ATE109234T1 - METHODS OF PREVENTIVE CONSOLIDATION OF SOIL IN UNDERGROUND MINING. - Google Patents
METHODS OF PREVENTIVE CONSOLIDATION OF SOIL IN UNDERGROUND MINING.Info
- Publication number
- ATE109234T1 ATE109234T1 AT91100265T AT91100265T ATE109234T1 AT E109234 T1 ATE109234 T1 AT E109234T1 AT 91100265 T AT91100265 T AT 91100265T AT 91100265 T AT91100265 T AT 91100265T AT E109234 T1 ATE109234 T1 AT E109234T1
- Authority
- AT
- Austria
- Prior art keywords
- soil
- tube
- rod
- methods
- nozzles
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Walking Sticks, Umbrellas, And Fans (AREA)
Abstract
A method for the preventive consolidation of tunnel excavations by using the protective umbrella techinique, exploiting an equipment comprising: a metallic tube (1) of reinforcement, a tubular rod (12) provided with nozzles, a piercing bit (4) and a double rotary unit. The process comprises the following phases: a) mainly sub-horizontal drilling of the soil with the piercing bit (4) coaxially contained inside the tube (1), said tube (1) and said rod (2) being rotated one opposite to each other by a rotary unit; b) injection of pressurized liquid mixtures through the nozzles of the rod (2) with the removal of the finest part of the soil that is being consolidated; c) extraction of the rod from the inside of the tube. <IMAGE>
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT00330690A IT1238428B (en) | 1990-01-11 | 1990-01-11 | PROCEDURE FOR THE PREVENTIVE CONSOLIDATION OF GALLERY EXCAVATIONS USING THE PROTECTIVE UMBRELLA TECHNIQUE |
Publications (1)
Publication Number | Publication Date |
---|---|
ATE109234T1 true ATE109234T1 (en) | 1994-08-15 |
Family
ID=11104658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
AT91100265T ATE109234T1 (en) | 1990-01-11 | 1991-01-10 | METHODS OF PREVENTIVE CONSOLIDATION OF SOIL IN UNDERGROUND MINING. |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0437262B2 (en) |
AT (1) | ATE109234T1 (en) |
DE (1) | DE69103027T3 (en) |
IT (1) | IT1238428B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH089863B2 (en) * | 1991-08-14 | 1996-01-31 | 株式会社エヌ、アイ、テイ | All-angle ground improvement body construction method and its equipment |
RU2468207C1 (en) * | 2011-04-05 | 2012-11-27 | Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" | Method for reinforcement of mines soil |
CN104564113B (en) * | 2015-01-15 | 2016-08-17 | 山东科技大学 | The construction method of roadway surrounding rock fiber slurry grouting and reinforcing |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT1208123B (en) * | 1983-04-19 | 1989-06-06 | Fondedile Spa | CONGLOMERATE COLUMN MADE IN THE GROUND IN SITU BY PLACING INERT MATERIALS DURING PERFORATION AND CONTEMPORARY OR SUBSEQUENT INJECTION WITH SUITABLE BINDERS, RELEVANT EXECUTION PROCEDURES |
CH665878A5 (en) * | 1984-12-11 | 1988-06-15 | Rodio Found Eng Ltd | PROCEDURE FOR THE CONSOLIDATION OF LAND IN THE EXCAVATION OF GALLERIES. |
-
1990
- 1990-01-11 IT IT00330690A patent/IT1238428B/en active IP Right Grant
-
1991
- 1991-01-10 EP EP91100265A patent/EP0437262B2/en not_active Expired - Lifetime
- 1991-01-10 AT AT91100265T patent/ATE109234T1/en not_active IP Right Cessation
- 1991-01-10 DE DE69103027T patent/DE69103027T3/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
DE69103027D1 (en) | 1994-09-01 |
EP0437262B1 (en) | 1994-07-27 |
EP0437262B2 (en) | 1998-01-14 |
IT9003306A0 (en) | 1990-01-11 |
EP0437262A1 (en) | 1991-07-17 |
DE69103027T3 (en) | 1998-06-10 |
IT9003306A1 (en) | 1991-07-12 |
IT1238428B (en) | 1993-07-26 |
DE69103027T2 (en) | 1994-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0044706A3 (en) | Method and apparatus for forming and using a bore hole | |
GB1392969A (en) | Drilling apparatus | |
ES8103260A1 (en) | Method for recovering methane from coal seams. | |
ES8503764A1 (en) | Method for making a concrete or similar pile on site. | |
ATE109234T1 (en) | METHODS OF PREVENTIVE CONSOLIDATION OF SOIL IN UNDERGROUND MINING. | |
DE68909533T2 (en) | Method and drilling machine for examining and utilizing layers of earth. | |
DE3862239D1 (en) | DRILLING DEVICE FOR A HIGH PRESSURE INJECTION DRILLING METHOD. | |
ES400968A1 (en) | Consolidation of rock strata | |
KR910020296A (en) | Apparatus and method for preliminary petrification of underground mine soil using protected umbrella network technique | |
ATE151834T1 (en) | METHOD FOR APPLYING BINDER SUSPENSION | |
GB1470880A (en) | Method and apparatus for inserting tubular structural members in a soil formation | |
DE2801132A1 (en) | Underground hole boring system - uses telescopic cylinder for advancing tube injecting liq. and granulate, and extracting excavated material | |
JPS5520802A (en) | Construction of chemical grouting pipe | |
GB1419258A (en) | Automatic ground drilling apparatus | |
DE2909983C2 (en) | Method for driving a route, a tunnel or the like | |
ES2065795A2 (en) | Soil consolidation | |
SU1456582A1 (en) | Method of recovering materials from underground formations | |
JPH0376990A (en) | Quadruple pipe type core tube sampler and sampling method using said sampler | |
DE3910504A1 (en) | Subsequent redevelopment of landfill sites | |
IT1255670B (en) | Method for the in-situ making of columns of earth consolidated by injecting binding mixtures and fitting a reinforcement | |
SU1793830A3 (en) | Soil corer | |
GB1173156A (en) | Ground-Water Lowering by Drill-Place Method | |
GB1340355A (en) | Method and apparatus for making a bore hole in the ground | |
IT1264784B1 (en) | PROCEDURE FOR THE EXCAVATION OF STONE BLOCKS AND EQUIPMENT TO IMPLEMENT THIS PROCEDURE | |
JPS57100211A (en) | Sampling method and apparatus for undisturbed soil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
RER | Ceased as to paragraph 5 lit. 3 law introducing patent treaties |