ZA201800778B - Fully mechanized mining-filling mixed mining working face filling section length determination method - Google Patents
Fully mechanized mining-filling mixed mining working face filling section length determination methodInfo
- Publication number
- ZA201800778B ZA201800778B ZA2018/00778A ZA201800778A ZA201800778B ZA 201800778 B ZA201800778 B ZA 201800778B ZA 2018/00778 A ZA2018/00778 A ZA 2018/00778A ZA 201800778 A ZA201800778 A ZA 201800778A ZA 201800778 B ZA201800778 B ZA 201800778B
- Authority
- ZA
- South Africa
- Prior art keywords
- filling
- mining
- determination method
- working face
- section length
- Prior art date
Links
- 238000000034 method Methods 0.000 title 1
- 238000005065 mining Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/005—Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510925707.8A CN105464700B (en) | 2015-12-14 | 2015-12-14 | Fully mechanized mining filling mixed mining working face filling segment length determines method |
PCT/CN2016/106335 WO2017101634A1 (en) | 2015-12-14 | 2016-11-18 | Fully mechanized mining-filling mixed mining working face filling section length determination method |
Publications (1)
Publication Number | Publication Date |
---|---|
ZA201800778B true ZA201800778B (en) | 2018-12-19 |
Family
ID=55602805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ZA2018/00778A ZA201800778B (en) | 2015-12-14 | 2018-02-06 | Fully mechanized mining-filling mixed mining working face filling section length determination method |
Country Status (6)
Country | Link |
---|---|
CN (1) | CN105464700B (en) |
AU (1) | AU2016370451A1 (en) |
CA (1) | CA2986062C (en) |
RU (1) | RU2676770C1 (en) |
WO (1) | WO2017101634A1 (en) |
ZA (1) | ZA201800778B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105464700B (en) * | 2015-12-14 | 2017-12-26 | 中国矿业大学 | Fully mechanized mining filling mixed mining working face filling segment length determines method |
CN105912810B (en) * | 2016-04-29 | 2019-02-19 | 中国矿业大学 | A kind of filling with fully mechanized mining is mixed adopts face transition bracket supporting parameter design method |
CN106761754A (en) * | 2017-03-31 | 2017-05-31 | 中国矿业大学 | A kind of girdle comprehensive mining and gas control network one cooperative control system and method |
CN109488301A (en) * | 2018-09-30 | 2019-03-19 | 中国矿业大学 | A kind of mine, which picks up, fills place's recovery method |
CN109209380B (en) * | 2018-09-30 | 2020-10-30 | 中国矿业大学 | Design method for mining, selecting, filling and controlling |
CN109057797A (en) * | 2018-09-30 | 2018-12-21 | 中国矿业大学 | A kind of mine, which picks up to fill, takes out mining Design method |
CN110145363B (en) * | 2019-04-30 | 2024-03-29 | 中国矿业大学(北京) | Roof control method for realizing transition from fully mechanized mining face caving to filling mining |
CN110924944B (en) * | 2019-11-29 | 2020-09-22 | 北京科技大学 | Coal mine main roadway down-pressing coal segmented circulating filling mining method |
CN113128044B (en) * | 2021-04-15 | 2022-04-12 | 辽宁工程技术大学 | Method for determining advancing mining step pitch of lateral mining working wall of soft rock opencast coal mine |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5782539A (en) * | 1995-11-16 | 1998-07-21 | Peterson; Randall D. | Wall-to-wall surface mining process |
RU2323339C2 (en) * | 2006-05-16 | 2008-04-27 | Станислав Александрович Кариман | Face equipment assembly |
CN1936271B (en) * | 2006-08-21 | 2011-06-29 | 山东盛泉矿业有限公司 | Method for filling coal-steam-free extraction working surface goaf by coal mine waste rock |
CN1963149B (en) * | 2006-11-17 | 2011-09-14 | 中国矿业大学 | Mining method for replacement of banded coal under building by waste rock |
CN101586460B (en) * | 2009-06-02 | 2011-03-30 | 中国矿业大学 | Coal mining solid filling method |
CN102865099B (en) * | 2012-08-29 | 2014-12-24 | 山西晋煤集团金鼎煤机矿业有限责任公司 | Under-building, under-railway and under-water mining filling process |
CN102996131B (en) * | 2012-12-10 | 2014-10-29 | 中国矿业大学 | Solid-filling coal mining method with two pre-excavating tunnels for advancing |
CN103670507B (en) * | 2013-02-04 | 2015-10-21 | 中国矿业大学 | Method for determining width of waste rock filling belt in goaf of steeply inclined fully mechanized mining face |
RU2553699C2 (en) * | 2013-10-23 | 2015-06-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Сибирский государственный индустриальный университет" | Method of methane capture during mining of coal layers by powered mining complex |
CN103742148B (en) * | 2014-01-14 | 2016-08-17 | 山东科技大学 | The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam |
CN104405437B (en) * | 2014-10-08 | 2016-05-18 | 中国矿业大学 | A kind of solid filling with combine the hybrid working face mining method of adopting |
CN104775819B (en) * | 2015-03-27 | 2017-01-18 | 中国矿业大学 | Deep inclined coal seam mining roadway mine pressure control mining method |
CN104963687B (en) * | 2015-07-09 | 2017-02-22 | 太原理工大学 | Method for recycling upper part residual coal and backfilling goaf by utilizing full-mechanized caving mining in extremely thick coal seam |
CN104989408A (en) * | 2015-07-14 | 2015-10-21 | 三峡大学 | Safe and high-efficiency mining method for metal mine in mountainous area |
CN105134215A (en) * | 2015-09-25 | 2015-12-09 | 西安科技大学 | Local filling mining method for longwall face along strike of steeply dipping seam |
CN105464700B (en) * | 2015-12-14 | 2017-12-26 | 中国矿业大学 | Fully mechanized mining filling mixed mining working face filling segment length determines method |
-
2015
- 2015-12-14 CN CN201510925707.8A patent/CN105464700B/en active Active
-
2016
- 2016-11-18 WO PCT/CN2016/106335 patent/WO2017101634A1/en active Application Filing
- 2016-11-18 CA CA2986062A patent/CA2986062C/en active Active
- 2016-11-18 RU RU2017146578A patent/RU2676770C1/en active
- 2016-11-18 AU AU2016370451A patent/AU2016370451A1/en not_active Abandoned
-
2018
- 2018-02-06 ZA ZA2018/00778A patent/ZA201800778B/en unknown
Also Published As
Publication number | Publication date |
---|---|
CN105464700A (en) | 2016-04-06 |
CA2986062C (en) | 2023-08-29 |
CN105464700B (en) | 2017-12-26 |
RU2676770C1 (en) | 2019-01-11 |
WO2017101634A1 (en) | 2017-06-22 |
AU2016370451A1 (en) | 2017-10-26 |
CA2986062A1 (en) | 2017-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ZA201800778B (en) | Fully mechanized mining-filling mixed mining working face filling section length determination method | |
HK1252656A1 (en) | Benchmarking through data mining | |
PL2924236T3 (en) | Mining drill rig | |
LU92657B1 (en) | Mining sandboxes | |
GB2549405B (en) | Hydrazide-based curing agents for use in subterranean operations | |
PL3305447T3 (en) | Step-structured twist drill | |
GB201714629D0 (en) | Tunnel | |
SG11201705709PA (en) | Tunnel boring machine | |
SG11201707854UA (en) | Tunnel boring machine | |
GB201801139D0 (en) | Determining downhole forces using pressure differntials | |
SG11201801992QA (en) | Drilling machine | |
GB201711212D0 (en) | Compositions and methods for completing subterranean wells | |
GB201500619D0 (en) | Seal extraction tool | |
PL3359322T3 (en) | Drilling tool | |
GB201505716D0 (en) | Specification for downhole tool | |
SG11201800534YA (en) | Grouting apparatus | |
GB2525705B (en) | Activator composition and method for making concrete | |
ZA201503784B (en) | Tunneling method | |
GB2544085B (en) | Downhole tool & method | |
GB201619587D0 (en) | Drill bits | |
GB201804440D0 (en) | Downhole seal | |
GB2541017B (en) | Downhole cutting tool | |
GB201521744D0 (en) | Drill | |
GB201521741D0 (en) | Drill | |
GB201517240D0 (en) | Rig |