WO2023162684A1 - 作業機械 - Google Patents
作業機械 Download PDFInfo
- Publication number
- WO2023162684A1 WO2023162684A1 PCT/JP2023/004058 JP2023004058W WO2023162684A1 WO 2023162684 A1 WO2023162684 A1 WO 2023162684A1 JP 2023004058 W JP2023004058 W JP 2023004058W WO 2023162684 A1 WO2023162684 A1 WO 2023162684A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- flow rate
- circuit pump
- pump
- closed circuit
- charge
- Prior art date
Links
- 239000003921 oil Substances 0.000 claims abstract description 121
- 238000009412 basement excavation Methods 0.000 claims abstract description 105
- 239000010720 hydraulic oil Substances 0.000 claims abstract description 80
- 230000007704 transition Effects 0.000 claims abstract description 17
- 239000012530 fluid Substances 0.000 claims description 38
- 230000007423 decrease Effects 0.000 claims description 34
- 238000001514 detection method Methods 0.000 claims description 28
- 238000006073 displacement reaction Methods 0.000 claims description 16
- 230000003247 decreasing effect Effects 0.000 claims description 15
- 238000007599 discharging Methods 0.000 claims description 8
- 238000000034 method Methods 0.000 description 51
- 230000008569 process Effects 0.000 description 50
- 238000012937 correction Methods 0.000 description 29
- 238000011010 flushing procedure Methods 0.000 description 29
- 238000012545 processing Methods 0.000 description 29
- 238000012986 modification Methods 0.000 description 22
- 230000004048 modification Effects 0.000 description 22
- 239000002689 soil Substances 0.000 description 21
- 238000010586 diagram Methods 0.000 description 15
- 230000006866 deterioration Effects 0.000 description 14
- 230000006870 function Effects 0.000 description 8
- 238000007790 scraping Methods 0.000 description 7
- 230000008859 change Effects 0.000 description 6
- 230000000694 effects Effects 0.000 description 6
- 238000004891 communication Methods 0.000 description 4
- 230000003628 erosive effect Effects 0.000 description 4
- 230000035939 shock Effects 0.000 description 3
- 238000002485 combustion reaction Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000008602 contraction Effects 0.000 description 2
- 230000001050 lubricating effect Effects 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000002950 deficient Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
- E02F9/2221—Control of flow rate; Load sensing arrangements
- E02F9/2225—Control of flow rate; Load sensing arrangements using pressure-compensating valves
- E02F9/2228—Control of flow rate; Load sensing arrangements using pressure-compensating valves including an electronic controller
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
- E02F9/2221—Control of flow rate; Load sensing arrangements
- E02F9/2232—Control of flow rate; Load sensing arrangements using one or more variable displacement pumps
- E02F9/2235—Control of flow rate; Load sensing arrangements using one or more variable displacement pumps including an electronic controller
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
- E02F9/2278—Hydraulic circuits
- E02F9/2289—Closed circuit
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
- E02F9/2278—Hydraulic circuits
- E02F9/2292—Systems with two or more pumps
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
- E02F9/22—Hydraulic or pneumatic drives
- E02F9/2278—Hydraulic circuits
- E02F9/2296—Systems with a variable displacement pump
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B11/00—Servomotor systems without provision for follow-up action; Circuits therefor
- F15B11/16—Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors
- F15B11/17—Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors using two or more pumps
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B21/00—Common features of fluid actuator systems; Fluid-pressure actuator systems or details thereof, not covered by any other group of this subclass
- F15B21/04—Special measures taken in connection with the properties of the fluid
- F15B21/047—Preventing foaming, churning or cavitation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B21/00—Common features of fluid actuator systems; Fluid-pressure actuator systems or details thereof, not covered by any other group of this subclass
- F15B21/08—Servomotor systems incorporating electrically operated control means
- F15B21/087—Control strategy, e.g. with block diagram
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B7/00—Systems in which the movement produced is definitely related to the output of a volumetric pump; Telemotors
- F15B7/005—With rotary or crank input
- F15B7/006—Rotary pump input
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B21/00—Common features of fluid actuator systems; Fluid-pressure actuator systems or details thereof, not covered by any other group of this subclass
- F15B21/005—Filling or draining of fluid systems
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/20—Fluid pressure source, e.g. accumulator or variable axial piston pump
- F15B2211/205—Systems with pumps
- F15B2211/20507—Type of prime mover
- F15B2211/20523—Internal combustion engine
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/20—Fluid pressure source, e.g. accumulator or variable axial piston pump
- F15B2211/205—Systems with pumps
- F15B2211/2053—Type of pump
- F15B2211/20538—Type of pump constant capacity
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/20—Fluid pressure source, e.g. accumulator or variable axial piston pump
- F15B2211/205—Systems with pumps
- F15B2211/2053—Type of pump
- F15B2211/20546—Type of pump variable capacity
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/20—Fluid pressure source, e.g. accumulator or variable axial piston pump
- F15B2211/205—Systems with pumps
- F15B2211/2053—Type of pump
- F15B2211/20561—Type of pump reversible
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/20—Fluid pressure source, e.g. accumulator or variable axial piston pump
- F15B2211/265—Control of multiple pressure sources
- F15B2211/2656—Control of multiple pressure sources by control of the pumps
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/20—Fluid pressure source, e.g. accumulator or variable axial piston pump
- F15B2211/27—Directional control by means of the pressure source
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/50—Pressure control
- F15B2211/505—Pressure control characterised by the type of pressure control means
- F15B2211/50509—Pressure control characterised by the type of pressure control means the pressure control means controlling a pressure upstream of the pressure control means
- F15B2211/50518—Pressure control characterised by the type of pressure control means the pressure control means controlling a pressure upstream of the pressure control means using pressure relief valves
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/50—Pressure control
- F15B2211/515—Pressure control characterised by the connections of the pressure control means in the circuit
- F15B2211/5157—Pressure control characterised by the connections of the pressure control means in the circuit being connected to a pressure source and a return line
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/60—Circuit components or control therefor
- F15B2211/61—Secondary circuits
- F15B2211/611—Diverting circuits, e.g. for cooling or filtering
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/60—Circuit components or control therefor
- F15B2211/61—Secondary circuits
- F15B2211/613—Feeding circuits
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/60—Circuit components or control therefor
- F15B2211/63—Electronic controllers
- F15B2211/6303—Electronic controllers using input signals
- F15B2211/6306—Electronic controllers using input signals representing a pressure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/60—Circuit components or control therefor
- F15B2211/63—Electronic controllers
- F15B2211/6303—Electronic controllers using input signals
- F15B2211/6336—Electronic controllers using input signals representing a state of the output member, e.g. position, speed or acceleration
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/60—Circuit components or control therefor
- F15B2211/63—Electronic controllers
- F15B2211/6303—Electronic controllers using input signals
- F15B2211/6346—Electronic controllers using input signals representing a state of input means, e.g. joystick position
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/60—Circuit components or control therefor
- F15B2211/665—Methods of control using electronic components
- F15B2211/6652—Control of the pressure source, e.g. control of the swash plate angle
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/70—Output members, e.g. hydraulic motors or cylinders or control therefor
- F15B2211/705—Output members, e.g. hydraulic motors or cylinders or control therefor characterised by the type of output members or actuators
- F15B2211/7051—Linear output members
- F15B2211/7053—Double-acting output members
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B2211/00—Circuits for servomotor systems
- F15B2211/80—Other types of control related to particular problems or conditions
- F15B2211/86—Control during or prevention of abnormal conditions
- F15B2211/8609—Control during or prevention of abnormal conditions the abnormal condition being cavitation
Definitions
- the present invention relates to working machines.
- Patent Document 1 A working machine including a charge circuit connected to an oil flow path is known (see Patent Document 1).
- the charge circuit described in Patent Document 1 has a charge flow path connected to a hydraulic fluid flow path, and a charge pump that discharges hydraulic fluid to the charge flow path.
- An object of the present invention is to provide a working machine capable of suppressing deterioration of a closed circuit pump.
- a work machine includes an articulated work device that has a hydraulic actuator and performs excavation work; an open circuit pump that is connected to the hydraulic actuator in an open circuit to supply hydraulic fluid to the hydraulic actuator; a charge pump; and a charge that guides the hydraulic fluid discharged from the charge pump to the closed circuit. a flow path; and a controller that controls the discharge volumes of the closed circuit pump and the open circuit pump. Further, the working machine includes a surplus oil discharge device that discharges surplus hydraulic oil in the closed circuit to the charge flow path.
- the controller changes the pressure of the charge passage from a state equal to or greater than a predetermined pressure threshold to a state less than the pressure threshold, or changes the state from a state in which the work device is not performing excavation work to a state in which excavation work is performed. In the case of transition, the discharge capacity of the open circuit pump is increased, or the discharge capacity of the closed circuit pump is decreased.
- FIG. 1 is a side view of a hydraulic excavator shown as an example of a working machine according to a first embodiment of the present invention.
- FIG. 2 is a diagram showing a hydraulic system mounted on a hydraulic excavator.
- FIG. 3 is a hardware configuration diagram of the controller.
- FIG. 4 is a functional block diagram of the controller.
- FIG. 5 is a diagram showing a first discharge flow rate table and a second discharge flow rate table stored in the nonvolatile memory.
- FIG. 6 is a flowchart showing an example of flow rate control executed by the controller according to the first embodiment;
- FIG. 7 is a flowchart showing an example of flow rate control executed by the controller according to the second embodiment.
- FIG. 8 is a flow chart showing an example of flow rate control executed by a controller according to the third embodiment.
- FIG. 9 is a diagram showing a hydraulic system mounted on a hydraulic excavator according to the fourth embodiment.
- FIG. 10 is a hardware configuration diagram of a controller according to the fourth embodiment.
- FIG. 11 is a functional block diagram of a controller according to the fourth embodiment.
- FIG. 12 is a diagram illustrating an example of processing for computing the posture of the working device.
- FIG. 13 is a flowchart showing an example of excavation determination processing executed by the controller according to the fourth embodiment.
- FIG. 14 is a flow chart showing an example of flow rate control executed by a controller according to the fourth embodiment.
- FIG. 1 is a side view of a hydraulic excavator 100 shown as an example of a working machine according to the first embodiment of the invention.
- the hydraulic excavator 100 includes a crawler-type traveling body 30, a revolving body (vehicle body) 40 provided to be able to turn with respect to the traveling body 30, and a front body attached to the revolving body 40 for excavating work. and a working device (hereinafter referred to as a working device) 20 .
- the present invention can be applied to construction machines such as wheel loaders, and various work machines that perform excavation work at construction sites, mining sites, and the like using work devices.
- the traveling body 30 is provided with a pair of left and right traveling hydraulic motors (hereinafter referred to as traveling motors) 31 .
- the left and right crawlers are independently driven to rotate by the left and right traveling motors 31 .
- the traveling body 30 travels forward or backward.
- the revolving body 40 is provided with an operating device for performing various operations of the hydraulic excavator 100 and an operator's cab 41 in which an operator's seat and the like are arranged.
- the operating devices include an operating device for operating the work device 20 , an operating device for operating the traveling body 30 , and an operating device for operating the revolving body 40 .
- the revolving body 40 is equipped with a prime mover such as an engine, a hydraulic pump driven by the engine, a revolving hydraulic motor (hereinafter referred to as a revolving motor) 42, and the like.
- a prime mover such as an engine, a hydraulic pump driven by the engine, a revolving hydraulic motor (hereinafter referred to as a revolving motor) 42, and the like.
- the revolving body 40 is revolved rightward or leftward with respect to the traveling body 30 by a revolving motor 42 .
- the work device 20 is a multi-joint type work device attached to the revolving structure 40, and includes a plurality of hydraulic actuators (hydraulic cylinders) and a plurality of (three in this embodiment) driven actuators driven by the plurality of hydraulic actuators. It has a target member.
- the boom 24, the arm 23, and the bucket 22, which are members to be driven, are connected in series.
- the base end of the boom 24 is rotatably connected to the front part of the revolving body 40 via a boom pin.
- the base end of the arm 23 is rotatably connected to the tip of the boom 24 via an arm pin.
- the bucket 22 is rotatably connected to the tip of the arm 23 via a bucket pin.
- the boom 24 is rotationally driven by the telescopic motion of a boom cylinder 27, which is a hydraulic cylinder.
- the arm 23 is rotationally driven by an extension and contraction operation of an arm cylinder 26, which is a hydraulic cylinder.
- the bucket 22 is rotatably driven by an expansion and contraction operation of a bucket cylinder 25, which is a hydraulic cylinder.
- the boom cylinder 27 has one end connected to the boom 24 and the other end connected to the frame of the revolving body 40 .
- the arm cylinder 26 has one end connected to the arm 23 and the other end connected to the boom 24 .
- the bucket cylinder 25 has one end connected to the bucket 22 via a bucket link and the other end connected to the arm 23 .
- FIG. 2 is a diagram showing the hydraulic system 60 mounted on the hydraulic excavator 100. As shown in FIG. The hydraulic system 60 comprises a plurality of hydraulic circuits for driving a plurality of hydraulic actuators (25-27, 31, 42).
- FIG. 2 shows the hydraulic circuit that drives the arm cylinder 26, and omits the hydraulic circuit that drives the other hydraulic actuators (25, 27, 31, 42).
- the arm cylinder 26 includes a bottomed cylindrical cylinder tube with one end closed, a head cover closing the opening at the other end of the cylinder tube, a cylinder rod 26r passing through the head cover and inserted into the cylinder tube, and the cylinder rod 26r. and a piston 26p that is provided at the tip of the cylinder tube and divides the inside of the cylinder tube into a rod-side oil chamber 26b and a bottom-side oil chamber 26a.
- the hydraulic system 60 includes a closed circuit pump 1 connected to the arm cylinder 26 via a closed circuit Cc to supply and discharge working oil to and from the arm cylinder 26, and an open circuit Oc to the arm cylinder 26.
- the open circuit pump 3 connected to supply hydraulic oil to the arm cylinder 26, the operating device 8 instructing the operation of the arm cylinder 26, and the discharge capacity (displacement capacity) of the closed circuit pump 1 and the open circuit pump 3 are controlled.
- a controller 7 a controller 7;
- the operating device 8 is one of operating devices for operating the work device 20 .
- the discharge capacity is the discharge amount per pump rotation.
- the closed circuit Cc is a circuit for returning the return oil from the hydraulic actuator to the pump.
- the open circuit Oc is a circuit that does not return oil from the hydraulic actuator to the pump.
- the open circuit Oc is a circuit that returns oil from the hydraulic actuator to a tank (not shown).
- the hydraulic system 60 includes a first switching valve 15a, a second switching valve 15b, a first relief valve 19a, a second relief valve 19b, a flushing valve 16, a charge circuit 63, a tank 17, an engine 5 and .
- the closed circuit pump 1 and the open circuit pump 3 are rotationally driven by the engine 5 and discharge hydraulic oil.
- the engine 5 is a power source of the hydraulic excavator 100, and is configured by an internal combustion engine such as a diesel engine, for example. Hydraulic oil is stored in the tank 17 .
- the closed circuit pump 1 is a variable displacement hydraulic pump whose discharge capacity (displacement volume) can be changed.
- the closed circuit pump 1 is, for example, a swash plate hydraulic pump or a swash shaft hydraulic pump.
- the discharge capacity of the closed circuit pump 1 is controlled by a regulator (hereinafter referred to as first regulator) 2 for the closed circuit pump.
- the first regulator 2 controls the displacement of the closed circuit pump 1 by controlling the tilting angle of the swash plate or the swash shaft of the closed circuit pump 1 based on the control signal from the controller 7 .
- the discharge flow rate of the closed circuit pump 1 is determined according to the discharge capacity of the closed circuit pump 1 and the rotational speed of the engine 5 .
- the closed circuit pump 1 is a bi-tilting hydraulic pump capable of discharging hydraulic oil in two directions.
- the closed circuit pump 1 has a first pump port 1a and a second pump port 1b.
- the closed circuit pump 1 can be switched between a first discharge state and a second discharge state. In the first discharge state, the closed circuit pump 1 sucks working oil from the second pump port 1b and discharges working oil from the first pump port 1a. In the second discharge state, the closed circuit pump 1 sucks working oil from the first pump port 1a and discharges working oil from the second pump port 1b.
- the first pump port 1 a of the closed circuit pump 1 and the bottom side oil chamber 26 a of the arm cylinder 26 are connected by a first flow path 61 .
- a second flow path 62 connects the second pump port 1 b of the closed circuit pump 1 and the rod side oil chamber 26 b of the arm cylinder 26 .
- the closed circuit Cc is formed by connecting the closed circuit pump 1 and the arm cylinder 26 by the first flow path 61 and the second flow path 62 .
- the open circuit pump 3 is a variable displacement hydraulic pump whose discharge capacity (displacement volume) can be changed.
- the open circuit pump 3 is, for example, a swash plate hydraulic pump or a swash shaft hydraulic pump.
- the discharge capacity of the open circuit pump 3 is controlled by a regulator (hereinafter referred to as a second regulator) 4 for the open circuit pump.
- the second regulator 4 controls the displacement of the open circuit pump 3 by controlling the tilt angle of the swash plate or the swash shaft of the open circuit pump 3 based on the control signal from the controller 7 .
- the discharge flow rate of the open circuit pump 3 is determined according to the discharge capacity of the open circuit pump 3 and the rotation speed of the engine 5 .
- the open circuit pump 3 is a unidirectional hydraulic pump capable of discharging hydraulic oil in one direction.
- the open circuit pump 3 has a pump port 3a and a suction port 3b.
- the open circuit pump 3 sucks the hydraulic oil in the tank 17 from the suction port 3b and discharges it from the pump port 3a.
- the pump port 3a of the open circuit pump 3 is connected to the first flow path 61 via the first switching valve 15a. Also, the pump port 3a of the open circuit pump 3 is connected to the second flow path 62 via the second switching valve 15b.
- the first switching valve 15a and the second switching valve 15b are, for example, 2-port 2-position electromagnetic switching valves.
- the first switching valve 15a and the second switching valve 15b are switched between the open position and the closed position based on the control signal from the controller 7.
- the first switching valve 15a and the second switching valve 15b are switched to the closed position by the urging force of the spring when not energized.
- the discharge flow path of the open circuit pump 3 and the first flow path 61 communicate through the first switching valve 15a.
- the first switching valve 15a is switched to the closed position, communication between the discharge flow path of the open circuit pump 3 and the first flow path 61 is blocked by the first switching valve 15a.
- the first relief valve 19 a is connected to the first flow path 61 and regulates the maximum pressure of the first flow path 61 .
- the second relief valve 19 b is connected to the second flow path 62 and regulates the maximum pressure of the second flow path 62 .
- the charge circuit 63 includes the charge pump 9, a charge flow path 11 that guides the hydraulic oil discharged from the charge pump 9 to the closed circuit Cc through the first makeup valve 66a or the second makeup valve 66b, and the charge flow path 11. and a charge relief valve 65 that defines a maximum pressure.
- the charge pump 9 is a fixed capacity hydraulic pump with a constant discharge capacity.
- Charge pump 9 is, for example, a gear pump.
- the charge pump 9 is driven by the engine 5 and sucks and discharges hydraulic oil in the tank 17 .
- the set pressure of the charge relief valve 65 is set to, for example, about 2 MPa.
- the charge relief valve 65 discharges the surplus hydraulic oil discharged from the charge pump 9 to the tank 17 and maintains the pressure of the charge flow path 11 at 2 MPa.
- a pump port 9 a of the charge pump 9 is connected to the charge flow path 11 , and a suction port 9 b of the charge pump 9 is connected to the tank 17 .
- the charge channel 11 is connected to the first channel 61 via the first make-up valve 66a.
- the first make-up valve 66 a is a check valve that allows hydraulic fluid to flow from the charge flow path 11 to the first flow path 61 and prohibits hydraulic fluid to flow from the first flow path 61 to the charge flow path 11 . be.
- the charge flow path 11 is connected to the second flow path 62 via the second make-up valve 66b.
- the second make-up valve 66b is a check valve that allows hydraulic fluid to flow from the charge flow path 11 to the second flow path 62 and prohibits hydraulic fluid to flow from the second flow path 62 to the charge flow path 11. be.
- the charge pump 9 sucks hydraulic oil from the tank 17 and discharges the hydraulic oil to the charge flow path 11 . Hydraulic oil discharged from the charge pump 9 to the charge flow path 11 replenishes the closed circuit Cc through the first makeup valve 66a or the second makeup valve 66b.
- the flushing valve 16 is connected to the first flow path 61, the second flow path 62, and the charge flow path 11, and discharges surplus hydraulic fluid (hereinafter also referred to as surplus oil) in the closed circuit Cc to the charge flow path 11. Excess oil discharge device.
- the flushing valve 16 communicates the high-pressure side of the first flow path 61 and the second flow path 62 with the charge flow path 11 .
- the flushing valve 16 moves in the first direction D1
- the first flow path 61 and the charge flow path 11 are in contact with the flushing valve 16.
- Communicate via When the pressure in the second flow path 62 is higher than the pressure in the first flow path 61, the flushing valve 16 moves in the second direction D2, and the second flow path 62 and the charge flow path 11 are in contact with the flushing valve 16. Communicate via.
- the operation device 8 has a tiltable operation lever 8b and an operation amount sensor 8a that detects the operation amount (inclination angle) of the operation lever 8b.
- the manipulated variable sensor 8 a is electrically connected to the controller 7 .
- the operation amount sensor 8a detects the amount of operation of the operation lever 8b and outputs a signal representing the detection result to the controller 7.
- the controller 7 is electrically connected to the pressure sensor 10, the first regulator 2, the second regulator 4, the first switching valve 15a, and the second switching valve 15b.
- the pressure sensor 10 detects the pressure (hereinafter also referred to as charge pressure) Pc of the charge flow path 11 and outputs a signal representing the detection result to the controller 7 .
- the controller 7 outputs control signals to the first regulator 2 and the second regulator 4 as well as the first switching valve 15a and the second switching valve 15b based on the detection results of the operation amount sensor 8a and the pressure sensor 10 .
- the controller 7 includes a processing unit 71 such as a CPU (Central Processing Unit), MPU (Micro Processing Unit), DSP (Digital Signal Processor), ROM (Read Only Memory), flash memory, hard disk drive, etc.
- the controller 7 may be composed of one computer, or may be composed of a plurality of computers.
- an ASIC application specific integrated circuit
- FPGA Field Programmable Gate Array
- the non-volatile memory 72 stores programs capable of executing various calculations.
- the non-volatile memory 72 is a storage medium that can read a program that implements the functions of this embodiment.
- the processing device 71 expands the program stored in the nonvolatile memory 72 to the volatile memory 73 and executes the calculation.
- the processing unit 71 performs predetermined arithmetic processing on signals received from the input interface 74, the nonvolatile memory 72 and the volatile memory 73 according to a program.
- the input interface 74 converts signals input from various devices (manipulated amount sensor 8a, pressure sensor 10, etc.) into data that can be calculated by the processing device 71.
- the output interface 75 generates a signal for output according to the calculation result of the processing device 71, and outputs the signal to various devices (first switching valve 15a, second switching valve 15b, first regulator 2, second switching valve 15b). regulator 4, etc.).
- FIG. 4 is a functional block diagram of the controller 7.
- the controller 7 executes a program stored in the nonvolatile memory 72 to perform a target supply flow rate calculation section 101, a target discharge flow rate calculation section 102, a valve control section 103, a determination section 104, It functions as a correction unit 105 and a pump control unit 106 .
- the discharge flow rates of the closed circuit pump 1 and the open circuit pump 3 are determined by the discharge capacity and the rotation speed of the engine 5 .
- the controller 7 controls the discharge flow rate of the closed circuit pump 1 and the open circuit pump 3 by controlling the discharge capacity of the closed circuit pump 1 and the open circuit pump 3 .
- the target supply flow rate calculation unit 101 calculates a target value for the flow rate of hydraulic oil to be supplied to the arm cylinder 26 (hereinafter referred to as target supply flow rate) based on the manipulated variable detected by the manipulated variable sensor 8a.
- the nonvolatile memory 72 stores a supply flow rate table that defines the relationship between the manipulated variable and the target supply flow rate.
- the supply flow rate table defines supply flow rate characteristics in which the target supply flow rate increases as the manipulated variable increases.
- the target supply flow rate calculation unit 101 refers to the supply flow rate table stored in the nonvolatile memory 72 and calculates the target supply flow rate based on the manipulated variable detected by the manipulated variable sensor 8a.
- the target discharge flow rate calculation unit 102 calculates a target flow rate Q1, which is the target value of the discharge flow rate of the closed circuit pump 1, and the discharge flow rate of the open circuit pump 3, based on the target supply flow rate calculated by the target supply flow rate calculation unit 101.
- a target flow rate Q2 which is a target value of is calculated.
- a first discharge flow rate table and a second discharge flow rate table shown in FIG. 5 are stored in the nonvolatile memory 72 .
- the first discharge flow rate table defines the relationship between the target supply flow rate and the target flow rate Q1.
- the second discharge flow rate table defines the relationship between the target supply flow rate and the target flow rate Q2.
- the first discharge flow rate table defines discharge flow rate characteristics in which the target flow rate Q1 increases as the target supply flow rate increases in the range of the target supply flow rate from 0 to a predetermined value Ft.
- the target flow rate Q2 is 0 when the target supply flow rate is less than the predetermined value Ft, and when the target supply flow rate is equal to or higher than the predetermined value Ft, the target flow rate Q2 increases as the target supply flow rate increases.
- the arm cylinder 26 (hydraulic actuator to be operated) is driven by the hydraulic fluid discharged from the closed circuit pump 1 when the target supply flow rate is in the range from 0 to the predetermined value Ft.
- the arm cylinder 26 is driven by hydraulic fluid (total flow rate) discharged from both the closed circuit pump 1 and the open circuit pump 3 .
- the target discharge flow rate calculation unit 102 refers to the first discharge flow rate table stored in the nonvolatile memory 72, and calculates the target flow rate of the closed circuit pump 1 based on the target supply flow rate calculated by the target supply flow rate calculation unit 101. Compute Q1.
- the target discharge flow rate calculation unit 102 refers to the second discharge flow rate table stored in the nonvolatile memory 72, and calculates the target flow rate of the open circuit pump 3 based on the target supply flow rate calculated by the target supply flow rate calculation unit 101. Compute Q2.
- the valve control unit 103 identifies the operating direction of the operating lever 8b based on the detection result of the operating amount sensor 8a.
- the valve control unit 103 outputs an ON signal to the first switching valve 15a and an OFF signal to the second switching valve 15b when the operating direction of the operating lever 8b is the arm cloud direction. As a result, the first switching valve 15a is positioned at the open position, and the second switching valve 15b is positioned at the closed position.
- the valve control unit 103 When the operating direction of the operating lever 8b is the arm dumping direction, the valve control unit 103 outputs an ON signal to the second switching valve 15b and an OFF signal to the first switching valve 15a. As a result, the second switching valve 15b is positioned at the open position, and the first switching valve 15a is positioned at the closed position.
- the ON signal corresponds to a control signal (control current) for exciting the solenoids of the first switching valve 15a and the second switching valve 15b to switch to the open position.
- the off signal is a control signal (control current) corresponding to standby current.
- the determination unit 104 determines whether or not the charge pressure Pc detected by the pressure sensor 10 is less than the pressure threshold value Pc0.
- the pressure threshold Pc0 is, for example, equal to or lower than the set pressure of the charge relief valve 65, and is set to an arbitrary value equal to or higher than the pressure at which cavitation does not occur in the closed circuit pump 1.
- the charge pressure Pc drops when the closed circuit cannot be replenished with hydraulic oil from the charge circuit 63 .
- the determination unit 104 monitors the detection result of the pressure sensor 10 and detects that the charge pressure Pc has decreased from the pressure threshold value Pc0 or more to less than the pressure threshold value Pc0. That is, the determination unit 104 has a function of detecting, based on the detection result of the pressure sensor 10, that the closed circuit cannot be replenished with hydraulic oil from the charge circuit 63.
- the correction unit 105 adjusts the corrected target flow rate Q2c based on the target flow rate Q1 of the closed circuit pump 1 and the discharge flow rate Q3 of the charge pump 9. Calculate.
- the corrected target flow rate Q2c is calculated by the following equation (1).
- Q2c Q1-Q3 (1)
- Q1 is the target flow rate of the closed circuit pump 1 calculated by the target discharge flow rate calculator 102
- Q3 is the discharge flow rate of the charge pump 9.
- the discharge flow rate Q3 of the charge pump 9 is stored in the nonvolatile memory 72.
- the pump control unit 106 outputs to the first regulator 2 a control signal for setting the discharge flow rate of the closed circuit pump 1 to the target flow rate Q1 calculated by the target discharge flow rate calculation unit 102 . That is, the pump control unit 106 controls the discharge capacity of the closed circuit pump 1 via the first regulator 2 so that the discharge flow rate of the closed circuit pump 1 becomes the target flow rate Q1.
- the pump control unit 106 sets the discharge flow rate of the open circuit pump 3 to the target flow rate Q2 calculated by the target discharge flow rate calculation unit 102. to the second regulator 4 . That is, the pump control unit 106 controls the discharge capacity of the open circuit pump 3 via the second regulator 4 so that the discharge flow rate of the open circuit pump 3 becomes the target flow rate Q2.
- the pump control unit 106 controls the discharge flow rate of the open circuit pump 3 to the corrected target flow rate Q2c calculated by the correction unit 105.
- a signal is output to the second regulator 4 . That is, the pump control unit 106 controls the discharge capacity of the open circuit pump 3 via the second regulator 4 so that the discharge flow rate of the open circuit pump 3 becomes the corrected target flow rate Q2c.
- the pump control unit 106 increases the discharge capacity of the open circuit pump 3 compared to before the charge pressure Pc drops below the pressure threshold Pc0. As a result, the discharge flow rate of the open circuit pump 3 increases.
- the pump control unit 106 reduces the discharge capacity of the open circuit pump 3 compared to before the charge pressure Pc rises to the pressure threshold Pc0 or more. . As a result, the discharge flow rate of the open circuit pump 3 is reduced.
- step S110 the target supply flow rate calculation unit 101 calculates the target supply flow rate to the arm cylinder 26 based on the operation amount detected by the operation amount sensor 8a, and operates the operation lever 8b. After specifying the direction, the process proceeds to step S115.
- step S115 the target discharge flow rate calculation unit 102 calculates the target flow rate Q1 of the closed circuit pump 1 and the target flow rate Q2 of the open circuit pump 3 based on the target supply flow rate calculated in step S110, and the process proceeds to step S120. move on.
- step S120 the determination unit 104 determines whether or not the charge pressure Pc detected by the pressure sensor 10 is less than the pressure threshold value Pc0. If it is determined in step S120 that the charge pressure Pc is equal to or higher than the pressure threshold value Pc0, the process proceeds to step S125, and if it is determined that the charge pressure Pc is less than the pressure threshold value Pc0, the process proceeds to step S130.
- step S125 the pump control unit 106 outputs a control signal corresponding to the target flow rate Q2 calculated in step S115 to the second regulator 4 of the open circuit pump 3.
- step S125 the valve control unit 103 outputs a control signal corresponding to the operation direction specified in step S110 to the first switching valve 15a and the second switching valve 15b.
- step S140 the controller 7 proceeds to step S140.
- step S130 the correction unit 105 subtracts the discharge flow rate Q3 of the charge pump 9 stored in the nonvolatile memory 72 from the target flow rate Q1 of the closed circuit pump 1 calculated in step S115. It is calculated as the corrected target flow rate Q2c, and the process proceeds to step S135.
- step S135 the pump control unit 106 outputs a control signal corresponding to the corrected target flow rate Q2c calculated in step S130 to the second regulator 4 of the open circuit pump 3.
- step S135 the valve control unit 103 outputs a control signal corresponding to the operation direction specified in step S110 to the first switching valve 15a and the second switching valve 15b. After completing the process of step S135, the controller 7 proceeds to step S140.
- step S140 the pump control unit 106 outputs a control signal corresponding to the target flow rate Q1 calculated in step S115 to the first regulator 2 of the closed circuit pump 1, and performs the processing shown in the flowchart of FIG. 6 in this control cycle. finish. That is, when the process of step S140 ends, the process of step S110 in the next control cycle is executed.
- the discharge flow rate of the charge pump 9 is 30 [L/min]. 0 [MPa].
- the controller 7 calculates the target supply flow rate.
- the controller 7 calculates the target flow rate Q1 of the closed circuit pump 1 and the target flow rate Q2 of the open circuit pump 3 based on the target supply flow rate.
- the controller 7 outputs control signals corresponding to the calculation results to the first regulator 2 and the second regulator 4 .
- the controller 7 also outputs an ON signal to the first switching valve 15a to switch the first switching valve 15a to the open position.
- the controller 7 outputs an OFF signal to the second switching valve 15b to hold the second switching valve 15b at the closed position.
- the target supply flow rate is 100 [L/min]
- the target flow rate Q1 of the closed circuit pump 1 is 80 [L/min]
- the target flow rate Q2 of the open circuit pump 3 is 20 [L/min]
- the controller 7 sets the discharge flow rate of the closed circuit pump 1 to 80 [L/min] and the discharge flow rate of the open circuit pump 3 to 20 [L/min]. min]
- the first regulator 2 and the second regulator 4 are controlled.
- the required flow rate of hydraulic oil returning to the closed circuit pump 1 is 80 [L/min], which is the same as the discharge flow rate. Therefore, of the hydraulic fluid discharged from the charge pump 9, 10 [L/min] of hydraulic fluid is supplied from the charge flow path 11 to the second flow path 62 through the second make-up valve 66b. Of the hydraulic fluid discharged from the charge pump 9 , the remaining 20 [L/min] of hydraulic fluid that is not refilled into the second flow path 62 is discharged from the charge relief valve 65 to the tank 17 .
- Hydraulic oil is supplied to the bottom side oil chamber 26a of the arm cylinder 26 and is discharged from the rod side oil chamber 26b, thereby extending the arm cylinder 26.
- the extension speed of the arm cylinder 26 is determined by the flow rate of hydraulic oil supplied to the bottom side oil chamber 26a and the pressure receiving area of the bottom side oil chamber 26a.
- the arm 23's crowding motion is restricted. For example, the crowding motion of the arm 23 slows down or stops.
- the extension operation of the arm cylinder 26 is restricted, the flow rate of hydraulic fluid discharged from the rod-side oil chamber 26b to the second flow path 62 is reduced.
- the flow rate of hydraulic oil discharged from the rod-side oil chamber 26b to the second flow path 62 becomes 0 [L/min].
- the discharge flow rate of the charge pump 9 is 30 [L/min]. Note that in the present embodiment, hydraulic fluid discharged from the open circuit pump 3 to the first flow path 61 is guided to the charge flow path 11 through the flushing valve 16 .
- the discharge flow rate of the open circuit pump 3 remains at 20 [L/min]
- the return oil to the closed circuit pump 1 will be the discharge flow rate of 30 [L/min] of the charge pump 9 and the Combined with the discharge flow rate of 20 [L/min], the result is 50 [L/min], which is less than the required flow rate of return oil to the closed circuit pump 1 of 80 [L/min].
- the return oil to the closed circuit pump 1 is insufficient, the pressure on the return side of the closed circuit pump 1 temporarily becomes negative, causing cavitation, and the closed circuit pump 1 may deteriorate.
- the return oil to the closed circuit pump 1 is insufficient, there is a possibility that the flow rate necessary for lubricating the movable parts such as the gears and bearings of the closed circuit pump 1 cannot be secured temporarily. As a result, the movable portion may be dented and deteriorated.
- the controller 7 increases the discharge flow rate of the open circuit pump 3 to make up for the shortage of return oil to the closed circuit pump 1 . Specifically, when the charge pressure Pc drops from the pressure threshold value Pc0 or more to less than the pressure threshold value Pc0 due to the restricted operation of the arm cylinder 26, the controller 7 reduces the discharge flow rate of the open circuit pump 3. increase.
- the controller 7 increases the discharge flow rate of the open circuit pump 3 by 30 [L/min], which is the shortage, in order to equalize the flow rate on the discharge side and the suction side of the closed circuit pump 1 .
- the flow rate of the hydraulic oil guided from the charge flow path 11 to the second flow path 62 through the second make-up valve 66b is 30 [L/min] of the discharge flow rate of the charge pump 9 and 50 [L/min] of the discharge flow rate of the open circuit pump 3. [L/min] is added to 80 [L/min]. As a result, the required flow rate of the return oil of the closed circuit pump 1 is ensured. As the discharge flow rate of the open circuit pump 3 increases, the pressure in the charge flow path 11 recovers to the set pressure.
- a hydraulic excavator (work machine) 100 includes an articulated work device 20 having an arm cylinder (hydraulic actuator) 26 and performing excavation work, and an arm cylinder 26 connected to the arm cylinder 26 via a closed circuit Cc. , an open circuit pump 3 connected to the arm cylinder 26 via an open circuit Oc to supply hydraulic oil to the arm cylinder 26, a charge pump 9, and a charge pump 9 a pressure sensor 10 for detecting a charge pressure Pc that is the pressure in the charge flow path 11; and a controller 7 for controlling the discharge capacities of the closed circuit pump 1 and the open circuit pump 3 .
- the controller 7 determines whether or not the charge pressure Pc detected by the pressure sensor 10 is less than the pressure threshold value Pc0 (step S120 in FIG. 6).
- the controller 7 repeats the determination process (step S120) at a predetermined control cycle, and detects that the charge pressure Pc has decreased from the pressure threshold value Pc0 or more to less than the pressure threshold value Pc0 when the negative determination changes to the positive determination. do.
- the controller 7 increases the discharge capacity of the open circuit pump 3 when the charge pressure Pc detected by the pressure sensor 10 drops from the pressure threshold value Pc0 or more to less than the pressure threshold value Pc0 (steps S130 and S135 in FIG. 6).
- the controller 7 increases the discharge capacity of the open circuit pump 3 when the charge pressure Pc transitions from a state equal to or greater than the predetermined pressure threshold value Pc0 to a state less than the pressure threshold value Pc0. As a result, the flow rate of hydraulic oil discharged from the open circuit pump 3 increases.
- the controller 7 maintains the discharge flow rate of the closed circuit pump 1 and increases the discharge capacity of the open circuit pump 3. to increase With this configuration, the arm cylinder 26 can be driven at the operating speed required by the operator immediately after excavating hard soil.
- the controller 7 changes the discharge flow rate of the closed circuit pump 1 from the target value (target flow rate) Q1 to the charge pump
- the target value (corrected target flow rate) Q2c of the discharge flow rate of the open circuit pump 3 is calculated by subtracting the discharge flow rate Q3 from 9 (step S130 in FIG. 6).
- the controller 7 controls the discharge capacity of the open circuit pump 3 based on the calculated target value (corrected target flow rate) Q2c of the discharge flow rate of the open circuit pump 3 (step S135 in FIG. 6).
- the charge circuit 63 may leak hydraulic oil due to deterioration over time.
- the pressure in the charge flow path 11 decreases, there is a risk that the replenishment flow rate of hydraulic oil from the charge flow path 11 to the closed circuit Cc will be insufficient.
- the return oil can be replenished to the closed circuit Cc by increasing the discharge flow rate of the open circuit pump 3 .
- the controller 7 when the charge pressure Pc decreases from the pressure threshold value Pc0 or more to less than the pressure threshold value Pc0, the controller 7 maintains the discharge capacity (tilt angle) of the closed circuit pump 1 and causes the open circuit pump 3 to discharge. Increase capacity (tilt angle).
- the controller 7 increases the discharge capacity (tilt angle) of the open circuit pump 3 and closes the circuit. Decrease the discharge capacity (tilt angle) of the pump 1 . Details of control by the controller 7 according to the second embodiment will be described below.
- FIG. 7 is a diagram similar to FIG. 6, and is a flowchart showing an example of flow rate control executed by the controller 7 according to the second embodiment.
- the processes of steps S223 to S246 are executed instead of the processes of steps S125 to S140 of the flowchart of FIG.
- step S120 the determination unit 104 determines whether or not the charge pressure Pc detected by the pressure sensor 10 is less than the pressure threshold value Pc0. If it is determined in step S120 that the charge pressure Pc is equal to or higher than the pressure threshold value Pc0, the process proceeds to step S223, and if it is determined that the charge pressure Pc is less than the pressure threshold value Pc0, the process proceeds to step S233.
- step S223 the pump control unit 106 outputs a control signal corresponding to the target flow rate Q1 calculated in step S115 to the first regulator 2 of the closed circuit pump 1, and proceeds to step S226.
- step S226 the pump control unit 106 outputs a control signal corresponding to the target flow rate Q2 calculated in step S115 to the second regulator 4 of the open circuit pump 3.
- step S226 the valve control unit 103 outputs a control signal corresponding to the operation direction specified in step S110 to the first switching valve 15a and the second switching valve 15b.
- step S226 the controller 7 finishes the process shown in the flowchart of FIG. 7 in this control cycle.
- step S233 the correction unit 105 calculates the adjusted flow rate Qa based on the target flow rate Q1 and the target flow rate Q2 calculated in step S115 and the discharge flow rate Q3 of the charge pump 9.
- FIG. The adjusted flow rate Qa is calculated by the following equation (2).
- Qa [Q1-(Q2+Q3)]/2 (2)
- the process proceeds to step S236.
- step S236 the correction unit 105 calculates a corrected target flow rate Q1c based on the target flow rate Q1 calculated in step S115 and the adjusted flow rate Qa calculated in step S233.
- the corrected target flow rate Q1c is calculated by the following equation (3).
- Q1c Q1-Qa (3)
- the process proceeds to step S239.
- step S239 the correction unit 105 calculates a corrected target flow rate Q2c based on the target flow rate Q2 calculated in step S115 and the adjusted flow rate Qa calculated in step S233.
- the corrected target flow rate Q2c is calculated by the following equation (4).
- Q2c Q2+Qa (4)
- the process proceeds to step S243.
- step S243 the pump control unit 106 outputs a control signal corresponding to the corrected target flow rate Q1c calculated in step S236 to the first regulator 2 of the closed circuit pump 1, and proceeds to step S246.
- step S246 the pump control unit 106 outputs a control signal corresponding to the corrected target flow rate Q2c calculated in step S236 to the second regulator 4 of the open circuit pump 3.
- step S246 the valve control unit 103 outputs a control signal corresponding to the operation direction specified in step S110 to the first switching valve 15a and the second switching valve 15b.
- step S246 the controller 7 finishes the process shown in the flowchart of FIG. 7 in this control cycle.
- the discharge flow rate of the charge pump 9 is 30 [L/min]
- the pressure receiving area ratio of the bottom side oil chamber 26a and the rod side oil chamber 26b of the arm cylinder 26 is 1:0.7
- the charge relief valve The set pressure of 65 is assumed to be 2.0 [MPa].
- the target supply flow rate is calculated to be 100 [L/min]
- the target flow rate Q2 to be 20 [L/min] during excavation.
- the controller 7 according to the first embodiment increases the discharge capacity of the open circuit pump 3 while maintaining the discharge capacity of the closed circuit pump 1.
- the controller 7 according to the second embodiment increases the discharge capacity of the open circuit pump 3 and increases the discharge capacity of the closed circuit pump 1 when the charge pressure Pc decreases from the pressure threshold value Pc0 or more to less than the pressure threshold value Pc0. Decrease capacity.
- the controller 7 calculates half of the insufficient hydraulic fluid flow rate of 30 [L/min] as the adjustment flow rate Qa.
- the flow rate of the hydraulic oil guided from the charge flow path 11 to the second flow path 62 through the second make-up valve 66b is 30 [L/min] of the discharge flow rate of the charge pump 9 and 35 [L/min] of the discharge flow rate of the open circuit pump 3. [L/min] is added to 65 [L/min]. Since the discharge flow rate of the closed circuit pump 1 is reduced to 65 [L/min], the required flow rate of the return oil of the closed circuit pump 1 is ensured.
- the controller 7 increases the discharge capacity of the open circuit pump 3 and closes it when the charge pressure Pc detected by the pressure sensor 10 decreases from the pressure threshold value Pc0 or more to less than the pressure threshold value Pc0.
- the discharge capacity of the circuit pump 1 is decreased (steps S233, S236, S239, S243, S246 in FIG. 7).
- the controller 7 controls the sum of the discharge flow rate of the closed circuit pump 1 and the discharge flow rate of the open circuit pump 3. is maintained, the discharge capacity of the open circuit pump 3 is increased and the discharge capacity of the closed circuit pump 1 is decreased (steps S233, S236, S239, S243, S246 in FIG. 7).
- the total value (100 [L/min]) of the discharge flow rate (80 [L/min]) of the closed circuit pump 1 and the discharge flow rate (20 [L/min]) of the open circuit pump 3 before the above determination ]), and the total value (130 [L/min]) of the discharge flow rate of the closed circuit pump 1 (80 [L / min]) and the discharge flow rate of the open circuit pump 3 (50 [L / min]) after the above determination was different. Therefore, in the first embodiment, there is a risk that a shock will occur in the operation of the work device 20 after excavating hard soil.
- a hydraulic excavator 100 according to a third embodiment of the present invention will be described with reference to FIG.
- the same reference numerals are given to the same or corresponding configurations as those described in the first embodiment, and the differences will be mainly described.
- the controller 7 when the charge pressure Pc decreases from the pressure threshold value Pc0 or more to less than the pressure threshold value Pc0, the controller 7 maintains the discharge capacity (tilt angle) of the closed circuit pump 1 and causes the open circuit pump 3 to discharge. Increase capacity (tilt angle).
- the controller 7 when the charge pressure Pc drops from the pressure threshold value Pc0 or more to less than the pressure threshold value Pc0, the controller 7 maintains the discharge capacity (tilt angle) of the open circuit pump 3 and closes it. The discharge capacity (tilting angle) of the circuit pump 1 is decreased. Details of control by the controller 7 according to the third embodiment will be described below.
- FIG. 8 is a diagram similar to FIG. 6, and is a flowchart showing an example of flow rate control executed by the controller 7 according to the third embodiment.
- the processes of steps S325 to S340 are executed instead of the processes of steps S125 to S140 of the flowchart of FIG.
- step S120 the determination unit 104 determines whether or not the charge pressure Pc detected by the pressure sensor 10 is less than the pressure threshold value Pc0. If it is determined in step S120 that the charge pressure Pc is equal to or greater than the pressure threshold value Pc0, the process proceeds to step S325, and if it is determined that the charge pressure Pc is less than the pressure threshold value Pc0, the process proceeds to step S330.
- step S325 the pump control unit 106 outputs a control signal corresponding to the target flow rate Q1 calculated in step S115 to the first regulator 2 of the closed circuit pump 1, and proceeds to step S340.
- step S330 the correction unit 105 adds the discharge flow rate Q3 of the charge pump 9 stored in the nonvolatile memory 72 to the target flow rate Q2 of the open circuit pump 3 calculated in step S115. It is calculated as the corrected target flow rate Q1c, and the process proceeds to step S335.
- step S335 the pump control unit 106 outputs a control signal corresponding to the corrected target flow rate Q1c calculated in step S330 to the first regulator 2 of the closed circuit pump 1, and proceeds to step S340.
- step S340 the pump control unit 106 outputs a control signal corresponding to the target flow rate Q2 calculated in step S115 to the second regulator 4 of the open circuit pump 3.
- step S340 the valve control unit 103 outputs a control signal corresponding to the operation direction specified in step S110 to the first switching valve 15a and the second switching valve 15b.
- step S340 the controller 7 finishes the process shown in the flowchart of FIG. 8 in this control cycle.
- the discharge flow rate of the charge pump 9 is 30 [L/min]
- the pressure receiving area ratio of the bottom side oil chamber 26a and the rod side oil chamber 26b of the arm cylinder 26 is 1:0.7
- the charge relief valve The set pressure of 65 is assumed to be 2.0 [MPa].
- the target supply flow rate is calculated to be 100 [L/min]
- the target flow rate Q2 to be 20 [L/min] during excavation.
- the controller 7 reduces the discharge capacity of the closed circuit pump 1 when the charge pressure Pc detected by the pressure sensor 10 drops from the pressure threshold value Pc0 or more to less than the pressure threshold value Pc0.
- the controller 7 reduces the discharge capacity of the closed circuit pump 1 when the charge pressure Pc transitions from a state equal to or greater than the predetermined pressure threshold Pc0 to a state less than the pressure threshold Pc0.
- the flow rate of hydraulic oil discharged from the closed circuit pump 1 is reduced.
- the controller 7 sets the discharge flow rate of the open circuit pump 3 to a target value (target flow rate) Q2. 9 is calculated as a target value (correction target flow rate) Q1c of the discharge flow rate of the closed circuit pump 1.
- the controller 7 controls the discharge capacity of the closed circuit pump 1 based on the calculated target value (correction target flow rate) Q1c of the discharge flow rate of the closed circuit pump 1 .
- the hydraulic system 60 includes a closed circuit pump 1 connected to the arm cylinder 26 via a closed circuit Cc to supply and discharge working oil to and from the arm cylinder 26, and an open circuit Oc to the arm cylinder 26.
- An open circuit pump 3 connected to supply hydraulic oil to the arm cylinder 26 and a controller 7 for controlling the discharge capacity (displacement capacity) of the closed circuit pump 1 and the open circuit pump 3 are provided.
- the discharge capacity is the discharge amount per pump rotation.
- the closed circuit Cc is a circuit for returning the return oil from the hydraulic actuator to the pump.
- the open circuit Oc is a circuit that does not return oil from the hydraulic actuator to the pump.
- the open circuit Oc is a circuit that returns oil from the hydraulic actuator to a tank (not shown).
- the hydraulic system 60 also includes an arm operation device 8A that instructs the operation of the arm cylinder 26, a boom operation device 8B that instructs the operation of the boom cylinder 27, an arm angle sensor 23S that detects the rotation angle of the arm 23, and a boom angle sensor 24S that detects the rotation angle of the boom 24 .
- the arm operating device 8A has a tiltable arm operating lever 8Ab and an arm operating amount sensor 8Aa that detects the operating amount (inclination angle) of the arm operating lever 8Ab.
- the boom operation device 8B has a tiltable boom operation lever 8Bb and a boom operation amount sensor 8Ba that detects the operation amount (inclination angle) of the boom operation lever 8Bb.
- the arm operation amount sensor 8Aa and the boom operation amount sensor 8Ba are electrically connected to the controller 7.
- the arm operation amount sensor 8Aa detects the amount of operation of the arm operation lever 8Ab and outputs a signal representing the detection result to the controller 7 .
- the boom operation amount sensor 8Ba detects the operation amount of the boom operation lever 8Bb and outputs a signal representing the detection result to the controller 7.
- An arm operation device 8A that operates the arm 23 and a boom operation device 8B that operates the boom 24 constitute an operation device 8 that operates the work device 20.
- the arm angle sensor 23S and boom angle sensor 24S are electrically connected to the controller 7.
- the arm angle sensor 23S detects the rotation angle of the arm 23 and outputs to the controller 7 a signal representing the detection result.
- the boom angle sensor 24S detects the rotation angle of the boom 24 and outputs to the controller 7 a signal representing the detection result.
- the arm angle sensor 23S and the boom angle sensor 24S are, for example, potentiometers that acquire the rotation angle of the driven member and output a signal (voltage) corresponding to the acquired angle to the controller 7.
- the arm angle sensor 23S and the boom angle sensor 24S may be ground angle sensors.
- the orientation sensor that constitutes the orientation detection device 28 may be an IMU (Inertial Measurement Unit).
- the arm angle sensor 23S is an attitude sensor that detects the attitude of the arm 23, and the boom angle sensor 24S is an attitude sensor that detects the attitude of the boom 24.
- the arm angle sensor 23S and the boom angle sensor 24S constitute the attitude detection device 28 that detects the attitude of the working device 20. As shown in FIG.
- the hydraulic system 60 includes a first switching valve 15a, a second switching valve 15b, a first relief valve 19a, a second relief valve 19b, a flushing valve 16, a charge circuit 63, a tank 17, an engine 5 and .
- the closed circuit pump 1 and the open circuit pump 3 are rotationally driven by the engine 5 and discharge hydraulic oil.
- the engine 5 is a power source of the hydraulic excavator 100, and is configured by an internal combustion engine such as a diesel engine, for example. Hydraulic oil is stored in the tank 17 .
- the closed circuit pump 1 is a variable displacement hydraulic pump whose discharge capacity (displacement volume) can be changed.
- the closed circuit pump 1 is, for example, a swash plate hydraulic pump or a swash shaft hydraulic pump.
- the discharge capacity of the closed circuit pump 1 is controlled by a regulator (hereinafter referred to as first regulator) 2 for the closed circuit pump.
- the first regulator 2 controls the displacement of the closed circuit pump 1 by controlling the tilting angle of the swash plate or the swash shaft of the closed circuit pump 1 based on the control signal from the controller 7 .
- the discharge flow rate of the closed circuit pump 1 is determined according to the discharge capacity of the closed circuit pump 1 and the rotational speed of the engine 5 .
- the closed circuit pump 1 is a bi-tilting hydraulic pump capable of discharging hydraulic oil in two directions.
- the closed circuit pump 1 has a first pump port 1a and a second pump port 1b.
- the closed circuit pump 1 can be switched between a first discharge state and a second discharge state. In the first discharge state, the closed circuit pump 1 sucks working oil from the second pump port 1b and discharges working oil from the first pump port 1a. In the second discharge state, the closed circuit pump 1 sucks working oil from the first pump port 1a and discharges working oil from the second pump port 1b.
- the first pump port 1 a of the closed circuit pump 1 and the bottom side oil chamber 26 a of the arm cylinder 26 are connected by a first flow path 61 .
- a second flow path 62 connects the second pump port 1 b of the closed circuit pump 1 and the rod side oil chamber 26 b of the arm cylinder 26 .
- the closed circuit Cc is formed by connecting the closed circuit pump 1 and the arm cylinder 26 by the first flow path 61 and the second flow path 62 .
- the open circuit pump 3 is a variable displacement hydraulic pump whose discharge capacity (displacement volume) can be changed.
- the open circuit pump 3 is, for example, a swash plate hydraulic pump or a swash shaft hydraulic pump.
- the discharge capacity of the open circuit pump 3 is controlled by a regulator (hereinafter referred to as a second regulator) 4 for the open circuit pump.
- the second regulator 4 controls the displacement of the open circuit pump 3 by controlling the tilt angle of the swash plate or the swash shaft of the open circuit pump 3 based on the control signal from the controller 7 .
- the discharge flow rate of the open circuit pump 3 is determined according to the discharge capacity of the open circuit pump 3 and the rotation speed of the engine 5 .
- the open circuit pump 3 is a unidirectional hydraulic pump capable of discharging hydraulic oil in one direction.
- the open circuit pump 3 has a pump port 3a and a suction port 3b.
- the open circuit pump 3 sucks the hydraulic oil in the tank 17 from the suction port 3b and discharges it from the pump port 3a.
- the pump port 3a of the open circuit pump 3 is connected to the first flow path 61 via the first switching valve 15a. Also, the pump port 3a of the open circuit pump 3 is connected to the second flow path 62 via the second switching valve 15b.
- the first switching valve 15a and the second switching valve 15b are, for example, 2-port 2-position electromagnetic switching valves.
- the first switching valve 15a and the second switching valve 15b are switched between the open position and the closed position based on the control signal from the controller 7.
- the first switching valve 15a and the second switching valve 15b are switched to the closed position by the urging force of the spring when not energized.
- the discharge flow path of the open circuit pump 3 and the first flow path 61 communicate through the first switching valve 15a.
- the first switching valve 15a is switched to the closed position, communication between the discharge flow path of the open circuit pump 3 and the first flow path 61 is blocked by the first switching valve 15a.
- the first relief valve 19 a is connected to the first flow path 61 and regulates the maximum pressure of the first flow path 61 .
- the second relief valve 19 b is connected to the second flow path 62 and regulates the maximum pressure of the second flow path 62 .
- the charge circuit 63 includes the charge pump 9, a charge flow path 11 that guides the hydraulic oil discharged from the charge pump 9 to the closed circuit Cc through the first makeup valve 66a or the second makeup valve 66b, and the charge flow path 11. and a charge relief valve 65 that defines a maximum pressure.
- the charge pump 9 is a fixed capacity hydraulic pump with a constant discharge capacity.
- Charge pump 9 is, for example, a gear pump.
- the charge pump 9 is driven by the engine 5 and sucks and discharges hydraulic oil in the tank 17 .
- the set pressure of the charge relief valve 65 is set to, for example, about 2 MPa.
- the charge relief valve 65 discharges the surplus hydraulic oil discharged from the charge pump 9 to the tank 17 and maintains the pressure of the charge flow path 11 at 2 MPa.
- a pump port 9 a of the charge pump 9 is connected to the charge flow path 11 , and a suction port 9 b of the charge pump 9 is connected to the tank 17 .
- the charge channel 11 is connected to the first channel 61 via the first make-up valve 66a.
- the first make-up valve 66 a is a check valve that allows hydraulic fluid to flow from the charge flow path 11 to the first flow path 61 and prohibits hydraulic fluid to flow from the first flow path 61 to the charge flow path 11 . be.
- the charge flow path 11 is connected to the second flow path 62 via the second make-up valve 66b.
- the second make-up valve 66b is a check valve that allows hydraulic fluid to flow from the charge flow path 11 to the second flow path 62 and prohibits hydraulic fluid to flow from the second flow path 62 to the charge flow path 11. be.
- the charge pump 9 sucks hydraulic oil from the tank 17 and discharges the hydraulic oil to the charge flow path 11 . Hydraulic oil discharged from the charge pump 9 to the charge flow path 11 replenishes the closed circuit Cc through the first makeup valve 66a or the second makeup valve 66b.
- the flushing valve 16 is connected to the first flow path 61, the second flow path 62, and the charge flow path 11, and discharges surplus hydraulic fluid (hereinafter also referred to as surplus oil) in the closed circuit Cc to the charge flow path 11. Excess oil discharge device.
- the flushing valve 16 communicates the high-pressure side of the first flow path 61 and the second flow path 62 with the charge flow path 11 .
- the flushing valve 16 moves in the first direction D1
- the first flow path 61 and the charge flow path 11 are in contact with the flushing valve 16.
- Communicate via When the pressure in the second flow path 62 is higher than the pressure in the first flow path 61, the flushing valve 16 moves in the second direction D2, and the second flow path 62 and the charge flow path 11 are in contact with the flushing valve 16. Communicate via.
- the controller 7 is electrically connected to the first regulator 2, the second regulator 4, the first switching valve 15a, and the second switching valve 15b.
- the controller 7 outputs control signals to the first regulator 2 and the second regulator 4 as well as the first switching valve 15a and the second switching valve 15b based on signals from the operation device 8 and the posture detection device 28 .
- the controller 7 includes a processing unit 71 such as a CPU (Central Processing Unit), MPU (Micro Processing Unit), DSP (Digital Signal Processor), ROM (Read Only Memory), flash memory, hard disk drive, etc.
- the controller 7 may be composed of one computer, or may be composed of a plurality of computers.
- an ASIC application specific integrated circuit
- FPGA Field Programmable Gate Array
- the non-volatile memory 72 stores programs capable of executing various calculations.
- the non-volatile memory 72 is a storage medium that can read a program that implements the functions of this embodiment.
- the processing device 71 expands the program stored in the nonvolatile memory 72 to the volatile memory 73 and executes the calculation.
- the processing unit 71 performs predetermined arithmetic processing on signals received from the input interface 74, the nonvolatile memory 72 and the volatile memory 73 according to a program.
- the input interface 74 converts signals input from various devices (the operation device 8, the attitude detection device 28, etc.) into data that can be calculated by the processing device 71.
- the output interface 75 generates a signal for output according to the calculation result of the processing device 71, and outputs the signal to various devices (first switching valve 15a, second switching valve 15b, first regulator 2, second switching valve 15b). regulator 4, etc.).
- FIG. 11 is a functional block diagram of the controller 7.
- the controller 7 executes a program stored in the nonvolatile memory 72 to perform a target supply flow rate calculation section 101, a target discharge flow rate calculation section 102, a valve control section 103, a determination section 104, It functions as a correction unit 105 , a pump control unit 106 and an attitude calculation unit 107 .
- the discharge flow rates of the closed circuit pump 1 and the open circuit pump 3 are determined by the discharge capacity and the rotation speed of the engine 5 .
- the controller 7 controls the discharge flow rate of the closed circuit pump 1 and the open circuit pump 3 by controlling the discharge capacity of the closed circuit pump 1 and the open circuit pump 3 .
- the target supply flow rate calculation unit 101 calculates a target value (hereinafter referred to as target supply flow rate) of the flow rate of hydraulic oil to be supplied to the arm cylinder 26 based on the operation amount of the arm operation lever 8Ab detected by the arm operation amount sensor 8Aa. is calculated.
- the nonvolatile memory 72 stores a supply flow rate table that defines the relationship between the manipulated variable and the target supply flow rate.
- the supply flow rate table defines supply flow rate characteristics in which the target supply flow rate increases as the manipulated variable increases.
- the target supply flow rate calculation unit 101 refers to the supply flow rate table stored in the nonvolatile memory 72 and calculates the target supply flow rate based on the manipulated variable detected by the arm manipulated variable sensor 8Aa.
- the target discharge flow rate calculation unit 102 calculates a target flow rate Q1, which is the target value of the discharge flow rate of the closed circuit pump 1, and the discharge flow rate of the open circuit pump 3, based on the target supply flow rate calculated by the target supply flow rate calculation unit 101.
- a target flow rate Q2 which is a target value of is calculated.
- the non-volatile memory 72 stores a first discharge flow rate table and a second discharge flow rate table shown in FIG. 5, as in the first embodiment.
- the valve control unit 103 identifies the operation direction of the arm operation lever 8Ab based on the detection result of the arm operation amount sensor 8Aa.
- the valve control unit 103 outputs an ON signal to the first switching valve 15a and an OFF signal to the second switching valve 15b when the operation direction of the arm control lever 8Ab is the arm cloud direction.
- the first switching valve 15a is positioned at the open position
- the second switching valve 15b is positioned at the closed position.
- the valve control unit 103 When the operation direction of the arm control lever 8Ab is the arm dump direction, the valve control unit 103 outputs an ON signal to the second switching valve 15b and an OFF signal to the first switching valve 15a. As a result, the second switching valve 15b is positioned at the open position, and the first switching valve 15a is positioned at the closed position.
- the ON signal corresponds to a control signal (control current) for exciting the solenoids of the first switching valve 15a and the second switching valve 15b to switch to the open position.
- the off signal is a control signal (control current) corresponding to standby current.
- the posture computation unit 107 computes the posture of the work device 20 based on the signal from the posture detection device 28 .
- An example of calculation processing of the attitude of work device 20 by attitude calculation unit 107 will be described with reference to FIG. 12 .
- the attitude calculation unit 107 calculates a rotation angle (hereinafter also referred to as boom angle) ⁇ 1 of the boom 24 from the first reference plane R1 based on the signal from the boom angle sensor 24S.
- Posture calculation unit 107 calculates a rotation angle (hereinafter also referred to as an arm angle) ⁇ 2 of arm 23 from second reference plane R2 based on a signal from arm angle sensor 23S.
- the first reference plane R1 is, for example, a horizontal plane.
- the second reference plane R2 is a vertical plane orthogonal to the first reference plane (horizontal plane) R1.
- the second reference plane R2 may be, for example, a plane parallel to the turning center axis Ca of the turning body 40 (see FIG. 1).
- the second reference plane R2 is a plane orthogonal to the first reference plane R1, that is, a plane parallel to the traveling direction of the traveling body 30. As shown in FIG.
- the attitude calculation unit 107 calculates the height of the tip position of the arm 23 from the ground (hereinafter referred to as , arm tip height) Ha is calculated.
- the posture calculation unit 107 calculates the vertical distance H1 from the center position of the boom pin (also called foot pin) 24p to the center position of the arm pin 23p based on the following equation (1A).
- H1 L1 ⁇ sin ⁇ 1 (1A)
- L1 is the dimension (boom length) of the line connecting the center position of the boom pin 24p and the center position of the arm pin 23p.
- the center position of the boom pin 24 p is the center of rotation of the boom 24
- the center position of the arm pin 23 p is the center of rotation of the arm 23 .
- Posture calculation unit 107 calculates distance H2 in the vertical axis direction from the center position of bucket pin 22p to the center position of arm pin 23p based on the following equation (2A).
- H2 L2 ⁇ cos ⁇ 2 (2A)
- L2 is the dimension (arm length) of the line connecting the center position of the bucket pin 22p and the center position of the arm pin 23p.
- the center position of the bucket pin 22p is the center of rotation of the bucket 22 .
- the attitude calculation unit 107 calculates the arm tip height Ha, which is the distance in the vertical axis direction from the ground to the center position of the arm pin 23p, based on the following equation (3A).
- Ha Hb-H3 (3A)
- H3 is calculated by the following equation (4A).
- H3 H2-H1 (4A)
- Hb is the vertical distance from the ground to the center position of the boom pin 24p (hereinafter also referred to as boom foot height), which is stored in the nonvolatile memory 72 in advance.
- the hydraulic excavator 100 may excavate the ground on a deck installed on the ground.
- the boom foot height Hb is determined in consideration of the height of the deck from the ground. Since the height of the deck differs depending on the work site, it is preferable that the operator can change the boom foot height Ha0.
- the controller 7 determines the height threshold value Ha0 stored in the nonvolatile memory 72 based on the information input from the input device. to change
- the input device is, for example, a touch panel monitor, a switch box having a plurality of switches, or the like.
- the determination unit 104 shown in FIG. 11 is in a state in which excavation work is being performed by the work device 20 based on the calculation result of the attitude calculation unit 107 and the signals from the arm operation amount sensor 8Aa and the boom operation amount sensor 8Ba. Determine whether or not Details of an example of this determination method will be described below.
- Determination unit 104 determines whether the tip of work device 20 (the tip of bucket 22) is positioned below the ground based on distance H1, distance H2, and arm tip height Ha calculated by attitude calculation unit 107. Determine whether or not
- the posture of the work device 20 when the tip of the work device 20 is positioned below the ground is the posture when excavating the ground. Therefore, the determination unit 104 functions as a posture determination unit that determines whether or not the posture of the work device 20 is the posture for excavating the ground, based on the calculation result of the posture calculation unit 107 .
- the determination unit 104 determines whether or not an excavation operation is being performed. A detailed description is given below.
- the determination unit 104 determines whether or not a boom-up operation is being performed. The determining unit 104 determines that the boom raising operation is being performed when the operation amount in the boom raising direction is equal to or greater than the raising operation amount threshold. The determining unit 104 determines that the boom raising operation is not performed when the operation amount in the boom raising direction is less than the raising operation amount threshold value.
- the raise operation amount threshold is stored in the nonvolatile memory 72 .
- the determination unit 104 determines whether an arm cloud operation is being performed. The determination unit 104 determines that an arm-crowd operation is being performed when the operation amount in the arm-crowd direction is equal to or greater than the crowd operation amount threshold. The determination unit 104 determines that the arm-crowd operation is not performed when the operation amount in the arm-crowd direction is less than the crowd operation amount threshold.
- the cloud operation amount threshold is stored in the nonvolatile memory 72 .
- the determination unit 104 determines that at least one of the boom raising operation and the arm crowding operation is being performed, it determines that the operation device 8 is performing an excavation operation. That is, when any one of the boom-up single operation, the arm-crowd single operation, and the combined boom-up and arm-crowd operation is performed, the determination unit 104 determines that the operation device 8 is performing an excavation operation. If the determination unit 104 determines that neither the boom raising operation nor the arm crowding operation is performed, the determination unit 104 determines that the operation device 8 is not performing the excavation operation.
- excavation state a state in which excavation work is being performed by work device 20 (hereinafter referred to as , excavation state) and sets the excavation flag to ON.
- determining unit 104 determines that the tip of work device 20 is positioned above the ground, it is in a state in which excavation work by work device 20 is not being performed (hereinafter, also referred to as a non-excavation state). and sets the excavation flag to off.
- the determination unit 104 determines that the excavation state is not performed, and sets the excavation flag to OFF.
- the determination unit 104 repeatedly executes the excavation flag setting process at a predetermined control cycle.
- the determination unit 104 has a function of monitoring whether or not it is in the excavation state, and detecting state transitions between the non-excavation state and the excavation state.
- the correction unit 105 adjusts the target flow rate Q1 of the closed circuit pump 1, the target flow rate Q2 of the open circuit pump 3, and the discharge flow rate Q3 of the charge pump 9. , the corrected target flow rate Q1c for the closed circuit pump 1 and the corrected target flow rate Q2c for the open circuit pump 3 are calculated.
- the correction unit 105 calculates the adjusted flow rate Qa based on the target flow rate Q1, the target flow rate Q2, and the discharge flow rate Q3 of the charge pump 9.
- FIG. The adjusted flow rate Qa is calculated by the following equation (5A).
- Qa [Q1-(Q2+Q3)]/2
- Q1 is the target flow rate of the closed circuit pump 1 calculated by the target discharge flow rate calculator 102
- Q2 is the target flow rate of the open circuit pump 3 calculated by the target discharge flow rate calculator 102
- Q3 is the charge pump 9.
- is the discharge flow rate of The discharge flow rate Q3 of the charge pump 9 is stored in the nonvolatile memory 72.
- the correction unit 105 calculates a corrected target flow rate Q1c based on the target flow rate Q1 and the adjusted flow rate Qa.
- the corrected target flow rate Q1c is calculated by the following equation (6A).
- Q1c Q1-Qa (6A)
- the correction unit 105 calculates a corrected target flow rate Q2c based on the target flow rate Q2 and the adjusted flow rate Qa.
- the corrected target flow rate Q2c is calculated by the following equation (7A).
- Q2c Q2+Qa (7A)
- Qa is a value obtained by halving the shortfall of the return oil to the closed circuit pump 1, as expressed by the formula (5A).
- the pump control unit 106 sets the discharge flow rate of the closed circuit pump 1 to the target flow rate Q1 calculated by the target discharge flow rate calculation unit 102.
- a control signal is output to the first regulator 2 . That is, the pump control unit 106 controls the discharge capacity of the closed circuit pump 1 via the first regulator 2 so that the discharge flow rate of the closed circuit pump 1 becomes the target flow rate Q1.
- the pump control unit 106 sets the discharge flow rate of the open circuit pump 3 to the target flow rate Q2 calculated by the target discharge flow rate calculation unit 102.
- a control signal is output to the second regulator 4 . That is, the pump control unit 106 controls the discharge capacity of the open circuit pump 3 via the second regulator 4 so that the discharge flow rate of the open circuit pump 3 becomes the target flow rate Q2.
- the pump control unit 106 When the determination unit 104 determines that the hydraulic excavator 100 is in the excavating state, the pump control unit 106 outputs a control signal for setting the discharge flow rate of the closed circuit pump 1 to the corrected target flow rate Q1c calculated by the correction unit 105. Output to the first regulator 2 . That is, the pump control unit 106 controls the discharge capacity of the closed circuit pump 1 via the first regulator 2 so that the discharge flow rate of the closed circuit pump 1 becomes the corrected target flow rate Q1c.
- the pump control unit 106 When the determination unit 104 determines that the hydraulic excavator 100 is in the excavating state, the pump control unit 106 outputs a control signal for setting the discharge flow rate of the open circuit pump 3 to the corrected target flow rate Q2c calculated by the correction unit 105. Output to the second regulator 4 . That is, the pump control unit 106 controls the discharge capacity of the open circuit pump 3 via the second regulator 4 so that the discharge flow rate of the open circuit pump 3 becomes the corrected target flow rate Q2c.
- the pump control unit 106 increases the discharge capacity of the open circuit pump 3 and decreases the discharge capacity of the closed circuit pump 1 compared to the non-excavating state. As a result, the discharge flow rate of the open circuit pump 3 increases and the discharge flow rate of the closed circuit pump 1 decreases.
- the pump control unit 106 reduces the discharge capacity of the open circuit pump 3 and increases the discharge capacity of the closed circuit pump 1 compared to the excavation state. As a result, the discharge flow rate of the open circuit pump 3 decreases and the discharge flow rate of the closed circuit pump increases.
- step S110 the attitude calculation unit 107 calculates the boom angle ⁇ 1 based on the detection result of the boom angle sensor 24S.
- Posture calculation unit 107 calculates distance H1 based on calculated boom angle ⁇ 1 and boom length L1 stored in nonvolatile memory 72, and proceeds to step S115.
- the posture calculation unit 107 calculates the arm angle ⁇ 2 based on the detection result of the arm angle sensor 23S.
- Posture calculation unit 107 calculates distance H2 based on calculated arm angle ⁇ 2 and arm length L2 stored in nonvolatile memory 72, and proceeds to step S120.
- step S120 the attitude calculation unit 107 calculates the arm tip height Ha based on the distances H1 and H2 calculated in steps S110 and S115 and the boom foot height Hb stored in the nonvolatile memory 72, The process proceeds to step S130.
- step S130 determination unit 104 determines whether or not the tip of work device 20 is positioned below the ground based on the calculation results in steps S110 to S120. It is determined whether or not the posture is to
- step S135 the determination unit 104 determines whether or not an excavation operation has been performed based on the signal from the operation device 8. Based on the signal from the boom operation amount sensor 8Ba, the determination unit 104 determines whether or not a boom raising operation is being performed. Based on the signal from the arm operation amount sensor 8Aa, the determination unit 104 determines whether an arm crowding operation is being performed.
- step S135 if the determining unit 104 determines that at least one of the boom raising operation and the arm crowding operation is being performed, it determines that the operation device 8 is performing an excavation operation.
- step S135 if the determining unit 104 determines that neither the boom raising operation nor the arm crowding operation has been performed, it determines that the operation device 8 has not performed the excavation operation.
- step S135 When it is determined in step S135 that an excavation operation is being performed, the process proceeds to step S140, and when it is determined that an excavation operation is not being performed, the process proceeds to step S145.
- step S140 the determination unit 104 determines that the excavation work is being performed by the work device 20 (excavation state), and sets the excavation flag to ON.
- step S145 the determination unit 104 determines that the work device 20 is not performing excavation work (non-excavation state), and sets the excavation flag to OFF.
- step S140, S145 When the excavation flag setting process (steps S140, S145) ends, the process shown in the flowchart of FIG. 13 in this control cycle ends. That is, when the processing of steps S140 and S145 is finished, the processing of step S110 in the next control cycle is executed.
- step S210 the target supply flow rate calculation unit 101 calculates the target supply flow rate to the arm cylinder 26 based on the operation amount detected by the arm operation amount sensor 8Aa, and the arm operation lever 8Ab. is specified, and the process proceeds to step S215.
- step S215 the target discharge flow rate calculation unit 102 calculates the target flow rate Q1 of the closed circuit pump 1 and the target flow rate Q2 of the open circuit pump 3 based on the target supply flow rate calculated in step S210, and the process proceeds to step S220. move on.
- step S220 the determination unit 104 determines whether or not the excavation flag is set to ON. If it is determined in step S220 that the excavation flag is set to ON, the process proceeds to step S233, and if it is determined that the excavation flag is not set to ON, the process proceeds to step S223.
- step S223 the pump control unit 106 outputs a control signal corresponding to the target flow rate Q1 calculated in step S215 to the first regulator 2 of the closed circuit pump 1, and proceeds to step S226.
- step S226 the pump control unit 106 outputs a control signal corresponding to the target flow rate Q2 calculated in step S215 to the second regulator 4 of the open circuit pump 3.
- step S226 the valve control unit 103 outputs a control signal corresponding to the operation direction specified in step S210 to the first switching valve 15a and the second switching valve 15b.
- step S226 After finishing the process of step S226, the controller 7 finishes the process shown in the flowchart of FIG. 14 in this control cycle. In other words, when the process of step S226 ends, the process of step S210 in the next control cycle is executed.
- step S233 the correction unit 105 calculates the adjustment flow rate Qa based on the target flow rate Q1 and the target flow rate Q2 calculated in step S215 and the discharge flow rate Q3 of the charge pump 9, and proceeds to step S236.
- step S236 the correction unit 105 calculates a corrected target flow rate Q1c based on the target flow rate Q1 calculated in step S215 and the adjusted flow rate Qa calculated in step S233, and proceeds to step S239.
- step S239 the correction unit 105 calculates a corrected target flow rate Q2c based on the target flow rate Q2 calculated in step S215 and the adjusted flow rate Qa calculated in step S233, and proceeds to step S243.
- step S243 the pump control unit 106 outputs a control signal corresponding to the corrected target flow rate Q1c calculated in step S236 to the first regulator 2 of the closed circuit pump 1, and proceeds to step S246.
- step S246 the pump control unit 106 outputs a control signal corresponding to the corrected target flow rate Q2c calculated in step S239 to the second regulator 4 of the open circuit pump 3.
- step S246 the valve control unit 103 outputs a control signal corresponding to the operation direction specified in step S210 to the first switching valve 15a and the second switching valve 15b.
- the controller 7 finishes the process shown in the flowchart of FIG. 14 in this control cycle.
- the discharge capacity (tilting angle) of the open circuit pump 3 is increased and the discharge capacity (tilting angle) of the closed circuit pump 1 is increased compared to the non-excavating state.
- control hereinafter also referred to as flow rate adjustment control to reduce the angle).
- the discharge flow rate of the charge pump 9 is 30 [L/min]. 0 [MPa].
- the controller 7 calculates the target supply flow rate.
- the controller 7 calculates the target flow rate Q1 of the closed circuit pump 1 and the target flow rate Q2 of the open circuit pump 3 based on the target supply flow rate.
- the controller 7 outputs control signals corresponding to the calculation results to the first regulator 2 and the second regulator 4 .
- the controller 7 also outputs an ON signal to the first switching valve 15a to switch the first switching valve 15a to the open position.
- the controller 7 outputs an OFF signal to the second switching valve 15b to hold the second switching valve 15b at the closed position.
- the controller 7 controls the first regulator 2 and the It controls the second regulator 4 .
- the required flow rate of hydraulic oil returning to the closed circuit pump 1 is 80 [L/min], which is the same as the discharge flow rate. Therefore, of the hydraulic fluid discharged from the charge pump 9, 10 [L/min] of hydraulic fluid is supplied from the charge flow path 11 to the second flow path 62 through the second make-up valve 66b. Of the hydraulic fluid discharged from the charge pump 9 , the remaining 20 [L/min] of hydraulic fluid that is not refilled into the second flow path 62 is discharged from the charge relief valve 65 to the tank 17 .
- Hydraulic oil is supplied to the bottom side oil chamber 26a of the arm cylinder 26 and is discharged from the rod side oil chamber 26b, thereby extending the arm cylinder 26.
- the extension speed of the arm cylinder 26 is determined by the flow rate of hydraulic oil supplied to the bottom side oil chamber 26a and the pressure receiving area of the bottom side oil chamber 26a. The extension of the arm cylinder 26 causes the arm 23 to move toward the arm crowd.
- the flow rate of hydraulic oil discharged from the rod-side oil chamber 26b to the second flow path 62 becomes 0 [L/min].
- the discharge flow rate of the charge pump 9 is 30 [L/min].
- hydraulic fluid discharged from the open circuit pump 3 to the first flow path 61 is guided to the charge flow path 11 through the flushing valve 16 .
- the return oil to the closed circuit pump 1 has a discharge flow rate of 30 [L/min] from the charge pump 9 and a discharge flow rate of 20 [L/min] from the open circuit pump 3. ], which is 50 [L/min], which is less than the required flow rate of return oil to the closed circuit pump 1, 80 [L/min].
- the return oil to the closed circuit pump 1 is insufficient, the pressure on the return side of the closed circuit pump 1 temporarily becomes negative, causing cavitation, and the closed circuit pump 1 may deteriorate.
- the return oil to the closed circuit pump 1 is insufficient, there is a possibility that the flow rate necessary for lubricating the movable parts such as the gears and bearings of the closed circuit pump 1 cannot be secured temporarily. As a result, the movable portion may be dented and deteriorated.
- the controller 7 increases the discharge flow rate of the open circuit pump 3 during the excavation state compared to the non-excavation state. At the same time, the discharge flow rate of the closed circuit pump 1 is decreased. As a result, the required flow rate of return oil to the closed circuit pump 1 can be ensured when the operation of the arm cylinder 26 is restricted.
- the controller 7 calculates the half of the insufficient flow rate of hydraulic oil as the adjustment flow rate Qa due to the restricted operation of the arm cylinder 26 . Assuming that the flow rate adjustment control is not executed, the flow rate of the insufficient hydraulic oil is as follows.
- the controller 7 performs flow rate adjustment control during excavation in order to equalize the discharge amount and the suction amount of the closed circuit pump 1 even when the operation of the arm cylinder 26 is restricted. to run.
- the controller 7 calculates half of the deficient hydraulic oil flow rate of 30 [L/min] as the adjustment flow rate Qa.
- the flow rate of hydraulic oil supplied to the bottom-side oil chamber 26a of the arm cylinder 26 is equal to the discharge flow rate of 65 [L/min] of the closed circuit pump 1.
- the total value of the discharge flow rate 35 [L/min] of the circuit pump 3 is 100 [L/min].
- the return oil flow rate of the closed circuit pump 1 is the sum of the flow rate 70 [L/min] of hydraulic oil discharged from the rod-side oil chamber 26b of the arm cylinder 26 and the discharge flow rate 30 [L/min] of the charge pump 9. The value is 100 [L/min].
- the flow rate of hydraulic oil discharged from the rod-side oil chamber 26b of the arm cylinder 26 is 0 [L/min]. be.
- the flow rate of the hydraulic oil guided from the charge flow path 11 to the second flow path 62 through the second make-up valve 66b is 30 [L/min] of the charge pump 9 and 35 [L/min] of the open circuit pump 3.
- L/min] is added to 65 [L/min]. Since the discharge flow rate of the closed circuit pump 1 is 65 [L/min], the necessary flow rate of the return oil of the closed circuit pump 1 is ensured.
- a hydraulic excavator (work machine) 100 includes a multi-joint work device 20 having a plurality of hydraulic actuators (a boom cylinder 27, an arm cylinder 26, and a bucket cylinder 25) and performing excavation work.
- a posture detection device 28 that detects a posture
- an operation device 8 that operates the working device 20
- a closed circuit pump 1 that is connected to the arm cylinder 26 via a closed circuit Cc and supplies and discharges working oil to and from the arm cylinder 26.
- an open circuit pump 3 which is connected to the arm cylinder 26 by an open circuit Oc to supply hydraulic oil to the arm cylinder 26, a charge pump 9, and a charge flow path which guides the hydraulic oil discharged from the charge pump 9 to the closed circuit Cc.
- a flushing valve (surplus oil discharging device) 16 that discharges excess hydraulic oil in the closed circuit Cc to the charge flow path 11, and a controller 7 that controls the discharge capacities of the closed circuit pump 1 and the open circuit pump 3.
- the controller 7 determines the posture of the work device 20 or the height of the tip of the work device 20 based on the signal from the posture detection device 28 . Based on a signal from the operating device 8 in a state where the posture of the work device 20 or the height of the tip of the work device 20 satisfies a predetermined condition, the controller 7 controls the state in which the work device 20 is performing excavation work (excavation work). state). In this embodiment, the predetermined condition is satisfied when the tip of the working device 20 is positioned below the ground.
- the controller 7 according to the present embodiment calculates data (H1, H2, H3, Ha) representing the attitude of the working device 20, and determines whether or not the predetermined condition is satisfied based on the calculation result. .
- the controller 7 determines that the open circuit pump 3 is more open than before the transition. While increasing the discharge capacity, the discharge capacity of the closed circuit pump 1 is decreased. In the excavating state, the flow rate of hydraulic oil discharged from the open circuit pump 3 increases and the flow rate of hydraulic oil discharged from the closed circuit pump 1 decreases compared to the non-digging state.
- the controller 7 determines whether or not an excavation operation is being performed based on the signal from the operating device 8, and detects the tip of the bucket 22 (the working device 20) based on the signal from the attitude detection device 28. tip) is positioned below the ground. The controller 7 determines that the excavation work by the work device 20 is being performed when the tip of the bucket 22 is positioned below the ground and the excavation operation is being performed. The controller 7 determines that the excavation work by the work device 20 is not being performed when the tip of the bucket 22 is positioned above the ground. Further, when the excavation operation is not being performed, the controller 7 determines that the excavation work by the work device 20 is not being performed.
- the controller 7 determines that the total value of the discharge flow rate of the closed circuit pump 1 and the discharge flow rate of the open circuit pump 3 is To maintain this, the discharge capacity of the open circuit pump 3 is increased and the discharge capacity of the closed circuit pump 1 is decreased (steps S233, S236, S239, S243 and S246 in FIG. 14).
- the flow rate of the return oil of the closed circuit pump 1 is the same when the bucket 22 contacts hard soil and the movement of the arm 23 is restricted and after the bucket 22 excavates the hard soil. be. Therefore, it is possible to prevent a shock from occurring in the operation of the work device 20 after excavating hard soil.
- the controller 7 when it is determined that the charge pressure Pc detected by the pressure sensor 10 is less than the pressure threshold value Pc0, the controller 7 subtracts the discharge flow rate of the charge pump 9 from the target flow rate of the closed circuit pump 1.
- the present invention is not limited to this.
- the target flow rate of the open circuit pump 3 may be set to a lower value than in the first embodiment within a range in which deterioration due to insufficient return oil of the closed circuit pump 1 is unlikely to occur. Also, in the first embodiment, the controller 7 may slightly decrease the discharge flow rate of the closed circuit pump 1 .
- the present invention is not limited to this.
- the amount of increase in the target flow rate of the open circuit pump 3 and the amount of decrease in the target flow rate of the closed circuit pump 1 must match. good too.
- ⁇ Modification 3> when the charge pressure Pc detected by the pressure sensor 10 drops from the pressure threshold value Pc0 or more to less than the pressure threshold value Pc0, a value obtained by adding the discharge flow rate of the charge pump 9 to the target flow rate of the open circuit pump 3 is Although an example of calculating the target flow rate of the closed circuit pump 1 has been described, the present invention is not limited to this.
- the target flow rate of the closed circuit pump 1 may be set to a higher value than in the third embodiment within a range in which deterioration due to insufficient return oil of the closed circuit pump 1 is unlikely to occur. Also, in the third embodiment, the controller 7 may slightly increase the discharge flow rate of the open circuit pump 3 .
- the correction unit 105 calculates the corrected target flow rate Q2c when the determination unit 104 determines that the charge pressure Pc is less than the pressure threshold value Pc0.
- the present invention is limited to this. not.
- the process of step S130 in FIG. 6 may be performed between step S115 and step S120. That is, the correction unit 105 may always calculate the corrected target flow rate Q2c.
- the correction unit 105 calculates the corrected target flow rates Q1c and Q2c when the determination unit 104 determines that the charge pressure Pc is less than the pressure threshold value Pc0. is not limited to For example, the processing of steps S233, S236, and S239 in FIG. 7 may be performed between steps S115 and S120. That is, the correction unit 105 may always calculate the corrected target flow rates Q1c and Q2c.
- the correction unit 105 calculates the corrected target flow rate Q1c when the determination unit 104 determines that the charge pressure Pc is less than the pressure threshold value Pc0.
- the present invention is limited to this. not.
- the process of step S330 in FIG. 8 may be performed between steps S115 and S120. That is, the correction unit 105 may always calculate the corrected target flow rate Q1c.
- ⁇ Modification 7> In the fourth embodiment, an example has been described in which the amount of increase in the target flow rate of the open circuit pump 3 and the amount of decrease in the target flow rate of the closed circuit pump 1 when the non-excavating state transitions to the excavating state are the same.
- the invention is not limited to this.
- the amount of increase in the target flow rate of the open circuit pump 3 and the amount of decrease in the target flow rate of the closed circuit pump 1 do not have to match within a range in which deterioration due to insufficient return oil of the closed circuit pump 1 is unlikely to occur. .
- ⁇ Modification 8> In the fourth embodiment, an example in which the controller 7 determines that the tip of the work device 20 is positioned below the ground when the arm tip height Ha is equal to or less than the distance H3 has been described.
- the invention is not so limited.
- the controller 7 determines the posture of the work device 20, and if the state of the work device 20 satisfies the predetermined condition and the excavation operation is being performed, the controller 7 determines that the state is the excavation work state. good.
- the predetermined condition includes that the tip of the work device 20 is positioned below the ground, as described above. Further, the controller 7 determines the height of the tip of the work device 20, and if the excavation operation is being performed when the height of the tip of the work device 20 satisfies a predetermined condition, the excavation work is performed. state may be determined.
- ⁇ Modification 8-1> Specifically, for example, when the arm tip height Ha, which is data representing the attitude of the work device 20, is equal to or less than the height threshold Ha0, the controller 7 determines that the tip of the bucket 22 is positioned below the ground. It may be determined that In this example, the controller 7 determines that the tip of the bucket 22 is positioned above the ground when the arm tip height Ha is greater than the height threshold Ha0.
- the height threshold Ha0 is stored in the nonvolatile memory 72 in advance.
- the hydraulic excavator 100 may excavate the ground on the deck installed on the ground.
- the height threshold Ha0 is determined in consideration of the height of the deck from the ground. Since the height of the deck varies depending on the work site, it is preferable that the operator can change the height threshold value Ha0. For example, when an input device provided in the cab 41 is operated by the operator, the controller 7 determines the height threshold value Ha0 stored in the nonvolatile memory 72 based on the information input from the input device. to change
- the controller 7 also calculates the height of the tip of the bucket 22 based on the signal from the posture detection device 28, and if the calculation result is a negative value, the tip of the bucket 22 is below the ground. You may judge that it is located.
- the posture detection device 28 includes a posture sensor (angle sensor) that detects the rotation angle of the bucket 22 .
- the controller 7 may determine whether or not the work device 20 is in a state of scraping, which is excavation of the wall surface. The controller 7 determines that the scraping work is being performed by the work device 20 when the scraping work is being performed and the operation for scraping is being performed.
- the controller 7 determines whether or not the posture of the work device 20 is the posture for the scraping work. For example, the controller 7 determines that the posture of the work device 20 is the posture for scraping work when the tip of the bucket 22 is separated from the turning center axis Ca by a predetermined distance or more.
- the controller 7 determines whether or not an operation for scraping off, that is, an excavation operation for the wall surface is being performed based on signals from the boom operation amount sensor 8Ba and the arm operation amount sensor 8Aa. For example, when at least one of the boom lowering operation and the arm crowding operation is being performed, the controller 7 determines that the operation device 8 is performing an excavation operation on the wall surface. When neither the boom lowering operation nor the arm crowding operation is performed, the controller 7 determines that the operation device 8 is not performing the excavation operation on the wall surface.
- ⁇ Modification 10> the example in which the correction unit 105 calculates the corrected target flow rates Q1c and Q2c when the excavation flag is set to ON has been described, but the present invention is not limited to this.
- the processing of steps S233, S236, and S239 in FIG. 14 may be performed between steps S215 and S220. That is, the correction unit 105 may always calculate the corrected target flow rates Q1c and Q2c.
- the controller 7 when the non-excavating state transitions to the excavating state, the controller 7 increases the discharge capacity of the open circuit pump 3 and decreases the discharge capacity of the closed circuit pump 1 compared to before the transition. explained. However, when the non-excavating state transitions to the excavating state, the controller 7 performs capacity increase control to increase the discharge capacity of the open circuit pump 3 and capacity decrease control to decrease the discharge capacity of the closed circuit pump 1 compared to before the transition. can be configured to perform at least one of
- the hydraulic system 60 includes a first electromagnetic proportional valve capable of adjusting the flow rate of hydraulic oil discharged from the open circuit pump 3 and guiding it to the closed circuit Cc instead of the first switching valve 15a and the second switching valve 15b. and a second electromagnetic proportional valve.
- the hydraulic system 60 may include one spool valve having the functions of the first switching valve 15a and the second switching valve 15b instead of the first switching valve 15a and the second switching valve 15b.
- hydraulic actuators are not limited to hydraulic cylinders.
- the controller 7 executes the same flow rate control as in the above embodiments. good too.
- the controller 7 of the work machine operates when the pressure in the charge passage 11 transitions from a state equal to or greater than the predetermined pressure threshold value Pc0 to a state less than the pressure threshold value Pc0, or when the work device 20 excavates.
- the discharge capacity of the open circuit pump 3 is increased or the discharge capacity of the closed circuit pump 1 is decreased.
- control lines and information lines shown in the drawings are those considered to be necessary for explanation, and do not necessarily show all the control lines and information lines necessary on the product. In fact, it may be considered that almost all configurations are interconnected.
- Charge relief valve 66a... First make-up valve, 66b... Second make-up valve, 71... Processing unit, 72... Non-volatile memory, 73... Volatile memory, 74... Input interface, 75... Output interface, 100 Hydraulic excavator (working machine) 101 Target supply flow rate calculation unit 102 Target discharge flow rate calculation unit 103 Valve control unit 104 Determination unit 105 Correction unit 106 Pump control unit 107 Attitude calculation part, Cc... Closed circuit, Oc... Open circuit
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Fluid-Pressure Circuits (AREA)
- Operation Control Of Excavators (AREA)
Abstract
作業機械は、油圧アクチュエータと、油圧アクチュエータに閉回路で接続されて油圧アクチュエータに対して作動油の給排を行う閉回路ポンプと、油圧アクチュエータに開回路で接続されて油圧アクチュエータに作動油を供給する開回路ポンプと、チャージポンプと、チャージポンプから吐出された作動油を閉回路に導くチャージ流路と、閉回路の余剰な作動油をチャージ流路に排出する余剰油排出装置と、閉回路ポンプ及び開回路ポンプの吐出容量を制御するコントローラと、を備える。コントローラは、チャージ流路の圧力が所定の圧力閾値以上の状態から圧力閾値未満の状態に遷移した場合、または、作業装置が掘削作業を行っていない状態から掘削作業を行う状態に遷移した場合、開回路ポンプの吐出容量を増加させる、あるいは、閉回路ポンプの吐出容量を減少させる。
Description
本発明は、作業機械に関する。
油圧ポンプと油圧シリンダとの間で閉回路を構成する作動油流路と、油圧シリンダのロッド側油室とボトム側油室の受圧面積差により不足する閉回路の作動油を補うために、作動油流路に接続されるチャージ回路と、を備えた作業機械が知られている(特許文献1参照)。特許文献1に記載のチャージ回路は、作動油流路に接続されるチャージ流路と、チャージ流路に作動油を吐出するチャージポンプと、を有し、作動油流路の圧力がチャージ流路の圧力より小さくなったときに作動油流路へ作動油を補充する。
特許文献1に記載の作業機械では、掘削中にバケットが堅土等に当たり、油圧シリンダの動作が制限されると、油圧シリンダからの戻り油が減少し、作動油流路の圧力が低下する。作動油流路の圧力がチャージ流路の圧力よりも小さくなると、チャージ回路から作動油流路に作動油が補充されるが、瞬間的に、補充される油の量が閉回路ポンプに供給すべき必要流量に満たない場合がありえる。この場合、チャージ流路及び作動油流路が負圧状態になり、キャビテーションが生じやすくなる。また、これが何度も繰り返されると、閉回路ポンプの経年的な劣化を早めるおそれがある。
本発明は、閉回路ポンプの劣化を抑制可能な作業機械を提供することを目的とする。
本発明の一態様による作業機械は、油圧アクチュエータを有して掘削作業を行う多関節型の作業装置と、前記油圧アクチュエータに閉回路で接続されて前記油圧アクチュエータに対して作動油の給排を行う閉回路ポンプと、前記油圧アクチュエータに開回路で接続されて前記油圧アクチュエータに作動油を供給する開回路ポンプと、チャージポンプと、前記チャージポンプから吐出された作動油を前記閉回路に導くチャージ流路と、前記閉回路ポンプ及び前記開回路ポンプの吐出容量を制御するコントローラと、を備える。また、前記作業機械は、前記閉回路の余剰な作動油を前記チャージ流路に排出する余剰油排出装置を備える。前記コントローラは、前記チャージ流路の圧力が所定の圧力閾値以上の状態から前記圧力閾値未満の状態に遷移した場合、または、前記作業装置が掘削作業を行っていない状態から掘削作業を行う状態に遷移した場合、前記開回路ポンプの吐出容量を増加させる、あるいは、前記閉回路ポンプの吐出容量を減少させる。
本発明によれば、閉回路ポンプの劣化を抑制可能な作業機械を提供することができる。
図面を参照して、本発明の実施形態に係る作業機械について説明する。
<第1実施形態>
図1は、本発明の第1実施形態に係る作業機械の一例として示す油圧ショベル100の側面図である。図1に示すように、油圧ショベル100は、クローラ式の走行体30と、走行体30に対して旋回可能に設けられる旋回体(車体)40と、旋回体40に取り付けられ掘削作業を行うフロント作業装置(以下、作業装置と記す)20と、を備える。なお、本発明は、油圧ショベル100の他、例えばホイールローダなどの建設機械をはじめ、作業装置によって建設現場や鉱山現場などで掘削作業を行う種々の作業機械に適用可能である。
図1は、本発明の第1実施形態に係る作業機械の一例として示す油圧ショベル100の側面図である。図1に示すように、油圧ショベル100は、クローラ式の走行体30と、走行体30に対して旋回可能に設けられる旋回体(車体)40と、旋回体40に取り付けられ掘削作業を行うフロント作業装置(以下、作業装置と記す)20と、を備える。なお、本発明は、油圧ショベル100の他、例えばホイールローダなどの建設機械をはじめ、作業装置によって建設現場や鉱山現場などで掘削作業を行う種々の作業機械に適用可能である。
走行体30には左右一対の走行用の油圧モータ(以下、走行モータと記す)31が設けられる。左右の走行モータ31により、左右のクローラが独立して回転駆動される。これにより、走行体30が前方または後方に走行する。
旋回体40には、油圧ショベル100の各種操作を行う操作装置、及びオペレータが着席する運転席等が配置された運転室41が設けられている。操作装置には、作業装置20を操作する操作装置と、走行体30を操作する操作装置と、旋回体40を操作する操作装置とがある。
また、旋回体40には、エンジン等の原動機、エンジンにより駆動される油圧ポンプ及び旋回用の油圧モータ(以下、旋回モータと記す)42などが搭載されている。旋回体40は、旋回モータ42により走行体30に対して右方向または左方向に旋回される。
作業装置20は、旋回体40に取り付けられる多関節型の作業装置であって、複数の油圧アクチュエータ(油圧シリンダ)、及び複数の油圧アクチュエータにより駆動される複数(本実施形態では3つ)の駆動対象部材を有する。駆動対象部材であるブーム24、アーム23及びバケット22は、直列的に連結されている。ブーム24は、その基端部が旋回体40の前部に、ブームピンを介して回動可能に連結される。アーム23は、その基端部がブーム24の先端部に、アームピンを介して回動可能に連結される。バケット22は、アーム23の先端部に、バケットピンを介して回動可能に連結される。
ブーム24は、油圧シリンダであるブームシリンダ27の伸縮動作によって回転駆動される。アーム23は、油圧シリンダであるアームシリンダ26の伸縮動作によって回転駆動される。バケット22は、油圧シリンダであるバケットシリンダ25の伸縮動作によって回転駆動される。ブームシリンダ27は、その一端側がブーム24に接続され他端側が旋回体40のフレームに接続されている。アームシリンダ26は、その一端側がアーム23に接続され他端側がブーム24に接続されている。バケットシリンダ25は、その一端側がバケットリンクを介してバケット22に接続され他端側がアーム23に接続されている。
図2は、油圧ショベル100に搭載された油圧システム60を示す図である。油圧システム60は、複数の油圧アクチュエータ(25~27,31,42)を駆動させるための複数の油圧回路を備えている。
なお、図2では、アームシリンダ26を駆動させる油圧回路について図示し、その他の油圧アクチュエータ(25,27,31,42)を駆動させる油圧回路については図示を省略している。
アームシリンダ26は、一端が閉塞された有底筒状のシリンダチューブと、シリンダチューブの他端の開口を塞ぐヘッドカバーと、ヘッドカバーを貫通し、シリンダチューブに挿入されるシリンダロッド26rと、シリンダロッド26rの先端に設けられ、シリンダチューブ内をロッド側油室26bとボトム側油室26aとに区画するピストン26pと、を備える。
図2に示すように、油圧システム60は、アームシリンダ26に閉回路Ccで接続されてアームシリンダ26に対して作動油の給排を行う閉回路ポンプ1と、アームシリンダ26に開回路Ocで接続されてアームシリンダ26に作動油を供給する開回路ポンプ3と、アームシリンダ26の動作を指示する操作装置8と、閉回路ポンプ1及び開回路ポンプ3の吐出容量(押しのけ容積)を制御するコントローラ7と、を備えている。
操作装置8は、作業装置20を操作する操作装置の一つである。吐出容量とは、ポンプ1回転当たりの吐出量である。なお、閉回路Ccとは、油圧アクチュエータからの戻り油をポンプに戻す回路である。また、開回路Ocとは、油圧アクチュエータからの戻り油をポンプに戻さない回路であり、例えば油圧アクチュエータからの戻り油がタンク(図示せず)に戻るように構成された回路である。
また、油圧システム60は、第1切替弁15aと、第2切替弁15bと、第1リリーフ弁19aと、第2リリーフ弁19bと、フラッシング弁16と、チャージ回路63と、タンク17と、エンジン5と、を備えている。
閉回路ポンプ1及び開回路ポンプ3は、エンジン5により回転駆動され、作動油を吐出する。エンジン5は、油圧ショベル100の動力源であり、例えば、ディーゼルエンジン等の内燃機関により構成される。タンク17には、作動油が貯留されている。
閉回路ポンプ1は、吐出容量(押しのけ容積)を変更可能な可変容量型の油圧ポンプである。閉回路ポンプ1は、例えば、斜板式油圧ポンプ、あるいは斜軸式油圧ポンプである。
閉回路ポンプ1の吐出容量は、閉回路ポンプ用のレギュレータ(以下、第1レギュレータと記す)2によって制御される。第1レギュレータ2は、コントローラ7からの制御信号に基づいて、閉回路ポンプ1の斜板あるいは斜軸の傾転角を制御することにより、閉回路ポンプ1の吐出容量を制御する。閉回路ポンプ1の吐出流量は、閉回路ポンプ1の吐出容量とエンジン5の回転速度に応じて定まる。
閉回路ポンプ1は、2方向に作動油を吐出可能な両傾転型の油圧ポンプである。閉回路ポンプ1は、第1ポンプポート1aと第2ポンプポート1bを有する。閉回路ポンプ1は、第1吐出状態と第2吐出状態に切り換え可能である。閉回路ポンプ1は、第1吐出状態では、第2ポンプポート1bから作動油を吸入して第1ポンプポート1aから作動油を吐出する。閉回路ポンプ1は、第2吐出状態では、第1ポンプポート1aから作動油を吸入して第2ポンプポート1bから作動油を吐出する。
閉回路ポンプ1の第1ポンプポート1aとアームシリンダ26のボトム側油室26aとは第1流路61によって接続される。閉回路ポンプ1の第2ポンプポート1bとアームシリンダ26のロッド側油室26bとは第2流路62によって接続される。本実施形態では、閉回路ポンプ1とアームシリンダ26とが第1流路61と第2流路62によって接続されることにより、閉回路Ccが形成される。
開回路ポンプ3は、吐出容量(押しのけ容積)を変更可能な可変容量型の油圧ポンプである。開回路ポンプ3は、例えば、斜板式油圧ポンプ、あるいは斜軸式油圧ポンプである。
開回路ポンプ3の吐出容量は、開回路ポンプ用のレギュレータ(以下、第2レギュレータと記す)4によって制御される。第2レギュレータ4は、コントローラ7からの制御信号に基づいて、開回路ポンプ3の斜板あるいは斜軸の傾転角を制御することにより、開回路ポンプ3の吐出容量を制御する。開回路ポンプ3の吐出流量は、開回路ポンプ3の吐出容量とエンジン5の回転速度に応じて定まる。
開回路ポンプ3は、1方向に作動油を吐出可能な片傾転型の油圧ポンプである。開回路ポンプ3は、ポンプポート3aと吸込みポート3bを有する。開回路ポンプ3は、タンク17内の作動油を吸込みポート3bから吸入し、ポンプポート3aから吐出する。
開回路ポンプ3のポンプポート3aは、第1切替弁15aを介して第1流路61に接続される。また、開回路ポンプ3のポンプポート3aは、第2切替弁15bを介して第2流路62に接続される。
第1切替弁15a及び第2切替弁15bは、例えば、2ポート2位置の電磁切替弁である。第1切替弁15a及び第2切替弁15bは、コントローラ7からの制御信号に基づいて、開位置または閉位置に切り替えられる。第1切替弁15a及び第2切替弁15bは、非通電時には、ばねの付勢力により、閉位置に切り替えられる。
第1切替弁15aが開位置に切り替えられると、開回路ポンプ3の吐出流路と第1流路61とが第1切替弁15aを介して連通する。第1切替弁15aが閉位置に切り替えられると、開回路ポンプ3の吐出流路と第1流路61との連通が第1切替弁15aによって遮断される。
第2切替弁15bが開位置に切り替えられると、開回路ポンプ3の吐出流路と第2流路62とが第2切替弁15bを介して連通する。第2切替弁15bが閉位置に切り替えられると、開回路ポンプ3の吐出流路と第2流路62との連通が第2切替弁15bによって遮断される。
第1リリーフ弁19aは、第1流路61に接続され、第1流路61の最高圧力を規定する。第2リリーフ弁19bは、第2流路62に接続され、第2流路62の最高圧力を規定する。
チャージ回路63は、チャージポンプ9と、チャージポンプ9から吐出された作動油を第1メイクアップ弁66aまたは第2メイクアップ弁66bを通じて閉回路Ccに導くチャージ流路11と、チャージ流路11の最高圧力を規定するチャージリリーフ弁65と、を有する。
チャージポンプ9は、吐出容量が一定の固定容量型の油圧ポンプである。チャージポンプ9は、例えば、ギヤポンプである。チャージポンプ9は、エンジン5により駆動され、タンク17内の作動油を吸い込んで吐出する。
チャージリリーフ弁65の設定圧は、例えば、2MPa程度に設定される。チャージリリーフ弁65は、チャージポンプ9から吐出された作動油の余剰分をタンク17に排出し、チャージ流路11の圧力を2MPaに保持する。
チャージポンプ9のポンプポート9aはチャージ流路11に接続され、チャージポンプ9の吸込みポート9bはタンク17に接続される。
チャージ流路11は第1メイクアップ弁66aを介して第1流路61に接続されている。第1メイクアップ弁66aは、チャージ流路11から第1流路61への作動油の流れを許容し、第1流路61からチャージ流路11への作動油の流れを禁止するチェック弁である。
また、チャージ流路11は第2メイクアップ弁66bを介して第2流路62に接続される。第2メイクアップ弁66bは、チャージ流路11から第2流路62への作動油の流れを許容し、第2流路62からチャージ流路11への作動油の流れを禁止するチェック弁である。
チャージポンプ9は、タンク17から作動油を吸い込み、チャージ流路11に作動油を吐出する。チャージポンプ9からチャージ流路11に吐出された作動油は、第1メイクアップ弁66aまたは第2メイクアップ弁66bを通じて、閉回路Ccに補充される。
フラッシング弁16は、第1流路61、第2流路62、及びチャージ流路11に接続され、閉回路Ccの余剰な作動油(以下、余剰油とも記す)をチャージ流路11に排出する余剰油排出装置である。
フラッシング弁16は、第1流路61及び第2流路62のうちの高圧側の流路とチャージ流路11とを連通する。第2流路62の圧力に比べて第1流路61の圧力が高い場合、フラッシング弁16は第1方向D1に向かって移動し、第1流路61とチャージ流路11とがフラッシング弁16を介して連通する。第1流路61の圧力に比べて第2流路62の圧力が高い場合、フラッシング弁16は第2方向D2に向かって移動し、第2流路62とチャージ流路11とがフラッシング弁16を介して連通する。
操作装置8は、傾動可能な操作レバー8bと、操作レバー8bの操作量(傾き角)を検出する操作量センサ8aとを有する。操作量センサ8aは、コントローラ7に電気的に接続されている。操作量センサ8aは、操作レバー8bの操作量を検出し、その検出結果を表す信号をコントローラ7に出力する。
コントローラ7には、圧力センサ10、第1レギュレータ2、第2レギュレータ4、第1切替弁15a、及び第2切替弁15bが電気的に接続されている。圧力センサ10は、チャージ流路11の圧力(以下、チャージ圧とも記す)Pcを検出し、その検出結果を表す信号をコントローラ7に出力する。コントローラ7は、操作量センサ8a及び圧力センサ10の検出結果に基づいて、第1レギュレータ2及び第2レギュレータ4、並びに、第1切替弁15a及び第2切替弁15bに制御信号を出力する。
図3は、コントローラ7のハードウェア構成図である。図3に示すように、コントローラ7は、CPU(Central Processing Unit)、MPU(Micro Processing Unit)、DSP(Digital Signal Processor)等の処理装置71、ROM(Read Only Memory)、フラッシュメモリ、ハードディスクドライブ等の不揮発性メモリ72、所謂RAM(Random Access Memory)と呼ばれる揮発性メモリ73、入力インタフェース74、出力インタフェース75、及び、その他の周辺回路を備えたコンピュータで構成される。なお、コントローラ7は、1つのコンピュータで構成してもよいし、複数のコンピュータで構成してもよい。また、処理装置71としては、ASIC(application specific integrated circuit)、FPGA(Field Programmable Gate Array)などを用いることができる。
不揮発性メモリ72には、各種演算が実行可能なプログラムが格納されている。すなわち、不揮発性メモリ72は、本実施形態の機能を実現するプログラムを読み取り可能な記憶媒体である。
処理装置71は、不揮発性メモリ72に記憶されたプログラムを揮発性メモリ73に展開して演算実行する。処理装置71は、プログラムに従って入力インタフェース74、不揮発性メモリ72及び揮発性メモリ73から取り入れた信号に対して所定の演算処理を行う。
入力インタフェース74は、各種装置(操作量センサ8a、圧力センサ10等)から入力された信号を処理装置71で演算可能なデータに変換する。また、出力インタフェース75は、処理装置71での演算結果に応じた出力用の信号を生成し、その信号を各種装置(第1切替弁15a、第2切替弁15b、第1レギュレータ2、第2レギュレータ4等)に出力する。
図4は、コントローラ7の機能ブロック図である。図4に示すように、コントローラ7は、不揮発性メモリ72に記憶されているプログラムを実行することにより、目標供給流量演算部101、目標吐出流量演算部102、弁制御部103、判定部104、補正部105、及び、ポンプ制御部106として機能する。
なお、以下では、説明の便宜上、エンジン5の回転速度が一定値である場合について説明する。上述したように、閉回路ポンプ1及び開回路ポンプ3の吐出流量は、吐出容量とエンジン5の回転速度によって定まる。コントローラ7は、閉回路ポンプ1及び開回路ポンプ3の吐出容量を制御することにより、閉回路ポンプ1及び開回路ポンプ3の吐出流量を制御する。
目標供給流量演算部101は、操作量センサ8aにより検出された操作量に基づいて、アームシリンダ26に供給する作動油の流量の目標値(以下、目標供給流量と記す)を演算する。
不揮発性メモリ72には、操作量と目標供給流量との関係を規定する供給流量テーブルが記憶されている。供給流量テーブルは、操作量の増加に応じて目標供給流量が増加する供給流量特性を規定している。
目標供給流量演算部101は、不揮発性メモリ72に記憶されている供給流量テーブルを参照し、操作量センサ8aにより検出された操作量に基づいて、目標供給流量を演算する。
目標吐出流量演算部102は、目標供給流量演算部101により演算された目標供給流量に基づいて、閉回路ポンプ1の吐出流量の目標値である目標流量Q1、及び、開回路ポンプ3の吐出流量の目標値である目標流量Q2を演算する。
不揮発性メモリ72には、図5に示す第1吐出流量テーブルと第2吐出流量テーブルとが記憶されている。第1吐出流量テーブルは、目標供給流量と目標流量Q1との関係を規定する。第2吐出流量テーブルは、目標供給流量と目標流量Q2との関係を規定する。
第1吐出流量テーブルは、目標供給流量が0から所定値Ftまでの範囲において、目標供給流量が増加するほど目標流量Q1が増加する吐出流量特性を規定している。第2吐出流量テーブルは、目標供給流量が所定値Ft未満では目標流量Q2が0であり、目標供給流量が所定値Ft以上では目標供給流量の増加に応じて目標流量Q2が増加する吐出流量特性を規定している。すなわち、目標供給流量が0から所定値Ftまでの範囲内では、閉回路ポンプ1から吐出された作動油によってアームシリンダ26(操作対象の油圧アクチュエータ)が駆動される。一方、目標供給流量が所定値Ft以上の場合、閉回路ポンプ1及び開回路ポンプ3の両方から吐出された作動油(合計流量)によってアームシリンダ26が駆動される。
目標吐出流量演算部102は、不揮発性メモリ72に記憶されている第1吐出流量テーブルを参照し、目標供給流量演算部101により演算された目標供給流量に基づいて、閉回路ポンプ1の目標流量Q1を演算する。目標吐出流量演算部102は、不揮発性メモリ72に記憶されている第2吐出流量テーブルを参照し、目標供給流量演算部101により演算された目標供給流量に基づいて、開回路ポンプ3の目標流量Q2を演算する。
図4に示すように、弁制御部103は、操作量センサ8aの検出結果に基づいて、操作レバー8bの操作方向を特定する。
弁制御部103は、操作レバー8bの操作方向がアームクラウド方向である場合、オン信号を第1切替弁15aに出力するとともにオフ信号を第2切替弁15bに出力する。これにより、第1切替弁15aは開位置に位置し、第2切替弁15bは閉位置に位置する。
弁制御部103は、操作レバー8bの操作方向がアームダンプ方向である場合、オン信号を第2切替弁15bに出力するとともにオフ信号を第1切替弁15aに出力する。これにより、第2切替弁15bは開位置に位置し、第1切替弁15aは閉位置に位置する。
なお、オン信号とは、第1切替弁15a及び第2切替弁15bのソレノイドを励磁して、開位置に切り替えるための制御信号(制御電流)に相当する。オフ信号とは、待機電流に相当する制御信号(制御電流)である。
判定部104は、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0未満であるか否かを判定する。圧力閾値Pc0は、例えば、チャージリリーフ弁65の設定圧以下であり、閉回路ポンプ1においてキャビテーションが発生しない圧力以上の任意の値が設定される。
チャージ圧Pcは、チャージ回路63から閉回路に作動油を補充しきれなくなった場合に低下する。判定部104は、圧力センサ10の検出結果を監視し、チャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下したことを検出する。つまり、判定部104は、圧力センサ10の検出結果に基づいて、チャージ回路63から閉回路に作動油を補充しきれなくなったことを検出する機能を有している。
補正部105は、判定部104によりチャージ圧Pcが圧力閾値Pc0未満であると判定されると、閉回路ポンプ1の目標流量Q1とチャージポンプ9の吐出流量Q3に基づいて、補正目標流量Q2cを演算する。
本実施形態では、補正目標流量Q2cは、以下の式(1)により演算される。
Q2c=Q1-Q3 ・・・(1)
Q1は目標吐出流量演算部102により演算された閉回路ポンプ1の目標流量であり、Q3は、チャージポンプ9の吐出流量である。チャージポンプ9の吐出流量Q3は、不揮発性メモリ72に記憶されている。
Q2c=Q1-Q3 ・・・(1)
Q1は目標吐出流量演算部102により演算された閉回路ポンプ1の目標流量であり、Q3は、チャージポンプ9の吐出流量である。チャージポンプ9の吐出流量Q3は、不揮発性メモリ72に記憶されている。
ポンプ制御部106は、閉回路ポンプ1の吐出流量を目標吐出流量演算部102により演算された目標流量Q1とするための制御信号を第1レギュレータ2に出力する。つまり、ポンプ制御部106は、閉回路ポンプ1の吐出流量が目標流量Q1となるように、第1レギュレータ2を介して閉回路ポンプ1の吐出容量を制御する。
ポンプ制御部106は、判定部104によりチャージ圧Pcが圧力閾値Pc0以上であると判定されると、開回路ポンプ3の吐出流量を目標吐出流量演算部102により演算された目標流量Q2とするための制御信号を第2レギュレータ4に出力する。つまり、ポンプ制御部106は、開回路ポンプ3の吐出流量が目標流量Q2となるように、第2レギュレータ4を介して開回路ポンプ3の吐出容量を制御する。
ポンプ制御部106は、判定部104によりチャージ圧Pcが圧力閾値Pc0未満であると判定されると、開回路ポンプ3の吐出流量を補正部105により演算された補正目標流量Q2cとするための制御信号を第2レギュレータ4に出力する。つまり、ポンプ制御部106は、開回路ポンプ3の吐出流量が補正目標流量Q2cとなるように、第2レギュレータ4を介して開回路ポンプ3の吐出容量を制御する。
チャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下すると、ポンプ制御部106は、チャージ圧Pcが圧力閾値Pc0未満に低下する前に比べて開回路ポンプ3の吐出容量を増加させる。これにより、開回路ポンプ3の吐出流量が増加する。
なお、チャージ圧Pcが圧力閾値Pc0未満から圧力閾値Pc0以上に上昇すると、ポンプ制御部106は、チャージ圧Pcが圧力閾値Pc0以上に上昇する前に比べて開回路ポンプ3の吐出容量を減少させる。これにより、開回路ポンプ3の吐出流量が減少する。
図6を参照して、コントローラ7により実行される流量制御の一例について説明する。図6のフローチャートに示す処理は、図示しないイグニッションスイッチがオンされることにより開始され、図示しない初期設定が行われた後、所定の制御周期で繰り返し実行される。
図6に示すように、ステップS110において、目標供給流量演算部101は、操作量センサ8aによって検出された操作量に基づいて、アームシリンダ26への目標供給流量を演算するとともに操作レバー8bの操作方向を特定してステップS115へ進む。
ステップS115において、目標吐出流量演算部102は、ステップS110において演算された目標供給流量に基づいて、閉回路ポンプ1の目標流量Q1、及び開回路ポンプ3の目標流量Q2を演算し、ステップS120へ進む。
ステップS120において、判定部104は、圧力センサ10により検出されたチャージ圧Pcが、圧力閾値Pc0未満であるか否かを判定する。ステップS120において、チャージ圧Pcが圧力閾値Pc0以上であると判定されると、処理がステップS125へ進み、チャージ圧Pcが圧力閾値Pc0未満であると判定されると、処理がステップS130へ進む。
ステップS125において、ポンプ制御部106は、ステップS115において演算された目標流量Q2に応じた制御信号を開回路ポンプ3の第2レギュレータ4に出力する。
また、図示しないが、ステップS125において、弁制御部103は、ステップS110において特定された操作方向に応じた制御信号を第1切替弁15a及び第2切替弁15bに出力する。コントローラ7は、ステップS125の処理を終了すると、ステップS140へ進む。
ステップS130において、補正部105は、ステップS115において演算された閉回路ポンプ1の目標流量Q1から不揮発性メモリ72に記憶されているチャージポンプ9の吐出流量Q3を減算した値を開回路ポンプ3の補正目標流量Q2cとして演算し、ステップS135へ進む。
ステップS135において、ポンプ制御部106は、ステップS130において演算された補正目標流量Q2cに応じた制御信号を開回路ポンプ3の第2レギュレータ4に出力する。
また、図示しないが、ステップS135において、弁制御部103は、ステップS110において特定された操作方向に応じた制御信号を第1切替弁15a及び第2切替弁15bに出力する。コントローラ7は、ステップS135の処理を終了すると、ステップS140へ進む。
ステップS140において、ポンプ制御部106は、ステップS115において演算された目標流量Q1に応じた制御信号を閉回路ポンプ1の第1レギュレータ2に出力し、本制御周期における図6のフローチャートに示す処理を終了する。つまり、ステップS140の処理が終了すると、次の制御周期のステップS110の処理が実行される。
本実施形態に係る油圧ショベル100の動作の一例について説明する。なお、説明の便宜上、具体的な数値を記載して説明するが、これらの数値は一例にすぎない。チャージポンプ9の吐出流量は30[L/min]、アームシリンダ26のボトム側油室26aとロッド側油室26bの受圧面積比は1:0.7、チャージリリーフ弁65の設定圧は2.0[MPa]とする。
油圧ショベル100によって掘削を行うために、オペレータがアーム23の操作装置8をアームクラウド側に操作すると、コントローラ7により目標供給流量が演算される。
コントローラ7は、目標供給流量に基づいて、閉回路ポンプ1の目標流量Q1及び開回路ポンプ3の目標流量Q2を演算する。コントローラ7は、この演算結果に応じた制御信号を第1レギュレータ2及び第2レギュレータ4に出力する。
また、コントローラ7は、第1切替弁15aにオン信号を出力し第1切替弁15aを開位置に切り替える。なお、コントローラ7は、第2切替弁15bにオフ信号を出力し第2切替弁15bを閉位置で保持させる。
ここで、例えば、目標供給流量が100[L/min]、閉回路ポンプ1の目標流量Q1が80[L/min]、開回路ポンプ3の目標流量Q2が20[L/min]である場合について説明する。圧力センサ10により検出されるチャージ圧Pcが圧力閾値Pc0以上である場合、コントローラ7は、閉回路ポンプ1の吐出流量が80[L/min]、開回路ポンプ3の吐出流量が20[L/min]となるように、第1レギュレータ2及び第2レギュレータ4を制御する。
アームシリンダ26のボトム側油室26aに供給される作動油の流量が100[L/min]である場合、ボトム側油室26aとロッド側油室26bの受圧面積差により、ロッド側油室26bから排出される作動油の流量は70[L/min]となる。なお、閉回路Ccからフラッシング弁16を通じてチャージ流路11に供給される作動油の流量は0[L/min]である。
閉回路ポンプ1に戻る作動油の必要流量は、吐出流量と同じ80[L/min]である。このため、チャージポンプ9から吐出された作動油のうち、10[L/min]の作動油がチャージ流路11から第2メイクアップ弁66bを通じて第2流路62に補充される。なお、チャージポンプ9から吐出された作動油のうち、第2流路62に補充されない残りの20[L/min]の作動油は、チャージリリーフ弁65からタンク17に排出される。
アームシリンダ26のボトム側油室26aに作動油が供給され、ロッド側油室26bから作動油が排出されることでアームシリンダ26が伸長する。なお、アームシリンダ26の伸長速度は、ボトム側油室26aに供給される作動油の流量と、ボトム側油室26aの受圧面積によって定まる。アームシリンダ26が伸長することにより、アーム23がアームクラウド側に動作し、バケット22によって土砂が掘削される。
掘削中に、バケット22が堅土に接触すると、アーム23のクラウド動作が制限される。例えば、アーム23のクラウド動作が減速したり、停止したりする。アームシリンダ26の伸長動作が制限されると、ロッド側油室26bから第2流路62に排出される作動油の流量が減少する。
例えば、アーム23のクラウド動作が停止した場合、ロッド側油室26bから第2流路62に排出される作動油の流量は0[L/min]となる。チャージポンプ9の吐出流量は30[L/min]である。なお、本実施形態では、開回路ポンプ3から第1流路61に吐出された作動油が、フラッシング弁16を通じてチャージ流路11に導かれる。
しかしながら、開回路ポンプ3の吐出流量が20[L/min]のままであると、閉回路ポンプ1への戻り油は、チャージポンプ9の吐出流量30[L/min]と開回路ポンプ3の吐出流量20[L/min]を合わせた50[L/min]となり、閉回路ポンプ1への戻り油の必要流量である80[L/min]に満たない。
閉回路ポンプ1への戻り油が不足すると、一時的に閉回路ポンプ1の戻り側が負圧となることによりキャビテーションが発生し、閉回路ポンプ1が劣化するおそれがある。また、閉回路ポンプ1への戻り油が不足すると、一時的に閉回路ポンプ1のギヤ、軸受等の可動部を潤滑するために必要な流量を確保できなくなるおそれがある。その結果、可動部に齧りが生じ、可動部が劣化するおそれがある。
閉回路ポンプ1への戻り油の不足により、チャージ流路11及び第2流路62の圧力が低くなると、アームシリンダ26のボトム側油室26aとロッド側油室26bとの圧力差が大きくなる。その結果、アームシリンダ26のシリンダ推力が大きくなり、操作フィーリングが変化してしまう。
さらに、シリンダ推力が大きくなると、作業装置20の駆動対象部材同士の連結部分に作用する負荷も大きくなる。このため、作業装置20の駆動対象部材同士の連結部分の溶接部などに発生する応力が大きくなり、連結部分の寿命が低下するおそれがある。
そこで、本実施形態に係るコントローラ7は、これらの問題が発生することを防止するため、開回路ポンプ3の吐出流量を増加させることで、閉回路ポンプ1への戻り油の不足分を補う。具体的には、アームシリンダ26の動作が制限されることに起因して、チャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下した場合に、コントローラ7が開回路ポンプ3の吐出流量を増加させる。
バケット22が堅土に接触することにより、アームシリンダ26の動作が強制的に停止している状態では、ボトム側油室26aの圧力とロッド側油室26bの圧力との差により、フラッシング弁16が第1方向D1に切り替えられている。これにより、第1流路61とチャージ流路11とがフラッシング弁16を介して連通している。したがって、開回路ポンプ3から吐出された作動油は、余剰油としてフラッシング弁16を通じてチャージ流路11に導かれる。
チャージ流路11から第2メイクアップ弁66bを通じて第2流路62に導かれる作動油の流量は、チャージポンプ9の吐出流量30[L/min]と開回路ポンプ3の吐出流量20[L/min]とを加算した50[L/min]となる。したがって、閉回路ポンプ1への戻り油の不足は、30[L/min](=80[L/min]―50[L/min])となる。コントローラ7は、閉回路ポンプ1の吐出側の流量と吸込み側の流量を同じにするために、開回路ポンプ3の吐出流量を不足分である30[L/min]だけ増加させる。
具体的には、コントローラ7は、閉回路ポンプ1の目標流量Q1=80[L/min]からチャージポンプ9の吐出流量Q3=30[L/min]を減算した値を補正目標流量Q2c=50[L/min]として演算する。補正目標流量Q2cは、不足している作動油の流量30[L/min](=Q1-(Q2+Q3))を開回路ポンプ3の目標流量20[L/min](=Q2)に加算した値50[L/min](=Q2c)に相当する。
コントローラ7は、開回路ポンプ3の吐出流量が、補正目標流量Q2c=50[L/min]となるように、第2レギュレータ4を制御する。つまり、コントローラ7は、不足している作動油の流量だけ、開回路ポンプ3の吐出流量を増加させる。
これにより、チャージ流路11から第2メイクアップ弁66bを通じて第2流路62に導かれる作動油の流量は、チャージポンプ9の吐出流量30[L/min]と開回路ポンプ3の吐出流量50[L/min]とを加算した80[L/min]となる。その結果、閉回路ポンプ1の戻り油の必要流量が確保される。なお、開回路ポンプ3の吐出流量が増加することにより、チャージ流路11の圧力が設定圧まで回復する。
上述した実施形態によれば、次の作用効果を奏する。
(1)油圧ショベル(作業機械)100は、アームシリンダ(油圧アクチュエータ)26を有して掘削作業を行う多関節型の作業装置20と、アームシリンダ26に閉回路Ccで接続されてアームシリンダ26に対して作動油の給排を行う閉回路ポンプ1と、アームシリンダ26に開回路Ocで接続されてアームシリンダ26に作動油を供給する開回路ポンプ3と、チャージポンプ9と、チャージポンプ9から吐出された作動油を閉回路Ccに導くチャージ流路11と、チャージ流路11の圧力であるチャージ圧Pcを検出する圧力センサ10と、閉回路Ccの余剰な作動油をチャージ流路11に排出するフラッシング弁(余剰油排出装置)16と、閉回路ポンプ1及び開回路ポンプ3の吐出容量を制御するコントローラ7と、を備える。
コントローラ7は、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0未満であるか否かを判定する(図6のステップS120)。コントローラ7は、所定の制御周期で上記判定処理(ステップS120)を繰り返し行い、否定判定から肯定判定に変わったときに、チャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下したことを検出する。コントローラ7は、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下した場合、開回路ポンプ3の吐出容量を増加させる(図6のステップS130,S135)。つまり、コントローラ7は、チャージ圧Pcが所定の圧力閾値Pc0以上の状態から圧力閾値Pc0未満の状態に遷移した場合、開回路ポンプ3の吐出容量を増加させる。これにより、開回路ポンプ3から吐出される作動油の流量が増加する。
この構成では、掘削中にバケット22が堅土に接触するなどしてアームシリンダ26の動作が制限された場合に、開回路ポンプ3の吐出流量を増加させ、閉回路ポンプ1の戻り油が不足することを防止できる。その結果、閉回路ポンプ1の戻り油の不足に起因してキャビテーションや齧りが発生することを防止することができる。
したがって、本実施形態によれば、キャビテーションや齧りによる閉回路ポンプ1の劣化を抑制可能な油圧ショベル(作業機械)100を提供することができる。
(2)また、本実施形態によれば、閉回路ポンプ1の戻り油の不足に起因するアームシリンダ26のシリンダ推力の変化を防止することができる。その結果、操作フィーリングの変化を防止することができる。
(3)さらに、本実施形態によれば、閉回路ポンプ1の戻り油の不足に起因するアームシリンダ26のシリンダ推力の増加を防止することにより、作業装置20の駆動対象部材同士の連結部分等の負荷が大きくなることを抑制することができる。その結果、作業装置20の寿命の低下を抑制することができる。
(4)コントローラ7は、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0以上から圧力閾値未満に低下した場合、閉回路ポンプ1の吐出流量を保持しつつ、開回路ポンプ3の吐出容量を増加させる。この構成により、堅土を掘削した後、直ちにオペレータの要求する動作速度でアームシリンダ26を駆動することができる。
(5)コントローラ7は、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下した場合、閉回路ポンプ1の吐出流量の目標値(目標流量)Q1からチャージポンプ9の吐出流量Q3を減じた値を開回路ポンプ3の吐出流量の目標値(補正目標流量)Q2cとして演算する(図6のステップS130)。コントローラ7は、演算された開回路ポンプ3の吐出流量の目標値(補正目標流量)Q2cに基づいて開回路ポンプ3の吐出容量を制御する(図6のステップS135)。これにより、閉回路ポンプ1への戻り油の必要流量を適切に確保することができるので、効果的に閉回路ポンプ1の劣化を抑制することができる。
(6)ところで、チャージ回路63では、経年劣化により、作動油のリークが発生することがある。この場合、チャージ流路11の圧力が低下するため、チャージ流路11から閉回路Ccへの作動油の補充流量が不足するおそれがある。本実施形態では、チャージ流路11の圧力が低下した場合に、開回路ポンプ3の吐出流量を増加させることにより、閉回路Ccへの戻り油の補充を行うことができる。
したがって、本実施形態によれば、経年劣化により、チャージ回路63の作動油のリークが発生した場合であっても、閉回路Ccへの戻り油の補充を適切に行うことができる。その結果、上記(1)と同様、キャビテーションや齧りによる閉回路ポンプ1の劣化を抑制することができる。また、上記(2)と同様、操作フィーリングの変化を防止することができる。さらに、上記(3)と同様、作業装置20の寿命の低下を抑制することができる。
<第2実施形態>
図7を参照して、本発明の第2実施形態に係る油圧ショベル100について説明する。なお、第1実施形態で説明した構成と同一もしくは相当する構成には同一の参照番号を付し、相違点を主に説明する。
図7を参照して、本発明の第2実施形態に係る油圧ショベル100について説明する。なお、第1実施形態で説明した構成と同一もしくは相当する構成には同一の参照番号を付し、相違点を主に説明する。
第1実施形態では、チャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下すると、コントローラ7が、閉回路ポンプ1の吐出容量(傾転角)を維持しつつ、開回路ポンプ3の吐出容量(傾転角)を増加させる。
これに対して、第2実施形態では、チャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下すると、コントローラ7が、開回路ポンプ3の吐出容量(傾転角)を増加させるとともに閉回路ポンプ1の吐出容量(傾転角)を減少させる。以下、第2実施形態に係るコントローラ7による制御の内容について詳しく説明する。
図7は、図6と同様の図であり、第2実施形態に係るコントローラ7により実行される流量制御の一例について示すフローチャートである。図7のフローチャートでは、図6のフローチャートのステップS125~S140の処理に代えて、ステップS223~S246の処理が実行される。
図7に示すように、ステップS120において、判定部104は、圧力センサ10により検出されたチャージ圧Pcが、圧力閾値Pc0未満であるか否かを判定する。ステップS120において、チャージ圧Pcが圧力閾値Pc0以上であると判定されると、処理がステップS223へ進み、チャージ圧Pcが圧力閾値Pc0未満であると判定されると、処理がステップS233へ進む。
ステップS223において、ポンプ制御部106は、ステップS115において演算された目標流量Q1に応じた制御信号を閉回路ポンプ1の第1レギュレータ2に出力し、ステップS226へ進む。
ステップS226において、ポンプ制御部106は、ステップS115において演算された目標流量Q2に応じた制御信号を開回路ポンプ3の第2レギュレータ4に出力する。
また、図示しないが、ステップS226において、弁制御部103は、ステップS110において特定された操作方向に応じた制御信号を第1切替弁15a及び第2切替弁15bに出力する。
コントローラ7は、ステップS226の処理を終了すると、本制御周期における図7のフローチャートに示す処理を終了する。
ステップS233において、補正部105は、ステップS115において演算された目標流量Q1及び目標流量Q2とチャージポンプ9の吐出流量Q3に基づいて、調整流量Qaを演算する。調整流量Qaは、次式(2)により演算される。
Qa=[Q1-(Q2+Q3)]/2 ・・・(2)
調整流量Qaが演算されると、処理がステップS236へ進む。
Qa=[Q1-(Q2+Q3)]/2 ・・・(2)
調整流量Qaが演算されると、処理がステップS236へ進む。
ステップS236において、補正部105は、ステップS115において演算された目標流量Q1と、ステップS233において演算された調整流量Qaに基づいて、補正目標流量Q1cを演算する。補正目標流量Q1cは、次式(3)により演算される。
Q1c=Q1-Qa ・・・(3)
補正目標流量Q1cが演算されると、処理がステップS239へ進む。
Q1c=Q1-Qa ・・・(3)
補正目標流量Q1cが演算されると、処理がステップS239へ進む。
ステップS239において、補正部105は、ステップS115において演算された目標流量Q2と、ステップS233において演算された調整流量Qaに基づいて、補正目標流量Q2cを演算する。補正目標流量Q2cは、次式(4)により演算される。
Q2c=Q2+Qa ・・・(4)
補正目標流量Q2cが演算されると、処理がステップS243へ進む。
Q2c=Q2+Qa ・・・(4)
補正目標流量Q2cが演算されると、処理がステップS243へ進む。
ステップS243において、ポンプ制御部106は、ステップS236において演算された補正目標流量Q1cに応じた制御信号を閉回路ポンプ1の第1レギュレータ2に出力し、ステップS246へ進む。
ステップS246において、ポンプ制御部106は、ステップS236において演算された補正目標流量Q2cに応じた制御信号を開回路ポンプ3の第2レギュレータ4に出力する。
また、図示しないが、ステップS246において、弁制御部103は、ステップS110において特定された操作方向に応じた制御信号を第1切替弁15a及び第2切替弁15bに出力する。
コントローラ7は、ステップS246の処理を終了すると、本制御周期における図7のフローチャートに示す処理を終了する。
本実施形態に係る油圧ショベル100の動作の一例について説明する。なお、説明の便宜上、具体的な数値を記載して説明するが、これらの数値は一例にすぎない。第1実施形態と同様、チャージポンプ9の吐出流量は30[L/min]、アームシリンダ26のボトム側油室26aとロッド側油室26bの受圧面積比は1:0.7、チャージリリーフ弁65の設定圧は2.0[MPa]とする。また、第1実施形態と同様、掘削中、目標供給流量が100[L/min]、目標流量Q1が80[L/min]、目標流量Q2が20[L/min]に演算されている場合に、バケット22が堅土に接触したときの動作について説明する。
第1実施形態に係るコントローラ7は、チャージ圧Pcが圧力閾値Pc0から圧力閾値Pc0未満に低下した場合、閉回路ポンプ1の吐出容量を維持させた状態で、開回路ポンプ3の吐出容量を増加させる。これに対して、第2実施形態に係るコントローラ7は、チャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下した場合、開回路ポンプ3の吐出容量を増加させるとともに閉回路ポンプ1の吐出容量を減少させる。
バケット22が堅土に接触することにより、アームシリンダ26の動作が強制的に停止している状態では、ボトム側油室26aの圧力とロッド側油室26bの圧力との差により、フラッシング弁16が第1方向D1に切り替えられている。これにより、第1流路61とチャージ流路11とがフラッシング弁16を介して連通している。したがって、開回路ポンプ3から吐出された作動油は、余剰油としてフラッシング弁16を通じてチャージ流路11に導かれる。
チャージ流路11から第2メイクアップ弁66bを通じて第2流路62に導かれる作動油の流量は、チャージポンプ9の吐出流量30[L/min]と開回路ポンプ3の吐出流量20[L/min]とを加算した50[L/min]となる。したがって、閉回路ポンプ1への戻り油の不足は、30[L/min](=80[L/min]―50[L/min])となる。コントローラ7は、閉回路ポンプ1の吐出量と吸込み量とを同じにするために、開回路ポンプ3の吐出流量を15[L/min](=30[L/min]/2)だけ増加させるとともに閉回路ポンプ1の吐出流量を15[L/min](=30[L/min]/2)だけ減少させる。
具体的には、コントローラ7は、不足している作動油の流量30[L/min]の半分を調整流量Qaとして演算する。コントローラ7は、開回路ポンプ3の目標流量Q2=20[L/min]に調整流量Qa=15[L/min]を加算した値を補正目標流量Q2c=35[L/min]として演算する。また、コントローラ7は、閉回路ポンプ1の目標流量Q1=80[L/min]から調整流量Qa=15[L/min]だけ減算した値を補正目標流量Q1c=65[L/min]として演算する。
コントローラ7は、閉回路ポンプ1の吐出流量が、補正目標流量Q1c=65[L/min]となるように、第1レギュレータ2を制御する。コントローラ7は、開回路ポンプ3の吐出流量が、補正目標流量Q2c=35[L/min]となるように、第2レギュレータ4を制御する。
これにより、チャージ流路11から第2メイクアップ弁66bを通じて第2流路62に導かれる作動油の流量は、チャージポンプ9の吐出流量30[L/min]と開回路ポンプ3の吐出流量35[L/min]とを加算した65[L/min]となる。閉回路ポンプ1の吐出流量は、65[L/min]まで減少しているため、閉回路ポンプ1の戻り油の必要流量が確保される。
このように第2実施形態に係るコントローラ7は、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下した場合、開回路ポンプ3の吐出容量を増加させるとともに閉回路ポンプ1の吐出容量を減少させる(図7のステップS233,S236,S239,S243,S246)。
このような第2実施形態によれば、第1実施形態で説明した(1)~(3),(6)と同様の効果を得ることができる。さらに、本第2実施形態によれば、以下の(7)の効果を得ることができる。
(7)コントローラ7は、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下した場合、閉回路ポンプ1の吐出流量と開回路ポンプ3の吐出流量の合計値が維持されるように、開回路ポンプ3の吐出容量を増加させるとともに閉回路ポンプ1の吐出容量を減少させる(図7のステップS233,S236,S239,S243,S246)。
第1実施形態では、上記判定前の閉回路ポンプ1の吐出流量(80[L/min])と開回路ポンプ3の吐出流量(20[L/min])の合計値(100[L/min])と、上記判定後の閉回路ポンプ1の吐出流量(80[L/min])と開回路ポンプ3の吐出流量(50[L/min])の合計値(130[L/min])とが異なっていた。このため、第1実施形態では、堅土を掘削した後の作業装置20の動作にショックが発生するおそれがある。
これに対して、第2実施形態によれば、上記判定前の閉回路ポンプ1の吐出流量(80[L/min])と開回路ポンプ3の吐出流量(20[L/min])の合計値(100[L/min])と、上記判定後の閉回路ポンプ1の吐出流量(65[L/min])と開回路ポンプ3の吐出流量(35[L/min])の合計値(100[L/min])とが同じになる。このため、堅土を掘削した後の作業装置20の動作にショックが発生することを防止できる。
<第3実施形態>
図8を参照して、本発明の第3実施形態に係る油圧ショベル100について説明する。なお、第1実施形態で説明した構成と同一もしくは相当する構成には同一の参照番号を付し、相違点を主に説明する。
図8を参照して、本発明の第3実施形態に係る油圧ショベル100について説明する。なお、第1実施形態で説明した構成と同一もしくは相当する構成には同一の参照番号を付し、相違点を主に説明する。
第1実施形態では、チャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下すると、コントローラ7が、閉回路ポンプ1の吐出容量(傾転角)を維持しつつ、開回路ポンプ3の吐出容量(傾転角)を増加させる。
これに対して、第3実施形態では、チャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下すると、コントローラ7が、開回路ポンプ3の吐出容量(傾転角)を維持しつつ、閉回路ポンプ1の吐出容量(傾転角)を減少させる。以下、第3実施形態に係るコントローラ7による制御の内容について詳しく説明する。
図8は、図6と同様の図であり、第3実施形態に係るコントローラ7により実行される流量制御の一例について示すフローチャートである。図8のフローチャートでは、図6のフローチャートのステップS125~S140の処理に代えて、ステップS325~S340の処理が実行される。
図8に示すように、ステップS120において、判定部104は、圧力センサ10により検出されたチャージ圧Pcが、圧力閾値Pc0未満であるか否かを判定する。ステップS120において、チャージ圧Pcが圧力閾値Pc0以上であると判定されると、処理がステップS325へ進み、チャージ圧Pcが圧力閾値Pc0未満であると判定されると、処理がステップS330へ進む。
ステップS325において、ポンプ制御部106は、ステップS115において演算された目標流量Q1に応じた制御信号を閉回路ポンプ1の第1レギュレータ2に出力し、ステップS340へ進む。
ステップS330において、補正部105は、ステップS115において演算された開回路ポンプ3の目標流量Q2に不揮発性メモリ72に記憶されているチャージポンプ9の吐出流量Q3を加算した値を閉回路ポンプ1の補正目標流量Q1cとして演算し、ステップS335へ進む。
ステップS335において、ポンプ制御部106は、ステップS330において演算された補正目標流量Q1cに応じた制御信号を閉回路ポンプ1の第1レギュレータ2に出力し、ステップS340へ進む。
ステップS340において、ポンプ制御部106は、ステップS115において演算された目標流量Q2に応じた制御信号を開回路ポンプ3の第2レギュレータ4に出力する。
また、図示しないが、ステップS340において、弁制御部103は、ステップS110において特定された操作方向に応じた制御信号を第1切替弁15a及び第2切替弁15bに出力する。
コントローラ7は、ステップS340の処理を終了すると、本制御周期における図8のフローチャートに示す処理を終了する。
本実施形態に係る油圧ショベル100の動作の一例について説明する。なお、説明の便宜上、具体的な数値を記載して説明するが、これらの数値は一例にすぎない。第1実施形態と同様、チャージポンプ9の吐出流量は30[L/min]、アームシリンダ26のボトム側油室26aとロッド側油室26bの受圧面積比は1:0.7、チャージリリーフ弁65の設定圧は2.0[MPa]とする。また、第1実施形態と同様、掘削中、目標供給流量が100[L/min]、目標流量Q1が80[L/min]、目標流量Q2が20[L/min]に演算されている場合に、バケット22が堅土に接触したときの動作について説明する。
コントローラ7は、開回路ポンプ3の目標流量Q2=20[L/min]とチャージポンプ9の目標流量Q3=30[L/min]とを加算した値を補正目標流量Q1c=50[L/min]として演算する。補正目標流量Q1cは、不足している作動油の流量30[L/min](=Q1-(Q2+Q3))を閉回路ポンプ1の目標流量80[L/min](=Q1)から減算した値50[L/min](=Q1c)に相当する。
コントローラ7は、閉回路ポンプ1の吐出流量が、補正目標流量Q1c=50[L/min]となるように、第1レギュレータ2を制御する。つまり、コントローラ7は、不足している作動油の流量だけ、閉回路ポンプ1の吐出流量を減少させる。これにより、開回路ポンプ3の吐出流量とチャージポンプ9の吐出流量の合計値である閉回路ポンプ1の戻り油の流量と、閉回路ポンプ1の吐出流量とが一致し、閉回路ポンプ1への戻り油の不足がなくなる。
このように第3実施形態に係るコントローラ7は、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下した場合、閉回路ポンプ1の吐出容量を減少させる。別の言い方をすれば、コントローラ7は、チャージ圧Pcが所定の圧力閾値Pc0以上の状態から圧力閾値Pc0未満の状態に遷移した場合、閉回路ポンプ1の吐出容量を減少させる。これにより、閉回路ポンプ1から吐出される作動油の流量が減少する。
このような第3実施形態によれば、第1実施形態で説明した(1)~(3),(6)と同様の効果を得ることができる。さらに、本第3実施形態によれば、以下の(8)の効果を得ることができる。
(8)コントローラ7は、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下した場合、開回路ポンプ3の吐出流量の目標値(目標流量)Q2にチャージポンプ9の吐出流量Q3を加えた値を閉回路ポンプ1の吐出流量の目標値(補正目標流量)Q1cとして演算する。コントローラ7は、演算された閉回路ポンプ1の吐出流量の目標値(補正目標流量)Q1cに基づいて閉回路ポンプ1の吐出容量を制御する。これにより、閉回路ポンプ1への戻り油の必要流量を適切に確保することができるので、効果的に閉回路ポンプ1の劣化を抑制することができる。
<第4実施形態>
図9を参照して、本発明の第4実施形態に係る油圧ショベル100について説明する。図9に示すように、油圧システム60は、アームシリンダ26に閉回路Ccで接続されてアームシリンダ26に対して作動油の給排を行う閉回路ポンプ1と、アームシリンダ26に開回路Ocで接続されてアームシリンダ26に作動油を供給する開回路ポンプ3と、閉回路ポンプ1及び開回路ポンプ3の吐出容量(押しのけ容積)を制御するコントローラ7と、を備えている。吐出容量とは、ポンプ1回転当たりの吐出量である。なお、閉回路Ccとは、油圧アクチュエータからの戻り油をポンプに戻す回路である。また、開回路Ocとは、油圧アクチュエータからの戻り油をポンプに戻さない回路であり、例えば油圧アクチュエータからの戻り油がタンク(図示せず)に戻るように構成された回路である。
図9を参照して、本発明の第4実施形態に係る油圧ショベル100について説明する。図9に示すように、油圧システム60は、アームシリンダ26に閉回路Ccで接続されてアームシリンダ26に対して作動油の給排を行う閉回路ポンプ1と、アームシリンダ26に開回路Ocで接続されてアームシリンダ26に作動油を供給する開回路ポンプ3と、閉回路ポンプ1及び開回路ポンプ3の吐出容量(押しのけ容積)を制御するコントローラ7と、を備えている。吐出容量とは、ポンプ1回転当たりの吐出量である。なお、閉回路Ccとは、油圧アクチュエータからの戻り油をポンプに戻す回路である。また、開回路Ocとは、油圧アクチュエータからの戻り油をポンプに戻さない回路であり、例えば油圧アクチュエータからの戻り油がタンク(図示せず)に戻るように構成された回路である。
また、油圧システム60は、アームシリンダ26の動作を指示するアーム操作装置8Aと、ブームシリンダ27の動作を指示するブーム操作装置8Bと、アーム23の回動角度を検出するアーム角センサ23Sと、ブーム24の回動角度を検出するブーム角センサ24Sと、を備えている。
アーム操作装置8Aは、傾動可能なアーム操作レバー8Abと、アーム操作レバー8Abの操作量(傾き角)を検出するアーム操作量センサ8Aaとを有する。ブーム操作装置8Bは、傾動可能なブーム操作レバー8Bbと、ブーム操作レバー8Bbの操作量(傾き角)を検出するブーム操作量センサ8Baとを有する。
アーム操作量センサ8Aa及びブーム操作量センサ8Baは、コントローラ7に電気的に接続されている。アーム操作量センサ8Aaは、アーム操作レバー8Abの操作量を検出し、その検出結果を表す信号をコントローラ7に出力する。ブーム操作量センサ8Baは、ブーム操作レバー8Bbの操作量を検出し、その検出結果を表す信号をコントローラ7に出力する。
アーム23を操作するアーム操作装置8A、及びブーム24を操作するブーム操作装置8Bは、作業装置20を操作する操作装置8を構成する。
アーム角センサ23S及びブーム角センサ24Sは、コントローラ7に電気的に接続されている。アーム角センサ23Sは、アーム23の回動角度を検出し、その検出結果を表す信号をコントローラ7に出力する。ブーム角センサ24Sは、ブーム24の回動角度を検出し、その検出結果を表す信号をコントローラ7に出力する。
アーム角センサ23S及びブーム角センサ24Sは、例えば、駆動対象部材の回動角度を取得し、取得した角度に応じた信号(電圧)をコントローラ7に出力するポテンショメータである。なお、アーム角センサ23S及びブーム角センサ24Sは、対地角センサであってもよい。また、姿勢検出装置28を構成する姿勢センサは、IMU(Inertial Measurement Unit:慣性計測装置)であってもよい。
アーム角センサ23Sはアーム23の姿勢を検出する姿勢センサであり、ブーム角センサ24Sはブーム24の姿勢を検出する姿勢センサである。つまり、アーム角センサ23S及びブーム角センサ24Sは、作業装置20の姿勢を検出する姿勢検出装置28を構成する。
さらに、油圧システム60は、第1切替弁15aと、第2切替弁15bと、第1リリーフ弁19aと、第2リリーフ弁19bと、フラッシング弁16と、チャージ回路63と、タンク17と、エンジン5と、を備えている。
閉回路ポンプ1及び開回路ポンプ3は、エンジン5により回転駆動され、作動油を吐出する。エンジン5は、油圧ショベル100の動力源であり、例えば、ディーゼルエンジン等の内燃機関により構成される。タンク17には、作動油が貯留されている。
閉回路ポンプ1は、吐出容量(押しのけ容積)を変更可能な可変容量型の油圧ポンプである。閉回路ポンプ1は、例えば、斜板式油圧ポンプ、あるいは斜軸式油圧ポンプである。
閉回路ポンプ1の吐出容量は、閉回路ポンプ用のレギュレータ(以下、第1レギュレータと記す)2によって制御される。第1レギュレータ2は、コントローラ7からの制御信号に基づいて、閉回路ポンプ1の斜板あるいは斜軸の傾転角を制御することにより、閉回路ポンプ1の吐出容量を制御する。閉回路ポンプ1の吐出流量は、閉回路ポンプ1の吐出容量とエンジン5の回転速度に応じて定まる。
閉回路ポンプ1は、2方向に作動油を吐出可能な両傾転型の油圧ポンプである。閉回路ポンプ1は、第1ポンプポート1aと第2ポンプポート1bを有する。閉回路ポンプ1は、第1吐出状態と第2吐出状態に切り換え可能である。閉回路ポンプ1は、第1吐出状態では、第2ポンプポート1bから作動油を吸入して第1ポンプポート1aから作動油を吐出する。閉回路ポンプ1は、第2吐出状態では、第1ポンプポート1aから作動油を吸入して第2ポンプポート1bから作動油を吐出する。
閉回路ポンプ1の第1ポンプポート1aとアームシリンダ26のボトム側油室26aとは第1流路61によって接続される。閉回路ポンプ1の第2ポンプポート1bとアームシリンダ26のロッド側油室26bとは第2流路62によって接続される。本実施形態では、閉回路ポンプ1とアームシリンダ26とが第1流路61と第2流路62によって接続されることにより、閉回路Ccが形成される。
開回路ポンプ3は、吐出容量(押しのけ容積)を変更可能な可変容量型の油圧ポンプである。開回路ポンプ3は、例えば、斜板式油圧ポンプ、あるいは斜軸式油圧ポンプである。
開回路ポンプ3の吐出容量は、開回路ポンプ用のレギュレータ(以下、第2レギュレータと記す)4によって制御される。第2レギュレータ4は、コントローラ7からの制御信号に基づいて、開回路ポンプ3の斜板あるいは斜軸の傾転角を制御することにより、開回路ポンプ3の吐出容量を制御する。開回路ポンプ3の吐出流量は、開回路ポンプ3の吐出容量とエンジン5の回転速度に応じて定まる。
開回路ポンプ3は、1方向に作動油を吐出可能な片傾転型の油圧ポンプである。開回路ポンプ3は、ポンプポート3aと吸込みポート3bを有する。開回路ポンプ3は、タンク17内の作動油を吸込みポート3bから吸入し、ポンプポート3aから吐出する。
開回路ポンプ3のポンプポート3aは、第1切替弁15aを介して第1流路61に接続される。また、開回路ポンプ3のポンプポート3aは、第2切替弁15bを介して第2流路62に接続される。
第1切替弁15a及び第2切替弁15bは、例えば、2ポート2位置の電磁切替弁である。第1切替弁15a及び第2切替弁15bは、コントローラ7からの制御信号に基づいて、開位置または閉位置に切り替えられる。第1切替弁15a及び第2切替弁15bは、非通電時には、ばねの付勢力により、閉位置に切り替えられる。
第1切替弁15aが開位置に切り替えられると、開回路ポンプ3の吐出流路と第1流路61とが第1切替弁15aを介して連通する。第1切替弁15aが閉位置に切り替えられると、開回路ポンプ3の吐出流路と第1流路61との連通が第1切替弁15aによって遮断される。
第2切替弁15bが開位置に切り替えられると、開回路ポンプ3の吐出流路と第2流路62とが第2切替弁15bを介して連通する。第2切替弁15bが閉位置に切り替えられると、開回路ポンプ3の吐出流路と第2流路62との連通が第2切替弁15bによって遮断される。
第1リリーフ弁19aは、第1流路61に接続され、第1流路61の最高圧力を規定する。第2リリーフ弁19bは、第2流路62に接続され、第2流路62の最高圧力を規定する。
チャージ回路63は、チャージポンプ9と、チャージポンプ9から吐出された作動油を第1メイクアップ弁66aまたは第2メイクアップ弁66bを通じて閉回路Ccに導くチャージ流路11と、チャージ流路11の最高圧力を規定するチャージリリーフ弁65と、を有する。
チャージポンプ9は、吐出容量が一定の固定容量型の油圧ポンプである。チャージポンプ9は、例えば、ギヤポンプである。チャージポンプ9は、エンジン5により駆動され、タンク17内の作動油を吸い込んで吐出する。
チャージリリーフ弁65の設定圧は、例えば、2MPa程度に設定される。チャージリリーフ弁65は、チャージポンプ9から吐出された作動油の余剰分をタンク17に排出し、チャージ流路11の圧力を2MPaに保持する。
チャージポンプ9のポンプポート9aはチャージ流路11に接続され、チャージポンプ9の吸込みポート9bはタンク17に接続される。
チャージ流路11は第1メイクアップ弁66aを介して第1流路61に接続されている。第1メイクアップ弁66aは、チャージ流路11から第1流路61への作動油の流れを許容し、第1流路61からチャージ流路11への作動油の流れを禁止するチェック弁である。
また、チャージ流路11は第2メイクアップ弁66bを介して第2流路62に接続される。第2メイクアップ弁66bは、チャージ流路11から第2流路62への作動油の流れを許容し、第2流路62からチャージ流路11への作動油の流れを禁止するチェック弁である。
チャージポンプ9は、タンク17から作動油を吸い込み、チャージ流路11に作動油を吐出する。チャージポンプ9からチャージ流路11に吐出された作動油は、第1メイクアップ弁66aまたは第2メイクアップ弁66bを通じて、閉回路Ccに補充される。
フラッシング弁16は、第1流路61、第2流路62、及びチャージ流路11に接続され、閉回路Ccの余剰な作動油(以下、余剰油とも記す)をチャージ流路11に排出する余剰油排出装置である。
フラッシング弁16は、第1流路61及び第2流路62のうちの高圧側の流路とチャージ流路11とを連通する。第2流路62の圧力に比べて第1流路61の圧力が高い場合、フラッシング弁16は第1方向D1に向かって移動し、第1流路61とチャージ流路11とがフラッシング弁16を介して連通する。第1流路61の圧力に比べて第2流路62の圧力が高い場合、フラッシング弁16は第2方向D2に向かって移動し、第2流路62とチャージ流路11とがフラッシング弁16を介して連通する。
コントローラ7には、第1レギュレータ2、第2レギュレータ4、第1切替弁15a、及び第2切替弁15bが電気的に接続されている。コントローラ7は、操作装置8及び姿勢検出装置28からの信号に基づいて、第1レギュレータ2及び第2レギュレータ4、並びに、第1切替弁15a及び第2切替弁15bに制御信号を出力する。
図10は、コントローラ7のハードウェア構成図である。図10に示すように、コントローラ7は、CPU(Central Processing Unit)、MPU(Micro Processing Unit)、DSP(Digital Signal Processor)等の処理装置71、ROM(Read Only Memory)、フラッシュメモリ、ハードディスクドライブ等の不揮発性メモリ72、所謂RAM(Random Access Memory)と呼ばれる揮発性メモリ73、入力インタフェース74、出力インタフェース75、及び、その他の周辺回路を備えたコンピュータで構成される。なお、コントローラ7は、1つのコンピュータで構成してもよいし、複数のコンピュータで構成してもよい。また、処理装置71としては、ASIC(application specific integrated circuit)、FPGA(Field Programmable Gate Array)などを用いることができる。
不揮発性メモリ72には、各種演算が実行可能なプログラムが格納されている。すなわち、不揮発性メモリ72は、本実施形態の機能を実現するプログラムを読み取り可能な記憶媒体である。
処理装置71は、不揮発性メモリ72に記憶されたプログラムを揮発性メモリ73に展開して演算実行する。処理装置71は、プログラムに従って入力インタフェース74、不揮発性メモリ72及び揮発性メモリ73から取り入れた信号に対して所定の演算処理を行う。
入力インタフェース74は、各種装置(操作装置8、姿勢検出装置28等)から入力された信号を処理装置71で演算可能なデータに変換する。また、出力インタフェース75は、処理装置71での演算結果に応じた出力用の信号を生成し、その信号を各種装置(第1切替弁15a、第2切替弁15b、第1レギュレータ2、第2レギュレータ4等)に出力する。
図11は、コントローラ7の機能ブロック図である。図11に示すように、コントローラ7は、不揮発性メモリ72に記憶されているプログラムを実行することにより、目標供給流量演算部101、目標吐出流量演算部102、弁制御部103、判定部104、補正部105、ポンプ制御部106、及び、姿勢演算部107として機能する。
なお、以下では、説明の便宜上、エンジン5の回転速度が一定値である場合について説明する。上述したように、閉回路ポンプ1及び開回路ポンプ3の吐出流量は、吐出容量とエンジン5の回転速度によって定まる。コントローラ7は、閉回路ポンプ1及び開回路ポンプ3の吐出容量を制御することにより、閉回路ポンプ1及び開回路ポンプ3の吐出流量を制御する。
目標供給流量演算部101は、アーム操作量センサ8Aaにより検出されたアーム操作レバー8Abの操作量に基づいて、アームシリンダ26に供給する作動油の流量の目標値(以下、目標供給流量と記す)を演算する。
不揮発性メモリ72には、操作量と目標供給流量との関係を規定する供給流量テーブルが記憶されている。供給流量テーブルは、操作量の増加に応じて目標供給流量が増加する供給流量特性を規定している。
目標供給流量演算部101は、不揮発性メモリ72に記憶されている供給流量テーブルを参照し、アーム操作量センサ8Aaにより検出された操作量に基づいて、目標供給流量を演算する。
目標吐出流量演算部102は、目標供給流量演算部101により演算された目標供給流量に基づいて、閉回路ポンプ1の吐出流量の目標値である目標流量Q1、及び、開回路ポンプ3の吐出流量の目標値である目標流量Q2を演算する。
不揮発性メモリ72には、第1実施形態と同様、図5に示す第1吐出流量テーブルと第2吐出流量テーブルとが記憶されている。
図11に示すように、弁制御部103は、アーム操作量センサ8Aaの検出結果に基づいて、アーム操作レバー8Abの操作方向を特定する。
弁制御部103は、アーム操作レバー8Abの操作方向がアームクラウド方向である場合、オン信号を第1切替弁15aに出力するとともにオフ信号を第2切替弁15bに出力する。これにより、第1切替弁15aは開位置に位置し、第2切替弁15bは閉位置に位置する。
弁制御部103は、アーム操作レバー8Abの操作方向がアームダンプ方向である場合、オン信号を第2切替弁15bに出力するとともにオフ信号を第1切替弁15aに出力する。これにより、第2切替弁15bは開位置に位置し、第1切替弁15aは閉位置に位置する。
なお、オン信号とは、第1切替弁15a及び第2切替弁15bのソレノイドを励磁して、開位置に切り替えるための制御信号(制御電流)に相当する。オフ信号とは、待機電流に相当する制御信号(制御電流)である。
姿勢演算部107は、姿勢検出装置28からの信号に基づいて、作業装置20の姿勢を演算する。図12を参照して、姿勢演算部107による作業装置20の姿勢の演算処理の一例について説明する。図12に示すように、姿勢演算部107は、ブーム角センサ24Sからの信号に基づいて、ブーム24の第1基準面R1からの回動角度(以下、ブーム角とも記す)θ1を演算する。姿勢演算部107は、アーム角センサ23Sからの信号に基づいて、アーム23の第2基準面R2からの回動角度(以下、アーム角とも記す)θ2を演算する。
第1基準面R1は、例えば、水平面である。この場合、第2基準面R2は、第1基準面(水平面)R1に直交する鉛直面である。また、第2基準面R2は、例えば、旋回体40の旋回中心軸Ca(図1参照)に平行な面であってもよい。この場合、第2基準面R2は、第1基準面R1に直交する面、すなわち走行体30の進行方向に平行な面である。
姿勢演算部107は、ブーム角θ1、アーム角θ2、及び不揮発性メモリ72に記憶されている作業装置20の寸法L1,L2等に基づいて、地面からのアーム23の先端位置の高さ(以下、アーム先端高さとも記す)Haを演算する。
姿勢演算部107は、以下の式(1A)に基づいて、ブームピン(フートピンとも呼ばれる)24pの中心位置からアームピン23pの中心位置までの鉛直軸方向の距離H1を演算する。
H1=L1×sinθ1 ・・・(1A)
ここで、L1は、ブームピン24pの中心位置とアームピン23pの中心位置とを結ぶ線分の寸法(ブーム長さ)である。ブームピン24pの中心位置は、ブーム24の回動中心であり、アームピン23pの中心位置はアーム23の回動中心である。
H1=L1×sinθ1 ・・・(1A)
ここで、L1は、ブームピン24pの中心位置とアームピン23pの中心位置とを結ぶ線分の寸法(ブーム長さ)である。ブームピン24pの中心位置は、ブーム24の回動中心であり、アームピン23pの中心位置はアーム23の回動中心である。
姿勢演算部107は、以下の式(2A)に基づいて、バケットピン22pの中心位置からアームピン23pの中心位置までの鉛直軸方向の距離H2を演算する。
H2=L2×cosθ2 ・・・(2A)
ここで、L2は、バケットピン22pの中心位置とアームピン23pの中心位置とを結ぶ線分の寸法(アーム長さ)である。バケットピン22pの中心位置は、バケット22の回動中心である。
H2=L2×cosθ2 ・・・(2A)
ここで、L2は、バケットピン22pの中心位置とアームピン23pの中心位置とを結ぶ線分の寸法(アーム長さ)である。バケットピン22pの中心位置は、バケット22の回動中心である。
姿勢演算部107は、以下の式(3A)に基づいて、地面からアームピン23pの中心位置までの鉛直軸方向の距離であるアーム先端高さHaを演算する。
Ha=Hb-H3 ・・・(3A)
H3は、以下の式(4A)により演算される。
H3=H2―H1 ・・・(4A)
ここで、Hbは、地面からブームピン24pの中心位置までの鉛直軸方向の距離(以下、ブームフート高さとも記す)であり、予め不揮発性メモリ72に記憶されている。
Ha=Hb-H3 ・・・(3A)
H3は、以下の式(4A)により演算される。
H3=H2―H1 ・・・(4A)
ここで、Hbは、地面からブームピン24pの中心位置までの鉛直軸方向の距離(以下、ブームフート高さとも記す)であり、予め不揮発性メモリ72に記憶されている。
油圧ショベル100は、地面に設置されるデッキ上で地面の掘削を行うことがある。この場合、地面からのデッキの高さを考慮してブームフート高さHbが定められる。なお、作業現場によってデッキの高さが異なるので、オペレータによってブームフート高さHa0を変更できるようにすることが好ましい。例えば、コントローラ7は、運転室41内に設けられている入力装置がオペレータに操作されることにより、入力装置から入力される情報に基づいて、不揮発性メモリ72に記憶されている高さ閾値Ha0を変更する。入力装置は、例えば、タッチパネルモニタ、複数のスイッチを有するスイッチボックス等である。
図11に示す判定部104は、姿勢演算部107の演算結果と、アーム操作量センサ8Aa及びブーム操作量センサ8Baからの信号に基づいて、作業装置20による掘削作業が行われている状態であるか否かを判定する。以下、この判定方法の一例の詳細について説明する。
判定部104は、姿勢演算部107により演算された距離H1、距離H2、及びアーム先端高さHaに基づいて、作業装置20の先端(バケット22の先端)が、地面よりも下側に位置しているか否かを判定する。
判定部104は、アーム先端高さHaが距離H3(=H2―H1)以下であるか否かを判定する。判定部104は、アーム先端高さHaが距離H3以下である場合、作業装置20の先端が地面よりも下側に位置していると判定する。判定部104は、アーム先端高さHaが距離H3よりも大きい場合、作業装置20の先端が地面よりも上側に位置していると判定する。
作業装置20の先端が地面よりも下側に位置しているときの作業装置20の姿勢は、地面を掘削するときの姿勢である。このため、判定部104は、姿勢演算部107の演算結果に基づいて、作業装置20の姿勢が地面を掘削するときの姿勢であるか否かを判定する姿勢判定部として機能している。
判定部104は、操作装置8からの信号に基づいて、掘削操作が行われているか否かを判定する。以下に詳しく説明する。
判定部104は、ブーム操作量センサ8Baからの信号に基づいて、ブーム上げ操作が行われているか否かを判定する。判定部104は、ブーム上げ方向の操作量が上げ操作量閾値以上である場合、ブーム上げ操作が行われていると判定する。判定部104は、ブーム上げ方向の操作量が上げ操作量閾値未満である場合、ブーム上げ操作が行われていないと判定する。上げ操作量閾値は、不揮発性メモリ72に記憶されている。
判定部104は、アーム操作量センサ8Aaからの信号に基づいて、アームクラウド操作が行われているか否かを判定する。判定部104は、アームクラウド方向の操作量がクラウド操作量閾値以上である場合、アームクラウド操作が行われていると判定する。判定部104は、アームクラウド方向の操作量がクラウド操作量閾値未満である場合、アームクラウド操作が行われていないと判定する。クラウド操作量閾値は、不揮発性メモリ72に記憶されている。
判定部104は、ブーム上げ操作、及び、アームクラウド操作の少なくとも一方の操作が行われていると判定した場合、操作装置8によって掘削操作が行われていると判定する。つまり、ブーム上げ単独操作、アームクラウド単独操作、及びブーム上げとアームクラウドの複合操作のいずれかが行われた場合、判定部104は、操作装置8によって掘削操作が行われていると判定する。判定部104は、ブーム上げ操作、及び、アームクラウド操作のいずれも行われていないと判定した場合には、操作装置8によって掘削操作が行われていないと判定する。
判定部104は、作業装置20の先端が地面よりも下側に位置し、かつ、掘削操作が行われていると判定した場合には、作業装置20による掘削作業が行われている状態(以下、掘削状態とも記す)であると判定して掘削フラグをオンに設定する。
判定部104は、作業装置20の先端が地面よりも上側に位置していると判定した場合には、作業装置20による掘削作業が行われていない状態(以下、非掘削状態とも記す)であると判定して掘削フラグをオフに設定する。判定部104は、掘削操作が行われていないと判定した場合には、非掘削状態であると判定して掘削フラグをオフに設定する。
判定部104は、所定の制御周期で繰り返し、掘削フラグの設定処理を実行する。つまり、判定部104は、掘削状態であるか否かを監視し、非掘削状態と掘削状態との間の状態の遷移を検出する機能を有している。
補正部105は、判定部104により油圧ショベル100が掘削状態であると判定されると、閉回路ポンプ1の目標流量Q1と、開回路ポンプ3の目標流量Q2と、チャージポンプ9の吐出流量Q3とに基づいて、閉回路ポンプ1の補正目標流量Q1cと開回路ポンプ3の補正目標流量Q2cを演算する。
補正部105は、目標流量Q1、目標流量Q2、及びチャージポンプ9の吐出流量Q3に基づいて、調整流量Qaを演算する。調整流量Qaは、次式(5A)により演算される。
Qa=[Q1-(Q2+Q3)]/2 ・・・(5A)
Q1は目標吐出流量演算部102により演算された閉回路ポンプ1の目標流量であり、Q2は目標吐出流量演算部102により演算された開回路ポンプ3の目標流量であり、Q3は、チャージポンプ9の吐出流量である。チャージポンプ9の吐出流量Q3は、不揮発性メモリ72に記憶されている。
Qa=[Q1-(Q2+Q3)]/2 ・・・(5A)
Q1は目標吐出流量演算部102により演算された閉回路ポンプ1の目標流量であり、Q2は目標吐出流量演算部102により演算された開回路ポンプ3の目標流量であり、Q3は、チャージポンプ9の吐出流量である。チャージポンプ9の吐出流量Q3は、不揮発性メモリ72に記憶されている。
補正部105は、目標流量Q1及び調整流量Qaに基づいて、補正目標流量Q1cを演算する。補正目標流量Q1cは、次式(6A)により演算される。
Q1c=Q1-Qa ・・・(6A)
補正部105は、目標流量Q2及び調整流量Qaに基づいて、補正目標流量Q2cを演算する。補正目標流量Q2cは、次式(7A)により演算される。
Q2c=Q2+Qa ・・・(7A)
Qaは、式(5A)で表されるように、閉回路ポンプ1への戻り油の不足分を半分にした値である。
Q1c=Q1-Qa ・・・(6A)
補正部105は、目標流量Q2及び調整流量Qaに基づいて、補正目標流量Q2cを演算する。補正目標流量Q2cは、次式(7A)により演算される。
Q2c=Q2+Qa ・・・(7A)
Qaは、式(5A)で表されるように、閉回路ポンプ1への戻り油の不足分を半分にした値である。
ポンプ制御部106は、判定部104により油圧ショベル100が非掘削状態であると判定されると、閉回路ポンプ1の吐出流量を目標吐出流量演算部102により演算された目標流量Q1とするための制御信号を第1レギュレータ2に出力する。つまり、ポンプ制御部106は、閉回路ポンプ1の吐出流量が目標流量Q1となるように、第1レギュレータ2を介して閉回路ポンプ1の吐出容量を制御する。
ポンプ制御部106は、判定部104により油圧ショベル100が非掘削状態であると判定されると、開回路ポンプ3の吐出流量を目標吐出流量演算部102により演算された目標流量Q2とするための制御信号を第2レギュレータ4に出力する。つまり、ポンプ制御部106は、開回路ポンプ3の吐出流量が目標流量Q2となるように、第2レギュレータ4を介して開回路ポンプ3の吐出容量を制御する。
ポンプ制御部106は、判定部104により油圧ショベル100が掘削状態であると判定されると、閉回路ポンプ1の吐出流量を補正部105により演算された補正目標流量Q1cとするための制御信号を第1レギュレータ2に出力する。つまり、ポンプ制御部106は、閉回路ポンプ1の吐出流量が補正目標流量Q1cとなるように、第1レギュレータ2を介して閉回路ポンプ1の吐出容量を制御する。
ポンプ制御部106は、判定部104により油圧ショベル100が掘削状態であると判定されると、開回路ポンプ3の吐出流量を補正部105により演算された補正目標流量Q2cとするための制御信号を第2レギュレータ4に出力する。つまり、ポンプ制御部106は、開回路ポンプ3の吐出流量が補正目標流量Q2cとなるように、第2レギュレータ4を介して開回路ポンプ3の吐出容量を制御する。
したがって、非掘削状態から掘削状態に遷移すると、ポンプ制御部106は、非掘削状態のときに比べて開回路ポンプ3の吐出容量を増加させるとともに閉回路ポンプ1の吐出容量を減少させる。これにより、開回路ポンプ3の吐出流量が増加するとともに閉回路ポンプ1の吐出流量が減少する。
なお、掘削状態から非掘削状態に遷移すると、ポンプ制御部106は、掘削状態のときに比べて開回路ポンプ3の吐出容量を減少させるとともに閉回路ポンプ1の吐出容量を増加させる。これにより、開回路ポンプ3の吐出流量が減少するとともに閉回路ポンプの吐出流量が増加する。
図13を参照して、コントローラ7により実行される掘削判定処理の一例について説明する。図13のフローチャートに示す処理は、図示しないイグニッションスイッチがオンされることにより開始され、図示しない初期設定が行われた後、所定の制御周期で繰り返し実行される。
図13に示すように、ステップS110において、姿勢演算部107は、ブーム角センサ24Sの検出結果に基づいてブーム角θ1を演算する。姿勢演算部107は、演算したブーム角θ1と不揮発性メモリ72に記憶されているブーム長さL1に基づいて距離H1を演算し、ステップS115へ進む。
ステップS115において、姿勢演算部107は、アーム角センサ23Sの検出結果に基づいてアーム角θ2を演算する。姿勢演算部107は、演算したアーム角θ2と不揮発性メモリ72に記憶されているアーム長さL2に基づいて距離H2を演算し、ステップS120へ進む。
ステップS120において、姿勢演算部107は、ステップS110,S115で演算された距離H1,H2、及び不揮発性メモリ72に記憶されているブームフート高さHbに基づいて、アーム先端高さHaを演算し、ステップS130へ進む。
ステップS130において、判定部104は、ステップS110~S120での演算結果に基づいて、作業装置20の先端が地面の下側に位置しているか否か、すなわち、作業装置20の姿勢が地面を掘削する姿勢であるか否かを判定する。
ステップS130において、判定部104は、アーム先端高さHaが判定用の距離H3(=H2―H1)以下である場合には、作業装置20の先端が地面の下側に位置している、すなわち作業装置20の姿勢が地面を掘削する姿勢であると判定し、ステップS135へ進む。
ステップS130において、判定部104は、アーム先端高さHaが判定用の距離H3(=H2―H1)よりも大きい場合には、作業装置20の先端が地面の下側に位置していない、すなわち作業装置20の姿勢が地面を掘削する姿勢でないと判定し、ステップS145へ進む。
ステップS135において、判定部104は、操作装置8からの信号に基づいて、掘削操作が行われたか否かを判定する。判定部104は、ブーム操作量センサ8Baからの信号に基づいて、ブーム上げ操作が行われているか否かを判定する。判定部104は、アーム操作量センサ8Aaからの信号に基づいて、アームクラウド操作が行われているか否かを判定する。
ステップS135において、判定部104は、ブーム上げ操作、及び、アームクラウド操作の少なくとも一方の操作が行われていると判定した場合、操作装置8によって掘削操作が行われていると判定する。
ステップS135において、判定部104は、ブーム上げ操作、及び、アームクラウド操作のいずれの操作も行われていないと判定した場合、操作装置8によって掘削操作が行われていないと判定する。
ステップS135において、掘削操作が行われていると判定されると、処理がステップS140へ進み、掘削操作が行われていないと判定されると、処理がステップS145へ進む。
ステップS140において、判定部104は、作業装置20による掘削作業が行われている状態(掘削状態)であると判定し、掘削フラグをオンに設定する。
ステップS145において、判定部104は、作業装置20による掘削作業が行われていない状態(非掘削状態)であると判定し、掘削フラグをオフに設定する。
掘削フラグの設定処理(ステップS140,S145)が終了すると、本制御周期における図13のフローチャートに示す処理が終了する。つまり、ステップS140,S145の処理が終了すると、次の制御周期のステップS110の処理が実行される。
図14を参照して、コントローラ7により実行される流量制御の一例について説明する。図14のフローチャートに示す処理は、図示しないイグニッションスイッチがオンされることにより開始され、図示しない初期設定が行われた後、所定の制御周期で繰り返し実行される。
図14に示すように、ステップS210において、目標供給流量演算部101は、アーム操作量センサ8Aaによって検出された操作量に基づいて、アームシリンダ26への目標供給流量を演算するとともにアーム操作レバー8Abの操作方向を特定してステップS215へ進む。
ステップS215において、目標吐出流量演算部102は、ステップS210において演算された目標供給流量に基づいて、閉回路ポンプ1の目標流量Q1、及び開回路ポンプ3の目標流量Q2を演算し、ステップS220へ進む。
ステップS220において、判定部104は、掘削フラグがオンに設定されているか否かを判定する。ステップS220において、掘削フラグがオンに設定されていると判定されると、処理がステップS233へ進み、掘削フラグがオンに設定されていないと判定されると、処理がステップS223へ進む。
ステップS223において、ポンプ制御部106は、ステップS215において演算された目標流量Q1に応じた制御信号を閉回路ポンプ1の第1レギュレータ2に出力し、ステップS226へ進む。
ステップS226において、ポンプ制御部106は、ステップS215において演算された目標流量Q2に応じた制御信号を開回路ポンプ3の第2レギュレータ4に出力する。
また、図示しないが、ステップS226において、弁制御部103は、ステップS210において特定された操作方向に応じた制御信号を第1切替弁15a及び第2切替弁15bに出力する。
コントローラ7は、ステップS226の処理を終了すると、本制御周期における図14のフローチャートに示す処理を終了する。つまり、ステップS226の処理が終了すると、次の制御周期のステップS210の処理が実行される。
ステップS233において、補正部105は、ステップS215において演算された目標流量Q1及び目標流量Q2とチャージポンプ9の吐出流量Q3に基づいて、調整流量Qaを演算し、ステップS236へ進む。
ステップS236において、補正部105は、ステップS215において演算された目標流量Q1と、ステップS233において演算された調整流量Qaに基づいて、補正目標流量Q1cを演算し、ステップS239へ進む。
ステップS239において、補正部105は、ステップS215において演算された目標流量Q2と、ステップS233において演算された調整流量Qaに基づいて、補正目標流量Q2cを演算し、ステップS243へ進む。
ステップS243において、ポンプ制御部106は、ステップS236において演算された補正目標流量Q1cに応じた制御信号を閉回路ポンプ1の第1レギュレータ2に出力し、ステップS246へ進む。
ステップS246において、ポンプ制御部106は、ステップS239において演算された補正目標流量Q2cに応じた制御信号を開回路ポンプ3の第2レギュレータ4に出力する。
また、図示しないが、ステップS246において、弁制御部103は、ステップS210において特定された操作方向に応じた制御信号を第1切替弁15a及び第2切替弁15bに出力する。コントローラ7は、ステップS246の処理を終了すると、本制御周期における図14のフローチャートに示す処理を終了する。
このように、本実施形態では、掘削状態であるときには、非掘削状態であるときに比べて開回路ポンプ3の吐出容量(傾転角)を増加させるとともに閉回路ポンプ1の吐出容量(傾転角)を減少させる制御(以下、流量調整制御とも記す)を実行する。
本実施形態に係る油圧ショベル100の動作の一例について説明する。なお、説明の便宜上、具体的な数値を記載して説明するが、これらの数値は一例にすぎない。チャージポンプ9の吐出流量は30[L/min]、アームシリンダ26のボトム側油室26aとロッド側油室26bの受圧面積比は1:0.7、チャージリリーフ弁65の設定圧は2.0[MPa]とする。
オペレータがアーム操作レバー8Abをアームクラウド側に操作すると、コントローラ7により目標供給流量が演算される。
コントローラ7は、目標供給流量に基づいて、閉回路ポンプ1の目標流量Q1及び開回路ポンプ3の目標流量Q2を演算する。コントローラ7は、この演算結果に応じた制御信号を第1レギュレータ2及び第2レギュレータ4に出力する。
また、コントローラ7は、第1切替弁15aにオン信号を出力し第1切替弁15aを開位置に切り替える。なお、コントローラ7は、第2切替弁15bにオフ信号を出力し第2切替弁15bを閉位置で保持させる。
ここで、例えば、目標供給流量が100[L/min]、閉回路ポンプ1の目標流量Q1が80[L/min]、開回路ポンプ3の目標流量Q2が20[L/min]である場合について説明する。非掘削状態である場合、コントローラ7は、閉回路ポンプ1の吐出流量が80[L/min]、開回路ポンプ3の吐出流量が20[L/min]となるように、第1レギュレータ2及び第2レギュレータ4を制御する。
アームシリンダ26のボトム側油室26aに供給される作動油の流量が100[L/min]である場合、ボトム側油室26aとロッド側油室26bの受圧面積差により、ロッド側油室26bから排出される作動油の流量は70[L/min]となる。なお、閉回路Ccからフラッシング弁16を通じてチャージ流路11に供給される作動油の流量は0[L/min]である。
閉回路ポンプ1に戻る作動油の必要流量は、吐出流量と同じ80[L/min]である。このため、チャージポンプ9から吐出された作動油のうち、10[L/min]の作動油がチャージ流路11から第2メイクアップ弁66bを通じて第2流路62に補充される。なお、チャージポンプ9から吐出された作動油のうち、第2流路62に補充されない残りの20[L/min]の作動油は、チャージリリーフ弁65からタンク17に排出される。
アームシリンダ26のボトム側油室26aに作動油が供給され、ロッド側油室26bから作動油が排出されることでアームシリンダ26が伸長する。なお、アームシリンダ26の伸長速度は、ボトム側油室26aに供給される作動油の流量と、ボトム側油室26aの受圧面積によって定まる。アームシリンダ26が伸長することにより、アーム23がアームクラウド側に動作する。
これに対して、掘削作業が行われているときには、バケット22が堅土に接触するといった事象が発生する場合がある。掘削中に、バケット22が堅土に接触すると、アーム23のクラウド動作が制限される。例えば、アーム23のクラウド動作が減速したり、停止したりする。アームシリンダ26の伸長動作が制限されると、ロッド側油室26bから第2流路62に排出される作動油の流量が減少する。
例えば、アーム23のクラウド動作が停止した場合、ロッド側油室26bから第2流路62に排出される作動油の流量は0[L/min]となる。チャージポンプ9の吐出流量は30[L/min]である。
なお、本実施形態では、開回路ポンプ3から第1流路61に吐出された作動油が、フラッシング弁16を通じてチャージ流路11に導かれる。しかしながら、仮に、流量調整制御が実行されない場合を想定すると、閉回路ポンプ1への戻り油は、チャージポンプ9の吐出流量30[L/min]と開回路ポンプ3の吐出流量20[L/min]を合わせた50[L/min]となり、閉回路ポンプ1への戻り油の必要流量である80[L/min]に満たない。
閉回路ポンプ1への戻り油が不足すると、一時的に閉回路ポンプ1の戻り側が負圧となることによりキャビテーションが発生し、閉回路ポンプ1が劣化するおそれがある。また、閉回路ポンプ1への戻り油が不足すると、一時的に閉回路ポンプ1のギヤ、軸受等の可動部を潤滑するために必要な流量を確保できなくなるおそれがある。その結果、可動部に齧りが生じ、可動部が劣化するおそれがある。
閉回路ポンプ1への戻り油の不足により、チャージ流路11及び第2流路62の圧力が低くなると、アームシリンダ26のボトム側油室26aとロッド側油室26bとの圧力差が大きくなる。その結果、アームシリンダ26のシリンダ推力が大きくなり、操作フィーリングが変化してしまう。
さらに、シリンダ推力が大きくなると、作業装置20の駆動対象部材同士の連結部分に作用する負荷も大きくなる。このため、作業装置20の駆動対象部材同士の連結部分の溶接部などに発生する応力が大きくなり、連結部分の寿命が低下するおそれがある。
そこで、本実施形態に係るコントローラ7は、これらの問題が発生することを防止するため、掘削状態であるときに、非掘削状態のときに比べて開回路ポンプ3の吐出流量を増加させておくとともに閉回路ポンプ1の吐出流量を減少させておく。これにより、アームシリンダ26の動作が制限されたときに、閉回路ポンプ1への戻り油の必要流量を確保することができる。
バケット22が堅土に接触することにより、アームシリンダ26の動作が強制的に停止している状態では、ボトム側油室26aの圧力とロッド側油室26bの圧力との差により、フラッシング弁16が第1方向D1に切り替えられている。これにより、第1流路61とチャージ流路11とがフラッシング弁16を介して連通している。したがって、開回路ポンプ3から吐出された作動油は、余剰油としてフラッシング弁16を通じてチャージ流路11に導かれる。
コントローラ7は、アームシリンダ26の動作が制限されることにより、不足する作動油の流量の半分を調整流量Qaとして演算する。不足する作動油の流量は、流量調整制御を実行しない場合を想定すると、次のようになる。
チャージ流路11から第2メイクアップ弁66bを通じて第2流路62に導かれる作動油の流量は、チャージポンプ9の吐出流量30[L/min]と開回路ポンプ3の吐出流量20[L/min]とを加算した50[L/min]となる。したがって、閉回路ポンプ1への戻り油の不足は、30[L/min](=80[L/min]―50[L/min])となる。
本実施形態に係るコントローラ7は、アームシリンダ26の動作が制限された場合であっても、閉回路ポンプ1の吐出量と吸込み量とを同じにするために、掘削状態のときに流量調整制御を実行する。流量調整制御において、コントローラ7は、非掘削状態のときに比べて、開回路ポンプ3の吐出流量を15[L/min](=30[L/min]/2)だけ増加させるとともに閉回路ポンプ1の吐出量を15[L/min](=30[L/min]/2)だけ減少させる。
具体的には、コントローラ7は、不足する作動油の流量30[L/min]の半分を調整流量Qaとして演算する。コントローラ7は、開回路ポンプ3の目標流量20[L/min]に調整流量Qa=15[L/min]を加算した値を補正目標流量Q2c=35[L/min]として演算する。また、コントローラ7は、閉回路ポンプ1の目標流量80[L/min]から調整流量Qa=15[L/min]だけ減算した値を補正目標流量Q1c=65[L/min]として演算する。
コントローラ7は、閉回路ポンプ1の吐出流量が、補正目標流量Q1c=65[L/min]となるように、第1レギュレータ2を制御する。コントローラ7は、開回路ポンプ3の吐出流量が、補正目標流量Q2c=35[L/min]となるように、第2レギュレータ4を制御する。
掘削中、アームシリンダ26の動作が制限されていない状態において、アームシリンダ26のボトム側油室26aに供給される作動油の流量は、閉回路ポンプ1の吐出流量65[L/min]と開回路ポンプ3の吐出流量35[L/min]の合計値100[L/min]である。閉回路ポンプ1の戻り油の流量は、アームシリンダ26のロッド側油室26bから排出される作動油の流量70[L/min]と、チャージポンプ9の吐出流量30[L/min]の合計値100[L/min]である。
掘削中、バケット22が堅土に接触し、アームシリンダ26の動作が停止している状態では、アームシリンダ26のロッド側油室26bから排出される作動油の流量は0[L/min]である。しかしながら、チャージ流路11から第2メイクアップ弁66bを通じて第2流路62に導かれる作動油の流量は、チャージポンプ9の吐出流量30[L/min]と開回路ポンプ3の吐出流量35[L/min]とを加算した65[L/min]となる。閉回路ポンプ1の吐出流量は、65[L/min]であるため、閉回路ポンプ1の戻り油の必要流量が確保される。
上述した本第4実施形態によれば、次の作用効果を奏する。
(1A)油圧ショベル(作業機械)100は、複数の油圧アクチュエータ(ブームシリンダ27、アームシリンダ26及びバケットシリンダ25)を有して掘削作業を行う多関節型の作業装置20と、作業装置20の姿勢を検出する姿勢検出装置28と、作業装置20を操作する操作装置8と、アームシリンダ26に閉回路Ccで接続されてアームシリンダ26に対して作動油の給排を行う閉回路ポンプ1と、アームシリンダ26に開回路Ocで接続されてアームシリンダ26に作動油を供給する開回路ポンプ3と、チャージポンプ9と、チャージポンプ9から吐出された作動油を閉回路Ccに導くチャージ流路11と、閉回路Ccの余剰な作動油をチャージ流路11に排出するフラッシング弁(余剰油排出装置)16と、閉回路ポンプ1及び開回路ポンプ3の吐出容量を制御するコントローラ7と、を備える。
コントローラ7は、姿勢検出装置28からの信号に基づいて作業装置20の姿勢または作業装置20の先端の高さを判定する。コントローラ7は、作業装置20の姿勢または作業装置20の先端の高さが所定の条件を満たす状態における操作装置8からの信号に基づいて、作業装置20による掘削作業が行われている状態(掘削状態)であるか否かを判定する。本実施形態において、上記所定の条件は、作業装置20の先端が地面よりも下側に位置している場合に満たされる。本実施形態に係るコントローラ7は、作業装置20の姿勢を表すデータ(H1,H2,H3,Ha)を演算し、その演算結果に基づいて上記所定の条件が満たされているか否かを判定する。作業装置20による掘削作業が行われていない状態(非掘削状態)から掘削作業が行われている状態(掘削状態)に遷移した場合、コントローラ7は、遷移前に比べて、開回路ポンプ3の吐出容量を増加させるとともに閉回路ポンプ1の吐出容量を減少させる。掘削状態では、非掘削状態に比べて開回路ポンプ3から吐出される作動油の流量が増加するとともに、閉回路ポンプ1から吐出される作動油の流量が減少する。
この構成では、掘削中にバケット22が堅土に接触するなどしてアームシリンダ26の動作が制限された場合であっても閉回路ポンプ1の戻り油が不足することを防止できる。その結果、閉回路ポンプ1の戻り油の不足に起因してキャビテーションや齧りが発生することを防止することができる。
したがって、本実施形態によれば、キャビテーションや齧りによる閉回路ポンプ1の劣化を抑制可能な油圧ショベル(作業機械)100を提供することができる。
(2A)また、本実施形態によれば、閉回路ポンプ1の戻り油の不足に起因するアームシリンダ26のシリンダ推力の変化を防止することができる。その結果、操作フィーリングの変化を防止することができる。
(3A)さらに、本実施形態によれば、閉回路ポンプ1の戻り油の不足に起因するアームシリンダ26のシリンダ推力の増加を防止することにより、作業装置20の駆動対象部材同士の連結部分等の負荷が大きくなることを抑制することができる。その結果、作業装置20の寿命の低下を抑制することができる。
(4A)コントローラ7は、操作装置8からの信号に基づいて、掘削操作が行われているか否かを判定するとともに、姿勢検出装置28からの信号に基づいて、バケット22の先端(作業装置20の先端)が地面よりも下側に位置しているか否かを判定する。コントローラ7は、バケット22の先端が地面よりも下側に位置し、かつ、掘削操作が行われている場合に、作業装置20による掘削作業が行われている状態であると判定する。コントローラ7は、バケット22の先端が地面よりも上側に位置している場合には、作業装置20による掘削作業が行われていない状態であると判定する。また、コントローラ7は、掘削操作が行われていない場合には、作業装置20による掘削作業が行われていない状態であると判定する。
この構成によれば、地面の下側を掘削している間、流量調整制御が実行される。これにより、地面の下側の掘削中に、バケット22が堅土に接触し、アームシリンダ26の動作が制限されたとしても閉回路ポンプ1の戻り油が不足することを防止できる。
(5A)コントローラ7は、作業装置20による掘削作業が行われていない状態から掘削作業が行われる状態に遷移した場合、閉回路ポンプ1の吐出流量と開回路ポンプ3の吐出流量の合計値が維持されるように、開回路ポンプ3の吐出容量を増加させるとともに閉回路ポンプ1の吐出容量を減少させる(図14のステップS233,S236,S239,S243,S246)。
この構成によれば、非掘削状態での閉回路ポンプ1の吐出流量(80[L/min])と開回路ポンプ3の吐出流量(20[L/min])の合計値(100[L/min])と、掘削状態での閉回路ポンプ1の吐出流量(65[L/min])と開回路ポンプ3の吐出流量(35[L/min])の合計値(100[L/min])とが同じになる。これにより、掘削状態と非掘削状態のそれぞれにおいて、オペレータの意図した速度で作業装置20を動作させることができる。
(6A)また、バケット22が堅土に接触し、アーム23の動作が制限されているときと、バケット22が堅土を掘削した後とでは、閉回路ポンプ1の戻り油の流量が同じである。このため、堅土を掘削した後の作業装置20の動作にショックが発生することを防止できる。
次のような変形例も本発明の範囲内である。
<変形例1>
第1実施形態では、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0未満であると判定された場合、コントローラ7は、閉回路ポンプ1の目標流量からチャージポンプ9の吐出流量を減じた値を開回路ポンプ3の目標流量として演算する例について説明したが、本発明はこれに限定されない。
第1実施形態では、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0未満であると判定された場合、コントローラ7は、閉回路ポンプ1の目標流量からチャージポンプ9の吐出流量を減じた値を開回路ポンプ3の目標流量として演算する例について説明したが、本発明はこれに限定されない。
閉回路ポンプ1の戻り油の不足に起因した劣化が発生しにくい範囲内で、開回路ポンプ3の目標流量は、第1実施形態に比べて低い値に設定されてもよい。また、第1実施形態において、コントローラ7は、閉回路ポンプ1の吐出流量をわずかに減少させてもよい。
<変形例2>
第2実施形態では、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下したときの開回路ポンプ3の目標流量の増加量と、閉回路ポンプ1の目標流量の減少量とが同じである例について説明したが、本発明はこれに限定されない。閉回路ポンプ1の戻り油の不足に起因した劣化が発生しにくい範囲内であれば、開回路ポンプ3の目標流量の増加量と閉回路ポンプ1の目標流量の減少量とは一致させなくてもよい。
第2実施形態では、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下したときの開回路ポンプ3の目標流量の増加量と、閉回路ポンプ1の目標流量の減少量とが同じである例について説明したが、本発明はこれに限定されない。閉回路ポンプ1の戻り油の不足に起因した劣化が発生しにくい範囲内であれば、開回路ポンプ3の目標流量の増加量と閉回路ポンプ1の目標流量の減少量とは一致させなくてもよい。
<変形例3>
第3実施形態では、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下した場合、開回路ポンプ3の目標流量にチャージポンプ9の吐出流量を加えた値を閉回路ポンプ1の目標流量として演算する例について説明したが、本発明はこれに限定されない。
第3実施形態では、圧力センサ10により検出されたチャージ圧Pcが圧力閾値Pc0以上から圧力閾値Pc0未満に低下した場合、開回路ポンプ3の目標流量にチャージポンプ9の吐出流量を加えた値を閉回路ポンプ1の目標流量として演算する例について説明したが、本発明はこれに限定されない。
閉回路ポンプ1の戻り油の不足に起因した劣化が発生しにくい範囲内で、閉回路ポンプ1の目標流量は、第3実施形態に比べて高い値に設定されてもよい。また、第3実施形態において、コントローラ7は、開回路ポンプ3の吐出流量をわずかに増加させてもよい。
<変形例4>
第1実施形態では、補正部105は、判定部104によりチャージ圧Pcが圧力閾値Pc0未満であると判定された場合に補正目標流量Q2cを演算する例について説明したが、本発明はこれに限定されない。例えば、図6のステップS130の処理は、ステップS115とステップS120との間で実行されることとしてもよい。つまり、補正部105は、常時、補正目標流量Q2cを演算してもよい。
第1実施形態では、補正部105は、判定部104によりチャージ圧Pcが圧力閾値Pc0未満であると判定された場合に補正目標流量Q2cを演算する例について説明したが、本発明はこれに限定されない。例えば、図6のステップS130の処理は、ステップS115とステップS120との間で実行されることとしてもよい。つまり、補正部105は、常時、補正目標流量Q2cを演算してもよい。
<変形例5>
第2実施形態では、補正部105は、判定部104によりチャージ圧Pcが圧力閾値Pc0未満であると判定された場合に補正目標流量Q1c,Q2cを演算する例について説明したが、本発明はこれに限定されない。例えば、図7のステップS233,S236,S239の処理は、ステップS115とステップS120との間で実行されることとしてもよい。つまり、補正部105は、常時、補正目標流量Q1c,Q2cを演算してもよい。
第2実施形態では、補正部105は、判定部104によりチャージ圧Pcが圧力閾値Pc0未満であると判定された場合に補正目標流量Q1c,Q2cを演算する例について説明したが、本発明はこれに限定されない。例えば、図7のステップS233,S236,S239の処理は、ステップS115とステップS120との間で実行されることとしてもよい。つまり、補正部105は、常時、補正目標流量Q1c,Q2cを演算してもよい。
<変形例6>
第3実施形態では、補正部105は、判定部104によりチャージ圧Pcが圧力閾値Pc0未満であると判定された場合に補正目標流量Q1cを演算する例について説明したが、本発明はこれに限定されない。例えば、図8のステップS330の処理は、ステップS115とステップS120との間で実行されることとしてもよい。つまり、補正部105は、常時、補正目標流量Q1cを演算してもよい。
第3実施形態では、補正部105は、判定部104によりチャージ圧Pcが圧力閾値Pc0未満であると判定された場合に補正目標流量Q1cを演算する例について説明したが、本発明はこれに限定されない。例えば、図8のステップS330の処理は、ステップS115とステップS120との間で実行されることとしてもよい。つまり、補正部105は、常時、補正目標流量Q1cを演算してもよい。
<変形例7>
第4実施形態では、非掘削状態から掘削状態に遷移したときの開回路ポンプ3の目標流量の増加量と、閉回路ポンプ1の目標流量の減少量とが同じである例について説明したが、本発明はこれに限定されない。閉回路ポンプ1の戻り油の不足に起因した劣化が発生しにくい範囲内で、開回路ポンプ3の目標流量の増加量と閉回路ポンプ1の目標流量の減少量とは一致させなくてもよい。
第4実施形態では、非掘削状態から掘削状態に遷移したときの開回路ポンプ3の目標流量の増加量と、閉回路ポンプ1の目標流量の減少量とが同じである例について説明したが、本発明はこれに限定されない。閉回路ポンプ1の戻り油の不足に起因した劣化が発生しにくい範囲内で、開回路ポンプ3の目標流量の増加量と閉回路ポンプ1の目標流量の減少量とは一致させなくてもよい。
<変形例8>
第4実施形態では、アーム先端高さHaが距離H3以下である場合に、コントローラ7が、作業装置20の先端が地面よりも下側に位置していると判定する例について説明したが、本発明はこれに限定されない。コントローラ7は、作業装置20の姿勢を判定し、作業装置20の姿勢が上記所定の条件を満たす状態であるときに、掘削操作が行われている場合に、掘削作業状態であると判定すればよい。なお、上記所定の条件は、上述したように、作業装置20の先端が地面よりも下側に位置していることを含む。また、コントローラ7は、作業装置20の先端の高さを判定し、作業装置20の先端の高さが所定の条件を満たす状態であるときに、掘削操作が行われている場合に、掘削作業状態であると判定してもよい。
第4実施形態では、アーム先端高さHaが距離H3以下である場合に、コントローラ7が、作業装置20の先端が地面よりも下側に位置していると判定する例について説明したが、本発明はこれに限定されない。コントローラ7は、作業装置20の姿勢を判定し、作業装置20の姿勢が上記所定の条件を満たす状態であるときに、掘削操作が行われている場合に、掘削作業状態であると判定すればよい。なお、上記所定の条件は、上述したように、作業装置20の先端が地面よりも下側に位置していることを含む。また、コントローラ7は、作業装置20の先端の高さを判定し、作業装置20の先端の高さが所定の条件を満たす状態であるときに、掘削操作が行われている場合に、掘削作業状態であると判定してもよい。
<変形例8-1>
具体的には、例えば、コントローラ7は、作業装置20の姿勢を表すデータであるアーム先端高さHaが高さ閾値Ha0以下である場合に、バケット22の先端が地面よりも下側に位置していると判定してもよい。この例では、コントローラ7は、アーム先端高さHaが高さ閾値Ha0よりも大きい場合には、バケット22の先端が地面よりも上側に位置していると判定する。高さ閾値Ha0は、予め不揮発性メモリ72に記憶されている。
具体的には、例えば、コントローラ7は、作業装置20の姿勢を表すデータであるアーム先端高さHaが高さ閾値Ha0以下である場合に、バケット22の先端が地面よりも下側に位置していると判定してもよい。この例では、コントローラ7は、アーム先端高さHaが高さ閾値Ha0よりも大きい場合には、バケット22の先端が地面よりも上側に位置していると判定する。高さ閾値Ha0は、予め不揮発性メモリ72に記憶されている。
上述したように、油圧ショベル100は、地面に設置されるデッキ上で地面の掘削を行うことがある。この場合、地面からのデッキの高さを考慮して高さ閾値Ha0が定められる。なお、作業現場によってデッキの高さが異なるので、オペレータによって高さ閾値Ha0を変更できるようにすることが好ましい。例えば、コントローラ7は、運転室41内に設けられている入力装置がオペレータに操作されることにより、入力装置から入力される情報に基づいて、不揮発性メモリ72に記憶されている高さ閾値Ha0を変更する。
<変形例8-2>
また、コントローラ7は、姿勢検出装置28からの信号に基づいて、バケット22の先端の高さを演算し、その演算結果が負の値である場合にバケット22の先端が地面よりも下側に位置していると判定してもよい。この場合、姿勢検出装置28には、バケット22の回動角度を検出する姿勢センサ(角度センサ)が含まれる。
また、コントローラ7は、姿勢検出装置28からの信号に基づいて、バケット22の先端の高さを演算し、その演算結果が負の値である場合にバケット22の先端が地面よりも下側に位置していると判定してもよい。この場合、姿勢検出装置28には、バケット22の回動角度を検出する姿勢センサ(角度センサ)が含まれる。
<変形例9>
第4実施形態では、バケット22の先端が地面よりも下側に位置し、かつ、掘削操作が行われている場合に、作業装置20による掘削作業が行われている状態であると判定する例について説明したが、本発明はこれに限定されない。
第4実施形態では、バケット22の先端が地面よりも下側に位置し、かつ、掘削操作が行われている場合に、作業装置20による掘削作業が行われている状態であると判定する例について説明したが、本発明はこれに限定されない。
例えば、コントローラ7は、作業装置20によって壁面の掘削作業である掻き落とし作業が行われている状態であるか否かを判定してもよい。コントローラ7は、掻き落とし作業を行う姿勢であり、かつ、掻き落としを行うための操作が行われている場合に、作業装置20による掻き落とし作業が行われている状態であると判定する。
コントローラ7は、姿勢検出装置28からの信号に基づいて、作業装置20の姿勢が掻き落とし作業を行う姿勢であるか否かを判定する。例えば、コントローラ7は、バケット22の先端が旋回中心軸Caから所定距離以上離れている場合に、作業装置20の姿勢が掻き落とし作業を行う姿勢であると判定する。
また、コントローラ7は、ブーム操作量センサ8Ba及びアーム操作量センサ8Aaからの信号に基づいて、掻き落としを行うための操作、すなわち壁面に対する掘削操作が行われているか否かを判定する。例えば、コントローラ7は、ブーム下げ操作、及び、アームクラウド操作の少なくとも一方の操作が行われている場合、操作装置8によって壁面に対する掘削操作が行われていると判定する。コントローラ7は、ブーム下げ操作、及び、アームクラウド操作のいずれの操作も行われていない場合、操作装置8によって壁面に対する掘削操作が行われていないと判定する。
この構成によれば、壁面の奥側を掘削している間、流量調整制御が実行される。これにより、壁面の奥側の掘削中に、バケット22が堅土に接触し、アームシリンダ26の動作が制限されたとしても閉回路ポンプ1の戻り油が不足することを防止できる。
<変形例10>
第4実施形態では、補正部105は、掘削フラグがオンに設定されているときに補正目標流量Q1c,Q2cを演算する例について説明したが、本発明はこれに限定されない。例えば、図14のステップS233,S236,S239の処理は、ステップS215とステップS220との間で実行されることとしてもよい。つまり、補正部105は、常時、補正目標流量Q1c,Q2cを演算してもよい。
第4実施形態では、補正部105は、掘削フラグがオンに設定されているときに補正目標流量Q1c,Q2cを演算する例について説明したが、本発明はこれに限定されない。例えば、図14のステップS233,S236,S239の処理は、ステップS215とステップS220との間で実行されることとしてもよい。つまり、補正部105は、常時、補正目標流量Q1c,Q2cを演算してもよい。
<変形例11>
第4実施形態において、非掘削状態から掘削状態に遷移した場合、コントローラ7は、遷移前に比べて、開回路ポンプ3の吐出容量を増加させるとともに閉回路ポンプ1の吐出容量を減少させる例について説明した。しかしながら、非掘削状態から掘削状態に遷移した場合、コントローラ7は、遷移前に比べて、開回路ポンプ3の吐出容量を増加させる容量増加制御及び閉回路ポンプ1の吐出容量を減少させる容量減少制御の少なくとも一方を実行する構成とすることができる。
第4実施形態において、非掘削状態から掘削状態に遷移した場合、コントローラ7は、遷移前に比べて、開回路ポンプ3の吐出容量を増加させるとともに閉回路ポンプ1の吐出容量を減少させる例について説明した。しかしながら、非掘削状態から掘削状態に遷移した場合、コントローラ7は、遷移前に比べて、開回路ポンプ3の吐出容量を増加させる容量増加制御及び閉回路ポンプ1の吐出容量を減少させる容量減少制御の少なくとも一方を実行する構成とすることができる。
<変形例12>
上記実施形態では、第1切替弁15a及び第2切替弁15bが電磁切替弁である例について説明したが、本発明はこれに限定されない。油圧システム60は、第1切替弁15a及び第2切替弁15bに代えて、開回路ポンプ3から吐出された作動油の流量を調整して閉回路Ccに導くことが可能な第1電磁比例弁及び第2電磁比例弁を備えていてもよい。
上記実施形態では、第1切替弁15a及び第2切替弁15bが電磁切替弁である例について説明したが、本発明はこれに限定されない。油圧システム60は、第1切替弁15a及び第2切替弁15bに代えて、開回路ポンプ3から吐出された作動油の流量を調整して閉回路Ccに導くことが可能な第1電磁比例弁及び第2電磁比例弁を備えていてもよい。
<変形例13>
上記実施形態では、第1切替弁15a及び第2切替弁15bが個別に設けられている例について説明したが、本発明はこれに限定されない。油圧システム60は、第1切替弁15a及び第2切替弁15bに代えて、第1切替弁15a及び第2切替弁15bの機能を有する1つのスプール弁を備えていてもよい。
上記実施形態では、第1切替弁15a及び第2切替弁15bが個別に設けられている例について説明したが、本発明はこれに限定されない。油圧システム60は、第1切替弁15a及び第2切替弁15bに代えて、第1切替弁15a及び第2切替弁15bの機能を有する1つのスプール弁を備えていてもよい。
<変形例14>
上記実施形態では、アームシリンダ26の動作が制限された場合の流量制御について説明したが、本発明はこれに限定されない。ブームシリンダ27及びバケットシリンダ25の油圧回路をアームシリンダ26の油圧回路と同様の構成として、ブームシリンダ27及びバケットシリンダ25の油圧回路において、コントローラ7が、上記実施形態と同様の流量制御を実行してもよい。
上記実施形態では、アームシリンダ26の動作が制限された場合の流量制御について説明したが、本発明はこれに限定されない。ブームシリンダ27及びバケットシリンダ25の油圧回路をアームシリンダ26の油圧回路と同様の構成として、ブームシリンダ27及びバケットシリンダ25の油圧回路において、コントローラ7が、上記実施形態と同様の流量制御を実行してもよい。
また、油圧アクチュエータは、油圧シリンダに限定されることもない。例えば、第1~第3実施形態において、旋回モータ42などの油圧モータの動作が制限されることによりチャージ圧が低下した場合に、コントローラ7が、上記実施形態と同様の流量制御を実行してもよい。
以上のとおり、上記実施形態に係る作業機械のコントローラ7は、チャージ流路11の圧力が所定の圧力閾値Pc0以上の状態から圧力閾値Pc0未満の状態に遷移した場合、または、作業装置20が掘削作業を行っていない状態から掘削作業を行う状態に遷移した場合、開回路ポンプ3の吐出容量を増加させる、あるいは、閉回路ポンプ1の吐出容量を減少させる。この構成では、掘削中に作業装置20が堅土に接触するなどして油圧アクチュエータの動作が制限された場合であっても閉回路ポンプ1の戻り油が不足することを防止できる。その結果、閉回路ポンプ1の戻り油の不足に起因してキャビテーションや齧りが発生することを防止することができる。したがって、この構成によれば、キャビテーションや齧りによる閉回路ポンプ1の劣化を抑制可能な作業機械を提供することができる。
以上、本発明の実施形態について説明したが、上記実施形態は本発明の適用例の一部を示したに過ぎず、本発明の技術的範囲を上記実施形態の具体的構成に限定する趣旨ではない。
上述した実施形態及び変形例は本発明を理解し易く説明するために例示したものであり、必ずしも説明した全ての構成を備えるものに限定されない。また、ある実施形態、変形例の構成の一部を他の実施形態、変形例の構成に置き換えることが可能であり、また、ある実施形態、変形例の構成に他の実施形態、変形例の構成を加えることも可能である。なお、図中に示した制御線や情報線は説明上必要と考えられるものを示しており、製品上で必要な全ての制御線や情報線を示しているとは限らない。実際にはほとんど全ての構成が相互に接続されていると考えてもよい。
1…閉回路ポンプ、2…第1レギュレータ、3…開回路ポンプ、4…第2レギュレータ、5…エンジン、7…コントローラ、8…操作装置、8a…操作量センサ、8b…操作レバー、8A…アーム操作装置、8Aa…アーム操作量センサ、8Ab…アーム操作レバー、8B…ブーム操作装置、8Ba…ブーム操作量センサ、8Bb…ブーム操作レバー、9…チャージポンプ、10…圧力センサ、11…チャージ流路、15a…第1切替弁、15b…第2切替弁、16…フラッシング弁(余剰油排出装置)、17…タンク、20…作業装置、22…バケット、23…アーム、24…ブーム、25…バケットシリンダ(油圧アクチュエータ)、26…アームシリンダ(油圧アクチュエータ)、26a…ボトム側油室、26b…ロッド側油室、27…ブームシリンダ(油圧アクチュエータ)、28…姿勢検出装置、30…走行体、31…走行モータ(油圧アクチュエータ)、40…旋回体(車体)、42…旋回モータ(油圧アクチュエータ)、60…油圧システム、61…第1流路、62…第2流路、63…チャージ回路、65…チャージリリーフ弁、66a…第1メイクアップ弁、66b…第2メイクアップ弁、71…処理装置、72…不揮発性メモリ、73…揮発性メモリ、74…入力インタフェース、75…出力インタフェース、100…油圧ショベル(作業機械)、101…目標供給流量演算部、102…目標吐出流量演算部、103…弁制御部、104…判定部、105…補正部、106…ポンプ制御部、107…姿勢演算部、Cc…閉回路、Oc…開回路
Claims (12)
- 油圧アクチュエータを有して掘削作業を行う多関節型の作業装置と、前記油圧アクチュエータに閉回路で接続されて前記油圧アクチュエータに対して作動油の給排を行う閉回路ポンプと、前記油圧アクチュエータに開回路で接続されて前記油圧アクチュエータに作動油を供給する開回路ポンプと、チャージポンプと、前記チャージポンプから吐出された作動油を前記閉回路に導くチャージ流路と、前記閉回路ポンプ及び前記開回路ポンプの吐出容量を制御するコントローラと、を備える作業機械において、
前記閉回路の余剰な作動油を前記チャージ流路に排出する余剰油排出装置を備え、
前記コントローラは、前記チャージ流路の圧力が所定の圧力閾値以上の状態から前記圧力閾値未満の状態に遷移した場合、または、前記作業装置が掘削作業を行っていない状態から掘削作業を行う状態に遷移した場合、前記開回路ポンプの吐出容量を増加させる、あるいは、前記閉回路ポンプの吐出容量を減少させる
ことを特徴とする作業機械。 - 請求項1に記載の作業機械において、
前記チャージ流路の圧力を検出する圧力センサを含み、
前記コントローラは、前記圧力センサにより検出された前記チャージ流路の圧力が前記圧力閾値以上から前記圧力閾値未満に低下した場合、前記開回路ポンプの吐出容量を増加させる
ことを特徴とする作業機械。 - 請求項2に記載の作業機械において、
前記コントローラは、前記圧力センサにより検出された前記チャージ流路の圧力が前記圧力閾値以上から前記圧力閾値未満に低下した場合、前記閉回路ポンプの吐出容量を保持しつつ、前記開回路ポンプの吐出容量を増加させる
ことを特徴とする作業機械。 - 請求項2に記載の作業機械において、
前記コントローラは、
前記圧力センサにより検出された前記チャージ流路の圧力が前記圧力閾値以上から前記圧力閾値未満に低下した場合、前記閉回路ポンプの吐出流量の目標値から前記チャージポンプの吐出流量を減じた値を前記開回路ポンプの吐出流量の目標値として演算し、
演算された前記開回路ポンプの吐出流量の目標値に基づいて前記開回路ポンプの吐出容量を制御する
ことを特徴とする作業機械。 - 請求項2に記載の作業機械において、
前記コントローラは、前記圧力センサにより検出された前記チャージ流路の圧力が前記圧力閾値以上から前記圧力閾値未満に低下した場合、前記開回路ポンプの吐出容量を増加させるとともに前記閉回路ポンプの吐出容量を減少させる
ことを特徴とする作業機械。 - 請求項5に記載の作業機械において、
前記コントローラは、前記圧力センサにより検出された前記チャージ流路の圧力が前記圧力閾値以上から前記圧力閾値未満に低下した場合、前記閉回路ポンプの吐出流量と前記開回路ポンプの吐出流量の合計値が維持されるように、前記開回路ポンプの吐出容量を増加させるとともに前記閉回路ポンプの吐出容量を減少させる
ことを特徴とする作業機械。 - 請求項1に記載の作業機械において、
前記チャージ流路の圧力を検出する圧力センサを含み、
前記コントローラは、前記圧力センサにより検出された前記チャージ流路の圧力が前記圧力閾値以上から前記圧力閾値未満に低下した場合、前記閉回路ポンプの吐出容量を減少させる
ことを特徴とする作業機械。 - 請求項7に記載の作業機械において、
前記コントローラは、
前記圧力センサにより検出された前記チャージ流路の圧力が前記圧力閾値以上から前記圧力閾値未満に低下した場合、前記開回路ポンプの吐出流量の目標値に前記チャージポンプの吐出流量を加えた値を前記閉回路ポンプの吐出流量の目標値として演算し、
演算された前記閉回路ポンプの吐出流量の目標値に基づいて前記閉回路ポンプの吐出容量を制御する
ことを特徴とする作業機械。 - 請求項1に記載の作業機械において、
前記作業装置の姿勢を検出する姿勢検出装置と、前記作業装置を操作する操作装置と、を含み、
前記コントローラは、
前記姿勢検出装置からの信号に基づいて前記作業装置の姿勢または前記作業装置の先端の高さを判定し、
前記作業装置の姿勢または前記作業装置の先端の高さが所定の条件を満たす状態における前記操作装置からの信号に基づいて、前記作業装置による掘削作業が行われている状態であるか否かを判定し、
前記作業装置による掘削作業が行われていない状態から掘削作業が行われている状態に遷移した場合、
前記開回路ポンプの吐出容量を増加させるとともに前記閉回路ポンプの吐出容量を減少させる
ことを特徴とする作業機械。 - 請求項9に記載の作業機械において、
前記コントローラは、
前記操作装置からの信号に基づいて、掘削操作が行われているか否かを判定するとともに、
前記姿勢検出装置からの信号に基づいて、前記作業装置の先端が地面よりも下側に位置しているか否かを判定し、
前記作業装置の先端が地面よりも下側に位置し、かつ、前記掘削操作が行われている場合に、前記作業装置による掘削作業が行われている状態であると判定する
ことを特徴とする作業機械。 - 請求項9に記載の作業機械において、
前記コントローラは、前記作業装置による掘削作業が行われていない状態から掘削作業が行われる状態に遷移した場合、前記閉回路ポンプの吐出流量と前記開回路ポンプの吐出流量の合計値が維持されるように、前記開回路ポンプの吐出容量を増加させるとともに前記閉回路ポンプの吐出容量を減少させる
ことを特徴とする作業機械。 - 請求項9に記載の作業機械において、
前記コントローラは、
前記操作装置からの信号に基づいて、掘削操作が行われているか否かを判定するとともに、
前記姿勢検出装置からの信号に基づいて、前記作業装置の姿勢が掘削する姿勢であるか否かを判定し、
前記作業装置の姿勢が掘削する姿勢であり、かつ、前記掘削操作が行われている場合に、前記作業装置による掘削作業が行われている状態であると判定する
ことを特徴とする作業機械。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP23759688.7A EP4435271A1 (en) | 2022-02-24 | 2023-02-07 | Work machine |
CN202380015465.1A CN118434978A (zh) | 2022-02-24 | 2023-02-07 | 作业机械 |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2022-026879 | 2022-02-24 | ||
JP2022026879A JP2023123044A (ja) | 2022-02-24 | 2022-02-24 | 建設機械 |
JP2022-026846 | 2022-02-24 | ||
JP2022026846A JP2023123027A (ja) | 2022-02-24 | 2022-02-24 | 作業機械 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2023162684A1 true WO2023162684A1 (ja) | 2023-08-31 |
Family
ID=87765668
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2023/004058 WO2023162684A1 (ja) | 2022-02-24 | 2023-02-07 | 作業機械 |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP4435271A1 (ja) |
WO (1) | WO2023162684A1 (ja) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013174325A (ja) | 2012-02-27 | 2013-09-05 | Komatsu Ltd | 油圧駆動システム |
JP2014020431A (ja) * | 2012-07-17 | 2014-02-03 | Komatsu Ltd | 油圧駆動システム |
US20160076558A1 (en) * | 2013-04-22 | 2016-03-17 | Parker-Hannifin Corporation | Method of increasing electro-hydrostatic actuator piston velocity |
JP2019178760A (ja) * | 2018-03-30 | 2019-10-17 | 日立建機株式会社 | 建設機械 |
JP2021032361A (ja) * | 2019-08-26 | 2021-03-01 | 日立建機株式会社 | 建設機械 |
-
2023
- 2023-02-07 EP EP23759688.7A patent/EP4435271A1/en active Pending
- 2023-02-07 WO PCT/JP2023/004058 patent/WO2023162684A1/ja active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013174325A (ja) | 2012-02-27 | 2013-09-05 | Komatsu Ltd | 油圧駆動システム |
JP2014020431A (ja) * | 2012-07-17 | 2014-02-03 | Komatsu Ltd | 油圧駆動システム |
US20160076558A1 (en) * | 2013-04-22 | 2016-03-17 | Parker-Hannifin Corporation | Method of increasing electro-hydrostatic actuator piston velocity |
JP2019178760A (ja) * | 2018-03-30 | 2019-10-17 | 日立建機株式会社 | 建設機械 |
JP2021032361A (ja) * | 2019-08-26 | 2021-03-01 | 日立建機株式会社 | 建設機械 |
Also Published As
Publication number | Publication date |
---|---|
EP4435271A1 (en) | 2024-09-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6502499B2 (en) | Hydraulic recovery system for construction machine and construction machine using the same | |
US20100162885A1 (en) | System and method for enabling floating of earthmoving implements | |
KR20130140917A (ko) | 토공 기계의 블레이드 레벨 제어용 시스템 및 방법 | |
JP7499564B2 (ja) | 液圧ポンプ流量較正システム | |
US9328480B2 (en) | Hydraulic excavator | |
WO2020003811A1 (ja) | 建設機械 | |
WO2019043898A1 (ja) | 作業機械の制御システム及び作業機械の制御方法 | |
WO2020067053A1 (ja) | 作業車両 | |
WO2019012701A1 (ja) | 作業機械および作業機械の制御方法 | |
CN113396288A (zh) | 工程机械 | |
JP6605316B2 (ja) | 作業機械の駆動装置 | |
WO2023162684A1 (ja) | 作業機械 | |
JP2023123044A (ja) | 建設機械 | |
JP2020143446A (ja) | 建設機械 | |
KR102088784B1 (ko) | 작업 기계 및 작업 기계의 제어 방법 | |
JP2023123027A (ja) | 作業機械 | |
US11608610B2 (en) | Control of a hydraulic system | |
US12000118B2 (en) | Construction machine | |
EP3660223B1 (en) | Construction machinery | |
WO2022209920A1 (ja) | 作業機械 | |
JP2021021427A (ja) | 建設機械 | |
WO2024201853A1 (ja) | 建設機械 | |
WO2019012700A1 (ja) | 作業機械および作業機械の制御方法 | |
JP2022157924A (ja) | ショベル | |
JP2023150467A (ja) | 作業機械 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 23759688 Country of ref document: EP Kind code of ref document: A1 |
|
DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2023759688 Country of ref document: EP |
|
ENP | Entry into the national phase |
Ref document number: 2023759688 Country of ref document: EP Effective date: 20240620 |