BE551549A - - Google Patents

Info

Publication number
BE551549A
BE551549A BE551549DA BE551549A BE 551549 A BE551549 A BE 551549A BE 551549D A BE551549D A BE 551549DA BE 551549 A BE551549 A BE 551549A
Authority
BE
Belgium
Prior art keywords
pile
concrete
hollow space
shoe
stake
Prior art date
Application number
Other languages
French (fr)
Publication of BE551549A publication Critical patent/BE551549A/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

       

   <Desc/Clms Page number 1> 
 



   L'invention se rapporte à un procédé de fabrication d'un pieu à battre avec enveloppe en béton, par battage d'un corps de pieu pourvu d'un soulier de pieu déplaceur et introduction sous pression de béton par la partie infé- rieure du pieu dans l'espace creux engendré par le soulier de pieu dans le terrain de construction autour du corps de pieu. Par le béton s'élevant dans cet espace creux sous une surpression, la région de terre entourant l'es- pace creux est densifiée et l'espace creux est irrégu- 

 <Desc/Clms Page number 2> 

   lièrement   élargi suivant la résistance différente des couches du sol traversées par battage.

   Les pieux de bat- tage fabriqués par un tel procédé se distinguent par une grande capacité de portée et une résistance élevée à la traction parce que, en dehors du corps du pieu, l'enve- loppe de béton également porte de même avec sa section transversale non régulière et ancre le pieu fortement au terrain de construction. 



   L'invention vise à développer le procédé de façon à ce qu'il puisse aussi s'employer avec avantage particuliè- rement dans des terrains se laissant aller et dans ceux fortement traversés par de l'eau. 



   L'invention consiste en ce que pendant le battage un ciment ou béton fluide est alimenté sous faible près-. sion pour le remplissage continu de l'espace creux pro- duit, en ce que vers la fin .du processus de battage l'espace creux rempli est étanchéisé en haut et en ce que du béton est encore forcé sous pression plus élevée. 



   Il existe en soi des terrains dans lesquels l'es- pace creux créé lors du battage du p ieu autour du corps est repoussé par suite de l'élasticité du sol, comme c'est le cas par exemple dans les terrains marécageux ou fangeux, si bien qu'en poursuivant le battage, sous l'in- fluence des secousses, l'espace creux continue à se   ré-   trécir et peut; marne se combler en partie. Etant donné que      par le procédé selon l'invention, l'espace creux se comble aussitôt avec le ciment ou béton fluide qui sort durant le battage à la partie inférieure du corps du pieu, ni la terre, ni l'eau souterraine ne peuvent pénétrer dans l'espace creux. 

 <Desc/Clms Page number 3> 

 



   Le procédé de l'invention va maintenant être expliqué avec plus de détails en se servant dit dessin.      



   Dans   celui-ci :        la figure 1 montre un pieu battu avec l'enveloppe      de béton, suivant une représentation en coupe, la figure 2 montre à une plus grande échelle en coupe longitudinale la partie inférieure du pieu avec espace creux comblé aussitôt après le début du battage, de même que l'ex- trémité supérieure du pieu complètement enfoncé. 



   Les figures 3 et 4 montrent des coupes transversales suivant les lignes III - III et IV - IV de la figure 2. 



   Dans la figure 5 est représentée une coupe   longitu-   dinale passant à travers une autre forme de réalisation de la tête de pieu. 



   A   l'extrémité   inférieure du corps de pieu creux 61 représenté est fixé un soulier de pieu déplaceur creux 62, en forme de coin. Vers le haut, le soulier de pieu est ouvert, et sa face supérieure transversale est plus grande que la section transversale du corps du pieu. Dans co soulier de pieu déplaceur est inséré dans le plan axial du corps 61 un burin 63, de manière à ce qu'il fasse saillie par le bas au dehors du soulier de pieu et touche avec son extrémité supérieure émoussée le bord inférieur du corps dupieu. En vue du raccordemement ferme du soulier de pieu 
62 avec le corps de pieu 61, on fait usage de tôles de renfort   64,   soudées au corps de pieu et aux parois du soulier de pieu.

   Dans la partie inférieure du corps du pieu il peut être prévu, comme l'exemple figuré le montre, des ouvertures 65 conduisant à l'extérieur, bien que le plus souvent celles-ci ne soient pas indispensables. En naut,   . le   corps du pieu est obturé par une plaque de tête 66. 

 <Desc/Clms Page number 4> 

 En-dessous de la plaque de tête   estappliqué   à une   ouver- '   ture 67 du corps de pieu un conduit tubulaire 68 auquel on peut raccorder une conduite d'alimentation de béton   @   69. Au voisinage de l'extrémité supérieure du corps est fixée au corps de pieu 61 une cloche   d'étanchéisation   70, en forme conique creuse.

   La cloche   d'étanchéisation   peut 
 EMI4.1 
 aussi être conçue amovible, si bien que quelques heures après enfoncement d'un pieu elle peut être enlevée et réemployée pour un des pieux suivants. 



   Lors du battage du corps du pieu, le soulier de pieu 62 engendre autour du corps de pieu un espace creux 
71 dans le terrain de construction. Suivant l'invention, on introduit sous pression lors du battage par le con- duit 69 et la tubulure 68 un lait de ciment ou un béton très.'fluide dams le corps de pieu 61 et dans le soulier de pieu 62. Le ciment ou béton fluide sort du soulier de . pieu 62, ouvert au-dessus, et monte dans l'espace creux 71 créé autour du corps du pieu par le soulier de pieu. Ainsi, l'espace creux 71 est continuellement comblé avec la messe dé oéton ou de ciment. Ces processus se font jusqu' au moment où, à la fin du processus de battage, la cloche d'étanchéisation 70 pénètre dans le terrain de construc- tion et obture par le haut l'espace creux 71 comblé. La masse de ciment ou de béton ne peut plus alors monter que jusqu'à la cloche 70.

   Lors du battage et de l'introduction sous pression du remplissage de béton ou matière analogue, on veille à ce que le niveau de béton soit maintenu un peu en-dessous de la surface du terrain de construction. 



   Après que le pieu a été battu jusqu'à la profondeur voulue et que l'espace creux produit par le soulier de pieu déplaceur a été rempli par le béton fluide ou un produit analogue introduit sous faible pression, et après 

 <Desc/Clms Page number 5> 

 que l'espace creux et la masse de remplissage ont été étanchéisés par le haut, on accroît notablement la pres- sion d'alimentation du béton. Le béton alimenté sous une pression plus forte a en l'occurence une nature pâteuse ou grenue appropriée. Par densification ultérieure de la région du sol entourant l'espace creux initial 71, on engendre ainsi l'enveloppe de béton finale 73 (figure 1). 



   La figure 5 montre au lieu de la plaque de tête 66 un élément de tête   74   pour l'obturation supérieure du corps de pieu 61. Dans cet élément de tête est prévu un forage angulaire 75 à la partie horizontale duquel le con- duit tubulaire 70 est adapté. 



   Au lieu du corps tubulaire représenté à titre   d'exem-   ple on peut employer également comme corps de pieu un profil plein. Dans ce cas, le béton ou ciment fluide est alimenté par une ou plusieurs canalisations d'amenée (tuyauteries} extérieures au corps de pieu, au soulier de pieu. 



   REVENDICATIONS. 
 EMI5.1 
 



  S:==!C:==::C =:!=:==:===!= =;:M:==#=!S==Zt:M: 

**ATTENTION** fin du champ DESC peut contenir debut de CLMS **.



   <Desc / Clms Page number 1>
 



   The invention relates to a method of manufacturing a driving pile with a concrete casing, by driving a pile body provided with a displacing pile shoe and introducing concrete under pressure through the lower part of the pile. stake in the hollow space created by the stake shoe in the construction site around the stake body. By the concrete rising in this hollow space under an overpressure, the earth region surrounding the hollow space is densified and the hollow space is irregular.

 <Desc / Clms Page number 2>

   Largely widened according to the different resistance of the soil layers crossed by threshing.

   Driving piles produced by such a process are distinguished by a high bearing capacity and high tensile strength because, outside the body of the pile, the concrete shell also bears the same with its cross section. non-regular transverse and anchors the pile strongly to the construction site.



   The invention aims to develop the process in such a way that it can also be used with advantage, particularly in land which is loose and in those heavily crossed by water.



   The invention consists in that during the threshing a cement or fluid concrete is fed under low near-. This means that the filled hollow space is sealed at the top towards the end of the beating process, and concrete is forced under the higher pressure again.



   There are lands in themselves in which the hollow space created during the driving of the pile around the body is pushed back due to the elasticity of the soil, as is the case for example in marshy or muddy soils, so that by continuing to thresh, under the influence of the tremors, the hollow space continues to shrink and can; marl fill in part. Given that by the method according to the invention, the hollow space is immediately filled with the cement or fluid concrete which comes out during the driving at the lower part of the body of the pile, neither the earth nor the underground water can penetrate in the hollow space.

 <Desc / Clms Page number 3>

 



   The method of the invention will now be explained in more detail using said drawing.



   In it: figure 1 shows a driven pile with the concrete envelope, following a cross-section, figure 2 shows on a larger scale in longitudinal section the lower part of the pile with hollow space filled immediately after the start driving, as well as the top end of the fully driven pile.



   Figures 3 and 4 show cross sections along lines III - III and IV - IV of figure 2.



   In Figure 5 is shown a longitudinal section passing through another embodiment of the pile head.



   Attached to the lower end of the hollow stake body 61 shown is a wedge-shaped hollow displacer stake shoe 62. Upward, the stake shoe is open, and its transverse upper face is larger than the cross section of the stake body. In co displacer stake shoe is inserted in the axial plane of the body 61 a chisel 63, so that it protrudes from below outside the stake shoe and touches with its blunt upper end the lower edge of the stake body . For the firm connection of the stake shoe
62 With the stake body 61, use is made of reinforcing plates 64, welded to the stake body and to the walls of the stake shoe.

   In the lower part of the body of the pile it can be provided, as the illustrated example shows, openings 65 leading to the outside, although most often these are not essential. In naut,. the body of the pile is closed by a head plate 66.

 <Desc / Clms Page number 4>

 Below the head plate is applied to an opening 67 of the pile body a tubular conduit 68 to which can be connected a concrete feed line 69. In the vicinity of the upper end of the body is attached to the pipe. pile body 61 a sealing bell 70, in a hollow conical shape.

   The sealing bell can
 EMI4.1
 also be designed removable, so that a few hours after driving a pile it can be removed and reused for one of the following piles.



   When driving the pile body, the stake shoe 62 creates a hollow space around the pile body
71 in the construction site. According to the invention, during the threshing, is introduced under pressure through the pipe 69 and the pipe 68 a cement milk or a very fluid concrete in the pile body 61 and in the pile shoe 62. The cement or fluid concrete comes out of the shoe. stake 62, open above, and rises into the hollow space 71 created around the body of the stake by the stake shoe. Thus, the hollow space 71 is continuously filled with the mass of oeton or cement. These processes are carried out until the moment when, at the end of the threshing process, the sealing bell 70 enters the construction site and closes the filled hollow 71 from above. The mass of cement or concrete can then only rise to the bell 70.

   When driving and introducing under pressure the filling of concrete or the like, it is ensured that the concrete level is kept slightly below the surface of the construction site.



   After the pile has been driven to the desired depth and the hollow space produced by the displacing stake shoe has been filled with fluid concrete or the like introduced under low pressure, and after

 <Desc / Clms Page number 5>

 when the cavity and the filling material have been sealed from above, the concrete feed pressure is significantly increased. Concrete fed under higher pressure here has an appropriate pasty or grainy nature. By subsequent densification of the region of the ground surrounding the initial hollow space 71, the final concrete envelope 73 is thus generated (FIG. 1).



   Fig. 5 shows instead of the head plate 66 a head element 74 for the upper sealing of the pile body 61. In this head element is provided an angular bore 75 at the horizontal part of which the tubular duct 70. is suitable.



   Instead of the tubular body shown by way of example, a solid profile can also be used as the pile body. In this case, the concrete or fluid cement is fed by one or more supply pipes (pipes} external to the pile body, to the pile shoe.



   CLAIMS.
 EMI5.1
 



  S: ==! C: == :: C =:! =: ==: ===! = = ;: M: == # =! S == Zt: M:

** ATTENTION ** end of DESC field can contain start of CLMS **.


    

Claims (1)

1.- Procédé de fabrication d'un pieu à battre avec enveloppe de béton, par battage d'un corps de pieu muni d'un soulier de pieu déplaceur et introduction sous pres- sion de béton par la partie inférieure du pieu dans l'es- pace creux engendré par le soulier de pieu dans le terrain de construction autour du corps de pieu, caractérisé en ce que durant le battage on alimente un ciment ou béton fluide sous faible pression pour le remplissage continu de l'espace creux engendré, en ce que vers la fin du processus de battage l'espace cfeux rempli est étanchéisé en haut, et en ce qu'on introduit encore du béton sous une pression plus élevée* <Desc/Clms Page number 6> 2.- Procédé suivant la revendication 1, caractérisé en ce que lors du battage, le niveau du ciment ou béton introduit sous pression est un peu en-dessous de la sur- face du terrain de construction. 1.- A method of manufacturing a pile to be driven with a concrete envelope, by driving a pile body fitted with a displacing pile shoe and introducing concrete under pressure through the lower part of the pile into the pile. hollow space created by the pile shoe in the construction site around the pile body, characterized in that during the driving a cement or fluid concrete is supplied under low pressure for the continuous filling of the generated hollow space, in that towards the end of the threshing process the filled space is sealed at the top, and in that more concrete is introduced under higher pressure * <Desc / Clms Page number 6> 2. A method according to claim 1, characterized in that during threshing, the level of the cement or concrete introduced under pressure is a little below the surface of the construction site.
BE551549D BE551549A (en)

Publications (1)

Publication Number Publication Date
BE551549A true BE551549A (en)

Family

ID=177044

Family Applications (1)

Application Number Title Priority Date Filing Date
BE551549D BE551549A (en)

Country Status (1)

Country Link
BE (1) BE551549A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1274519B (en) * 1959-04-06 1968-08-01 Mueller Ludwig Method for making a foundation pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1274519B (en) * 1959-04-06 1968-08-01 Mueller Ludwig Method for making a foundation pile

Similar Documents

Publication Publication Date Title
FR2516958A1 (en) DEVICE FOR MOLDING HOLLOW PILES AND METHOD FOR PREPARING SUCH PILES USING THE DEVICE
FR2513304A1 (en) TOOL FOR DRILLING IN THE SOIL OF HOLES WITH REINFORCED WALLS AND METHOD FOR DRILLING SUCH HOLES
BE551549A (en)
EP0413676A1 (en) Process for fixing anchors
JP6319942B2 (en) Steel pipe sheet pile press-in method and pipes
EP2900875A1 (en) Method for producing a ground anchor
JP2008045367A (en) Ground consolidation construction method and ground-subsidence correction construction method
FR2475617A1 (en) COMPRESSION TREPAN WITH PLANE CLOSURE PLATE
EP0532441A1 (en) Method for consolidating tunnel walls, gallery walls, or the like, anchoring bolt for carrying out the method, and method for making such anchoring bolts
US44751A (en) Improved mode of sinking piles
JP2866252B2 (en) Construction method of hollow pipe pile
BE720112A (en)
BE522814A (en)
BE546120A (en)
DE255805C (en)
WO2000040808A1 (en) Method and device for forming a foundation pipe pile in the ground
BE1006194A5 (en) Drilling device and process for the formation of piles or the like
FR2522706A2 (en)
JP2003003464A (en) Internal excavation method through steel pipe pile
JP2006016860A (en) Road bed improvement method and screw drill and rolling compaction pipe used in it
BE518438A (en)
JP2951049B2 (en) Consolidation method of medium excavation pile
WO2024117903A1 (en) Alternative method for moving organic plant material to an underground location with an anaerobic environment and injection lance head for use in the method
FR2668514A1 (en) Method and device for chopping the tops off concrete constructions
JPS6140816B2 (en)