ATE73880T1 - METHOD FOR BUILDING A TUNNEL WITH A LOW COVER UNDER TRACKS OR THE LIKE. - Google Patents
METHOD FOR BUILDING A TUNNEL WITH A LOW COVER UNDER TRACKS OR THE LIKE.Info
- Publication number
- ATE73880T1 ATE73880T1 AT88113864T AT88113864T ATE73880T1 AT E73880 T1 ATE73880 T1 AT E73880T1 AT 88113864 T AT88113864 T AT 88113864T AT 88113864 T AT88113864 T AT 88113864T AT E73880 T1 ATE73880 T1 AT E73880T1
- Authority
- AT
- Austria
- Prior art keywords
- tunnel
- concrete slab
- sections
- reinforced concrete
- earth
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 239000011150 reinforced concrete Substances 0.000 abstract 3
- 239000004567 concrete Substances 0.000 abstract 2
- 238000004519 manufacturing process Methods 0.000 abstract 2
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/005—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Railway Tracks (AREA)
- Lining And Supports For Tunnels (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
In the method for producing an underground structure, preferably a tunnel, with little earth cover under railway tracks or the like, the individual concreted structure or tunnel sections are advanced in the timed shifting process after their production. In order to prevent movements in the covering earth and the railway tracks during the digging-out of the earth at the local face and during the advancing of the tunnel sections, the rails, together with the sleepers and ballast foundation, are removed in sections. In a dug-out, flat pit is installed a covering reinforced concrete slab, onto which the ballast bed and the track skeleton are mounted again. The same procedure is followed in neighbouring areas and the reinforced concrete slab has further reinforced concrete slabs concreted onto it until the region through which a tunnel is to be driven is overlapped by a continuous concrete slab. After this concrete slab, which forms a securing means for the track, has been erected, the tunnel sections are advanced underneath said slab. <IMAGE>
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19873733246 DE3733246A1 (en) | 1987-10-01 | 1987-10-01 | METHOD FOR PRODUCING A TUNNEL WITH LOW COVERAGE UNDER RAILWAY SYSTEMS OR THE LIKE |
EP88113864A EP0309739B1 (en) | 1987-10-01 | 1988-08-25 | Method for constructing a tunnel with little earth cover under railway tracks or the like |
Publications (1)
Publication Number | Publication Date |
---|---|
ATE73880T1 true ATE73880T1 (en) | 1992-04-15 |
Family
ID=6337415
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AT88113864T ATE73880T1 (en) | 1987-10-01 | 1988-08-25 | METHOD FOR BUILDING A TUNNEL WITH A LOW COVER UNDER TRACKS OR THE LIKE. |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0309739B1 (en) |
AT (1) | ATE73880T1 (en) |
DE (2) | DE3733246A1 (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB8927648D0 (en) * | 1989-12-07 | 1990-02-07 | Aeb Jacked Structures Ltd | Improvements in and relating to forming a passageway through the ground |
DE19725089A1 (en) * | 1997-04-30 | 1998-11-05 | Bilfinger Berger Bau | Method of building tunnel structure under existing construction |
DE19844888A1 (en) * | 1998-09-30 | 2000-04-06 | Bilfinger Berger Bau | Process for producing a structure using the press-through method |
NL1013611C2 (en) * | 1998-11-18 | 2000-07-03 | Hattum & Blankevoort Bv | Method of constructing passageway under existing road or railway, uses prefabricated sections driven through earth by hydraulic ram |
EP1712734B1 (en) * | 2005-04-11 | 2010-06-09 | Tunnel Holding Svizzera Sa | Method and apparatus for the construction of underpasses to cross railway lines with one or more tracks |
WO2012090013A2 (en) * | 2010-12-28 | 2012-07-05 | Tunnel Holding Svizzera S.A. | Method and apparatus to make railway underpasses |
CN104790959B (en) * | 2015-04-03 | 2017-03-01 | 核工业井巷建设集团公司 | A kind of Shallow-buried Tunnels with Small Spacing ground method for tunnel construction |
CN105114127B (en) * | 2015-07-30 | 2016-12-28 | 同济大学 | The safety interaction control method of tunnel undercrossing tunnel and system |
CN105064314B (en) * | 2015-07-30 | 2017-04-05 | 同济大学 | A kind of method for determining undercrossing tunnel engineering Rigidity Matching |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2143487A1 (en) * | 1971-07-05 | 1973-01-25 | Entwurfs Und Ingenieurbuero De | PROCESS AND DEVICE FOR ERECTING TRAFFIC STRUCTURES AT CROSSROADS ON THE LOWER LEVEL |
CH544191A (en) * | 1971-07-19 | 1973-11-15 | Hirsch Enrico | Method of constructing a passage under a communication route, in particular under an existing route |
DE2219567A1 (en) * | 1972-04-21 | 1973-10-31 | Held & Francke Bau Ag | PROCEDURE FOR NIGHTLY INSTALLATION OF AN UNDERGROUND STRUCTURE |
-
1987
- 1987-10-01 DE DE19873733246 patent/DE3733246A1/en not_active Withdrawn
-
1988
- 1988-08-25 DE DE8888113864T patent/DE3869306D1/en not_active Expired - Fee Related
- 1988-08-25 AT AT88113864T patent/ATE73880T1/en active
- 1988-08-25 EP EP88113864A patent/EP0309739B1/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
EP0309739B1 (en) | 1992-03-18 |
DE3869306D1 (en) | 1992-04-23 |
EP0309739A2 (en) | 1989-04-05 |
EP0309739A3 (en) | 1990-02-28 |
DE3733246A1 (en) | 1989-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB1423775A (en) | Railway tracks | |
DE69304625D1 (en) | Process for installing a railway track in concrete | |
DE50012838D1 (en) | Method for producing a fixed track for rail vehicles | |
DE59501846D1 (en) | Process for producing a ballastless track system for at least one railroad track | |
ATE73880T1 (en) | METHOD FOR BUILDING A TUNNEL WITH A LOW COVER UNDER TRACKS OR THE LIKE. | |
DE69924777D1 (en) | Method for producing a track superstructure | |
CN108385456A (en) | A kind of board-like ballastless track bed board integral replacing method of cast-in-place railway roadbed | |
BR8305517A (en) | RAILWAY STRUCTURE, PROCESS OF BUILDING AN RAILWAY STRUCTURE, BODY IN BAG FORMAT AND FOUNDATION FOR A RAILWAY | |
ATE324491T1 (en) | METHOD FOR PRODUCING A SOLID ROADWAY FOR RAIL-BOUND TRAFFIC, AND A SOLID ROADWAY FOR IMPLEMENTING THE PROCESS | |
ATE310123T1 (en) | METHOD FOR PRODUCING A SOUND-INSULATED TRACK | |
RU2754694C1 (en) | Method for construction of metro line using trenchless method with permanent cross-section casing and single type of tunnel-penetrating mechanized complex | |
SU1413195A1 (en) | Underground railway station and method of constructing same | |
CN113565522B (en) | Tunnel Boring Machine (TBM) station-passing bracket between mountain tunnels and station-passing method | |
ATE251255T1 (en) | METHOD FOR PRODUCING A SOLID ROADWAY FOR RAIL VEHICLES | |
SU1395723A1 (en) | Method of constructing ballast-free railway track | |
CN117702552A (en) | Ballast-free track ballast bed plate construction method | |
ES468207A1 (en) | Railways concrete plates for use in such railways and methods to lay such railways | |
Colombo et al. | Innovative Technique for the Realisation of Large Diameter Tunnels in Loose Sand | |
SU78323A1 (en) | Winter tent for winter work | |
Nakahara | Shinkansen slab track to be laid on earthworks | |
COLLINS et al. | HIGH SPEED TRACK ON THE WESTERN REGION OF BRITISH RAILWAYS. | |
Bucher et al. | New Rail Tunnels under Central Berlin | |
SU718542A1 (en) | Method of consolidating the under-ballast layer of permanent way | |
CN113512913A (en) | Construction method of assembled polyurethane solidified track bed of high-speed railway | |
Tsygankov et al. | Metro Bridge over the River Ob in Novosibirsk |