Gitterrost ist mit zwei in     einem    ver  tikalen Abstand     voneinanderliegenden,    nach  der Innenseite vorspringenden     Längsträgern     6 versehen. Diese weisen einen     I-förmigen          Querschnitt    mit horizontalem Steg auf, des  sen dem Rost 3     anlieoencler    Flansch an Rost  stäben anliegt, und mit diesen verschweisst ist.  



  Die     Spriesswinden    4 sind     beiderends    mit  je einem Schuh versehen, der einen     obern          Schenkel    7 sowie einen seitlichen Sehenkel  8, ferner einen untern Sehenkel 9 aufweist  und im     Querschnitt    U-förmig gestaltet ist, wo  bei die Schenkel 7 und 9 den Flanschen, der  Sehenkel 8 dem Steg des     U-Profils    entspricht.

    Der Schenkel 7 eines jeden Fusses liegt auf  dein, innern Flansch des betreffenden Lang  trägers 6 auf,     %vogegen    der Sehenkel 8 seit  lich an diesem Trägerflansch anliegt, wobei  dem Anziehen der Winde 4 entsprechend die  Schenkel 8 der beiden     Windenfüsse    mit an  gemessenem Druck die Roste     fegen    die     CTi-a-          benwände    pressen.

   Zum lösbaren Verbinden  der Schuhe mit den Längsträgern 6 sind die  Schenkel. 7, 9 sowie die Stege der Längsträger  an der Angriffsstelle der     Windenfüsse    mit  konzentrischen     Bohrun,-en    versehen, durch  welche ein Dorn 10     hindureligetrieben    ist, des  sen oberes Ende zur     Bildung    eines Hand  griffes 11     abgewinkelt    ist.

   In     diesem        Zustande     bildet dann ,jedes Paar einander gegenüber  liegender Wandbauelemente mit den vier an  diesen angreifenden gemeinsamen Winden ein       Wandstützaggi@egat    das bei gelösten Winden  als     zusammenhängendes    Ganzes     hantierbar    ist.  



  Das Verfahren zur Herstellung der dar  gestellten     Spriessuno,        gellt    nun folgender  massen vor sieh  Sobald der Bagger den Graben auf ein so  langes Stück ausgehoben hat, dass ausserhalb  des     Baggerlöffelbereiehes        ein    vorerwähntes      Stützaggregat Platz hat, wird ein solches vor  her auf dem Terrain mit einem zur Graben  weite passenden Abstand der beiden     Stütz-          wandeleinente    zusammengestelltes Aggregat  bis ungefähr zum Rand in den Graben abge  senkt und von oben her in dieser Lage fest  gehalten. Zu     diesem        Zweeke    kann z.

   B. in  jeder obern Ecke der Gitterroste 3 eine Trag  stange     hindurchgestossen    werden, so     class    sie  auf beiden Seiten des Aggregates genügend       weit        vorragt,    um dort Traggriffe für die       Bedientnig    zu     bilden.    Es fasst dann je ein  Arbeiter an     einem    der vier Handgriffe an.  Hierauf wird das Aggregat     über    den Graben       gebraelit    und in diesen hinabgesenkt., bis die       Tragstangen    auf den     Grabenrändern    auf  liegen.

   Alsdann wird ein zweites, inzwischen       zusammengestelltes    Stützaggregat auf das  erste     Agt;iegat        aufgestockt    und zweckmässig  mit     dein        erstgenannten        Stützaggregat    lösbar  verbunden. Zn diesem Zwecke können z. B.

    Laschen dienen, welche die beiden     Ctitterroste     miteinander     verbinden.    Man kann jedoch auch  vier     senkrechte    Flachstäbe hierzu benützen,  indem je ein     Flaehstab    durch übereinander       befindliehe    Sehlitze in den Stegen der ein  ander zugekehrten Längsträger 6 beider     Stüt.z-          aggregate    hindurchgesteckt wird.

   Die vier  Flachstäbe weisen zweckmässig Schlitze auf,  durch welche     Keile        hindurehgesteckt    werden,  die oberhalb und unterhalb der Längsträger  stege     Hindurchgetrieben    werden, so dass nun  mehr beide Aggregate zugfest aufeinander  gestockt sind. Alsdann werden, wie vorher für  das untere Aggregat beschrieben, Tragstangen  am Oberende des obern Aggregates     ange-          braclit    und nach Anfassen der Traggriffe die  untern Tragstangen herausgezogen. Nun wird  das aus den beiden Aggregaten bestehende  Stützgebilde     wieder    in den Graben abgesenkt.

    Nötigen     ralIs,    das heisst bei noch grösserer     Gra-          bentiefe,    können in der beschriebenen Weise       weitere    Aggregate aufgestockt und samt den  vorangehenden Aggregaten etappenweise abge  senkt werden, bis das     unterste    Aggregat seine  vorbestimmte Höhenlage erreicht hat, welche  sieh nach der Grabensohle richtet. .Jetzt, ist im  Bereich     dieser        Stiitzag.-regate    jede Gefahr des    etwaigen Einstürzens der     Grabenwände    be  seitigt, so dass die Arbeiter innerhalb dieser  Aggregate in den Graben hinuntersteigen kön  nen.

   Diese ziehen nun vorerst von oben nach  unten sämtliche Winden 4 so weit an, dass die       Wandstützelemente    überall mit dem vorbe  stimmten     Druck    an den     Grabenwänden    satt  anliegen.  



  Sobald die Baggerarbeit wieder so weit  fortgeschritten ist, dass Platz für ein nettes  Aggregat entsteht, wird in der gleichen Weise  wie vorher beschrieben, unter ein- oder mehr  maligem Aufstocken die entsprechende     Sprie-          ssung    hergestellt, wobei die     netten    Stützaggre  gate     -unmittelbar    vor den bereits montierten       Stützaggregaten    angeordnet werden. Die an  einanderstossenden Enden der     Stützwandele-          mente    werden dann zweckmässig lösbar mit  einander verbunden.

   Dazu können vorteil  haft Laschen dienen, welche die aneinander  stossenden     Enden    der Träger 6 der     hinterein-          anclerliegenden        Stützwandelemente        miteinart-          der    verbinden, wobei die Laschen und die  Stege der Längsträger 6 entsprechende, zu  einander passende Bohrungen aufweisen,  durch welche Verbindungsschrauben oder  Dorne eingezogen werden können. Auf diese  Weise werden laufend hinter dem Bagger stän  dig neue     Stützaggregate    im Graben montiert;  so dass stets nur eine minimale Länge des  Grabens unmittelbar hinter dem Bagger un  gesichert ist.  



  Zum Demontieren kann in umgekehrter  Weise vorgegangen werden, indem vorerst die  Längsverbindungen der     Stützwandelemente     gelöst, alsdann     sukzessive    die     Spriesswinden    4  so weit gelockert werden, dass die Stützwand  elemente von den     Grabenwänden    abgezogen  werden und etwas Spiel mit letzterem haben.  Alsdann kann entweder das ganze Gebilde  eines Aggregates mit allen auf dieses auf  gestockten Aggregaten gemeinsam angehoben  werden, wobei, wenn ein Kran zur Verfügung  steht bzw. der Bagger als Hebezeug eingerich  tet ist, dieses Gebilde als ein Ganzes aus dem  Graben herausgehoben und auf das Terrain  abgestellt werden.

   Andernfalls kann auch  analog wie beim Montieren ein     etagenweises         Anheben des Gebildes erfolgen, wobei dann  sukzessive immer das oberste Aggregat vom       darunterliegenden    gelöst und alsdann abge  hoben wird, bis sämtliche Aggregate des be  treffenden Gebildes aus dem Graben heraus  gezogen sind. Alsdann wird das nächste Ge  bilde in gleicher Weise demontiert.  



  Man kann jedoch auch anders vorgehen,  insbesondere wenn jede     Einsturzgefahr    der       Grabenwände    vermieden werden muss. In die  sem Fall werden nach Lockern der Winden die  Winden der untersten Aggregate entfernt,  alsdann werden die untersten     Stützw        and-          elemente    nach dem     Grabeninnern    zu gezogen  und zwischen den andern     Spriesswinden    hin  durch nach oben aus dem Graben heraus  bewegt. Nunmehr kann das Zuschütten des  Grabens von oben erfolgen, und zwar je nach  den Verhältnissen etappenweise je im Be  reiche eines entfernten     Aggregates.     



  Nachdem auf diese Weise der Graben um  die Höhe bis zum zweituntersten Aggregat  aufgeschüttet worden ist, kann für die wei  teren Aggregate in analoger Weise vorgegan  gen werden, so dass die     Grabenwände    jeweils  nie auf eine grössere Höhe     unabgestützt    sind,  als einer Aggregathöhe entspricht. Natürlich  kann die Höhe der Aggregate je nach den  jeweils vorliegenden Bodenverhältnissen ver  schieden sein.  



  Sind besonders ungünstige Verhältnisse  vorhanden, indem etwa stellenweise reiner  Sand oder sogar Flüssigkeitsmaterial aus den       Grabenwänden    auszutreten droht, dann kann  man auch beim Herstellen der     Spriessung     jeweils nach Einsetzen eines Aggregates in den  Graben an die vorbestimmte Stelle zwischen  dem Drahtgeflecht 5 und der     Grabenwand     Holzplatten einsetzen, die ein der gefährdeten       Grabenwandstelle    entsprechendes Ausmass  haben.



  Method and device for securing opposing walls against collapse when excavating earth Excavations, such as building pits, water supply and sewer trenches and the like, require excavations at greater depths in order to secure the earth walls against collapse. As a rule, round and square timber, stains and the like were used for this.

   The production of the sprouts from their individual parts, however, requires a relatively large amount of work and time, with the workers having to descend into the excavated earth. The workers are constantly at risk of collapse of the unsecured earth walls.

   With this in mind, the accident insurance company has already issued extensive restrictions on the excavation depth with unsecured walls, which, however, are largely (lesavotiiei-t because it is not possible with the previous methods,

   to carry out excavations of deep earth in a commercial manner without endangering the workers. The conditions are particularly unfavorable in the trenches recently dug by excavators to a depth of 5 m,

   which do not allow a step-by-step sprint from top to bottom with the previous methods and, in addition, because of the relatively high performance of Grabenba.g -ern result in such rapid work progress that the workers are not capable of the previous methods to be able to follow the excavator directly with the sprouting.

   However, the longer the unsecured distance between the working front of the excavator and the crevice, the greater the risk of collapse of the still unsecured earth walls.



  The present invention now overcomes the inadequacy of the previous methods and means. It relates to a method and a device for preventing walls opposite one another from collapsing when excavating earth, in particular in their application for supporting the walls of a trench. According to the present invention, the method is characterized in that supporting wall elements held in pairs by means of jib winches are lowered into the excavation and are pressed against the supporting earth walls by actuating the winches.

   The preparation for practicing this procedure is. according to the invention characterized in that it has supporting wall elements and a number for pairwise releasable support of the same at a distance from one another be certain spreader winches. This makes it possible, without going down into the excavation, to cover the opposing earth walls to the predetermined depth with supporting wall elements and to support the opposing supporting wall elements in pairs.

   These support wall elements can be kept in stock in suitable, appropriately normalized sizes or made in advance, with two or more pairs of support wall elements being strung together in vertical and horizontal directions. The wall components can be kept relatively easy and handy with appropriate training and consist expediently of a grating with wire mesh, sheet metal or otherwise filled fields, the grating being stiffened by longitudinal beams protruding towards the inside ver, on which the spreader winches can be releasably attached.



  The method according to the present invention is explained, for example, on the basis of the drawing which illustrates an embodiment of the device according to the invention in the installed state.



       Fig. 1 shows. a vertical longitudinal section. along the line I-I in FIG. 2.



       FIG. 2 shows, on a larger scale, a cross-section along the line II-II in FIG. 1. As can be seen from FIG. 1, a backhoe excavator 1, which can be moved on your terrain and digs a trench 2, is seen on a larger scale.

   The already excavated part of the crab is provided with a protrusion right into the immediate working area of the excavator spoon, which, as can be seen in FIG are, consists,

   wherein the Stüt.z- wall elements 3 of each pair lie snugly against one of the mutually opposite trench walls and are pressed against this earth wall by the sprout coils 4. The support wall elements 3 are designed and have the same design as one another. each a grating made of vertical and horizontal, suitably tubular metal rods, the fields of which are filled by bracing by means of a wire mesh 5. The mesh size of this wire mesh is kept in such a way that it provides sufficient support to support the soil.

   Parts of the trench wall in which there is substantial amounts of liquid material or pure sand can also be secured against leakage through the meshes by specially made wooden panels or the like, which have been inserted between the wire fleelite 5 and the trench wall.



  Each grating is provided with two longitudinal members 6 projecting towards the inside at a vertical distance from one another. These have an I-shaped cross-section with a horizontal web, the sen the grate 3 anlieoencler flange rests on the grate rods, and is welded to them.



  The spreader winches 4 are each provided with a shoe at both ends, which has an upper leg 7 and a lateral leg 8, furthermore a lower leg 9 and is U-shaped in cross-section, where the legs 7 and 9 have the flanges, the leg 8 corresponds to the web of the U-profile.

    The leg 7 of each foot rests on your, inner flange of the relevant longitudinal beam 6,% vogegen the leg 8 since Lich rests on this beam flange, whereby the tightening of the winch 4, the legs 8 of the two winch feet with a measured pressure the grids sweep press the CTi side walls.

   The legs are used to releasably connect the shoes to the longitudinal members 6. 7, 9 and the webs of the side members at the point of application of the winch feet with concentric Bohrun, -en through which a mandrel 10 is driven, the sen upper end to form a handle 11 is angled.

   In this state, each pair of opposing wall construction elements with the four common winches acting on them then forms a wall support assembly which can be handled as a coherent whole when the winches are released.



  The process for the production of the Spriessuno shown is now as follows. As soon as the excavator has dug the trench on such a long piece that there is space for the aforementioned support unit outside the excavator bucket area, one of these is used in front of the terrain with a trench wide matching distance between the two supporting elements, the assembled unit is lowered into the trench approximately to the edge and held firmly in this position from above. For this purpose z.

   B. in each upper corner of the gratings 3 a support rod are pushed through, so class it protrudes far enough on both sides of the unit to form there carrying handles for the operator. Then one worker takes one of the four handles. The unit is then lifted over the trench and lowered into it until the support bars rest on the trench edges.

   Then a second, in the meantime assembled, support unit is added to the first unit and is appropriately releasably connected to the first-mentioned support unit. For this purpose z. B.

    Lugs are used that connect the two grids to one another. However, it is also possible to use four vertical flat bars for this purpose by inserting a flaeh bar through one on top of the other in the webs of the facing longitudinal members 6 of both support units.

   The four flat bars expediently have slots through which wedges are inserted, which are driven through webs above and below the longitudinal girders, so that now both units are stacked on top of one another in a tensile manner. Then, as previously described for the lower unit, support rods are braced on the upper end of the upper unit and the lower support rods are pulled out after gripping the handles. Now the support structure consisting of the two units is lowered back into the trench.

    If ralIs are required, that is, if the trench depth is even greater, additional units can be increased in the manner described and lowered together with the preceding units in stages until the lowest unit has reached its predetermined height, which is directed towards the bottom of the trench. Now, in the area of this support regate, any danger of the trench walls collapsing is eliminated, so that the workers can descend into the trench within these units.

   These now initially pull all the winches 4 from top to bottom so far that the wall support elements abut everywhere with the predetermined pressure on the trench walls.



  As soon as the dredging work has progressed so far that there is space for a nice unit, the corresponding sprouting is made in the same way as described above, with one or more increases, with the nice support units - immediately in front of the already mounted support units are arranged. The ends of the supporting wall elements that abut one another are then advantageously connected to one another in a detachable manner.

   For this purpose, brackets can advantageously be used which connect the abutting ends of the beams 6 of the support wall elements lying one behind the other, the brackets and the webs of the longitudinal beams 6 having corresponding, matching bores through which connecting screws or mandrels can be drawn . In this way, new support units are constantly installed in the trench behind the excavator; so that only a minimal length of the trench is secured immediately behind the excavator.



  To dismantle it can be done in the opposite way by first loosening the longitudinal connections of the support wall elements, then successively loosening the spreader winches 4 so that the support wall elements are pulled off the trench walls and have some play with the latter. Then either the whole structure of an aggregate with all aggregates on top of it can be lifted together, whereby if a crane is available or the excavator is set up as a hoist, this structure is lifted out of the ditch as a whole and onto the terrain be turned off.

   Otherwise, the structure can also be raised in stages, as in the case of assembly, in which case the top unit is successively detached from the underlying structure and then lifted off until all units of the structure in question are pulled out of the trench. The next Ge is then dismantled in the same way.



  One can, however, proceed differently, especially if any danger of collapse of the trench walls must be avoided. In this case, after the winches have been loosened, the winches of the lowest aggregates are removed, then the lowest supporting wall elements are drawn towards the inside of the trench and moved upwards out of the trench between the other jibs. The trench can now be filled in from above, depending on the circumstances in stages, depending on the area of a distant unit.



  After the trench has been heaped up to the height of the second lowest aggregate in this way, steps can be taken for the other aggregates in an analogous manner, so that the trench walls are never unsupported to a greater height than corresponds to an aggregate height. Of course, the height of the units can be different depending on the prevailing soil conditions.



  If the conditions are particularly unfavorable, in which, for example, there is a risk of pure sand or even liquid material escaping from the trench walls, then you can also use wooden plates at the predetermined point between the wire mesh 5 and the trench wall when creating the splitting after an assembly has been inserted into the trench, which have a dimension corresponding to the endangered trench wall location.

 

Claims (1)

PATENTANSPRÜCHE I. Verfahren zur Einsturzsicherung von einander gegenüberliegenden Wänden bei Erdaushebungen, dadurch gekennzeichnet, dass paarweise mittels Spriesswinden in einem der Weite der Erdaushebung angepassten gegenseitigen Abstand gehaltene Stützwand elemente in die Erdaushebung abgesenkt und durch Betätigung der Winden an die zu stüt zenden Erdwände gepresst werden. II. Vorrichtung zur Ausübung des Ver fahrens nach Patentanspruch I, dadurch ge kennzeichnet, dass sie Stützwandelemente und eine Anzahl zum paarweisen lösbaren Abstüt zen derselben in einem Abstand voneinander bestimmte Spriesswinden aufweist. PATENT CLAIMS I. A method for preventing walls opposite one another from collapsing when excavating earth, characterized in that supporting wall elements held in pairs by means of jib winches in a spaced-apart distance from one another are lowered into the excavation and pressed against the earth walls to be supported by actuating the winches. II. Apparatus for performing the method according to claim I, characterized in that it has supporting wall elements and a number of bracing which can be detached in pairs of the same at a distance from one another certain spriesswindeln. III. Anwendung des Verfahrens nach Pa- tentansprueh I, zum Abstützen der Wände eines Grabens. UNTERAN SPRÜ CHE 1. III. Application of the method according to patent claim I for supporting the walls of a trench. SUBSCRIBE 1. Verfahren nach Patentanspruch I, da durch gekennzeichnet, dass Stützaggregate, die je zwei Stützwandelemente und ehre Anzahl von diese in gegenseitigem Abstand haltenden Spriesswinden aufweisen, übereinandergestoekt werden, indem vorerst ein Aggregat. bis un gefähr zum Rand in die Erdaushebung ab gesenkt und von oben her in dieser Lage fest gehalten wird, bis ein zweites Aggregat auf das erste Aggregat aufgesetzt. ist, worauf beide Aggregate zusammen abgesenkt und nötigen falls in dieser Weise eitere A--regate auf gestockt und samt. Method according to patent claim I, characterized in that support units, each having two support wall elements and the number of jamming winches keeping them at a mutual distance, are stacked by initially placing one unit. It is lowered into the excavation around the edge and held firmly in this position from above until a second unit is placed on the first unit. is, whereupon both aggregates are lowered together and, if in this way, necessary additional A - regate raised and all together. den vorangebenden etap penweise abgesenkt. werden, bis das unterste Aggregat seine vorbestimmte Höhenlage er reicht Trat, wonach das Betätigen der Winden erfolgt. 2. Verfahren nach L nterarrsprrreh 1, da durch gekennzeichnet, da.ss beim Aufstecken jedes neu aufgesetzte Stützaggregat mit dem darunterliegenden Stützaggregat\ lösbar ver bunden wird. 3. the previous stage lowered. until the lowest unit reaches its predetermined altitude he stepped, after which the winches are operated. 2. The method according to L nterarrsprrreh 1, characterized in that when attaching each new support unit is releasably connected to the underlying support unit \. 3. Verfahren nach Patentanspruch I, da durch gekennzeichnet, dass Stützaggregate, die je zwei Stützwandelemente und eine Anzahl von diese in gegenseitigem Abstand haltende Spriesswinden aufweisen, unmittelbar hinter einanderliegend getrennt. in der Erdaushebung montiert und alsdann die aneinanderstossen- den Enden der Stützwandelernente mitein ander lösbar verbunden werden. 4. Method according to patent claim I, characterized in that support units, each having two support wall elements and a number of spreader winches keeping them at a mutual distance, are separated directly behind one another. mounted in the excavation and then the abutting ends of the supporting wall elements are releasably connected to each other. 4th Verfahren nach Patentanspruch I, da durch gekennzeichnet, dass aneinanderstossend montierte Wandelemente miteinander lösbar verbunden werden. 5. Verfahren nach Patentanspruch I, da durch gekennzeichnet, dass die Wandelemente nach der Montage in der Erdaushebung ver schalt werden. 6. Method according to claim 1, characterized in that wall elements mounted butting are releasably connected to one another. 5. The method according to claim I, characterized in that the wall elements are switched ver after assembly in the excavation. 6th Vorrichtung nach Patentanspruch 1I, dadurch gekennzeichnet, dass die Stützwand elemente je einen Gitterrost mit gefüllten Fel dern aufweisen, der mit nach der Innenseite vorspringenden Längsträgern versehen ist, und dass die Spriesswinden beiderends Mittel zum lösbaren Anbringen an einander gegen überliegenden Längsträgern der Stützwand elemente eines jeden Paares aufweisen. 7. Device according to claim 1I, characterized in that the support wall elements each have a grating with filled fields, which is provided with longitudinal beams protruding towards the inside, and that the spreader winches at both ends have means for releasably attaching to opposing longitudinal beams of the support wall elements of each Pair. 7th Vorrichtung nach Unteranspruch 6, da durch gekennzeichnet, dass die Spriesswinden beiderends mit je einem Schuh versehen sind, der zwei Schenkel aufweist, von denen der eine Schenkel zum Aufliegen, der andere zum seit lichen Abstützen an den betreffenden Längs trägern bestimmt ist. B. Vorrichtung nach Unteranspruch 7, da durch gekennzeichnet, dass einer der Schenkel eines jeden Windenfusses zum lösbaren Ver binden mit dem betreffenden Längsträger ein gerichtet ist. 9. Vorrichtung nach Unteranspruch 6, da durch gekennzeichnet, dass die Felder eines jeden Gitterrostes durch Drahtgeflecht ausge füllt sind. 10. Device according to dependent claim 6, characterized in that the spreader winches are each provided with a shoe at both ends, which has two legs, one leg of which is intended to rest, the other for lateral support on the relevant longitudinal beams. B. Device according to dependent claim 7, characterized in that one of the legs of each winch foot to releasably bind Ver with the relevant longitudinal member is directed. 9. The device according to dependent claim 6, characterized in that the fields of each grating are filled out by wire mesh. 10. Vorrichtung nach Unteranspruch 6, dadurch gekennzeichnet, dass die Felder eines jeden Gitterrostes durch Bleche ausgefüllt sind. Device according to dependent claim 6, characterized in that the fields of each grating are filled with metal sheets.
CH330395D 1956-01-19 1955-07-05 Method and device for the protection against collapse of opposing walls when excavating earth CH330395A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH330395T 1956-01-19

Publications (1)

Publication Number Publication Date
CH330395A true CH330395A (en) 1958-06-15

Family

ID=4501677

Family Applications (1)

Application Number Title Priority Date Filing Date
CH330395D CH330395A (en) 1956-01-19 1955-07-05 Method and device for the protection against collapse of opposing walls when excavating earth

Country Status (1)

Country Link
CH (1) CH330395A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2576355A1 (en) * 1985-01-18 1986-07-25 Cometal Formwork for building tunnels

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2576355A1 (en) * 1985-01-18 1986-07-25 Cometal Formwork for building tunnels

Similar Documents

Publication Publication Date Title
DE2546946A1 (en) Buried sealing wall production - has workable plastic erosion resistant sealing mass and sealing membrane
CH632307A5 (en) An excavation pit FOR A TRENCH AND HOLE.
DE202023105194U1 (en) Recoverable, diagonally braced compression steel pipe pile for anchoring excavations
DE2135577A1 (en) DUCTING AND FLOOR INSTALLATION DEVICE
DE1947249A1 (en) Foundation or civil engineering structure and process for its production
CH330395A (en) Method and device for the protection against collapse of opposing walls when excavating earth
DE2824562A1 (en) ARTICULATED DEVICE FOR STRENGTHENING THE WALLS OF BUILDING DITCHES, PIPE DITCHES, etc.
CH597438A5 (en) Support shuttering for deep trenches
DE957739C (en) Method for bracing construction pits
DE1059359B (en) Method and device for bracing progressively excavated construction pits, for example by excavators
AT516826B1 (en) Device for excavation protection
CH245930A (en) Pressed concrete construction process for the production of building structures under water.
DE7309646U (en) Installation device for cemetery graves
CH351234A (en) Method and device for bracing construction pits, in particular sewer trenches
DE2461255A1 (en) Continuous, variable size trench cutting device - vertical support beams attached to shell type trench edge support walls
DE7227703U (en) TRENCH COMPACTOR
DE243388C (en)
EP0531600A1 (en) Method of making trench walls and shuttering element used in the method
CH582282A5 (en) Progressive excavation and filling system for trenches - has inserted shoring walls with rear wall facilitating progressive filling
DE2135782C3 (en) Driving device for creating pipe trenches
DE1634888C (en) Method and device for underground laying of pipelines or the like
DE1708617A1 (en) Shaft made of prefabricated parts
DE2458337C2 (en) Shoring basket for continuously progressing shoring of a sewer trench
DE2305093A1 (en) FORMWORK CONSTRUCTION FOR USE WITH CONCRETE
DE102020123673A1 (en) System and method for creating a barrier impassable for burrowers