AU2005322968A1 - System and method for an automated project office and automatic risk assessment and reporting - Google Patents

System and method for an automated project office and automatic risk assessment and reporting Download PDF

Info

Publication number
AU2005322968A1
AU2005322968A1 AU2005322968A AU2005322968A AU2005322968A1 AU 2005322968 A1 AU2005322968 A1 AU 2005322968A1 AU 2005322968 A AU2005322968 A AU 2005322968A AU 2005322968 A AU2005322968 A AU 2005322968A AU 2005322968 A1 AU2005322968 A1 AU 2005322968A1
Authority
AU
Australia
Prior art keywords
project
user
questions
projects
risk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
AU2005322968A
Other languages
English (en)
Inventor
Gene Clater
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Computer Aid Inc
Original Assignee
Computer Aid Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US11/249,744 external-priority patent/US7640225B2/en
Application filed by Computer Aid Inc filed Critical Computer Aid Inc
Publication of AU2005322968A1 publication Critical patent/AU2005322968A1/en
Abandoned legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
AU2005322968A 2004-12-30 2005-12-30 System and method for an automated project office and automatic risk assessment and reporting Abandoned AU2005322968A1 (en)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US64010404P 2004-12-30 2004-12-30
US60/640,104 2004-12-30
US11/249,744 US7640225B2 (en) 2004-10-14 2005-10-14 System and method for process automation and enforcement
US11/249,744 2005-10-14
PCT/US2005/047212 WO2006073978A2 (en) 2004-12-30 2005-12-30 System and method for an automated project office and automatic risk assessment and reporting

Publications (1)

Publication Number Publication Date
AU2005322968A1 true AU2005322968A1 (en) 2006-07-13

Family

ID=36648037

Family Applications (1)

Application Number Title Priority Date Filing Date
AU2005322968A Abandoned AU2005322968A1 (en) 2004-12-30 2005-12-30 System and method for an automated project office and automatic risk assessment and reporting

Country Status (6)

Country Link
EP (1) EP1846822A2 (de)
JP (1) JP2008527500A (de)
AU (1) AU2005322968A1 (de)
CA (1) CA2593045A1 (de)
MX (1) MX2007008041A (de)
WO (1) WO2006073978A2 (de)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9021095B2 (en) 2011-05-27 2015-04-28 Oracle International Corporation Method and system for implementing an on-demand scheduler in a mobile device
US9165011B2 (en) 2011-09-30 2015-10-20 Oracle International Corporation Concurrent calculation of resource qualification and availability using text search
KR101139626B1 (ko) 2011-12-07 2012-04-27 우리투자증권 주식회사 운용과정 기반의 포트폴리오 리스크 평가 방법 및 시스템
WO2017154914A1 (ja) 2016-03-10 2017-09-14 三菱電機株式会社 プロジェクト管理支援システム、プロジェクト管理支援方法及びプロジェクト管理支援プログラム
CN107862444A (zh) * 2017-10-23 2018-03-30 青岛市市北区审计局 一种审计人员业绩考核自动化管理系统
CN113095606B (zh) * 2021-06-09 2021-08-31 北矿智云科技(北京)有限公司 设备维修的预判方法、装置及系统

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6714915B1 (en) * 1999-11-22 2004-03-30 International Business Machines Corporation System and method for project designing and developing a procurement and accounts payable system
US20020120490A1 (en) * 2001-02-26 2002-08-29 Gajewski Arthur Joseph Vehicle systems concept development process
US20040054610A1 (en) * 2001-11-28 2004-03-18 Monetaire Monetaire wealth management platform
US20030204462A1 (en) * 2002-04-30 2003-10-30 Eisler Clifford R. Method and system for administering the hedging of an employee deferred compensation plan using swaps and options
US7664664B2 (en) * 2003-04-23 2010-02-16 Oracle International Corporation Methods and systems for portfolio planning
US7698148B2 (en) * 2003-09-12 2010-04-13 Raytheon Company Web-based risk management tool and method
US20050114829A1 (en) * 2003-10-30 2005-05-26 Microsoft Corporation Facilitating the process of designing and developing a project

Also Published As

Publication number Publication date
WO2006073978A2 (en) 2006-07-13
CA2593045A1 (en) 2006-07-13
WO2006073978A3 (en) 2007-11-22
MX2007008041A (es) 2007-10-19
JP2008527500A (ja) 2008-07-24
EP1846822A2 (de) 2007-10-24

Similar Documents

Publication Publication Date Title
US8041647B2 (en) System and method for an automated project office and automatic risk assessment and reporting
US20220215300A1 (en) Methods and systems for resource and organization achievement
US7168045B2 (en) Modeling business objects
US7930201B1 (en) EDP portal cross-process integrated view
US20040002887A1 (en) Presenting skills distribution data for a business enterprise
US7519539B1 (en) Assisted profiling of skills in an enterprise management system
US20170147960A1 (en) Systems and Methods for Project Planning and Management
US7222330B2 (en) Project planning system with content loaded project planning template generator and a plurality of content loaded project planning templates
US8046703B2 (en) Monitoring and integration of an organization's planning processes
US20070192157A1 (en) Interactive system for managing, tracking and reporting work and staff performance in a business environment
US20100023385A1 (en) Individual productivity and utilization tracking tool
US20030135481A1 (en) Rules based method and system for project performance monitoring
US20100324952A1 (en) Continuous governance, risk and compliance management
US20100268705A1 (en) Database and data access layer
US20040243458A1 (en) Method and system for organization management utilizing document-centric intergrated information exchange and dynamic data collaboration
US20030018511A1 (en) Adaptable integrated-content product development system
WO1997031320A1 (en) Strategic management system
AU2005322968A1 (en) System and method for an automated project office and automatic risk assessment and reporting
US8448128B2 (en) Post-merger integration systems
US20080183743A1 (en) Method and computer based system for performance management
Albadri et al. The Role of Controls to Minimize Risks of Information Technology Project Failures
Zenié et al. Analyzing and redesigning a remote sensing business process for rapid estimates of agriculture in Europe
Hanschke et al. IT landscape management
Orci Capability Maturity Model for
Verleun et al. Management of large balanced scorecard implementations: the case of a major insurance company

Legal Events

Date Code Title Description
MK1 Application lapsed section 142(2)(a) - no request for examination in relevant period