BE718890A - WATER TREATMENT. - Google Patents

WATER TREATMENT.

Info

Publication number
BE718890A
BE718890A BE718890DA BE718890A BE 718890 A BE718890 A BE 718890A BE 718890D A BE718890D A BE 718890DA BE 718890 A BE718890 A BE 718890A
Authority
BE
Belgium
Prior art keywords
basin
liquid
inlet
scum
channel
Prior art date
Application number
Other languages
French (fr)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US474389A external-priority patent/US3395800A/en
Priority claimed from GB35814/68A external-priority patent/GB1236748A/en
Priority claimed from AU41363/68A external-priority patent/AU426301B2/en
Application filed filed Critical
Publication of BE718890A publication Critical patent/BE718890A/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/0018Separation of suspended solid particles from liquids by sedimentation provided with a pump mounted in or on a settling tank
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/02Settling tanks with single outlets for the separated liquid
    • B01D21/04Settling tanks with single outlets for the separated liquid with moving scrapers
    • B01D21/06Settling tanks with single outlets for the separated liquid with moving scrapers with rotating scrapers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/24Feed or discharge mechanisms for settling tanks
    • B01D21/2405Feed mechanisms for settling tanks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/24Feed or discharge mechanisms for settling tanks
    • B01D21/2427The feed or discharge opening located at a distant position from the side walls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/24Feed or discharge mechanisms for settling tanks
    • B01D21/2433Discharge mechanisms for floating particles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/24Feed or discharge mechanisms for settling tanks
    • B01D21/2433Discharge mechanisms for floating particles
    • B01D21/2438Discharge mechanisms for floating particles provided with scrapers on the liquid surface for removing floating particles

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Removal Of Floating Material (AREA)

Description

  

   <Desc/Clms Page number 1> 
 
 EMI1.1 
 



  :BR1iJVJe J) 1 nVr.?TJ:mr 2-L -:;"''''..--- 
 EMI1.2 
 "Epuration des eaux" 
 EMI1.3 
 4 04 eî 1 6 1 ---g q31 3 .- gf e,,e' c ? É-1 'y . -,-4 c-./ -0 :,,, .J CA;i .ef/6"g' r1 IL 7"-1,.3j./ O.u. 6(o ) - -e6 I? Ê"p,e 7s? ±-.. PQLa,-Qd- 141, " àL ÉÉ<' laf é? (1-Q<' .j 
 EMI1.4 
 

 <Desc/Clms Page number 2> 

 
 EMI2.1 
 .f::1, jtih"1:c#:1.c invention oonoo);"1'lO l'épuration doco eaux et v1 t' Pf'( ,:':'.}X .lC;::', :..!., .>w:ct Moyen pour réaliser uno opération sen- >.4.î¯;i r:,:<;;i ; , ..'1 .a  >.'r .:,:', un bassin do dépôt ou do décantation d'insS < 1 .L ? #:. " :

   J.i> i ; i , do t1ju.t'¯:'':;:'tt d'eaux d'écoute ou do r6siduairofJ de l'inflt.a Btß,A'^Q Y 1. i>1.',:;.i:";; i!1vcn; ion concerne V4.YWmLtlV un moyen spécial pour /'1.;' ;""" 3':; ".9.,-:.::.; et a.c".c;3 s r6r"duià 1% faible donaité qui co r:0pn:r'cHt: 1/.....,"t:','/, < :tuz:' 1 surface du liquide contenu dans un bassin ou ,;1,W(\ ;< i' < = <1 ,' .. 1: 1 j .. ; . = : 1() 2-rïtc,,cnt <,1 ' t=-,iw d ' 6 gout J .

   Ces J rlouàt o.spocts Oc, i". f:a ;': r,C? "'.-.. :,1:,': Tm;\r,=,n1; 0't1'c comb:lu0D pour. réaliser une 01)0r'-itio;'. e(' ,1 \,;,:': fp: , rl... ; ^ >.sca l'ontlcmcnt dans dao bassins do cî(pt9t 43ro'.s'Pfl: .'t 1 .; 1 ' ,µïÙlù,Q Î à ,"i,'c r\I"!,\cJ';):1.f.;:C:,lt da 1. population et 1 expansion industrielle oui Pl\iVUlj,1!."; é::P,' C,I.'""lcn1;I.1.t:ton des qua.nt:l.M3 d'oaux ù'éo1outD uu't doivent t,.,;;,,\,) '(,\'".i',,60...: o.voc 1.111 bon rcndcacn'b dans dco imrto..l1o.tiono do r,:'W. G:.:>x:a-'.; \,1.'C:11Y';' '.rdouta o.±l#1 ùe réduire au minimum la polluJ.n, ç ci. 1 v-ut':"i''!,t.cn des suvottcu 111:..-I,\11'011co Q'h o.:rJdi':lc;lo11oo. 



  Le:! iJ 'rC;FX1: r.t, '.,'1; ;;.2t2'1û de façon ,'LfnFJx.2,J.e satisfaits par In construction j!=; nouv.::l1cJ :i.3"4:;'i...(2'v Îi.Q7ilC de traitement K. t GQ,u3C c1'6aOU1S prison-' tan'" ùet; 1..üwtc.. de; dupôt d'une dijaension de plus en pluo grande. 



  :il:,mlJ fnçoa [1.Halú":?,c, <1?fi ba>r...'e,ïla do d<5p8t Fa'lp"e:tcniL..rc,1""a on% 6t6 cofzc :c,! t; lor, installations de traitement d'eaux d' Eoutu Q.Oi,\.191:1.0::1' :''ç. de fou:Pbr=1; i1'ai,;jynen%a%ion de capacité nécessaire. ID. coM?n:.a.ava dù '.'''.,3 1;1;zi:S,.ns de dépôt plus grands oocaaionno non soulenseui. Ii 'Q;l0 f', irCi:",.¯.G' ;.'¯';,'r :i"v2I:.tC' à uno oominunautë ou t..2 una installation ind1J.rj"ric:!.lc, Q :^ q.4: encore une allocation de terrain qui p01ll1rai t ùtl'e ï,7'"...:.:i; '.1'%:'¯t::û.i';Ctt:âE':ICâI'î pour une autre capacité quelconque. 



  1. rl<CCl1.tc invention 'fournit un moyen nouveau pour augmenter ùOrlf,d.W"(:L1oJ,,,'Íi la. capacit6 d'un bacsin de c?c;ni3t sans diminuer son rondement do C::I;o.:rtiol1. Ainsi, les bassins de dépôt actuels peuvent ôtre ¯ww,.3.r.:r>'r; sranN'ormé; pour incorporer la présente invention ot de ftiçon de deux ou trois fois leur capacité actuelle. 



  D'une façon n10ClC de nouveaux bassins de dépôt pour traiter un volume c1lct",: c c'âï:,',3."; donné peuvent Être construits sur la base d'une fraction ('-c 1"'- :1,;.;c;<zioii, de bassins construits d'une façon classique. 



  Par c'::csrl'''? .1 1;"=;"; avoré que des bassine de dépôt primaires construits w't:c' ::ô't: la présente invention ont des -vitesses de dépôt d'arri- uvée bien supérieures a 1.000 litres par mètre carré par jour à côté de 40O litres par mètre carré environ par jour pour des bassins de r',li14.. prinaircs classiques. i:.;., ;'.:.iz de d,4pôt classiques présentent de façon générale 

 <Desc/Clms Page number 3> 

 
 EMI3.1 
 un puits d.'alimentation central ou évacuation d'écoulement des eaux d'entrée et une cuve de liaison déversoir   périphérique.   Suivant une variante, certaines installations comportent une   alimentation     périphé-   
 EMI3.2 
 rique ou évacuation d'écoulement des eaux d'emtr6o et une cuve de liaison centrale des eaux de sortie.

   Suivant la présente invention, on s'est rendu compte que   l'augmentation   des vitesses de dépôt d'entrée décrites ci-dessus peut-être obtenue en plaçant le canal   d'eaux     d'on-   trée et le canal d'eaux de sortie le long do la périphérie externe d'un bassin de dépôt et en combinant cette installation spéciale àd   une   nouvelle technique   d'évacuation   d'écoulement d'eaux d'entrée.

   Cotte technique d'évacuation consiste   à   évacuer les   eaux   d'entrée   au-dessous   de la surface de l'eau dans un 'sens à peu près horizontal et à une vitesse qui entraîne le courant en direction du centre du bassin à un bas niveau et qui provoque un courant   de   surface en direction ot au- ,dessus des déversoirs   d'eaux de   sortie placés le long de la   périphérie   du bassin de dépôt. 



   Comme   on   va l'expliquer plus   'en   détail   ci-dessous,   la préd sente invention comprend également une nouvelle technique de retrait de scories qui consiste   à   recueillir   l'écume   et autres matières à faible densité flottant sur   -la   surface du liquide du bassin de   dépôt   et à les laisser se déposer dans une chambre de mélange dans   laquelle   la boue est pompée au fond du bassin de   dépôt..   Le rapport   dos   matières 
 EMI3.3 
 respectives est tel qu'il assure que la densité de fécume est augmcn- tée à un point tel qu'elles restent avec la boue.

   Le   composé   d'écume 
 EMI3.4 
 et de boue peut alors être pompé vers le fond du bassin de dtjpéit c.a il reste jucqu'à ce qu'il soit éliminé die la bouc non mélangée pur la. conduite de sortie de la boue dans 1''appareil ce d,pÔ4u-. On se rend ainsi compte que le problème difficile soulevé jucqu'ici pour 33.^:nv: l'écume est complètement résolu par la   présente   invention. 



   Par conséquent, la   présente   Invention   fournit :   - un procédé et un appareil   nouveaux     ot     perfectionnés   pour 
 EMI3.5 
 le traitement d'eaux d't;butc et d'eaux r0siduairea cïo 11ir.ductrio ; - une construction de bassin de dépôt nouvelle ot perfectionnée ayant don vitesses de dépôt dlentr6e scnnibicmcnt au'Ecntco par rapport à celles pouvant être obtenues avec les appareile do   dépôt   
 EMI3.6 
 construits d'une façon c3a.NSiqua ;

   - une nouvelle construction de bassin do dépôt qui permet 
 EMI3.7 
 la construction de bassina de dépôt qui peuvent traiter des cJ.pacfl.%6z ne pouvant jusqu'à présent Ùtre traitées convc'r'ab'icscnt que da,nn dl::;1 bassins de dépôt d'une dimension beaucoup plus   crante ;   

 <Desc/Clms Page number 4> 

 - une nouvelle installation des canaux d'entrée et   dessertie   d'un bassin do dépôt qui assure une opération sensiblement améliorée ;

   - une technique d'alimentation d'entrée spéciale dans un bassin de dépôt qui assure un écoulement de surface plus efficaoe en direction ot au-dessus do   déversoirs ;   - une nouvelle installation d'évacuation du courant d'entrée d'un bassin de   dépôt   dans laquelle le courant d'entrée est introduit dans le bassin à peu près horizontalement et juste assez haut hors du fond, de façon à ne pas détruire la boue déposée, tout en aidant simultanément l'entrée de la boue dans une position centrale de décharge   - une   installation perfectionnée de canaux d'entrée et de cortio d'un bassin de dépôt dans laquelle le canal d'entrée empêche   les   écumes de se déplacer dans le canal de sortie ;

   - un moyen pour l'élimination par un courant unique de l'écume et de la boue contenues dans un bassin de dépôt de traitement   d'eaux   d'égouts ; - une technique spéciale d'élimination de l'écume dans   la-   quelle l'écume et autres matières à faible densité flottant sur la surface du bassin de dépôt sont transférées vers une chambre de mélange dans laquelle la boue est également pompée pour son mélange combiné, de   façon à   augmenter la densité de l'écume pour qu'elle approche étroi-   toment   de celle de la boue pour faciliter l'élimination par un courant unique de ces deux matières. 



     D'autron   avantages et caractéristiques de l'invention ressortiront de la description qui va cuivre faite en regard des dessins annexés et donnant à titre purement indicatif mais nullement limitatif une forme de   réalisation   de   l'invention.   



     Sur ces   dessins la   fleure   1 est une vue en plan partielle du bassin de dépôt primaire comportant certaines   particularités   de la présente invention ; la   figure 2   est une vue en coupe avec arrachement suivant   la ligne 2-2 de la :figure 1 ;   la   figure   3   est   une vue en coupe partielle à plus grande   échelle suivant la ligne 3-3 de la figure 1 ;   la figure 4 est une vue en coupe partielle à plus grande échelle suivant la ligne 4-4 de la figure 1 ;' la figure 5 est une vue en coupe en partie schématique d'une autre forme de réalisation de la présente invention ;

   la figure 6 est une vue en coupe partielle en partie schéma- 

 <Desc/Clms Page number 5> 

 tique   d'une   autre   variante ;   
 EMI5.1 
 la figure 7 est uno vue en cc'upo partielle C.1 partie ['ch<iaatiquo rcprucontant la nouvelle tcc?-.:?c {la retrait do l' (CV.ï:10 Cila présenta invention ; et la figure 8 est une vue en ct'/U:,:,c D. '::''\.:J.:J Grande QCl10110 nuivant la ligne 8-8 de la 1'i{!Ure 7. 



  Dans la forme de réalisation do l' in7on't.;ton 2"c,nrQecrrt:o ce,j;;¯> les fleures 1 à 4 le numéro de référessc 10 inûiquo do façon 0::,":'':?.0 un bassin de dépôt de boues circulaire :!!Z'"koni<.'.11'h 'un ca'1 1'';w=¯' il placé le long de ça périphérie oxto2.tio ot un canal do ccrtio '): :î =: ¯ ,tapot6 espace de ce damier vers l ' i;;"1;<51?io:;r<* :c canal Ù 1 c-n'b:r::0 1 1 alimenté par une conduite 13)o:Jt d0'."L'Zi': L.. fournir v.:no nl:1!';Cll.tJQ.';;l':\ approximativement wnifoxme au baosin de dç,r0,b par une ti0:i:'J.O dc 't'\.'::;'i1!17 -de descente 26 espaces unii'om6mcnt 20 101'1.';

   Ci% aaiial. 11 Jo Une com1ui J,r;:; de sortie 15 fait ccEBuniquer le canal de sortie 12 avec acutro0 0" sembles de traitement de l'installation c1e traitement d'ca''.r: el' ÚCCn'1.-î.;c.. pour une purification supp10ffiontD.iro suivant la. confisuration cr' {;C01,lement de 11 installation rc,rt3.cu,.exo . Par c;ncmDle, si 10 bassin ûc dépôt 10 est le 'bassin de d6ptt principal de l'installation de traitement, la conduite de sortie 15 peut avantaseucesient oommtmiqucr avec des réservoirs dia±ration. D'autre part, ai la ba-oïn 10 vat util:J.c0 comme bassin de dépôt secondaire ou finalles   eaux   de sortie provohant de ce dernier peuvent être   transmises   à un bassin de retenue. 



   Comme représenté, le bassin de dépêt 10 est muni   d'un   dis positif de balayage 17 pour déplacer de la boue recueillie sur le 
 EMI5.2 
 fond du bassin vers une conduite de sortie centrale (non ropréccntéo) placée dans une partie 16 d1un puits collecteur du bassin do de)pôt 10. Le dispositif -de balayage 17 comprend un   élément   de support central 
 EMI5.3 
 18a vertical à'où partent deux bras radiaux 1 ib et 18e pouvant tour- ner. Chacun des bras radiaux 18b et 18c   présente   une   série de     lame,-,   de charrue 19 pouvant être mices en place de façon réglable   montres   
 EMI5.4 
 sur ces derniers.

   Lorsque les bras 18b ct 18ç tournent, les lamea de charrue   19   balaient la boue recueillie sur le fond 20 de l'appareil de dépôt   10   dans le puits collecteur 16   d'où   elle est pompée dans une conduite 21   ,de   retrait de boue par une pompe à 'boue (non représentée) pour un traitement 'et/ou une évacuation supplémentaire. Si on le dé sire, un trottoir 22 faisant communiquer la périphérie externe du 
 EMI5.5 
 bassin 10 avec 1161,-ment die support central 18a, peut être prévu. 



   Dans la forme de réalisation représentée sur les figures 1 à 4, le canal de sortie 12 est mis   en   place immédiatement à proxi 

 <Desc/Clms Page number 6> 

 
 EMI6.1 
 ..;J.L4 d11 <:<:=ii..;l. ,1 cn -t:< (;} 11, une paroi co#;: 1lio 23 emparant les deux .:in;.>ix. Yi:  ps.roi périphérique interne 24 do déversoir de sortis et il')81; ;;;uni d'un 1Go'J tmp5rieur r6cb..ble 24a. Cotte nouvelle conotruc- (10 La d6pôt, à savoir, ou les canaux d'entrée et sortie #J:;'; tow,1 dctt.'1 p].ae:J#i 10 lonj=; C1CD partieo périphériques du basain, peract do fOl'D01' <10;'1 ccnfigurationa tl'Ôcoulemont dans le bassin de dépôt qui f::lc.d.litont cl.2t'.C mie crandc mesure le dépôt par gravité des constituante uôlidcG de l".aliï3ntation d'eaux d,6gouto. 



  Un siiipt-ct 9-=por-bunt de la présente invention réside dans la COl1o-!;l'uction do tui;ai:;: do desocnto qui fournit uno nouvelle entrée dQna le besoin de dupût 1Q et qui coopre avec la construction de ca r#aui -ùpfci=ila é,6irlAi ±'-dec-ruJ, pour fournir des vitesses d'entrée do dôi>0'i a.u;'"B&ntdcs Ù 'une façon significative. 



  Li principe, la. technique spéciale d'évacuation de 11("cou¯ lcm(;z'.; d' C)iJ,t:r0C de le. présente invention implique l'introduction de l'aliscnia.tion d'outrée dans le bassin de dépôt, de façon à assurer wi 6couléei;1; dos natieres solides qui viennent de pénétrer dans le 11,ilei.eiiii, en direction du centre de l'appareil de dépôt par dessous de la curfacc du liquide d'alimentation et un écoulement de surface corrcr'pondant du liquide aprec que la plus grande partie de ses consti'i;unnf:n colidoc a'coi: déposée au fond du bassin. L'écoulement en desHou;' de la. tic 1 ion d'entrée peut Être réalisé en ôcmcii#;;;;t 1lbol1i:::'b.Ol d' cntrÓe souo la surface du liquide dans un coî Q..pprm:i:i.'o.t:ivc!'1ont horioonta et à un niveau aussi bas que possible sans li boue qui s'est préalablement déposée sur le fond du b8cin.

   L vitesse de l'alimentation d'entrée doit être soigneusemont rÓ160 pour obtenir les rdsultats désirés et varie sensiblement suivant les physîquos du 'bassin de dépota c'est-adira, la dinonaion, la forme et la construction du bassin. Au cours d'ocsaia préliminaires de l'invention, une vitesse d'entrée comprise outre 30 et 60 contimètres par seconde environ s'est avérée comme étant approprioe. 
 EMI6.2 
 



  Une forme de réalisation du nouveau moyen d'évacuation de 
 EMI6.3 
 l'écoulement dlc-ntria do la présente invention est représentée sur les figures 1, 2 et 3. Comme représenté, une série de tuyaux de descente 26 en forme d'l pouvant fournir un sens d'écoulement réglé sont montés- sur la paroi inférieure 27 du canal d'entrée 11. Chacun des tuyaux de 
 EMI6.4 
 descente 26 comprend une partie droite 28 de tuyau, dont une extrémité est calibrée pour Être reçue dans une ouverture 27a ménagée dans la paroi inférieure 27. Une partie coudée/sous un angle de 90  29 est 

 <Desc/Clms Page number 7> 

 prévue à l'extrémité opposée de la partie 28 du tuyau et, si on le désire, elle peut être raccordée à un ajutage d'évacuation évasé 30. 



  A ce sujet, on notera que l'ajutage 30 n'est pas   indispensable   et qu' il peut être supprimé, étant donné que la partie coudée 29 est habituellement suffisante pour diriger l'alimentation d'entrée dans le bassin de dépôt 10 dans un sens sensiblement horizontal, de sorte qu' elle ne détruit pas la boue déposée sur le fond du bassin. Des essais effectués avec des bassins de dépôt munie de la construction de canaux et de tuyaux de descente de la présente invention indiquent que la plus grande partie de l'alimentation d'entréese déplace complètement à travers le bassin, son constituant de sortie passant   au-dessus   de la partie du déversoir directement oppocée au point d'entrée dans la bassin.

   Toutefois, une certaine quantité de l'alimentation   d'entrée   se déplace suivant un trajet semi-circulaire, lequel lorsque l'alimen tation d'entrée pénètre dans le   bassin,   part le long de sa   surface   
 EMI7.1 
 inférieure jucqu'à atteindra à pou prèo le milieu du baas.n. le cons- tituant de sortie se repliant ensuite le long de la surface ot péné 
 EMI7.2 
 trant dans le canal de sortie dans une position qui oat située u, peu près directement au-ùot-JUJ do l'ajutage d'évacuation par lequel il est entré. 



   Un autre avantage   accessoire   obtenu avec la   construction   de 
 EMI7.3 
 tuyaux de descente de la présente invention est qu'elle inof,1,$±c l'excoulement de boue vera la position de dôchme centrale. Ainoi, bien que le tuyau de descente soit de préférence à un niveaau rt,zqt'i ;1,:1. ne remet pas en circulation la. boue déposée, les couro,ntn do (:1.'1:t':-'l}C inférieure poussent la boue en direotian du contre lu bassin, oa ±f',c:!.'" litant ainsi le retrait de la boue. 



  Le fonctionnement notablement aaëliox'd du bacain d, n0 obtenu par l'installation de canaux et la. construction do tuyau": de descente spéciales de la présente invention a été démontre 0. 'tt"w ±0.- çon frappante au cours d'un essai d'une durée de à jours, 1o ydsu1tats de cet essai sont classés ci-dcncotao, les donn6co de Jr. colonne I montrant le fonctionnement d'un l1Qcain c'àa à.<5pÙ.b N;'i];ipi1J. construit cuivant l'invention et les données do 1.% colonne II mOl1-;;r::J.n'h le fonctionnement d'un bassin de d p8i= principal d'une construction classique. Tous les chiffres représentent den moyonnoo do donnocn en- globant toute   la   période   d'essai   de 30   jours.   

 <Desc/Clms Page number 8> 

 



   1 II Débit (Millions de m3 par jour)   48.   20 Matières Solides en Suspension dans les eaux d'égouts brutes   (mg/L)   424 424 (L'entrée dans les bassins contient une boue activée de déchets de 400 à 500 mg/L environ de matières solides en suspension au-dessus   des     matières   solides en suspension des eaux d'égouts brutes) 
 EMI8.1 
 Sortie o (m;

  /T 293 283 Pourcentage de Retrait 30, 33, 3 Vitesse de Dépôt des eaux d'entrée (r,3 par mbtre carr6 par jour) 1100 450   La.     vitesse   de dépôt obtenue dans le bassin de   dépôt   principal   construit     suivant   la. présente invention a été   2,45   fois plus grande que   colle   obtenue avec les bassins principaux de construction 
 EMI8.2 
 classique (c'ont-à-dire 100 m3 par mètre carré par jour au lieu de po me par motro carre par jour). A ce propos, il est intéressant de noter que 2: "1'?-tor Pollution Control Fédération - Manual of Prmetice- 4-4 Trea:,men.t Plant Design" indique une vitesse de dépôt de 400 m' pnr m et par jour'pour des bassins de dépôt principaux construits de façon clacoiquc.

   L'importance du fonctionnement sensiblement o,mc:..o obteriu dans dos appareils de dépôt construits suivant la présente invention resnort lorsqu'on remarque que lia rendement (pourcentage de retrait) de 1'appareil do àispôt principal (!)"comportant les partic1.t.. 



  '!.0..3.q de la prcsonto invention est ccnaiblemcnt le marne que celui obtenu ûvec l'appareil de dépôt construit de façon classique (II) en <Mp1:t 'du fait que l'appareil de d6p8t I est de la même dimension que i' ;py:=-,rcii- do d6p$t II et passe un à6bit 2,5 5 fois environ plus important que ' .ST i.'i,..S. de dôp0t II. 



  Dce cE:"aio analocrue)D ont été faits sur un" bassin do ddp8t oecondairo au coura d'un proodd6 de traitement de boue activée. Les donnccn ci-dcncous ropr6ocntent dos lectures faites pendant une périodc (1.0 18 jours h. dcn débits soutenus pendant une période moyenne de 13 heures pD,!' jour. 13 colonne III donne lea données obtenues sur le fonctionneront d'un bacsin de dépôt secondaire construit suivant la présente i tyon tion, tandis que les donneea de la colonne IV sont celles ohteuucG sur le fonctionnement d'un bassin de dépôt secondaire d'une construction olacsiquo. 

 <Desc/Clms Page number 9> 

 



   111 IV Matières Solides on Suspension dans la liqueur d'aération   (mg/L)   3.400   3.400   Matières Solides en Suspension dans les eaux de sortie   (mg/L)   27   21   Vitesse de   dépôt   des eaux   d'entrée   m3 par mètre carré par jour)   1.100   400
Ici également, il est   intéressant   de noter que la vitese de dépôt des eaux d'entre de l'appareil de dépôt secendaire consturit suivant la présente invention a été   2,8   fois plus grande que celle et tenue avec un appareil de dépôt secondaire classique   (1100     m   par mèten carré -par jour au lieu de 400 m3 par mètre carré par jour)

   dans dif férence notable de la concentration de matières solides en suspendi de l'eau de sortie. la Water Pollution Control Poderatin Man   @   Practice - Sewage Plant Design indique une   vitesse   de   dépôt   d'en de 500 m3 par mètre carré par jour pour des appareils do   dépôt   secon daires construits de façon classique. 



   La figure 4 représente la communication de la   conduito   d'ad mission d'alimentation 13 avec le canal de sortie   11.   Comme ropréconté en particulier sur la figure 1, une partie d'accouplement 31   présente   deux extrémités ouvertes divergentes   31   et 31b qui sont reçues chacu ne dans le canal 11 pour former un canal d'entrée continu section droite en forme d'U. 



   Bien que le bassin de dépôt représenté sur les figures 1   à   4 soit montré comme étant d'une construction circulaire, on ce rend compte que la nouvelle mise en place des canaux et la nouvelle construction de tuyaux de descente de la présente invention peuvent également être utilisées avantageusement dans dos   bassins   de dépôt d'une forme carrée ou rectangulaire. Toutefois, dans ces installations, il est préférable que les tuyaux de descente soient mis en place le long de la périphérie de façon à éviter une turbulence dans les coins.

   Cette opération peut être facilement réalisée en plaçant les tuyaux de descente plus près du centre de chaque côté du bassin de   dépôt   et en évitant de les placer sur des côtés adjacents d'un coin do telle fa- çon que leurs écoulements d'évacuation se coupent les uns les autres. 



   Une autre forme de réalisation de l'installation de canaux d'entrée et de sortie est représentée sur la figure 5. Comme représenté, le numéro de référence 40 indique un bassin de dépôt dans lequel le canal d'entrée 41 est disposé en relation écartée par rapport au canal de sortie 42. Un tuyau de descente 43 sensiblement comme décrit 

 <Desc/Clms Page number 10> 

 
 EMI10.1 
 <1>131> la iorie de réalisation antérieure, est écalomont représenté* Les canKu-x d' ont1.'.:o et do sortie sont montéo sur un plateau 44 qui- est .ta,-:û"io ron:fo:::';,; p\1' un élément de support 45. Ainsi, on notera qu'il u'et't j;ai; .anav;:;orâ:¯:b.c pour la présente invention que les canaux d'entrée ot de "ortie cotent aontés juxtaposes l'un à l'autre. 



  Uno trvicito tonne de réalication de la présente invention est !'C1!'l'6c(m,tÓa sur la ficure 6. Cette construction ressemble étroitcK:cnt à colle de la forcia de réalisation représentée sur la figure 5 en ce quo les c nc.ta:: d'entrée et de sortie sont on relation espacée l'un v..x .x.3poxt îz l'autre. Toutefois, lec distinctions principales, c",d:Jt:'1.u1; entro ces dei;1 fennec do r6alioation résident dans le fait   que   lo canal   d'entrée   51 est mis en   place à   l'intérieur du canal de 
 EMI10.2 
 sortie 52 et que le ;f?;toau de support 57 présente une série de trous 57b qui permettent 1'6coulement de fluide à. travers ce dernier.

   Un tuyau de descente 55 est monté comme décrit dans les formes de réalisüt1r.m ?XWc>c'cß:to 3 tandis que 1'alimentation d'entrée dans le canal 51 (non rr.pr6Dcni:Jc) peut Otre faite au-dessus ou au mome niveau que lo canal 51.   La.   conduite de sortie 52 est raccordée à une conduite de 
 EMI10.3 
 sortie costparabio à celle indiquée par le numéro de référence 15 sur   la   figure 1. Par   conséquent,   dans cette forme de réalisation, le constituant de sortie de l'alimentation se déplace sous le canal d'entrée 
 EMI10.4 
 51 afin d'atteindre un réservoir de sortie 54.

   Cette installation de canaux présente i7n r.vt,t;;e supplémentaire par rapport à ceux qui sont décrits prJcédCEascnt en ce qu'avec cette construction, la paroi 56 du ca-nal d' en Ûxs=c 51 sort à cmp0ciie1- les écumes et autres Matières de faible dencito flottant sur la surface de l'eau du bassin 53 drattein.-. dre le   réservoir   de sortie 54 et de contaminer le courant de sortie. les figures 7 et 8 représentent schématiquement le nouveau moyen de retrait do l'écume de la présente invention.

   Dans la forme de   réalisation     représentée,   le numéro de référence 75 indique de façon 
 EMI10.5 
 '6n;lraloùtr bassin de dépôt ayant une paroi latérale verticale 76 qui   prend   sur une partie de base 77 s'étendant radialement vers l'intérieur laquelle rejoint une partie conique 78 se terminant dans une région 79   définit   un puits collecteur.

   Un arbre 80 vertical, disposé au centre   supporte     un     bottier   82 La partie périphérique externe du boi tior   82   a la forme d'une   lèvre   83 s'étendant radialement qui est por-   tée   par le bord   supérieur   84 de la paroi   76     @   Comme représenté, le bottier 82 comprend une paroi supérieure   86   et une paroi inférieure 87. La paroi inférieure 87 comprend une partie externe 87a et une partie interne 87b entre lesquelles est pré- 

 <Desc/Clms Page number 11> 

 vue une ouverture annulaire 88 qui permet la rotation d'une chambre de mélange 91 autour de l'intérieur du bassin de dépôt 75.

   La chambre de mélange 91 est reliée à un dispositif de raclage 92 qui peut être sélectivement élevé..ou abaissé ' suivant le niveau de l'eau pour ramasser les écumes et autres matières de faible densité flottant sur la surface 93 de l'eau et pour les transporter à l'intérieur de la chambre de mélange 91. 



   Comme représenté en particulier sur la figure 8, le dispositif de raclage de l'écume 92 comprend un élément transporteur allongé 94 du type à vis   d'Archimède   monté pour tourner dans une enveloppe 96. L'enveloppe 96 est construite de façon à présenter un bord d'écu-   mage 97 sur la paroi plus courte 98 du dispositif 92 tournée vers la l'avant d'après le sens de/rotation. Dans la forme de réalisation re-   
 EMI11.1 
 présentée, le dispositif 92 tourne dans le sens dextrorsum autour de la surface supérieure du liquide contenu dans le bassin de dép8t 76. 



   La partie la plus externe du bras d'écumage 92 est assujettie à un élément de support 99 et   @   glisse sur la surface inclinée 101 du boitier 82. Un moyen approprié pour faciliter le mouvement de rotation de l'élément 99 sur la surface interne de la paroi inclinée 101 peut être prévu sous la forme d'un mécanisme de portée ou, si on le désire, les surfaces de contact   99a   et 101a pouvant présenter un enduit d'une matière à graissage automatique, tel que, par exemple, le téflon*
Dans la forme de réalisation particulière représentée sur la 
 EMI11.2 
 figure 7, la position de la*.chambre de mélange 91 rè,,Cle la mise on pliace des parties inclinées et horizontales 92, et 92b,

   respectivosicnt et exerce ainsi une influence sur le point interne auquel l'écume   est   ramassée par le transporteur à vis 94. Bien que cc ne soit   pas   repré 
 EMI11.3 
 senté spécialement, la chambre de mélange 91 pourrait 6tre taontco do façon qu'elle soit placée au centre du bassin de dépôt 75 (c'o::1'-hdire alignée avec l'arbre s'étendant verticalement) en poet%r.t?.h 0\ bras d'écumage 92 do s'avancer plus près on direction, du centre du   barin.   Suivant une variante, un dispositif auxiliaire peut être pré 
 EMI11.4 
 vu pour ramasser l'écume placée autour du centre fim1Odiat du. bs-soin do dépôt 75 dans la chambre de mélange 91.

   Par conséquent, on se rond compte que   la.   construction particulière   représentée   montre   simplement   
 EMI11.5 
 les principes de la prégento invention et qu'on peut la nodificy considérablement sans sortir de son cadre. 



  Une conduite tubulaire 102 est destinée à faire <;owu-#1YiPigv.oJ. la partie la plus basse du bassin do dÓpi:H; 75 dana lequel la boue ce 

 <Desc/Clms Page number 12> 

   dépose   avec le côté d'aspiration d'une pompe 103   à. boue.   Le côte de sortie de   la   pompe   103     à   boue est relié à une conduite 104 qui dépose   la boue pomp60 dans la chambre de mélange 91. La boue' pompée du fond du bassin 75 se combine ainsi/l'écume ramassée le*long de la surface     supérieure   du liquide. Un dispositif d'homogénéisation ou de mélange approprie 107 relie   à   un moteur 108 forme un bon mélange de l'écume plus   légère   avec la boue lourde. 



     Apres   un mélange intime des écumes et de la boue, le compo- d'écume et de boue formé est ensuite ramené vers une partie 79a de puits collecteur du   bassin   75 par une conduite 109. En pratique, il   s'est   révélé nécessaire de mélanger des quantités relativement grandes de   boue à   de petites quantités d'écume, afin que le composé d'écume et de boue formé soit suffisamment lourd, de façon qu'il reste dans le fond du bassin. Les écumes alors mélangées, à la boue, peuvent être pompées avec la boue au cours d'une opération à un courant unique.

   Ainsi, le problème difficile soulevé jusqu'à présent pour supprimer les écumes et d'autres matières   à   faible densité se trouvant dans les eaux d'égouts et autres eaux résiduaires de l'industrie est complètement résolu. 



     Bien   que, dans la forme de réalisation représentée, on ait utilisé un bras d'écumage rotatif 92, on notera que dans certaines opérations ce dernier peut être fixe. Dans certaines installations, il est   souhaitable   de prévoir un moyen quelconque pour pousser   les 'écu-   ems flottant sur la surface supérieure en direction du bord d'écumage 97   du   bras 92.

   Cette opération peut être réalisée au moyen d'une série de palettes se déplaçant lentement ou de dispositifs analogues qui   impriment   un mouvement de la surface supérieure de l'eau en direction du bord d'écumage
Il va de soi que   l'invention   n'est pas limitée aux formes de réalication décrites .et représentées et est susceptible de recevoir   diverses     variantes:   conformes à. con   esprit..  sans sortir de son cadre.



   <Desc / Clms Page number 1>
 
 EMI1.1
 



  : BR1iJVJe J) 1 nVr.?TJ:mr 2-L - :; "'' '' ..---
 EMI1.2
 "Water purification"
 EMI1.3
 4 04 eî 1 6 1 --- g q31 3 .- gf e ,, e 'c? É-1 'y. -, - 4 c-./ -0: ,,, .J CA; i .ef / 6 "g 'r1 IL 7" -1, .3j. / O.u. 6 (o) - -e6 I? Ê "p, e 7s? ± - .. PQLa, -Qd- 141," àL ÉÉ <'laf é? (1-Q <'.j
 EMI1.4
 

 <Desc / Clms Page number 2>

 
 EMI2.1
 .f :: 1, jtih "1: c #: 1.c invention oonoo);" 1'lO doco water purification and v1 t 'Pf' (,: ':'.} X .lC; :: ', : ..!.,.> w: ct Means to perform an operation sen-> .4.î¯; ir:,: <;; i;, .. '1 .a>.' r.:,: ' , a deposit or settling basin of insS <1 .L? # :. ":

   J.i> i; i, do t1ju.t'¯: '':;: 'tt of tap water or do r6siduairofJ of the inflt.a Btß, A' ^ QY 1. i> 1. ',:;. i: ";; i! 1vcn; ion relates to V4.YWmLtlV a special means for / '1 .;' ; "" "3 ':; ".9., -:. ::.; And ac" .c; 3 s r6r "duià 1% low donaity which co r: 0pn: r'cHt: 1 / .....," t: ', '/, <: tuz:' 1 surface of the liquid contained in a basin or,; 1, W (\; <i '<= <1,' .. 1: 1 j ..;. =: 1 () 2 -rïtc ,, cnt <, 1 't = -, iw of 6 taste J.

   These J rlouàt o.spocts Oc, i ". F: a; ': r, C?"' .- ..:, 1 :, ': Tm; \ r, =, n1; 0't1'c comb: lu0D for. perform a 01) 0r'-itio; '. e (', 1 \,;,:': fp:, rl ...; ^> .sca ontlcmcnt in dao basins do cî (pt9t 43ro'.s'Pfl: .'t 1.; 1 ', µïÙlù, Q Î à, "i, 'cr \ I"!, \ cJ';): 1.f.;: C:, lt da 1. population and 1 industrial expansion yes Pl \ iVUlj, 1 !. "; é :: P, 'C, I.' "" lcn1; I.1.t: tone of qua.nt: l.M3 from where ù'éo1outD uu't must t,., ;; ,, \, ) '(, \' ". i ',, 60 ...: o.voc 1.111 good rcndcacn'b in dco imrto..l1o.tiono do r,:' W. G:.:> x: a- ' .; \, 1.'C: 11Y ';' '.rdouta o. ± l # 1 ùe minimize the polluJ.n, ç ci. 1 v-ut': "i ''!, T.cn des suvottcu 111: ..- I, \ 11'011co Q'h o.:rJdi':lc;lo11oo.



  The:! iJ 'rC; FX1: r.t,'., '1; ;;. 2t2'1û so, 'LfnFJx.2, J.e satisfied by In construction j! =; new ::l1cJ: i.3 "4:; 'i ... (2'v Îi.Q7ilC of treatment K. t GQ, u3C c1'6aOU1S prison-' tan '" ùet; 1..üwtc .. of; warehouse of an increasingly large dimension.



  : il:, mlJ fnçoa [1.Halú ":?, c, <1? fi ba> r ... 'e, ïla do d <5p8t Fa'lp" e: tcniL..rc, 1 "" a on % 6t6 cofzc: c ,! t; lor, water treatment plants of Eoutu Q.Oi, \. 191: 1.0 :: 1 ':' 'ç. crazy: Pbr = 1; i1'ai,; jynen% a% ion of capacity required. ID. coM? n: .a.ava dù '.' ''., 3 1; 1; zi: S, .ns of larger deposit oocaaionno non soulenseui. Ii 'Q; l0 f', irCi: ",. ¯.G ';.' ¯ ';,' r: i" v2I: .tC 'at uno oominunautë or t..2 una installation ind1J.rj "ric: ! .lc, Q: ^ q.4: still an allocation of land which p01ll1rai t ùtl'e ï, 7 '"...:.: i; '.1'%: '¯t :: û.i'; Ctt: âE ': ICâI'î for any other capacity.



  1. The invention provides a new means of increasing ùOrlf, dW "(: L1oJ ,,, 'Íi the capacity of a side tank without decreasing its roundness do C :: I; o.:rtiol 1. Thus, current deposition basins can be ¯ww, .3.r.: r> 'r; sranN'ormé; to incorporate the present invention and reach two or three times their current capacity.



  In a way n10ClC new deposition basins to treat a volume c1lct ",: c c'âï:, ', 3."; given can be constructed on the basis of a fraction ('-c 1 "' -: 1,;.; c; <zioii, basins constructed in a classical way.



  By c ':: csrl' ''? .1 1; "=;"; found that primary deposit basins constructed w't: c ':: ô't: the present invention have arrival deposit speeds well above 1,000 liters per square meter per day besides 40O liters per day. approximately square meter per day for basins of r ', li14 .. classical prinaries. i:.;.,; '.:. iz of d, Classics generally present

 <Desc / Clms Page number 3>

 
 EMI3.1
 a central supply well or drainage outlet for inlet water and a peripheral spillway connection tank. According to a variant, certain installations include a peripheral
 EMI3.2
 rique or evacuation of outflow water and a central connection tank for outlet water.

   According to the present invention, it has been realized that the increase in the inlet deposition rates described above can be obtained by placing the inlet water channel and the outlet water channel along the outer periphery of a settling basin and combining this special installation with a new technique for draining inlet water flow.

   This drainage technique consists of discharging the inlet water below the surface of the water in an approximately horizontal direction and at a speed which drives the current towards the center of the basin at a low level and which causes a surface current in the ot direction above the outlet water weirs placed along the periphery of the settling basin.



   As will be explained in more detail below, the present invention also includes a novel slag removal technique which involves collecting scum and other low density material floating on the surface of the liquid in the slag tank. deposit and allow them to settle in a mixing chamber in which the sludge is pumped to the bottom of the deposit basin.
 EMI3.3
 respective ones is such that it ensures that the density of the starch is increased to such an extent that they remain with the mud.

   The scum compound
 EMI3.4
 and sludge can then be pumped to the bottom of the dtjpeit basin, which remains until it is removed from the pure unmixed goat. outlet pipe for the sludge in the apparatus ce d, pÔ4u-. It is thus realized that the difficult problem raised so far for 33. ^: Nv: scum is completely solved by the present invention.



   Therefore, the present invention provides: - a new and improved method and apparatus for
 EMI3.5
 the treatment of summer water and waste water from cïo 11ir.ductrio; - a new and improved deposition basin construction with scnibicmcnt entry deposition speeds to the Ecntco compared to those obtainable with the deposition apparatus.
 EMI3.6
 built in a c3a.NSiqua way;

   - a new construction of a deposit basin which
 EMI3.7
 the construction of deposition basins which can treat cJ.pacfl.% 6z which until now cannot be treated convc'r'ab'icscnt that da, nn dl ::; 1 deposition basins of a much larger dimension ;

 <Desc / Clms Page number 4>

 - a new installation of the inlet channels and served by a deposit basin which ensures a significantly improved operation;

   - a special inlet feed technique in a settling basin which ensures a more efficient surface flow in the direction ot above the weirs; - a new installation for evacuating the inlet stream of a deposit basin in which the inlet stream is introduced into the basin approximately horizontally and just high enough out of the bottom, so as not to destroy the sludge deposited, while simultaneously aiding the entry of the sludge into a central discharge position - an improved installation of inlet channels and cortio of a deposit basin in which the inlet channel prevents the scum from moving into the output channel;

   - a means for the removal by a single stream of scum and sludge contained in a sewage treatment deposit basin; - a special scum removal technique in which scum and other low density material floating on the surface of the settling basin is transferred to a mixing chamber in which the sludge is also pumped for its combined mixing , so as to increase the density of the scum so that it approximates that of the sludge to facilitate single stream removal of these two materials.



     Further advantages and characteristics of the invention will emerge from the description which goes copper given with reference to the appended drawings and giving, purely as an indication but in no way limiting, an embodiment of the invention.



     In these drawings, figure 1 is a partial plan view of the primary deposit basin comprising certain features of the present invention; Figure 2 is a cutaway sectional view taken along line 2-2 of: Figure 1; Figure 3 is a partial sectional view on a larger scale taken along line 3-3 of Figure 1; Figure 4 is a partial sectional view on a larger scale taken along line 4-4 of Figure 1; Fig. 5 is a partially schematic sectional view of another embodiment of the present invention;

   Figure 6 is a partial sectional view partly diagram-

 <Desc / Clms Page number 5>

 tick of another variant;
 EMI5.1
 Figure 7 is a partial view of C.1 part ['ch <iaatiquo rcprucontant the new tcc? -.:? c {the withdrawal of the (CV.ï: 10 Cila presenta invention; and Figure 8 is a side view '/ U:,:, c D.' :: '' \ .: J.:J Grande QCl10110 interfering with line 8-8 of 1'i {! Ure 7.



  In the embodiment do l 'in7on't.; Ton 2 "c, nrQecrrt: o ce, j ;; ¯> flowers 1 to 4 the reference number 10 inûiquo do way 0 ::,":' ': ? .0 a circular sludge tank: !! Z '"koni <.'. 11'h 'un ca'1 1' '; w = ¯' it placed along this periphery oxto2.tio ot a canal do ccrtio '):: î =: ¯, tap6 space of this checkerboard towards i ;; "1; <51? io:; r <*: c channel Ù 1 c-n'b: r :: 0 1 1 supplied by a pipe 13) o: Jt d0 '. "L'Zi': L .. supply v.:no nl: 1! '; Cll.tJQ.' ;; l ': \ approximately wnifoxme au baosin de dç , r0, b by a ti0: i: 'JO dc' t '\.' ::; 'i1! 17 -de descent 26 spaces unii'om6mcnt 20 101'1.';

   Ci% aaiial. 11 Jo A com1ui J, r;:; output 15 makes ccEBunicate the output channel 12 with acutro0 0 "ss of treatment of the installation c1e treatment of ca ''. r: el 'ÚCCn'1.-î.; c .. for a purification supp10ffiontD.iro according to the. confisuration created '{; C01, element of 11 rc installation, rt3.cu, .exo. By c; ncmDle, if 10 basin ûc deposit 10 is the main deposit basin of the treatment plant, the pipe outlet 15 can advantageously be used with dia ± ration tanks. On the other hand, at the base 10 vat util: J.c0 as secondary deposit basin or final outlet water from the latter can be transmitted to a basin restraint.



   As shown, the settling tank 10 is provided with a positive sweeping device 17 to move the mud collected on the tank.
 EMI5.2
 bottom of the basin to a central outlet pipe (not roprécntéo) placed in a part 16 of a collecting well of the basin do) pot 10. The sweeping device 17 comprises a central support element
 EMI5.3
 18a vertical where two radial arms 1bb and 18e start which can turn. Each of the radial arms 18b and 18c has a series of blade, -, plow 19 which can be adjusted in an adjustable manner.
 EMI5.4
 on these.

   When the arms 18b and 18c rotate, the plow blades 19 sweep the sludge collected on the bottom 20 of the deposition apparatus 10 in the collecting well 16 from where it is pumped into a pipe 21, for sludge removal by a 'slurry pump (not shown) for further treatment' and / or disposal. If desired, a sidewalk 22 communicating the outer periphery of the
 EMI5.5
 basin 10 with 1161, -ment die central support 18a, can be provided.



   In the embodiment shown in Figures 1 to 4, the outlet channel 12 is placed immediately close to

 <Desc / Clms Page number 6>

 
 EMI6.1
 ..; J.L4 d11 <: <: = ii ..; l. , 1 cn -t: <(;} 11, a wall co # ;: 1lio 23 encompassing both.: In;.> Ix. Yi: ps. Internal peripheral king 24 do weir de exits and il ') 81; ;;; united of a 1Go'J tmp5rieur r6cb..ble 24a. Cotte nouvelle conotruc- (10 The depot, namely, or the inlet and outlet channels #J :; '; tow, 1 dctt.'1 p] .ae: J # i 10 lonj =; C1CD parto peripheral basain , peract do fOl'D01 '<10;' 1 ccnfigurationa tl'Ôcoulemont in the deposition basin which f :: lc.d.litont cl.2t'.C mie crandc measures the deposition by gravity of the uôlidcG constituents of the ". Aliï3ntation of sewage water.



  A siiipt-ct 9- = por-bunt of the present invention resides in the COl1o - !; the induction do tui; ai:;: do desocnto which provides a new entry dQna the need for the 1Q dup and which cooperates with the construction hence, to provide input velocities do dôi> 0'i au; '"B & ntdcs une' in a meaningful way.



  Li principle, the. special evacuation technique of 11 ("coū lcm (; z '.; d' C) iJ, t: r0C of the. present invention involves the introduction of the outflow alization into the deposit basin , so as to ensure wi 6couléei; 1; dos natieres solids which have just entered the 11, ilei.eiiii, in the direction of the center of the deposition apparatus below the curfacc of the feed liquid and a surface flow corresponding to the liquid after the greater part of its consti'i; unnf: n colidoc a'coi: deposited at the bottom of the basin. The flow out of the inlet tic 1 can be achieved en ôcmcii # ;;;; t 1lbol1i ::: 'b.Ol d' cntrÓe souo the surface of the liquid in a coî Q..pprm: i: i.'ot: ivc! '1ont horioonta and at such a low level as possible without the mud which has previously settled on the bottom of the b8cin.

   The speed of the inlet feed must be taken carefully up to 160 to obtain the desired results and will vary considerably depending on the physics of the deposit basin that is to say, the dinonaion, shape and construction of the basin. In preliminary ocaia of the invention, an inlet speed of in excess of about 30 to 60 contimeters per second has been found to be appropriate.
 EMI6.2
 



  One embodiment of the novel means of evacuation of
 EMI6.3
 The flow of the present invention is shown in Figures 1, 2 and 3. As shown, a series of L-shaped downpipes 26 capable of providing a regulated flow direction are mounted on the wall. lower 27 of the inlet channel 11. Each of the
 EMI6.4
 downspout 26 comprises a straight portion 28 of pipe, one end of which is calibrated to be received in an opening 27a in the bottom wall 27. A 90 ° angled / angled portion 29 is

 <Desc / Clms Page number 7>

 provided at the opposite end of part 28 of the pipe and, if desired, it can be connected to a flared discharge nozzle 30.



  In this connection, it will be appreciated that the nozzle 30 is not essential and that it can be omitted, since the elbow portion 29 is usually sufficient to direct the inlet feed into the settling basin 10 in a tank. substantially horizontal direction, so that it does not destroy the mud deposited on the bottom of the basin. Tests carried out with deposition basins provided with the channel and downspout construction of the present invention indicate that most of the inlet feed moves completely through the basin with its outlet component passing through the basin. above the part of the weir directly opposite to the point of entry into the basin.

   However, a certain amount of the inlet feed moves in a semicircular path, which when the inlet feed enters the basin, runs along its surface.
 EMI7.1
 lower until it reaches the middle of the baas.n. the output component then folding back along the surface ot pene
 EMI7.2
 entering the outlet channel in a position which is located approximately directly above the discharge nozzle through which it entered.



   Another ancillary benefit obtained with the construction of
 EMI7.3
 the downpipes of the present invention is that it inof, 1, $ ± c the flow of sludge will go to the central dôchme position. Ainoi, although the downpipe is preferably one level at rt, zqt'i; 1,: 1. does not put the. mud deposited, the couro, ntn do (: 1.'1: t ': -' l} C lower push the mud in direotian from against the basin, oa ± f ', c:!.' "thus reading the withdrawal of mud.



  The operation notably aaëliox'd of bacain d, n0 obtained by the installation of channels and. Special descent pipe construction of the present invention has been shown to be 0. 'tt "w ± 0 - strikingly during a test lasting from to days, 10 states of this test are listed below. dcncotao, the data from Jr. column I showing the operation of a l1Qcain càa à. <5pÙ.b N; 'i]; ipi1J. constructed according to the invention and the data do 1.% column II mOl1 - ;; r :: J.n'h the operation of a d p8i = main basin of a conventional construction. All figures represent den moyonnoo do donnocn over the entire 30 day trial period.

 <Desc / Clms Page number 8>

 



   1 II Flow (Millions of m3 per day) 48. 20 Suspended Solids in raw sewage (mg / L) 424 424 (The entry to the basins contains an activated sludge of waste of 400 to 500 mg / Approximately l of suspended solids above suspended solids of raw sewage)
 EMI8.1
 Output o (m;

  / T 293 283 Percentage of Withdrawal 30, 33, 3 Inlet Water Deposition Rate (r, 3 per square meter per day) 1100 450 The deposition rate obtained in the main deposition basin constructed according to the. present invention was 2.45 times greater than glue obtained with main construction basins
 EMI8.2
 classic (ie 100 m3 per square meter per day instead of po me per square motor per day). In this connection, it is interesting to note that 2: "1 '? - tor Pollution Control Federation - Manual of Prmetice- 4-4 Trea:, men.t Plant Design" indicates a deposition rate of 400 m' pnr m and per day 'for main deposit ponds built in a clacoiquc way.

   The importance of the operation substantially achieved in deposition apparatuses constructed in accordance with the present invention is evident when one notices that the efficiency (percentage of shrinkage) of the main depot apparatus (!) "Comprising the partic1.t ..



  '! .0..3.q of the previous invention is weakly the same as that obtained with the depositing apparatus conventionally constructed (II) in <Mp1: t' because the depositing apparatus I is of the same dimension as i '; py: = -, rcii- do d6p $ t II and passes a throughput 2.5 about 5 times greater than' .ST i.'i, .. S. of deposit II.



  Dce cE: "aio analocrue) D were made on a" secondary ddp8t basin during an activated sludge treatment proodd6. The data below presents the readings taken during a period (1.0 18 days at a time of sustained flow for an average period of 13 hours at day 13 column III gives the data obtained on the operation of a deposit tank. secondary built according to the present i tyon tion, while the data of column IV are those ohteuucG on the operation of a secondary deposit basin of an olacsiquo construction.

 <Desc / Clms Page number 9>

 



   111 IV Solids on Suspension in the aeration liquor (mg / L) 3.400 3.400 Solids in suspension in the outlet water (mg / L) 27 21 Inlet water deposition rate m3 per square meter per day) 1,100,400
Here also, it is interesting to note that the speed of depositing the inlet water of the secondary deposition apparatus constituting according to the present invention was 2.8 times greater than that and held with a conventional secondary deposition apparatus ( 1100 m per square meter - per day instead of 400 m3 per square meter per day)

   noticeably different from the suspended solids concentration of the outlet water. The Water Pollution Control Poderatin Man @ Practice - Sewage Plant Design indicates an ene deposition rate of 500 m3 per square meter per day for conventionally constructed secondary deposition devices.



   FIG. 4 shows the communication of the supply inlet duct 13 with the outlet channel 11. As pre-assembled in particular in FIG. 1, a coupling part 31 has two divergent open ends 31 and 31b which are received. each in channel 11 to form a continuous straight section U-shaped inlet channel.



   Although the settling basin shown in Figures 1-4 is shown to be of circular construction, it will be appreciated that the new channel placement and the new downspout construction of the present invention can also be used. advantageously used in back deposit basins of a square or rectangular shape. However, in these installations, it is preferable that the downpipes are laid along the periphery so as to avoid turbulence in the corners.

   This can be easily accomplished by placing the downspouts closer to the center of each side of the settling basin and avoiding placing them on adjacent sides of a corner so that their discharge flows intersect. each other.



   Another embodiment of the inlet and outlet channel installation is shown in Fig. 5. As shown, the reference numeral 40 indicates a deposit basin in which the inlet channel 41 is disposed in spaced relation. relative to the outlet channel 42. A downpipe 43 substantially as described

 <Desc / Clms Page number 10>

 
 EMI10.1
 <1> 131> the iorie of previous realization, is ecalomont shown * The canKu-x of ont1. '.: o and do output are mounted on a plate 44 which is .ta, -: û "io ron: fo ::: ';,; p \ 1' a support element 45. Thus, it will be noted that u'et't j; ai; .anav;:; orâ: ¯: bc for the present invention that the channels of entry ot of "nettle side aontés juxtaposes one to the other.



  Uno trvicito ton of realization of the present invention is! 'C1!' The 6c (m, tÓa on the ficure 6. This construction closely resembles the glue of the construction force shown in figure 5 in that the c nc.ta :: input and output are a spaced relation one v..x .x.3poxt îz the other. However, the main distinctions, c ", d: Jt: '1.u1; entro these dei; 1 fennec do r6alioation reside in the fact that the input channel 51 is placed inside the
 EMI10.2
 outlet 52 and that the support body 57 has a series of holes 57b which allow fluid flow to. through the latter.

   A downpipe 55 is fitted as described in the embodiments? XWc> c'cß: to 3 while the inlet feed to channel 51 (not rr.pr6Dcni: Jc) can be made at- above or at the same level as channel 51. The outlet pipe 52 is connected to a
 EMI10.3
 costparabio output to that indicated by reference numeral 15 in Fig. 1. Therefore, in this embodiment, the output component of the power supply moves under the input channel.
 EMI10.4
 51 in order to reach an outlet tank 54.

   This installation of channels presents i7n r.vt, t ;; e additional compared to those which are described above in that with this construction, the wall 56 of the channel of Ûxs = c 51 exits cmp0ciie1- les scum and other Low dencito matter floating on the surface of the water in the basin 53 drattein.-. dre the outlet tank 54 and contaminate the outlet stream. Figures 7 and 8 schematically show the novel scum removal means of the present invention.

   In the illustrated embodiment, the reference numeral 75 indicates
 EMI10.5
 A deposit basin having a vertical side wall 76 which engages a radially inwardly extending base portion 77 which meets a conical portion 78 terminating in a region 79 defines a collection well.

   A centrally located vertical shaft 80 supports a casing 82 The outer peripheral part of the housing 82 is in the form of a radially extending lip 83 which is carried by the upper edge 84 of the wall 76. As shown, the housing 82 comprises an upper wall 86 and a lower wall 87. The lower wall 87 comprises an external part 87a and an internal part 87b between which is pre-

 <Desc / Clms Page number 11>

 view of an annular opening 88 which allows the rotation of a mixing chamber 91 around the interior of the deposit basin 75.

   The mixing chamber 91 is connected to a scraping device 92 which can be selectively raised or lowered depending on the water level to pick up scum and other low density material floating on the surface 93 of the water and to transport them inside the mixing chamber 91.



   As shown in particular in Figure 8, the scum scraping device 92 comprises an elongated Archimedean screw type conveyor member 94 mounted to rotate in a casing 96. The casing 96 is constructed so as to present a skimming edge 97 on the shorter wall 98 of device 92 facing forward in the direction of rotation. In the embodiment re-
 EMI11.1
 shown, the device 92 rotates in the dextrorsum direction around the upper surface of the liquid contained in the deposit basin 76.



   The outermost portion of the skimmer arm 92 is secured to a support member 99 and slides over the inclined surface 101 of the housing 82. A suitable means for facilitating the rotational movement of the member 99 on the inner surface of the housing. the inclined wall 101 may be provided as a bearing mechanism or, if desired, the contact surfaces 99a and 101a may be coated with a self-lubricating material, such as, for example, Teflon *
In the particular embodiment shown in
 EMI11.2
 figure 7, the position of the mixing chamber 91 re ,, Key the placing of the inclined and horizontal parts 92, and 92b,

   respectivosicnt and thus exerts an influence on the internal point at which the scum is picked up by the screw conveyor 94. Although cc is not shown
 EMI11.3
 Specially felt, the mixing chamber 91 could be arranged so that it was placed in the center of the settling basin 75 (c'o :: 1'-hdire aligned with the shaft extending vertically) in poet% rt? .h 0 \ skim arm 92 do move closer in direction, to the center of the barin. According to an alternative, an auxiliary device can be pre
 EMI11.4
 seen to pick up the scum placed around the fim1Odiat center of the. bs-care of deposit 75 in the mixing chamber 91.

   Therefore, we can see that the. particular construction shown simply shows
 EMI11.5
 the principles of the prégento invention and that one can modify it considerably without going beyond its framework.



  A tubular conduit 102 is intended to make <; owu- # 1YiPigv.oJ. the lowest part of the do dÓpi basin: H; 75 in which mud this

 <Desc / Clms Page number 12>

   removal with the suction side of a pump 103 to. mud. The outlet side of the slurry pump 103 is connected to a line 104 which deposits the slurry pump 60 in the mixing chamber 91. The sludge pumped from the bottom of the basin 75 thus combines / the scum collected along the path. upper surface of the liquid. A suitable homogenizing or mixing device 107 connected to a motor 108 forms a good mixture of the lighter scum with the heavy mud.



     After an intimate mixing of the scum and the sludge, the scum and sludge compo- sory formed is then returned to a part 79a of the collecting well of the basin 75 by a pipe 109. In practice, it has been found necessary to mix relatively large amounts of sludge to small amounts of scum, so that the scum-sludge compound formed is heavy enough so that it remains in the bottom of the basin. The scum then mixed with the slurry can be pumped with the slurry in a single stream operation.

   Thus, the difficult problem raised so far of removing dross and other low density material from sewage and other industrial wastewater is completely solved.



     Although in the embodiment shown a rotary skimmer arm 92 has been used, it will be appreciated that in some operations the latter may be stationary. In some installations, it is desirable to provide some means for urging the skims floating on the top surface towards the skim edge 97 of the arm 92.

   This can be done by means of a series of slowly moving paddles or similar devices which impart movement from the upper surface of the water towards the skim edge.
It goes without saying that the invention is not limited to the embodiments described and shown and is capable of receiving various variants: in accordance with. con mind .. without going outside its frame.

 

Claims (1)

R E S U M E A -. Procédé d'alimentation de 1'écume et autres matières à faible densité qui flottent sur la surface d'un liquide contenu dans un appareil de dépôt destiné à former un dépôt par gravité d'eaux d'égouts et d'eaux résiduaires de l'industrie, caractérisé par les points suivante séparément ou en combinaisons ; 1. R E S U M E A -. A method of feeding scum and other low density material which floats on the surface of a liquid contained in a deposition apparatus for forming a gravity deposition of sewage and waste water from the water. industry, characterized by the following points separately or in combinations; 1. Il comprend les étapes suivantes :écumer la. surface du liquide contenu dans l'appareil de dépôt pour enlever l'écume et au- <Desc/Clms Page number 13> EMI13.1 très Ltt.'w''C L3 faible ti.P<:1; flottnn-- cur cc1J,c-cà, ;Y: ùn<;r 0,'Fra;.:,., et autres Ratières à faible densité dans ii#ie c , 'o^o (la g,jl::'1{;o l'Ü:.)'" por la boue du fond de l'appareil do c3"pt d.zk; la c l'?tzo !le 1;:62 '.1n.... It includes the following steps: skim the. surface of the liquid contained in the deposition apparatus for removing scum and other <Desc / Clms Page number 13> EMI13.1 very Ltt.'w''C L3 weak ti.P <: 1; flotnn-- cur cc1J, c-cà,; Y: ùn <; r 0, 'Fra;.:,., and other low density dobby in ii # ie c,' o ^ o (la g, jl :: '1 {; o l'Ü :.)' "por the mud from the bottom of the apparatus do c3" pt d.zk; la c l '? tzo! le 1;: 62' .1n .... Se, combiner l'douma ot les mo.tioroc à faible ùcoe=xà;1;6 contenues CÎt"J2D la chambre de mÓJ.o.ne à la. bouc pour :Colinc:!." un compose do bouc afin,n'l une densité plue forte que celle du liquide cOï'rom1 t1C.llCl 1 'aj¯>j>a#o:il, do dépôt ot amener ledit composa d t Ôet1;J0 o-h (10 bouc vers ),(1 i'#;'2 po cot appareil, do façon quo ce conposo v.l la bouc non nôl#-,nrso ;;0 ':-..'. ,,vant au fond (le 3.' o..P!X'11'oll de dépôt puissent Otro =nlcv6r w"Jt<*.'a3'1'L,';."'''1<.. mont on uri0 C;'V'c 'L..,t3.f,lâ. <7. C01)l't.mt t.l;.,13r: do P C:J)ptl:i'0il do û6)j'e 2. Se, combine the duma ot the low mo.tioroc ùcoe = xà; 1; 6 contained Cît "J2D the chamber of mÓJ.o.ne to the. Goat for: Colinc:!." a compound do goat so, n'l a greater density than that of the liquid cOï'rom1 t1C.llCl 1 'aj¯> j> a # o: il, do deposit ot bring said compound dt Ôet1; J0 oh (10 goat vers), (1 i '#;' 2 in on the device side, so this conposo vl the goat not nôl # -, nrso ;; 0 ': - ..'. ,, vant at the bottom (the 3. 'o ..P! X'11'oll deposit can Otro = nlcv6r w "Jt <*. 'A3'1'L,' ;." '' '1 <.. mount on uri0 C;' V'c 'L .., t3.f, lâ. <7. C01) l't.mt tl;., 13r: do PC: J) ptl: i'0il do û6) j'e 2. Il comprond les Eitv.'...pca G1.1..".Vii2"a.L"i 1 in4;rvduir,i la <:i:.::. ','" d'entrée do liquide ccntcuant des m,":d;:,0:!.'C.J éJé.3(d<<;;1 t1r'.UD Lin 11;[.'::';; -- dépôt z, proximité do ::0. partie p6ripii;5z<fl,q¯uo infuriouro i?an> rn r..'#?'., d'écouloment dix3, . pou près ho:.r.'ir30n'k11cE1Clrt et n une vitcsso ((1,:t1née à provoquer un dcoulcaont on donoous de :Le. ourfoco d- co:?, d'entrée en direction de la partie contrôle du bc\nsin ot mi cJ(;0\(1,ement de surface du liquide . distance do la partie centrale en Q00tion de la p6rîph,rie du bansin, retirer le liquide dan-- clac.: It understands the Eitv .'... pca G1.1 .. ". Vii2" aL "i 1 in4; rvduir, i la <: i:. ::. ','" Of the liquid inlet containing m, ": d;:, 0:!. 'CJ éJé.3 (d << ;; 1 t1r'.UD Lin 11; [.' :: ';; - repository z, proximity do :: 0. part p6ripii ; 5z <fl, q¯uo infuriouro i? An> rn r .. '#?'., Out of ten3,. Pou near ho: .r.'ir30n'k11cE1Clrt and n a vitcsso ((1,: t1née to cause a flow of: Le. ourfoco d- co:?, input towards the control part of the bc \ nsin ot mi cJ (; 0 \ (1, surface element of the liquid. distance from the part central in Q00tion of the periph, rie of the bansin, withdraw the liquid in - clac .: !)oo:tions situées le Ions do la psripheric ::m,pÓ1.':leu'l:'c du bassin, 6Ctt':),ol' la surface du liquide contenu dans le bassin pour enlever les écumes et autres matières de faible 'densité flottant cur cotte dernière, amc EMI13.2 ner l'écume et autres matières à faible densité dans une o.t' .'o de mélange, pomper les matiorcs solides préalablement â6poc6oa An fond du bassin dans la chambre de m6lanGe, combiner 1 eN dcumos et les matières à faible densité de la chambre do m6lance aux matioros solides préalablement dûposdôs pour former un compose d'écume et de matiôrcs solides ayant une densité plue élevée quo celle du liquide contenu dans le bassin et amener le compose d'écume et de matière solides vers le fond du bassin, !) oo: tions located on the Ions of the psripheric :: m, pÓ1. ': leu'l:' c of the basin, 6Ctt ':), ol' the surface of the liquid contained in the basin to remove scum and other matter low density floating heart chain last, amc EMI13.2 Drain the scum and other low density material in a mixing tank, pump the solids previously at the bottom of the basin into the mixing chamber, combine the liquid and the low density material from the mixing chamber. mixes with the solid materials previously deposited to form a compound of scum and solid materials having a higher density than that of the liquid contained in the basin and to bring the compound of scum and solid material to the bottom of the basin, de façon que le composé et les matières solides non mélangées déposées puissent être enlèves simultanément sur une base à courant unique. so that the compound and unmixed solids deposited can be removed simultaneously on a single stream basis. 3. Il comprend les étapes suivantes : introduire le cotirant d'entrée de liquide contenant des matières solides dans le bassin 'de dépôt au moyen d'une série d'éléments d'évacuation du courant d'entrée qui communiquent avec un canal d'entrée placé sur la périphé rie, ce courant d'entrée étant évacué dans le bassin à proximité de sa partie périphérique inférieure en un courant dirigé à peu près horizontalement sans remettre en suspension une partie importante des matières solides qui se sont préalablement déposées sur le fond du bassin, ce courant d'entrée étant dirigé vers la partie centrale du bas- <Desc/Clms Page number 14> EMI14.1 1:I,h !t un J':;b1; 3. It comprises the following steps: introducing the inlet side of liquid containing solids into the deposition basin by means of a series of discharge elements of the inlet stream which communicate with a flow channel. inlet placed on the periphery, this inlet stream being discharged into the basin near its lower peripheral part in a stream directed more or less horizontally without resuspending a large part of the solids which have previously deposited on the bottom basin, this inlet current being directed towards the central part of the lower <Desc / Clms Page number 14> EMI14.1 1: I, h! T a J ':; b1; (lui 'k'.)V;)i1lW un ÓCCH.t10::1cn't 110 surface inférieure du oK,a=û tilt cn-t!'(#c et: direction do la partie centrale du bassin et un dcoulcsent de w,ar':¯. du liquide a distance do cotte partie contralo en ;#.1;,éct,fo;1 dc 1-. périphérie du bassin ot rotiror le liquida du basnin 1?nnri 1013 ponitions ,itnûe^ le long do ça périphérie'supérieure. (him 'k'.) V;) i1lW a ÓCCH.t10 :: 1cn't 110 lower surface of the oK, a = û tilt cn-t! '(# c and: direction do the central part of the basin and a dcoulcsent of w, ar ': ¯. of the liquid at a distance from this part contralo in; #. 1;, éct, fo; 1 dc 1-. periphery of the basin ot rotiror the liquida of the basnin 1? nnri 1013 ponitions, itnûe ^ le long do that upper periphery. 4. 10 liquide est retira f.1ono1.b1cl11ont le long de toute la p0rirh(.rio t:ur<:dct::"0 dll buccin. 4. 10 liquid is withdrawn f.1ono1.b1cl11ont along the entire p0rirh (.rio t: ur <: dct :: "0 dll whelk. Si Le W , E ?;4a ; al Cl::sr0c ost introduit dans un bassin de d6pOt a;- . -, . :, '-e 1::':':: c:\";",: <"1Cmcnf< d,'6vae.a-=.t1,on du couran% cl'ontr60, qui cont Bin en p3'T.ea ;",<.; 2.0' ,:: 00 r-i=o:în O!1po:::6oo du bassin d'une façon par lml1..lo110 tZ') 't,r?'2;#'#: est f.'':'t.1''v:.''CGzl' cvitco dan< los coinol du basr2à;.. If Le W, E?; 4a; al Cl :: sr0c ost introduced into a deposit basin a; -. -,. :, '-e 1 ::': ':: c: \ ";" ,: <"1Cmcnf <d,' 6vae.a - =. t1, we run% cl'ontr60, which contains Bin in p3 ' T.ea; ", <.; 2.0 ', :: 00 ri = o: în O! 1po ::: 6oo of the pelvis in a way by lml1..lo110 tZ') 't, r?' 2; # '#: is f.' ': 't.1''v:.' 'CGzl' cvitco dan <los coinol du basr2à; .. C. o s'.3 cai: :-.i:1; t Ci;:r00 o,,,t, introduit dans un 3?,it,",,II do dépôt 1rcuJ.c.:.tn.: :":',1.' dos (1 t ion du courant d'entrée qui sont n5,z eu n1..;",; c:t1;1,:'1.j:L:':Ç;l; le lynx do tout [con- canal d'enUri..>fd place :u.. 2( j=¯t ,¯:, .'i¯':::v(; 7 Í .:..r::,' -2..,) lo n".:'! ;':.' 'i d J entrJo ook introduit d<.'x..81'..7 le bassin eu 1>z=o.r<#i:.:z ie 6c 3':i ::.F#.>iù G.'t.,t'.'¯,"?r''.àt:3 d'évacuation du courant d'^ài'r0, il :.'01".<10 11; 6.>;>v3.;i.1<=.:% de liquide de surface inférieure qui provoque un i c.^:ß des 1..:'iü!'oc -1olidoa déposées en direction de la partie centrale du buccin, de façon à faciliter le retrait de ces matières EMI14.2 ;c'1 vc'c d'u'no conduite de sortie de matières solides placée au centre. C. o s'.3 cai:: -. I: 1; t Ci;: r00 o ,,, t, introduced in a 3?, it, ",, II do deposit 1rcuJ.c.:.tn .::": ', 1.' dos (1 t ion of the input current which are n5, z eu n1 ..; ",; c: t1; 1,: '1.j: L:': Ç; l; the lynx do all [con- enUri channel ..> fd place: u .. 2 (j = ¯t, ¯ :, .'ī '::: v (; 7 Í.: .. r ::,' -2 .., ) lo n ".: '!;' :. '' id J entrJo ook introduced d <. 'x..81' .. 7 the pool had 1> z = or <#i:.: z ie 6c 3 ' : i ::. F #.> iù G.'t., t '.' ¯, "? r ''. àt: 3 evacuation of the current of ^ ài'r0, il:. '01". < 10 11; 6.>;> V3.; I.1 <=.:% Lower surface liquid which causes an i c. ^: Ss of the 1 ..: 'iü!' Oc -1olidoa deposited in the direction of the central part of the whelk, so as to facilitate the removal of such material EMI14.2 ; c'1 vc'c of u'no outlet pipe for solids placed in the center. ;# - .('\.1.':;:-.'o::'1. pour traiter un liquide contenant des matières colidoc l"M" [':'[jt1'1j1' lo d6pÙt zn61,iors par gravitation dos constituants de mati.2n:'ot} colidcn C01YtGl'lUO dans la liquide, caractérisé par les 'poil1t;; ...'.d.F :;C3 ^wb'n;#â:l.,''7t ou on combinaisons : 1. Il cem:=ac un oo.::::o1n comportant une structure de base et do parois 0!.c'r:L:o;1nrntc:J, '1.; ; # -. ('\. 1.':;: -. 'O ::' 1. To treat a liquid containing colidoc material l "M" [':' [jt1'1j1 'lo d6pÙt zn61, iors by gravitation dos constituents of mati.2n: 'ot} colidcn C01YtGl'lUO in the liquid, characterized by the' poil1t ;; ... '. dF:; C3 ^ wb'n; # â: l.,' '7t or there are combinations: 1. Il cem: = ac un oo.::::o1n comprising a basic structure and do walls 0! .c'r: L: o; 1nrntc: J, '1 .; \Il moyen définissant un canal d'entrée placé à proximité do la partie périphérique du bassin, un moyen définissant un canal de sortie placé à proximité de la partie périphérique du bas- sin et destine à recevoir un écoulement de surface du liquide contenu dans le baccin, une série d'éléments d'évacuation reliés au canal d'en- trée, \ It means defining an inlet channel placed near the peripheral part of the basin, a means defining an outlet channel placed near the peripheral part of the basin and intended to receive a surface flow of the liquid contained in the basin. baccin, a series of evacuation elements connected to the inlet channel, chacun des éléments d'évacuation ayant une ouverture d'évacuation à proximité de con extrémité inférieure pour évacuer le courant de liquide contenant dos matières solides dans le bassin à proximité de 'sa partie périphérique inférieure dans un sens à peu près horizontal sans remettre en suspension une partie importante des matières solides qui se sont préalablement déposées sur le fond du bassin, each of the discharge members having a discharge opening near its lower end for discharging the stream of liquid containing solids in the basin near its lower peripheral part in an approximately horizontal direction without resuspending a large part of the solid matter which has previously settled on the bottom of the basin, les éléments d'évacuation du courant d'entrée étant disposés le long du canal d'en- trée et leurs ouvertures d'évacuation étant dirigées vers la partie <Desc/Clms Page number 15> centrale du bassin et ayant des dimensions capables de provoquer un écoulement de surface inférieure du courant d'entrée contenant les matières solides en direction de la partie centrale du bassin et un écoulement de surface du liquide à distance de la partie centrale vers le canal de sortie. the input current discharge elements being disposed along the inlet channel and their discharge openings being directed towards the part. <Desc / Clms Page number 15> center of the basin and having dimensions capable of causing a lower surface flow of the inlet stream containing the solids to the central part of the basin and a surface flow of the liquid away from the central part to the outlet channel . 2. Le bassin est à peu près rectangulaire et la série d'élé ments d'évacuation du courant d'entrée sont disposas le long de la périphérie du bassin d'une façon par laquelle une turbulence est effec- tivement évitée dans ses parties de coins. 2. The basin is roughly rectangular and the series of inlet stream discharge elements are arranged along the periphery of the basin in such a way that turbulence is effectively avoided in its parts. corners. 3. Le canal d'entrée est sensiblement continu le long do la périphérie du bassin. 3. The inlet channel is substantially continuous along the periphery of the basin. 4. Le canal de sortie est sensiblement continu le long do la périphérie du bassin. 4. The outlet channel is substantially continuous along the periphery of the basin. 5. Les canaux d'entrée et de sortie cent sensiblement continus le long de la périphérie externe du bassin et sont juxtaposes l'un par rapport à l'autre.. 5. The inlet and outlet channels one hundred substantially continuous along the outer periphery of the pelvis and are juxtaposed with respect to each other. 6. Les canaux d'entrée et de sortie sont sensiblement continus le long de la périphérie externe du bassin et sensiblement à la même hauteur. 6. The inlet and outlet channels are substantially continuous along the outer periphery of the pelvis and substantially at the same height. 7. Les éléments d'évacuation du courant d'entrée présentent une partie s'étendant approximativement vers le bas qui s'étend dans une partie à peu près horizontale munie d'une ouverture d'évacuation qui est à peu près dirigée vers la partie centrale du bassin. 7. The input stream discharge members have an approximately downwardly extending portion which extends into a substantially horizontal portion provided with a discharge opening which is substantially directed toward the portion. central basin. 8. Le bassin de dépôt comprend un bras d'écumage monté sur ce dernier pour recueillir les écumes et autres matières à faible densité flottant sur la surface du liquide contenu dans le bassin une chambre de mélange montée dans le bassin, un moyon pour transmettre les écumes et autres'matières à faible densité recueillies par l'écu moire dans la chambre de mélange, un moyon pour amener la bouc du fond du bassin de dépôt dans la chambre de mélange pour y former un composa d'écume et de boue et un moyen pour transmettre ce compose do la cham bre de mélange au fond du bassin de dépôt. 8. The settling basin comprises a skimming arm mounted on the latter to collect the dross and other low density material floating on the surface of the liquid contained in the basin a mixing chamber mounted in the basin, a hub for transmitting the scum and other low density material collected by the scum in the mixing chamber, a means for bringing the goat from the bottom of the settling basin into the mixing chamber to form a scum and sludge compound therein and a means for transmitting this compound from the mixing chamber to the bottom of the deposition basin. 9. Le bras d'écumage este monté pour tourner à l'int6riour du bassin de dépôt. 9. The skimmer arm is mounted to rotate inside the settling basin.
BE718890D 1965-07-23 1968-07-31 WATER TREATMENT. BE718890A (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US474389A US3395800A (en) 1965-07-23 1965-07-23 Sewage treatment and apparatus therefor
CA25878 1968-07-24
GB35814/68A GB1236748A (en) 1968-07-26 1968-07-26 Method of and apparatus for processing a solids-containing liquid
AU41363/68A AU426301B2 (en) 1968-07-29 1968-07-29 Improvements in sewage treatment and apparatus therefor

Publications (1)

Publication Number Publication Date
BE718890A true BE718890A (en) 1968-12-31

Family

ID=27423186

Family Applications (1)

Application Number Title Priority Date Filing Date
BE718890D BE718890A (en) 1965-07-23 1968-07-31 WATER TREATMENT.

Country Status (1)

Country Link
BE (1) BE718890A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0641585A2 (en) * 1993-08-20 1995-03-08 ENVIREX Inc. Clarifier

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0641585A2 (en) * 1993-08-20 1995-03-08 ENVIREX Inc. Clarifier
EP0641585A3 (en) * 1993-08-20 1995-08-09 Envirex Clarifier.

Similar Documents

Publication Publication Date Title
FR2512802A1 (en) APPARATUS AND METHOD FOR CLARIFYING WATER BY COMBINED USE OF FLOTATION AND FILTRATION PROCESSES
EP0870527A1 (en) System and filter cartridge with a granular and cellular material
SI9300268A (en) Lamellar apparatus and method for clarifying water
CH641744A5 (en) WATER PURIFICATION PLANT.
EP2965806B1 (en) Water or industrial effluent treatment plant comprising stirring means with common drive means
BE718890A (en) WATER TREATMENT.
CA1258544A (en) Mud bed clarifying process for liquid laden with solids
EP0276621B1 (en) Filter for the overflow of water from a swimming pool having a storage vessel serving as a gravity filter
CN101254956A (en) Water purifying apparatus and water purification agent
FR3030318B1 (en) DEVICE FOR PRETREATMENT OF SEDIMENTS FROM A BACKGROUND OF A LIQUID MEDIUM COMPRISING SUCCESSIVE SIEVE STAGES
FR2741870A1 (en) Production of potable water from waste or sea waters
BE826477A (en) DEVICE FOR THE TREATMENT OF WASTEWATER
FR2587234A1 (en) CONCENTRATOR FOR PASTA OR SUSPENSION, IN PARTICULAR FOR PAPER PULP
RU2200803C1 (en) System for discharge and cleaning of surface run- off
FR2484272A1 (en) Installation to purify liq. effluent - employs rotary screen filter with continuous back flush cleaning by compressed air
WO2008043950A2 (en) Plant for the successive-phase purification of effluents
FR2619025A1 (en) Device for grading a heterogeneous mixture of solid bodies
CN210496798U (en) Grit piece-rate system
KR102489997B1 (en) Filtration material washing machine
JP4082713B1 (en) Sediment cleaning equipment
BE437133A (en)
RU2200802C1 (en) System for discharge and cleaning of surface run- off
FR2554736A1 (en) METHOD AND DEVICE FOR FILTERING LIQUIDS
CH502275A (en) Liquid purifier
WO2006056717A1 (en) Sedimentation unit and one-piece water-treatment installation which connects said sedimentation unit and a filtration system

Legal Events

Date Code Title Description
RE Patent lapsed

Owner name: SMITH & LOVELESS INC.

Effective date: 19870731