Prior art keywords
consumer
power
planning
customer
contract
Prior art date
Application number
PCT/JP2022/005092
Other languages
English (en)
French (fr)
Inventor
眞 杉村
耕治 工藤
博 倉金
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to PCT/JP2022/005092 priority Critical patent/WO2023152820A1/ja
Publication of WO2023152820A1 publication Critical patent/WO2023152820A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Definitions

  • the present invention relates to a planning device, a planning method and a recording medium.
  • An example of the purpose of this disclosure is to provide a control device that can solve the above-described problems.
  • the planning device targets at least one customer who can be a provider of regulating power for stabilizing the power system.
  • the planning method includes: targeting at least one consumer who can be a provider of regulating power for stabilizing the power system; irrespective of whether or not there is a contract for the reserve providing service in at least one contract unit period of, planning an operation plan for the reserve providing service by the customer's system for a planning period including the contract unit period. .
  • the recording medium is provided to the computer for at least one consumer who can be a provider of a regulating power for stabilizing the electric power system, and for each consumer, a regulating power providing service irrespective of whether or not there is a contract for the reserve providing service in at least one contract unit period of, planning an operation plan for the reserve providing service by the system of the customer for a planning period including the contract unit period. It is a recording medium for recording a program for causing
  • FIG. 4 is a diagram showing an example of timing when a host controller according to the first embodiment plans allocation of a reserve control amount to a consumer. It is a figure which shows the example of the procedure of a process in the high-order control apparatus which concerns on 1st embodiment.
  • FIG. 10 is a diagram showing an example of setting the contract status of the reserve providing service in the optimization problem in the second embodiment;
  • FIG. 10 is a diagram showing an example of a processing procedure in which a higher-level control device according to the second embodiment performs a control power providing service;
  • FIG. 12 is a diagram showing an example of setting the contract status of the reserve providing service in the optimization problem in the third embodiment.
  • FIG. 10 is a diagram showing an example of a processing procedure for performing a control power providing service by a host controller according to the third embodiment; It is a figure which shows the example of a structure of the control apparatus which concerns on 4th embodiment. It is a figure which shows the example of the procedure of the process in the planning method which concerns on 5th embodiment.
  • 1 is a schematic block diagram showing a configuration of a computer according to at least one embodiment; FIG.
  • FIG. 1 is a diagram showing an example of the configuration of a power system according to the first embodiment.
  • the power system 1 includes a central power supply command system 11, an aggregation operator system 12, a first upper gateway device 21, a higher controller 22, a second upper gateway device 23, It includes a power system 30 , a consumer installation system 50 , and a large-scale power storage system 70 .
  • the customer installation system 50 includes a distribution board 51 , a power load 52 , a photovoltaic (PV) system 53 , and a power storage system 60 .
  • the power storage system 60 includes a lower gateway device 61 , a lower control device 62 , a power conditioning subsystem (PCS) 63 , and a storage battery 64 .
  • the large power storage system 70 includes a lower control device 71 , a power conditioning system 72 , and a large storage battery 73 . Also, in FIG. 1, a communication path is indicated by a dashed line, and a power path is indicated by a solid line.
  • the lower gateway device 61 and the lower control device 62 also consume power, but power is received in a configuration that does not disturb the AC side (distribution board 51 side) output of the power storage system 60 .
  • the central load dispatching system 11 is installed in the central load dispatching center of a power transmission and distribution operator, and controls the balance of power supply and demand in the power system 30 .
  • the central power supply command system 11 requests the host controller to provide an ancillary service for stabilizing the power system 30 by discharging or charging storage batteries provided by power consumers and the like.
  • the storage battery 64 and the large storage battery 73 correspond to examples of storage batteries used for ancillary services.
  • An electric power consumer is also simply called a consumer. When counting the number of consumers, it is also written as 1, 2, . . . or as 1, 2, .
  • the power system 30 is used for power transmission and distribution of commercial power under the supervision and control of a power transmission and distribution business operator.
  • the aggregation provider system 12 is provided in the equipment of the aggregator, and notifies the host controller 22 of information on energy resource aggregation.
  • information is automatically transmitted between devices will be described as an example, but part or all of the information transmission may be performed by a person such as sending an e-mail or FAX by a person in charge.
  • energy resource aggregation refers to providing an ancillary service to power transmission and distribution companies by collecting the charging and discharging of storage batteries provided by a plurality of consumers. Energy resource aggregation is also simply referred to as resource aggregation.
  • the aggregator here is a business operator that performs resource aggregation.
  • the aggregator may be hierarchically configured such as a resource aggregator (RA) and an aggregation coordinator (AC).
  • a resource aggregator collects charge/discharge of storage batteries provided by a plurality of consumers.
  • the aggregation coordinator further summarizes the charging/discharging power supply service that the resource aggregator has collected for a plurality of consumers and the like, and provides the service to the power transmission and distribution business operator.
  • the aggregation provider system 12 may be hierarchically provided by providing each of the layered aggregation service providers with the aggregation provider system 12 .
  • the upper first gateway device 21 mediates communication between the central power supply command system 11 and the upper control device 22 .
  • the host control device 22 causes a storage battery provided by a customer or the like to charge and discharge.
  • the high-level control device 22 can provide a relatively large amount of adjustment power by collecting charging and discharging of storage batteries provided by a plurality of consumers.
  • the upper-level second gateway device 23 mediates communication between the upper-level control device 22 and control devices installed at consumers and the like.
  • the low-level control device 62 and the low-level control device 71 correspond to an example of control devices installed in a customer's house or the like.
  • the subordinate control device 62 controls charging and discharging of the storage battery 64 in cooperation with the power conditioning system 63 .
  • the lower gateway device 61 may have a function of controlling the storage battery 64 in cooperation with the power conditioning system 63, or a part thereof.
  • the lower gateway device 61 also corresponds to an example of a control device installed in a consumer or the like.
  • the subordinate control device 71 cooperates with the power conditioning system 72 to control charging and discharging of the large storage battery 73 .
  • the host first gateway device 21, host controller 22, and host second gateway device 23 are provided in the facilities of a SaaS (Software As A Service or System As A Service) provider.
  • a SaaS provider provides a service that performs resource aggregation.
  • the aggregator uses the aggregation provider system 12 to notify the upper control device 22 of information on resource aggregation, and causes the upper control device 22 to execute resource aggregation.
  • An aggregator may have a higher-level controller. For example, the aggregation provider system 12 and the host controller 22 may be combined to form one system.
  • the customer installation system 50 is a system that combines power equipment and power loads installed in one customer, and a control device that controls the power equipment and power loads.
  • the customer installation system 50 corresponds to an example of a customer system.
  • the distribution board 51 is provided on the side of the customer installation system 50 at the interconnection point between the power system 30 and the customer installation system 50, and distributes electricity between the power system 30 and each device of the customer installation system 50. mediate the transaction. For example, during forward power flow in the distribution board 51 , the distribution board 51 distributes electricity (commercial power) supplied from the power system 30 to each device of the customer installation system 50 .
  • the power load 52 is a general term for equipment that consumes power.
  • the number of devices that constitute the power load 52 is not limited to a specific number. Also, the type of equipment that constitutes the power load 52 is not limited to a specific one.
  • the photovoltaic power generation system 53 receives sunlight to generate power and outputs AC power.
  • the power storage system 60 is a system that combines a storage battery 64 and a configuration that controls charging and discharging of the storage battery 64 .
  • the lower gateway device 61 mediates communication between the upper control device 22 and the lower control device 62 .
  • the lower gateway device 61 may have the function of controlling charging and discharging of the storage battery 64 in cooperation with the power conditioning system 63, or a part thereof.
  • the subordinate control device 62 controls charging and discharging of the storage battery 64 in cooperation with the power conditioning system 63 .
  • the lower control device 62 instructs the power conditioning system 63 to charge, discharge, or stop charging and discharging the storage battery 64, and the power conditioning system 63 causes the storage battery 64 to charge and discharge according to the instruction of the lower control device 62. , or the charging and discharging of the storage battery 64 is stopped.
  • the lower control device 62 particularly controls charging and discharging of the storage battery 64 in response to instructions or requests from the higher control device 22 .
  • the power conditioning system 63 converts between AC power and DC power. When charging the storage battery 64 , the power conditioning system 63 converts AC power from the distribution board 51 side into DC power and supplies the storage battery 64 with the DC power. When the storage battery 64 is discharged, the power conditioning system 63 converts the DC power from the storage battery 64 into AC power and supplies it to the distribution board 51 side.
  • the power conditioning system 63 controls charging and discharging of the storage battery 64 in cooperation with the subordinate control device 62 as described above. Any two of the lower gateway device 61, the lower control device 62, and the power conditioning system 63, or a combination of these three may be configured as one device.
  • the configuration of the customer installation system 50 is not limited to the configuration shown in FIG. 1, and various configurations including a storage battery and a mechanism for controlling charging and discharging of the storage battery can be employed.
  • the customer installation system 50 does not have to include the photovoltaic power generation system 53 .
  • the configuration of the customer installation system 50 may differ depending on the customer.
  • the power conditioning system 63 may be configured as a multi-input power conditioning system (hybrid PCS) such that both the storage battery 64 and the photovoltaic power generation system 53 are connected to the power conditioning system 63 .
  • the large-scale power storage system 70 provides a charging/discharging function for stabilizing the power system 30.
  • a low-order controller 71 controls charging and discharging of a large-sized storage battery 73 in cooperation with a power conditioning system 72 in accordance with instructions or requests from the high-rank controller 22 .
  • the low order control device 71 and the power conditioning system 72 may be combined to form one device. In that case, the low order control device 71 converts DC power and AC power between the electric power system 30 and the large storage battery 73 .
  • FIG. 2 is a diagram showing an example of the configuration of the host controller 22.
  • the upper control device 22 includes a reference value determination section 110 and a control information calculation section 120 .
  • the reference value determination unit 110 includes a constraint condition setting unit 111 , an operation plan formulation unit 112 and a reference value output unit 113 .
  • the upper controller 22 executes resource aggregation as described above.
  • An ancillary service for which resource aggregation is performed by the host controller 22 is also referred to as a coordination power providing service.
  • Bidding for the balancing power providing service is made in units of product blocks, which are contract unit periods of the balancing power providing service, and consumer list patterns in which consumers are grouped together. In other words, for each product block, it is assumed that any one of a plurality of consumer list patterns will be awarded the coordination power providing service.
  • the consumer list pattern corresponds to an example of a consumer group that includes multiple consumers and is the contract unit of the adjustment power provision service for each contract unit period (product block).
  • the fact that a customer is registered in the customer list pattern is an example of the customer being included in the customer group.
  • the fact that a customer is registered in a customer list pattern is also called that the customer is included in the customer list pattern.
  • the consumer is an example of a person who can be the provider of the reserve power in that it provides the reserve power when there is an agreement to provide the reserve power provision service.
  • the host controller 22 acquires the bidding result information of the balancing power providing service from the aggregation operator system 12, and allocates the securing balancing capacity amount to the consumer so that the contracted balancing capacity shown in the bidding result information can be secured. to plan In addition, it is assumed that the aggregator is required to report a reference value (baseline) to the supply and demand adjustment market at least a predetermined time before the start of the supply and demand provision service. The reference value is expressed in power value (eg, kilowatts (kW)). The control power is calculated as the difference between the power value and the reference value.
  • a reference value baseline
  • the reference value is expressed in power value (eg, kilowatts (kW)).
  • the control power is calculated as the difference between the power value and the reference value.
  • the host controller 22 plans allocation of the reserve control capacity to the customers before the reference value notification deadline, and in the plan, the reference value is set for each customer. decide.
  • the host controller 22 transmits the determined reference value for each consumer to the aggregation provider system 12, and the aggregation provider system 12 calculates the reference value for each consumer list pattern based on the reference value for each consumer. Calculate and report to the balancing market. It can be said that the reference value for each consumer list pattern is the reference value of the adjustability that the upper control device 22 aggregates by resource aggregation.
  • FIG. 3 is a diagram showing an example of timing when the host controller 22 plans allocation of the reserve control capacity amount to the consumer.
  • the example of FIG. 3 shows an example of a frame time every 30 minutes and an example of a command amount integrated value for each frame time.
  • product blocks are shown every 3 hours, such as 0:00 to 3:00, 3:00 to 6:00, and 6:00 to 9:00.
  • the gate close Gate Close; GC
  • GC the deadline for submitting plans for power generation and retail electricity business operators
  • submission of reference values in units is required. Therefore, the aggregator system 12 declares the reference value for each consumer list pattern as the reference value for the product block one and a half hours before the start of each product block.
  • the host controller 22 plans allocation of the reserve control capacity to the consumers, and determines in the plan for each consumer is communicated to the aggregation provider system 12.
  • the time widths and timings shown in FIG. 3 are examples, and the present invention is not limited to these.
  • the host controller 22 provides an energy management service to the customer installation system 50 .
  • the host controller 22 adjusts power supply and demand in the customer installation system 50 based on a predetermined purpose such as efficiency of power usage.
  • the host controller 22 plans charging and discharging of the storage battery 64 of the customer installation system 50 based on simultaneous multi-use in which the energy management service and the ancillary service are simultaneously performed.
  • the host control device 22 may provide the energy management service to some of the consumers targeted for the ancillary service. For example, there may be a customer installation system 50 that performs ancillary services but does not perform energy management.
  • the power storage system 60 may plan the energy management service.
  • the lower controller 62 may notify the upper controller 22 of the energy management service plan.
  • the upper controller 22 may plan the ancillary service in consideration of the energy management service plan notified from the lower controller 62 .
  • FIG. 4 is a diagram showing an example of a procedure of processing in the power system 1.
  • the aggregation provider system 12 notifies the contract-related information to the host controller 22 in advance (step S101).
  • the contract-related information includes information on contracts for provision of coordination power between the aggregator and each consumer.
  • the contract-related information includes information such as the customer list pattern, the content of the contract for providing adjustment power for each customer registered in the customer list pattern, and the specifications of the customer installation system 50. may be
  • the contract-related information includes information on the energy management service, such as the type of energy management service and the content of that service, for each consumer.
  • the aggregation operator system 12 notifies the upper control device 22 of the successful bid result (agreement result) at the time of winning the bid for the coordination power providing service (step S102). For example, bidding is done collectively for one week from Saturday to the following Friday.
  • the aggregation operator system 12 collects the winning bidder list pattern, the balancing power contract amount ( contracted control reserve amount) and information such as the contracted price are communicated to the host controller 22;
  • the host controller 22 determines a reference value for each customer (each customer installation system 50) registered in the customer list pattern that has made a successful bid for that product block, The system 12 is contacted (step S103).
  • the upper control device 22 performs an operation plan for determining the reference value for each product block 90 minutes before the start of the product block, and aggregates the reference values determined in the operation plan.
  • the operator system 12 is contacted.
  • the host controller 22 registers the contracted reserve control capacity amount notified from the aggregation operator system 12 in step S102 in the winning customer list pattern. Make a plan (draft) so as to allocate to the demanders who are present. The host controller 22 also plans the charging/discharging amount of the storage battery 64 in the energy management service for each consumer, and determines the reference value so as to include the planned charging/discharging amount.
  • the aggregation operator system 12 calculates a reference value for each consumer list pattern based on the reference value for each consumer registered in the successful bidder list pattern, and reports it to the supply and demand adjustment market system 13 .
  • the supply and demand adjustment market system 13 is a system that provides a supply and demand adjustment market, which is a market for supply and demand trading.
  • the host controller 22 makes an operation plan for implementing the flexibility providing service every predetermined period, such as every 15 minutes, and based on the operation plan. to control each consumer installation system 50 .
  • the host controller 22 receives status information of the customer-installed system 50 from the lower-level controller 62 of each customer-installed system 50 at predetermined intervals such as every 15 minutes (step S105). , and receives a notification of a control command from the central power supply command system 11 (step S106). In the control command from the central power supply command system 11, the required amount of control power is notified within the range of the contracted control power secured amount.
  • the host controller 22 determines the charge/discharge amount of the storage battery 64 of each customer, for example, every 30-minute frame time based on the notified required amount of control power, and sends the storage battery 64 to the lower controller 62. charge/discharge control (step S107).
  • the host controller 22 allocates the required controllability to the customers registered in the successful bidder list pattern within the range of the controllability secured amount for each customer determined in step S103.
  • the host controller 22 sums the charge/discharge amount for providing controllability allocated to each consumer and the charge/discharge amount for the energy management service planned in step S103. Then, the upper control device 22 notifies the lower control device 62 of control command information indicating the calculated charge/discharge amount. As a result, the upper control device 22 instructs the lower control device 62 to charge and discharge the storage battery 64 with the indicated charge/discharge amount.
  • the customer installation systems 50 of the customers registered in the winning customer list pattern are required to maintain the reference value even if they do not provide the adjustability.
  • the host controller 22 makes an operation plan for determining the reference value, for example, using the following information.
  • Information 1-1 Information on the specifications of each customer installation system 50 ⁇ Upper limit value (AC chargeable amount) [kWh] and lower limit value (AC dischargeable amount) [kWh] of the remaining amount of power storage allowed in the storage battery 64 ⁇ DC (direct current) maximum charge/discharge power value of storage battery 64 (charge power upper limit value [kW], discharge power upper limit value [kW]) ⁇ AC (alternating current) maximum charge/discharge power value of the power conditioning system 63 (charge power upper limit value [kW], discharge power upper limit value [kW]) ⁇ AC/DC conversion efficiency and DC/AC conversion efficiency of power conditioning system 63 ⁇ Type of power conditioning system 63 (hybrid PCS, separate PCS, etc.) ⁇ Maximum power value [kW] generated by photovoltaic power generation system 53 ⁇ Grid connection status (whether or not to allow reverse power flow due to frequency adjustment, etc.) ⁇ Maximum value of power purchased from the grid, maximum power sold from the grid (upper limit of power to be bought and sold with the grid) [kW]
  • Energy management service related information ⁇ Energy management service status (energy management service mode (type) such as peak cut, peak shift, self-consumption of solar power generation, etc.) ⁇ Peak cut threshold [kW] ⁇ Unit price of selling electricity [yen/kWh], unit price of purchasing electricity by time period [yen/kWh] ⁇ Energy management service plan (planned value for charging/discharging storage battery for each time slot)
  • Energy management service status energy management service mode (type) such as peak cut, peak shift, self-consumption of solar power generation, etc.)
  • Peak cut threshold [kW] Unit price of selling electricity [yen/kWh]
  • unit price of purchasing electricity by time period [yen/kWh] ⁇ Energy management service plan (planned value for charging/discharging storage battery for each time slot)
  • each product block for each service (primary reserve capacity, secondary reserve capacity (1), secondary reserve capacity (2), etc.), the customer list pattern and reserve capacity contract amount that have made a successful bid. It is included in the successful bid result information acquired from the aggregation operator system 12 in S102.
  • Information obtained by the upper controller 22 from the lower controller 62 2-1 Electric power supply and demand information of each customer installation system 50 (each resource), customer load power amount cumulative value, generated power amount cumulative value, system power purchase amount cumulative value, system power sales cumulative value These information are obtained, for example, in step S105. It is included in the state information acquired from the lower control device 62 .
  • step S105 The state information acquired by the host controller 22 for the operation plan (step S107) for service implementation in a certain product block is used in the operation plan (step S103) for determining the reference value for the next product block. You may do so.
  • the host controller 22 uses this information to determine the frame time for 24 hours from the frame time next to the current time for all consumers (all consumers registered in any of the consumer list patterns). Every (30 minutes unit), the reference value of each customer installation system 50 and the available amount of adjustment power are calculated. At this time, as will be described later, for each product block, the host controller 22 sets the provision amount of adjustment power to 0 for the consumer installation system 50 of the customer for whom provision of adjustment power is not agreed in the product block. Calculate so that
  • the host controller 22 draws up a 24-hour plan as described above.
  • the period targeted for planning by the host controller 22 is not limited to 24 hours, and can be set to various periods including a plurality of product blocks.
  • step S102 the host control device 22 is notified by the aggregation operator system 12 of the sum of the available adjustment capacity amounts by the consumers registered in the successful bidder list pattern for each product block. Develop a plan to match the force commitment amount.
  • the host controller 22 makes a plan for determining the reference value, for example, in the following procedure.
  • A) Demand Prediction The host controller 22 collects power supply and demand information (cumulative value of consumer load power, cumulative value of generated power, etc.) of each customer installation system 50 (resource) from the lower controller 62, A load demand forecast for each customer installation system 50 for a predetermined period is performed.
  • the upper controller 22 receives energy management-related information (state of energy management, peak cut threshold, unit price of electricity sales, hourly purchase price, etc.), and determine the energy management that each consumer is implementing.
  • energy management-related information state of energy management, peak cut threshold, unit price of electricity sales, hourly purchase price, etc.
  • the host controller 22 sets the mode (kind) of the energy management service such as peak shift or peak cut, threshold values for peak cut, and hourly electricity rates for peak shift. Know the conditions.
  • the host controller 22 considers the plan and makes a plan for the control power providing service. draft.
  • the host controller 22 collects the latest information on the storage battery 64 of each consumer (the upper limit of charge/discharge of the storage battery 64, SOC, etc.) from the lower controller 62. .
  • the host controller 22 receives state information of each consumer installation system 50 and specification information of the power storage system 60 (the upper limit of charge of the storage battery 64) from the aggregation operator system 12. ⁇ Discharge upper limit value, upper limit value/lower limit value of remaining power storage capacity, AC/DC conversion efficiency/DC/AC conversion efficiency of power conditioning system 63, type of power conditioning system 63 (hybrid PCS, separate PCS), grid connection status etc.) are obtained.
  • the host controller 22 generates an optimization problem using these pieces of information, and formulates a plan by solving the obtained optimization problem. For example, the host controller 22 uses a constraint as an expression representing a limit or change that must be physically met.
  • the host controller 22 uses an objective function in which the evaluation becomes higher as the sum of the customer's monetary gain from the provision of controllability and the customer's monetary gain from the implementation of energy management for all consumers increases.
  • the objective function is such that the smaller the sum of the electricity charges for all consumers, the higher the evaluation.
  • the host controller 22 solves an optimization problem that searches for a solution that maximizes the evaluation indicated by the objective function under the obtained constraint conditions, thereby providing operation and energy management for providing adjustment power to each consumer. plan the operation of For example, the host controller 22 calculates the charge/discharge amount of the storage battery 64 by energy management, the reference value (reference value of control power), and the control power secured amount for each consumer and every 30-minute frame time. calculate.
  • the host controller 22 causes the charge/discharge amount of the storage battery 64 by the energy management to be reflected in the reference value. This can be done, for example, by including an expression representing the relationship between the charge/discharge amount of the storage battery 64 by energy management and the reference value in the constraint conditions.
  • the host controller 22 sets the provision amount of the balancing power to 0 for the consumer installed system 50 of the customer for whom provision of the balancing power is not contracted in the product block. Calculate so that
  • the reference value determining unit 110 performs various processes for determining the above-described reference value (adjustment power reference value) for each customer. For example, the reference value determination unit 110 performs the processing from steps S101 to S104 in FIG.
  • the constraint setting unit 111 sets constraints for the optimization problem for determining the reference value for each consumer.
  • the constraint condition setting unit 111 sets the amount of reserve capacity to be secured for a combination of commodity blocks and consumers for which there is no contract for the reserve provision service among the combinations of commodity blocks and consumers included in the planning period. Set a constraint including a formula to make it zero.
  • the constraint condition setting unit 111 determines the product block and its demand for consumers who are not registered in the consumer list pattern that has made a successful bid in that product block. Constraint conditions including a mathematical formula for setting the amount of control power to be secured in combination with a house to 0 are set.
  • the constraint setting unit 111 corresponds to an example of constraint setting means.
  • the operation of the customer installation system 50 related to energy management and the operation of the customer installation system 50 related to provision of adjustment power are performed. It is also conceivable to generate optimization problems separately for and . For example, regarding the operation of the customer installation system 50 related to energy management, it is conceivable to generate an optimization problem for a planning period such as 24 hours. In addition, regarding the operation of the customer installation system 50 related to the provision of adjustment power, for each product block, an optimization problem is generated for customers registered in the customer list pattern that has made a successful bid for that product block. can be considered.
  • the charge/discharge amount (both charge/discharge power and charge/discharge power amount) of the storage battery 64 there is a trade-off relationship between the amount that can be used in energy management and the amount that is secured for adjustment power. be.
  • the usable amount in energy management Alternatively, either the amount of reserve for adjustability will be determined first. For this reason, it is conceivable that an appropriate allocation between the usable amount for energy management and the reserved amount for adjustment power cannot be found.
  • the host controller 22 needs to repeatedly determine the reference value for each consumer every three hours (each product block). In addition, it is conceivable that there are many consumers to be planned, such as a maximum of 9999 consumers can be registered in one consumer list pattern. For this reason, when the host controller 22 calculates the reference value for each consumer, there are time limits and computational resource limits. For example, a method of repeatedly simulating the operation of the customer installation system 50 and searching for an operation with a high evaluation cannot be adopted.
  • the constraint condition setting unit 111 adjusts the combinations of product blocks and consumers included in the planning period for which there is no contract for the flexibility providing service, among the combinations of product blocks and consumers. Constraints are set including formulas for zeroing the amount of force to be secured.
  • the constraint setting unit 111 can set the reserve reserve amount to 0 for each product block for which the reserve provision service is not contracted.
  • the constraint set by the constraint setting unit 111 allows each customer to be treated as if it participates in the flexibility provision service throughout the planning period, and in fact the contract is not executed.
  • the validity of the plan obtained by solving the optimization problem can be ensured by setting the adjustability securing amount to 0 for the product block that does not have any.
  • the reference value determination unit 110 uses the constraint conditions set by the constraint condition setting unit 111 to operate the customer installation system 50 in energy management and to operate the customer installation system 50 in ensuring adjustment power for each product block.
  • the reference value determining unit 110 can make a plan for the adjustability providing service for a period longer than the product block.
  • the reference value determination unit 110 solves this optimization problem, it is processed by distinguishing whether or not the control power providing service is contracted. does not need to be changed.
  • the reserve amount of reserve capacity is 0 in product blocks for which there is no contract for the reserve provision service. This is consistent with the bidding status of the coordination power provision service.
  • the constraint setting unit 111 may set a constraint including a mathematical formula for setting the reserve reserve amount to 0 for a combination of a product block and a customer for which there is no contract for the reserve provision service.
  • the constraint setting unit 111 may set a constraint including an equation for substituting 0 for a variable indicating the amount of reserve reserve in a combination of a product block and a customer for which no contract for reserve provision service is made. may As a result, even in the plan obtained by solving the optimization problem by the reference value determination unit 110, it is expected that the reserve amount of reserve capacity will be 0 for the combination of the commodity block and the consumer for which there is no contract for the reserve provision service. .
  • the constraint setting unit 111 may set a constraint including a formula for setting the reserve capacity to 0 for a combination of a product block and a customer list pattern for which there is no contract for the reserve provision service. .
  • the constraint setting unit 111 sets a constraint including an equation for substituting 0 for a variable indicating the amount of reserves to be secured in a combination of a product block for which no contract for the reserves provision service is made and a customer squirrel pattern. You may do so.
  • the constraints of the optimization problem include an expression indicating that the amount of reserve control power in a customer list pattern is the sum of the reserve amounts of control power of all consumers included in the consumer list pattern.
  • the constraint condition setting unit 111 or the operation planning unit 112 includes, in the product block and the consumer list pattern, a mathematical formula for setting the secured adjustment capacity to 0 for the combination of the product block and the consumer list pattern. It is also possible to develop a mathematical formula for setting the amount of controllability to be secured to 0 for each combination with a consumer. As a result, in the plan obtained by solving the optimization problem by the reference value determination unit 110, it is expected that the reserve amount of reserve capacity will be 0 for the combination of the commodity block and the customer for which there is no contract for the reserve provision service. .
  • the constraint setting unit 111 provides a mathematical formula for setting the reserve reserve amount to 0 for a combination of a product block and a customer for which there is no contract for the reserve provision service, It is also possible to provide a mathematical formula for setting the secured amount of controllability to 0 for a combination of a product block and a consumer list pattern that do not have one.
  • the constraint condition setting unit 111 sets the reserve reserve amount to 0 for a combination of a commodity block and a customer for which no contract for the reserve provision service is provided, instead of setting the reserve reserve amount to 0.
  • a mathematical formula may be provided for setting the secured amount of adjustability to 0 for a combination of a commodity block with no contract and a consumer list pattern.
  • Constraint condition setting unit 111 sets a constraint condition including a mathematical formula that sets the remuneration unit price of the control power providing service to 0 or less for combinations of product blocks and consumers for which the control power providing service is not contracted. good too.
  • an evaluation function in the optimization problem an evaluation function can be used that indicates a higher evaluation as the sum of monetary benefits of all consumers in the optimization problem increases.
  • the reference value determination unit 110 calculates the amount of controllability to be secured as 0 for product blocks and consumers whose unit reward is 0 or negative, based on the above evaluation function. .
  • the operation planning unit 112 for each of all consumers targeted by the host controller 22, regardless of whether or not there is an agreement for the flexibility providing service in each product block, throughout the planning period including a plurality of product blocks. Based on the power supply and demand situation in the consumer installation system 50, an operation plan for the power supply providing service is drawn up.
  • an operation plan for the adjustment power providing service and energy management during the planning period is drawn up.
  • the operation plan formulation unit 112 determines a reference value for each consumer in the formulation of the operation plan.
  • the operation plan formulation unit 112 corresponds to an example of an operation plan formulation means.
  • the constraint condition setting unit 111 may include constraint conditions based on the power supply and demand situation in the customer installation system 50 in the constraint conditions of the optimization problem.
  • the solving of the optimization problem by the operation planning unit 112 corresponds to an example of planning the operation plan of the flexibility providing service based on the power supply and demand situation in the customer installation system 50 .
  • the state of power supply and demand in the customer installation system 50 referred to here can be various situations related to the power supply and demand in the customer installation system 50 .
  • the constraint setting unit 111 receives information from the aggregation operator system 12 and information from the lower control device 62 (static information such as specification information and dynamic information such as state information) as described above. ) may be used to set constraints for the optimization problem.
  • the constraint condition setting unit 111 sets a constraint condition including a formula that sets the remuneration unit price of the reserve power providing service to 0 or less for the combination of the contract unit period and the consumer in which the reserve reserve service is not contracted. may be set.
  • the operation planning unit 112 may solve the optimization problem using an evaluation function that indicates a higher evaluation as the total monetary gain of all consumers targeted for the optimization problem increases.
  • the reference value output unit 113 notifies the aggregation operator system 12 of the reference value for each consumer determined by the operation plan planning unit 112 .
  • the control information calculation unit 120 determines the charge/discharge amount of the storage battery 64 of each consumer, and performs various processes for instructing the lower control device 62 to perform charge/discharge control. For example, the control information calculator 120 performs the processing from steps S105 to S107 in FIG.
  • the operation planning unit 112 targets at least one consumer who can be a provider of the balancing power for stabilizing the power system. Regardless of whether or not there is a contract for the product block, an operation plan for the adjustment power providing service by the customer installation system 50 of the customer in the planning period including the product block is drawn up.
  • the operation planning unit 112 draws up an operation plan for the reserve providing service, regardless of whether the reserve providing service is contracted in the combination of the customer and the contract unit period of the reserve providing service. .
  • the host controller 22 it is possible to formulate a plan for the control power providing service without having to select the target of the plan according to the contract status of the control power providing service.
  • the operation planning unit 112 a combination of a consumer and a contract unit period for which there is no contract for the flexibility provision service can be included in the plan.
  • the plan for the coordination power providing service in each product block can be drafted by reflecting not only the impact of implementation of other services in the product block but also the impact of implementation of other services over the entire planning period.
  • the operation planning unit 112 can plan the coordination power providing service by reflecting the influence of other services with relatively high accuracy.
  • the operation planning unit 112 draws up an operation plan for the control power providing service based on the power supply and demand situation in the customer installation system 50 . As a result, it is expected that the operation plan formulation unit 112 can formulate an operation plan for the coordination power providing service with high accuracy.
  • the constraint setting unit 111 sets constraints including a mathematical formula for setting the reserve capacity of the reserve provision service to 0 for combinations of product blocks and consumers for which there is no contract for the reserve provision service.
  • the operation planning unit 112 solves an optimization problem using the constraints set by the constraint setting unit 111, thereby drawing up an operation plan for the flexibility providing service during the planning period.
  • the constraint setting unit 111 can set the reserve reserve amount to 0 for each product block for which the reserve provision service is not contracted.
  • the constraint set by the constraint setting unit 111 allows each customer to be treated as if it participates in the flexibility provision service throughout the planning period, and in fact the contract is not executed.
  • the validity of the plan obtained by solving the optimization problem can be ensured by setting the adjustability securing amount to 0 for the product block that does not have any.
  • the reference value determination unit 110 uses the constraint conditions set by the constraint condition setting unit 111 to operate the customer installation system 50 in energy management and to operate the customer installation system 50 in ensuring adjustment power for each product block.
  • the reference value determining unit 110 can make a plan for the adjustability providing service for a period longer than the product block.
  • the reference value determination unit 110 solves this optimization problem, it is processed by distinguishing whether or not the control power providing service is contracted. does not need to be changed.
  • the reserve amount of reserve capacity is 0 in product blocks for which there is no contract for the reserve provision service. This is consistent with the bidding status of the coordination power provision service.
  • the constraint setting unit 111 sets a constraint including a formula for setting the reserve reserve amount to 0 for a combination of a commodity block and a customer for which there is no contract for reserve provision service.
  • the constraint setting unit 111 sets a constraint including a formula for setting the reserve capacity to 0 for a combination of a product block and a consumer list pattern for which no agreement of the reserve provision service is made.
  • the secured amount of balancing power in the customer list pattern is the total amount of secured balancing power of the customers included in the customer list pattern.
  • the product block and the consumer list pattern It is expected that the amount of controllability secured in the combination with each consumer included in is zero.
  • the constraint setting unit 111 sets constraint conditions including a mathematical formula that sets the remuneration unit price of the reserve providing service to 0 or less for combinations of product blocks and consumers for which the reserve providing service is not contracted.
  • the operation planning unit 112 solves an optimization problem using an evaluation function that indicates a higher evaluation as the total monetary gain of all consumers targeted for the optimization problem increases.
  • the reference value determination unit 110 calculates the amount of controllability to be secured as 0 for product blocks and consumers whose unit reward is 0 or negative, based on the above evaluation function. .
  • a second embodiment and a third embodiment describe a more specific example of the first embodiment.
  • the power system and the individual configurations of its parts are the same as those described in the first embodiment.
  • the second and third embodiments will also be described using the configurations shown in FIGS. 1 and 2.
  • FIG. 5 is a diagram showing an example of setting the contract status of the control power providing service in the optimization problem in the second embodiment.
  • nine consecutive product blocks #1 to #9 are shown. It is assumed that 24 hours, which is the length of time for eight consecutive product blocks out of the nine, is the length of time for which the host controller 22 draws up an operation plan.
  • FIG. 5 shows consumer list patterns that have won bids for each of the nine product blocks.
  • FIG. 5 shows five consumer list patterns C1, C2, C3, C4 and C8. Among these consumer list patterns, the following consumers are registered in the consumer list patterns C1 and C3, respectively.
  • Consumer list pattern C1 A1-A40
  • Consumer list pattern C3 A1-A20, B1-B20
  • the reference value determining unit 110 sets an optimization problem for individual consumer list patterns. Specifically, the reference value determining unit 110 sets an optimization problem for consumers A1 to A40 registered in the consumer list pattern that have won bids in the product block for which the reference value is to be determined.
  • a product block whose reference value is to be determined is referred to as a target product block.
  • a customer list pattern in which the target product block is successfully bid is referred to as a target customer list pattern.
  • the reference value determination unit 110 applies a mathematical formula based on the successful bid result to the consumer registered in the target consumer list pattern. generated and included in the constraint.
  • the constraint condition setting unit 111 sets a mathematical formula for setting the secured adjustment capacity to 0 for the consumers registered in the target consumer list pattern. generated and included in the constraint.
  • the constraint setting unit 111 includes, in the constraint, a mathematical expression that makes the amount of adjustment power secured in the customer installation system 50 of each customer registered in the target customer list pattern zero.
  • the constraint setting unit 111 may include in the constraint a mathematical expression for setting the amount of control force to be secured to 0.
  • the constraint setting unit 111 may include in the constraint a mathematical expression that sets the remuneration unit price of the adjustability provision service to 0 or less.
  • the reference value determination unit 110 draws up a 24-hour operation plan for the customer installation system 50 of the customer registered in the customer list pattern C1, and determines the reference value for each customer in the commodity block #1. decide.
  • the constraint condition setting unit 111 sets the product blocks #1 and #5 for which the consumer list pattern C1 has been successfully bid, for each consumer registered in the consumer list pattern C1, a mathematical formula based on the successful bid result in the constraints.
  • the constraint condition setting unit 111 registers the product blocks #2, #3, #4, #6, #7, and #8 for which the consumer list pattern C1 has not been successfully bid, in the consumer list pattern C1.
  • the constraints include a formula that makes the amount of controllability secured to be 0 for each customer who is in the line.
  • the reference value determining unit 110 draws up a 24-hour operation plan for the customer installation system 50 of the customer registered in the customer list pattern C3, and determines the reference value for each customer in the commodity block #2. decide.
  • the constraint condition setting unit 111 determines the successful bid result for each consumer registered in the consumer list pattern C3 for product blocks #2, #3, and #8 for which the consumer list pattern C3 has been successfully bid. Include formulas based on in constraints. On the other hand, for product blocks #4, #5, #6, #7 and #8 for which the consumer list pattern C3 has not been successfully bid, the constraint condition setting unit 111 sets each demand registered in the consumer list pattern C3. Concerning the house, a mathematical expression that makes the amount of control power to be secured equal to 0 is included in the constraint conditions.
  • the constraint setting unit 111 sets the product blocks included in the planning period and the consumers registered in the consumer list patterns that do not have a contract for the balancing power provision service in the product blocks among the consumer list patterns.
  • a constraint condition including a mathematical formula for setting the secured amount of controllability to 0 is set for each consumer list pattern.
  • the operation planning unit 112 solves an optimization problem for each customer list pattern using the constraint conditions for each customer list pattern.
  • the operation plan formulation unit 112 formulates a plan based on both the adjustment power provision service and the energy management service plan for the product block for which the target customer list pattern is successfully bid.
  • the operation planning unit 112 substantially does not plan for the responsiveness providing service for product blocks for which the target consumer list pattern has not been successfully bid, and makes a plan based only on the energy management service.
  • FIG. 6 is a diagram showing an example of a processing procedure in which the host control device 22 according to the second embodiment performs the adjustability providing service.
  • the host controller 22 performs the process of FIG. 6 for each product block before the aggregation operator system 12 declares the reference value to the supply and demand adjustment market system 13 .
  • the host controller 22 starts a loop L1 for performing processing for each customer list pattern (step S201).
  • the reference value determining unit 110 draws up an operation plan for the consumer list pattern to be processed in the loop L1 (step S202).
  • the reference value determining unit 110 formulates an operation plan by setting and solving an optimization problem for the consumer list pattern to be processed in the loop L1.
  • the reference value determination unit 110 adjusts the customer installation system 50 of the customer registered in the customer list pattern for which the reference value is to be determined (the customer list pattern for which the next product block is bid). It determines the amount of power to be secured, determines the reference value, and determines the control of the equipment of the customer installation system 50 for energy management. For other customer-installed systems 50, the reference value determining unit 110 determines control of devices of the customer-installed systems 50 for energy management.
  • the reference value output unit 113 determines whether or not the customer list pattern to be processed in the loop L1 is the customer list pattern that has won a successful bid in the next product block (the product block whose time comes next). is determined (step S203).
  • the reference value output unit 113 aggregates the reference values of each consumer registered in the consumer list pattern. It is transmitted to the provider system 12 (step S204).
  • the host control device 22 performs termination processing of the loop L1 (step S205). Specifically, the host controller 22 determines whether or not the loop L1 has been processed for all consumer list patterns. If the host control device 22 determines that there is an unprocessed consumer list pattern, the process returns to step S201, and the host control device 22 continues the processing of the loop L1 for the unprocessed consumer list pattern. On the other hand, if it is determined that the loop L1 has been processed for all consumer list patterns, the host controller 22 terminates the loop L1.
  • step S205 when the host controller 22 ends the loop L1, the control information calculation unit 120 waits for the arrival of the time of the product block to which the reference value output unit 113 sent the reference value in step S204, and The system 50 is controlled (step S206).
  • the control information calculator 120 notifies the lower controller 62 of the control command information and instructs it to control each part of the customer installation system 50 .
  • the control information calculation unit 120 performs control for providing adjustment power and control for energy management for the customer installation system 50 of the customer registered in the customer list pattern for which the product block was successfully bid. conduct. As for other consumer installation systems 50, the control information calculation unit 120 performs control for energy management.
  • step S206 the host controller 22 terminates the processing of FIG.
  • step S203 determines in step S203 that the pattern is not the consumer list pattern for which the next product block has been successfully bid (step S203: NO)
  • step S203 determines in step S203 that the pattern is not the consumer list pattern for which the next product block has been successfully bid (step S203: NO)
  • the constraint condition setting unit 111 determines that the product block included in the planning period and the demand that is registered in the customer list pattern that does not have a contract for the balancing power provision service in the product block among the customer list patterns.
  • Constraint conditions including a mathematical formula for setting the amount of controllability to be secured to 0 are set for each consumer list pattern for combinations with houses.
  • the operation planning unit 112 solves an optimization problem for each customer list pattern using the constraint conditions for each customer list pattern.
  • the scale of the optimization problem is relatively small in that the optimization problem is generated for one consumer list pattern.
  • the host controller 22 according to the second embodiment is expected to obtain a highly evaluated solution to the optimization problem in a relatively short period of time.
  • each optimization problem can be solved by parallel processing, and it is expected that the calculation time is relatively short.
  • FIG. 7 is a diagram showing an example of setting the contract status of the control power providing service in the optimization problem in the third embodiment.
  • FIG. 7 also shows nine consecutive product blocks from #1 to #9, and the consumer list pattern for each product block is the same as in FIG. is. It is assumed that the consumers registered in each consumer list pattern are the same as in the case of FIG. In particular, 40 customers from A1 to A40 are registered in the customer list pattern C1, and 40 customers from A1 to A20 and B1 to B20 are registered in the customer list pattern C3. It is assumed that the customer is registered. In this way, customers A1 to A20 are registered in both customer list patterns C1 and C3, while customer list patterns C2, C4 and C5 overlap with both customer list patterns C1 and C3. It is assumed that there are no customers registered with It is also assumed that the length of time for the host controller 22 to formulate an operation plan is 24 hours, as in the case of FIG.
  • the reference value determination unit 110 sets an optimization problem targeting all consumers (all consumers registered in at least one consumer list pattern). Accordingly, in the third embodiment, handling of consumers registered in a plurality of consumer list patterns is different from that in the second embodiment. In the third embodiment, the reference value determining unit 110 generates an optimization problem that reflects the agreement by bidding for each customer list pattern for customers registered in a plurality of customer list patterns.
  • the reference value determining unit 110 determines the reference value for the product block #1, among the customers registered in the customer list pattern C1 for which a successful bid has been made, customers A1 to A20 are included in the customer list It is also registered in pattern C3.
  • consumers A1 to A20 are not only the product blocks #1 and #5 for which the customer list pattern C1 has been successfully bid, but also the product blocks #2, #3 and the product blocks for which the consumer list pattern C3 has been successfully bid. #8 is also contracted.
  • the reference value determining unit 110 sets the optimization problem for all consumers
  • the constraint condition setting unit 111 sets the constraint condition reflecting the successful bids of all consumer list patterns. do. Therefore, the constraint setting unit 111 determines which of the product blocks #1, #2, #3, #5, and #8 for the customers A1 to A20 in the optimization problem for the operation plan in the product block #1. Set constraints that also reflect commitments. In addition, the constraint condition setting unit 111 reflects any contracts of product blocks #2, #3, #5, and #8 for consumers A1 to A20 in the optimization problem for the operation plan in product block #1. set constraints.
  • FIG. 8 is a diagram showing an example of a processing procedure in which the host control device 22 according to the third embodiment performs the adjustability providing service.
  • the host controller 22 performs the process of FIG. 8 for each product block before the aggregation operator system 12 declares the reference value to the supply and demand adjustment market system 13 .
  • the reference value determining unit 110 draws up an operation plan for all consumers (step S301). As described above, the reference value determining unit 110 formulates an operation plan by setting and solving an optimization problem for all consumers.
  • the reference value determination unit 110 determines the reference value for the customer installation system 50 (the customer installation system 50 of the customer registered in the customer list pattern for which the successful bid is made in the next product block). It determines the amount of controllability to be secured, determines the reference value, and determines the control of the equipment of the customer installation system 50 for energy management. For other customer-installed systems 50, the reference value determining unit 110 determines control of devices of the customer-installed systems 50 for energy management.
  • the host controller 22 starts a loop L2 for performing processing for each consumer list pattern (step S302).
  • the reference value output unit 113 determines whether or not the customer list pattern to be processed in the loop L2 is the customer list pattern that has won a successful bid in the next product block (the product block whose time comes next). is determined (step S303).
  • the reference value output unit 113 aggregates the reference values of each consumer registered in the consumer list pattern. It is transmitted to the provider system 12 (step S304).
  • the host control device 22 performs termination processing of the loop L2 (step S305). Specifically, the host controller 22 determines whether or not the loop L2 has been processed for all consumer list patterns. If the host control device 22 determines that there is an unprocessed consumer list pattern, the process returns to step S302, and the host control device 22 continues the processing of loop L2 for the unprocessed consumer list pattern. On the other hand, when determining that the loop L2 has been processed for all consumer list patterns, the host controller 22 terminates the loop L2.
  • step S305 when the upper control device 22 ends the loop L2, the control information calculation unit 120 waits for the arrival of the time of the product block to which the reference value output unit 113 sent the reference value in step S304.
  • the system 50 is controlled (step S306).
  • the control information calculator 120 notifies the lower controller 62 of the control command information and instructs it to control each part of the customer installation system 50 .
  • the control information calculation unit 120 performs control for providing adjustment power and control for energy management for the customer installation system 50 of the customer registered in the customer list pattern for which the product block was successfully bid. conduct. As for other consumer installation systems 50, the control information calculation unit 120 performs control for energy management.
  • step S306 the host controller 22 terminates the processing of FIG.
  • step S303: NO the reference value output unit 113 determines in step S303 that the pattern is not the consumer list pattern for which the next product block has been successfully bid (step S303: NO)
  • step S305 the process proceeds to step S305.
  • the constraint condition setting unit 111 selects, among combinations of product blocks included in the planning period and customers included in at least one of a plurality of customer list patterns, the contracted power supply service contract Constraint conditions including a mathematical formula for setting the secured amount of adjustability to 0 for combinations of product blocks and consumers with no Set the constraints for the optimization problem of .
  • the operation planning unit 112 solves an optimization problem for all customers included in at least one of a plurality of customer list patterns.
  • the optimization problem is generated by reflecting the agreement by the successful bid of all the consumer list patterns in which the consumer is registered, and the plan is created. can draft.
  • the host controller 22 according to the third embodiment is expected to be able to formulate a plan with high accuracy.
  • a consumer registered in a plurality of consumer list patterns is not repeatedly subjected to the optimization problem for each consumer list pattern. It can be evaluated that the scale of the problem is relatively small.
  • one optimization problem is generated for all consumers, so the number of optimization problems to be solved can be reduced.
  • the host controller 22 targets only all consumers belonging to a plurality of contracted consumer list patterns during a predetermined period of the planning target instead of all consumers. good. This can reduce the computational cost.
  • the third embodiment does not require parallel processing, so the use cost of the optimization calculation execution environment is is expected to be relatively inexpensive.
  • FIG. 9 is a diagram showing an example of the configuration of a control device according to the fourth embodiment. With the configuration shown in FIG.
  • the operation planning unit 611 targets at least one customer who can be a provider of the balancing power for stabilizing the power system. For each customer, at least one contract unit period of the balancing power provision service irrespective of whether or not there is a contract for the reserve providing service, an operation plan for the reserve providing service by the customer's system for a planned period including the contract unit period is drawn up.
  • the operation plan making unit 611 corresponds to an example of an operation plan making means.
  • the operation planning unit 611 draws up an operation plan for the reserve providing service regardless of whether the reserve providing service is contracted in the combination of the customer and the contract unit period of the reserve providing service. .
  • the planning device 610 it is possible to formulate a plan for the control power providing service without having to select the target of the plan according to the contract status of the control power providing service.
  • plan for the flexibility provision service for each contract unit period should reflect not only the impact of other services during the contract unit period, but also the impact of other services during the entire planning period. can be done.
  • the planning device 610 in this respect, it is possible to formulate a plan for the coordination power providing service by reflecting the influence of other services with relatively high accuracy.
  • FIG. 10 is a diagram showing an example of processing procedures in the planning method according to the fifth embodiment.
  • the planning method shown in FIG. 10 includes drafting an operation plan (step S611).
  • step S611 the computer solves an optimization problem using constraints to formulate an operation plan for the coordination power providing service during the planning period.
  • a combination of a consumer and a contract unit period for which there is no contract for the flexibility providing service can also be included in the plan.
  • the planning method shown in FIG. 10 it is possible to simultaneously implement the flexibility provision service and a service (referred to as "other services") that preferably has a planning period including multiple contract unit periods, such as peak shift.
  • the plan for the flexibility provision service for each contract unit period should reflect not only the impact of other services during that contract unit period, but also the impact of other services over the entire planning period. be able to.
  • FIG. 11 is a schematic block diagram showing the configuration of a computer according to at least one embodiment;
  • computer 700 includes CPU 710 , main memory device 720 , auxiliary memory device 730 , interface 740 , and nonvolatile recording medium 750 .
  • any one or more of the upper control device 22 and the planning device 610 or a part thereof may be implemented in the computer 700 .
  • the operation of each processing unit described above is stored in the auxiliary storage device 730 in the form of a program.
  • the CPU 710 reads out the program from the auxiliary storage device 730, develops it in the main storage device 720, and executes the above processing according to the program.
  • the CPU 710 secures storage areas corresponding to the storage units described above in the main storage device 720 according to the program.
  • Communication between each device and another device is executed by the interface 740 having a communication function and performing communication under the control of the CPU 710 .
  • the interface 740 also has a port for the nonvolatile recording medium 750 and reads information from the nonvolatile recording medium 750 and writes information to the nonvolatile recording medium 750 .
  • the host controller 22 When the host controller 22 is implemented in the computer 700, the operation of each part thereof is stored in the auxiliary storage device 730 in the form of a program.
  • the CPU 710 reads out the program from the auxiliary storage device 730, develops it in the main storage device 720, and executes the above processing according to the program.
  • the CPU 710 secures a storage area in the main storage device 720 for the host controller 22 to perform processing according to the program. Communication between the host controller 22 and other devices is performed by the interface 740 having a communication function and operating under the control of the CPU 710 . Interaction between host controller 22 and the user is executed by interface 740 having an input device and an output device, presenting information to the user through the output device under the control of CPU 710, and accepting user operations through the input device. be.
  • the operation of each part thereof is stored in the auxiliary storage device 730 in the form of a program.
  • the CPU 710 reads out the program from the auxiliary storage device 730, develops it in the main storage device 720, and executes the above processing according to the program.
  • the CPU 710 secures a storage area in the main storage device 720 for the planning device 610 to perform processing according to the program. Communication between the planning device 610 and other devices is performed by the interface 740 having a communication function and operating under the control of the CPU 710 . Interaction between the planning device 610 and the user is executed by the interface 740 having an input device and an output device, presenting information to the user through the output device under the control of the CPU 710, and accepting user operations through the input device. .
  • any one or more of the programs described above may be recorded in the nonvolatile recording medium 750 .
  • the interface 740 may read the program from the nonvolatile recording medium 750 . Then, the CPU 710 directly executes the program read by the interface 740, or it may be temporarily stored in the main storage device 720 or the auxiliary storage device 730 and then executed.
  • a program for executing all or part of the processing performed by the host controller 22 and the planning device 610 is recorded on a computer-readable recording medium, and the program recorded on this recording medium is transferred to the computer system. Each part may be processed by reading and executing.
  • the "computer system” referred to here includes hardware such as an OS and peripheral devices.
  • “computer-readable recording medium” refers to portable media such as flexible discs, magneto-optical discs, ROM (Read Only Memory), CD-ROM (Compact Disc Read Only Memory), hard disks built into computer systems It refers to a storage device such as
  • the program may be for realizing part of the functions described above, or may be capable of realizing the functions described above in combination with a program already recorded in the computer system.
  • the present invention may be applied to a planning device, a planning method, and a recording medium.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

計画装置が、電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間における前記調整力提供サービスの約定の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案する運用計画立案手段を備える。

Description

計画装置、計画方法および記録媒体
 本発明は、計画装置、計画方法および記録媒体に関する。
 電力需要家が備える蓄電池を用いて、電力系統安定化のための調整力を提供するアンシラリー(Ancillary)サービスが知られている(例えば、特許文献1参照)。
日本国特開2020-137368号公報
 調整力提供サービス(アンシラリーサービス)の約定状況に応じて計画の対象を選択する必要なしに、調整力提供サービスの計画を立案できることが好ましい。
 この開示の目的の一例は、上述した課題を解決することのできる制御装置を提供することである。
 本発明の第一の態様によれば、計画装置は、電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間における前記調整力提供サービスの約定の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案する運用計画立案手段を備える。
 本発明の第二の態様によれば、計画方法は、コンピュータが、電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間における前記調整力提供サービスの約定の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案することを含む。
 本発明の第三の態様によれば、記録媒体は、コンピュータに、電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間における前記調整力提供サービスの約定の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案することを実行させるためのプログラムを記録する記録媒体である。
 本発明によれば、調整力提供サービスの約定状況に応じて計画の対象を選択する必要なしに、調整力提供サービスの計画を立案できる。
第一実施形態に係る電力システムの構成の例を示す図である。 第一実施形態に係る上位制御装置の構成の例を示す図である。 第一実施形態に係る上位制御装置が需要家への調整力確保量の割当の計画を行うタイミングの例を示す図である。 第一実施形態に係る上位制御装置における処理の手順の例を示す図である。 第二実施形態における最適化問題での、調整力提供サービスの約定状況の設定の例を示す図である。 第二実施形態に係る上位制御装置が調整力提供サービスを行う処理手順の例を示す図である。 第三実施形態における最適化問題での、調整力提供サービスの約定状況の設定の例を示す図である。 第三実施形態に係る上位制御装置が調整力提供サービスを行う処理手順の例を示す図である。 第四実施形態に係る制御装置の構成の例を示す図である。 第五実施形態に係る計画方法における処理の手順の例を示す図である。 少なくとも1つの実施形態に係るコンピュータの構成を示す概略ブロック図である。
 以下、本発明の実施形態を説明するが、以下の実施形態は請求の範囲にかかる発明を限定するものではない。また、実施形態の中で説明されている特徴の組み合わせの全てが発明の解決手段に必須であるとは限らない。
<第一実施形態>
 図1は、第一実施形態に係る電力システムの構成の例を示す図である。図1に示す構成で、電力システム1は、中央給電指令システム11と、アグリゲーション事業者システム12と、上位側第一ゲートウェイ装置21と、上位制御装置22と、上位側第二ゲートウェイ装置23と、電力系統30と、需要家設置システム50と、大型蓄電システム70とを備える。
 需要家設置システム50は、分電盤51と、電力負荷52と、太陽光発電(Photovoltaic;PV)システム53と、蓄電システム60とを備える。蓄電システム60は、下位側ゲートウェイ装置61と、下位制御装置62と、パワーコンディショニングシステム(Power Conditioning Subsystem;PCS)63と、蓄電池64とを備える。
 大型蓄電システム70は、下位制御装置71とパワーコンディショニングシステム72と、大型蓄電池73とを備える。
 また、図1では、通信経路を破線で示し、電力経路を実線で示している。図1において、下位側ゲートウェイ装置61および下位制御装置62も電力を消費しているが、蓄電システム60のAC側(分電盤51側)出力の擾乱にならない構成で受電されている。
 中央給電指令システム11は、送配電事業者の中央給電指令所に設けられ、電力系統30における電力の需給バランスを制御する。また、中央給電指令システム11は、電力需要家等が備える蓄電池の放電または充電によって電力系統30の安定化を図るアンシラリーサービスの提供を上位制御装置に要求する。図1の例では、蓄電池64および大型蓄電池73が、アンシラリーサービスに用いられる蓄電池の例に該当する。
 電力需要家を単に需要家とも称する。需要家の数を数える際、1件、2件、・・・とも表記する、あるいは、1つ、2つ、・・・とも表記する。
 電力系統30は、送配電事業者の監視制御のもと、商用電力の送配電に用いられる。
 アグリゲーション事業者システム12は、アグリゲータ(Aggregator)の設備に設けられ、エネルギーリソースアグリゲーション(Energy Resource Aggregation)に関する情報を上位制御装置22に通知する。なお、以下では装置間で自動的に情報伝達が行われる場合を例に説明するが、情報伝達の一部または全部が、担当者によるメールまたはFAXの送信など人間によって行われていてもよい。
 ここでいうエネルギーリソースアグリゲーションは、複数の需要家等が備える蓄電池の充放電を取りまとめて送配電事業者にアンシラリーサービスを提供することである。エネルギーリソースアグリゲーションを、単にリソースアグリゲーションとも称する。
 ここでいうアグリゲータは、リソースアグリゲーションを行う事業者である。
 アグリゲータが、リソースアグリゲータ(Resource Aggregator;RA)と、アグリゲーションコーディネータ(Aggregation Coordinator;AC)とによって構成されるなど、アグリゲータが階層的に構成されていてもよい。リソースアグリゲータは、複数の需要家等が備える蓄電池の充放電を取りまとめる。アグリゲーションコーディネータは、リソースアグリゲータが複数の需要家等について取り纏めた充放電電力提供サービスを、複数のリソースアグリゲータについてさらに取り纏めて送配電事業者にサービス提供する。
 この場合、階層化されたアグリゲーションサービス事業者の各々がアグリゲーション事業者システム12を備えることで、アグリゲーション事業者システム12が階層的に設けられていてもよい。
 上位側第一ゲートウェイ装置21は、中央給電指令システム11と上位制御装置22との通信を仲介する。
 上位制御装置22は、中央給電指令システム11からの要求に応じて、需要家等が備える蓄電池に充放電を行わせる。上位制御装置22は、複数の需要家等が備える蓄電池の充放電を取りまとめることで、比較的大容量の調整力を提供することができる。
 上位側第二ゲートウェイ装置23は、上位制御装置22と需要家等に設置されている制御装置との通信を仲介する。図1の例では、下位制御装置62および下位制御装置71が、需要家等に設置されている制御装置の例に該当する。下位制御装置62は、パワーコンディショニングシステム63と協働して蓄電池64の充放電を制御する。あるいは、下位側ゲートウェイ装置61が、パワーコンディショニングシステム63と協働して蓄電池64を制御する機能、あるいはその一部を有していてもよい。この場合、下位側ゲートウェイ装置61も、需要家等に設置されている制御装置の例に該当する。下位制御装置71は、パワーコンディショニングシステム72と協働して大型蓄電池73の充放電を制御する。
 上位側第一ゲートウェイ装置21と、上位制御装置22と、上位側第二ゲートウェイ装置23とは、SaaS(Software As A Service、または、System As A Service)事業者の設備に設けられている。
 ここでは、SaaS事業者は、リソースアグリゲーションを実行するサービスを提供する。アグリゲータは、アグリゲーション事業者システム12を用いてリソースアグリゲーションに関する情報を上位制御装置22に通知し、上位制御装置22にリソースアグリゲーションを実行させる。
 アグリゲータが上位制御装置を有していてもよい。例えば、アグリゲーション事業者システム12と、上位制御装置22とが組み合わさって1つのシステムとして構成されていてもよい。
 需要家設置システム50は、1つの需要家に設けられている電力設備および電力負荷と、それら電力設備および電力負荷を制御する制御装置との組み合わせによるシステムである。
 需要家設置システム50は、需要家のシステムの例に該当する。
 分電盤51は、電力系統30と需要家設置システム50との連系点の需要家設置システム50側に設けられ、電力系統30と、需要家設置システム50の各機器との間の電気のやり取りを仲介する。例えば、分電盤51における順潮流時には、分電盤51は、電力系統30から供給される電気(商用電力)を、需要家設置システム50の各機器に分配する。
 電力負荷52は、電力を消費する機器の総称である。電力負荷52を構成する機器の個数は、特定の個数に限定されない。また、電力負荷52を構成する機器の種類も、特定のものに限定されない。
 太陽光発電システム53は、太陽光を受けて発電し、交流電力を出力する。
 蓄電システム60は、蓄電池64と、蓄電池64の充放電を制御する構成との組み合わせによるシステムである。
 下位側ゲートウェイ装置61は、上位制御装置22と下位制御装置62との通信を仲介する。上述したように、下位側ゲートウェイ装置61が、パワーコンディショニングシステム63と協働して蓄電池64の充放電を制御する機能、またはその一部を有していてもよい。
 下位制御装置62は、パワーコンディショニングシステム63と協働して蓄電池64の充放電を制御する。例えば、下位制御装置62が、蓄電池64の充電、放電、または充放電停止をパワーコンディショニングシステム63に指示し、パワーコンディショニングシステム63が、下位制御装置62の指示に従って、蓄電池64に充放電を行わせ、または、蓄電池64の充放電を停止させる。
 下位制御装置62は、特に、上位制御装置22からの指示または要求に応じて、蓄電池64の充放電を制御する。
 パワーコンディショニングシステム63は、交流電力と直流電力との変換を行う。蓄電池64の充電時には、パワーコンディショニングシステム63は、分電盤51側からの交流電力を直流電力に変換して蓄電池64に供給する。蓄電池64の放電時には、パワーコンディショニングシステム63は、蓄電池64からの直流電力を交流電力に変換し、分電盤51側に供給する。
 また、パワーコンディショニングシステム63は、上記のように、下位制御装置62と協働して蓄電池64の充放電を制御する。
 下位側ゲートウェイ装置61、下位制御装置62、および、パワーコンディショニングシステム63のうち何れか2つ、またはこれら3つが組み合わさって1つの装置として構成されていてもよい。
 需要家設置システム50の構成は、図1に示す構成に限定されず、蓄電池およびその蓄電池の充放電を制御する機構を備えるいろいろな構成とすることができる。たとえば、需要家設置システム50が太陽光発電システム53を備えていなくてもよい。
 また、需要家によって需要家設置システム50の構成が異なっていてもよい。例えば、蓄電池64および太陽光発電システム53の何れもパワーコンディショニングシステム63に接続されるなど、パワーコンディショニングシステム63が、マルチ入力型のパワーコンディショニングシステム(ハイブリッドPCS)として構成されていてもよい。
 大型蓄電システム70は、電力系統30の安定化のための充放電機能を提供する。大型蓄電システム70では、下位制御装置71が、上位制御装置22からの指示または要求に応じて、パワーコンディショニングシステム72と協働して大型蓄電池73の充放電を制御する。また、下位制御装置71とパワーコンディショニングシステム72とが組み合わさって1つの装置として構成されていてもよい。その場合、下位制御装置71は、電力系統30と大型蓄電池73との間の、直流電力と交流電力との変換を行う。
 図2は、上位制御装置22の構成の例を示す図である。図2に示す構成で、上位制御装置22は、基準値決定部110と、制御情報算出部120とを備える。基準値決定部110は、制約条件設定部111と、運用計画立案部112と、基準値出力部113とを備える。
 上位制御装置22は、上記のようにリソースアグリゲーションを実行する。上位制御装置22がリソースアグリゲーションの対象とするアンシラリーサービスを調整力提供サービスとも称する。調整力提供サービスの落札は、調整力提供サービスの約定単位期間である商品ブロック、および、需要家をグループに纏めた需要家リストパターンを単位として行われるものとする。すなわち、商品ブロック毎に、複数の需要家リストパターンのうち何れかについて、調整力提供サービスが落札されるものとする。
 需要家リストパターンは、複数の需要家を含み約定単位期間(商品ブロック)毎の調整力提供サービスの約定の単位となる需要家グループの例に該当する。需要家が需要家リストパターンに登録されていることは、その需要家が需要家グループに含まれることの例に該当する。需要家が需要家リストパターンに登録されていることを、その需要家が需要家リストパターン含まれるとも称する。
 需要家は、調整力の提供者の例に該当する。また、需要家は、調整力提供サービスの約定がある場合に調整力の提供を行う点で、調整力の提供者たり得る者の例に該当する。
 上位制御装置22は、調整力提供サービスの落札結果情報をアグリゲーション事業者システム12から取得し、落札結果情報に示される調整力約定量を確保できるように、需要家への調整力確保量の割当を計画する。
 また、調整力提供サービス開始より所定時間以上前に、アグリゲータが需給調整市場に対して基準値(ベースライン)を申告するように要求されるものとする。基準値は、電力値(例えば、キロワット(kW))で表される。調整力は、その電力値と基準値との差で計算される。
 上記の基準値申告の要求に対し、上位制御装置22は、基準値の申告期限よりも前に、需要家への調整力確保量の割当を計画し、計画において、需要家毎に基準値を決定する。上位制御装置22は、決定した需要家毎の基準値をアグリゲーション事業者システム12に送信し、アグリゲーション事業者システム12は、需要家毎の基準値に基づいて需要家リストパターン単位での基準値を算出し、需給調整市場に申告する。需要家リストパターン単位での基準値は、上位制御装置22がリソースアグリゲーションで纏められた調整力の基準値、といえる。
 図3は、上位制御装置22が需要家への調整力確保量の割当の計画を行うタイミングの例を示す図である。
 図3の例で、30分毎のコマ時間と、コマ時間毎の指令量積算値の例とが示されている。
 また、図3では、0時から3時、3時から6時、6時から9時のように6つのコマ時間を合わせた3時間毎の商品ブロックが示されている。各商品ブロックの開始1時間前に、発電・小売電気事業者の計画提出期限であるゲートクローズ(Gate Close;GC)が設定されており、ゲートクローズよりも30分以上前に、需要家リストパターン単位での基準値を提出することが要求される。したがって、アグリゲーション事業者システム12は、各商品ブロックの開始1時間半前までに、その商品ブロックについての基準値として、需要家リストパターン単位での基準値を申告する。
 上位制御装置22は、アグリゲーション事業者システム12が需要家リストパターン単位での基準値を申告するのに先立って、需要家への調整力確保量の割当を計画し、計画において決定する需要家毎の基準値をアグリゲーション事業者システム12に連絡する。
 ただし、図3に示す時間幅およびタイミングは例であり、これらに限定されない。
 また、上位制御装置22は、需要家設置システム50に対してエネルギーマネージメントサービスを提供する。エネルギーマネージメントサービスでは、上位制御装置22は、例えば電力利用の効率化など所定の目的に基づいて、需要家設置システム50における電力需給を調整する。
 特に、上位制御装置22は、エネルギーマネージメントサービスとアンシラリーサービスとを同時に実行する同時マルチユースに基づいて、需要家設置システム50の蓄電池64の充放電を計画する。
 上位制御装置22が、アンシラリーサービスの対象となる需要家のうち一部の需要家についてエネルギーマネージメントサービスを提供するようにしてもよい。例えば、アンシラリーサービスは実施するがエネルギーマネージメントは実施しない需要家設置システム50があってもよい。
 また、一部の需要家では、蓄電システム60がエネルギーマネージメントサービスの計画を行うようにしてもよい。この場合、下位制御装置62が上位制御装置22にエネルギーマネージメントサービスの計画を通知するようにしてもよい。そして、上位制御装置22が、下位制御装置62から通知されたエネルギーマネージメントサービスの計画を考慮してアンシラリーサービスの計画を行うようにしてもよい。
 図4は、電力システム1における処理の手順の例を示す図である。
 図4の処理で、アグリゲーション事業者システム12は、予め、契約関連情報を上位制御装置22に通知する(ステップS101)。契約関連情報には、アグリゲータと各需要家との間の、調整力の提供についての契約に関する情報が含まれる。例えば、契約関連情報には、需要家リストパターンと、需要家リストパターンに登録されている需要家毎の、調整力提供の契約内容、および、需要家設置システム50の仕様等の情報が含まれていてもよい。
 また、アグリゲータと需要家との間でエネルギーマネージメントサービスが締結されている場合、需要家毎の、エネルギーマネージメントサービスの種類およびそのサービスの内容など、エネルギーマネージメントサービスに関する情報が契約関連情報に含まれていてもよい。
 また、アグリゲーション事業者システム12は、調整力提供サービスの落札時に、落札結果(約定結果)を上位制御装置22に連絡する(ステップS102)。例えば、落札は、土曜日から次の金曜日までの1週間分纏めて行われる。アグリゲーション事業者システム12は、落札された1週間分の商品ブロック毎、かつ、調整力提供サービスの種類が複数ある場合はサービスの種類毎に、落札された需要家リストパターン、調整力約定量(約定された調整力確保量)、および、約定価格などの情報を上位制御装置22に連絡する。
 また、上位制御装置22は、商品ブロック毎に、その商品ブロックで落札された需要家リストパターンに登録されている需要家毎(需要家設置システム50毎)の基準値を決定し、アグリゲーション事業者システム12に連絡する(ステップS103)。上記のように、上位制御装置22は、商品ブロック毎に、その商品ブロックの開始90分前よりも前に、基準値の決定のための運用計画を行い、運用計画で決定した基準値をアグリゲーション事業者システム12に連絡する。
 基準値の決定のための運用計画では、上位制御装置22は、ステップS102でアグリゲーション事業者システム12から通知される、約定された調整力確保量を、落札された需要家リストパターンに登録されている需要家に割り振るように、計画を立てる(立案する)。
 上位制御装置22は、各需要家について、エネルギーマネージメントサービスでの蓄電池64の充放電量も計画し、計画した充放電量を含むように基準値を決定する。
 アグリゲーション事業者システム12は、落札された需要家リストパターンに登録されている需要家毎の基準値に基づいて、需要家リストパターン単位での基準値を算出し、需給調整市場システム13に申告する(ステップS104)。需給調整市場システム13は、調整力取引の市場である需給調整市場を提供するシステムである。
 調整力サービスの実施期間(商品ブロックの期間到来時)においては、上位制御装置22は、例えば15分毎など所定期間毎に、調整力提供サービス実施のための運用計画を行い、運用計画に基づいて各需要家設置システム50を制御する。
 具体的には、上位制御装置22は、15分毎など所定期間毎に、各需要家設置システム50の下位制御装置62から、その需要家設置システム50の状態情報の連絡を受け(ステップS105)、また、中央給電指令システム11から制御指令の通知を受ける(ステップS106)。中央給電指令システム11から制御指令では、約定された調整力確保量の範囲内で、調整力の要求量が通知される。
 次に、上位制御装置22は、通知された調整力の要求量に基づいて、例えば30分のコマ時間毎に各需要家の蓄電池64の充放電量を決定し、下位制御装置62に蓄電池64の充放電制御を指示する(ステップS107)。
 上位制御装置22は、要求される調整力を、落札された需要家リストパターンに登録されている需要家に、ステップS103で決定した需要家毎の調整力確保量の範囲内で割り振る。
 上位制御装置22は、各需要家に割り振った調整力提供のための充放電量と、ステップS103で計画したエネルギーマネージメントサービスのための充放電量とを合計する。そして、上位制御装置22は、算出した充放電量を示す制御指令情報を下位制御装置62に通知する。これにより、上位制御装置22は、示される充放電量で蓄電池64に充放電を行わせるように、下位制御装置62に指示する。
 落札された需要家リストパターンに登録されている需要家の需要家設置システム50は、調整力を提供しない場合でも、基準値を維持することが要求される。
 上記のステップS103での、上位制御装置22による基準値の決定について、さらに説明する。
 上位制御装置22は、例えば以下の情報を用いて基準値の決定のための運用計画を行う。
1.上位制御装置22が、アグリゲーション事業者システム12から取得する情報
1-1.各需要家設置システム50の仕様の情報
・蓄電池64で許容される、蓄電残量の上限値(AC充電可能量)[kWh]、下限値(AC放電可能量)[kWh]
・蓄電池64のDC(直流)最大充放電電力値(充電電力上限値[kW]、放電電力上限値[kW])
・パワーコンディショニングシステム63のAC(交流)最大充放電電力値(充電電力上限値[kW]、放電電力上限値[kW])
・パワーコンディショニングシステム63のAC/DC変換効率、DC/AC変換効率
・パワーコンディショニングシステム63のタイプ(ハイブリッドPCS、セパレートPCSなど)
・太陽光発電システム53の発電最大電力値[kW]
・系統連系状態(周波数調整による逆潮流を許可するか否か、など)
・系統買電最大電力値、系統売電最大電力値(系統と売買する電力の上限値)[kW]
 これらの情報は、例えば、ステップS101でアグリゲーション事業者システム12から取得する契約関連情報に含まれる。
1-2.エネルギーマネージメントサービス関連情報
・エネルギーマネージメントサービス状態(ピークカット、ピークシフト、太陽光発電の自家消費など、エネルギーマネージメントサービスのモード(種類))
・ピークカット閾値[kW]
・売電料金単価[円/kWh]、時間帯別の買電料金単価[円/kWh]
・エネルギーマネージメントサービスの計画(時間帯毎の蓄電池の充放電の計画値)
 これらの情報は、例えば、ステップS101でアグリゲーション事業者システム12から取得する契約関連情報に含まれる。
1-3.各商品ブロックにおける、サービス毎(一次調整力、二次調整力(1)、二次調整力(2)など)の、落札された需要家リストパターンおよび調整力約定量
 この情報は、例えば、ステップS102でアグリゲーション事業者システム12から取得する落札結果情報に含まれる。
2.上位制御装置22が、下位制御装置62から取得する情報
2-1.各需要家設置システム50(各リソース)の電力需給情報
・需要家負荷電力量累積値
・発電電力量累積値
・系統買電量累積値
・系統売電量累積値
 これらの情報は、例えば、ステップS105で下位制御装置62から取得する状態情報に含まれる。
2-2.最新の蓄電池の情報
・AC(交流)充放電可能電力値(蓄電池64の充電上限値[kW]、放電上限値[kW])
・蓄電残量(SOC(State Of Charge))
 これらの情報は、例えば、ステップS105で下位制御装置62から取得する状態情報に含まれる。上位制御装置22が、ある商品ブロックにおけるサービス実施のための運用計画(ステップS107)のために取得する状態情報を、次の商品ブロックにおける基準値の決定のための運用計画(ステップS103)に用いるようにしてもよい。
 上位制御装置22は、これらの情報を用いて、全需要家(何れかの需要家リストパターンに登録されている全ての需要家)について、現在時刻の次のコマ時間から24時間分、コマ時間毎(30分単位)に、各需要家設置システム50の基準値、および、調整力の提供可能量を算出する。
 その際、後述するように、上位制御装置22は、各商品ブロックについて、その商品ブロックで調整力の提供が約定されていない需要家の需要家設置システム50については、調整力の提供量が0になるように計算を行う。
 ここで、エネルギーマネージメントサービスについて、1日分など比較的長時間の計画を立案することが好ましい場合がある。例えば、ピークシフトについて有効な計画を立案するためには、電気料金が安い時間帯と、電気料金が高い時間帯とが計画に含まれている必要がある。そこで、上位制御装置22は、上記のように24時間の計画を立案する。
 ただし、上位制御装置22が計画の対象とする期間は、24時間に限定されず、複数の商品ブロックを含むいろいろな期間とすることができる。
 上位制御装置22は、各商品ブロックについて、落札された需要家リストパターンに登録されている需要家による調整力の提供可能量の総和が、ステップS102でアグリゲーション事業者システム12から通知される、調整力約定量に一致するように計画を立案する。
 上位制御装置22は、例えば、以下のような手順で、基準値の決定のための計画の立案を行う。
(A)需要予測
 上位制御装置22は、下位制御装置62から、各需要家設置システム50(リソース)の電力需給情報(需要家負荷電力量累積値、発電電力量累積値など)を収集し、所定期間の各需要家設置システム50の負荷需要予測を行う。
(B)エネルギーマネージメントの判定
 上位制御装置22は、アグリゲーション事業者システム12、または、下位制御装置62から、エネルギーマネージメント関連情報(エネルギーマネージメントの状態、ピークカット閾値、売電料金単価、時間帯別の買電料金単価など)を入手し、各需要家が実施しているエネルギーマネージメントを判定する。
 具体的には、上位制御装置22は、ピークシフトまたはピークカットなどエネルギーマネージメントサービスのモード(種類)、および、ピークカットの場合の閾値、および、ピークシフトの場合の時間帯別の電気料金などの条件を把握する。需要家のエネルギーマネージメントが計画されている場合、あるいは、上位制御装置22が需要家のエネルギーマネージメントの計画を立案する場合、上位制御装置22は、その計画を考慮して調整力提供サービスの計画を立案する。
(C)最新の蓄電池の状況の収集
 上位制御装置22は、下位制御装置62から、各需要家の蓄電池64の最新の情報(蓄電池64の充電上限値・放電上限値、SOCなど)を収集する。
(D)需要家の静的な情報の入手
 上位制御装置22は、アグリゲーション事業者システム12から、各需要家設置システム50の状態情報、および、蓄電システム60の仕様情報(蓄電池64の充電上限値・放電上限値、蓄電残量の上限値・下限値、パワーコンディショニングシステム63のAC/DC変換効率・DC/AC変換効率、パワーコンディショニングシステム63のタイプ(ハイブリッドPCS、セパレートPCS)、系統連系状態など)を入手する。
(E)調整力約定量の入手
 上位制御装置22は、アグリゲーション事業者システム12から、各商品ブロックにおける、サービス毎(一次調整力、二次調整力(1)、二次調整力(2)など)の、落札された需要家リストパターンおよび調整力約定量を入手する。
(F)計画の立案
 上位制御装置22は、これらの情報を用いて最適化問題を生成し、得られた最適化問題を解くことで計画を立案する。例えば、上位制御装置22は、物理的に満たさなければならない制限または変化を表す式を制約条件とする。
 また、上位制御装置22は、調整力提供による需要家の金銭的利得、および、エネルギーマネージメント実施による需要家の金銭的利得の全需要家についての合計が大きいほど評価が高くなる目的関数を用いる。需要家の買電電力については、電気料金の全需要家についての合計が小さいほど評価が高くなる目的関数とする。
 上位制御装置22は、得られた制約条件の下で、目的関数が示す評価がなるべく高くなる解を探索する最適化問題を解くことで、各需要家の調整力提供用の運用およびエネルギーマネージメント用の運用を計画する。例えば、上位制御装置22は、需要家毎、かつ、30分のコマ時間毎に、エネルギーマネージメントによる蓄電池64の充放電量と、基準値(調整力の基準値)と、調整力確保量とを算出する。
 その際、上位制御装置22は、エネルギーマネージメントによる蓄電池64の充放電量が基準値に反映されるようにする。このことは、例えば、エネルギーマネージメントによる蓄電池64の充放電量と基準値との関係を示す式を制約条件に含めることで行うことができる。
 また、後述するように、上位制御装置22は、各商品ブロックについて、その商品ブロックで調整力の提供が約定されていない需要家の需要家設置システム50については、調整力の提供量が0になるように計算を行う。
 図2に示す構成で、基準値決定部110は、上述した需要家毎の基準値(調整力の基準値)を決定するための各種処理を行う。例えば、基準値決定部110は、図4のステップS101からS104までの処理を行う。
 制約条件設定部111は、需要家毎の基準値を決定するための最適化問題の制約条件を設定する。特に、制約条件設定部111は、計画期間に含まれる商品ブロックと需要家との組み合わせのうち、調整力提供サービスの約定が無い、商品ブロックと需要家との組み合わせについて、調整力の確保量を0にするための数式を含む制約条件を設定する。
 すなわち、制約条件設定部111は、上述した24時間の計画期間に含まれる商品ブロック毎に、その商品ブロックで落札された需要家リストパターンに登録されていない需要家について、その商品ブロックとその需要家との組み合わせにおける調整力の確保量を0にするための数式を含む制約条件を設定する。
 制約条件設定部111は、制約条件設定手段の例に該当する。
 ここで、上記のように計画期間を24時間に設定する場合など、計画期間に複数の商品ブロックが含まれる場合、落札された需要家リストパターンが商品ブロック毎に異なることが考えられる。この場合、最適化問題の対象となる需要家設置システム50が商品ブロック毎に異なる。
 このように、最適化問題の対象となる需要家設置システム50が商品ブロック毎に異なる場合、エネルギーマネージメントに係る需要家設置システム50の運用と、調整力の提供に係る需要家設置システム50の運用とで最適化問題を別々に生成することも考えられる。
 例えば、エネルギーマネージメントに係る需要家設置システム50の運用については、24時間等の計画期間について最適化問題を生成することが考えられる。また、調整力の提供に係る需要家設置システム50の運用については、商品ブロック毎に、その商品ブロックで落札された需要家リストパターンに登録されている需要家を対象として最適化問題を生成することが考えられる。
 しかしながら、この方法では、エネルギーマネージメントのための需要家設置システム50の運用と、調整力の提供のための需要家設置システム50の運用との関係を計画に十分反映することができない。この点で、計画の精度が低くなってしまうと考えられる。
 例えば、蓄電池64の充放電量(充放電電力、および、充放電電力量のいずれも)について、エネルギーマネージメントでの使用可能分と、調整力のための確保の分とは、トレードオフの関係にある。これに対し、エネルギーマネージメントに係る需要家設置システム50の運用と、調整力の提供に係る需要家設置システム50の運用とで最適化問題を別々に生成する場合、エネルギーマネージメントでの使用可能分、または、調整力のための確保の分の何れかを先に決定することになる。このため、エネルギーマネージメントでの使用可能分と、調整力のための確保の分との適切な配分を見いだせないことが考えられる。
 また、上位制御装置22は、需要家毎の基準値の決定を、3時間毎(商品ブロック毎)に繰り返し行う必要がある。また、1つの需要家リストパターンに最大9999件の需要家を登録可能であるなど、計画の対象となる需要家が多いことが考えられる。このことから、上位制御装置22が需要家毎の基準値を算出する際、時間上の制限および計算資源上の制限がある。例えば、需要家設置システム50の運用のシミュレーションを繰り返し実行して評価の高い運用を探索するといった方法は、採用できないと考えられる。
 そこで、制約条件設定部111は、上記のように、計画期間に含まれる商品ブロックと需要家との組み合わせのうち、調整力提供サービスの約定が無い、商品ブロックと需要家との組み合わせについて、調整力の確保量を0にするための数式を含む制約条件を設定する。
 制約条件設定部111は、制約条件の設定により、各需要家について、調整力提供サービスの約定がない商品ブロックでの調整力確保量が0となるようにすることができる。この点で、制約条件設定部111が設定する制約条件では、各需要家が、あたかも計画期間中ずっと調整力提供サービスに参加しているかのように扱うことができ、かつ、実際には約定がない商品ブロックでは調整力確保量を0とすることで、最適化問題を解いて得られる計画の妥当性を確保できる。
 基準値決定部110は、制約条件設定部111が設定する制約条件を用いて、エネルギーマネージメントにおける需要家設置システム50の運用と、商品ブロック毎の調整力の確保における需要家設置システム50の運用とを纏めて表す最適化問題を設定することができる。この点で、基準値決定部110が設定する最適化問題では、エネルギーマネージメントのための需要家設置システム50の運用と、調整力の提供のための需要家設置システム50の運用との関係が十分に反映されることが期待される。基準値決定部110がこの最適化問題を解いて得られる計画では、エネルギーマネージメントでの使用可能分と、調整力のための確保の分とが適切に配分されていることが期待される。
 また、基準値決定部110は、調整力提供サービスの計画を、商品ブロックよりも長い期間について立案することができる。
 また、調整力提供サービスの約定の有無が条件分岐ではなく数式で表されていることで、基準値決定部110がこの最適化問題を解く際、調整力提供サービスの約定の有無を区別して処理を変える必要がない。
 また上記のように、基準値決定部110がこの最適化問題を解いて得られる計画では、各需要家について、調整力提供サービスの約定が無い商品ブロックでは調整力の確保量が0になっている点で、調整力提供サービスの落札状況に整合している。
 制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量を0に設定する数式を含む制約条件を設定するようにしてもよい。例えば、制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせにおける調整力の確保量を示す変数に0を代入する等式を含む制約条件を設定するようにしてもよい。
 これにより、基準値決定部110が最適化問題を解いて得られる計画でも、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量が0になると期待される。
 制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家リストパターンとの組み合わせについて、調整力の確保量を0に設定する数式を含む制約条件を設定するようにしてもよい。例えば、制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家リスパターンとの組み合わせにおける調整力の確保量を示す変数に0を代入する等式を含む制約条件を設定するようにしてもよい。
 この場合、需要家リストパターンにおける調整力の確保量が、その需要家リストパターンに含まれる全需要家における調整力の確保量の合計であることを示す式が、最適化問題の制約条件に含まれていてもよい。あるいは、制約条件設定部111または運用計画立案部112が、商品ブロックと需要家リストパターンとの組み合わせについて、調整力の確保量を0に設定する数式を、商品ブロックと需要家リストパターンに含まれる各需要家との組み合わせについて、調整力の確保量を0に設定する数式に展開するようにしてもよい。
 これにより、基準値決定部110が最適化問題を解いて得られる計画で、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量が0になると期待される。
 制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量を0に設定する数式を設けることに加えて、調整力提供サービスの約定がない商品ブロックと需要家リストパターンとの組み合わせについて、調整力の確保量を0に設定する数式を設けるようにしてもよい。
 あるいは、制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量を0に設定する数式を設けることに代えて、調整力提供サービスの約定がない商品ブロックと需要家リストパターンとの組み合わせについて、調整力の確保量を0に設定する数式を設けるようにしてもよい。
 制約条件設定部111が、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力提供サービスの報酬単価を0またはそれ以下とする数式を含む制約条件を設定するようにしてもよい。この場合、最適化問題における評価関数として、最適化問題の対象の全需要家の金銭的利得の合計が大きいほど高い評価を示す評価関数を用いることができる。
 報酬単価が0またはそれ以下の場合、報酬単価に調整力提供量を乗算して算出される報酬(金銭的利得)も0またはそれ以下になる。このことから基準値決定部110が、上記の評価関数に基づいて、報酬単価が0またはマイナスになっている商品ブロックかつ需要家について、調整力の確保量を0と算出することが期待される。
 運用計画立案部112は、上位制御装置22が対象とする全ての需要家のそれぞれについて、個々の商品ブロックにおける調整力提供サービスの約定の有無にかかわらず、複数の商品ブロックを含む計画期間を通しての需要家設置システム50における電力需給の状況に基づいて、調整力提供サービスの運用計画を立案する。
 例えば、制約条件設定部111が設定した制約条件を用いた最適化問題を解くことで、計画期間における調整力提供サービスおよびエネルギーマネージメントの運用計画を立案する。特に、運用計画立案部112は、運用計画の立案において需要家毎の基準値を決定する。運用計画立案部112は、運用計画立案手段の例に該当する。
 制約条件設定部111が、最適化問題の制約条件に、需要家設置システム50における電力需給の状況に基づく制約条件を含めるようにしてもよい。この場合、運用計画立案部112が最適化問題を解くことは、需要家設置システム50における電力需給の状況に基づいて調整力提供サービスの運用計画を立案することの例に該当する。
 ここでいう、需要家設置システム50における電力需給の状況は、需要家設置システム50における電力の需給に関連するいろいろな状況とすることができる。例えば、制約条件設定部111が、上述したような、アグリゲーション事業者システム12からの情報、および、下位制御装置62からの情報(仕様情報などの静的情報、および、状態情報などの動的情報)に基づいて、最適化問題の制約条件を設定するようにしてもよい。
 上記のように、制約条件設定部111が、調整力提供サービスの約定がない約定単位期間と需要家との組み合わせについて、調整力提供サービスの報酬単価を0またはそれ以下とする数式を含む制約条件を設定するようにしてもよい。この場合、運用計画立案部112は、最適化問題の対象の全需要家の金銭的利得の合計が大きいほど高い評価を示す評価関数を用いた最適化問題を解くようにしてもよい。
 基準値出力部113は、運用計画立案部112が決定した需要家毎の基準値をアグリゲーション事業者システム12に連絡する。
 制御情報算出部120は、上述した、各需要家の蓄電池64の充放電量を決定し、下位制御装置62に充放電制御を指示するための各種処理を行う。例えば、制御情報算出部120は、図4のステップS105からS107までの処理を行う。
 以上のように、運用計画立案部112は、電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、少なくとも1つの商品ブロックにおける調整力提供サービスの約定の有無にかかわらず、その商品ブロックを含む計画期間におけるその需要家の需要家設置システム50による調整力提供サービスの運用計画を立案する。
 運用計画立案部112は、上記のように、需要家と、調整力提供サービスの約定単位期間との組み合わせにおける調整力提供サービスの約定の有無にかかわらず、調整力提供サービスの運用計画を立案する。上位制御装置22によれば、この点で、調整力提供サービスの約定状況に応じて計画の対象を選択する必要なしに、調整力提供サービスの計画を立案できる。
 また、運用計画立案部112によれば、調整力提供サービスの約定の無い、需要家と約定単位期間との組み合わせも、計画の対象に含めることができる。これにより、運用計画立案部112では、調整力提供サービスと、例えばピークシフトなど複数の商品ブロックを含む計画期間を設けることが好ましいサービス(「他のサービス」と称する)との同時実施の際に、個々の商品ブロックにおける調整力提供サービスの計画を、その商品ブロックにおける他のサービスの実施の影響だけでなく、計画期間全体における他のサービスの実施の影響を反映して立案することができる。運用計画立案部112によれば、この点で、他のサービスの影響を比較的高精度に反映して調整力提供サービスの計画を立案することができる。
 また、運用計画立案部112は、需要家設置システム50における電力需給の状況に基づいて調整力提供サービスの運用計画を立案する。
 これにより、運用計画立案部112が、調整力提供サービスの運用計画を高精度に立案できることが期待される。
 また、制約条件設定部111は、調整力提供サービスの約定が無い商品ブロックと需要家との組み合わせについて、調整力提供サービスの確保量を0にするための数式を含む制約条件を設定する。運用計画立案部112は、制約条件設定部111が設定した制約条件を用いた最適化問題を解くことで、計画期間における調整力提供サービスの運用計画を立案する。
 制約条件設定部111は、制約条件の設定により、各需要家について、調整力提供サービスの約定がない商品ブロックでの調整力確保量が0となるようにすることができる。この点で、制約条件設定部111が設定する制約条件では、各需要家が、あたかも計画期間中ずっと調整力提供サービスに参加しているかのように扱うことができ、かつ、実際には約定がない商品ブロックでは調整力確保量を0とすることで、最適化問題を解いて得られる計画の妥当性を確保できる。
 基準値決定部110は、制約条件設定部111が設定する制約条件を用いて、エネルギーマネージメントにおける需要家設置システム50の運用と、商品ブロック毎の調整力の確保における需要家設置システム50の運用とを纏めて表す最適化問題を設定することができる。この点で、基準値決定部110が設定する最適化問題では、エネルギーマネージメントのための需要家設置システム50の運用と、調整力の提供のための需要家設置システム50の運用との関係が十分に反映されることが期待される。基準値決定部110がこの最適化問題を解いて得られる計画では、エネルギーマネージメントでの使用可能分と、調整力のための確保の分とが適切に配分されていることが期待される。
 また、基準値決定部110は、調整力提供サービスの計画を、商品ブロックよりも長い期間について立案することができる。
 また、調整力提供サービスの約定の有無が条件分岐ではなく数式で表されていることで、基準値決定部110がこの最適化問題を解く際、調整力提供サービスの約定の有無を区別して処理を変える必要がない。
 また上記のように、基準値決定部110がこの最適化問題を解いて得られる計画では、各需要家について、調整力提供サービスの約定が無い商品ブロックでは調整力の確保量が0になっている点で、調整力提供サービスの落札状況に整合している。
 また、制約条件設定部111は、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量を0に設定する数式を含む制約条件を設定する。
 これにより、基準値決定部110が最適化問題を解いて得られる計画でも、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力の確保量が0になると期待される。
 また、制約条件設定部111は、前記調整力提供サービスの約定がない商品ブロックと需要家リストパターンとの組み合わせについて、調整力の確保量を0に設定する数式を含む制約条件を設定する。
 ここで、需要家リストパターンにおける調整力の確保量は、その需要家リストパターンに含まれる需要家における調整力の確保量の合計である。
 これにより、基準値決定部110が最適化問題を解いて得られる計画でも、調整力提供サービスの約定がない商品ブロックと需要家リストパターンとの組み合わせについて、その商品ブロックと、その需要家リストパターンに含まれる各需要家との組み合わせにおける調整力の確保量が0になると期待される。
 また、制約条件設定部111は、調整力提供サービスの約定がない商品ブロックと需要家との組み合わせについて、調整力提供サービスの報酬単価を0またはそれ以下とする数式を含む制約条件を設定する。運用計画立案部112は、最適化問題の対象の全需要家の金銭的利得の合計が大きいほど高い評価を示す評価関数を用いた最適化問題を解く。
 報酬単価が0またはそれ以下の場合、報酬単価に調整力提供量を乗算して算出される報酬(金銭的利得)も0またはそれ以下になる。このことから基準値決定部110が、上記の評価関数に基づいて、報酬単価が0またはマイナスになっている商品ブロックかつ需要家について、調整力の確保量を0と算出することが期待される。
<第二実施形態>
 第二実施形態および第三実施形態では、第一実施形態の更に具体的な例について説明する。第二実施形態および第三実施形態でも、電力システムおよびその各部の個構成は、第一実施形態で説明したのと同様である。第二実施形態および第三実施形態でも、図1および図2に示す構成を用いて説明する。
 第二実施形態では、上位制御装置22が、需要家リストパターン毎に最適化問題を設定する場合の例について説明する。
 図5は、第二実施形態における最適化問題での、調整力提供サービスの約定状況の設定の例を示す図である。
 図5の例では、#1から#9までの、連続する9個の商品ブロックが示されている。これら9個のうち8個の連続する商品ブロックの時間長である24時間が、上位制御装置22が運用計画を立案する時間長であるものとする。
 また、図5では、9個の商品ブロックのそれぞれについて、落札された需要家リストパターンが示されている。図5では、需要家リストパターンC1、C2、C3、C4およびC8の5個の需要家リストパターンが示されている。
 これらの需要家リストパターンのうち、需要家リストパターンC1、C3には、それぞれ以下の需要家が登録されているものとする。
需要家リストパターンC1:A1-A40
需要家リストパターンC3:A1-A20、B1-B20
 このように、需要家リストパターンC1には、需要家A1からA40まで40件の需要家が登録されている。また、需要家リストパターンC3には、需要家A1からA20まで、および、需要家B1からB20までの40件の需要家が登録されている。
 また、需要家A1からA20は、需要家リストパターンC1、C3の両方に登録されている。需要家リストパターンC2、C4およびC5には、需要家リストパターンC1、C3の何れとも重複して登録されている需要家はないものとする。
 第二実施形態では、基準値決定部110は、個々の需要家リストパターンを対象として最適化問題を設定する。具体的には、基準値決定部110は、基準値の決定対象の商品ブロックで落札されている需要家リストパターンに登録されている需要家A1からA40を対象として、最適化問題を設定する。
 以下では、基準値の決定対象の商品ブロックを、対象商品ブロックと称する。また、対象商品ブロックで落札されている需要家リストパターンを、対象需要家リストパターンと称する。
 また、基準値決定部110(制約条件設定部111)は、対象需要家リストパターンが落札されている商品ブロックについては、落札結果に基づく数式を、対象需要家リストパターンに登録されている需要家毎に生成して制約条件に含める。一方、制約条件設定部111は、対象需要家リストパターンが落札されていない商品ブロックについては、調整力の確保量を0にするための数式を、対象需要家リストパターンに登録されている需要家毎に生成して制約条件に含める。具体的には、制約条件設定部111は、対象需要家リストパターンに登録されている各需要家の需要家設置システム50における調整力の確保量が0になるような数式を制約条件に含める。
 上記のように、制約条件設定部111が、調整力の確保量を0に設定する数式を制約条件に含めるようにしてもよい。あるいは、制約条件設定部111が、調整力提供サービスの報酬単価を0またはそれ以下とする数式を制約条件に含めるようにしてもよい。
 例えば、商品ブロック#1では、需要家リストパターンC1が落札されている。そこで、基準値決定部110は、需要家リストパターンC1に登録されている需要家の需要家設置システム50の運用計画を24時間分立案して、商品ブロック#1における需要家毎の基準値を決定する。
 その際、制約条件設定部111は、需要家リストパターンC1が落札されている商品ブロック#1および#5については、需要家リストパターンC1に登録されている各需要家について、落札結果に基づく数式を制約条件に含める。一方、制約条件設定部111は、需要家リストパターンC1が落札されていない商品ブロック#2、#3、#4、#6、#7および#8については、需要家リストパターンC1に登録されている各需要家について、調整力の確保量が0になるような数式を制約条件に含める。
 また、商品ブロック#2では、需要家リストパターンC3が落札されている。そこで、基準値決定部110は、需要家リストパターンC3に登録されている需要家の需要家設置システム50の運用計画を24時間分立案して、商品ブロック#2における需要家毎の基準値を決定する。
 その際、制約条件設定部111は、需要家リストパターンC3が落札されている商品ブロック#2、#3および#8については、需要家リストパターンC3に登録されている各需要家について、落札結果に基づく数式を制約条件に含める。一方、制約条件設定部111は、需要家リストパターンC3が落札されていない商品ブロック#4、#5、#6、#7および#8については、需要家リストパターンC3に登録されている各需要家について、調整力の確保量が0になるような数式を制約条件に含める。
 このように、制約条件設定部111は、計画期間に含まれる商品ブロックと、需要家リストパターンのうち、その商品ブロックに調整力提供サービスの約定がない需要家リストパターンに登録されている需要家との組み合わせについて、調整力の確保量を0にするための数式を含む制約条件を、需要家リストパターン毎に設定する。
 運用計画立案部112は、需要家リストパターン毎の制約条件を用いた需要家リストパターン毎の最適化問題を解く。
 これにより、運用計画立案部112は、対象需要家リストパターンが落札されている商品ブロックについては調整力提供サービスと、エネルギーマネージメントサービスの計画との両方に基づく計画を立案する。
 一方、運用計画立案部112は、対象需要家リストパターンが落札されていない商品ブロックについては、実質的には調整力提供サービスの計画を行わず、エネルギーマネージメントサービスのみに基づく計画を立案する。
 図6は、第二実施形態に係る上位制御装置22が調整力提供サービスを行う処理手順の例を示す図である。上位制御装置22は、商品ブロック毎に、アグリゲーション事業者システム12が需給調整市場システム13に基準値を申告するよりも前に、図6の処理を行う。
 図6の処理で、上位制御装置22は、需要家リストパターン毎に処理を行うループL1を開始する(ステップS201)。
 次に、基準値決定部110は、ループL1で処理対象になっている需要家リストパターンについて運用計画を立案する(ステップS202)。上記のように、基準値決定部110は、ループL1で処理対象になっている需要家リストパターンについて最適化問題を設定して解くことで、運用計画を立案する。
 基準値決定部110は、基準値決定の対象となる需要家リストパターン(次の商品ブロックで落札されている需要家リストパターン)に登録されている需要家の需要家設置システム50については、調整力の確保量の決定、基準値の決定、および、エネルギーマネージメントのための需要家設置システム50の機器の制御を決定する。それ以外の需要家設置システム50については、基準値決定部110は、エネルギーマネージメントのための需要家設置システム50の機器の制御を決定する。
 次に、基準値出力部113は、ループL1で処理対象になっている需要家リストパターンが、次の商品ブロック(次に時間が到来する商品ブロック)で落札された需要家リストパターンか否かを判定する(ステップS203)。
 次の商品ブロックで落札された需要家リストパターンであると判定した場合(ステップS203:YES)、基準値出力部113は、その需要家リストパターンに登録されている各需要家の基準値をアグリゲーション事業者システム12へ送信する(ステップS204)。
 次に、上位制御装置22は、ループL1の終端処理を行う(ステップS205)。具体的には、上位制御装置22は、全ての需要家リストパターンについてループL1の処理を行ったか否かを判定する。未処理の需要家リストパターンがあると上位制御装置22が判定した場合、処理がステップS201へ戻り、上位制御装置22は、未処理の需要家リストパターンについて引き続きループL1の処理を行う。一方、全ての需要家リストパターンについてループL1の処理を行ったと判定した場合、上位制御装置22は、ループL1を終了する。
 ステップS205で、上位制御装置22がループL1を終了した場合、制御情報算出部120は、ステップS204で基準値出力部113が基準値を送付した商品ブロックの時刻の到来を待って、需要家設置システム50の制御を行う(ステップS206)。制御情報算出部120は、下位制御装置62に制御指令情報を通知して、需要家設置システム50の各部に対する制御を行うよう指示する。
 制御情報算出部120は、その商品ブロックで落札された需要家リストパターンに登録されている需要家の需要家設置システム50については、調整力提供のための制御とエネルギーマネージメントのための制御とを行う。それ以外の需要家設置システム50については、制御情報算出部120は、エネルギーマネージメントのための制御を行う。
 ステップS206の後、上位制御装置22は、図6の処理を終了する。
 一方、ステップS203で、次の商品ブロックで落札された需要家リストパターンではないと、基準値出力部113が判定した場合(ステップS203:NO)、処理がステップS205へ進む。
 以上のように、制約条件設定部111は、計画期間に含まれる商品ブロックと、需要家リストパターンのうち、その商品ブロックに調整力提供サービスの約定がない需要家リストパターンに登録されている需要家との組み合わせについて、調整力の確保量を0にするための数式を含む制約条件を、需要家リストパターン毎に設定する。運用計画立案部112は、需要家リストパターン毎の制約条件を用いた需要家リストパターン毎の最適化問題を解く。
 第二実施形態に係る上位制御装置22によれば、1つの需要家リストパターンを対象として最適化問題を生成する点で、最適化問題の規模が比較的小さい。第二実施形態に係る上位制御装置22によれば、この点で、最適化問題について比較的短時間で評価の高い解を得られると期待される。
 また、第二実施形態に係る上位制御装置22では、需要家リストパターン毎の最適化問題を解く際に、他の需要家リストパターンの影響を考慮する必要が無い。したがって、第二実施形態に係る上位制御装置22では、各最適化問題を並列処理で解くことができ、計算時間が比較的短いことが期待される。
<第三実施形態>
 第三実施形態では、上位制御装置22が、全需要家について1つの最適化問題を設定する場合の例について説明する。
 図7は、第三実施形態における最適化問題での、調整力提供サービスの約定状況の設定の例を示す図である。
 図5の場合と同じく図7でも、#1から#9までの、連続する9個の商品ブロックが示されており、それぞれの商品ブロックで落札された需要家リストパターンも図5の場合と同じである。
 各需要家リストパターンに登録されている需要家も、図5の場合と同じものとする。特に、需要家リストパターンC1には、需要家A1からA40まで40件の需要家が登録され、需要家リストパターンC3には、需要家A1からA20まで、および、需要家B1からB20までの40件の需要家が登録されているものとする。このように需要家A1からA20は、需要家リストパターンC1、C3の両方に登録されている一方、需要家リストパターンC2、C4およびC5には、需要家リストパターンC1、C3の何れとも重複して登録されている需要家はないものとする。
 また、上位制御装置22が運用計画を立案する時間長も、図5の場合と同じく24時間であるものとする。
 第三実施形態では、基準値決定部110は、全需要家(少なくとも何れか1つの需要家リストパターンに登録されている需要家全て)を対象として最適化問題を設定する。
 これにより、第三実施形態では、特に、複数の需要家リストパターンに登録されている需要家の扱いが、第二実施形態の場合と異なる。第三実施形態では、基準値決定部110は、複数の需要家リストパターンに登録されている需要家について、それぞれの需要家リストパターンの落札による約定が反映された最適化問題を生成する。
 例えば、基準値決定部110が商品ブロック#1における基準値を決定する際、落札されている需要家リストパターンC1に登録されている需要家のうち、需要家A1からA20までは、需要家リストパターンC3にも登録されている。これにより、需要家A1からA20までは、は、需要家リストパターンC1が落札された商品ブロック#1および#5だけでなく、需要家リストパターンC3が落札された商品ブロック#2、#3および#8でも約定されている。
 第三実施形態では、基準値決定部110が全需要家を対象とする最適化問題を設定することで、制約条件設定部111は、全ての需要家リストパターンの落札を反映した制約条件を設定する。
 したがって、制約条件設定部111は、商品ブロック#1における運用計画のための最適化問題で、需要家A1からA20について、商品ブロック#1、#2、#3、#5、#8の何れの約定も反映した制約条件を設定する。
 また、制約条件設定部111は、商品ブロック#1における運用計画のための最適化問題で、需要家A1からA20について、商品ブロック#2、#3、#5、#8の何れの約定も反映した制約条件を設定する。
 図8は、第三実施形態に係る上位制御装置22が調整力提供サービスを行う処理手順の例を示す図である。上位制御装置22は、商品ブロック毎に、アグリゲーション事業者システム12が需給調整市場システム13に基準値を申告するよりも前に、図8の処理を行う。
 図8の処理で、基準値決定部110は、全ての需要家を対象に運用計画を立案する(ステップS301)。上記のように、基準値決定部110は、全需要家を対象として最適化問題を設定して解くことで、運用計画を立案する。
 基準値決定部110は、基準値決定の対象となる需要家設置システム50(次の商品ブロックで落札されている需要家リストパターンに登録されている需要家の需要家設置システム50)については、調整力の確保量の決定、基準値の決定、および、エネルギーマネージメントのための需要家設置システム50の機器の制御を決定する。それ以外の需要家設置システム50については、基準値決定部110は、エネルギーマネージメントのための需要家設置システム50の機器の制御を決定する。
 次に、上位制御装置22は、需要家リストパターン毎に処理を行うループL2を開始する(ステップS302)。
 次に、基準値出力部113は、ループL2で処理対象になっている需要家リストパターンが、次の商品ブロック(次に時間が到来する商品ブロック)で落札された需要家リストパターンか否かを判定する(ステップS303)。
 次の商品ブロックで落札された需要家リストパターンであると判定した場合(ステップS303:YES)、基準値出力部113は、その需要家リストパターンに登録されている各需要家の基準値をアグリゲーション事業者システム12へ送信する(ステップS304)。
 次に、上位制御装置22は、ループL2の終端処理を行う(ステップS305)。具体的には、上位制御装置22は、全ての需要家リストパターンについてループL2の処理を行ったか否かを判定する。未処理の需要家リストパターンがあると上位制御装置22が判定した場合、処理がステップS302へ戻り、上位制御装置22は、未処理の需要家リストパターンについて引き続きループL2の処理を行う。一方、全ての需要家リストパターンについてループL2の処理を行ったと判定した場合、上位制御装置22は、ループL2を終了する。
 ステップS305で、上位制御装置22がループL2を終了した場合、制御情報算出部120は、ステップS304で基準値出力部113が基準値を送付した商品ブロックの時刻の到来を待って、需要家設置システム50の制御を行う(ステップS306)。制御情報算出部120は、下位制御装置62に制御指令情報を通知して、需要家設置システム50の各部に対する制御を行うよう指示する。
 制御情報算出部120は、その商品ブロックで落札された需要家リストパターンに登録されている需要家の需要家設置システム50については、調整力提供のための制御とエネルギーマネージメントのための制御とを行う。それ以外の需要家設置システム50については、制御情報算出部120は、エネルギーマネージメントのための制御を行う。
 ステップS306の後、上位制御装置22は、図8の処理を終了する。
 一方、ステップS303で、次の商品ブロックで落札された需要家リストパターンではないと、基準値出力部113が判定した場合(ステップS303:NO)、処理がステップS305へ進む。
 以上のように、制約条件設定部111は、計画期間に含まれる商品ブロックと、複数の需要家リストパターンの少なくとも何れか1つに含まれる需要家との組み合わせのうち、調整力提供サービスの約定が無い商品ブロックと需要家との組み合わせについて、調整力の確保量を0にするための数式を含む制約条件、かつ、複数の需要家リストパターンの少なくとも何れか1つに含まれる需要家全体についての最適化問題の制約条件を設定する。
 運用計画立案部112は、複数の需要家リストパターンの少なくとも何れか1つに含まれる需要家全体についての最適化問題を解く。
 第三実施形態に係る上位制御装置22によれば、各需要家について、その需要家が登録されている全ての需要家リストパターンの落札による約定を反映させて最適化問題を生成し、計画を立案することができる。第三実施形態に係る上位制御装置22によれば、この点で、計画を高精度に立案できること期待される。
 また、第三実施形態に係る上位制御装置22では、複数の需要家リストパターンに登録されている需要家が需要家リストパターン毎に繰り返し最適化問題の対象となることがない点で、全体での問題の規模が比較的小さいと評価できる。
 また、第三実施形態に係る上位制御装置22では、全需要家を対象として1つの最適化問題を生成するので、解くべき最適化問題の個数が少なくて済む。
 なお、第三実施形態に係る上位制御装置22が、対象を全需要家ではなく、計画対象の所定期間において、約定された複数の需要家リストパターンに属する全需要家のみとするようにしてもよい。
 これにより、計算コストを下げることができる。
 また、上位制御装置22の処理を、最適化計算の実行環境を仮受けて行うことを考えた場合、第三実施形態では、並列処理が不要である点で、最適化計算実行環境の利用コストが比較的安価であることが期待される。
<第四実施形態>
 図9は、第四実施形態に係る制御装置の構成の例を示す図である。図9に示す構成で、計画装置610は、運用計画立案部611を備える。
 かかる構成で、運用計画立案部611は、電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間における前記調整力提供サービスの約定の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案する。
 運用計画立案部611は、運用計画立案手段の例に該当する。
 運用計画立案部611は、上記のように、需要家と、調整力提供サービスの約定単位期間との組み合わせにおける調整力提供サービスの約定の有無にかかわらず、調整力提供サービスの運用計画を立案する。計画装置610によれば、この点で、調整力提供サービスの約定状況に応じて計画の対象を選択する必要なしに、調整力提供サービスの計画を立案できる。
 また、運用計画立案部611によれば、調整力提供サービスの約定の無い、需要家と約定単位期間との組み合わせも、計画の対象に含めることができる。これにより、運用計画立案部611では、調整力提供サービスと、例えばピークシフトなど複数の約定単位期間を含む計画期間を設けることが好ましいサービス(「他のサービス」と称する)との同時実施の際に、個々の約定単位期間における調整力提供サービスの計画を、その約定単位期間における他のサービスの実施の影響だけでなく、計画期間全体における他のサービスの実施の影響を反映して立案することができる。計画装置610によれば、この点で、他のサービスの影響を比較的高精度に反映して調整力提供サービスの計画を立案することができる。
<第五実施形態>
 図10は、第五実施形態に係る計画方法における処理の手順の例を示す図である。図10に示す計画方法は、運用計画を立案すること(ステップS611)を含む。
 運用計画を立案すること(ステップS611)では、コンピュータが、制約条件を用いた最適化問題を解くことで、計画期間における調整力提供サービスの運用計画を立案する。
 図10に示す計画方法では、上記のように、需要家と、調整力提供サービスの約定単位期間との組み合わせにおける調整力提供サービスの約定の有無にかかわらず、調整力提供サービスの運用計画を立案する。図10に示す計画方法によれば、この点で、調整力提供サービスの約定状況に応じて計画の対象を選択する必要なしに、調整力提供サービスの計画を立案できる。
 また、図10に示す計画方法によれば、調整力提供サービスの約定の無い、需要家と約定単位期間との組み合わせも、計画の対象に含めることができる。これにより、図10に示す計画方法では、調整力提供サービスと、例えばピークシフトなど複数の約定単位期間を含む計画期間を設けることが好ましいサービス(「他のサービス」と称する)との同時実施の際に、個々の約定単位期間における調整力提供サービスの計画を、その約定単位期間における他のサービスの実施の影響だけでなく、計画期間全体における他のサービスの実施の影響を反映して立案することができる。図10に示す計画方法によれば、この点で、他のサービスの影響を比較的高精度に反映して調整力提供サービスの計画を立案することができる。
 図11は、少なくとも1つの実施形態に係るコンピュータの構成を示す概略ブロック図である。
 図11に示す構成で、コンピュータ700は、CPU710と、主記憶装置720と、補助記憶装置730と、インタフェース740と、不揮発性記録媒体750とを備える。
 上記の上位制御装置22、および、計画装置610のうち何れか1つ以上またはその一部が、コンピュータ700に実装されてもよい。その場合、上述した各処理部の動作は、プログラムの形式で補助記憶装置730に記憶されている。CPU710は、プログラムを補助記憶装置730から読み出して主記憶装置720に展開し、当該プログラムに従って上記処理を実行する。また、CPU710は、プログラムに従って、上述した各記憶部に対応する記憶領域を主記憶装置720に確保する。各装置と他の装置との通信は、インタフェース740が通信機能を有し、CPU710の制御に従って通信を行うことで実行される。また、インタフェース740は、不揮発性記録媒体750用のポートを有し、不揮発性記録媒体750からの情報の読出、および、不揮発性記録媒体750への情報の書込を行う。
 上位制御装置22がコンピュータ700に実装される場合、その各部の動作は、プログラムの形式で補助記憶装置730に記憶されている。CPU710は、プログラムを補助記憶装置730から読み出して主記憶装置720に展開し、当該プログラムに従って上記処理を実行する。
 また、CPU710は、プログラムに従って、上位制御装置22が処理を行うための記憶領域を主記憶装置720に確保する。
 上位制御装置22と他の装置との通信は、インタフェース740が通信機能を有し、CPU710の制御に従って動作することで実行される。
 上位制御装置22とユーザとのインタラクションは、インタフェース740が入力デバイスおよび出力デバイスを有し、CPU710の制御に従って出力デバイスにて情報をユーザに提示し、入力デバイスにてユーザ操作を受け付けることで実行される。
 計画装置610がコンピュータ700に実装される場合、その各部の動作は、プログラムの形式で補助記憶装置730に記憶されている。CPU710は、プログラムを補助記憶装置730から読み出して主記憶装置720に展開し、当該プログラムに従って上記処理を実行する。
 また、CPU710は、プログラムに従って、計画装置610が処理を行うための記憶領域を主記憶装置720に確保する。
 計画装置610と他の装置との通信は、インタフェース740が通信機能を有し、CPU710の制御に従って動作することで実行される。
 計画装置610とユーザとのインタラクションは、インタフェース740が入力デバイスおよび出力デバイスを有し、CPU710の制御に従って出力デバイスにて情報をユーザに提示し、入力デバイスにてユーザ操作を受け付けることで実行される。
 上述したプログラムのうち何れか1つ以上が不揮発性記録媒体750に記録されていてもよい。この場合、インタフェース740が不揮発性記録媒体750からプログラムを読み出すようにしてもよい。そして、CPU710が、インタフェース740が読み出したプログラムを直接実行するか、あるいは、主記憶装置720または補助記憶装置730に一旦保存して実行するようにしてもよい。
 なお、上位制御装置22、および、計画装置610が行う処理の全部または一部を実行するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより各部の処理を行ってもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。
 また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM(Read Only Memory)、CD-ROM(Compact Disc Read Only Memory)等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。また上記プログラムは、前述した機能の一部を実現するためのものであってもよく、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよい。
 以上、この発明の実施形態について図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計等も含まれる。
 本発明は、計画装置、計画方法および記録媒体に適用してもよい。
 22 上位制御装置
 110 基準値決定部
 111 制約条件設定部
 112、611 運用計画立案部
 113 基準値出力部
 120 制御情報算出部
 610 計画装置

Claims (10)

  1.  電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間における前記調整力提供サービスの約定の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案する運用計画立案手段
     を備える計画装置。
  2.  前記運用計画立案手段は、前記需要家のシステムにおける電力需給の状況に基づいて前記調整力提供サービスの運用計画を立案する、
     請求項1に記載の計画装置。
  3.  前記調整力提供サービスの約定が無い、前記約定単位期間と前記需要家との組み合わせについて、前記調整力の確保量を0にするための数式を含む制約条件を設定する制約条件設定手段を備え、
     前記運用計画立案手段は、前記制約条件を用いた最適化問題を解くことで、前記計画期間における前記調整力提供サービスの運用計画を立案する、
     請求項1または請求項2に記載の計画装置。
  4.  前記制約条件設定手段は、前記計画期間に含まれる約定単位期間と、複数の前記需要家を含み前記約定単位期間毎の前記調整力提供サービスの約定の単位となる需要家グループのうち、その約定単位期間に前記調整力提供サービスの約定がない需要家グループに含まれる需要家との組み合わせについて、前記調整力の確保量を0にするための数式を含む制約条件を、前記需要家グループ毎に設定し、
     前記運用計画立案手段は、前記需要家グループ毎の制約条件を用いた前記需要家グループ毎の最適化問題を解く、
     請求項3に記載の計画装置。
  5.  前記制約条件設定手段は、前記計画期間に含まれる前記約定単位期間と、複数の前記需要家を含み前記約定単位期間毎の前記調整力提供サービスの約定の単位となる需要家グループの少なくとも何れか1つに含まれる前記需要家との組み合わせのうち、前記調整力提供サービスの約定が無い、前記約定単位期間と前記需要家との組み合わせについて、前記調整力の確保量を0にするための数式を含む前記制約条件、かつ、複数の前記需要家グループの少なくとも何れか1つに含まれる需要家全体についての前記最適化問題の前記制約条件を設定し、
     前記運用計画立案手段は、複数の前記需要家グループの少なくとも何れか1つに含まれる需要家全体についての前記最適化問題を解く、
     請求項3に記載の計画装置。
  6.  前記制約条件設定手段は、前記調整力提供サービスの約定がない、前記約定単位期間と前記需要家との組み合わせについて、前記調整力の確保量を0に設定する数式を含む前記制約条件を設定する、
     請求項3から5の何れか一項に記載の計画装置。
  7.  前記制約条件設定手段は、前記調整力提供サービスの約定がない、前記約定単位期間と、複数の前記需要家を含み前記約定単位期間毎の前記調整力提供サービスの約定の単位となる需要家グループとの組み合わせについて、前記調整力の確保量を0に設定する数式を含む前記制約条件を設定する、
     請求項3から6の何れか一項に記載の計画装置。
  8.  前記制約条件設定手段は、前記調整力提供サービスの約定がない、前記約定単位期間と前記需要家との組み合わせについて、前記調整力提供サービスの報酬単価を0またはそれ以下とする数式を含む前記制約条件を設定し、
     前記運用計画立案手段は、前記最適化問題の対象の全需要家の金銭的利得の合計が大きいほど高い評価を示す評価関数を用いた前記最適化問題を解く、
     請求項3から7の何れか一項に記載の計画装置。
  9.  コンピュータが、
     電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間における前記調整力提供サービスの約定の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案する
     ことを含む計画方法。
  10.  コンピュータに、
     電力系統安定化のための調整力の提供者たり得る少なくとも1つの需要家を対象として、各需要家について、調整力提供サービスの少なくとも1つの約定単位期間における前記調整力提供サービスの約定の有無にかかわらず、その約定単位期間を含む計画期間における前記需要家のシステムによる前記調整力提供サービスの運用計画を立案すること
     を実行させるためのプログラムを記録する記録媒体。
PCT/JP2022/005092 2022-02-09 2022-02-09 計画装置、計画方法および記録媒体 WO2023152820A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/005092 WO2023152820A1 (ja) 2022-02-09 2022-02-09 計画装置、計画方法および記録媒体

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/005092 WO2023152820A1 (ja) 2022-02-09 2022-02-09 計画装置、計画方法および記録媒体

Publications (1)

Publication Number Publication Date
WO2023152820A1 true WO2023152820A1 (ja) 2023-08-17

Family

ID=87563817

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/005092 WO2023152820A1 (ja) 2022-02-09 2022-02-09 計画装置、計画方法および記録媒体

Country Status (1)

Country Link
WO (1) WO2023152820A1 (ja)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015045084A1 (ja) * 2013-09-27 2015-04-02 株式会社日立製作所 電力系統制御装置、電力系統システムおよび電力系統制御方法
WO2017203664A1 (ja) * 2016-05-26 2017-11-30 日本電気株式会社 制御装置、蓄電池制御装置、制御システム、電池部制御装置、制御方法、蓄電池制御方法、電池部制御装置の動作方法及びプログラム
JP2019134522A (ja) * 2018-01-29 2019-08-08 株式会社東芝 蓄電池管理装置、蓄電池管理方法および蓄電池管理プログラム
JP2019213364A (ja) * 2018-06-06 2019-12-12 株式会社東芝 蓄電池管理装置、蓄電池管理方法および蓄電池管理プログラム
JP2020137368A (ja) * 2019-02-25 2020-08-31 日本電気株式会社 上位装置、制御装置、端末装置、充放電制御システム、蓄電池群監視制御システム、制御方法およびプログラム
JP2021184682A (ja) * 2020-05-22 2021-12-02 株式会社東芝 蓄電池管理装置、蓄電池管理方法および蓄電池管理プログラム

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015045084A1 (ja) * 2013-09-27 2015-04-02 株式会社日立製作所 電力系統制御装置、電力系統システムおよび電力系統制御方法
WO2017203664A1 (ja) * 2016-05-26 2017-11-30 日本電気株式会社 制御装置、蓄電池制御装置、制御システム、電池部制御装置、制御方法、蓄電池制御方法、電池部制御装置の動作方法及びプログラム
JP2019134522A (ja) * 2018-01-29 2019-08-08 株式会社東芝 蓄電池管理装置、蓄電池管理方法および蓄電池管理プログラム
JP2019213364A (ja) * 2018-06-06 2019-12-12 株式会社東芝 蓄電池管理装置、蓄電池管理方法および蓄電池管理プログラム
JP2020137368A (ja) * 2019-02-25 2020-08-31 日本電気株式会社 上位装置、制御装置、端末装置、充放電制御システム、蓄電池群監視制御システム、制御方法およびプログラム
JP2021184682A (ja) * 2020-05-22 2021-12-02 株式会社東芝 蓄電池管理装置、蓄電池管理方法および蓄電池管理プログラム

Similar Documents

Publication Publication Date Title
Alam et al. An optimal P2P energy trading model for smart homes in the smart grid
Haghifam et al. Optimal operation of smart distribution networks in the presence of demand response aggregators and microgrid owners: A multi follower Bi-Level approach
Nunna et al. Multi-agent based demand response management system for combined operation of smart microgrids
CN109937431B (zh) 用于管理电力供应/需求的调度设备、方法及计算机可读存储介质
JP2022130284A (ja) プールおよび先物市場におけるバーチャルパワープラントのリスク制約最適化
Greve et al. A system operator’s utility function for the frequency response market
KR20210012630A (ko) P2p 전력거래 메커니즘 설계 방법 및 그 시스템
JP7289810B2 (ja) 電力売買支援装置、電力売買支援方法及びプログラム
JP2018036926A (ja) マイクログリッドの運転計画システムおよび方法
JP7298581B2 (ja) 移動体による電力取引のための入札条件決定装置及び電力取引システム
JPWO2017170018A1 (ja) 電力制御装置、電力制御方法、およびプログラム
JP7435628B2 (ja) 制御装置、パワーコンディショニングシステム、分散電源システム、電力制御システム、制御方法およびプログラム
JP6117984B1 (ja) 需給管理装置、需給管理方法及び需給管理プログラム
JP7279698B2 (ja) 移動体による電力取引のための入札条件決定装置
WO2023152820A1 (ja) 計画装置、計画方法および記録媒体
JP7345287B2 (ja) 電力取引約定処理装置および電力取引約定処理方法
Fioriti et al. A bi-level formulation to help aggregators size Energy Communities: a proposal for virtual and physical Closed Distribution Systems
JP6698371B2 (ja) 電気料金管理装置、電気料金管理方法及びプログラム
JP2018173678A (ja) 支援装置、支援システム、支援方法及びプログラム
Aguilar et al. Intent profile strategy for virtual power plant participation in simultaneous energy markets With dynamic storage management
JP7363924B2 (ja) サービス管理装置、パワーコンディショニングシステム、分散電源システム、電力制御システムおよびプログラム
JP7345331B2 (ja) 入札計画決定装置および入札計画決定方法
Guo et al. Transactive Operational Framework for Internet Data Centers in Geo-Distributed Local Energy Markets
Liu et al. Integrating demand response into electricity market
Spasova et al. Energy exchange strategy for local energy markets with heterogenous renewable sources

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22925841

Country of ref document: EP

Kind code of ref document: A1