WO2023286149A1 - 作業状況管理システム - Google Patents

作業状況管理システム Download PDF

Info

Publication number
WO2023286149A1
WO2023286149A1 PCT/JP2021/026264 JP2021026264W WO2023286149A1 WO 2023286149 A1 WO2023286149 A1 WO 2023286149A1 JP 2021026264 W JP2021026264 W JP 2021026264W WO 2023286149 A1 WO2023286149 A1 WO 2023286149A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
information
time
location
content
Prior art date
Application number
PCT/JP2021/026264
Other languages
English (en)
French (fr)
Inventor
雅哉 原川
秀秋 田代
英松 林
遥香 茅野
剛 水野
淳 三浦
Original Assignee
三菱電機株式会社
株式会社ムセンコネクト
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社, 株式会社ムセンコネクト filed Critical 三菱電機株式会社
Priority to JP2021578255A priority Critical patent/JP7048063B1/ja
Priority to PCT/JP2021/026264 priority patent/WO2023286149A1/ja
Publication of WO2023286149A1 publication Critical patent/WO2023286149A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • This disclosure relates to a work situation management system that manages the work situation of workers.
  • the work evaluation system of Patent Document 1 specifies the work content and work time of the worker based on the time-series data of the worker's position information, and the time-series data of the production amount corresponding to the specified work content. , the working time of the worker, and the work status of the worker is quantitatively evaluated.
  • the present disclosure has been made in view of the above, and aims to obtain a work situation management system that can accurately manage the work situation based on the work time of effective work that contributes to production.
  • the work situation management system of the present disclosure includes a location tag that is arranged at a fixed position within the work area and stores unique identification information within the work area; A smart tag that is attached to a moving object that moves within a work area and receives identification information from the location tag when it enters a specific area around the location tag; and a management device that manages the work status of the moving object based on.
  • the management device identifies position information, which is the position of the location tag corresponding to the identification information received from the smart tag, based on the identification correspondence information in which the position of the location tag in the work area and the identification information are associated.
  • the work content corresponding to the location information specified by the location management unit and the time information that is information on the time corresponding to the work content and a work analysis unit that identifies the identified work content as either effective work set as work that contributes to production or ineffective work set as work that does not contribute to production.
  • the management device calculates a working time for calculating an effective working time that is a working time for valid work and an invalid working time that is a working time for invalid work based on the time information and at least one of valid work and invalid work. and an analysis unit that analyzes the productivity of the moving object using the effective work time and the ineffective work time.
  • the work situation management system has the effect of being able to accurately manage the work situation based on the working time of effective work that contributes to production.
  • FIG. 1 is a diagram showing a first configuration example of a work situation management system according to a first embodiment
  • FIG. FIG. 4 is a diagram showing the trajectory of smart tags displayed by the management device according to the first embodiment
  • FIG. FIG. 4 shows a second configuration example of the work situation management system according to the first embodiment
  • 1 is a diagram showing a system configuration of a work situation management system according to a first embodiment
  • 4 is a flowchart showing a procedure of work situation management processing executed by the work situation management system according to the first embodiment
  • FIG. 2 is a diagram showing a configuration example of work management information stored in a database unit included in the management apparatus according to the first embodiment
  • FIG. FIG. 2 is a diagram showing a hardware configuration example that implements the management device according to the first embodiment
  • FIG. 11 is a diagram showing a configuration of a work analysis unit according to a second embodiment
  • FIG. 1 is a diagram showing a first configuration example of a work situation management system according to a first embodiment.
  • the work situation management system 1X is a system that determines the work content and work time of the worker based on the position where the worker works, and manages the work situation of the worker.
  • the work situation management system 1X distinguishes between effective work and ineffective work, and calculates the work time for effective work.
  • Effective work is, for example, work that is set to contribute to production, such as producing a product by assembling parts.
  • Ineffective work is, for example, work that does not directly contribute to production, such as when a worker does not have a part or jig at hand and the worker goes looking for a part or jig.
  • Disabled work includes rests outside of prescribed hours, equipment repairs, etc.
  • the work situation management system 1X in Embodiment 1 identifies the position of the worker in the work area 80 arranged on the site of the factory, and manages the work situation of the worker based on the worker's position.
  • the work situation management system 1X includes a management device 5, a plurality of location tags 2, a smart tag 3, and a gateway device 4.
  • the number of smart tags 3 may be plural or one.
  • the location tag 2, the smart tag 3, and the gateway device 4 are arranged within the work area 80.
  • the management device 5 may be arranged within the work area 80 or may be arranged outside the work area 80 .
  • the location tag 2 stores information for specifying the position within the work area 80.
  • Information for specifying a position within the work area 80 is an identification number (hereinafter referred to as a location ID (IDentifier)) that can specify the location tag 2 .
  • IDentifier an identification number that can specify the location tag 2 .
  • each location tag 2 has a location ID that can identify itself.
  • the location tags 2 are arranged at various fixed positions within the work area 80, such as devices, workbenches, operation panels, conference rooms, rest rooms, parts storage areas, jig storage areas, passageways, and pillars.
  • a location tag 2 wirelessly communicates with a smart tag 3 that has entered a communicable range with the location tag 2, and transmits location information, which is information including a location ID, to the smart tag 3 with which communication is possible.
  • location information is information that contributes to specifying the location of the smart tag 3 .
  • the location ID is associated with the position of the location tag 2 and managed by the management device 5 .
  • the smart tag 3 is a portable tag, and becomes a mobile station when carried by a worker.
  • the smart tag 3 can receive from the location tag 2 a location ID for identifying the location of the worker by being carried by the worker.
  • the smart tag 3 is configured to be able to wirelessly communicate with the location tag 2 when it enters a specific area around the location tag 2, and the location tag 2, which has become wirelessly communicable, can communicate with the location tag 2.
  • Receive location information that includes an ID.
  • the location ID is information for identifying the location of the location tag 2
  • the location ID received by the smart tag 3 is information for identifying the location of the smart tag 3 .
  • the movement target whose position is specified within the work area 80 is not limited to the worker.
  • the moving object whose position is specified may be a movable peripheral equipment such as a trolley.
  • the smart tag 3 is fixed to peripheral equipment such as a trolley.
  • a case where the target whose position is specified is the worker will be described.
  • the smart tag 3 is configured to be able to wirelessly communicate with multiple location tags 2.
  • the smart tag 3 associates the received location information with the reception strength of wireless communication when the location information was received, and transmits the information to the gateway device 4 .
  • the smart tag 3 may transmit information identifying the smart tag 3 (hereinafter referred to as smart ID) to the gateway device 4 .
  • the smart tag 3 associates the location information, the reception strength of the wireless communication when the location information is received, and the smart ID, and transmits them to the gateway device 4 .
  • the gateway device 4 transmits time information, which is information on the time when the location information was received, location information, and information in which the reception strength is associated (hereinafter sometimes referred to as acquired information) via wired or wireless communication. to the management device 5.
  • time information which is information on the time when the location information was received, location information, and information in which the reception strength is associated (hereinafter sometimes referred to as acquired information) via wired or wireless communication.
  • the time information transmitted by the gateway device 4 to the management device 5 is not limited to information on the time when the location information is received, and may be information on the time when the location information is transmitted. Further, in the work situation management system 1X, the smart tag 3 may transmit the time information to the gateway device 4. FIG. In this case, the smart tag 3 associates time information, location information, and reception intensity, and sends them to the gateway device 4 .
  • the time information in this case is information on the time when the smart tag 3 received or sent the location information.
  • the management device 5 receives acquired information including location information from the gateway device 4 .
  • the management device 5 is a computer that identifies the position of the worker within the work area 80 based on the location ID included in the location information and manages it as position information.
  • the management device 5 has map information that is map information of the site (work area 80) where the location tag 2 is installed.
  • the management device 5 stores information (hereinafter referred to as identification correspondence information) in which the coordinate information, which is the information of the coordinates of the location tag 2 included in the map information, and the location ID of the location tag 2 are associated with each other.
  • the management device 5 stores identification correspondence information in a database unit 55 or the like, which will be described later.
  • the management device 5 identifies the location of the location tag 2 using the location ID and identification correspondence information. In this way, the location tag 2 does not have its own location information, and the management device 5 specifies the location (coordinates) of the location tag 2 based on the identification correspondence information and the unique location ID of the location tag 2. do. Thereby, the management device 5 identifies and manages the location of the smart tag 3 corresponding to the location of the location tag 2 .
  • the location tag 2 does not have its own location information but has a location ID here, the location tag 2 may have its own location information. If the location tag 2 has its own location information, the location tag 2 transmits the location information including the location ID and the location information to the smart tag 3 .
  • the management device 5 Upon receiving the acquired information from the gateway device 4, the management device 5 identifies the location IDs received by one smart tag 3 during the same time period based on the time information included in the acquired information.
  • the same time zone is the time (period) that is regarded as the same time among the times indicated by the received time information.
  • the gateway device 4 attaches time information indicating the same time to each of the multiple location IDs received from the smart tag 3 .
  • the gateway device 4 or smart tag 3 associates different time information with each location ID. Since the management device 5 treats location IDs whose communication timing is only shifted as location IDs acquired at the same time, even if there is a difference in the time information attached to the location IDs, the identification The time included in the period is assumed to be the same location ID.
  • the management device 5 uses, for example, the communication cycle between the smart tag 3 and the gateway device 4 as this specific period.
  • the management device 5 selects the location information corresponding to the highest reception intensity among the location information received at the same time, and determines that the smart tag 3 exists near the location tag 2 having the selected location information. Based on the identification correspondence information and the location ID included in the selected location information, the management device 5 identifies the position of the smart tag 3 on the map indicated by the map information and displays it on the display device. That is, the management device 5 displays the position indicated by the coordinate information associated with the location ID included in the selected location information as the position of the smart tag 3 on the map.
  • the display device may be included in the management device 5 or may be a device having a configuration different from that of the management device 5 .
  • the smart tag 3 may select the location information corresponding to the highest reception strength among the location tags 2 received at the same time. In this case, the smart tag 3 determines that its own smart tag 3 exists near the location tag 2 having the selected location information, and transmits the selected location information to the gateway device 4 .
  • the management device 5 displays the positions of the smart tags 3 on the map in chronological order.
  • the management device 5 can display the trajectory of the smart tag 3 by connecting the display positions of the smart tag 3 and displaying them.
  • FIG. 2 is a diagram showing the trajectory of smart tags displayed by the management device according to the first embodiment.
  • FIG. 2 shows an example of the trajectory of the smart tag 3 displayed on the display device by the management device 5 .
  • the movement start position Pa of the smart tag 3 in a specific period is indicated by the movement start position Pa
  • the movement end position of the smart tag 3 is indicated by the movement end position Pb.
  • a trajectory L1 indicates the trajectory of the smart tag 3 during a specific period.
  • the management device 5 analyzes the work status of the worker using data related to the trajectory L1 of the smart tag 3, such as time information and the position information of the smart tag 3 derived from the location ID.
  • FIG. 3 is a diagram illustrating a second configuration example of the work situation management system according to the first embodiment.
  • constituent elements in FIG. 3 constituent elements that achieve the same functions as those of the work situation management system 1X shown in FIG.
  • a work situation management system 1X In the work situation management system 1X described in FIG. 1, the gateway device 4 and the management device 5 are directly connected for communication.
  • a work situation management system 1Y which is a second configuration example of the work situation management system, a plurality of gateway devices 4 are connected to a management device 5 via a data collection platform 6.
  • the work situation management system 1Y like the work situation management system 1X, is a system that manages the work situation of workers.
  • the work situation management system 1Y includes a management device 5, multiple location tags 2, multiple smart tags 3, and multiple gateway devices 4.
  • FIG. 1 is a system that manages the work situation of workers.
  • the work situation management system 1Y includes a management device 5, multiple location tags 2, multiple smart tags 3, and multiple gateway devices 4.
  • location tags 2, smart tags 3, and gateway devices 4 are arranged in work areas 80A-80C.
  • Location tags 2, smart tags 3, and gateway devices 4 are arranged in work areas 80A to 80C, respectively, similar to work area 80.
  • FIG. Note that the management device 5 and the data collection platform 6 may be placed in any of the work areas 80A-80C, or may be placed outside the work areas 80A-80C.
  • Each gateway device 4 within workspaces 80A-80C transmits the acquired information to data collection platform 6 .
  • the data collection platform 6 receives acquired information from each gateway device 4 in the work areas 80A to 80C and transmits it to the management device 5.
  • the management device 5 may be provided on a cloud server. In this case, the data collection platform 6 transmits the acquired information to the cloud server on which the functions of the management device 5 are installed.
  • the data collection platform 6 is a software (S/W: SoftWare) platform for the purpose of data collection, and is a data collection device capable of executing data collection by being installed in an industrial PC (Personal Computer). becomes.
  • the data collection platform 6 has multiple data collection function units that comply with various communication standards. Even if each gateway device 4 communicates according to a different communication standard, the data collection platform 6 uses the data collection function unit corresponding to each communication standard of the gateway device 4 to enable the gateway device 4 having a different communication standard. Acquisition information, which is data including location IDs and the like, can be collected from.
  • the data collection platform 6 can collect data not only from the gateway device 4, but also from an external system 7, which will be described later.
  • the data collection platform 6 processes data acquired from the gateway device 4 and the external system 7 into a data format that can be used by the management device 5 and transmits the processed data to the management device 5 .
  • the work situation management system 1Y shown in FIG. 3 will be described in detail below. Note that even when the management device 5 is arranged in the work situation management system 1X, it performs the same processing as when it is arranged in the work situation management system 1Y.
  • FIG. 4 is a diagram showing the system configuration of the work situation management system according to the first embodiment.
  • FIG. 5 is a diagram for explaining configurations of a location tag, a smart tag, and an external system according to the first embodiment;
  • FIG. 4 and 5 show functional blocks of the work situation management system 1Y and the external system 7 shown in FIG. 4 and 5 show a case where the work situation management system 1Y shown in FIG. 3 includes location tags 2A and 2B and smart tags 3A and 3B.
  • Location tags 2A and 2B are tags similar to location tag 2
  • smart tags 3A and 3B are tags similar to smart tag 3.
  • the location tags 2A and 2B may be referred to as the location tag 2 when the location tags 2A and 2B are not distinguished from each other.
  • location tags 2A and 2B installed on the factory premises and serving as fixed stations, smart tags 3A and 3B installed in workers and serving as mobile stations, and a gateway device 4 , the data collection platform 6, and the management device 5 are components of the work situation management system 1Y. 5, illustration of the attendance management system 7B, the work management system 7C, and the schedule management system 7D shown in FIG. 4 is omitted.
  • location tags 2A, 2B and smart tag 3A are arranged in the same work area (for example, one of work areas 80A to 80C) will be described.
  • the smart tags 3A and 3B have the same configuration, so the description of the smart tag 3B is omitted.
  • FIGS. 4 and 5 describe a case where the location tags 2A and 2B include the location ID and coordinate information indicating the coordinates of the location tags 2A and 2B in the location information and transmit the location information to the smart tag 3A.
  • the external system 7 has, for example, a production management system 7A, an attendance management system 7B, a work management system 7C, and a schedule management system 7D.
  • the production management system 7A is a system that manages the production volume and productivity of the production line.
  • the attendance management system 7B is a system for managing the attendance of workers.
  • the work management system 7C is a system that manages the work of workers.
  • the schedule management system 7D is a system that manages, as schedule information, the work contents of each worker for each hour.
  • the external system 7 is connected to the data collection platform 6. That is, the production management system 7A, the attendance management system 7B, the work management system 7C, and the schedule management system 7D are connected to the data collection platform 6.
  • each location tag 2 has a location information transmission unit 21.
  • the location information transmitting unit 21 establishes communication with the smart tag 3A located outside the location tag 2, the location information transmitting unit 21 transmits the location information set inside the location tag 2 to the smart tag using a specific communication method. Send to 3A.
  • the smart tag 3A has a location information receiving section 31, a location determining section 32, a motion sensor section 33, and an information transmitting section .
  • the location information receiving section 31 receives the location information transmitted from the location tag 2 and sends it to the location determining section 32 .
  • the location information receiving section 31 measures the reception strength, associates the location information with the reception strength, and transmits the information to the location determination section 32 .
  • the location determination unit 32 determines its own position, that is, the position of the smart tag 3A, based on the location information. Specifically, the location determination unit 32 selects location information with a high reception strength when received from among a plurality of pieces of location information received in the same time period.
  • the location determination unit 32 selects, for example, the location information with the highest reception strength when received from the location information of the location tags 2A and 2B received during the same time period.
  • the location information with high reception strength selected by the location determination unit 32 is not limited to location information indicating the highest reception strength among the reception strengths of the received location information.
  • the location determination unit 32 may select top N (N is a natural number equal to or greater than 2) pieces of location information with high reception strength.
  • the location determination unit 32 may select location information whose reception strength is greater than or equal to a specific value.
  • the location determination unit 32 determines that the smart tag 3A is located near the location tag 2 corresponding to the selected location information.
  • the location determination unit 32 transmits the selected one or more pieces of location information to the information transmission unit 34 as location determination result information.
  • the location determination result information includes location information and reception strength corresponding to this location information.
  • the management device 5 may not have the function of selecting specific location information from the multiple pieces of location information described above. A case will be described below where the location information selected by the location determination unit 32 is the top N pieces of location information with the highest reception strength.
  • the motion sensor unit 33 of the smart tag 3A detects the motion of the smart tag 3A.
  • the motion sensor unit 33 has sensors such as a vibration sensor and an acceleration sensor, and acquires data for analyzing the motion of the worker or the truck.
  • the motion sensor unit 33 can detect the worker's crouching motion by taking out the part based on the acceleration detected by the acceleration sensor.
  • the motion sensor unit 33 can detect the start and end of loading onto the truck, the movement of the truck, etc. based on the vibration detected by the vibration sensor. can.
  • the motion sensor unit 33 transmits the acquired data (sensing result) to the information transmission unit 34 as motion information (motion sensor signal).
  • motion information include acceleration of the smart tag 3A, vibration of the smart tag 3A, squat action of the worker, timing of starting loading onto the truck, timing of ending loading onto the truck, and movement of the truck.
  • the information transmission unit 34 associates the location determination result information from the location determination unit 32 with the motion information from the motion sensor unit 33 and transmits them to the gateway device 4 .
  • the gateway device 4 transmits the acquired information in which the location determination result information, the motion information, and the time information are associated with each other to the management device 5 via the data collection platform 6 .
  • the acquired information here is information in which location information, reception intensity corresponding to this location information, motion information, and time information are associated with each other.
  • the production control system 7A is a system for managing the production of products, and includes, for example, a production amount counting device 71, a mechanical device 70, a camera 72 as an imaging device, and a code reader 73. ing.
  • the production amount counting device 71 is a device that counts the production amount of products produced by the mechanical device 70 .
  • a mechanical device 70 , a camera 72 and a code reader 73 are connected to the output counting device 71 .
  • the camera 72 detects the passage of the product by photographing the product in front of the camera 72 and notifies the production amount counting device 71 of it.
  • the code reader 73 detects the passage of the product by reading the bar code attached to the product and notifies the code reader 73 of it.
  • the production amount counting device 71 has a production amount counter 71A and an information transmitting section 71B.
  • the output counter 71A counts the number of notifications from the camera 72 and the number of notifications from the code reader 73 .
  • the production amount counter 71A transmits the result of counting the number of notifications as production amount information to the information transmitting section 71B.
  • the production amount information transmitted by the production amount counter 71A includes the result of counting the number of notifications and time information corresponding to this counting result.
  • the information transmission unit 71B transmits production amount information to the management device 5 via the data collection platform 6 .
  • the management device 5 includes a device management unit 50, a map management unit 51, a location management unit 52, a work analysis unit 53, a work time calculation unit 54, a database unit 55, and external cooperation. It has a section 56 and an analysis display section 57 .
  • the device management unit 50 receives the acquired information from the smart tag 3A.
  • the device management unit 50 manages attribute information by storing attribute information corresponding to location information.
  • the device management unit 50 reads the attribute information of the location information included in the received acquired information.
  • the map management unit 51 stores and manages map information in the factory.
  • the position management unit 52 associates the position of the smart tag 3A with map information managed by the map management unit 51 .
  • the position management unit 52 manages the position information of the smart tag 3A by storing the associated information as the position information of the smart tag 3A.
  • the work analysis unit 53 determines the work content of the worker and whether the work content belongs to valid work or invalid work. I do.
  • the work analysis unit 53 sends the determination result to the work time calculation unit 54 .
  • the work time calculation unit 54 calculates the work start time, which is the start time, and the work end time, which is the end time, of effective work set as work that contributes to production or ineffective work set as work that does not contribute to production. Based on this, the working hours of effective work and ineffective work are calculated.
  • the work time calculation unit 54 causes the database unit 55 to accumulate, as work management information, information in which the work content, the work time of effective work, and the work time of ineffective work are associated with each other.
  • the database unit 55 accumulates work management information.
  • the database unit 55 stores, as database information, information that classifies the work contents for each location (for each area with respect to the position information) for each worker and for each truck.
  • the database information is information in which position information and work content are associated with each other.
  • the database unit 55 stores database information for each movement target.
  • the external cooperation unit 56 acquires production amount information including information such as the production amount from the external system 7 via the data collection platform 6 and sends it to the analysis display unit 57 . Also, the external cooperation unit 56 sends the information generated by the management device 5 to the external system 7 via the data collection platform 6 . The external cooperation unit 56, for example, sends the productivity in the work areas 80A to 80C analyzed by the management device 5 to the production management system 7A.
  • the analysis display unit 57 which is an analysis unit, analyzes productivity in the work areas 80A-80C. Specifically, the analysis display unit 57 calculates, for example, the production efficiency of workers or trucks based on the production amount information and the working hours accumulated in the database unit 55 . The analysis display unit 57 displays analysis results such as production efficiency on the display device.
  • the configuration of the management device 5 will be described in detail below. Here, a case where the smart tag 3A receives the location information from the location tag 2A will be described.
  • the device management unit 50 of the management device 5 manages the attribute information of the location tag 2A corresponding to the location information and the attribute information of the smart tag 3A corresponding to the smart ID, which is the identification information of the smart tag 3A.
  • the attribute information of the location tag 2A is, for example, coordinate information indicating the installation location of the location tag 2A within the factory premises, the manufacturing number of the location tag 2A, information of the management department of the location tag 2A, and the like.
  • the attribute information of the smart tag 3A is, for example, the object to which the smart tag 3A is attached (worker, trolley, etc.), the serial number of the smart tag 3A, the information of the management department of the smart tag 3A, and the like.
  • the attribute information of the location tag 2A is managed by the management device 5 with a location ID, which is identification information of the location tag 2A. That is, the management device 5 stores information in which the attribute information of the location tag 2A and the location ID are associated with each other (hereinafter referred to as location ID attribute information). Information in which the coordinate information in the attribute information of the location tag 2A is associated with the location ID is the aforementioned identification correspondence information.
  • the device management unit 50 when the device management unit 50 receives the location ID from the data collection platform 6, it reads the attribute information of the location tag 2A corresponding to the location ID from the location ID attribute information.
  • the device management unit 50 identifies, for example, the location information of the location tag 2A, the manufacturing number of the location tag 2A, the information of the management department of the location tag 2A, and the like based on the location ID and the location ID attribute information.
  • the device management section 50 sends the identification correspondence information and the location information to the location management section 52.
  • the device management section 50 also sends the attribute information and the location ID to the analysis display section 57 .
  • the device management section 50 sends the location information to the position management section 52 .
  • the attribute information of the smart tag 3A is managed by the management device 5 with a smart ID, which is identification information of the smart tag 3A. That is, the management device 5 stores information in which the attribute information of the smart tag 3 and the smart ID are associated (hereinafter referred to as smart ID attribute information).
  • the device management unit 50 reads the attribute information of the smart tag 3A corresponding to the smart ID from the smart ID attribute information.
  • the device management unit 50 identifies, for example, the manufacturing number of the smart tag 3A, information about the management department of the smart tag 3A, and the like, based on the smart ID and smart ID attribute information.
  • the location management unit 52 identifies the coordinates of the smart tag 3A located near the location tag 2A based on the identification correspondence information and the location ID.
  • the position management unit 52 associates the coordinates of the smart tag 3A with the map information stored in the map management unit 51, and stores the associated information as the position information of the smart tag 3A.
  • the position information of the smart tag 3A is indicated by coordinates on the map information.
  • the work analysis unit 53 reads the location information of the smart tag 3A from the location management unit 52. Based on the position information of the smart tag 3A and the database information, the work analysis unit 53 determines the work content of the worker and whether the work content belongs to valid work or invalid work. The work analysis unit 53 determines that the work content belongs to valid work, for example, when the worker's position is within a specific range from the device, workbench, or operation panel. On the other hand, the work analysis unit 53 determines that the work content belongs to invalid work, for example, when the worker's position is within a specific range from the meeting room, break room, parts storage area, jig storage area, or passageway.
  • the management device 5 in the work situation management system 1Y can analyze the work situation of the worker after classifying the work of the worker into effective work and ineffective work. Therefore, the management device 5 can display suggestions for further improvement in effective work, and suggestions for reducing wasteful work in ineffective work.
  • FIG. 6 is a flowchart of a work situation management process procedure executed by the work situation management system according to the first embodiment.
  • the device management section 50 receives the acquired information and extracts the smart ID from the acquired information. After acquiring the smart ID, the device management unit 50 reads the attribute information of the smart tag 3A corresponding to the smart ID, and based on the read attribute information, determines whether the smart tag 3A is attached to the worker or attached to the truck. determine what is being done. That is, the device management unit 50 determines the type of the movement target attached with the smart tag 3A. The device management section 50 sends this determination result to the location management section 52 . The device management section 50 also extracts location information from the obtained information and sends it to the location management section 52 .
  • the location management unit 52 extracts the coordinate information of the location tag 2A from the location information. Based on this coordinate information and the map information of the map management section 51, the position management section 52 determines the position of the movement target (worker or truck) whose type is determined by the device management section 50.
  • the location management unit 52 extracts the location ID from the location information. In addition, the position management unit 52 reads identification correspondence information from the database unit 55 . The location management unit 52 identifies the coordinates of the smart tag 3A located near the location tag 2A based on the identification correspondence information and the location ID. Based on the coordinates of the smart tag 3A and the map information of the map management unit 51, the position management unit 52 determines the position of the movement target whose type is determined by the device management unit 50. FIG.
  • the position management unit 52 sends the position of the movement target to the work analysis unit 53 as the position information of the smart tag 3A. Also, the position management unit 52 sends the type of movement target to the work analysis unit 53 .
  • the work analysis unit 53 identifies the work content to be determined as valid or invalid based on the type of the movement target and the position information of the smart tag 3A (step S10).
  • the work analysis unit 53 identifies work content by the following method.
  • the work analysis unit 53 identifies the work content based on the position of the worker or the truck. That is, the work analysis unit 53 determines the work content of the worker or the truck based on the work content assumed at the position of the worker or the truck. Specifically, the work analysis unit 53 analyzes the work content corresponding to the position information specified by the position management unit 52 based on the database information that is information in which the position of the worker or the truck and the work content are associated with each other. identify.
  • the work contents for each place are classified for each worker and for each truck and stored in the database section 55 as database information.
  • the work analysis section 53 analyzes the work contents of the worker or the truck based on this database information. Identify. For example, when the worker is positioned at the place where the assembling device is arranged, the work analysis unit 53 determines that the worker is currently assembling the product as the work content. Further, when the truck is positioned where the assembling apparatus is arranged, the work analysis unit 53 determines that the truck is transporting the parts necessary for assembling the product as the work content.
  • the schedule management system 7D manages the work content for each worker for each hour as schedule information.
  • the external cooperation unit 56 cooperates with the external system 7 .
  • the external cooperation unit 56 acquires schedule information from the schedule management system 7 ⁇ /b>D and sends it to the work analysis unit 53 .
  • the external cooperation unit 56 acquires production information from the production management system 7A and sends it to the analysis display unit 57 .
  • the work analysis unit 53 determines in detail the work content of the worker or the truck by referring to the schedule information. For example, when a worker is positioned at a location where an assembly device is arranged, the work analysis unit 53 determines whether the worker will produce a product based on the length of time the worker is positioned at this location and the work schedule of the schedule information. It is determined which of the assembly work is being performed as the work status.
  • the work analysis unit 53 acquires motion information, which is vibration data of the smart tag 3A, from the smart tag 3A.
  • the work analysis unit 53 identifies the work content of the worker or the truck by analyzing the acquired motion information according to, for example, the following guidelines.
  • the work analysis unit 53 determines whether the work content is valid or invalid (step S20).
  • the work analysis unit 53 uses the database information of the database unit 55, the position information of the smart tag 3A specified by the position management unit 52, the time information included in the acquired information, and the motion information to determine whether the work content is valid work. or invalid work.
  • the work analysis unit 53 determines whether or not the work content is invalid work based on, for example, the following criteria. ⁇ The time from work interruption to work start exceeds the reference time (allowable interval time) ⁇ The worker moves from the work place to an unexpected place
  • the work analysis unit 53 prepares a case (reference) of invalid work that can be determined as invalid work among the work contents obtained based on the position information and time information of the smart tag 3A, and performs invalid work. It is determined whether the work is effective or ineffective depending on whether or not it corresponds to the case. Note that the work analysis unit 53 prepares a case (reference) of effective work that can be determined as effective work among the work contents obtained based on the position information and time information of the smart tag 3A. Whether the work is effective or ineffective may be determined based on whether or not the work is applicable.
  • the work analysis unit 53 determines that the time from work interruption to work start exceeds the reference time, that is, for example, when determining invalid work that the worker skips the work, the position information and time information of the smart tag 3A , and motion information to determine invalid work. Specifically, based on the time information and the motion information, the work analysis unit 53 calculates a time interval (period) during which effective work cannot be confirmed. is determined to be invalid work.
  • the work analysis unit 53 determines the case where the worker moves from the work place to an unexpected place, that is, for example, when determining invalid work in which the worker goes looking for a jig or part because there is no jig or part, the position of the smart tag 3A Information and time information and database information are used to determine invalid work. Specifically, the work analysis unit 53 confirms the position of the worker based on the position information, and determines whether or not the confirmed position belongs to a position (region) that can be determined as effective work indicated by the database information. confirm.
  • the work analysis unit 53 cannot confirm that the position of the smart tag 3A belongs to a position that can be determined as valid work, the work with the position information and time interval during which it cannot be confirmed is determined as invalid work.
  • the work analysis unit 53 can confirm that the position of the smart tag 3A belongs to a position that can be determined as valid work, it determines that the work with the position information and time interval during this confirmation is valid work.
  • the work analysis unit 53 After determining that the work content is valid or invalid, the work analysis unit 53 reflects the determination result in the work management information of the database unit 55 .
  • the work analysis unit 53 calculates the effective work start time and end time based on the effective work content, which is the work content of the effective work (step S30).
  • the work analysis unit 53 also calculates the start time and end time of the invalid work based on the content of the invalid work, which is the work content of the invalid work (step S31).
  • the work analysis unit 53 may perform the processing of step S30 and the processing of step S31 in any order.
  • the work time calculation unit 54 calculates the work start time and work end time of the invalid work using the time information of the invalid work content that is the basis for calculating the time interval of the invalid work. Further, the work time calculation unit 54 calculates, for example, the work start time and work end time of effective work based on the work end time and work start time of ineffective work. In this case, the work time calculation unit 54 sets the work start time of the invalid work as the work end time of the valid work, and sets the work end time of the invalid work as the work start time of the valid work.
  • the work time calculation unit 54 may calculate the work start time and work end time of the effective work using the time information of the effective work content that is the basis for calculating the time interval of the effective work. Further, the work time calculation unit 54 may calculate, for example, the work start time and work end time of invalid work based on the work end time and work start time of valid work. In this case, the work time calculation unit 54 sets the work start time of the valid work as the work end time of the invalid work, and sets the work end time of the valid work as the work start time of the invalid work.
  • the work time calculation unit 54 calculates an effective work time 65B, which is the work time of effective work, based on the work start time and work end time of the effective work. Further, the work time calculation unit 54 calculates an invalid work time 65C, which is the work time of the invalid work, based on the work start time and work end time of the invalid work. In this manner, the work time calculation unit 54 calculates the effective work time 65B and the ineffective work time 65C based on the time information and at least one of the effective work and the ineffective work.
  • the work time calculation unit 54 reflects the calculation result in the database unit 55. That is, the work time calculation unit 54 saves the effective work time 65B and the ineffective work time 65C in the work management information of the database unit 55 (step S40).
  • FIG. 7 is a diagram illustrating a configuration example of work management information stored in a database unit included in the management apparatus according to the first embodiment
  • work content 65A In the work management information, work content 65A, effective work time 65B that is work time for effective work, ineffective work time 65C that is work time for ineffective work, and presence time 65D that is total work time are associated. It is
  • the determination result of the work content in the work analysis unit 53 is registered in the work content 65A.
  • the work content 65A for example, a work name indicating the content of the work such as "attachment of A part" is registered.
  • the effective work time 65B includes an effective work interval 65B1, which is a time interval for effective work, and an effective start/end time 65B2, which indicates the start time and end time of the effective work time 65B.
  • the effective work interval 65B1 is the total time from the start time to the end time of the effective work time 65B.
  • the effective work interval 65B1 registers the time interval associated with the determination result of effective work.
  • the effective start/end time 65B2 registers the start time and end time of the effective work time 65B, which is the calculation result of the work time calculator 54.
  • the invalid work time 65C includes an invalid work interval 65C1 that is a time interval for invalid work, and an invalid start and end time 65C2 that indicates the start time and end time of the invalid work time 65C.
  • the invalid work interval 65C1 is the total time from the start time to the end time of the invalid work time 65C.
  • the invalid work interval 65C1 registers the time interval associated with the determination result of invalid work.
  • the invalid start/end time 65C2 the start time and end time of the invalid work time 65C, which is the calculation result of the work time calculator 54, are registered.
  • the presence time 65D registers the sum of the time interval of the effective work time 65B and the time interval of the ineffective work time 65C.
  • the analysis display unit 57 acquires work management information from the database unit 55 and acquires production amount information from the external cooperation unit 56 (step S50).
  • the analysis display unit 57 is, for example, a so-called BI (Business Intelligence) tool.
  • the analysis display unit 57 analyzes productivity using work management information and production information (step S60). Specifically, the analysis display unit 57 uses the work management information and the production amount information to determine (1) the ratio of valid time and invalid time, (2) the ratio of valid time and invalid time for each work content, ( 3) Production efficiency in working hours (effective working hours 65B+ineffective working hours 65C), (4) production efficiency in effective working hours (ideal production efficiency), etc. are analyzed. The analysis display unit 57 displays the analysis result on the display device.
  • the analysis display unit 57 may display the attribute information of the location tag 2 on the display device. In this case, the analysis display section 57 acquires the attribute information of the location tag 2 from the device management section 50 .
  • the analysis display unit 57 may display the attribute information of the smart tag 3A on the display device. In this case, the analysis display unit 57 acquires the attribute information of the smart tag 3A from the device management unit 50. FIG.
  • FIG. 8 is a diagram of a hardware configuration example that implements the management device according to the first embodiment
  • the management device 5 can be realized by the input device 300, the processor 100, the memory 200, and the output device 400.
  • An example of the processor 100 is a CPU (Central Processing Unit, central processing unit, processing unit, arithmetic unit, microprocessor, microcomputer, DSP (Digital Signal Processor)) or system LSI (Large Scale Integration).
  • Examples of the memory 200 are RAM (Random Access Memory) and ROM (Read Only Memory).
  • the management device 5 is implemented by the processor 100 reading and executing a computer-executable management program for executing the operation of the management device 5 stored in the memory 200 . It can also be said that the management program, which is a program for executing the operation of the management device 5 , causes a computer to execute the procedure or method of the management device 5 .
  • the management program executed by the management device 5 includes a device management unit 50, a map management unit 51, a location management unit 52, a work analysis unit 53, a work time calculation unit 54, an external cooperation unit 56, an analysis display 57, which are loaded onto the main memory and generated on the main memory.
  • the input device 300 receives acquisition information, production information, etc. from the data collection platform 6 and sends them to the memory 200 .
  • the memory 200 corresponds to the database unit 55.
  • the memory 200 stores database information, acquisition information, production information, identification correspondence information, attribute information of the location tags 2A and 2B, attribute information of the smart tags 3A and 3B, work management information, management programs, and the like.
  • Database information, acquisition information, output information, identification correspondence information, attribute information of location tags 2A and 2B, attribute information of smart tags 3A and 3B, work management information, management programs, and the like are read by processor 100 .
  • the memory 200 is used as a temporary memory when the processor 100 executes various processes.
  • the output device 400 sends the analysis result by the analysis display unit 57 to the display device.
  • the management program may be stored in a computer-readable storage medium in an installable or executable format and provided as a computer program product. Also, the management program may be provided to the management device 5 via a network such as the Internet. Some of the functions of the management device 5 may be implemented by dedicated hardware such as a dedicated circuit, and some may be implemented by software or firmware.
  • the work situation management system 1Y manages work contents by dividing them into effective work and ineffective work by implementing the operation flow shown in FIG.
  • the work situation management system 1Y can analyze and evaluate the work content only based on the work time of the effective work excluding the work time of the indefinite work of the ineffective work. Therefore, the work situation management system 1Y can accurately manage the work situation based on the working time of the effective work, which is the essential work directly linked to production, excluding uncertainties. As a result, the work situation management system 1Y can improve productivity.
  • Embodiment 2 Next, Embodiment 2 will be described with reference to FIG.
  • the work analysis unit 53 included in the management device 5 of the work situation management system 1Y learns work content and work effectiveness.
  • the management device 5 performs the same processing as in the first embodiment except for the work analysis unit 53 .
  • FIG. 9 is a diagram showing the configuration of the work analysis unit according to the second embodiment.
  • the work analysis unit 53 of the management device 5 includes a work content determination unit 151 and an effective work determination unit 161 . Note that the work content determination unit 151 and the effective work determination unit 161 may be arranged in the work analysis unit 53 included in the management device 5 of the work situation management system 1X.
  • the work content determination unit 151 generates a first learning model by learning the work content corresponding to the worker's position information from the worker's position information and the work content, and based on the first learning model.
  • the content of the worker's work is determined from the worker's position information.
  • a first learning model is a learning model for discriminating a worker's work content from the worker's position information.
  • the valid work determination unit 161 learns the work content determination criteria corresponding to the work content from the work content and the criteria for determining the validity or ineffectiveness of the work (hereinafter referred to as work content determination criteria). is generated, and the work content judgment criteria are calculated based on the second learning model.
  • the second learning model is a learning model for discriminating work content judgment criteria from work content.
  • the work content determination criteria include time information, which is information on the time when the location information was received, and the worker's position information.
  • first area, second area, first time, second time, etc. are work content determination criteria.
  • the work content determination unit 151 has a state observation unit 152 and a learning unit 153 .
  • the state observation unit 152 observes, as state variables, position information indicating the position of the worker within the work areas 80A to 80C and work content determination criteria, which are work content determination criteria.
  • the position information here is, for example, the coordinate information of the location tag 2, the satellite positioning information, the position information obtained from the reception intensity, the position information calculated from the reception intensity with a plurality of devices, and the reception with the equipment. Information such as distance calculated from the intensity.
  • the state variables may include motion information (movement information) indicating the movement of the worker.
  • the state observation unit 152 observes the worker's position information, the worker's motion information, and the work content judgment criteria as state variables.
  • the motion information includes, for example, at least one of motion information detected by the motion sensor unit 33 described above, a camera image obtained from the camera 72, and a camera moving image obtained from the camera 72.
  • the learning unit 153 learns work content determination criteria corresponding to position information and motion information according to a data set created based on state variables including position information, motion information, and work content determination criteria.
  • the work content determination criteria are criteria for specifying the work content.
  • the work content determination criteria indicate the worker's work content obtained from the position information and the motion information. That is, the learning unit 153 learns the work content corresponding to the position information and the motion information according to the data set created based on the state variables including the position information, the motion information, and the work content judgment criteria.
  • the work contents here are managed by itemizing.
  • the work contents are managed by itemizing, for example, the work of supplying the part X to the apparatus, the work of mounting the part Y, and the work of picking up the jig from another place.
  • the learning unit 153 may use any learning algorithm. As an example, a case where reinforcement learning is applied to the learning unit 153 will be described. Reinforcement learning is learning in which an agent (action subject) in a certain environment observes the current state and decides what action to take. Agents obtain rewards from the environment by selecting actions, and learn policies that maximize rewards through a series of actions. Q learning (Q-learning) or TD learning (TD-learning) is known as a representative method of reinforcement learning.
  • Q learning Q-learning
  • TD-learning TD learning
  • a general update formula (action-value table) for the action-value function Q(s, a) is represented by the following Expression (1).
  • t represents the environment at time t
  • a t represents the action at time t.
  • Action a t changes the environment to s t+1 .
  • r t+1 represents the reward obtained by changing the environment
  • represents the discount rate
  • represents the learning coefficient.
  • is in the range of 0 ⁇ 1
  • is in the range of 0 ⁇ 1.
  • the update formula represented by formula (1) increases the action value Q if the action value of the best action a at time t+1 is greater than the action value Q of the action a executed at time t, and conversely If so, the action value Q is made smaller.
  • the action value function Q(s, a) is updated so that the action value Q of action a at time t approaches the best action value at time t+1.
  • the best behavioral value in a certain environment will be propagated to the behavioral value in the previous environment.
  • the learning unit 153 includes a reward calculation unit 154 and a function update unit 155.
  • the reward calculator 154 calculates a reward r based on the state variables.
  • the remuneration calculation unit 154 calculates a remuneration r based on whether or not the user has corrected the classification of the work content.
  • Classification of work content is a process of classifying which work includes the work corresponding to the position information. If the work corresponding to the position information is not set to the appropriate work, the user corrects the work corresponding to the position information to the appropriate work. That is, when the work corresponding to the position information is not associated with an appropriate work, the user corrects the classification of the work content.
  • the remuneration calculation unit 154 increases the remuneration r (for example, gives a remuneration of "1") when the user does not correct the classification of work content.
  • the remuneration calculation unit 154 reduces the remuneration r (for example, gives a remuneration of "-1") when the user corrects the classification of work content.
  • the function updating unit 155 updates the function for determining the work content criteria according to the reward calculated by the reward calculating unit 154 .
  • the function updating unit 155 uses the action value function Q(s t , a t ) represented by Equation (1) as a function for calculating the work content judgment criteria.
  • the work content determination unit 151 uses the action value function Q(s t , a t ) to determine the work content corresponding to the position information.
  • the valid work determination unit 161 has a state observation unit 162 and a learning unit 163 .
  • the state observation unit 162 observes, as state variables, work content information (hereinafter referred to as work content information) indicated by work content judgment criteria and effectiveness judgment information that contributes to judgment of effectiveness.
  • the validity determination information includes, for example, criteria set by the user for determining that the work is valid, criteria set by the user for determining that the work is ineffective, This includes information on work content used for examination.
  • the validity determination information is a valid work determination criterion set by the user and an invalid work determination criterion set by the user, that is, a valid/invalid classification criterion.
  • the learning unit 163 learns effectiveness judgment information corresponding to work content information according to a data set created based on state variables including work content information and effectiveness judgment information. In other words, the learning unit 163 determines the criteria for valid work and the criteria for invalid work corresponding to the work content according to the data set created based on the state variables including the work content information and the effectiveness determination information. learn.
  • the learning unit 163 may use any learning algorithm.
  • the learning unit 163 uses, for example, the above-described reinforcement learning.
  • the learning unit 163 has a reward calculation unit 164 and a function update unit 165 .
  • the reward calculation unit 164 calculates rewards based on state variables.
  • the remuneration calculation unit 164 calculates a remuneration r based on whether or not the criterion for valid work or the criterion for invalid work has been modified by the user. For example, the reward calculation unit 164 increases the reward r (for example, gives a reward of "1") when the user does not modify the criterion, ie, modify the classification of validity or invalidity. On the other hand, the remuneration calculation unit 164 reduces the remuneration r (for example, gives a remuneration of "-1") when the user modifies the criterion.
  • the remuneration calculation unit 164 increases the remuneration r when the user does not modify the work content from valid work to invalid work, and decreases the remuneration r when the user corrects the work content from invalid work to valid work.
  • the function update unit 165 updates the function for determining the validity/invalidity classification criteria, that is, the validity determination information, according to the reward calculated by the reward calculation unit 164 .
  • the function updating unit 165 uses the action value function Q(s t , a t ) represented by Equation (1) as a function for calculating the valid/invalid classification criteria.
  • the effective work determination unit 161 uses the action-value function Q(s t , a t ) to calculate the effectiveness determination information corresponding to the work in the work content information, and based on the effectiveness determination information, the work content information Determine whether work is valid or invalid.
  • the work time calculation unit 54 calculates the work time for effective work and the work time for ineffective work.
  • the analysis display unit 57 calculates the production efficiency of the worker or the truck based on the production amount information, the working time of effective work, and the working time of ineffective work.
  • Embodiment 2 the case where reinforcement learning is applied to the learning algorithm used by the learning units 153 and 163 has been described, but the learning algorithm is not limited to reinforcement learning. Besides reinforcement learning, learning algorithms such as supervised learning, unsupervised learning, or semi-supervised learning can be applied to the learning units 153 and 163 .
  • the learning units 153 and 163 can also use deep learning that learns to extract the feature quantity itself as a learning algorithm, and other known methods such as neural networks, genetic programming, functional logic, etc.
  • Machine learning may be performed according to programming, support vector machines, and the like.
  • the work content determination unit 151 is used to learn the work content of the worker from the position information of the worker. It may be a device separate from the system 1Y.
  • the effective work determination unit 161 is used to learn the effectiveness of the work content, and is connected to the work situation management system 1Y via a network, for example, and is separate from the work situation management system 1Y. It may be a device. At least one of the work content determination unit 151 and the effective work determination unit 161 may be built in the work situation management system 1Y. Furthermore, at least one of the work content determination unit 151 and the effective work determination unit 161 may exist on a cloud server.
  • the management device 5 can accurately determine the work content of the worker from the worker's position information. becomes possible. Moreover, since the work analysis unit 53 includes the effective work determination unit 161, the management device 5 can accurately determine the effectiveness of the work content. In this way, the work situation management system 1Y determines the work content of the worker from the position information of the worker and determines the effectiveness of the work content. Accurate work status can be managed based on As a result, the work situation management system 1Y can improve productivity.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Factory Administration (AREA)

Abstract

作業状況管理システム(1X)が、固定位置に配置されるロケーションタグ(2)と、移動対象に付されてロケーションタグから識別情報を受信するスマートタグ(3)と、スマートタグから識別情報を受信する管理装置(5)と、を備え、管理装置は、受信した識別情報に対応するロケーションタグの位置情報を特定する位置管理部と、位置情報と作業内容とが対応付けされた作業内容対応情報に基づいて、特定された位置情報に対応する作業内容を特定し、特定した作業内容を、生産に寄与する作業に設定されている有効作業、または生産に寄与しない作業に設定されている無効作業の何れかに判別する作業解析部と、作業内容の時間情報と、有効作業および無効作業の少なくとも一方とに基づいて、有効作業時間および無効作業時間を算出する作業時間算出部と、有効作業時間および無効作業時間を用いて、移動対象による生産性を分析する分析部と、を有する。

Description

作業状況管理システム
 本開示は、作業者の作業状況を管理する作業状況管理システムに関する。
 従来、作業者が介在する生産工程においては、生産効率を向上させるため、作業者の作業内容、作業時間、生産量などのデータに基づいて作業者の作業状況を定量的に評価することが望まれている。
 例えば、特許文献1の作業評価システムは、作業者の位置情報の時系列データに基づいて、作業者の作業内容および作業時間を特定し、特定した作業内容に対応する生産量の時系列データと、作業者の作業時間とに基づいて、作業者の作業状況を定量的に評価している。
国際公開第2020/039559号
 しかしながら、上記特許文献1の技術では、部品の取り出しなどの生産に寄与しない無効な作業(以下、無効作業という)と、生産に寄与する有効な作業(以下、有効作業という)とを区別することができず、無効作業の作業時間を含んだ作業時間に対して作業状況を評価していた。このため、上記特許文献1の技術では、生産に寄与する有効作業の作業時間に基づいた正確な作業状況を管理できないという問題があった。
 本開示は、上記に鑑みてなされたものであって、生産に寄与する有効作業の作業時間に基づいた正確な作業状況を管理することができる作業状況管理システムを得ることを目的とする。
 上述した課題を解決し、目的を達成するために、本開示の作業状況管理システムは、作業領域内の固定位置に配置されるとともに、作業領域内で固有の識別情報を記憶するロケーションタグと、作業領域内で移動する移動対象に付されるとともに、ロケーションタグの周りの特定領域に入った場合にロケーションタグから識別情報を受信するスマートタグと、スマートタグから識別情報を受信し、識別情報に基づいて、移動対象による作業状況を管理する管理装置と、を備える。管理装置は、作業領域内でのロケーションタグの位置と識別情報とが対応付けされた識別対応情報に基づいて、スマートタグから受信した識別情報に対応するロケーションタグの位置である位置情報を特定する位置管理部と、位置情報と作業内容とが対応付けされた作業内容対応情報に基づいて、位置管理部が特定した位置情報に対応する作業内容および作業内容に対応する時間の情報である時間情報を特定し、特定した作業内容を、生産に寄与する作業に設定されている有効作業、または生産に寄与しない作業に設定されている無効作業の何れかに判別する作業解析部と、を有する。また、管理装置は、時間情報と、有効作業および無効作業の少なくとも一方とに基づいて、有効作業の作業時間である有効作業時間および無効作業の作業時間である無効作業時間を算出する作業時間算出部と、有効作業時間および無効作業時間を用いて、移動対象による生産性を分析する分析部と、を有する。
 本開示にかかる作業状況管理システムは、生産に寄与する有効作業の作業時間に基づいた正確な作業状況を管理することができるという効果を奏する。
実施の形態1にかかる作業状況管理システムの第1の構成例を示す図 実施の形態1にかかる管理装置が表示するスマートタグの軌跡を示す図 実施の形態1にかかる作業状況管理システムの第2の構成例を示す図 実施の形態1にかかる作業状況管理システムのシステム構成を示す図 実施の形態1にかかるロケーションタグ、スマートタグ、および外部システムの構成を説明するための図 実施の形態1にかかる作業状況管理システムが実行する作業状況の管理処理手順を示すフローチャート 実施の形態1にかかる管理装置が備えるデータベース部が格納する作業管理情報の構成例を示す図 実施の形態1にかかる管理装置を実現するハードウェア構成例を示す図 実施の形態2にかかる作業解析部の構成を示す図
 以下に、本開示の実施の形態にかかる作業状況管理システムを図面に基づいて詳細に説明する。
実施の形態1.
 図1は、実施の形態1にかかる作業状況管理システムの第1の構成例を示す図である。作業状況管理システム1Xは、作業者が作業を行う位置に基づいて作業者の作業内容および作業時間を判断し、作業者の作業状況を管理するシステムである。
 作業状況管理システム1Xは、有効作業と無効作業とを区別し、有効作業の作業時間を算出する。有効作業は、例えば、部品の組み立てによって製品を生産するといった生産に寄与すると設定されている作業である。無効作業は、例えば、部品または治具が作業者の手元になく、作業者が部品または治具を探しに行くといった生産に直接寄与しないと設定されている作業である。無効作業には、規定時間外での休息、設備の修理なども含まれる。
 実施の形態1における作業状況管理システム1Xは、例えば、工場の敷地内に配置された作業領域80において作業者の位置を特定し、作業者の位置に基づいて作業者の作業状況を管理する。作業状況管理システム1Xは、管理装置5と、複数のロケーションタグ2と、スマートタグ3と、ゲートウェイ機器4とを備えている。スマートタグ3は、複数であってもよいし、1つであってもよい。
 作業状況管理システム1Xでは、ロケーションタグ2、スマートタグ3、およびゲートウェイ機器4が作業領域80内に配置されている。なお、管理装置5は、作業領域80内に配置されてもよいし、作業領域80の外部に配置されてもよい。
 作業状況管理システム1Xは、作業領域80内での位置を特定するための情報をロケーションタグ2が記憶している。作業領域80内での位置を特定するための情報は、ロケーションタグ2を特定可能な識別番号(以下、ロケーションID(IDentifier)という)である。このように、作業状況管理システム1Xでは、ロケーションタグ2が、各々、自身を特定可能なロケーションIDを有している。
 ロケーションタグ2は、作業領域80内における装置、作業台、操作盤、会議室、休憩室、部品置き場、治具置き場、通路、柱などの種々の固定位置に配置される。ロケーションタグ2は、ロケーションタグ2との間で通信可能な範囲に入ったスマートタグ3と無線通信し、通信可能なスマートタグ3に対してロケーションIDを含んだ情報であるロケーション情報を送信する固定局である。ロケーション情報は、スマートタグ3の位置の特定に寄与する情報である。ロケーションIDは、ロケーションタグ2の位置と対応付けされて管理装置5で管理されている。
 スマートタグ3は、可搬可能なタグであり、作業者に所持されることによって移動局となる。スマートタグ3は、作業者に所持されることによって作業者の位置を特定するためのロケーションIDをロケーションタグ2から受信することができる。具体的には、スマートタグ3は、ロケーションタグ2の周りの特定領域に入った場合に、ロケーションタグ2と無線通信し得るように構成されており、無線通信可能となったロケーションタグ2からロケーションIDを含んだロケーション情報を受信する。ロケーションIDは、ロケーションタグ2の位置を特定するための情報であり、スマートタグ3によって受信されたロケーションIDは、スマートタグ3の位置を特定するための情報となる。
 なお、作業領域80内で位置が特定される移動対象は、作業者に限られるものではない。例えば、位置が特定される移動対象は台車などの移動可能な周辺設備であってもよい。この場合、スマートタグ3は、台車などの周辺設備に固定される。ここでは、位置が特定される対象が作業者である場合について説明する。
 スマートタグ3は、複数のロケーションタグ2と無線通信し得るように構成されている。スマートタグ3は、受信したロケーション情報と、ロケーション情報を受信した際の無線通信の受信強度とを対応付けしてゲートウェイ機器4に送信する。
 なお、スマートタグ3は、スマートタグ3を識別する情報(以下、スマートIDという)をゲートウェイ機器4に送信してもよい。この場合、スマートタグ3は、ロケーション情報と、ロケーション情報を受信した際の無線通信の受信強度と、スマートIDとを対応付けしてゲートウェイ機器4に送信する。
 ゲートウェイ機器4は、ロケーション情報を受信した時間の情報である時間情報と、ロケーション情報と、受信強度とを対応付けした情報(以下、取得情報という場合がある)を、有線通信または無線通信を介して管理装置5に送信する。
 なお、ゲートウェイ機器4が管理装置5に送信する時間情報は、ロケーション情報を受信した時間の情報に限らず、ロケーション情報を送信した時間の情報であってもよい。また、作業状況管理システム1Xでは、スマートタグ3が時間情報をゲートウェイ機器4に送信してもよい。この場合、スマートタグ3は、時間情報と、ロケーション情報と、受信強度とを対応付けしてゲートウェイ機器4に送る。この場合の時間情報は、スマートタグ3がロケーション情報を受信した時間の情報または送信した時間の情報である。
 管理装置5は、ゲートウェイ機器4からロケーション情報を含んだ取得情報を受信する。管理装置5は、ロケーション情報に含まれるロケーションIDに基づいて、作業者の作業領域80内での位置を特定し、位置情報として管理するコンピュータである。
 管理装置5は、ロケーションタグ2が設置された敷地内(作業領域80)の地図の情報である地図情報を有している。管理装置5は、地図情報に含まれるロケーションタグ2の座標の情報である座標情報と、ロケーションタグ2のロケーションIDとが対応付けされた情報(以下、識別対応情報という)を記憶している。管理装置5は、後述するデータベース部55などで識別対応情報を記憶しておく。
 管理装置5は、ロケーションIDおよび識別対応情報を用いて、ロケーションタグ2の位置を特定する。このように、ロケーションタグ2は、自身では位置情報を有しておらず、管理装置5が、識別対応情報と、ロケーションタグ2に固有のロケーションIDとによってロケーションタグ2の位置(座標)を特定する。これにより、管理装置5は、ロケーションタグ2の位置に対応するスマートタグ3の位置を特定し管理する。
 なお、ここでは、ロケーションタグ2が自身の位置情報を有しておらずロケーションIDを有している場合について説明するが、ロケーションタグ2が自身の位置情報を有していてもよい。ロケーションタグ2が自身の位置情報を有している場合、ロケーションタグ2は、ロケーション情報にロケーションIDおよび位置情報を含めてスマートタグ3に送信する。
 管理装置5は、ゲートウェイ機器4から取得情報を受信すると、取得情報に含まれる時間情報に基づいて、1つのスマートタグ3が同時間帯に受信したロケーションIDを特定する。
 ここで同時間帯とは、受信した時間情報が示す時間のうち同一の時間とみなす時間(期間)である。例えば、スマートタグ3が、複数のロケーションタグ2の近くに位置している場合、スマートタグ3は、複数のロケーションタグ2のそれぞれからロケーションIDを同時に受信する場合がある。この場合、ゲートウェイ機器4は、スマートタグ3から受信した複数のロケーションIDのそれぞれに同じ時間を示す時間情報を付すこととなる。
 ところが、スマートタグ3が移動しておらず、同じ場所にいた場合であっても、複数のロケーションタグ2のそれぞれに対し、通信タイミングがずれる可能性がある。この場合、ゲートウェイ機器4またはスマートタグ3は、各ロケーションIDに対して異なる時間情報を対応付けることとなる。管理装置5は、このような通信タイミングがずれただけのロケーションIDに対しては同時間に取得されたロケーションIDと扱うため、ロケーションIDに付された時間情報に差があった場合でも、特定の期間に含まれる時間については同時間のロケーションIDとする。管理装置5は、この特定の期間として、例えば、スマートタグ3とゲートウェイ機器4との間の通信周期を用いる。
 管理装置5は、同時間に受信したロケーション情報のうち、最も高い受信強度に対応するロケーション情報を選択し、選択したロケーション情報を有するロケーションタグ2の近くにスマートタグ3が存在すると判断する。そして、管理装置5は、識別対応情報と、選択したロケーション情報に含まれるロケーションIDとに基づいて、地図情報で示される地図上でのスマートタグ3の位置を特定し表示装置に表示する。すなわち、管理装置5は、選択したロケーション情報に含まれるロケーションIDに紐づけられた座標情報が示す位置を、地図上でスマートタグ3の位置として表示する。表示装置は、管理装置5が備えていてもよいし、管理装置5とは別構成の装置であってもよい。
 なお、スマートタグ3が、管理装置5の代わりに、同時間に受信したロケーションタグ2のうち、最も高い受信強度に対応するロケーション情報を選択してもよい。この場合、スマートタグ3は、選択したロケーション情報を有するロケーションタグ2の近くに自身のスマートタグ3が存在すると判断し、選択したロケーション情報をゲートウェイ機器4に送信する。
 管理装置5は、時系列で地図上にスマートタグ3の位置を表示させる。管理装置5は、スマートタグ3の表示位置を繋いで表示させることで、スマートタグ3の軌跡を表示させることができる。
 図2は、実施の形態1にかかる管理装置が表示するスマートタグの軌跡を示す図である。図2では、管理装置5が表示装置に表示させるスマートタグ3の軌跡の一例を示している。図2では、特定期間におけるスマートタグ3の移動開始位置を移動開始位置Paで示し、スマートタグ3の移動終了位置を移動終了位置Pbで示している。また、特定期間におけるスマートタグ3の軌跡を軌跡L1で示している。
 管理装置5は、スマートタグ3の軌跡L1に関するデータ、例えば、時間情報と、ロケーションIDから導かれるスマートタグ3の位置情報とを用いて、作業者の作業状況を分析する。
 ここで、作業状況管理システム1Xの他の構成例について説明する。図3は、実施の形態1にかかる作業状況管理システムの第2の構成例を示す図である。図3の各構成要素のうち図1に示す作業状況管理システム1Xと同一機能を達成する構成要素については同一符号を付しており、重複する説明は省略する。
 図1で説明した作業状況管理システム1Xでは、ゲートウェイ機器4と管理装置5とが直接通信接続されている。作業状況管理システムの第2の構成例である作業状況管理システム1Yは、複数のゲートウェイ機器4が、データ収集プラットフォーム6を介して管理装置5に接続されている。
 作業状況管理システム1Yは、作業状況管理システム1Xと同様に、作業者の作業状況を管理するシステムである。作業状況管理システム1Yは、管理装置5と、複数のロケーションタグ2と、複数のスマートタグ3と、複数のゲートウェイ機器4とを備えている。
 作業状況管理システム1Yでは、ロケーションタグ2、スマートタグ3、およびゲートウェイ機器4が作業領域80A~80C内に配置されている。作業領域80A~80C内には、それぞれ、作業領域80と同様に、ロケーションタグ2、スマートタグ3、およびゲートウェイ機器4が配置されている。なお、管理装置5およびデータ収集プラットフォーム6は、作業領域80A~80Cの何れかに配置されてもよいし、作業領域80A~80Cの外部に配置されてもよい。
 作業領域80A~80C内では、作業領域80と同様の処理が実行される。作業領域80A~80C内の各ゲートウェイ機器4は、取得情報をデータ収集プラットフォーム6に送信する。
 データ収集プラットフォーム6は、作業領域80A~80C内の各ゲートウェイ機器4から取得情報を受信して管理装置5に送信する。なお、管理装置5は、クラウドサーバ上に設けられてもよい。この場合、データ収集プラットフォーム6は、管理装置5の機能が搭載されたクラウドサーバに取得情報を送信する。
 データ収集プラットフォーム6は、データ収集を目的としたソフトウェア(S/W:SoftWare)プラットフォームであり、工業用PC(Personal Computer)に搭載されることでデータ収集を実行することが可能になるデータ収集装置となる。
 データ収集プラットフォーム6は、各種の通信規格に準じたデータ収集機能部を複数有している。データ収集プラットフォーム6は、各ゲートウェイ機器4が異なる通信規格で通信する場合であっても、ゲートウェイ機器4の各通信規格に対応するデータ収集機能部を用いることで、異なる通信規格を有するゲートウェイ機器4からロケーションID等を含んだデータである取得情報を収集することができる。
 データ収集プラットフォーム6は、ゲートウェイ機器4からのデータ収集に加え、後述する外部システム7からもデータ収集が可能である。データ収集プラットフォーム6は、ゲートウェイ機器4および外部システム7から取得したデータを、管理装置5で利用可能なデータ形式に加工し、加工したデータを、管理装置5に送信する。
 作業状況管理システム1X,1Yは、同様の処理を実行するので、以下では、図3に示す作業状況管理システム1Yについて詳細に説明する。なお、管理装置5は、作業状況管理システム1Xに配置される場合であっても、作業状況管理システム1Yに配置される場合と同様の処理を実行する。
 図4は、実施の形態1にかかる作業状況管理システムのシステム構成を示す図である。図5は、実施の形態1にかかるロケーションタグ、スマートタグ、および外部システムの構成を説明するための図である。
 図4および図5では、図3に示す作業状況管理システム1Yおよび外部システム7の機能ブロックを示している。また、図4および図5では、図3に示す作業状況管理システム1Yが、ロケーションタグ2A,2Bと、スマートタグ3A,3Bとを備える場合を示している。ロケーションタグ2A,2Bは、ロケーションタグ2と同様のタグであり、スマートタグ3A,3Bは、スマートタグ3と同様のタグである。以下、ロケーションタグ2A,2Bを区別しない場合には、ロケーションタグ2A,2Bをロケーションタグ2として説明する場合がある。
 図4および図5に示す構成要素のうち、工場の敷地内に設置され固定局となるロケーションタグ2A,2Bと、作業者に設置され移動局となるスマートタグ3A,3Bと、ゲートウェイ機器4と、データ収集プラットフォーム6と、管理装置5とが作業状況管理システム1Yの構成要素である。図5では、図4に示した、勤怠管理システム7B、作業管理システム7C、およびスケジュール管理システム7Dの図示を省略している。
 図4および図5では、ロケーションタグ2A,2Bとスマートタグ3Aとが、同じ作業領域(例えば、作業領域80A~80Cの何れか)に配置されている場合について説明する。なお、スマートタグ3A,3Bは、同様の構成を有しているので、スマートタグ3Bについての説明は省略する。
 また、図4および図5では、ロケーションタグ2A,2Bが、ロケーションIDとともに、ロケーションタグ2A,2Bの座標を示す座標情報をロケーション情報に含めてスマートタグ3Aに送信する場合について説明する。
 図4に示すように、外部システム7は、例えば、生産管理システム7Aと、勤怠管理システム7Bと、作業管理システム7Cと、スケジュール管理システム7Dとを有している。
 生産管理システム7Aは、生産ラインでの生産量および生産性を管理するシステムである。勤怠管理システム7Bは、作業者の勤怠を管理するシステムである。作業管理システム7Cは、作業者の作業を管理するシステムである。スケジュール管理システム7Dは、作業者毎に時間毎の作業内容をスケジュール情報として管理するシステムである。
 外部システム7は、データ収集プラットフォーム6に接続されている。すなわち、生産管理システム7A、勤怠管理システム7B、作業管理システム7C、およびスケジュール管理システム7Dは、データ収集プラットフォーム6に接続されている。
 図5に示すように、ロケーションタグ2は、それぞれロケーション情報送信部21を有している。ロケーション情報送信部21は、ロケーションタグ2の外部に位置しているスマートタグ3Aとの間で通信を確立すると、ロケーションタグ2の内部に設定されているロケーション情報を、特定の通信方式でスマートタグ3Aに送信する。
 スマートタグ3Aは、ロケーション情報受信部31と、ロケーション判定部32と、モーションセンサ部33と、情報送信部34とを有している。
 ロケーション情報受信部31は、ロケーションタグ2から送信されてくるロケーション情報を受信して、ロケーション判定部32に送る。ロケーション情報受信部31は、ロケーションタグ2からロケーション情報を受信する際に、受信強度を測定し、ロケーション情報と受信強度とを対応付けしてロケーション判定部32に送信する。
 ロケーション判定部32は、ロケーション情報に基づいて、自身の位置、すなわちスマートタグ3Aの位置を判定する。具体的には、ロケーション判定部32は、同時間帯に受信した複数のロケーション情報のうち、受信した際の受信強度が高いロケーション情報を選択する。
 ロケーション判定部32は、例えば、同時間帯に受信したロケーションタグ2A,2Bのロケーション情報のうち、受信した際の受信強度が最も高いロケーション情報を選択する。
 なお、ロケーション判定部32が選択する受信強度が高いロケーション情報は、受信したロケーション情報の受信強度のうち最も高い受信強度を示すロケーション情報のみに限らない。例えば、ロケーション判定部32は、受信強度が高い上位N(Nは2以上の自然数)個のロケーション情報を選択してもよい。また、ロケーション判定部32は、受信強度が特定値以上のロケーション情報を選択してもよい。
 ロケーション判定部32は、選択したロケーション情報に対応するロケーションタグ2の近傍にスマートタグ3Aが位置していると判定する。ロケーション判定部32は、選択した1または複数のロケーション情報をロケーション判定結果情報として情報送信部34に送信する。ロケーション判定結果情報には、ロケーション情報と、このロケーション情報に対応する受信強度とが含まれている。
 なお、受信強度が高いロケーション情報が、最も高い受信強度を示す1つのロケーション情報のみの場合、スマートタグ3Aから管理装置5へ送信されるロケーション情報は1つになる。この場合、管理装置5は、上述した複数のロケーション情報から特定のロケーション情報を選択する機能を有していなくてもよい。以下では、ロケーション判定部32が選択するロケーション情報が、受信強度が高い上位N個のロケーション情報である場合について説明する。
 スマートタグ3Aのモーションセンサ部33は、スマートタグ3Aの動作を検出する。モーションセンサ部33は、振動センサ、加速度センサ等のセンサを有しており、作業者または台車の動作を分析するためのデータを取得する。
 モーションセンサ部33は、例えば、作業者がスマートタグ3Aを保持している場合、加速度センサが検出した加速度に基づいて、部品の取り出しによって作業者がしゃがむ動作などを検知することができる。また、モーションセンサ部33は、例えば、スマートタグ3Aが台車に設置されている場合、振動センサが検知した振動に基づいて、台車への積み荷の開始および終了、台車の移動などを検知することができる。モーションセンサ部33は、取得したデータ(センシング結果)をモーション情報(モーションセンサ信号)として情報送信部34に送信する。モーション情報の例は、スマートタグ3Aの加速度、スマートタグ3Aの振動、作業者がしゃがむ動作、台車への積み荷の開始タイミング、台車への積み荷の終了タイミング、台車の移動などである。
 情報送信部34は、ロケーション判定部32からのロケーション判定結果情報と、モーションセンサ部33からのモーション情報とを対応付けしてゲートウェイ機器4に送信する。
 ゲートウェイ機器4は、ロケーション判定結果情報とモーション情報と時間情報とが対応付けされた取得情報を、データ収集プラットフォーム6を介して、管理装置5に送信する。ここでの取得情報は、ロケーション情報と、このロケーション情報に対応する受信強度と、モーション情報と、時間情報とが対応付けされた情報である。
 生産管理システム7Aは、製品の生産を管理するシステムであり、システムの一部に、例えば、生産高カウント装置71と、機械装置70と、撮像装置であるカメラ72と、コードリーダ73とを備えている。
 生産高カウント装置71は、機械装置70が生産した製品の生産高をカウントする装置である。生産高カウント装置71には、機械装置70と、カメラ72と、コードリーダ73とが接続されている。
 カメラ72は、カメラ72から見て面前の製品を撮影することで製品の通過を検知して生産高カウント装置71に通知する。コードリーダ73は、製品に付加されたバーコードを読み込むことで製品の通過を検知してコードリーダ73に通知する。
 生産高カウント装置71は、生産高カウンタ71Aと、情報送信部71Bとを有している。生産高カウンタ71Aは、カメラ72からの通知回数、およびコードリーダ73からの通知回数をカウントする。生産高カウンタ71Aは、通知回数のカウント結果を生産高情報として情報送信部71Bに送信する。生産高カウンタ71Aが送信する生産高情報には、通知回数のカウント結果と、このカウント結果に対応する時間情報とが含まれている。情報送信部71Bは、データ収集プラットフォーム6を介して管理装置5に生産高情報を送信する。
 図4に示すように、管理装置5は、デバイス管理部50と、地図管理部51と、位置管理部52と、作業解析部53と、作業時間算出部54と、データベース部55と、外部連携部56と、解析表示部57とを有している。
 デバイス管理部50は、スマートタグ3Aから取得情報を受信する。デバイス管理部50は、ロケーション情報に対応する属性情報を記憶しておくことで属性情報を管理する。デバイス管理部50は、スマートタグ3Aから取得情報を受信すると、受信した取得情報に含まれるロケーション情報の属性情報を読み出す。
 地図管理部51は、工場内の地図情報を記憶しておき管理する。位置管理部52は、スマートタグ3Aの位置と、地図管理部51が管理している地図情報とを対応付けする。位置管理部52は、対応付けした情報をスマートタグ3Aの位置情報として記憶することで、スマートタグ3Aの位置情報を管理する。作業解析部53は、位置管理部52が管理しているスマートタグ3Aの位置情報に基づいて、作業者の作業内容の判別と、作業内容が有効作業に属するか無効作業に属するかの判別とを行う。作業解析部53は、判別結果を作業時間算出部54に送る。
 作業時間算出部54は、生産に寄与する作業に設定されている有効作業または生産に寄与しない作業に設定されている無効作業の、開始時間である作業開始時間および終了時間である作業終了時間に基づいて、有効作業および無効作業の作業時間を算出する。作業時間算出部54は、作業内容と、有効作業の作業時間と、無効作業の作業時間とを対応付けした情報を、作業管理情報としてデータベース部55に蓄積させる。
 データベース部55は、作業管理情報を蓄積する。また、データベース部55は、場所毎(位置情報に対する領域毎)の作業内容を作業者毎および台車毎に区分した情報を、データベース情報として格納しておく。データベース情報は、位置情報と作業内容とが対応付けされた情報である。データベース部55は、移動対象毎のデータベース情報を格納しておく。
 外部連携部56は、データ収集プラットフォーム6を介して、外部システム7から生産量等の情報を含んだ生産高情報などを取得し、解析表示部57に送る。また、外部連携部56は、管理装置5が生成した情報を、データ収集プラットフォーム6を介して、外部システム7に送る。外部連携部56は、例えば、管理装置5が分析した作業領域80A~80Cにおける生産性を生産管理システム7Aに送る。
 分析部である解析表示部57は、作業領域80A~80Cにおける生産性を分析する。具体的には、解析表示部57は、生産高情報、およびデータベース部55に蓄積された作業時間に基づいて、例えば、作業者または台車の生産効率を算出する。解析表示部57は、生産効率などの分析結果を表示装置に表示させる。
 以下、管理装置5の構成について詳細に説明する。なお、ここでは、スマートタグ3Aが、ロケーションタグ2Aからロケーション情報を受信した場合について説明する。
 管理装置5のデバイス管理部50は、ロケーション情報に対応するロケーションタグ2Aの属性情報、スマートタグ3Aの識別情報であるスマートIDに対応するスマートタグ3Aの属性情報を管理する。
 ロケーションタグ2Aの属性情報は、例えば、ロケーションタグ2Aの工場敷地内における設置場所を示す座標情報、ロケーションタグ2Aの製造番号、ロケーションタグ2Aの管理部門の情報などである。
 スマートタグ3Aの属性情報は、例えば、スマートタグ3Aが取り付けられた対象(作業者、台車など)、スマートタグ3Aの製造番号、スマートタグ3Aの管理部門の情報などである。
 ロケーションタグ2Aの属性情報は、ロケーションタグ2Aの識別情報であるロケーションIDが付されて管理装置5で管理されている。すなわち、管理装置5は、ロケーションタグ2Aの属性情報と、ロケーションIDとが対応付けされた情報(以下、ロケーションID属性情報という)を記憶しておく。ロケーションタグ2Aの属性情報のうちの座標情報と、ロケーションIDとが対応付けされた情報が前述の識別対応情報である。
 デバイス管理部50は、例えば、データ収集プラットフォーム6からロケーションIDを受け取った場合、ロケーションID属性情報から、ロケーションIDに対応するロケーションタグ2Aの属性情報を読み出す。デバイス管理部50は、例えば、ロケーションIDおよびロケーションID属性情報に基づいて、ロケーションタグ2Aの位置情報、ロケーションタグ2Aの製造番号、ロケーションタグ2Aの管理部門の情報などを特定する。
 ロケーションタグ2Aの属性情報には、識別対応情報が含まれているので、デバイス管理部50は、識別対応情報およびロケーション情報を位置管理部52に送る。また、デバイス管理部50は、属性情報およびロケーションIDを解析表示部57に送る。
 なお、ロケーション情報にロケーションタグ2Aの座標情報が含まれている場合、属性情報には、識別対応情報が含まれていなくてもよい。この場合、デバイス管理部50は、ロケーション情報を位置管理部52に送る。
 また、スマートタグ3Aの属性情報は、スマートタグ3Aの識別情報であるスマートIDが付されて管理装置5で管理されている。すなわち、管理装置5は、スマートタグ3の属性情報と、スマートIDとが対応付けされた情報(以下、スマートID属性情報という)を記憶しておく。
 デバイス管理部50は、例えば、データ収集プラットフォーム6からスマートIDを受け取った場合、スマートID属性情報から、スマートIDに対応するスマートタグ3Aの属性情報を読み出す。デバイス管理部50は、例えば、スマートIDおよびスマートID属性情報に基づいて、スマートタグ3Aの製造番号、スマートタグ3Aの管理部門の情報などを特定する。
 位置管理部52は、識別対応情報およびロケーションIDに基づいて、ロケーションタグ2Aの近傍に位置するスマートタグ3Aの座標を特定する。位置管理部52は、スマートタグ3Aの座標と、地図管理部51が記憶している地図情報とを対応付けし、対応付けした情報を、スマートタグ3Aの位置情報として記憶しておく。スマートタグ3Aの位置情報は、地図情報上での座標で示される。
 作業解析部53は、位置管理部52からスマートタグ3Aの位置情報を読み出す。作業解析部53は、スマートタグ3Aの位置情報およびデータベース情報に基づいて、作業者の作業内容の判別、作業内容が有効作業に属するか無効作業に属するかの判別を実行する。作業解析部53は、例えば、作業者の位置が、装置、作業台、または操作盤から特定範囲内である場合、作業内容が有効作業に属すると判定する。一方、作業解析部53は、例えば、作業者の位置が、会議室、休憩室、部品置き場、治具置き場、または通路から特定範囲内である場合、作業内容が無効作業に属すると判定する。
 これにより、作業状況管理システム1Yにおける管理装置5は、作業者の作業を有効作業と無効作業とに分けたうえで、作業者の作業状況を分析することが可能となる。したがって、管理装置5は、有効作業において更なる改善の示唆を表示でき、無効作業において無駄作業削減の示唆を表示できる。
 つぎに、作業状況管理システム1Yにおける作業状況の管理処理手順について説明する。図6は、実施の形態1にかかる作業状況管理システムが実行する作業状況の管理処理手順を示すフローチャートである。
 管理装置5では、デバイス管理部50が、取得情報を受信し、取得情報からスマートIDを抽出する。デバイス管理部50は、スマートIDを取得すると、スマートIDに対応するスマートタグ3Aの属性情報を読み出し、読み出した属性情報に基づいてスマートタグ3Aが作業者に付されているものか、台車に付されているものかを判断する。すなわち、デバイス管理部50は、スマートタグ3Aが付されている移動対象の種別を判断する。デバイス管理部50は、この判断結果を位置管理部52に送る。また、デバイス管理部50は、取得情報からロケーション情報を抽出し、位置管理部52に送る。
 続いて、位置管理部52は、ロケーション情報にロケーションタグ2Aの座標情報が含まれている場合、ロケーション情報からロケーションタグ2Aの座標情報を抽出する。位置管理部52は、この座標情報と、地図管理部51の地図情報とに基づいて、デバイス管理部50が種別を判断した移動対象(作業者または台車)の位置を判断する。
 一方、ロケーション情報にロケーションタグ2Aの座標情報が含まれていない場合、位置管理部52は、ロケーション情報からロケーションIDを抽出する。また、位置管理部52は、データベース部55から識別対応情報を読み出す。位置管理部52は、識別対応情報およびロケーションIDに基づいて、ロケーションタグ2Aの近傍に位置するスマートタグ3Aの座標を特定する。そして、位置管理部52は、スマートタグ3Aの座標と、地図管理部51の地図情報とに基づいて、デバイス管理部50が種別を判断した移動対象の位置を判断する。
 位置管理部52は、移動対象の位置をスマートタグ3Aの位置情報として作業解析部53に送る。また、位置管理部52は、移動対象の種別を作業解析部53に送る。作業解析部53は、移動対象の種別およびスマートタグ3Aの位置情報に基づいて、有効無効の判断対象となる作業内容を特定する(ステップS10)。作業解析部53は、以下の方法で作業内容を特定する。
 作業内容は、工場敷地内にいる作業者毎および台車毎に予め決められているので、作業解析部53は、作業者または台車の位置に基づいて作業内容を特定する。すなわち、作業解析部53は、作業者または台車の位置で想定される作業内容に基づいて、作業者または台車の作業内容を判別する。具体的には、作業解析部53は、作業者または台車の位置と、作業内容とが対応付けされた情報であるデータベース情報に基づいて、位置管理部52が特定した位置情報に対応する作業内容を特定する。
 場所毎の作業内容は、作業者毎および台車毎に区分されてデータベース情報としてデータベース部55に格納されており、作業解析部53は、このデータベース情報に基づいて作業者または台車での作業内容を特定する。作業解析部53は、例えば、組み立て装置が配置されている場所に作業者が位置している場合、作業内容として、作業者が製品の組み立て作業を実施中であると判定する。また、作業解析部53は、組み立て装置が配置されている場所に台車が位置している場合、作業内容として、台車が製品の組み立てに必要な部品を搬送中であると判定する。
 スケジュール管理システム7Dは、作業者毎に時間毎の作業内容をスケジュール情報として管理している。外部連携部56は、外部システム7と連携している。外部連携部56は、スケジュール管理システム7Dからスケジュール情報を取得し、作業解析部53に送る。また、外部連携部56は、生産管理システム7Aから生産高情報を取得し、解析表示部57に送る。
 作業解析部53は、スケジュール情報を参照することにより、作業者または台車の作業内容を詳細に判定する。作業解析部53は、例えば、組み立て装置が配置されている場所に作業者が位置している場合、この場所に位置する時間の長さと、スケジュール情報の作業スケジュールとに基づいて、作業者が製品の組み立て作業のうち、何れの作業を実施中かを作業状況として判定する。
 つぎに、作業解析部53は、スマートタグ3Aからスマートタグ3Aの振動のデータであるモーション情報を取得する。作業解析部53は、取得したモーション情報を、例えば、以下の指針で解析することにより、作業者または台車の作業内容を特定する。
 (1)移動対象が作業者の場合
 ・最初の振動があると作業の開始と判定
 ・振動の中断があると作業の第1の工程の完了と判定
 ・振動の中断から再開があると第2の工程の開始と判定
 ・振動の開始および中断の回数により全工程の完了を判定
 (2)移動対象が台車の場合
 ・最初の振動があると荷下ろし作業の開始と判定
 ・定期的な振動があると荷下ろし作業中と判定
 ・連続的な振動の停止、または台車の移動を示す振動があると荷下ろし作業の終了と判定
 続いて、作業解析部53は、作業内容の有効無効を判定する(ステップS20)。ここで、作業解析部53が、作業状況の作業内容のうち有効作業と無効作業とを判別する手順について説明する。作業解析部53は、データベース部55のデータベース情報と、位置管理部52が特定したスマートタグ3Aの位置情報と、取得情報に含まれる時間情報と、モーション情報とを用いて、作業内容が有効作業であるか無効作業であるかの判定を行う。作業解析部53は、例えば、以下の基準に基づいて、作業内容が無効作業であるか否かの判定を実施する。
・作業中断から作業開始までの時間が基準時間(インターバルの許容時間)を超える
・作業者が作業場所から、想定外の場所に移動する
 このように、作業解析部53は、スマートタグ3Aの位置情報および時間情報に基づいて得られる作業内容のうち、無効作業と判定可能な無効作業のケース(基準)を準備しておき、無効作業ケースに該当するか否かによって有効作業か無効作業かを判定する。なお、作業解析部53は、スマートタグ3Aの位置情報および時間情報に基づいて得られる作業内容のうち、有効作業と判定可能な有効作業のケース(基準)を準備しておき、有効作業ケースに該当するか否かによって有効作業か無効作業かを判定してもよい。
 作業解析部53は、作業中断から作業開始までの時間が基準時間を超えるケース、すなわち、例えば、作業者が作業をさぼっているという無効作業を判定する場合、スマートタグ3Aの位置情報および時間情報と、モーション情報とを用いて無効作業を判定する。具体的には、作業解析部53は、時間情報およびモーション情報に基づいて、有効作業を確認できない時間間隔(期間)を算出し、算出した時間間隔が基準時間を超える場合、その時間間隔の作業を無効作業であると判定する。
 作業解析部53は、作業者が作業場所から想定外の場所に移動するケース、すなわち、例えば、治具や部品が無く作業者が探しに行くという無効作業を判定する場合、スマートタグ3Aの位置情報および時間情報と、データベース情報とを用いて無効作業を判定する。具体的には、作業解析部53は、位置情報に基づいて作業者の位置を確認し、確認した位置が、データベース情報で示される有効作業と判定可能な位置(領域)に属するか否かを確認する。
 作業解析部53は、スマートタグ3Aの位置が有効作業と判定可能な位置に属すると確認できない場合、この確認できない間の位置情報および時間間隔の作業を無効作業と判定する。
 一方、作業解析部53は、スマートタグ3Aの位置が有効作業と判定可能な位置に属すると確認できた場合、この確認できた間の位置情報および時間間隔の作業を有効作業と判定する。
 作業解析部53は、作業内容を有効作業または無効作業と判定した後、判定結果をデータベース部55の作業管理情報に反映する。
 作業解析部53は、有効作業の作業内容である有効作業内容に基づいて、有効作業の開始時間および終了時間を算出する(ステップS30)。また、作業解析部53は、無効作業の作業内容である無効作業内容に基づいて、無効作業の開始時間および終了時間を算出する(ステップS31)。作業解析部53は、ステップS30の処理と、ステップS31の処理とを何れの順番で実行してもよい。
 例えば、作業時間算出部54は、無効作業の時間間隔の算定元となった無効作業内容の時間情報を用いて、無効作業の作業開始時間および作業終了時間を算出する。また、作業時間算出部54は、例えば、有効作業の作業開始時間および作業終了時間を、無効作業の作業終了時間および作業開始時間に基づいて算出する。この場合、作業時間算出部54は、無効作業の作業開始時間を有効作業の作業終了時間とし、無効作業の作業終了時間を有効作業の作業開始時間とする。
 なお、例えば、作業時間算出部54は、有効作業の時間間隔の算定元となった有効作業内容の時間情報を用いて、有効作業の作業開始時間および作業終了時間を算出してもよい。また、作業時間算出部54は、例えば、無効作業の作業開始時間および作業終了時間を、有効作業の作業終了時間および作業開始時間に基づいて算出してもよい。この場合、作業時間算出部54は、有効作業の作業開始時間を無効作業の作業終了時間とし、有効作業の作業終了時間を無効作業の作業開始時間とする。
 また、作業時間算出部54は、有効作業の作業開始時間および作業終了時間に基づいて、有効作業の作業時間である後述の有効作業時間65Bを算出する。また、作業時間算出部54は、無効作業の作業開始時間および作業終了時間に基づいて、無効作業の作業時間である後述の無効作業時間65Cを算出する。このように、作業時間算出部54は、時間情報と、有効作業および無効作業の少なくとも一方と、に基づいて、有効作業時間65Bおよび無効作業時間65Cを算出する。
 作業時間算出部54は、算出結果をデータベース部55に反映する。すなわち、作業時間算出部54は、有効作業時間65Bおよび無効作業時間65Cをデータベース部55の作業管理情報に保存する(ステップS40)。
 ここでデータベース部55が格納する作業管理情報について説明する。図7は、実施の形態1にかかる管理装置が備えるデータベース部が格納する作業管理情報の構成例を示す図である。
 作業管理情報では、作業内容65Aと、有効作業の作業時間である有効作業時間65Bと、無効作業の作業時間である無効作業時間65Cと、トータルの作業時間である在場時間65Dとが対応付けされている。
 作業内容65Aには、作業解析部53における作業内容の判定結果が登録される。作業内容65Aには、例えば、「A部取り付け作業」といった作業の内容を示す作業名が登録される。
 有効作業時間65Bには、有効作業の時間間隔である有効作業間隔65B1と、有効作業時間65Bの開始時間および終了時間を示す有効開始終了時間65B2とが含まれている。有効作業間隔65B1は、有効作業時間65Bの開始時間から終了時間までの合計時間である。
 有効作業間隔65B1には、有効作業の判定結果に伴う時間間隔が登録される。有効開始終了時間65B2には、作業時間算出部54の算出結果である有効作業時間65Bの開始時間および終了時間が登録される。
 無効作業時間65Cには、無効作業の時間間隔である無効作業間隔65C1と、無効作業時間65Cの開始時間および終了時間を示す無効開始終了時間65C2とが含まれている。無効作業間隔65C1は、無効作業時間65Cの開始時間から終了時間までの合計時間である。
 無効作業間隔65C1には、無効作業の判定結果に伴う時間間隔が登録される。無効開始終了時間65C2には、作業時間算出部54の算出結果である無効作業時間65Cの開始時間および終了時間が登録される。在場時間65Dには、有効作業時間65Bの時間間隔と無効作業時間65Cの時間間隔との合計が登録される。
 解析表示部57は、データベース部55から作業管理情報を取得し、外部連携部56から生産高情報を取得する(ステップS50)。解析表示部57は、例えば、いわゆるBI(Business Intelligence)ツールである。
 解析表示部57は、作業管理情報および生産高情報を用いて生産性を分析する(ステップS60)。具体的には、解析表示部57は、作業管理情報および生産高情報を用いて、(1)有効時間と無効時間の割合、(2)作業内容毎の有効時間と無効時間との割合、(3)作業時間(有効作業時間65B+無効作業時間65C)における生産効率、(4)有効時間における生産効率(あるべき生産効率)などを分析する。解析表示部57は、分析結果を表示装置に表示させる。
 なお、解析表示部57は、ロケーションタグ2の属性情報を表示装置に表示させてもよい。この場合、解析表示部57は、ロケーションタグ2の属性情報をデバイス管理部50から取得する。
 また、解析表示部57は、スマートタグ3Aの属性情報を表示装置に表示させてもよい。この場合、解析表示部57は、スマートタグ3Aの属性情報をデバイス管理部50から取得する。
 ここで、管理装置5のハードウェア構成について説明する。図8は、実施の形態1にかかる管理装置を実現するハードウェア構成例を示す図である。
 管理装置5は、入力装置300、プロセッサ100、メモリ200、および出力装置400により実現することができる。プロセッサ100の例は、CPU(Central Processing Unit、中央処理装置、処理装置、演算装置、マイクロプロセッサ、マイクロコンピュータ、DSP(Digital Signal Processor)ともいう)またはシステムLSI(Large Scale Integration)である。メモリ200の例は、RAM(Random Access Memory)、ROM(Read Only Memory)である。
 管理装置5は、プロセッサ100が、メモリ200で記憶されている管理装置5の動作を実行するための、コンピュータで実行可能な、管理プログラムを読み出して実行することにより実現される。管理装置5の動作を実行するためのプログラムである管理プログラムは、管理装置5の手順または方法をコンピュータに実行させるものであるともいえる。
 管理装置5で実行される管理プログラムは、デバイス管理部50と、地図管理部51と、位置管理部52と、作業解析部53と、作業時間算出部54と、外部連携部56と、解析表示部57とを含むモジュール構成となっており、これらが主記憶装置上にロードされ、これらが主記憶装置上に生成される。
 入力装置300は、データ収集プラットフォーム6から取得情報、生産高情報などを受付けてメモリ200に送る。
 メモリ200は、データベース部55に対応している。メモリ200は、データベース情報、取得情報、生産高情報、識別対応情報、ロケーションタグ2A,2Bの属性情報、スマートタグ3A,3Bの属性情報、作業管理情報、管理プログラムなどを記憶する。データベース情報、取得情報、生産高情報、識別対応情報、ロケーションタグ2A,2Bの属性情報、スマートタグ3A,3Bの属性情報、作業管理情報、管理プログラムなどは、プロセッサ100によって読み出される。また、メモリ200は、プロセッサ100が各種処理を実行する際の一時メモリに使用される。出力装置400は、解析表示部57による分析結果を表示装置に送る。
 管理プログラムは、インストール可能な形式または実行可能な形式のファイルで、コンピュータが読み取り可能な記憶媒体に記憶されてコンピュータプログラムプロダクトとして提供されてもよい。また、管理プログラムは、インターネットなどのネットワーク経由で管理装置5に提供されてもよい。なお、管理装置5の機能について、一部を専用回路などの専用のハードウェアで実現し、一部をソフトウェアまたはファームウェアで実現するようにしてもよい。
 このように実施の形態1によれば、作業状況管理システム1Yは、図6に示す動作フローを実施することによって、作業内容を有効作業と無効作業とに分けて管理する。これにより、作業状況管理システム1Yは、無効作業という不確定に生じる作業時間が除外された有効作業の作業時間だけで作業内容を分析し評価することができる。したがって、作業状況管理システム1Yは、不確定要素を除いた生産に直結する本質的な作業である有効作業の作業時間に基づいた正確な作業状況を管理することができる。これにより、作業状況管理システム1Yは、生産性を向上させることが可能となる。
実施の形態2.
 つぎに、図9を用いて実施の形態2について説明する。実施の形態2では、作業状況管理システム1Yの管理装置5が備える作業解析部53が、作業内容および作業の有効性を学習する。管理装置5は、作業解析部53以外は、実施の形態1と同様の処理を実行する。
 図9は、実施の形態2にかかる作業解析部の構成を示す図である。管理装置5の作業解析部53は、作業内容判別部151と、有効作業判別部161とを備えている。なお、作業内容判別部151および有効作業判別部161は、作業状況管理システム1Xの管理装置5が備える作業解析部53に配置されてもよい。
 作業内容判別部151は、作業者の位置情報と、作業内容とから、作業者の位置情報に対応する作業内容を学習することで第1の学習モデルを生成し、第1の学習モデルに基づいて作業者の位置情報から作業者の作業内容を判別する。第1の学習モデルは、作業者の位置情報から作業者の作業内容を判別するための学習モデルである。
 有効作業判別部161は、作業内容と、作業の有効性または無効性の判断基準(以下、作業内容判断基準という)とから、作業内容に対応する作業内容判断基準を学習することで、第2の学習モデルを生成し、第2の学習モデルに基づいて作業内容判断基準を算出する。第2の学習モデルは、作業内容から、作業内容判断基準を判別するための学習モデルである。作業内容判断基準には、ロケーション情報を受信した時間の情報である時間情報、作業者の位置情報などが含まれている。
 例えば、作業者が第1の領域に第1の時間以上滞在していた場合に、作業は有効作業であると判定される。また、作業者が第2の領域に第2の時間未満滞在していた場合に、作業は無効作業であると判定される。これらの第1の領域、第2の領域、第1の時間、第2の時間などが、作業内容判断基準である。
 作業内容判別部151は、状態観測部152と、学習部153とを有している。状態観測部152は、作業者の作業領域80A~80C内での位置を示す位置情報と、作業内容の判断基準である作業内容判断基準とを状態変数として観測する。ここでの位置情報は、例えば、ロケーションタグ2の座標情報、衛星測位情報、受信強度から得られる位置情報、複数の機器との間の受信強度から算出された位置情報、設備との間の受信強度から算出された距離の情報などである。
 なお、状態変数には、作業者の動きを示すモーション情報(動作情報)が含まれていてもよい。この場合、状態観測部152は、作業者の位置情報と、作業者のモーション情報と、作業内容判断基準とを状態変数として観測する。
 モーション情報は、例えば、前述のモーションセンサ部33が検出したモーション情報と、カメラ72から得られるカメラ画像と、カメラ72から得られるカメラ動画との少なくとも1つを含んでいる。
 学習部153は、位置情報と、モーション情報と、作業内容判断基準とを含んだ状態変数に基づいて作成されるデータセットに従って、位置情報およびモーション情報に対応する作業内容判断基準を学習する。作業内容判断基準は、作業内容を特定する基準である。作業内容判断基準は、位置情報およびモーション情報から得られる作業者の作業内容を示す。すなわち、学習部153は、位置情報とモーション情報と作業内容判断基準とを含んだ状態変数に基づいて作成されるデータセットに従って、位置情報およびモーション情報に対応する作業内容を学習する。ここでの作業内容は、項目分けして管理されている。作業内容は、例えば、部品Xの装置への供給作業、部品Yの取り付け作業、治具を他の場所に取りに行く作業のように項目分けして管理されている。
 学習部153は、何れの学習アルゴリズムを用いてもよい。一例として、学習部153に強化学習(Reinforcement Learning)が適用された場合について説明する。強化学習は、ある環境内におけるエージェント(行動主体)が、現在の状態を観測し、取るべき行動を決定する、という学習である。エージェントは行動を選択することで環境から報酬を得て、一連の行動を通じて報酬が最も多く得られるような方策を学習する。強化学習の代表的な手法として、Q学習(Q-learning)またはTD学習(TD-learning)が知られている。例えば、Q学習の場合、行動価値関数Q(s,a)の一般的な更新式(行動価値テーブル)は、以下の式(1)で表される。
Figure JPOXMLDOC01-appb-M000001
 式(1)において、tは時刻tにおける環境を表し、atは時刻tにおける行動を表す。行動atにより、環境はst+1に変わる。rt+1はその環境の変化によってもらえる報酬を表し、γは割引率を表し、αは学習係数を表す。なお、γは0<γ≦1、αは0<α≦1の範囲とする。Q学習が適用された場合、作業内容判断基準が行動atとなる。
 式(1)で表される更新式は、時刻t+1における最良の行動aの行動価値が、時刻tにおいて実行された行動aの行動価値Qよりも大きければ、行動価値Qを大きくし、逆の場合は、行動価値Qを小さくする。換言すれば、時刻tにおける行動aの行動価値Qを、時刻t+1における最良の行動価値に近づけるように、行動価値関数Q(s,a)を更新する。それにより、或る環境における最良の行動価値が、それ以前の環境における行動価値に順次伝播していくようになる。
 学習部153は、報酬計算部154と、関数更新部155とを備えている。報酬計算部154は、状態変数に基づいて報酬rを計算する。報酬計算部154は、ユーザによる作業内容の区分け修正の有無に基づいて、報酬rを計算する。作業内容の区分けは、位置情報に対応する作業が何れの作業に含まれているかを分別する処理である。位置情報に対応する作業が適切な作業に設定されていない場合、ユーザによって、位置情報に対応する作業が適切な作業に修正される。すなわち、位置情報に対応する作業が適切な作業に対応付けされていない場合、ユーザによって、作業内容の区分け修正が行われる。
 報酬計算部154は、例えば、ユーザによる作業内容の区分け修正が無い場合には報酬rを増大させる(例えば「1」の報酬を与える)。他方、報酬計算部154は、ユーザによる作業内容の区分け修正が有る場合には報酬rを低減する(例えば「-1」の報酬を与える)。
 関数更新部155は、報酬計算部154によって計算される報酬に従って、作業内容判断基準を決定するための関数を更新する。関数更新部155は、例えばQ学習の場合、式(1)で表される行動価値関数Q(st,at)を、作業内容判断基準を算出するための関数として用いる。作業内容判別部151は、行動価値関数Q(st,at)を用いて、位置情報に対応する作業内容を判別する。
 有効作業判別部161は、状態観測部162と、学習部163とを有している。状態観測部162は、作業内容判断基準で示される作業内容の情報(以下、作業内容情報という)と、有効性の判断に寄与する情報である有効性判断情報とを状態変数として観測する。
 有効性判断情報は、例えば、ユーザによって設定された有効作業であると判定する基準、ユーザによって設定された無効作業であると判定する基準、解析表示部57において有効作業を更に効率化するために検討用に利用された作業内容の情報などである。以下では、有効性判断情報が、ユーザによって設定された有効作業の判定基準、およびユーザによって設定された無効作業の判定基準、すなわち有効無効の区分け基準である場合について説明する。
 学習部163は、作業内容情報と有効性判断情報とを含んだ状態変数に基づいて作成されるデータセットに従って、作業内容情報に対応する有効性判断情報を学習する。換言すると、学習部163は、作業内容情報と有効性判断情報とを含んだ状態変数に基づいて作成されるデータセットに従って、作業内容に対応する、有効作業の判定基準および無効作業の判定基準を学習する。
 学習部163は、何れの学習アルゴリズムを用いてもよい。学習部163は、例えば、上述した強化学習を用いる。学習部163は、報酬計算部164と、関数更新部165とを備えている。
 報酬計算部164は、状態変数に基づいて報酬を計算する。報酬計算部164は、有効作業の判定基準または無効作業の判定基準のユーザによる修正の有無などに基づいて、報酬rを計算する。報酬計算部164は、例えば、ユーザによる判定基準の修正、すなわち有効性または無効性の区分け修正が無い場合には、報酬rを増大させる(例えば「1」の報酬を与える)。他方、報酬計算部164は、ユーザによる判定基準の修正が有る場合には報酬rを低減する(例えば「-1」の報酬を与える)。すなわち、報酬計算部164は、ユーザが作業内容を有効作業から無効作業に修正しない場合には報酬rを増大させ、ユーザが作業内容を無効作業から有効作業に修正した場合には報酬rを低減させる。
 関数更新部165は、報酬計算部164によって計算される報酬に従って、有効無効の区分け基準、すなわち有効性判断情報を決定するための関数を更新する。関数更新部165は、例えばQ学習の場合、式(1)で表される行動価値関数Q(st,at)を有効無効の区分け基準を算出するための関数として用いる。有効作業判別部161は、行動価値関数Q(st,at)を用いて、作業内容情報の作業に対応する有効性判断情報を算出し、有効性判断情報に基づいて、作業内容情報の作業が有効作業であるか無効作業であるかを判別する。
 実施の形態2でも実施の形態1と同様に、作業時間算出部54が有効作業の作業時間、および無効作業の作業時間を算出する。また、解析表示部57は、生産高情報、有効作業の作業時間、および無効作業の作業時間に基づいて、作業者または台車の生産効率を算出する。
 なお、実施の形態2では、学習部153,163が用いる学習アルゴリズムに強化学習が適用された場合について説明したが、学習アルゴリズムは強化学習に限られるものではない。学習部153,163へは、強化学習以外にも、教師あり学習、教師なし学習、又は半教師あり学習等の学習アルゴリズが適用されることも可能である。
 また、学習部153,163は、学習アルゴリズムとしては、特徴量そのものの抽出を学習する深層学習(Deep Learning)を用いることもでき、他の公知の方法、例えばニューラルネットワーク、遺伝的プログラミング、機能論理プログラミング、サポートベクターマシンなどに従って機械学習を実行してもよい。
 なお、作業内容判別部151は、作業者の位置情報から作業者の作業内容を学習するために使用されるが、例えば、ネットワークを介して作業状況管理システム1Yに接続された、この作業状況管理システム1Yとは別個の装置であってもよい。また、有効作業判別部161は、作業内容の有効性を学習するために使用されるが、例えば、ネットワークを介して作業状況管理システム1Yに接続された、この作業状況管理システム1Yとは別個の装置であってもよい。また、作業内容判別部151および有効作業判別部161の少なくとも一方は、作業状況管理システム1Yに内蔵されていてもよい。さらに、作業内容判別部151および有効作業判別部161の少なくとも一方は、クラウドサーバ上に存在していてもよい。
 このように実施の形態2によれば、作業解析部53が、作業内容判別部151を備えているので、管理装置5は、作業者の位置情報から作業者の作業内容を正確に判定することが可能となる。また、作業解析部53が、有効作業判別部161を備えているので、管理装置5は、作業内容の有効性を正確に判定することが可能となる。このように、作業状況管理システム1Yは、作業者の位置情報から作業者の作業内容を判定し、作業内容の有効性を判定するので、実施の形態1と同様に、有効作業の作業時間に基づいた正確な作業状況を管理することができる。これにより、作業状況管理システム1Yは、生産性を向上させることが可能となる。
 以上の実施の形態に示した構成は、一例を示すものであり、別の公知の技術と組み合わせることも可能であるし、実施の形態同士を組み合わせることも可能であるし、要旨を逸脱しない範囲で、構成の一部を省略、変更することも可能である。
 1X,1Y 作業状況管理システム、2,2A,2B ロケーションタグ、3,3A,3B スマートタグ、4 ゲートウェイ機器、5 管理装置、6 データ収集プラットフォーム、7 外部システム、7A 生産管理システム、7B 勤怠管理システム、7C 作業管理システム、7D スケジュール管理システム、21 ロケーション情報送信部、31 ロケーション情報受信部、32 ロケーション判定部、33 モーションセンサ部、34 情報送信部、50 デバイス管理部、51 地図管理部、52 位置管理部、53 作業解析部、54 作業時間算出部、55 データベース部、56 外部連携部、57 解析表示部、65A 作業内容、65B 有効作業時間、65B1 有効作業間隔、65B2 有効開始終了時間、65C 無効作業時間、65C1 無効作業間隔、65C2 無効開始終了時間、65D 在場時間、70 機械装置、71 生産高カウント装置、71A 生産高カウンタ、71B 情報送信部、72 カメラ、73 コードリーダ、80,80A~80C 作業領域、100 プロセッサ、151 作業内容判別部、152,162 状態観測部、153,163 学習部、154,164 報酬計算部、155,165 関数更新部、161 有効作業判別部、200 メモリ、300 入力装置、400 出力装置、L1 軌跡、Pa 移動開始位置、Pb 移動終了位置。

Claims (12)

  1.  作業領域内の固定位置に配置されるとともに、前記作業領域内で固有の識別情報を記憶するロケーションタグと、
     前記作業領域内で移動する移動対象に付されるとともに、前記ロケーションタグの周りの特定領域に入った場合に前記ロケーションタグから前記識別情報を受信するスマートタグと、
     前記スマートタグから前記識別情報を受信し、前記識別情報に基づいて、前記移動対象による作業状況を管理する管理装置と、
     を備え、
     前記管理装置は、
     前記作業領域内での前記ロケーションタグの位置と前記識別情報とが対応付けされた識別対応情報に基づいて、前記スマートタグから受信した前記識別情報に対応する前記ロケーションタグの位置である位置情報を特定する位置管理部と、
     前記位置情報と作業内容とが対応付けされた作業内容対応情報に基づいて、前記位置管理部が特定した前記位置情報に対応する前記作業内容および前記作業内容に対応する時間の情報である時間情報を特定し、特定した前記作業内容を、生産に寄与する作業に設定されている有効作業、または生産に寄与しない作業に設定されている無効作業の何れかに判別する作業解析部と、
     前記時間情報と、前記有効作業および前記無効作業の少なくとも一方とに基づいて、前記有効作業の作業時間である有効作業時間および前記無効作業の作業時間である無効作業時間を算出する作業時間算出部と、
     前記有効作業時間および前記無効作業時間を用いて、前記移動対象による生産性を分析する分析部と、
     を有する、
     ことを特徴とする作業状況管理システム。
  2.  作業領域内の固定位置に配置されるとともに、前記作業領域内での位置を示す位置情報を記憶するロケーションタグと、
     前記作業領域内で移動する移動対象に付されるとともに、前記ロケーションタグの周りの特定領域に入った場合に前記ロケーションタグから前記位置情報を受信するスマートタグと、
     前記スマートタグから前記位置情報を受信し、前記位置情報に基づいて、前記移動対象による作業状況を管理する管理装置と、
     を備え、
     前記管理装置は、
     前記位置情報と作業内容とが対応付けされた作業内容対応情報に基づいて、受信した前記位置情報に対応する前記作業内容および前記作業内容に対応する時間の情報である時間情報を特定し、特定した前記作業内容を、生産に寄与する作業に設定されている有効作業、または生産に寄与しない作業に設定されている無効作業の何れかに判別する作業解析部と、
     前記時間情報と、前記有効作業および前記無効作業の少なくとも一方とに基づいて、前記有効作業の作業時間である有効作業時間および前記無効作業の作業時間である無効作業時間を算出する作業時間算出部と、
     前記有効作業時間および前記無効作業時間を用いて、前記移動対象による生産性を分析する分析部と、
     を有する、
     ことを特徴とする作業状況管理システム。
  3.  作業領域内の固定位置に配置されるとともに、前記作業領域内で固有の識別情報を記憶するロケーションタグと、
     前記作業領域内で移動する移動対象に付されるとともに、前記ロケーションタグの周りの特定領域に入った場合に前記ロケーションタグから前記識別情報を受信するスマートタグと、
     前記スマートタグから前記識別情報を受信し、前記識別情報に基づいて、前記移動対象による作業状況を管理する管理装置と、
     を備え、
     前記管理装置は、
     前記作業領域内での前記ロケーションタグの位置と前記識別情報とが対応付けされた識別対応情報に基づいて、前記スマートタグから受信した前記識別情報に対応する前記ロケーションタグの位置である位置情報を特定する位置管理部と、
     前記位置情報と前記位置情報に対応する作業内容とから前記位置情報に対応する前記作業内容を学習することで第1の学習モデルを生成し、前記第1の学習モデルに基づいて前記位置情報から前記作業内容を判別する作業内容判別部と、
     前記作業内容と、前記作業内容の作業が生産に寄与する作業に設定されている有効作業であるか生産に寄与しない作業に設定されている無効作業であるかを判定する判定基準とから前記作業内容に対応する前記判定基準を学習することで第2の学習モデルを生成し、前記第2の学習モデルに基づいて、前記作業内容に対応する前記判定基準を判別し、前記判定基準に基づいて、前記作業内容を、前記有効作業または前記無効作業の何れかに判別する有効作業判別部と、
     前記作業内容判別部が判別した前記作業内容に対応する時間を示す時間情報と、前記有効作業および前記無効作業の少なくとも一方とに基づいて、前記有効作業の作業時間である有効作業時間および前記無効作業の作業時間である無効作業時間を算出する作業時間算出部と、
     前記有効作業時間および前記無効作業時間を用いて、前記移動対象による生産性を分析する分析部と、
     を有する、
     ことを特徴とする作業状況管理システム。
  4.  作業領域内の固定位置に配置されるとともに、前記作業領域内での位置を示す位置情報を記憶するロケーションタグと、
     前記作業領域内で移動する移動対象に付されるとともに、前記ロケーションタグの周りの特定領域に入った場合に前記ロケーションタグから前記位置情報を受信するスマートタグと、
     前記スマートタグから前記位置情報を受信し、前記位置情報に基づいて、前記移動対象による作業状況を管理する管理装置と、
     を備え、
     前記管理装置は、
     前記位置情報と前記位置情報に対応する作業内容とから前記位置情報に対応する前記作業内容を学習することで第1の学習モデルを生成し、前記第1の学習モデルに基づいて前記位置情報から前記作業内容を判別する作業内容判別部と、
     前記作業内容と、前記作業内容の作業が生産に寄与する作業に設定されている有効作業であるか生産に寄与しない作業に設定されている無効作業であるかを判定する判定基準とから前記作業内容に対応する前記判定基準を学習することで第2の学習モデルを生成し、前記第2の学習モデルに基づいて、前記作業内容に対応する前記判定基準を判別し、前記判定基準に基づいて、前記作業内容を、前記有効作業または前記無効作業の何れかに判別する有効作業判別部と、
     前記作業内容判別部が判別した前記作業内容に対応する時間を示す時間情報と、前記有効作業および前記無効作業の少なくとも一方とに基づいて、前記有効作業の作業時間である有効作業時間および前記無効作業の作業時間である無効作業時間を算出する作業時間算出部と、
     前記有効作業時間および前記無効作業時間を用いて、前記移動対象による生産性を分析する分析部と、
     を有する、
     ことを特徴とする作業状況管理システム。
  5.  前記分析部は、前記有効作業時間と、前記無効作業時間と、外部から取得した製品の生産量の情報とに基づいて、前記移動対象による前記製品の生産効率を算出し、算出結果を表示装置に表示させる、
     ことを特徴とする請求項1から4の何れか1つに記載の作業状況管理システム。
  6.  前記スマートタグが送信した情報を受信して前記管理装置に送信するゲートウェイ機器をさらに備え、
     前記管理装置は、前記スマートタグが送信した情報を、前記ゲートウェイ機器を介して受信する、
     ことを特徴とする請求項1から5の何れか1つに記載の作業状況管理システム。
  7.  前記ゲートウェイ機器が送信した情報を受信して前記管理装置に送信するデータ収集装置をさらに備え、
     前記管理装置は、前記スマートタグが送信した情報を、前記ゲートウェイ機器および前記データ収集装置を介して受信する、
     ことを特徴とする請求項6に記載の作業状況管理システム。
  8.  前記作業解析部は、前記時間情報を用いて前記有効作業と前記無効作業とを判別する、
     ことを特徴とする請求項1または2に記載の作業状況管理システム。
  9.  前記スマートタグは、前記スマートタグの動作を検出して検出結果であるモーション情報を生成するモーションセンサ部を有し、
     前記作業解析部は、前記モーション情報を用いて、前記有効作業の開始時間、前記有効作業の終了時間、前記無効作業の開始時間、および前記無効作業の終了時間を判定する、
     ことを特徴とする請求項1または2に記載の作業状況管理システム。
  10.  前記作業内容対応情報は、前記移動対象毎に、前記位置情報と前記作業内容とが対応付けされている、
     ことを特徴とする請求項1または2に記載の作業状況管理システム。
  11.  前記移動対象は、作業者、または前記作業領域内で使用される周辺設備である、
     ことを特徴とする請求項1から10の何れか1つに記載の作業状況管理システム。
  12.  前記スマートタグは、前記スマートタグの動作を検出して検出結果であるモーション情報を生成するモーションセンサ部を有し、
     前記作業内容判別部は、前記モーションセンサ部が検出した前記スマートタグの動作を示す情報と、撮像装置が撮像した画像と、前記撮像装置が撮像した動画との少なくも1つを用いて、前記第1の学習モデルを生成するとともに前記作業内容を判別する、
     ことを特徴とする請求項3または4に記載の作業状況管理システム。
PCT/JP2021/026264 2021-07-13 2021-07-13 作業状況管理システム WO2023286149A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2021578255A JP7048063B1 (ja) 2021-07-13 2021-07-13 作業状況管理システム
PCT/JP2021/026264 WO2023286149A1 (ja) 2021-07-13 2021-07-13 作業状況管理システム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2021/026264 WO2023286149A1 (ja) 2021-07-13 2021-07-13 作業状況管理システム

Publications (1)

Publication Number Publication Date
WO2023286149A1 true WO2023286149A1 (ja) 2023-01-19

Family

ID=81259157

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/026264 WO2023286149A1 (ja) 2021-07-13 2021-07-13 作業状況管理システム

Country Status (2)

Country Link
JP (1) JP7048063B1 (ja)
WO (1) WO2023286149A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011145817A (ja) * 2010-01-13 2011-07-28 Hitachi Ltd 作業実績収集システムおよび作業実績収集方法
JP2020125923A (ja) * 2019-02-01 2020-08-20 マージシステム株式会社 屋内空間作業支援システム
JP2021030334A (ja) * 2019-08-21 2021-03-01 オムロン株式会社 調整支援装置、調整支援システム、調整支援方法及び調整支援プログラム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011145817A (ja) * 2010-01-13 2011-07-28 Hitachi Ltd 作業実績収集システムおよび作業実績収集方法
JP2020125923A (ja) * 2019-02-01 2020-08-20 マージシステム株式会社 屋内空間作業支援システム
JP2021030334A (ja) * 2019-08-21 2021-03-01 オムロン株式会社 調整支援装置、調整支援システム、調整支援方法及び調整支援プログラム

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
NAKATA, SATOSHI; OKAMOTO, AZUMA; HORIKAWA, MITSUYOSHI: "CM-008 Proposal of a Business Situation Visualization System using Smart Tags", PROCEEDINGS OF 18TH FORUM ON INFORMATION TECHNOLOGY (FIT2019); SEPTEMBER 3-5, 2019, IEICE, JP, vol. 18, no. 4, 20 August 2019 (2019-08-20) - 5 September 2019 (2019-09-05), JP, pages 59 - 65, XP009542781 *
YUKI SATO, MIYOSHI HORIKAWA, HIGASHI OKAMOTO, 'KEI NAKATA IWATE PREFECTURAL UNIVERSITY FACULTY OF SOFTWARE AND INFORMATION SCIENC: "Action Classification of Worker using Smart Tags in the Manufacturing Process", PROCEEDINGS OF THE 82ND NATIONAL CONVENTION OF IPSJ ((3) NETWORK SECURITY, IPSJ, JP, no. 6W-02, 20 February 2020 (2020-02-20), JP, pages 3 - 3-238, XP009542708 *

Also Published As

Publication number Publication date
JPWO2023286149A1 (ja) 2023-01-19
JP7048063B1 (ja) 2022-04-05

Similar Documents

Publication Publication Date Title
JP7074965B2 (ja) 金属処理産業における内部個人位置特定に基づく製造制御
JP7234214B2 (ja) 屋内位置特定システムの移動可能ユニットへの加工片の割り当て支援方法
CN100480930C (zh) 基于位置的诊断方法和装置
JP7179833B2 (ja) 屋内位置特定システムの移動可能ユニットの移動可能ユニットデータセットに対する処理計画の画像の支援を受けた割り当て方法
AU2019201074A1 (en) Systems and methods for mobile point-of-sale process management
DE112015003933T5 (de) Vorrichtung und Verfahren zum Ausführen eines Sachen-Auswahlprozesses
EP3434626A1 (en) Projection instruction device, parcel sorting system, and projection instruction method
AU2019329781B2 (en) Method and system to digitally track and monitor an automotive refinish repair process
US20180272540A1 (en) Resort sanitation monitor and controller
JP2019537786A (ja) 金属処理産業における製造工程の内部位置特定に基づく制御
US11797950B2 (en) Method and system to digitally track and monitor an automotive refinish repair process
JPWO2013145631A1 (ja) 動線データ解析装置、システム、プログラム及び方法
JP2008225704A (ja) 作業評価装置、作業評価方法、および、制御プログラム
EP3434623A1 (en) Projection indicator, cargo assortment system, and projection indicating method
Zhong et al. A big data cleansing approach for n-dimensional RFID-Cuboids
WO2023286149A1 (ja) 作業状況管理システム
WO2011111316A1 (ja) 装置操作情報分析装置および作業者作業内容分析方法
CN114255521A (zh) 基于巡检机器人的数据处理系统、方法、装置和存储介质
CN111553552A (zh) 维修人员选择装置、机器学习方法
JP4913013B2 (ja) 移動体の管理方法及び管理システム
CN115696169A (zh) 一种mes生产管理系统的数据获取方法
JP2021179981A (ja) 情報処理システム、情報処理装置およびプログラム
JP2020038411A (ja) 設備保全装置、設備保全システムおよび設備保全方法
KR20190087981A (ko) 행동 특징량 해석 시스템 및 행동 특징량 해석 방법
WO2022097381A1 (ja) 情報処理装置、情報処理方法及びプログラム

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2021578255

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21950092

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE