BE1004846A6 - Method for sealing a pressurised fluid leak, particularly oil or gas, andequipment for the use of said method - Google Patents

Method for sealing a pressurised fluid leak, particularly oil or gas, andequipment for the use of said method Download PDF

Info

Publication number
BE1004846A6
BE1004846A6 BE9100357A BE9100357A BE1004846A6 BE 1004846 A6 BE1004846 A6 BE 1004846A6 BE 9100357 A BE9100357 A BE 9100357A BE 9100357 A BE9100357 A BE 9100357A BE 1004846 A6 BE1004846 A6 BE 1004846A6
Authority
BE
Belgium
Prior art keywords
tubing
aforementioned
production
well
casing
Prior art date
Application number
BE9100357A
Other languages
French (fr)
Original Assignee
Anbergen Henricus Johannes
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anbergen Henricus Johannes filed Critical Anbergen Henricus Johannes
Priority to BE9100357A priority Critical patent/BE1004846A6/en
Application granted granted Critical
Publication of BE1004846A6 publication Critical patent/BE1004846A6/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B29/00Cutting or destroying pipes, packers, plugs or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
    • E21B29/08Cutting or deforming pipes to control fluid flow

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Pipe Accessories (AREA)

Abstract

Method for sealing an oil or gas leak, ignited or not, accidentally escapingfrom the production casing (1) of a well (2), which particularly consists inclearing an area (6) of the tube (2''), which contains the surface casing(2'), the casing (1) and the tubing (4), bending (in 8) the tube (2'') untilthe casing (4) is compressed to reduce the flow rate of the leak, injectingin the tubing or in the annular area (7) between the latter and the casing(1) below the bent area (8), a pressurised liquid so that it is distributedin the annular area (7) and the tubing to create a liquid plug placing thewell (2) in the idle state and maintaining said plug until a new productionhead (3) is installed on the well and equipment for the use of said method.<IMAGE>

Description

       

   <Desc/Clms Page number 1> 
 



  "Procédé pour colmater une fuite de fluide sous pression, en particulier de pétrole ou de gaz, et équipement pour la mise en oeuvre de ce procédé" 
La présente invention a pour objet un procédé pour colmater une fuite de fluide sous pression dans une canalisation, en particulier une fuite de pétrole ou de gaz, enflammé ou non, s'échappant accidentellement du tubage de production d'un puits éruptif suite à la destruction partielle ou totale de la tête de production de puits, (tête d'éruption ou arbre de Noël) associée au tubage de surface dudit puits, à l'intérieur duquel sont disposés le tubage de production et le tube d'écoulement, appelé tubing, qui achemine le   pétrol   ou le gaz depuis le fond du puits jusqu'à la surface et qui est suspendu à la tête de production précitée, ce tubage de surface étant disposé dans un tube guide.

   



   On connaît, pour colmater des fuites de pétrole ou de gaz dans des puits éruptifs, divers procédés, et entre autres : un premier procédé qui met en oeuvre des explosifs pour souffler la flamme s'échappant de la fuite en brûlant l'oxygène qui l'entretient et qui consiste ensuite à placer un obturateur-sur le tubage de production sans interrompre l'écoulement du pétrole et un second procédé qui consiste à forer un puits dans le voisinage du puits présentant la fuite de manière à ce que les deux puits se croisent et à couler du béton par le nouveau puits pour interrompre, quand le béton pénètre dans le puits présentant la fuite, l'écoulement du pétrole dans ce dernier. 



   Ces procédés présentent divers inconvénients. En effet, le premier procédé est très dangereux à mettre en oeuvre et requiert l'intervention d'un personnel extrêmement spécialise et forcément très rare, ce qui rend quasiment impossible une 

 <Desc/Clms Page number 2> 

 intervention rapide lorsqu'un nombre important de puits doivent être remis en état simultanément. Quand au second procédé, il est, du fait du forage d'un puits secondaire par lequel s'effectue le colmatage du puits présentant la fuite, lent et onéreux, d'autant plus que le puits colmaté ne pourra être remis en production qu'après un nouveau forage éliminant le bouchon de béton. 



   L'invention a pour but de remédier à ces inconvénients et de procurer un procédé fiable et pratiquement sans danger qui peut être rapidement mis en oeuvre, à un coût inférieur au coût des procédés connus, par du personnel qui ne doit pas être spécialisé dans des travaux de ce genre. 



   A cet effet, suivant l'invention, ledit procédé consiste à excaver le sol mécaniquement soit avec protection de l'opérateur, soit par télécommande, pour dénuder, en dessous du niveau de la fuite, une zone saine du tube   guide, - à déformer   ce dernier par écrasement dans ladite zone saine, pour provoquer l'écrasement du tubing, afin de réduire le débit de pétrole ou de gaz s'échappant du puits jusqu'à un niveau tel qu'il permettra l'injection soit dans le tubing soit dans l'espace annulaire subsistant entre le tubing et le tubage de production, d'un liquide, bien connu dans l'exploitation du pétrole et du gaz naturel, dont la densité est adaptée à la profondeur du forage et à la pression au niveau de la couche de production-et qui a pour but de former un bouchon liquide qui,

   en empêchant la montée du pétrole ou du gaz dans le tubing et 
 EMI2.1 
 dans l'espace annulaire, met le puits à l'état de sommeil tant que le bouchon liquide est   maintenu, - à   maintenir le tube guide à l'état   écrasé, - à dénuder le   tubage de surface dans sa zone saine en dessous de l'endroit où le tube guide a été écrasé,- à créer une première enceinte étanche autour du tubage de surface   dénudé, - à   forer, à partir d'au moins une seconde enceinte étanche fixée sur l'enceinte étanche précitée, au moins un conduit débouchant dans l'espace annulaire   susdit, - à   raccorder sur l'une ou l'autre de ces enceintes étanches la 

 <Desc/Clms Page number 3> 

 tubulure d'injection du liquide   précité,

   - à   injecter ce dernier sous pression pour qu'il se repartisse dans l'espace annulaire susdit et remonte dans le tubing par la base de ce dernier jusqu'à créer le bouchon liquide qui met le puits en état de   sommeil, - à dénuder le   tubage de production au-dessus de la zone   d'écrasement, - à   obturer le tubage de production et le tubing dans leur zone   dénudée, - à   maintenir le bouchon liquide précité jusqu'à l'installation, d'une manière connue en soi, d'une nouvelle tête de production de puits. 



   L'invention a également pour objet un équipement pour la mise en oeuvre du procédé susdit. 



   Suivant l'invention, cet équipement comprend un engin motorisé de génie civil protégé contre le feu, piloté ou télécommandé, agencé pour réaliser dans le sol une rampe d'accès au puits éruptif et dégager le tube guide, sur tout son pourtour, en dessous du niveau de la   fuite,-une   pince mobile pouvant être guidée sur la rampe d'accès et formée par au moins deux poutrelles indéformables montées à charnière, autour d'un axe vertical, à une de leurs extrémités et disposées dans au moins un étrier placé à proximité des extrémités de la pince opposées à l'axe, cet étrier étant agencé de manière à ce que ces extrémités puissent être écartées, d'une distance supérieure au diamètre externe du tube guide, des vérins à double effet,

   étant fixés sur l'étrier pour pouvoir agir sur les poutrelles afin de les écarter et les rapporcher l'une de l'autre pour écraser le tube guide et les tubes situés à l'intérieur de ce dernier, les poutrelles étant garnies, aux endroits destinés à coopérer avec le tube guide, d'éléments amovibles agencés pour déformer lesdit tubes et les écraser sans les   déchi rer, - un ét au   dont les deux mâchoires sont formées par les éléments amovibles susdits qui sont boulonnées l'une sur l'autre, avant d'être dégagés de la pince qui reste en position fermée jusqu'à complet boulonnage, pour maintenir l'écrasement du tube guide réalisé par ladite   pince,-quatre   éléments demi-cylindriques, d'un diamètre interne légèrement 

 <Desc/Clms Page number 4> 

 supérieur au diamètre externe du tubage de surface,

   destinés à constituer, en les superposant deux à deux et en les assemblant les uns aux autres, la première enceinte étanche précitée, comportant chacun, le long de leurs bords libres parallèles à leur axe, des flasques pour permettre leur assemblage et, sur le pourtour de leurs bases, des flasques perpendiculaires à leur axe destinés à coopérer, pour maintenir des joints demi-circulaires s'appuyant sur le tubage de surface et les bases des éléments pour assurer l'étanchéité des espaces compris entre le tubage, les éléments et les joints, avec des anneaux demi-circulaires qui leur sont parallèles et qui prennent appui sur les joints précités lorsqu'ils sont boulonnés sur les flasques perpendiculaires à l'axe des éléments   demi-cylindriques,-au moins   une seconde enceinte étanche fixée sur un des deux éléments demi-cylindriques,

   destinés à former la partie supérieure de la première enceinte étanche   susdite,-des   moyens de forage agencés dans cette seconde enceinte, avec prise de force à l'extérieur de celle-ci et à travers un presse étoupe, de manière à pouvoir réaliser à partir du tubage de surface, au moins le conduit aboutissant dans l'espace annulaire   précité, - une   tubulure d'injection de liquide précité, commandée par une vanne, associée à ladite seconde enceinte pour l'introduction sous pression, dans l'espace annulaire susdit, dudit'liquide à travers ledit conduit, --des moyens de contrôle, tels que manomètre,

   associés à la tubulure susdite pour contrôler état du bouchon liquide précité et des moyens agencés pour dénuder le tubage de production au-dessus de la zone d'écrasement précitée et pour obturer ledit tubage de production et le tubing dans leur zone dénudée. 



   D'autres détails et particularités de l'invention ressortiront de la description des dessins annexés au présent mémoire et qui, à titre   d'exemptes non limitatif, illustrent te   procédé et l'équipement conformes à l'invention. 

 <Desc/Clms Page number 5> 

 



   Les figures 1 à 12 sont des vues schématiques, en élévation et avec brisures partielles, illustrant les diverses phases du procédé suivant l'invention. 



   La figure 13 est une vue schématique en perspective montrant la pince faisant partie de l'équipement pour la mise en oeuvre du procédé susdit. 



   La figure 14 est une vue schématique en élévation, avec brisures partielles, montrant divers éléments de l'équipement précité. 



   Dans les différentes figures, les mêmes notations de référence désignent des éléments identiques ou analogues. 



   Le procédé suivant l'invention et illustre aux dessins concerne le colmatage d'une fuite de pétrole ou de gaz, enflammé ou non, s'échappant accidentellement du tubage de production 1 d'un puits éruptif 2, suite à la destruction partielle ou totale de la tête de production 3 du puits fixée au tubage de surface   2'dans   lequel sont disposés le tubage de 
 EMI5.1 
 production 1 et le tube d'écoulement 4 qui achemine le pétrole ou le gaz depuis le gisement jusqu'à la surface du sol et qui est suspendu à la tête de production 3. 



   Par tube de production l, on entend le premier tube qui entoure le tube central d'écoulement 4 et qui délimite avec ce dernier l'espace annulaire 7 précité, ce tube de production 1 s'appuyant sur le terrain jusqu'au niveau de la roche productrice. Par tube guide 2", on entend le tube de plus grand diamètre qui maintient en place les terrains voisins de la surface lors du forage tandis que le tube de surface 2', sur lequel est fixée la tête de production 3, est le tube immédiatement voisin au tube guide, d'une longueur supérieure à celle du tube guide et généralement cimenté à ce dernier et au terrain. 



   Ce procédé consiste tout d'abord, comme montré à la figure   l,   a excaver le sol mécaniquement, avec protection de l'opérateur ou par télécommande, pour mettre à nu, en dessous du niveau de la fuite 5, une zone saine 6 du tube guide 2". On 

 <Desc/Clms Page number 6> 

 procède alors, comme montre à la figure 2, à l'écrasement dudit tube guide 2"en 8, dans cette zone saine 6, jusqu'à écrasement du tube d'écoulement 4 de manière à réduire le débit de gaz ou de pétrole s'échappant du puits.

   Cet écrasement du tube guide 2"sera poursuivi jusqu'au moment où la déformation du tube d'écoulement 4 ramènera le débit à un niveau qui permettra l'injection soit dans le tube d'écoulement 4, soit dans l'espace annulaire 7 subsistant entre ce dernier et le tubage de production, d'un liquide, bien connu dans l'exploitation du pétrole et du gaz naturel, dont la densité est adaptée à la profondeur du forage et à la pression régnant au niveau de la couche de production, ce liquide ayant pour but de former un bouchon liquide qui empêche la montée du pétrole ou du gaz dans le tube d'écoulement 4 et dans l'espace annulaire 7 et qui met le puits 2 à l'état de sommeil tant que le bouchon liquide est maintenu. 



   Pour éviter que le tube d'écoulement 4 et le tubage de production 1 ne se déforment sous l'effet de la pression du pétrole ou du gaz dans le puits 2, lorsque les organes provoquant la déformation susdite sont enlevés, et que le débit qui a été réduit au niveau de la fuite 5 n'augmente à nouveau, on maintient, en 8 et comme montré à la figure 3, les 
 EMI6.1 
 tubes 2", 2', 1 et 4 dans t'état où ils ont été écrasés pour obtenir le débit souhaité qui permet l'injection du liquide précité.-
Comme montré aux figures 4 et 5, on découpe le tube guide 2", en dessous de l'endroit 8 où il a été écrasé, pour dénuder le tubage de surface 2'.

   On crée, autour de la zone dénudée 9 dudit tubage 2', une première enceinte étanche 9', on fixe ensuite sur cette dernière au moins une seconde enceinte étanche 12 à partir de laquelle on fore, à partir du tube de surface 2', soit un conduit 13, soit comme dans la forme de réalisation illustrée aux dessins, d'une part, un conduit 13 qui débouche dans l'espace annulaire 7 et, d'autre part, un orifice 14 dans le tube d'écoulement 4. On raccorde 

 <Desc/Clms Page number 7> 

 ensuite, sur l'une ou l'autre de ces enceintes étanches 9'et 12, les tubulures d'injection 15 du liquide susdit. Ce dernier est alors injecté sous pression de manière ce qu'il répartisse dans l'espace annulaire 7 et dans le tube d'écoulement ou tubing 4 jusqu'au moment où il crée le bouchon liquide qui met 
 EMI7.1 
 le puits en état de sommeil. 



   On pourrait prévoir de réunir le conduit 13 et l'orifice 14 précités par un tubage, de sorte que le liquide précité serait injecté, non plus dans l'espace annulaire 7 et le tubing 4, mais directement dans ce dernier, le liquide descendant alors dans ledit tubing 4 et se répartissant, à partir de la base de ce dernier, dans l'espace annulaire 7. 



   On pourrait encore prévoir l'utilisation d'une 
 EMI7.2 
 autre enceinte étanche, également fixée sur l'enceinte. 9, par exemple, à l'opposé de la première et à partir de laquelle on forerait un second conduit 13 débouchant dans l'espace annu- laire 7. Dans ce cas, on forerait à partir de la première enceinte étanche 12 un conduit 13 dans le tubage de production et une ouverture 14 dans le tubing et on insérerait, dans ces conduit et ouverture, un tubage ayant pour but d'éviter le court circuit hydraulique entre les deux conduits 13 forés à partir des deux enceintes précitées. 



   Lorsque le gaz ou le liquide a cessé de jaillir au niveau de la fuite 5 et que le puits 2 est inactif, on peut alors, comme montré à la figure 6, dénuder le tubage de production 1 au-dessus de la zone d'écrasement 8. On obture alors le tubage de production 1 et le tube d'écoulement 4, en 44, dans leur zone dénudée. On maintient ensuite le bouchon liquide, et de ce fait le puits en l'état de sommeil, jusqu'à l'installation, d'une manière connue en soi, d'une nouvelle tête de production. 



   Suivant l'invention et comme montré à la figure 7, on utilise avantageusement, avant de découper les tubes l et 4 en dessous du niveau d'écrasement 8 pour fixer la nouvelle tête de production 3, comme sécurité au cas où le bouchon liquide 

 <Desc/Clms Page number 8> 

 susdit cesserait accidentellement d'exercer ses effets et jusqu'au moment de l'installation de la nouvelle tête de production de puits, une chambre étanche 18 résistante à la pression et pouvant servir d'obturateur. Cette chambre 18 est ancrée sur l'enceinte étanche 9'de manière à couvrir celle-ci, la seconde enceinte étanche 12 ainsi que la zone dénudée et obturée desdits tube de production 1 et tube d'écoulement 4. 



  Cette chambre 18 est dimensionnée d'une manière connue en soi. 



   C'est de l'intérieur de cette chambre 18, accessible grâce à un clapet d'accès 19, que l'on peut procéder aux travaux préliminaires pour l'installation de la nouvelle tête de production de puits ainsi qu'aux travaux d'installation de cette dernière. 



   Ces travaux consistent tout d'abord à couper, en 52, comme montré à la figure 8, sensiblement perpendiculai- 
 EMI8.1 
 rement   leur axe et entre l'endroit 8 où le tube guide 2"avec les tubes qu'il contient ont été écrasés et le sommet de l'enceinte étanche 9', le tube guide 2", le tubage de surface 2'et le tubage de production 1 et ce, sans couper le tubing 4. 



   Comme montré       la figure 9, on soulève alors, suivant leur axe et grâce à des moyens de levage, tels que palans, prévus dans la chambre 18 et non représentés, les tronçons coupés des tubes 2"et des tubages 2'et 1. Ceux-ci entraînent vers le haut le tubing   4,'qui   n'a pas été coupé. On interrompt-le soulèvement susdit lorsque l'orifice 14, réalisé dans ledit tubing pour l'injection du liquide précité, est situé au-dessus du niveau 52 où les tubes 2"et tubages 2'et 1 ont été coupés. Toujours comme montré       la figure 9, on maintient, en 53 et en dessous du niveau de l'orifice 14, le tubing 4 pour l'immobiliser par rapport aux tubes 2"ainsi qu'au tubage 2'et 1. 



   Comme illustré à la figure 10 et tout en continuant à maintenir, en 53, le tubing 4, on coupe ce dernier, en 54, entre l'endroit 53 où il est maintenu et l'orifice 14, de sorte que le tubing 4 s'étendant en dessous du niveau 54, où il 

 <Desc/Clms Page number 9> 

 a été coupé, est partiquement sain et étanche. 



   On évacue alors de la chambre 18, comme montre à la figure 11, les tronçons coupés des tubes 2", tubages 2'et 1 et tubing 4, ce dernier étant toujours maintenu en 53. On sépare la seconde enceinte étanche 12 de l'enceinte étanche 9' et de la tubulure d'injection 15 et on démonte la partie supérieure de ladite enceinte   9'afin,   d'une part, de dégager le conduit 13 foré dans les tubages 2'et 1 et débouchant dans l'espace annulaire 7 et, d'autre part, à permettre l'injection, en 56, à travers la tubulure 15 raccordée à la chambre étanche 18, du liquide susdit dans le tubing 4 et l'espace annulaire 7, via la chambre 18 qui aurait été évacuée et dont le clapet 19 aurait été hermétiquement fermé, dans le cas où le bouchon liquide précédemment créé perdrait de son efficacité.

   La chambre 18 est pourvue d'une tubulure de vidange 48 qui permet d'évacuer le pétrole, le gaz ou le liquide qui s'y introduirait. 



   On découpe alors en 55, toujours comme montré à la figure   11,   les tubages 2'et 1 sensiblement perpendiculairement à leur axe en dessous du niveau du conduit 13 précité et suivant leur axe, de sorte qu'en dessous du niveau de la coupure 55, lesdits tubages 2'et 1 sont sains et étanches. Après évacuation de la chambre 18, des tronçons de tubage coupés, on peut alors procéder, de l'intérieur de ladite chambre 18, au filetage des tubages et tubing pour la pose, d'une manière connue en soi, de la nouvelle tête de production de puits. 



   Pour pallier à tout risque en cas de réveil du puits, le procédé suivant l'invention prévoit, comme montré à la figure 12, que, dès que le tubing 4 est coupe et soit en attendant de procéder aux opérations ultérieures telles qu'illustrées à la figure 11, soit pendant au moins une partie de ces opérations, l'on raccorde l'extrémité libre 4'du tubing 4 à une tubulure 49 débouchant à l'extérieur de la chambre étanche 18 et par laquelle on peut injecter le liquide précité directement dans le tubing 4, au cas où le bouchon liquide 

 <Desc/Clms Page number 10> 

 aurait perdu ses effets. 



   Dans le cas où le tubing 4 se serait effondré dans le tubage de production 1, on procéderait alors aux opérations décrites précédemment et illustrés aux figures 8 à 11, à l'exception du maintien du tubing et de la coupe de ce dernier du fait que ledit tubing est absent à l'endroit où se réalisent lesdites opérations. Après préparation des tubes 2'et tubage de production 1, on procède, d'une manière connue en soi à la mise en place de la tête de production et, après enlèvement de la chambre 18 et de la partie inférieure de l'enceinte étanche 9', à la récupération du tubing. 



   Suivant l'invention, l'équipement pour la mise en oeuvre du procédé susdit comprend un engin motorisé de génie civil, non représenté aux dessins, qui est protégé contre le feu, piloté ou télécommandé, et qui est agencé pour réaliser dans le sol une rampe d'accès 20 au puits éruptif 2 et dégager le tube guide 2", sur tout son pourtour, en dessous du niveau de la fuite 5 (voir figure 1). Ledit équipement comprend ensuite pour déformer les tubages susdits une pince mobile 20' pouvant être déplacée et guidée, par exemple par rail, sur la rampe d'accès 20.

   Cette pince est formée, comme montré à la 
 EMI10.1 
 figure 13, par deux paires de poutrelles indéformables 21, 21' et 22, 221 montées à charnière, autour d'un axe vertical 23, à une de leurs extrémités et disposées dans un ou plusieurs étriers 24 placés à proximité des extrémités de la pince opposée à l'axe 23 de manière à ce que ces dernières puissent être écartées, à leurs extrémités opposées à la charnière précitée, d'une distance supérieure au diamètre externe du tube guide 2". Des vérins à double effet 25 sont fixés dans le ou les étriers 24 de manière à pouvoir agir sur la paire de poutrelles 22,22'afin de l'écarter ou la rapprocher de l'autre paire de poutrelles 21,   21' pour écraser le   tube guide 2"et les tubes disposés à l'intérieur de celui-ci.

   Chacune des paires de poutrelles est avantageusement garnie, aux endroits des poutrelles destinés à coopérer avec le tube guide 2", 

 <Desc/Clms Page number 11> 

 d'éléments indéformables amovibles 26 profilés pour déformer les tubes susdits et les écraser sans les déchirer. Pour maintenir les tubes écrasés en 8, l'équipement comprend un étau 27 dont les deux mâchoires 28 sont formées, comme montré à la figure (3) par les éléments 26 précités qui sont boulonnés l'un sur l'autre, avant d'être dégagés de la pince, qui reste en position fermée jusqu'à complet boulonnage, pour maintenir l'écrasement du tube guide 2"et des tubes intérieurs, qui a été réalisé par la pince. 



   L'équipement précité comprend aussi quatre éléments demi-cylindriques 29, 29', comme montré à la figure 14, qui ont un diamètre interne légèrement supérieur au diamètre externe du tubage de surface 2'et qui sont destinés à constituer, en les superposant deux à deux et en les assemblant les uns aux autres, la première enceinte 9'susdite. Ces éléments 29 et 291 comportent chacun, le long de leur bords libres parallèles à leur axe 30, des flasques 31 et 31'pour permettre leur assemblage, à l'aide de boulons, en vue de former l'enceinte 9'autour du tubage 2', ainsi que des flasques 32 et   32'perpendiculaires a t'axe   30 qui sont disposés sur le pourtour de leurs bases.

   Ces flasques 32 et 32'sont destinés à coopérer, pour maintenir des joints demi-circulaires 33, 33'et 33"s'appuyant sur le tubage de surface   2'et   sur les éléments 29 et 29'à proximité de leur base de manière à assurer l'-étanchéité des espaces 34 et   34'compris   entre le tubage de surface 2', les éléments 29 et 29'les joints 33,33' et 33", avec des anneaux demi-circulaires 35,   35'et 35"qui   prennent appui sur les joints 33, 33'et 33"lorsqu'ils sont boulonnés sur les flasques 32 et 32'présentés par les éléments 29 et   29'.   Les anneaux 35, 35'et 35"ont leur paroi interne qui se présente avantageusement sous la forme d'une rampe conique 36 sur laquelle prend appui le joint 33,33'ou 33" correspondant qui a une section trapézoïdale, de sorte que, lorsque les anneaux 35,

     351 et 3511 sont boulonnés   sur les flasques 32, 321 et 32", les joints 33, 33'et 33"se déplacent 

 <Desc/Clms Page number 12> 

 sur les rampes 36 pour rendre la chambre 9'formée par les éléments 29 et 29'coaxiale au tubage de surface 2', pour assurer l'étanchéité parfaite des espaces 34 et   34'et   pour s'opposer à tout déplacement de l'enceinte 9', suivant l'axe 30, quelle que soit la charge supportée par ladite enceinte. 



  L'étanchéité entre les éléments 29 et   291 est réalisée   par des joints 37 s'étendant parallèlement à l'axe 30. 



   L'enceinte étanche 12 précitée est fixée, par exemple par soudure, à l'un des éléments 29'et renferme des moyens de forage 38 dont la prise de force 39 est extérieure à l'enceinte et pénètre dans celle-ci à travers un presse étoupe 40. Le presse étoupe susdit est agencé dans un bouchon fileté 40'vissé sur le corps de l'enceinte 12. De sorte que, lorsque les conduits 13 et ouverture 14 ont été forés dans les. tubages   2'et   1 et dans le tubing 4, les moyens de forage 38 peuvent être récupérés et le bouchon fileté 40'est remplacé par une pièce filetée pleine. La tubulure d'injection 15 du liquide précité, est associée à l'enceinte 12 pour l'introduction sous pression, dans le tubage 1 et le tube d'écoulement 4, du liquide à travers le conduit 13 aboutissant dans l'espace annulaire 7 et l'ouverture 14 du tubing 4.

   Des moyens de contrôle, tels qu'un manomètre non représenté, sont associés à la tubulure 15 pour contrôler l'état du bouchon liquide formé dans les tubage 1 et tube d'écoulement 4 par l'injection du liquide susdit. L'équipement comprend du matériel pour dénuder le tubage de production 1 au dessus de la zone d'écrasement 8 et pour obturer ce tubage 1 et le tube d'écoulement 4 dans leur zone dénudée, ainsi que pour dégager des portions de tubes et tubages comportant les conduits 13 et ouverture 14 à éliminer avant la pose de la tête de production de puits. 



   L'équipement susdit comprend avantageusement, comme montré à la figure 14 et pour constituer l'obturateur, une chambre étanche 18 coiffant les enceintes étanches 9'et 12 ainsi que la zone dénudée et obturée 44 du tubage de production 1 et du tube d'écoulement 4. Cette chambre 18 est constituée de 

 <Desc/Clms Page number 13> 

 deux coquilles 45 et 45'assemblées aux flasques inférieurs 32 des éléments 29, à l'opposé des anneaux 35', pour former le fond d'allure demi-sphérique de la chambre, d'au moins un élément tubulaire 46 boulonné aux coquilles 45 et 45'et par un couvercle 47 dans lequel est agencé le clapet d'accès 19 précité permettant à du personnel de pénétrer dans le chambre. 



   L'équipement précité comprend enfin des moyens de levage, non représentés, agencés à l'intérieur de la chambre 18, pour soulever et maintenir le tubing 4 par rapport aux tubages 2', 1 et pour dégager les portions de tube et de tubage à éliminer. La chambre 18 comprend en outre une tubulure de vidange 48, commandée par une vanne 50 située à l'extérieur de la chambre, destinée       évacuer du pétrole, du gaz ou du liquide susdit qui se répendrait dans ladite chambre. La chambre comprend la tubulure 49, commandée par la vanne extérieure 51, qui est destinée a être raccordée au tubing 4 dans le but décrit ci-avant.

   La tubulure 41, présentée par la chambre 18 et raccordée à la tubulure 15 susdite, est montée sur cette chambre 18 de manière à pouvoir, soit injecter du liquide dans l'enceinte 12, soit, lorsque cette dernière est démontée et tant que la tubulure 49 n'a pas été raccordée au tubing 4, injecter du liquide dans la chambre pour   qu 1 il   se répande ensuite dans le tubing 4 et dans l'espace annulaire précité 7. 



   Il doit être entendu que l'invention n'est nullement'limitée aux formes de réalisation décrites et que bien des modifications peuvent être apportées à ces dernières sans sortir du cadre du présent brevet. 



   On pourrait notamment prévoir, comme montré en traits mixtes       la figure 4, deux enceintes étanches 12 et 12' disposés en regard l'une de l'autre sur les éléments 29', les moyens de forage   38'associés à l'enceinte   12, réalisant un conduit   19'dans le   tubage de production 1. Les conduits 19 et orifice 14 précités recoivent un tubage 52 qui oblige le liquide susdit injecté à travers l'enceinte 12 à s'écouler directement dans le tubing 4 et qui évite le court-circuit 

 <Desc/Clms Page number 14> 

 hydraulique entre les deux enceintes 12 et 12'par l'espace annulaire 7 ou par l'espace 34', l'enceinte étanche 12''étant destinée       récolter le pétrole ou le gaz remplacé par le liquide injecté à partir de l'enceinte étanche 12. 



   On pourrait aussi pour que le poids de la chambre 18 et des charges qu'elle porte ne soit pas supporté par la fixation des demi-coquilles 45, 451 de celle-ci aux éléments 29 et au tube 2', prévoir de supporter la chambre 18 par des supports 18'reposant sur des socles en béton réalisés à même le sol (voir figure 7).



   <Desc / Clms Page number 1>
 



  "Method for sealing a leak of pressurized fluid, in particular oil or gas, and equipment for implementing this method"
The present invention relates to a method for sealing a leak of pressurized fluid in a pipeline, in particular an oil or gas leak, ignited or not, accidentally escaping from the production casing of an eruptive well following the partial or total destruction of the well production head (eruption head or Christmas tree) associated with the surface casing of said well, inside which are placed the production casing and the flow tube, called tubing , which conveys the oil or gas from the bottom of the well to the surface and which is suspended from the aforementioned production head, this surface casing being arranged in a guide tube.

   



   Various methods are known for plugging oil or gas leaks in eruptive wells, and among others: a first method which uses explosives to blow the flame escaping from the leak by burning the oxygen which l maintenance, which then consists of placing a shutter on the production casing without interrupting the flow of oil and a second method which consists in drilling a well in the vicinity of the well presenting the leak so that the two wells are intersect and pour concrete through the new well to interrupt, when the concrete enters the leaking well, the flow of oil through it.



   These methods have various drawbacks. Indeed, the first process is very dangerous to implement and requires the intervention of extremely specialized and necessarily very rare personnel, which makes it almost impossible to

 <Desc / Clms Page number 2>

 rapid intervention when a large number of wells must be reconditioned simultaneously. As for the second method, it is, due to the drilling of a secondary well by which the sealing of the leaking well is carried out, slow and expensive, all the more so since the clogged well cannot be put back into production until after a new drilling eliminating the concrete plug.



   The object of the invention is to remedy these drawbacks and to provide a reliable and practically harmless method which can be quickly implemented, at a cost lower than the cost of known methods, by personnel who need not be specialized in works of this kind.



   To this end, according to the invention, said method consists in mechanically excavating the ground either with operator protection, or by remote control, to strip, below the level of the leak, a healthy zone of the guide tube, - to deform the latter by crushing in said healthy zone, to cause crushing of the tubing, in order to reduce the flow of oil or gas escaping from the well to a level such that it will allow injection either into the tubing or in the annular space remaining between the tubing and the production tubing, of a liquid, well known in the exploitation of petroleum and natural gas, the density of which is adapted to the depth of the drilling and to the pressure at the level of the production layer - and which aims to form a liquid plug which,

   preventing the rise of oil or gas in the tubing and
 EMI2.1
 in the annular space, puts the well in the sleeping state as long as the liquid stopper is maintained, - to maintain the guide tube in the crushed state, - to strip the surface casing in its healthy zone below the place where the guide tube has been crushed, - to create a first sealed enclosure around the stripped surface casing, - to drill, from at least one second sealed enclosure fixed to the above-mentioned sealed enclosure, at least one conduit opening into the abovementioned annular space, - to be connected to one or other of these sealed enclosures the

 <Desc / Clms Page number 3>

 injection pipe for the aforementioned liquid,

   - to inject the latter under pressure so that it is distributed in the aforementioned annular space and rises in the tubing by the base of the latter until creating the liquid plug which puts the well in a state of sleep, - to strip the production tubing above the crushing zone, - to close the production tubing and the tubing in their bare zone, - to maintain the aforementioned liquid plug until installation, in a manner known per se, of a new well production head.



   The invention also relates to equipment for implementing the above method.



   According to the invention, this equipment comprises a motorized civil engineering device protected against fire, piloted or remote-controlled, arranged to produce in the ground an access ramp to the eruptive well and to clear the guide tube, all around its circumference, below the level of the leak, -a movable clamp that can be guided on the access ramp and formed by at least two non-deformable beams mounted with a hinge, around a vertical axis, at one of their ends and arranged in at least one bracket placed near the ends of the clamp opposite the axis, this stirrup being arranged so that these ends can be spaced apart, by a distance greater than the external diameter of the guide tube, of double-acting cylinders,

   being fixed on the stirrup to be able to act on the beams in order to separate them and bring them together to crush the guide tube and the tubes located inside the latter, the beams being lined, at the locations intended to cooperate with the guide tube, of removable elements arranged to deform the said tubes and to crush them without tearing them, - a state in which the two jaws are formed by the above-mentioned removable elements which are bolted one on the other , before being released from the clamp which remains in the closed position until complete bolting, to maintain the crushing of the guide tube produced by said clamp, -four semi-cylindrical elements, with an internal diameter slightly

 <Desc / Clms Page number 4>

 greater than the external diameter of the surface casing,

   intended to constitute, by superimposing them two by two and assembling them to each other, the aforementioned first sealed enclosure, each comprising, along their free edges parallel to their axis, flanges to allow their assembly and, on the periphery of their bases, flanges perpendicular to their axis intended to cooperate, to maintain semicircular joints resting on the surface casing and the bases of the elements to seal the spaces between the casing, the elements and the joints, with semicircular rings which are parallel to them and which bear on the abovementioned joints when they are bolted to the flanges perpendicular to the axis of the semi-cylindrical elements, -at least one second sealed enclosure fixed on one of the two semi-cylindrical elements,

   intended to form the upper part of the above-mentioned first sealed enclosure, -drilling means arranged in this second enclosure, with PTO outside of it and through a cable gland, so as to be able to produce from surface tubing, at least the conduit terminating in the abovementioned annular space, - aforementioned liquid injection tubing, controlled by a valve, associated with said second enclosure for introduction under pressure, into the abovementioned annular space , of said liquid through said conduit, - control means, such as a pressure gauge,

   associated with the aforementioned tubing to control the state of the aforementioned liquid plug and of the means arranged for stripping the production tubing above the aforementioned crushing zone and for closing said production tubing and the tubing in their bare zone.



   Other details and particularities of the invention will emerge from the description of the drawings annexed to this specification and which, by way of non-limiting example, illustrate the process and the equipment according to the invention.

 <Desc / Clms Page number 5>

 



   Figures 1 to 12 are schematic views, in elevation and partially broken, illustrating the various phases of the method according to the invention.



   Figure 13 is a schematic perspective view showing the clamp forming part of the equipment for the implementation of the above method.



   Figure 14 is a schematic elevational view, partially broken, showing various elements of the above equipment.



   In the different figures, the same reference notations designate identical or analogous elements.



   The process according to the invention and illustrated in the drawings relates to the sealing of an oil or gas leak, ignited or not, accidentally escaping from the production casing 1 of an eruptive well 2, following partial or total destruction of the production head 3 of the well fixed to the surface casing 2 'in which the casing of the
 EMI5.1
 production 1 and the flow tube 4 which carries oil or gas from the deposit to the ground surface and which is suspended from the production head 3.



   By production tube 1 means the first tube which surrounds the central flow tube 4 and which delimits with the latter the abovementioned annular space 7, this production tube 1 resting on the ground up to the level of the producing rock. By 2 "guide tube is meant the tube of larger diameter which holds the land adjacent to the surface in place during drilling while the surface tube 2 ', on which the production head 3 is fixed, is the tube immediately adjacent to the guide tube, of a length greater than that of the guide tube and generally cemented to the latter and to the ground.



   This process consists first of all, as shown in FIG. 1, of excavating the soil mechanically, with operator protection or by remote control, to expose, below the level of the leak 5, a healthy zone 6 of the 2 "guide tube.

 <Desc / Clms Page number 6>

 then proceeds, as shown in FIG. 2, to crush said guide tube 2 "at 8, in this healthy zone 6, until the flow tube 4 is crushed so as to reduce the flow of gas or oil s escaping from the well.

   This crushing of the guide tube 2 "will be continued until the deformation of the flow tube 4 will reduce the flow to a level which will allow injection either into the flow tube 4 or into the annular space 7 remaining between the latter and the production casing, a liquid, well known in the exploitation of petroleum and natural gas, the density of which is adapted to the depth of the drilling and to the pressure prevailing at the level of the production layer, this liquid intended to form a liquid plug which prevents the rise of oil or gas in the flow tube 4 and in the annular space 7 and which puts the well 2 in the sleep state as long as the liquid plug is maintained.



   To prevent the flow tube 4 and the production casing 1 from deforming under the effect of the oil or gas pressure in the well 2, when the members causing the above deformation are removed, and the flow which has been reduced at the level of the leak 5 does not increase again, we maintain, at 8 and as shown in FIG. 3, the
 EMI6.1
 tubes 2 ", 2 ', 1 and 4 in the state in which they were crushed to obtain the desired flow rate which allows the injection of the aforementioned liquid.
As shown in FIGS. 4 and 5, the guide tube 2 "is cut below the location 8 where it was crushed, in order to strip the surface casing 2 '.

   A first sealed enclosure 9 ′ is created around the stripped zone 9 of said casing 2 ′, then at least one second sealed enclosure 12 is fixed on the latter, from which one drills from the surface tube 2 ′, either a conduit 13, or as in the embodiment illustrated in the drawings, on the one hand, a conduit 13 which opens into the annular space 7 and, on the other hand, an orifice 14 in the flow tube 4. We connect

 <Desc / Clms Page number 7>

 then, on one or other of these sealed enclosures 9 ′ and 12, the injection pipes 15 for the above-mentioned liquid. The latter is then injected under pressure so that it distributes in the annular space 7 and in the flow tube or tubing 4 until the moment when it creates the liquid plug which puts
 EMI7.1
 the well in a state of sleep.



   Provision could be made to join the aforementioned conduit 13 and the orifice 14 by tubing, so that the aforementioned liquid would be injected, no longer into the annular space 7 and the tubing 4, but directly into the latter, the liquid then descending in said tubing 4 and distributed, from the base of the latter, in the annular space 7.



   We could still foresee the use of a
 EMI7.2
 another waterproof enclosure, also attached to the enclosure. 9, for example, opposite the first and from which a second conduit 13 would be drilled opening into the annular space 7. In this case, a conduit 13 would be drilled from the first sealed enclosure 12 in the production casing and an opening 14 in the tubing and a casing would be inserted in these conduits and apertures whose purpose is to avoid the short hydraulic circuit between the two conduits 13 drilled from the two aforementioned enclosures.



   When the gas or liquid has stopped spouting at the level of the leak 5 and the well 2 is inactive, it is then possible, as shown in FIG. 6, to strip the production casing 1 above the crushing zone 8. The production casing 1 and the flow tube 4 are then closed at 44, in their bare area. The liquid plug is then maintained, and therefore the well in the sleep state, until the installation, in a manner known per se, of a new production head.



   According to the invention and as shown in FIG. 7, advantageously, before cutting the tubes l and 4 below the level of crushing 8 to fix the new production head 3, as security in the event that the liquid plug

 <Desc / Clms Page number 8>

 above would accidentally cease to have its effects and until the time of installation of the new well production head, a sealed chamber 18 resistant to pressure and capable of serving as a shutter. This chamber 18 is anchored on the sealed enclosure 9 ′ so as to cover the latter, the second sealed enclosure 12 as well as the stripped and closed area of said production tube 1 and flow tube 4.



  This chamber 18 is dimensioned in a manner known per se.



   It is from the interior of this chamber 18, accessible by means of an access valve 19, that one can proceed to the preliminary works for the installation of the new well production head as well as to the works of installation of the latter.



   These works consist first of all in cutting, at 52, as shown in FIG. 8, substantially perpendicular to
 EMI8.1
 rement their axis and between the place 8 where the guide tube 2 "with the tubes it contains were crushed and the top of the sealed enclosure 9 ', the guide tube 2", the surface casing 2' and the production casing 1 without cutting the tubing 4.



   As shown in FIG. 9, the cut sections of the tubes 2 "and of the casings 2 ′ and 1 are then raised, along their axis and by means of lifting means, such as hoists, provided in the chamber 18 and not shown. -this lead upwards the tubing 4, "which has not been cut. The abovementioned lifting is interrupted when the orifice 14, produced in said tubing for the injection of the abovementioned liquid, is situated above the level 52 where the 2 ″ tubes and 2 ′ and 1 tubes were cut. Still as shown in FIG. 9, the tubing 4 is maintained at 53 and below the level of the orifice 14 to immobilize it relative to the tubes 2 "as well as to the tubing 2 ′ and 1.



   As illustrated in FIG. 10 and while continuing to maintain, at 53, the tubing 4, the latter is cut, at 54, between the place 53 where it is maintained and the orifice 14, so that the tubing 4 s extending below level 54, where it

 <Desc / Clms Page number 9>

 has been cut, is partially sound and watertight.



   The cut sections of the 2 "tubes, casings 2 ′ and 1 and tubing 4 are then removed from the chamber 18, as shown in FIG. 11, the latter always being maintained at 53. The second sealed enclosure 12 is separated from the sealed enclosure 9 ′ and injection tubing 15 and the upper part of said enclosure 9 ′ is dismantled in order, on the one hand, to clear the conduit 13 drilled in the casings 2 ′ and 1 and opening into the annular space 7 and, on the other hand, to allow the injection, at 56, through the tubing 15 connected to the sealed chamber 18, of the aforementioned liquid into the tubing 4 and the annular space 7, via the chamber 18 which would have been evacuated and the valve 19 would have been hermetically closed, in the event that the previously created liquid plug would lose its effectiveness.

   The chamber 18 is provided with a drain pipe 48 which makes it possible to evacuate the oil, the gas or the liquid which would be introduced therein.



   Then cut at 55, still as shown in FIG. 11, the casings 2 ′ and 1 substantially perpendicular to their axis below the level of the above-mentioned conduit 13 and along their axis, so that below the level of the cut 55 , said casings 2 ′ and 1 are sound and waterproof. After evacuation of the chamber 18, cut sections of casing, one can then proceed, from the interior of said chamber 18, to thread the casings and tubing for the laying, in a manner known per se, of the new head of well production.



   To overcome any risk in the event of the well being awakened, the method according to the invention provides, as shown in FIG. 12, that, as soon as the tubing 4 is cut and is pending the carrying out of the subsequent operations as illustrated in FIG. 11, or during at least part of these operations, the free end 4 ′ of the tubing 4 is connected to a tube 49 opening out to the sealed chamber 18 and through which the abovementioned liquid can be injected directly in tubing 4, in case the liquid plug

 <Desc / Clms Page number 10>

 would have lost its effects.



   In the case where the tubing 4 would have collapsed in the production casing 1, the operations described above and illustrated in FIGS. 8 to 11 would then be carried out, with the exception of maintaining the tubing and cutting the latter because said tubing is absent at the place where said operations are carried out. After preparation of the tubes 2 ′ and production casing 1, the production head is put into place in a manner known per se and, after removal of the chamber 18 and the lower part of the sealed enclosure 9 ', recovering the tubing.



   According to the invention, the equipment for implementing the above-mentioned process comprises a motorized civil engineering machine, not shown in the drawings, which is protected against fire, piloted or remote-controlled, and which is designed to produce in the ground a access ramp 20 to the eruptive well 2 and release the guide tube 2 ", around its entire periphery, below the level of the leak 5 (see FIG. 1). Said equipment then comprises, for deforming the above-mentioned casings, a mobile clamp 20 ' can be moved and guided, for example by rail, on the access ramp 20.

   This clamp is formed, as shown in the
 EMI10.1
 Figure 13, by two pairs of non-deformable beams 21, 21 'and 22, 221 hinged, about a vertical axis 23, at one of their ends and arranged in one or more stirrups 24 placed near the ends of the clamp opposite the axis 23 so that the latter can be separated, at their ends opposite the aforementioned hinge, by a distance greater than the external diameter of the guide tube 2 ". Double-acting cylinders 25 are fixed in the or the stirrups 24 so as to be able to act on the pair of beams 22, 22 ′ in order to move it apart or bring it closer to the other pair of beams 21, 21 ′ to crush the guide tube 2 "and the tubes arranged at the inside of it.

   Each pair of beams is advantageously lined, at the places of the beams intended to cooperate with the guide tube 2 ",

 <Desc / Clms Page number 11>

 non-deformable removable elements 26 profiled to deform the aforementioned tubes and crush them without tearing them. To keep the tubes crushed at 8, the equipment comprises a vice 27, the two jaws 28 of which are formed, as shown in FIG. (3) by the above-mentioned elements 26 which are bolted one on the other, before be released from the clamp, which remains in the closed position until complete bolting, to maintain the crushing of the 2 "guide tube and the inner tubes, which has been achieved by the clamp.



   The above-mentioned equipment also comprises four semi-cylindrical elements 29, 29 ′, as shown in FIG. 14, which have an internal diameter slightly greater than the external diameter of the surface casing 2 ′ and which are intended to constitute, by superimposing them two in pairs and by assembling them to each other, the first enclosure 9'susdite. These elements 29 and 291 each have, along their free edges parallel to their axis 30, flanges 31 and 31 ′ to allow their assembly, using bolts, in order to form the enclosure 9 ′ around the casing 2 ', as well as flanges 32 and 32' perpendicular to the axis 30 which are arranged around the periphery of their bases.

   These flanges 32 and 32 'are intended to cooperate, in order to maintain semi-circular joints 33, 33' and 33 "resting on the surface casing 2 'and on the elements 29 and 29' near their base so to ensure the tightness of the spaces 34 and 34 ′ comprised between the surface casing 2 ′, the elements 29 and 29 ′ the joints 33, 33 ′ and 33 ″, with semi-circular rings 35, 35 ′ and 35 ″ which are supported on the seals 33, 33 ′ and 33 ″ when they are bolted to the flanges 32 and 32 ′ presented by the elements 29 and 29 ′. The rings 35, 35 ′ and 35 ″ have their internal wall which is advantageously in the form of a conical ramp 36 on which the corresponding seal 33, 33 ′ or 33 ″ is supported, which has a trapezoidal section, so that, when the rings 35,

     351 and 3511 are bolted to the flanges 32, 321 and 32 ", the seals 33, 33 'and 33" move

 <Desc / Clms Page number 12>

 on the ramps 36 to make the chamber 9 ′ formed by the elements 29 and 29 ′ coaxial with the surface casing 2 ′, to ensure perfect sealing of the spaces 34 and 34 ′ and to oppose any movement of the enclosure 9 ', along the axis 30, whatever the load supported by said enclosure.



  The seal between the elements 29 and 291 is produced by seals 37 extending parallel to the axis 30.



   The aforementioned sealed enclosure 12 is fixed, for example by welding, to one of the elements 29 ′ and contains drilling means 38 whose power take-off 39 is external to the enclosure and enters the latter through a cable gland 40. The aforementioned cable gland is arranged in a threaded plug 40 'screwed onto the body of the enclosure 12. So that, when the conduits 13 and opening 14 have been drilled in them. casings 2 ′ and 1 and in the tubing 4, the drilling means 38 can be recovered and the threaded plug 40 is replaced by a solid threaded part. The injection pipe 15 for the aforementioned liquid is associated with the enclosure 12 for the introduction under pressure, into the casing 1 and the flow tube 4, of the liquid through the conduit 13 ending in the annular space 7 and the opening 14 of the tubing 4.

   Control means, such as a pressure gauge not shown, are associated with the tube 15 to control the state of the liquid plug formed in the casing 1 and flow tube 4 by the injection of the aforementioned liquid. The equipment includes material for stripping the production casing 1 above the crushing zone 8 and for sealing this casing 1 and the flow tube 4 in their bare zone, as well as for clearing portions of tubes and casings comprising the conduits 13 and opening 14 to be eliminated before the installation of the well production head.



   The above-mentioned equipment advantageously comprises, as shown in FIG. 14 and to constitute the shutter, a sealed chamber 18 covering the sealed enclosures 9 ′ and 12 as well as the stripped and closed area 44 of the production casing 1 and the tube flow 4. This chamber 18 consists of

 <Desc / Clms Page number 13>

 two shells 45 and 45 'assembled at the lower flanges 32 of the elements 29, opposite the rings 35', to form the hemispherical bottom of the chamber, of at least one tubular element 46 bolted to the shells 45 and 45 ′ and by a cover 47 in which the aforementioned access valve 19 is arranged, allowing personnel to enter the chamber.



   The above-mentioned equipment finally comprises lifting means, not shown, arranged inside the chamber 18, for lifting and holding the tubing 4 relative to the casings 2 ', 1 and for clearing the portions of tube and casing to eliminate. The chamber 18 further comprises a drain pipe 48, controlled by a valve 50 located outside the chamber, intended to evacuate the above-mentioned oil, gas or liquid which would spread into said chamber. The chamber comprises the tubing 49, controlled by the external valve 51, which is intended to be connected to the tubing 4 for the purpose described above.

   The tubing 41, presented by the chamber 18 and connected to the aforementioned tubing, is mounted on this chamber 18 so as to be able either to inject liquid into the enclosure 12, or, when the latter is dismantled and as long as the tubing 49 has not been connected to the tubing 4, inject liquid into the chamber so that it then spreads into the tubing 4 and into the abovementioned annular space 7.



   It should be understood that the invention is in no way limited to the embodiments described and that many modifications can be made to these without departing from the scope of this patent.



   One could in particular provide, as shown in dashed lines in FIG. 4, two sealed enclosures 12 and 12 ′ arranged opposite one another on the elements 29 ′, the drilling means 38 ′ associated with the enclosure 12, producing a conduit 19 ′ in the production tubing 1. The aforementioned conduits 19 and orifice 14 receive a tubing 52 which forces the aforementioned liquid injected through the enclosure 12 to flow directly into the tubing 4 and which avoids the short- circuit

 <Desc / Clms Page number 14>

 hydraulic between the two enclosures 12 and 12 ′ by the annular space 7 or by the space 34 ′, the sealed enclosure 12 ′ being intended to collect the oil or the gas replaced by the liquid injected from the sealed enclosure 12.



   One could also so that the weight of the chamber 18 and of the loads which it carries is not supported by the fixing of the half-shells 45, 451 of the latter to the elements 29 and to the tube 2 ′, plan to support the chamber 18 by supports 18'reposant on concrete bases made on the ground (see Figure 7).


    

Claims (7)

REVENDICATIONS 1. Procédé pour colmater une fuite de fluide sous pression dans une canalisation, en particulier une fuite de pétrole ou de gaz, enflammé ou non, s'échappant accidentellement du tubage de production (1) d'un puits éruptif (2) suite la destruction partielle ou totale de la tête de production (3) de puits, (tête d'éruption ou arbre de Noël) associée au tubage de surface (2') dudit puits, à l'intérieur duquel sont disposés le tubage de production (1) et le tube d'écoulement (4), appelé tubing, qui achemine le pétrole ou le gaz depuis le fond du puits jusqu'à la surface et qui est suspendu à la tête de production (3) précitée, ce tubage de surface (2') étant disposé dans un tube guide (2"), ledit procédé étant caractérisé en ce qu'il consiste à excaver le sol mécaniquement soit avec protection de l'opérateur,  CLAIMS 1. Method for plugging a leak of pressurized fluid in a pipeline, in particular an oil or gas leak, ignited or not, accidentally escaping from the production casing (1) of an eruptive well (2) following the partial or total destruction of the production head (3) of wells (eruption head or Christmas tree) associated with the surface casing (2 ') of said well, inside which the production casing (1 ) and the flow tube (4), called tubing, which conveys the oil or gas from the bottom of the well to the surface and which is suspended from the abovementioned production head (3), this surface casing ( 2 ') being placed in a guide tube (2 "), said method being characterized in that it consists in excavating the ground mechanically either with operator protection, soit par télécommande, pour dénuder, en dessous du niveau de la fuite (5), une zone saine (6) du tube guide (211), - à déformer ce dernier par écrasement (en 8) dans ladite zone saine (6), pour provoquer l'écrasement du tubing (4) afin de réduire le débit de pétrole ou de gaz s'échappant du puits (2) jusqu'à un niveau tel qu'il permettra l'injection soit dans le tubing (4), soit dans l'espace annulaire (7) subsistant entre le tubing (4) et le tubage de production (1), d'un liquide, bien connu dans l'exploitation du pétrole et du gaz naturel, dont 1a densité est adaptée à la profondeur-du forage et à la pression au niveau de la couche de production et qui a pour but de former un bouchon liquide qui, en empêchant la montée du pétrole ou du gaz dans le tubing (4) et dans l'espace annulaire (7), met le puits (2)  either by remote control, to strip, below the level of the leak (5), a healthy zone (6) of the guide tube (211), - to deform the latter by crushing (at 8) in said healthy zone (6), to cause crushing of the tubing (4) in order to reduce the flow of oil or gas escaping from the well (2) to a level such that it will allow injection either into the tubing (4) or in the annular space (7) remaining between the tubing (4) and the production tubing (1), of a liquid, well known in the exploitation of petroleum and natural gas, the density of which is adapted to the depth - drilling and pressure at the level of the production layer and which aims to form a liquid plug which, by preventing the rise of oil or gas in the tubing (4) and in the annular space (7) , puts the well (2) à l'état de sommeil tant que le bouchon liquide est maintenu, - à maintenir le tube guide (2") à l'état écrasé,-à dénuder le tubage de surface (2') dans sa zone saine (6) en dessous de l'endroit (8) où le tube guide (2") a été écrasé, - à créer, en 9, une première enceinte étanche (9') autour du tubage de surface (2') dénudé, - à forer, à partir d'au moins une seconde enceinte étanche (12) fixée sur l'enceinte étanche (9) précitée, d'au <Desc/Clms Page number 16> moins un conduit (13) débouchant dans l'espace annulaire (7) susdit et, - à raccorder sur l'une ou l'autre de ces enceintes étanche (91, 12) la tubulure d'injection (15) du liquide précité,  in the sleeping state as long as the liquid stopper is maintained, - in maintaining the guide tube (2 ") in the crushed state, - in stripping the surface casing (2 ') in its healthy zone (6) below from the place (8) where the guide tube (2 ") was crushed, - to create, at 9, a first sealed enclosure (9 ') around the bare surface casing (2'), - to drill, to from at least a second waterproof enclosure (12) fixed on the aforementioned waterproof enclosure (9), from  <Desc / Clms Page number 16>  at least one conduit (13) opening into the abovementioned annular space (7) and, - to be connected to one or other of these sealed enclosures (91, 12) the injection pipe (15) of the aforementioned liquid, - à injecter ce dernier sous pression pour qu'il se répartisse dans l'espace annulaire (7) susdit et remonte dans le tubing (4) par la base de ce dernier jusqu'à créer le bouchon liquide qui met le puits en état de sommeil, - à dénuder le tubage de production (1) au-dessus de la zone d'écrasement (8), - obturer le tubage de production (1) et le tubing (4) dans leur zone dénudée, - à maintenir le bouchon liquide précité jusqu'à l'installation, d'une manière connue en soi, d'une nouvelle tête de production de puits.  - To inject the latter under pressure so that it is distributed in the annular space (7) above and rises in the tubing (4) by the base of the latter until creating the liquid plug which puts the well in a state of sleep, - to strip the production tubing (1) above the crushing zone (8), - to block the production tubing (1) and the tubing (4) in their bare zone, - to maintain the plug aforementioned liquid until the installation, in a manner known per se, of a new well production head. 2. Procédé suivant la revendication 1, caractérisé en ce qu'on utilise, comme sécurité au cas où le bouchon liquide susdit perdrait accidentellement une partie de son efficacité et jusqu'au moment de l'installation de la nouvelle tête de production de puits, une chambre étanche (18) résistante à la pression que l'on ancre sur la première enceinte étanche (9') précitée de manière à couvrir cette dernière, la seconde enceinte étanche (12) ainsi que la zone dénudée et obturée des tube de production (1) et tubing (4) et on dimentionne la chambre (18) susdite, d'une manière connue en soi.  2. Method according to claim 1, characterized in that one uses, as safety in the event that the aforementioned liquid plug accidentally loses part of its effectiveness and until the installation of the new well production head, a sealed chamber (18) resistant to the pressure which is anchored on the aforementioned first sealed enclosure (9 ′) so as to cover the latter, the second sealed enclosure (12) as well as the stripped and closed area of the production tubes (1) and tubing (4) and the above-mentioned chamber (18) is dimensioned, in a manner known per se. 3. Procédé suivant la revendication 2, caractérisé en ce qu'on procède aux travaux préliminaires pour l'installation de la nouvelle tête de production de puits ainsi qu'aux travaux d'installation de cette dernière depuis l'intérieur de la chambre étanche (18) que l'on dote d'un clapet d'accès (19), ces travaux consistant à couper, (en 52) sensiblement perpendiculairement à leur axe et entre l'endroit (8) où le tube guide (2") a été écrasé et le sommet de la première enceinte étanche (9'), le tube guide (2"), le tubage de surface (21) et le tubage de production (1),-à soulever les tronçons coupés de tubes (2") et tubages (2'et 1) suivant leur axe en entrainant le tubing (4), qui n'a pas été coupé,  3. Method according to claim 2, characterized in that one proceeds to the preliminary work for the installation of the new well production head as well as the installation work of the latter from inside the sealed chamber ( 18) which is provided with an access valve (19), these works consisting in cutting (at 52) substantially perpendicular to their axis and between the place (8) where the guide tube (2 ") has been crushed and the top of the first sealed enclosure (9 '), the guide tube (2 "), the surface casing (21) and the production casing (1), - to lift the cut sections of tubes (2" ) and casings (2 ′ and 1) along their axis, driving the tubing (4), which has not been cut, jusqu'au moment où il peut être maintenu au-dessus du niveau où les tube (2") et <Desc/Clms Page number 17> EMI17.1 tubages (2'et 1) ont été coupés. - à immobiliser (en 53) le tubing (4) par rapport aux tubes (2") et tubage (2'et 1) en le maintenant. - à couper (en 54) le tubing au-dessus de l'endroit où il est maintenu.  until it can be kept above the level where the tubes (2 ") and  <Desc / Clms Page number 17>    EMI17.1  casings (2 ′ and 1) were cut. - to immobilize (at 53) the tubing (4) in relation to the tubes (2 ") and casing (2 ′ and 1) while holding it. - to cut (at 54) the tubing above the place where it is maintained. - A évacuer de la chambre étanche (18) les tronçons coupés du tube (2"), des tubages (2'et 1) et du tubing (4) tout en maintenant ce dernier immobile (en 53) par rapport aux tube (2") et tubages (2 1 et 1), - à démonter la seconde enceinte étanche (12) et une partie de la première enceinte étanche (91) de manière, d'une part, à dégager le conduit (13) précité débouchant dans l'espace annulaire (7) et, EMI17.2 d'autre part, à permettre l'injection, à travers la tubulure d'injection (15) raccordée à la chambre étanche (18), du liquide précité dans le cas où le bouchon liquide précité perdrait de son efficacité.  - Evacuate from the sealed chamber (18) the cut sections of the tube (2 "), the casings (2 ′ and 1) and the tubing (4) while keeping the latter stationary (at 53) relative to the tube (2 ") and casings (2 1 and 1), - to disassemble the second sealed enclosure (12) and part of the first sealed enclosure (91) so as, on the one hand, to release the aforementioned conduit (13) opening into the annular space (7) and,  EMI17.2  on the other hand, to allow injection, through the injection tubing (15) connected to the sealed chamber (18), of the aforementioned liquid in the event that the aforementioned liquid stopper loses its effectiveness. - à couper (en 55) les tubages (2' et 1), sensiblement perpendiculairement à leur axe, en dessous du conduit (13) et à évacuer les tronçons coupés de la chambre étanche (18), - et à procéder au filetage des tubages et tubing pour la pose, d'une manière connue en soi, de la nouvelle tête de production de puits.  - to cut (at 55) the casings (2 ′ and 1), substantially perpendicular to their axis, below the duct (13) and to evacuate the cut sections from the sealed chamber (18), - and to thread the casings and tubing for the installation, in a manner known per se, of the new well production head. 4. Procédé suivant la revendication 3, caractérisé en ce que, dès que le tubing (4) est coupe et soit en attendant de procéder aux opérations ultérieures, soit pendant au moins une partie de ces dernières, on raccorde l'extrémité libre (4') du tubing (4) à une tubulure (49) débouchant à l'extérieur de la chambre'étanche (la).  4. Method according to claim 3, characterized in that, as soon as the tubing (4) is cut and either while waiting to carry out the subsequent operations, or during at least part of the latter, the free end (4) is connected ') from the tubing (4) to a tube (49) opening out of the sealed chamber (la). 5. Equipement pour la mise en oeuvre du procédé suivant l'une quelconque des revendications 1 à 4, caractérisé en ce qu'il comprend un engin motorisé de génie civil protégé contre le feu, piloté ou télécommandé, agencé pour réaliser dans le sol une rampe d'accès (20) au puits éruptif (2) et dégager le tube guide (2"), sur tout son pourtour, en dessous du niveau de la fuite (5),-une pince mobile (20') pouvant être guidée sur la rampe d'accès (20) et formée par au moins deux poutrelles indéformables (21 et 22) montées à charnière, autour d'un axe vertical (23), à une de leurs extrémités et <Desc/Clms Page number 18> disposées dans au moins un étrier (24) place à proximité des extrémités de la pince opposées à l'axe (23), cet étrier étant agencé de manière à ce que ces extrémités puissent être écartées,  5. Equipment for implementing the method according to any one of claims 1 to 4, characterized in that it comprises a motorized civil engineering vehicle protected against fire, piloted or remote-controlled, arranged to carry out in the ground a access ramp (20) to the eruptive well (2) and release the guide tube (2 "), around its entire periphery, below the level of the leak (5), - a mobile clamp (20 ') which can be guided on the access ramp (20) and formed by at least two non-deformable beams (21 and 22) hinged, around a vertical axis (23), at one of their ends and  <Desc / Clms Page number 18>  arranged in at least one stirrup (24) placed near the ends of the clamp opposite the axis (23), this stirrup being arranged so that these ends can be separated, d'une distance supérieure au diamètre externe du tube guide (2"), des vérins (25), à double effet, étant fixés sur l'étrier (24) pour pouvoir agir sur les poutrelles (21,22) EMI18.1 afin de les écarter et les rapporcher l'une de l'autre pour écraser le tube guide (2") et les tubes situés à l'intérieur de ce dernier, les poutrelles (21,22) étant garnies, aux endroits destinés à coopérer avec le tube guide (2"), d'éléments amovibles (26) agencés pour déformer lesdit tubes et les écraser sans les déchirer, - un étau (27) dont les deux mâchoires (28) sont formées par les éléments amovibles (26) susdits qui sont boulonnées l'une sur l'autre, avant d'être dégagés de la pince qui reste en position fermée jusqu'à complet boulonnage, pour maintenir l'écrasement du tube guide (2") réalisé par ladite pince,  from a distance greater than the external diameter of the guide tube (2 "), cylinders (25), double acting, being fixed on the stirrup (24) to be able to act on the beams (21,22)  EMI18.1  in order to move them apart and bring them closer to each other to crush the guide tube (2 ") and the tubes located inside the latter, the beams (21,22) being lined, at the places intended to cooperate with the guide tube (2 "), removable elements (26) arranged to deform the said tubes and crush them without tearing them, - a vice (27) whose two jaws (28) are formed by the removable elements (26) above which are bolted to each other, before being released from the clamp which remains in the closed position until complete bolting, to maintain the crushing of the guide tube (2 ") produced by said clamp, - quatre éléments demi-cylindriques (29,29'), d'un diamètre interne légèrement supérieur au diamètre externe du tubage de surface (2'), destinés à constituer, en les super- EMI18.2 posant deux à deux et en les assemblant les uns aux autres, la première enceinte étanche (9') précitée, comportant chacun, le long de leurs bords libres parallèles à leur axe, des flasques (31, 31') pour permettre leur assemblage et, sur le pourtour de leurs bases, des flasques (32, 32') perpendiculaires à leur axe destinés à'coopérer, pour maintenir des joints demi-circulaires (33,33'et 33") s'appuyant sur le tubage de surface (2') et les bases des éléments pour assurer 11 étanchéité des espaces (34 et 341) compris entre le tubage (2'), les éléments (29, 291) et les joints (33, 331 et 33"), avec des anneaux demi-circulaires (35,35'et 35")  - four semi-cylindrical elements (29,29 '), with an internal diameter slightly greater than the external diameter of the surface casing (2'), intended to constitute, by super  EMI18.2  placing two by two and assembling them to each other, the aforementioned first sealed enclosure (9 '), each comprising, along their free edges parallel to their axis, flanges (31, 31') to allow their assembly and , on the periphery of their bases, flanges (32, 32 ') perpendicular to their axis intended to co-operate, to maintain semi-circular joints (33, 33' and 33 ") resting on the surface casing ( 2 ') and the bases of the elements to seal the spaces (34 and 341) between the casing (2'), the elements (29, 291) and the seals (33, 331 and 33 "), with rings semicircular (35.35 'and 35 ") qui leur sont parallèles et qui prennent appui sur les joints (33,33'et 33") précités lorsqu'ils sont boulonnés sur les flasques (32 et 32') perpendiculaires à l'axe des éléments demi-cylindriques (29 et 29'),-au moins une seconde enceinte étanche (12) fixée sur un des deux éléments demi-cylindriques, (29') destinés à former la <Desc/Clms Page number 19> partie supérieure de la première enceinte étanche (9') susdite, - des moyens de forage (38) agencés dans cette seconde enceinte (12), avec prise de force (39) à l'extérieur de celle-ci et à travers un presse étoupe (40), de manière à pouvoir réaliser à partir du tubage de surface (2') au moins le conduit (13) aboutissant dans l'espace annulaire (7) précité, - une tubulure d'injection (15) de liquide précité, commandée par une vanne (42),  which are parallel to them and which bear on the aforementioned seals (33.33 'and 33 ") when they are bolted to the flanges (32 and 32') perpendicular to the axis of the semi-cylindrical elements (29 and 29 ' ), - at least a second sealed enclosure (12) fixed to one of the two semi-cylindrical elements (29 ') intended to form the  <Desc / Clms Page number 19>  upper part of the above-mentioned first sealed enclosure (9 '), - drilling means (38) arranged in this second enclosure (12), with PTO (39) outside of the latter and through a press tow (40), so as to be able to produce, from the surface casing (2 ′) at least the conduit (13) terminating in the abovementioned annular space (7), - an injection pipe (15) for the aforementioned liquid , controlled by a valve (42), associée à ladite seconde enceinte (12) pour l'introduction sous pression, dans l'espace annulaire (7) susdit, dudit liquide à travers ledit conduit (13),-des moyens de contrôle, tels que manomètre, associés à la tubulure (41) susdite pour contrôler l'état du bouchon liquide précité et des moyens agencés pour dénuder le tubage de production (1) au-dessus de la zone d'écrasement (8) précitée et pour obturer ledit tubage de production (1) et le tubing (4) dans leur zone dénudée.  associated with said second enclosure (12) for the introduction under pressure, into the abovementioned annular space (7), of said liquid through said conduit (13), - control means, such as a pressure gauge, associated with the tubing ( 41) above to check the state of the aforementioned liquid plug and means arranged to strip the production tubing (1) above the aforementioned crushing zone (8) and to close said production tubing (1) and the tubing (4) in their bare area. 6. Equipement suivant la revendication 5, caractérisé en ce qu'il comprend, pour constituer l'obturateur susdit, une chambre étanche (18) coiffant la première enceinte étanche (9'), la seconde enceinte étanche (12) et la zone dénudée et obturée (44) du tubage de production (1) et du tubing (4) et assemblée à deux coquilles (45, 451) formant le fond d'allure demi-sphérique de la chambre (18) et qui sont fixées au flasque inférieur (32) de chacun des deux éléments demi-cylindriques (29) constituant la partie inférieure de la première enceinte étanche (9') précitée.  6. Equipment according to claim 5, characterized in that it comprises, to constitute the aforementioned shutter, a sealed chamber (18) covering the first sealed enclosure (9 '), the second sealed enclosure (12) and the bare area and closed (44) of the production casing (1) and the tubing (4) and assembled with two shells (45, 451) forming the hemispherical bottom of the chamber (18) and which are fixed to the lower flange (32) of each of the two semi-cylindrical elements (29) constituting the lower part of the aforementioned first sealed enclosure (9 '). 7. Equipement suivant la revendication 6, caractérisé en ce que la chambre étanche (18) susdite est pourvue, dans sa partie opposée aux coquilles (45,45') précitées, d'une part, d'un clapet (19) agencé pour permettre à du personnel d'accéder à la chambre (18) avec du matériel, pour préparer les tubages pour la pose ultérieure de la tête de production, ce clapet étant avantageusement à fermeture rapide, et, d'autre part, de moyens de levage agencés pour permettre l'évacuation de la chambre de tronçons de tube et de tubage endommagés et la manoeuvre du tubing (4) le long de son axe, ladite chambre (18) <Desc/Clms Page number 20> comportant la tubulure (15) du liquide précité se raccordant à la seconde enceinte étanche (12) avec la vanne de commande précitée (42) située à l'extérieur de la chambre, une tubulure de vidange (48)  7. Equipment according to claim 6, characterized in that the above-mentioned sealed chamber (18) is provided, in its part opposite to the aforementioned shells (45,45 '), on the one hand, with a valve (19) arranged for allow personnel to access the chamber (18) with equipment, to prepare the casings for the subsequent installation of the production head, this valve advantageously being quick closing, and, on the other hand, lifting means arranged to allow the evacuation of the tube sections of damaged tubing and casing and the operation of the tubing (4) along its axis, said chamber (18)  <Desc / Clms Page number 20>  comprising the tubing (15) of the aforementioned liquid connecting to the second sealed enclosure (12) with the aforementioned control valve (42) located outside the chamber, a drain tubing (48) de cette dernière associée à une des deux coquilles (45, 45') précitées ainsi qu'une tubulure (49) destinée à être raccordée au tubing (4), chacune de ces deux dernières tubulures (48,49) étant pourvue d'une vanne (50, 51) située à l'extérieur de la chambre étanche (18).  of the latter associated with one of the aforementioned two shells (45, 45 ′) as well as a tube (49) intended to be connected to the tubing (4), each of these last two tubes (48,49) being provided with a valve (50, 51) located outside the sealed chamber (18).
BE9100357A 1991-04-17 1991-04-17 Method for sealing a pressurised fluid leak, particularly oil or gas, andequipment for the use of said method BE1004846A6 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BE9100357A BE1004846A6 (en) 1991-04-17 1991-04-17 Method for sealing a pressurised fluid leak, particularly oil or gas, andequipment for the use of said method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BE9100357A BE1004846A6 (en) 1991-04-17 1991-04-17 Method for sealing a pressurised fluid leak, particularly oil or gas, andequipment for the use of said method

Publications (1)

Publication Number Publication Date
BE1004846A6 true BE1004846A6 (en) 1993-02-09

Family

ID=3885451

Family Applications (1)

Application Number Title Priority Date Filing Date
BE9100357A BE1004846A6 (en) 1991-04-17 1991-04-17 Method for sealing a pressurised fluid leak, particularly oil or gas, andequipment for the use of said method

Country Status (1)

Country Link
BE (1) BE1004846A6 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2486544A (en) * 2010-12-15 2012-06-20 Vetco Gray Inc Emergency subsea wellhead closure device or flow diverter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2486544A (en) * 2010-12-15 2012-06-20 Vetco Gray Inc Emergency subsea wellhead closure device or flow diverter
US8622139B2 (en) 2010-12-15 2014-01-07 Vetco Gray Inc. Emergency subsea wellhead closure devices

Similar Documents

Publication Publication Date Title
EP0423296B1 (en) Device for blocking off a well in open flow
EP0020232B1 (en) Method and apparatus for anchoring conduits such as pipe-lines on sea beds
EP1525371B1 (en) Telescopic guide line for offshore drilling
CA2093544C (en) Flexible line installing device with bend limiting device
EP0265344B1 (en) Method for producting a pile in the ground, drilling machine and device for carrying out such a method
FR2588297A1 (en) DEVICE FOR UNDERWATER DRILLING OF FOUNDATIONS
FR2544013A1 (en) METHOD AND APPARATUS FOR PERFORMING MEASUREMENTS OR / AND INTERVENTIONS IN A WELL
FR2519688A1 (en) SEALING SYSTEM FOR DRILLING WELLS IN WHICH CIRCULATES A HOT FLUID
FR2890098A1 (en) INSTALLATION COMPRISING AT LEAST TWO FOUNDAL-SURFACE CONNECTIONS OF AT LEAST TWO SUB-MARINE DUCTS BASED ON THE BOTTOM OF THE SEA
CA2064429C (en) Sealing device for expansion joints cut in dams
EP3234263A1 (en) Method for mounting an undersea installation comprising at least one section of pipe, and associated installation
EP0213024B1 (en) Device for placing and holding a cover for an opening inside a vessel
BE1004846A6 (en) Method for sealing a pressurised fluid leak, particularly oil or gas, andequipment for the use of said method
FR2707335A1 (en) Method for re-establishing circulation in an extraction well and device for implementing this method
BE1004718A6 (en) Method for sealing a pressurised fluid leak, particularly oil or gas, andequipment for the use of said method
CA1301637C (en) Remote anchoring and tensioning system for an elongated element
FR2539808A1 (en) SAFETY DEVICE FOR A SUBMERSIBLE WELL HEAD
EP0511355B1 (en) Device providing tightened operational safety for underground liquified gas storage
FR2488972A1 (en) METHOD OF INTERVENTION ON A CONDUIT TRANSPORTING A FLUID IN PARTICULAR ON A DRIVING CONDUCT
FR2635799A1 (en) Method and device for positioning underground ducts.
FR2498674A1 (en) PARKING TOOL FOR COMPLETION SYSTEM FOR PUMPS TOOL PUMPS
CA1117864A (en) Fast plugging device for leaks in pressurized oilwells
FR2677700A1 (en) Method and device for capping a well during blow-off, the device being fixed by explosion
EP0238412B1 (en) Method and device for working at a gas conduit in operation
BE526927A (en)

Legal Events

Date Code Title Description
RE Patent lapsed

Owner name: ANBERGEN HENRICUS JOHANNES

Effective date: 19930430