CH264229A - Method of constructing a cofferdam and cofferdam obtained by this process. - Google Patents

Method of constructing a cofferdam and cofferdam obtained by this process.

Info

Publication number
CH264229A
CH264229A CH264229DA CH264229A CH 264229 A CH264229 A CH 264229A CH 264229D A CH264229D A CH 264229DA CH 264229 A CH264229 A CH 264229A
Authority
CH
Switzerland
Prior art keywords
elements
prefabricated
cofferdam
tube
molded
Prior art date
Application number
Other languages
French (fr)
Inventor
Ognibeni Tito
Original Assignee
Ognibeni Tito
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ognibeni Tito filed Critical Ognibeni Tito
Publication of CH264229A publication Critical patent/CH264229A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Revetment (AREA)

Description

  

      Procédé    de construction d'un batardeau et batardeau obtenu par ce procédé.    La présente invention a pour objet un  procédé de construction d'un batardeau et  comprend également un batardeau obtenu par  ce procédé.  



  Jusqu'ici, on a formé les batardeaux de  fondation au moyen de pieux tangents moulés  dans le sol. On a également. proposé de cons  tituer de tels     batardeaux    par     fonçage    succes  sif de     caissons    métalliques agrafés ou non,       remplis    de béton simple ou armé et retirés  successivement.  



  La présente invention se distingue de ces  procédés connus en ce qu'on fonce     dans    un  terrain des éléments préfabriqués en laissant  un espace entre eux, en ce qu'on moule sur       place    dans chaque espace un élément intermé  diaire et en ce qu'on forme une liaison méca  nique étanche entre lesdits éléments.  



  Le dessin représente, à, titre d'exemple,  plusieurs formes d'exécution d'un détail du  batardeau selon l'invention.  



  Les     fig.    1 à 3 sont. des vues en plan et  en coupe transversale d'une première forme  d'exécution d'un élément préfabriqué, disposé  entre deux     éléments    moulés sur place, ainsi  que deux variantes.  



  La     fig.    3a     est    une vue en coupe longitu  dinale par la ligne     a-a    de la     fig.    3.  



  La     fig.    4 est une deuxième forme d'exécu  tion d'un élément préfabriqué vu en coupe  transversale.    La fi-. 5 est également une vue en coupe  transversale d'une variante de l'élément pré  fabriqué selon la     fig.    1..  



  Les     fig.    6 et     6a    montrent une vue en coupe       t.ranmersale,    respectivement en élévation, d'une  troisième forme d'exécution de l'élément pré  fabriqué disposé entre deux éléments moulés  sur place.  



  Les     fig.    7 et 7a montrent en coupe trans  versale et en élévation par la ligne     b-b    de  la.     fig.    7 une quatrième forme d'exécution de  l'élément préfabriqué.  



  lies     fig.    8 et 8a montrent en plan, respec  tivement en élévation, l'application de diffé  rents     types    d'éléments préfabriqués à la cons  truction d'un batardeau permettant l'établisse  ment d'une enceinte étanche à l'eau.  



  Les     fig.    9 à 12 sont d'autres variantes de  l'élément préfabriqué.  



  Dans un exemple de mise en     oeuvre    du  procédé selon l'invention que l'on va décrire  en se référant à la     fig.    1, on fonce un tube C  dans le terrain, on fonce un élément préfabri  qué constitué par une poutre     .l    munie  d'étriers F, protégés par des boucliers S et on  retire ensuite le tube C. Les boucliers S ser  vent également. à guider des tubes C' pour  les éléments moulés sur place, adjacents à.  la poutre A. Ces tubes C' sont foncés dans le  terrain et découpent des lentilles L dans la  section circulaire du tube C retiré.

   Du béton  est ensuite coulé dans chaque tube C' pour      former     un    pieu P et lesdits tubes C' ainsi que  les boucliers S sont retirés en même temps, de  faon à permettre au béton des pieux P de  venir en contact avec les étriers     E    et les sur  faces découvertes de la poutre A pour former  une liaison mécanique et étanche avec celles-ci.  La poutre A peut être foncée au moyen d'une  sonnette par exemple.  



  Dans une variante de cette mise en     pauvre     du procédé, pour laquelle la poutre A est en       deux    parties longitudinales, on retire le tube  C et on écarte ces parties perpendiculairement  à la ligne de séparation qui est disposée dans  le plan passant par les axes des éléments si  tués de part et d'autre de la poutre A, de telle  manière que ces parties occupent la section  du forage. On remplit ensuite l'espace ménagé  entre les deux parties de la poutre A avec le  béton des pieux P adjacents moulés sur place,  le tout de façon à obtenir une paroi continue.  



  Dans une autre variante du procédé, l'élé  ment     préfabriqué    peut être foncé directement  dans le sol sans l'aide d'in tube, l'extrémité       inférieure    de cet élément étant conformée de  façon à faciliter le     fonçage    et à protéger les       boucliers    portés par ledit élément..  



  A la     fig.    I, la poutre A est pleine et  armée. Les étriers E dépassent des deux faces  destinées à venir en contact avec les pieux P  adjacents. Les deux autres faces de la poutre  A présentent des gorges formant des lunettes  <I>-Lu</I> de forme approximativement semi-circu  laire.  



  Dans la variante de la     fig.    2, la poutre A  est tubulaire, c'est-à-dire présente un trou  central axial V. Ce trou a non seulement pour  but d'alléger la poutre A, mais permet égale  ment de loger     im    tube d'aspiration     R    s'éten  dant dans un tube filtrant     b',    comme repré  senté aux     fig.    3 et 3a., Z     désignant    la zone  filtrante ménagée sous la poutre A. Avec cette  disposition, il est possible de rabattre la nappe  souterraine en évitant l'installation de puits       filtrants    ménagés en dehors du batardeau.  



  Les lunettes semi-circulaires<I>Lit</I> servent à  alléger la poutre A et à permettre également.  de loger des colonnes filtrantes constituées  par un matériau calibré G, par exemple du    gravier. Ces     colonnes    filtrantes servent. au  drainage du terrain et     relient    les nappes su  périeures à la nappe inférieure     qui    est. pom  pée à travers la zone filtrante Z par le tuyau  d'aspiration R.

   On peut insérer un ou plu  sieurs tubes T     dans    la masse de     gmavier    cali  bré G des colonnes filtrantes pour injecter,  par exemple, du ciment dans cette masse de  façon à obtenir une plus grande étanchéité  du batardeau et à remplir des vides formés  entre le     batardeau    et le terrain ou un ouvrage  existant.  



  Dans la forme d'exécution représentée à la       fig.    4, la poutre préfabriquée est en deux par  ties longitudinales symétriques. Les faces de  ces parties destinées à venir en contact avec  les pieux P adjacents sont. protégées par des  boucliers S également en deux parties. L'es  pace prévu entre les deux parties de la poutre  A est rempli par le béton des pieux P moulés  sur place, l'ensemble formant ainsi une paroi  étanche.  



  Les boucliers de protection S     peuvent    être       façonnés    comme représenté à la     fig.    5, de telle  manière qu'après le retrait du tube C, ils  puissent être élargis et occuper la section en  tière du forage, en assurant ainsi     tin    plus  grand recouvrement des faces et des étriers  de la poutre A.  



  Dans la forme d'exécution représentée aux       fig.    6 et 6a, la poutre A présente, à son extré  mité     inférieure,    une pointe Pu, façonnée de  manière à protéger les boucliers S qui, à leur  tour, protègent les     étriers    E dépassant des  faces de la poutre A destinées à venir en con  tact avec les pieux P adjacents.  



  A la     fig.    7, A désigne une poutre préfabri  quée tubulaire dont l'extrémité inférieure a       fuie    forme de sabot tranchant     pour    faciliter  la pénétration de la poutre dans le terrain.  Le trou central V permet l'évacuation du ma  tériau désagrégé par les tubes de lançage T pla  cés dans les     lunettes   <I>Lu.</I> Ces tubes de lançage       pourraient    également être disposés dans le  trou  La poutre préfabriquée peut. être     phis    lon  gue que les pieux moulés en place et dépasser  le terrain.

   Dans les travaux avec un tirant      d'eau, les pieux P s'arrêtent au niveau du  fond, tandis que les poutres A peuvent dépas  ser le fond et     traverser    l'eau ou bien être pro  longées par des poutres en acier ou en béton  armé, coulées dans le béton des poutres pré  fabriquées. Les prolongements de ces poutres  d peuvent former des éléments de batardeau  et permettre la construction d'une enceinte  étanche à l'eau. Les     fig.    8 et     8cc    montrent trois  variantes de poutres     .l,    celle de gauche étant  en une pièce, celle du milieu comprenant un  prolongement constitué par une poutre métal  lique 0 en double T et. celle de droite étant.

    prolongée par une poutre     JI,    également en  double     T,    mais en béton armé.  



  La poutre préfabriquée peut être établie  de façon à être raccordée à un rideau de     pal-          planches    métalliques. A la     fig.    9, une     demi-          palplanche        R    est noyée dans la poutre A,  l'agrafe libre de cette palplanche pouvant être  raccordée au rideau métallique N de même  profil que celui de la     demi-palplanche    K.  



  On peut également disposer dans la poutre       préfabriquée    une poutre métallique en<B>U</B> ou  de tout autre profil pour former une rainure  de batardeau ou un raccord comme repré  senté aux     fig.    10 et 11.  



  La poutre A peut porter en plus des  étriers dépassant les deux faces destinées à  venir en contact avec le béton des pieux P,  des bandes longitudinales     m,    protégées égale  ment par les boucliers     S    comme les étriers E,  en vue d'obtenir une plus grande étanchéité  du rideau (voir     fig.    12).  



  Des rainures longitudinales, latérales et  centrales ou des saillies peuvent être prévues  sur les faces des étriers E de la poutre<B>-1</B> pour  empêcher les boucliers 8 de se déplacer laté  ralement, tout en permettant de retirer ces  boucliers dans le sens vertical. Cette disposi  tion permet, en outre,     d'augmenter    l'étan  chéité du batardeau.



      Method of constructing a cofferdam and cofferdam obtained by this process. The present invention relates to a method of constructing a cofferdam and also comprises a cofferdam obtained by this method.



  So far, the foundation cofferdams have been formed using tangent piles molded into the ground. We also have. proposed to constitute such cofferdams by successive driving of metal caissons, stapled or not, filled with simple or reinforced concrete and withdrawn successively.



  The present invention differs from these known methods in that prefabricated elements are driven into a ground while leaving a space between them, in that an intermediate element is molded in place in each space and in that one forms a sealed mechanical connection between said elements.



  The drawing represents, by way of example, several embodiments of a detail of the cofferdam according to the invention.



  Figs. 1 to 3 are. plan and cross-sectional views of a first embodiment of a prefabricated element, disposed between two elements molded in place, as well as two variants.



  Fig. 3a is a longitudinal sectional view through line a-a of FIG. 3.



  Fig. 4 is a second embodiment of a prefabricated element seen in cross section. The fi-. 5 is also a view in cross section of a variant of the pre-fabricated element according to FIG. 1 ..



  Figs. 6 and 6a show a t.ranmersal sectional view, respectively in elevation, of a third embodiment of the pre-fabricated element disposed between two elements molded in place.



  Figs. 7 and 7a show in cross section and in elevation by line b-b of the. fig. 7 a fourth embodiment of the prefabricated element.



  lees fig. 8 and 8a show in plan, respec tively in elevation, the application of different types of prefabricated elements to the construction of a cofferdam allowing the establishment of a watertight enclosure.



  Figs. 9 to 12 are further variations of the precast element.



  In an exemplary implementation of the method according to the invention which will be described with reference to FIG. 1, we drive a tube C into the ground, we drive a prefabricated element consisting of a beam .l provided with brackets F, protected by shields S and then remove the tube C. The shields S also serve. in guiding tubes C 'for the elements molded in place, adjacent to. beam A. These tubes C 'are dark in the ground and cut lenses L in the circular section of the tube C withdrawn.

   Concrete is then poured into each tube C 'to form a pile P and said tubes C' as well as the shields S are withdrawn at the same time, so as to allow the concrete of the piles P to come into contact with the brackets E and the on the exposed faces of the beam A to form a mechanical and sealed connection with them. Beam A can be darkened by means of a bell for example.



  In a variant of this lean process, for which the beam A is in two longitudinal parts, the tube C is removed and these parts are separated perpendicularly to the separation line which is arranged in the plane passing through the axes of the elements. if killed on either side of beam A, so that these parts occupy the section of the borehole. The space between the two parts of the beam A is then filled with concrete from the adjacent P piles molded in place, all so as to obtain a continuous wall.



  In another variant of the process, the prefabricated element can be sunk directly into the ground without the aid of a tube, the lower end of this element being shaped so as to facilitate driving and to protect the shields carried by the tube. said element ..



  In fig. I, beam A is solid and reinforced. The brackets E protrude from the two faces intended to come into contact with the adjacent piles P. The other two faces of the beam A have grooves forming <I> -Lu </I> glasses of approximately semi-circular shape.



  In the variant of FIG. 2, the beam A is tubular, that is to say has an axial central hole V. This hole is not only intended to lighten the beam A, but also makes it possible to accommodate a suction tube R s' extending into a filter tube b ', as shown in fig. 3 and 3a., Z designating the filtering zone provided under the beam A. With this arrangement, it is possible to lower the groundwater table while avoiding the installation of filtering wells made outside the cofferdam.



  The semi-circular <I> Lit </I> glasses serve to lighten the A-beam and also allow. to house filter columns made of a calibrated material G, for example gravel. These filter columns are used. to the drainage of the land and connect the upper water tables to the lower water table which is. pumped through the filtering zone Z by the suction pipe R.

   One or more T tubes can be inserted into the mass of calibrated gmavier G of the filter columns to inject, for example, cement into this mass so as to obtain a greater seal of the cofferdam and to fill the voids formed between the cofferdam. and the land or an existing structure.



  In the embodiment shown in FIG. 4, the prefabricated beam is in two symmetrical longitudinal parts. The faces of these parts intended to come into contact with the adjacent P piles are. protected by S shields also in two parts. The space provided between the two parts of the beam A is filled with the concrete of the P piles molded on site, the assembly thus forming a sealed wall.



  The protective shields S can be shaped as shown in fig. 5, so that after removal of tube C, they can be widened and occupy the third section of the borehole, thus ensuring greater overlap of the faces and stirrups of beam A.



  In the embodiment shown in FIGS. 6 and 6a, the beam A has, at its lower end, a point Pu, shaped so as to protect the shields S which, in turn, protect the brackets E protruding from the faces of the beam A intended to come into contact. with adjacent P piles.



  In fig. 7, A designates a prefabricated tubular beam, the lower end of which has been shaped like a cutting shoe to facilitate the penetration of the beam into the ground. The central hole V allows the evacuation of the material broken up by the launching tubes T placed in the glasses <I> Lu. </I> These launching tubes could also be arranged in the hole The prefabricated beam can. be longer than the stakes cast in place and protrude beyond the ground.

   In works with a draft, the P piles stop at the level of the bottom, while the A beams can exceed the bottom and cross the water or be extended by steel or reinforced concrete beams. , pre-fabricated beams cast in concrete. The extensions of these beams d can form cofferdam elements and allow the construction of a watertight enclosure. Figs. 8 and 8cc show three variants of .l beams, the one on the left being in one piece, the middle one comprising an extension consisting of a metal beam 0 in double T and. the one on the right being.

    extended by a JI beam, also in double T, but in reinforced concrete.



  The prefabricated beam can be established so as to be connected to a curtain of metal sheets. In fig. 9, a half sheet pile R is embedded in the beam A, the free clip of this sheet pile being able to be connected to the metal wall N of the same profile as that of the half sheet pile K.



  It is also possible to place in the prefabricated beam a metal beam in <B> U </B> or any other profile to form a cofferdam groove or a connection as shown in figs. 10 and 11.



  The beam A can carry in addition to the brackets protruding from the two faces intended to come into contact with the concrete of the piles P, longitudinal bands m, also protected by the shields S like the brackets E, in order to obtain a greater tightness of the curtain (see fig. 12).



  Longitudinal, lateral and central grooves or protrusions may be provided on the faces of the brackets E of the beam <B> -1 </B> to prevent the shields 8 from moving sideways, while still allowing these shields to be removed in the vertical direction. This arrangement also makes it possible to increase the watertightness of the cofferdam.

 

Claims (1)

REVENDICATIONS: I. Procédé de construction d'un batardeau, caractérisé en ce qu'on fonce dans un terrain des éléments préfabriqués en laissant. un espace entre eux, en ce qu'on moule sur place dans chaque espace un élément intermédiaire et en ce qu'on forme une liaison mécanique étanche entre lesdits éléments. II. Batardeau obtenu selon le procédé dé fini à la revendication I. <B>SOUS-REVENDICATIONS.</B> 1. CLAIMS: I. A method of constructing a cofferdam, characterized in that prefabricated elements are driven into a field leaving. a space between them, in that an intermediate element is molded on site in each space and in that a sealed mechanical connection is formed between said elements. II. Cofferdam obtained according to the process defined in claim I. <B> SUB-CLAIMS. </B> 1. Procédé selon la revendication I, carac térisé en ce qu'on fonce un tube dans le ter rain, en ce qu'on fonce un élément préfabri qué muni, de chaque côté, d'organes de pro tection, dans ledit tube, en ce qu'on retire ce tube, en ce qu'on fonce un tube adjacent à l'élément préfabriqué de façon qu'il soit guidé par les organes de protection, en ce qu'on coule du béton dans ce tube pour former l'élé ment moulé et en ce qu'on retire le tube de cet élément moulé, ainsi que les organes de protection susdits de façon à permettre au béton de venir en contact avec la surface ad jacente de l'élément préfabriqué protégée au paravant par lesdits organes de protection. ?. Process according to Claim I, characterized in that a tube is driven into the ground, in that a prefabricated element provided with protective members on each side is driven into said tube, in this respect. that this tube is removed, by driving a tube adjacent to the prefabricated element so that it is guided by the protective members, in that concrete is poured into this tube to form the element molded element and in that the tube is removed from this molded element, as well as the aforesaid protection members so as to allow the concrete to come into contact with the ad jacent surface of the prefabricated element protected from the front by said protection. ?. Procédé selon la revendication I, carac térisé en ce qu'on fonce un tube dans le ter rain, en ce qu'on fonce dans ce tube un élé ment préfabriqué formé de deux parties longi tudinales symétriques et munies d'organes de protection de chaque côté, en ce qu'on retire ledit tube, en ce qu'on écarte les deux parties de l'élément préfabriqué perpendiculairement à la ligne de séparation de ces parties qui est disposée dans le plan passant par les axes des éléments situés de part et d'autre de l'élément préfabriqué, de telle manière qu'elles occu pent au moins la section du forage, et en ce qu'on remplit l'espace prévu entre lesdites parties de l'élément préfabriqué avec le béton des éléments adjacents moulés sur place, le tout de façon à former une paroi continue. Process according to Claim I, characterized in that a tube is driven into the ground, in that a prefabricated element formed of two symmetrical longitudinal parts and provided with protective members on each side is driven into this tube. side, in that said tube is removed, in that the two parts of the prefabricated element are separated perpendicular to the line of separation of these parts which is arranged in the plane passing through the axes of the elements located on both sides other part of the prefabricated element, in such a way that they occupy at least the section of the borehole, and in that the space provided between said parts of the prefabricated element is filled with the concrete of the adjacent molded elements on site, all so as to form a continuous wall. 3. Procédé selon la revendication I, carac térisé en ce qu'on fonce directement les élé ments préfabriqués dans le terrain, l'extré mité inférieure de chaque élément étant con formée de manière à protéger, lors du fon- ca;;,e, des boucliers prévus sur ledit élément. 4. 3. Method according to claim I, characterized in that the prefabricated elements are driven directly into the ground, the lower end of each element being shaped so as to protect, during the casting ;;, e , shields provided on said element. 4. Batardeau selon la revendication II, ca ractérisé en ce que la liaison mécanique entre les éléments préfabriqués et les éléments mou- lés sur place est réalisée au moyen d'étriers bétonnés qui dépassent à partir des deux faces de l'élément préfabriqué, destinées à venir en contact avec les éléments moulés adjacents et en ce que des organes de protection sont pré vus pour protéger lesdits étriers, ces organes servant également de moyens de guidage pour le fonçage des tubes des éléments moulés ad jacents. 5. Batardeau selon la revendication II, ca ractérisé en ce que chaque élément préfabri qué présente un -trou central axial. 6. Coffer dam according to claim II, characterized in that the mechanical connection between the prefabricated elements and the elements molded in place is achieved by means of concrete brackets which protrude from the two faces of the prefabricated element, intended to come in. in contact with the adjacent molded elements and in that protective members are provided to protect said stirrups, these members also serving as guide means for driving the tubes of the adjacent molded elements. 5. Cofferdam according to claim II, ca acterized in that each prefabricated element has an axial central -hole. 6. Batardeau selon la revendication II et la sous-revendication 5, caractérisé en ce que chaque élément préfabriqué présente, en outre, sur ses faces latérales des gorges longi tudinales destinées à former des drains ver- ticaiux. 7. Batardeau selon la revendication II, ca ractérisé en ce que chaque élément préfabriqué est formé de deux parties longitudinales sy métriques, écartées l'une de l'autre de façon à occuper au moins la section de forage, l'es pace entre ces deux parties étant occupé par le béton des éléments adjacents moulés sur place. 8. Coffer dam according to claim II and sub-claim 5, characterized in that each prefabricated element also has on its lateral faces longitudinal grooves intended to form vertical drains. 7. Cofferdam according to claim II, characterized in that each prefabricated element is formed of two sy metric longitudinal parts, spaced from each other so as to occupy at least the drilling section, the space between these two parts being occupied by the concrete of the adjacent elements cast in place. 8. Batardeau selon la revendication II et la sous-revendication 4, caractérisé en ce que chaque élément préfabriqué présente une pointe à son extrémité inférieure conformée de façon à protéger des boucliers prévus sur les faces de cet élément préfabriqué, destinées à venir en contact avec les éléments moulés adjacents. Cofferdam according to claim II and sub-claim 4, characterized in that each prefabricated element has a point at its lower end shaped so as to protect shields provided on the faces of this prefabricated element, intended to come into contact with the elements. adjacent moldings. 9. Batardeau selon la revendication II, ca- ; ractérisé en ce que les éléments .préfabriqués dépassent le terrain et sont plus longs que les éléments moulés sur place et s'arrêtant au ni veau du terrain, le tout de façon à permettre la construction d'une enceinte étanche à l'eau. 10. Batardeau selon la revendication II et la sous-revendication 9, caractérisé en ce que les éléments préfabriqués sont prolongés par des poutres présentant des rainures destinées à recevoir les parois formant ladite enceinte. 11. 9. Cofferdam according to claim II, ca-; Ractérisé in that the prefabricated elements protrude from the ground and are longer than the elements molded in place and stopping at the level of the ground, the whole so as to allow the construction of a watertight enclosure. 10. Cofferdam according to claim II and sub-claim 9, characterized in that the prefabricated elements are extended by beams having grooves intended to receive the walls forming said enclosure. 11. Batardeau selon la revendication II, caractérisé en ce que certains éléments pré fabriqués présentent des moyens permettant de les raccorder à un rideau métallique de palplanches. 12. Batardeau selon la revendication II, caractérisé en ce que chaque élément préfa briqué est muni de tôles longitudinales sur les faces destinées à venir en contact avec les éléments moulés sur place. 13. Batardeau selon la revendication II, caractérisé en ce que certains éléments pré fabriqués comprennent une poutre longitudi nale en U formant une rainure permettant de les raccorder à une paroi. 14. Cofferdam according to Claim II, characterized in that certain pre-fabricated elements have means enabling them to be connected to a metal sheet pile wall. 12. Cofferdam according to claim II, characterized in that each prefabricated element is provided with longitudinal sheets on the faces intended to come into contact with the elements molded on site. 13. Cofferdam according to claim II, characterized in that certain pre-fabricated elements comprise a longitudinal U-shaped beam forming a groove allowing them to be connected to a wall. 14. Batardeau selon la revendication II et la sous-revendication 4, caractérisé en ce que l'élément préfabriqué comprend des moyens pour empêcher le déplacement transversal des organes de protection. Coffer dam according to claim II and sub-claim 4, characterized in that the prefabricated element comprises means for preventing the transverse displacement of the protection members.
CH264229D 1945-09-25 1946-09-17 Method of constructing a cofferdam and cofferdam obtained by this process. CH264229A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
IT264229X 1945-09-25

Publications (1)

Publication Number Publication Date
CH264229A true CH264229A (en) 1949-10-15

Family

ID=11219452

Family Applications (1)

Application Number Title Priority Date Filing Date
CH264229D CH264229A (en) 1945-09-25 1946-09-17 Method of constructing a cofferdam and cofferdam obtained by this process.

Country Status (1)

Country Link
CH (1) CH264229A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT387055B (en) * 1982-05-17 1988-11-25 Holzmann Philipp Ag SHUTDOWN DEVICE FOR SLOT WALL LAMPS

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT387055B (en) * 1982-05-17 1988-11-25 Holzmann Philipp Ag SHUTDOWN DEVICE FOR SLOT WALL LAMPS

Similar Documents

Publication Publication Date Title
EP0839231B1 (en) River bank flood barrier
CA1217349A (en) Engineering of reinforced concrete structures, such as tunnels, underpasses and the like, and precast concrete elements used in said engineering processes
CA1302111C (en) Process and apparatus for making a rigid load-bearing slab
CH642416A5 (en) METHOD OF CONSTRUCTING UNDERGROUND WORKS WITH VERTICAL WALLS, DEVICE FOR EXECUTING THE METHOD AND UNDERGROUND WORK.
WO1991002851A2 (en) Cellular structures for sustaining walls
JP2004162370A (en) Steel pipe structural permanent column erection method
EP0028558B1 (en) Method of improving the sliding resistance of a civil engineering construction and its foundation
WO2019053615A1 (en) Retaining wall comprising precast piles and pile for such a wall
CH264229A (en) Method of constructing a cofferdam and cofferdam obtained by this process.
FR2687711A1 (en) Method for constructing a building, such as an underground shelter, by assembly of prefabricated elements
FR2660681A1 (en) Connection element and methods for constructing walls which are connected at their base to a sole plate or to a baseplate
JP2018044337A (en) Structure and method for reinforcing embankment
FR2792661A1 (en) Barrage assembly for controlling the flow of water through a channel, into and out of a main body of water and other such applications, utilizes piles driven through the bed and lower substrata supporting rotating vanes
EP0242497A1 (en) Tunnel construction process
FR2473085A1 (en) Mfr. of continuous concrete wall - is cast in sections using successive trenches containing overlapping reinforcing frames and transverse bulkheads
BE894650R (en) Reinforced concrete construction underground - has frames dropped into excavations with positioning detents ensuring continuity
BE468138A (en)
FR2780424A1 (en) Vertical reinforced concrete wall cast in situ in ground
FR2528885A1 (en) Element for forming bridge in ditches - retains earth wall whilst allowing continuation of flow through ditch
CA2881902A1 (en) Shoring system using at least one liquid-controlling slide rail
FR2463841A1 (en) Metal support frame fitting tombstone - is staked to ground when level with splayed base for stability
BE876763A (en) METHOD AND DEVICE FOR SUPPORTING A BUILDING FROM AN UNDERGROUND GALLERY.
FR2534611A1 (en) Method and device for producing a moulded wall of hard earth
FR2523641A1 (en) Method of seating underwater tunnel - uses concrete sections made in trench and pushed forward through water
BE890940A (en) METHOD FOR CONSTRUCTING A WALL AND ELEMENTS FOR USE IN THIS PROCESS