Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DET27582Aexternal-prioritypatent/DE1255127B/de
Priority claimed from FR41704Aexternal-prioritypatent/FR1459555A/fr
Application filedfiledCritical
Publication of BE681164ApublicationCriticalpatent/BE681164A/fr
Procede pour realiser un joint de construction entre deux elements prefabriques d'un ouvrage, joint de construction s'y rapportant et ouvrage comportant un tel joint.