WO2023243077A1 - 健全性評価装置、健全性評価方法、および健全性評価プログラム - Google Patents

健全性評価装置、健全性評価方法、および健全性評価プログラム Download PDF

Info

Publication number
WO2023243077A1
WO2023243077A1 PCT/JP2022/024306 JP2022024306W WO2023243077A1 WO 2023243077 A1 WO2023243077 A1 WO 2023243077A1 JP 2022024306 W JP2022024306 W JP 2022024306W WO 2023243077 A1 WO2023243077 A1 WO 2023243077A1
Authority
WO
WIPO (PCT)
Prior art keywords
health
node
evaluation
nodes
health evaluation
Prior art date
Application number
PCT/JP2022/024306
Other languages
English (en)
French (fr)
Inventor
智晴 竹内
将史 山田
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to PCT/JP2022/024306 priority Critical patent/WO2023243077A1/ja
Priority to JP2022568453A priority patent/JP7292538B1/ja
Publication of WO2023243077A1 publication Critical patent/WO2023243077A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/50Trackside diagnosis or maintenance, e.g. software upgrades
    • B61L27/57Trackside diagnosis or maintenance, e.g. software upgrades for vehicles or trains, e.g. trackside supervision of train conditions
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y10/00Economic sectors
    • G16Y10/40Transportation
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y20/00Information sensed or collected by the things
    • G16Y20/20Information sensed or collected by the things relating to the thing itself
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y40/00IoT characterised by the purpose of the information processing
    • G16Y40/20Analytics; Diagnosis

Definitions

  • the present disclosure relates to a health evaluation device, a health evaluation method, and a health evaluation program.
  • the present invention relates to a soundness evaluation system, a soundness evaluation device, a soundness evaluation method, and a soundness evaluation program for evaluating the soundness of a vehicle formation.
  • Condition-based maintenance is also called CBM.
  • CBM is an abbreviation for Condition Based Maintenance.
  • Patent Document 1 describes a technology for calculating the healthy operation rate of the top node using the healthy operation rate of each node and the impact value for the upper node in a service system in which the connection relationships between a plurality of nodes are configured in a hierarchical structure. is disclosed.
  • Patent Document 1 It is conceivable to apply a hierarchical structure representing the relationship between a vehicle composition and a plurality of component devices included in the vehicle composition to Patent Document 1, and calculate the healthy operation rate of the vehicle composition that is the highest node.
  • the healthy operation rate of the highest node is calculated using the healthy operation rate of each node and the impact value for the upper node.
  • Patent Document 1 when the health of some nodes deteriorates, the deterioration information in the health is rounded off as the health is integrated into the upper nodes. Therefore, when calculating the health of the entire vehicle formation, there is a problem that it becomes difficult to see that the state of some nodes is poor.
  • the organization evaluation unit integrates the health evaluation values of the lower nodes according to the magnitude relationship between the health evaluation values of the lower nodes of the evaluation target node and each of the plurality of threshold values. Dynamically determine the integration process. Therefore, according to the health evaluation device according to the present disclosure, by appropriately reflecting the abnormality or deterioration state of some nodes in the health evaluation value of the evaluation target node, the vehicle formation that is the highest node This has the effect that it can be appropriately reflected in the soundness evaluation value of.
  • FIG. FIG. 3 is a flowchart of equipment health evaluation processing by the equipment evaluation unit according to the first embodiment.
  • FIG. 3 is a flowchart of a composition soundness evaluation process by the composition evaluation unit according to the first embodiment.
  • FIG. 3 is a flow diagram of a process for calculating a health evaluation value of an evaluation target node according to the first embodiment.
  • FIG. 3 is a flow diagram of visualization information generation processing by the visualization information generation unit according to the first embodiment.
  • FIG. 3 is a diagram illustrating an example of visualization information that visualizes health evaluation information according to the first embodiment.
  • FIG. 3 is a flowchart of processing for defining a dependency database and a physical configuration database according to the first embodiment.
  • FIG. 7 is a flowchart of a process for calculating a health evaluation value of an evaluation target node according to Embodiment 2.
  • the health evaluation system 700 includes a vehicle organization device 100, a vehicle appearance inspection device 200, a health evaluation device 300, a plan generation device 400, and a health monitoring device 500. Below, the functions of each functional element included in each device of the health evaluation system 700 will be briefly described.
  • the vehicle formation device 100 is an in-vehicle device installed in the vehicle formation 10 to be evaluated.
  • the vehicle formation 10 is, for example, a railway vehicle formation.
  • the vehicle organization device 100 is sometimes referred to as a railway vehicle organization.
  • the vehicle appearance inspection device 200 inspects the external condition of each part of the vehicle formation 10 to be evaluated.
  • the soundness evaluation device 300 performs soundness evaluation on the vehicle formation 10.
  • the health evaluation device 300 is a device that evaluates the health of the vehicle formation 10 made up of a plurality of nodes 11.
  • the vehicle organization 10 is configured as a collection of N nodes 11.
  • the vehicle organization device 100 includes an operation data collection section 101 and an operation data transmission section 102.
  • the operation data collection unit 101 acquires operating status data from each node as device operation data.
  • the operation data transmitter 102 transmits equipment operation data to the health evaluation device 300.
  • the vehicle appearance inspection device 200 includes an appearance inspection section 201 that inspects the condition of each part based on the appearance of the vehicle formation 10 to be evaluated, and the appearance inspection data that is the result data of the inspection by the appearance inspection section 201 to the soundness evaluation device 300. It includes an inspection data transmitter 202 that transmits the test data.
  • the vehicle data receiving unit 301 receives equipment operation data, node dependencies, and physical configuration information transmitted from the vehicle organization device 100. Further, the vehicle data receiving unit 301 receives visual inspection data transmitted from the vehicle visual inspection apparatus 200.
  • the composition evaluation unit 303 includes a composition health estimation unit 331, a dependency database 332, a deadline estimation unit 333, a composition health database 334, a visualization information generation unit 335, and a physical configuration database 336.
  • FIG. 2 is a diagram showing a detailed configuration example of the composition soundness estimating section 331 in the composition evaluation section 303 according to the present embodiment.
  • the organization health estimation section 331 includes a threshold database 311, a determination section 312, and an evaluation value calculation section 313.
  • the threshold value database 311 stores a plurality of threshold values for determining the magnitude relationship with the health evaluation value of the lower node.
  • the threshold database 311 stores a first threshold th1 and a second threshold th2.
  • the functions of the determination unit 312 and the evaluation value calculation unit 313 will be described later.
  • the dependency database 332 stores dependency information 33 of the nodes 11 necessary for estimating the health of the vehicle formation 10.
  • the deadline estimating unit 333 estimates the operation deadline 32 of the vehicle formation 10 from the health evaluation value 31 of the vehicle formation 10.
  • the formation health database 334 stores the estimated health evaluation value 31 of the vehicle formation 10 and the operation deadline 32 of the vehicle formation 10. Information including the health evaluation value 31 and the operation deadline 32 is referred to as health evaluation information 34.
  • the visualization information generation unit 335 generates visualization information 35 for visualizing the health evaluation value 31 of the vehicle formation 10 and the operation deadline 32 of the vehicle formation 10.
  • the physical configuration database 336 stores physical configuration information 36 of nodes, that is, devices, necessary for generating the visualization information 35.
  • FIG. 3 is a diagram showing an example of the hardware configuration of the health evaluation system 700 according to the present embodiment.
  • the hardware configuration of the health evaluation system 700 includes a vehicle organization device 100, a vehicle appearance inspection device 200, a health evaluation device 300, a plan generation device 400, and a health monitoring device 500. Each device of the health evaluation system 700 communicates via a network.
  • the health evaluation device 300 and the plan generation device 400 may be on-premise servers or servers configured on the cloud.
  • the vehicle formation device 100 includes nodes forming the vehicle formation to be evaluated, a control device that controls the operation of each node, and a sensor that senses the operating status of each node.
  • the vehicle formation device 100 also includes a calculation device that generates equipment operation data to be sent to the health evaluation device, and temporary storage of information such as intermediate data in the generation operation of the equipment operation data or generated equipment operation data.
  • a main storage device is provided.
  • the vehicle formation device 100 includes a communication device that transmits generated equipment operation data to the health evaluation device.
  • the plan generation device 400 is a calculation device that generates a maintenance plan or an operation plan for a vehicle configuration from the received health evaluation information of the vehicle configuration, and a main storage device that temporarily stores intermediate data in the generation operation of the maintenance plan or operation plan. Equipped with The plan generation device 400 also includes an external storage device that stores generated maintenance plan information data or operation plan information data, and a communication device that receives vehicle organization health evaluation information.
  • the health monitoring device 500 includes an arithmetic unit that performs visualization processing of the received vehicle formation health evaluation information for visualization, and generation processing of various definition information such as node dependencies or node physical configurations.
  • the health monitoring device 500 also includes a main storage device that temporarily stores intermediate data in each calculation.
  • the health monitoring device 500 also includes a communication device that receives visualization information data related to vehicle formation health evaluation and transmits various definition information such as node dependencies or node physical configurations.
  • the health monitoring device 500 includes a display device that displays visualized information for health evaluation of a vehicle formation, and an input device for inputting various definition information such as dependency relationships of nodes or physical configurations of nodes.
  • Each device of the vehicle formation device 100, the vehicle appearance inspection device 200, the health evaluation device 300, the plan generation device 400, and the health monitoring device 500 may be referred to as each device of the health evaluation system 700.
  • Each device of the health evaluation system 700 which is a computer, includes a calculation device and other hardware such as a main storage device, an external storage device, an input interface, an output interface, and a communication device.
  • the arithmetic device is also called a processor.
  • the main storage device is also called memory.
  • the arithmetic unit is connected to other hardware via signal lines and controls this other hardware.
  • the vehicle formation device 100 includes an operation data collection section 101 and an operation data transmission section 102 as functional elements.
  • the vehicle appearance inspection apparatus 200 includes an appearance inspection section 201 and an inspection data transmission section 202 as functional elements.
  • the health evaluation device 300 includes a vehicle data receiving section 301, an equipment evaluation section 302, a composition evaluation section 303, an information setting section 304, an evaluation information transmitting section 305, and a setting information receiving section 306 as functional elements.
  • the plan generation device 400 includes a health evaluation information receiving section 401 and a planning section 402 as functional elements.
  • the health monitoring device 500 includes a visualization information receiving section 501, an information visualization section 502, an information setting section 503, and a setting information transmitting section 504 as functional elements.
  • the arithmetic device is a device that executes the health evaluation program.
  • the health evaluation program includes the functions of the vehicle data reception section 301, the equipment evaluation section 302, the formation evaluation section 303, the information setting section 304, the evaluation information transmission section 305, and the setting information reception section 306. This is a program that will make this happen.
  • the arithmetic device is an IC that performs arithmetic processing. Specific examples of the arithmetic device are a CPU, a DSP, and a GPU.
  • IC is an abbreviation for Integrated Circuit.
  • CPU is an abbreviation for Central Processing Unit.
  • DSP is an abbreviation for Digital Signal Processor.
  • GPU is an abbreviation for Graphics Processing Unit.
  • the main storage device is a storage device that temporarily stores data.
  • a specific example of the main storage device is SRAM or DRAM.
  • SRAM is an abbreviation for Static Random Access Memory.
  • DRAM is an abbreviation for Dynamic Random Access Memory.
  • the external storage device is a storage device that stores data.
  • a specific example of the external storage device is an HDD.
  • the external storage device may be a portable storage medium such as an SD (registered trademark) memory card, CF, NAND flash, flexible disk, optical disk, compact disc, Blu-ray (registered trademark) disc, or DVD.
  • SD registered trademark
  • SD registered trademark
  • CF is an abbreviation for Secure Digital
  • CF is an abbreviation for CompactFlash®.
  • DVD is an abbreviation for Digital Versatile Disk.
  • An input interface is a port that is connected to an input device such as a mouse, keyboard, or touch panel.
  • the input interface is a USB terminal.
  • the input interface may be a port connected to a LAN.
  • USB is an abbreviation for Universal Serial Bus.
  • LAN is an abbreviation for Local Area Network.
  • the output interface is a port to which a cable of a display device such as a display is connected.
  • the output interface is a USB terminal or an HDMI (registered trademark) terminal.
  • the display is specifically an LCD.
  • the output interface is also referred to as a display interface.
  • HDMI (registered trademark) is an abbreviation for High Definition Multimedia Interface.
  • LCD is an abbreviation for Liquid Crystal Display.
  • the communication device has a receiver and a transmitter.
  • the communication device is connected to a communication network such as a LAN, the Internet, or a telephone line.
  • the communication device is a communication chip or NIC.
  • NIC is an abbreviation for Network Interface Card.
  • the health evaluation program is executed in each device of the health evaluation system 700.
  • the health evaluation program is loaded into the arithmetic device and executed by the arithmetic device.
  • the main storage device stores not only the health evaluation program but also the OS.
  • OS is an abbreviation for Operating System.
  • the computing device executes the health evaluation program while executing the OS.
  • the health evaluation program and the OS may be stored in an external storage device.
  • the health evaluation program and OS stored in the external storage device are loaded into the main storage device and executed by the arithmetic unit. Note that part or all of the health evaluation program may be incorporated into the OS.
  • the health evaluation device 300 may include a plurality of processors that replace the arithmetic device. These multiple processors share the responsibility of executing the health evaluation program. Each processor is a device that executes a health evaluation program in the same way as an arithmetic device.
  • the data, information, signal values, and variable values used, processed, or output by the health evaluation program are stored in the main storage device, external storage device, or register or cache memory within the arithmetic device.
  • the “units” of the vehicle data receiving section 301, the equipment evaluation section 302, the composition evaluation section 303, the information setting section 304, the evaluation information transmitting section 305, and the setting information receiving section 306 are referred to as “circuit”. ”, “process”, “procedure”, “process”, or “circuitry”.
  • the health evaluation program causes the computer to execute vehicle data reception processing, equipment evaluation processing, formation evaluation processing, information setting processing, evaluation information transmission processing, and setting information reception processing.
  • the "processing" of vehicle data reception processing, equipment evaluation processing, formation evaluation processing, information setting processing, evaluation information transmission processing, and setting information reception processing is defined as "program”, “program product”, and "computer-readable memory storing a program”.
  • the health evaluation method is a method performed by each device of the health evaluation system 700 executing a health evaluation program.
  • the health evaluation program may be provided stored in a computer-readable recording medium. Further, the health evaluation program may be provided as a program product.
  • the operating procedure of the health evaluation system 700 corresponds to a health evaluation method.
  • a program that realizes the operation of the health evaluation system 700 corresponds to a health evaluation program that causes a computer to execute a health evaluation process.
  • the operation of the health evaluation system 700 is the operation of each device of the health evaluation system 700.
  • the health evaluation device 300 is a device that evaluates the health of the vehicle formation 10 made up of a plurality of nodes 11.
  • FIG. 4 is an overall flow diagram of the health evaluation process by the health evaluation device 300 according to the present embodiment.
  • the health evaluation process is executed by the health evaluation device 300.
  • the health evaluation process may be executed at regular timing, such as daily or weekly, or at any arbitrary timing.
  • step S101 the vehicle data receiving unit 301 acquires equipment operation data or visual inspection data corresponding to each node constituting the vehicle formation as information for equipment health evaluation.
  • step S102 the device evaluation unit 302 and the organization evaluation unit 303 evaluate the health of each node.
  • the device evaluation unit 302 calculates a health evaluation value and an operation deadline for a terminal node among the plurality of nodes on which there is no node on which the self node depends.
  • a node on which the own node depends is called a lower node.
  • the organization evaluation unit 303 calculates the health evaluation value and operation deadline for nodes other than the terminal node.
  • the organization evaluation unit 303 acquires dependency relationship information 33 from the dependency relationship database 332.
  • the organization evaluation unit 303 uses the dependency relationship information 33 to determine the evaluation target node 20 among the plurality of nodes according to the magnitude relationship between the health evaluation value of the lower node of the evaluation target node 20 and each of the plurality of threshold values. , dynamically determines an integration process for integrating the health evaluation values of lower nodes.
  • the organization evaluation unit 303 calculates the health evaluation value of the evaluation target node 20 by integrating the health evaluation values of the lower nodes using dynamically determined integration processing.
  • the evaluation target node 20 is a node to be evaluated among a plurality of nodes, and is a node on which a dependent lower node exists.
  • step S103 the formation evaluation unit 303 checks whether the evaluation of all nodes in the vehicle formation has been completed. If not completed, the process returns to step S101 and repeats the health evaluation for the remaining nodes. If completed, the process advances to step S104.
  • step S104 the formation evaluation unit 303 evaluates the soundness of the vehicle formation and generates soundness evaluation information including a health evaluation value and an operation deadline for the vehicle formation.
  • step S ⁇ b>105 the formation evaluation unit 303 transmits soundness evaluation information on the vehicle formation to the plan generation device 400 using the evaluation information transmission unit 305 .
  • step S106 the formation evaluation unit 303 generates visualization information that visualizes the soundness evaluation information in the vehicle formation.
  • step S107 the composition evaluation unit 303 transmits the visualization information to the health monitoring device 500.
  • FIG. 5 is a diagram showing an example of the construction of dependency relationship information 33 stored in dependency relationship database 332 according to the present embodiment.
  • the dependency database 332 has the vehicle formation 10 at its apex and stores dependency information 33 in which dependency relationships among a plurality of nodes are set. Furthermore, in the dependency relationship database 332, importance levels representing the strength of dependency relationships are set in the dependency relationship information 33.
  • dependency relation database 332 dependence relations are defined by directed graphs (arrows), and the importance of the dependence relations is associated with the directed graph.
  • All nodes in the vehicle formation including the vehicle formation 10 itself, include the vehicle formation 10, middle nodes such as vehicles, and terminal nodes such as SIVs or storage batteries.
  • a terminal node is a node that has no dependent node, that is, a node that has no directed graph toward itself.
  • FIG. 6 is a comparative example with respect to the present embodiment, and is a diagram illustrating a comparative example of a setting example in a dependency relationship with the vehicle formation 10 as the apex.
  • the dependence relationships of a plurality of nodes, the importance level w of each node, and the calculated health evaluation value H are set.
  • 100 indicates the healthiest state
  • 0 indicates the most abnormal, ie, dangerous state.
  • FIG. 7 is a flow diagram of equipment health evaluation processing by equipment evaluation section 302 according to the present embodiment.
  • the device health evaluation process is executed by the device evaluation unit 302 of the health evaluation device 300. Further, the device health evaluation process corresponds to a part of the detailed flow of step S102 in the overall flow diagram of FIG. 3.
  • the equipment health evaluation process is a process for evaluating the health of the terminal nodes in the vehicle formation to be evaluated. In the example of FIG. 5, node 1, node 2, node 3, and node 4 are the terminal nodes.
  • step S201 the equipment health estimating unit 321 estimates the health of the end node as a health evaluation value based on the equipment operation data or visual inspection data corresponding to the end node configuring the vehicle formation.
  • step S202 the equipment operation deadline estimating unit 322 calculates the operation deadline of the terminal node based on the health evaluation value of the terminal node.
  • step S203 each piece of information including the health evaluation value and the operation deadline is stored in the equipment health database.
  • Step S303> the organization health estimating unit 331 acquires the health evaluation value and operation deadline of the lower node 21 on which the evaluation target node 20 depends. Additionally, the organization health estimating unit 331 obtains the degree of importance of the dependency relationship between the evaluation target node 20 and the lower node 21. The organization health estimation unit 331 acquires health evaluation information including the health evaluation value and operation deadline of the lower node 21 from the equipment health database 323 or the organization health database 334.
  • the equipment health database 323 or the organization health database 334 When the lower node 21 is a terminal node, health evaluation information is obtained from the equipment health database 323.
  • the lower node 21 is an intermediate element node such as a vehicle or a power source, the health evaluation information is obtained from the organization health database 334.
  • the middle node 1 is the evaluation target node 20
  • the health evaluation value H and the corresponding importance level w of each of the nodes 1, 2, 3, and 4 are obtained.
  • the evaluation value calculation unit 313 performs processing on one lower node among all the lower nodes, which are a plurality of lower nodes.
  • the evaluation value calculation unit 313 determines whether the lower node to be processed has a health evaluation value equal to or greater than the first threshold th1, which is the largest among the plurality of thresholds. That is, the evaluation value calculation unit 313 determines whether or not H node_x ⁇ th1 regarding the health evaluation value H node_x of the lower node x.
  • the weighting coefficient ⁇ times is, for example, a constant multiplier such as 2 times, 3 times, or 5 times. ⁇ may be set in any way depending on conditions such as the importance, risk, or cost of each node in the vehicle formation. Through this process, by increasing the importance of lower nodes with relatively small health evaluation values, it is possible to reflect the deterioration of some lower nodes to a greater extent in the health evaluation value of the evaluation target node 20. .
  • step S346 the evaluation value calculation unit 313 determines whether the integrated importance w' has been obtained for all lower nodes. If the integrated importance w' has been acquired for all lower nodes, the process advances to step S347.
  • step S347 the evaluation value calculation unit 313 multiplies the health evaluation value H node_x of each lower node by the integrated importance w'node_x , adds the value obtained by the multiplication, and evaluates the value obtained by the addition. Processing is performed to determine the health evaluation value of the target node 20. That is, the evaluation value calculation unit 313 performs weighted addition of the health evaluation value of the evaluation target node 20 using the integrated importance w' that is the corrected importance.
  • the health evaluation value Hp of the evaluation target node 20 is calculated using the integrated importance w' that is the corrected importance. It is assumed that the evaluation target node depends on the health of N lower nodes.
  • Equation 1 it is possible to appropriately reflect the abnormality or deterioration state of some nodes in the health evaluation value of the higher-order node.
  • ⁇ Variation 1> As shown in FIG. 5, it is assumed that middle node 1 depends on nodes 1, 2, 3, and 4.
  • ⁇ Variation 2> As shown in FIG. 5, it is assumed that middle node 1 depends on nodes 1, 2, 3, and 4.
  • the health evaluation values and importance levels of nodes 1, 2, 3, and 4 are the same as those of nodes 1, 2, 3, and 4 in FIG.
  • the health evaluation value Hp of the middle node 1 is 20, which is the smallest among the lower nodes.
  • the health evaluation value of the middle node 1 is 60, and the information of the node 4 in a dangerous state is rounded off due to information integration.
  • the health evaluation value Hp of the middle node 1 is 20, and the information on the node 4 is appropriately reflected in the health evaluation value of the middle node 1.
  • step S305 the deadline estimating unit 333 calculates the operation deadline 32 of the evaluation target node 20 based on the dependency relationship information 33 and the operation deadline of the lower node.
  • the organization evaluation unit 303 stores the health evaluation value 31 and the operation deadline 32 of the evaluation target node 20 in the organization health database 334 .
  • the operation deadline at the lower node includes the operation deadline at the terminal node.
  • the deadline estimation unit 333 extracts the worst value from among the operation deadlines of all the nodes on which the evaluation target node 20 depends, and calculates the operation deadline 32 of the evaluation target node 20 based on the worst value.
  • the deadline estimating unit 333 extracts the operational deadline whose date is closest to the evaluation time as the worst value. That is, the deadline estimating unit 333 sets the earliest operating deadline among the operating deadlines of the lower nodes of the evaluation target node 20 as the operation deadline 32 of the evaluation target node 20 .
  • step S306 the organization health estimation unit 331 stores the health evaluation value 31 and operation deadline 32 of the evaluation target node 20 in the organization health database 334 as the health evaluation information 34 of the evaluation target node 20.
  • step S307 the formation health estimating unit 331 checks whether the health evaluation of all nodes in the vehicle formation including the vehicle formation itself (the vehicle formation, intermediate elements such as vehicles, and each node) has been completed. If the process has not been completed, the process returns to step S302 to repeat the process, and if the process has been completed, the process ends.
  • the middle node 1 corresponds to the evaluation target node 20.
  • the nodes whose health evaluation has been completed up to that point are referred to, and a node that depends only on one of them is set as the next evaluation target node, and finally The process is completed when the soundness evaluation of the "vehicle formation" is completed.
  • FIG. 10 is a flow diagram of visualization information generation processing by the visualization information generation unit 335 according to the present embodiment.
  • the visualization information generation process is executed by the visualization information generation unit 335. Further, this process corresponds to the detailed flow of step S106 in the overall flow diagram of FIG.
  • the visualization information generation unit 335 completes the calculation of the health evaluation value and operation deadline for the vehicle formation
  • the visualization information generation unit 335 generates an inspection deadline representing the deadline for each inspection of the vehicle formation and each node based on the operation deadline of each node. calculate.
  • the visualization information generation unit 335 then generates visualization information 35 for visualizing the health and inspection deadlines of the vehicle formation and each node.
  • the visualization information generation unit 335 calculates a recommended inspection deadline for recommending the start of each inspection of the vehicle composition and each node, based on the respective inspection deadlines of the vehicle composition and each node.
  • the visualization information generation unit 335 also includes information for visualizing the respective recommended inspection deadlines of the vehicle formation and each node in the visualization information 35.
  • the visualization information generation unit 335 generates visualization information 35 that visualizes the health, inspection deadline, and recommended inspection deadline of each vehicle configuration and each node as a time series transition from the past to the present and further into the future. .
  • step S401 the visualization information generation unit 335 acquires the physical configuration information of the vehicle formation stored in the physical configuration database 336.
  • the visualization information generation unit 335 acquires the vehicle configuration stored in the configuration health database 334 and the health evaluation information of all nodes constituting the vehicle configuration.
  • the visualization information generation unit 335 calculates each node's inspection deadline and recommended inspection deadline based on the operation deadline of the health evaluation information.
  • the visualization information generation unit 335 sorts the acquired health evaluation information of all nodes according to the acquired physical configuration information.
  • the inspection deadline is a date subtracted from the operation deadline in consideration of the number of days required for inspection of the node.
  • the recommended inspection deadline is the date subtracted from the inspection deadline by taking into account the number of days required to procure replacement parts for maintenance of the node and the minimum number of days (lead time) required to secure maintenance personnel.
  • the number of days required for inspection and lead time can be set individually for each vehicle formation and each node that constitutes the vehicle formation, and can be set and changed by maintenance personnel using the health monitoring device 500. .
  • the visualization information generation unit 335 transmits the visualization information 35 of the vehicle formation health to the health monitoring device 500 in the process of step S107.
  • FIG. 11 is an example of visualization information 35 that visualizes the health evaluation information according to the present embodiment.
  • FIG. 11 shows a display example in which the health monitoring device 500 visualizes the vehicle formation to be evaluated and the health evaluation information of each of the plurality of nodes forming the vehicle formation.
  • the vehicle configuration and each node are arranged in the sorted order based on the physical configuration of the nodes in the vehicle configuration by the process of step S404.
  • the health evaluation value at the time of evaluation (currently) is set.
  • information regarding the inspection deadline of the device (recommended inspection deadline/inspection deadline/operation deadline) is set.
  • time-series changes in health evaluation values from the past to the present and even into the future are displayed.
  • the health evaluation value may be displayed as a numerical value, or may be converted and displayed as several types of label information such as "healthy”, “needs caution”, and “danger” as shown in FIG. 11. Furthermore, in the time-series change portion of the soundness evaluation value, lines may be displayed in a superimposed manner so that the current date and each date of the recommended inspection deadline/inspection deadline/operation deadline of the vehicle composition can be seen.
  • FIG. 12 is a flow diagram of processing for defining the dependency relationship database 332 and the physical configuration database 336 according to this embodiment.
  • FIG. 12 shows a processing flow related to definition of equipment dependency relationship information and equipment physical configuration information necessary for vehicle formation health evaluation.
  • the information setting unit 304 of the health evaluation device 300 acquires information on the dependencies and physical configurations of a plurality of nodes from the control device of the vehicle formation to be evaluated, and stores it in a database.
  • the information setting unit 304 acquires information for modifying or changing information on dependencies and physical configurations of a plurality of nodes, and modifies or changes the database.
  • Information for modifying or changing the dependencies and physical configuration information of a plurality of nodes may be obtained from a maintenance person via the input device of the health monitoring device 500, for example.
  • step S501 the vehicle data receiving unit 301 acquires information on the dependency relationship and physical configuration of each node configuring the vehicle formation from a control device included in the vehicle formation.
  • step S502 the information setting unit 304 constructs the dependency relationship of each node configuring the vehicle formation as dependency relationship information 33.
  • step S503 the information setting unit 304 modifies/changes the constructed dependency relationship information 33 based on the information acquired by the setting information receiving unit 306.
  • step S504 stores the modified/changed dependency relationship information 33 in the dependency relationship database 332.
  • step S505 the information setting unit 304 constructs the physical configuration of each node configuring the vehicle formation as physical configuration information 36.
  • step S506 the information setting unit 304 modifies and changes the constructed physical configuration information 36 based on the information acquired by the setting information receiving unit 306.
  • step S507 the information setting unit 304 stores the corrected/changed physical configuration information 36 in the physical configuration database 336.
  • each device of health evaluation system 700 are realized by software.
  • the functions of each device of the health evaluation system 700 may be realized by hardware.
  • each device of the health evaluation system 700 includes an electronic circuit instead of a calculation device.
  • the electronic circuit is a dedicated electronic circuit that realizes the functions of each device of the health evaluation system 700.
  • the electronic circuit is specifically a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, a logic IC, a GA, an ASIC, or an FPGA.
  • GA is an abbreviation for Gate Array.
  • ASIC is an abbreviation for Application Specific Integrated Circuit.
  • FPGA is an abbreviation for Field-Programmable Gate Array.
  • each device in the health evaluation system 700 may be realized by one electronic circuit, or may be realized by being distributed among multiple electronic circuits.
  • part of the functions of each device of the health evaluation system 700 may be realized by an electronic circuit, and the remaining functions may be realized by software. Further, some or all of the functions of each device of the health evaluation system 700 may be realized by firmware.
  • a mode has been described in which the first threshold th1 and the second threshold th2 are used as the plurality of thresholds in the integration process of integrating the health evaluation values of lower nodes.
  • a second threshold smaller than the first threshold th1 is used as a plurality of thresholds.
  • An aspect using the third threshold value th3 larger than th2 will be described.
  • the configuration of health evaluation system 700 according to this embodiment is the same as that of Embodiment 1.
  • the threshold database 311 in FIG. 2 stores a third threshold th3 that is smaller than the first threshold th1 and larger than the second threshold th2.
  • the weighting coefficient ⁇ includes a first weighting coefficient ⁇ 1 and a second weighting coefficient ⁇ 2.
  • the second weighting coefficient ⁇ 2 is larger than the first weighting coefficient ⁇ 1, that is, ⁇ 2> ⁇ 1.
  • the evaluation value calculation unit 313 assigns a first weight to the corresponding importance w for a lower node having a health evaluation value smaller than the first threshold th1 and greater than or equal to the third threshold th3.
  • the value multiplied by the coefficient ⁇ 1 is calculated as the integrated importance w'.
  • the evaluation value calculation unit 313 multiplies the corresponding importance w by the second weighting coefficient ⁇ 2 for lower nodes having a health evaluation value smaller than the third threshold th3 and larger than the second threshold th2.
  • the obtained value is calculated as the integrated importance w'.
  • the second weighting coefficient ⁇ 2 takes a larger value than the first weighting coefficient ⁇ 1, for a lower node with a smaller health evaluation value, its health evaluation value is set to be larger than the health evaluation value of the evaluation target node 20. It can be reflected.
  • FIG. 13 is a flow diagram of the process of calculating the health evaluation value of the evaluation target node 20 according to the present embodiment.
  • the flow diagram in FIG. 13 corresponds to the detailed flow of step S304 in FIG. 8 described in the first embodiment.
  • the processing from step S344a to step S346 is performed when all of the health evaluation values of the lower nodes are larger than the second threshold th2, that is, when the health evaluation values of the lower nodes are less than or equal to the second threshold th2.
  • This process is performed when there is no lower node that has a lower node.
  • an integrated importance w' is calculated for each of all lower nodes according to the magnitude relationship between the health evaluation value and the first threshold th1 and the third threshold th3.
  • the health evaluation value of the evaluation target node 20 is calculated by adding the value obtained by multiplying the health evaluation value and the integrated importance w' for each of all lower nodes. Specifically, it is as follows.
  • the evaluation value calculation unit 313 processes one lower node among all the lower nodes, which are multiple lower nodes of the evaluation target node 20.
  • step S344a the evaluation value calculation unit 313 determines whether or not the lower node to be processed has a health evaluation value equal to or higher than the third threshold th3. That is, the evaluation value calculation unit 313 determines whether or not H node_x ⁇ th3 regarding the health evaluation value H node_x of the lower node x.
  • step S344b If the health evaluation value is equal to or greater than the third threshold th3, the process advances to step S344b. If the health evaluation value is not greater than or equal to the third threshold th3, the process advances to step S350b.
  • step S350b the health evaluation value of the lower node to be processed is smaller than the third threshold th3 and larger than the second threshold th2.
  • step S344b the evaluation value calculation unit 313 determines whether the lower node to be processed has a health evaluation value equal to or greater than the first threshold th1. That is, the evaluation value calculation unit 313 determines whether or not H node_x ⁇ th1 regarding the health evaluation value H node_x of the lower node x.
  • step S345 If the health evaluation value is equal to or greater than the first threshold th1, the process advances to step S345. If the health evaluation value is not greater than or equal to the first threshold th1, the process advances to step S350a.
  • step S350a the health evaluation value of the lower node to be processed is smaller than the first threshold th1 and greater than or equal to the third threshold th3.
  • the evaluation value calculation unit 313 adds a first weighting coefficient ⁇ 1 to the corresponding importance w for lower nodes having a health evaluation value smaller than the first threshold th1 and greater than or equal to the third threshold th3.
  • the second weighting coefficient ⁇ 2 takes a larger value than the first weighting coefficient ⁇ 1
  • its health evaluation value is used as the health of the evaluation target node 20. This can be reflected more greatly in the gender evaluation value.
  • the health evaluation value Hp of the middle node 1 (0.2 ⁇ 100+0.9 ⁇ 70+1.8 ⁇ 40+1.2 ⁇ 30)/(0.2+0.9+1.8+1.2) ⁇ 46.6.
  • two threshold values th1 and th2 are used for determining the dynamic determination of the integration process. Furthermore, in this embodiment, three threshold values th1, th2, and th3 are used for dynamic determination of the integration process. By employing the method of the embodiment described above, it is also possible to dynamically determine the integration process using four or more threshold values.
  • the information integration logic can be dynamically changed according to the health evaluation value of each dependent lower node using the three threshold values. .
  • the soundness evaluation system 700 according to the present embodiment in addition to the effect of improving the overall soundness evaluation value calculation by reducing the influence of information rounding, by increasing the number of threshold values (case classification), The effect of connecting the changes in evaluation values before and after the threshold value more smoothly can also be obtained.
  • each part of each device of the health evaluation system has been described as an independent functional block.
  • the configuration of each device of the health evaluation system does not have to be the configuration of the above-described embodiment.
  • the functional blocks of each device of the health evaluation system may have any configuration as long as they can realize the functions described in the embodiments described above.
  • each device of the health evaluation system may not be one device, but may be a system composed of a plurality of devices.
  • a plurality of parts of Embodiments 1 and 2 may be combined and implemented. Alternatively, one part of these embodiments may be implemented.
  • these embodiments may be implemented in any combination, in whole or in part. That is, in Embodiments 1 and 2, it is possible to freely combine each embodiment, to modify any component of each embodiment, or to omit any component in each embodiment.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Health & Medical Sciences (AREA)
  • Accounting & Taxation (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Mechanical Engineering (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

健全性評価装置(300)は、複数のノードから構成される車両編成の健全性を評価する。機器評価部(302)は、複数のノードのうち依存する下位ノードが存在しない末端のノードについて、健全性を表す健全性評価値を算出する、編成評価部(303)は、依存関係データベース(332)から、複数のノードの各ノード同士の依存関係が設定された依存関係情報を取得する。編成評価部(303)の編成健全性推定部(331)は、評価対象ノードについて、下位ノードの健全性評価値と複数の閾値の各々との大小関係に応じて、下位ノードの健全性評価値を統合する統合処理を動的に決定し、動的に決定される統合処理により評価対象ノードの健全性評価値(31)を算出する。

Description

健全性評価装置、健全性評価方法、および健全性評価プログラム
 本開示は、健全性評価装置、健全性評価方法、および健全性評価プログラムに関する。特に、車両編成に関する健全性を評価する健全性評価システム、健全性評価装置、健全性評価方法、および健全性評価プログラムに関する。
 近年、鉄道保守の状態基準保全化による保守効率化および最適化が進められている。状態基準保全化は、CBM化ともいわれる。CBMは、Condition Based Maintenanceの略語である。保守計画の立案には、車両編成中の各構成機器に対する個別の健全性評価だけでは不十分であり、保守の単位である車両編成ごとに健全性を評価する必要がある。しかし、各構成機器の重要性を考慮した統合的な評価はできておらず、正確な保守タイミングの判断が困難である。
 特許文献1には、複数のノード間の接続関係が階層構造で構成されるサービスシステムにおいて、各ノードの健全動作率と上位ノードに対するインパクト値を用いて最上位ノードの健全動作率を算出する技術が開示されている。
特開2011-180805号公報
 特許文献1に対して車両編成と当該車両編成が備える複数の構成機器との関係を表した階層構造を当てはめ、最上位ノードである車両編成の健全動作率を算出することが考えられる。特許文献1の技術では、各ノードの健全動作率と上位ノードに対するインパクト値とを用いて最上位ノードの健全動作率を算出している。
 しかし、特許文献1の技術では、一部のノードにおいて健全性が劣化した場合、上位ノードに健全性が情報統合されるにつれて健全性における劣化情報が丸められてしまう。よって、車両編成全体の健全性を算出する際に、一部のノードの状態が悪いことが見えにくくなってしまうという課題がある。
 本開示では、健全性評価の対象となる評価対象ノードの各下位ノードの健全性評価値と複数の閾値の各々との大小関係に応じて、下位ノードの健全性評価値を統合する統合処理を動的に決定する。これにより、本開示では、一部の下位ノードの異常あるいは劣化状態を評価対象ノードの健全性評価値に適切に反映させることで、結果的に最上位ノードである車両編成の健全性評価値に適切に反映させることを目的とする。
 本開示に係る健全性評価装置は、複数のノードから構成される車両編成の健全性を評価する健全性評価装置において、
 前記複数のノードのうち依存する下位ノードが存在しない末端のノードについて、健全性を表す健全性評価値を算出する機器評価部と、
 前記車両編成を頂点とし、前記複数のノードの各ノード同士の依存関係が設定された依存関係情報を格納する依存関係データベースから前記依存関係情報を取得し、前記複数のノードのうち評価対象の評価対象ノードであって依存する下位ノードが存在する評価対象ノードについて、前記下位ノードの健全性評価値と複数の閾値の各々との大小関係に応じて、前記下位ノードの健全性評価値を統合する統合処理を動的に決定し、動的に決定される統合処理により前記評価対象ノードの健全性評価値を算出する編成評価部と
を備える。
 本開示に係る健全性評価装置では、編成評価部が、評価対象ノードの下位ノードにおける健全性評価値と複数の閾値の各々との大小関係に応じて、下位ノードの健全性評価値を統合する統合処理を動的に決定する。よって、本開示に係る健全性評価装置によれば、一部のノードの異常あるいは劣化状態を評価対象ノードの健全性評価値に適切に反映させることで、結果的に最上位ノードである車両編成の健全性評価値に適切に反映させることができるという効果を奏する。
実施の形態1に係る健全性評価システムの構成例を示す図。 実施の形態1に係る編成評価部における編成健全性推定部の詳細構成例を示す図。 実施の形態1に係る健全性評価システムのハードウェア構成例を示す図。 実施の形態1に係る健全性評価装置による健全性評価処理の全体フロー図。 実施の形態1に係る依存関係データベースに格納されている依存関係情報の構築例を示す図。 実施の形態1に対する比較例であり、車両編成10を頂点とした依存関係における設定例の比較例を示す図。 実施の形態1に係る機器評価部による機器健全性評価処理のフロー図。 実施の形態1に係る編成評価部による編成健全性評価処理のフロー図。 実施の形態1に係る評価対象ノードの健全性評価値を算出する処理のフロー図。 実施の形態1に係る可視化情報生成部による可視化情報生成処理のフロー図。 実施の形態1に係る健全性評価情報を可視化した可視化情報の例を示す図。 実施の形態1に係る依存関係データベースと物理構成データベースを定義する処理のフロー図。 実施の形態2に係る評価対象ノードの健全性評価値を算出する処理のフロー図。
 以下、本実施の形態について、図を用いて説明する。各図中、同一または相当する部分には、同一符号を付している。実施の形態の説明において、同一または相当する部分については、説明を適宜省略または簡略化する。また、以下の図では各構成部材の大きさの関係が実際のものとは異なる場合がある。また、実施の形態の説明において、上、下、左、右、前、後、表、裏といった向きあるいは位置が示されている場合がある。これらの表記は、説明の便宜上の記載であり、装置、器具、あるいは部品の配置、方向および向きを限定するものではない。
 実施の形態1.
***構成の説明***
 図1は、本実施の形態に係る健全性評価システム700の構成例を示す図である。
 健全性評価システム700は、複数のノード11から構成される車両編成10の健全性を評価するシステムである。ノード11は、車両編成10を構成する構成機器、あるいは単に機器とも称される。
 健全性評価システム700は、車両編成装置100、車両外観検査装置200、健全性評価装置300、計画生成装置400、および、健全性監視装置500からなる。
 以下において、健全性評価システム700の各装置が備える各機能要素の機能を簡単に説明する。
 車両編成装置100は、評価対象となる車両編成10に搭載される車載装置である。車両編成10は、例えば、鉄道車両編成である。車両編成装置100は、鉄道車両編成と称されることがある。
 車両外観検査装置200は、評価対象の車両編成10の各部の外部状態を検査する。
 健全性評価装置300は、車両編成10に対する健全性評価を行う。健全性評価装置300は、複数のノード11から構成される車両編成10の健全性を評価する装置である。
 計画生成装置400は、健全性評価装置300が算出した車両編成10の健全性評価情報34を用いて保守計画および運用計画といった計画を算出する。
 健全性監視装置500は、健全性評価で用いるノードの依存関係情報33あるいはノードの物理構成情報36といった各種定義情報の設定あるいは変更を行う。また、健全性監視装置500は、健全性評価装置300が算出した健全性評価情報34を確認および監視する。
 車両編成装置100において、車両編成10は、N個のノード11の集合体として構成される。車両編成装置100は、稼働データ収集部101と稼働データ送信部102を備える。稼働データ収集部101は、各ノードから稼働中の状態データを機器稼働データとして取得する。稼働データ送信部102は、機器稼働データを健全性評価装置300に送信する。
 車両外観検査装置200は、評価対象となる車両編成10の外観から各部の状態を検査する外観検査部201と、外観検査部201が検査した結果データである外観検査データを健全性評価装置300に送信する検査データ送信部202を備える。
 健全性評価装置300は、車両データ受信部301、機器評価部302、編成評価部303、情報設定部304、評価情報送信部305、および、設定情報受信部306を備える。
 車両データ受信部301は、車両編成装置100から送信される機器稼働データ、ノードの依存関係、および物理構成情報を受信する。また、車両データ受信部301は、車両外観検査装置200から送信される外観検査データを受信する。
 機器評価部302は、車両編成10の各ノードについて健全性を評価する。特に、機器評価部302では、複数のノード11のうち、自ノードが依存する下位ノードが存在しない末端のノードについて、健全性を評価する。
 編成評価部303は、各ノード11について、下位ノードの健全性評価値を情報統合して健全性評価値31を算出する。そして、編成評価部303は、各ノード11についての健全性評価値31を含む健全性評価情報34を用いて、車両編成10全体における健全性を評価する。
 情報設定部304は、車両編成10に対する健全性評価に必要なノード11の依存関係情報33、および、ノード11の物理構成情報36といった各種定義情報を生成する。情報設定部304は、依存関係情報33を依存関係データベース332に格納し、物理構成情報36を物理構成データベース336に格納する。
 評価情報送信部305は、編成評価部303により算出された健全性評価情報34を計画生成装置400と健全性監視装置500に送信する。
 設定情報受信部306は、健全性監視装置500において設定された各種定義情報を受信する。
 さらに、機器評価部302は、機器健全性推定部321、機器運用期限推定部322、および、機器健全性データベース323を備える。
 機器健全性推定部321は、車両編成10における末端のノード11に対する健全性を健全性評価値31として推定する。
 機器運用期限推定部322は、健全性評価値31から当該ノードの運用期限32を推定する。
 機器健全性データベース323は、推定した健全性評価値31と運用期限32を格納する。
 編成評価部303は、編成健全性推定部331、依存関係データベース332、期限推定部333、編成健全性データベース334、可視化情報生成部335、および、物理構成データベース336を備える。
 編成健全性推定部331は、車両編成10のノード11の各々について、自ノードが依存する各下位ノードの健全性評価値の情報統合を行う。編成健全性推定部331は、車両編成10のノード11における健全性評価値31を、当該ノード11の下位ノードの健全性評価値と複数の閾値の各々との大小関係に応じて算出する。このとき、編成健全性推定部331は、下位ノードの健全性評価値と複数の閾値の各々との大小関係に応じて、下位ノードの健全性評価値を統合する統合処理の方式を動的に決定する。
 図2は、本実施の形態に係る編成評価部303における編成健全性推定部331の詳細構成例を示す図である。
 編成健全性推定部331は、閾値データベース311、判定部312、および評価値算出部313を備える。
 閾値データベース311は、下位ノードの健全性評価値との大小関係を判定するための複数の閾値を格納する。例えば、閾値データベース311には、第1の閾値th1と第2の閾値th2とが格納される。
 判定部312および評価値算出部313の機能については、後述する。
 依存関係データベース332は、車両編成10に対する健全性の推定に必要なノード11の依存関係情報33を格納する。
 期限推定部333は、車両編成10における健全性評価値31から車両編成10の運用期限32を推定する。
 編成健全性データベース334は、推定した車両編成10の健全性評価値31と車両編成10の運用期限32を格納する。
 健全性評価値31と運用期限32とを含む情報を、健全性評価情報34とする。
 可視化情報生成部335は、車両編成10の健全性評価値31と車両編成10の運用期限32を可視化するための可視化情報35を生成する。
 物理構成データベース336は、可視化情報35の生成に必要なノード、すなわち機器の物理構成情報36を格納する。
 計画生成装置400は、健全性評価装置300が算出した車両編成10の健全性評価情報34を受信する健全性評価情報受信部401と、受信した健全性評価情報34をもとに車両編成10の保守計画あるいは運用計画を立案する計画部402を備える。
 健全性監視装置500は、可視化情報受信部501、情報可視化部502、情報設定部503、および、設定情報送信部504を備える。
 可視化情報受信部501は、健全性評価装置300が算出した車両編成10の健全性評価情報34を可視化する可視化情報35を受信する。
 情報可視化部502は、受信した健全性評価情報34を可視化する。
 情報設定部503は、健全性評価で用いるノードの依存関係情報33あるいはノードの物理構成情報36といった各種定義情報の設定を行う。
 設定情報送信部504は、設定したノードの依存関係情報33あるいはノードの物理構成情報36といった各種定義情報を健全性評価装置300に送信する。
 図3は、本実施の形態に係る健全性評価システム700のハードウェア構成例を示す図である。
 健全性評価システム700のハードウェア構成は、車両編成装置100、車両外観検査装置200、健全性評価装置300、計画生成装置400、および、健全性監視装置500からなる。健全性評価システム700の各装置はネットワークを介して通信する。
 健全性評価装置300と計画生成装置400は、オンプレミスなサーバでもよいしクラウド上に構成されたサーバでもよい。
 車両編成装置100は、評価対象となる車両編成を構成するノード、各ノードの動作を制御する制御装置、および、各ノードの稼働状況をセンシングするセンサを備える。また、車両編成装置100は、健全性評価装置へ送信するための機器稼働データを生成する演算装置、および、機器稼働データの生成演算における中間データあるいは生成済の機器稼働データの各情報を一時記憶する主記憶装置を備える。また、車両編成装置100は、生成済の機器稼働データを健全性評価装置へ送信する通信装置を備える。
 車両外観検査装置200は、車両編成の外観から各部の状態を計測するセンサを備える。また、車両外観検査装置200は、健全性評価装置へ送信するための外観検査データを生成する演算装置、および、外観検査データの生成演算における中間データあるいは生成済の外観検査データを一記憶する主記憶装置を備える。また、車両外観検査装置200は、生成済の外観検査データを健全性評価装置に送信する通信装置を備える。
 健全性評価装置300は、ノードの健全性評価、車両編成の健全性評価、車両編成健全性の可視化情報生成、および各種情報設定の各種処理を行う演算装置を備える。また、健全性評価装置300は、演算装置における各種中間データあるいは生成済のノードの健全性評価情報、車両編成の健全性評価情報、および可視化情報の各情報を一時記憶する主記憶装置を備える。また、健全性評価装置300は、生成済のノードの健全性評価情報、および、車両編成の健全性評価情報、ノードの依存関係情報およびノードの物理構成情報を格納する外部記憶装置を備える。また、健全性評価装置300は、機器稼働データ、外観検査データ、ノードの依存関係あるいはノードの物理構成に関する各種設定情報データを受信、また、車両編成の健全性評価情報を送信する通信装置を備える。
 計画生成装置400は、受信した車両編成の健全性評価情報から車両編成の保守計画あるいは運用計画を生成する演算装置、および、保守計画あるいは運用計画の生成演算における中間データを一時保存する主記憶装置を備える。また、計画生成装置400は、生成済の保守計画情報データあるいは運用計画情報データを格納する外部記憶装置、および、車両編成の健全性評価情報を受信する通信装置を備える。
 健全性監視装置500は、受信した可視化のための車両編成の健全性評価情報の可視化処理、およびノードの依存関係あるいはノードの物理構成といった各種定義情報の生成処理を行う演算装置を備える。また、健全性監視装置500は、各演算における中間データを一時記憶する主記憶装置を備える。また、健全性監視装置500は、車両編成健全性評価に関する可視化情報データの受信、およびノードの依存関係あるいはノードの物理構成といった各種定義情報の送信を行う通信装置を備える。また、健全性監視装置500は、車両編成の健全性評価の可視化情報を表示する表示装置、ノードの依存関係あるいはノードの物理構成といった各種定義情報を入力するための入力装置を備える。
 車両編成装置100、車両外観検査装置200、健全性評価装置300、計画生成装置400、および、健全性監視装置500の各装置を、健全性評価システム700の各装置と呼ぶ場合がある。
 健全性評価システム700の各装置は、コンピュータである。
 以下では、健全性評価システム700の各装置が備える、演算装置、主記憶装置、外部記憶装置、通信装置、入力インタフェース、出力インタフェース、および通信装置について説明する。入力インタフェースは入力装置に接続される。出力インタフェースは表示装置に接続される。
 コンピュータである健全性評価システム700の各装置は、演算装置を備えるとともに、主記憶装置、外部記憶装置、入力インタフェース、出力インタフェース、および通信装置といった他のハードウェアを備える。演算装置は、プロセッサともいう。主記憶装置は、メモリともいう。演算装置は、信号線を介して他のハードウェアと接続され、これら他のハードウェアを制御する。
 車両編成装置100は、機能要素として、稼働データ収集部101と稼働データ送信部102を備える。
 車両外観検査装置200は、機能要素として、外観検査部201と検査データ送信部202を備える。
 健全性評価装置300は、機能要素として、車両データ受信部301と機器評価部302と編成評価部303と情報設定部304と評価情報送信部305と設定情報受信部306を備える。
 計画生成装置400は、機能要素として、健全性評価情報受信部401と計画部402を備える。
 健全性監視装置500は、機能要素として、可視化情報受信部501と情報可視化部502と情報設定部503と設定情報送信部504を備える。
 以下では、主に、健全性評価装置300を例としてハードウェアを説明するが、他の装置においても以下の説明を適用することができる。
 例えば、コンピュータの機能要素は、ソフトウェアにより実現される。
 演算装置は、健全性評価プログラムを実行する装置である。例えば、健全性評価装置300では、健全性評価プログラムは、車両データ受信部301と機器評価部302と編成評価部303と情報設定部304と評価情報送信部305と設定情報受信部306の機能を実現するプログラムである。
 演算装置は、演算処理を行うICである。演算装置の具体例は、CPU、DSP、GPUである。ICは、Integrated Circuitの略語である。CPUは、Central Processing Unitの略語である。DSPは、Digital Signal Processorの略語である。GPUは、Graphics Processing Unitの略語である。
 主記憶装置は、データを一時的に記憶する記憶装置である。主記憶装置の具体例は、SRAM、あるいはDRAMである。SRAMは、Static Random Access Memoryの略語である。DRAMは、Dynamic Random Access Memoryの略語である。
 外部記憶装置は、データを保管する記憶装置である。外部記憶装置の具体例は、HDDである。また、外部記憶装置は、SD(登録商標)メモリカード、CF、NANDフラッシュ、フレキシブルディスク、光ディスク、コンパクトディスク、ブルーレイ(登録商標)ディスク、DVDといった可搬の記憶媒体であってもよい。なお、HDDは、Hard Disk Driveの略語である。SD(登録商標)は、Secure Digitalの略語である。CFは、CompactFlash(登録商標)の略語である。DVDは、Digital Versatile Diskの略語である。
 入力インタフェースは、マウス、キーボード、あるいはタッチパネルといった入力装置と接続されるポートである。入力インタフェースは、具体的には、USB端子である。なお、入力インタフェースは、LANと接続されるポートであってもよい。USBは、Universal Serial Busの略語である。LANは、Local Area Networkの略語である。
 出力インタフェースは、ディスプレイといった表示装置のケーブルが接続されるポートである。出力インタフェースは、具体的には、USB端子またはHDMI(登録商標)端子である。ディスプレイは、具体的には、LCDである。出力インタフェースは、表示器インタフェースともいう。HDMI(登録商標)は、High Definition Multimedia Interfaceの略語である。LCDは、Liquid Crystal Displayの略語である。
 通信装置は、レシーバとトランスミッタを有する。通信装置は、LAN、インターネット、あるいは電話回線といった通信網に接続している。通信装置は、具体的には、通信チップまたはNICである。NICは、Network Interface Cardの略語である。
 健全性評価プログラムは、健全性評価システム700の各装置において実行される。健全性評価プログラムは、演算装置に読み込まれ、演算装置によって実行される。主記憶装置には、健全性評価プログラムだけでなく、OSも記憶されている。OSは、Operating Systemの略語である。演算装置は、OSを実行しながら、健全性評価プログラムを実行する。健全性評価プログラムおよびOSは、外部記憶装置に記憶されていてもよい。外部記憶装置に記憶されている健全性評価プログラムおよびOSは、主記憶装置にロードされ、演算装置によって実行される。なお、健全性評価プログラムの一部または全部がOSに組み込まれていてもよい。
 健全性評価装置300は、演算装置を代替する複数のプロセッサを備えていてもよい。これら複数のプロセッサは、健全性評価プログラムの実行を分担する。それぞれのプロセッサは、演算装置と同じように、健全性評価プログラムを実行する装置である。
 健全性評価プログラムにより利用、処理または出力されるデータ、情報、信号値および変数値は、主記憶装置、外部記憶装置、または、演算装置内のレジスタあるいはキャッシュメモリに記憶される。
 例えば、健全性評価装置300では、車両データ受信部301と機器評価部302と編成評価部303と情報設定部304と評価情報送信部305と設定情報受信部306の各部の「部」を「回路」、「工程」、「手順」、「処理」、あるいは「サーキットリー」に読み替えてもよい。健全性評価プログラムは、車両データ受信処理と機器評価処理と編成評価処理と情報設定処理と評価情報送信処理と設定情報受信処理を、コンピュータに実行させる。車両データ受信処理と機器評価処理と編成評価処理と情報設定処理と評価情報送信処理と設定情報受信処理の「処理」を「プログラム」、「プログラムプロダクト」、「プログラムを記憶したコンピュータ読取可能な記憶媒体」、または「プログラムを記録したコンピュータ読取可能な記録媒体」に読み替えてもよい。また、健全性評価方法は、健全性評価システム700の各装置が健全性評価プログラムを実行することにより行われる方法である。
 健全性評価プログラムは、コンピュータ読取可能な記録媒体に格納されて提供されてもよい。また、健全性評価プログラムは、プログラムプロダクトとして提供されてもよい。
***動作の説明***
 次に、本実施の形態に係る健全性評価システム700の動作について説明する。健全性評価システム700の動作手順は、健全性評価方法に相当する。また、健全性評価システム700の動作を実現するプログラムは、健全性評価処理をコンピュータに実行させる健全性評価プログラムに相当する。健全性評価システム700の動作とは、健全性評価システム700の各装置の動作である。
 また、健全性評価値31を算出する評価対象のノード11、すなわち評価対象機器を評価対象ノード20と称して説明する。
 健全性評価装置300は、複数のノード11から構成される車両編成10の健全性を評価する装置である。
<健全性評価処理>
 図4は、本実施の形態に係る健全性評価装置300による健全性評価処理の全体フロー図である。
 健全性評価処理は健全性評価装置300にて実行される。健全性評価処理は、例えば日毎あるいは週毎といった定期的なタイミングで実行しても、任意のタイミングで実行してもよい。
 ステップS101において、車両データ受信部301は、機器健全性評価のための情報として、車両編成を構成する各ノードに対応する機器稼働データあるいは外観検査データを取得する。
 ステップS102において、機器評価部302および編成評価部303は、個別のノードに対する健全性を評価する。
 機器評価部302は、複数のノードのうち、自ノードが依存するノードが存在しない末端のノードについて、健全性評価値と運用期限とを算出する。自ノードが依存するノードを下位ノードという。
 また、編成評価部303は、末端のノード以外のノードについて、健全性評価値と運用期限とを算出する。
 編成評価部303は、依存関係データベース332から依存関係情報33を取得する。編成評価部303は、依存関係情報33を用いて、複数のノードのうち評価対象ノード20について、評価対象ノード20の下位ノードの健全性評価値と複数の閾値の各々との大小関係に応じて、下位ノードの健全性評価値を統合する統合処理を動的に決定する。そして、編成評価部303は、動的に決定される統合処理を用いて下位ノードの健全性評価値を情報統合することにより評価対象ノード20の健全性評価値を算出する。
 なお、評価対象ノード20とは、複数のノードのうちの評価対象のノードであり、依存する下位ノードが存在するノードである。
 ステップS103において、編成評価部303は、車両編成中の全ノードに対する評価が完了したか確認する。完了していなければ、処理はステップS101に戻り、残りのノードに対する健全性評価を繰り返す。完了していれば、処理はステップS104に進む。
 ステップS104において、編成評価部303は、車両編成に対する健全性を評価し、車両編成についての健全性評価値と運用期限とを含む健全性評価情報を生成する。
 ステップS105において、編成評価部303は、評価情報送信部305により、車両編成における健全性評価情報を計画生成装置400に送信する。
 さらに、ステップS106において、編成評価部303は、車両編成における健全性評価情報を可視化する可視化情報を生成する。
 最後に、ステップS107において、編成評価部303は、可視化情報を健全性監視装置500に送信する。
 図5は、本実施の形態に係る依存関係データベース332に格納されている依存関係情報33の構築例を示す図である。
 依存関係データベース332は、車両編成10を頂点とし、複数のノードの各ノード同士の依存関係が設定された依存関係情報33を格納する。また、依存関係データベース332は、依存関係情報33に、依存関係の強さを表す重要度が設定されている。
 依存関係データベース332は、依存関係が有向グラフ(矢印)により定義され、有向グラフに依存関係の重要度が対応付けられている。
 図5の依存関係情報33では、有向グラフネットワークにより、ルートノードである車両編成10、ルートノードが依存するミドルノード1,2,3,4、および、ミドルノード1が依存するノード1,2,3,4の各々における機能的な依存関係が定義されている。
 例えば、ルートノードは、車両編成10である。ミドルノード1,2,3,4の各々は、車両編成10が機能的に依存する車両である。ノード1,2,3,4の各々は、車両に搭載され、車両が機能的に依存するSIVあるいは蓄電池といった機器である。
 なお、以下において、車両編成10と車両編成に紐づけられるノードを車両編成中の全ノードと呼ぶ場合がある。車両編成10そのものを含む車両編成中の全ノードには、車両編成10、車両といったミドルノード、および、SIVあるいは蓄電池といった末端のノードが含まれる。
 末端のノードとは、依存するノードが存在しないノード、すなわち、自ノードに向かう有向グラフが存在しないノードである。
 図5では、ルートノードの健全性は、ミドルノード1,2,3,4の各々の健全性状態に依存する。ミドルノード1の健全性は、ノード1,2,3,4の各々の健全性状態に依存する。
 なお、図5において、wは、重要度を表している。例えば、ノード4について、重要度w=0.5である。重要度wは、あるノードに向かう全ての依存関係に対して、その合計値が1となるように設定されている。
 図6は、本実施の形態に対する比較例であり、車両編成10を頂点とした依存関係における設定例の比較例を示す図である。
 図6の比較例では、複数のノードの依存関係と、各ノードの重要度wと、算出後の健全性評価値Hとが設定されている。
 例えば、健全度評価値Hは、100が最も健全であり、0が最も異常、すなわち危険な状態を示す。
 比較例では、ノード4のみが健全性評価値が20と低い。しかし、比較例のように単純に重要度と健全性評価値を重みづけ加算した場合、ミドルノード1の健全性評価値は60となる。このように、情報統合により情報が丸められ、中間ノードの健全性評価値は上昇する。最終的には、もう保守が必要なノード(機器、検査項目)があるにも関わらず編成の健全性評価値は高くなってしまい、問題ない車両であるように見えてしまう。***
<<機器健全性評価処理>>
 図7は、本実施の形態に係る機器評価部302による機器健全性評価処理のフロー図である。
 機器健全性評価処理は、健全性評価装置300の機器評価部302にて実行される。また、機器健全性評価処理は、図3の全体フロー図におけるステップS102の一部の詳細フローに相当する。
 機器健全性評価処理は、評価対象の車両編成における末端のノードに対する健全性評価を行う処理である。図5の例では、ノード1、ノード2、ノード3、およびノード4が末端のノードとなる。
 ステップS201において、機器健全性推定部321は、車両編成を構成する末端のノードに対応する機器稼働データあるいは外観検査データをもとに、当該末端のノードの健全性を健全性評価値として推定する。
 次に、ステップS202において、機器運用期限推定部322は、末端のノードの健全性評価値に基づいて末端のノードの運用期限を算出する。
 ステップS203において、健全性評価値と運用期限との各情報が機器健全性データベースに格納される。
 ここで、ノードの健全性を表す健全性評価値とは、例えば、当該ノードが異常あるいは故障といった問題がなく稼働できる残り日数を示す余寿命情報である。あるいは、健全性評価値とは、新品状態および保守直後のような、健全性が保証されている状態を基準に、現在から将来にかけてどれだけ状態変化、すなわち劣化しているかを数値化した劣化度情報である。健全性評価値は、余寿命情報と劣化度情報の、いずれかの指標または両指標とする。
 また、ステップS201の機器健全性推定部321における健全性の推定方法、ならびに、ステップS202の機器運用期限推定部322における当該ノードの運用期限の推定方法については、どのような推定方法を採用しても構わない。例えば、機械学習による推定方法でもよいし、統計分析に基づく推定方法でもよい。
<<編成健全性評価処理>>
 図8は、本実施の形態に係る編成評価部303による編成健全性評価処理のフロー図である。
 編成健全性評価処理は、編成評価部303にて実行される、車両編成に対する健全性評価の処理である。また、編成健全性評価処理は、図3の全体フロー図におけるステップS102の一部とステップS104との詳細フローに相当する。
 図5の例では、ノード1、ノード2、ノード3、およびノード4といった、依存する下位ノードが存在しない末端のノードの健全性評価が完了している。一方、依存する下位ノードが存在するミドルノード1の健全性評価は完了していない。編成健全性評価処理は、これらのミドルノードの健全性評価と車両編成の健全性評価とを行う処理である。
 ステップS301において、編成健全性推定部331は、依存関係データベース332に格納されている、評価対象の車両編成10を構成するノードの依存関係情報33を取得する。
 ステップS302において、編成健全性推定部331は、車両編成そのものを含む車両編成中の全ノードの中から、自身が依存している下位ノードの健全性評価がすべて完了しているノードを抽出し、健全性を評価する対象である評価対象ノード20とする。
 評価対象ノード20には、自評価対象ノードが依存するノードが存在する。すなわち、評価対象ノード20には、自評価対象ノードに向かう有向グラフが存在する。
 評価対象ノード20が依存するノードを、評価対象ノードの下位ノード21と称する。
 編成評価部303は、複数のノードのうち、依存するノードが存在するノードを順に評価対象ノード20として、評価対象ノード20の健全性評価値を算出する。そして、編成評価部303は、最終的に、車両編成10が依存するノードの全てについて健全性評価値の算出が完了すると、車両編成10の健全性評価値を算出する。
 具体的には、編成評価部303は、ステップS302からステップS307の処理を繰り返す。
 図5では、例えば、ミドルノード1を評価対象ノード20とする。また、ミドルノード1が依存する下位ノード21は、ノード1、ノード2、ノード3、およびノード4である。ノード1、ノード2、ノード3、およびノード4のすべてについて、健全性評価が完了している場合に、ミドルノード1の健全性評価が可能になる。
<下位ノード21の健全性評価値および重要度を取得:ステップS303>
 ステップS303において、編成健全性推定部331は、評価対象ノード20が依存する下位ノード21の健全性評価値と運用期限を取得する。また、編成健全性推定部331は、評価対象ノード20と下位ノード21との間の依存関係の重要度を取得する。
 編成健全性推定部331は、下位ノード21の健全性評価値および運用期限を含む健全性評価情報を、機器健全性データベース323、あるいは、編成健全性データベース334から取得する。
 下位ノード21が末端のノードの場合、健全性評価情報は、機器健全性データベース323から取得される。下位ノード21が車両あるいは電源といった中間要素のノードの場合、健全性評価情報は、編成健全性データベース334から取得する。
 編成健全性データベース334には、ステップS302からステップS307の処理で既に算出済みの中間要素のノードについて、健全性評価値および運用期限を含む健全性評価情報が格納されている。
 編成健全性推定部331は、依存関係情報33から、評価対象ノード20と下位ノード21との間の依存関係の重要度を取得する。重要度は、依存関係における重みを表す。
 図5の具体例では、ミドルノード1の下位ノード21であるノード1,2,3,4について、健全性評価値、運用期限、および依存関係の重要度が取得される。
<評価対象ノード20の健全性評価値の算出:ステップS304>
 図9は、本実施の形態に係る評価対象ノード20の健全性評価値を算出する統合処理のフロー図である。図9のフロー図は、ステップS304の詳細フローに相当する。
 まず、ステップS304における評価対象ノード20の健全性評価値を算出する統合処理の概要について説明する。
 編成健全性推定部331は、評価対象ノード20について、下位ノード21の健全性評価値と複数の閾値の各々との大小関係に応じて、下位ノードの健全性評価値を統合する統合処理を動的に決定する。そして、編成健全性推定部331は、動的に決定される統合処理により評価対象ノード20の健全性評価値を算出する。
 具体的には、編成健全性推定部331により、下位ノード21の健全性評価値と、閾値データベース311に格納されている第1の閾値th1と第2の閾値th2の各々との大小関係に応じて、統合処理が動的に決定される。
 具体的には、以下の通りである。
 処理の説明の前提として、評価対象ノード20の健全性評価値Hpを算出するものとする。評価対象ノード20は、N個の下位ノード(x={1,…,N})を有する。Nは、2以上の整数とする。下位ノードxは、健全性評価値Hnode_xと重要度wnode_xとが対応する。
 ステップS341において、編成健全性推定部331の判定部312は、全下位ノード(x={1,…,N})の健全性評価値Hnode_xと重要度wnode_xを取得する。なお、ここで、依存関係情報33から取得された下位ノードの重要度を対応重要度と称する。
 図5の例では、ミドルノード1を評価対象ノード20とすると、ノード1,2,3,4の各々における健全性評価値Hと対応重要度wとが取得される。
 ステップS342およびステップS343において、判定部312は、複数の下位ノードの中に、複数の閾値の中で最も小さい第2の閾値th2以下の健全性評価値を有する下位ノードがあるか否かを判定する。
 具体的には、判定部312は、全下位ノードの健全性評価値Hnode_x(x={1,…,N})について、Hnode_x>th2か否かを判定する。
 下位ノードの健全性評価値の全てが第2の閾値th2より大きい場合、ステップS344に進む。
 一方、下位ノードの健全性評価値のうち第2の閾値th2以下のものがある場合、ステップS349に進む。
 ここでは、下位ノードの健全性評価値の全てが第2の閾値th2より大きいか否か、すなわち、第2の閾値th2以下の健全性評価値を有する下位ノードがあるか否かを判定している。しかし、下位ノードの健全性評価値の全てが第2の閾値th2以上か否か、すなわち、第2の閾値th2より小さい健全性評価値を有する下位ノードがあるか否かを判定してもよい。以下の説明においても同様に、「~以上」あるいは「~以下」を、矛盾のない範囲で、「~より大きい」あるいは「~より小さい」としてもよい。
 ステップS349の処理は、第2の閾値th2以下の健全性評価値を有する下位ノードが存在する場合の処理である。評価値算出部313は、複数の下位ノードの中に第2の閾値th2以下の健全性評価値を有する下位ノードがあれば、下位ノードの健全性評価値を統合する統合処理を次のように行う。
 ステップS349において、評価値算出部313は、統合処理として、複数の下位ノードの各々の健全性評価値うち、最も小さい健全性評価値を評価対象ノード20の健全性評価値とする統合処理を行う。その後、処理はステップS348に進む。
 ステップS344からステップS346の処理は、下位ノードの健全性評価値の全てが第2の閾値th2より大きい場合、すなわち、第2の閾値th2以下の健全性評価値を有する下位ノードが存在しない場合の処理である。
 ステップS344からステップS346の処理は、全下位ノードの各々において、健全性評価値と第1の閾値th1との大小関係に応じた統合重要度w’が算出される。
 そして、ステップS347において、全下位ノードの各々について、健全性評価値と統合重要度w’とを乗算した値を加算することにより、評価対象ノード20の健全性評価値が算出される。
 ステップS344からステップS347の処理の概要は、以下の通りである。
 評価値算出部313は、複数の下位ノードの中に第2の閾値th2以下の健全性評価値を有する下位ノードがなければ、複数の下位ノードの各下位ノードについて、依存関係情報から各下位ノードに対応する重要度を対応重要度wとして取得する。評価値算出部313は、対応重要度wに対して各下位ノードの健全性評価値と複数の閾値の各々との大小関係に応じて定められる重み付け係数αを乗じた統合重要度w’を算出する。評価値算出部313は、各下位ノードの健全性評価値に統合重要度w’を乗算し、乗算により得られた値を加算する。評価値算出部313は、加算により得られた値を評価対象ノード20の健全性評価値とする処理を行う。評価値算出部313は、以上の処理を下位ノードの健全性評価値を統合する統合処理として動的に決定し、動的に決定される統合処理により評価対象ノード20の健全性評価値を算出する。
 具体的には、以下の通りである。
 評価値算出部313は、複数の下位ノードである全下位ノードのうちのひとつの下位ノードについて処理を行う。
 ステップS344において、評価値算出部313は、処理対象の下位ノードについて、複数の閾値の中で最も大きい第1の閾値th1以上の健全性評価値を有するか否かを判定する。すなわち、評価値算出部313は、下位ノードxの健全性評価値Hnode_xについて、Hnode_x≧th1か否かを判定する。
 第1の閾値th1以上の健全性評価値を有する場合、ステップS345に進む。
 第1の閾値th1以上の健全性評価値ではない場合、ステップS350に進む。
 ステップS345において、評価値算出部313は、第1の閾値th1以上の健全性評価値を有する下位ノードについては、対応重要度wをそのまま統合重要度w’として取得する。すなわち、評価値算出部313は、下位ノードxの対応重要度wnode_xを据置き、w’node_x=wnode_xとする。
 ステップS350において、評価値算出部313は、第1の閾値th1より小さい健全性評価値を有する下位ノードについては、対応重要度wに重み付け係数αを乗算した値を統合重要度w’として算出する。すなわち、評価値算出部313は、下位ノードxの対応重要度wnode_xをα倍、すなわちw’node_x=α×wnode_xとする。重み付け係数α倍は、例えば、2倍、3倍、あるいは5倍といった定数倍である。αは、車両編成の各ノードの重要性、危険度、あるいはコストといった条件により、どのように設定されてもよい。
 この処理により、健全性評価値が比較的小さい下位ノードについては、重要度を高くすることにより、一部の下位ノードの劣化をより大きく評価対象ノード20の健全性評価値に反映させることができる。
 ステップS346において、評価値算出部313は、全下位ノードについて統合重要度w’を取得したかを判定する。
 全下位ノードについて統合重要度w’を取得した場合は、ステップS347に進む。
 ステップS347において、評価値算出部313は、各下位ノードの健全性評価値Hnode_xに統合重要度w’ node_xを乗算し、乗算により得られた値を加算し、加算により得られた値を評価対象ノード20の健全性評価値とする処理を行う。すなわち、評価値算出部313は、修正後の重要度である統合重要度w’を用いて、評価対象ノード20の健全性評価値を重み付き加算する。
 評価対象ノード20の健全性評価値Hpを、修正後の重要度である統合重要度w’を用いて算出する場合について説明する。評価対象ノードがN個の下位ノードの健全性に依存するものとする。
 評価対象ノード20が依存する各ノードの健全性評価値をHi(i=1,・・・,N)、依存する各ノードの統合重要度をw’i(i=1,・・・,N)、全下位ノードの統合重要度w’の総和をWとする。このとき、評価値算出部313は、次の数1のように重み付き加算する。
(数1)健全性評価値Hp=(w’1・H1+・・・+w’N・HN)/W
 数1により、一部のノードの異常あるいは劣化状態を上位のノードの健全性評価値に適切に反映させることを可能とする。
 具体例のバリエーションについて説明する。
<バリエーション1>
 図5に示すようにミドルノード1が、ノード1,2,3,4に依存するものとする。ミドルノード1の健全性評価値Hpを算出する。
 th1=50,th2=25とする。
 α=5とする。
 ノード1は、H1=100およびw1=0.2とする。
 ノード2は、H2=70およびw2=0.3とする。
 ノード3は、H3=40およびw3=0.3とする。
 ノード4は、H4=20およびw4=0.2とする。
 本実施の形態に係る健全性評価装置300によれば、H4=20がth2=25より小さいため、ミドルノード1の健全性評価値Hpは、下位ノードの中で一番小さい20となる(ステップS349)。
<バリエーション2>
 図5に示すようにミドルノード1が、ノード1,2,3,4に依存するものとする。ミドルノード1の健全性評価値Hpを算出する。
 th1=50,th2=25とする。
 α=5とする。
 ノード1は、H1=100およびw1=0.2とする。
 ノード2は、H2=70およびw2=0.3とする。
 ノード3は、H3=40およびw3=0.3とする。
 ノード4は、H4=30およびw4=0.2とする。
 本実施の形態に係る健全性評価装置300によれば、th2以下の健全性評価値は無い。
 H1=100はth1=50以上である。よって、w’1は、w1=0.2の据置きである。
 H2=70はth1=50以上である。よって、w’2は、w2=0.3の据置きである。
 H3=40はth2=20より大きく、th1=50より小さい。よって、w’3=α×w3=5×0.3=1.5である。
 H4=30はth2=20より大きく、th1=50より小さい。よって、w’4=α×w4=5×0.2=1.0である。
 ミドルノード1の健全性評価値Hp=(0.2×100+0.3×70+1.5×40+1.0×30)/(0.2+0.3+1.5+1.0)=37となる。
<バリエーション3>
 また、ノード1,2,3,4の健全性評価値と重要度を、図6におけるノード1,2,3,4と同様とする。
 本実施の形態に係る健全性評価装置300によれば、H4=20がth2=25より小さいため、ミドルノード1の健全性評価値Hpは、下位ノードの中で一番小さい20となる。
 図6の比較例では、ミドルノード1の健全性評価値は60であり、情報統合により、危険な状態のノード4の情報が丸められてしまっている。
 一方、本実施の形態に係る健全性評価装置300によれば、ミドルノード1の健全性評価値Hpは20となり、ノード4の情報が適切にミドルノード1の健全性評価値に反映される。
 次に、図8に戻り説明を続ける。
 ステップS305において、期限推定部333は、依存関係情報33と下位ノードにおける運用期限とに基づいて、評価対象ノード20の運用期限32を算出する。編成評価部303は、評価対象ノード20の健全性評価値31と運用期限32とを編成健全性データベース334に格納する。
 なお、下位ノードにおける運用期限には、末端のノードの運用期限が含まれる。
 具体的には、期限推定部333は、評価対象ノード20が依存する全ノードにおける運用期限の中から最悪値を抽出し、最悪値に基づいて評価対象ノード20の運用期限32を算出する。期限推定部333は、評価時点から最も日付が近い運用期限を最悪値として抽出する。
 つまり、期限推定部333は、評価対象ノード20の下位ノードの運用期限のうち、最も早く到来する運用期限を評価対象ノード20の運用期限32とする。
 ステップS306において、編成健全性推定部331は、評価対象ノード20の健全性評価値31と運用期限32とを、評価対象ノード20の健全性評価情報34として編成健全性データベース334に格納する。
 ステップS307において、編成健全性推定部331は、車両編成そのものを含む車両編成中の全ノード(車両編成、車両といった中間要素、各ノード)の健全性評価が完了しているか確認する。完了していなければ処理はステップS302に戻って処理を繰り返し、完了していれば処理を終了する。
 図5の具体例では、ミドルノード1が評価対象ノード20に該当する。上記の処理では、ステップS302にて、都度、そこまでの時点で健全性評価が完了したノードを参照し、その中のいずれかにのみ依存するノードを次の評価対象ノードとしていき、最終的に「車両編成」の健全性評価まで終えたところで処理完了となる。
<<可視化情報生成処理>>
 図10は、本実施の形態に係る可視化情報生成部335による可視化情報生成処理のフロー図である。
 可視化情報生成処理は、可視化情報生成部335にて実行される。また、本処理は、図4の全体フロー図におけるステップS106の詳細フローに相当する。
 可視化情報生成部335は、車両編成について健全性評価値と運用期限との算出が完了すると、各ノードの運用期限に基づいて、車両編成と各ノードとのそれぞれの検査の期限を表す検査期限を算出する。そして、可視化情報生成部335は、車両編成と各ノードとのそれぞれの健全性と検査期限とを可視化するための可視化情報35を生成する。
 また、可視化情報生成部335は、車両編成と各ノードとのそれぞれの検査期限に基づいて、車両編成と各ノードとのそれぞれの検査の開始を推奨する推奨検査期限を算出する。そして、可視化情報生成部335は、車両編成と各ノードとのそれぞれの推奨検査期限を可視化するための情報も可視化情報35に含める。
 可視化情報生成部335は、車両編成と各ノードとのそれぞれの健全性、検査期限、および推奨検査期限を、過去から現在、さらに将来に至るまでの時系列推移として可視化する可視化情報35を生成する。
 ステップS401において、可視化情報生成部335は、物理構成データベース336に格納されている車両編成の物理的な構成情報を取得する。
 ステップS402において、可視化情報生成部335は、編成健全性データベース334に格納されている車両編成および車両編成を構成する全ノードの健全性評価情報を取得する。
 ステップS403において、可視化情報生成部335は、健全性評価情報のうち運用期限をもとに、各ノードの検査期限と推奨検査期限の各情報を算出する。
 最後に、ステップS403において、可視化情報生成部335は、取得した物理構成情報に沿って、取得した全ノードの健全性評価情報をソートする。
 ここで、ステップS403の処理について、検査期限は、当該ノードの検査所要日数を考慮して運用期限から減算した日付とする。また、推奨検査期限は、当該ノードの保守に係る交換部品の調達に必要な日数および保守人員の確保に必要な最低日数(リードタイム)を考慮して検査期限から減算した日付とする。このとき、検査所要日数およびリードタイムについては、車両編成および車両編成を構成するノードごとに個別に設定することができ、健全性監視装置500にて保守員が設定・変更することが可能である。
 また、図10の可視化情報生成処理のフローが完了すると、ステップS107の処理にて、可視化情報生成部335は、車両編成健全性の可視化情報35を健全性監視装置500に送信する。
 図11は、本実施の形態に係る健全性評価情報を可視化した可視化情報35の例である。
 図11は、健全性監視装置500において、評価対象の車両編成、および、車両編成を構成する複数のノードのそれぞれの健全性評価情報を可視化した表示例を示している。
 図11では、ステップS404の処理により、車両編成におけるノードの物理構成に基づいてソートした順に車両編成および各ノードが並ぶ。また、その右隣の列には、評価時点(現在)の健全性評価値が設定される。さらにその右隣には機器の検査期限に関する情報(推奨検査期限/検査期限/運用期限)が設定される。そしてその横、図の最右側には、過去から現在、さらには将来に至る健全性評価値の時系列変化の様子が表示される。
 なお、健全性評価値については、数値で表示してもよいし、図11のように「健全」「要注意」「危険」といった数種類のラベル情報に変換して表示してもよい。また、健全性評価値の時系列変化の部分で、現在、また、当該車両編成の推奨検査期限/検査期限/運用期限の各日付が分かるような線を重畳表示してもよい。
 図11に示すように、本実施の形態に係る健全性評価システム700によれば、車両2の機器Bのみが要保守の「危険」で、他の車両および機器の状態は「健全」であった場合でも、車両2の機器Bの情報が丸められることはない。車両2の機器Bの「危険」の情報が「車両2」および「編成1」に適切に反映される。
 図12は、本実施の形態に係る依存関係データベース332と物理構成データベース336を定義する処理のフロー図である。
 図12では、車両編成健全性評価に必要な、機器依存関係情報および機器物理構成情報の定義に係る処理フローが示されている。
 健全性評価装置300の情報設定部304は、複数のノードの依存関係および物理構成の情報を、評価対象の車両編成の制御装置から取得し、データベースに格納する。
 情報設定部304は、複数のノードの依存関係および物理構成の情報を修正あるいは変更する情報を取得し、データベースを修正あるいは変更する。複数のノードの依存関係および物理構成の情報を修正あるいは変更する情報は、例えば、健全性監視装置500の入力装置を介して、保守者から取得してもよい。
 ステップS501において、車両データ受信部301は、車両編成が具備する制御装置から、車両編成を構成する各ノードの依存関係および物理構成の情報を取得する。
 ステップS502において、情報設定部304は、車両編成を構成する各ノードの依存関係を依存関係情報33として構築する。
 ステップS503において、情報設定部304は、設定情報受信部306が取得した情報をもとに構築済の依存関係情報33を修正・変更する。
 ステップS504において、情報設定部304は、修正・変更した依存関係情報33を依存関係データベース332に格納する。
 ステップS505において、情報設定部304は、車両編成を構成する各ノードの物理構成を物理構成情報36として構築する。
 ステップS506において、情報設定部304は、設定情報受信部306が取得した情報をもとに構築済の物理構成情報36を修正・変更する。
 ステップS507において、情報設定部304は、修正・変更した物理構成情報36を物理構成データベース336に格納する。
 ここで、ステップS501の処理について、車両編成中の各ノードの依存関係および物理構成の情報は、例えば車両編成全体を制御する列車統合管理装置(TCMS)といった制御装置から取得することができる。TCMSは、Train Control and Management Systemの略語である。
 次に、ステップS503およびステップS505の処理に関して、依存関係情報33あるいは物理構成情報36は、健全性監視装置500の情報設定部503にて修正・変更することができる。ここで修正・変更可能な情報として、依存関係あるいは物理構成の接続(有向グラフ)、および各ノード間の依存関係の重要度である。なお、修正・変更情報は、健全性評価を行うための事前準備として最初に一度行うだけでなく、健全性評価の時系列変化を監視する中で適宜見直していくことも可能である。
 ***他の構成***
 本実施の形態では、健全性評価システム700の各装置の機能がソフトウェアで実現される。変形例として、健全性評価システム700の各装置の機能がハードウェアで実現されてもよい。
 具体的には、健全性評価システム700の各装置は、演算装置に替えて電子回路を備える。
 電子回路は、健全性評価システム700の各装置の機能を実現する専用の電子回路である。電子回路は、具体的には、単一回路、複合回路、プログラム化したプロセッサ、並列プログラム化したプロセッサ、ロジックIC、GA、ASIC、または、FPGAである。GAは、Gate Arrayの略語である。ASICは、Application Specific Integrated Circuitの略語である。FPGAは、Field-Programmable Gate Arrayの略語である。
 健全性評価システム700の各装置の機能は、1つの電子回路で実現されてもよいし、複数の電子回路に分散して実現されてもよい。
 別の変形例として、健全性評価システム700の各装置の機能の一部が電子回路で実現され、残りの機能がソフトウェアで実現されてもよい。また、健全性評価システム700の各装置の機能の一部またはすべての機能がファームウェアで実現されてもよい。
 プロセッサと電子回路の各々は、プロセッシングサーキットリとも呼ばれる。つまり、健全性評価システム700の各装置の機能は、プロセッシングサーキットリにより実現される。
***本実施の形態の効果の説明***
 以上のように、本実施の形態に係る健全性評価システム700によれば、評価対象ノードが依存する各下位ノードの情報統合を行う編成評価部における編成健全性推定部が、各下位ノードの健全性評価値と複数の閾値に応じて場合分けする。そして、編成評価部における編成健全性推定部が、それぞれの場合に適した情報統合ロジックを動的に当てはめて、情報統合処理をする。複数の閾値として、例えば、第1の閾値th1と第2の閾値th2(th1>th2)を用いる。
 これにより、本実施の形態に係る健全性評価システム700によれば、情報の丸めの影響を受けにくくなり、一部の異常あるいは劣化状態を全体の健全性評価値に伝搬可能となる。
 また、本実施の形態に係る健全性評価システム700によれば、車両編成の健全性評価値から搭載機器の異常・劣化状態を認識しやすくなる。とくに重要度が高い下位要素の健全性評価値はより確実に上位に伝搬されるため、全体(車両編成)の健全性評価が高度化するという効果がある。
 実施の形態2.
 本実施の形態では、主に、実施の形態1と異なる点および実施の形態1に追加する点について説明する。
 本実施の形態において、実施の形態1と同様の機能を有する構成については同一の符号を付し、その説明を省略する。
 実施の形態1では、下位ノードの健全性評価値を統合する統合処理において、複数の閾値として、第1の閾値th1と第2の閾値th2を用いる態様について説明した。
 本実施の形態では、下位ノードの健全性評価値を統合する統合処理において、複数の閾値として、第1の閾値th1と第2の閾値th2に加え、第1の閾値th1より小さく第2の閾値th2より大きい第3の閾値th3を用いる態様について説明する。
***構成の説明***
 本実施の形態に係る健全性評価システム700の構成は、実施の形態1と同様である。
 ただし、図2の閾値データベース311には、第1の閾値th1と第2の閾値th2に加え、第1の閾値th1より小さく第2の閾値th2より大きい第3の閾値th3が格納されている。
 また、本実施の形態では、重み付け係数αとして、第1の重み付け係数α1と第2の重み付け係数α2とがある。第2の重み付け係数α2は、第1の重み付け係数α1より大きい、すなわちα2>α1とする。
 本実施の形態では、評価値算出部313は、第1の閾値th1より小さく、かつ、第3の閾値th3以上の健全性評価値を有する下位ノードについては、対応重要度wに第1の重み付け係数α1を乗算した値を統合重要度w’として算出する。また、評価値算出部313は、第3の閾値th3より小さく、かつ、第2の閾値th2より大きい健全性評価値を有する下位ノードについては、対応重要度wに第2の重み付け係数α2を乗算した値を統合重要度w’として算出する。
 第2の重み付け係数α2は、第1の重み付け係数α1より大きい値をとるため、健全性評価値がより小さい下位ノードについては、その健全性評価値を評価対象ノード20の健全性評価値により大きく反映させることができる。
***動作の説明***
 本実施の形態では、実施の形態1で説明した図9の評価対象ノード20の健全性評価値を算出する処理のフロー図が実施の形態1と異なる。
 図13は、本実施の形態に係る評価対象ノード20の健全性評価値を算出する処理のフロー図である。図13のフロー図は、実施の形態1で説明した図8のステップS304の詳細フローに相当する。
 ステップS341からステップS343、ステップS346からステップS348、およびステップS349の処理は、実施の形態1で説明した図9と同様である。
 実施の形態1と同様に、ステップS344aからステップS346の処理は、下位ノードの健全性評価値の全てが第2の閾値th2より大きい場合、すなわち、第2の閾値th2以下の健全性評価値を有する下位ノードが存在しない場合の処理である。
 ステップS344aからステップS346の処理では、全下位ノードの各々について、健全性評価値と第1の閾値th1および第3の閾値th3との大小関係に応じた統合重要度w’が算出される。
 そして、ステップS347において、全下位ノードの各々について、健全性評価値と統合重要度w’とを乗算した値を加算することにより、評価対象ノード20の健全性評価値が算出される。
 具体的には、以下の通りである。
 評価値算出部313は、評価対象ノード20の複数の下位ノードである全下位ノードのうちのひとつの下位ノードについて処理を行う。
 ステップS344aにおいて、評価値算出部313は、処理対象の下位ノードについて、第3の閾値th3以上の健全性評価値を有するか否かを判定する。すなわち、評価値算出部313は、下位ノードxの健全性評価値Hnode_xについて、Hnode_x≧th3か否かを判定する。
 第3の閾値th3以上の健全性評価値を有する場合、ステップS344bに進む。
 第3の閾値th3以上の健全性評価値ではない場合、ステップS350bに進む。
 ステップS350bでは、処理対象の下位ノードの健全性評価値は、第3の閾値th3より小さく、かつ、第2の閾値th2より大きいことを意味する。
 評価値算出部313は、第3の閾値th3より小さく、かつ、第2の閾値th2より大きい健全性評価値を有する下位ノードについては、対応重要度wに第2の重み付け係数α2を乗算した値を統合重要度w’として算出する。すなわち、評価値算出部313は、下位ノードxの対応重要度wnode_xをα2倍、すなわちw’node_x=α2×wnode_xとする。
 ステップS344bにおいて、評価値算出部313は、処理対象の下位ノードについて、第1の閾値th1以上の健全性評価値を有するか否かを判定する。すなわち、評価値算出部313は、下位ノードxの健全性評価値Hnode_xについて、Hnode_x≧th1か否かを判定する。
 第1の閾値th1以上の健全性評価値を有する場合、ステップS345に進む。
 第1の閾値th1以上の健全性評価値ではない場合、ステップS350aに進む。
 ステップS345において、評価値算出部313は、第1の閾値th1以上の健全性評価値を有する下位ノードについては、対応重要度wをそのまま統合重要度w’として取得する。すなわち、評価値算出部313は、下位ノードxの対応重要度wnode_xを据置き、w’node_x=wnode_xとする。
 ステップS350aでは、処理対象の下位ノードの健全性評価値は、第1の閾値th1より小さく、かつ、第3の閾値th3以上であることを意味する。
 ステップS350aにおいて、評価値算出部313は、第1の閾値th1より小さく、かつ、第3の閾値th3以上の健全性評価値を有する下位ノードについては、対応重要度wに第1の重み付け係数α1を乗算した値を統合重要度w’として算出する。すなわち、評価値算出部313は、下位ノードxの対応重要度wnode_xをα1倍、すなわち、w’node_x=α1×wnode_xとする。
 第2の重み付け係数α2は、第1の重み付け係数α1より大きい値をとるため、劣化度が高いといった健全性評価値がより小さい下位ノードについては、その健全性評価値を評価対象ノード20の健全性評価値により大きく反映させることができる。
 この処理により、健全性評価値が比較的小さい下位ノードについては、重要度を高くすることができ、より大きく評価対象ノード20の健全性評価値に反映させることができる。
 具体的のバリエーションについて説明する。
<バリエーション4>
 ミドルノード1が、ノード1,2,3,4に依存するものとする。ミドルノード1の健全性評価値Hpを算出する。
 th1=75,th3=50,th2=25とする。
 α1=3、α2=6とする。
 ノード1は、H1=100およびw1=0.2とする。
 ノード2は、H2=70およびw2=0.3とする。
 ノード3は、H3=40およびw3=0.3とする。
 ノード4は、H4=30およびw4=0.2とする。
 本実施の形態に係る健全性評価装置300によれば、th2以下の健全性評価値は無い。
 H1=100は、th1=75以上である。よって、w’1は、w1=0.2の据置きである。
 H2=70は、th3=50以上、th1=75より小さい。よって、w’2は、w2=α1×0.3=0.9である。
 H3=40は、th2=25より大きく、th3=50以下である。よって、w’3は、w3=α2×0.3=1.8である。
 H4=30は、th2=25より大きく、th3=50以下である。よって、w’4は、w4=α2×0.2=1.2である。
 ミドルノード1の健全性評価値Hp=(0.2×100+0.9×70+1.8×40+1.2×30)/(0.2+0.9+1.8+1.2)≒46.6となる。
***他の構成***
 実施の形態1では、統合処理の動的な決定の判定に、2つの閾値th1,th2を用いた。また、本実施の形態では、統合処理の動的な決定の判定に、3つの閾値th1,th2,th3を用いた。上述した実施の形態の方式を採用することにより、4つ以上の閾値を用いて統合処理の動的な決定の判定を実行してもよい。
***本実施の形態の効果の説明***
 以上のように、本実施の形態に係る健全性評価システム700によれば、3つの閾値により、依存する各下位ノードの健全性評価値に応じて情報統合ロジックを動的に変更することができる。2つの閾値による情報統合ロジックの判定と比較して、閾値前後の下位ノードが存在するときの上位ノードの健全性評価値について、閾値を超えた前後の健全性評価値のギャップをより滑らかにできる。
 よって、本実施の形態に係る健全性評価システム700によれば、情報丸めの影響の軽減による全体の健全性評価値算出の高度化効果に加え、閾値(場合分け)の数を増やすことで、閾値前後の評価値の変化をより滑らかにつなぐ効果も得られる。
 以上の実施の形態1および2では、健全性評価システムの各装置の各部を独立した機能ブロックとして説明した。しかし、健全性評価システムの各装置の構成は、上述した実施の形態のような構成でなくてもよい。健全性評価システムの各装置の機能ブロックは、上述した実施の形態で説明した機能を実現することができれば、どのような構成でもよい。また、健全性評価システムの各装置は、1つの装置でなく、複数の装置から構成されたシステムでもよい。
 また、実施の形態1および2のうち、複数の部分を組み合わせて実施しても構わない。あるいは、これらの実施の形態のうち、1つの部分を実施しても構わない。その他、これらの実施の形態を、全体としてあるいは部分的に、どのように組み合わせて実施しても構わない。
 すなわち、実施の形態1および2では、各実施の形態の自由な組み合わせ、あるいは各実施の形態の任意の構成要素の変形、もしくは各実施の形態において任意の構成要素の省略が可能である。
 なお、上述した実施の形態は、本質的に好ましい例示であって、本開示の範囲、本開示の適用物の範囲、および本開示の用途の範囲を制限することを意図するものではない。上述した実施の形態は、必要に応じて種々の変更が可能である。
 10 車両編成、11 ノード、20 評価対象ノード、21 下位ノード、31 健全性評価値、32 運用期限、33 依存関係情報、34 健全性評価情報、35 可視化情報、36 物理構成情報、100 車両編成装置、101 稼働データ収集部、102 稼働データ送信部、200 車両外観検査装置、201 外観検査部、202 検査データ送信部、300 健全性評価装置、301 車両データ受信部、302 機器評価部、303 編成評価部、304 情報設定部、305 評価情報送信部、306 設定情報受信部、311 閾値データベース、312 判定部、313 評価値算出部、321 機器健全性推定部、322 機器運用期限推定部、323 機器健全性データベース、331 編成健全性推定部、332 依存関係データベース、333 期限推定部、334 編成健全性データベース、335 可視化情報生成部、336 物理構成データベース、400 計画生成装置、401 健全性評価情報受信部、402 計画部、500 健全性監視装置、501 可視化情報受信部、502 情報可視化部、503 情報設定部、504 設定情報送信部、700 健全性評価システム。

Claims (11)

  1.  複数のノードから構成される車両編成の健全性を評価する健全性評価装置において、
     前記複数のノードのうち依存する下位ノードが存在しない末端のノードについて、健全性を表す健全性評価値を算出する機器評価部と、
     前記車両編成を頂点とし、前記複数のノードの各ノード同士の依存関係が設定された依存関係情報を格納する依存関係データベースから前記依存関係情報を取得し、前記複数のノードのうち評価対象の評価対象ノードであって依存する下位ノードが存在する評価対象ノードについて、前記下位ノードの健全性評価値と複数の閾値の各々との大小関係に応じて、前記下位ノードの健全性評価値を統合する統合処理を動的に決定し、動的に決定される統合処理により前記評価対象ノードの健全性評価値を算出する編成評価部と
    を備えた健全性評価装置。
  2.  前記評価対象ノードは、複数の下位ノードに依存しており、
     前記編成評価部は、
     前記複数の下位ノードの中に、前記複数の閾値の中で最も小さい第2の閾値以下の健全性評価値を有する下位ノードがあるか否かを判定する判定部と、
     前記複数の下位ノードの中に前記第2の閾値以下の健全性評価値を有する下位ノードがあれば、前記統合処理として、前記複数の下位ノードの各々の健全性評価値うち、最も小さい健全性評価値を前記評価対象ノードの健全性評価値とする処理を行う評価値算出部と
    を備える請求項1に記載の健全性評価装置。
  3.  前記依存関係データベースでは、
     前記依存関係情報に前記依存関係の強さを表す重要度が設定されており、
     前記評価値算出部は、
     前記複数の下位ノードの中に前記第2の閾値以下の健全性評価値を有する下位ノードがなければ、前記統合処理として、前記複数の下位ノードの各下位ノードについて、前記依存関係情報から各下位ノードに対応する重要度を対応重要度として取得し、前記対応重要度に対して各下位ノードの健全性評価値と複数の閾値の各々との大小関係に応じて定められる重み付け係数を乗じた統合重要度を算出し、各下位ノードの健全性評価値に前記統合重要度を乗算し、乗算により得られた値を加算し、加算により得られた値を前記評価対象ノードの健全性評価値とする処理を行う請求項2に記載の健全性評価装置。
  4.  前記評価値算出部は、
     前記複数の下位ノードの中に前記第2の閾値以下の健全性評価値を有する下位ノードがなければ、前記複数の下位ノードの各下位ノードについて前記複数の閾値の中で最も大きい第1の閾値以上の健全性評価値を有するか否かを判定し、前記第1の閾値以上の健全性評価値を有する下位ノードについては前記対応重要度を前記統合重要度として取得し、前記第1の閾値より小さい健全性評価値を有する下位ノードについては前記対応重要度に前記重み付け係数を乗算した値を前記統合重要度として算出する請求項3に記載の健全性評価装置。
  5.  前記複数の閾値には、前記第1の閾値より小さく前記第2の閾値より大きい第3の閾値が含まれており、
     前記重み付け係数には、第1の重み付け係数と第2の重み付け係数とが含まれており、
     前記評価値算出部は、
     前記第1の閾値より小さく、かつ、前記第3の閾値以上の健全性評価値を有する下位ノードについては前記対応重要度に前記第1の重み付け係数を乗算した値を前記統合重要度として算出し、前記第3の閾値より小さく、かつ、前記第2の閾値より大きい健全性評価値を有する下位ノードについては前記対応重要度に前記第2の重み付け係数を乗算した値を前記統合重要度として算出する請求項4に記載の健全性評価装置。
  6.  前記第2の重み付け係数は、前記第1の重み付け係数より大きい請求項5に記載の健全性評価装置。
  7.  前記依存関係データベースは、
     前記依存関係が有向グラフにより定義され、前記有向グラフに前記依存関係の重要度が対応付けられた前記依存関係情報を格納する請求項1から請求項6のいずれか1項に記載の健全性評価装置。
  8.  前記編成評価部は、
     前記複数のノードのうち、自ノードが依存するノードが存在するノードを順に評価対象ノードとして、前記評価対象ノードの健全性評価値を算出し、前記車両編成が依存するノードの全てについて健全性評価値の算出が完了すると、前記車両編成の健全性評価値を算出する請求項1から請求項7のいずれか1項に記載の健全性評価装置。
  9.  前記編成評価部は、
     前記車両編成について健全性評価値と運用期限とを算出すると、前記複数のノードの各ノードの運用期限に基づいて、前記車両編成と前記複数のノードの各ノードとのそれぞれの検査の期限を表す検査期限を算出し、前記車両編成と前記複数のノードの各ノードとのそれぞれの健全性と検査期限とを可視化するための可視化情報を生成する請求項5に記載の健全性評価装置。
  10.  複数のノードから構成される車両編成の健全性を評価する健全性評価装置に用いられる健全性評価方法において、
     コンピュータが、前記複数のノードのうち依存する下位ノードが存在しない末端のノードについて、健全性を表す健全性評価値を算出し、
     コンピュータが、前記車両編成を頂点とし、前記複数のノードの各ノード同士の依存関係が設定された依存関係情報を格納する依存関係データベースから前記依存関係情報を取得し、前記複数のノードのうち評価対象の評価対象ノードであって依存する下位ノードが存在する評価対象ノードについて、前記下位ノードの健全性評価値と複数の閾値の各々との大小関係に応じて、前記下位ノードの健全性評価値を統合する統合処理を動的に決定し、動的に決定される統合処理により前記評価対象ノードの健全性評価値を算出する健全性評価方法。
  11.  複数のノードから構成される車両編成の健全性を評価する健全性評価装置に用いられる健全性評価プログラムにおいて、
     前記複数のノードのうち依存する下位ノードが存在しない末端のノードについて、健全性を表す健全性評価値を算出する機器評価処理と、
     前記車両編成を頂点とし、前記複数のノードの各ノード同士の依存関係が設定された依存関係情報を格納する依存関係データベースから前記依存関係情報を取得し、前記複数のノードのうち評価対象の評価対象ノードであって依存する下位ノードが存在する評価対象ノードについて、前記下位ノードの健全性評価値と複数の閾値の各々との大小関係に応じて、前記下位ノードの健全性評価値を統合する統合処理を動的に決定し、動的に決定される統合処理により前記評価対象ノードの健全性評価値を算出する編成評価処理と
    をコンピュータに実行させる健全性評価プログラム。
PCT/JP2022/024306 2022-06-17 2022-06-17 健全性評価装置、健全性評価方法、および健全性評価プログラム WO2023243077A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
PCT/JP2022/024306 WO2023243077A1 (ja) 2022-06-17 2022-06-17 健全性評価装置、健全性評価方法、および健全性評価プログラム
JP2022568453A JP7292538B1 (ja) 2022-06-17 2022-06-17 健全性評価装置、健全性評価方法、および健全性評価プログラム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/024306 WO2023243077A1 (ja) 2022-06-17 2022-06-17 健全性評価装置、健全性評価方法、および健全性評価プログラム

Publications (1)

Publication Number Publication Date
WO2023243077A1 true WO2023243077A1 (ja) 2023-12-21

Family

ID=86729217

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/024306 WO2023243077A1 (ja) 2022-06-17 2022-06-17 健全性評価装置、健全性評価方法、および健全性評価プログラム

Country Status (2)

Country Link
JP (1) JP7292538B1 (ja)
WO (1) WO2023243077A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1020932A (ja) * 1996-06-28 1998-01-23 Toshiba Corp プラント異常診断装置
JP2004157788A (ja) * 2002-11-06 2004-06-03 Ntt Power & Building Facilities Inc 建物性能総合評価システム及びその方法
JP2019022306A (ja) * 2017-07-14 2019-02-07 株式会社東芝 異常診断装置、異常診断方法およびコンピュータプログラム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4588530B2 (ja) * 2005-05-20 2010-12-01 鹿島建設株式会社 資産運用管理支援システム、資産運用管理支援方法、プログラム、記録媒体
US10417076B2 (en) * 2014-12-01 2019-09-17 Uptake Technologies, Inc. Asset health score

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1020932A (ja) * 1996-06-28 1998-01-23 Toshiba Corp プラント異常診断装置
JP2004157788A (ja) * 2002-11-06 2004-06-03 Ntt Power & Building Facilities Inc 建物性能総合評価システム及びその方法
JP2019022306A (ja) * 2017-07-14 2019-02-07 株式会社東芝 異常診断装置、異常診断方法およびコンピュータプログラム

Also Published As

Publication number Publication date
JPWO2023243077A1 (ja) 2023-12-21
JP7292538B1 (ja) 2023-06-16

Similar Documents

Publication Publication Date Title
CA2775419C (en) Method, monitoring system and computer program product for monitoring the health of a monitored system utilizing an associative memory
CN108647967A (zh) 选择区块链共识机制的方法、装置以及共识节点
Krieger et al. Comparison of risk of hypertensive complications of pregnancy among women with versus without coarctation of the aorta
Niese et al. Assessing changeability under uncertain exogenous disturbance
Basheer et al. Certainty, trust and evidence: Towards an integrative model of confidence in multi-agent systems
Holvad et al. Measuring inefficiency in the Norwegian bus industry using multi-directional efficiency analysis
Wang et al. Nonuniform timeslicing of dynamic graphs based on visual complexity
Cao et al. Specification of a performance indicator using the evidential-reasoning approach
Khlif et al. Quality metrics for business process modeling
Lin et al. Planning life tests with progressively Type-I interval censored data from the lognormal distribution
WO2023243077A1 (ja) 健全性評価装置、健全性評価方法、および健全性評価プログラム
Tambe et al. An extensible CBM architecture for naval fleet maintenance using open standards
US20240070621A1 (en) Soundness evaluation device, soundness evaluation method and computer readable medium
Walters Applying causal mediation analysis to personality disorder research.
Siebert et al. Economic evaluation of an N-terminal pro B-type natriuretic peptide-supported diagnostic strategy among dyspneic patients suspected of acute heart failure in the emergency department
US20190034174A1 (en) Defining Metrics Thresholds for Ranges Using a Parameritized Line of Text Synchronized with an Interactive Display
Li et al. The congenital birth defects burden in children younger than 14 years of age, 1990–2019: An age-period-cohort analysis of the global burden of disease study
US20220245483A1 (en) Identifying Influential Effects to Be Adjusted in Goal Seek Analysis
Bidari et al. Rapid emergency medicine score (rems) as a predictor of early mortality in the setting of emergency department
Leão et al. How to tell the good from the bad in failure prognostics methods
Gönül-Sezer et al. Comparison of system dynamics and discrete event simulation approaches
JP2022124240A (ja) 診断パターン生成方法及び計算機
Lipke Project duration increase from rework
US20180032931A1 (en) Resource monitoring method and system
CN115185831A (zh) 软件系统测试需求评估方法、装置、电子设备及存储介质

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2022568453

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22946893

Country of ref document: EP

Kind code of ref document: A1