WO2023188954A1 - ガスメータおよびガスメータ消費電力管理システム - Google Patents

ガスメータおよびガスメータ消費電力管理システム Download PDF

Info

Publication number
WO2023188954A1
WO2023188954A1 PCT/JP2023/005503 JP2023005503W WO2023188954A1 WO 2023188954 A1 WO2023188954 A1 WO 2023188954A1 JP 2023005503 W JP2023005503 W JP 2023005503W WO 2023188954 A1 WO2023188954 A1 WO 2023188954A1
Authority
WO
WIPO (PCT)
Prior art keywords
gas meter
gas
control device
power consumption
acceleration sensor
Prior art date
Application number
PCT/JP2023/005503
Other languages
English (en)
French (fr)
Inventor
一哉 内村
光男 横畑
Original Assignee
パナソニックIpマネジメント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニックIpマネジメント株式会社 filed Critical パナソニックIpマネジメント株式会社
Publication of WO2023188954A1 publication Critical patent/WO2023188954A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F3/00Measuring the volume flow of fluids or fluent solid material wherein the fluid passes through the meter in successive and more or less isolated quantities, the meter being driven by the flow
    • G01F3/02Measuring the volume flow of fluids or fluent solid material wherein the fluid passes through the meter in successive and more or less isolated quantities, the meter being driven by the flow with measuring chambers which expand or contract during measurement
    • G01F3/20Measuring the volume flow of fluids or fluent solid material wherein the fluid passes through the meter in successive and more or less isolated quantities, the meter being driven by the flow with measuring chambers which expand or contract during measurement having flexible movable walls, e.g. diaphragms, bellows
    • G01F3/22Measuring the volume flow of fluids or fluent solid material wherein the fluid passes through the meter in successive and more or less isolated quantities, the meter being driven by the flow with measuring chambers which expand or contract during measurement having flexible movable walls, e.g. diaphragms, bellows for gases

Definitions

  • the present invention relates to a gas meter and a gas meter power consumption management system.
  • a seismic sensor that operates in a power saving mode and a calculation mode that consumes more power than the power saving mode (Patent Document 1).
  • the mode shifts from the power saving mode to a calculation mode in which an earthquake index value is calculated based on the acceleration.
  • the power saving mode is maintained. This prevents the operation mode from always being in the calculation mode, which contributes to reducing power consumption.
  • gas meters are installed outdoors, they are subject to many vibrations caused by, for example, vibrations caused by passing cars and trains, vibrations caused by rainstorms, and even resonance vibrations when gas flows through the gas flow path. affected by noise. Therefore, changes in acceleration caused by these unexpected vibrations may cause repeated transitions from the power saving mode to the measurement mode. As a result, power consumption may increase. As a result, the battery of the gas meter may run out unexpectedly, causing the gas meter to become inoperable.
  • an object of the present invention is to provide a gas meter and a gas meter power consumption management system that can prevent the gas meter from becoming inoperable.
  • the gas meter of the present invention is a gas meter installed in each of a plurality of consumer homes, and includes an acceleration sensor that detects acceleration, a control device, and a battery that supplies power to the acceleration sensor and the control device.
  • the control device transitions from a normal mode to at least one calculation mode in which power consumption in the battery is larger than the normal mode based on the acceleration detected by the acceleration sensor, and integrates values related to the power consumption.
  • a warning signal is output when the value exceeds a predetermined estimated integrated value.
  • the normal mode shifts to the calculation mode, and in the calculation mode, the earthquake index value is calculated based on the acceleration.
  • the calculation mode consumes more battery power than the normal mode. For example, if the acceleration detected by the acceleration sensor frequently exceeds a predetermined value due to a lot of noise caused by vibrations caused by passing cars or trains, the number of times the system shifts to the calculation mode increases accordingly.
  • a warning signal is output to, for example, the center server.
  • the center server can early discover gas meters that consume a lot of power and are likely to run out of electricity at an early stage in the future. As a result, it is possible to prevent the gas meter from unexpectedly running out of battery (battery exhaustion), and it is possible to prevent the gas meter from becoming inoperable.
  • a warning signal when the integrated value of the operating time of the control device in at least one or more calculation modes as the integrated value exceeds the estimated integrated operating time predetermined as the assumed integrated value, A warning signal may be output.
  • the gas meter includes a measuring section that is provided in a flow path through which gas supplied to gas equipment installed in the consumer's home flows and measures the flow rate of gas flowing through the flow path; a blocking unit that switches the channel from an open state where gas can flow to a closed state that blocks the flow of gas in the channel; and a storage unit that stores a threshold value for the integrated value of the operating time of the control device.
  • the control device outputs a warning signal when the integrated value of the operating time of the control device in the calculation mode reaches the threshold value, or causes the cutoff unit to change the flow path from the open state to the open state. It may also be switched to the closed state.
  • the gas meter when the integrated value of the operation time of the control device in the calculation mode reaches the threshold value, a warning signal is output or the gas flow path is shut off by the shutoff section.
  • the gas meter can be brought into a safe state before the battery of the gas meter unexpectedly runs out and the safety function of the gas meter becomes inoperable.
  • the gas meter power consumption management system of the present invention is a gas meter power consumption management system comprising a gas meter corresponding to a consumer's residence and a center server capable of communicating with the gas meter, wherein the gas meter has an acceleration sensor that detects acceleration. , a communication unit that communicates with the center server, a gas meter control unit, and a battery that supplies power to the acceleration sensor, the communication unit, and the gas meter control unit, and the gas meter control unit is configured to communicate with the acceleration sensor. transition from the normal mode to at least one calculation mode in which the power consumption in the battery is larger than the normal mode based on the acceleration detected by the above, and transmit an integrated value of the values related to the power consumption to the center server.
  • the center server includes a warning unit that outputs a warning signal when the integrated value obtained from the gas meter exceeds a predetermined estimated integrated value.
  • FIG. 1 is a block diagram showing a gas meter power consumption management system including a gas meter according to an embodiment of the present invention.
  • FIG. 2 is a block diagram showing the components of the gas meter of FIG. 1.
  • FIG. 3 is a diagram showing a line of change over time of the assumed operation time and a line of change over time of the actual operation time of the control device.
  • 1 is a block diagram showing a gas meter power consumption management system according to an embodiment of the present invention.
  • gas meter and a gas meter power consumption management system according to an embodiment of the present invention will be described with reference to the drawings.
  • the gas meter and gas meter power consumption management system described below are only one embodiment of the present invention. Therefore, the present invention is not limited to the following embodiments, and additions, deletions, and changes can be made without departing from the spirit of the present invention.
  • FIG. 1 is a block diagram showing a gas meter power consumption management system 100 including a gas meter 13 according to this embodiment.
  • FIG. 2 is a block diagram showing the components of the gas meter 13 in FIG. 1.
  • the gas meter power consumption management system 100 includes a center server 10 and a plurality of customer homes 20. Although four customer homes 20 are illustrated in FIG. 1, the number of customer homes 20 in the earthquake safety system 100 may be plural, and may be three or less, or five or more.
  • each customer's house 20 is provided with two gas containers 11, a switch 12, a gas meter 13, and two gas appliances 14.
  • Examples of the customer's home 20 include hospitals, schools, municipal facilities, nursing care facilities, general households, commercial facilities, etc., but are not limited to these, and any building that can use gas can be used as the customer's home 20. included in.
  • the gas container 11 is also called a gas cylinder, and is filled with gas such as LP gas (liquefied petroleum gas).
  • gas such as LP gas (liquefied petroleum gas).
  • LP gas liquefied petroleum gas
  • gas will be simply referred to as gas.
  • the gas supply here is exemplified by supplying gas from the gas container 11 to the gas equipment 14, it may also be a mode in which gas is supplied to each customer's house 20 through a conduit buried underground.
  • the switch 12 switches the gas supply path so that the gas in one of the two gas containers 11 is supplied to the customer's house 20. Thereby, even if one of the two gas containers 11 runs out of gas, the gas in the other gas container 11 can be supplied to the gas equipment 14.
  • the gas meter 13 has a communication section 13a.
  • the communication unit 13a has a function of wirelessly communicating with the center server 10.
  • a wireless communication method between the communication unit 13a and the center server 10 for example, a communication network such as the Internet, LAN, or LPWA (Low Power Wide Area) can be used.
  • the communication unit 13a periodically sends information on the amount of gas used in the customer's home 20 to the center server 10 along with information on the date of use, an ID for identifying the customer's home 20, and information on the location of the customer's home 20. Send.
  • the communication unit 13a may not be built into the gas meter 13, but may be configured as an external slave unit to communicate with the gas meter 13.
  • the gas appliance 14 is, for example, a gas stove, a gas water heater, a gas fan heater, etc., but is not limited to these, and any appliance that consumes gas is included in the gas appliance 14.
  • the center server 10 includes a control device 1, a storage section 4, and a communication section 5.
  • the control device 1 is composed of a microcontroller including a CPU (Central Processing Unit) and memory that stores programs (ROM (Read Only Memory) and RAM (Random Access Memory)), or an ASIC (Application Specific Integrated Circuit). be done.
  • a CPU Central Processing Unit
  • memory that stores programs (ROM (Read Only Memory) and RAM (Random Access Memory)), or an ASIC (Application Specific Integrated Circuit). be done.
  • ASIC Application Specific Integrated Circuit
  • the gas meter 13 includes, in addition to the communication section 13a described above, a control device 13b, an acceleration sensor 13c, a storage section 13d for storing various information, a cutoff section 13e, a measurement section 13f, a battery 13h, and a housing.
  • a main body portion 15 is provided.
  • the measurement unit 13f is provided in a flow path 13r through which gas is supplied to the gas equipment 14 installed in the consumer's residence 20.
  • the measuring unit 13f measures the flow rate of gas supplied from the gas container 11 to the gas equipment 14 via the flow path 13r. That is, the measuring unit 13f measures the amount of gas used in the customer's house 20.
  • the measurement unit 13f may be an ultrasonic flow meter that measures the flow rate from the propagation speed of ultrasonic waves in a pipe through which gas flows.
  • the blocking part 13e switches the channel 13r from an open state where gas can flow to a closed state where the flow of gas in the channel 13r is blocked.
  • the battery 13h supplies power to the communication section 13a, the control device 13b, the acceleration sensor 13c, the storage section 13d, the cutoff section 13e, and the measurement section 13f, respectively.
  • the acceleration sensor 13c is a known sensor using, for example, a piezoelectric element.
  • the acceleration sensor 13c is provided within the main body portion 15. Specifically, the acceleration sensor 13c is provided, for example, on a control board that is a printed wiring board provided within the main body portion 15.
  • the acceleration sensor 13c detects, for example, acceleration in each of three mutually orthogonal acceleration axes when vibration occurs.
  • the storage unit 13d stores in advance an estimated cumulative operating time and a threshold value to be compared with the actual operating time of the control device 13b. Note that the estimated cumulative operation time and the threshold value will be described later.
  • the control device 13b receives the acceleration detected by the acceleration sensor 13c.
  • the control device 13b shifts from the normal mode to at least one calculation mode when the acceleration detected by the acceleration sensor 13c exceeds a threshold value.
  • the control device 13b calculates an earthquake index value based on the acceleration in the calculation mode.
  • the control device 13b measures the scale of the earthquake, such as the SI (Spectral Intensity) value, seismic intensity, magnitude, amplitude, or displacement, which is generally used as an earthquake index value that quantifies the degree of damage caused to a building.
  • SI Standard Intensity
  • the control device 13b outputs a warning signal when the integrated value of the operating time of the control device 13b in the calculation mode exceeds the estimated integrated operating time stored in the storage section 13d.
  • FIG. 3 is a diagram showing a temporal variation line K1 of the assumed operating time and a temporal variation line K2 of the actual operating time of the control device 13b.
  • a temporal change line K1 of the estimated operating time is a line that corresponds to the estimated operating time of the control device 13b with respect to the number of years that have passed.
  • the expected operating time change line K1 over time is determined such that the estimated operating time of the control device 13b reaches the threshold Ts when, for example, 10 years have passed since the gas meter 13 started being used.
  • the control device 13b measures the operating time of the control device 13b in the calculation mode.
  • the control device 13b outputs a warning signal when the cumulative value of the operating time of the control device 13b in the calculation mode on the temporal change line K2 exceeds the estimated cumulative operating time stored in the storage section 13d.
  • the control device 13b outputs a warning signal at time T1. This warning signal may be sent to the center server 10 or to the gas company.
  • the control device 13b outputs a warning signal at time T2 when the integrated value of the operating time of the control device 13b in the calculation mode reaches the threshold Ts stored in the storage section 13d.
  • This warning signal may be sent to the center server 10 or to the gas company.
  • the control device 13b switches the flow path 13r from the open state to the closed state using the blocking portion 13e at the above-mentioned time T2.
  • the control device 13b executes the following process. That is, the control device 13b accumulates the operating time of the control device 13b for each calculation mode. Then, for each calculation mode, the control device 13b issues a warning or the like when the cumulative equivalent time obtained by weighting the cumulative operation time in one calculation mode exceeds the expected cumulative value.
  • the above weighting may be, for example, a ratio of power consumption in each calculation mode.
  • the above threshold value Ts stored in the storage unit 13d may be a fixed value or a variable value.
  • the threshold value Ts can be varied based on, for example, the number of times of communication with an external device such as the center server 10 or the like.
  • the normal mode shifts to the calculation mode, and in the calculation mode, based on the acceleration Earthquake index values are calculated.
  • the calculation mode consumes more power than the normal mode. For example, if the acceleration detected by the acceleration sensor 13c often exceeds a predetermined value due to a lot of noise caused by vibrations caused by passing cars or trains, the number of times the calculation mode is shifted will increase accordingly. .
  • a warning signal is output to the center server 10 when the integrated value of the operating time of the control device 13b in the calculation mode exceeds the estimated integrated operating time.
  • the center server 10 can early discover gas meters 13 that have increased power consumption and are likely to run out of battery at an early stage in the future. This can prevent the battery of the gas meter 13 from unexpectedly running out, and can prevent the gas meter 13 from becoming inoperable.
  • FIG. 4 is a block diagram showing a gas meter power consumption management system 100A according to this embodiment.
  • the gas meter power consumption management system 100A according to the second embodiment is basically the same as the first embodiment, but the center server 10 compares the cumulative value of the operating time of the control device 13b in the calculation mode with the estimated cumulative operating time.
  • This embodiment differs from the first embodiment in that the following steps are performed. Note that, in the following, the same components in the second embodiment as those in the first embodiment are given the same reference numerals, and explanations thereof will be omitted unless otherwise specified.
  • the gas meter power consumption management system 100A includes a center server 10A and a plurality of customer homes 20.
  • a gas meter 13A is installed in the consumer's house 20.
  • the gas meter 13A has a gas meter control section 13g.
  • the gas meter control unit 13g receives the acceleration detected by the acceleration sensor 13c.
  • the gas meter control unit 13g shifts from the normal mode to the calculation mode when the acceleration detected by the acceleration sensor 13c exceeds a threshold value.
  • the gas meter control unit 13g calculates an earthquake index value based on the acceleration in the calculation mode.
  • the gas meter control unit 13g measures the operating time of the gas meter control unit 13g in the calculation mode.
  • the gas meter control unit 13g transmits the integrated value of the operating time of the gas meter control unit 13g in the calculation mode to the center server 10A.
  • the center server 10A includes a warning section 1A, a storage section 4, and a communication section 5.
  • the storage unit 4 stores in advance an estimated cumulative operating time and a threshold value to be compared with the actual operating time of the gas meter control unit 13g of the gas meter 13A.
  • the warning unit 1A obtains the integrated value of the operating time from the gas meter 13A via the communication unit 5.
  • the warning unit 1A outputs a warning signal when the acquired cumulative value of the operating time exceeds the estimated cumulative operating time stored in the storage unit 4. This warning signal is sent to the gas utility.
  • the warning unit 1A outputs a warning signal to the gas utility company when the integrated value of the operating time of the gas meter control unit 13g in the calculation mode reaches the threshold value stored in the storage unit 4.
  • the warning unit 1A notifies the gas meter 13A to switch the flow path 13r from the open state to the closed state using the blocking unit 13e when the cumulative value of the operating time of the gas meter control unit 13g reaches the above threshold value.
  • the center server 10A outputs a warning signal to the gas utility company when the cumulative value of the operating time of the gas meter control unit 13g in the calculation mode exceeds the estimated cumulative operating time.
  • the gas utility company can early discover the gas meter 13 where the power consumption in the battery 13h increases and the battery is likely to run out at an early stage in the future. This can prevent the battery of the gas meter 13A from unexpectedly running out, and can prevent the gas meter 13A from becoming inoperable.
  • the integrated value of the operating time of the control device 13b in the calculation mode is used as the integrated value of the value related to the power consumption in the battery 13h, but the present invention is not limited to this.
  • the current consumption of the control device 13b in the calculation mode, etc. can be used as the integrated value of the values related to the power consumption in the battery 13h.
  • gas containers 11 and two gas devices 14 are illustrated, but the number of gas containers 11 is not limited to this, and the number of gas containers 11 may be one or three or more, and the number of gas devices 14 is one. One or three or more may be used.
  • the gas container 11 is filled with LP gas (liquefied petroleum gas) as an example of gas, but the gas container 11 is not limited to this, and the gas container 11 may be filled with other gas such as oxygen. You can.
  • LP gas liquefied petroleum gas

Landscapes

  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Measuring Volume Flow (AREA)

Abstract

ガスメータは、複数の需要家宅の各々に設置されるガスメータであって、加速度を検出する加速度センサと、制御装置と、加速度センサおよび制御装置に電力を供給するバッテリと、を備え、制御装置は、加速度センサにより検出された加速度に基づき通常モードからバッテリにおける消費電力が通常モードよりも大きい少なくとも1つ以上の演算モードに移行し、消費電力に関わる値の積算値が、予め定められた想定積算値を超えた際に警告信号を出力する。

Description

ガスメータおよびガスメータ消費電力管理システム
 本発明は、ガスメータおよびガスメータ消費電力管理システムに関する。
 従来、省電力モードおよび当該省電力モードよりも消費電力の大きい演算モードで動作する感震センサが知られている(特許文献1)。この感震センサにおいては、加速度測定部により測定された加速度に基づき地震が発生したと判定される場合に、省電力モードから上記加速度に基づき地震指標値を演算する演算モードに移行する。一方、地震が発生していないと判定される場合には省電力モードに維持される。これにより、動作モードが常に演算モードになることを避けることができ、消費電力の低減に寄与するとのことである。
特許第6666023号公報
 しかしながら、ガスメータは屋外に設置されるものであるがゆえ、例えば自動車や列車等の通過による振動、暴風雨による振動、更にはガス流路内をガスが通流する際の共振振動などに起因する多くのノイズの影響を受ける。そのため、これらの予期せぬ振動に基づく加速度の変化をきっかけにして、省電力モードから測定モードへの移行を繰り返すことがある。その結果、消費電力が大きくなってしまうことがあった。このため、ガスメータの電池切れが予期せず起こり動作不能が生じることがあった。
 そこで、本発明は、動作不能に至ることを未然に防ぐことが可能なガスメータおよびガスメータ消費電力管理システムを提供することを目的とする。
 本発明のガスメータは、複数の需要家宅の各々に設置されるガスメータであって、加速度を検出する加速度センサと、制御装置と、前記加速度センサおよび前記制御装置に電力を供給するバッテリと、を備え、前記制御装置は、前記加速度センサにより検出された加速度に基づき通常モードから前記バッテリにおける消費電力が前記通常モードよりも大きい少なくとも1つ以上の演算モードに移行し、前記消費電力に関わる値の積算値が、予め定められた想定積算値を超えた際に警告信号を出力するものである。
 本発明に従えば、加速度センサにより検出された加速度が所定値以上になったときに、通常モードから演算モードに移行し、当該演算モードにおいて上記加速度に基づき地震指標値が算出される。演算モードでは通常モードよりもバッテリの消費電力が大きくなる。例えば自動車や列車の通過による振動等に起因する多くのノイズを受けて加速度センサにより検出される加速度が所定値以上になることが多くなれば、これに伴い演算モードに移行する回数が多くなる。この場合、消費電力に関わる値の積算値が想定積算値を超えた際に警告信号が例えばセンターサーバに出力される。これにより、センターサーバは、消費電力が大きくなって、将来的な早い時期に電気切れが起こりそうなガスメータを早期発見することができる。これによって、ガスメータの電池切れ(バッテリ切れ)が予期せず起こることを防ぐことができ、ガスメータが動作不能に陥ることを未然に防ぐことが可能となる。
 上記発明において、前記制御装置は、前記積算値として少なくとも1つ以上の前記演算モードにおける前記制御装置の動作時間の積算値が、前記想定積算値として予め定められた想定積算動作時間を超えた際に警告信号を出力してもよい。
 上記構成に従えば、上記動作時間が増えることにより消費電力が大きくなってしまい、その結果ガスメータの電池切れが予期せず起こることを未然に防ぐことができる。
 上記発明において、ガスメータは、前記需要家宅に設置されたガス機器に供給されるガスが通流する流路に設けられて前記流路を通流するガスの流量を計測する計測部と、前記流路をガスが通流可能な開放状態から前記流路内のガスの流れを遮断する閉鎖状態へと切り替える遮断部と、前記制御装置の動作時間の前記積算値についての閾値を記憶する記憶部と、をさらに備え、前記制御装置は、前記演算モードにおける前記制御装置の動作時間の前記積算値が前記閾値に達した際に警告信号を出力又は前記遮断部により前記流路を前記開放状態から前記閉鎖状態に切り替えてもよい。
 上記構成に従えば、演算モードにおける制御装置の動作時間の積算値が閾値に達した際に、警告信号が出力又は遮断部によるガスの流路の遮断が行われる。この場合、ガスメータの電池切れが予期せず起きて当該ガスメータの保安機能が働かなくなる前にガスメータを安全な状態に移行させることができる。
 本発明のガスメータ消費電力管理システムは、需要家宅に対応するガスメータおよび前記ガスメータとの間で通信可能なセンターサーバを備えるガスメータ消費電力管理システムであって、前記ガスメータは、加速度を検出する加速度センサと、前記センターサーバとの通信を行う通信部と、ガスメータ制御部と、前記加速度センサ、前記通信部および前記ガスメータ制御部に電力を供給するバッテリと、を備え、前記ガスメータ制御部は、前記加速度センサにより検出された加速度に基づき通常モードから前記バッテリにおける消費電力が前記通常モードよりも大きい少なくとも1つ以上の演算モードに移行し、且つ、前記消費電力に関わる値の積算値を前記センターサーバに送信し、前記センターサーバは、前記ガスメータから取得した前記積算値が、予め定められた想定積算値を超えた際に警告信号を出力する警告部を備えるものである。
 本発明によれば、動作不能に至ることを未然に防ぐことが可能なガスメータおよびガスメータ消費電力管理システムを提供することができる。
本発明の一実施形態に係るガスメータを含むガスメータ消費電力管理システムを示すブロック図である。 図1のガスメータの構成要素を示すブロック図である。 制御装置の想定動作時間の経時変化線と実動作時間の経時変化線を示す図である。 本発明の一実施形態に係るガスメータ消費電力管理システムを示すブロック図である。
 以下、本発明の実施形態に係るガスメータおよびガスメータ消費電力管理システムについて図面を参照しながら説明する。以下に説明するガスメータおよびガスメータ消費電力管理システムは本発明の一実施形態に過ぎない。従って、本発明は以下の実施形態に限定されるものではなく、本発明の趣旨を逸脱しない範囲で追加、削除および変更が可能である。
 (第1実施形態)
 図1は本実施形態に係るガスメータ13を含むガスメータ消費電力管理システム100を示すブロック図である。図2は図1のガスメータ13の構成要素を示すブロック図である。
 図1に示すように、ガスメータ消費電力管理システム100はセンターサーバ10および複数の需要家宅20を含む。なお、図1では4つの需要家宅20を例示しているが、地震保安システム100において需要家宅20は複数であればよく、3つ以下であってもよく、5つ以上であってもよい。
 各需要家宅20には、一例として、2つのガス容器11と、切替器12と、ガスメータ13と、2つのガス機器14とが設けられる。需要家宅20の例としては、病院、学校、自治体施設、介護施設、一般家庭および商業施設等が挙げられるが、これらに限定されるものではなく、ガスを使用し得る建物であれば需要家宅20に包含される。
 ガス容器11はガスボンベとも呼ばれ、当該ガス容器11内にはLPガス(液化石油ガス)等のガスが充填されている。以下の説明では、LPガスを単にガスと記載する。なお、ここでのガス供給は、ガス容器11からガス機器14へガスを供給する態様を例示しているが、地下に埋設された導管を通じて各需要家宅20へガスを供給する態様としてもよい。切替器12は2つのガス容器11のうち一方のガス容器11内のガスが需要家宅20に供給されるようにガス供給路の切り替えを行う。これにより、2つのガス容器11のうち一方のガス容器11内でガス切れが生じても、他方のガス容器11内のガスがガス機器14に供給され得る。
 ガスメータ13は通信部13aを有する。通信部13aはセンターサーバ10に対して無線により通信を行う機能を有する。通信部13aとセンターサーバ10との無線通信方式としては、例えばインターネットやLAN、又はLPWA(Low Power Wide Area)等の通信ネットワークを用いることができる。通信部13aは、需要家宅20におけるガスの使用量の情報を、使用された日付情報、当該需要家宅20を特定するIDおよび当該需要家宅20の所在地域情報と併せてセンターサーバ10に定期的に送信する。なお、通信部13aは、ガスメータ13に内蔵せず、外付けの子機として構成し、ガスメータ13と通信するようにしてもよい。
 ガス機器14は、例えばガスコンロ、ガス給湯器、又はガスファンヒーター等であるが、これらに限定されるものではなく、ガスを消費する機器であればガス機器14に包含される。
 センターサーバ10は、制御装置1と、記憶部4と、通信部5とを有する。制御装置1は、CPU(Central Processing Unit)とプログラムを記憶したメモリ(ROM(Read Only Memory)およびRAM(Random Access Memory))とを含むマイクロコントローラ、又は、ASIC(Application Specific Integrated Circuit)等で構成される。記憶部4としては各種メモリ又はハードディスク等を用いることができる。
 図2に示すように、ガスメータ13は上述の通信部13aの他に、制御装置13b、加速度センサ13c、各種情報を記憶する記憶部13d、遮断部13e、計測部13f、バッテリ13hおよび筐体である本体部15を備える。
 計測部13fは需要家宅20に設置されたガス機器14に供給されるガスが通流する流路13rに設けられる。計測部13fはガス容器11から流路13rを介してガス機器14に供給されるガスの流量を計測する。すなわち、計測部13fは需要家宅20におけるガスの使用量を計測する。一例として、計測部13fはガスが流れる管路内での超音波の伝搬速度から流量を計測する超音波式流量計であってもよい。
 遮断部13eは流路13rをガスが通流可能な開放状態から流路13r内のガスの流れを遮断する閉鎖状態へと切り替える。バッテリ13hは、通信部13a、制御装置13b、加速度センサ13c、記憶部13d、遮断部13e、および計測部13fにそれぞれ電力を供給する。
 加速度センサ13cは例えば圧電素子等を用いた公知のセンサである。加速度センサ13cは本体部15内に設けられる。具体的には、加速度センサ13cは例えば本体部15内に設けられたプリント配線基板である制御基板に設けられる。加速度センサ13cは、振動が生じた際に、例えば相互に直交する3軸の各加速度軸における加速度をそれぞれ検出する。
 記憶部13dは、制御装置13bの実動作時間と比較される想定積算動作時間と閾値を予め記憶する。なお、想定積算動作時間および上記閾値については後述する。
 制御装置13bは加速度センサ13cにより検出された加速度を受信する。制御装置13bは加速度センサ13cにより検出された加速度が閾値以上になる場合に通常モードから少なくとも1つ以上の演算モードに移行する。本実施形態において演算モードは複数あってもよい。制御装置13bは演算モードにおいて加速度に基づき地震指標値を算出する。制御装置13bは、地震指標値として例えば建物に対してどの程度の被害が生じるかを数値化したものとして一般に用いられるSI(Spectral Intensity)値、震度、マグニチュード、振幅又は変位等、地震の規模を比較可能な各種値を算出することができる。バッテリ13hにおいて上記のような演算モードにおける消費電力は通常モードにおける消費電力よりも大きい。
 制御装置13bは、演算モードにおける当該制御装置13bの動作時間の積算値が、記憶部13dに記憶されている想定積算動作時間を超えた際に警告信号を出力する。以下、図面を参照しつつ詳しく説明する。
 図3は制御装置13bの想定動作時間の経時変化線K1と実動作時間の経時変化線K2を示す図である。図3に示すように、想定動作時間の経時変化線K1は経過年数に対して制御装置13bの想定動作時間を対応させたものである。
 想定動作時間の経時変化線K1は、ガスメータ13の使用開始から例えば10年の時間が経過したときに、制御装置13bの想定動作時間が閾値Tsに達するように定められる。
 制御装置13bは演算モードにおける当該制御装置13bの動作時間を計測する。制御装置13bは、経時変化線K2において演算モードにおける当該制御装置13bの動作時間の積算値が、記憶部13dに記憶されている想定積算動作時間を超えた際に警告信号を出力する。図3では、制御装置13bは時間T1に警告信号を出力する。この警告信号はセンターサーバ10に送信されてもよいし、ガス事業者に送信されてもよい。
 制御装置13bは演算モードにおける制御装置13bの動作時間の積算値が、記憶部13dに記憶されている閾値Tsに達した時間T2において警告信号を出力する。この警告信号はセンターサーバ10に送信されてもよいし、ガス事業者に送信されてもよい。或いは、制御装置13bは上記の時間T2において遮断部13eにより流路13rを開放状態から閉鎖状態に切り替える。
 ここで、制御装置13bは加速度センサ13cにより検出された加速度が閾値以上になるときに通常モードから複数の演算モードに移行する場合には、以下の処理を実行する。即ち、制御装置13bは、演算モードごとに、当該制御装置13bの動作時間をそれぞれ積算する。そして、制御装置13bは、演算モードごとに、一の演算モードにおける積算動作時間に重み付けを行って得た積算相当時間が想定積算値を超えた場合に警告等を実行する。上記の重み付けは、例えば、各演算モードにおける消費電力の比率であってもよい。
 記憶部13dに記憶される上述の閾値Tsは固定値であってもよいし、変動値であってもよい。閾値Tsを変動値とする場合には、例えばセンターサーバ10等の外部との通信の回数等に基づき閾値Tsを変動させることができる。
 以上述べたように、本実施形態のガスメータ13においては、加速度センサ13cにより検出された加速度が所定値以上になったときに、通常モードから演算モードに移行し、当該演算モードにおいて上記加速度に基づき地震指標値が算出される。演算モードでは通常モードよりも消費電力が大きくなる。例えば自動車や列車の通過による振動等に起因する多くのノイズを受けて加速度センサ13cにより検出される加速度が所定値以上になることが多くなれば、これに伴い演算モードに移行する回数が多くなる。これに対して、ガスメータ13では演算モードにおける制御装置13bの動作時間の積算値が想定積算動作時間を超えた際に警告信号がセンターサーバ10に出力される。これにより、センターサーバ10は、消費電力が大きくなって、将来的な早い時期に電池切れが起こりそうなガスメータ13を早期発見することができる。これによって、ガスメータ13の電池切れが予期せず起こることを防ぐことができ、ガスメータ13が動作不能に陥ることを未然に防ぐことが可能となる。
 (第2実施形態)
 図4は本実施形態に係るガスメータ消費電力管理システム100Aを示すブロック図である。第2実施形態に係るガスメータ消費電力管理システム100Aは基本的に第1実施形態と同じであるが、センターサーバ10が演算モードにおける制御装置13bの動作時間の積算値と想定積算動作時間との比較を行う点で第1実施形態と異なる。なお、以下では、第2実施形態において第1実施形態の構成要素と同じ構成要素には同じ符号を付与し、特筆する場合を除き説明を省略する。
 図4に示すように、ガスメータ消費電力管理システム100Aはセンターサーバ10Aおよび複数の需要家宅20を含む。需要家宅20にはガスメータ13Aが設けられる。ガスメータ13Aはガスメータ制御部13gを有する。
 ガスメータ制御部13gは加速度センサ13cにより検出された加速度を受信する。ガスメータ制御部13gは加速度センサ13cにより検出された加速度が閾値以上になる場合に通常モードから演算モードに移行する。ガスメータ制御部13gは演算モードにおいて加速度に基づき地震指標値を算出する。
 ガスメータ制御部13gは演算モードにおける当該ガスメータ制御部13gの動作時間を計測する。ガスメータ制御部13gは演算モードにおけるガスメータ制御部13gの動作時間の積算値をセンターサーバ10Aに送信する。
 センターサーバ10Aは、警告部1Aと、記憶部4と、通信部5とを有する。記憶部4は、ガスメータ13Aのガスメータ制御部13gの実動作時間と比較される想定積算動作時間と閾値を予め記憶する。
 警告部1Aはガスメータ13Aから通信部5を介して上記動作時間の積算値を取得する。警告部1Aは取得した上記動作時間の積算値が、記憶部4に記憶されている想定積算動作時間を超えた際に警告信号を出力する。この警告信号はガス事業者に送信される。
 また、警告部1Aは演算モードにおけるガスメータ制御部13gの動作時間の積算値が、記憶部4に記憶されている閾値に達した際にガス事業者に対して警告信号を出力する。或いは、警告部1Aはガスメータ制御部13gの動作時間の積算値が上記閾値に達した際に、遮断部13eにより流路13rを開放状態から閉鎖状態に切り替えるようガスメータ13Aに通知する。
 本実施形態のガスメータ消費電力管理システム100Aにおいては、センターサーバ10Aは演算モードにおけるガスメータ制御部13gの動作時間の積算値が想定積算動作時間を超えた際に警告信号をガス事業者に出力する。これにより、ガス事業者は、バッテリ13hにおける消費電力が大きくなって、将来的な早い時期に電池切れが起こりそうなガスメータ13を早期発見することができる。これによって、ガスメータ13Aの電池切れが予期せず起こることを防ぐことができ、ガスメータ13Aが動作不能に陥ることを未然に防ぐことが可能となる。
 (変形例)
 本発明は上述の実施形態に限定されるものではなく、本発明の要旨を逸脱しない範囲で種々の変形が可能である。例えば以下の通りである。
 上記実施形態では、バッテリ13hにおける消費電力に関わる値の積算値として、演算モードにおける制御装置13bの動作時間の積算値を用いたが、これに限定されるものではない。バッテリ13hにおける消費電力に関わる値の積算値として、演算モードにおける制御装置13bの消費電流等を用いることができる。
 また、上記実施形態では、2つのガス容器11および2つのガス機器14を例示したが、これに限定されるものではなく、ガス容器11は1つ又は3つ以上でもよく、ガス機器14は1つ又は3つ以上でもよい。
 さらに、上記実施形態では、ガス容器11にガスの一例としてのLPガス(液化石油ガス)を充填したが、これに限定されるものではなく、ガス容器11に酸素等の他のガスを充填してもよい。
 10 センターサーバ
 13 ガスメータ
 13a 通信部
 13b 制御装置
 13c 加速度センサ
 13d 記憶部
 13e 遮断部
 13f 計測部
 13g ガスメータ制御部
 13h バッテリ
 20 需要家宅
 100,100A ガスメータ消費電力管理システム
 

Claims (4)

  1.  複数の需要家宅の各々に設置されるガスメータであって、
     加速度を検出する加速度センサと、
     制御装置と、
     前記加速度センサおよび前記制御装置に電力を供給するバッテリと、を備え、
     前記制御装置は、
     前記加速度センサにより検出された加速度に基づき通常モードから前記バッテリにおける消費電力が前記通常モードよりも大きい少なくとも1つ以上の演算モードに移行し、
     前記消費電力に関わる値の積算値が、予め定められた想定積算値を超えた際に警告信号を出力する、ガスメータ。
  2.  前記制御装置は、前記積算値として少なくとも1つ以上の前記演算モードにおける前記制御装置の動作時間の積算値が、前記想定積算値として予め定められた想定積算動作時間を超えた際に警告信号を出力する、請求項1に記載のガスメータ。
  3.  前記需要家宅に設置されたガス機器に供給されるガスが通流する流路に設けられて前記流路を通流するガスの流量を計測する計測部と、
     前記流路をガスが通流可能な開放状態から前記流路内のガスの流れを遮断する閉鎖状態へと切り替える遮断部と、
     前記制御装置の動作時間の前記積算値についての閾値を記憶する記憶部と、をさらに備え、
     前記制御装置は、前記演算モードにおける前記制御装置の動作時間の前記積算値が前記閾値に達した際に警告信号を出力又は前記遮断部により前記流路を前記開放状態から前記閉鎖状態に切り替える、請求項2に記載のガスメータ。
  4.  需要家宅に対応するガスメータおよび前記ガスメータとの間で通信可能なセンターサーバを備えるガスメータ消費電力管理システムであって、
     前記ガスメータは、
     加速度を検出する加速度センサと、
     前記センターサーバとの通信を行う通信部と、
     ガスメータ制御部と、
     前記加速度センサ、前記通信部および前記ガスメータ制御部に電力を供給するバッテリと、を備え、
     前記ガスメータ制御部は、前記加速度センサにより検出された加速度に基づき通常モードから前記バッテリにおける消費電力が前記通常モードよりも大きい少なくとも1つ以上の演算モードに移行し、且つ、前記消費電力に関わる値の積算値を前記センターサーバに送信し、
     前記センターサーバは、
     前記ガスメータから取得した前記積算値が、予め定められた想定積算値を超えた際に警告信号を出力する警告部を備える、ガスメータ消費電力管理システム。
PCT/JP2023/005503 2022-03-29 2023-02-16 ガスメータおよびガスメータ消費電力管理システム WO2023188954A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022053397A JP2023146287A (ja) 2022-03-29 2022-03-29 ガスメータおよびガスメータ消費電力管理システム
JP2022-053397 2022-03-29

Publications (1)

Publication Number Publication Date
WO2023188954A1 true WO2023188954A1 (ja) 2023-10-05

Family

ID=88200299

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/005503 WO2023188954A1 (ja) 2022-03-29 2023-02-16 ガスメータおよびガスメータ消費電力管理システム

Country Status (2)

Country Link
JP (1) JP2023146287A (ja)
WO (1) WO2023188954A1 (ja)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019168421A (ja) * 2018-03-26 2019-10-03 パナソニックIpマネジメント株式会社 マイコン式ガスメーター

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019168421A (ja) * 2018-03-26 2019-10-03 パナソニックIpマネジメント株式会社 マイコン式ガスメーター

Also Published As

Publication number Publication date
JP2023146287A (ja) 2023-10-12

Similar Documents

Publication Publication Date Title
JP4792851B2 (ja) フィールド機器
US9019120B2 (en) Energy manager—water leak detection
US10324117B2 (en) Monitoring power consumption by electrical devices using monitored operational parameters
JP2012235458A (ja) 地震活動に基づいてユーティリティ供給を遮断するための方法およびシステム
KR100691391B1 (ko) 파워콘트롤러 및 상기 파워콘트롤러를 포함한 전자식전력제어시스템
KR101871367B1 (ko) 디바이스들의 전력 소비량에 대한 정보에 기초하여 디바이스들의 동작들을 제어하는 방법 및 그 장치
JP2018510597A (ja) 電力供給を制御するシステムおよび方法
WO2023188954A1 (ja) ガスメータおよびガスメータ消費電力管理システム
KR20110127032A (ko) 스마트 홈을 위한 댁내 망 제어 시스템 및 방법
KR20170112465A (ko) 지능형 원격 검침 시스템 내에서 재해 감시 장치 및 그 방법
CN110736030A (zh) 一种家用燃气智能监测系统
US11079775B1 (en) Flow monitoring device and system
WO2023181732A1 (ja) ガスメータ
Tharanyaa et al. Theft identification and automated water supply system using embedded technology
Ševčík et al. Wireless sensor network for smart power metering
KR20160015059A (ko) 전자식 전력량계 및 이의 동작 방법
Geller Beyond the smart grid
JP4830940B2 (ja) 電力線搬送通信システム
JP7122501B2 (ja) メータ用無線装置
JP2008102067A (ja) ガス遮断装置
JP2002246964A (ja) 電力線搬送通信装置
JP7022897B2 (ja) ガス遮断装置
WO2023181698A1 (ja) 地震保安システム
CN112005283B (zh) 燃气切断装置和燃气切断装置用无线装置
JP2009210244A (ja) ガス供給システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23778984

Country of ref document: EP

Kind code of ref document: A1