BE1008489A3 - Process for producing a coated tunnel. - Google Patents

Process for producing a coated tunnel. Download PDF

Info

Publication number
BE1008489A3
BE1008489A3 BE9400658A BE9400658A BE1008489A3 BE 1008489 A3 BE1008489 A3 BE 1008489A3 BE 9400658 A BE9400658 A BE 9400658A BE 9400658 A BE9400658 A BE 9400658A BE 1008489 A3 BE1008489 A3 BE 1008489A3
Authority
BE
Belgium
Prior art keywords
auxiliary tube
tube elements
elements
tunnel
station
Prior art date
Application number
BE9400658A
Other languages
French (fr)
Inventor
Frederic Bernier
Original Assignee
Centre Etd Energie Nucleaire
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Centre Etd Energie Nucleaire filed Critical Centre Etd Energie Nucleaire
Priority to BE9400658A priority Critical patent/BE1008489A3/en
Priority to DE1995614160 priority patent/DE69514160T2/en
Priority to ES95201867T priority patent/ES2143001T3/en
Priority to EP19950201867 priority patent/EP0692606B1/en
Application granted granted Critical
Publication of BE1008489A3 publication Critical patent/BE1008489A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Procédé de réalisation d'un tunnel revêtu, selon lequel un tunnel de section circulaire est creusé dans le sol à l'aide d'un tunnelier (2) et un revêtement (7-8) est placé à l'intérieur de ce tunnel, caractérisé en ce que le tunnelier (2) est avancé indépendamment de la mise en place du revêtement (7), et que ce revêtement (7-8) est posé en deux étapes : une première étape au cours de laquelle des éléments de tube auxiliaires (9) sectionnés sur leur longueur et repliés sur eux-mêmes sont poussés à l'aide d'une station de poussage (13) au travers des éléments de tube auxiliaires (9) déjà en place jusqu'au niveau de leur emplacement où ils s'ouvrent par élasticité, et une deuxième étape au cours de laquelle des éléments (12) d'un revêtement final (8) sont poussés au travers des éléments de tube auxiliaires (9) déjà en place.Method for producing a coated tunnel, according to which a circular cross-section tunnel is dug into the ground using a tunneling machine (2) and a covering (7-8) is placed inside this tunnel, characterized in that the tunnel boring machine (2) is advanced independently of the positioning of the covering (7), and that this covering (7-8) is laid in two stages: a first stage during which auxiliary tube elements (9) sectioned along their length and folded back on themselves are pushed using a pushing station (13) through the auxiliary tube elements (9) already in place to the level of their location where they open by elasticity, and a second step during which elements (12) of a final coating (8) are pushed through the auxiliary tube elements (9) already in place.

Description

       

   <Desc/Clms Page number 1> 
 



  Procédé de réalisation d'un tunnel revêtu. L'invention concerne un procédé de réalisation d'un tunnel revêtu de section circulaire, selon lequel un tunnel est creusé à l'aide d'un tunnelier et un revêtement est placé à l'intérieur de ce tunnel. 



  L'invention concerne en particulier la réalisation d'un microtunnel revêtu, c'est-à-dire un tunnel de petit diamètre où l'intervention humaine n'est pas possible. 



  Dans un procédé connu sous le nom de"pipe-jacking", des éléments de revêtement sont poussés les uns derrière les autres, à partir d'une chambre de départ, à l'arrière d'un microtunnelier, assurant ainsi son avancement. 



  Si ce procédé est applicable dans certains sols stables, il est parfois impraticable dans d'autres sols qui se tassent ou convergent assez rapidement, tels que des sols argileux. 



  Il est évident que, suite à la convergence, la friction du sol sur les sections du revêtement augmente, au fur et à mesure que le microtunnelier avance. Du fait de l'augmentation de cette friction, des forces de poussée toujours plus grandes sont nécessaires pour faire avancer le tunnelier et les éléments de revêtement déjà introduits ainsi que le microtunnelier. Ces forces peuvent devenir rapidement trop importantes, en particulier à grande profondeur, rendant la construction d'un tunnel d'une longueur supérieure à 30 m irréalisable par cette technique. 



  Un autre procédé, basé sur un dispositif qui maintient sous pression les parois du tunnel pendant les opérations de creusement, est en cours de développement. L'excavation 

 <Desc/Clms Page number 2> 

 terminée, le dispositif est retiré et le revêtement final est placé par la méthode de"pipe-jacking". Cette technique, bien qu'originale, requiert une infrastructure lourde et onéreuse. 



  L'invention a pour but de remédier aux inconvénients susdits et de procurer un procédé permettant la réalisation de tunnels revêtus d'une manière simple et continue, dans des sols convergents situés à grande profondeur. 



  Ce but est atteint par le fait que le tunnelier est avancé indépendamment de la mise en place du revêtement, et que ce revêtement est posé en deux étapes : une première étape au cours de laquelle des éléments de tube auxiliaires sectionnés sur leur longueur et repliés sur eux-mêmes sont poussés à l'aide d'une station de poussage au travers des éléments de tube auxiliaires déjà en place jusqu'au niveau de leur emplacement où ils s'ouvrent par élasticité, et une deuxième étape au cours de laquelle des éléments d'un revêtement final sont poussés au travers des éléments de tube auxiliaires déjà en place. 



  Les avantages obtenus grâce à cette invention consistent essentiellement en ce que les forces de frottement à l'interface revêtement-sol sont éliminées. En effet, le frottement a lieu entre la face intérieure des éléments de tube auxiliaires en place et la face extérieure des nouveaux éléments de tube auxiliaires introduits. La pression exercée par le sol n'influence donc plus les forces de frottement lors du poussage des tubes étant donné que celle-ci est reprise par les éléments de tube auxiliaires extérieurs déjà en place, durant la réalisation du tunnel. 

 <Desc/Clms Page number 3> 

 



  Dans une forme de réalisation particulière de l'invention, le tunnel est creusé à l'aide d'un tunnelier comprenant une station d'ancrage, une station de poussage et une station d'excavation en répétant successivement les étapes suivantes : ancrage du tunnelier dans le sol, poussage de la station d'excavation durant le creusement et rétraction de la station d'ancrage vers la station de poussage. 



  Dans une autre forme de réalisation de l'invention, les éléments de tube auxiliaires sont maintenus en position repliée par un dispositif approprié et sont libérés au niveau de leur emplacement final. 



  Dans une forme de réalisation de l'invention, un dispositif de calage est prévu entre les éléments de tube auxiliaires pour éviter leur entraînement lors de l'introduction d'un élément de tube auxiliaire à travers ceux-ci. 



  Dans une autre forme de réalisation de l'invention, les éléments de tube auxiliaires s'ouvrent au niveau de leur emplacement jusque dans une position ouverte dans laquelle une ouverture longitudinale subsiste, ces éléments de tube auxiliaires en place pouvant ensuite se fermer sous l'action de la convergence du sol. 



  Les éléments de tube auxiliaires qui sont poussés peuvent alors être pourvus d'un guide pour les guider lorsqu'ils se ferment sous l'action de la convergence du sol. 



  Les éléments du revêtement final peuvent avoir un diamètre égal, aux tolérances près, au diamètre intérieur des éléments de tube auxiliaires en position finale fermée. 



  Dans une forme de réalisation particulière de l'invention, le revêtement final est mis en place sous forme d'éléments 

 <Desc/Clms Page number 4> 

 de tube classiques qui sont soudés entre eux pour former un revêtement étanche. 



  Le revêtement final ou une partie de celui-ci peut être utilisé pour pousser les derniers éléments de tube auxiliaires à installer au travers des éléments de tube auxiliaires déjà en place. 



  D'autres particularités et avantages de l'invention ressortiront de la description donnée ci-après d'un procédé pour réaliser un tunnel, selon l'invention. Cette description n'est donnée qu'à titre d'exemple non-limitatif en se référant aux dessins annexés, dans lesquels : la figure 1 montre en coupe un microtunnel en train d'être réalisé par le procédé selon l'invention ; la figure 2 représente une coupe selon la ligne II-II de la figure 1 ; la figure 3 représente une coupe selon la ligne
III-III de la figure 1 ; la figure 4 représente, sur une échelle agrandie, le détail indiqué par F4 à la figure 3, la figure 5 représente une coupe selon la ligne V-V de la figure 1. 



  Les figures ont trait à la réalisation d'un microtunnel horizontal de diamètre compris entre 0,5 et 1,5 m, à partir d'une galerie principale déjà existante 16, dans un sol 1 argileux, à grande profondeur. 

 <Desc/Clms Page number 5> 

 Pour réaliser ce microtunnel, un microtunnelier 2 est utilisé constitué de trois stations, c'est-à-dire une station d'ancrage 3, une station de poussage 4 et une station d'excavation 5. 



  A l'aide de la station d'ancrage 3, munie de vérins hydrauliques 6, le microtunnelier 2 est ancré dans le sol 1. Ensuite, la station d'excavation 5 composée d'un instrument de forage à attaque globale est avancée, durant le creusement, à l'aide de la station de poussage 4 munie également de vérins hydrauliques. Lorsque les vérins hydrauliques de la station de poussage 4 sont en fin de course, la station d'ancrage 3 est libérée et rétractée vers la station d'excavation 5, à l'aide des vérins hydrauliques de la station de poussage 4. La place nécessaire à l'emplacement d'un élement d'un revêtement auxiliaire 7 est ainsi libérée à l'arrière du microtunnelier 2. La procédure susdite est répétée, en commençant par un nouvel ancrage du microtunnelier 2. 



  A l'arrière du microtunnelier, le revêtement est placé en deux étapes,   c'est-à-dire   une premiere étape au cours de laquelle un revêtement auxiliaire 7, destiné à reprendre durant la réalisation du tunnel, les pressions du sol 1 (de l'ordre de 1 MPa), est mis en place et une deuxième étape au cours de laquelle un revêtement final 8, destiné à reprendre les pressions du sol 1 à long terme (de l'ordre de 5 MPa), est mis en place. 



  Le revêtement auxiliaire 7 est formé d'éléments de tube auxiliaires 9, par exemple en métal, d'une épaisseur comprise entre 5 et 10 mm, qui sont sectionnés sur toute leur longueur et repliés sur eux mêmes, tel que représenté à la figure 2. Ces éléments de tube auxiliaires 9 peuvent être acheminés, les uns derrière les autres, en position 

 <Desc/Clms Page number 6> 

 repliée, jusqu'au niveau de leur emplacement en les poussant au travers des éléments de tube auxiliaires 9 déjà en place, tel que représenté à la figure 2. Au niveau de leur emplacement, les éléments de tube auxiliaires 9 s'ouvrent par élasticité et reprennent leur position initiale, c'est-à-dire la position qu'ils avaient après leur sectionnement, tel que représenté à la figure 3, laissant ainsi une ouverture longitudinale 10.

   Chaque élément de tube auxiliaire 9 est muni sur sa face extérieure au niveau de la section longitudinale, d'un guide 11 formé par un rebord courbé. La fonction de ce guide fait l'objet d'un autre paragraphe. 



  La pose du revêtement auxiliaire 7 est réalisée de la manière suivante : un premier élément de tube auxiliaire 9 est mis en place dans le microtunnel ; les éléments de tube auxiliaires 9 suivants sont préalablement repliés sur eux-mêmes et introduits les uns après les autres, tel que représenté en coupe à la figure 2, à partir de la galerie principale 16, au fur et à mesure que le microtunnelier 2 excave. 



  Il est possible de maintenir les éléments de tube auxiliaires 9 en position repliée au cours de leur introduction, par un dispositif approprié, comme par exemple des lanières, ce dispositif permettant de libérer les éléments de tube auxiliaires au niveau de leur emplacement. 



  Les éléments de tube auxiliaires 9 sont ainsi poussés jusqu'au niveau de leur emplacement, à l'aide d'une station de poussage 13, placée dans la galerie principale 16. 



  Les forces de frottement ne dépendent donc plus de la pression du sol 1, puisque celle-ci est reprise par les 

 <Desc/Clms Page number 7> 

 éléments de tube auxiliaires 9 durant le creusement du microtunnel. 



  Afin d'empêcher l'entraînement des éléments de tube auxiliaires 9 en place, lors du poussage des éléments de tube auxiliaires 9 repliés, les éléments de tube auxiliaires 9 sont rendus solidaires par des dispositifs de calage appropriés. 



  Au niveau de leur emplacement, les éléments de tube auxiliaires 9 s'ouvrent par élasticité, tel que représenté à la figure 3, laissant une ouverture longitudinale 10. Le guide 11 susdit limite le mouvement des parois de l'élément de tube auxiliaire 9. 



  La section longitudinale de chaque élément de tube auxiliaire 9 est telle qu'un bord de l'ouverture 10 soit pourvu d'une rainure en V 14 et que l'autre bord de cette même ouverture 10 possède une extrémité correspondante 15 en V, tel que représenté en détail à la figure 4. 



  Suite à la convergence du sol 1, l'ouverture 10 se referme. 



  Le guide 11 et la rainure 14 jointe à   l'extrémité   15 de l'élément de tube auxiliaire assurent une parfaite fermeture de cet élément de tube auxiliaire 9 lorsque le sol 1 argileux a convergé, tel que représenté à la figure 5. 



  Lorsque le dernier élément de tube auxiliaire 9 replié a été introduit dans le microtunnel, la mise en place du revêtement final 8 en métal débute. Ce revêtement final 8 étanche est destiné à reprendre la pression exercée par le sol 1 à long terme. Ce revêtement final 8 a un diamètre extérieur égal, aux tolérances près, au diamètre intérieur du revêtement auxiliaire 7 avec les éléments de tube auxiliaires 9 dans leur position fermée. 

 <Desc/Clms Page number 8> 

 Le revêtement final 8 est introduit sous forme d'éléments de tube 12 qui sont poussés, les uns après les autres, à partir de la galerie principale 16, à l'aide de la station de poussage 13. Au fur et à mesure de leur introduction, les éléments de tube 12 sont soudés afin d'assurer leur étanchéité. 



  Le revêtement final 8 peut est utilisé pour pousser vers leur emplacement les derniers éléments de tube auxiliaires 9. 



  Le microtunnel est réalisé dès que tous les éléments de tube auxiliaires 9 se trouvent à leur emplacement et que tous les éléments de tube 12 du revêtement final 8 ont été introduits. 



  Le procédé décrit ci-dessus permet, de manière simple et continue, de réaliser des tunnels dans des sols convergents à grande profondeur.



   <Desc / Clms Page number 1>
 



  Method for making a coated tunnel. The invention relates to a method of making a coated tunnel of circular section, according to which a tunnel is dug using a tunnel boring machine and a lining is placed inside this tunnel.



  The invention relates in particular to the production of a coated microtunnel, that is to say a small diameter tunnel where human intervention is not possible.



  In a process known as "pipe-jacking", coating elements are pushed one behind the other, from a starting chamber, behind a microtunnelier, thus ensuring its advancement.



  If this process is applicable in certain stable soils, it is sometimes impractical in other soils which settle or converge fairly quickly, such as clay soils.



  It is obvious that, following convergence, the friction of the soil on the sections of the coating increases, as the microtunnelier advances. Due to the increase in this friction, ever greater thrust forces are required to advance the TBM and the lining elements already introduced as well as the microtunnel. These forces can quickly become too great, especially at great depths, making the construction of a tunnel longer than 30 m impracticable by this technique.



  Another process, based on a device which keeps the walls of the tunnel under pressure during the digging operations, is under development. The excavation

 <Desc / Clms Page number 2>

 finished, the device is removed and the final covering is placed by the "pipe-jacking" method. This technique, although original, requires a heavy and expensive infrastructure.



  The object of the invention is to remedy the above-mentioned drawbacks and to provide a method allowing the production of coated tunnels in a simple and continuous manner, in converging soils located at great depths.



  This object is achieved by the fact that the TBM is advanced independently of the installation of the covering, and that this covering is laid in two stages: a first stage during which auxiliary tube elements cut along their length and folded over themselves are pushed using a pushing station through the auxiliary tube elements already in place to the level of their location where they open by elasticity, and a second step during which elements of a final coating are pushed through the auxiliary tube elements already in place.



  The advantages obtained thanks to this invention essentially consist in that the friction forces at the coating-floor interface are eliminated. Indeed, friction takes place between the inner face of the auxiliary tube elements in place and the outer face of the new auxiliary tube elements introduced. The pressure exerted by the ground therefore no longer influences the friction forces when pushing the tubes since this is taken up by the external auxiliary tube elements already in place, during the construction of the tunnel.

 <Desc / Clms Page number 3>

 



  In a particular embodiment of the invention, the tunnel is dug using a tunneling machine comprising an anchoring station, a pushing station and an excavation station by successively repeating the following steps: anchoring the tunneling machine in the ground, pushing from the excavation station during digging and retraction from the anchor station to the pushing station.



  In another embodiment of the invention, the auxiliary tube elements are held in the folded position by an appropriate device and are released at their final location.



  In one embodiment of the invention, a wedging device is provided between the auxiliary tube elements to prevent their entrainment during the introduction of an auxiliary tube element through them.



  In another embodiment of the invention, the auxiliary tube elements open at their location into an open position in which a longitudinal opening remains, these auxiliary tube elements in place can then close under the action of soil convergence.



  The auxiliary tube elements which are pushed can then be provided with a guide to guide them when they close under the action of the convergence of the ground.



  The elements of the final covering may have a diameter equal, with the tolerances, to the internal diameter of the auxiliary tube elements in the closed final position.



  In a particular embodiment of the invention, the final coating is put in place in the form of elements

 <Desc / Clms Page number 4>

 of conventional tubes which are welded together to form a waterproof coating.



  The final coating or a portion thereof can be used to push the last auxiliary tube elements to be installed through the auxiliary tube elements already in place.



  Other features and advantages of the invention will emerge from the description given below of a method for producing a tunnel, according to the invention. This description is given only by way of nonlimiting example with reference to the accompanying drawings, in which: FIG. 1 shows in section a microtunnel being produced by the method according to the invention; 2 shows a section along the line II-II of Figure 1; Figure 3 shows a section along the line
III-III of Figure 1; FIG. 4 represents, on an enlarged scale, the detail indicated by F4 in FIG. 3, FIG. 5 represents a section along the line V-V of FIG. 1.



  The figures relate to the production of a horizontal microtunnel with a diameter between 0.5 and 1.5 m, from an already existing main gallery 16, in a clay soil 1, at great depth.

 <Desc / Clms Page number 5>

 To make this microtunnel, a microtunnelier 2 is used consisting of three stations, that is to say an anchoring station 3, a pushing station 4 and an excavation station 5.



  With the aid of the anchoring station 3, fitted with hydraulic jacks 6, the microtunnelier 2 is anchored in the ground 1. Next, the excavation station 5 composed of a drilling instrument with global attack is advanced, during digging, using the pushing station 4 also provided with hydraulic cylinders. When the hydraulic cylinders of the pushing station 4 are at the end of their travel, the anchoring station 3 is released and retracted towards the excavation station 5, using the hydraulic cylinders of the pushing station 4. The place necessary for the location of an element of an auxiliary covering 7 is thus released at the rear of the microtunnelier 2. The above procedure is repeated, starting with a new anchoring of the microtunnelier 2.



  At the rear of the microtunnel, the covering is placed in two stages, that is to say a first stage during which an auxiliary covering 7, intended to take up during the construction of the tunnel, the pressures of the ground 1 (of of the order of 1 MPa), is put in place and a second stage during which a final coating 8, intended to take up the pressures of the ground 1 in the long term (of the order of 5 MPa), is put in place .



  The auxiliary coating 7 is formed of auxiliary tube elements 9, for example of metal, of a thickness of between 5 and 10 mm, which are sectioned over their entire length and folded back on themselves, as shown in FIG. 2 These auxiliary tube elements 9 can be routed, one behind the other, in position

 <Desc / Clms Page number 6>

 folded up to their position by pushing them through the auxiliary tube elements 9 already in place, as shown in FIG. 2. At their position, the auxiliary tube elements 9 open by elasticity and return to their initial position, that is to say the position they had after their cutting, as shown in FIG. 3, thus leaving a longitudinal opening 10.

   Each auxiliary tube element 9 is provided on its outer face at the level of the longitudinal section, with a guide 11 formed by a curved rim. The function of this guide is the subject of another paragraph.



  The auxiliary covering 7 is laid in the following manner: a first auxiliary tube element 9 is placed in the microtunnel; the following auxiliary tube elements 9 are previously folded back on themselves and introduced one after the other, as shown in section in FIG. 2, from the main gallery 16, as the microtunnelier 2 excavates .



  It is possible to keep the auxiliary tube elements 9 in the folded position during their introduction, by an appropriate device, such as for example straps, this device making it possible to release the auxiliary tube elements at their location.



  The auxiliary tube elements 9 are thus pushed to the level of their location, using a pushing station 13, placed in the main gallery 16.



  The friction forces therefore no longer depend on the pressure of the ground 1, since this is taken up by the

 <Desc / Clms Page number 7>

 auxiliary tube elements 9 during the digging of the microtunnel.



  In order to prevent the driving of the auxiliary tube elements 9 in place, when the folded auxiliary tube elements 9 are pushed, the auxiliary tube elements 9 are made integral by suitable wedging devices.



  At their location, the auxiliary tube elements 9 open by elasticity, as shown in FIG. 3, leaving a longitudinal opening 10. The above guide 11 limits the movement of the walls of the auxiliary tube element 9.



  The longitudinal section of each auxiliary tube element 9 is such that one edge of the opening 10 is provided with a V-groove 14 and that the other edge of this same opening 10 has a corresponding end 15 in V, as as shown in detail in Figure 4.



  Following the convergence of the ground 1, the opening 10 closes.



  The guide 11 and the groove 14 joined to the end 15 of the auxiliary tube element ensure perfect closure of this auxiliary tube element 9 when the clay soil 1 has converged, as shown in FIG. 5.



  When the last folded auxiliary tube element 9 has been introduced into the microtunnel, the installation of the final coating 8 of metal begins. This sealed final coating 8 is intended to take up the pressure exerted by the ground 1 in the long term. This final coating 8 has an outside diameter equal, with tolerances, to the inside diameter of the auxiliary coating 7 with the auxiliary tube elements 9 in their closed position.

 <Desc / Clms Page number 8>

 The final covering 8 is introduced in the form of tube elements 12 which are pushed, one after the other, from the main gallery 16, using the pushing station 13. As they are introduction, the tube elements 12 are welded to ensure their tightness.



  The final covering 8 can be used to push the last auxiliary tube elements 9 to their location.



  The microtunnel is produced as soon as all the auxiliary tube elements 9 are in their location and all the tube elements 12 of the final covering 8 have been introduced.



  The process described above makes it possible, in a simple and continuous manner, to make tunnels in converging soils at great depth.


    

Claims (1)

Revendications. Claims. 1. - Procédé de réalisation d'un tunnel revêtu, selon lequel un tunnel de section circulaire est creusé dans le sol à l'aide d'un tunnelier (2) et un revêtement (7-8) est placé à l'intérieur de ce tunnel, caractérisé en ce que le tunnelier (2) est avancé indépendamment de la mise en place du revêtement (7), et que ce revêtement (7-8) est posé en deux étapes :   1. - Method for making a coated tunnel, according to which a circular section tunnel is dug into the ground using a tunneling machine (2) and a covering (7-8) is placed inside this tunnel, characterized in that the tunnel boring machine (2) is advanced independently of the positioning of the covering (7), and that this covering (7-8) is laid in two stages: une première étape au cours de laquelle des éléments de tube auxiliaires (9) sectionnés sur leur longueur et repliés sur eux-mêmes sont poussés à l'aide d'une station de poussage (13) au travers des éléments de tube auxiliaires (9) déjà en place jusqu'au niveau de leur emplacement où ils s'ouvrent par élasticité, et une deuxième étape au cours de laquelle des éléments (12) d'un revêtement final (8) sont poussés au travers des éléments de tube auxiliaires (9) déjà en place.  a first step during which auxiliary tube elements (9) sectioned along their length and folded back on themselves are pushed using a pushing station (13) through the auxiliary tube elements (9) already in place up to the level of their location where they open by elasticity, and a second step during which elements (12) of a final coating (8) are pushed through the auxiliary tube elements (9 ) already in place. 2.-Procédé selon la revendication précédente, caractérisé en ce que le tunnel est creusé à l'aide d'un tunnelier (2) comprenant une station d'ancrage (3), une station de poussage (4) et une station d'excavation (5) en répétant successivement les étapes suivantes : ancrage du tunnelier (2) dans le sol, poussage de la station d'excavation (5) durant le creusement et rétraction de la station d'ancrage (3) vers la station de poussage (4). 2.-Method according to the preceding claim, characterized in that the tunnel is dug using a tunneling machine (2) comprising an anchoring station (3), a pushing station (4) and a station excavation (5) by successively repeating the following steps: anchoring the tunnel boring machine (2) in the ground, pushing the excavation station (5) during digging and retracting the anchoring station (3) towards the pushing station (4). 3.-Procédé selon l'une ou l'autre des revendications précédentes, caractérisé en ce que les éléments de tube auxiliaires (9) sont maintenus en position repliée par un dispositif approprié et sont libérés au niveau de leur emplacement final. <Desc/Clms Page number 10> 4.-Procédé selon l'une ou l'autre des revendications précédentes, caractérisé en ce qu'un dispositif de calage est prévu entre les éléments de tube auxiliaires (9) afin d'éviter leur entraînement lors de l'introduction d'un élément de tube auxiliaire (9) à travers ceux-ci. 3.-Method according to either of the preceding claims, characterized in that the auxiliary tube elements (9) are kept in the folded position by a suitable device and are released at their final location.  <Desc / Clms Page number 10>  4.-Method according to either of the preceding claims, characterized in that a wedging device is provided between the auxiliary tube elements (9) in order to avoid their entrainment during the introduction of a auxiliary tube element (9) therethrough. 5.-Procédé selon l'une ou l'autre des revendications précédentes, caractérisé en ce que les éléments de tube auxiliaires (9) s'ouvrent au niveau de leur emplacement jusque dans une position ouverte dans laquelle une ouverture longitudinale (10) subsiste, ces éléments de tube auxiliaires (9) en place pouvant ensuite se fermer sous l'action de la convergence du sol. 5.-Method according to either of the preceding claims, characterized in that the auxiliary tube elements (9) open at their location into an open position in which a longitudinal opening (10) remains , these auxiliary tube elements (9) in place which can then close under the action of the convergence of the ground. 6.-Procédé selon la revendication précédente, caractérisé en ce que les éléments de tube auxiliaires (9) qui sont poussés sont pourvus d'un guide (11) pour les guider lorsqu'ils se ferment sous l'action de la convergence du sol. 6.-Method according to the preceding claim, characterized in that the auxiliary tube elements (9) which are pushed are provided with a guide (11) to guide them when they close under the action of the convergence of the ground . 7.-Procédé selon l'une ou l'autre des revendications 5 et 6, caractérisé en ce que les éléments de tube auxiliaires (9) sont sectionnés sur leur longueur présentant un bord (14) rainuré en forme de V et un bord correspondant (15) EMI10.1 assurant une parfaite fermeture lorsqu'ils sont joints. 7.-Method according to either of claims 5 and 6, characterized in that the auxiliary tube elements (9) are sectioned along their length having an edge (14) grooved in V shape and a corresponding edge (15)  EMI10.1  ensuring perfect closure when joined. 8.-Procédé selon l'une ou l'autre des revendications 5 à 7, caractérisé en ce que des éléments (12) du revêtement final (8) sont introduits ayant un diamètre égal, aux tolérances près, au diamètre intérieur des éléments de tube auxiliaires (9) en position finale fermée. 8.-A method according to either of claims 5 to 7, characterized in that elements (12) of the final coating (8) are introduced having a diameter equal, within tolerances, to the inner diameter of the elements auxiliary tube (9) in the closed end position. 9.-Procédé selon l'une ou l'autre des revendications précédentes, caractérisé en ce que le revêtement final (8) est mis en place sous forme d'éléments (12) de tube <Desc/Clms Page number 11> classiques soudés entre eux pour former un revêtement étanche. 9.-Method according to either of the preceding claims, characterized in that the final coating (8) is put in place in the form of elements (12) of tube  <Desc / Clms Page number 11>  classics welded together to form a waterproof coating. 10. - Procédé selon l'une ou l'autre des revendications précédentes, caractérisé en ce que le revêtement final (8) ou une partie de celui-ci est utilisé pour pousser les derniers éléments de tube auxiliaires (9) à installer au travers des éléments de tube auxiliaires (9) déjà en place.   10. - Method according to either of the preceding claims, characterized in that the final coating (8) or a part thereof is used to push the last auxiliary tube elements (9) to be installed through auxiliary tube elements (9) already in place.
BE9400658A 1994-07-13 1994-07-13 Process for producing a coated tunnel. BE1008489A3 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
BE9400658A BE1008489A3 (en) 1994-07-13 1994-07-13 Process for producing a coated tunnel.
DE1995614160 DE69514160T2 (en) 1994-07-13 1995-07-07 Process for lining tunnels
ES95201867T ES2143001T3 (en) 1994-07-13 1995-07-07 PROCEDURE FOR CARRYING OUT A COVERED TUNNEL.
EP19950201867 EP0692606B1 (en) 1994-07-13 1995-07-07 Method for lining a tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BE9400658A BE1008489A3 (en) 1994-07-13 1994-07-13 Process for producing a coated tunnel.

Publications (1)

Publication Number Publication Date
BE1008489A3 true BE1008489A3 (en) 1996-05-07

Family

ID=3888254

Family Applications (1)

Application Number Title Priority Date Filing Date
BE9400658A BE1008489A3 (en) 1994-07-13 1994-07-13 Process for producing a coated tunnel.

Country Status (4)

Country Link
EP (1) EP0692606B1 (en)
BE (1) BE1008489A3 (en)
DE (1) DE69514160T2 (en)
ES (1) ES2143001T3 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0728974A1 (en) * 1995-02-24 1996-08-28 Kawasaki Steel Corporation Buried pipe laying method
BE1009528A3 (en) * 1995-08-08 1997-04-01 Verstraeten Beheersmij Bv Method for making a cladded underground tunnel
SG60092A1 (en) * 1996-09-05 1999-02-22 Toyo Technos Co Ltd Semi-shield method and apparatus for the same
EP0881359A1 (en) * 1997-05-28 1998-12-02 Herrenknecht GmbH Method and arrangement for constructing a tunnel by using a driving shield
DE19745130A1 (en) * 1997-10-13 1999-04-15 Ruhrgas Ag Method for laying a line and line with a jacket pipe and a product pipe
RU2485318C1 (en) * 2012-01-25 2013-06-20 Константин Петрович Безродный Method to construct station tunnels with low subsidence of earth surface
CN108150205B (en) * 2017-12-31 2019-04-16 中铁隧道集团二处有限公司 The method that pipe jacking tunnel constructs underground parking
RU2739880C1 (en) * 2020-03-10 2020-12-29 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Method of inclined tunnels construction in weak water-saturated soils
RU2768765C1 (en) * 2021-05-04 2022-03-24 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Method for construction of escalator tunnel constructed by tunnelling in weak waterlogged soils

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1372856A (en) * 1919-09-02 1921-03-29 Winterbottom Joseph Method of building sewers and tunnels
US3645102A (en) * 1970-12-28 1972-02-29 Commercial Shearing Telescoping lining and support structure and method for lining tunnels and shafts
DE2109383A1 (en) * 1971-02-27 1972-09-07
US4116011A (en) * 1976-06-04 1978-09-26 Pablo Girault Method of excavating tunnels
FR2403504A1 (en) * 1977-09-14 1979-04-13 Gewerk Eisenhuette Westfalia Concrete underground pipe installation by boring - uses hydraulic pipe thrusting system and has thrust ring between pipe and thrust equipment
DE3122710A1 (en) * 1981-06-06 1982-12-23 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen Method and device for laying pipes having a relatively small internal diameter in the earth
EP0257287A1 (en) * 1986-08-08 1988-03-02 Dyckerhoff & Widmann Aktiengesellschaft Pressure-sealed pipe joint for a driving pipe made of steel
FR2635799A1 (en) * 1988-08-26 1990-03-02 Montcocol Method and device for positioning underground ducts.
EP0432901A1 (en) * 1989-12-13 1991-06-19 Taisei Corporation Method and apparatus for excavating a shaft and tunnel

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2544834C3 (en) * 1975-10-07 1982-04-22 Gewerkschaft Walter, 4300 Essen Device for sinking shafts in unstable rock

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1372856A (en) * 1919-09-02 1921-03-29 Winterbottom Joseph Method of building sewers and tunnels
US3645102A (en) * 1970-12-28 1972-02-29 Commercial Shearing Telescoping lining and support structure and method for lining tunnels and shafts
DE2109383A1 (en) * 1971-02-27 1972-09-07
US4116011A (en) * 1976-06-04 1978-09-26 Pablo Girault Method of excavating tunnels
FR2403504A1 (en) * 1977-09-14 1979-04-13 Gewerk Eisenhuette Westfalia Concrete underground pipe installation by boring - uses hydraulic pipe thrusting system and has thrust ring between pipe and thrust equipment
DE3122710A1 (en) * 1981-06-06 1982-12-23 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen Method and device for laying pipes having a relatively small internal diameter in the earth
EP0257287A1 (en) * 1986-08-08 1988-03-02 Dyckerhoff & Widmann Aktiengesellschaft Pressure-sealed pipe joint for a driving pipe made of steel
FR2635799A1 (en) * 1988-08-26 1990-03-02 Montcocol Method and device for positioning underground ducts.
EP0432901A1 (en) * 1989-12-13 1991-06-19 Taisei Corporation Method and apparatus for excavating a shaft and tunnel

Also Published As

Publication number Publication date
EP0692606B1 (en) 1999-12-29
DE69514160T2 (en) 2000-07-13
EP0692606A1 (en) 1996-01-17
DE69514160D1 (en) 2000-02-03
ES2143001T3 (en) 2000-05-01

Similar Documents

Publication Publication Date Title
CA2632379C (en) Plug intended to be inserted into a duct on which a fluid flows and associated fluid prospecting well
BE1008489A3 (en) Process for producing a coated tunnel.
EP0842347B9 (en) Device and process for the lining of a pipe branch, particularly in an oil well
FR2507281A1 (en) APPARATUS AND METHOD FOR CONNECTING TUBULAR ELEMENTS
WO2016041858A1 (en) Method and installation for mechanical excavation of a cross passage between two traffic tunnels or between two vertical wells
WO2002029208A1 (en) Method and system for increasing tubing resistance to pressure
WO2008135356A1 (en) Method for casing using multiple expanded areas and using at least one inflatable bladder
FR2484509A1 (en) CYLINDER FOR TENSIONING CABLES (OR RODS) IN PRE-TENSIONED CONCRETE STRUCTURES
EP3099967B1 (en) Tool for working on the wall of a pipe and related method
FR2568979A1 (en) ADVANCED TELESCOPIC ASSEMBLY TO REPAIR UNDERWATER PIPES WITH LARGE DEPTHS
FR2996247A1 (en) HYDRAULIC FRACTURING METHOD AND CORRESPONDING EQUIPMENT
CA1273288A (en) Safety valve for an oil well, and tooling for operating said valve
FR2511076A1 (en) SEGMENT AND RING OF TUNNEL COATING
FR2997440A1 (en) METHOD AND DEVICE FOR SHAPING A WELL BY HYDROFORMING
FR2558520A1 (en) METHOD AND DEVICE FOR INSTALLING SEAL LININGS IN A WELL
WO1996021083A1 (en) Method and device for casing a well, particularly an oil well bore or a pipe, using an in situ curable flexible tubular preform
EP3414399B1 (en) Method for producing an anchoring tie rod and anchoring tie rod
FR2560635A2 (en) Underground road tunnel formation system
FR2594864A1 (en) Method, reinforcement and devices for casting a wall in the ground
EP0847462B1 (en) Novel draining wall, method for producing same and element implementated thereby
FR2915264A1 (en) Well or pipe liner coating method for e.g. water production field, has expanding expanded zones of tube, where expanded zones are spaced by non-expanded zones so that total length of expanded zones is lower than that of non-expanded zones
FR2726882A1 (en) Method of replacing old buried pipe by new
BE901814R (en) Underground road tunnel formation system - forms intermediate layer between rock and intermediate formwork before lining
FR2732380A1 (en) METHOD AND DEVICE FOR MAINTAINING AN EVACUATION DRAINAGE DURING A PIPELINE CONSTRUCTION
EP0441686A1 (en) Sealed connection device for two identical pipes

Legal Events

Date Code Title Description
RE Patent lapsed

Effective date: 20030731