SU1413195A1 - Underground railway station and method of constructing same - Google Patents

Underground railway station and method of constructing same Download PDF

Info

Publication number
SU1413195A1
SU1413195A1 SU874176486A SU4176486A SU1413195A1 SU 1413195 A1 SU1413195 A1 SU 1413195A1 SU 874176486 A SU874176486 A SU 874176486A SU 4176486 A SU4176486 A SU 4176486A SU 1413195 A1 SU1413195 A1 SU 1413195A1
Authority
SU
USSR - Soviet Union
Prior art keywords
station
roof
erecting
erection
tray
Prior art date
Application number
SU874176486A
Other languages
Russian (ru)
Inventor
Юрий Степанович Фролов
Владимир Ашотович Даниэльян
Юрий Евгеньевич Крук
Борис Васильевич Лямин
Евгений Иосифович Собирай
Иван Васильевич Шавернев
Original Assignee
Ленинградский институт инженеров железнодорожного транспорта им.акад.В.Н.Образцова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ленинградский институт инженеров железнодорожного транспорта им.акад.В.Н.Образцова filed Critical Ленинградский институт инженеров железнодорожного транспорта им.акад.В.Н.Образцова
Priority to SU874176486A priority Critical patent/SU1413195A1/en
Application granted granted Critical
Publication of SU1413195A1 publication Critical patent/SU1413195A1/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Изобретение относитс  к подземному строительству, преимущественно к строительству станций метрополитена мелкого заложени  в неустойчивых грунтйх, и позвол ет улучшить стати ческую работу, снизить материалоем кость и обеспечить возможность воз ведени  станции без вскрыти  дневной поверхности. Станци  метрополитена включает боковые опоры 1, свод 2 и лоток 3, На дневной поверхностиThe invention relates to underground construction, mainly to the construction of small metro stations in unstable soils, and allows to improve the static work, reduce the material and the bone and ensure the possibility of station construction without opening the surface. The metro station includes side supports 1, roof 2 and tray 3, On the surface

Description

(L

Од SOd s

слcl

вдоль станции уложен силовой элемент 4, соединенный со сводом 2 регулируемыми т жами 5. Способ возведени  станции метрополитена включает проходку боковых вспомогательных тоннелей 6, в которых возвод т опоры 1. До начала разработки калоттной прорези 7 с поверхности грунта заглубл ют систему т жей 5, возвод т на дневной поверхности силовой элемент 4 в виде плоской решетки или плиты и соедин ют его с верхними концами т жей 5. ЗатемPower station 4 is laid along the station, connected to roof 2 of adjustable weights 5. The method of erecting a metro station involves driving lateral auxiliary tunnels 6 in which supports 1 are erected. Before the development of the cutting section 7 from the ground surface, the slotting system 5 is buried, The power element 4 is erected on the day surface in the form of a flat grid or plate and is connected to the upper ends of the string 5. Then

разрабатывают калоттную прорезь 7 и возвод т свод 2, причем по мере возведени  свода 2 его подвешивают к нижним концам т жей 5 и путем регулировани  нат жени  обжимают слой грунта между сводом 2 станции и силовым элементом 4, С отставанием разра- батьшают  дро станции 8, возвод т лоток 3, а затем укладьшают основание 9 под пути метрополитена, монтируют платформу 10 и другие внутренние конструкции. 1 шт.they develop a mortot slot 7 and erect a roof 2, and as the roof 2 is erected, it is suspended to the lower ends of the string 5 and, by adjusting the tension, squeeze the soil layer between the roof 2 of the station and the strength element 4, with a lag, develop the core 8, Tray 3 is erected, and then the base 9 is laid under the subway tracks, platform 10 and other internal structures are mounted. 1 PC.

tt

Изобретение относитс  к подземному строительству, преимущественно к строительству станций метрополитена мелкого заложени  в неустойчивых грунтах.5The invention relates to underground construction, mainly to the construction of small metro stations in unstable soils.

Цель изобретени  - улучшение статической работы, снижение материалоемкости и обеспечение возможности возведени  без вскрыти  дневной поверхности.The purpose of the invention is to improve static work, reduce material consumption and provide the possibility of construction without opening the day surface.

На чертеже приведена станци  метрополитена , поперечный разрез.The drawing shows a metro station, a cross-section.

Станци  метрополитена вкгаочает бо ковые опоры 1, свод 2 и лоток 3. На дневной поверхности вдоль станции 5 уложен силовой элемент 4, соединенный со сводом 2 регулируемыми т жами 5.The metro station includes side supports 1, arch 2 and tray 3. A power element 4 is connected to the surface along station 5, which is connected to the arch 2 by adjustable weights 5.

Станци  метрополитена возводитс  следующим образом.A subway station is erected as follows.

Щитами перегонных тоннелей прохо- 20 д т боковые вспомогательные тоннели 6, в которых возвод т опоры 1. До начала разработки калоттной прорези 7 с поверхности грунта заглубл ют сис- тему т жей 5, возвод т на дневной поверхности силовой элемент 4 в виде плоской решетки или плиты и соедин ют его с верхними концами т жей 5. Затем разрабатьшают калоттную прорезь 7 и возвод т свод 2, причем по мере 30 возведени  свода 2 его подвешивают к нижним концам т жей 5 и путем регулировани  нат жени  обжимают слой грун- та между сводом 2 станции и силовым элементом 4, С отставанием от возве- 35 дени  сводовой части разрабатывают  дро 8 станции, возвод т лоток 3, а затем укладывают основание 9 под пути метрополитена, монтируют плат25Shields of the tunnels lead through 20 d t lateral auxiliary tunnels 6, in which supports 1 are erected. Prior to commencing the development of a calotte slot 7 from the ground surface, the system of grades 5 is built up, the power element 4 is erected on a day surface in the form of a flat grid. or slabs and connect it to the upper ends of the grip 5. Then, the mortot notch 7 is developed and the roof 2 is erected, and as the ceiling 2 is erected 30 it is suspended to the lower ends of the string 5 and the ground layer is compressed by adjusting the tension vault 2 stations and power element 4 m, with a lag of 35 vozve- spinning crest of the core developing station 8, to erect the tray T 3, and then placed under the base 9 underground path mounted plat25

00

5 five

0 0 5 0 0 5

5five

форму 10 и другие внутренние конст- рукции.Form 10 and other internal constructions.

Предлагаемое изобретение имеет следующие преимущества: снижаетс  расход материала на устройство свода за счет создани  пространственной конструкции перекрыти , включающей грунт в кровле станции; возможно сооружение станции метрополитена при мелком заложении без вскрыти  земной поверхности; исключаетс  необходимость вьтолнени  трудоемких и дорог госто щих работ по перекладке городских подземных коммуникаций над станцией; возможна нормальна  эксплуатаци  наземных городских транспорт ных магистралей в процессе строительства станции; работы можно вьшолн ть в услови х плотной городской застрой ки и независимо от погодных условий; исключаютс  трудоемкие и материалоем кие работы по креплению котлована; возможен пропуск щитовых комплексов перегонных тоннелей транзитом через станцию.The present invention has the following advantages: the consumption of material for the vault device is reduced by creating a spatial ceiling structure that includes the soil in the station roof; it is possible to build a metro station with a small laying without opening the earth's surface; eliminating the need for labor-intensive and expensive roads for re-laying urban underground communications over the station; normal operation of urban land highways during the construction of the station is possible; works can be performed in conditions of dense urban development and regardless of weather conditions; labor-intensive and material work on the fastening of the excavation are excluded; it is possible to pass the shield complexes of the distillation tunnels in transit through the station.

Claims (1)

1. Станци  метрополитена, включающа  боковые опоры, свод и лоток, отличающа с  тем, что, с целью улучшени  статистической работы , снижени  материалоемкости и обеспечени  возможности возведени  без вскрыти  дневной поверхности, она снабжена уложенным на дневной поверхности вдоль станции силовьда элементом, соединенным со сводом ре3U131951. A metro station including side supports, a roof and a tray, characterized in that, in order to improve statistical work, reduce material consumption and ensure the possibility of erection without opening the day surface, it is equipped with an element laid on the day surface along with the roof pe3U13195 гулируемыми т жами с образованиемвскрыти  дневной поверхности, до напространственной системы,чала разработки калоттной прорези сguided by the formation of an open surface of the day before the spatial system, the beginning of the development of a mortar slot with 2, Способ возведени  станции метро-поверхности грунта заглубл ют систе- политена включающий проходку боковыхму т жей, возвод т на дневной поверх- вспомогательных тоннелей, возведениености силовой элемент, соедин ю.т его в них опор, разработку калоттной про-с верхними концами т  жй, а по мере рези с возведением свода и разработкуразработки калоттной прорези   воз- грунтового  дра возведением лотка,ведени  свода последний подвевивают к отличающийс  тем, что, toнижним концам т жей и путем рогули- с целью улучшени  статической работы,ровани  их нат жени  обдамают слой снижени  материалоемкости и обеспе-грунта между сводом станции и силовьн чеии  возможности возведени  безэлементом.2, A method of erecting a metro station on the surface of the ground deepens the system, including the penetration of side weights, erecting a power element on the day surface of the auxiliary tunnel, erecting a support element in them, developing a calotte pro- as well as cutting with the erection of the arch and the development of the scotch slot of the submerged core by erecting the tray, leading the arch to the latter by the fact that, by the low ends of the gravel and by roguli, in order to improve the static work, their tensions will be buried by a layer of reduced material consumption and provision of soil between the station roof and the strength of the possibility of erection without an element.
SU874176486A 1987-01-06 1987-01-06 Underground railway station and method of constructing same SU1413195A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874176486A SU1413195A1 (en) 1987-01-06 1987-01-06 Underground railway station and method of constructing same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874176486A SU1413195A1 (en) 1987-01-06 1987-01-06 Underground railway station and method of constructing same

Publications (1)

Publication Number Publication Date
SU1413195A1 true SU1413195A1 (en) 1988-07-30

Family

ID=21278578

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874176486A SU1413195A1 (en) 1987-01-06 1987-01-06 Underground railway station and method of constructing same

Country Status (1)

Country Link
SU (1) SU1413195A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2514865C1 (en) * 2012-11-22 2014-05-10 Открытое акционерное общество "Метрогипротранс, (ОАО "Метрогипротранс") Method to install subway lines

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1073385, кл. Е 02 D 29/04, 1982. Тоннели и метрополитены. М.: Транспорт, 1975, с.415, 506. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2514865C1 (en) * 2012-11-22 2014-05-10 Открытое акционерное общество "Метрогипротранс, (ОАО "Метрогипротранс") Method to install subway lines

Similar Documents

Publication Publication Date Title
CN106703828B (en) The construction method of subway station is built using prefabricated assembled lining cutting combination PBA
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN206448151U (en) Overhead road of city precast pier
CN104018405B (en) The double-deck road structure that a kind of " stake-anchor-framework " is compound
CN105201516B (en) A kind of main structure of subway station and its tetrad arch PBA excavating construction methods
CN108868778A (en) A kind of Large Underground Structure no-dig technique construction method
CN105735354B (en) A kind of city underground engineering lid digs full-reverse construction method
CN205116217U (en) Height is filled and is prefabricated cast -in -place combination formula stake siding wall protective structure
CN109914456A (en) A kind of bridge and subway tunnel adjoin newly-built or with design and construction method when building
KR101206860B1 (en) Excavation tunnel constructing method using vertical side wall and arch ceiling
CN108978673A (en) A kind of foundation pit supporting construction and construction method of viaduct pile foundation underpinning
KR20200024519A (en) Solar panel installing structure using linear site
RU2715497C1 (en) Method of erection and arrangement of a single-span underground metro station of an open method of performing works
RU2587673C1 (en) Transport junction and method for construction thereof
SU1413195A1 (en) Underground railway station and method of constructing same
Hulme et al. SINGAPORE MASS RAPID TRANSIT SYSTEM: CONSTRUCTION.
CN209444343U (en) A kind of hole column tunneling is inverse to build underground structure
CN214302989U (en) Build assembled garage parking on ground additional
JP2860751B2 (en) Construction method of underpass introduction section
JPH06185294A (en) Running passage construction method on side slope
JP3146333B2 (en) Tunnel construction method
Moh et al. Underpass beneath Taipei international airport
SU1273572A1 (en) Method of constructing subterranean structure
CN110359924A (en) A kind of coal mine down-hole tunnel crossed space structure
Sepehrmanesh REM de l'Est project in Montreal