CN205576966U - Assembled RC case becomes foundation structure - Google Patents
Assembled RC case becomes foundation structure Download PDFInfo
- Publication number
- CN205576966U CN205576966U CN201620153027.9U CN201620153027U CN205576966U CN 205576966 U CN205576966 U CN 205576966U CN 201620153027 U CN201620153027 U CN 201620153027U CN 205576966 U CN205576966 U CN 205576966U
- Authority
- CN
- China
- Prior art keywords
- tie beam
- collar tie
- column
- assembled
- stand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000002787 reinforcement Effects 0.000 claims abstract description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 27
- 238000000034 method Methods 0.000 abstract description 9
- 238000011065 in-situ storage Methods 0.000 abstract description 5
- 230000001133 acceleration Effects 0.000 abstract 1
- 238000004870 electrical engineering Methods 0.000 abstract 1
- 238000012856 packing Methods 0.000 abstract 1
- 230000001737 promoting effect Effects 0.000 abstract 1
- 230000000284 resting effect Effects 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 3
- 238000010923 batch production Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000001932 seasonal effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model provides an assembled RC case becomes foundation structure, includes collar tie beam, stand, supporting legs, arrangement of reinforcement, hollow side's pipe, notch and packing baffle, the stand upside is through the articulated collar tie beam that is connected with, the fixed supporting legs that is provided with of stand downside, and the inside hollow side pipe that is provided with of collar tie beam, hollow side's outside of tubes inclines and is provided with the arrangement of reinforcement, and the collar tie beam both ends are provided with six collar tie beam round holes, all are provided with the notch on stand trilateral, and the stand upper surface is provided with a plurality of stand hole. The utility model discloses an advantage: can satisfy concrete engineering site environment requirement, overall stability and bearing capacity satisfy rules and require and can guarantee the daily use of box -type substation comprehensively. Relative cast in situ concrete basis, the time of resting that can eliminate process join, realize the overhead crossing operation, improve work efficiency, reduce engineering cost, guarantee construction safety, for the green construction provides technical guarantee, supply electrical engineering to guarantee the quality the acceleration rate to newly -built house and play positive promoting effect.
Description
Technical field
This utility model relates to power supply field of engineering technology, particularly to a kind of assembled
RC case becomes base structure.
Background technology
In New Dwelling power supply engineering, affect construction period weight bigger be exactly box-type substation
Construction.Traditional case becomes basis and uses cast-in-situ construction method construction, and this method pours at the scene
Time, earthwork evacuation amount is big, and construction complexity is high.Install box-type substation from civil engineering excavation,
Basis pours, concrete curing to rigging up and debugging about needs the time of 40 days just can complete,
As affected by the extraneous unpredictable element such as seasonal climate, personnel's interference more can cause the duration without
Limit extends.For General Promotion electric service ability, accelerating Business Process System bulk velocity, state's net is originally
Small stream company applies assembled RC case to become basis in the New Dwelling power supply engineering of the emphasis people's livelihood,
Reduce job site noise with this, prevent airborne dust, minimizing environmental pollution, cleaning transport, minimizing
Place is disturbed, and eliminate procedure connection rests the time, it is achieved interchange operation, reduces construction
Personnel, thus improve work efficiency, reduce comprehensive cost, shorten the construction period, it is ensured that New Dwelling
Power supply engineering is guaranteed the quality speedup.Fabricated construction is the abbreviation of prefabricated concrete structure, is with in advance
Component processed is the main bearing member xoncrete structure through assembling, being formed by connecting.Assembled steel reinforced
Xoncrete structure is the important directions of China's building structure development in recent years, the country of up-to-date enforcement
Standard, is more advantageous for improving production efficiency, saves the energy and ensure construction engineering quality.
Utility model content
The purpose of this utility model be in order to existing bulky, noise is big, airborne dust is serious, ring
Environment pollution problem serious, ineffective, spy provides a kind of assembled RC case and becomes basis
Structure.
This utility model provides a kind of assembled RC case and becomes base structure, it is characterised in that:
Described assembled RC case becomes base structure and includes collar tie beam 1, column 2, spike 3, arrangement of reinforcement
4, hollow square tube 5, notch 7 and filling baffle plate 9;By being hingedly connected with circle on the upside of column 2
Beam 1, is fixedly installed a spike 3 on the downside of column 2, collar tie beam 1 is internally provided with hollow square tube
5, it is provided with arrangement of reinforcement 4 outside hollow square tube 5, collar tie beam 1 two ends are provided with six collar tie beam circular holes 6,
Being provided with notch 7 on three of column 2, column 2 upper surface is provided with several legholes
Hole 8.
The cross section of described collar tie beam 1 is rectangle.
A diameter of 35mm of described collar tie beam circular hole 6.
Described column 2 uses the rectangle section form of inner hollow, and column 2 is divided into four sections,
Connected by reinforcing bar stem stem between every section.
The described a length of 60mm of notch 7, a diameter of 18mm of described column hole 8.
Assembled RC case becomes the design principle on basis: according to the up-to-date Chinese people issuing implementation
Republic's " prefabricated concrete structure technical regulation " and " state's net 10kV box-type substation allusion quotation
Type designing technique directive/guide ", assembled RC case becomes basis and is designed by following principle:
Composition component meets stability and bearing requirements, from heavy and light, intensity height, has the most firm
Degree, satisfied transport not ultra-wide, superelevation and be easy to lifting construction requirement.
Being easy to processing, reduce installation workload and alignment error, member profile shape makes every effort to succinct,
Construction measure is simple.
Change traditional civil engineering cast-in-situ construction method construction, add according to standardized designs, batch production
Work, the thinking of fabricated construction, reduce the work on the spot scope of operation, shortens construction period.Eliminate
Procedure connection rest the time, it is achieved interchange operation, provide safeguard for green construction.
Advantage of the present utility model:
Assembled RC case described in the utility model becomes base structure, is adopted with collar tie beam by column
Form with being hinged and connected to connect, constitute the architecture of load-bearing, use with column by filling plate washer
Reserved notch connects, and not load-bearing is only played and gone along with sb. to guard him and compartmentation, for ensureing the carrying of component
Power and rigidity, and meet the design requirement from heavy and light, collar tie beam uses rectangular cross-sectional, internal pre-
Burying hollow square tube and arrangement of reinforcement, the circular hole of a diameter of 35mm is left at two ends.Meet National Technical rule
Journey and the requirement of state's net modular design fire protection technology, it is possible to meet concrete engineering site environment comprehensively
Requirement, stability in the large and bearing capacity meet regulatory requirements and ensure that box-type substation is daily
Use.Cast in situ concrete foundation relatively, can eliminate procedure connection rests the time, it is achieved vertical
Body cross-operation, improves work efficiency, reduces engineering cost, guarantee construction safety, for green
Construction provide technical guarantee, for New Dwelling power supply engineering guarantee the quality speedup play actively promote make
With.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings and this utility model is described in further detail by embodiment:
Fig. 1 is that assembled RC case becomes basis overall structure front view;
Fig. 2 is that assembled RC case becomes basic left diagram;
Fig. 3 is that assembled RC case becomes foundation ring girder figure arrangement of reinforcement;
Fig. 4 is that assembled RC case becomes foundation ring girder plane graph;
Fig. 5 is that assembled RC case becomes basic stand column profile;
In figure: 1-collar tie beam, 2-column, 3-props up spike, 4-arrangement of reinforcement, the hollow square tube of 5-, 6-
Collar tie beam circular hole, 7-notch, 8-column hole, 9-fills baffle plate.
Detailed description of the invention
Embodiment 1
Present embodiments provide a kind of assembled RC case and become base structure, it is characterised in that: institute
The assembled RC case stated become base structure include collar tie beam 1, column 2, a spike 3, arrangement of reinforcement 4,
Hollow square tube 5, notch 7 and filling baffle plate 9;By being hingedly connected with collar tie beam on the upside of column 2
1, it is fixedly installed a spike 3 on the downside of column 2, collar tie beam 1 is internally provided with hollow square tube 5,
Being provided with arrangement of reinforcement 4 outside hollow square tube 5, collar tie beam 1 two ends are provided with six collar tie beam circular holes 6,
Being provided with notch 7 on three of column 2, column 2 upper surface is provided with several legholes
Hole 8.
The cross section of described collar tie beam 1 is rectangle.
A diameter of 35mm of described collar tie beam circular hole 6.
Described column 2 uses the rectangle section form of inner hollow, and column 2 is divided into four sections,
Connected by reinforcing bar stem stem between every section.
The described a length of 60mm of notch 7, a diameter of 18mm of described column hole 8.
Assembled RC case becomes the design principle on basis: according to the up-to-date Chinese people issuing implementation
Republic's " prefabricated concrete structure technical regulation " and " state's net 10kV box-type substation allusion quotation
Type designing technique directive/guide ", assembled RC case becomes basis and is designed by following principle:
Composition component meets stability and bearing requirements, from heavy and light, intensity height, has the most firm
Degree, satisfied transport not ultra-wide, superelevation and be easy to lifting construction requirement.
Being easy to processing, reduce installation workload and alignment error, member profile shape makes every effort to succinct,
Construction measure is simple.
Change traditional civil engineering cast-in-situ construction method construction, add according to standardized designs, batch production
Work, the thinking of fabricated construction, reduce the work on the spot scope of operation, shortens construction period.Eliminate
Procedure connection rest the time, it is achieved interchange operation, provide safeguard for green construction.
Claims (5)
1. an assembled RC case becomes base structure, it is characterised in that: described assembled RC
Case becomes base structure and includes collar tie beam (1), column (2), a spike (3), arrangement of reinforcement (4), sky
Heart square tube (5), notch (7) and filling baffle plate (9);Column (2) upside is by hinged company
Being connected to collar tie beam (1), column (2) downside is fixedly installed in a spike (3), collar tie beam (1)
Portion is provided with hollow square tube (5), and hollow square tube (5) outside is provided with arrangement of reinforcement (4), collar tie beam
(1) two ends are provided with six collar tie beam circular holes (6), and three of column (2) are provided with groove
Mouth (7), column (2) upper surface is provided with several column holes (8).
2. become base structure according to the assembled RC case described in claim 1, it is characterised in that:
The cross section of described collar tie beam (1) is rectangle.
3. become base structure according to the assembled RC case described in claim 1, it is characterised in that:
A diameter of 35mm of described collar tie beam circular hole (6).
4. become base structure, its feature according to a kind of assembled RC case described in claim 1
It is: described column (2) uses the rectangle section form of inner hollow, column (2) point
It is four sections, is connected by reinforcing bar stem stem between every section.
5. become base structure, its feature according to a kind of assembled RC case described in claim 1
It is: described notch (7) a length of 60mm, a diameter of the 18 of described column hole (8)
mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620153027.9U CN205576966U (en) | 2016-02-29 | 2016-02-29 | Assembled RC case becomes foundation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620153027.9U CN205576966U (en) | 2016-02-29 | 2016-02-29 | Assembled RC case becomes foundation structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205576966U true CN205576966U (en) | 2016-09-14 |
Family
ID=56870979
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620153027.9U Active CN205576966U (en) | 2016-02-29 | 2016-02-29 | Assembled RC case becomes foundation structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205576966U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109518715A (en) * | 2018-12-28 | 2019-03-26 | 国家电网有限公司 | A kind of assembling type base for modular construction power supply |
-
2016
- 2016-02-29 CN CN201620153027.9U patent/CN205576966U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109518715A (en) * | 2018-12-28 | 2019-03-26 | 国家电网有限公司 | A kind of assembling type base for modular construction power supply |
CN109518715B (en) * | 2018-12-28 | 2023-12-05 | 国家电网有限公司 | Assembled foundation for modularized construction power supply |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202882185U (en) | Ribbed-type rigid grid cable dome | |
CN104372967A (en) | Raking prop structure used for natural draft cooling tower and construction method thereof | |
CN102561787B (en) | Anticorrosive composite chimney unit and chimney | |
CN101333869A (en) | Construction method for integrally hoisting steel platform and integrally traversing girders layer | |
CN205576966U (en) | Assembled RC case becomes foundation structure | |
CN204357167U (en) | A kind of cooling stack inclined strut structure | |
CN201722774U (en) | Large-span steel structural corridor set between new and old buildings | |
CN201172986Y (en) | Four-tube self-supporting steel chimney for power generating plant | |
CN203461693U (en) | Ultrahigh steel support leg for combined gantry crane with Bailey truss | |
CN203129580U (en) | Formwork system | |
CN202416973U (en) | Anti-corrosion compound chimney unit and chimney | |
CN207469504U (en) | The superpower anti-buckling support of full steel structure | |
CN200996212Y (en) | Self-erecting steel-structural chimney | |
CN203867271U (en) | Straight reinforced double-ellipsoid combined chimney | |
CN203867270U (en) | Double-oval conjoined chimney | |
CN201367754Y (en) | Three-pipe free-standing steel chimney in power plant | |
CN203225074U (en) | Advertising board of net rack structure | |
CN203924871U (en) | Four pipe disjunctor chimneys | |
CN110371699A (en) | A kind of major diameter single tube trestle | |
CN204510925U (en) | A kind of homogenization warehouse factory building structure | |
CN213710604U (en) | Sleeve type obliquely woven chimney | |
CN203867272U (en) | One-piece oval chimney with enclosure supporting structure | |
CN217205709U (en) | Inner 8-shaped sleeve type chimney | |
CN220055942U (en) | Elevator wall-attached connection structure for adduction type building | |
CN111561211B (en) | Tower with guide rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |