BE806494A - PROCESS FOR EXECUTING JOINTS ON SIDERO-CEMENT PIPES - Google Patents
PROCESS FOR EXECUTING JOINTS ON SIDERO-CEMENT PIPESInfo
- Publication number
- BE806494A BE806494A BE137044A BE137044A BE806494A BE 806494 A BE806494 A BE 806494A BE 137044 A BE137044 A BE 137044A BE 137044 A BE137044 A BE 137044A BE 806494 A BE806494 A BE 806494A
- Authority
- BE
- Belgium
- Prior art keywords
- emi
- phase
- ring
- pipes
- sleeve
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/005—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
Description
<EMI ID=1.1>
<EMI ID=2.1>
le coût élevé des: travaux de fonçage proviennent principalement des nombreux temps morts dus à l'imbrication des différentes opérations exigeant chacune de la main d'oeuvre hautement spécialisée.
Actuellement, il est fait usage de tuyaux en
<EMI ID=3.1>
un cimentage extérieur b et un cimentage intérieur � ainsi que aux extrémités des tôles fortes ^ qui après fonçage : se <EMI ID=4.1>
soudure a. Dans une telle réalisation, le travail de fonçage ne peut être poursuivi qu'après remplissage et durcissement
<EMI ID=5.1>
La présente invention a pour but de permettre une exécution du travail en continu et une meilleure utilisation des hommes et du matériel et l'obtention de différents avantages qui seront énumérés ci-après.
Elle consiste essentiellement en ce que les tuyaux d'un tronçon sont tout d'abord foncés sans former les joints définitifs et en ce que les joints sont exécutés après qu'un tronçon a été mis en place.
Suivant l'invention les travaux sont exécutés selon une série de phases qui se distinguent essentiellement tant dans les particularités de leur succession que dans la nature de chacune d'elles.
Le procédé, objet de l'invention, est applicable non seulement aux fonçages de tuyaux destinés à devenir des gaines mais aussi à la réalisation d'une conduite sous pression.
A titre d'exemple non limitatif on décrira ci-après, en se référant aux dessins, les différentes phases dans le cas du terrassement et de la création d'une conduite d'eau ou d'un autre fluide sous pression au travers par exemple d'une forêt.
La figure 1 est une vue schématique de l'installation ; La figure 2 est une vue en coupe du détail II de la figure 1 représentant les extrémités de deux tuyaux en sidéro-ciment juxtaposées et devant être reliées conformément au procédé <EMI ID=6.1> La figure 3 est une vue en perspective montrant la composition d'un tuyau en sidéro-ciment <EMI ID=7.1>
<EMI ID=8.1>
soire ainsi que de maintenir le centrage des tuyaux juxta- posés lors du fonçage
Les figures 5 et 6 sont des vues de détail relatives à 1" appareillage utilisé La figure 7 est une coupe prise par la ligne
<EMI ID=9.1>
Lee figures 8 à 13 illustrent les différentes phases successives de l'exécution La figure 10 est une coupe par la ligne X-X dans la figure 9 La figure 1 montre un tube en acier 1 contenant une installation comprenant une machine Taupe 2 par exemple du type westfalia Lunen permettant une mécanisation des travaux de terrassement en tête de fonçage.
Cette figure montre également un premier tube
3 en sidérc-ciment qui a été foncé derrière la machine de terrassement 2.
La figure 2 représente deux tuyaux mis bout à bout sans joint et illustre le détail II de la figure 1 où l'on a montré un second tube 4 faisant suite au tube 3.
Sur cette figure 2 et également sur la figure 3 on montre en 5 le ciment extérieur avec armatures6, en 7
le ciment intérieur avec armatures 8 et les tubes en acier
9 qui sont munis chacun à leur extrémité des anneaux de renforcement 11 constitués par une tôle forte destinée à être reliée à une manchette intérieure (non représentée à la figure
2) dont il sera question ci-après et destinée à réaliser l'étanchéité entre . tuyaux successifs.
<EMI ID=10.1>
La phase suivante (figures 4 à 7) consiste à poser un anneau expansif de centrage 12 à l'arrière du pre-
<EMI ID=11.1>
on enfile ensuite le second tube 4 en sidéro-ciment sur l'anneau 12 après intercalation d'un anneau en bois 13 pour la répartition des efforts de poussée.
cet anneau 12 est en général formé de trois é"léments dont l'expansion pour atteindre le diamètre intérieur des tôles fortes est réalisé à l'aide de tiges filetées
14 munies de boulons 15 en général au nombre de six traversant des oreilles 16 prévues aux extrémités des éléments de l'anneau.
Par action sur les écrous de l'anneau de centrage, on réalise le centrage des deux tubes 3 et 4.
L'anneau intercalaire on bois 13 est prévu en deux parties collées 13-13<1> afin de pouvoir détacher facilement la partie intérieure 131 pour l'injection ultérieure d'un produit de protection ainsi que cela sera expliqué ci-après.
Les opérations exposées ci -dessus peuvent
<EMI ID=12.1>
Phase 1 :
Installation de la machine de fonçage Phase 2
<EMI ID=13.1>
phase 3
Pose d'un anneau expansif de centrage. Phase 4 :
<EMI ID=14.1>
l'anneau de centrage après intercalation d'un anneau en bois.
Phase 5 t
Centrage des deux tubes par action sur les écrous de l'anneau de centrage.
Les phases immédiatement suivantes sont t Phase 6
Ponçage du second tube.
<EMI ID=15.1>
Répétition.* des opérations 3 à 6 jusqu'à achè-
<EMI ID=16.1>
Enlèvement des anneaux de centrage 12. Phase 9 :
<EMI ID=17.1>
2 cm de profondeur (partie 13<1>) (figure 8).
La partie intérieure de l'anneau intercalaire
<EMI ID=18.1>
du bois jusqu'à une profondeur au moins égale à 2 cm. Les
<EMI ID=19.1>
éventuellement d'un ciseau à bois.
Phase 10 :
<EMI ID=20.1>
les deux tuyaux .,dans un plan vertical longitudinal axial.
cette tôle est destinée à séparer en deux la partie supérieure de l'intervalle annulaire aux fins de pouvoir s'assurer ultérieurement que le produit de protection remplira bien intégralement l'espace annulaire 18.
Phase 11
Soudage d'une manchette intérieure 19 (figure
9) en tôle forte (par exemple : 80 x 8) sur les tôles fortes
11 des tuyaux aux fins de réaliser l'étanchéité du joint.
Cette manchette 19 comporte trois trous taraudés (figure 10) dont deux 20-21 (figure 11) situés à la partie supérieure sont prolongés par des buselures 22-23 entre lesquelles se trouve la tôle 17 et qui sont destinés
à permettre de purger l'espace annulaire au moment du remplis sage du produit protecteur.
A la partie inférieure est prévu un raccord
<EMI ID=21.1>
Phase 12 (figure la) Essai à l'air,
L'espace annulaire 18 formé après soudure de la
<EMI ID=22.1>
raccord inférieur 24 sera relié au compresseur tandis que les raccords supérieurs 22-23 seront munie l'un d'un manomètre 30, l'autre d'une soupape de sécurité 25 tarée à
<EMI ID=23.1>
neau de bois 13 resté en place.
Les cordons de soudure 26 sont alors passés à l'eau savonneuse pour vérification d'étanchéité. phase 13 (figure 11) le action masse passivante.
<EMI ID=24.1>
20-21.
<EMI ID=25.1>
Phase 14 (figure 12) Obturation des orifices.
Après remplissage du produit protecteur, les buselures 22-23 seront obturées par des tigas filetées 27. L'étanchéité parfaite sera obtenue par soudage d'un cordon de soudure 28 autour des tiges filetées que l'on aura eu le soin de laisser déborder de 4 à 5 mm.
Phase 15 (figure 13) Cimentage intérieur.
Après les opérations précédentes, il suffit pour la protection intérieure du joint, de procéder au cimentage 29 habituel avec les agrégats recommandés par le fournisseur des tuyaux. Au besoin une armature légère
sera mise en place pour prévenir tout décollage du cimentage.
L'invention englobe également les tuyaux en sidéro-ciment modifiés en vue de la mise en pratique du procédé.
ces tuyaux se distinguent en ce que les tôles
<EMI ID=26.1>
de manière que lors de la juxtaposition de deux tubes, ces tôles fortes ce trouvent disposées horizontalement à un même niveau en laissant un espace pour le placement de la manchette intérieure d'étanchéité 12.
<EMI ID=27.1> <EMI ID=28.1> du matériel ;
- pas d'attente pour le soudage du joint et la prise des cimentages extérieur et intérieur ;
- flexibilité des tronçons en cours de fonçage permettant des corrections éventuelles ;
- assurance de ne pas avoir des cimentages extérieur ou intérieur fissurés par des efforts de flexion dus au fonçage
- contrôle de l'étanchéité du joint entre tuyaux après fonçage et non �vant.
REVENDICATIONS
1. Procédé d'exécution de joints sur des
tuyaux en sidéro-ciment caractérisé en ce que les tuyaux d'un tronçon sont tout d'abord foncés sans former les joints définitifs et en ce que ces joints sont exécutés après qu'un tronçon a été mis en place.
<EMI ID = 1.1>
<EMI ID = 2.1>
the high cost of: sinking work is mainly due to the many downtimes due to the overlapping of the various operations, each requiring highly specialized labor.
Currently, use is made of pipes made of
<EMI ID = 3.1>
an exterior cementing b and an interior cementing � as well as at the ends of heavy plates ^ which after driving: is <EMI ID = 4.1>
welding a. In such an embodiment, the driving work can only be continued after filling and hardening.
<EMI ID = 5.1>
The object of the present invention is to enable the work to be carried out continuously and to make better use of men and equipment and to obtain various advantages which will be listed below.
It essentially consists in that the pipes of a section are first darkened without forming the final joints and in that the joints are made after a section has been put in place.
According to the invention, the work is carried out according to a series of phases which differ essentially both in the particularities of their succession and in the nature of each of them.
The method, object of the invention, is applicable not only to the sinking of pipes intended to become sheaths but also to the production of a pressure pipe.
By way of non-limiting example, the following will describe, with reference to the drawings, the various phases in the case of earthworks and the creation of a water pipe or of another pressurized fluid through, for example. of a forest.
Figure 1 is a schematic view of the installation; Figure 2 is a sectional view of detail II of Figure 1 showing the ends of two siderocement pipes juxtaposed and to be connected according to the method <EMI ID = 6.1> Figure 3 is a perspective view showing the composition of a siderocement pipe <EMI ID = 7.1>
<EMI ID = 8.1>
evening as well as to maintain the centering of the juxtaposed pipes when jacking
Figures 5 and 6 are detail views relating to 1 "equipment used Figure 7 is a section taken through the line
<EMI ID = 9.1>
Figures 8 to 13 illustrate the different successive phases of the execution Figure 10 is a section through the line XX in figure 9 Figure 1 shows a steel tube 1 containing an installation comprising a Taupe machine 2, for example of the Westfalia type Lunen allowing a mechanization of earthworks at the top of the sinking head.
This figure also shows a first tube
3 in sidereal cement which was dark behind the earthmoving machine 2.
Figure 2 shows two pipes placed end to end without a joint and illustrates detail II of figure 1 where a second tube 4 has been shown following on from tube 3.
In this figure 2 and also in figure 3 we show at 5 the external cement with reinforcements 6, at 7
interior cement with 8 reinforcements and steel pipes
9 which are each provided at their end with reinforcing rings 11 formed by a heavy plate intended to be connected to an internal sleeve (not shown in FIG.
2) which will be discussed below and intended to achieve the seal between. successive pipes.
<EMI ID = 10.1>
The next phase (Figures 4 to 7) consists of placing an expanding centering ring 12 at the rear of the first
<EMI ID = 11.1>
the second siderocement tube 4 is then threaded onto the ring 12 after inserting a wooden ring 13 for the distribution of the thrust forces.
this ring 12 is generally formed of three elements whose expansion to reach the internal diameter of the heavy plates is achieved using threaded rods
14 provided with bolts 15 generally six in number passing through ears 16 provided at the ends of the elements of the ring.
By acting on the nuts of the centering ring, the two tubes 3 and 4 are centered.
The wood insert ring 13 is provided in two glued parts 13-13 <1> in order to be able to easily detach the inner part 131 for the subsequent injection of a protective product as will be explained below.
The operations described above may
<EMI ID = 12.1>
Phase 1 :
Installation of the jacking machine Phase 2
<EMI ID = 13.1>
phase 3
Installation of an expanding centering ring. Phase 4:
<EMI ID = 14.1>
the centering ring after inserting a wooden ring.
Phase 5 t
Centering of the two tubes by acting on the nuts of the centering ring.
The immediately following phases are t Phase 6
Sanding of the second tube.
<EMI ID = 15.1>
Repeat. * Operations 3 to 6 until complete
<EMI ID = 16.1>
Removal of the centering rings 12. Phase 9:
<EMI ID = 17.1>
2 cm deep (part 13 <1>) (figure 8).
The inner part of the intermediate ring
<EMI ID = 18.1>
wood to a depth of at least 2 cm. The
<EMI ID = 19.1>
possibly a wood chisel.
Phase 10:
<EMI ID = 20.1>
the two pipes., in an axial longitudinal vertical plane.
this sheet is intended to separate the upper part of the annular gap in two in order to be able to ensure subsequently that the protective product will indeed completely fill the annular space 18.
Phase 11
Welding of an inner sleeve 19 (figure
9) in heavy plate (for example: 80 x 8) on heavy plates
11 of the pipes for the purpose of sealing the joint.
This sleeve 19 has three threaded holes (figure 10), two of which 20-21 (figure 11) located at the upper part are extended by nozzles 22-23 between which the sheet 17 is located and which are intended
to allow the annular space to be purged at the time of wise filling of the protective product.
At the bottom is a fitting
<EMI ID = 21.1>
Phase 12 (figure la) Air test,
The annular space 18 formed after welding of the
<EMI ID = 22.1>
lower connection 24 will be connected to the compressor while the upper connections 22-23 will be fitted one with a pressure gauge 30, the other with a safety valve 25 calibrated to
<EMI ID = 23.1>
wooden pole 13 remained in place.
The weld beads 26 are then passed through soapy water to check the tightness. phase 13 (figure 11) the passivating mass action.
<EMI ID = 24.1>
20-21.
<EMI ID = 25.1>
Phase 14 (figure 12) Sealing of the orifices.
After filling with the protective product, the nozzles 22-23 will be closed by threaded tigas 27. Perfect tightness will be obtained by welding a weld bead 28 around the threaded rods that we have taken care to let overflow. 4 to 5 mm.
Phase 15 (figure 13) Interior cementing.
After the previous operations, it suffices for the internal protection of the joint to proceed with the usual cementing 29 with the aggregates recommended by the supplier of the pipes. If necessary, a light frame
will be in place to prevent any detachment of the cement.
The invention also encompasses siderocement pipes modified for the practice of the method.
these pipes are distinguished in that the sheets
<EMI ID = 26.1>
so that when two tubes are juxtaposed, these heavy plates are placed horizontally at the same level, leaving a space for the placement of the inner sealing sleeve 12.
<EMI ID = 27.1> <EMI ID = 28.1> of the hardware;
- no waiting for the welding of the joint and the setting of the exterior and interior cementings;
- flexibility of the sections during sinking allowing possible corrections;
- assurance of not having exterior or interior cementing cracked by bending forces due to driving
- check the tightness of the joint between pipes after jacking and not before.
CLAIMS
1. Process for making joints on
siderocement pipes characterized in that the pipes of a section are first darkened without forming the final joints and in that these joints are made after a section has been put in place.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BE137044A BE806494A (en) | 1973-10-25 | 1973-10-25 | PROCESS FOR EXECUTING JOINTS ON SIDERO-CEMENT PIPES |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BE137044A BE806494A (en) | 1973-10-25 | 1973-10-25 | PROCESS FOR EXECUTING JOINTS ON SIDERO-CEMENT PIPES |
Publications (1)
Publication Number | Publication Date |
---|---|
BE806494A true BE806494A (en) | 1974-02-15 |
Family
ID=3842321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BE137044A BE806494A (en) | 1973-10-25 | 1973-10-25 | PROCESS FOR EXECUTING JOINTS ON SIDERO-CEMENT PIPES |
Country Status (1)
Country | Link |
---|---|
BE (1) | BE806494A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1991000974A1 (en) * | 1989-07-12 | 1991-01-24 | Halbergerhütte Gmbh | Pipe connection for advance working pipes laid underground by an advance working technique |
-
1973
- 1973-10-25 BE BE137044A patent/BE806494A/en unknown
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1991000974A1 (en) * | 1989-07-12 | 1991-01-24 | Halbergerhütte Gmbh | Pipe connection for advance working pipes laid underground by an advance working technique |
US5165822A (en) * | 1989-07-12 | 1992-11-24 | Halbergerhutte Gmbh | Pipe joint for driving pipes laid underground by the driving technique |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2328031A (en) | Pipe clamp and method and apparatus for applying same | |
EP0020232B1 (en) | Method and apparatus for anchoring conduits such as pipe-lines on sea beds | |
US1911775A (en) | Method of making pipe couplings | |
WO2007063016A1 (en) | Method and device for cementing a well or a pipe | |
DE2457386C2 (en) | Process for explosion welding of pipes under water | |
CA2673798A1 (en) | A method of repairing leakage in pipelines | |
BE806494A (en) | PROCESS FOR EXECUTING JOINTS ON SIDERO-CEMENT PIPES | |
CA2064429C (en) | Sealing device for expansion joints cut in dams | |
CN106592532B (en) | The construction method of concrete works deformation joint sealing swaging die with reinforcing fiber | |
FR2498290A1 (en) | PROCESS FOR INTERIOR COATING OF MAIN TUBULAR DUCTS TO WHICH CONNECTIONS OF SUPPLY DUCTS OF VARIOUS BUILDINGS ARE CONNECTED | |
EP0010053B1 (en) | Method for constructing basins for the nuclear industry, and basins realized according to this method | |
BE696516A (en) | ||
FR2536826A1 (en) | Method for anchoring a submerged pipe, device for implementing it and the anchoring thus produced. | |
EP0377541A1 (en) | Process and apparatus for anchoring the shieldings of a reinforced-earth wall | |
FR2545120A1 (en) | Method for the underwater connection of two hollow concrete elements such as two successive tunnel elements | |
FR2635799A1 (en) | Method and device for positioning underground ducts. | |
US3177955A (en) | Apparatus for the placing of thin wall well screen pipe or tubing horizon-tally into a subterranean formation | |
EP3201399B1 (en) | Method of manufacturing an underground storage tank and corresponding tank | |
JPH0539887A (en) | Pipe connecting structure and connecting pipe and pipe used in this connecting structure | |
FR2915264A1 (en) | Well or pipe liner coating method for e.g. water production field, has expanding expanded zones of tube, where expanded zones are spaced by non-expanded zones so that total length of expanded zones is lower than that of non-expanded zones | |
BE1004846A6 (en) | Method for sealing a pressurised fluid leak, particularly oil or gas, andequipment for the use of said method | |
CH229376A (en) | Device for showing forces, in particular in civil engineering works. | |
FR2619137A1 (en) | METHOD FOR CONSTRUCTING A CONCRETE FOUNDATION IN THE BASEMENT, ESPECIALLY ON BUILDING LANDS | |
CH236194A (en) | Method for sealing the wall and the bottom of a large-sized tank intended to receive a fluid by sealing, and device for implementing this method. | |
FR2641294A1 (en) | Method and device for anchoring scales for supporting an armoured soil wall |