AU2005322968A1 - System and method for an automated project office and automatic risk assessment and reporting - Google Patents
System and method for an automated project office and automatic risk assessment and reporting Download PDFInfo
- Publication number
- AU2005322968A1 AU2005322968A1 AU2005322968A AU2005322968A AU2005322968A1 AU 2005322968 A1 AU2005322968 A1 AU 2005322968A1 AU 2005322968 A AU2005322968 A AU 2005322968A AU 2005322968 A AU2005322968 A AU 2005322968A AU 2005322968 A1 AU2005322968 A1 AU 2005322968A1
- Authority
- AU
- Australia
- Prior art keywords
- project
- user
- questions
- projects
- risk
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Human Resources & Organizations (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US64010404P | 2004-12-30 | 2004-12-30 | |
US60/640,104 | 2004-12-30 | ||
US11/249,744 US7640225B2 (en) | 2004-10-14 | 2005-10-14 | System and method for process automation and enforcement |
US11/249,744 | 2005-10-14 | ||
PCT/US2005/047212 WO2006073978A2 (en) | 2004-12-30 | 2005-12-30 | System and method for an automated project office and automatic risk assessment and reporting |
Publications (1)
Publication Number | Publication Date |
---|---|
AU2005322968A1 true AU2005322968A1 (en) | 2006-07-13 |
Family
ID=36648037
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AU2005322968A Abandoned AU2005322968A1 (en) | 2004-12-30 | 2005-12-30 | System and method for an automated project office and automatic risk assessment and reporting |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP1846822A2 (de) |
JP (1) | JP2008527500A (de) |
AU (1) | AU2005322968A1 (de) |
CA (1) | CA2593045A1 (de) |
MX (1) | MX2007008041A (de) |
WO (1) | WO2006073978A2 (de) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9021095B2 (en) | 2011-05-27 | 2015-04-28 | Oracle International Corporation | Method and system for implementing an on-demand scheduler in a mobile device |
US9165011B2 (en) | 2011-09-30 | 2015-10-20 | Oracle International Corporation | Concurrent calculation of resource qualification and availability using text search |
KR101139626B1 (ko) | 2011-12-07 | 2012-04-27 | 우리투자증권 주식회사 | 운용과정 기반의 포트폴리오 리스크 평가 방법 및 시스템 |
WO2017154914A1 (ja) | 2016-03-10 | 2017-09-14 | 三菱電機株式会社 | プロジェクト管理支援システム、プロジェクト管理支援方法及びプロジェクト管理支援プログラム |
CN107862444A (zh) * | 2017-10-23 | 2018-03-30 | 青岛市市北区审计局 | 一种审计人员业绩考核自动化管理系统 |
CN113095606B (zh) * | 2021-06-09 | 2021-08-31 | 北矿智云科技(北京)有限公司 | 设备维修的预判方法、装置及系统 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6714915B1 (en) * | 1999-11-22 | 2004-03-30 | International Business Machines Corporation | System and method for project designing and developing a procurement and accounts payable system |
US20020120490A1 (en) * | 2001-02-26 | 2002-08-29 | Gajewski Arthur Joseph | Vehicle systems concept development process |
US20040054610A1 (en) * | 2001-11-28 | 2004-03-18 | Monetaire | Monetaire wealth management platform |
US20030204462A1 (en) * | 2002-04-30 | 2003-10-30 | Eisler Clifford R. | Method and system for administering the hedging of an employee deferred compensation plan using swaps and options |
US7664664B2 (en) * | 2003-04-23 | 2010-02-16 | Oracle International Corporation | Methods and systems for portfolio planning |
US7698148B2 (en) * | 2003-09-12 | 2010-04-13 | Raytheon Company | Web-based risk management tool and method |
US20050114829A1 (en) * | 2003-10-30 | 2005-05-26 | Microsoft Corporation | Facilitating the process of designing and developing a project |
-
2005
- 2005-12-30 AU AU2005322968A patent/AU2005322968A1/en not_active Abandoned
- 2005-12-30 EP EP05855725A patent/EP1846822A2/de not_active Withdrawn
- 2005-12-30 WO PCT/US2005/047212 patent/WO2006073978A2/en active Application Filing
- 2005-12-30 MX MX2007008041A patent/MX2007008041A/es not_active Application Discontinuation
- 2005-12-30 JP JP2007549582A patent/JP2008527500A/ja active Pending
- 2005-12-30 CA CA002593045A patent/CA2593045A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
WO2006073978A2 (en) | 2006-07-13 |
CA2593045A1 (en) | 2006-07-13 |
WO2006073978A3 (en) | 2007-11-22 |
MX2007008041A (es) | 2007-10-19 |
JP2008527500A (ja) | 2008-07-24 |
EP1846822A2 (de) | 2007-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8041647B2 (en) | System and method for an automated project office and automatic risk assessment and reporting | |
US20220215300A1 (en) | Methods and systems for resource and organization achievement | |
US7168045B2 (en) | Modeling business objects | |
US7930201B1 (en) | EDP portal cross-process integrated view | |
US20040002887A1 (en) | Presenting skills distribution data for a business enterprise | |
US7519539B1 (en) | Assisted profiling of skills in an enterprise management system | |
US20170147960A1 (en) | Systems and Methods for Project Planning and Management | |
US7222330B2 (en) | Project planning system with content loaded project planning template generator and a plurality of content loaded project planning templates | |
US8046703B2 (en) | Monitoring and integration of an organization's planning processes | |
US20070192157A1 (en) | Interactive system for managing, tracking and reporting work and staff performance in a business environment | |
US20100023385A1 (en) | Individual productivity and utilization tracking tool | |
US20030135481A1 (en) | Rules based method and system for project performance monitoring | |
US20100324952A1 (en) | Continuous governance, risk and compliance management | |
US20100268705A1 (en) | Database and data access layer | |
US20040243458A1 (en) | Method and system for organization management utilizing document-centric intergrated information exchange and dynamic data collaboration | |
US20030018511A1 (en) | Adaptable integrated-content product development system | |
WO1997031320A1 (en) | Strategic management system | |
AU2005322968A1 (en) | System and method for an automated project office and automatic risk assessment and reporting | |
US8448128B2 (en) | Post-merger integration systems | |
US20080183743A1 (en) | Method and computer based system for performance management | |
Albadri et al. | The Role of Controls to Minimize Risks of Information Technology Project Failures | |
Zenié et al. | Analyzing and redesigning a remote sensing business process for rapid estimates of agriculture in Europe | |
Hanschke et al. | IT landscape management | |
Orci | Capability Maturity Model for | |
Verleun et al. | Management of large balanced scorecard implementations: the case of a major insurance company |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MK1 | Application lapsed section 142(2)(a) - no request for examination in relevant period |