CN109518715A - A kind of assembling type base for modular construction power supply - Google Patents

A kind of assembling type base for modular construction power supply Download PDF

Info

Publication number
CN109518715A
CN109518715A CN201811618064.2A CN201811618064A CN109518715A CN 109518715 A CN109518715 A CN 109518715A CN 201811618064 A CN201811618064 A CN 201811618064A CN 109518715 A CN109518715 A CN 109518715A
Authority
CN
China
Prior art keywords
strip steel
steel construction
construction
power supply
type base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811618064.2A
Other languages
Chinese (zh)
Other versions
CN109518715B (en
Inventor
时谊
闫凯
郭魏凯
曹松山
胡慧婧
余成
蒋倩
邹俊
俞斌
戴金
殷建刚
杨林
盛根林
董林啸
张梦媛
薛琰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Power Transmission Engineering Co Ltd
State Grid Corp of China SGCC
Xuji Group Co Ltd
State Grid Hubei Electric Power Co Ltd
Original Assignee
Hubei Power Transmission Engineering Co Ltd
State Grid Corp of China SGCC
Xuji Group Co Ltd
State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Power Transmission Engineering Co Ltd, State Grid Corp of China SGCC, Xuji Group Co Ltd, State Grid Hubei Electric Power Co Ltd filed Critical Hubei Power Transmission Engineering Co Ltd
Priority to CN201811618064.2A priority Critical patent/CN109518715B/en
Publication of CN109518715A publication Critical patent/CN109518715A/en
Application granted granted Critical
Publication of CN109518715B publication Critical patent/CN109518715B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Power Engineering (AREA)
  • Building Environments (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention provides a kind of assembling type base for modular construction power supply, including the first strip steel construction and the second strip steel construction, the first strip steel construction is connected with the second strip steel construction plug;The first strip steel construction and the second strip steel construction include cover board and box body, and the cover board is interlocked with box body plug;It is simple in sturcture, ingenious in design, infrastructure efficiency is greatly improved, and convenient transportation can be recycled.

Description

A kind of assembling type base for modular construction power supply
Technical field
The present invention relates to construction of transformer substation field more particularly to a kind of assembling type bases for modular construction power supply.
Background technique
State Grid Corporation of China carries forward vigorously the modular transformer substation of " standardized designs, batch production processing, modularization construction " Building-up work replaces current rambling temporary construction power supply by standardization, miniaturization, modular construction power supply, The efficiency of substation's construction can be improved, save human and material resources cost.Since conventional concrete foundation casting craft is complicated, applies Work efficiency rate is lower, has not adapted to the requirement of construction power supply efficiently to put into operation, just one kind has been needed to be able to satisfy in this case Construction power supply " arrives and uses " assembling type base of demand, thus lifting construction power supply service efficiency.
Summary of the invention
It is a kind of for modular construction power supply it is an object of the invention in view of the above shortcomings of the prior art, provide Assembling type base matches with modular construction power supply, and it is convenient to assemble, and can be improved the service efficiency of power supply.
To achieve the above object, present invention employs following technical solutions:
The present invention provides a kind of assembling type bases for modular construction power supply, including the first strip steel construction and Two strip steel constructions, the first strip steel construction are connected with the second strip steel construction plug;
The first strip steel construction and the second strip steel construction include cover board and box body, the cover board with it is described Box body plug is interlocked;
The two sidewalls of the box body are all provided with fluted, and one end on the groove is equipped with the arc for resisting the cover board Shape protrusion;
The side wall of the first strip steel construction is equipped with multiple spaced cylindric holes, the cylindric hole The strip projected parts for being surrounded by a circle and being arranged concentrically;
The both ends of the second strip steel construction are equipped with cylindrical bump, and the cylindrical bump passes through described cylindric Hole is connected with the first strip steel construction plug.
Further, the side wall of the surrounding of the cylindric hole is equipped with multiple circular through holes.
Further, multiple hollow circular casings are equipped in the first strip steel construction.
Further, the first strip steel construction has two, and two first strip steel constructions are parallel and interval is arranged; The second strip steel construction has two, two second strip steel construction intervals and is arranged in parallel, and is distributed in two institutes It states between the first strip steel construction.
Further, the length of the first strip steel construction is greater than the length of the second strip steel construction.
Further, the side of the first strip steel construction is equipped with strip-shaped baffle along its length.
Further, the cylindric hole is externally provided with baffle, and the baffle and the first strip steel construction pass through 3M glue It is connected.
The invention has the benefit that it is simple in sturcture, ingenious in design, infrastructure efficiency is greatly improved, and transport Defeated convenience can be recycled;
1) the first strip steel construction and the second strip steel construction are connected by cylindric hole with cylindrical bump, building blocks The connection type of formula, it is easy to assembly, it can Reusability;
2) the first strip steel construction and the second strip steel construction are assembled into ladder configuration, and stability is strong.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of assembling type base for modular construction power supply of the invention;
Fig. 2 is the structural schematic diagram of box side wall;
Fig. 3 is the schematic cross-sectional view of cylindric hole;
Fig. 4 is the structural schematic diagram of the second strip steel construction;
Fig. 5 is mounting structure schematic diagram.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawing, to the present invention into Row is further described.It should be appreciated that described herein, specific examples are only used to explain the present invention, is not used to limit The present invention.
A kind of assembling type base for modular construction power supply referring to FIG. 1 to FIG. 4, including the first strip steel construction 1 With the second strip steel construction 2, the first strip steel construction 1 is connected with the second strip steel construction 2 plug;
The first strip steel construction 1 and the second strip steel construction 2 include cover board 101 and box body 102, the lid Plate 101 is interlocked with the box body 102 plug;
The two sidewalls of the box body 102 are all provided with fluted 103, and one end on the groove 103 is equipped with for by the lid The arc convex 109 that plate 101 resists;
That is, cover board 101 can be slided along the groove 103 of two sides, so that cover board 101 be made to be interlocked with box body 102.
It can effectively prevent cover board 101 from pushing through on groove 103 in addition, groove 103 is equipped with arc convex 109, and Release box body 102.
The side wall of the first strip steel construction 1 is equipped with multiple spaced cylindric holes 104, described cylindric The strip projected parts 105 for being surrounded by a circle and being arranged concentrically of hole 104;
The both ends of the second strip steel construction 2 are equipped with cylindrical bump 201, and the cylindrical bump 201 passes through institute Cylindric hole 104 is stated to be connected with the first strip steel construction 1 plug.
Cylindrical bump 201 is inserted into cylindric hole 104, to make the first strip steel construction 1 and the second strip steel knot Structure 2 is connected.
In addition, that the first strip steel construction 1 and the second strip steel construction 2 can be made to connect is stronger for strip projected parts 105.
Wherein, strip projected parts 105 be interruption setting, and height and width it is smaller, prevent cylindrical bump 201 be not easy to from It is extracted in cylindric hole 104.
The side wall of the surrounding of the cylindric hole 104 is equipped with multiple circular through holes 106.
Wherein, the stone in cylindric hole 104 can be discharged for circular through hole 106, make the first strip steel construction 1 and The docking of two strip steel constructions 2 is more smooth.
Multiple hollow circular casings 3 are equipped in the first strip steel construction 1.
Wherein, hollow circular casing 3 facilitates cabling, and circular casing can carry out waterproof to electric wire, this is multiple hollow Electric wire can be carried out classification setting by circular casing.
The first strip steel construction 1 has two, and two the first strip steel constructions 1 are parallel and interval is arranged;It is described Second strip steel construction 2 has two, and two second strip steel constructions 2 are spaced and are arranged in parallel, and are distributed in described in two Between first strip steel construction 1.
The length of the first strip steel construction 1 is greater than the length of the second strip steel construction 2.
The side of the first strip steel construction 1 is equipped with strip-shaped baffle 107 along its length.
That is, the setting of two first bar shaped steel constructions 1 interval, and it is equipped with the side of strip-shaped baffle 107 towards outside, two The setting at the second bar shaped steel construction 2 interval forms trapezoidal shape and fixes between two first bar shaped steel constructions 1.This setting can Guarantee securely to be connected between the first bar shaped steel construction 1 and the second bar shaped steel construction 2.
Referring to Fig. 5, preventing modularization from applying in addition, strip-shaped baffle 107 can position modular construction power supply 4 Difficulty is aligned between work power supply and pedestal.
The cylindric hole 104 is externally provided with baffle 108, and the baffle 108 passes through 3M with the first strip steel construction 1 Glue is connected.
When needing to use the cylindric hole 104 at this, by baffle 108 to be released on the first strip steel construction 1, no The baffle 108 on its surface can be continued to stay on the first strip steel construction 1, prevented in pedestal by the cylindric hole 104 needed When mutually consolidating with cement, cement enters in cylindric hole 104.
Embodiments of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but can not Therefore limitations on the scope of the patent of the present invention are interpreted as.It should be pointed out that for those of ordinary skill in the art, Without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection model of the invention It encloses.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (7)

1. a kind of assembling type base for modular construction power supply, it is characterised in that: including the first strip steel construction (1) and Two strip steel constructions (2), the first strip steel construction (1) are connected with the second strip steel construction (2) plug;
The first strip steel construction (1) and the second strip steel construction (2) include cover board (101) and box body (102), institute Cover board (101) is stated to be interlocked with the box body (102) plug;
The two sidewalls of the box body (102) are all provided with fluted (103), and one end on the groove (103) is equipped with for will be described The arc convex (109) that cover board (101) resists;
The side wall of the first strip steel construction (1) is equipped with multiple spaced cylindric holes (104), described cylindric The strip projected parts (105) for being surrounded by a circle and being arranged concentrically of hole (104);
The both ends of the second strip steel construction (2) are equipped with cylindrical bump (201), and the cylindrical bump (201) passes through The cylindric hole (104) is connected with the first strip steel construction (1) plug.
2. a kind of assembling type base for modular construction power supply according to claim 1, it is characterised in that: the circle The side wall of the surrounding of column hole (104) is equipped with multiple circular through holes (106).
3. a kind of assembling type base for modular construction power supply according to claim 1, it is characterised in that: described Multiple hollow circular casings (3) are equipped in one strip steel construction (1).
4. a kind of assembling type base for modular construction power supply according to claim 1, it is characterised in that: described One strip steel construction (1) has two, and two first strip steel constructions (1) are parallel and interval is arranged;The second strip steel Structure (2) has two, and two second strip steel constructions (2) are spaced and are arranged in parallel, and are distributed in two described first Between shape steel construction (1).
5. a kind of assembling type base for modular construction power supply according to claim 1, it is characterised in that: described The length of one strip steel construction (1) is greater than the length of the second strip steel construction (2).
6. a kind of assembling type base for modular construction power supply according to claim 1, it is characterised in that: described The side of one strip steel construction (1) is equipped with strip-shaped baffle (107) along its length.
7. a kind of assembling type base for modular construction power supply according to claim 1, it is characterised in that: the circle Column hole (104) is externally provided with baffle (108), and the baffle (108) is connected with the first strip steel construction (1) by 3M glue It connects.
CN201811618064.2A 2018-12-28 2018-12-28 Assembled foundation for modularized construction power supply Active CN109518715B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811618064.2A CN109518715B (en) 2018-12-28 2018-12-28 Assembled foundation for modularized construction power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811618064.2A CN109518715B (en) 2018-12-28 2018-12-28 Assembled foundation for modularized construction power supply

Publications (2)

Publication Number Publication Date
CN109518715A true CN109518715A (en) 2019-03-26
CN109518715B CN109518715B (en) 2023-12-05

Family

ID=65797467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811618064.2A Active CN109518715B (en) 2018-12-28 2018-12-28 Assembled foundation for modularized construction power supply

Country Status (1)

Country Link
CN (1) CN109518715B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29702946U1 (en) * 1997-02-21 1997-06-19 A. Schuchmann Rohrleitungsbau GmbH, 99092 Erfurt Transformer foundation
CN203014188U (en) * 2012-11-28 2013-06-19 徐州昂内斯电力科技有限公司 Movable electric control cabinet
CN205576966U (en) * 2016-02-29 2016-09-14 国网辽宁省电力有限公司本溪供电公司 Assembled RC case becomes foundation structure
CN205591251U (en) * 2016-05-05 2016-09-21 国网山东省电力公司青岛供电公司 Transformer basis

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29702946U1 (en) * 1997-02-21 1997-06-19 A. Schuchmann Rohrleitungsbau GmbH, 99092 Erfurt Transformer foundation
CN203014188U (en) * 2012-11-28 2013-06-19 徐州昂内斯电力科技有限公司 Movable electric control cabinet
CN205576966U (en) * 2016-02-29 2016-09-14 国网辽宁省电力有限公司本溪供电公司 Assembled RC case becomes foundation structure
CN205591251U (en) * 2016-05-05 2016-09-21 国网山东省电力公司青岛供电公司 Transformer basis

Also Published As

Publication number Publication date
CN109518715B (en) 2023-12-05

Similar Documents

Publication Publication Date Title
CN109518715A (en) A kind of assembling type base for modular construction power supply
CN207010043U (en) A kind of JP cabinets inspection platform
CN209261209U (en) A kind of civil engineering work formwork structure
CN207620365U (en) Temporary support structure
CN209873852U (en) A assembled basis for modularization construction power
CN215167362U (en) Novel assembled stair concrete prefab
CN210239530U (en) Fireproof glass sealing strip fastening and anti-loosening device
CN210724007U (en) Novel wire fixing device for fixing railway cable wiring
CN204139585U (en) A kind of scaffold
CN216480526U (en) Detachable lines lamps and lanterns
CN221298761U (en) Split plug-in type cement electric pole
CN111021583A (en) Vertical connection structure of assembled shear wall structure
CN209554619U (en) A kind of hoisting structure of modular construction power supply
CN210743739U (en) Novel cooling structure of dry-type transformer
CN207705129U (en) A kind of electricity box are spaced apart deck
CN209974057U (en) Stand column structure of sightseeing elevator
CN210743738U (en) Cooling device of dry-type transformer
CN217079105U (en) High performance concrete frame structure prefabricated building
CN219410978U (en) Post-pouring strip baffle assembly structure
CN209653359U (en) Remove the auxiliary device of the diagonal brace of builder's jack
CN211622260U (en) Multifunctional wallboard made of composite building energy-saving material
CN210453250U (en) Concrete mixing plant powder feed arrangement
CN215907402U (en) Face empty post template location fixing device
KR200433369Y1 (en) Pull box
CN217204922U (en) Transverse clamping groove type overlapping tile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant