ATE73880T1 - METHOD FOR BUILDING A TUNNEL WITH A LOW COVER UNDER TRACKS OR THE LIKE. - Google Patents

METHOD FOR BUILDING A TUNNEL WITH A LOW COVER UNDER TRACKS OR THE LIKE.

Info

Publication number
ATE73880T1
ATE73880T1 AT88113864T AT88113864T ATE73880T1 AT E73880 T1 ATE73880 T1 AT E73880T1 AT 88113864 T AT88113864 T AT 88113864T AT 88113864 T AT88113864 T AT 88113864T AT E73880 T1 ATE73880 T1 AT E73880T1
Authority
AT
Austria
Prior art keywords
tunnel
concrete slab
sections
reinforced concrete
earth
Prior art date
Application number
AT88113864T
Other languages
German (de)
Inventor
Joachim Dipl-Ing Eisenblaetter
Hans-Fritz Dipl-Ing Pallor
Otto Dipl-Ing Zwick
Original Assignee
Kunz Alfred & Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunz Alfred & Co filed Critical Kunz Alfred & Co
Application granted granted Critical
Publication of ATE73880T1 publication Critical patent/ATE73880T1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/005Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Railway Tracks (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

In the method for producing an underground structure, preferably a tunnel, with little earth cover under railway tracks or the like, the individual concreted structure or tunnel sections are advanced in the timed shifting process after their production. In order to prevent movements in the covering earth and the railway tracks during the digging-out of the earth at the local face and during the advancing of the tunnel sections, the rails, together with the sleepers and ballast foundation, are removed in sections. In a dug-out, flat pit is installed a covering reinforced concrete slab, onto which the ballast bed and the track skeleton are mounted again. The same procedure is followed in neighbouring areas and the reinforced concrete slab has further reinforced concrete slabs concreted onto it until the region through which a tunnel is to be driven is overlapped by a continuous concrete slab. After this concrete slab, which forms a securing means for the track, has been erected, the tunnel sections are advanced underneath said slab. <IMAGE>
AT88113864T 1987-10-01 1988-08-25 METHOD FOR BUILDING A TUNNEL WITH A LOW COVER UNDER TRACKS OR THE LIKE. ATE73880T1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19873733246 DE3733246A1 (en) 1987-10-01 1987-10-01 METHOD FOR PRODUCING A TUNNEL WITH LOW COVERAGE UNDER RAILWAY SYSTEMS OR THE LIKE
EP88113864A EP0309739B1 (en) 1987-10-01 1988-08-25 Method for constructing a tunnel with little earth cover under railway tracks or the like

Publications (1)

Publication Number Publication Date
ATE73880T1 true ATE73880T1 (en) 1992-04-15

Family

ID=6337415

Family Applications (1)

Application Number Title Priority Date Filing Date
AT88113864T ATE73880T1 (en) 1987-10-01 1988-08-25 METHOD FOR BUILDING A TUNNEL WITH A LOW COVER UNDER TRACKS OR THE LIKE.

Country Status (3)

Country Link
EP (1) EP0309739B1 (en)
AT (1) ATE73880T1 (en)
DE (2) DE3733246A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8927648D0 (en) * 1989-12-07 1990-02-07 Aeb Jacked Structures Ltd Improvements in and relating to forming a passageway through the ground
DE19725089A1 (en) * 1997-04-30 1998-11-05 Bilfinger Berger Bau Method of building tunnel structure under existing construction
DE19844888A1 (en) * 1998-09-30 2000-04-06 Bilfinger Berger Bau Process for producing a structure using the press-through method
NL1013611C2 (en) * 1998-11-18 2000-07-03 Hattum & Blankevoort Bv Method of constructing passageway under existing road or railway, uses prefabricated sections driven through earth by hydraulic ram
EP1712734B1 (en) * 2005-04-11 2010-06-09 Tunnel Holding Svizzera Sa Method and apparatus for the construction of underpasses to cross railway lines with one or more tracks
WO2012090013A2 (en) * 2010-12-28 2012-07-05 Tunnel Holding Svizzera S.A. Method and apparatus to make railway underpasses
CN104790959B (en) * 2015-04-03 2017-03-01 核工业井巷建设集团公司 A kind of Shallow-buried Tunnels with Small Spacing ground method for tunnel construction
CN105114127B (en) * 2015-07-30 2016-12-28 同济大学 The safety interaction control method of tunnel undercrossing tunnel and system
CN105064314B (en) * 2015-07-30 2017-04-05 同济大学 A kind of method for determining undercrossing tunnel engineering Rigidity Matching

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2143487A1 (en) * 1971-07-05 1973-01-25 Entwurfs Und Ingenieurbuero De PROCESS AND DEVICE FOR ERECTING TRAFFIC STRUCTURES AT CROSSROADS ON THE LOWER LEVEL
CH544191A (en) * 1971-07-19 1973-11-15 Hirsch Enrico Method of constructing a passage under a communication route, in particular under an existing route
DE2219567A1 (en) * 1972-04-21 1973-10-31 Held & Francke Bau Ag PROCEDURE FOR NIGHTLY INSTALLATION OF AN UNDERGROUND STRUCTURE

Also Published As

Publication number Publication date
EP0309739B1 (en) 1992-03-18
DE3869306D1 (en) 1992-04-23
EP0309739A2 (en) 1989-04-05
EP0309739A3 (en) 1990-02-28
DE3733246A1 (en) 1989-04-13

Similar Documents

Publication Publication Date Title
GB1423775A (en) Railway tracks
DE69304625D1 (en) Process for installing a railway track in concrete
DE50012838D1 (en) Method for producing a fixed track for rail vehicles
DE59501846D1 (en) Process for producing a ballastless track system for at least one railroad track
ATE73880T1 (en) METHOD FOR BUILDING A TUNNEL WITH A LOW COVER UNDER TRACKS OR THE LIKE.
DE69924777D1 (en) Method for producing a track superstructure
CN108385456A (en) A kind of board-like ballastless track bed board integral replacing method of cast-in-place railway roadbed
BR8305517A (en) RAILWAY STRUCTURE, PROCESS OF BUILDING AN RAILWAY STRUCTURE, BODY IN BAG FORMAT AND FOUNDATION FOR A RAILWAY
ATE324491T1 (en) METHOD FOR PRODUCING A SOLID ROADWAY FOR RAIL-BOUND TRAFFIC, AND A SOLID ROADWAY FOR IMPLEMENTING THE PROCESS
ATE310123T1 (en) METHOD FOR PRODUCING A SOUND-INSULATED TRACK
RU2754694C1 (en) Method for construction of metro line using trenchless method with permanent cross-section casing and single type of tunnel-penetrating mechanized complex
SU1413195A1 (en) Underground railway station and method of constructing same
CN113565522B (en) Tunnel Boring Machine (TBM) station-passing bracket between mountain tunnels and station-passing method
ATE251255T1 (en) METHOD FOR PRODUCING A SOLID ROADWAY FOR RAIL VEHICLES
SU1395723A1 (en) Method of constructing ballast-free railway track
CN117702552A (en) Ballast-free track ballast bed plate construction method
ES468207A1 (en) Railways concrete plates for use in such railways and methods to lay such railways
Colombo et al. Innovative Technique for the Realisation of Large Diameter Tunnels in Loose Sand
SU78323A1 (en) Winter tent for winter work
Nakahara Shinkansen slab track to be laid on earthworks
COLLINS et al. HIGH SPEED TRACK ON THE WESTERN REGION OF BRITISH RAILWAYS.
Bucher et al. New Rail Tunnels under Central Berlin
SU718542A1 (en) Method of consolidating the under-ballast layer of permanent way
CN113512913A (en) Construction method of assembled polyurethane solidified track bed of high-speed railway
Tsygankov et al. Metro Bridge over the River Ob in Novosibirsk