WO2023226319A1 - Protective device for high-altitude welding construction of large bridge high-strength steel box-shaped arch rib - Google Patents

Protective device for high-altitude welding construction of large bridge high-strength steel box-shaped arch rib Download PDF

Info

Publication number
WO2023226319A1
WO2023226319A1 PCT/CN2022/131802 CN2022131802W WO2023226319A1 WO 2023226319 A1 WO2023226319 A1 WO 2023226319A1 CN 2022131802 W CN2022131802 W CN 2022131802W WO 2023226319 A1 WO2023226319 A1 WO 2023226319A1
Authority
WO
WIPO (PCT)
Prior art keywords
frame
strength steel
protective device
arch
steel box
Prior art date
Application number
PCT/CN2022/131802
Other languages
French (fr)
Chinese (zh)
Inventor
杜飞
王艳华
刘海龙
曹庆喜
郑磊
周科文
牛凯
王峻
郭强
胡娟
陈天怡
谢耿
Original Assignee
中国路桥工程有限责任公司
南通振华重型装备制造有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国路桥工程有限责任公司, 南通振华重型装备制造有限公司 filed Critical 中国路桥工程有限责任公司
Publication of WO2023226319A1 publication Critical patent/WO2023226319A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/02Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
    • E04G1/04Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section
    • E04G1/06Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section comprising members with rod-like or tubular portions fitting together end to end, with or without separate connecting pieces

Definitions

  • the utility model relates to the technical field of manufacturing steel bridge box arch ribs, and in particular to a protective device for high-altitude welding construction of high-strength steel box arch ribs for large bridges.
  • S690 grade high-strength steel has a greater tendency to be hardened, and cold cracks are prone to occur during welding.
  • the welding quality is difficult to guarantee. It has high requirements on the welding process and welding environment, and is especially sensitive to rain and wind. Therefore, when using high-strength steel materials, The moisture-proof and thermal insulation measures taken when the box-shaped arch ribs are closed and welded at high altitude are very critical.
  • the utility model provides a protective device for high-altitude welding construction of high-strength steel box-shaped arch ribs of large bridges, thereby effectively solving the problems in the background technology.
  • a protective device for high-altitude welding construction of high-strength steel box-type arch ribs of large bridges including:
  • a support frame configured as an arch structure as a whole, and the top of the support frame is provided with a slope structure;
  • the protective railings are arranged on the top of the supporting frame and are arranged around the top of the supporting frame;
  • the ladder is fixedly arranged on one end of the support frame, and the ladder is arranged vertically;
  • Covering structure covers the support frame, and the joints of the two box-shaped arch ribs are located in the opening of the arch structure.
  • the covering structure blocks wind and rain.
  • the support frame includes two bottom frames and a top frame.
  • the top frame is provided at the top of the two bottom frames.
  • An opening is provided between the two bottom frames.
  • the two bottom frames and the top frame constitute The arch structure.
  • the two bottom frames respectively include:
  • a plurality of support poles, a plurality of the support poles are arranged vertically, and the top ends are fixedly connected to the top frame;
  • a number of supporting cross bars are arranged horizontally, and both ends are fixedly connected to the two supporting vertical bars respectively.
  • the bottom frame further includes a plurality of first diagonal struts, which are arranged at an angle. Both ends of the first diagonal struts are respectively fixedly connected to two supporting vertical poles to support them.
  • a second diagonal strut is provided between the two bottom frames.
  • the second diagonal strut is arranged at an angle and is located at the top of the opening of the arch structure.
  • the second diagonal strut is opposite to the arch structure. Support the opening.
  • the top frame includes a plurality of transverse square tubes and a longitudinal square tube, and the plurality of transverse square tubes and longitudinal square tubes are perpendicular to each other to form a rectangular frame, and the top frame is arranged at an angle.
  • lifting rings are fixedly provided on the top frame.
  • the protective railing includes a bottom plate and a plurality of rods.
  • the bottom plate is fixedly connected to the top frame.
  • the plurality of rods constitute a frame structure for protection.
  • the protective railing is provided with a passage at the ladder.
  • the ladder includes a straight ladder and a cage.
  • the straight ladder is arranged vertically.
  • the straight ladder is provided with a connecting piece at one end close to the supporting frame.
  • the connecting piece is fixedly connected to the supporting frame.
  • the cage is arranged at one end of the straight ladder away from the support frame to protect personnel.
  • the utility model is provided with a supporting frame, a protective railing, a ladder and a covering structure.
  • the supporting frame is set as an arch structure as a whole, and the covering structure covers the outside of the supporting frame.
  • the The protective device is placed on the box-shaped arch ribs.
  • the box-shaped arch ribs pass through the arch structure.
  • the joint between the two box-shaped arch ribs is located in the opening of the arch structure.
  • the welding area is located inside the protective device, which can prevent wind and rain. Effectively control the ambient temperature and humidity in the welding area, provide strong conditions for high-strength steel welding, ensure welding quality, and improve construction efficiency.
  • Figure 1 is a side view of the utility model
  • Figure 2 is a front view of the utility model
  • Figure 3 is a top view of the utility model
  • Figure 4 is a front view of the supporting frame
  • Figure 5 is a top view of the supporting frame
  • Figure 6 is a cross-sectional view of A-A in Figure 5;
  • Figure 7 is a side view of the supporting frame
  • Figure 8 is a schematic structural diagram of the protective railing
  • Figure 9 is a schematic structural diagram of the protective railing at the ladder.
  • Figure 10 is a side view of the ladder.
  • connection should be understood in a broad sense.
  • it can be a fixed connection or a detachable connection. , or integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediary, or it can be an internal connection between two components.
  • connection should be understood in a broad sense.
  • it can be a fixed connection or a detachable connection. , or integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediary, or it can be an internal connection between two components.
  • a protective device for high-altitude welding construction of high-strength steel box arch ribs for large bridges including:
  • Support frame 1 the support frame 1 is configured as an arch structure as a whole, and the top of the support frame 1 is provided with a slope structure 11;
  • the protective railing 2 is arranged on the top of the supporting frame 1, and is arranged around the top of the supporting frame 1;
  • the ladder 3 is fixedly installed on one end of the support frame 1, and the ladder 3 is installed vertically;
  • the cladding structure 4 covers the support frame 1.
  • the joints of the two box-shaped arch ribs are located in the opening of the arch structure.
  • the cladding structure 4 shields the wind and rain.
  • the cladding structure 4 can be set as Color steel tiles.
  • the support frame 1 is set as an arch structure as a whole, and the cladding structure 4 covers the outside of the support frame 1.
  • the protective device is placed on On the box-shaped arch ribs, the box-shaped arch ribs pass through the arch structure.
  • the joint between the two box-shaped arch ribs is located in the opening of the arch structure.
  • the welding area is located inside the protective device, which can achieve wind and rain protection and effectively control the welding.
  • the regional ambient temperature and humidity provide strong conditions for high-strength steel welding, ensure welding quality, and improve construction efficiency.
  • the top of the support frame 1 is provided with a slope-shaped structure 11, which can effectively allow rainwater to slide down and prevent it from accumulating on the top of the protective device.
  • the support frame 1 includes two bottom frames 12 and a top frame 13.
  • the top frame 13 is provided at the top of the two bottom frames 12.
  • An opening is provided between the two bottom frames 12.
  • the two bottom frames 12 and the top frame 13 form an arch. structure.
  • the two bottom frames 12 and the top frame 13 form an arch structure, so that the box-shaped arch ribs pass between the arch structures. Since the supporting frame 1 is provided with a cladding structure 4, it is effective Provide protection from wind and rain.
  • the two bottom frames 12 respectively include:
  • Several support poles 121 are arranged vertically, and the top ends are fixedly connected to the top frame 13;
  • a plurality of supporting cross bars 122 are arranged horizontally, and both ends are fixedly connected to the two supporting vertical bars 121 respectively.
  • the bottom frame 12 also includes a plurality of first diagonal struts 123.
  • the plurality of first diagonal struts 123 are arranged at an angle. Both ends of the first diagonal struts 123 are respectively fixedly connected to the two support poles 121 to support them.
  • a number of support vertical bars 121, support cross bars 122 and first diagonal braces 123 are provided to ensure the structural strength of the bottom frame 12, to resist wind and rain, and not to cause deformation.
  • a second diagonal brace 14 is provided between the two bottom frames 12.
  • the second diagonal brace 14 Arranged at an angle and located at the top of the opening of the arch structure, the second diagonal brace 14 supports the opening of the arch structure to ensure the structural strength of the support frame 1 .
  • the top of the protective device needs to be set as a slope structure 11 to facilitate rainwater sliding down, the heights at both ends of the opening of the arch structure are set differently.
  • the top frame 13 includes a plurality of transverse square tubes 131 and a longitudinal square tube 132.
  • the plurality of transverse square tubes 131 and longitudinal square tubes 132 are perpendicular to each other to form a rectangular frame, and the top frame 13 is arranged at an angle.
  • lifting rings 133 are fixedly provided on the top frame 13 .
  • a number of lifting rings 133 are fixedly provided on the top frame 13 .
  • the protective railing 2 includes a bottom plate 21 and a plurality of rods 22.
  • the bottom plate 21 is fixedly connected to the top frame 13.
  • the plurality of rods 22 constitute a frame structure for protection.
  • the protective railing 2 is provided with a passage 23 at the ladder 3.
  • a passage 23 is provided on the protective railing 2 to facilitate the entry of personnel.
  • the ladder 3 includes a straight ladder 31 and a cage 32.
  • the straight ladder 31 is installed vertically.
  • the straight ladder 31 is provided with a connecting piece 311 at one end close to the supporting frame 1.
  • the connecting piece 311 is fixedly connected to the supporting frame 1.
  • the cage 32 is arranged at one end of the straight ladder 31 away from the support frame 1 to protect personnel.
  • the ladder 3 is provided with a straight ladder 31 and a cage 32.
  • the straight ladder 31 is provided with a connecting piece 311 at one end of the straight ladder 31 close to the supporting frame 1.
  • the connecting piece 311 is fixedly connected to the supporting frame 1.
  • the cage 32 is arranged on the straight ladder. 31 is away from the end of the support frame 1. When the personnel are on the ladder 3, the cage 32 protects the workers and protects the safety of the workers.
  • present utility model is not limited by the above-mentioned embodiments.
  • the above-mentioned embodiments and descriptions only illustrate the principles of the present utility model. Without departing from the spirit and scope of the present utility model, the present utility model can be There will also be various changes and improvements in the new model, and these changes and improvements all fall within the scope of the claimed utility model.
  • the protection scope of the present utility model is defined by the appended claims and their equivalents.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Bridges Or Land Bridges (AREA)
  • Ladders (AREA)

Abstract

A protective device for high-altitude welding construction of a large bridge high-strength steel box-shaped arch rib, comprising: a supporting framework (1), which is integrally configured in an arch structure, and a top end of which is provided with a slope structure (11); a protective railing (2), which is arranged at the top end of the supporting framework (1) and is arranged around the top end of the supporting framework (1); a ladder (3), which is fixedly arranged at one end of the supporting framework (1) and is vertically arranged; and a coating structure (4), which coats the supporting framework (1), wherein a joint between two box-shaped arch ribs is positioned in an opening of the arch structure, and the coating structure (4) shields the device from wind and rain. The box-shaped arch ribs pass through the arch structure, the joint between the two box-shaped arch ribs is positioned in the opening of the arch structure, and a welding area is positioned inside the protective device, so that wind and rain can be prevented, the environmental temperature and humidity of a soldering area can be effectively controlled, powerful conditions are provided for high-strength steel welding, the welding quality is guaranteed, and the construction efficiency is improved.

Description

一种大型桥梁高强钢箱型拱肋高空焊接施工的防护装置A protective device for high-altitude welding construction of high-strength steel box-shaped arch ribs in large bridges 技术领域Technical field
本实用新型涉及钢桥梁箱型拱肋制造技术领域,尤其涉及一种大型桥梁高强钢箱型拱肋高空焊接施工的防护装置。The utility model relates to the technical field of manufacturing steel bridge box arch ribs, and in particular to a protective device for high-altitude welding construction of high-strength steel box arch ribs for large bridges.
背景技术Background technique
随着国内外交通工程的快速发展,在保证大型钢结构桥梁拱肋承载能力的同时,为了给大型桥梁减重,越来越多的S690级高强度合金结构钢开始应用于钢结构桥梁。With the rapid development of transportation engineering at home and abroad, in order to reduce the weight of large bridges while ensuring the load-bearing capacity of large steel structure bridge arch ribs, more and more S690 grade high-strength alloy structural steel has begun to be used in steel structure bridges.
S690级高强钢有较大的淬硬倾向,焊接时易出现冷裂纹,焊接质量难以保证,对焊接工艺以及施焊环境要求较高,尤其对雨水和风特别敏感,因此,在高强度钢材料的箱型拱肋进行桥位高空合拢施焊时所采取的防湿保温措施非常关键。S690 grade high-strength steel has a greater tendency to be hardened, and cold cracks are prone to occur during welding. The welding quality is difficult to guarantee. It has high requirements on the welding process and welding environment, and is especially sensitive to rain and wind. Therefore, when using high-strength steel materials, The moisture-proof and thermal insulation measures taken when the box-shaped arch ribs are closed and welded at high altitude are very critical.
鉴于上述问题的存在,本设计人基于从事此类产品工程应用多年丰富的实务经验及专业知识,并配合学理的运用,积极加以研究创新,以期创设一种大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,使其更具有实用性。In view of the existence of the above problems, the designer based on his rich practical experience and professional knowledge in the engineering application of such products for many years, and combined with the application of academic theory, actively researched and innovated, in order to create a high-altitude welding of high-strength steel box-type arch ribs for large bridges. Construction protective devices make it more practical.
公开于该背景技术部分的信息仅仅旨在加深对本实用新型的总体背景技术的理解,而不应当被视为承认或以任何形式暗示该信息构成已为本领域技术人员所公知的现有技术。The information disclosed in this Background section is merely intended to enhance understanding of the general background of the present invention and should not be construed as an admission or in any way implied that the information constitutes prior art that is already known to those skilled in the art.
实用新型内容Utility model content
本实用新型提供了一种大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,从而有效解决背景技术中的问题。The utility model provides a protective device for high-altitude welding construction of high-strength steel box-shaped arch ribs of large bridges, thereby effectively solving the problems in the background technology.
为了达到上述目的,本实用新型所采用的技术方案是:一种大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,包括:In order to achieve the above purpose, the technical solution adopted by this utility model is: a protective device for high-altitude welding construction of high-strength steel box-type arch ribs of large bridges, including:
支撑骨架,所述支撑骨架整体设置为拱门结构,所述支撑骨架其顶端设置有坡形结构;A support frame, the support frame is configured as an arch structure as a whole, and the top of the support frame is provided with a slope structure;
防护栏杆,所述防护栏杆设置于所述支撑骨架顶端,且绕设于所述支撑骨架顶端的四周;Protective railings, the protective railings are arranged on the top of the supporting frame and are arranged around the top of the supporting frame;
爬梯,所述爬梯固定设置于所述支撑骨架的其中一端,所述爬梯竖直设 置;Ladder, the ladder is fixedly arranged on one end of the support frame, and the ladder is arranged vertically;
包覆结构,所述包覆结构包覆于所述支撑骨架外,两箱型拱肋拼缝处位于所述拱门结构的开口内,所述包覆结构对风雨进行遮挡。Covering structure, the covering structure covers the support frame, and the joints of the two box-shaped arch ribs are located in the opening of the arch structure. The covering structure blocks wind and rain.
进一步地,所述支撑骨架包括两底部框架和顶部框架,所述顶部框架设置于两所述底部框架顶端,两所述底部框架之间设置有开口,两所述底部框架和所述顶部框架构成所述拱门结构。Further, the support frame includes two bottom frames and a top frame. The top frame is provided at the top of the two bottom frames. An opening is provided between the two bottom frames. The two bottom frames and the top frame constitute The arch structure.
进一步地,两所述底部框架分别包括:Further, the two bottom frames respectively include:
若干支撑立杆,若干所述支撑立杆竖直设置,顶端与所述顶部框架固定连接;A plurality of support poles, a plurality of the support poles are arranged vertically, and the top ends are fixedly connected to the top frame;
若干支撑横杆,若干所述支撑横杆水平设置,且两端分别与两所述支撑立杆固定连接。A number of supporting cross bars are arranged horizontally, and both ends are fixedly connected to the two supporting vertical bars respectively.
进一步地,所述底部框架还包括若干第一斜撑杆,若干所述第一斜撑杆倾斜设置,所述第一斜撑杆两端分别与两支撑立杆固定连接,对其进行支撑。Furthermore, the bottom frame further includes a plurality of first diagonal struts, which are arranged at an angle. Both ends of the first diagonal struts are respectively fixedly connected to two supporting vertical poles to support them.
进一步地,两所述底部框架之间设置有第二斜撑杆,所述第二斜撑杆倾斜设置,且位于所述拱门结构开口的顶端,所述第二斜撑杆对所述拱门结构开口处进行支撑。Further, a second diagonal strut is provided between the two bottom frames. The second diagonal strut is arranged at an angle and is located at the top of the opening of the arch structure. The second diagonal strut is opposite to the arch structure. Support the opening.
进一步地,所述拱门结构开口两端的高度不同。Furthermore, the heights of both ends of the opening of the arch structure are different.
进一步地,所述顶部框架包括若干横向方管和纵向方管,若干所述横向方管和纵向方管相互垂直构成矩形框架,所述顶部框架倾斜设置。Further, the top frame includes a plurality of transverse square tubes and a longitudinal square tube, and the plurality of transverse square tubes and longitudinal square tubes are perpendicular to each other to form a rectangular frame, and the top frame is arranged at an angle.
进一步地,所述顶部框架上固定设置有若干吊环。Further, several lifting rings are fixedly provided on the top frame.
进一步地,所述防护栏杆包括底板和若干杆体,所述底板与所述顶部框架固定连接,若干杆体构成框架结构进行防护,所述防护栏杆在所述爬梯处设置有通行口。Further, the protective railing includes a bottom plate and a plurality of rods. The bottom plate is fixedly connected to the top frame. The plurality of rods constitute a frame structure for protection. The protective railing is provided with a passage at the ladder.
进一步地,所述爬梯包括直梯和套笼,所述直梯竖直设置,所述直梯在靠近支撑骨架的一端设置有连接件,所述连接件与所述支撑骨架固定连接,所述套笼设置于所述直梯远离所述支撑骨架的一端,对人员进行防护。Further, the ladder includes a straight ladder and a cage. The straight ladder is arranged vertically. The straight ladder is provided with a connecting piece at one end close to the supporting frame. The connecting piece is fixedly connected to the supporting frame. The cage is arranged at one end of the straight ladder away from the support frame to protect personnel.
本实用新型的有益效果为:本实用新型通过设置支撑骨架、防护栏杆、爬梯和包覆结构,支撑骨架整体设置为拱形结构,包覆结构对支撑骨架外进行包覆,在焊接时,将防护装置放置于箱型拱肋上,箱型拱肋穿过拱门结构,两箱型拱肋的拼缝处位于拱门结构的开口内,将焊接区域位于防护装置的内部,可以实现防风防雨,有效控制施焊区域的环境温度和湿度,给高强钢焊接提供有力条件,保证焊接质量,提高了施工效率。The beneficial effects of the utility model are: the utility model is provided with a supporting frame, a protective railing, a ladder and a covering structure. The supporting frame is set as an arch structure as a whole, and the covering structure covers the outside of the supporting frame. During welding, the The protective device is placed on the box-shaped arch ribs. The box-shaped arch ribs pass through the arch structure. The joint between the two box-shaped arch ribs is located in the opening of the arch structure. The welding area is located inside the protective device, which can prevent wind and rain. Effectively control the ambient temperature and humidity in the welding area, provide strong conditions for high-strength steel welding, ensure welding quality, and improve construction efficiency.
附图说明Description of the drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面 描述中的附图仅仅是本实用新型中记载的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings in the following description These are only some embodiments recorded in the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without exerting creative efforts.
图1为本实用新型的侧面视图;Figure 1 is a side view of the utility model;
图2为本实用新型的正面视图;Figure 2 is a front view of the utility model;
图3为本实用新型的俯视图;Figure 3 is a top view of the utility model;
图4为支撑骨架的正面视图;Figure 4 is a front view of the supporting frame;
图5为支撑骨架的俯视图;Figure 5 is a top view of the supporting frame;
图6为图5中A-A的剖视图;Figure 6 is a cross-sectional view of A-A in Figure 5;
图7为支撑骨架的侧面视图;Figure 7 is a side view of the supporting frame;
图8为防护栏杆的结构示意图;Figure 8 is a schematic structural diagram of the protective railing;
图9为防护栏杆在爬梯处的结构示意图;Figure 9 is a schematic structural diagram of the protective railing at the ladder;
图10为爬梯的侧面视图。Figure 10 is a side view of the ladder.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example.
在本发明的描述中,需要说明的是,属于“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或者位置关系为基于附图所示的方位或者位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of the present invention, it should be noted that the terms “center”, “upper”, “lower”, “left”, “right”, “vertical”, “horizontal”, “inner”, “outer”, etc. The indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings. It is only for the convenience of describing the present invention and simplifying the description. It does not indicate or imply that the indicated device or element must have a specific orientation or a specific orientation. construction and operation, and therefore should not be construed as limitations of the invention.
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如可以是固定连接,也可以是可拆卸连接,或一体式连接;可以是机械连接,也可以是电连接;可以是直接连接,也可以是通过中间媒介间接连接,可以是两个元件内部的连通。对于 本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that, unless otherwise clearly stated and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection or a detachable connection. , or integrated connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediary, or it can be an internal connection between two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood on a case-by-case basis.
如图1至10所示:一种大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,包括:As shown in Figures 1 to 10: a protective device for high-altitude welding construction of high-strength steel box arch ribs for large bridges, including:
支撑骨架1,支撑骨架1整体设置为拱门结构,支撑骨架1其顶端设置有坡形结构11; Support frame 1, the support frame 1 is configured as an arch structure as a whole, and the top of the support frame 1 is provided with a slope structure 11;
防护栏杆2,防护栏杆2设置于支撑骨架1顶端,且绕设于支撑骨架1顶端的四周; Protective railing 2, the protective railing 2 is arranged on the top of the supporting frame 1, and is arranged around the top of the supporting frame 1;
爬梯3,爬梯3固定设置于支撑骨架1的其中一端,爬梯3竖直设置;The ladder 3 is fixedly installed on one end of the support frame 1, and the ladder 3 is installed vertically;
包覆结构4,包覆结构4包覆于支撑骨架1外,两箱型拱肋拼缝处位于拱门结构的开口内,包覆结构4对风雨进行遮挡,其中,包覆结构4可以设置为彩钢瓦。The cladding structure 4 covers the support frame 1. The joints of the two box-shaped arch ribs are located in the opening of the arch structure. The cladding structure 4 shields the wind and rain. The cladding structure 4 can be set as Color steel tiles.
通过设置支撑骨架1、防护栏杆2、爬梯3和包覆结构4,支撑骨架1整体设置为拱形结构,包覆结构4对支撑骨架1外进行包覆,在焊接时,将防护装置放置于箱型拱肋上,箱型拱肋穿过拱门结构,两箱型拱肋的拼缝处位于拱门结构的开口内,将焊接区域位于防护装置的内部,可以实现防风防雨,有效控制施焊区域的环境温度和湿度,给高强钢焊接提供有力条件,保证焊接质量,提高了施工效率。By arranging the support frame 1, protective railing 2, ladder 3 and cladding structure 4, the support frame 1 is set as an arch structure as a whole, and the cladding structure 4 covers the outside of the support frame 1. During welding, the protective device is placed on On the box-shaped arch ribs, the box-shaped arch ribs pass through the arch structure. The joint between the two box-shaped arch ribs is located in the opening of the arch structure. The welding area is located inside the protective device, which can achieve wind and rain protection and effectively control the welding. The regional ambient temperature and humidity provide strong conditions for high-strength steel welding, ensure welding quality, and improve construction efficiency.
其中支撑骨架1顶端设置坡形结构11,能够有效的让雨水滑落,不会在防护装置顶部堆积。The top of the support frame 1 is provided with a slope-shaped structure 11, which can effectively allow rainwater to slide down and prevent it from accumulating on the top of the protective device.
在本实施例中,支撑骨架1包括两底部框架12和顶部框架13,顶部框架13设置于两底部框架12顶端,两底部框架12之间设置有开口,两底部框架12和顶部框架13构成拱门结构。In this embodiment, the support frame 1 includes two bottom frames 12 and a top frame 13. The top frame 13 is provided at the top of the two bottom frames 12. An opening is provided between the two bottom frames 12. The two bottom frames 12 and the top frame 13 form an arch. structure.
通过设置两底部框架12和顶部框架13,两底部框架12和顶部框架13构成拱门结构,从而箱型拱肋从拱门结构之间穿过,由于支撑骨架1外设置有包覆结构4,有效的对风雨进行遮挡。By arranging two bottom frames 12 and a top frame 13, the two bottom frames 12 and the top frame 13 form an arch structure, so that the box-shaped arch ribs pass between the arch structures. Since the supporting frame 1 is provided with a cladding structure 4, it is effective Provide protection from wind and rain.
作为上述实施例的优选,两底部框架12分别包括:As a preferred embodiment of the above, the two bottom frames 12 respectively include:
若干支撑立杆121,若干支撑立杆121竖直设置,顶端与顶部框架13固定连接; Several support poles 121 are arranged vertically, and the top ends are fixedly connected to the top frame 13;
若干支撑横杆122,若干支撑横杆122水平设置,且两端分别与两支撑立杆121固定连接。A plurality of supporting cross bars 122 are arranged horizontally, and both ends are fixedly connected to the two supporting vertical bars 121 respectively.
其中,底部框架12还包括若干第一斜撑杆123,若干第一斜撑杆123倾斜设置,第一斜撑杆123两端分别与两支撑立杆121固定连接,对其进行支撑。Among them, the bottom frame 12 also includes a plurality of first diagonal struts 123. The plurality of first diagonal struts 123 are arranged at an angle. Both ends of the first diagonal struts 123 are respectively fixedly connected to the two support poles 121 to support them.
为了保证底部框架12的支撑效果,设置有若干支撑立杆121、支撑横杆122和第一斜撑杆123,保证底部框架12的结构强度,能够抗风抗雨,不会产生变形。In order to ensure the support effect of the bottom frame 12, a number of support vertical bars 121, support cross bars 122 and first diagonal braces 123 are provided to ensure the structural strength of the bottom frame 12, to resist wind and rain, and not to cause deformation.
由于两底部框架12之间为开口,开口处若只通过顶部框架13进行连接,其结构强度较低,所以在两底部框架12之间设置有第二斜撑杆14,第二斜撑杆14倾斜设置,且位于拱门结构开口的顶端,第二斜撑杆14对拱门结构开口处进行支撑,保证支撑骨架1的结构强度。Since there is an opening between the two bottom frames 12, if the opening is connected only through the top frame 13, the structural strength will be low, so a second diagonal brace 14 is provided between the two bottom frames 12. The second diagonal brace 14 Arranged at an angle and located at the top of the opening of the arch structure, the second diagonal brace 14 supports the opening of the arch structure to ensure the structural strength of the support frame 1 .
其中,由于需要将防护装置的顶端设置为坡形结构11,来方便使雨水滑落,所以在拱门结构开口两端的高度设置的不同。Among them, since the top of the protective device needs to be set as a slope structure 11 to facilitate rainwater sliding down, the heights at both ends of the opening of the arch structure are set differently.
在本实施例中,顶部框架13包括若干横向方管131和纵向方管132,若干横向方管131和纵向方管132相互垂直构成矩形框架,顶部框架13倾斜设置。In this embodiment, the top frame 13 includes a plurality of transverse square tubes 131 and a longitudinal square tube 132. The plurality of transverse square tubes 131 and longitudinal square tubes 132 are perpendicular to each other to form a rectangular frame, and the top frame 13 is arranged at an angle.
其中,顶部框架13上固定设置有若干吊环133。通过设置若干吊环133,方便将防护装置进行吊装,从而将防护装置运输到焊接处,对焊接处进行防护。Among them, a number of lifting rings 133 are fixedly provided on the top frame 13 . By arranging several lifting rings 133, it is convenient to hoist the protective device, thereby transporting the protective device to the welding place and protecting the welding place.
作为上述实施例的优选,防护栏杆2包括底板21和若干杆体22,底板21与顶部框架13固定连接,若干杆体22构成框架结构进行防护,防护栏杆2在爬梯3处设置有通行口23。As a preferred embodiment of the above, the protective railing 2 includes a bottom plate 21 and a plurality of rods 22. The bottom plate 21 is fixedly connected to the top frame 13. The plurality of rods 22 constitute a frame structure for protection. The protective railing 2 is provided with a passage 23 at the ladder 3.
由于工作人员需要从爬梯3到防护装置顶部,所以在防护栏杆2上设置有 通行口23,方便人员进入。Since the staff needs to go from the ladder 3 to the top of the protective device, a passage 23 is provided on the protective railing 2 to facilitate the entry of personnel.
作为上述实施例的优选,爬梯3包括直梯31和套笼32,直梯31竖直设置,直梯31在靠近支撑骨架1的一端设置有连接件311,连接件311与支撑骨架1固定连接,套笼32设置于直梯31远离支撑骨架1的一端,对人员进行防护。As a preferred embodiment of the above embodiment, the ladder 3 includes a straight ladder 31 and a cage 32. The straight ladder 31 is installed vertically. The straight ladder 31 is provided with a connecting piece 311 at one end close to the supporting frame 1. The connecting piece 311 is fixedly connected to the supporting frame 1. , the cage 32 is arranged at one end of the straight ladder 31 away from the support frame 1 to protect personnel.
通过将爬梯3设置直梯31和套笼32,直梯31在直梯31在靠近支撑骨架1的一端设置有连接件311,连接件311与支撑骨架1固定连接,套笼32设置于直梯31远离支撑骨架1的一端,在人员在爬梯3上时,套笼32对工作人员进行防护,保护工作人员的安全。The ladder 3 is provided with a straight ladder 31 and a cage 32. The straight ladder 31 is provided with a connecting piece 311 at one end of the straight ladder 31 close to the supporting frame 1. The connecting piece 311 is fixedly connected to the supporting frame 1. The cage 32 is arranged on the straight ladder. 31 is away from the end of the support frame 1. When the personnel are on the ladder 3, the cage 32 protects the workers and protects the safety of the workers.
本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。Those skilled in the industry should understand that the present utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principles of the present utility model. Without departing from the spirit and scope of the present utility model, the present utility model can be There will also be various changes and improvements in the new model, and these changes and improvements all fall within the scope of the claimed utility model. The protection scope of the present utility model is defined by the appended claims and their equivalents.

Claims (10)

  1. 一种大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,其特征在于,包括:A protective device for high-altitude welding construction of high-strength steel box arch ribs for large bridges, which is characterized by including:
    支撑骨架,所述支撑骨架整体设置为拱门结构,所述支撑骨架其顶端设置有坡形结构;A support frame, the support frame is configured as an arch structure as a whole, and the top of the support frame is provided with a slope structure;
    防护栏杆,所述防护栏杆设置于所述支撑骨架顶端,且绕设于所述支撑骨架顶端的四周;Protective railings, the protective railings are arranged on the top of the supporting frame and are arranged around the top of the supporting frame;
    爬梯,所述爬梯固定设置于所述支撑骨架的其中一端,所述爬梯竖直设置;A ladder, the ladder is fixedly arranged on one end of the support frame, and the ladder is arranged vertically;
    包覆结构,所述包覆结构包覆于所述支撑骨架外,两箱型拱肋拼缝处位于所述拱门结构的开口内,所述包覆结构对风雨进行遮挡。Covering structure, the covering structure covers the support frame, and the joints of the two box-shaped arch ribs are located in the opening of the arch structure. The covering structure blocks wind and rain.
  2. 根据权利要求1所述的大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,其特征在于,所述支撑骨架包括两底部框架和顶部框架,所述顶部框架设置于两所述底部框架顶端,两所述底部框架之间设置有开口,两所述底部框架和所述顶部框架构成所述拱门结构。The protective device for high-altitude welding construction of high-strength steel box-type arch ribs of large bridges according to claim 1, characterized in that the support frame includes two bottom frames and a top frame, and the top frame is arranged at the top of the two bottom frames. , an opening is provided between the two bottom frames, and the two bottom frames and the top frame constitute the arch structure.
  3. 根据权利要求2所述的大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,其特征在于,两所述底部框架分别包括:The protective device for high-altitude welding construction of high-strength steel box arch ribs for large bridges according to claim 2, characterized in that the two bottom frames respectively include:
    若干支撑立杆,若干所述支撑立杆竖直设置,顶端与所述顶部框架固定连接;A plurality of support poles, a plurality of the support poles are arranged vertically, and the top ends are fixedly connected to the top frame;
    若干支撑横杆,若干所述支撑横杆水平设置,且两端分别与两所述支撑立杆固定连接。A number of supporting cross bars are arranged horizontally, and both ends are fixedly connected to the two supporting vertical bars respectively.
  4. 根据权利要求3所述的大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,其特征在于,所述底部框架还包括若干第一斜撑杆,若干所述第一斜撑杆倾斜设置,所述第一斜撑杆两端分别与两支撑立杆固定连接,对其进行支撑。The protection device for high-altitude welding construction of high-strength steel box-type arch ribs of large bridges according to claim 3, characterized in that the bottom frame further includes a plurality of first diagonal braces, and a plurality of the first diagonal braces are arranged at an angle, The two ends of the first diagonal support rod are respectively fixedly connected to the two supporting vertical rods to support them.
  5. 根据权利要求3所述的大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,其特征在于,两所述底部框架之间设置有第二斜撑杆,所述第二斜撑杆倾斜设置,且位于所述拱门结构开口的顶端,所述第二斜撑杆对所述拱门结构开口处进行支撑。The protective device for high-altitude welding construction of high-strength steel box-shaped arch ribs of large bridges according to claim 3, characterized in that a second diagonal brace is provided between the two bottom frames, and the second diagonal brace is arranged at an angle , and is located at the top of the opening of the arch structure, and the second diagonal brace supports the opening of the arch structure.
  6. 根据权利要求5所述的大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,其特征在于,所述拱门结构开口两端的高度不同。The protective device for high-altitude welding construction of high-strength steel box-type arch ribs of large bridges according to claim 5, characterized in that the heights of the two ends of the arch structure opening are different.
  7. 根据权利要求1所述的大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,其特征在于,所述顶部框架包括若干横向方管和纵向方管,若干所述横向方管和纵向方管相互垂直构成矩形框架,所述顶部框架倾斜设置。The protective device for high-altitude welding construction of high-strength steel box-type arch ribs of large bridges according to claim 1, characterized in that the top frame includes a plurality of transverse square tubes and a plurality of longitudinal square tubes, and a plurality of the transverse square tubes and longitudinal square tubes A rectangular frame is formed perpendicularly to each other, and the top frame is arranged at an angle.
  8. 根据权利要求7所述的大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,其特征在于,所述顶部框架上固定设置有若干吊环。The protective device for high-altitude welding construction of high-strength steel box-shaped arch ribs of large bridges according to claim 7, characterized in that a number of lifting rings are fixedly provided on the top frame.
  9. 根据权利要求1所述的大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,其特征在于,所述防护栏杆包括底板和若干杆体,所述底板与所述顶部框架固定连接,若干杆体构成框架结构进行防护,所述防护栏杆在所述爬梯处设置有通行口。The protective device for high-altitude welding construction of high-strength steel box-shaped arch ribs of large bridges according to claim 1, characterized in that the protective railings include a bottom plate and a plurality of rods, the bottom plate is fixedly connected to the top frame, and a plurality of rods constitute The frame structure provides protection, and the protective railing is provided with a passage at the ladder.
  10. 根据权利要求1所述的大型桥梁高强钢箱型拱肋高空焊接施工的防护装置,其特征在于,所述爬梯包括直梯和套笼,所述直梯竖直设置,所述直梯在靠近支撑骨架的一端设置有连接件,所述连接件与所述支撑骨架固定连接,所 述套笼设置于所述直梯远离所述支撑骨架的一端,对人员进行防护。The protective device for high-altitude welding construction of high-strength steel box-type arch ribs of large bridges according to claim 1, characterized in that the ladder includes a straight ladder and a cage, the straight ladder is arranged vertically, and the straight ladder is located close to One end of the supporting frame is provided with a connecting piece, and the connecting piece is fixedly connected to the supporting frame. The cage is arranged on an end of the straight ladder away from the supporting frame to protect personnel.
PCT/CN2022/131802 2022-05-23 2022-11-15 Protective device for high-altitude welding construction of large bridge high-strength steel box-shaped arch rib WO2023226319A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202221311387.9U CN217810519U (en) 2022-05-23 2022-05-23 Protective device for high-strength steel box type arch rib high-altitude welding construction of large bridge
CN202221311387.9 2022-05-23

Publications (1)

Publication Number Publication Date
WO2023226319A1 true WO2023226319A1 (en) 2023-11-30

Family

ID=83988628

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2022/131802 WO2023226319A1 (en) 2022-05-23 2022-11-15 Protective device for high-altitude welding construction of large bridge high-strength steel box-shaped arch rib

Country Status (2)

Country Link
CN (1) CN217810519U (en)
WO (1) WO2023226319A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB473023A (en) * 1936-03-03 1937-10-04 Archibald Milne Hamilton Improvements in the construction of buildings with metal skeletons
CN206034305U (en) * 2016-08-30 2017-03-22 中铁宝桥集团有限公司 Protection device for high altitude welding construction
CN215519816U (en) * 2021-09-02 2022-01-14 中交一公局第二工程有限公司 Detachable bolt-replacing protection platform for steel truss girder

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB473023A (en) * 1936-03-03 1937-10-04 Archibald Milne Hamilton Improvements in the construction of buildings with metal skeletons
CN206034305U (en) * 2016-08-30 2017-03-22 中铁宝桥集团有限公司 Protection device for high altitude welding construction
CN215519816U (en) * 2021-09-02 2022-01-14 中交一公局第二工程有限公司 Detachable bolt-replacing protection platform for steel truss girder

Also Published As

Publication number Publication date
CN217810519U (en) 2022-11-15

Similar Documents

Publication Publication Date Title
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
WO2023226319A1 (en) Protective device for high-altitude welding construction of large bridge high-strength steel box-shaped arch rib
CN207700708U (en) A kind of shellring shape ceiling mounted tracks of unit glass curtain wall
CN211691387U (en) Steel column is assembled operation platform for butt joint construction
CN208456187U (en) A kind of steel structural overhead weld job wind-proof shed
CN105952130B (en) A kind of suspension platform installation method for the construction of building cornice position
CN108412231A (en) Assembled is bolted reinforcing steel processing shed and its assemble method entirely
CN202416824U (en) Movable type exterior projecting scaffold for steel structure
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN208430845U (en) A kind of converter station DC fields high voltage polar line outlet structure
CN205840289U (en) A kind of suspension type vertical operating platform
CN205531410U (en) A simply can dismantle construction canopy for steel construction job site
CN205560795U (en) Truss -like supporting platform of chimney inner tube
CN207686369U (en) A kind of 800kV current conversion stations alternating current filter combined frame work
CN204558892U (en) The truss beam structure that a kind of band is encorbelmented
CN107795133A (en) A kind of monoblock type shielded frame platform and its construction method
CN107081550B (en) Draw and insert-type overhead welding platform and its installation method
CN207277870U (en) A kind of elevator protective device with shaped
CN206205452U (en) A kind of telescopic bulk concrete pours regularization operating platform
CN104836123B (en) The framework girder construction that a kind of band is encorbelmented
CN211622529U (en) Simple and easy protection platform of pin-connected panel
CN205576966U (en) Assembled RC case becomes foundation structure
CN116971538B (en) Large-span arched beam structure and construction and installation method thereof
CN104795733B (en) The truss beam bidirectional two-sided hanging point that a kind of band is encorbelmented
CN215364623U (en) Anti-climbing device for tower crane

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22943506

Country of ref document: EP

Kind code of ref document: A1