WO2022181526A1 - 通信システムおよび基地局 - Google Patents

通信システムおよび基地局 Download PDF

Info

Publication number
WO2022181526A1
WO2022181526A1 PCT/JP2022/006884 JP2022006884W WO2022181526A1 WO 2022181526 A1 WO2022181526 A1 WO 2022181526A1 JP 2022006884 W JP2022006884 W JP 2022006884W WO 2022181526 A1 WO2022181526 A1 WO 2022181526A1
Authority
WO
WIPO (PCT)
Prior art keywords
gnb
relay
remote
communication
information
Prior art date
Application number
PCT/JP2022/006884
Other languages
English (en)
French (fr)
Inventor
満 望月
忠宏 下田
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to EP22759562.6A priority Critical patent/EP4301045A1/en
Priority to US18/546,704 priority patent/US20240129820A1/en
Priority to JP2023502376A priority patent/JPWO2022181526A1/ja
Priority to CN202280015955.7A priority patent/CN116868623A/zh
Priority to KR1020237027272A priority patent/KR20230147612A/ko
Publication of WO2022181526A1 publication Critical patent/WO2022181526A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/03Reselecting a link using a direct mode connection
    • H04W36/033Reselecting a link using a direct mode connection in pre-organised networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0055Transmission or use of information for re-establishing the radio link
    • H04W36/0064Transmission or use of information for re-establishing the radio link of control information between different access points
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0055Transmission or use of information for re-establishing the radio link
    • H04W36/0069Transmission or use of information for re-establishing the radio link in case of dual connectivity, e.g. decoupled uplink/downlink
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/08Reselecting an access point
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/16Performing reselection for specific purposes
    • H04W36/18Performing reselection for specific purposes for allowing seamless reselection, e.g. soft reselection
    • H04W36/185Performing reselection for specific purposes for allowing seamless reselection, e.g. soft reselection using make before break
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/34Reselection control
    • H04W36/36Reselection control by user or terminal equipment
    • H04W36/362Conditional handover
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W88/00Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
    • H04W88/02Terminal devices
    • H04W88/04Terminal devices adapted for relaying to or from another terminal or user
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W92/00Interfaces specially adapted for wireless communication networks
    • H04W92/16Interfaces between hierarchically similar devices
    • H04W92/18Interfaces between hierarchically similar devices between terminal devices
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection
    • H04W48/08Access restriction or access information delivery, e.g. discovery data delivery
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/14Direct-mode setup

Definitions

  • This disclosure relates to wireless communication technology.
  • LTE Long Term Evolution
  • SAE System Architecture Evolution
  • OFDM Orthogonal Frequency Division Multiplexing
  • SC-FDMA Single Carrier Frequency Division Multiple Access
  • LTE does not include circuit switching and is only a packet communication method.
  • FIG. 1 is an explanatory diagram showing the structure of a radio frame used in an LTE communication system.
  • one radio frame is 10 ms.
  • a radio frame is divided into 10 equally sized subframes.
  • a subframe is divided into two equal-sized slots.
  • a downlink synchronization signal is included in the first and sixth subframes of each radio frame.
  • Synchronization signals include a primary synchronization signal (P-SS) and a secondary synchronization signal (S-SS).
  • Non-Patent Document 1 (Chapter 5) describes the decisions made by 3GPP regarding the channel configuration in the LTE system. It is assumed that CSG (Closed Subscriber Group) cells also use the same channel configuration as non-CSG cells.
  • a physical broadcast channel is a communication terminal device such as a base station device (hereinafter sometimes simply referred to as a "base station”) to a mobile terminal device (hereinafter sometimes simply referred to as a “mobile terminal”). (hereinafter sometimes simply referred to as "communication terminal”).
  • a BCH transport block is mapped to 4 subframes in a 40 ms interval. There is no explicit signaling of 40ms timing.
  • PCFICH Physical Control Format Indicator Channel
  • the PCFICH notifies the communication terminal from the base station of the number of OFDM (Orthogonal Frequency Division Multiplexing) symbols used for PDCCHs.
  • PCFICH is transmitted every subframe.
  • a Physical Downlink Control Channel is a channel for downlink transmission from a base station to a communication terminal.
  • PDCCH includes resource allocation information for a downlink shared channel (DL-SCH), which is one of the transport channels described later, and paging channel (PCH), which is one of the transport channels described later. ) and HARQ (Hybrid Automatic Repeat ReQuest) information on DL-SCH.
  • DL-SCH downlink shared channel
  • PCH paging channel
  • HARQ Hybrid Automatic Repeat ReQuest
  • PDCCH carries an uplink scheduling grant.
  • the PDCCH carries Ack (Acknowledgment)/Nack (Negative Acknowledgment), which are response signals to uplink transmission.
  • PDCCH is also called L1/L2 control signal.
  • a physical downlink shared channel is a channel for downlink transmission from a base station to a communication terminal.
  • a downlink shared channel (DL-SCH), which is a transport channel, and a PCH, which is a transport channel, are mapped to the PDSCH.
  • a Physical Multicast Channel is a channel for downlink transmission from a base station to a communication terminal.
  • a multicast channel (Multicast Channel: MCH), which is a transport channel, is mapped to PMCH.
  • a physical uplink control channel is a channel for uplink transmission from a communication terminal to a base station.
  • PUCCH carries Ack/Nack, which is a response signal for downlink transmission.
  • PUCCH carries CSI (Channel State Information).
  • CSI is composed of RI (Rank Indicator), PMI (Precoding Matrix Indicator), and CQI (Channel Quality Indicator) reports.
  • RI is rank information of a channel matrix in MIMO.
  • PMI is precoding weight matrix information used in MIMO.
  • CQI is quality information indicating the quality of received data or communication channel quality.
  • PUCCH also carries a scheduling request (SR).
  • SR scheduling request
  • a physical uplink shared channel is a channel for uplink transmission from a communication terminal to a base station.
  • An uplink shared channel (UL-SCH), which is one of transport channels, is mapped to the PUSCH.
  • a Physical Hybrid ARQ Indicator Channel is a channel for downlink transmission from a base station to a communication terminal.
  • PHICH carries Ack/Nack, which is a response signal to uplink transmission.
  • a physical random access channel is a channel for uplink transmission from a communication terminal to a base station. PRACH carries a random access preamble.
  • a downlink reference signal (reference signal: RS) is a symbol known as an LTE communication system.
  • the following five types of downlink reference signals are defined.
  • Cell-specific reference signal (CRS), MBSFN reference signal (MBSFN reference signal), data demodulation reference signal (DM-RS) which is UE-specific reference signal (UE-specific reference signal) , Positioning Reference Signal (PRS), Channel State Information Reference Signal (CSI-RS).
  • RSRP reference signal received power
  • the uplink reference signal is also a symbol known as an LTE communication system.
  • the following two types of uplink reference signals are defined. They are a data demodulation reference signal (DM-RS) and a sounding reference signal (SRS).
  • DM-RS data demodulation reference signal
  • SRS sounding reference signal
  • Non-Patent Document 1 (Chapter 5) will be explained.
  • the broadcast channel (BCH) is broadcast over the entire coverage of the base station (cell).
  • BCH is mapped to a Physical Broadcast Channel (PBCH).
  • PBCH Physical Broadcast Channel
  • HARQ Hybrid ARQ
  • DL-SCH downlink shared channel
  • the DL-SCH can be broadcast to the entire coverage of the base station (cell).
  • DL-SCH supports dynamic or semi-static resource allocation.
  • Semi-static resource allocation is also called persistent scheduling.
  • DL-SCH supports discontinuous reception (DRX) of communication terminals in order to reduce the power consumption of communication terminals.
  • the DL-SCH is mapped onto a physical downlink shared channel (PDSCH).
  • PDSCH physical downlink shared channel
  • a paging channel supports DRX of a communication terminal in order to enable low power consumption of the communication terminal.
  • the PCH is required to be broadcast to the entire coverage of the base station (cell).
  • the PCH is dynamically mapped to a physical resource such as a Physical Downlink Shared Channel (PDSCH) that can be used for traffic.
  • PDSCH Physical Downlink Shared Channel
  • a multicast channel is used for broadcasting to the entire coverage of a base station (cell).
  • the MCH supports SFN combining of MBMS (Multimedia Broadcast Multicast Service) services (MTCH and MCCH) in multi-cell transmission.
  • MCH supports semi-static resource allocation.
  • MCH is mapped to PMCH.
  • HARQ Hybrid ARQ
  • PUSCH physical uplink shared channel
  • RACH random access channel
  • PRACH Physical Random Access Channel
  • HARQ is a technique for improving the communication quality of a transmission line by combining automatic repeat request (ARQ) and error correction (Forward Error Correction).
  • ARQ automatic repeat request
  • FEC Correction Forward Error Correction
  • HARQ has the advantage that error correction functions effectively by retransmission even for a transmission path whose communication quality changes. In particular, it is possible to further improve the quality by combining the reception result of the initial transmission and the reception result of the retransmission at the time of retransmission.
  • BCCH broadcast control channel
  • BCH broadcast channel
  • DL-SCH downlink shared channel
  • a paging control channel is a downlink channel for transmitting changes in paging information and system information.
  • PCCH is used when the network does not know the cell location of the communication terminal.
  • a logical channel, PCCH is mapped to a transport channel, a paging channel (PCH).
  • a common control channel is a channel for transmission control information between a communication terminal and a base station. CCCH is used when the communication terminal does not have an RRC connection with the network.
  • CCCH is mapped to a downlink shared channel (DL-SCH), which is a transport channel.
  • DL-SCH downlink shared channel
  • UL-SCH uplink shared channel
  • a multicast control channel is a downlink channel for one-to-many transmission.
  • MCCH is used for transmission of MBMS control information for one or several MTCHs from the network to communication terminals.
  • MCCH is used only for communication terminals that are receiving MBMS.
  • MCCH is mapped to a multicast channel (MCH), which is a transport channel.
  • a dedicated control channel is a channel that transmits dedicated control information between a communication terminal and a network on a one-to-one basis.
  • DCCH is used when the communication terminal is in an RRC connection.
  • DCCH is mapped to an uplink shared channel (UL-SCH) in uplink, and mapped to a downlink shared channel (DL-SCH) in downlink.
  • UL-SCH uplink shared channel
  • DL-SCH downlink shared channel
  • a dedicated traffic channel is a one-to-one communication channel to a dedicated communication terminal for transmitting user information.
  • DTCH exists in both uplink and downlink.
  • the DTCH is mapped to an uplink shared channel (UL-SCH) in uplink, and mapped to a downlink shared channel (DL-SCH) in downlink.
  • UL-SCH uplink shared channel
  • DL-SCH downlink shared channel
  • a multicast traffic channel is a downlink channel for transmitting traffic data from a network to communication terminals.
  • MTCH is a channel used only by communication terminals that are receiving MBMS.
  • MTCH is mapped to a multicast channel (MCH).
  • CGI is a Cell Global Identifier.
  • ECGI is an E-UTRAN Cell Global Identifier.
  • LTE Long Term Evolution Advanced
  • UMTS Universal Mobile Telecommunication System
  • CSG Cell Subscriber Group
  • Communication terminal location tracking is performed in units of areas consisting of one or more cells. Position tracking is performed to track the position of the communication terminal even in a standby state and to call the communication terminal, in other words, to enable the communication terminal to receive a call.
  • the area for position tracking of this communication terminal is called a tracking area.
  • LTE-A Long Term Evolution Advanced
  • CA Carrier Aggregation
  • the UE When CA is configured, the UE, which is a communication terminal, has a network (Network: NW) and only one RRC connection. In an RRC connection, one serving cell provides NAS mobility information and security inputs. This cell is called a primary cell (PCell).
  • PCell In the downlink, the carrier corresponding to the PCell is the downlink primary component carrier (DL PCC).
  • DL PCC downlink primary component carrier
  • UPC uplink primary component carrier
  • a secondary cell is configured together with the PCell to form a set of serving cells.
  • the carrier corresponding to the SCell is the Downlink Secondary Component Carrier (DL SCC).
  • the carrier corresponding to the SCell is the uplink secondary component carrier (UL SCC).
  • a serving cell set consisting of one PCell and one or more SCells is configured for one UE.
  • LTE-A new technologies in LTE-A include technology that supports wider bands (wider bandwidth extension) and coordinated multiple point transmission and reception (CoMP) technology.
  • CoMP under consideration for LTE-A in 3GPP is described in Non-Patent Document 1.
  • small-scale base station devices small-scale base station devices
  • technologies such as installing a large number of small eNBs and configuring a large number of small cells to improve frequency utilization efficiency and increase communication capacity are being studied.
  • DC dual connectivity
  • eNBs that perform dual connectivity (DC)
  • MeNB master eNB
  • SeNB secondary eNB
  • the volume of mobile network traffic is on the rise, and communication speeds are also increasing. Once full-scale operation of LTE and LTE-A is started, it is expected that the communication speed will be further increased.
  • 5G 5th generation radio access system
  • METIS a 5th generation radio access system
  • the 5G radio access system Compared to the LTE system, the 5G radio access system has 1000 times the system capacity, 100 times the data transmission speed, 1/10th the data processing delay, and 100 times the number of simultaneous connections of communication terminals. As a requirement, it is necessary to further reduce power consumption and reduce the cost of the device.
  • the NR system is being studied based on the LTE and LTE-A systems, but the following changes and additions have been made to the LTE and LTE-A systems.
  • OFDM is used in the downlink direction
  • OFDM is used in the uplink direction
  • DFT-s-OFDM DFT-spread-OFDM
  • NR In NR, cell coverage is ensured by forming a narrow beam-shaped transmission/reception range (beamforming) and changing the direction of the beam (beam sweeping).
  • Various subcarrier intervals that is, various numerologies are supported in the NR frame configuration.
  • one subframe is 1 millisecond and one slot is composed of 14 symbols regardless of numerology.
  • the number of slots included in one subframe is one in numerology with a subcarrier interval of 15 kHz, and increases in proportion to the subcarrier interval in other numerologies (Non-Patent Document 13 (3GPP TS38.211 )reference).
  • the downlink synchronization signal in NR is transmitted from the base station as a synchronization signal burst (hereinafter sometimes referred to as an SS burst) with a predetermined period and a predetermined duration.
  • the SS burst is composed of synchronization signal blocks (Synchronization Signal Blocks: hereinafter sometimes referred to as SS blocks) for each beam of the base station.
  • the base station transmits the SS block of each beam by changing the beam within the duration of the SS burst.
  • the SS block consists of P-SS, S-SS and PBCH.
  • phase tracking reference signal a phase tracking reference signal (PTRS) as a downlink reference signal for NR.
  • the PTRS is added to the uplink reference signal as well as the downlink.
  • SFI Slot Format Indication
  • BWP Bandwidth Part
  • SL Side Link
  • EPS Evolved Packet System
  • Non-Patent Documents 1, 16, 20, 21, 22, and 23 Various services using SL communication (also called PC5 communication) are being considered to support both EPS and 5G core systems (see Non-Patent Documents 1, 16, 20, 21, 22, and 23). .
  • Communication is performed between terminals in SL communication.
  • SL communication not only direct communication between terminals but also communication between UE and NW via a relay has been proposed (see Non-Patent Documents 20, 23, and 27).
  • the problem is how to improve communication quality between the terminal and the NW. For example, in HO of a remote UE via a relay UE, how to reduce data communication delay time during HO, how to improve robustness during HO, and the like.
  • one object of the present disclosure is to improve communication quality in a communication system using inter-terminal communication.
  • a first base station connected to a first communication terminal that supports inter-terminal communication in which communication terminals communicate directly with each other, and a second communication terminal that supports inter-terminal communication are connected. and a second base station.
  • the second base station when the first communication terminal receives a handover request for connecting to its own base station via the second communication terminal, the first communication terminal and the second communication terminal Communication setting information indicating settings for performing terminal-to-terminal communication is transmitted to the first communication terminal and the second communication terminal.
  • communication quality can be improved in a communication system using inter-terminal communication.
  • FIG. 2 is an explanatory diagram showing the configuration of a radio frame used in an LTE communication system
  • 1 is a block diagram showing the overall configuration of an LTE-based communication system 200 under discussion in 3GPP
  • FIG. 1 is a block diagram showing the overall configuration of an NR-based communication system 210 under discussion in 3GPP
  • FIG. 3 is a block diagram of DC with eNB and gNB connecting to EPC
  • FIG. 4 is a block diagram of DC by gNB connected to NG core
  • FIG. 4 is a block diagram of DC by eNB and gNB connecting to NG core
  • FIG. 4 is a block diagram of DC by eNB and gNB connecting to NG core
  • 3 is a block diagram showing the configuration of mobile terminal 202 shown in FIG. 2.
  • FIG. 3 is a block diagram showing the configuration of base station 203 shown in FIG. 2.
  • FIG. It is a block diagram which shows the structure of MME. It is a block diagram which shows the structure of a 5GC part.
  • FIG. 2 is a flowchart showing an overview from cell search to standby operation performed by a communication terminal (UE) in an LTE-based communication system;
  • FIG. 1 is a diagram showing an example of a cell configuration in an NR system;
  • FIG. FIG. 4 is a sequence diagram showing an example of a method of HO of a remote UE via a relay UE, according to Embodiment 1;
  • FIG. 10 is a sequence diagram showing another example of a remote UE HO method via a relay UE, according to the first embodiment;
  • FIG. 10 is a sequence diagram showing an example of a method of HO of a remote UE via a relay UE, regarding Modification 1 of Embodiment 1;
  • FIG. 10 is a sequence diagram showing an example of the I-DAPS HO method for Modification 2 of Embodiment 1;
  • FIG. 12 is a sequence diagram showing another example of the I-DAPS HO method for Modification 2 of Embodiment 1;
  • FIG. 10 is a sequence diagram showing an example of an I-CHO method for Embodiment 2;
  • FIG. 13 is a sequence diagram showing an example of a method for a remote UE to perform HO to a HO destination gNB of a relay UE, according to Embodiment 3;
  • FIG. 12 is a sequence diagram showing another example of a method for the remote UE to perform HO to the HO destination gNB of the relay UE, regarding the third embodiment;
  • FIG. 12 is a sequence diagram showing another example of a method for the remote UE to perform HO to the HO destination gNB of the relay UE, regarding the third embodiment;
  • FIG. 2 is a block diagram showing the overall configuration of an LTE-based communication system 200 under discussion in 3GPP.
  • the radio access network is called E-UTRAN (Evolved Universal Terrestrial Radio Access Network) 201 .
  • a mobile terminal device hereinafter referred to as “user equipment (UE)”
  • UE user equipment
  • base station E-UTRAN NodeB: eNB
  • communication terminal equipment includes not only mobile terminal equipment such as mobile phone terminal equipment, but also non-moving devices such as sensors.
  • communication terminal device may be simply referred to as “communication terminal”.
  • a control protocol for the mobile terminal 202 such as RRC (Radio Resource Control), and a user plane (hereinafter sometimes referred to as U-Plane), such as PDCP (Packet Data Convergence Protocol), RLC (Radio Link Control), MAC (Medium Access Control) and PHY (Physical layer) terminate at the base station 203, the E-UTRAN is composed of one or more base stations 203.
  • RRC Radio Resource Control
  • U-Plane user plane
  • PDCP Packet Data Convergence Protocol
  • RLC Radio Link Control
  • MAC Medium Access Control
  • PHY Physical layer
  • a control protocol RRC Radio Resource Control
  • RRC Radio Resource Control
  • the states of the base station 203 and mobile terminal 202 in RRC include RRC_IDLE and RRC_CONNECTED.
  • RRC_IDLE PLMN (Public Land Mobile Network) selection, system information (SI) notification, paging, cell re-selection, mobility, etc. are performed.
  • RRC_CONNECTED the mobile terminal has an RRC connection and can send and receive data to and from the network. Also, in RRC_CONNECTED, handover (HO), measurement of neighboring cells (measurement), etc. are performed.
  • the base station 203 is composed of one or more eNBs 207.
  • EPC Evolved Packet Core
  • EPS Evolved Packet System
  • the EPC, which is the core network, and the E-UTRAN 201, which is the radio access network, may be collectively referred to as a “network”.
  • the eNB 207 is a Mobility Management Entity (MME), or an S-GW (Serving Gateway), or an MME/S-GW section including the MME and S-GW (hereinafter sometimes referred to as "MME section") 204 and Control information is communicated between the eNB 207 and the MME unit 204 via the S1 interface.
  • MME Mobility Management Entity
  • S-GW Serving Gateway
  • MME/S-GW section including the MME and S-GW
  • Control information is communicated between the eNB 207 and the MME unit 204 via the S1 interface.
  • a plurality of MME units 204 may be connected to one eNB 207 .
  • the eNBs 207 are connected by an X2 interface, and control information is communicated between the eNBs 207 .
  • the MME unit 204 is a higher-level device, specifically a higher-level node, and controls connection between the eNB 207, which is a base station, and the mobile terminal (UE) 202.
  • the MME unit 204 constitutes an EPC, which is a core network.
  • Base station 203 constitutes E-UTRAN 201 .
  • the base station 203 may configure one cell or multiple cells. Each cell has a predetermined range as coverage, which is a range in which mobile terminal 202 can be communicated with, and wirelessly communicates with mobile terminal 202 within the coverage. When one base station 203 constitutes a plurality of cells, each cell is configured to be able to communicate with the mobile terminal 202 .
  • FIG. 3 is a block diagram showing the overall configuration of a 5G communication system 210 under discussion in 3GPP.
  • the radio access network is called NG-RAN (Next Generation Radio Access Network) 211 .
  • the UE 202 is capable of wireless communication with an NR base station device (hereinafter referred to as "NR base station (NG-RAN NodeB: gNB)") 213, and transmits and receives signals by wireless communication.
  • NR base station (NG-RAN NodeB: gNB) Next Generation Radio Access Network
  • the core network is called 5G Core (5GC).
  • 5GC 5G Core
  • Control protocols for UE 202 such as RRC (Radio Resource Control), user plane (hereinafter sometimes referred to as U-Plane), such as SDAP (Service Data Adaptation Protocol), PDCP (Packet Data Convergence Protocol), RLC (Radio Link Control), MAC (Medium Access Control), and PHY (Physical layer) terminate at the NR base station 213, the NG-RAN is configured by one or more NR base stations 213.
  • RRC Radio Resource Control
  • U-Plane user plane
  • SDAP Service Data Adaptation Protocol
  • PDCP Packet Data Convergence Protocol
  • RLC Radio Link Control
  • MAC Medium Access Control
  • PHY Physical layer
  • the function of the control protocol RRC (Radio Resource Control) between the UE 202 and the NR base station 213 is the same as in LTE.
  • the states of the NR base station 213 and the UE 202 in RRC include RRC_IDLE, RRC_CONNECTED, and RRC_INACTIVE.
  • RRC_IDLE and RRC_CONNECTED are the same as in the LTE system.
  • RRC_INACTIVE maintains the connection between the 5G core and the NR base station 213, while system information (System Information: SI) is broadcast, paging, cell re-selection, mobility, etc. are performed. .
  • SI System Information
  • gNB 217 has access and mobility management function (AMF), session management function (SMF), or user plane function (UPF), or AMF/SMF/UPF including AMF, SMF and UPF section (hereinafter sometimes referred to as “5GC section”) 214 via an NG interface.
  • AMF access and mobility management function
  • SMF session management function
  • UPF user plane function
  • AMF/SMF/UPF including AMF, SMF and UPF section hereinafter sometimes referred to as “5GC section” 214 via an NG interface.
  • AMF access and mobility management function
  • SMF session management function
  • UPF user plane function
  • AMF/SMF/UPF including AMF, SMF and UPF section hereinafter sometimes referred to as “5GC section” 214 via an NG interface.
  • Control information and/or user data are communicated between the gNB 217 and the 5GC unit 214 .
  • the NG interface is a generic term for the N2 interface between gNB 217 and AMF, the
  • the 5GC unit 214 is a host device, specifically a host node, and distributes paging signals to one or more base stations 203 and/or base stations 213 .
  • the 5GC unit 214 performs mobility control in the idle state (Idle State).
  • the 5GC unit 214 manages the tracking area list when the mobile terminal 202 is in the standby state, inactive state, and in the active state.
  • the 5GC unit 214 initiates the paging protocol by sending a paging message to the cell belonging to the Tracking Area in which the mobile terminal 202 is registered.
  • each cell is configured to be able to communicate with UE 202 .
  • the gNB 217 may be divided into a central unit (hereinafter referred to as CU) 218 and a distributed unit (hereinafter referred to as DU) 219.
  • CU central unit
  • DU distributed unit
  • One CU 218 is configured in gNB 217 .
  • One or more DUs 219 are configured in gNBs 217 .
  • CU 218 is connected to DU 219 by an F1 interface, and control information and/or user data are communicated between CU 218 and DU 219 .
  • the 5G communication system may include the Unified Data Management (UDM) function and Policy Control Function (PCF) described in Non-Patent Document 21 (3GPP TS23.501).
  • UDM and/or PCF may be included in 5GC section 214 in FIG.
  • a location management function (LMF) described in Non-Patent Document 24 (3GPP TS38.305) may be provided.
  • the LMF may be connected to the base station via AMF as disclosed in Non-Patent Document 25 (3GPP TS23.273).
  • the non-3GPP interworking function (N3IWF) described in Non-Patent Document 21 (3GPP TS23.501) may be included.
  • the N3IWF may terminate an access network (AN) with the UE in non-3GPP access with the UE.
  • AN access network
  • FIG. 4 is a diagram showing the configuration of DC by eNB and gNB connected to EPC.
  • solid lines indicate U-Plane connections
  • dashed lines indicate C-Plane connections.
  • the eNB 223-1 is the master base station and the gNB 224-2 is the secondary base station (this DC configuration is sometimes referred to as EN-DC).
  • FIG. 4 shows an example in which the U-Plane connection between the MME unit 204 and the gNB 224-2 is performed via the eNB 223-1, but even if it is performed directly between the MME unit 204 and the gNB 224-2 good.
  • FIG. 5 is a diagram showing the configuration of DC by gNBs connected to the NG core.
  • solid lines indicate U-Plane connections
  • dashed lines indicate C-Plane connections.
  • gNB 224-1 is the master base station
  • gNB 224-2 is the secondary base station (this DC configuration may be referred to as NR-DC).
  • FIG. 5 shows an example in which the U-Plane connection between the 5GC unit 214 and the gNB224-2 is performed via the gNB224-1. good.
  • FIG. 6 is a diagram showing the configuration of DC by eNB and gNB connected to the NG core.
  • solid lines indicate U-Plane connections
  • dashed lines indicate C-Plane connections.
  • the eNB 226-1 is the master base station and the gNB 224-2 is the secondary base station (this DC configuration may be referred to as NG-EN-DC).
  • FIG. 6 shows an example in which the U-Plane connection between the 5GC unit 214 and the gNB224-2 is performed via the eNB226-1. good.
  • FIG. 7 is a diagram showing another configuration of DC by eNB and gNB connected to the NG core.
  • solid lines indicate U-Plane connections
  • dashed lines indicate C-Plane connections.
  • gNB 224-1 is the master base station
  • eNB 226-2 is the secondary base station (this DC configuration may be referred to as NE-DC).
  • FIG. 7 shows an example in which the U-Plane connection between the 5GC unit 214 and the eNB 226-2 is performed via the gNB 224-1. good.
  • FIG. 8 is a block diagram showing the configuration of mobile terminal 202 shown in FIG. Transmission processing of the mobile terminal 202 shown in FIG. 8 will be described.
  • control data from the protocol processing unit 301 and user data from the application unit 302 are saved in the transmission data buffer unit 303 .
  • the data stored in the transmission data buffer unit 303 is transferred to the encoder unit 304 and subjected to encoding processing such as error correction.
  • the data encoded by the encoder section 304 is modulated by the modulation section 305 . Precoding in MIMO may be performed in modulation section 305 .
  • the modulated data After being converted into a baseband signal, the modulated data is output to frequency conversion section 306 and converted into a radio transmission frequency. Thereafter, transmission signals are transmitted to base station 203 from antennas 307-1 to 307-4.
  • FIG. 8 illustrates the case where the number of antennas is four, but the number of antennas is not limited to four.
  • the reception processing of the mobile terminal 202 is executed as follows. Radio signals from base station 203 are received by antennas 307-1 to 307-4. The received signal is converted from a radio reception frequency to a baseband signal by frequency conversion section 306 , and demodulated by demodulation section 308 . Weight calculation and multiplication processing may be performed in the demodulator 308 . The demodulated data is passed to the decoder section 309 and subjected to decoding processing such as error correction. Of the decoded data, control data is passed to protocol processing section 301 and user data is passed to application section 302 . A series of processing of mobile terminal 202 is controlled by control unit 310 .
  • the control unit 310 is connected to each of the units 301 to 309, though omitted in FIG.
  • the control unit 310 is implemented by, for example, a processing circuit including a processor and memory. That is, the control unit 310 is realized by the processor executing a program describing a series of processes of the mobile terminal 202 . A program describing a series of processes of the mobile terminal 202 is stored in the memory. Examples of memory are nonvolatile or volatile semiconductor memories such as RAM (Random Access Memory), ROM (Read Only Memory), flash memory, and the like.
  • the control unit 310 may be realized by a dedicated processing circuit such as FPGA (Field Programmable Gate Array), ASIC (Application Specific Integrated Circuit), DSP (Digital Signal Processor). In FIG. 8, the number of antennas used for transmission and the number of antennas used for reception by mobile terminal 202 may be the same or different.
  • FIG. 9 is a block diagram showing the configuration of base station 203 shown in FIG. Transmission processing of the base station 203 shown in FIG. 9 will be described.
  • EPC communication section 401 transmits and receives data between base station 203 and EPC (MME section 204, etc.).
  • the 5GC communication unit 412 transmits and receives data between the base station 203 and 5GC (5GC unit 214, etc.).
  • the other base station communication unit 402 transmits and receives data to and from another base station.
  • EPC communication unit 401, 5GC communication unit 412, and other base station communication unit 402 exchange information with protocol processing unit 403, respectively. Control data from protocol processing section 403 , and user data and control data from EPC communication section 401 , 5GC communication section 412 , and other base station communication section 402 are saved in transmission data buffer section 404 .
  • the data stored in the transmission data buffer unit 404 is passed to the encoder unit 405 and subjected to encoding processing such as error correction. There may be data that is directly output from transmission data buffer section 404 to modulation section 406 without being subjected to encoding processing.
  • the encoded data is subjected to modulation processing in modulation section 406 . Precoding in MIMO may be performed in modulation section 406 .
  • the modulated data is output to frequency conversion section 407 and converted into a radio transmission frequency.
  • a transmission signal is then transmitted to one or more mobile terminals 202 from antennas 408-1 to 408-4.
  • FIG. 9 illustrates the case where the number of antennas is four, but the number of antennas is not limited to four.
  • the reception processing of the base station 203 is executed as follows. Radio signals from one or more mobile terminals 202 are received by antenna 408 . The received signal is converted from a radio reception frequency to a baseband signal by frequency conversion section 407 and demodulated by demodulation section 409 . The demodulated data is passed to the decoder section 410 and subjected to decoding processing such as error correction. Of the decoded data, control data is passed to protocol processing unit 403, 5GC communication unit 412, EPC communication unit 401, or other base station communication unit 402, and user data is passed to 5GC communication unit 412, EPC communication unit 401, or other base station communication unit. It is passed to the station communication unit 402 .
  • control unit 411 A series of processes of the base station 203 are controlled by the control unit 411 . Therefore, the control unit 411 is connected to each of the units 401 to 410 and 412, though omitted in FIG. Like the control unit 310 of the mobile terminal 202 described above, the control unit 411 is realized by a processing circuit including a processor and memory, or by a dedicated processing circuit such as FPGA, ASIC, or DSP. In FIG. 9, the number of antennas used for transmission and the number of antennas used for reception by the base station 203 may be the same or different.
  • FIG. 9 is a block diagram showing the configuration of the base station 203
  • the base station 213 may also have the same configuration. 8 and 9, the number of antennas of mobile terminal 202 and the number of antennas of base station 203 may be the same or different.
  • FIG. 10 is a block diagram showing the configuration of the MME.
  • FIG. 10 shows the configuration of MME 204a included in MME section 204 shown in FIG.
  • the PDN GW communication unit 501 transmits and receives data between the MME 204a and the PDN GW (Packet Data Network Gate Way).
  • a base station communication unit 502 transmits and receives data via the S1 interface between the MME 204 a and the base station 203 . If the data received from the PDN GW is user data, the user data is passed from the PDN GW communication unit 501 to the base station communication unit 502 via the user plane communication unit 503 and then to one or more base stations 203 sent. When the data received from the base station 203 is user data, the user data is passed from the base station communication unit 502 to the PDN GW communication unit 501 via the user plane communication unit 503 and transmitted to the PDN GW.
  • PDN GW Packet Data Network Gate Way
  • control data is passed from the PDN GW communication unit 501 to the control plane control unit 505.
  • control data is passed from the base station communication section 502 to the control plane control section 505 .
  • the HeNBGW communication unit 504 transmits and receives data between the MME 204a and the HeNB GW (Home-eNB Gate Way). Control data received by the HeNBGW communication unit 504 from the HeNB GW is passed to the control plane control unit 505 . The HeNBGW communication unit 504 transmits control data input from the control plane control unit 505 to the HeNB GW.
  • the control plane control unit 505 includes a NAS security unit 505-1, an SAE bearer control unit 505-2, an idle state (Idle State) mobility management unit 505-3, and the like, and a control plane (hereinafter referred to as C-Plane). in some cases).
  • the NAS security unit 505-1 performs NAS (Non-Access Stratum) message security and the like.
  • the SAE bearer control unit 505-2 manages SAE (System Architecture Evolution) bearers.
  • the idle state mobility management unit 505-3 manages mobility in the standby state (idle state: LTE-IDLE state, or simply called idle), generates and controls paging signals in the standby state, Adds, deletes, updates, searches, manages the tracking area list, etc. of the tracking areas of one or more mobile terminals 202 .
  • the MME 204a distributes paging signals to one or more base stations 203.
  • the MME 204a also performs mobility control in the idle state.
  • the MME 204a manages the tracking area list when the mobile terminal 202 is in a standby state and in an active state.
  • the MME 204a initiates the paging protocol by sending a paging message to a cell belonging to the Tracking Area in which the mobile terminal 202 is registered.
  • Management of the CSG, CSG ID, and whitelist of the eNB 207 connected to the MME 204a may be performed by the idle state mobility manager 505-3.
  • control unit 506 is connected to each of the units 501 to 505, although omitted in FIG.
  • control unit 506 is implemented by a processing circuit including a processor and memory, or by a dedicated processing circuit such as FPGA, ASIC, or DSP.
  • FIG. 11 is a block diagram showing the configuration of the 5GC section.
  • FIG. 11 shows the configuration of the 5GC section 214 shown in FIG. 3 described above.
  • FIG. 11 shows a case where the 5GC section 214 shown in FIG. 5 includes an AMF configuration, an SMF configuration, and a UPF configuration.
  • the Data Network communication unit 521 transmits and receives data between the 5GC unit 214 and the Data Network.
  • the base station communication unit 522 transmits and receives data via the S1 interface between the 5GC unit 214 and the base station 203 and/or the NG interface between the 5GC unit 214 and the base station 213 .
  • the user data is passed from the Data Network communication unit 521 to the base station communication unit 522 via the user plane communication unit 523, and is sent to one or more base stations 203 and/or transmitted to base station 213 .
  • the user data is passed from the base station communication unit 522 to the data network communication unit 521 via the user plane communication unit 523, and transferred to the data network. sent to.
  • control data When the data received from the Data Network is control data, the control data is passed from the Data Network communication section 521 to the session management section 527 via the user plane communication section 523 .
  • the session manager 527 passes control data to the control plane controller 525 . If the data received from base station 203 and/or base station 213 is control data, the control data is passed from base station communication section 522 to control plane control section 525 .
  • the control plane controller 525 passes control data to the session manager 527 .
  • the control plane control unit 525 includes a NAS security unit 525-1, a PDU session control unit 525-2, an idle state (Idle State) mobility management unit 525-3, etc., and is a control plane (hereinafter also referred to as C-Plane). existing).
  • the NAS security unit 525-1 performs NAS (Non-Access Stratum) message security and the like.
  • the PDU session control unit 525-2 manages the PDU session between the mobile terminal 202 and the 5GC unit 214, and the like.
  • the idle state mobility management unit 525-3 manages mobility in the standby state (idle state: RRC_IDLE state, or simply called idle), generates and controls paging signals in the standby state, Adds, deletes, updates, searches, manages the tracking area list, etc. of the tracking areas of one or more mobile terminals 202 .
  • control unit 526 A series of processes of the 5GC unit 214 are controlled by the control unit 526 . Therefore, the control unit 526 is connected to each of the units 521 to 523, 525 and 527, although omitted in FIG. Like the control unit 310 of the mobile terminal 202 described above, the control unit 526 is implemented by a processing circuit including a processor and memory, or by a dedicated processing circuit such as FPGA, ASIC, or DSP.
  • FIG. 12 is a flowchart showing an overview from cell search to standby operation performed by a communication terminal (UE) in an LTE communication system.
  • UE communication terminal
  • FIG. 12 is a flowchart showing an overview from cell search to standby operation performed by a communication terminal (UE) in an LTE communication system.
  • step ST601 slot timing, frame Synchronize timing.
  • a combination of P-SS and S-SS is called a Synchronization Signal (SS).
  • the synchronization signal (SS) is assigned a synchronization code corresponding to the PCI assigned to each cell on a one-to-one basis.
  • the communication terminal synchronizes using these 504 PCIs and detects (specifies) the PCI of the synchronized cell.
  • the communication terminal transmits a cell-specific reference signal (RS), which is a reference signal (RS) transmitted from the base station to each cell, for the next synchronized cell. ) and measure the RS received power (Reference Signal Received Power: RSRP).
  • RS Cell-specific reference signal
  • RSRP Reference Signal Received Power
  • a code corresponding to PCI on a one-to-one basis is used for the reference signal (RS). It can be separated from other cells by correlating with that code.
  • step ST603 the communication terminal selects the cell with the best RS reception quality, for example, the cell with the highest RS reception power, that is, the best cell, from among the one or more cells detected up to step ST602. select.
  • the communication terminal receives the PBCH of the best cell and obtains BCCH, which is broadcast information.
  • MIB Master Information Block
  • DL downlink
  • dl-bandwidth transmission bandwidth configuration
  • SFN System Frame Number
  • SIB1 includes information on access to the cell, information on cell selection, and scheduling information on other SIBs (SIBk; an integer of k ⁇ 2). SIB1 also includes a tracking area code (TAC).
  • TAC tracking area code
  • step ST606 the communication terminal compares the TAC of SIB1 received in step ST605 with the TAC portion of the tracking area identifier (TAI) in the tracking area list already held by the communication terminal.
  • a tracking area list is also called a TAI list.
  • TAI is identification information for identifying a tracking area, and is composed of MCC (Mobile Country Code), MNC (Mobile Network Code), and TAC (Tracking Area Code).
  • MCC Mobile Country Code
  • MNC Mobile Network Code
  • TAC Track Area Code
  • MCC Mobile Country Code
  • MNC Mobile Network Code
  • TAC Track Area Code
  • step ST606 if the TAC received in step ST605 is the same as the TAC included in the tracking area list, the communication terminal enters standby operation in that cell.
  • the communication terminal sends a TAU (Tracking Area Update) to the core network (Core Network, EPC) including the MME etc. through the cell. Request a change of tracking area to do so.
  • TAU Track Area Update
  • the example shown in FIG. 12 shows an example of the operation from cell search to standby in the LTE system, but in the NR system, the best beam may be selected in addition to the best cell in step ST603.
  • beam information for example, a beam identifier may be obtained in step ST604.
  • scheduling information of Remaining Minimum SI (RMSI) may be acquired in step ST604.
  • the RMSI may be received in step ST605.
  • a device constituting the core network (hereinafter sometimes referred to as “core network side device") is based on the identification number (UE-ID etc.) of the communication terminal sent from the communication terminal together with the TAU request signal. Update area list.
  • the core network device transmits the updated tracking area list to the communication terminal.
  • the communication terminal rewrites (updates) the TAC list held by the communication terminal based on the received tracking area list. After that, the communication terminal enters standby operation in the cell.
  • cells configured by eNBs have relatively wide coverage.
  • cells are configured to cover an area with relatively wide coverage of multiple cells configured by multiple eNBs.
  • a cell configured by an eNB When converted to small cells, a cell configured by an eNB has a narrower coverage than the coverage of a cell configured by a conventional eNB. Therefore, as in the past, in order to cover a certain area, a large number of eNBs made into smaller cells are required compared to conventional eNBs.
  • a cell with relatively large coverage such as a cell composed of conventional eNBs
  • a macro cell such as a cell composed of conventional eNBs
  • an eNB that constitutes a macro cell will be referred to as a “macro eNB”.
  • a cell with relatively small coverage such as a cell made into a small cell
  • an eNB that constitutes the small cell is referred to as a "small eNB”.
  • a macro eNB may be, for example, a "Wide Area Base Station" described in Non-Patent Document 7.
  • a small eNB may be, for example, a low power node, a local area node, a hotspot, or the like.
  • the small eNB is a pico eNB that constitutes a pico cell, a femto eNB that constitutes a femto cell, HeNB, RRH (Remote Radio Head), RRU (Remote Radio Unit), RRE (Remote Radio Equipment) or RN (Relay Node).
  • the small eNB may be a "Local Area Base Station" or a "Home Base Station" described in Non-Patent Document 7.
  • FIG. 13 shows an example of a cell configuration in NR.
  • narrow beams are formed and transmitted in different directions.
  • base station 750 transmits and receives to and from mobile terminals using beam 751-1 at a given time. At other times, base station 750 transmits to and receives from mobile terminals using beam 751-2. Similarly, the base station 750 uses one or more of the beams 751-3 to 751-8 to transmit and receive with the mobile terminal. In this manner, base station 750 constitutes a wide-area cell.
  • FIG. 13 shows an example in which the number of beams used by the base station 750 is eight, the number of beams may be different from eight. Also, in the example shown in FIG. 13, the number of beams used simultaneously by the base station 750 is one, but a plurality of beams may be used.
  • SL Side Link
  • D2D Device to Device
  • V2V Vehicle to Vehicle
  • the Physical sidelink broadcast channel (PSBCH) carries system and synchronization related information and is transmitted from the UE.
  • the physical sidelink discovery channel (PSDCH) carries sidelink discovery messages from the UE.
  • a physical sidelink control channel (PSCCH) carries control information from the UE for sidelink communication and V2X sidelink communication.
  • the physical sidelink shared channel (PSSCH) carries data from the UE for sidelink communication and V2X sidelink communication.
  • a physical sidelink feedback channel (PSFCH) carries HARQ feedback on the sidelink from the UE that received the PSSCH transmission to the UE that transmitted the PSSCH.
  • a sidelink broadcast channel (SL-BCH: Sidelink broadcast channel) has a predetermined transport format and is mapped to a physical channel PSBCH.
  • the Sidelink Discovery Channel has periodic broadcast transmissions of fixed size and predetermined format.
  • SL-DCH also supports both UE autonomous resource selection and eNB scheduled resource allocation. There is a collision risk with UE automatic resource selection, and there is no collision when the UE is allocated dedicated resources by the eNB.
  • SL-DCH also supports HARQ combining, but not HARQ feedback.
  • SL-DCH is mapped to PSDCH, which is a physical channel.
  • a sidelink shared channel supports broadcast transmission.
  • SL-SCH supports both UE autonomous resource selection and eNB scheduled resource allocation. There is a collision risk with UE automatic resource selection, and there is no collision when the UE is allocated dedicated resources by the eNB.
  • SL-SCH also supports HARQ combining, but not HARQ feedback.
  • SL-SCH also supports dynamic link adaptation by varying transmit power, modulation and coding.
  • SL-SCH is mapped to PSSCH which is a physical channel.
  • a sidelink broadcast control channel (SBCCH: Sidelink Broadcast Control Channel) is a sidelink channel for reporting sidelink system information from one UE to another UE.
  • SBCCH is mapped to SL-BCH, which is a transport channel.
  • a sidelink traffic channel is a one-to-many sidelink traffic channel for transmitting user information from one UE to another UE.
  • STCH is only used by UEs with sidelink communication capability and UEs with V2X sidelink communication capability.
  • Point-to-point communication between UEs with two sidelink communication capabilities is also realized with STCH.
  • STCH is mapped to SL-SCH which is a transport channel.
  • a sidelink control channel is a sidelink control channel for transmitting control information from one UE to another UE.
  • SCCH is mapped to SL-SCH which is a transport channel.
  • V2X communication in NR is being studied based on the LTE system and the LTE-A system, the following changes and additions have been made from the LTE system and the LTE-A system.
  • PC5-S signaling is implemented to establish a link for implementing SL, or PC5 communication.
  • the link is implemented at the V2X layer and is also referred to as a layer 2 link.
  • RRC signaling in SL communication is also called PC5 RRC signaling.
  • PC5 RRC signaling it has been proposed to notify UE capabilities between UEs that perform PC5 communication, and to notify AS layer settings for performing V2X communication using PC5 communication.
  • Non-Patent Document 20 (3GPP TR23.703), Non-Patent Document 23 (3GPP TS23.303), Non-Patent Document 23 (3GPP TS23.303), Reference 27 (3GPP TR38.836)
  • a relay between the UE and the NW may be called a UE-to-NW relay or a UE-NW relay.
  • a UE that implements relaying between a UE and a NW may be referred to as a relay UE.
  • a method using a UE-NW relay can be considered.
  • communication between a gNB and a UE takes place via a relay UE.
  • Communication between the gNB and the relay UE is performed by Uu, and communication between the relay UE and the remote UE is performed by PC5.
  • both a relay UE and a remote UE may exist within the coverage of a gNB.
  • the gNB in which the relay UE exists in coverage (hereinafter sometimes referred to as gNB#1) and the gNB in which the remote UE exists in coverage (hereinafter sometimes referred to as gNB#2) may be the same. and can be different. In such a situation, it is conceivable that the remote UE communicates via the relay UE with a gNB that exists within the coverage of the relay UE.
  • the remote UE can obtain better communication quality by connecting with gNB#1 via the relay UE.
  • the remote UE communicates with gNB#1 via the relay UE. In this case, the transmission power of the remote UE is less, so that the power consumption can be reduced.
  • the HO (HandOver) method from the directly connected gNB to the indirectly connected gNB via the relay UE is discussed (see Non-Patent Document 26 (3GPP R2-2009145)).
  • SL communication hereinafter referred to as PC5 communication
  • PC5 communication is performed between the remote UE and the relay UE.
  • a transmitting side UE (hereinafter sometimes referred to as UE-TX) sends a receiving side UE (hereinafter sometimes referred to as UE-RX) for communication in the UE-TX to UE-RX direction.
  • Settings for communication from UE-TX to UE-RX include, for example, RRC settings (see Non-Patent Document 19 (3GPP TS38.331)).
  • RRC Radio Resource Control
  • Embodiment 1 discloses a method for solving such problems.
  • settings for PC5 communication may be referred to as settings necessary for PC5 communication, settings for PC5 communication, and the like.
  • the HO destination gNB (hereinafter sometimes referred to as T-gNB) is for the remote UE, the PC5 communication between the remote UE and the relay UE Notify required settings.
  • the T-gNB notifies the relay UE of the settings required for PC5 communication between the remote UE and the relay UE.
  • the relay UE is a relay UE connected or connectable with the T-gNB, and the remote UE connects with the T-gNB via the relay UE.
  • the relay UE in other words, the connection destination relay UE may be referred to as relay UE#2.
  • the gNB to which the remote UE that performs HO is connected before the start of HO may be referred to as the HO source gNB or S-gNB.
  • the T-gNB notifies the remote UE and relay UE#2 of the settings used for PC5 communication from the remote UE to relay UE#2.
  • the T-gNB notifies the remote UE of the settings used for PC5 communication from the remote UE to the relay UE#2.
  • the T-gNB may inform the remote UE via the S-gNB of the configuration. If the S-gNB connects with the remote UE via the relay UE, the T-gNB may notify the remote UE of the configuration via the S-gNB, the relay UE.
  • the relay UE when the remote UE connects to the S-gNB via the relay UE in other words, the connection source relay UE, which is the relay UE to which the remote UE is connected before the start of HO, is the relay It may be called UE#1.
  • the T-gNB and S-gNB may be the same gNB. It may be the case of HO between different cells of the same gNB.
  • settings related only to transmission (TX) in PC5 communication from the remote UE to the relay UE#2 may be notified.
  • settings related to both transmission (TX) and reception (RX) in PC5 communication from the remote UE to the relay UE#2 may be notified. Notification may be made by combining these settings.
  • the remote UE notifies the relay UE#2 of the settings used for PC5 communication from the remote UE to the relay UE#2. That is, the remote UE notifies the configuration received from the T-gNB.
  • the remote UE may signal the configuration received via the S-gNB.
  • the remote UE may notify some or all of the parameters set to the own remote UE.
  • settings to be reported from the remote UE to the relay UE#2 settings related to both TX and RX in PC5 communication from the remote UE to the relay UE#2 may be reported.
  • the setting related only to TX in the PC5 communication from the remote UE to the relay UE#2 may not be notified.
  • the interface between base stations may be used for notification from the T-gNB to the S-gNB.
  • Xn signaling may be used for the notification. For example, it may be notified by being included in a response message to the HO request. By doing so, it is possible to reduce the amount of signaling because there is no need to notify Xn signaling separately.
  • Notification from the S-gNB to the remote UE may use RRC signaling. For example, it may be notified by being included in the RRCreconfiguration message. By doing so, it is possible to reduce the amount of signaling because there is no need to report RRC signaling separately.
  • RRC signaling For example, it may be notified by being included in the RRCreconfiguration message. By doing so, it is possible to reduce the amount of signaling because there is no need to report RRC signaling separately.
  • the remote UE may notify the relay UE#2 using PC5-S signaling. It may be notified by including it in a Direct Communication Request message. It may be notified by being included in the security protected PC5-S message. As another method, the remote UE may notify the relay UE#2 using SL RRC signaling. It may be notified by being included in the PC5-RRC message. It may be notified by being included in the RRCreconfigurationSidelink message. As another method, it may be notified by including it in the RRC message notified from the remote UE to the T-gNB. It may be notified by being included in the RRCreconfigurationcomplete message. Relay UE#2 may receive the message from the remote UE to notify the T-gNB and obtain the configuration.
  • (4-1) Settings for SL SRB0.
  • (4-1-2) Settings for SL SRB1.
  • (4-1-3) Settings for SL SRB2.
  • (4-1-4) Settings for SL SRB3.
  • (4-1-5) A combination of (4-1-1) to (4-1-4).
  • a DC using a relay UE may be set. For example, when a DC using a relay UE is set, the setting regarding SL SRB3 in (4-1-4) may be performed.
  • a default DRB with a preset setting may be provided as the SL DRB.
  • (4-2) SL DRB-related settings may be default DRB-related settings.
  • the setting regarding SL DRB may be a setting as to whether or not to use the default DRB. This makes it possible to set SL DRB suitable for the service after this. Also, it is possible to use the default DRB before the SL DRB suitable for the service is set.
  • SL DRB settings can be flexibly implemented.
  • the setting related to mapping of SLRB and Uu RB in (5) is a setting related to mapping of SLRB used between remote UE and relay UE and Uu RB used between relay UE and gNB in communication between remote UE and gNB. good too.
  • the information about the UE to be the target of PC5 communication in (7) may be, for example, information about the destination UE of PC5 communication. It may be information about the source UE of the PC5 communication.
  • the information about the UE may be, for example, a UE identifier.
  • the UE identifier may be, for example, the L2ID.
  • Information about the destination UE of the PC5 communication may be, for example, the destination L2ID.
  • Information about the source UE of the PC5 communication may be, for example, the source L2ID.
  • the remote UE can obtain from the T-gNB the settings used for PC5 communication from the remote UE to the relay UE#2.
  • the relay UE#2 can obtain from the T-gNB the settings used for PC5 communication from the remote UE to the relay UE#2.
  • the T-gNB notifies the remote UE of the settings used for PC5 communication from the remote UE to the relay UE#2.
  • the method disclosed above may be appropriately applied.
  • the remote UE can obtain the settings used for PC5 communication between the remote UE and relay UE#2 from the T-gNB.
  • the T-gNB may notify the relay UE#2 of the settings used for PC5 communication from the remote UE to the relay UE#2.
  • the T-gNB may notify some or all of the parameters set to the remote UE.
  • settings to be reported from the T-gNB to the relay UE#2 settings related to both TX and RX in PC5 communication from the remote UE to the relay UE#2 may be reported.
  • the setting to be notified from the T-gNB to the relay UE#2 the setting related only to TX in the PC5 communication from the remote UE to the relay UE#2 may not be notified.
  • the T-gNB may notify the relay UE#2 using the Uu interface between the T-gNB and the relay UE#2. You may notify using RRC signaling.
  • it may be notified by being included in the RRCreconfiguration message.
  • it may be notified by being included in a message for requesting relay between the remote UE and gNB.
  • a new RRC message may be provided for notification of the setting.
  • the relay UE#2 can acquire from the T-gNB the settings to be used for PC5 communication from the remote UE to the relay UE#2.
  • the remote UE does not need to notify the relay UE#2, early setting is possible.
  • it since it is not necessary to perform communication between the remote UE and the relay UE#2 for this setting, it becomes possible to set the SL SRB0 between the remote UE and the relay UE#2.
  • the T-gNB notifies the remote UE and the relay UE#2 of the settings used for PC5 communication from the relay UE#2 to the remote UE.
  • the T-gNB notifies the remote UE of the settings used for PC5 communication from the relay UE#2 to the remote UE.
  • the notification method it is preferable to appropriately apply the setting notification method used for PC5 communication from the remote UE to the relay UE#2 disclosed above.
  • the settings to be notified to the remote UE settings related to both TX and RX in PC5 communication from the relay UE#2 to the remote UE may be notified.
  • settings to be notified to the remote UE settings related only to TX in PC5 communication from the relay UE#2 to the remote UE may be notified. Notification may be made by combining these settings.
  • the remote UE may notify the relay UE#2 of the settings used for PC5 communication from the relay UE#2 to the remote UE.
  • the remote UE signals the configuration received from the T-gNB.
  • the remote UE may signal the configuration received via the S-gNB.
  • settings to be reported from the remote UE to the relay UE#2 settings related to both TX and RX in PC5 communication from the relay UE#2 to the remote UE may be reported.
  • a setting related only to TX in PC5 communication from the relay UE#2 to the remote UE may be notified. Notification may be made by combining these settings.
  • the notification method it is preferable to appropriately apply the setting notification method used for PC5 communication from the remote UE to the relay UE#2 disclosed above.
  • the remote UE can acquire from the T-gNB the settings to be used for PC5 communication from the relay UE#2 to the remote UE.
  • the relay UE#2 can obtain from the T-gNB the settings used for PC5 communication from the relay UE#2 to the remote UE.
  • the notification method from the T-gNB to the remote UE the notification method of the setting used for the PC5 communication from the remote UE to the relay UE#2 disclosed above may be appropriately applied.
  • the settings to be notified to the remote UE some or all of the parameters to be set from the T-gNB to the relay UE#2, which will be described later, may be notified.
  • settings to be notified to the remote UE settings related to both TX and RX in PC5 communication from the relay UE#2 to the remote UE may be notified.
  • the setting related only to transmission TX in PC5 communication from the relay UE#2 to the remote UE may not be notified.
  • the remote UE can acquire from the T-gNB the settings used for the PC5 communication from the relay UE#2 to the remote UE.
  • the T-gNB notifies the relay UE#2 of the settings used for PC5 communication from the relay UE#2 to the remote UE.
  • settings to be notified from the T-gNB to the relay UE#2 settings related to both TX and RX in PC5 communication from the relay UE#2 to the remote UE may be notified.
  • settings to be notified from the T-gNB to the relay UE#2 settings related only to TX in PC5 communication from the relay UE#2 to the remote UE may be notified. Notification may be made by combining these settings.
  • the notification method from the T-gNB to the relay UE#2 may appropriately apply the notification method of the settings required for the PC5 communication from the remote UE to the relay UE#2 disclosed above.
  • the relay UE#2 can acquire from the T-gNB the settings to be used for PC5 communication from the relay UE#2 to the remote UE.
  • early setting is possible.
  • the T-gNB notifies the relay UE#2 of the setting used for PC5 communication from the relay UE#2 to the remote UE.
  • the notification method the notification method disclosed above may be appropriately applied.
  • the relay UE#2 notifies the remote UE of the setting used for PC5 communication from the relay UE#2 to the remote UE.
  • Relay UE#2 notifies the configuration received from T-gNB.
  • the settings to be reported from the relay UE#2 to the remote UE settings related to both TX and RX in PC5 communication from the relay UE#2 to the remote UE may be reported.
  • the setting to be notified from the remote UE to the relay UE#2 the setting related only to TX in the PC5 communication from the relay UE#2 to the remote UE may not be notified.
  • the relay UE#2 may notify the remote UE using PC5-S signaling. It may be notified by including it in a Direct Communication Request message. It may be notified by being included in the security protected PC5-S message. As another method, the relay UE#2 may notify the remote UE using SL RRC signaling. It may be notified by being included in the PC5-RRC message. It may be notified by being included in the RRCreconfigurationSidelink message. As another method, the T-gNB may be included in the RRC message notified to the remote UE via the relay UE #2. It may be notified by being included in the RRCreconfiguration message.
  • the remote UE can acquire from the T-gNB the settings to be used for PC5 communication from the relay UE#2 to the remote UE.
  • a method of notifying the settings used for PC5 communication from the remote UE to the relay UE#2 and a method of notifying the settings used for the PC5 communication from the relay UE#2 to the remote UE may be used in combination as appropriate. By doing so, it becomes possible to notify the setting used for two-way PC5 communication between the remote UE and the relay UE#2.
  • the remote UE and relay UE#2 can each obtain settings for use in two-way PC5 communication between the remote UE and relay UE#2.
  • FIG. 14 is a sequence diagram showing an example of a remote UE HO method via a relay UE, according to the first embodiment.
  • the remote UE performs data communication between the S-gNB and CN.
  • CN there is UPF, for example.
  • the S-gNB notifies the remote UE of the measurement settings.
  • the measurement settings the DL measurement settings and the SL measurement settings may be combined.
  • a gNB and a UE may be combined as measurement targets.
  • the DL measurement setting is set for the gNB, and the SL measurement setting is set for the UE. Different frequencies may be set for DL measurement and SL measurement setting, or the same frequency may be set. DL measurement and SL measurement may be performed at the set frequency.
  • the remote UE performs measurements according to the measurement settings received from the S-gNB.
  • the remote UE performs discovery processing to detect relay UEs.
  • the remote UE detects relay UEs that can connect to the gNB.
  • Discovery processing may be performed on UEs that are subject to reporting in measurement settings.
  • Discovery processing may be performed before SL measurement, and SL measurement may be performed on relay UEs detected in the discovery processing.
  • the relay UE may notify the remote UE of information about the relay UE, information of the gNB to which the relay UE is connected, status information of the relay UE, information indicating whether the relay UE is capable of relaying, and the like.
  • the identifier of the relay UE may be used as the information on the relay UE.
  • a gNB identifier may be used as the information on the gNB to which the relay UE is connected.
  • the state information of the relay UE may be the RRC connection state with the gNB or the CM (Connection Management) connection state with the CN.
  • Information about services may be included as information indicating whether the relay UE is capable of relaying.
  • Information about services may be, for example, information indicating services that can be relayed.
  • the relay UE may notify the remote UE of this information in the discovery process.
  • the relay UE may notify the remote UE of the information by PC5-S signaling.
  • the relay UE may notify the remote UE of the information by PC5-RRC signaling. It is effective when a PC5 connection is established between the remote UE and the relay UE, for example, when the PC5 connection establishment process is performed following the discovery process.
  • the relay UE may broadcast the information.
  • the remote UE may receive the information reported from the relay UE. By doing so, the remote UE can acquire the information.
  • the remote UE reports the measurement result to the S-gNB.
  • the DL measurement result and the SL measurement result may be combined and reported.
  • the SL measurement result may be reported to the relay UE detected in the discovery process. Include the DL measurement result and the SL measurement result in the measurement report message.
  • the SL measurement result may include information on the target relay UE, information on the gNB to which the relay UE connects, state information on the relay UE, information indicating whether the relay UE is capable of relaying, and the like. By doing so, the S-gNB can acquire the measurement result of the relay UE in the remote UE.
  • the S-gNB determines HO of the remote UE.
  • S-gNB uses measurement results, information on the relay UE, information on the gNB to which the relay UE connects, state information on the relay UE, information indicating whether the relay UE can relay, etc. Determine the HO of the remote UE. do it.
  • it is determined to change the connection destination of the remote UE from the S-gNB to the relay UE.
  • the S-gNB decides to make the T-gNB connected to the relay UE the HO destination.
  • the S-gNB notifies the T-gNB of the HO request of the remote UE.
  • the HO request message may include information about the remote UE, such as the identifier of the remote UE, the context of the remote UE, and so on.
  • the HO request message may include information about the relay UE to be connected, such as the identifier of the relay UE and information indicating whether the relay UE is capable of relaying. By doing so, the T-gNB can acquire information about the remote UE to be the HO target and the relay UE to be connected.
  • the T-gNB which receives information about the remote UE to be HO-targeted and the relay UE to be connected from the S-gNB, performs HO acceptance control on the remote UE.
  • HO acceptance control the T-gNB determines whether HO can be accepted via a relay that connects to the remote UE, and performs RRC settings for the remote UE in the T-gNB.
  • the T-gNB may configure for PC5 communication between remote UE and relay UE.
  • RRC setting may be performed as setting for PC5 communication. By doing so, the T-gNB can notify the remote UE and the relay UE of the PC5 communication settings.
  • the settings for PC5 communication between the remote UE and the relay UE may be made after receiving a relay response from the relay UE, which will be described later.
  • the T-gNB When notifying the setting to the relay UE, the T-gNB notifies via the S-gNB and the remote UE, or directly from the T-gNB to the relay UE, notifies separately from the HO request message and other methods should be used. By doing so, T-gNB can be set for PC5 communication using the relay response from the relay UE.
  • the T-gNB notifies a relay request message to the relay UE to which the HO target remote UE is connected.
  • Information about the remote UE may be included in the relay request message.
  • Information about the relay UE may be included in the relay request message.
  • Information indicating whether the relay UE is capable of relaying may be included. May include information about services.
  • the relay request message may include information indicating the contents of the PC5 communication settings set by the T-gNB (hereinafter referred to as PC5 communication setting information).
  • the setting information for PC5 communication is an example of communication setting information indicating setting contents for performing terminal-to-terminal communication, that is, PC5 communication, between the remote UE and the relay UE. In the example of FIG.
  • the T-gNB includes the setting information for PC5 communication from the relay UE to the remote UE in the relay request message and notifies the relay UE.
  • the relay UE that has received the notification implements connection acceptance control of the remote UE that is the HO target.
  • connection acceptance control of the remote UE the relay UE determines whether or not it is possible to connect to the remote UE. That is, the relay UE determines whether it can connect to the remote UE and whether it can relay.
  • the relay UE notifies the T-gNB of the relay response message.
  • the relay response message may include information about the remote UE, information about the relay UE, and information indicating whether the relay UE is capable of relaying the remote UE to be HO-targeted.
  • the relay response message may include information indicating that the setting for PC5 communication has been completed. In the example of FIG. 14, an acknowledgment is notified as a relay response message.
  • the T-gNB may notify the relay UE, which is the connection destination of the HO target remote UE, of information regarding the configuration of the adaptation layer.
  • T-gNB may include the information in the relay request message and notify. It is preferable to appropriately apply the method of notifying the setting information for PC5 communication from the T-gNB to the relay UE, which is the connection destination of the remote UE targeted for HO, disclosed above.
  • information on adaptation layer settings information on adaptation layer settings between remote UE and relay UE used for communication between remote UE and T-gNB and/or information on adaptation layer settings between relay UE and T-gNB may be
  • the relay UE that has received the information about the adaptation layer setting can perform the adaptation layer setting.
  • the relay UE may include information indicating that the adaptation layer configuration is completed in the relay response message sent in step 1408 . By doing so, T-gNB can recognize that the setting of the adaptation layer is completed for the relay UE.
  • the T-gNB notifies the S-gNB of the HO request response message.
  • the acknowledgment is notified as the HO request response message.
  • Information about the remote UE may be included in the HO Request Response message.
  • Information about the relay UE may be included in the HO Request Response message.
  • Information indicating whether the relay UE is capable of relaying may be included.
  • the HO Request Response message may include the RRC configuration for communication with the T-gNB configured by the T-gNB in the remote UE.
  • the HO request response message may include the PC5 communication setting information set by the T-gNB.
  • the T-gNB includes the setting information for PC5 communication from the remote UE to the relay UE in the HO request response message and notifies the S-gNB.
  • the T-gNB may notify the S-gNB of information regarding the settings of the adaptation layer used for communication between the remote UE and the T-gNB.
  • the information may be included in the HO request response message and notified.
  • the method of notifying the setting information for PC5 communication from the T-gNB to the S-gNB disclosed above may be appropriately applied.
  • information on adaptation layer settings information on adaptation layer settings between remote UE and relay UE used for communication between remote UE and T-gNB and/or information on adaptation layer settings between relay UE and T-gNB may be notified.
  • the S-gNB notifies the HO target remote UE of an RRC message for RRC setting change (it may be an HO instruction) to the T-gNB.
  • the S-gNB notifies the message via the relay UE.
  • An RRCReconfiguration message may be used as the RRC message.
  • Information about the remote UE may be included in the RRC message.
  • the RRC message may include information about the relay UE to be connected.
  • the RRC message may include information about the T-gNB to be the HO destination.
  • the RRC message may include the RRC configuration for communication with the T-gNB of the remote UE configured by the T-gNB. By doing so, the remote UE can receive the RRC configuration set by the T-gNB.
  • the RRC message may include setting information for PC5 communication.
  • the remote UE can receive the setting information for PC5 communication with the relay UE.
  • the setting information for PC5 communication from the remote UE to the relay UE is notified.
  • the S-gNB may notify the remote UE of information regarding the configuration of the adaptation layer used for communication between the remote UE and the T-gNB.
  • the information may be included in the RRC configuration change message and notified.
  • the method of notifying the PC5 communication setting information from the S-gNB to the remote UE disclosed above may be appropriately applied.
  • information on adaptation layer settings information on adaptation layer settings between remote UE and relay UE used for communication between remote UE and T-gNB and/or information on adaptation layer settings between relay UE and T-gNB may be notified.
  • the S-gNB When the remote UE is connected to the S-gNB via the relay UE (relay UE #1), the S-gNB is used for communication between the remote UE and the T-gNB to the remote UE via the relay UE. Information about the settings of the adaptation layer may be notified.
  • the remote UE can receive information about the configuration of the adaptation layer used for communication between the remote UE and the T-gNB, and can configure the adaptation layer.
  • the remote UE establishes a PC5 connection with the connected relay UE.
  • the remote UE notifies the relay UE of the setting information for PC5 communication from the remote UE to the relay UE.
  • the relay UE notifies the remote UE of the setting information for PC5 communication from the relay UE to the remote UE.
  • PC5 communication becomes possible between the remote UE and the relay UE.
  • data communication on the PC 5 becomes possible between the remote UE and the relay UE.
  • the S-gNB may notify the remote UE of information regarding the configuration of the adaptation layer used for communication between the remote UE and the T-gNB.
  • the information may be included in the RRC configuration change message and notified.
  • the method of notifying the PC5 communication setting information from the S-gNB to the remote UE disclosed above may be appropriately applied.
  • information on adaptation layer settings information on adaptation layer settings between remote UE and relay UE used for communication between remote UE and T-gNB and/or information on adaptation layer settings between relay UE and T-gNB may be notified.
  • the remote UE stops communication with the S-gNB when receiving the RRC message for the RRC setting change from the S-gNB to the T-gNB in step ST1410. It may release the configuration for communication with the S-gNB.
  • the remote UE if the remote UE is connected to the S-gNB via the relay UE, communication with the relay UE is stopped.
  • the setting for PC5 communication with the relay UE may be released. By doing so, the remote UE can quickly perform the PC5 connection process with the destination relay UE and the RRC connection process with the T-gNB via the relay UE.
  • the remote UE may stop communication with the S-gNB when establishing a PC5 connection with the destination relay UE in step ST1411. It may release the configuration for communication with the S-gNB. If the remote UE is connected with the S-gNB via the relay UE, it may stop communicating with the relay UE. The setting for PC5 communication with the relay UE may be released. By doing so, the remote UE can perform RRC connection processing with the T-gNB via the relay UE after reliably establishing the PC5 connection with the connection destination relay UE.
  • the remote UE may notify the relay UE of information regarding the settings of the adaptation layer used for communication between the remote UE and the T-gNB. For this notification, the above-disclosed method of notifying the setting information for PC5 communication from the remote UE to the relay UE may be appropriately applied.
  • information on adaptation layer settings information on adaptation layer settings between remote UE and relay UE used for communication between remote UE and T-gNB and/or information on adaptation layer settings between relay UE and T-gNB may be notified.
  • a relay UE that receives information about the configuration of the adaptation layer used for communication between the remote UE and the T-gNB can configure the adaptation layer.
  • the condition for stopping communication with the S-gNB may be that the remote UE is directly connected to the S-gNB.
  • the remote UE does not have to perform connection processing with both the connection source relay UE and the connection destination relay UE.
  • the configuration of the remote UE can be simplified. Also, it is possible to avoid complication of the HO process of the remote UE.
  • the remote UE notifies the T-gNB of RRC setting completion via the connection destination relay UE.
  • the notification may be done using RRC signaling between the remote UE and the T-gNB.
  • An RRCReconfigurationcomplete message may be used.
  • the T-gNB can recognize that the remote UE has performed the RRC configuration and the RRC connection has been performed via the relay UE. This enables communication between the remote UE and the T-gNB via the relay UE.
  • the T-gNB Upon receiving the RRC setup complete message from the remote UE, the T-gNB performs path switch processing for the remote UE with the CN in step ST1413. By doing so, it is possible to perform a path switch process from the S-gNB to the T-gNB for the remote UE. Also, the CN's UPF can transmit DL data to the remote UE to the T-gNB. Also, data communication becomes possible between the remote UE and the UPF via the T-gNB and the relay UE.
  • the T-gNB may include information about the remote UE in the CN's path switch request message to the AMF.
  • the path switch request message information related to remote UE communications may be included.
  • the information about the communication of the remote UE may include information indicating whether or not the communication is via the relay UE.
  • Information about the relay UE may be included.
  • the information may be included in the switch request message that the AMF informs the UPF in the CN.
  • the information may be included in the path switch request response message from the UPF to the AMF.
  • the information may also be included in the path switch request response message from AMF to T-gNB.
  • the aforementioned path switch request message and path switch request response message between AMF and UPF may be notified via SMF.
  • step ST1414 the T-gNB notifies the S-gNB of the release of the context of the remote UE. By doing so, the S-gNB can release the context of the remote UE.
  • the S-gNB When the remote UE is connected to the S-gNB via the relay UE, if the S-gNB receives the release of the UE context from the T-gNB, the S-gNB sends the connection source relay UE the remote UE MAY signal the release of the context.
  • the connection source relay UE that has received the notification can release the context of the remote UE.
  • the S-gNB When the S-gNB receives the release of the UE context from the T-gNB, it may notify the connection source relay UE to stop communication with the remote UE. You may notify this communication stop by RRC signaling.
  • Information about the remote UE may be included in the communication stop message.
  • the communication stop message may include cause information of the communication stop. For example, the cause information may include information indicating that communication is stopped due to HO.
  • Configuration for relay communication between remote UE and S-gNB may be released.
  • the settings for PC5 communication may be released.
  • step ST1415 data communication becomes possible among the remote UE, connection destination relay UE, T-gNB, and CN.
  • the remote UE can change the connection destination of the gNB while maintaining the RRC connection. Further, it is possible to continue the communication service even when the connection destination of the gNB of the remote UE is changed.
  • FIG. 15 is a sequence diagram showing another example of the HO method of the remote UE via the relay UE, according to the first embodiment.
  • steps common to those in FIG. 14 are assigned the same step numbers, and common descriptions are omitted.
  • the setting method for PC5 communication between the remote UE and the relay UE is different from the example of FIG.
  • the setting information for PC5 communication between the remote UE and the relay UE is notified directly from the T-gNB to the relay UE, and the setting to the remote UE is from the T-gNB to the S - Notification via gNB.
  • the T-gNB notifies the relay UE of setting information for PC5 communication from the remote UE to the relay UE and setting information for PC5 communication from the relay UE to the remote UE.
  • the relay UE can receive the setting information for PC5 communication from the remote UE to the relay UE and the setting information for PC5 communication from the relay UE to the remote UE.
  • the T-gNB notifies the S-gNB of the setting information for PC5 communication from the remote UE to the relay UE and the setting information for PC5 communication from the relay UE to the remote UE.
  • step ST1510 the S-gNB notifies the remote UE of the setting information for PC5 communication from the remote UE to the relay UE and the setting information for PC5 communication from the relay UE to the remote UE.
  • the remote UE can receive PC5 communication setting information from the remote UE to the relay UE and PC5 communication setting information from the relay UE to the remote UE.
  • connection destination relay UE of the PC5 communication setting information it is not necessary to notify the connection destination relay UE of the PC5 communication setting information to the remote UE, or from the remote UE to the connection destination relay UE of the PC5 communication setting information. Therefore, it can be set at an early stage. Also, since it is not necessary to perform communication between the connection destination relay UE and the remote UE for this setting, it is possible to set the SL SRB between the relay UE and the remote UE. For example, it is possible to set from SRB0 of SL.
  • the remote UE and the relay UE#2 can acquire the settings used for the PC5 communication between the remote UE and the relay UE#2, and the PC5 communication between the remote UE and the relay UE#2 is possible. becomes. Therefore, the remote UE can connect with the T-gNB via the relay UE#2, and the remote UE can communicate with the T-gNB via the relay UE#2. Therefore, HO of the remote UE from S-gNB to T-gNB is possible. HO to the gNB to which the remote UE connects indirectly via the relay UE, in other words, the HO of the remote UE via the relay UE becomes possible, and service continuity is obtained.
  • Modification 1 of the first embodiment The setting of DRB in the communication between the remote UE and the gNB via the relay UE becomes the setting via the relay UE.
  • Non-Patent Documents 1 to 27 and other documents regarding setting of DRB via the relay UE For this reason, there arises a problem that communication cannot be performed between the remote UE and the gNB via the relay UE.
  • HO of the remote UE via the relay UE there is no disclosure of how to handle DRB settings in communication between the remote UE and the S-gNB.
  • Modification 1 of Embodiment 1 discloses a method for solving such a problem.
  • a remote It notifies information about the setting of DRB between the UE and the relay UE#1.
  • Information about the remote UE and the relay UE #1 of the DRB setting used for communication between the remote UE and the S-gNB via the relay UE #1 may be notified from the S-gNB to the T-gNB.
  • the S-gNB notifies the T-gNB of mapping information from the QoS flow between the remote UE and the relay UE #1 to the DRB, which is used for communication between the remote UE and the S-gNB via the relay UE #1.
  • the S-gNB may notify the T-gNB of the QoS flow-to-DRB mapping information used for communication between the remote UE and the S-gNB via the relay UE#1.
  • S-gNB to T-gNB to be used for communication between the remote UE and S-gNB via the relay UE #1, even if notifying the information about the setting of the DRB between the relay UE #1 and the S-gNB good. Even if notifying the T-gNB from the S-gNB of the DRB settings used for communication between the remote UE and the S-gNB via the relay UE #1, the information about the relay UE #1 and the S-gNB good. S-gNB notifies T-gNB of mapping information from QoS flow between relay UE #1 and S-gNB to DRB used for communication between remote UE and S-gNB via relay UE #1 You may
  • the T-gNB can acquire information about the DRB settings used for communication between the remote UE and the S-gNB via the relay UE#1.
  • a DRB setting method between a remote UE and a gNB via a relay UE is disclosed.
  • the S-gNB may configure DRB between the remote UE and the S-gNB via the relay UE#1.
  • the S-gNB may perform DRB configuration between the remote UE and the relay UE #1 and DRB configuration between the relay UE #1 and the S-gNB.
  • the S-gNB performs DRB settings between the remote UE and the S-gNB via the relay UE #1, settings between the remote UE and the relay UE #1, and settings between the relay UE #1 and the S-gNB.
  • the S-gNB may perform the setup of communication in each direction.
  • the gNB is not particularly limited to the S-gNB, which is the HO source gNB. It may be applied when communication is performed between a remote UE and a gNB via a relay UE.
  • the S-gNB configures both between the remote UE and the S-gNB via the relay UE #1, between the remote UE and the relay UE #1, and between the relay UE #1 and the S-gNB becomes possible. Both settings can be used to provide suitable settings for communication between the remote UE and the S-gNB. Also, the S-gNB will be able to recognize both configurations.
  • the relay UE#1 may configure DRB for communication from the relay UE#1 to the remote UE in communication between the remote UE and the S-gNB via the relay UE#1.
  • the relay UE#1 may configure DRB for communication from the remote UE to the relay UE#1 for communication between the remote UE and the S-gNB via the relay UE#1.
  • the S-gNB configures DRB for communication between the relay UE#1 and the S-gNB for communication between the remote UE and the S-gNB via the relay UE#1.
  • the gNB is not particularly limited to the S-gNB, which is the HO source gNB. It may be applied when communication is performed between a remote UE and a gNB via a relay UE.
  • the relay UE#1 and the remote UE make settings between the remote UE and the relay UE#1 in the communication between the remote UE and the S-gNB via the relay UE#1.
  • the relay UE #1 and the remote UE consider the radio wave propagation situation between the remote UE and the relay UE #1, the radio resource usage situation in each UE, etc., and configure settings suitable for communication between the remote UE and the relay UE #1. It becomes possible to
  • the relay UE#1 may notify the S-gNB of the DRB setting for communication from the relay UE#1 to the remote UE.
  • the remote UE may notify the relay UE#1 of the DRB setting for communication from the remote UE to the relay UE#1.
  • Relay UE#1 may notify the S-gNB of the configuration. By doing so, the S-gNB can recognize the settings between the remote UE and the relay UE#1 for communication between the remote UE and the S-gNB via the relay UE#1.
  • the S-gNB can notify the T-gNB of information regarding the DRB settings used for communication between the remote UE and the S-gNB via the relay UE#1.
  • Information about DRB settings includes, for example, information for identifying DRBs, setting information for each protocol stack, logical channel information, RLC channel information, and RLC bearer information.
  • Information about QoS flows and/or mapping information from QoS flows to DRBs may be included in information about DRB settings.
  • the relay UE In communication between the remote UE and the gNB via the relay UE, the relay UE requires DRB mapping between the remote UE and the relay UE and DRB mapping between the relay UE and the remote UE.
  • the S-gNB In the HO of the remote UE via the relay UE, from the S-gNB to the T-gNB, information about the setting of the DRB between the remote UE and the relay UE #1, which is used for communication between the remote UE and the S-gNB, and Information on DRB mapping settings between relay UE #1 and S-gNB is notified.
  • the DRB mapping method may be mapping using DRB identifiers.
  • the information about the DRB mapping setting may be mapping information by the DRB identifier.
  • the S-gNB may associate the information on the DRB configuration disclosed above with the mapping information by the DRB identifier and notify the T-gNB.
  • the mapping method may be mapping using RLC channel identifiers.
  • the information about the mapping setting may be mapping information based on the identifier of the RLC channel.
  • the S-gNB may associate the information on the DRB configuration disclosed above with the mapping information by the RLC channel identifier and notify the T-gNB.
  • the mapping method may be mapping using identifiers of logical channels.
  • the information about the mapping settings may be mapping information based on logical channel identifiers.
  • the S-gNB may associate the information on the DRB configuration disclosed above with the mapping information by the identifier of the logical channel and notify the T-gNB.
  • the S-gNB may associate the QoS flow-to-DRB mapping information between the remote UE and the S-gNB with the DRB mapping information in the relay UE and notify the T-gNB.
  • the S-gNB associates QoS flow-to-DRB mapping information in communication from the remote UE to the S-gNB and/or communication from the S-gNB to the remote UE with DRB mapping information in the relay UE, May notify the T-gNB.
  • the S-gNB performs mapping configuration between the DRB configuration between the remote UE and the relay UE #1 and the DRB configuration between the relay UE #1 and the S-gNB.
  • the S-gNB may separate DRB mapping for remote UE-to-S-gNB communications and DRB mapping for S-gNB-to-remote UE communications.
  • the S-gNB may perform mapping configuration for each direction.
  • the gNB is not particularly limited to the S-gNB, which is the HO source gNB. It may be applied when communication is performed between a remote UE and a gNB via a relay UE.
  • the S-gNB can implement mapping settings suitable for communication between the remote UE and the S-gNB. Also, the S-gNB becomes aware of the mapping information.
  • Relay UE #1 configures DRB between relay UE #1 and remote UE and DRB configuration between relay UE #1 and S-gNB for communication between remote UE #1 and S-gNB via relay UE #1. Mapping settings with settings may be implemented.
  • Relay UE#1 may distinguish between DRB mapping for remote UE to S-gNB communication and DRB mapping for S-gNB to remote UE communication.
  • Relay UE#1 may perform mapping for each direction.
  • the gNB is not particularly limited to the S-gNB, which is the HO source gNB. It may be applied when communication is performed between a remote UE and a gNB via a relay UE.
  • the relay UE#1 can perform the mapping setting for the mapping performed by the relay UE#1. Therefore, it is possible to set mapping suitable for communication between the remote UE and the S-gNB via the relay UE #1 in consideration of the radio resource usage status of the relay UE #1.
  • the relay UE#1 instructs the S-gNB to configure the DRB between the relay UE#1 and the remote UE for the communication between the remote UE and the S-gNB via the relay UE#1, and the relay UE#1 and the S-gNB.
  • the S-gNB is used for communication between the remote UE and the S-gNB to the T-gNB, the DRB between the remote UE and the relay UE #1, the relay UE #1 and the S-gNB It becomes possible to notify the information about the mapping setting of the DRB between.
  • Non-Patent Document 27 ( 3GPP TR 38.836)
  • the adaptation layer between the remote UE and the relay UE #1 used for communication between the remote UE and the S-gNB Information on settings and/or Information on settings of the adaptation layer between the relay UE#1 and the S-gNB may be notified.
  • T-gNB uses information about the configuration of the adaptation layer that has been configured in the communication between the remote UE and S-gNB, the adaptation layer of the communication between the remote UE and T-gNB via the relay UE #2 can be set. T-gNB can use the information to configure the adaptation layer early.
  • FIG. 16 is a sequence diagram showing an example of a HO method of a remote UE via a relay UE, according to modification 1 of the first embodiment.
  • steps common to those in FIGS. 14 and 15 are assigned the same step numbers, and common descriptions are omitted.
  • the example of FIG. 16 discloses a method of notifying the T-gNB of information regarding the DRB configuration in the communication between the remote UE and the S-gNB.
  • the S-gNB performs DRB settings for communication between the remote UE and relay UE #1 for communication between the remote UE and S-gNB.
  • the S-gNB notifies the remote UE of information regarding DRB settings for communication between the remote UE and the relay UE#1 via the relay UE#1.
  • the information is included in the RRCReconfiguration message between the S-gNB and the remote UE and notified.
  • the S-gNB performs DRB configuration for the communication between the relay UE#1 and the S-gNB for the communication between the remote UE and the S-gNB.
  • the S-gNB notifies the relay UE#1 of information regarding DRB settings for communication between the remote UE and the relay UE#1.
  • the information is included in the RRCReconfiguration message between the S-gNB and the relay UE#1 and notified.
  • the DRB information between the remote UE and the relay UE#1, the DRB information between the relay UE#1 and the S-gNB, and the DRB mapping information at the relay UE#1 are reported.
  • step ST1603 data communication is performed between the remote UE, relay UE#1, S-gNB, and UPF of CN.
  • step ST1604 the S-gNB notifies the remote UE of the measurement settings via the relay UE#1.
  • step ST1605 the remote UE notifies the S-gNB of the measurement report via the relay UE#1.
  • the S-gNB which has determined the HO of the remote UE in step ST1405, notifies the T-gNB of the HO request message in step ST1606.
  • the HO Request message may contain information regarding the DRB configuration for communication between the remote UE and the S-gNB.
  • the HO Request message may include mapping information from QoS flows to DRBs for communications between the remote UE and the S-gNB.
  • the HO request message may include DRB mapping information in the relay UE#1.
  • the T-gNB can recognize the DRB configuration used for communication between the remote UE and the S-gNB via the relay UE#1.
  • Each of the above-mentioned information included in the HO request message is an example of data communication setting information indicating the setting contents regarding data communication between the S-gNB and the remote UE.
  • T-gNB is notified from S-gNB, using the DRB settings that have been used for communication between the remote UE and S-gNB via the relay UE # 1, relay UE # 2 via the remote UE and Configure the DRB settings used for communication between T-gNBs.
  • the T-gNB notifies the relay UE#2 of information on the DRB setting used for communication between the remote UE and the T-gNB via the relay UE#2.
  • the information may be included in the relay request message and notified.
  • information on the DRB setting used for communication between the remote UE and the T-gNB information on the DRB setting between the remote UE and the relay UE # 2 for communication between the remote UE and the T-gNB, and between the remote UE and the T-gNB Information regarding the DRB configuration between the relay UE#2 of the communication and the T-gNB may be included in the relay request message.
  • the relay request message may include mapping information from QoS flows to DRBs for communications between the remote UE and the T-gNB.
  • the relay request message may include DRB mapping information in relay UE#2. By doing so, the T-gNB can notify the relay UE#2 of the DRB setting for communication between the remote UE and the T-gNB via the relay UE#2.
  • the T-gNB notifies the S-gNB of information on the DRB setting used for communication between the remote UE and the T-gNB via the relay UE#2.
  • the information may be included in the HO request response message and notified.
  • the information on the DRB setting for the communication between the remote UE and the T-gNB may include the information on the DRB setting between the remote UE and the relay UE #2 for the communication between the remote UE and the T-gNB.
  • the S-gNB can receive the DRB configuration for the communication between the remote UE and the T-gNB.
  • the S-gNB notifies the remote UE of information on the DRB setting used for communication between the remote UE and the T-gNB via the relay UE#2.
  • the information may be included in the RRC configuration change message and notified.
  • an RRCReconfiguration message is used as the RRC setting change message.
  • S-gNB notifies the message via relay UE#1.
  • the information on the DRB setting for the communication between the remote UE and the T-gNB may be the information on the DRB setting between the remote UE and the relay UE #2 for the communication between the remote UE and the T-gNB.
  • the remote UE can receive the DRB configuration for communication between the remote UE and the T-gNB.
  • the remote UE can perform data communication with the T-gNB.
  • Embodiment 1 the communication is stopped triggered by step ST1410 described above, but here, the S-gNB, in step ST1610, after notifying the remote UE of the RRC configuration change message, step ST1611 , the relay UE#1 is notified of communication stop with the remote UE. You may notify by RRC signaling.
  • Information about the remote UE may be included in the communication stop message.
  • the communication stop message may include cause information of the communication stop. For example, information indicating that communication is stopped due to HO may be included.
  • the relay UE#1 Upon receiving the message to stop communication with the remote UE from the S-gNB, the relay UE#1 stops relay communication between the remote UE and the S-gNB. Configuration for relay communication between remote UE and S-gNB may be released. Buffers for relay communication between remote UE and S-gNB may be reset. Also, the relay UE#1 may release the setting for PC5 communication with the remote UE, for example. By doing so, it is possible to avoid unnecessary continuation of the relay process in the relay UE#1. Also, the power consumption of the relay UE#1 can be reduced.
  • the S-gNB can notify the T-gNB of information regarding the setting of the DRB used for communication between the remote UE and the S-gNB via the relay UE#1.
  • the T-gNB can use this information to perform DRB configuration for communication between the remote UE and the T-gNB via relay UE#2. Also, the setting can be notified to the remote UE and relay UE#2.
  • the remote UE In HO when the remote UE and the gNB are directly connected, the remote UE starts sending UL data to the T-gNB after the RA process is successful for the T-gNB.
  • the remote UE In the case of HO of the remote UE via the relay UE, there is no RA processing for the T-gNB since the remote UE is not directly connected with the T-gNB. In such a case, the timing at which the remote UE starts transmitting UL data to the T-gNB via the relay UE becomes unknown.
  • a method for solving such problems is disclosed.
  • the remote UE starts transmitting UL data to the T-gNB via the relay UE#2 after transmitting the RRC setup complete message to the T-gNB.
  • the T-gNB can recognize that an RRC connection has been established with the remote UE.
  • the T-gNB can recognize that the remote UE has configured the RRC configuration notified from the T-gNB to the remote UE via the S-gNB.
  • the T-gNB may receive UL data from the remote UE via relay UE#2.
  • UL data can be transmitted and received between the remote UE and the T-gNB via the relay UE#2.
  • the remote UE may start transmitting UL data after completing the PC5-RRC connection with relay UE#2.
  • Relay UE#2 may transmit the UL data received from the remote UE to the T-gNB. By doing so, the remote UE can early transmit UL data to the T-gNB via the relay UE#2.
  • DRB can be set in communication between the remote UE and the gNB via the relay UE. Also, communication between the remote UE and the gNB via the relay UE becomes possible. Also, in the HO of the remote UE via the relay UE, the T-gNB can acquire the DRB setting in the communication between the remote UE and the S-gNB. Therefore, in the T-gNB, it is possible to configure the DRB between the remote UE and the T-gNB using the DRB configuration between the remote UE and the S-gNB. Also, in the HO of the remote UE via the relay UE, for example, it is possible to maintain service continuity, enable optimal communication for the QoS required for the service, and set DRB at the T-gNB early. Therefore, it is possible to obtain effects such as being able to perform processing related to HO with low delay, being able to improve robustness of HO, and the like.
  • Modified example 2 of the first embodiment Reduction of data communication delay time is required in HO of a remote UE via a relay UE.
  • Non-Patent Documents 1 to 27 and other documents do not disclose any method for reducing the data communication delay time in such HO.
  • Modification 2 of Embodiment 1 discloses a method for solving such a problem.
  • a DAPS (Dual Active Protocol Stack) HO is provided in the HO of the remote UE via the relay UE.
  • the DAPS HO in the HO of the remote UE via the relay UE may be referred to as the I-DAPS HO.
  • a detailed method is disclosed.
  • the remote UE activates the protocol stacks used for both communication with the S-gNB and communication with the T-gNB.
  • a protocol stack for communication between the remote UE and the S-gNB via the relay UE#1 may be used as the protocol stack for communication with the S-gNB.
  • As the protocol stack for communication with the T-gNB a protocol stack for communication between the remote UE and the T-gNB via the relay UE#2 may be used.
  • I-DAPS HO HO from the gNB directly connected to the remote UE to the gNB connected via the relay UE and/or HO from the gNB connected directly to the gNB connected via the remote UE and the relay UE and/or HO from a gNB connected to a remote UE via a relay UE to a gNB connected via a relay UE may be used.
  • these may be referred to as I-DAPS HO types.
  • NW can set I-DAPS HO to remote UE.
  • NW can set I-DAPS HO to relay UE.
  • NW may be, for example, AMF or SMF.
  • the RAN may be, for example, a gNB.
  • the gNB may be an S-gNB or a T-gNB.
  • S-gNB performs the setting, it is possible to set the I-DAPS HO according to the communication service and communication status of the remote UE to be HOed and the communication status of the relay UE#1.
  • T-gNB performs the setting, it is possible to set the I-DAPS HO according to the communication service and communication status of the remote UE to be HOed and the communication status of the relay UE#2.
  • the NW notifies the remote UE of the I-DAPS HO setting.
  • Information indicating whether or not to set the I-DAPS HO may be included as the setting information for the I-DAPS HO.
  • Information indicating the type of I-DAPS HO may be included as I-DAPS HO setting information.
  • the type of I-DAPS HO may be associated with information indicating whether or not to set. By doing so, the NW can select which type of I-DAPS HO to set for the remote UE and/or relay UE. Also, the NW can notify the remote UE and/or relay UE which type of I-DAPS HO is to be executed. The remote UE and/or relay UE can determine which type of I-DAPS HO should be performed when the remote UE is HOed via the relay UE.
  • the NW notifies the remote UE of the I-DAPS HO setting by RRC signaling. Also, the NW notifies the relay UE of the I-DAPS HO setting by RRC signaling.
  • RRC signaling for example, an RRCReconfiguration message may be used for notification.
  • the notification method is valid during RRC connection between a remote UE or a relay UE and a gNB. Also, for example, it may be notified by an RRCSetup message. In this case, the remote UE and the relay UE can be set when establishing an RRC connection with the gNB, so early setting is possible. Also, for example, it may be notified by an RRCResume message.
  • the setting can be made at the time of shifting to the RRC connected state, so the setting can be made early. Also, for example, it may be notified by an RRC Reestavage message. In this case, if the remote UE or relay UE is RLF (Radio Link Failure) or the like, it can be set when shifting to the RRC connection state, so early setting is possible.
  • RLF Radio Link Failure
  • the T-gNB may notify relay #2 of the I-DAPS HO setting in a relay request message.
  • the remote UE may notify the NW whether or not I-DAPS HO can be implemented.
  • the relay UE may notify the NW whether or not I-DAPS HO can be implemented.
  • Information indicating whether or not the I-DAPS HO type can be implemented may be associated and notified.
  • Information indicating whether or not the I-DAPS HO can be implemented, or information that associates the I-DAPS HO type with information indicating whether or not the I-DAPS HO can be performed may be used as the capability information.
  • a method for stopping DL transmission from the relay UE#1 to the remote UE in the I-DAPS HO of the remote UE from the gNB connected via the relay UE is disclosed.
  • the S-gNB notifies the relay UE#1 of information indicating to stop transmission and reception between the remote UE and the S-gNB.
  • Information indicating that the relay configuration between the remote UE and S-gNB is released may be notified.
  • information indicating to stop transmission and reception between the remote UE and S-gNB and/or information indicating to release the relay setting between the remote UE and S-gNB is hereinafter referred to as HO source relay setting release Sometimes referred to as information.
  • the S-gNB may notify the relay UE#1 that the HO was successful. The notification of the information may be triggered by the S-gNB receiving the HO success message from the T-gNB.
  • the relay UE #1 Upon receiving the information, the relay UE #1 stops DL transmission to the remote UE.
  • Relay UE #1 that has received the information may release the configuration for DL transmission to the remote UE, or may release the relay configuration between the remote UE and S-gNB.
  • the notification of the information from the S-gNB to the relay UE#1 may be performed using RRC signaling.
  • the information may be included in the RRC message and notified. For example, it may be notified by being included in the RRCReconfiguration message. It may be notified by being included in the RRC message regarding the relay.
  • a message may be provided from the S-gNB to the relay UE#1 to notify whether or not the HO is successful, and the S-gNB may notify the relay UE#1 of the information by including the information in the message. By doing so, the relay UE#1 can recognize HO success of the remote UE.
  • the notification of the information from the S-gNB to the relay UE#1 may be performed using MAC signaling. This information may be included in the MAC CE (Control Element) and notified. Notification of the information from the S-gNB to the relay UE#1 may use L1/L2 signaling. The information may be included in the PDCCH and notified. By doing so, it is possible to notify the information from the S-gNB to the relay UE#1 earlier. Also, it is possible to reduce the delay until the DL transmission from the relay UE#1 to the remote UE is stopped. In addition, since useless transmission/reception processing time between the relay UE#1 and the remote UE is reduced, power consumption can be reduced.
  • the relay UE #1 can stop DL transmission from the relay UE #1 to the remote UE in response to the HO success of the remote UE. Also, the relay UE #1 can release the settings used for DL transmission between the relay UE #1 and the remote UE in response to the HO success of the remote UE. Therefore, it is possible to reduce wasteful processing such as DL transmission processing to the remote UE being performed by the relay UE #1 even though the remote UE has succeeded in HO. Also, it becomes possible for the relay UE #1 to release the radio resource used for this process.
  • the relay UE #1 that received the HO source relay setting release information stops DL transmission to the remote UE.
  • the relay UE #1 that has received the information may stop receiving DL from the S-gNB.
  • Relay UE #1 that has received the information may release the configuration for DL reception from the S-gNB.
  • the relay UE#1 that has received the information may stop UL reception from the remote UE.
  • the relay UE#1 that has received the information may release the configuration for UL reception from the remote UE.
  • Relay UE #1 that has received the information may stop UL transmission to the S-gNB.
  • Relay UE #1 that has received the information may release the configuration for UL transmission to the S-gNB.
  • the T-gNB notifies the remote UE of information indicating to stop transmission and reception between the remote UE and the S-gNB.
  • Information indicating that the configuration of communication between the remote UE and S-gNB is released may be notified.
  • Information indicating that transmission/reception between the remote UE and S-gNB is to be stopped and/or Information indicating that the communication setting between the remote UE and S-gNB is to be released is hereinafter referred to as HO source communication setting release information
  • T-gNB may notify the information to the remote UE via relay UE #2. Notification of the information may be triggered by the T-gNB receiving RRCReconfiguration from the remote UE.
  • the remote UE transmits and receives data between the remote UE and the S-gNB until receiving the information. If the remote UE receives the information, it will stop sending and receiving data between the remote UE and the S-gNB and release the configuration for communication with the S-gNB.
  • Notification of the information from the T-gNB to the remote UE may be performed using RRC signaling.
  • the information may be included in the RRC message and notified. For example, it may be notified by being included in the RRCReconfiguration message.
  • a message indicating transmission/reception stop or configuration release between the remote UE and S-gNB may be provided, and the information may be included in the message from the T-gNB to the remote UE. By doing so, the remote UE can receive the information from the T-gNB.
  • the notification of the information from the T-gNB to the remote UE may be performed using MAC signaling.
  • MAC signaling from the T-gNB to the relay UE#2 and SL MAC signaling from the relay UE#2 to the remote UE may be used. This information may be included in MAC CE and notified. Notification of the information from the T-gNB to the remote UE may be performed using L1/L2 signaling.
  • the information may be included in the PDCCH from the T-gNB to the relay UE#2 and the PSCCH from the relay UE#2 to the remote UE. By doing so, it becomes possible to notify the information from the T-gNB to the remote UE earlier. In addition, it is possible to reduce the delay until transmission and reception stop between the remote UE and S-gNB. In addition, since useless transmission/reception processing time in the remote UE is reduced, power consumption can be reduced.
  • the remote UE can stop communication with the S-gNB and determine the setting release for the communication. Therefore, it is possible to reduce unnecessary processing such as communication processing being performed between the remote UE and the S-gNB even though the remote UE has succeeded in HO. Also, it becomes possible for the relay UE #1 to release the radio resource used for this process.
  • the remote UE initiates transmission of UL data to the T-gNB in the I-DAPS HO of the remote UE via the relay UE.
  • the remote UE from the T-gNB, when receiving information indicating to stop transmission and reception between the remote UE and the S-gNB or information indicating to release the communication settings between the remote UE and the S-gNB, Start sending UL data to the T-gNB via relay UE#2. By doing so, it becomes possible for the remote UE to start UL data transmission to the T-gNB by stopping communication with the S-gNB or releasing the communication configuration.
  • UL data with a PDCP SN for which transmission has not been confirmed may be transmitted to the T-gNB. It may be transmitted to the T-gNB after the first UL data that has not been confirmed to be transmitted. UL data with the first PDCP SN for which transmission has not been confirmed may be transmitted to the T-gNB. By doing so, it is possible to ensure continuity of UL data during HO of the remote UE.
  • the remote UE When the remote UE sends the RRCReconfigurationcomplete message to the T-gNB, it starts sending UL data to the T-gNB via the relay UE#2. By doing so, it is possible to start transmitting UL data to the T-gNB early. For example, even if the remote UE does not stop communication with the S-gNB or release the communication setting, it is possible to start UL data transmission to the T-gNB via the relay UE #2.
  • the remote UE at the time of transmitting the RRCReconfigurationcomplete message to the T-gNB, if there is UL data that has not been confirmed to be transmitted to the S-gNB, in order from the UL data that is not confirmed to be transmitted, T - may be sent to the gNB.
  • the transmission method the method disclosed above may be appropriately applied. By doing so, it is possible to ensure the continuity of UL data during HO of the remote UE, as in the case described above.
  • FIG. 17 is a sequence diagram showing an example of the I-DAPS HO method for the second modification of the first embodiment.
  • steps common to those in FIGS. 14 and 16 are assigned the same step numbers, and common descriptions are omitted.
  • the relay UE#1 notifies the S-gNB of the DAPS HO capability during relay. It may be included in the UE capability information and notified.
  • the relay UE may notify the CN of the DAPS HO capability during relay.
  • the S-gNB may notify the CN of the relay UE#1 DAPS HO capability during relay.
  • the relay UE#2 notifies the T-gNB of the DAPS HO capability during relay.
  • the remote UE notifies the S-gNB of the DAPS HO capability. Notify via the relay UE#1. It may be included in the UE capability information and notified.
  • the remote UE may notify the CN of the DAPS HO capability when relaying.
  • the S-gNB may inform the CN of the remote UE's DAPS HO capability.
  • the DAPS HO may be the I-DAPS HO. By doing so, the S-gNB or CN can recognize whether the remote UE or relay UE is capable of DAPS HO.
  • the S-gNB determines I-DAPS HO for the remote UE.
  • the S-gNB notifies the T-gNB of the I-DAPS HO request.
  • the I-DAPS HO request message may contain information indicating that it is an I-DAPS HO request.
  • the T-gNB notifies the relay UE#2 of the relay request. Information on the I-DAPS HO setting should be included in the relay request message. By doing so, relay UE#2 can recognize that I-DAPS HO is applied to the remote UE and the setting information of I-DAPS HO.
  • the S-gNB Upon receiving the HO request response from the T-gNB in step ST1609, the S-gNB notifies the remote UE of information on the I-DAPS HO setting in step ST1710. You may notify using the message for an RRC setting change.
  • the S-gNB notifies the remote UE of the information via the relay UE#1.
  • the remote UE that receives the notification of this information recognizes that the I-DAPS HO implementation has been instructed.
  • the remote UE performs I-DAPS HO processing.
  • the S-gNB in step ST1711, notifies the relay UE#1 of information regarding the setting of I-DAPS HO. You may notify using the message for an RRC setting change.
  • the relay UE#1 that has received the notification of the information recognizes that the connected remote UE has been instructed to perform I-DAPS HO. Then, the relay UE#1 performs remote UE I-DAPS HO processing.
  • the S-gNB determines data transfer to the T-gNB.
  • S-gNB may determine the data transfer of the buffer data held in the buffer, may determine the data transfer of the DL.
  • the S-gNB may decide to forward the buffered data and the data from the CN's UPF.
  • the S-gNB transfers the SN state to the T-gNB. Early Status Transfer may be used for the transfer.
  • the SN state the SN and/or HFN (Hyper Frame Number) information of the first DL data to be transferred to the T-gNB may be included.
  • the S-gNB transfers the data received in step ST1714 to the T-gNB.
  • the data may be DL data.
  • DL data that the S-gNB has not yet been able to send to the remote UE may be forwarded.
  • the S-gNB may forward the DL data received from the CN's UPF.
  • T-gNB buffers data from S-gNB.
  • the T-gNB may transfer the data transferred from the S-gNB to the relay UE#2 to which the remote UE is connected.
  • Relay UE#2 may buffer the data forwarded from the T-gNB.
  • the relay UE #2 can early transmit the data received from the T-gNB to the remote UE.
  • the relay UE#2 may transmit the DL data received from the T-gNB to the remote UE after establishing the PC5 connection between the remote UE and the relay UE#2.
  • the S-gNB After notifying the remote UE of the RRC configuration change message including the I-DAPS HO configuration information in step ST1710 above, the S-gNB does not stop communication with the remote UE.
  • the S-gNB does not release the configuration for communication with the remote UE.
  • the remote UE does not stop communication with the S-gNB after receiving the message from the S-gNB in step ST1710 described above.
  • relay UE #1 does not stop relay communication between remote UE and S-gNB after receiving a message for changing RRC settings including setting information of I-DAPS HO from S-gNB in step ST1711 described above. .
  • Do not release configuration for relay communication between remote UE and S-gNB. Do not stop PC5 communication with the remote UE. Do not stop communication with the S-gNB. Do not release these communication settings.
  • the S-gNB's assignment of PDCP SNs to DL data may not stop until the SN status is sent to the T-gNB in step ST1721.
  • the S-gNB does not stop sending DL data to the remote UE until it receives the HO Success message.
  • the S-gNB may not stop receiving UL data from the remote UE until it receives the HO Success message.
  • the remote UE transmits an RRC setup complete message to the T-gNB.
  • the remote UE notifies the RRC setup complete message via relay UE#2.
  • a remote UE that has notified the RRC configuration complete message may start data transmission to the T-gNB. In that case, the remote UE initiates data transmission via the relay UE.
  • the T-gNB may send data received from the remote UE to the UPF.
  • the remote UE that established the PC5 connection with the relay UE#2 in ST1411 may start data transmission to the relay UE#2.
  • Relay UE#2 may send the data received from the remote UE to the T-gNB.
  • the T-gNB may send data received from the remote UE to the UPF.
  • the remote UE will be able to send data earlier.
  • the T-gNB that has received the RRC setting complete message from the remote UE notifies the remote UE of the HO source communication setting release information in step ST1716.
  • T-gNB notifies the information via relay UE#2.
  • the remote UE stops transmission/reception with the S-gNB and releases the communication settings.
  • the T-gNB that has received the RRC configuration complete message notifies the S-gNB of HO success in step ST1718.
  • the notification may use a HO success message. By doing so, the S-gNB can recognize that the remote UE has completed the RRC connection to the T-gNB by the I-DAPS HO.
  • the S-gNB that has received the HO success message from the T-gNB in step ST1718 notifies the relay UE#1 of the HO source relay configuration release information in step ST1719.
  • the notification may use a HO success message.
  • the relay UE#1 stops transmission and reception of relay communication between the remote UE and the S-gNB, and releases the communication settings. By doing so, after the remote UE succeeds in HO, the relay UE #1 can quickly stop transmission/reception of relay communication between the remote UE and the S-gNB and release the communication settings. .
  • the S-gNB transfers the SN state to the T-gNB.
  • An SN Status Transfer message may be used for the transfer.
  • the SN state may include UL data information that needs to be retransmitted from the remote UE to the T-gNB.
  • the SN state may include DL data information newly transmitted from the T-gNB to the remote UE.
  • the data information may be PDCP SN information attached to the data. By doing so, the T-gNB can recognize which data to send and receive to the remote UE.
  • the S-gNB transfers the data received in step ST1722 to the T-gNB.
  • the data may be DL data.
  • the S-gNB may forward DL data to the T-gNB that has not yet been sent to the remote UE.
  • the S-gNB may forward the DL data received from the UPF to the T-gNB.
  • a remote UE that has completed an RRC connection with the T-gNB in step ST1412 may start data communication with the T-gNB.
  • the remote UE may start data communication with the T-gNB.
  • the remote UE starts data communication with the T-gNB via relay UE#2. By doing so, communication between the remote UE and the T-gNB becomes possible.
  • step ST1413 path switch processing is performed between the T-gNB and CN, and in step ST1724, the data with End Marker attached is the last data transferred from the UPF to the T-gNB via the S-gNB. sent. End Marker is information indicating that it is the last data to be transferred. This allows the T-gNB to recognize the last data transferred from the S-gNB.
  • step ST1725 data communication is performed between the T-gNB and UPF.
  • FIG. 18 is a sequence diagram showing another example of the I-DAPS HO method for the second modification of the first embodiment.
  • steps common to those in FIG. 17 are assigned the same step numbers, and common descriptions are omitted.
  • Data communication may occur between the remote UE and the T-gNB before the remote UE stops transmitting and receiving with the S-gNB.
  • FIG. 18 discloses such a case.
  • step ST1717 and step ST1720 stop transmission and reception with S-gNB, before the setting is released, S-gNB transfers the SN state in step ST1721, and in step ST1722, data transfer to T-gNB conduct.
  • DL data may be transferred as the data.
  • the S-gNB may forward DL data that has not yet been sent to the remote UE.
  • the S-gNB may forward DL data received from the UPF.
  • the T-gNB transmits the data transferred from the S-gNB to the remote UE via relay UE#2. By doing so, data communication between the remote UE and the T-gNB can be performed early.
  • DAPS HO can be implemented in HO of the remote UE via the relay UE, so communication delay time during HO processing can be reduced. Also, in the relay UE, wasteful relay processing can be reduced. It is possible to reduce the power consumption of the relay UE. Also, it is possible to reduce malfunction of the relay UE.
  • Embodiment 1 3 Modification of Embodiment 1 3.
  • the remote UE switches all UL transmissions to the T-gNB to start transmitting UL data to the T-gNB, the S- There may be problems with communication to and from gNBs.
  • Modification 3 of Embodiment 1 discloses a method for solving such a problem.
  • the remote UE until receiving the communication stop or communication setting release information with the S-gNB, UL transmission regarding retransmission of communication between the S-gNB, to the relay UE # 1 do it against
  • UL transmissions for retransmissions of communications to and from the S-gNB are disclosed below.
  • (11) SL L1 CSI FB (Feed Back).
  • (12) SL HARQ FB.
  • (13) SL L2 RLC FB.
  • ROHC FB (15) SL HARQ data retransmission.
  • (16) SL RLC data retransmission.
  • the relay UE #1 can receive UL transmission from the remote UE regarding retransmission of communication between the remote UE and the S-gNB.
  • Relay UE # 1 until receiving the transmission/reception stop information or relay setting release information between the remote UE and S-gNB, UL transmission regarding retransmission of communication between the remote UE and S-gNB to the S-gNB do.
  • UL transmissions for retransmissions of communications between remote UE and S-gNB are disclosed below.
  • the S-gNB can receive UL transmissions from the relay UE#1 regarding retransmission of communication between the remote UE and the S-gNB.
  • the remote UE may continue UL transmissions on Uu for communications between the remote UE and the S-gNB to the S-gNB. For example, RLC retransmissions between the remote UE and the S-gNB may occur when such transmissions occur.
  • RLC retransmissions between the remote UE and the S-gNB may occur when such transmissions occur.
  • Four specific examples of transmissions on Uu for communication between remote UE and S-gNB are disclosed below. (31) L2 RLC FB. (32) RLC data retransmission. (33) ROHC FB. (34) A combination of (31) to (33).
  • the S-gNB receives UL transmissions on Uu for communication between the remote UE and the S-gNB from the remote UE. It becomes possible.
  • the S-gNB receives UL transmissions from the remote UE regarding communication between the remote UE and the S-gNB. It becomes possible. Therefore, communication between the remote UE and the S-gNB continues.
  • I-DAPS HO of the remote UE via the relay UE it is possible to reduce the data communication delay time and improve the robustness of the HO process.
  • Modified example 4 of the first embodiment In HO when the UE is directly connected to the gNB, HO failure is managed by a timer. The timer is started upon receipt of an RRC configuration change and stopped upon completion of RA processing. When the timer expires, in other words, if the RA process is not completed within the timer, HO fails and RRC re-establishment is performed. However, in the HO of the remote UE via the relay UE, when connecting to the T-gNB via the relay UE, RA processing to the T-gNB is not performed. None of the above-mentioned Non-Patent Documents 1 to 27 and other documents disclose any processing in such a case.
  • the remote UE manages HO failures with a timer.
  • Start is reception of RRC configuration change from S-gNB.
  • the stop is defined as the PC5-RRC connection completion with the relay UE.
  • the stop may be PC5-RRC connection completion with the relay UE and RRC connection status information reception with the T-gNB from the relay UE.
  • the stop may be performed with an RRC setup complete notification to the T-gNB.
  • the stop may be reception of a HO Source Configuration Release message from the T-gNB.
  • the RRC re-establishment process should be performed on the gNB connected to the relay UE.
  • the timer expires, if connected to the S-gNB, revert back to the S-gNB configuration and activate the S-gNB's SRB for CP (Control Plane) signaling
  • CP Control Plane
  • Embodiment 2 Improved robustness is required in HO of a remote UE via a relay UE.
  • CHO Conditional HO
  • this method is for the case where the UE connects directly to the gNB, and nothing is disclosed about the case where the UE connects to the gNB via a relay UE.
  • Embodiment 2 discloses a method for improving robustness in HO of a remote UE via a relay UE.
  • the communication system provides CHO in HO of remote UE via relay UE.
  • the CHO in HO of the remote UE via the relay UE may be referred to as I-CHO.
  • a detailed method is disclosed.
  • the S-gNB configures one or more gNBs as HO destination candidates.
  • the S-gNB may configure one or more cells configured by one or more gNBs that are candidates for HO destination.
  • Candidate cells may be cells configured by different gNBs.
  • a cell that can be directly connected to a remote UE may be used as a candidate cell.
  • One or more cells that can be directly connected to the remote UE may be set as HO destination candidates.
  • a cell that satisfies a predetermined reception quality (including reception power, SINR, etc.) on the DL may be a directly connectable cell.
  • the predetermined DL reception quality may be determined in advance by a standard, or may be notified or individually notified from the gNB. By doing so, a cell that can be connected without a relay UE can be set as a HO destination candidate. Also, it is possible to avoid complication of the HO process.
  • a cell connected to a relay UE may be used as a candidate cell.
  • Cells connected to one or more relay UEs may be set as HO destination candidates.
  • a cell connected to a relay UE that satisfies a predetermined reception quality on SL may be a connectable cell via the relay UE. By doing so, a cell that can be connected via the relay UE can be a HO destination candidate. In addition, it becomes possible to extend cell coverage via relay UEs.
  • Candidate cells may be cells to which one or a plurality of relay UEs to which the remote UE is previously connected with PC5 are connected.
  • a cell to which a relay UE that satisfies a predetermined reception quality on SL is connected may be a connectable cell via the relay UE.
  • the cells disclosed above may be combined as candidate cells.
  • the setting of the candidate cells disclosed above may be statically determined in advance by standards or the like. Alternatively, it may be possible to set candidate cells as disclosed above.
  • the setting may be performed by the S-gNB.
  • the AMF may perform the setting and notify the S-gNB of the setting.
  • the S-gNB sets DL measurements and/or SL measurements for the remote UE.
  • the remote UE notifies the S-gNB of the measurement results according to the settings.
  • the S-gNB uses the DL measurement results and/or SL measurement results received from the remote UEs to select one or more relay UEs that are candidates for connection destinations of the remote UEs.
  • the S-gNB may select the gNB to which the selected relay UE connects as a HO destination candidate.
  • the S-gNB can select one or more cells as HO destination candidates.
  • the method disclosed in Embodiment 1 may be appropriately applied.
  • the S-gNB notifies one or more candidate HO destination gNBs (T-gNB) of the HO request of the remote UE.
  • Xn signaling may be used for notification to each T-gNB.
  • a HO request message may be used.
  • a signaling method is disclosed when a T-gNB connects with multiple relay UEs.
  • the message for each relay UE is notified from the S-gNB to the T-gNB. By doing so, it becomes possible to notify a message for each relay UE that is a candidate to which the remote UE connects. In addition, it becomes possible to notify different messages for each relay UE.
  • the S-gNB notifies the T-gNB of a message for each gNB. Specifically, information on one or more relay UEs to which the gNB connects is included in one message from the S-gNB to the T-gNB and notified. By doing so, the amount of signaling can be reduced.
  • a message for each cell may be notified from the S-gNB to the T-gNB. Specifically, information on one or more relay UEs to which the cell connects is included in one message and notified from the S-gNB to the T-gNB for each cell. In this method, the message is notified to the T-gNB as many times as the number of target cells. By doing so, it becomes possible to notify a different message for each cell to which the relay UE is connected.
  • the HO destination candidate T-gNB notifies the relay UE, which is the connection destination candidate, of a relay request message. Specifically, the HO destination candidate T-gNB uses the information about the relay UE, which is the connection destination candidate, obtained from the S-gNB, and notifies the relay UE, which is the connection destination candidate, of the relay request message. good. Information about the remote UE to be HO-targeted may be included in the relay request message. As the information about the remote UE, for example, information for identifying the remote UE, the context of the remote UE, etc. may be used. The relay request message may contain configuration information regarding PC5 communication between the remote UE and the relay UE. Regarding the notification of the relay request message, the method disclosed in the first embodiment and the first modification of the first embodiment may be applied as appropriate.
  • a relay UE which is a connection destination candidate that receives the relay request message from the HO destination candidate T-gNB, uses the information included in the message to establish a connection between the HO target remote UE and the HO destination candidate T-gNB. You may also configure settings for relaying between A relay UE, which is a connection destination candidate, notifies a relay request response to the HO destination candidate T-gNB to be connected. Acknowledgment should be sent when configuration for relaying is complete. A negative acknowledgment may be sent if the relay setting is not completed or if the relay setting is to be rejected. Reason information may be included in the negative response. By doing so, the HO destination candidate T-gNB can recognize whether or not the relay UE, which is the connection destination candidate, has been set to relay the HO target remote UE.
  • the HO destination candidate T-gNB notifies the S-gNB of the HO request response.
  • the method of notifying the HO request response message may appropriately apply the method of notifying the HO request described above.
  • the information disclosed in the first embodiment may be appropriately applied to the information to be included in the HO request response.
  • the S-gNB may reconfigure the T-gNB as a HO destination candidate. At this time, it may select from among the T-gNBs that have received an acknowledgment for the HO request to the T-gNB. By doing so, the S-gNB considers the situation of the relay UE # 2 connected to the T-gNB or the T-gNB, and can more flexibly set the T-gNB of the HO destination candidate to the remote UE. becomes.
  • the S-gNB sets I-CHO execution conditions for one or more T-gNBs that are HO destination candidates for the remote UE to be HOed. Specifically, the S-gNB notifies the remote UE of the I-CHO execution condition settings. After receiving the HO request response from all T-gNBs that have notified the HO request, the S-gNB may notify the remote UE of the I-CHO execution condition setting of the T-gNB. As another method, the S-gNB receives the HO request response from some of the T-gNBs that have notified the HO request, and then notifies the remote UE of the I-CHO execution condition setting of the T-gNB. good too. The notification may be made multiple times. The S-gNB may modify or additionally configure the T-gNB and the T-gNB's I-CHO execution conditions for the remote UE. The S-gNB may notify the configuration until it receives a HO success message from the T-gNB.
  • the remote UE evaluates whether to activate the I-CHO of each T-gNB according to the T-gNB and the I-CHO execution conditions of the T-gNB received from the S-gNB.
  • the SL reception quality from the relay UE connected to the T-gNB may be used to evaluate whether to activate I-CHO.
  • the remote UE measures the SL reception quality from the relay UE.
  • the SL reception quality may be derived by adding a predetermined offset to the SL reception quality measurement result.
  • the remote UE may activate I-CHO when the SL reception quality derived from the measurements is better than a predetermined SL reception quality threshold.
  • the predetermined SL reception quality threshold and/or predetermined offset disclosed above may be included in the setting of the I-CHO execution conditions.
  • a measurement event for I-CHO may be provided.
  • a predetermined SL reception quality threshold and/or a predetermined offset may be set as a measurement event for I-CHO.
  • the I-CHO execution condition setting may include an I-CHO measurement event.
  • the remote UE executes HO via the relay UE for the T-gNB connected to the relay UE that first satisfies the I-CHO activation condition.
  • the remote UE implements PC5 connection to the relay UE that first satisfies the I-CHO activation condition among the HO destination candidate T-gNBs.
  • the remote UE notifies the T-gNB of RRCReconfigurationcomplete via the relay UE. In this way, the remote UE implements an RRC connection to the T-gNB connecting to the relay UE that first satisfies the I-CHO activation condition.
  • the setting of the I-CHO execution conditions may include information associated with the I-CHO execution conditions of the T-gNBs that are candidates for HO destinations.
  • the I-CHO execution condition setting may include information on the T-gNB of the HO destination candidate.
  • Information for identifying the T-gNB may be included as information about the T-gNB of the HO destination candidate.
  • Information about the T-gNB of the HO destination candidate may include RRC configuration information used for communication with the remote UE.
  • Information on the relay UE connected to the HO destination candidate T-gNB may be included as the I-CHO execution condition setting.
  • the information about the relay UE may include settings regarding PC5 communication between the remote UE and the relay UE.
  • the settings related to PC5 communication between the remote UE and the relay UE the settings disclosed in the first embodiment and the first modification of the first embodiment may be applied as appropriate.
  • Such settings include, for example, PC5 communication settings from the remote UE to the relay UE and/or PC5 communication settings from the relay UE to the remote UE and/or DRB setting information between the remote UE and the relay UE.
  • the information about the relay UE may include information for identifying the relay UE.
  • the S-gNB should notify the remote UE of the I-CHO execution condition settings of one or more T-gNBs that are HO destination candidates using RRC signaling. For example, it may be notified by being included in the RRCReconfiguration message. You may notify via relay UE#1. By using RRC signaling, for example, more information can be notified, so it is possible to include information on multiple T-gNBs that are HO destination candidates. By doing so, the remote UE can receive the I-CHO execution condition settings of one or more T-gNBs that are candidates for HO destinations.
  • a remote UE that has completed setting the T-gNB's I-CHO execution conditions received from the S-gNB may notify the S-gNB of the RRCReconfigurationcomplete message via the relay UE#1.
  • the S-gNB that received the message can recognize that the remote UE has completed the setting of the I-CHO execution conditions of the T-gNB.
  • the remote UE evaluates the I-CHO execution conditions. As a result of the evaluation of the I-CHO execution conditions by the remote UE, I-CHO is activated for the T-gNB that connects with the relay UE that satisfies the conditions. The remote UE performs PC5 connection processing to the relay UE that satisfies the I-CHO execution conditions. If only the relay UE connected to the PC5 is set as the connection destination candidate relay UE of the I-CHO in advance, the PC5 connection processing may be omitted. By doing so, the HO processing time can be shortened.
  • the remote UE notifies the HO candidate destination T-gNB to which the relay UE connects via the relay UE that satisfies the I-CHO execution condition of the RRC setup complete message.
  • An RRCReconfigurationcomplete message may be used.
  • the T-gNB that received the message can recognize that the remote UE has successfully established an RRC connection via the relay UE#2.
  • the T-gNB that has completed the RRC connection with the remote UE notifies the S-gNB of HO success.
  • a HOsuccess message may be used for the notification.
  • Information to be included in the HO success message may include information about the HO target remote UE, information indicating which relay UE the connection is made through, information about PC5 communication between the remote UE and the relay UE, and the like. By doing so, the S-gNB can recognize when the remote UE satisfies the I-CHO execution condition and has completed connection to the T-gNB via the relay UE.
  • the remote UE may stop communicating with the S-gNB when detecting a relay UE that satisfies the I-CHO execution conditions. By doing so, it becomes possible to stop the communication process with the S-gNB early, and the power consumption of the remote UE can be reduced.
  • the remote UE may stop communication with the S-gNB when the PC5 connection is completed with the relay UE that satisfies the I-CHO execution conditions. By doing so, it is possible to continue communication with the S-gNB even if the PC5 connection with the relay UE fails. If the remote UE fails to connect to the PC5 with the relay UE, the PC5 connection process may be performed again for the same relay UE. Alternatively, if the remote UE fails to connect to the PC5 with the relay UE, the I-CHO execution condition evaluation should be continued or performed again, and then the relay UE that satisfies the I-CHO execution conditions and the PC5 connection process should be performed. . By doing so, it becomes possible to reliably execute PC5 connection with the relay UE.
  • the remote UE may stop communicating with the S-gNB when it completes the connection with the T-gNB via the relay UE that satisfies the I-CHO execution conditions.
  • the timing to determine the completion of connection with the T-gNB may be the completion of notification of the RRCReconfigurationcomplete message. If the notification of the RRCReconfigurationcomplete message fails, the same T-gNB may be notified of the RRC configuration complete message again. When the notification is completed, it becomes possible to connect with the same T-gNB.
  • the I-CHO execution condition evaluation may be continued or performed again, and then the T-gNB may be notified of the RRC configuration complete message via the relay UE that satisfies the I-CHO execution condition.
  • the remote UE When the notification is completed, it becomes connectable with the T-gNB. By doing so, the remote UE can surely stop communication with the S-gNB after connecting with the HO destination T-gNB. Also, the robustness of the HO process of the remote UE via the relay UE can be improved.
  • a method for an S-gNB to stop communication with a remote UE via a relay UE is disclosed.
  • the S-gNB stops transmission and reception with the remote UE via the relay UE when it receives the HO success message from the T-gNB. It may release the configuration for communication with the remote UE.
  • the method in I-DAPS HO disclosed in Modification 2 of Embodiment 1 may be applied as appropriate. By doing so, it is possible to stop communication processing with the S-gNB, it is possible to reduce wasteful processing in the S-gNB, and low power consumption can be achieved.
  • the S-gNB receives the HO success message from the T-gNB, it notifies the relay UE#1 of a message to stop transmission and reception between the remote UE and the S-gNB.
  • a HO success message may be used as the message.
  • the relay UE#1 stops transmission/reception between the remote UE and the S-gNB.
  • the configuration for communication between remote UE and S-gNB may be released.
  • the method in I-DAPS HO disclosed in Modification 2 of Embodiment 1 may be applied as appropriate. By doing so, wasteful processing in the relay UE can be reduced, and power consumption can be reduced.
  • a data transfer method in I-CHO of a remote UE via a relay UE is disclosed.
  • the S-gNB forwards the SN state to the T-gNB if it receives the HO success message from the T-gNB.
  • An SN Status Transfer message may be used for the transfer.
  • the SN state may include UL data information that needs to be retransmitted from the remote UE to the T-gNB.
  • the SN state may include DL data information newly transmitted from the T-gNB to the remote UE.
  • As UL data information and DL data information PDCP SN information attached to data may be used. By doing so, the T-gNB can recognize which data to send and receive to the remote UE.
  • the S-gNB After transferring the SN state, the S-gNB transfers data to the T-gNB.
  • the data may be DL data. If the S-gNB has DL data that has not yet been sent to the remote UE, the S-gNB may forward the DL data.
  • the S-gNB may forward the DL data received from the UPF after forwarding the SN state.
  • the T-gNB transmits the data transferred from the S-gNB to the relay UE.
  • the relay UE may be a candidate relay UE to which the remote UE is connected.
  • the T-gNB may send data forwarded from the S-gNB to the relay UE before receiving the RRC configuration complete message from the remote UE. By doing so, the T-gNB can transmit data to the relay UE earlier.
  • the relay UE#2 may transmit the data received from the T-gNB to the remote UE. By doing so, the relay UE can transmit data to the remote UE earlier. It also allows earlier data transmission from the T-gNB to the remote UE.
  • the T-gNB may send the data transferred from the S-gNB to the remote UE.
  • the data may be transmitted via relay UE#2.
  • the RRC configuration complete message may be RRCReconfigurationcomplete.
  • UPF Due to the path switching process from S-gNB to T-gNB between T-gNB and CN node, UPF starts DL data transmission to T-gNB.
  • the T-gNB may send DL data from UPF to the remote UE.
  • the remote UE After the remote UE establishes a PC5 connection with the relay UE#2 that satisfies the I-CHO execution condition, it transmits data to the relay UE#2.
  • the remote UE may send data to the relay UE#2 before sending the RRC configuration complete message to the T-gNB. By doing so, the remote UE can transmit data to the relay UE#2 earlier.
  • relay UE#2 When relay UE#2 is connected to the T-gNB, it may transmit the data received from the remote UE to the T-gNB. By doing so, the relay UE#2 can transmit data to the T-gNB earlier. It also enables earlier data transmission from the remote UE to the T-gNB.
  • the remote UE may send data to the T-gNB.
  • the data may be transmitted via relay UE#2.
  • the RRC configuration complete message may be RRCReconfigurationcomplete.
  • the S-gNB may transfer data to one or more T-gNBs as HO destination candidates before receiving the HO success message from the T-gNB.
  • the trigger for the S-gNB to start data transfer before receiving the HO success message from the T-gNB may be the case where the S-gNB notifies the HO target remote UE of the I-CHO execution condition setting.
  • the I-CHO instruction may be used as a trigger for starting data transfer, instead of the notification of the I-CHO execution condition setting.
  • the S-gNB may trigger the start of data transfer when it receives an RRC configuration complete message for I-CHO execution condition configuration from the remote UE.
  • the S-gNB forwards the SN state to one or more T-gNBs as potential HO destinations before receiving the HO success message from the T-gNB.
  • SN Status Transfer may be used for the transfer. Early Status Transfer may be used.
  • the SN state may include SN and/or HFN (Hyper Frame Number) information of the first DL data to be transferred to one or more T-gNBs as HO destination candidates.
  • the S-gNB After transferring the SN state, the S-gNB transfers data to the T-gNB. DL data may be transferred as the data. If the S-gNB has DL data that has not yet been sent to the remote UE, the S-gNB may forward the DL data. The S-gNB may forward the DL data received from the UPF after forwarding the SN state.
  • the S-gNB may send an Early Status Transfer and transfer data to one or more T-gNBs that are HO destination candidates. For example, two relay UEs that are likely to be connection destinations by HO may be selected, and Early Status Transfer may be transmitted and data transferred only to T-gNBs connected to the two relay UEs. In this case, the amount of signaling and the amount of data to be transferred can be reduced.
  • the S-gNB can transfer data earlier to one or more T-gNBs that are HO destination candidates. Therefore, if the T-gNB that transferred the data becomes the HO destination, the data has already been transferred to the T-gNB, so the T-gNB can transmit data to the remote UE early. Become.
  • the S-gNB does not stop assigning PDCP SNs to DL data until it sends the SN status to the T-gNB that received the HO success message. Also, the S-gNB does not stop sending DL data to the remote UE until it receives the HO Success message. Also, the S-gNB may not stop receiving UL data for the remote UE until it receives the HO Success message. By doing so, the relay UE that satisfies the I-CHO execution condition is determined in the remote UE, and transmission and reception with the S-gNB can be continued in the remote UE until the PC5 connection to the relay UE is started. Become.
  • the S-gNB that receives the HO success message from the T-gNB, among the T-gNB that has notified the HO request message as a HO destination candidate, to the T-gNB other than the T-gNB determined as the HO destination, to cancel the HO Notice.
  • the S-gNB may notify the T-gNB determined as the HO destination of cancellation of HO of the HO destination candidate cell other than the cell determined as the HO destination.
  • An HO cancel message may be used for the notification.
  • the HO cancellation message may include information about the remote UE to be the HO target.
  • Information about the remote UE may include information for identifying the remote UE.
  • the HO cancellation message may include information about the T-gNB (which may be a cell) subject to HO cancellation.
  • Information about the T-gNB (which may be a cell) may include information for identifying the T-gNB (which may be a cell).
  • the HO cancel message may include information about the connection destination relay UE (relay UE#2).
  • Information for identifying the relay UE #2 may be included as the information about the relay UE #2.
  • the HO cancel message may include information about the T-gNB (which may be a cell) that connects with the destination relay UE (relay UE#2).
  • Information about the T-gNB may include information to identify the T-gNB (which may be a cell).
  • the T-gNB Upon receiving the HO cancellation, the T-gNB notifies the connection destination candidate relay UEs other than the connection destination relay UE (relay UE#2) of the HO cancellation. That is, the T-gNB notifies HO cancellation to the connection destination candidate relay UE to which each T-gNB connects.
  • RRC signaling may be used for the notification.
  • a new RRC message may be provided to notify the HO cancellation to the relay UE.
  • the RRC message may be a HO cancel message.
  • Information about the remote UE to be HO-targeted may be included in the HO cancellation message to the relay UE.
  • Information about the remote UE may include information for identifying the remote UE.
  • the HO cancellation message to the relay UE may include information about the T-gNB (which may be a cell) subject to HO cancellation.
  • Information about the T-gNB (which may be a cell) may include information for identifying the T-gNB (which may be a cell).
  • Information about the connection destination relay UE (relay UE#2) may be included in the HO cancel message to the relay UE.
  • Information for identifying the relay UE #2 may be included as the information about the relay UE #2.
  • the HO cancellation message to the relay UE may include information about the T-gNB (which may be a cell) that connects with the destination relay UE (relay UE#2).
  • Information about the T-gNB may include information to identify the T-gNB (which may be a cell).
  • Information to identify the C-IHO may be included. That is, information for identifying the C-IHO may be included in the relay request message sent by the I-CHO to the connection destination candidate relay UE. Also, information for identifying the C-IHO to be canceled may be included in the HO cancel message to the connection destination candidate relay UE. Information for identifying the C-IHO included in the relay request message may be used as the information included in the HO cancel message. By doing so, the connection destination candidate relay UE can recognize which I-CHO to cancel among the I-CHOs indicated by the information included in the HO request message received from the T-gNB.
  • connection destination candidate relay UE can receive the HO cancellation becomes.
  • a connection destination candidate relay UE that receives the HO cancel message cancels the I-CHO setting of the remote UE.
  • the relay UE may cancel the relay request message received from the T-gNB.
  • the relay UE may cancel the relay configuration by the relay request message received from the T-gNB.
  • the relay UE may release information about the remote UE to be HO-targeted or settings regarding PC5 communication with the remote UE.
  • FIG. 19 is a sequence diagram showing an example of the I-CHO method for the second embodiment.
  • steps common to those in FIG. 16 are assigned the same step numbers, and common descriptions are omitted.
  • steps ST1901, ST1902, ST1903 and ST1933 the capabilities of I-CHO are notified. That is, in step ST1901, the relay UE#1 notifies the S-gNB of the I-CHO capability. In step ST1902, the relay UE#2 notifies the T-gNB#1 of the I-CHO capability. In step ST1933, the relay UE#3 notifies the T-gNB#2 of the I-CHO capability. In step ST1903, the remote UE notifies the S-gNB of the I-CHO capability via the relay UE#1.
  • the method disclosed in Modification 2 of Embodiment 1 may be applied as appropriate. This allows the S-gNB or CN to recognize whether the remote UE or relay UE is I-CHO capable.
  • step ST1905 the S-gNB determines the I-CHO for the remote UE. At this time, the S-gNB determines one or more I-CHO connection destination candidate relay UEs and HO destination candidate T-gNBs. In step ST1906 and step ST1926, the S-gNB notifies the T-gNB of the determined HO destination candidate of the HO request. In the example of FIG. 19, S-gNB determines T-gNB#1 and T-gNB#2 as HO destination candidates in step ST1905, and in step ST1906 and step ST1926, T-gNB#1 and T-gNB# 2 of the HO request message. Information indicating that the message is a CHO request may be included.
  • HO destination candidate T-gNB that is, T-gNB # 1 and T-gNB # 2 is connected to its own T-gNB, to the connection destination candidate relay UE, a relay request Notice.
  • T-gNB #1 in step ST1907, notifies the relay request message to the relay UE #2, T-gNB #2, in step ST1927, the relay request to the relay UE #3 Notify me of a message.
  • the relay request message may include information regarding CHO configuration. By doing so, the relay UE#2 and the relay UE#3 can recognize that CHO is applied to the remote UE and the CHO setting information.
  • each relay UE as a connection destination candidate notifies the connected T-gNB of a relay request response.
  • Relay UE#2 notifies T-gNB#1 of a relay request response
  • relay UE#3 notifies T-gNB#2 of a relay request response.
  • each T-gNB as a HO destination candidate notifies the S-gNB of the HO request response.
  • T-gNB#1, in step ST1909 notifies the S-gNB of the HO request response
  • T-gNB#2 in step ST1929 notifies the S-gNB of the HO request response.
  • the methods disclosed in Embodiment 1 and Modification 1 of Embodiment 1 may be appropriately applied as the notification methods for the respective HO request message, relay request message, relay request response message, and HO request response message.
  • the S-gNB that has received the HO request response from each T-gNB that is a HO destination candidate notifies the remote UE of the CHO execution condition setting in step ST1910.
  • the S-gNB notifies the setting via the relay UE#1.
  • the S-gNB signals the configuration, for example, in the RRCReconfiguration message of RRC signaling.
  • the message may include information as disclosed above as CHO execution condition settings. For example, information on the CHO connection destination relay UE, information on the HO destination candidate T-gNB connected to the relay UE, information on each CHO execution condition, etc. may be included. This allows the remote UE to evaluate the CHO execution conditions.
  • the remote UE may notify the S-gNB of an RRC configuration complete message.
  • the remote UE notifies the message via relay UE#1.
  • the S-gNB can recognize that the remote UE has set the CHO execution condition. Also, it is possible to reduce the occurrence of CHO malfunctions.
  • the S-gNB may perform data transfer to one or more T-gNBs among the HO candidate destination T-gNBs before receiving the HO success message from the T-gNB. For example, data transfer may be made to one T-gNB. By narrowing down the transfer destination to one, the amount of data to be transferred can be reduced.
  • the S-gNB determines the data transfer destination T-gNB. In the example of FIG. 19, T-gNB#1 is determined as the data transfer destination.
  • the S-gNB transfers the SN state to the data transfer destination T-gNB#1. Early Status Transfer may be used in the transfer.
  • step ST1914 the S-gNB transfers the data held in the buffer and the data from the UPF to the data transfer destination T-gNB#1.
  • the data may be DL data.
  • the method disclosed in Modification 2 of Embodiment 1 may be applied as appropriate.
  • step ST1915 the data transferred from S-gNB is buffered in T-gNB#1.
  • the T-gNB may transfer the data transferred from the S-gNB to the relay UE, which is a connection destination candidate for the remote UE. For example, in the example of FIG. 19, T-gNB#1 may forward to relay UE#2. Relay UE#2 may buffer the data forwarded from T-gNB#1. By doing so, when the relay UE to which the remote UE is connected becomes the relay UE #2, the relay UE #2 early transmits the data received from the T-gNB #1 to the remote UE. It becomes possible.
  • the remote UE evaluates the CHO execution condition.
  • the remote UE determines a relay UE that satisfies the CHO execution condition as a connection destination relay UE.
  • the T-gNB connected to the relay UE is determined as the HO destination T-gNB.
  • the relay UE#2 is determined as the connection destination
  • the T-gNB#1 is determined as the HO destination.
  • the remote UE that has determined the HO destination may stop communication with the S-gNB.
  • the settings for the communication may be released. Communication with the relay UE#1 for communication with the S-gNB may be stopped.
  • the settings for the communication may be released.
  • the remote UE that has determined the relay UE#2 as the connection destination in step ST1932 establishes a PC5 connection with the relay UE#2 in step ST1411.
  • the remote UE notifies the T-gNB#1 determined as the HO destination of a HO setting change completion message via the relay UE#2.
  • T-gNB#1 which has received the HO configuration change complete message from the remote UE, notifies the S-gNB of the HO success message in step ST1718.
  • the S-gNB notifies the HO source relay setting release information to the relay UE#1 in step ST1719.
  • a HO success message may be used for the notification.
  • the S-gNB may include the HO source relay configuration release information in the HO success message and notify the relay UE#1.
  • the relay UE#1 stops transmission and reception between the remote UE and the S-gNB and releases the setting.
  • the method disclosed in Modification 2 of Embodiment 1 may be applied as appropriate.
  • the HO cancel message is notified to T-gNB#2.
  • T-gNB#2 that has received the HO cancel message may discard the transferred data if the data has been transferred from the S-gNB in advance.
  • the T-gNB#2 notifies a connection destination candidate relay UE that has not been determined as a connection destination, ie relay UE#3, to connect with the own T-gNB, of a relay cancel message.
  • connection destination candidate relay UE (here, relay UE #3) that has not been determined as the connection destination can recognize that the remote UE has been connected to another relay UE. Also, it becomes possible for the own relay UE to recognize that it has not become a connection destination relay UE by I-CHO.
  • relay UE#3 Upon receiving the relay cancel message, relay UE#3 releases the I-CHO configuration. The relay UE#3 that has received the relay cancel message may discard the transferred data if the data has been transferred from the T-gNB#2 in advance. By doing so, it is possible to reduce wasteful consumption of radio resources in the relay UE#3 that has not become a connection destination.
  • connection destination relay UEs and multiple HO destination T-gNBs in HO of the remote UE via the relay UE.
  • I-CHO with communication between the remote UE and the gNB via the relay UE.
  • the connection destination relay UE and the HO destination T-gNB are determined from a plurality of options, so the robustness in the HO process can be improved.
  • Embodiment 3 In a state where the relay UE is connected to the remote UE, HO processing of the relay UE may be performed due to movement of the relay UE or the like. When such HO of the relay UE occurs while the remote UE is communicating with the NW via the relay UE, how to perform connection processing between the remote UE and the NW is described in Non-Patent Document 1 above. 27 and other documents have no disclosure.
  • Embodiment 3 discloses a method for processing the connection between the remote UE and the NW that accompanies the HO of the relay UE.
  • the relay UE does not perform the HO process even if movement or the like occurs when it is connected to the remote UE. That is, the relay UE connected to the PC5 with the remote UE may not perform the HO process.
  • a relay UE that performs relay processing for communication between a remote UE and a gNB may not perform HO processing.
  • the relay UE activates RLF (Radio Link Failure) when the quality of communication with the gNB deteriorates due to movement, for example.
  • RLF Radio Link Failure
  • the relay UE detects a connectable cell by performing cell selection or cell reselection processing before releasing the RRC connection with the gNB, and performs RRC establishment processing on the cell.
  • a relay UE that fails cell detection within a predetermined timer releases the RRC connection with the gNB. Also, the relay UE performs cell selection or cell reselection again, performs RRC establishment processing for the detected cell, and implements an RRC connection. RRCestablishment may be executed as the RRC establishment process. By doing so, the relay UE can connect with the gNB again without HO.
  • the remote UE releases the RRC connection with the gNB connected via the relay UE when the relay UE performs RLF or RRC connection release.
  • the relay UE may notify the remote UE of RLF or RRC connection release with the gNB.
  • a remote UE that receives the notification can recognize that the relay UE has released the RLF or RRC connection with the gNB. By doing so, the remote UE can release the RRC connection with the gNB connected via the relay UE.
  • the remote UE may maintain the RRC connection state for a predetermined period after receiving the RLF or RRC connection release notification with the gNB from the relay UE. By doing so, if the relay UE returns to the original RRC connection state with the gNB during the predetermined period, the remote UE can maintain the connection state with the gNB.
  • the predetermined period may be managed by a timer.
  • the remote UE may reset and release buffers and protocols used for communication with the gNB as release processing of the RRC connection with the gNB connected via the relay UE. This makes it possible to avoid wasteful consumption of radio resources in the remote UE.
  • a gNB connected to a remote UE via a relay UE may release the RRC connection with the remote UE if it determines that the RRC connection with the relay UE has been released.
  • the decision to release the RRC connection with the relay UE may be made when communication does not occur for a predetermined period of time.
  • the predetermined period may be managed by a timer.
  • the gNB may reset and release buffers and protocols used for communication with the remote UE as the RRC connection release process with the remote UE. This makes it possible to avoid wasteful consumption of radio resources in the gNB.
  • the remote UE may perform RRC establishment processing for the gNB. After establishing the RRC connection with the gNB, the relay UE may notify the remote UE of the RRC status. This allows the remote UE to recognize whether the relay UE has established an RRC connection with the gNB. By doing so, the remote UE can communicate with the gNB again via the relay UE.
  • a relay UE connected to the remote UE and the PC5 may perform HO processing.
  • a relay UE that is performing relay processing for communication between a remote UE and a gNB may perform HO processing.
  • the remote UE performs HO to the HO destination gNB of the relay UE.
  • the remote UE may change the gNB to connect to the HO destination gNB of the relay UE.
  • the remote UE may also perform the HO.
  • the remote UE may be allowed to HO only to the HO destination gNB of the relay UE.
  • a method is disclosed in which the remote UE performs HO to the HO destination gNB of the relay UE.
  • FIG. 20 is a sequence diagram showing an example of a method for the remote UE to perform HO to the HO destination gNB of the relay UE, according to the third embodiment.
  • the remote UE performs data communication with the S-gNB and CN via the relay UE.
  • step ST2002 the S-gNB notifies the relay UE of the measurement settings.
  • step ST2003 the S-gNB receives measurement reports from the relay UE.
  • step ST2004 the S-gNB determines HO of the relay UE using, for example, measurement reports from the relay UE.
  • step ST2005 the S-gNB notifies the T-gNB of the HO request of the relay UE.
  • a HO request message may be used for the notification.
  • the S-gNB may notify the T-gNB of the remote UE's HO request together with the relay UE's HO request message or in the relay UE's HO request message. By doing so, the T-gNB can recognize that the HO request of the remote UE has been made along with the HO request of the relay UE.
  • the T-gNB that has received the HO request of the relay UE and the HO request of the remote UE implements admission control of the relay UE and admission control of the remote UE.
  • the T-gNB performs RRC configuration for relay UEs and remote UEs.
  • the T-gNB notifies the S-gNB of the HO request response message of the relay UE.
  • the RRC configuration for the relay UE may be included in the HO request response message of the relay UE.
  • the T-gNB notifies the HO Request Response of the remote UE together with the HO Request Response message to the relay UE or included in the HO Request Response message to the relay UE.
  • the RRC configuration of the remote UE may be included in the HO request response of the remote UE.
  • the S-gNB notifies the remote UE of an RRC message for RRC setting change (which may be an HO instruction) to the T-gNB.
  • the S-gNB notifies the RRC message via the relay UE.
  • An RRCReconfiguration message may be used as the RRC message.
  • the RRC message may include the RRC configuration of the remote UE configured by the T-gNB. By doing so, the remote UE can receive the RRC configuration set by the T-gNB.
  • the remote UE that receives the RRC message and performs RRC configuration may notify the S-gNB of RRCReconfigurationComplete in step ST2008.
  • a remote UE may notify via a relay UE. By doing so, the S-gNB can recognize that the RRC configuration has been performed on the remote UE.
  • the S-gNB notifies the relay UE of an RRC message for changing the RRC settings to the T-gNB.
  • the S-gNB may also notify the relay UE of the RRC message.
  • RRCReconfiguration may be used as the RRC message.
  • S-gNB may include the RRC configuration of the relay UE configured by the T-gNB in the RRC message notified to the relay UE. By doing so, the relay UE can receive the RRC configuration set by the T-gNB.
  • the relay UE Upon receiving the notification, the relay UE stops communicating with the S-gNB. It may release the configuration for communication with the S-gNB.
  • the relay UE that has stopped communication with the S-gNB in step ST2013, notifies the T-gNB of the RRC configuration change complete message. By doing so, the relay UE can notify the T-gNB of the RRC setting completion.
  • the T-gNB will be able to recognize that the relay UE has performed the RRC configuration. This enables communication between the relay UE and the T-gNB.
  • the remote UE that receives the RRC message for the RRC setting change from the S-gNB to the T-gNB in step ST2007 described above does not immediately stop communication with the S-gNB.
  • the remote UE may not stop communicating with the relay UE for communication with the S-gNB.
  • a remote UE receiving an RRC configuration change message from an S-gNB to a T-gNB may not immediately send an RRC configuration change complete message with the T-gNB.
  • the RRC configuration change complete message may be RRCReconfigurationcomplete.
  • the relay UE may notify the remote UE of the RRC status message with the gNB.
  • the RRC status message with the gNB may include information indicating the change of the gNB with which the RRC is connected. Information identifying the changed gNB may be included. Information identifying the gNB before the change may be included.
  • the RRC status message may include RRC connection complete with T-gNB. The relay UE that has notified the RRC setting completion with the T-gNB, in step ST2014, notifies the remote UE of the RRC state message including the RRC connection completion with the T-gNB.
  • the remote UE Upon receiving the notification, the remote UE stops communicating with the S-gNB.
  • the remote UE may stop communicating with the relay UE for communication with the S-gNB. It may release the configuration for communication with the S-gNB.
  • the remote UE that has stopped communicating with the S-gNB transmits an RRC configuration change complete message to the T-gNB via the relay UE in step ST2015.
  • the remote UE can notify the HO destination T-gNB of the relay UE of the RRC setting completion via the relay UE.
  • the T-gNB will be able to recognize that the remote UE has performed RRC configuration. This enables data communication between the remote UE and the T-gNB via the relay UE in step ST2016.
  • the remote UE from the reception of the RRC message for the RRC setting change to the T-gNB, until the successful notification of the RRC setting complete message to the T-gNB, if not performed within a predetermined time, for example, the remote UE HO failure processing may be performed for the T-gNB.
  • the predetermined time may be used as a timer.
  • the remote UE resets the timer if the RRC configuration complete message notification to the T-gNB is successful within the timer.
  • the predetermined time may be statically determined in advance by standards or the like, or may be notified to the remote UE in advance from the gNB, for example, from the S-gNB.
  • RRC signaling may be used for the notification.
  • the timer may be a timer when connecting with a gNB via a relay UE. It may be different from the timer when connecting directly to the gNB. In this case, flexible setting is possible. Alternatively, the timer for connecting to the gNB via the relay UE and the timer for directly connecting to the gNB may be the same. In this case, the processing can be simplified.
  • the T-gNB that receives the RRC setup complete message from the relay UE performs path switch processing for the relay UE with the CN. By doing so, it becomes possible to implement the path switch process from the S-gNB to the T-gNB for the relay UE.
  • UPF can send DL data to relay UE to T-gNB. Data communication is enabled between the relay UE and the UPF.
  • the T-gNB that has received the RRC configuration complete message from the remote UE performs path switch processing for the remote UE with the CN. By doing so, it is possible to perform a path switch process from the S-gNB to the T-gNB for the remote UE.
  • the UPF can send DL data to the remote UE to the T-gNB. Data communication is enabled between the remote UE and the UPF.
  • T-gNB when receiving the RRC configuration complete message from the relay UE and the remote UE, may perform a path switch process for the relay UE and the remote UE between the CN.
  • the T-gNB may include information about the communication of the relay UE and information about the communication of the remote UE in the path switch request message to the AMF.
  • the AMF may include information about the relay UE's communication and information about the remote UE's communication in the path switch request message to the UPF.
  • the path switch request response message from the UPF to the AMF may contain information about the communication of the relay UE and the communication of the remote UE.
  • the path switch request response message from the AMF to the T-gNB may include information on the communication of the relay UE and information on the communication of the remote UE.
  • the T-gNB notifies the S-gNB of the release of the context of the relay UE and the release of the context of the remote UE. These may be included in the same message and notified. This allows the S-gNB to release the context of the relay UE and the context of the remote UE.
  • the UPF can perform path switching processing to the T-gNB for the communication of the relay UE and the communication of the remote UE. Also, the UPF can transmit DL data to the relay UE and the remote UE for the T-gNB. Also, data communication becomes possible between the relay UE and the UPF, and data communication becomes possible between the remote UE and the UPF. Also, by doing so, it is possible to reduce the amount of signaling.
  • T-gNB when receiving the RRC configuration complete message from the relay UE and the remote UE, between the CN and the path switch process for the relay UE and the remote UE discloses a method to implement .
  • the T-gNB performs path switch processing with the CN. This enables path switching between the relay UE and the remote UE.
  • step ST2019 data communication becomes possible between the remote UE and the T-gNB and CN via the relay UE.
  • the T-gNB notifies the S-gNB of the UE context release of the relay UE and the remote UE. This enables UE context release for relay UEs and remote UEs.
  • the S-gNB implements the RRC configuration change notification to the T-gNB for the remote UE, or the RRC configuration change notification to the T-gNB for the relay UE, whichever is later, the S-gNB is T -
  • the gNB may perform data transfer processing for communication between the remote UE and the UPF. Also, the S-gNB may perform data transfer processing for communication (if any) between the relay UE and the UPF to the T-gNB.
  • the S-gNB performs RRC configuration change notification to the T-gNB for the remote UE, or performs RRC configuration change notification to the T-gNB for the relay UE, whichever is earlier,
  • the S-gNB may perform data transfer processing for communication between the remote UE and the UPF to the T-gNB.
  • the S-gNB may perform data transfer processing for communication (if any) between the relay UE and the UPF to the T-gNB. This may be applied when the remote UE performs HO to the HO destination gNB of the relay UE. By doing so, it is possible to early perform the data transfer processing of the communication between the remote UE and the UPF and the data transfer processing of the communication (if any) between the relay UE and the UPF for the T-gNB.
  • the S-gNB performs RRC configuration change notification implementation to the T-gNB for the remote UE, performs data transfer processing for communication between the remote UE and the UPF for the T-gNB, and S - The gNB may perform the data forwarding process for the communication (if any) between the relay UE and the UPF to the T-gNB with the RRC configuration change notification implementation to the T-gNB for the relay UE.
  • the S-gNB should also forward the data received from the UPF. By doing so, it is possible to early implement the data transfer process of the communication between the remote UE and the UPF for the T-gNB. In addition, since each data is transferred at an individual timing, malfunction can be reduced.
  • step ST2009 the S-gNB transfers the SN state to the T-gNB.
  • the SN status may be transferred using SN Status Transfer.
  • step ST2010 the S-gNB transfers data to the T-gNB.
  • the T-gNB buffers the data transferred from the S-gNB.
  • T-gNB is triggered by the reception of the RRC configuration complete message from the relay UE or the reception of the RRC configuration complete message from the remote UE, whichever is later, DL data and/or UL data between the remote UE start sending and receiving
  • the reception of the RRC configuration complete message from the remote UE in step ST2015 is triggered, and in step ST2016, the T-gNB starts data transmission/reception with the remote UE.
  • the T-gNB may transmit the buffered data. By doing so, it is possible to transmit and receive data between the remote UE and the T-gNB via the relay UE.
  • the S-gNB notifies the remote UE of the RRC setting change is performed prior to notifying the relay UE of the RRC setting change, and the S-gNB performs the RRC setting change to the relay UE.
  • the S-gNB sends and receives DL data and/or UL data to and from the remote UE for the relay UE until data transfer is performed may be implemented.
  • the relay UE may transmit/receive the DL data and/or UL data to/from the remote UE.
  • the relay UE When the relay UE receives an RRC configuration change from the S-gNB, it should stop sending DL data to the remote UE. As a result, the relay UE does not need to send feedback information such as a PDCP Status report for DL data transmission to the remote UE to the S-gNB. That is, feedback processing can be simplified. Moreover, it becomes possible to reduce the processing in the relay UE.
  • the relay UE may stop receiving UL data from the remote UE when receiving an RRC configuration change from the S-gNB. Alternatively, the relay UE may continue to receive UL data from the remote UE upon receiving an RRC configuration change from the S-gNB.
  • a relay UE may buffer UL data received from a remote UE during HO. After notifying the T-gNB of the RRC configuration completion, the relay UE transmits the UL data received from the remote UE to the T-gNB. By doing so, it is possible to shorten the delay time until UL data can be transmitted from the remote UE to the T-gNB.
  • the remote UE's DAPS HO may be performed accordingly.
  • the remote UE may activate the protocol stack for both communication with the S-gNB and communication with the T-gNB via the relay UE.
  • the method disclosed in Modification 2 of Embodiment 1 may be appropriately applied.
  • the HO of the remote UE is performed after the HO of the relay UE is completed.
  • FIG. 21 is a sequence diagram showing another example of a method for the remote UE to perform HO to the HO destination gNB of the relay UE, according to the third embodiment.
  • the example of FIG. 21 discloses a method of performing HO of the remote UE after HO of the relay UE is completed.
  • steps common to those in FIG. 20 are assigned the same step numbers, and common descriptions are omitted.
  • the S-gNB which has received the HO request response message from the T-gNB in step ST2006, notifies the relay UE of the RRC setting change message in step ST2011, and performs HO of the relay UE.
  • HO of the relay UE is performed in step ST2011 and in steps ST2009 to ST2013 following this.
  • the T-gNB that has received the RRC configuration complete message from the relay UE in step ST2013 notifies the remote UE of the RRC configuration change message in step ST2101. The message may be notified via the relay UE. This allows the remote UE to implement RRC configuration for communication between the remote UE and the T-gNB, which is configured by the T-gNB.
  • the remote UE performs RRC configuration according to the RRC configuration change message received from the T-gNB, and notifies the T-gNB of the RRC configuration complete message in step ST2015.
  • the message may be notified via the relay UE.
  • the T-gNB can recognize that the remote UE has completed the RRC setting, and can recognize that communication is possible.
  • the relay UE informs the remote UE of the RRC configuration of the T-gNB.
  • FIG. 22 is a sequence diagram showing another example of a method for the remote UE to perform HO to the HO destination gNB of the relay UE, according to the third embodiment.
  • the example of FIG. 22 discloses how the relay UE informs the remote UE of the RRC configuration of the T-gNB.
  • steps common to those in FIG. 20 are assigned the same step numbers, and common descriptions are omitted.
  • the S-gNB that received the HO request response message from the T-gNB in step ST2006 notifies the relay UE of the RRC configuration change message in step ST2201.
  • the RRC configuration change message includes information about the RRC configuration for communication with the T-gNB of the remote UE.
  • a relay UE that receives the RRC configuration change message stops communication with the S-gNB. It may release the configuration for communication with the S-gNB. Also, the relay UE implements RRC settings for communication with the T-gNB.
  • the relay UE notifies the remote UE of the RRC setting change message.
  • the message may contain information about the RRC configuration for communication with the T-gNB.
  • the remote UE can receive information about the RRC configuration for communication with the T-gNB.
  • the remote UE stops communication with the S-gNB. It may release the configuration for communication with the S-gNB.
  • the remote UE performs RRC configuration for communication with the T-gNB.
  • the remote UE notifies the relay UE of the RRC setting completion for communication with the T-gNB.
  • An RRC configuration complete message may be used for the notification.
  • the relay UE notifies the T-gNB of the RRC configuration complete message.
  • the message may include completion of RRC setup for communication with the T-gNB at the relay UE and completion of RRC setup for communication with the T-gNB at the remote UE.
  • the T-gNB can recognize that the RRC configuration has been completed in the relay UE, and can recognize that the RRC configuration has been completed in the remote UE.
  • the T-gNB can recognize that it has become possible to communicate with the remote UE via the relay UE.
  • the remote UE can communicate with the T-gNB via the relay UE.
  • the relay UE notifies the remote UE of the RRC setting for communication with the T-gNB, so that the remote UE can perform HO to the T-gNB. Also, since communication of RRC messages from the T-gNB to the remote UE becomes unnecessary, the amount of signaling can be reduced.
  • the CN may perform the setting. For example, the CN node notifies the RAN node of the HO availability setting. The CN node or the RAN node may notify the relay UE of the HO availability setting.
  • a CN node may be an AMF.
  • the RAN may set the HO availability. For example, the HO availability setting may be performed from the RAN node to the relay UE. By doing so, it is possible to set whether or not the relay UE connected to the remote UE can perform HO according to the radio wave propagation condition, the processing load on the relay UE, and the like.
  • the relay UE that is performing the relay processing of the communication between the remote UE and the gNB disclosed above does not perform the HO processing.
  • the remote UE implements HO to the HO destination gNB of the relay UE. By doing so, it is possible to perform optimum connection processing between the remote UE and the NW accompanying the HO of the relay UE according to the radio wave propagation condition, the processing load on the relay UE, and the like.
  • Embodiment 4 Robustness in connection between remote UE and gNB via relay UE is required.
  • the identifier of the cell to which the UE was previously connected is disclosed.
  • the remote UE connects with the gNB via the relay UE such a method cannot be applied because the remote UE is directly connected with the relay UE and not directly connected with the cell.
  • Embodiment 4 discloses a method for improving robustness in connection between a remote UE and a gNB via a relay UE.
  • the gNB when the remote UE establishes or re-establishes an RRC connection with the gNB via the relay UE, the gNB receives the RRC re-establishment request message to notify you.
  • Information about the previously connected relay UE is included in the RRC re-establishment request message.
  • Information for identifying the relay UE may be used as the information on the relay UE.
  • the RRC re-establishment request message may include information about the gNB to which the previously connected relay UE connects.
  • Information for identifying the gNB may be used as the information about the gNB.
  • the gNB connecting to the remote UE via the relay UE can recognize the relay UE to which the remote UE was previously connected.
  • the remote UE When the remote UE establishes or re-establishes an RRC connection with the gNB without going through the relay UE, it notifies the gNB of an RRC re-establishment request message.
  • Information about the previously connected relay UE is included in the RRC re-establishment request message.
  • Information for identifying the relay UE may be used as the information on the relay UE.
  • the RRC re-establishment request message may include information about the gNB to which the previously connected relay UE connects.
  • Information for identifying the gNB may be used as the information about the gNB.
  • the gNB connecting with the remote UE can recognize the relay UE with which the remote UE was previously connected.
  • the number of previously connected relay UEs is not limited to one, and may be multiple.
  • the maximum number may be statically determined by a standard or the like. Malfunctions can be reduced, and setting processing can be simplified.
  • the gNB may use information about the previously connected relay UE received from the remote UE and/or information about the gNB, for example, to set the remote UE to measure the relay UE.
  • Embodiment 5 when a UE connects directly to a gNB, the gNB provides the UE with an identifier, and the identifier is used to identify the UE in direct communication between the UE and the gNB.
  • the identifier is used to identify the UE in direct communication between the UE and the gNB.
  • direct communication between the remote UE and the gNB is no longer performed. Therefore, how UEs identify each other, or how a gNB identifies a remote UE becomes an issue.
  • the UE identifier used in communication between the remote UE and the gNB via the relay UE is not disclosed in the above-mentioned Non-Patent Documents 1 to 27 and other documents.
  • the destination L2ID (Destination Use the default value as Layer-2 ID).
  • a default value may be used as the destination L2ID in the discovery process for searching for relay UEs.
  • the default value may be for PC5 communication from remote UE to relay UE.
  • the default value may be for PC5 communication from relay UE to remote UE.
  • the default value may be for two-way PC5 communication.
  • a default destination L2 ID may be provided for relay.
  • a default destination L2ID may be provided for U2N relays.
  • a default destination L2ID may be provided for U2U relay.
  • a default destination L2ID may be provided separately from that for U2N relay.
  • the destination L2ID may be associated with a service type.
  • a service type for relay may be provided. The UE derives the destination L2ID from the service type. For example, the UE uses the default destination L2ID for relay if the service type is relay.
  • the destination L2 ID may be associated with an application layer ID.
  • the UE may associate the destination L2 ID with the application layer ID.
  • the UE In communication between the remote UE and the gNB via the relay UE, the UE itself may assign the source L2 ID (source Layer-2 ID) when establishing the PC5 connection between the remote UE and the relay UE. In the discovery process, the UE itself may allocate the source L2ID.
  • a source L2ID may be associated with an application layer ID. These may be associated by the UE.
  • a gNB allocates a UE identifier to a remote UE connecting via a relay UE.
  • the gNB may assign a UE identity per cell to the remote UE.
  • the UE identifier may be the C-RNTI. Other RNTIs may be used.
  • the gNB notifies the remote UE of the UE identifier assigned to the remote UE via the relay UE.
  • the gNB notifies the remote UE of the UE identifier assigned to the remote UE using RRC signaling performed between the remote UE and the gNB via the relay UE.
  • the gNB may notify the remote UE of the UE identifier in the RRC connection establishment process performed with the remote UE via the relay UE, for example, in the RRC setup process.
  • the gNb may include the UE identifier in the RRCSetup message and notify the remote UE.
  • the gNB may notify the remote UE of the UE identifier in the RRC configuration change process performed with the remote UE via the relay UE.
  • the gNB may notify by including the UE identifier in the RRCReconfiguration message.
  • the gNB may notify the remote UE of the UE identifier in the RRC connection state transition process between the Inactive state and the Active state performed with the remote UE via the relay UE.
  • the gNB may notify by including the UE identifier in the RRCResume message.
  • the gNB may notify the remote UE of the UE identifier assigned to the remote UE using MAC signaling performed with the remote UE via the relay UE.
  • the gNB may include the UE identifier in MAC CE and notify it.
  • the gNB can notify the remote UE of the UE identifier assigned to the remote UE.
  • the remote UE will be able to receive the UE identity from the gNB.
  • the remote UE can use the UE identifier received from the gNB to communicate with the gNB via the relay UE.
  • the gNB may include the UE identifier assigned to the remote UE in the RRC message to the remote UE. By receiving the UE identifier, the remote UE can recognize that the RRC message is for itself.
  • the relay UE receives an RRC message from a gNB to a remote UE, the relay UE can recognize which remote UE the RRC message is for by receiving the UE identifier.
  • a relay UE is enabled to relay the RRC message to a remote UE.
  • the UE identifier assigned to the remote UE may be included in the RRC message from the remote UE to the gNB.
  • the gNB can recognize which UE the RRC message is from.
  • the relay UE can recognize which remote UE the RRC message is from by receiving the UE identifier.
  • a relay UE is enabled to relay the RRC message to the gNB.
  • the gNB may include the UE identifier assigned to the remote UE in MAC signaling to the remote UE.
  • the gNB may include the UE identifier in MAC CE as MAC signaling.
  • the remote UE can recognize that the MAC signaling is addressed to itself.
  • the relay UE receives MAC signaling from a gNB to a remote UE, the relay UE can recognize which remote UE the MAC signaling is for by receiving the UE identifier.
  • a relay UE is enabled to relay the MAC signaling to a remote UE.
  • the MAC signaling from the remote UE to the gNB may include the UE identifier assigned to the remote UE.
  • the gNB may include the UE identifier in MAC CE as MAC signaling.
  • the gNB can recognize which UE the MAC signaling is from.
  • the relay UE receives the MAC signaling from the remote UE to the gNB, the relay UE receives the UE identifier so that it can recognize which remote UE the MAC signaling is from. It allows the relay UE to relay the MAC signaling to the gNB.
  • a method of assigning and notifying a UE identifier in HO is disclosed.
  • the T-gNB assigns the UE identifier used for communication with the remote UE to the HO target remote UE.
  • the T-gNB notifies the assigned UE identifier to the remote UE via the S-gNB. If the remote UE is connected to the S-gNB via the relay UE, the T-gNB notifies the remote UE of the assigned UE identifier via the S-gNB and the relay UE.
  • Xn signaling may be used to notify the UE identifier from the T-gNB to the S-gNB.
  • the UE identifier may be included in an HO request response (HO Request Ack) message.
  • RRC signaling may be used to notify the UE identity from the S-gNB to the remote UE.
  • the UE identifier may be included in an RRC configuration change (or RRCReconfiguration) message and notified.
  • MAC signaling may be used to notify the UE identifier from the S-gNB to the remote UE.
  • the remote UE can quickly acquire the UE identifier assigned by the HO destination T-gNB. It is possible to use the UE identity early in the communication between the remote UE and the T-gNB.
  • the UE identifier assigned to the remote UE may be SL-RNTI.
  • SL-RNTI may be used in communication between remote UE and gNB.
  • the gNB may allocate SL-RNTI to the remote UE separately from the C-RNTI, which is the UE identifier of the remote UE disclosed above.
  • a gNB may assign multiple UE identities to a remote UE. The gNB notifies the remote UE of the assigned UE identities.
  • C-RNTI may be used in communication between remote UE and gNB and SL-RNTI may be used in communication between remote UE and relay UE.
  • the gNB can provide the identifier to the UE in the communication between the remote UE and the gNB via the relay UE.
  • the UE identifier is notified from the gNB to the remote UE in the RA process.
  • the gNB-provided identifier of the remote UE can be used to identify the remote UE in the communication. Also, since the remote UE can be identified, it is possible to reduce malfunctions in communication between the remote UE and the gNB via the relay UE.
  • gNB or cell may be a gNB or a cell.
  • HO between gNBs it may be HO between cells. It may be HO between cells configured by S-gNB and cells configured by T-gNB.
  • the S-gNB and T-gNB may be the same or different. As a case where the S-gNB and the T-gNB are the same, for example, HO between different cells configured by the same gNB may be. If the S-gNB and T-gNB are the same, for example, the processing between the S-gNB and T-gNB disclosed herein may be eliminated.
  • the method disclosed herein may be applied as appropriate to the switching process between remote UE and gNB to/from indirect communication via relay UE, for example, when S-gNB and T-gNB are the same.
  • it may be appropriately applied to switching processing from direct communication between the remote UE and the gNB to communication (indirect communication) between the remote UE and the gNB via the relay UE.
  • it may be appropriately applied to switching processing from communication (indirect communication) between the remote UE and the gNB via the relay UE to direct communication between the remote UE and the gNB.
  • the remote UE and the gNB communicate via two relay UEs, the relay UE #21 and the relay UE #22, the PC connection between the remote UE and the relay UE #21, the relay UE #21 and the relay UE
  • the methods disclosed above may be appropriately applied.
  • the remote UE when the remote UE connects with the T-gNB via relay UE #21 and relay UE #22, the PC connection between the remote UE and relay UE #21
  • the T-gNB may notify the remote UE via the S-gNB of the settings used for the relay UE #21 and the settings used for the PC connection between the relay UE #22.
  • the remote UE may notify the relay UE #21 of some or all of the settings.
  • Relay UE #21 may notify relay UE #22 of some or all of the settings.
  • UE-TX is the UE that generated the service data
  • UE-RX is the UE that receives the service data.
  • service data is generated in UE2 and data is transmitted to UE1
  • UE2 is UE-TX
  • UE1 is UE-
  • the method of the present disclosure may be applied as RX. With this, similar effects can be obtained.
  • a subframe is an example of a communication time unit in the fifth generation communication system.
  • a subframe may be a scheduling unit.
  • the processing described in units of subframes may be performed in units of TTIs, slots, subslots, or minislots.
  • V2X Vehicle-to-everything
  • SL communication used in various services such as proximity-based service, public safety, communication between wearable terminals, and communication between devices in factories.

Abstract

端末間通信を利用した通信システムにおいて通信品質を向上させるために、通信システムは、通信端末同士が直接通信する端末間通信をサポートする第1の通信端末(Remote UE)が接続された第1の基地局(S-gNB)と、端末間通信をサポートする第2の通信端末(Relay UE)が接続された第2の基地局(T-gNB)と、を含み、第2の基地局は、第1の通信端末が第2の通信端末を介して自基地局に接続するためのハンドオーバの要求を受信した場合、第1の通信端末と第2の通信端末とが端末間通信を行うための設定内容を示す通信設定情報を、第1の通信端末および第2の通信端末へ送信する。

Description

通信システムおよび基地局
 本開示は、無線通信技術に関する。
 移動体通信システムの規格化団体である3GPP(3rd Generation Partnership Project)において、無線区間についてはロングタームエボリューション(Long Term Evolution:LTE)と称し、コアネットワークおよび無線アクセスネットワーク(以下、まとめて、ネットワークとも称する)を含めたシステム全体構成については、システムアーキテクチャエボリューション(System Architecture Evolution:SAE)と称される通信方式が検討されている(例えば、非特許文献1~5)。この通信方式は3.9G(3.9 Generation)システムとも呼ばれる。
 LTEのアクセス方式としては、下り方向はOFDM(Orthogonal Frequency Division Multiplexing)、上り方向はSC-FDMA(Single Carrier Frequency Division Multiple Access)が用いられる。また、LTEは、W-CDMA(Wideband Code Division Multiple Access)とは異なり、回線交換を含まず、パケット通信方式のみになる。
 非特許文献1(5章)に記載される、3GPPでの、LTEシステムにおけるフレーム構成に関する決定事項について、図1を用いて説明する。図1は、LTE方式の通信システムで使用される無線フレームの構成を示す説明図である。図1において、1つの無線フレーム(Radio frame)は10msである。無線フレームは10個の等しい大きさのサブフレーム(Subframe)に分割される。サブフレームは、2個の等しい大きさのスロット(slot)に分割される。無線フレーム毎に1番目および6番目のサブフレームに下り同期信号(Downlink Synchronization Signal)が含まれる。同期信号には、第一同期信号(Primary Synchronization Signal:P-SS)と、第二同期信号(Secondary Synchronization Signal:S-SS)とがある。
 3GPPでの、LTEシステムにおけるチャネル構成に関する決定事項が、非特許文献1(5章)に記載されている。CSG(Closed Subscriber Group)セルにおいてもnon-CSGセルと同じチャネル構成が用いられると想定されている。
 物理報知チャネル(Physical Broadcast Channel:PBCH)は、基地局装置(以下、単に「基地局」という場合がある)から移動端末装置(以下、単に「移動端末」という場合がある)などの通信端末装置(以下、単に「通信端末」という場合がある)への下り送信用のチャネルである。BCHトランスポートブロック(transport block)は、40ms間隔中の4個のサブフレームにマッピングされる。40msタイミングの明白なシグナリングはない。
 物理制御フォーマットインジケータチャネル(Physical Control Format Indicator Channel:PCFICH)は、基地局から通信端末への下り送信用のチャネルである。PCFICHは、PDCCHsのために用いるOFDM(Orthogonal Frequency Division Multiplexing)シンボルの数を、基地局から通信端末へ通知する。PCFICHは、サブフレーム毎に送信される。
 物理下り制御チャネル(Physical Downlink Control Channel:PDCCH)は、基地局から通信端末への下り送信用のチャネルである。PDCCHは、後述のトランスポートチャネルの1つである下り共有チャネル(Downlink Shared Channel:DL-SCH)のリソース割り当て(allocation)情報、後述のトランスポートチャネルの1つであるページングチャネル(Paging Channel:PCH)のリソース割り当て(allocation)情報、DL-SCHに関するHARQ(Hybrid Automatic Repeat reQuest)情報を通知する。PDCCHは、上りスケジューリンググラント(Uplink Scheduling Grant)を運ぶ。PDCCHは、上り送信に対する応答信号であるAck(Acknowledgement)/Nack(Negative Acknowledgement)を運ぶ。PDCCHは、L1/L2制御信号とも呼ばれる。
 物理下り共有チャネル(Physical Downlink Shared Channel:PDSCH)は、基地局から通信端末への下り送信用のチャネルである。PDSCHには、トランスポートチャネルである下り共有チャネル(DL-SCH)、およびトランスポートチャネルであるPCHがマッピングされている。
 物理マルチキャストチャネル(Physical Multicast Channel:PMCH)は、基地局から通信端末への下り送信用のチャネルである。PMCHには、トランスポートチャネルであるマルチキャストチャネル(Multicast Channel:MCH)がマッピングされている。
 物理上り制御チャネル(Physical Uplink Control Channel:PUCCH)は、通信端末から基地局への上り送信用のチャネルである。PUCCHは、下り送信に対する応答信号(response signal)であるAck/Nackを運ぶ。PUCCHは、CSI(Channel State Information)を運ぶ。CSIは、RI(Rank Indicator)、PMI(Precoding Matrix Indicator)、CQI(Channel Quality Indicator)レポートで構成される。RIとは、MIMOにおけるチャネル行列のランク情報である。PMIとは、MIMOにて用いるプリコーディングウェイト行列の情報である。CQIとは、受信したデータの品質、もしくは通信路品質を示す品質情報である。またPUCCHは、スケジューリングリクエスト(Scheduling Request:SR)を運ぶ。
 物理上り共有チャネル(Physical Uplink Shared Channel:PUSCH)は、通信端末から基地局への上り送信用のチャネルである。PUSCHには、トランスポートチャネルの1つである上り共有チャネル(Uplink Shared Channel:UL-SCH)がマッピングされている。
 物理HARQインジケータチャネル(Physical Hybrid ARQ Indicator Channel:PHICH)は、基地局から通信端末への下り送信用のチャネルである。PHICHは、上り送信に対する応答信号であるAck/Nackを運ぶ。物理ランダムアクセスチャネル(Physical Random Access Channel:PRACH)は、通信端末から基地局への上り送信用のチャネルである。PRACHは、ランダムアクセスプリアンブル(random access preamble)を運ぶ。
 下り参照信号(リファレンスシグナル(Reference Signal):RS)は、LTE方式の通信システムとして既知のシンボルである。以下の5種類の下りリファレンスシグナルが定義されている。セル固有参照信号(Cell-specific Reference Signal:CRS)、MBSFN参照信号(MBSFN Reference Signal)、UE固有参照信号(UE-specific Reference Signal)であるデータ復調用参照信号(Demodulation Reference Signal:DM-RS)、位置決定参照信号(Positioning Reference Signal:PRS)、チャネル状態情報参照信号(Channel State Information Reference Signal:CSI-RS)。通信端末の物理レイヤの測定として、リファレンスシグナルの受信電力(Reference Signal Received Power:RSRP)測定がある。
 上り参照信号についても同様に、LTE方式の通信システムとして既知のシンボルである。以下の2種類の上りリファレンスシグナルが定義されている。データ復調用参照信号(Demodulation Reference Signal:DM-RS)、サウンディング用参照信号(Sounding Reference Signal:SRS)である。
 非特許文献1(5章)に記載されるトランスポートチャネル(Transport Channel)について、説明する。下りトランスポートチャネルのうち、報知チャネル(Broadcast Channel:BCH)は、その基地局(セル)のカバレッジ全体に報知される。BCHは、物理報知チャネル(PBCH)にマッピングされる。
 下り共有チャネル(Downlink Shared Channel:DL-SCH)には、HARQ(Hybrid ARQ)による再送制御が適用される。DL-SCHは、基地局(セル)のカバレッジ全体への報知が可能である。DL-SCHは、ダイナミックあるいは準静的(Semi-static)なリソース割り当てをサポートする。準静的なリソース割り当ては、パーシステントスケジューリング(Persistent Scheduling)ともいわれる。DL-SCHは、通信端末の低消費電力化のために通信端末の間欠受信(Discontinuous reception:DRX)をサポートする。DL-SCHは、物理下り共有チャネル(PDSCH)へマッピングされる。
 ページングチャネル(Paging Channel:PCH)は、通信端末の低消費電力を可能とするために通信端末のDRXをサポートする。PCHは、基地局(セル)のカバレッジ全体への報知が要求される。PCHは、動的にトラフィックに利用できる物理下り共有チャネル(PDSCH)のような物理リソースへマッピングされる。
 マルチキャストチャネル(Multicast Channel:MCH)は、基地局(セル)のカバレッジ全体への報知に使用される。MCHは、マルチセル送信におけるMBMS(Multimedia Broadcast Multicast Service)サービス(MTCHとMCCH)のSFN合成をサポートする。MCHは、準静的なリソース割り当てをサポートする。MCHは、PMCHへマッピングされる。
 上りトランスポートチャネルのうち、上り共有チャネル(Uplink Shared Channel:UL-SCH)には、HARQ(Hybrid ARQ)による再送制御が適用される。UL-SCHは、ダイナミックあるいは準静的(Semi-static)なリソース割り当てをサポートする。UL-SCHは、物理上り共有チャネル(PUSCH)へマッピングされる。
 ランダムアクセスチャネル(Random Access Channel:RACH)は、制御情報に限られている。RACHは、衝突のリスクがある。RACHは、物理ランダムアクセスチャネル(PRACH)へマッピングされる。
 HARQについて説明する。HARQとは、自動再送要求(Automatic Repeat reQuest:ARQ)と誤り訂正(Forward Error Correction)との組合せによって、伝送路の通信品質を向上させる技術である。HARQには、通信品質が変化する伝送路に対しても、再送によって誤り訂正が有効に機能するという利点がある。特に、再送にあたって初送の受信結果と再送の受信結果との合成をすることで、更なる品質向上を得ることも可能である。
 再送の方法の一例を説明する。受信側にて、受信データが正しくデコードできなかった場合、換言すればCRC(Cyclic Redundancy Check)エラーが発生した場合(CRC=NG)、受信側から送信側へ「Nack」を送信する。「Nack」を受信した送信側は、データを再送する。受信側にて、受信データが正しくデコードできた場合、換言すればCRCエラーが発生しない場合(CRC=OK)、受信側から送信側へ「Ack」を送信する。「Ack」を受信した送信側は次のデータを送信する。
 非特許文献1(6章)に記載される論理チャネル(ロジカルチャネル:Logical Channel)について、説明する。報知制御チャネル(Broadcast Control Channel:BCCH)は、報知システム制御情報のための下りチャネルである。論理チャネルであるBCCHは、トランスポートチャネルである報知チャネル(BCH)、あるいは下り共有チャネル(DL-SCH)へマッピングされる。
 ページング制御チャネル(Paging Control Channel:PCCH)は、ページング情報(Paging Information)およびシステム情報(System Information)の変更を送信するための下りチャネルである。PCCHは、通信端末のセルロケーションをネットワークが知らない場合に用いられる。論理チャネルであるPCCHは、トランスポートチャネルであるページングチャネル(PCH)へマッピングされる。
 共有制御チャネル(Common Control Channel:CCCH)は、通信端末と基地局との間の送信制御情報のためのチャネルである。CCCHは、通信端末がネットワークとの間でRRC接続(connection)を有していない場合に用いられる。下り方向では、CCCHは、トランスポートチャネルである下り共有チャネル(DL-SCH)へマッピングされる。上り方向では、CCCHは、トランスポートチャネルである上り共有チャネル(UL-SCH)へマッピングされる。
 マルチキャスト制御チャネル(Multicast Control Channel:MCCH)は、1対多の送信のための下りチャネルである。MCCHは、ネットワークから通信端末への1つあるいはいくつかのMTCH用のMBMS制御情報の送信のために用いられる。MCCHは、MBMS受信中の通信端末のみに用いられる。MCCHは、トランスポートチャネルであるマルチキャストチャネル(MCH)へマッピングされる。
 個別制御チャネル(Dedicated Control Channel:DCCH)は、1対1にて、通信端末とネットワークとの間の個別制御情報を送信するチャネルである。DCCHは、通信端末がRRC接続(connection)である場合に用いられる。DCCHは、上りでは上り共有チャネル(UL-SCH)へマッピングされ、下りでは下り共有チャネル(DL-SCH)にマッピングされる。
 個別トラフィックチャネル(Dedicated Traffic Channel:DTCH)は、ユーザ情報の送信のための個別通信端末への1対1通信のチャネルである。DTCHは、上りおよび下りともに存在する。DTCHは、上りでは上り共有チャネル(UL-SCH)へマッピングされ、下りでは下り共有チャネル(DL-SCH)へマッピングされる。
 マルチキャストトラフィックチャネル(Multicast Traffic Channel:MTCH)は、ネットワークから通信端末へのトラフィックデータ送信のための下りチャネルである。MTCHは、MBMS受信中の通信端末のみに用いられるチャネルである。MTCHは、マルチキャストチャネル(MCH)へマッピングされる。
 CGIとは、セルグローバル識別子(Cell Global Identifier)のことである。ECGIとは、E-UTRANセルグローバル識別子(E-UTRAN Cell Global Identifier)のことである。LTE、後述のLTE-A(Long Term Evolution Advanced)およびUMTS(Universal Mobile Telecommunication System)において、CSG(Closed Subscriber Group)セルが導入される。
 通信端末の位置追跡は、1つ以上のセルからなる区域を単位に行われる。位置追跡は、待受け状態であっても通信端末の位置を追跡し、通信端末を呼び出す、換言すれば通信端末が着呼することを可能にするために行われる。この通信端末の位置追跡のための区域をトラッキングエリアと呼ぶ。
 また3GPPでは、リリース10として、ロングタームエボリューションアドヴァンスド(Long Term Evolution Advanced:LTE-A)の規格策定が進められている(非特許文献3、非特許文献4参照)。LTE-Aは、LTEの無線区間通信方式を基本とし、それにいくつかの新技術を加えて構成される。
 LTE-Aシステムでは、100MHzまでのより広い周波数帯域幅(transmission bandwidths)をサポートするために、二つ以上のコンポーネントキャリア(Component Carrier:CC)を集約する(「アグリゲーション(aggregation)する」とも称する)、キャリアアグリゲーション(Carrier Aggregation:CA)が検討されている。CAについては、非特許文献1に記載されている。
 CAが構成される場合、通信端末であるUEはネットワーク(Network:NW)と唯一のRRC接続(RRC connection)を有する。RRC接続において、1つのサービングセルがNASモビリティ情報とセキュリティ入力を与える。このセルをプライマリセル(Primary Cell:PCell)と呼ぶ。下りリンクで、PCellに対応するキャリアは、下りプライマリコンポーネントキャリア(Downlink Primary Component Carrier:DL PCC)である。上りリンクで、PCellに対応するキャリアは、上りプライマリコンポーネントキャリア(Uplink Primary Component Carrier:UL PCC)である。
 UEの能力(ケーパビリティ(capability))に応じて、セカンダリセル(Secondary Cell:SCell)が、PCellとともに、サービングセルの組を形成するために構成される。下りリンクで、SCellに対応するキャリアは、下りセカンダリコンポーネントキャリア(Downlink Secondary Component Carrier:DL SCC)である。上りリンクで、SCellに対応するキャリアは、上りセカンダリコンポーネントキャリア(Uplink Secondary Component Carrier:UL SCC)である。
 1つのPCellと1つ以上のSCellとからなるサービングセルの組が、1つのUEに対して構成される。
 また、LTE-Aでの新技術としては、より広い帯域をサポートする技術(Wider bandwidth extension)、および多地点協調送受信(Coordinated Multiple Point transmission and reception:CoMP)技術などがある。3GPPでLTE-Aのために検討されているCoMPについては、非特許文献1に記載されている。
 また、3GPPにおいて、将来の膨大なトラフィックに対応するために、スモールセルを構成するスモールeNB(以下「小規模基地局装置」という場合がある)を用いることが検討されている。例えば、多数のスモールeNBを設置して、多数のスモールセルを構成することによって、周波数利用効率を高めて、通信容量の増大を図る技術などが検討されている。具体的には、UEが2つのeNBと接続して通信を行うデュアルコネクティビティ(Dual Connectivity:DCと略称される)などがある。DCについては、非特許文献1に記載されている。
 デュアルコネクティビティ(DC)を行うeNBのうち、一方を「マスタeNB(MeNBと略称される)」といい、他方を「セカンダリeNB(SeNBと略称される)」という場合がある。
 モバイルネットワークのトラフィック量は、増加傾向にあり、通信速度も高速化が進んでいる。LTEおよびLTE-Aが本格的に運用を開始されると、更に通信速度が高速化されることが見込まれる。
 さらに、高度化する移動体通信に対して、2020年以降にサービスを開始することを目標とした第5世代(以下「5G」という場合がある)無線アクセスシステムが検討されている。例えば、欧州では、METISという団体で5Gの要求事項がまとめられている(非特許文献5参照)。
 5G無線アクセスシステムでは、LTEシステムに対して、システム容量は1000倍、データの伝送速度は100倍、データの処理遅延は10分の1(1/10)、通信端末の同時接続数は100倍として、更なる低消費電力化、および装置の低コスト化を実現することが要件として挙げられている。
 このような要求を満たすために、3GPPでは、リリース15として、5Gの規格検討が進められている(非特許文献6~19参照)。5Gの無線区間の技術は「New Radio Access Technology」と称される(「New Radio」は「NR」と略称される)。
 NRシステムは、LTEシステム、LTE-Aシステムを基にして検討が進められているが、以下の点でLTEシステム、LTE-Aシステムからの変更および追加が行われている。
 NRのアクセス方式としては、下り方向はOFDM、上り方向はOFDM、DFT-s-OFDM(DFT-spread-OFDM)が用いられる。
 NRでは、伝送速度向上、処理遅延低減のために、LTEに比べて高い周波数の使用が可能となっている。
 NRにおいては、狭いビーム状の送受信範囲を形成する(ビームフォーミング)とともにビームの向きを変化させる(ビームスイーピング)ことで、セルカバレッジの確保が図られる。
 NRのフレーム構成においては、様々なサブキャリア間隔、すなわち、様々なヌメロロジ(Numerology)がサポートされている。NRにおいては、ヌメロロジによらず、1サブフレームは1ミリ秒であり、また、1スロットは14シンボルで構成される。また、1サブフレームに含まれるスロット数は、サブキャリア間隔15kHzのヌメロロジにおいては1つであり、他のヌメロロジにおいては、サブキャリア間隔に比例して多くなる(非特許文献13(3GPP TS38.211)参照)。
 NRにおける下り同期信号は、同期信号バースト(Synchronization Signal Burst:以下、SSバーストと称する場合がある)として、所定の周期で、所定の継続時間をもって基地局から送信される。SSバーストは、基地局のビーム毎の同期信号ブロック(Synchronization Signal Block:以下、SSブロックと称する場合がある)により構成される。
 基地局はSSバーストの継続時間内において各ビームのSSブロックを、ビームを変えて送信する。SSブロックは、P-SS、S-SS、およびPBCHによって構成される。
 NRにおいては、NRの下り参照信号として、位相追尾参照信号(Phase Tracking Reference Signal:PTRS)の追加により、位相雑音の影響の低減が図られている。上り参照信号においても、下りと同様にPTRSが追加されている。
 NRにおいては、スロット内におけるDL/ULの切替えを柔軟に行うために、PDCCHに含まれる情報にスロット構成通知(Slot Format Indication:SFI)が追加された。
 また、NRにおいては、キャリア周波数帯のうちの一部(以下、Bandwidth Part(BWP)と称する場合がある)を基地局がUEに対して予め設定し、UEが該BWPにおいて基地局との送受信を行うことで、UEにおける消費電力の低減が図られる。
 3GPPでは、DCの形態として、EPCに接続するLTE基地局とNR基地局によるDC、5Gコアシステムに接続するNR基地局によるDC、また、5Gコアシステムに接続するLTE基地局とNR基地局によるDCが検討されている(非特許文献12、16、19参照)。
 また、3GPPでは、サイドリンク(SL:Side Link)通信(PC5通信とも称する)を用いたサービス(アプリケーションでもよい)を、後述するEPS(Evolved Packet System)においても、5Gコアシステムにおいてもサポートすることが検討されている(非特許文献1、16、20、21、22、23参照)。SL通信を用いたサービスとして、たとえば、V2X(Vehicle-to-everything)サービス、プロキシミティサービスなどがある。
3GPP TS 36.300 V16.2.0 3GPP S1-083461 3GPP TR 36.814 V9.2.0 3GPP TR 36.912 V16.0.0 "Scenarios, requirements and KPIs for 5G mobile and wireless system"、ICT-317669-METIS/D1.1 3GPP TR 23.799 V14.0.0 3GPP TR 38.801 V14.0.0 3GPP TR 38.802 V14.2.0 3GPP TR 38.804 V14.0.0 3GPP TR 38.912 V16.0.0 3GPP RP-172115 3GPP TS 37.340 V16.4.0 3GPP TS 38.211 V16.4.0 3GPP TS 38.213 V16.4.0 3GPP TS 38.214 V16.4.0 3GPP TS 38.300 V16.4.0 3GPP TS 38.321 V16.3.0 3GPP TS 38.212 V16.4.0 3GPP TS 38.331 V16.3.1 3GPP TR 23.703 V12.0.0 3GPP TS 23.501 V16.7.0 3GPP TS 23.287 V16.5.0 3GPP TS 23.303 V16.0.0 3GPP TS 38.305 V16.3.0 3GPP TS 23.273 V16.5.0 3GPP R2-2009145 3GPP TR 38.836 V1.0.1
 SL通信(PC5通信とも称する)を用いた多種のサービスを、EPSにおいても、5Gコアシステムにおいてもサポートすることが検討されている(非特許文献1、16、20、21、22、23参照)。SL通信では端末間で通信が行われる。SL通信においては、端末間の直接通信だけでなく、リレー(relay)を介したUEとNWとの間の通信が提案されている(非特許文献20、23、27参照)。このようなリレーを介した通信をサポートするシステムにおいて、端末とNW間の通信品質を如何に向上させるかが問題となる。たとえば、リレーUEを介したリモートUEのHOにおいて、如何にHO時のデータ通信遅延時間を低減するか、如何にHO時のロバスト性を向上させるかなどである。
 本開示は、上記課題に鑑み、端末間通信を利用した通信システムにおいて通信品質を向上させることを、目的の1つとする。
 本開示にかかる通信システムは、通信端末同士が直接通信する端末間通信をサポートする第1の通信端末が接続された第1の基地局と、端末間通信をサポートする第2の通信端末が接続された第2の基地局と、を含む。第2の基地局は、第1の通信端末が第2の通信端末を介して自基地局に接続するためのハンドオーバの要求を受信した場合、第1の通信端末と第2の通信端末とが端末間通信を行うための設定内容を示す通信設定情報を、第1の通信端末および第2の通信端末へ送信する。
 本開示によれば、端末間通信を利用した通信システムにおいて通信品質を向上させることができる。
 本開示の目的、特徴、局面、および利点は、以下の詳細な説明と添付図面とによって、より明白となる。
LTE方式の通信システムで使用される無線フレームの構成を示す説明図である。 3GPPにおいて議論されているLTE方式の通信システム200の全体的な構成を示すブロック図である。 3GPPにおいて議論されているNR方式の通信システム210の全体的な構成を示すブロック図である。 EPCに接続するeNBおよびgNBによるDCの構成図である。 NGコアに接続するgNBによるDCの構成図である。 NGコアに接続するeNBおよびgNBによるDCの構成図である。 NGコアに接続するeNBおよびgNBによるDCの構成図である。 図2に示す移動端末202の構成を示すブロック図である。 図2に示す基地局203の構成を示すブロック図である。 MMEの構成を示すブロック図である。 5GC部の構成を示すブロック図である。 LTE方式の通信システムにおいて通信端末(UE)が行うセルサーチから待ち受け動作までの概略を示すフローチャートである。 NRシステムにおけるセルの構成の一例を示す図である。 実施の形態1について、リレーUEを介したリモートUEのHOの方法の例を示すシーケンス図である。 実施の形態1について、リレーUEを介したリモートUEのHOの方法の他の例を示すシーケンス図である。 実施の形態1の変形例1について、リレーUEを介したリモートUEのHOの方法の例を示すシーケンス図である。 実施の形態1の変形例2について、I-DAPS HOの方法の例を示すシーケンス図である。 実施の形態1の変形例2について、I-DAPS HOの方法の他の例を示すシーケンス図である。 実施の形態2について、I-CHOの方法の例を示すシーケンス図である。 実施の形態3について、リモートUEがリレーUEのHO先gNBに対してHOを実施する方法の例を示すシーケンス図である。 実施の形態3について、リモートUEがリレーUEのHO先gNBに対してHOを実施する方法の他の例を示すシーケンス図である。 実施の形態3について、リモートUEがリレーUEのHO先gNBに対してHOを実施する方法の他の例を示すシーケンス図である。
 以下に、本開示の実施の形態にかかる通信システムおよび基地局を図面に基づいて詳細に説明する。
実施の形態1.
 図2は、3GPPにおいて議論されているLTE方式の通信システム200の全体的な構成を示すブロック図である。図2について説明する。無線アクセスネットワークは、E-UTRAN(Evolved Universal Terrestrial Radio Access Network)201と称される。通信端末装置である移動端末装置(以下「移動端末(User Equipment:UE)」という)202は、基地局装置(以下「基地局(E-UTRAN NodeB:eNB)」という)203と無線通信可能であり、無線通信で信号の送受信を行う。
 ここで、「通信端末装置」とは、移動可能な携帯電話端末装置などの移動端末装置だけでなく、センサなどの移動しないデバイスも含んでいる。以下の説明では、「通信端末装置」を、単に「通信端末」という場合がある。
 移動端末202に対する制御プロトコル、例えばRRC(Radio Resource Control)と、ユーザプレイン(以下、U-Planeと称する場合もある)、例えばPDCP(Packet Data Convergence Protocol)、RLC(Radio Link Control)、MAC(Medium Access Control)、PHY(Physical layer)とが基地局203で終端するならば、E-UTRANは1つあるいは複数の基地局203によって構成される。
 移動端末202と基地局203との間の制御プロトコルRRC(Radio Resource Control)は、報知(Broadcast)、ページング(paging)、RRC接続マネージメント(RRC connection management)などを行う。RRCにおける基地局203と移動端末202との状態として、RRC_IDLEと、RRC_CONNECTEDとがある。
 RRC_IDLEでは、PLMN(Public Land Mobile Network)選択、システム情報(System Information:SI)の報知、ページング(paging)、セル再選択(cell re-selection)、モビリティなどが行われる。RRC_CONNECTEDでは、移動端末はRRC接続(connection)を有し、ネットワークとのデータの送受信を行うことができる。またRRC_CONNECTEDでは、ハンドオーバ(Handover:HO)、隣接セル(Neighbor cell)の測定(メジャメント(measurement))などが行われる。
 基地局203は、1つあるいは複数のeNB207により構成される。またコアネットワークであるEPC(Evolved Packet Core)と、無線アクセスネットワークであるE-UTRAN201とで構成されるシステムは、EPS(Evolved Packet System)と称される。コアネットワークであるEPCと、無線アクセスネットワークであるE-UTRAN201とを合わせて、「ネットワーク」という場合がある。
 eNB207は、移動管理エンティティ(Mobility Management Entity:MME)、あるいはS-GW(Serving Gateway)、あるいはMMEおよびS-GWを含むMME/S-GW部(以下「MME部」という場合がある)204とS1インタフェースにより接続され、eNB207とMME部204との間で制御情報が通信される。1つのeNB207に対して、複数のMME部204が接続されてもよい。eNB207間は、X2インタフェースにより接続され、eNB207間で制御情報が通信される。
 MME部204は、上位装置、具体的には上位ノードであり、基地局であるeNB207と、移動端末(UE)202との接続を制御する。MME部204は、コアネットワークであるEPCを構成する。基地局203は、E-UTRAN201を構成する。
 基地局203は、1つのセルを構成してもよいし、複数のセルを構成してもよい。各セルは、移動端末202と通信可能な範囲であるカバレッジとして予め定める範囲を有し、カバレッジ内で移動端末202と無線通信を行う。1つの基地局203が複数のセルを構成する場合、1つ1つのセルが、移動端末202と通信可能に構成される。
 図3は、3GPPにおいて議論されている5G方式の通信システム210の全体的な構成を示すブロック図である。図3について説明する。無線アクセスネットワークは、NG-RAN(Next Generation Radio Access Network)211と称される。UE202は、NR基地局装置(以下「NR基地局(NG-RAN NodeB:gNB)」という)213と無線通信可能であり、無線通信で信号の送受信を行う。また、コアネットワークは、5Gコア(5G Core:5GC)と称される。
 UE202に対する制御プロトコル、例えばRRC(Radio Resource Control)と、ユーザプレイン(以下、U-Planeと称する場合もある)、例えばSDAP(Service Data Adaptation Protocol)、PDCP(Packet Data Convergence Protocol)、RLC(Radio Link Control)、MAC(Medium Access Control)、PHY(Physical layer)とがNR基地局213で終端するならば、NG-RANは1つあるいは複数のNR基地局213によって構成される。
 UE202とNR基地局213との間の制御プロトコルRRC(Radio Resource Control)の機能はLTEと同様である。RRCにおけるNR基地局213とUE202との状態として、RRC_IDLEと、RRC_CONNECTEDと、RRC_INACTIVEとがある。
 RRC_IDLE、RRC_CONNECTEDは、LTE方式と同様である。RRC_INACTIVEは5GコアとNR基地局213との間の接続が維持されつつ、システム情報(System Information:SI)の報知、ページング(paging)、セル再選択(cell re-selection)、モビリティなどが行われる。
 gNB217は、アクセス・移動管理機能(Access and Mobility Management Function:AMF)、セッション管理機能(Session Management Function:SMF)、あるいはUPF(User Plane Function)、あるいはAMF、SMFおよびUPFを含むAMF/SMF/UPF部(以下「5GC部」という場合がある)214とNGインタフェースにより接続される。gNB217と5GC部214との間で制御情報および/あるいはユーザデータが通信される。NGインタフェースは、gNB217とAMFとの間のN2インタフェース、gNB217とUPFとの間のN3インタフェース、AMFとSMFとの間のN11インタフェース、および、UPFとSMFとの間のN4インタフェースの総称である。1つのgNB217に対して、複数の5GC部214が接続されてもよい。gNB217間は、Xnインタフェースにより接続され、gNB217間で制御情報および/あるいはユーザデータが通信される。
 5GC部214は、上位装置、具体的には上位ノードであり、1つまたは複数の基地局203および/あるいは基地局213に対して、ページング信号の分配を行う。また、5GC部214は、待受け状態(Idle State)のモビリティ制御(Mobility Control)を行う。5GC部214は、移動端末202が待ち受け状態のとき、インアクティブ状態(Inactive State)および、アクティブ状態(Active State)のときに、トラッキングエリア(Tracking Area)リストの管理を行う。5GC部214は、移動端末202が登録されている(registered)追跡領域(トラッキングエリア:Tracking Area)に属するセルへ、ページングメッセージを送信することで、ページングプロトコルに着手する。
 NR基地局213も、基地局203同様、1つあるいは複数のセルを構成してもよい。1つのNR基地局213が複数のセルを構成する場合、1つ1つのセルが、UE202と通信可能に構成される。
 gNB217は、中央ユニット(Central Unit:以下、CUと称する場合がある)218と分散ユニット(Distributed Unit:以下、DUと称する場合がある)219に分割されていてもよい。CU218は、gNB217の中に1つ構成される。DU219は、gNB217の中に1つあるいは複数構成される。CU218は、DU219とF1インタフェースにより接続され、CU218とDU219との間で制御情報および/あるいはユーザデータが通信される。
 5G方式の通信システムにおいて、非特許文献21(3GPP TS23.501)に記載の統合データ管理(Unified Data Management:UDM)機能、ポリシー制御機能(Policy Control Function:PCF)が含まれてもよい。UDMおよび/あるいはPCFは、図3における5GC部214に含まれるとしてもよい。
 5G方式の通信システムにおいて、非特許文献24(3GPP TS38.305)に記載の位置管理機能(Location Management Function:LMF)が設けられてもよい。LMFは、非特許文献25(3GPP TS23.273)に開示されているように、AMFを経由して基地局に接続されていてもよい。
 5G方式の通信システムにおいて、非特許文献21(3GPP TS23.501)に記載の非3GPP相互動作機能(Non-3GPP Interworking Function:N3IWF)が含まれてもよい。N3IWFは、UEとの間における非3GPPアクセスにおいて、アクセスネットワーク(Access Network:AN)をUEとの間で終端してもよい。
 図4は、EPCに接続するeNBおよびgNBによるDCの構成を示した図である。図4において、実線はU-Planeの接続を示し、破線はC-Planeの接続を示す。図4において、eNB223-1がマスタ基地局となり、gNB224-2がセカンダリ基地局となる(このDC構成を、EN-DCと称する場合がある)。図4において、MME部204とgNB224-2との間のU-Plane接続がeNB223-1経由で行われる例について示しているが、MME部204とgNB224-2との間で直接行われてもよい。
 図5は、NGコアに接続するgNBによるDCの構成を示した図である。図5において、実線はU-Planeの接続を示し、破線はC-Planeの接続を示す。図5において、gNB224-1がマスタ基地局となり、gNB224-2がセカンダリ基地局となる(このDC構成を、NR-DCと称する場合がある)。図5において、5GC部214とgNB224-2との間のU-Plane接続がgNB224-1経由で行われる例について示しているが、5GC部214とgNB224-2との間で直接行われてもよい。
 図6は、NGコアに接続するeNBおよびgNBによるDCの構成を示した図である。図6において、実線はU-Planeの接続を示し、破線はC-Planeの接続を示す。図6において、eNB226-1がマスタ基地局となり、gNB224-2がセカンダリ基地局となる(このDC構成を、NG-EN-DCと称する場合がある)。図6において、5GC部214とgNB224-2との間のU-Plane接続がeNB226-1経由で行われる例について示しているが、5GC部214とgNB224-2との間で直接行われてもよい。
 図7は、NGコアに接続するeNBおよびgNBによるDCの、他の構成を示した図である。図7において、実線はU-Planeの接続を示し、破線はC-Planeの接続を示す。図7において、gNB224-1がマスタ基地局となり、eNB226-2がセカンダリ基地局となる(このDC構成を、NE-DCと称する場合がある)。図7において、5GC部214とeNB226-2との間のU-Plane接続がgNB224-1経由で行われる例について示しているが、5GC部214とeNB226-2との間で直接行われてもよい。
 図8は、図2に示す移動端末202の構成を示すブロック図である。図8に示す移動端末202の送信処理を説明する。まず、プロトコル処理部301からの制御データ、およびアプリケーション部302からのユーザデータが、送信データバッファ部303へ保存される。送信データバッファ部303に保存されたデータは、エンコーダー部304へ渡され、誤り訂正などのエンコード処理が施される。エンコード処理を施さずに、送信データバッファ部303から変調部305へ直接出力されるデータが存在してもよい。エンコーダー部304でエンコード処理されたデータは、変調部305にて変調処理が行われる。変調部305にて、MIMOにおけるプリコーディングが行われてもよい。変調されたデータは、ベースバンド信号に変換された後、周波数変換部306へ出力され、無線送信周波数に変換される。その後、アンテナ307-1~307-4から基地局203に送信信号が送信される。図8において、アンテナの数が4つである場合について例示したが、アンテナ数は4つに限定されない。
 また、移動端末202の受信処理は、以下のように実行される。基地局203からの無線信号がアンテナ307-1~307-4により受信される。受信信号は、周波数変換部306にて無線受信周波数からベースバンド信号に変換され、復調部308において復調処理が行われる。復調部308にて、ウェイト計算および乗算処理が行われてもよい。復調後のデータは、デコーダー部309へ渡され、誤り訂正などのデコード処理が行われる。デコードされたデータのうち、制御データはプロトコル処理部301へ渡され、ユーザデータはアプリケーション部302へ渡される。移動端末202の一連の処理は、制御部310によって制御される。よって制御部310は、図8では省略しているが、各部301~309と接続している。制御部310は、例えば、プロセッサおよびメモリを含んで構成される処理回路で実現される。すなわち、移動端末202の一連の処理が記述されたプログラムをプロセッサが実行することにより制御部310が実現される。移動端末202の一連の処理が記述されたプログラムはメモリに格納されている。メモリの例は、RAM(Random Access Memory)、ROM(Read Only Memory)、フラッシュメモリー、等の、不揮発性または揮発性の半導体メモリである。制御部310は、FPGA(Field Programmable Gate Array)、ASIC(Application Specific Integrated Circuit)、DSP(Digital Signal Processor)などの専用の処理回路で実現されてもよい。図8において、移動端末202が送信に用いるアンテナ数と受信に用いるアンテナ数は、同じであってもよいし、異なっていてもよい。
 図9は、図2に示す基地局203の構成を示すブロック図である。図9に示す基地局203の送信処理を説明する。EPC通信部401は、基地局203とEPC(MME部204など)との間のデータの送受信を行う。5GC通信部412は、基地局203と5GC(5GC部214など)との間のデータの送受信を行う。他基地局通信部402は、他の基地局との間のデータの送受信を行う。EPC通信部401、5GC通信部412、および他基地局通信部402は、それぞれプロトコル処理部403と情報の受け渡しを行う。プロトコル処理部403からの制御データ、ならびにEPC通信部401、5GC通信部412、および他基地局通信部402からのユーザデータおよび制御データは、送信データバッファ部404へ保存される。
 送信データバッファ部404に保存されたデータは、エンコーダー部405へ渡され、誤り訂正などのエンコード処理が施される。エンコード処理を施さずに、送信データバッファ部404から変調部406へ直接出力されるデータが存在してもよい。エンコードされたデータは、変調部406にて変調処理が行われる。変調部406にて、MIMOにおけるプリコーディングが行われてもよい。変調されたデータは、ベースバンド信号に変換された後、周波数変換部407へ出力され、無線送信周波数に変換される。その後、アンテナ408-1~408-4より1つもしくは複数の移動端末202に対して送信信号が送信される。図9において、アンテナの数が4つである場合について例示したが、アンテナ数は4つに限定されない。
 また、基地局203の受信処理は以下のように実行される。1つもしくは複数の移動端末202からの無線信号が、アンテナ408により受信される。受信信号は、周波数変換部407にて無線受信周波数からベースバンド信号に変換され、復調部409で復調処理が行われる。復調されたデータは、デコーダー部410へ渡され、誤り訂正などのデコード処理が行われる。デコードされたデータのうち、制御データはプロトコル処理部403あるいは5GC通信部412あるいはEPC通信部401あるいは他基地局通信部402へ渡され、ユーザデータは5GC通信部412あるいはEPC通信部401あるいは他基地局通信部402へ渡される。基地局203の一連の処理は、制御部411によって制御される。よって制御部411は、図9では省略しているが、各部401~410,412と接続している。制御部411は、上述した移動端末202の制御部310と同様に、プロセッサおよびメモリを含んで構成される処理回路、または、FPGA、ASIC、DSPなどの専用の処理回路で実現される。図9において、基地局203が送信に用いるアンテナ数と受信に用いるアンテナ数は、同じであってもよいし、異なっていてもよい。
 図9は、基地局203の構成について示したブロック図であるが、基地局213についても同様の構成としてもよい。また、図8および図9について、移動端末202のアンテナ数と、基地局203のアンテナ数は、同じであってもよいし、異なってもよい。
 図10は、MMEの構成を示すブロック図である。図10では、前述の図2に示すMME部204に含まれるMME204aの構成を示す。PDN GW通信部501は、MME204aとPDN GW(Packet Data Network Gate Way)との間のデータの送受信を行う。基地局通信部502は、MME204aと基地局203との間のS1インタフェースによるデータの送受信を行う。PDN GWから受信したデータがユーザデータであった場合、ユーザデータは、PDN GW通信部501から、ユーザプレイン通信部503経由で基地局通信部502に渡され、1つあるいは複数の基地局203へ送信される。基地局203から受信したデータがユーザデータであった場合、ユーザデータは、基地局通信部502から、ユーザプレイン通信部503経由でPDN GW通信部501に渡され、PDN GWへ送信される。
 PDN GWから受信したデータが制御データであった場合、制御データは、PDN GW通信部501から制御プレイン制御部505へ渡される。基地局203から受信したデータが制御データであった場合、制御データは、基地局通信部502から制御プレイン制御部505へ渡される。
 HeNBGW通信部504は、MME204aとHeNB GW(Home-eNB Gate Way)との間のデータの送受信を行う。HeNBGW通信部504がHeNB GWから受信した制御データは制御プレイン制御部505に渡される。HeNBGW通信部504は、制御プレイン制御部505から入力される制御データをHeNB GWへ送信する。
 制御プレイン制御部505には、NASセキュリティ部505-1、SAEベアラコントロール部505-2、アイドルステート(Idle State)モビリティ管理部505-3などが含まれ、制御プレイン(以下、C-Planeと称する場合もある)に対する処理全般を行う。NASセキュリティ部505-1は、NAS(Non-Access Stratum)メッセージのセキュリティなどを行う。SAEベアラコントロール部505-2は、SAE(System Architecture Evolution)のベアラの管理などを行う。アイドルステートモビリティ管理部505-3は、待受け状態(アイドルステート(Idle State):LTE-IDLE状態、または、単にアイドルとも称される)のモビリティ管理、待受け状態時のページング信号の生成および制御、傘下の1つあるいは複数の移動端末202のトラッキングエリアの追加、削除、更新、検索、トラッキングエリアリスト管理などを行う。
 MME204aは、1つまたは複数の基地局203に対して、ページング信号の分配を行う。また、MME204aは、待受け状態(Idle State)のモビリティ制御(Mobility control)を行う。MME204aは、移動端末202が待受け状態のとき、および、アクティブ状態(Active State)のときに、トラッキングエリア(Tracking Area)リストの管理を行う。MME204aは、移動端末202が登録されている(registered)追跡領域(トラッキングエリア:Tracking Area)に属するセルへ、ページングメッセージを送信することで、ページングプロトコルに着手する。MME204aに接続されるeNB207のCSGの管理、CSG IDの管理、およびホワイトリストの管理は、アイドルステートモビリティ管理部505-3で行われてもよい。
 MME204aの一連の処理は、制御部506によって制御される。よって制御部506は、図10では省略しているが、各部501~505と接続している。制御部506は、上述した移動端末202の制御部310と同様に、プロセッサおよびメモリを含んで構成される処理回路、または、FPGA、ASIC、DSPなどの専用の処理回路で実現される。
 図11は、5GC部の構成を示すブロック図である。図11では、前述の図3に示す5GC部214の構成を示す。図11は、図5にて示す5GC部214に、AMFの構成、SMFの構成およびUPFの構成が含まれた場合について示している。Data Network通信部521は、5GC部214とData Networkとの間のデータの送受信を行う。基地局通信部522は、5GC部214と基地局203との間のS1インタフェース、および/あるいは、5GC部214と基地局213との間のNGインタフェースによるデータの送受信を行う。Data Networkから受信したデータがユーザデータであった場合、ユーザデータは、Data Network通信部521から、ユーザプレイン通信部523経由で基地局通信部522に渡され、1つあるいは複数の、基地局203および/あるいは基地局213へ送信される。基地局203および/あるいは基地局213から受信したデータがユーザデータであった場合、ユーザデータは、基地局通信部522から、ユーザプレイン通信部523経由でData Network通信部521に渡され、Data Networkへ送信される。
 Data Networkから受信したデータが制御データであった場合、制御データは、Data Network通信部521からユーザプレイン通信部523経由でセッション管理部527へ渡される。セッション管理部527は、制御データを制御プレイン制御部525へ渡す。基地局203および/あるいは基地局213から受信したデータが制御データであった場合、制御データは、基地局通信部522から制御プレイン制御部525に渡される。制御プレイン制御部525は、制御データをセッション管理部527へ渡す。
 制御プレイン制御部525は、NASセキュリティ部525-1、PDUセッションコントロール部525-2、アイドルステート(Idle State)モビリティ管理部525-3などを含み、制御プレイン(以下、C-Planeと称する場合もある)に対する処理全般を行う。NASセキュリティ部525-1は、NAS(Non-Access Stratum)メッセージのセキュリティなどを行う。PDUセッションコントロール部525-2は、移動端末202と5GC部214との間のPDUセッションの管理などを行う。アイドルステートモビリティ管理部525-3は、待受け状態(アイドルステート(Idle State):RRC_IDLE状態、または、単にアイドルとも称される)のモビリティ管理、待受け状態時のページング信号の生成および制御、傘下の1つあるいは複数の移動端末202のトラッキングエリアの追加、削除、更新、検索、トラッキングエリアリスト管理などを行う。
 5GC部214の一連の処理は、制御部526によって制御される。よって制御部526は、図11では省略しているが、各部521~523,525,527と接続している。制御部526は、上述した移動端末202の制御部310と同様に、プロセッサおよびメモリを含んで構成される処理回路、または、FPGA、ASIC、DSPなどの専用の処理回路で実現される。
 次に通信システムにおけるセルサーチ方法の一例を示す。図12は、LTE方式の通信システムにおいて通信端末(UE)が行うセルサーチから待ち受け動作までの概略を示すフローチャートである。通信端末は、セルサーチを開始すると、ステップST601で、周辺の基地局から送信される第一同期信号(P-SS)、および第二同期信号(S-SS)を用いて、スロットタイミング、フレームタイミングの同期をとる。
 P-SSとS-SSとを合わせて、同期信号(Synchronization Signal:SS)という。同期信号(SS)には、セル毎に割り当てられたPCIに1対1に対応するシンクロナイゼーションコードが割り当てられている。PCIの数は504通りが検討されている。通信端末は、この504通りのPCIを用いて同期をとるとともに、同期がとれたセルのPCIを検出(特定)する。
 通信端末は、次に同期がとれたセルに対して、ステップST602で、基地局からセル毎に送信される参照信号(リファレンスシグナル:RS)であるセル固有参照信号(Cell-specific Reference Signal:CRS)を検出し、RSの受信電力(Reference Signal Received Power:RSRP)の測定を行う。参照信号(RS)には、PCIと1対1に対応したコードが用いられている。そのコードで相関をとることによって他セルと分離できる。ステップST601で特定したPCIから、該セルのRS用のコードを導出することによって、RSを検出し、RSの受信電力を測定することが可能となる。
 次にステップST603で、通信端末は、ステップST602までで検出された1つ以上のセルの中から、RSの受信品質が最もよいセル、例えば、RSの受信電力が最も高いセル、つまりベストセルを選択する。
 次にステップST604で、通信端末は、ベストセルのPBCHを受信して、報知情報であるBCCHを得る。PBCH上のBCCHには、セル構成情報が含まれるMIB(Master Information Block)がマッピングされる。したがって、PBCHを受信してBCCHを得ることで、MIBが得られる。MIBの情報としては、例えば、DL(ダウンリンク)システム帯域幅(送信帯域幅設定(transmission bandwidth configuration:dl-bandwidth)とも呼ばれる)、送信アンテナ数、SFN(System Frame Number)などがある。
 次にステップST605で、通信端末は、MIBのセル構成情報をもとに該セルのDL-SCHを受信して、報知情報BCCHの中のSIB(System Information Block)1を得る。SIB1には、該セルへのアクセスに関する情報、セルセレクションに関する情報、他のSIB(SIBk;k≧2の整数)のスケジューリング情報が含まれる。また、SIB1には、トラッキングエリアコード(Tracking Area Code:TAC)が含まれる。
 次にステップST606で、通信端末は、ステップST605で受信したSIB1のTACと、通信端末が既に保有しているトラッキングエリアリスト内のトラッキングエリア識別子(Tracking Area Identity:TAI)のTAC部分とを比較する。トラッキングエリアリストは、TAIリスト(TAI list)とも称される。TAIはトラッキングエリアを識別するための識別情報であり、MCC(Mobile Country Code)と、MNC(Mobile Network Code)と、TAC(Tracking Area Code)とによって構成される。MCCは国コードである。MNCはネットワークコードである。TACはトラッキングエリアのコード番号である。
 通信端末は、ステップST606で比較した結果、ステップST605で受信したTACがトラッキングエリアリスト内に含まれるTACと同じならば、該セルで待ち受け動作に入る。比較して、ステップST605で受信したTACがトラッキングエリアリスト内に含まれなければ、通信端末は、該セルを通して、MMEなどが含まれるコアネットワーク(Core Network,EPC)へ、TAU(Tracking Area Update)を行うためにトラッキングエリアの変更を要求する。
 図12に示す例においては、LTE方式におけるセルサーチから待ち受けまでの動作の例について示したが、NR方式においては、ステップST603において、ベストセルに加えてベストビームを選択してもよい。また、NR方式においては、ステップST604において、ビームの情報、例えば、ビームの識別子を取得してもよい。また、NR方式においては、ステップST604において、リメイニングミニマムSI(Remaining Minimum SI:RMSI)のスケジューリング情報を取得してもよい。NR方式においては、ステップST605において、RMSIを受信するとしてもよい。
 コアネットワークを構成する装置(以下「コアネットワーク側装置」という場合がある)は、TAU要求信号とともに通信端末から送られてくる該通信端末の識別番号(UE-IDなど)をもとに、トラッキングエリアリストの更新を行う。コアネットワーク側装置は、通信端末に更新後のトラッキングエリアリストを送信する。通信端末は、受信したトラッキングエリアリストに基づいて、通信端末が保有するTACリストを書き換える(更新する)。その後、通信端末は、該セルで待ち受け動作に入る。
 スマートフォンおよびタブレット型端末装置の普及によって、セルラー系無線通信によるトラフィックが爆発的に増大しており、世界中で無線リソースの不足が懸念されている。これに対応して周波数利用効率を高めるために、小セル化し、空間分離を進めることが検討されている。
 従来のセルの構成では、eNBによって構成されるセルは、比較的広い範囲のカバレッジを有する。従来は、複数のeNBによって構成される複数のセルの比較的広い範囲のカバレッジによって、あるエリアを覆うように、セルが構成されている。
 小セル化された場合、eNBによって構成されるセルは、従来のeNBによって構成されるセルのカバレッジに比べて範囲が狭いカバレッジを有する。したがって、従来と同様に、あるエリアを覆うためには、従来のeNBに比べて、多数の小セル化されたeNBが必要となる。
 以下の説明では、従来のeNBによって構成されるセルのように、カバレッジが比較的大きいセルを「マクロセル」といい、マクロセルを構成するeNBを「マクロeNB」という。また、小セル化されたセルのように、カバレッジが比較的小さいセルを「スモールセル」といい、スモールセルを構成するeNBを「スモールeNB」という。
 マクロeNBは、例えば、非特許文献7に記載される「ワイドエリア基地局(Wide Area Base Station)」であってもよい。
 スモールeNBは、例えば、ローパワーノード、ローカルエリアノード、ホットスポットなどであってもよい。また、スモールeNBは、ピコセルを構成するピコeNB、フェムトセルを構成するフェムトeNB、HeNB、RRH(Remote Radio Head)、RRU(Remote Radio Unit)、RRE(Remote Radio Equipment)またはRN(Relay Node)であってもよい。また、スモールeNBは、非特許文献7に記載される「ローカルエリア基地局(Local Area Base Station)」または「ホーム基地局(Home Base Station)」であってもよい。
 図13は、NRにおけるセルの構成の一例を示す。NRのセルでは、狭いビームを形成し、方向を変えて送信する。図13に示す例において、基地局750は、ある時間において、ビーム751-1を用いて移動端末との送受信を行う。他の時間において、基地局750は、ビーム751-2を用いて移動端末との送受信を行う。以下同様にして、基地局750はビーム751-3~751-8のうち1つあるいは複数を用いて移動端末との送受信を行う。このようにすることで、基地局750は広範囲のセルを構成する。
 図13において、基地局750が用いるビームの数を8とする例について示したが、ビームの数は8とは異なっていてもよい。また、図13に示す例において、基地局750が同時に用いるビームの数を1つとしたが、複数であってもよい。
 3GPPにおいて、D2D(Device to Device)通信、V2V(Vehicle to Vehicle)通信のため、サイドリンク(SL:Side Link)がサポートされている(非特許文献1、非特許文献16参照)。SLはPC5インタフェースによって規定される。
 SLに用いられる物理チャネル(非特許文献1参照)について説明する。物理サイドリンク報知チャネル(PSBCH:Physical sidelink broadcast channel)は、システムと同期に関連する情報を運び、UEから送信される。
 物理サイドリンクディスカバリチャネル(PSDCH:Physical sidelink discovery channel)は、UEからサイドリンクディスカバリメッセージを運ぶ。
 物理サイドリンク制御チャネル(PSCCH:Physical sidelink control channel)は、サイドリンク通信とV2Xサイドリンク通信のためのUEからの制御情報を運ぶ。
 物理サイドリンク共有チャネル(PSSCH:Physical sidelink shared channel)は、サイドリンク通信とV2Xサイドリンク通信のためのUEからのデータを運ぶ。
 物理サイドリンクフィードバックチャネル(PSFCH:Physical sidelink feedback channel)は、PSSCH送信を受信したUEから、PSSCHを送信したUEに、サイドリンク上でのHARQフィードバックを運ぶ。
 SLに用いられるトランスポートチャネル(非特許文献1参照)について説明する。サイドリンク報知チャネル(SL-BCH:Sidelink broadcast channel)は、予め決められたトランスポートフォーマットを有し、物理チャネルであるPSBCHにマッピングされる。
 サイドリンクディスカバリチャネル(SL-DCH:Sidelink discovery channel)は、固定サイズの予め決められたフォーマットの周期的報知送信を有する。また、SL-DCHは、UE自動リソース選択(UE autonomous resource selection)と、eNBによってスケジュールされたリソースアロケーションの両方をサポートする。UE自動リソース選択では衝突リスクが有り、UEがeNBによって個別リソースをアロケーションされた時は、衝突は無い。また、SL-DCHは、HARQコンバイニングをサポートするが、HARQフィードバックはサポートしない。SL-DCHは物理チャネルであるPSDCHにマッピングされる。
 サイドリンク共有チャネル(SL-SCH:Sidelink shared channel)は、報知送信をサポートする。SL-SCHは、UE自動リソース選択(UE autonomous resource selection)と、eNBによってスケジュールされたリソースアロケーションの両方をサポートする。UE自動リソース選択では衝突リスクが有り、UEがeNBによって個別リソースをアロケーションされた時は、衝突は無い。また、SL-SCHは、HARQコンバイニングをサポートするが、HARQフィードバックはサポートしない。また、SL-SCHは、送信電力、変調、コーディングを変えることによって、動的リンクアダプテーションをサポートする。SL-SCHは物理チャネルであるPSSCHにマッピングされる。
 SLに用いられる論理チャネル(非特許文献1参照)について説明する。サイドリンク報知制御チャネル(SBCCH:Sidelink Broadcast Control Channel)は、1つのUEから他のUEにサイドリンクシステム情報を報知するためのサイドリンク用チャネルである。SBCCHはトランスポートチャネルであるSL-BCHにマッピングされる。
 サイドリンクトラフィックチャネル(STCH:Sidelink Traffic Channel)は、1つのUEから他のUEにユーザ情報を送信するための1対多のサイドリンク用トラフィックチャネルである。STCHは、サイドリンク通信能力を有するUEと、V2Xサイドリンク通信能力を有するUEによってのみ用いられる。2つのサイドリンク通信能力を有するUE間の1対1通信もまたSTCHで実現される。STCHはトランスポートチャネルであるSL-SCHにマッピングされる。
 サイドリンク制御チャネル(SCCH:Sidelink Control Channel)は、1つのUEから他のUEに制御情報を送信するためのサイドリンク用制御チャネルである。SCCHはトランスポートチャネルであるSL-SCHにマッピングされる。
 3GPPでは、NRにおいてもV2X通信をサポートすることが検討されている。NRにおけるV2X通信の検討が、LTEシステム、LTE-Aシステムを基にして進められているが、以下の点でLTEシステム、LTE-Aシステムからの変更および追加が行われている。
 LTEではSL通信はブロードキャスト(broadcast)のみであった。NRでは、SL通信として、ブロードキャストに加え、ユニキャスト(unicast)とグループキャスト(groupcast)のサポートが検討されている(非特許文献22(3GPP TS23.287)参照)。
 ユニキャスト通信やグループキャスト通信では、HARQのフィードバック(Ack/Nack)、CSI報告等のサポートが検討されている。
 SL通信で、ブロードキャストに加え、ユニキャスト(unicast)とグループキャスト(groupcast)をサポートするため、PC5-Sシグナリングのサポートが検討されている(非特許文献22(3GPP TS23.287)参照)。たとえば、SL、すなわちPC5通信を実施するためのリンクを確立するため、PC5-Sシグナリングが実施される。該リンクはV2Xレイヤで実施され、レイヤ2リンクとも称される。
 また、SL通信において、RRCシグナリングのサポートが検討されている(非特許文献22(3GPP TS23.287)参照)。SL通信におけるRRCシグナリングを、PC5 RRCシグナリングとも称する。たとえば、PC5通信を行うUE間で、UEのケーパビリティを通知することや、PC5通信を用いてV2X通信を行うためのASレイヤの設定などを通知することが提案されている。
 SL通信においては、リレー(relay)を介したUEとNWとの間の通信が提案されている(非特許文献20(3GPP TR23.703)、非特許文献23(3GPP TS23.303)、非特許文献27(3GPP TR38.836)参照)。UEとNWとの間のリレーを、UE-to-NWリレー、あるいは、UE-NW間リレーと称する場合がある。本開示では、UEとNWとの間のリレーを実施するUEを、リレーUEと称する場合がある。
 たとえば、RANノード(たとえばgNB)のカバレッジ内のUEだけでなく、より遠方のUEとRANノードとの間で通信を行う必要性が生じる場合がある。このような場合、UE-NW間リレーを用いる方法が考えられる。たとえば、gNBとUE(リモートUEと称する場合がある)との間の通信を、リレーUEを介して行う。gNBとリレーUEとの間の通信をUuで行い、リレーUEとリモートUEとの間の通信をPC5で行う。
 たとえば、リレーUEとリモートUEとが、どちらもgNBのカバレッジ内に存在する場合がある。リレーUEがカバレッジ内に存在するgNB(以降gNB#1と称する場合がある)と、リモートUEがカバレッジ内に存在するgNB(以降gNB#2と称する場合がある)とは同じであっても良いし、異なってもよい。このような状況で、リモートUEがリレーUEを介して、リレーUEがカバレッジ内に存在するgNBと通信を行うことも考えられる。
 たとえば、gNB#2と接続しているリモートUEがgNB#2のカバレッジ端に存在するような場合、良好な通信品質を得られない場合が生じる。このような場合、リモートUEは、リレーUEを介してgNB#1と接続した方が、良好な通信品質を得ることができる。また、たとえば、リモートUEとgNB#2間の電波伝搬ロスよりも、リモートUEとリレーUE間の電波伝搬ロスが小さいような場合、リモートUEはリレーUEを介してgNB#1と通信を行った方が、リモートUEの送信電力が少なく済むため、低消費電力化を図ることができる。
 3GPPにおいては、リモートUEが、直接接続するgNBから、リレーUEを介して間接的に接続するgNBへのHO(HandOver)方法に関して議論されている(非特許文献26(3GPP R2-2009145)参照)。しかし、リモートUEがリレーUEを介して間接的に接続するgNBへのHOでは、従来のリモートUEが直接接続するgNB間のHOと異なり、リモートUEとリレーUE間でSL通信(以降PC5通信と称する場合がある)を行う必要が生じる。
 PC5通信では、送信側UE(以下、UE-TXと称する場合がある)から受信側UE(以下、UE-RXと称する場合がある)に対して、UE-TXからUE-RX方向の通信のための設定が行われることになる。UE-TXからUE-RX方向の通信のための設定として、たとえばRRC設定などがある(非特許文献19(3GPP TS38.331)参照)。しかし、リモートUEがリレーUEを介して間接的に接続するgNBへ/からのHO、言い換えると、リレーUEを介したリモートUEのHOにおけるPC5通信のための詳細な設定方法については、非特許文献19および他の文献等になんら開示されていない。このため、従来の方法を単に適用したたけでは、リレーUEを介したリモートUEのHOはできないという問題がある。
 本実施の形態1では、このような課題を解決する方法を開示する。なお、以降の説明では、PC5通信のための設定を、PC5通信に必要な設定、PC5通信用設定などと称する場合がある。
 前述の課題を解決するため、本実施の形態にかかる通信システムにおいて、HO先gNB(以下、T-gNBと称する場合がある)はリモートUEに対して、リモートUEとリレーUE間のPC5通信に必要な設定を通知する。また、T-gNBはリレーUEに対して、リモートUEとリレーUE間のPC5通信に必要な設定を通知する。該リレーUEはT-gNBと接続する、あるいは接続可能なリレーUEで、リモートUEは該リレーUEを介してT-gNBと接続する。本明細書では、該リレーUE、いいかえると、接続先リレーUEを、リレーUE#2と称する場合がある。また、HOを行うリモートUEがHO開始前に接続しているgNBを、HO元のgNBまたはS-gNBと称する場合がある。
 T-gNBはリモートUEとリレーUE#2に対して、リモートUEからリレーUE#2へのPC5通信に用いる設定を通知する。リモートUEからリレーUEへのPC5通信に用いる設定の通知方法を開示する。
 T-gNBはリモートUEに対して、リモートUEからリレーUE#2へのPC5通信に用いる設定を通知する。T-gNBは該設定をS-gNBを介してリモートUEに通知してもよい。S-gNBがリレーUEを介してリモートUEと接続する場合は、T-gNBは、S-gNB、リレーUEを介して該設定をリモートUEに通知してもよい。本明細書では、リモートUEがリレーUEを介してS-gNBと接続する場合の該リレーUE、いいかえると、リモートUEがHO開始前に接続しているリレーUEである接続元リレーUEを、リレーUE#1と称する場合がある。T-gNBとS-gNBとは同じgNBであってもよい。同じgNBの異なるセル間のHOの場合であってもよい。
 リモートUEに通知する該設定として、リモートUEからリレーUE#2へのPC5通信における送信(TX)のみに関する設定を通知してもよい。リモートUEに通知する該設定として、リモートUEからリレーUE#2へのPC5通信における送信(TX)と受信(RX)の両方に関する設定を通知してもよい。これらの設定を組み合わせて通知してもよい。
 リモートUEはリレーUE#2に対して、リモートUEからリレーUE#2へのPC5通信に用いる設定を通知する。すなわち、リモートUEは、T-gNBから受信した該設定を通知する。リモートUEは、S-gNBを介して受信した該設定を通知してもよい。リモートUEは、自リモートUEに設定したパラメータの一部または全部を通知してもよい。リモートUEからリレーUE#2に通知する該設定として、リモートUEからリレーUE#2へのPC5通信におけるTXとRXの両方に関する設定を通知してもよい。リモートUEからリレーUE#2に通知する該設定として、リモートUEからリレーUE#2へのPC5通信におけるTXのみに関する設定は通知しなくてもよい。
 T-gNBからS-gNBへの通知には、基地局間のインタフェースを用いてもよい。該通知にXnシグナリングを用いてもよい。たとえば、HO要求に対する応答メッセージに含めて通知してもよい。このようにすることで、別途Xnシグナリングを通知しなくて済むため、シグナリング量の削減を図れる。S-gNBからリモートUEへの通知には、RRCシグナリングを用いてもよい。たとえば、RRCreconfigurationメッセージに含めて通知してもよい。このようにすることで、別途RRCシグナリングを通知しなくて済むため、シグナリング量の削減を図れる。リレーUE#1を介してS-gNBとリモートUEが接続している場合は、S-gNBからリモートUEへの通知はリレーUE#1を介して行われてもよい。
 リモートUEからリレーUE#2へは、PC5―Sシグナリングを用いて通知してもよい。Direct Communication Requestメッセージに含めて通知してもよい。セキュリティプロテクテッドPC5-Sメッセージに含めて通知してもよい。他の方法として、リモートUEからリレーUE#2へは、SLのRRCシグナリングを用いて通知してもよい。PC5-RRCメッセージに含めて通知してもよい。RRCreconfigurationSidelinkメッセージに含めて通知してもよい。他の方法として、リモートUEからT-gNBに通知するRRCメッセージに含めて通知してもよい。RRCreconfigurationcompleteメッセージに含めて通知してもよい。リレーUE#2はリモートUEからT-gNBに通知する該メッセージを受信して該設定を取得するとよい。
 PC5通信に用いる設定について以下に例を8つ開示する。
(1)PC5-Sリンク確立に用いる設定。
(2)PC5-RRCシグナリングに用いる設定。
(3)PC5-Sシグナリングに用いる設定。
(4)SLRB(Side Link Radio Bearer)に関する設定。
(5)SLRBとUu RBのマッピングに関する設定。
(6)SLのCHに関する設定。
(7)PC5通信対象となるUEに関する情報。
(8)(1)~(7)の組合せ。
 (4)のSLRBに関する設定として、以下に例を3つ開示する。
(4-1)SL SRB(Signaling Radio Bearer)に関する設定。
(4-2)SL DRB(Data Radio Bearer)に関する設定。
(4-3)(4-1)と(4-2)の組合せ。
 (4-1)のSL SRBに関する設定として、以下に例を5つ開示する。
(4-1-1)SL SRB0に関する設定。
(4-1-2)SL SRB1に関する設定。
(4-1-3)SL SRB2に関する設定。
(4-1-4)SL SRB3に関する設定。
(4-1-5)(4-1-1)~(4-1-4)の組合せ。
 リレーUEを用いたDCが設定されてもよい。たとえば、リレーUEを用いたDCが設定されている場合に、(4-1-4)のSL SRB3に関する設定を行ってもよい。
 SL DRBとして、予め設定が決められているデフォルトDRBを設けてもよい。(4-2)のSL DRBに関する設定は、デフォルトDRBに関する設定であってもよい。SL DRBに関する設定は、デフォルトDRBを用いるか否かの設定であってもよい。これにより、サービスに適したSL DRBの設定をこの後に行うことが可能となる。また、サービスに適したSL DRBが設定される前にデフォルトDRBを用いることが可能となる。SL DRBの設定が柔軟に実施可能となる。
 (5)のSLRBとUu RBのマッピングに関する設定として、リモートUEとgNB間の通信における、リモートUEとリレーUE間に用いるSLRBと、リレーUEとgNB間に用いるUu RBのマッピングに関する設定であってもよい。
 (6)のSLのCHに関する設定として、以下に例を3つ開示する。
(6-1)SCCHに関する設定。
(6-2)STCHに関する設定。
(6-3)(6-1)と(6-2)の組合せ。
 (7)のPC5通信対象となるUEに関する情報は、たとえば、PC5通信の送信先UEに関する情報であってもよい。PC5通信の送信元UEに関する情報であってもよい。UEに関する情報として、たとえば、UE識別子であってもよい。UE識別子は、たとえば、L2IDであってもよい。PC5通信の送信先UEに関する情報は、たとえば、宛先L2IDであってもよい。PC5通信の送信元UEに関する情報は、たとえば、送信元L2IDであってもよい。
 このようにすることで、リモートUEは、T-gNBから、リモートUEからリレーUE#2へのPC5通信に用いる設定を取得することが可能となる。リレーUE#2は、T-gNBから、リモートUEからリレーUE#2へのPC5通信に用いる設定を取得することが可能となる。
 リモートUEからリレーUEへのPC5通信に用いる設定の他の通知方法を開示する。T-gNBはリモートUEに対して、リモートUEからリレーUE#2へのPC5通信に用いる設定を通知する。この方法は前述に開示した方法を適宜適用するとよい。リモートUEは、T-gNBから、リモートUEとリレーUE#2間のPC5通信に用いる設定を取得することが可能となる。
 T-gNBはリレーUE#2に対して、リモートUEからリレーUE#2へのPC5通信に用いる設定を通知してもよい。T-gNBは、リモートUEに設定したパラメータの一部または全部を通知してもよい。T-gNBからリレーUE#2に通知する該設定として、リモートUEからリレーUE#2へのPC5通信におけるTXとRXの両方に関する設定を通知してもよい。T-gNBからリレーUE#2に通知する該設定として、リモートUEからリレーUE#2へのPC5通信におけるTXのみに関する設定は通知しなくてもよい。T-gNBからリレーUE#2へは、T-gNBとリレーUE#2間のUuインタフェースを用いて通知してもよい。RRCシグナリングを用いて通知してもよい。たとえば、RRCreconfigurationメッセージに含めて通知してもよい。たとえば、リモートUEとgNB間のリレーを要求するためのメッセージに含めて通知してもよい。あるいは、該設定の通知用に新たにRRCメッセージを設けてもよい。
 このようにすることで、リレーUE#2は、T-gNBから、リモートUEからリレーUE#2へのPC5通信に用いる設定を取得することが可能となる。また、リモートUEからリレーUE#2への通知が不要なため、早期に設定可能となる。また、該設定のためリモートUEとリレーUE#2で通信を行う必要が無くなるため、リモートUEとリレーUE#2間のSLのSRB0の設定が可能となる。
 T-gNBはリモートUEとリレーUE#2に対して、リレーUE#2からリモートUEへのPC5通信に用いる設定を通知する。リレーUE#2からリモートUEへのPC5通信に用いる設定の通知方法を開示する。
 T-gNBはリモートUEに対して、リレーUE#2からリモートUEへのPC5通信に用いる設定を通知する。通知方法は、前述に開示したリモートUEからリレーUE#2へのPC5通信に用いる設定の通知方法を適宜適用するとよい。リモートUEに通知する該設定として、リレーUE#2からリモートUEへのPC5通信におけるTXとRXの両方に関する設定を通知してもよい。リモートUEに通知する該設定として、リレーUE#2からリモートUEへのPC5通信におけるTXのみに関する設定を通知してもよい。これらの設定を組合わせて通知してもよい。
 リモートUEはリレーUE#2に対して、リレーUE#2からリモートUEへのPC5通信に用いる設定を通知してもよい。この場合、リモートUEは、T-gNBから受信した該設定を通知する。リモートUEは、S-gNBを介して受信した該設定を通知してもよい。リモートUEからリレーUE#2に通知する該設定として、リレーUE#2からリモートUEへのPC5通信におけるTXとRXの両方に関する設定を通知してもよい。リモートUEからリレーUE#2に通知する該設定として、リレーUE#2からリモートUEへのPC5通信におけるTXのみに関する設定を通知してもよい。これらの設定を組合わせて通知してもよい。通知方法は、前述に開示したリモートUEからリレーUE#2へのPC5通信に用いる設定の通知方法を適宜適用するとよい。
 このようにすることで、リモートUEは、T-gNBから、リレーUE#2からリモートUEへのPC5通信に用いる設定を取得することが可能となる。リレーUE#2は、T-gNBから、リレーUE#2からリモートUEへのPC5通信に用いる設定を取得することが可能となる。
 リレーUE#2からリモートUEへのPC5通信に用いる設定の他の通知方法を開示する。T-gNBからリモートUEへの通知方法は、前述に開示したリモートUEからリレーUE#2へのPC5通信に用いる設定の通知方法を適宜適用するとよい。リモートUEに通知する該設定として、後述する、T-gNBからリレーUE#2に設定するパラメータの一部または全部を通知してもよい。リモートUEに通知する該設定として、リレーUE#2からリモートUEへのPC5通信におけるTXとRXの両方に関する設定を通知してもよい。リモートUEに通知する該設定として、リレーUE#2からリモートUEへのPC5通信における送信TXのみに関する設定は通知しなくてもよい。このようにすることで、リモートUEは、T-gNBから、リレーUE#2からリモートUEへのPC5通信に用いる設定を取得することが可能となる。
 T-gNBはリレーUE#2に対して、リレーUE#2からリモートUEへのPC5通信に用いる設定を通知する。T-gNBからリレーUE#2に通知する該設定として、リレーUE#2からリモートUEへのPC5通信におけるTXとRXの両方に関する設定を通知してもよい。T-gNBからリレーUE#2に通知する該設定として、リレーUE#2からリモートUEへのPC5通信におけるTXのみに関する設定を通知してもよい。これらの設定を組み合わせて通知してもよい。T-gNBからリレーUE#2への通知方法は、前述に開示したリモートUEからリレーUE#2へのPC5通信に必要な設定の通知方法を適宜適用するとよい。
 このようにすることで、リレーUE#2は、T-gNBから、リレーUE#2からリモートUEへのPC5通信に用いる設定を取得することが可能となる。また、リレーUE#2からリモートUEへの通知が不要なため、早期に設定可能となる。また、該設定のためリレーUE#2とリモートUEとで通信を行う必要が無くなるため、リレーUE#2とリモートUE間のSLのSRB0の設定が可能となる。
 T-gNBからリモートUEへの、リレーUE#2からリモートUEへのPC5通信に用いる設定の他の通知方法を開示する。T-gNBはリレーUE#2に対して、リレーUE#2からリモートUEへのPC5通信に用いる設定を通知する。通知方法は、前述に開示した通知方法を適宜適用するとよい。リレーUE#2はリモートUEに対して、リレーUE#2からリモートUEへのPC5通信に用いる設定を通知する。リレーUE#2は、T-gNBから受信した該設定を通知する。リレーUE#2からリモートUEに通知する該設定として、リレーUE#2からリモートUEへのPC5通信におけるTXとRXの両方に関する設定を通知してもよい。リモートUEからリレーUE#2に通知する該設定として、リレーUE#2からリモートUEへのPC5通信におけるTXのみに関する設定は通知しなくてもよい。
 リレーUE#2からリモートUEへは、PC5―Sシグナリングを用いて通知してもよい。Direct Communication Requestメッセージに含めて通知してもよい。セキュリティプロテクテッドPC5-Sメッセージに含めて通知してもよい。他の方法として、リレーUE#2からリモートUEへは、SLのRRCシグナリングを用いて通知してもよい。PC5-RRCメッセージに含めて通知してもよい。RRCreconfigurationSidelinkメッセージに含めて通知してもよい。他の方法として、T-gNBがリレーUE#2を介してリモートUEに通知するRRCメッセージに含めて通知してもよい。RRCreconfigurationメッセージに含めて通知してもよい。
 このようにすることで、リモートUEは、T-gNBから、リレーUE#2からリモートUEへのPC5通信に用いる設定を取得することが可能となる。
 リモートUEからリレーUE#2へのPC5通信に用いる設定の通知方法と、リレーUE#2からリモートUEへのPC5通信に用いる設定の通知方法とを適宜組合せて用いてもよい。このようにすることで、リモートUEとリレーUE#2間の双方向のPC5通信に用いる設定を通知することが可能となる。リモートUEとリレーUE#2は、各々、リモートUEとリレーUE#2間の双方向のPC5通信に用いる設定を取得可能となる。
 図14は、実施の形態1について、リレーUEを介したリモートUEのHOの方法の例を示すシーケンス図である。ステップST1401で、リモートUEはS-gNBとCN間でデータ通信を行う。CNとして例えばUPFがある。ステップST1402で、S-gNBはリモートUEに対して、メジャメントの設定を通知する。メジャメント設定として、DLのメジャメント設定とSLのメジャメント設定とを組合わせてもよい。gNBとUEとを組合わせてメジャメント対象としてもよい。gNBに対してはDLのメジャメント設定として、UEに対してはSLのメジャメント設定とする。DLメジャメントとSLメジャメント設定とで、異なる周波数を設定してもよいし、同じ周波数を設定してもよい。設定した周波数においてDLメジャメントとSLメジャメントを行うようにしてもよい。リモートUEは、S-gNBから受信したメジャメント設定に従ってメジャメントを実施する。
 ステップST1403で、リモートUEは、リレーUEを検出するため、ディスカバリー処理を実施する。ディスカバリー処理により、リモートUEはgNBに接続可能なリレーUEを検出する。ディスカバリー処理はメジャメント設定で報告対象になったUEに対して行われてもよい。SLメジャメントの前にディスカバリー処理が実施されてもよく、SLメジャメントはディスカバリー処理で検出したリレーUEに対して行われてもよい。
 リレーUEは、リモートUEに対して、リレーUEに関する情報、リレーUEの接続先のgNBの情報、リレーUEの状態情報、リレーUEがリレー可能か否かを示す情報などを通知してもよい。リレーUEに関する情報として、リレーUEの識別子を用いてもよい。リレーUEの接続先のgNBの情報として、gNBの識別子を用いてもよい。リレーUEの状態情報は、gNBとのRRC接続状態であってもよし、CNとのCM(Connection Management)接続状態であってもよい。リレーUEがリレー可能か否かを示す情報として、サービスに関する情報を含めてもよい。サービスに関する情報は、たとえば、リレー可能なサービスを示す情報であってもよい。
 リレーUEは、リモートUEに対して、該情報を、ディスカバリー処理において通知してもよい。リレーUEは、リモートUEに対して、該情報を、PC5-Sシグナリングで通知してもよい。あるいは、リレーUEは、リモートUEに対して、該情報を、PC5-RRCシグナリングで通知してもよい。リモートUEとリレーUEとの間でPC5の接続が確立される場合、たとえば、ディスカバリー処理に続いてPC5接続確立処理が行われる場合に有効である。他の方法として、リレーUEは該情報を報知してもよい。リモートUEはリレーUEから報知された該情報を受信するとよい。このようにすることで、リモートUEは該情報を取得することが可能となる。
 ステップST1404で、リモートUEはメジャメント結果をS-gNBに報告する。DLのメジャメント結果とSLのメジャメント結果を組み合わせて報告してもよい。SLのメジャメント結果の報告は、ディスカバリー処理で検出したリレーUEに対して行われてもよい。メジャメント報告メッセージに、DLメジャメント結果とSLメジャメント結果を含める。SLメジャメント結果として、対象とするリレーUEに関する情報、リレーUEの接続するgNBの情報、リレーUEの状態情報、リレーUEがリレー可能か否かを示す情報などを含めてもよい。このようにすることで、S-gNBはリモートUEにおけるリレーUEのメジャメント結果を取得できる。
 ステップST1405で、S-gNBはリモートUEのHOを決定する。S-gNBは、メジャメント結果、リレーUEに関する情報、リレーUEの接続するgNBの情報、リレーUEの状態情報、リレーUEがリレー可能か否かを示す情報などを用いて、リモートUEのHOを決定するとよい。ここでは、リモートUEの接続先をS-gNBからリレーUEに変更することを決定する。S-gNBは、リレーUEに接続するT-gNBをHO先にすることを決定する。
 ステップST1406でS-gNBはT-gNBに対してリモートUEのHO要求を通知する。HO要求メッセージに、リモートUEに関する情報、たとえばリモートUEの識別子、リモートUEのコンテキストなどを含めてもよい。HO要求メッセージに、接続先となるリレーUEに関する情報、たとえばリレーUEの識別子、リレーUEがリレー可能か否かを示す情報などを含めてもよい。このようにすることで、T-gNBは、HO対象となるリモートUEと接続先となるリレーUEに関する情報を取得することができる。
 S-gNBから、HO対象となるリモートUEと接続先となるリレーUEに関する情報を受信したT-gNBは、リモートUEに対してHO受入れ制御を実施する。HO受入れ制御において、T-gNBは、リモートUEに対して接続するリレーを介してHO受入れ可能か否かを判断し、T-gNBにおけるリモートUEのRRC設定を行う。T-gNBは、リモートUEとリレーUE間のPC5通信用設定を行ってもよい。PC5通信用設定としてRRC設定を行ってもよい。このようにすることで、T-gNBはリモートUE、リレーUEに対して、PC5通信用設定を通知可能となる。
 リモートUEとリレーUE間のPC5通信用設定は、後述する、リレーUEからのリレー応答を受信した後に行ってもよい。リレーUEに対して該設定を通知する場合、T-gNBは、S-gNBとリモートUEを介して通知する、あるいは、T-gNBから直接リレーUEに対して、HO要求メッセージとは別に通知するなどの方法を行うとよい。このようにすることで、リレーUEからのリレー応答を用いてT-gNBはPC5通信用の設定が可能となる。
 ステップST1407で、T-gNBはHO対象のリモートUEの接続先となるリレーUEに対して、リレー要求メッセージを通知する。リレー要求メッセージに、リモートUEに関する情報を含めてもよい。リレー要求メッセージに、リレーUEに関する情報を含めてもよい。リレーUEがリレー可能か否かを示す情報を含めてもよい。サービスに関する情報を含めてもよい。また、リレー要求メッセージに、T-gNBが設定したPC5通信用設定の内容を示す情報(以下では、PC5通信用設定情報と記載する)を含めてもよい。PC5通信用設定情報は、リモートUEとリレーUEとが端末間通信すなわちPC5通信を行うための設定内容を示す通信設定情報の一例である。図14の例では、T-gNBは、リレーUEからリモートUEへのPC5通信用設定情報をリレー要求メッセージに含めて、リレーUEに通知する。該通知を受信したリレーUEは、HO対象となるリモートUEの接続受入れ制御を実施する。リモートUEの接続受入れ制御において、リレーUEは、リモートUEに対して接続可能か否かを判断する。すなわち、リレーUEは、リモートUEに対して接続可能か否か、リレー可能か否かを判断する。ステップST1408で、リレーUEはT-gNBに対してリレー応答メッセージを通知する。リレー応答メッセージに、リモートUEに関する情報、リレーUEに関する情報、リレーUEがHO対象となるリモートUEのリレー可能か否かを示す情報を含めてもよい。リレー応答メッセージに、PC5通信用設定が完了したことを示す情報を含めてもよい。図14の例ではリレー応答メッセージとして肯定応答を通知する。
 ステップST1407で、T-gNBはHO対象のリモートUEの接続先となるリレーUEに対して、アダプテーションレイヤの設定に関する情報を通知してもよい。T-gNBは該情報をリレー要求メッセージに含めて通知してもよい。前述に開示した、T-gNBからHO対象のリモートUEの接続先となるリレーUEに対するPC5通信用設定情報の通知方法を適宜適用するとよい。アダプテーションレイヤの設定に関する情報として、リモートUEとT-gNB間の通信に用いる、リモートUEとリレーUE間のアダプテーションレイヤの設定に関する情報 and/or リレーUEとT-gNB間のアダプテーションレイヤの設定に関する情報としてもよい。アダプテーションレイヤの設定に関する情報を受信したリレーUEは、アダプテーションレイヤの設定を実施可能となる。リレーUEは、ステップ1408で送信するリレー応答メッセージに、アダプテーションレイヤの設定を完了したことを示す情報を含めてもよい。このようにすることで、リレーUEに対してアダプテーションレイヤの設定が完了したことをT-gNBが認識可能となる。
 ステップST1409で、T-gNBはS-gNBに対してHO要求応答メッセージを通知する。図14の例ではHO要求応答メッセージとして肯定応答を通知する。HO要求応答メッセージに、リモートUEに関する情報を含めてもよい。HO要求応答メッセージに、リレーUEに関する情報を含めてもよい。リレーUEがリレー可能か否かを示す情報を含めてもよい。HO要求応答メッセージに、リモートUEにT-gNBが設定したT-gNBとの通信用のRRC設定を含めてもよい。HO要求応答メッセージに、T-gNBが設定したPC5通信用設定情報を含めてもよい。図14の例では、T-gNBは、リモートUEからリレーUEへのPC5通信用設定情報をHO要求応答メッセージに含めて、S-gNBに通知する。
 ステップST1409で、T-gNBはS-gNBに対して、リモートUEとT-gNB間の通信に用いるアダプテーションレイヤの設定に関する情報を通知してもよい。該情報をHO要求応答メッセージに含めて通知してもよい。該通知に、前述に開示した、T-gNBからS-gNBに対するPC5通信用設定情報の通知方法を適宜適用するとよい。アダプテーションレイヤの設定に関する情報として、リモートUEとT-gNB間の通信に用いる、リモートUEとリレーUE間のアダプテーションレイヤの設定に関する情報 and/or リレーUEとT-gNB間のアダプテーションレイヤの設定に関する情報を通知してもよい。
 ステップST1410で、S-gNBはHO対象のリモートUEに対して、T-gNBへのRRC設定変更(HO指示であってもよい)のためのRRCメッセージを通知する。S-gNBは該メッセージをリレーUEを介して通知する。RRCメッセージとしてRRCReconfigurationメッセージを用いてもよい。該RRCメッセージに、リモートUEに関する情報を含めてもよい。該RRCメッセージに接続先となるリレーUEに関する情報を含めてもよい。該RRCメッセージに、HO先となるT-gNBに関する情報を含めてもよい。該RRCメッセージに、T-gNBが設定したリモートUEのT-gNBとの通信用RRC設定を含めてもよい。このようにすることで、リモートUEがT-gNBが設定したRRC設定を受信可能となる。該RRCメッセージに、PC5通信用設定情報を含めてもよい。このようにすることで、リモートUEがリレーUEとのPC5通信用設定情報を受信可能となる。図14の例では、リモートUEからリレーUEへのPC5通信用設定情報を通知する。
 ステップST1410で、S-gNBはリモートUEに対して、リモートUEとT-gNB間の通信に用いるアダプテーションレイヤの設定に関する情報を通知してもよい。該情報をRRC設定変更メッセージに含めて通知してもよい。該通知に、前述に開示した、S-gNBからリモートUEに対するPC5通信用設定情報の通知方法を適宜適用するとよい。アダプテーションレイヤの設定に関する情報として、リモートUEとT-gNB間の通信に用いる、リモートUEとリレーUE間のアダプテーションレイヤの設定に関する情報 and/or リレーUEとT-gNB間のアダプテーションレイヤの設定に関する情報を通知してもよい。
 リモートUEがリレーUE(リレーUE#1)を介してS-gNBと接続している場合、S-gNBは該リレーUEを介してリモートUEに対してリモートUEとT-gNB間の通信に用いるアダプテーションレイヤの設定に関する情報を通知してもよい。
 このようにすることで、リモートUEはリモートUEとT-gNB間の通信に用いるアダプテーションレイヤの設定に関する情報を受信でき、該アダプテーションレイヤの設定が可能となる。
 ステップST1411で、リモートUEは、接続先のリレーUEとの間でPC5接続を確立する。リモートUEは、PC5接続確立処理において、リモートUEからリレーUEへのPC5通信用設定情報を、リレーUEに対して通知する。リレーUEは、PC5接続確立処理において、リレーUEからリモートUEへのPC5通信用設定情報を、リモートUEに対して通知する。このようにすることで、リモートUEとリレーUE間でPC5通信が可能となる。また、リモートUEとリレーUE間でPC5上でのデータ通信が可能となる。
 ステップST1410で、S-gNBはリモートUEに対して、リモートUEとT-gNB間の通信に用いるアダプテーションレイヤの設定に関する情報を通知してもよい。該情報をRRC設定変更メッセージに含めて通知してもよい。該通知に、前述に開示した、S-gNBからリモートUEに対するPC5通信用設定情報の通知方法を適宜適用するとよい。アダプテーションレイヤの設定に関する情報として、リモートUEとT-gNB間の通信に用いる、リモートUEとリレーUE間のアダプテーションレイヤの設定に関する情報 and/or リレーUEとT-gNB間のアダプテーションレイヤの設定に関する情報を通知してもよい。
 リモートUEは、ステップST1410でS-gNBからT-gNBへのRRC設定変更のためのRRCメッセージを受信した場合に、S-gNBとの通信を停止する。S-gNBとの通信用設定をリリースしてもよい。図14の例では示していないが、リモートUEが、リレーUEを介してS-gNBと接続している場合は、該リレーUEとの通信を停止する。該リレーUEとのPC5通信用設定をリリースしてもよい。このようにすることで、リモートUEは早期に、接続先リレーUEとのPC5接続処理、リレーUEを介したT-gNBとのRRC接続処理を実施可能となる。
 リモートUEは、ステップST1411で接続先リレーUEとのPC5接続を確立した場合に、S-gNBとの通信を停止してもよい。S-gNBとの通信用設定をリリースしてもよい。リモートUEが、リレーUEを介してS-gNBと接続している場合は、該リレーUEとの通信を停止してもよい。該リレーUEとのPC5通信用設定をリリースしてもよい。このようにすることで、リモートUEは接続先リレーUEと確実にPC5接続確立後、リレーUEを介したT-gNBとのRRC接続処理を実施可能となる。
 ステップST1411で、リモートUEはリレーUEに対して、リモートUEとT-gNB間の通信に用いるアダプテーションレイヤの設定に関する情報を通知してもよい。該通知に、前述に開示した、リモートUEからリレーUEに対するPC5通信用設定情報の通知方法を適宜適用するとよい。アダプテーションレイヤの設定に関する情報として、リモートUEとT-gNB間の通信に用いる、リモートUEとリレーUE間のアダプテーションレイヤの設定に関する情報 and/or リレーUEとT-gNB間のアダプテーションレイヤの設定に関する情報を通知してもよい。リモートUEとT-gNB間の通信に用いるアダプテーションレイヤの設定に関する情報を受信したリレーUEは、該アダプテーションレイヤの設定を実施可能となる。
 リモートUEがステップST1411で接続先リレーUEとのPC5接続を確立した場合に、S-gNBとの通信を停止する条件は、リモートUEがS-gNBと直接接続している場合としてもよい。このようにすることで、リモートUEが、接続元リレーUEと接続先リレーUEとの双方と接続処理をしなくて済む。また、リモートUEの構成を簡略化可能となる。また、リモートUEのHO処理の複雑化を回避可能となる。
 ステップST1412で、リモートUEは接続先リレーUEを介してT-gNBに対してRRC設定完了を通知する。該通知をリモートUEとT-gNB間のRRCシグナリングを用いて行ってもよい。RRCReconfigurationcompleteメッセージを用いてもよい。このようにすることで、T-gNBは、リモートUEがRRC設定を実施し、リレーUEを介してRRC接続が実施されたことを認識できる。これにより、リレーUEを介してリモートUEとT-gNB間で通信が可能となる。
 リモートUEからRRC設定完了メッセージを受信したT-gNBは、ステップST1413で、CNとの間でリモートUEに対するパススイッチ処理を実施する。このようにすることで、リモートUEに対するS-gNBからT-gNBへのパススイッチ処理が実施可能となる。また、CNのUPFはT-gNBに対してリモートUEへのDLデータを送信可能となる。また、T-gNBとリレーUEを介して、リモートUEとUPFとの間でデータ通信が可能となる。
 T-gNBは、CNのAMFへのパススイッチ要求メッセージに、リモートUEに関する情報を含めてもよい。パススイッチ要求メッセージ、リモートUEの通信に関する情報を含めるとよい。リモートUEの通信に関する情報として、リレーUEを介した通信か否かを示す情報を含めてもよい。該リレーUEに関する情報を含めてもよい。CNにおいてAMFがUPFに通知するスイッチ要求メッセージに、該情報を含めてもよい。また、UPFからAMFへのパススイッチ要求応答メッセージに、該情報を含めてもよい。また、AMFからT-gNBへのパススイッチ要求応答メッセージに該情報を含めてもよい。前述のAMFとUPF間のパススイッチ要求メッセージやパススイッチ要求応答メッセージはSMFを介して通知されてもよい。
 ステップST1414で、T-gNBは、S-gNBに対して、リモートUEのコンテキストのリリースを通知する。このようにすることで、S-gNBは、リモートUEのコンテキストをリリースすることが可能となる。
 リモートUEがリレーUEを介してS-gNBと接続している時に、S-gNBがT-gNBからUEコンテキストのリリースを受信した場合、S-gNBは接続元リレーUEに対して、リモートUEのコンテキストのリリースを通知してもよい。該通知を受けた接続元リレーUEは、リモートUEのコンテキストをリリースすることができる。S-gNBは、T-gNBからUEコンテキストのリリースを受信した場合、接続元リレーUEに対してリモートUEとの通信停止を通知してもよい。該通信停止をRRCシグナリングで通知してもよい。該通信停止メッセージに、リモートUEに関する情報を含めてもよい。該通信停止メッセージに、通信停止の原因情報を含めてもよい。たとえば、原因情報として、HOによる通信停止であることを示す情報を含めてもよい。S-gNBからリモートUEとの通信停止メッセージを受信したリレーUEは、リモートUEとS-gNB間のリレー通信を停止する。リモートUEとS-gNB間のリレー通信のための設定をリリースするとしてもよい。たとえば、PC5通信用設定をリリースしてもよい。このようにすることで、リモートUEの接続先リレーUEが変更になったような場合に、リレーUEにおけるリレー処理が無駄に継続してしまうことを回避できる。また、リレーUEの低消費電力化が可能となる。
 パススイッチ処理終了後、ステップST1415で、リモートUE、接続先リレーUE、T-gNB、CN間でデータ通信が可能となる。
 このようにすることで、リレーUEを介したリモートUEのHOが可能となる。また、リモートUEはRRC接続を維持したままgNBの接続先を変更可能となる。また、リモートUEのgNBの接続先変更時も通信サービスを継続可能となる。
 図15は、実施の形態1について、リレーUEを介したリモートUEのHOの方法の他の例を示すシーケンス図である。図15において、図14と共通するステップについては同じステップ番号を付し、共通する説明を省略する。図15の例では、リモートUEとリレーUE間のPC5通信用設定方法が図14の例とは異なる。図15の例では、リモートUEとリレーUE間のPC5通信用設定情報を、リレーUEへの設定はT-gNBから直接リレーUEに対して通知し、リモートUEへの設定はT-gNBからS-gNBを介して通知する。ステップST1507で、T-gNBはリレーUEに対して、リモートUEからリレーUEへのPC5通信用設定情報と、リレーUEからリモートUEへのPC5通信用設定情報とを通知する。このようにすることで、リレーUEは、リモートUEからリレーUEへのPC5通信用設定情報と、リレーUEからリモートUEへのPC5通信用設定情報を受信可能となる。ステップST1509で、T-gNBはS-gNBに対して、リモートUEからリレーUEへのPC5通信用設定情報と、リレーUEからリモートUEへのPC5通信用設定情報とを通知する。ステップST1510で、S-gNBはリモートUEに対して、リモートUEからリレーUEへのPC5通信用設定情報とリレーUEからリモートUEへのPC5通信用設定情報とを通知する。このようにすることで、リモートUEは、リモートUEからリレーUEへのPC5通信用設定情報と、リレーUEからリモートUEへのPC5通信用設定情報とを受信可能となる。
 図15の例のような方法とすることで、接続先リレーUEからリモートUEへのPC5通信用設定情報の通知、あるいは、リモートUEから接続先リレーUEへのPC5通信用設定情報の通知が不要となるため、早期に設定可能となる。また、該設定のため接続先リレーUEとリモートUEとで通信を行う必要が無くなるため、リレーUEとリモートUE間のSLのSRBの設定が可能となる。たとえば、SLのSRB0からの設定が可能となる。
 このようにすることで、リモートUEとリレーUE#2は、リモートUEとリレーUE#2間のPC5通信に用いる設定を取得することができ、リモートUEとリレーUE#2間でPC5通信が可能となる。このため、リモートUEはリレーUE#2を介してT-gNBと接続することが可能となり、リモートUEはリレーUE#2を介してT-gNBと通信を行うことが可能となる。このため、S-gNBからT-gNBへのリモートUEのHOが可能となる。リモートUEがリレーUEを介して間接的に接続するgNBへのHO、言い換えると、リレーUEを介したリモートUEのHOが可能となり、サービスの連続性が得られる。
実施の形態1の変形例1.
 リレーUEを介したリモートUEとgNB間の通信におけるDRBの設定は、リレーUEを介した設定になる。しかし、リレーUEを介したDRBの設定については上述の非特許文献1~27および他の文献等になんら開示が無い。このためリレーUEを介したリモートUEとgNB間での通信ができないという問題が生じる。また、リレーUEを介したリモートUEのHOにおいて、リモートUEとS-gNB間の通信におけるDRBの設定の取扱いについてはなんら開示が無い。
 本実施の形態1の変形例1では、このような課題を解決する方法を開示する。
 前述の課題を解決するため、本実施の形態にかかる通信システムにおいては、S-gNBからT-gNBに対して、リレーUE#1を介したリモートUEとS-gNB間の通信に用いる、リモートUEとリレーUE#1間のDRBの設定に関する情報を通知する。S-gNBからT-gNBに対して、リレーUE#1を介したリモートUEとS-gNB間の通信に用いるDRBの設定の、リモートUEとリレーUE#1間に関する情報を通知してもよい。S-gNBからT-gNBに対して、リレーUE#1を介したリモートUEとS-gNB間の通信に用いる、リモートUEとリレーUE#1間のQoSフローからDRBへのマッピング情報を通知してもよい。S-gNBからT-gNBに対して、リレーUE#1を介したリモートUEとS-gNB間の通信に用いるQoSフローからDRBへのマッピング情報を通知してもよい。
 S-gNBからT-gNBに対して、リレーUE#1を介したリモートUEとS-gNB間の通信に用いる、リレーUE#1とS-gNB間のDRBの設定に関する情報を通知してもよい。S-gNBからT-gNBに対して、リレーUE#1を介したリモートUEとS-gNB間の通信に用いるDRBの設定の、リレーUE#1とS-gNB間に関する情報を通知してもよい。S-gNBからT-gNBに対して、リレーUE#1を介したリモートUEとS-gNB間の通信に用いる、リレーUE#1とS-gNB間のQoSフローからDRBへのマッピング情報を通知してもよい。
 このようにすることで、T-gNBは、リレーUE#1を介したリモートUEとS-gNB間の通信に用いるDRBの設定に関する情報を取得することができる。
 リレーUEを介したリモートUEとgNB間のDRBの設定方法について開示する。S-gNBは、リレーUE#1を介したリモートUEとS-gNB間のDRBの設定を行ってもよい。S-gNBは、リモートUEとリレーUE#1間のDRBの設定と、リレーUE#1とS-gNB間のDRBの設定とを実施してもよい。S-gNBは、リレーUE#1を介したリモートUEとS-gNB間のDRBの、リモートUEとリレーUE#1間の設定と、リレーUE#1とS-gNB間の設定とを実施してもよい。リレーUEを介したリモートUEとgNB間のDRBの設定として、リモートUEからS-gNBへの通信のための設定と、S-gNBからリモートUEへの通信のための設定とを分別してもよい。S-gNBは、各方向の通信の設定を実施してもよい。前述ではS-gNBと記したが、gNBは、特にHO元のgNBであるS-gNBに限らない。リレーUEを介してリモートUEとgNB間で通信が行われる場合に適用してもよい。
 このようにすることで、S-gNBが、リレーUE#1を介したリモートUEとS-gNB間の、リモートUEとリレーUE#1間、リレーUE#1とS-gNB間の両方の設定が可能となる。該両方の設定を用いて、リモートUEとS-gNB間の通信に適した設定とすることが可能となる。また、S-gNBは該両方の設定を認識可能となる。
 他の方法を開示する。リレーUE#1が、リレーUE#1を介したリモートUEとS-gNB間の通信の、リレーUE#1からリモートUEへの通信のDRBの設定を行ってもよい。リレーUE#1が、リレーUE#1を介したリモートUEとS-gNB間の通信の、リモートUEからリレーUE#1への通信のDRBの設定を行ってもよい。S-gNBが、リレーUE#1を介したリモートUEとS-gNB間の通信のリレーUE#1とS-gNB間の通信のDRBの設定を行う。前述ではS-gNBと記したが、gNBは、特にHO元のgNBであるS-gNBに限らない。リレーUEを介してリモートUEとgNB間で通信が行われる場合に適用してもよい。
 このようにすることで、リレーUE#1とリモートUEが、リレーUE#1を介したリモートUEとS-gNB間の通信の内、リモートUEとリレーUE#1間の設定が可能となる。リレーUE#1とリモートUEは、リモートUEとリレーUE#1間の電波伝搬状況や各UEでの無線リソース使用状況などを考慮して、リモートUEとリレーUE#1間の通信に適した設定とすることが可能となる。
 リレーUE#1はS-gNBに対して、リレーUE#1からリモートUEへの通信のDRBの設定を通知してもよい。リモートUEはリレーUE#1に対して、リモートUEからリレーUE#1への通信のDRBの設定を通知してもよい。リレーUE#1は、該設定をS-gNBに対して通知してもよい。このようにすることで、S-gNBは、リレーUE#1を介したリモートUEとS-gNB間の通信の、リモートUEとリレーUE#1間の設定を認識可能となる。
 このようにすることで、S-gNBは、T-gNBに対して、リレーUE#1を介したリモートUEとS-gNB間の通信に用いるDRBの設定に関する情報を通知可能となる。
 DRBの設定に関する情報として、たとえば、DRBを識別するための情報、各プロトコルスタックの設定情報、ロジカルチャネルの情報、RLCチャネルの情報、RLCベアラに関する情報などがある。QoSフローに関する情報 and/or QoSフローからDRBへのマッピング情報をDRBの設定に関する情報に含めてもよい。
 リレーUEを介したリモートUEとgNB間の通信では、リレーUEで、リモートUEとリレーUE間のDRBとリレーUEとリモートUE間のDRBのマッピングとが必要となる。リレーUEを介したリモートUEのHOにおいて、S-gNBからT-gNBに対して、リモートUEとS-gNB間の通信に用いる、リモートUEとリレーUE#1間のDRBの設定に関する情報と、リレーUE#1とS-gNB間のDRBのマッピング設定に関する情報とを、通知する。DRBのマッピング方法を、DRBの識別子を用いたマッピングとしてもよい。DRBのマッピング設定に関する情報を、DRBの識別子によるマッピング情報としてもよい。S-gNBは、前述に開示したDRBの設定に関する情報と、DRBの識別子によるマッピング情報とを関連付けて、T-gNBに通知してもよい。
 マッピング方法を、RLCチャネルの識別子を用いたマッピングとしてもよい。マッピング設定に関する情報を、RLCチャネルの識別子によるマッピング情報としてもよい。S-gNBは、前述に開示したDRBの設定に関する情報と、RLCチャネルの識別子によるマッピング情報とを関連付けて、T-gNBに通知してもよい。マッピング方法を、ロジカルチャネルの識別子を用いたマッピングとしてもよい。マッピング設定に関する情報を、ロジカルチャネルの識別子によるマッピング情報としてもよい。S-gNBは、前述に開示したDRBの設定に関する情報と、ロジカルチャネルの識別子によるマッピング情報とを関連付けて、T-gNBに通知してもよい。
 S-gNBは、リモートUEとS-gNB間のQoSフローからDRBへのマッピング情報と、リレーUEでのDRBのマッピング情報とを関連付けて、T-gNBに通知してもよい。S-gNBは、リモートUEからS-gNBへの通信 and/or S-gNBからリモートUEへの通信におけるQoSフローからDRBへのマッピング情報と、リレーUEでのDRBのマッピング情報とを関連付けて、T-gNBに通知してもよい。
 リレーUEを介したリモートUEとgNB間の通信における、リモートUEとリレーUE間のDRBと、リレーUEとリモートUE間のDRBとのマッピング方法について開示する。S-gNBは、リモートUEとリレーUE#1間のDRBの設定と、リレーUE#1とS-gNB間のDRBの設定とのマッピング設定を実施する。S-gNBは、リモートUEからS-gNBへの通信のためのDRBのマッピングと、S-gNBからリモートUEへの通信のためのDRBのマッピングとを分別してもよい。S-gNBは、各方向のマッピング設定を実施してもよい。前述ではS-gNBと記したが、gNBは、特にHO元のgNBであるS-gNBに限らない。リレーUEを介してリモートUEとgNB間で通信が行われる場合に適用してもよい。
 このようにすることで、S-gNBが、リモートUEとS-gNB間の通信に適したマッピング設定を実施可能となる。また、S-gNBはマッピング情報を認識可能となる。
 他の方法を開示する。リレーUE#1が、リレーUE#1を介したリモートUEとS-gNB間の通信の、リレーUE#1とリモートUE間のDRBの設定と、リレーUE#1とS-gNB間のDRBの設定とのマッピング設定を実施してもよい。リレーUE#1は、リモートUEからS-gNBへの通信のためのDRBのマッピングと、S-gNBからリモートUEへの通信のためのDRBのマッピングとを分別してもよい。リレーUE#1は、各方向のマッピングを実施してもよい。前述ではS-gNBと記したが、gNBは、特にHO元のgNBであるS-gNBに限らない。リレーUEを介してリモートUEとgNB間で通信が行われる場合に適用してもよい。
 このようにすることで、リレーUE#1が、リレーUE#1で行うマッピングのマッピング設定を実施可能となる。このため、リレーUE#1の無線リソース使用状況などを考慮して、リレーUE#1を介したリモートUEとS-gNB間の通信に適したマッピング設定とすることが可能となる。
 リレーUE#1はS-gNBに対して、リレーUE#1を介したリモートUEとS-gNB間の通信の、リレーUE#1とリモートUE間のDRBの設定と、リレーUE#1とS-gNB間のDRBの設定とのマッピング設定に関する情報を通知する。このようにすることで、S-gNBは、該マッピング設定を認識可能となる。
 このようにすることで、S-gNBは、T-gNBに対して、リモートUEとS-gNB間の通信に用いる、リモートUEとリレーUE#1間のDRBとリレーUE#1とS-gNB間のDRBのマッピング設定に関する情報を通知可能となる。
 リレーUEを介したリモートUEとgNB間の通信において、リレーUEとgNB間 and/or リモートUEとリレーUEとの間のプロトコルとして、アダプテーションレイヤを設けることが検討されている(非特許文献27(3GPP TR 38.836)参照)。リレーUEを介したリモートUEとgNBの通信のHOにおいて、S-gNBからT-gNBに対して、リモートUEとS-gNB間の通信に用いる、リモートUEとリレーUE#1間のアダプテーションレイヤの設定に関する情報 and/or リレーUE#1とS-gNB間のアダプテーションレイヤの設定に関する情報を通知してもよい。
 T-gNBは、リモートUEとS-gNB間の通信において設定されていたアダプテーションレイヤの設定に関する情報を用いて、リレーUE#2を介したリモートUEとT-gNBとの間の通信のアダプテーションレイヤの設定を実施可能となる。T-gNBは該情報を用いて早期にアダプテーションレイヤの設定を行うことが可能となる。
 図16は、実施の形態1の変形例1について、リレーUEを介したリモートUEのHOの方法の例を示すシーケンス図である。図16において、図14、図15と共通するステップについては同じステップ番号を付し、共通する説明を省略する。図16の例では、リモートUEとS-gNB間の通信におけるDRBの設定に関する情報をT-gNBに通知する方法について開示している。
 S-gNBは、リモートUEとS-gNB間の通信のリモートUEとリレーUE#1間の通信のDRB設定を実施する。ステップST1601で、S-gNBは、リモートUEに対して、リレーUE#1を介して、リモートUEとリレーUE#1間の通信のDRB設定に関する情報を通知する。図16の例では、該情報をS-gNBとリモートUE間のRRCReconfigurationメッセージに含めて通知する。S-gNBは、リモートUEとS-gNB間の通信のリレーUE#1とS-gNB間の通信のDRB設定を実施する。ステップST1602で、S-gNBは、リレーUE#1に対して、リモートUEとリレーUE#1間の通信のDRB設定に関する情報を通知する。図16の例では、該情報をS-gNBとリレーUE#1間のRRCReconfigurationメッセージに含めて通知する。該情報として、リモートUEとリレーUE#1間のDRB情報と、リレーUE#1とS-gNB間のDRB情報と、リレーUE#1でのDRBマッピング情報とを通知する。ステップST1603で、リモートUE、リレーUE#1、S-gNB、CNのUPF間でデータ通信が行われる。
 ステップST1604で、S-gNBはリレーUE#1を介してリモートUEに対してメジャメント設定を通知する。ステップST1605で、リモートUEはリレーUE#1を介してS-gNBに対してメジャメント報告を通知する。ステップST1405でリモートUEのHOを決定したS-gNBは、ステップST1606で、T-gNBに対してHO要求メッセージを通知する。HO要求メッセージに、リモートUEとS-gNB間の通信のDRB設定に関する情報を含めるとよい。リモートUEとS-gNB間の通信のDRB設定に関する情報として、リモートUEとS-gNB間の通信のリモートUEとリレーUE#1間のDRB設定に関する情報と、リモートUEとS-gNB間の通信のリレーUE#1とS-gNB間のDRB設定に関する情報とを含めるとよい。HO要求メッセージに、QoSフローからリモートUEとS-gNB間の通信のDRBへのマッピング情報を含めてもよい。HO要求メッセージに、リレーUE#1でのDRBマッピング情報を含めてもよい。このようにすることで、T-gNBが、リレーUE#1を介してリモートUEとS-gNB間の通信に用いられていたDRB設定を認識可能となる。HO要求メッセージに含める前述の各情報は、S-gNBとリモートUEとの間のデータ通信に関する設定内容を示すデータ通信用設定情報の一例である。
 T-gNBは、S-gNBから通知された、リレーUE#1を介したリモートUEとS-gNB間の通信に用いられていたDRB設定を用いて、リレーUE#2を介したリモートUEとT-gNB間の通信に用いるDRB設定を行う。
 ステップST1607で、T-gNBはリレーUE#2に対して、リレーUE#2を介したリモートUEとT-gNB間の通信に用いるDRB設定に関する情報を通知する。該情報をリレー要求メッセージに含めて通知するとよい。リモートUEとT-gNB間の通信に用いるDRB設定に関する情報として、リモートUEとT-gNB間の通信のリモートUEとリレーUE#2間のDRB設定に関する情報と、リモートUEとT-gNB間の通信のリレーUE#2とT-gNB間のDRB設定に関する情報とをリレー要求メッセージに含めるとよい。リレー要求メッセージに、QoSフローからリモートUEとT-gNB間の通信のDRBへのマッピング情報を含めてもよい。リレー要求メッセージに、リレーUE#2でのDRBマッピング情報を含めてもよい。このようにすることで、T-gNBはリレーUE#2に対して、リレーUE#2を介したリモートUEとT-gNB間の通信のDRB設定を通知可能となる。
 ステップST1609で、T-gNBはS-gNBに対して、リレーUE#2を介したリモートUEとT-gNB間の通信に用いるDRB設定に関する情報を通知する。該情報をHO要求応答メッセージに含めて通知するとよい。リモートUEとT-gNB間の通信のDRB設定に関する情報として、リモートUEとT-gNB間の通信のリモートUEとリレーUE#2間のDRB設定に関する情報を含めるとよい。このようにすることで、S-gNBは、リモートUEとT-gNB間の通信のDRB設定を受信可能となる。
 ステップST1610で、S-gNBはリモートUEに対して、リレーUE#2を介したリモートUEとT-gNB間の通信に用いるDRB設定に関する情報を通知する。該情報をRRC設定変更メッセージに含めて通知するとよい。ここでは、RRC設定変更メッセージとして、RRCReconfigurationメッセージを用いる。S-gNBは、該メッセージをリレーUE#1を介して通知する。リモートUEとT-gNB間の通信のDRB設定に関する情報を、リモートUEとT-gNB間の通信のリモートUEとリレーUE#2間のDRB設定に関する情報とするとよい。このようにすることで、リモートUEは、リモートUEとT-gNB間の通信のDRB設定を受信可能となる。リモートUEは該設定を用いることで、T-gNBとの間のデータ通信を実施可能となる。
 リモートUEとS-gNBとの間の通信の停止方法について実施の形態1で開示したが、ここでは他の方法を開示する。実施の形態1では、上述したステップST1410を契機として該通信を停止することとしたが、ここでは、S-gNBが、ステップST1610で、リモートUEに対してRRC設定変更メッセージを通知後、ステップST1611で、リレーUE#1に対して、リモートUEとの通信停止を通知する。RRCシグナリングで通知してもよい。該通信停止メッセージに、リモートUEに関する情報を含めてもよい。該通信停止メッセージに、通信停止の原因情報を含めてもよい。たとえば、HOによる通信停止であることを示す情報を含めてもよい。S-gNBからリモートUEとの通信停止メッセージを受信したリレーUE#1は、リモートUEとS-gNB間のリレー通信を停止する。リモートUEとS-gNB間のリレー通信のための設定をリリースするとしてもよい。リモートUEとS-gNBとの間のリレー通信のためのバッファをリセットしてもよい。また、リレーUE#1は、たとえば、リモートUEとの間のPC5通信用設定をリリースしてもよい。このようにすることで、リレーUE#1におけるリレー処理が無駄に継続してしまうことを回避できる。また、リレーUE#1の低消費電力化が可能となる。
 このような方法とすることで、S-gNBからT-gNBに対して、リレーUE#1を介してリモートUEとS-gNB間の通信に用いるDRBの設定に関する情報を通知可能となる。T-gNBは該情報を用いて、リレーUE#2を介したリモートUEとT-gNB間の通信のDRB設定を実施可能となる。また、該設定を、リモートUE、リレーUE#2に対して通知可能となる。
 リモートUEと直接gNBが接続する場合のHOでは、リモートUEは、T-gNBに対してRA処理成功後、T-gNBへのULデータの送信を開始する。しかし、リレーUEを介したリモートUEのHOの場合、リモートUEはT-gNBと直接接続されないため、T-gNBに対するRA処理は無い。このような場合、リモートUEがリレーUEを介してT-gNBに対してULデータの送信を開始するタイミングが不明となる。ここではこのような課題を解決する方法を開示する。
 前述の課題を解決するため、リモートUEは、T-gNBにRRC設定完了メッセージを送信後、リレーUE#2を介してT-gNBに対するULデータの送信を開始する。T-gNBはリモートUEからRRC設定完了メッセージを受信することで、リモートUEとの間でRRC接続が行われたことを認識できる。T-gNBは、T-gNBからS-gNBを介してリモートUEに通知したRRC設定を、リモートUEが設定したことを認識できる。T-gNBは、リモートUEからのULデータを、リレーUE#2を介して受信するとよい。リレーUE#2を介してリモートUEとT-gNB間でULデータの送受信が可能となる。
 他の方法を開示する。リモートUEは、リレーUE#2とのPC5-RRC接続完了後、ULデータの送信を開始してもよい。リレーUE#2は、リモートUEから受信したULデータを、T-gNBに対して送信してもよい。このようにすることで、リモートUEは早期にリレーUE#2を介してT-gNBに対してULデータを送信可能となる。
 このようにすることで、リレーUEを介したリモートUEとgNB間の通信において、DRBの設定が可能となる。また、リレーUEを介したリモートUEとgNB間での通信が可能となる。また、リレーUEを介したリモートUEのHOにおいて、リモートUEとS-gNB間の通信におけるDRBの設定を、T-gNBが取得可能となる。このため、T-gNBにおいて、リモートUEとS-gNB間のDRBの設定を用いた、リモートUEとT-gNB間のDRBの設定が可能となる。また、リレーUEを介したリモートUEのHOにおいて、たとえば、サービスの連続性が保てる、サービスに要求されるQoSに最適な通信が可能となる、T-gNBでのDRBの設定を早期に実施可能となる、HOに関する処理を低遅延で実施可能となる、HOのロバスト性の向上を図れる、等の効果を得ることができる。
実施の形態1の変形例2.
 リレーUEを介したリモートUEのHOにおいて、データ通信遅延時間の削減が要求される。しかし、このようなHOにおけるデータ通信遅延時間の削減方法については上述の非特許文献1~27および他の文献等に何ら開示が無い。
 本実施の形態1の変形例2では、このような課題を解決する方法を開示する。
 前述の課題を解決するため、リレーUEを介したリモートUEのHOにおいて、DAPS(Dual Active Protocol Stack)HOを設ける。以降、リレーUEを介したリモートUEのHOにおけるDAPS HOをI-DAPS HOと称する場合がある。詳細方法を開示する。リレーUEを介したリモートUEのHOにおいて、リモートUEは、S-gNBとの通信用とT-gNBとの通信用の、双方の通信に用いるプロトコルスタックをアクティブにする。S-gNBとの通信用のプロトコルスタックとして、リレーUE#1を介したリモートUEとS-gNB間の通信用のプロトコルスタックを使用してもよい。T-gNBとの通信用のプロトコルスタックとして、リレーUE#2を介したリモートUEとT-gNBの通信用のプロトコルスタックを使用してもよい。
 I-DAPS HOとして、リモートUEと直接接続するgNBからリレーUEを介して接続するgNBへのHO and/or リモートUEとリレーUEを介して接続するgNBから直接接続するgNBへのHO and/or リモートUEとリレーUEを介して接続するgNBからリレーUEを介して接続するgNBへのHOとしてもよい。以降、これらをI-DAPS HOのタイプと称する場合がある。
 リレーUEを介したリモートUEのI-DAPS HOの設定方法について開示する。NWはリモートUEにI-DAPS HOを設定可能とする。NWはリレーUEにI-DAPS HOを設定可能とする。NWとして、たとえば、AMFあるいはSMFであってもよい。たとえば、RANであってもよい。RANとして、たとえば、gNBであってもよい。gNBとしてS-gNBであってもよいしT-gNBであってもよい。S-gNBが設定を行う場合、HOさせるリモートUEの通信サービスや通信状況、リレーUE#1の通信状況に応じたI-DAPS HOの設定が可能となる。T-gNBが設定を行う場合、HOさせるリモートUEの通信サービスや通信状況、リレーUE#2の通信状況に応じたI-DAPS HOの設定が可能となる。
 NWはリモートUEに対して、I-DAPS HOの設定を通知する。I-DAPS HOの設定情報として、I-DAPS HOを設定するか否かを示す情報を含めてもよい。I-DAPS HOの設定情報として、I-DAPS HOのタイプを示す情報を含めてもよい。I-DAPS HOのタイプと、設定するか否かを示す情報とを関連付けてもよい。このようにすることで、NWは、リモートUE and/or リレーUEに対して、どのタイプのI-DAPS HOを設定するか選択することができる。また、NWは、リモートUE and/or リレーUEに対して、どのタイプのI-DAPS HOを実行させるかを通知可能となる。リモートUE and/or リレーUEは、リレーUEを介したリモートUEのHO時に、どのタイプのI-DAPS HOを実施すればよいか判断可能となる。
 I-DAPS HO設定の通知方法について開示する。NWはリモートUEに対して、I-DAPS HO設定を、RRCシグナリングで通知する。また、NWはリレーUEに対して、I-DAPS HO設定を、RRCシグナリングで通知する。RRCシグナリングとして、たとえば、RRCReconfigurationメッセージで通知してもよい。該通知方法は、リモートUEやリレーUEがgNBとRRC接続中に有効である。また、たとえば、RRCSetupメッセージで通知してもよい。この場合、リモートUEやリレーUEがgNBとRRC接続確立する際に設定できるため早期に設定可能となる。また、たとえば、RRCResumeメッセージで通知してもよい。この場合、リモートUEやリレーUEがgNBとInactive状態の場合にRRC接続状態に移行する際に設定できるため早期に設定可能となる。また、たとえば、RRCReestablichmentメッセージで通知してもよい。この場合、リモートUEやリレーUEがRLF(Radio Link Failure)等の場合にRRC接続状態に移行する際に設定できるため早期に設定可能となる。
 T-gNBはリレー#2に対して、I-DAPS HO設定を、リレー要求メッセージで通知してもよい。
 リモートUEはNWに対して、I-DAPS HO実施可能か否かを通知してもよい。リレーUEはNWに対して、I-DAPS HO実施可能か否かを通知してもよい。I-DAPS HOタイプと実施可能か否かを示す情報とを関連付けて通知してもよい。I-DAPS HO実施可能か否かの情報、あるいは、I-DAPS HOタイプと実施可能か否かを示す情報とを関連付けた情報をケーパビリティ情報としてもよい。
 リレーUEを介して接続するgNBからの、リモートUEのI-DAPS HOにおいて、リレーUE#1からリモートUEへのDL送信停止方法について開示する。S-gNBはリレーUE#1に対して、リモートUEとS-gNB間の送受信を停止することを示す情報を通知する。リモートUEとS-gNB間のリレー設定をリリースすることを示す情報を通知してもよい。本明細書では、リモートUEとS-gNB間の送受信を停止することを示す情報 and/or リモートUEとS-gNB間のリレー設定をリリースすることを示す情報を、以降、HO元リレー設定リリース情報と称する場合がある。S-gNBはリレーUE#1に対して、HOが成功したことを通知してもよい。該情報の通知は、S-gNBがT-gNBからHO成功メッセージを受信したことを契機に行われるとよい。
 該情報を受信したリレーUE#1は、リモートUEへのDL送信を停止する。該情報を受信したリレーUE#1は、リモートUEへのDL送信のための設定をリリースしてもよいし、リモートUEとS-gNB間のリレー設定をリリースしてもよい。
 S-gNBからリレーUE#1に対する該情報の通知は、RRCシグナリングを用いて行ってもよい。RRCメッセージに該情報を含めて通知してもよい。たとえば、RRCReconfigurationメッセージに含めて通知してもよい。リレーに関するRRCメッセージに含めて通知してもよい。S-gNBからリレーUE#1へHO成功か否かを通知するメッセージを設けて、S-gNBからリレーUE#1に対して、該情報を該メッセージに含めて通知してもよい。このようにすることで、リレーUE#1がリモートUEのHO成功を認識可能となる。
 S-gNBからリレーUE#1に対する該情報の通知は、MACシグナリングを用いて行ってもよい。MAC CE(Control Element)に該情報を含めて通知してもよい。S-gNBからリレーUE#1に対する該情報の通知は、L1/L2シグナリングを用いてもよい。PDCCHに該情報を含めて通知してもよい。このようにすることで、より早期にS-gNBからリレーUE#1に対して該情報を通知可能となる。また、リレーUE#1からリモートUEへのDL送信停止までの遅延を削減可能となる。また、リレーUE#1とリモートUEでの無駄な送受信処理時間が削減されるため低消費電力化が図れる。
 このようにすることで、リレーUEを介したリモートUEのI-DAPS HOにおいて、リレーUE#1がリモートUEのHO成功を認識することが可能となる。リレーUE#1は、リモートUEのHO成功に応じて、リレーUE#1からリモートUEへのDL送信を停止することが可能となる。また、リレーUE#1は、リモートUEのHO成功に応じて、リレーUE#1とリモートUEのDL送信に用いる設定をリリースすることが可能となる。このため、リモートUEがHO成功したにもかかわらず、リレーUE#1でリモートUEへのDL送信処理が行われてしまうような無駄な処理を削減することが可能となる。また、リレーUE#1で該処理に用いられる無線リソースをリリースすることが可能となる。
 前述に、HO元リレー設定リリース情報を受信したリレーUE#1が、リモートUEへのDL送信を停止することを開示した。これに限らず、該情報を受信したリレーUE#1が、S-gNBからのDL受信を停止してもよい。該情報を受信したリレーUE#1が、S-gNBからのDL受信のための設定をリリースしてもよい。該情報を受信したリレーUE#1が、リモートUEからのUL受信を停止してもよい。該情報を受信したリレーUE#1が、リモートUEからのUL受信のための設定をリリースしてもよい。該情報を受信したリレーUE#1が、S-gNBへのUL送信を停止してもよい。該情報を受信したリレーUE#1が、S-gNBへのUL送信のための設定をリリースしてもよい。このようにすることで、リレーUE#1での各送受信において前述の場合と同様の効果を得ることができる。
 リレーUEを介して接続するgNBへのリモートUEのI-DAPS HOにおいて、リモートUEでのDL/UL送受信停止方法について開示する。T-gNBはリモートUEに対して、リモートUEとS-gNB間の送受信を停止することを示す情報を通知する。リモートUEとS-gNB間の通信の設定をリリースすることを示す情報を通知してもよい。リモートUEとS-gNB間の送受信を停止することを示す情報 and/or リモートUEとS-gNB間の通信の設定をリリースすることを示す情報を、以降、HO元通信設定リリース情報と称する場合がある。T-gNBは、該情報を、リレーUE#2を介してリモートUEに通知するとよい。該情報の通知は、T-gNBがリモートUEからRRCReconfigurationを受信したことを契機に行われるとよい。
 リモートUEは、該情報を受信するまで、リモートUEとS-gNB間のデータを送受信する。リモートUEが、該情報を受信した場合、リモートUEとS-gNB間のデータの送受信を停止し、S-gNBとの間の通信用の設定をリリースする。
 T-gNBからリモートUEに対する該情報の通知は、RRCシグナリングを用いて行ってもよい。RRCメッセージに該情報を含めて通知してもよい。たとえば、RRCReconfigurationメッセージに含めて通知してもよい。リモートUEとS-gNB間の送受信停止あるいは設定リリースを示すメッセージを設けて、T-gNBからリモートUEに対して、該情報を該メッセージに含めて通知してもよい。このようにすることで、リモートUEはT-gNBから該情報を受信可能となる。
 T-gNBからリモートUEに対する該情報の通知は、MACシグナリングを用いて行ってもよい。T-gNBからリレーUE#2へのMACシグナリングおよびリレーUE#2からリモートUEへのSL MACシグナリングを用いて行ってもよい。MAC CEに該情報を含めて通知してもよい。T-gNBからリモートUEに対する該情報の通知は、L1/L2シグナリングを用いて行ってもよい。T-gNBからリレーUE#2へのPDCCHおよびリレーUE#2からリモートUEへのPSCCHに該情報を含めて通知してもよい。このようにすることで、より早期にT-gNBからリモートUEに対して該情報を通知可能となる。また、リモートUEとS-gNB間の送受信停止までの遅延を削減可能となる。また、リモートUEでの無駄な送受信処理時間が削減されるため低消費電力化が図れる。
 このようにすることで、リレーUEを介したリモートUEのI-DAPS HOにおいて、リモートUEがS-gNBとの通信停止、該通信用の設定リリースの判断を実施可能となる。このため、リモートUEがHO成功したにもかかわらず、リモートUEとS-gNB間で通信処理が行われてしまうような無駄な処理を削減することが可能となる。また、リレーUE#1で該処理に用いられる無線リソースをリリースすることが可能となる。
 リレーUEを介したリモートUEのI-DAPS HOにおいて、リモートUEがT-gNBに対してULデータの送信を開始する方法について開示する。リモートUEは、T-gNBから、リモートUEとS-gNB間の送受信を停止することを示す情報あるいはリモートUEとS-gNB間の通信の設定をリリースすることを示す情報を受信した場合に、リレーUE#2を介してT-gNBへのULデータの送信を開始する。このようにすることで、リモートUEがS-gNBとの通信停止あるいは通信設定のリリースによりT-gNBへのULデータ送信を開始することが可能となる。
 リモートUEは、S-gNBとの通信停止あるいは通信設定のリリースを行った時点でS-gNBに対して送信確達できていないULデータが存在する場合、送信確達できていないULデータから順番に、T-gNBに対して送信するとよい。送信確達できていないPDCP SNの付与されたULデータをT-gNBに対して送信してもよい。送信確達できていない最初のULデータ以降をT-gNBに対して送信してもよい。送信確達できていない最初のPDCP SNの付与されたULデータ以降をT-gNBに対して送信してもよい。このようにすることで、リモートUEのHO時におけるULデータの連続性が確保できる。
 他の方法を開示する。リモートUEは、T-gNBに対してRRCReconfigurationcompleteメッセージを送信した場合に、リレーUE#2を介してT-gNBへのULデータの送信を開始する。このようにすることで、早期にT-gNBに対してULデータの送信を開始可能となる。たとえば、リモートUEがS-gNBとの通信停止あるいは通信設定リリースをしていないような場合でも、リレーUE#2を介してT-gNBへのULデータ送信を開始することが可能となる。
 リモートUEは、T-gNBに対してRRCReconfigurationcompleteメッセージを送信した時点で、S-gNBに対して送信確達できていないULデータが存在する場合、送信確達できていないULデータから順番に、T-gNBに対して送信するとよい。送信方法は前述に開示した方法を適宜適用するとよい。このようにすることで、前述の場合と同様に、リモートUEのHO時におけるULデータの連続性が確保できる。
 図17は、実施の形態1の変形例2について、I-DAPS HOの方法の例を示すシーケンス図である。図17において、図14、図16と共通するステップについては同じステップ番号を付し、共通する説明を省略する。ステップST1701で、リレーUE#1はS-gNBに対してリレー時のDAPS HOケーパビリティを通知する。UEケーパビリティ情報に含めて通知してもよい。リレーUEはCNに対してリレー時のDAPS HOケーパビリティを通知してもよい。S-gNBがCNに対してリレーUE#1のリレー時のDAPS HOケーパビリティを通知してもよい。同様に、ステップST1702で、リレーUE#2からT-gNBに対して、リレー時のDAPS HOケーパビリティを通知する。ステップST1703で、リモートUEはS-gNBに対してDAPS HOケーパビリティを通知する。リレーUE#1を介して通知する。UEケーパビリティ情報に含めて通知してもよい。リモートUEはCNに対してリレー時のDAPS HOケーパビリティを通知してもよい。S-gNBがCNに対してリモートUEのDAPS HOケーパビリティを通知してもよい。該DAPS HOはI-DAPS HOとしてもよい。このようにすることで、S-gNBあるいはCNが、リモートUEあるいはリレーUEがDAPS HO可能か否かを認識できる。
 ステップST1405で、S-gNBは、リモートUEに対してI-DAPS HOを決定する。ステップST1706で、S-gNBはT-gNBに対してI-DAPS HO要求を通知する。該I-DAPS HO要求メッセージに、I-DAPS HOの要求であることを示す情報を含めるとよい。ステップST1707で、T-gNBはリレーUE#2に対して、リレー要求を通知する。該リレー要求メッセージに、I-DAPS HO設定に関する情報を含めるとよい。このようにすることで、リレーUE#2は、リモートUEにI-DAPS HOが適用されること、I-DAPS HOの設定情報を認識可能となる。
 ステップST1609でT-gNBからHO要求応答を受信したS-gNBは、ステップST1710で、リモートUEに対して、I-DAPS HOの設定に関する情報を通知する。RRC設定変更のためのメッセージを用いて通知してもよい。S-gNBは、該情報をリレーUE#1を介してリモートUEに通知する。該情報の通知を受けたリモートUEは、I-DAPS HOの実施が指示されたことを認識する。リモートUEは、I-DAPS HO処理を実施する。S-gNBは、ステップST1711で、リレーUE#1に対して、I-DAPS HOの設定に関する情報を通知する。RRC設定変更のためのメッセージを用いて通知してもよい。該情報の通知を受けたリレーUE#1は、接続するリモートUEに、I-DAPS HOの実施が指示されたことを認識する。そして、リレーUE#1においてリモートUEのI-DAPS HO処理を実施する。
 ステップST1712で、S-gNBはT-gNBに対してデータ転送を決定する。S-gNBは、バッファで保持しているバッファデータのデータ転送を決定してもよいし、DLのデータ転送を決定してもよい。S-gNBは、バッファデータとCNのUPFからのデータとを転送することに決定してもよい。ステップST1713で、S-gNBはT-gNBに対してSN状態を転送する。該転送にEarly Status Transferを用いてもよい。SN状態として、T-gNBに転送する最初のDLデータのSN and/or HFN(Hyper Frame Number)情報を含めてもよい。S-gNBは、該SN状態を転送以降、ステップST1714で受信したデータをT-gNBに対して転送する。該データをDLのデータとしてもよい。S-gNBがまだリモートUEに送信できていないDLデータを転送してもよい。S-gNBがCNのUPFから受信したDLデータを転送してもよい。ステップST1715で、T-gNBは、S-gNBからのデータをバッファする。
 T-gNBは、S-gNBから転送されたデータを、リモートUEの接続先となるリレーUE#2に対して転送してもよい。リレーUE#2はT-gNBから転送されたデータをバッファするとよい。このようにすることで、リレーUE#2は、リモートUEに対して、T-gNBから受信したデータを早期に送信可能となる。たとえば、リレーUE#2は、リモートUEとリレーUE#2間のPC5接続確立後、T-gNBから受信したDLデータを、リモートUEに対して送信してもよい。
 S-gNBはリモートUEに対して、I-DAPS HOの設定情報を含むRRC設定変更メッセージを上述のステップST1710で通知した後、リモートUEへの通信を停止しない。S-gNBは、リモートUEとの通信用設定をリリースしない。また、リモートUEは、S-gNBから該メッセージを上述のステップST1710で受信後、S-gNBとの通信を停止しない。S-gNBとの通信用設定をリリースしない。S-gNBとの通信のためのリレーUE#1との通信を停止しない。S-gNBとの通信のためのリレーUEとのPC5通信用設定をリリースしない。また、リレーUE#1は、S-gNBからI-DAPS HOの設定情報を含むRRC設定変更のためのメッセージを上述のステップST1711で受信後、リモートUEとS-gNB間のリレー通信を停止しない。リモートUEとS-gNB間のリレー通信用設定をリリースしない。リモートUEとのPC5通信を停止しない。S-gNBとの通信を停止しない。これらの通信用設定をリリースしない。
 S-gNBによるDLデータへのPDCP SNの割り当ては、ステップST1721で、T-gNBに対してSN状態を送信するまで停止しない、としてもよい。S-gNBは、HO成功メッセージを受信するまで、リモートUEに対してDLデータを送信するのを停止しない。S-gNBは、HO成功メッセージを受信するまで、リモートUEからのULデータを受信するのを停止しなくてもよい。
 ステップST1412で、リモートUEはT-gNBに対してRRC設定完了メッセージを送信する。リモートUEは該RRC設定完了メッセージをリレーUE#2を介して通知する。該RRC設定完了メッセージを通知したリモートUEは、T-gNBに対してデータ送信を開始してもよい。その場合、リモートUEは、リレーUEを介してデータ送信を開始する。T-gNBは、リモートUEから受信したデータをUPFに送信してもよい。
 ST1411でリレーUE#2とPC5接続を行ったリモートUEは、リレーUE#2に対してデータ送信を開始してもよい。リレーUE#2はリモートUEから受信したデータをT-gNBに送信してもよい。T-gNBは、リモートUEから受信したデータをUPFに送信してもよい。リモートUEはより早期にデータ送信が可能となる。
 リモートUEからRRC設定完了メッセージを受信したT-gNBは、ステップST1716で、リモートUEに対して、HO元通信設定リリース情報を通知する。T-gNBは、該情報をリレーUE#2を介して通知する。ステップST1717で、リモートUEは、S-gNBとの間の送受信を停止し、通信用設定をリリースする。リモートUEから、RRC設定完了メッセージを受信したT-gNBは、ステップST1718で、S-gNBに対して、HO成功を通知する。該通知ではHO成功メッセージを用いてもよい。このようにすることで、S-gNBは、I-DAPS HOによりリモートUEがT-gNBにRRC接続完了したことを認識可能となる。ステップST1718でT-gNBからHO成功メッセージを受信したS-gNBは、ステップST1719で、リレーUE#1に対して、HO元リレー設定リリース情報を通知する。該通知ではHO成功メッセージを用いてもよい。ステップST1720で、リレーUE#1は、リモートUEとS-gNB間のリレー通信の送受信を停止し、該通信用設定をリリースする。このようにすることで、リレーUE#1は、リモートUEがHOを成功後に、リモートUEとS-gNB間のリレー通信の送受信の停止、該通信用設定のリリースを速やかに実施することができる。また、リレーUE#1の送受信処理の無駄や無線リソースの無駄な利用を低減できる。リレーUE#1の低消費電力化、無線リソースの使用効率の向上が可能となる。
 ステップST1721で、S-gNBはT-gNBに対して、SN状態を転送する。該転送にSN Status Transferメッセージを用いてもよい。SN状態として、リモートUEからT-gNBに再度送信が必要なULデータ情報を含めてもよい。SN状態として、T-gNBからリモートUEに新たに送信するDLデータ情報を含めてもよい。データ情報として、データに付与するPDCP SN情報としてもよい。このようすることで、T-gNBはリモートUEに対してどのデータを送受信すればよいか認識可能となる。
 ステップST1722で受信したデータを、S-gNBは、T-gNBに対して転送する。該データをDLのデータとしてもよい。S-gNBは、まだリモートUEに送信できていないDLデータをT-gNBに対して転送してもよい。S-gNBは、UPFから受信したDLデータをT-gNBに対して転送してもよい。
 ステップST1412でT-gNBとRRC接続完了したリモートUEは、T-gNBとのデータ通信を開始してもよい。あるいは、ステップST1717で、S-gNBとの送受信を停止し、設定をリリースした後に、リモートUEは、T-gNBとのデータ通信を開始してもよい。ステップST1723で、リモートUEは、リレーUE#2を介してT-gNBとのデータ通信を開始する。このようにすることで、リモートUEとT-gNB間での通信が可能となる。
 ステップST1413で、T-gNBとCN間でパススイッチ処理が実施され、ステップST1724で、UPFからS-gNBを介してT-gNBに転送される最後のデータとして、End Markerが付与されたデータが送信される。End Markerは、転送される最後のデータであることを示す情報である。これにより、T-gNBはS-gNBから転送される最後のデータを認識できる。ステップST1725で、T-gNBとUPFとの間でデータ通信が行われる。
 このようにすることで、リレーUEを介したリモートUEのI-DAPS HOの実行が可能となる。
 図18は、実施の形態1の変形例2について、I-DAPS HOの方法の他の例を示すシーケンス図である。図18において、図17と共通するステップについては同じステップ番号を付し、共通する説明を省略する。リモートUEがS-gNBとの送受信停止する前に、リモートUEとT-gNB間でデータ通信が行われてもよい。図18ではこのような場合について開示している。
 ステップST1717、ステップST1720で、S-gNBとの送受信停止、設定がリリースされる前に、S-gNBは、ステップST1721でSN状態を転送し、ステップST1722で、T-gNBに対してデータ転送を行う。該データとしてDLのデータを転送してもよい。S-gNBは、まだリモートUEに送信できていないDLデータを転送してもよい。S-gNBは、UPFから受信したDLデータを転送してもよい。ステップST1723で、T-gNBはリレーUE#2を介してリモートUEに対してS-gNBから転送されたデータを送信する。このようにすることで、リモートUEとT-gNB間のデータ通信が早期に実施可能となる。
 このようにすることで、リレーUEを介したリモートUEのHOにおいて、DAPS HOを実施可能となるため、HO処理の際の通信遅延時間を削減可能となる。また、リレーUEにおいて、無駄なリレー処理を削減可能となる。リレーUEの低消費電力化が可能となる。また、リレーUEの誤動作の低減も可能となる。
実施の形態1の変形例3.
 リレーUEを介したリモートUEのI-DAPS HOにおいて、たとえば、リモートUEが、T-gNBに対してULデータを送信開始するため、全てのUL送信をT-gNBに切り替えてしまうと、S-gNBとの間の通信に問題が生じる場合がある。
 本実施の形態1の変形例3では、このような課題を解決する方法を開示する。
 前述の課題を解決するため、リモートUEは、S-gNBとの通信停止あるいは通信設定のリリース情報を受信するまで、S-gNBとの間の通信の再送に関するUL送信を、リレーUE#1に対して行う。S-gNBとの間の通信の再送に関するUL送信の具体例を以下に9つ開示する。
(11)SL L1 CSI FB(Feed Back)。
(12)SL HARQ FB。
(13)SL L2 RLC FB。
(14)ROHC FB。
(15)SL HARQ データ再送。
(16)SL RLC データ再送。
(17)SL PDCP データ再送。
(18)SL PDCP status report再送。
(19)(11)~(18)の組合せ。
 このようにすることで、リレーUE#1はリモートUEから、リモートUEとS-gNB間の通信の再送に関するUL送信を受信可能となる。
 リレーUE#1は、リモートUEとS-gNB間の送受信停止情報あるいはリレー設定リリース情報を受信するまで、リモートUEとS-gNBとの間の通信の再送に関するUL送信を、S-gNBに対して行う。リモートUEとS-gNBとの間の通信の再送に関するUL送信の具体例を以下に9つ開示する。
(21)L1 CSI FB。
(22)HARQ FB。
(23)L2 RLC FB。
(24)ROHC FB。
(25)HARQ データ再送。
(26)RLC データ再送。
(27)PDCP データ再送。
(28)PDCP status report再送。
(29)(21)~(28)の組合せ。
 このようにすることで、S-gNBはリレーUE#1から、リモートUEとS-gNB間の通信の再送に関するUL送信を受信可能となる。
 リモートUEはS-gNBに対して、リモートUEとS-gNB間の通信に関するUu上のUL送信を継続してもよい。たとえば、リモートUEとS-gNB間でRLCの再送が行われる場合に該送信を行ってもよい。リモートUEとS-gNB間の通信に関するUu上の送信の具体例を以下に4つ開示する。
(31)L2 RLC FB。
(32)RLC データ再送。
(33)ROHC FB。
(34)(31)~(33)の組合せ。
 このようにすることで、たとえば、リモートUEとS-gNB間でRLCの再送が行われる場合でも、S-gNBはリモートUEからリモートUEとS-gNB間の通信に関するUu上のUL送信を受信可能となる。
 また、このようにすることで、たとえリモートUEがT-gNBに対してULデータを送信開始したとしても、S-gNBはリモートUEから、リモートUEとS-gNB間の通信に関するUL送信を受信可能となる。このため、リモートUEとS-gNB間の通信が継続される。リレーUEを介したリモートUEのI-DAPS HOにおいて、データ通信遅延時間の削減が図れるとともに、HO処理のロバスト性を向上させることが可能となる。
実施の形態1の変形例4.
 UEが直接gNBと接続する場合のHOにおいて、HO失敗(HO failure)は、タイマで管理される。タイマのスタートはRRC設定変更の受信で、ストップはRA処理完了で行われる。タイマ満了時、いいかえると、タイマ内にRA処理完了しない場合はHO失敗となり、RRC再確立が実施される。しかし、リレーUEを介したリモートUEのHOにおいて、リレーUEを介してT-gNBに接続するような場合、T-gNBへのRA処理は実施されない。このような場合の処理について、上述の非特許文献1~27および他の文献等に何ら開示は無い。
 ここでは、このような課題を解決する方法を開示する。
 上述の課題を解決するため、リモートUEはHO失敗をタイマで管理する。スタートはS-gNBからのRRC設定変更の受信とする。ストップはリレーUEとのPC5-RRC接続完了とする。他の方法として、ストップをリレーUEとのPC5-RRC接続完了かつリレーUEからT-gNBとのRRC接続状態情報受信としてもよい。他の方法として、ストップをT-gNBへのRRC設定完了通知実施としてもよい。他の方法として、ストップを、T-gNBからのHO元通信設定リリースメッセージの受信としてもよい。
 タイマ満了時は、リレーUEと接続するgNBに対して、RRC再確立処理を実施するとよい。I-DAPS HOの場合は、タイマ満了時、S-gNBと接続していたら、S-gNB設定に切り戻り(revert back)、CP(Control Plane)シグナリングのためにS-gNBのSRBをアクティベーションしてもよい。I-DAPS HOの場合の他の方法として、タイマ満了時、リモートUEとリレーUE間がSL RLFでなく、リレーUEとS-gNB間がRLFで無い場合に、S-gNB設定に切り戻り(revert back)、CPシグナリングのためにS-gNBのSRBをアクティベーションしてもよい。
 このようにすることで、リレーUEを介したリモートUEのHOにおいて、T-gNBに対してRA処理を実施しないような場合も、HO失敗処理を実施可能となる。このため、電波伝搬環境等によるHO失敗処理を実施可能となる。また、リレーUEを介したリモートUEのHOにおける誤動作を削減可能となる。
実施の形態2.
 リレーUEを介したリモートUEのHOにおいてロバスト性の向上が要求される。HOにおけるロバスト性向上の方法としてCHO(Conditional HO)がある(非特許文献19(3GPP TS38.331)参照)。しかしこの方法は、UEが直接gNBと接続する場合の方法であり、UEがリレーUEを介してgNBと接続するような場合については何ら開示されていない。
 本実施の形態2では、リレーUEを介したリモートUEのHOにおいてロバスト性を向上する方法を開示する。
 上述の課題を解決するため、実施の形態2にかかる通信システムは、リレーUEを介したリモートUEのHOにおいてCHOを設ける。以降、リレーUEを介したリモートUEのHOにおけるCHOをI-CHOと称する場合がある。詳細方法を開示する。S-gNBはHO先の候補となる1つまたは複数のgNBを設定する。S-gNBはHO先の候補となる1つまたは複数のgNBが構成する1つまたは複数のセルを設定してもよい。候補となるセルは、異なるgNBが構成するセルであってもよい。
 候補となるセルとして、リモートUEに直接接続可能なセルとしてもよい。リモートUEに直接接続可能な1つまたは複数のセルをHO先の候補として設定してもよい。DL上で所定の受信品質(受信電力、SINR等を含む)を満たすセルを、直接接続可能なセルとしてもよい。該所定のDL受信品質は、あらかじめ規格で決められてもよいし、gNBから報知あるいは個別に通知されてもよい。このようにすることで、リレーUEを介さないで接続可能なセルをHO先の候補とできる。また、HO処理の複雑化を回避することが可能となる。
 候補となるセルとして、リレーUEに接続されるセルとしてもよい。1つまたは複数のリレーUEに接続されるセルをHO先の候補として設定してもよい。SL上で所定の受信品質を満たすリレーUEが接続するセルを、リレーUEを介して接続可能なセルとしてもよい。このようにすることで、リレーUEを介して接続可能なセルをHO先の候補とできる。また、リレーUEを介してセルのカバレッジを拡張することが可能となる。
 候補となるセルとして、リモートUEがあらかじめPC5接続をしている1つまたは複数のリレーUEが接続するセルとしてもよい。リモートUEがあらかじめPC5接続をしている1つまたは複数のリレーUEのうち、SL上で所定の受信品質を満たすリレーUEが接続するセルを、リレーUEを介して接続可能なセルとしてもよい。このようにすることで、リモートUEがあらかじめPC5接続しているリレーUEを介して接続可能なセルをHO先の候補とできる。HOのロバスト性を向上できる。
 候補となるセルとして、前述に開示したセルを組合せてもよい。
 前述に開示した候補となるセルの設定は、予め規格等で静的に決められてもよい。あるいは、前述に開示した候補となるセルの設定を可能としてもよい。該設定をS-gNBが行ってもよい。あるいは、該設定をAMFが行い、S-gNBに対して該設定を通知してもよい。前述に開示した候補となるセルの設定を可能とすることで、リレーUEやgNBの存在、その位置関係、電波伝搬環境等に応じて、柔軟なCHOの設定が可能となる。
 S-gNBはリモートUEに対して、DLのメジャメント and/or SLのメジャメントを設定する。リモートUEは該設定に応じてメジャメント結果をS-gNBに通知する。S-gNBは、リモートUEから受信したDLのメジャメント結果 and/or SLのメジャメント結果を用いて、該リモートUEの接続先の候補となる1つまたは複数のリレーUEを選択する。S-gNBは選択したリレーUEが接続するgNBをHO先の候補とするとよい。S-gNBは、HO先の候補となる1つまたは複数のセルを選択可能となる。
 このようにすることで、リモートUEに対して1つまたは複数のセルをHO先の候補に設定することが可能となる。
 S-gNBが、リモートUEの接続先候補となるリレーUEが接続するgNBを認識する方法として、実施の形態1で開示した方法を適宜適用するとよい。
 S-gNBは、候補となる1つまたは複数のHO先gNB(T-gNB)に対してリモートUEのHO要求を通知する。各T-gNBへの通知にXnシグナリングを用いてもよい。HO requestメッセージを用いてもよい。
 T-gNBが複数のリレーUEと接続する場合のシグナリング方法について開示する。S-gNBからT-gNBに対して、リレーUE毎のメッセージを通知する。このようにすることで、リモートUEが接続する候補となるリレーUE毎のメッセージを通知可能となる。また、リレーUE毎に異なるメッセージを通知可能となる。
 他の方法として、S-gNBからT-gNBに対して、gNB毎のメッセージを通知する。具体的には、S-gNBからT-gNBに対して、gNBが接続する1つまたは複数のリレーUEに関する情報を、1つのメッセージに含めて通知する。このようにすることで、シグナリング量を削減可能となる。
 S-gNBからT-gNBに対して、セル毎のメッセージを通知してもよい。具体的には、S-gNBからT-gNBに対して、セル毎に、セルが接続する1つまたは複数のリレーUEに関する情報を、1つのメッセージに含めて通知する。この方法では、T-gNBに対しては、対象となるセルの数だけメッセージが通知される。このようにすることで、リレーUEが接続するセル毎に異なるメッセージを通知可能となる。
 HO先候補のT-gNBは、接続先候補となるリレーUEに対して、リレー要求メッセージを通知する。具体的には、HO先候補のT-gNBは、S-gNBから取得した接続先候補となるリレーUEに関する情報を用いて、接続先候補となるリレーUEに対して、リレー要求メッセージを通知するとよい。リレー要求メッセージに、HO対象のリモートUEに関する情報を含めてもよい。リモートUEに関する情報として、たとえば、リモートUEを識別するための情報、リモートUEのコンテキストなどを用いてもよい。リレー要求メッセージに、リモートUEとリレーUE間のPC5通信に関する設定情報を含めてもよい。リレー要求メッセージの通知に関しては実施の形態1および実施の形態1の変形例1で開示した方法を適宜適用してもよい。
 HO先候補のT-gNBからリレー要求メッセージを受信した接続先候補となるリレーUEは、該メッセージに含まれる情報を用いて、HO対象となるリモートUEと、HO先候補のT-gNBとの間のリレーのための設定を行ってもよい。接続先候補となるリレーUEは、接続するHO先候補のT-gNBに対して、リレー要求応答を通知する。リレーのための設定が完了した場合は、肯定応答を通知するとよい。リレーのための設定が完了しなかった場合、あるいはリレーのための設定を拒否する場合は、否定応答を通知するとよい。否定応答に理由情報を含めてもよい。このようにすることで、HO先候補のT-gNBは、接続先候補となるリレーUEがHO対象となるリモートUEのリレー設定がなされたか否かを認識可能となる。
 HO先候補のT-gNBは、S-gNBに対してHO要求応答を通知する。HO要求応答メッセージの通知方法は、前述のHO要求の通知方法を適宜適用するとよい。HO要求応答に含める情報は実施の形態1で開示した情報を適宜適用するとよい。
 S-gNBは、HO先の候補となるT-gNBを再度設定してもよい。この際、T-gNBへのHO要求に対して肯定応答を受信したT-gNBの中から選択してもよい。このようにすることで、S-gNBは、T-gNBあるいはT-gNBに接続するリレーUE#2の状況を考慮して、リモートUEへのHO先候補のT-gNBをより柔軟に設定可能となる。
 S-gNBは、HOさせるリモートUEに対して、HO先の候補となる1つまたは複数のT-gNBのI-CHO実行条件を設定する。具体的には、S-gNBはI-CHO実行条件設定をリモートUEに通知する。S-gNBは、HO要求を通知した全てのT-gNBからHO要求応答を受信後、リモートUEに対して、T-gNBのI-CHO実行条件設定を通知してもよい。他の方法として、S-gNBは、HO要求を通知したT-gNBのうち一部からHO要求応答を受信後、リモートUEに対して、T-gNBのI-CHO実行条件設定を通知してもよい。該通知は複数回行ってもよい。S-gNBはリモートUEに対して、T-gNBおよびT-gNBのI-CHO実行条件の修正あるいは追加設定を実施してもよい。S-gNBは、T-gNBからHO成功(HO success)メッセージを受信するまで、該設定を通知してもよい。
 リモートUEは、S-gNBから受信したT-gNBおよびT-gNBのI-CHO実行条件に応じて、各T-gNBのI-CHOを起動するか否かを評価する。I-CHOを起動するか否かの評価に、T-gNBに接続するリレーUEからのSLの受信品質を用いてもよい。たとえば、リモートUEは、リレーUEからのSLの受信品質を測定する。SLの受信品質の測定結果に所定のオフセットを加えてSL受信品質を導出してもよい。リモートUEは、該測定結果から導出したSL受信品質が、所定のSL受信品質閾値より良好になった場合に、I-CHOを起動するとしてもよい。
 前述に開示した所定のSL受信品質閾値 and/or 所定のオフセットを、I-CHO実行条件の設定に含めてもよい。I-CHO用のメジャメントイベントを設けてもよい。I-CHO用のメジャメントイベントとして所定のSL受信品質閾値 and/or 所定のオフセットを設定してもよい。I-CHOの実行条件の設定として、I-CHO用メジャメントイベントを含めてもよい。このようにすることで、リモートUEは、HO先のT-gNBに接続するリレーUEからのSL受信品質を用いて、どのT-gNBにHOするかを判断することが可能となる。
 リモートUEは、HO先候補のT-gNBのうち、最初にI-CHO起動条件を満足したリレーUEに接続するT-gNBに対して、リレーUEを介したHOを実行する。具体的には、リモートUEは、HO先候補のT-gNBのうち、最初にI-CHO起動条件を満足したリレーUEにPC5接続を実施する。リモートUEは、該リレーUEを介してT-gNBに対して、RRCReconfigurationcompleteを通知する。このようにして、リモートUEは、最初にI-CHO起動条件を満足したリレーUEに接続するT-gNBに対して、RRC接続を実施する。
 I-CHO実行条件の設定として、HO先の候補となるT-gNBのI-CHO実行条件を関連付けた情報を含めてもよい。I-CHO実行条件設定として、HO先候補のT-gNBに関する情報を含めてもよい。HO先候補のT-gNBに関する情報として、T-gNBを識別するための情報を含めてもよい。HO先候補のT-gNBに関する情報として、リモートUEとの通信に用いるRRC設定情報を含めてもよい。
 I-CHO実行条件設定として、HO先候補T-gNBに接続するリレーUEに関する情報を含めてもよい。リレーUEに関する情報として、リモートUEとリレーUE間のPC5通信に関する設定を含めてもよい。リモートUEとリレーUE間のPC5通信に関する設定として、実施の形態1、実施の形態1の変形例1に開示した設定を適宜適用してもよい。該設定としては、たとえば、リモートUEからリレーUEへのPC5通信用設定 and/or リレーUEからリモートUEへのPC5通信用設定 and/or リモートUEとリレーUE間のDRB設定情報などがある。リレーUEに関する情報として、リレーUEを識別するための情報を含めてもよい。
 S-gNBはリモートUEに対して、HO先の候補となる1つまたは複数のT-gNBのI-CHO実行条件設定を、RRCシグナリングを用いて通知するとよい。たとえば、RRCReconfigurationメッセージに含めて通知してもよい。リレーUE#1を介して通知してもよい。RRCシグナリングを用いることで、たとえば、より多くの情報を通知できるため、HO先候補となる複数のT-gNBに関する情報を含めることが可能となる。このようにすることで、リモートUEは、HO先の候補となる1つまたは複数のT-gNBのI-CHO実行条件設定を受信可能となる。
 S-gNBから受信したT-gNBのI-CHO実行条件を設定完了したリモートUEは、リレーUE#1を介してS-gNBに対して、RRCReconfigurationcompleteメッセージを通知してもよい。該メッセージを受信したS-gNBは、リモートUEが、T-gNBのI-CHO実行条件の設定が完了したことを認識可能となる。
 リモートUEはI-CHO実行条件を評価する。リモートUEがI-CHO実行条件を評価した結果、該条件を満足するリレーUEと接続するT-gNBに対して、I-CHOを起動する。リモートUEは、I-CHO実行条件を満足するリレーUEに対して、PC5接続処理を実施する。あらかじめPC5接続しているリレーUEのみI-CHOの接続先候補リレーUEとしている場合は、該PC5接続処理を省略してもよい。このようにすることで、HO処理時間の短縮が図れる。
 リモートUEは、I-CHO実行条件を満足したリレーUEを介して、該リレーUEが接続するHO候補先T-gNBに対して、RRC設定完了メッセージを通知する。RRCReconfigurationcompleteメッセージを用いてもよい。該メッセージを受信したT-gNBは、リモートUEが、リレーUE#2を介してRRC接続成功したことを認識可能となる。
 リモートUEとRRC接続完了したT-gNBは、S-gNBに対して、HO成功を通知する。該通知にHOsuccessメッセージを用いてもよい。HO成功メッセージに含める情報として、HO対象リモートUEに関する情報、どのリレーUEを介して接続したかを示す情報、リモートUEとリレーUE間のPC5通信に関する情報などを含めてもよい。このようにすることで、S-gNBは、リモートUEがいつI-CHO実行条件を満足して、リレーUEを介してT-gNBに接続完了したかを認識可能となる。
 リモートUEがリレーUEを介したS-gNBとの通信を停止する方法を開示する。リモートUEは、I-CHO実行条件を満足するリレーUEを検出した場合に、S-gNBとの通信を停止してもよい。このようにすることで、早期にS-gNBとの通信処理を停止可能となり、リモートUEの低消費電力化が図れる。
 他の方法として、リモートUEは、I-CHO実行条件を満足するリレーUEとPC5接続を完了した場合に、S-gNBとの通信を停止してもよい。このようにすることで、リレーUEとのPC5接続に失敗した場合にもS-gNBとの通信を継続可能となる。リモートUEがリレーUEとのPC5接続に失敗した場合、再度同じリレーUEに対してPC5接続処理を実施してもよい。あるいは、リモートUEがリレーUEとのPC5接続に失敗した場合、I-CHO実行条件評価を引き続き行い、あるいは再度行い、次にI-CHO実行条件を満足するリレーUEとPC5接続処理を行うとよい。このようにすることで、リレーUEとのPC5接続を確実に実行可能となる。
 他の方法として、リモートUEは、I-CHO実行条件に満足するリレーUEを介してT-gNBと接続を完了した場合に、S-gNBとの通信を停止してもよい。T-gNBとの接続の完了と判断するタイミングは、RRCReconfigurationcompleteメッセージの通知完了時点であってもよい。RRCReconfigurationcompleteメッセージの通知に失敗した場合、再度同じT-gNBに対してRRC設定完了メッセージを通知してもよい。該通知が完了した場合に同じT-gNBと接続可能となる。あるいは、I-CHO実行条件評価を引き続き行い、あるいは再度行い、次にI-CHO実行条件を満足するリレーUEを介してT-gNBに対してRRC設定完了メッセージを通知してもよい。該通知が完了した場合に該T-gNBと接続可能となる。このようにすることで、リモートUEが確実にHO先T-gNBと接続後にS-gNBとの通信を停止可能となる。また、リレーUEを介したリモートUEのHO処理のロバスト性を向上できる。
 S-gNBがリレーUEを介したリモートUEとの通信を停止する方法を開示する。S-gNBは、T-gNBからHO成功メッセージを受信した場合に、リレーUEを介したリモートUEとの送受信を停止する。リモートUEとの通信用の設定をリリースしてもよい。S-gNBでのリモートUEとの通信の停止方法は、実施の形態1の変形例2で開示したI-DAPS HOでの方法を適宜適用してもよい。このようにすることで、S-gNBとの通信処理を停止可能となり、S-gNBでの無駄な処理を低減可能となり、低消費電力化が図れる。
 リレーUE#1がリモートUEとS-gNB間の通信のためのリレー処理を停止する方法を開示する。S-gNBは、T-gNBからHO成功メッセージを受信した場合に、リレーUE#1に対して、リモートUEとS-gNB間の送受信を停止するメッセージを通知する。該メッセージとしてHO成功メッセージを用いてもよい。該メッセージを受信したリレーUE#1は、リモートUEとS-gNB間の送受信を停止する。リモートUEとS-gNB間の通信用の設定をリリースしてもよい。リレーUE#1でのリモートUEとS-gNB間のリレー処理停止方法は、実施の形態1の変形例2で開示したI-DAPS HOでの方法を適宜適用してもよい。このようにすることで、リレーUEでの無駄な処理を低減可能となり、低消費電力化が図れる。
 リレーUEを介したリモートUEのI-CHOにおける、データ転送方法について開示する。S-gNBは、T-gNBからHO成功メッセージを受信した場合、T-gNBに対してSN状態を転送する。該転送にSN Status Transferメッセージを用いてもよい。SN状態として、リモートUEからT-gNBに再度送信が必要なULデータ情報を含めてもよい。SN状態として、T-gNBからリモートUEに新たに送信するDLデータ情報を含めてもよい。ULデータ情報およびDLデータ情報として、データに付与するPDCP SN情報を用いてもよい。このようにすることで、T-gNBはリモートUEに対してどのデータを送受信すればよいか認識可能となる。
 S-gNBは、該SN状態を転送以降、T-gNBに対してデータ転送を行う。該データをDLのデータとしてもよい。S-gNBがまだリモートUEに送信できていないDLデータを保持している場合、S-gNBは該DLデータを転送してもよい。S-gNBは、SN状態を転送後にUPFから受信したDLデータを転送してもよい。
 T-gNBはリレーUEに対して、S-gNBから転送されたデータを送信する。該リレーUEをリモートUEの接続先候補のリレーUEとしてもよい。T-gNBは、リモートUEからRRC設定完了メッセージを受信する前に、リレーUEに対して、S-gNBから転送されたデータを送信してもよい。このようにすることで、T-gNBはより早期にリレーUEまでデータ送信可能となる。リレーUE#2は、リモートUEとPC5接続完了後、T-gNBから受信したデータを、リモートUEに対して送信してもよい。このようにすることで、リレーUEはより早期にリモートUEまでデータ送信可能となる。また、T-gNBからリモートUEまでより早期にデータ送信可能となる。
 T-gNBは、リモートUEからRRC設定完了メッセージを受信後、S-gNBから転送されたデータをリモートUEに対して送信してもよい。該データをリレーUE#2を介して送信してもよい。RRC設定完了メッセージをRRCReconfigurationcompleteとしてもよい。リモートUEとT-gNB間でRRC接続完了後にデータを送信することで、T-gNBからリモートUEに対して確実にデータ送信開始可能となる。
 T-gNBとCNノード間でのS-gNBからT-gNBへのパススイッチ処理により、UPFはT-gNBへのDLデータ送信を開始する。T-gNBはUPFからのDLデータをリモートUEに対して送信するとよい。
 リモートUEは、I-CHO実行条件を満足したリレーUE#2に対してPC5接続を行った後、リレーUE#2に対してデータを送信する。リモートUEは、T-gNBに対してRRC設定完了メッセージを送信する前に、リレーUE#2に対してデータを送信してもよい。このようにすることで、リモートUEはより早期にリレーUE#2に対してデータ送信可能となる。リレーUE#2は、T-gNBと接続している場合、T-gNBに対して、リモートUEから受信したデータを送信してもよい。このようにすることで、リレーUE#2は、より早期にT-gNBに対してデータ送信可能となる。また、リモートUEからT-gNBまでより早期にデータ送信可能となる。
 リモートUEは、T-gNBへのRRC設定完了メッセージを送信後、T-gNBに対してデータを送信してもよい。該データをリレーUE#2を介して送信してもよい。RRC設定完了メッセージをRRCReconfigurationcompleteとしてもよい。リモートUEとT-gNB間でRRC接続完了後にデータを送信することで、リモートUEからT-gNBに対して確実にデータ送信可能となる。
 S-gNBは、T-gNBからHO成功メッセージを受信する前に、HO先候補の1つまたは複数のT-gNBに対してデータの転送を行ってもよい。T-gNBからHO成功メッセージを受信する前にS-gNBがデータ転送を開始するトリガを、S-gNBがHO対象のリモートUEに対してI-CHO実行条件設定を通知した場合としてもよい。I-CHO実行条件設定の通知に限らず、I-CHO指示をデータ転送開始のトリガとしてもよい。あるいは、S-gNBが、リモートUEから、I-CHO実行条件設定に対するRRC設定完了メッセージを受信した場合をデータ転送開始のトリガとしてもよい。
 T-gNBからHO成功メッセージを受信する前のデータ転送方法を開示する。S-gNBは、T-gNBからHO成功メッセージを受信する前に、HO先候補の1つまたは複数のT-gNBに対してSN状態を転送する。該転送にSN Status Transferを用いてもよい。Early Status Transferを用いてもよい。SN状態として、HO先候補の1つまたは複数のT-gNBに転送する最初のDLデータのSN and/or HFN(Hyper Frame Number)情報を含めてもよい。
 S-gNBは、該SN状態を転送以降、T-gNBに対してデータ転送を行う。該データとしてDLのデータを転送してもよい。S-gNBがまだリモートUEに送信できていないDLデータを保持している場合、S-gNBは該DLデータを転送してもよい。S-gNBは、SN状態を転送後にUPFから受信したDLデータを転送してもよい。
 S-gNBは、HO先候補の1つまたは複数のT-gNBの一部に対して、Early Status Transferの送信およびデータ転送を行ってもよい。たとえば、HOによる接続先となる可能性の高いリレーUEを2つ選択し、該2つのリレーUEに接続するT-gNBに対してのみEarly Status Transferの送信およびデータ転送を行ってもよい。この場合、シグナリング量、転送するデータ量を削減可能となる。
 このようにすることで、S-gNBはHO先候補の1つまたは複数のT-gNBに対してより早期にデータを転送可能となる。このため、もしデータを転送したT-gNBがHO先になった場合、既に該T-gNBへのデータ転送がなされているため、T-gNBは早期にリモートUEに対してデータを送信可能となる。
 S-gNBは、HO成功メッセージを受信したT-gNBに対してSN状態を送信するまで、DLデータにPDCP SNを割り当てるのを停止しない。また、S-gNBは、HO成功メッセージを受信するまで、リモートUEに対してDLデータを送信するのを停止しない。また、S-gNBは、HO成功メッセージを受信するまで、リモートUEに対してULデータを受信するのを停止しなくてもよい。このようにすることで、リモートUEにおいてI-CHO実行条件を満足するリレーUEが決定され、該リレーUEへのPC5接続が開始されるまで、リモートUEにおいてS-gNBとの送受信が継続可能となる。
 T-gNBからHO成功メッセージを受信したS-gNBは、HO先候補としてHO要求メッセージを通知したT-gNBのうち、HO先に決定したT-gNB以外のT-gNBに、HOのキャンセルを通知する。S-gNBは、HO先に決定したT-gNBに対して、HO先に決定したセル以外のHO先候補セルのHOのキャンセルを通知してもよい。該通知にHOキャンセルメッセージを用いてもよい。
 HOキャンセルメッセージに、HO対象となるリモートUEに関する情報を含めてもよい。リモートUEに関する情報として、リモートUEを識別するための情報を含めてもよい。HOキャンセルメッセージに、HOキャンセル対象となるT-gNB(セルであってもよい)に関する情報を含めてもよい。T-gNB(セルであってもよい)に関する情報として、T-gNB(セルであってもよい)を識別するための情報を含めてもよい。HOキャンセルメッセージに、接続先リレーUE(リレーUE#2)に関する情報を含めてもよい。リレーUE#2に関する情報として、リレーUE#2を識別するための情報を含めてもよい。HOキャンセルメッセージに、接続先リレーUE(リレーUE#2)と接続するT-gNB(セルであってもよい)に関する情報を含めてもよい。T-gNBに関する情報として、T-gNB(セルであってもよい)を識別するための情報を含めてもよい。
 このようにすることで、HO先候補となりHO先にならなかったT-gNB、HO先に決定したセル以外のHO先候補セルを構成するT-gNBは、HOキャンセルメッセージを受信することにより、HOのキャンセルを認識可能となり、該HOに対する設定をリリースすることが可能となる。また、後述に開示する、リレーUEへのHOキャンセルを通知可能となる。
 HOキャンセルを受信したT-gNBは、接続先リレーUE(リレーUE#2)以外の、接続先候補のリレーUEに対して、HOキャンセルを通知する。すなわち、T-gNBは、各T-gNBが接続する接続先候補のリレーUEに対して、HOキャンセルを通知する。該通知にはRRCシグナリングを用いてもよい。リレーUEへのHOキャンセルを通知するための新たなRRCメッセージを設けてもよい。たとえば、該RRCメッセージをHOキャンセルメッセージとしてもよい。
 リレーUEへのHOキャンセルメッセージに、HO対象となるリモートUEに関する情報を含めてもよい。リモートUEに関する情報として、リモートUEを識別するための情報を含めてもよい。リレーUEへのHOキャンセルメッセージに、HOキャンセル対象となるT-gNB(セルであってもよい)に関する情報を含めてもよい。T-gNB(セルであってもよい)に関する情報として、T-gNB(セルであってもよい)を識別するための情報を含めてもよい。リレーUEへのHOキャンセルメッセージに、接続先リレーUE(リレーUE#2)に関する情報を含めてもよい。リレーUE#2に関する情報として、リレーUE#2を識別するための情報を含めてもよい。リレーUEへのHOキャンセルメッセージに、接続先リレーUE(リレーUE#2)と接続するT-gNB(セルであってもよい)に関する情報を含めてもよい。T-gNBに関する情報として、T-gNB(セルであってもよい)を識別するための情報を含めてもよい。
 C-IHOを識別するための情報を含めてもよい。すなわち、I-CHOによる接続先候補リレーUEへのリレー要求メッセージに、C-IHOを識別するための情報を含めてもよい。また、接続先候補リレーUEへのHOキャンセルメッセージに、キャンセルするC-IHOを識別するための情報を含めてもよい。HOキャンセルメッセージに含める該情報として、リレー要求メッセージに含めたC-IHOを識別するための情報を用いるとよい。このようにすることで、接続先候補リレーUEは、T-gNBから受信したHO要求メッセージに含まれる情報が示すI-CHOのうち、どのI-CHOをキャンセルするかを認識可能となる。
 このように、S-gNBではなく、T-gNBから接続先リレーUE以外の、接続先候補のリレーUEに対してHOキャンセルを通知することで、接続先候補のリレーUEはHOキャンセルを受信可能となる。
 HOキャンセルメッセージを受信した接続先候補のリレーUEは、リモートUEのI-CHO設定をキャンセルする。該リレーUEは、T-gNBから受信したリレー要求メッセージをキャンセルしてもよい。該リレーUEは、T-gNBから受信したリレー要求メッセージによるリレー設定をキャンセルしてもよい。該リレーUEは、HO対象となるリモートUEに関する情報、あるいは、リモートUEとのPC5通信に関する設定をリリースしてもよい。
 このようにすることで、接続先候補となったが、接続先にならなかったリレーUEの、I-CHOに関する設定をリリースすることが可能となる。また、該リレーUEの無線リソースの無駄な消費を回避することが可能となる。
 図19は、実施の形態2について、I-CHOの方法の例を示すシーケンス図である。図19において、図16と共通するステップについては同じステップ番号を付し、共通する説明を省略する。ステップST1901、ステップST1902、ステップST1903、ステップST1933で、I-CHOのケーパビリティが通知される。すなわち、ステップST1901では、リレーUE#1がS-gNBに対して、I-CHOのケーパビリティを通知する。ステップST1902では、リレーUE#2がT-gNB#1に対して、I-CHOのケーパビリティを通知する。ステップST1933では、リレーUE#3がT-gNB#2に対して、I-CHOのケーパビリティを通知する。ステップST1903では、リモートUEがS-gNBに対して、リレーUE#1を介してI-CHOのケーパビリティを通知する。これらの通知方法は、実施の形態1の変形例2で開示した方法を適宜適用するとよい。これにより、S-gNBあるいはCNが、リモートUEあるいはリレーUEがI-CHO可能か否かを認識できる。
 ステップST1905で、S-gNBは、リモートUEに対してI-CHOを決定する。このとき、S-gNBは、I-CHOの接続先候補リレーUEと、HO先候補T-gNBを、それぞれ1つまたは複数決定する。ステップST1906およびステップST1926で、S-gNBは決定したHO先候補のT-gNBに対してHO要求を通知する。図19の例では、S-gNBは、ステップST1905でT-gNB#1およびT-gNB#2をHO先候補に決定し、ステップST1906およびステップST1926で、T-gNB#1およびT-gNB#2に対してHO要求メッセージを通知する。該メッセージにCHOの要求であることを示す情報を含めてもよい。ステップST1907およびステップST1927で、HO先候補のT-gNB、すなわち、T-gNB#1およびT-gNB#2は、自T-gNBが接続する、接続先候補リレーUEに対して、リレー要求を通知する。具体的には、T-gNB#1が、ステップST1907で、リレーUE#2に対してリレー要求メッセージを通知し、T-gNB#2が、ステップST1927で、リレーUE#3に対してリレー要求メッセージを通知する。該リレー要求メッセージに、CHO設定に関する情報を含めてもよい。このようにすることで、リレーUE#2、リレーUE#3は、リモートUEにCHOが適用されること、CHOの設定情報を認識可能となる。ステップST1908、ステップST1928で、接続先候補の各リレーUEは、接続しているT-gNBに対して、リレー要求応答を通知する。リレーUE#2は、T-gNB#1に対してリレー要求応答を通知し、リレーUE#3は、T-gNB#2に対してリレー要求応答を通知する。ステップST1909、ステップST1929で、HO先候補の各T-gNBは、S-gNBに対して、HO要求応答を通知する。T-gNB#1はステップST1909で、S-gNBに対してHO要求応答を通知し、T-gNB#2はステップST1929で、S-gNBに対してHO要求応答を通知する。それぞれの、HO要求メッセージ、リレー要求メッセージ、リレー要求応答メッセージ、HO要求応答メッセージの通知方法は、実施の形態1、実施の形態1の変形例1で開示した方法を適宜適用するとよい。
 HO先候補の各T-gNBからHO要求応答を受信したS-gNBは、リモートUEに対して、ステップST1910で、CHO実行条件設定を通知する。S-gNBは、該設定をリレーUE#1を介して通知する。S-gNBは、設定を、たとえば、RRCシグナリングのRRCReconfigurationメッセージで通知する。該メッセージに、CHO実行条件設定として、前述に開示したような情報を含めるとよい。たとえば、CHO接続先リレーUEに関する情報、該リレーUEに接続するHO先候補T-gNBに関する情報、各CHO実行条件に関する情報などを含めるとよい。これにより、リモートUEは、CHO実行条件を評価可能となる。
 ステップST1930で、リモートUEはS-gNBに対して、RRC設定完了メッセージを通知してもよい。リモートUEは該メッセージをリレーUE#1を介して通知する。このようにすることで、S-gNBは、リモートUEがCHO実行条件設定を行ったことを認識可能となる。また、CHOの誤動作の発生を低減可能となる。
 S-gNBは、HO成功メッセージをT-gNBから受信する前に、HO候補先のT-gNBの内の1つまたは複数のT-gNBに対してデータ転送を行ってもよい。たとえば、1つのT-gNBに対してデータ転送を行ってもよい。転送先を1つに絞ることで転送するデータ量を削減できる。ステップST1912で、S-gNBはデータ転送先のT-gNBを決定する。図19の例ではT-gNB#1をデータ転送先に決定する。ステップST1913で、S-gNBは、データ転送先のT-gNB#1へSN状態を転送する。該転送でEarly Status Transferを用いてもよい。ステップST1914で、S-gNBは、バッファで保持しているデータとUPFからのデータとを、データ転送先のT-gNB#1に対して転送する。該データはDLデータとしてもよい。これらの転送方法は、実施の形態1の変形例2で開示した方法を適宜適用してもよい。ステップST1915で、S-gNBから転送されたデータをT-gNB#1でバッファする。
 T-gNBは、S-gNBから転送されたデータを、リモートUEの接続先候補となるリレーUEに対して転送してもよい。たとえば、図19の例では、T-gNB#1はリレーUE#2に対して転送してもよい。リレーUE#2はT-gNB#1から転送されたデータをバッファするとよい。このようにすることで、リモートUEの接続先のリレーUEがリレーUE#2となった場合、リレーUE#2は、リモートUEに対して、T-gNB#1から受信したデータを早期に送信可能となる。
 ステップST1931で、リモートUEは、CHO実行条件を評価する。ステップST1932で、リモートUEは、CHO実行条件を満足したリレーUEを接続先リレーUEに決定する。また、該リレーUEに接続するT-gNBをHO先T-gNBに決定する。ここでは、リレーUE#2を接続先に、T-gNB#1をHO先に決定する。HO先を決定したリモートUEは、S-gNBとの通信を停止してもよい。該通信のための設定をリリースしてもよい。S-gNBとの通信のためのリレーUE#1との通信を停止してもよい。該通信のための設定をリリースしてもよい。
 ステップST1932で接続先としてリレーUE#2を決定したリモートUEは、ステップST1411で、リレーUE#2とPC5接続を確立する。ステップST1916で、リモートUEは、リレーUE#2を介して、HO先に決定したT-gNB#1に対してHO設定変更完了メッセージを通知する。リモートUEから、HO設定変更完了メッセージを受信したT-gNB#1は、ステップST1718で、S-gNBに対してHO成功メッセージを通知する。S-gNBは、ステップST1719でリレーUE#1に対して、HO元リレー設定リリース情報を通知する。該通知にHO成功メッセージを用いてもよい。すなわち、S-gNBは、HO成功メッセージにHO元リレー設定リリース情報を含ませてリレーUE#1に通知してもよい。ステップST1720でリレーUE#1は、リモートUEとS-gNB間の送受信停止と設定のリリースを実施する。これらの処理は、実施の形態1の変形例2で開示した方法を適宜適用するとよい。
 ステップST1718でT-gNB#1からHO成功メッセージを受信したS-gNBは、ステップST1917で、接続先リレーUEに決定しなかった接続先候補リレーUEと接続するT-gNBに対して、HOキャンセルメッセージを通知する。図19の例では、T-gNB#2に対してHOキャンセルメッセージを通知する。HOキャンセルメッセージを受信したT-gNB#2は、予めS-gNBからデータを転送されていた場合、転送されたデータを破棄してもよい。ステップST1918で、該T-gNB#2は、自T-gNBと接続する、接続先に決定されなかった接続先候補リレーUEすなわちリレーUE#3に対して、リレーキャンセルメッセージを通知する。このようにすることで、接続先に決定されなかった接続先候補リレーUE(ここではリレーUE#3)が、リモートUEが他のリレーUEに接続されたことを認識可能となる。また、自リレーUEが、I-CHOによる接続先リレーUEにならなかったことを認識可能となる。リレーキャンセルメッセージを受信したリレーUE#3は、I-CHO設定をリリースする。リレーキャンセルメッセージを受信したリレーUE#3は、予めT-gNB#2からデータを転送されていた場合、転送されたデータを破棄してもよい。このようにすることで、接続先にならなかったリレーUE#3での、無駄な無線リソースの消費を低減可能となる。
 このようにすることで、リレーUEを介したリモートUEのHOにおいて、複数の接続先リレーUEを設定することができ、また、複数のHO先T-gNBを設定することが可能となる。いいかえると、リレーUEを介したリモートUEとgNBの通信をともなうI-CHOを実施することが可能となる。リレーUEを介したリモートUEのHOにおいて、複数の選択肢から接続先リレーUEおよびHO先T-gNBを決定するため、HO処理におけるロバスト性を向上することができる。
実施の形態3.
 リレーUEがリモートUEと接続している状態において、リレーUEの移動等によりリレーUEのHO処理が行われる場合がある。リモートUEはリレーUEを介してNWと通信中に、このようなリレーUEのHOが生じた場合、リモートUEとNWとの接続処理をどのようにしたらよいかについては、上述の非特許文献1~27および他の文献等になんら開示が無い。
 本実施の形態3では、リレーUEのHOにともなうリモートUEとNW間の接続の処理方法を開示する。
 実施の形態3にかかる通信システムにおいては、リレーUEは、リモートUEと接続している場合は移動等が発生してもHO処理を実施しない。すなわち、リモートUEとPC5接続しているリレーUEはHO処理を実施しないとしてもよい。リモートUEとgNB間の通信のリレー処理を実施しているリレーUEはHO処理を実施しないとしてもよい。リレーUEは、たとえば移動などによりgNBとの通信品質が悪化した場合、RLF(Radio Link Failure)を起動する。RLFによりリレーUEはgNBとのRRC接続をリリースする前に、セル選択あるいはセル再選択処理を行い接続可能なセルを検出し、該セルに対してRRC確立処理を行う。所定のタイマ内にセル検出ができなかったリレーUEはgNBとのRRC接続をリリースする。また、リレーUEは再度セル選択あるいはセル再選択を行い、検出したセルに対してRRC確立処理を行いRRC接続を実施する。RRC確立処理としてRRCestablishmentを実行してもよい。このようにすることで、リレーUEはHOせずに、再度gNBと接続することが可能となる。
 リモートUEは、リレーUEがRLFあるいはRRC接続リリースを実施した場合、リレーUEを介して接続していたgNBとのRRC接続をリリースする。リレーUEは、gNBとのRLFあるいはRRC接続リリースを、リモートUEに通知してもよい。該通知を受信したリモートUEは、リレーUEがgNBとRLFあるいはRRC接続リリースしたことを認識可能となる。このようにすることで、リモートUEは、リレーUEを介して接続していたgNBとのRRC接続をリリースすることが可能となる。
 リモートUEは、リレーUEから、gNBとのRLFあるいはRRC接続リリースの通知を受信後、所定の期間RRC接続状態を維持するようにしてもよい。このようにすることで、該所定の期間中にリレーUEが元のgNBとRRC接続状態に戻ったような場合に、リモートUEは該gNBとの接続状態を維持可能となる。該所定の期間をタイマで管理してもよい。リモートUEは、リレーUEを介して接続していたgNBとのRRC接続のリリース処理として、該gNBとの通信に用いるバッファやプロトコルをリセット、リリースしてもよい。これにより、リモートUEでの無駄な無線リソースの消費を回避可能となる。
 リモートUEとリレーUEを介して接続していたgNBは、リレーUEとのRRC接続がリリースされたと判断した場合、リモートUEとのRRC接続をリリースしてもよい。リレーUEとのRRC接続リリースの判断は、所定の期間通信が発生しない場合、としてもよい。該所定の期間をタイマで管理してもよい。gNBは、リモートUEとのRRC接続のリリース処理として、リモートUEとの通信に用いるバッファやプロトコルをリセット、リリースしてもよい。これにより、gNBでの無駄な無線リソースの消費を回避可能となる。
 リモートUEは、リレーUEがgNBと再度接続後、該gNBに対してRRC確立処理を実施してもよい。リレーUEはgNBとRRC接続確立後、リモートUEに対してRRC状態を通知してもよい。これにより、リモートUEはリレーUEがgNBとRRC接続確立したか否かを認識できる。このようにすることで、リモートUEはリレーUEを介して再度gNBと通信可能となる。
 リレーUEのHOにともなうリモートUEとNW間の接続の処理方法について他の方法を開示する。リレーUEがリモートUEと接続している場合でもgNB間のHOを可能とする。すなわち、リレーUEはgNB間のHOを実施してもよい。リモートUEとPC5接続しているリレーUEはHO処理を実施してもよい。リモートUEとgNB間の通信のリレー処理を実施しているリレーUEはHO処理を実施してもよい。
 リレーUEがHOを実施した場合のリモートUEの処理について開示する。リモートUEは、リレーUEのHO先gNBに対してHOを行う。リモートUEは、接続するgNBをリレーUEのHO先gNBに変更するとしてもよい。リレーUEのHOとともに、リモートUEもHOを実施するとよい。リレーUEのHOの場合、リモートUEはリレーUEのHO先gNBに対してのみHOが許可されてもよい。これらの処理は、リモートUEがリレーUEを介してgNBに接続している場合に限定してもよい。
 リモートUEが、リレーUEのHO先gNBに対してHOを実施する方法を開示する。
 図20は、実施の形態3について、リモートUEがリレーUEのHO先gNBに対してHOを実施する方法の例を示すシーケンス図である。ステップST2001で、リモートUEは、リレーUEを介してS-gNB、CNとデータ通信を実施している。
 ステップST2002で、S-gNBはリレーUEに対してメジャメント設定を通知する。ステップST2003で、S-gNBはリレーUEからメジャメント報告を受信する。ステップST2004で、該S-gNBは、たとえばリレーUEからのメジャメント報告を用いて、リレーUEのHOを決定する。ステップST2005で、S-gNBはT-gNBに対してリレーUEのHO要求を通知する。該通知にHO要求メッセージを用いてもよい。S-gNBは、リモートUEのHO要求を、リレーUEのHO要求メッセージとともに、あるいは、リレーUEのHO要求メッセージに含めて、T-gNBに通知してもよい。このようにすることで、T-gNBは、リレーUEのHO要求とともに、リモートUEのHO要求が行われたことを認識可能となる。
 リレーUEのHO要求とリモートUEのHO要求を受信したT-gNBは、リレーUEのアドミッション制御およびリモートUEのアドミッション制御を実施する。T-gNBはリレーUEとリモートUEに対するRRC設定を行う。ステップST2006で、T-gNBは、S-gNBに対してリレーUEのHO要求応答メッセージを通知する。リレーUEのHO要求応答メッセージにリレーUEに対するRRC設定を含めてもよい。T-gNBは、リレーUEへのHO要求応答メッセージとともに、あるいは、リレーUEへのHO要求応答メッセージに含めて、リモートUEのHO要求応答を通知する。リモートUEのHO要求応答にリモートUEのRRC設定を含めてもよい。
 ステップST2007で、S-gNBはリモートUEに対してT-gNBへのRRC設定変更(HO指示であってもよい)のためのRRCメッセージを通知する。S-gNBは、該RRCメッセージをリレーUEを介して通知する。該RRCメッセージとしてRRCReconfigurationメッセージを用いてもよい。該RRCメッセージにT-gNBが設定したリモートUEのRRC設定を含めてもよい。このようにすることで、リモートUEがT-gNBが設定したRRC設定を受信可能となる。該RRCメッセージを受信し、RRC設定を実施したリモートUEは、ステップST2008で、S-gNBに対して、RRCReconfigurationCompleteを通知してもよい。リモートUEはリレーUEを介して通知してもよい。このようにすることで、S-gNBがリモートUEでの該RRC設定を実施したことを認識可能となる。
 ステップST2011で、S-gNBはリレーUEに対してT-gNBへのRRC設定変更のためのRRCメッセージを通知する。S-gNBは、前述のステップST2007でリモートUEに対してT-gNBへRRCメッセージを通知した場合に、リレーUEに対しても該RRCメッセージを通知してもよい。RRCメッセージとして、RRCReconfigurationを用いてもよい。S-gNBは、リレーUEに対して通知するRRCメッセージに、T-gNBが設定したリレーUEのRRC設定を含めてもよい。このようにすることで、リレーUEは、T-gNBが設定したRRC設定を受信可能となる。
 該通知を受信したリレーUEは、S-gNBとの通信を停止する。S-gNBとの通信用の設定をリリースしてもよい。S-gNBとの通信を停止したリレーUEは、ステップST2013で、T-gNBに対して、RRC設定変更完了メッセージを通知する。このようにすることで、リレーUEはT-gNBに対してRRC設定完了を通知することが可能となる。T-gNBは、リレーUEがRRC設定を実施したことを認識可能となる。これにより、リレーUEとT-gNB間で通信が可能となる。
 前述のステップST2007でS-gNBから、T-gNBへのRRC設定変更のためのRRCメッセージを受信したリモートUEは、ただちにS-gNBとの通信を停止しない。該リモートUEは、S-gNBとの通信のためのリレーUEとの通信を停止しないとしてもよい。S-gNBから、T-gNBへのRRC設定変更メッセージを受信したリモートUEは、ただちにT-gNBとのRRC設定変更完了メッセージを送信しないとしてもよい。RRC設定変更完了メッセージは、RRCReconfigurationcompleteであってもよい。
 リレーUEはリモートUEに対してgNBとのRRC状態メッセージを通知してもよい。gNBとのRRC状態メッセージに、RRC接続するgNBの変更を示す情報を含めてもよい。変更後のgNBを識別する情報を含めてもよい。変更前のgNBを識別する情報を含めてもよい。該RRC状態メッセージにT-gNBとのRRC接続完了を含めてもよい。T-gNBとのRRC設定完了の通知を行ったリレーUEは、ステップST2014で、リモートUEに対して、T-gNBとのRRC接続完了を含んだRRC状態メッセージを通知する。
 該通知を受信したリモートUEは、S-gNBとの通信を停止する。リモートUEは、S-gNBとの通信のためのリレーUEとの通信を停止するとしてもよい。S-gNBとの通信用の設定をリリースしてもよい。S-gNBとの通信を停止したリモートUEは、ステップST2015で、リレーUEを介してT-gNBに対してRRC設定変更完了メッセージを送信する。このようにすることで、リモートUEはリレーUEを介してリレーUEのHO先T-gNBに対してRRC設定完了を通知することが可能となる。T-gNBは、リモートUEがRRC設定を実施したことを認識可能となる。これにより、ステップST2016で、リモートUEとT-gNB間でリレーUEを介してデータ通信が可能となる。
 リモートUEにおいて、T-gNBへのRRC設定変更のためのRRCメッセージの受信から、T-gNBへのRRC設定完了メッセージ通知成功まで、所定の時間内で行われなかった場合、たとえば、リモートUEはT-gNBに対してHO失敗処理を行うとよい。該所定の時間をタイマとしてもよい。リモートUEは、タイマ内にT-gNBへのRRC設定完了メッセージ通知が成功した場合、タイマをリセットする。該所定の時間は予め規格等で静的に決められてもよいし、あらかじめgNBから、たとえばS-gNBから、リモートUEに通知されてもよい。該通知にはRRCシグナリングが用いられてもよい。該タイマはリレーUEを介してgNBと接続する場合のタイマとしてもよい。gNBと直接接続する場合のタイマとは異ならせてもよい。この場合、柔軟な設定が可能となる。あるいは、リレーUEを介してgNBと接続する場合のタイマと、gNBと直接接続する場合のタイマとを同じにしてもよい。この場合、処理を簡略化できる。
 リレーUEからRRC設定完了メッセージを受信したT-gNBは、CNとの間でリレーUEに対するパススイッチ処理を実施する。このようにすることで、リレーUEに対するS-gNBからT-gNBへのパススイッチ処理が実施可能となる。UPFはT-gNBに対してリレーUEへのDLデータを送信可能となる。リレーUEとUPF間でデータ通信が可能となる。また、リモートUEからRRC設定完了メッセージを受信したT-gNBは、CNとの間でリモートUEに対するパススイッチ処理を実施する。このようにすることで、リモートUEに対するS-gNBからT-gNBへのパススイッチ処理が実施可能となる。UPFはT-gNBに対してリモートUEへのDLデータを送信可能となる。リモートUEとUPF間でデータ通信が可能となる。
 パススイッチ処理の他の方法を開示する。T-gNBは、リレーUEとリモートUEからRRC設定完了メッセージを受信した場合に、CNとの間でリレーUEとリモートUEに対するパススイッチ処理を実施してもよい。この場合、T-gNBは、AMFへのパススイッチ要求メッセージに、リレーUEの通信に関する情報とリモートUEの通信に関する情報とを含めるとよい。AMFは、UPFへのパススイッチ要求メッセージに、リレーUEの通信に関する情報とリモートUEの通信に関する情報とを含めるとよい。また、UPFからAMFへのパススイッチ要求応答メッセージに、リレーUEの通信とリモートUEの通信に関する情報を含めてもよい。また、AMFからT-gNBへのパススイッチ要求応答メッセージにリレーUEの通信に関する情報とリモートUEの通信に関する情報とを含めてもよい。T-gNBは、S-gNBに対して、リレーUEのコンテキストのリリースと、リモートUEのコンテキストのリリースとを通知する。これらを同じメッセージに含めて通知してもよい。これにより、S-gNBは、リレーUEのコンテキストをリリースするとともに、リモートUEのコンテキストをリリースすることが可能となる。
 このようにすることで、UPFは、リレーUEの通信とリモートUEの通信に対して、T-gNBへのパススイッチ処理が実施可能となる。また、UPFは、T-gNBに対してリレーUEとリモートUEへDLデータを送信可能となる。また、リレーUEとUPF間でデータ通信が可能となるとともに、リモートUEとUPF間でデータ通信が可能となる。また、このようにすることで、シグナリング量を削減可能となる。
 図20の例では、T-gNBが、リレーUEとリモートUEからRRC設定完了メッセージを受信した場合に、CNとの間でリレーUEとリモートUEに対するパススイッチ処理を実施する方法を開示している。具体的には、ステップST2017で、T-gNBはCNとの間でパススイッチ処理を実施する。これにより、リレーUEとリモートUEのパススイッチが可能となる。また、ステップST2019で、リレーUEを介して、リモートUEとT-gNB、CN間でデータ通信が可能となる。ステップST2018で、T-gNBはS-gNBに対してリレーUEとリモートUEのUEコンテキストリリースを通知する。これにより、リレーUEとリモートUEのUEコンテキストリリースを実施可能となる。
 S-gNBが、リモートUEに対してT-gNBへのRRC設定変更通知実施、あるいは、リレーUEに対してT-gNBへのRRC設定変更通知実施のいずれか遅い方で、S-gNBはT-gNBに対して、リモートUEとUPF間の通信のデータ転送処理を行ってもよい。また、S-gNBはT-gNBに対して、リレーUEとUPF間の通信(もしあれば)のデータ転送処理を行ってもよい。
 他の方法として、S-gNBが、リモートUEに対してT-gNBへのRRC設定変更通知実施、あるいは、リレーUEに対してT-gNBへのRRC設定変更通知実施のいずれか早い方で、S-gNBはT-gNBに対して、リモートUEとUPF間の通信のデータ転送処理を行ってもよい。また、S-gNBはT-gNBに対して、リレーUEとUPF間の通信(もしあれば)のデータ転送処理を行ってもよい。リモートUEがリレーUEのHO先gNBに対してHOを実施する場合に適用するとよい。このようにすることで、T-gNBに対して、リモートUEとUPF間の通信のデータ転送処理およびリレーUEとUPF間の通信(もしあれば)のデータ転送処理を早期に実施可能となる。
 他の方法として、S-gNBは、リモートUEに対してT-gNBへのRRC設定変更通知実施で、T-gNBに対してリモートUEとUPF間の通信のデータ転送処理を行い、また、S-gNBは、リレーUEに対してT-gNBへのRRC設定変更通知実施で、T-gNBに対してリレーUEとUPF間の通信(もしあれば)のデータ転送処理を行ってもよい。S-gNBはUPFから受信したデータも転送するとよい。このようにすることで、T-gNBに対して、リモートUEとUPF間の通信のデータ転送処理を早期に実施可能となる。また、各々個別のタイミングで転送するため、誤動作を低減可能となる。
 図20の場合、ステップST2009で、S-gNBはT-gNBに対してSN状態を転送する。SN Status Transferを用いて該SN状態を転送してもよい。ステップST2010で、S-gNBはT-gNBに対してデータを転送する。
 ステップST2012で、S-gNBから転送されたデータをT-gNBでバッファする。T-gNBは、リレーUEからのRRC設定完了メッセージの受信、あるいは、リモートUEからのRRC設定完了メッセージの受信のどちらか遅い方をトリガとして、リモートUEとの間のDLデータ and/or ULデータの送受信を開始する。図20の例では、ステップST2015でのリモートUEからのRRC設定完了メッセージの受信がトリガとなり、ステップST2016で、T-gNBは、リモートUEとの間でデータ送受信を開始する。データ送受信を開始後、T-gNBは、バッファしていたデータを送信してもよい。このようにすることで、リモートUEとT-gNB間でリレーUEを介してデータの送受信が実施可能となる。
 S-gNBがリモートUEに対してRRC設定変更を通知するのが、リレーUEに対してRRC設定変更を通知するよりも先に行われ、S-gNBがリレーUEに対して行うRRC設定変更の通知でT-gNBに対してSN状態転送とデータ転送を行うような場合、S-gNBは、データ転送を行うまで、リレーUEに対して、リモートUEとのDLデータ and/or ULデータの送受信を実施してもよい。リレーUEはリモートUEに対して、該DLデータ and/or ULデータの送受信を実施してもよい。
 リレーUEは、S-gNBからRRC設定変更を受信した場合、リモートUEへのDLデータ送信を停止するとよい。これにより、リレーUEは、リモートUEへのDLデータ送信に対するPDCP Status report等のフィードバック情報をS-gNBに対して送信しなくて済む。すなわち、フィードバック処理を簡略化できる。また、リレーUEでの処理を削減可能となる。
 リレーUEは、S-gNBからRRC設定変更を受信した場合、リモートUEからのULデータ受信を停止してもよい。他の方法として、リレーUEは、S-gNBからRRC設定変更を受信した場合、リモートUEからのULデータ受信を継続してもよい。リレーUEは、HO中、リモートUEから受信したULデータをバッファしてもよい。リレーUEは、T-gNBへのRRC設定完了通知後、T-gNBに対してリモートUEから受信したULデータを送信する。このようにすることで、リモートUEからT-gNBへのULデータ送信可能となるまでの遅延時間を短縮可能となる。
 リレーUEがDAPS HOを行う場合は、それに付随して、リモートUEのDAPS HOが行われてもよい。リモートUEはリレーUEを介してS-gNBとの通信とT-gNBとの通信の両方のプロトコルスタックをアクティブにするとよい。リレーUEを介したリモートUEのDAPS HOについては、実施の形態1の変形例2で開示した方法を適宜適用するとよい。
 リモートUEがリレーUEのHO先gNBに対してHOを実施する他の方法を開示する。該他の方法では、リレーUEのHO完了後、リモートUEのHOを実施する。
 図21は、実施の形態3について、リモートUEがリレーUEのHO先gNBに対してHOを実施する方法の他の例を示すシーケンス図である。図21の例では、リレーUEのHO完了後、リモートUEのHOを実施する方法について開示する。図21において、図20と共通するステップについては同じステップ番号を付し、共通する説明を省略する。
 ステップST2006でT-gNBからHO要求応答メッセージを受信したS-gNBは、ステップST2011で、リレーUEに対してRRC設定変更メッセージを通知し、リレーUEのHOを実施する。ステップST2011、および、これに続くステップST2009からステップST2013で、リレーUEのHOが実施される。ステップST2013でリレーUEからRRC設定完了メッセージを受信したT-gNBは、ステップST2101で、リモートUEに対してRRC設定変更メッセージを通知する。該メッセージはリレーUEを介して通知するとよい。これにより、リモートUEは、T-gNBが設定する、リモートUEとT-gNB間の通信のRRC設定を実施可能となる。リモートUEは、T-gNBから受信したRRC設定変更メッセージに従ってRRC設定を実施し、ステップST2015で、T-gNBに対して、RRC設定完了メッセージを通知する。該メッセージはリレーUEを介して通知するとよい。これにより、T-gNBは、リモートUEがRRC設定を完了したことを認識可能となり、通信可能となったことを認識できる。
 このように、リレーUEのHO完了後、リモートUEのHOを実施することで、リモートUEとリレーUEでのHO処理実施のタイミングが複雑になることを回避できる。このため、HO処理の誤動作を低減でき、HO処理のロバスト性を向上させることができる。
 リモートUEがリレーUEのHO先gNBに対してHOを実施する他の方法を開示する。該他の方法では、リレーUEがリモートUEにT-gNBのRRC設定を通知する。
 図22は、実施の形態3について、リモートUEがリレーUEのHO先gNBに対してHOを実施する方法の他の例を示すシーケンス図である。図22の例では、リレーUEがリモートUEにT-gNBのRRC設定を通知する方法について開示する。図22において、図20と共通するステップについては同じステップ番号を付し、共通する説明を省略する。
 ステップST2006でT-gNBからHO要求応答メッセージを受信したS-gNBは、ステップST2201で、リレーUEに対してRRC設定変更メッセージを通知する。該RRC設定変更メッセージに、リモートUEのT-gNBとの通信用RRC設定に関する情報を含める。該RRC設定変更メッセージを受信したリレーUEは、S-gNBとの通信を停止する。S-gNBとの通信用設定をリリースしてもよい。また、リレーUEは、T-gNBとの通信用RRC設定を実施する。
 ステップST2202で、リレーUEはリモートUEに対して、RRC設定変更メッセーを通知する。該メッセージに、T-gNBとの通信用RRC設定に関する情報を含めるとよい。このようにすることで、リモートUEは、T-gNBとの通信用RRC設定に関する情報を受信可能となる。T-gNBとの通信用RRC設定に関する情報を受信したリモートUEは、S-gNBとの通信を停止する。S-gNBとの通信用設定をリリースしてもよい。リモートUEは、T-gNBとの通信用RRC設定を実施する。
 リモートUEは、ステップST2203で、リレーUEに対して、T-gNBとの通信用RRC設定完了を通知する。該通知にRRC設定完了メッセージを用いてもよい。ステップST2204で、リレーUEは、T-gNBに対して、RRC設定完了メッセージを通知する。該メッセージに、リレーUEでのT-gNBとの通信用RRC設定の完了と、リモートUEでのT-gNBとの通信用RRC設定の完了とを含めるとよい。これにより、T-gNBは、リレーUEでRRC設定が完了したことを認識でき、また、リモートUEでRRC設定が完了したことを認識可能となる。これにより、T-gNBは、リレーUEを介してリモートUEと通信可能となったことを認識できる。ステップST2016で、リモートUEはリレーUEを介してT-gNBと通信可能となる。
 このように、リレーUEがリモートUEにT-gNBとの通信用RRC設定を通知することで、リモートUEがT-gNBに対してHOを実施できる。また、T-gNBからリモートUEへのRRCメッセージの通信が不要となるため、シグナリング量を削減できる。
 このようにすることで、リモートUEを、リレーUEのHO先gNBに対してHOさせることが可能となる。リモートUEと接続しているリレーUEがHOするような場合も、リモートUEとNW間の通信サービスの連続性を確保することが可能となる。
 リモートUEと接続中のリレーUEのHO可否を設定可能としてもよい。CNが該設定を実施してもよい。例えば、CNノードからRANノードに該HO可否の設定を通知する。CNノードあるいはRANノードがリレーUEに該HO可否の設定を通知してもよい。CNノードはAMFであってもよい。あるいは、RANが該HO可否の設定を実施してもよい。例えば、RANノードからリレーUEに対して、該HO可否の設定を実施してもよい。このようにすることで、電波伝搬状況や、リレーUEでの処理負荷等に応じて、リモートUEと接続中のリレーUEのHO可否を設定可能となる。HO否の場合は、前述に開示した、リモートUEとgNB間の通信のリレー処理を実施しているリレーUEはHO処理を実施しないとする。HO可の場合は、リモートUEがリレーUEのHO先gNBに対してHOを実施する。このようにすることで、電波伝搬状況や、リレーUEでの処理負荷等に応じて、最適な、リレーUEのHOにともなうリモートUEとNW間の接続処理を実施可能となる。
実施の形態4.
 リレーUEを介したリモートUEとgNBとの接続におけるロバスト性が要求される。従来、UEとgNBとの直接接続におけるロバスト性を向上させるため、たとえば、UEからgNBに対して、RRC再確立要求メッセージ(RRCReestablishmentRequest)を通知する際に、UEが前回接続していたセルの識別子を送信する方法が開示されている。しかし、リモートUEがリレーUEを介してgNBと接続する場合、リモートUEはリレーUEと直接接続しており、セルとは直接接続していないため、このような方法は適用できない。
 本実施の形態4では、リレーUEを介したリモートUEとgNBとの接続におけるロバスト性を向上させる方法を開示する。
 本実施の形態にかかる通信システムにおいて、リモートUEは、リレーUEを介してgNBとの間でRRC接続を確立あるいは再確立する場合、リレーUEを介して、gNBに対して、RRC再確立要求メッセージを通知する。該RRC再確立要求メッセージに、前回接続していたリレーUEに関する情報を含める。リレーUEに関する情報として、リレーUEを識別するための情報を用いてもよい。該RRC再確立要求メッセージに、前回接続していたリレーUEが接続するgNBに関する情報を含めてもよい。gNBに関する情報として、gNBを識別するための情報を用いてもよい。
 このようにすることで、リレーUEを介してリモートUEと接続するgNBは、リモートUEが前回接続していたリレーUEを認識可能となる。
 リモートUEは、リレーUEを介さず、gNBとの間でRRC接続を確立あるいは再確立する場合、gNBに対して、RRC再確立要求メッセージを通知する。該RRC再確立要求メッセージに、前回接続していたリレーUEに関する情報を含める。リレーUEに関する情報として、リレーUEを識別するための情報を用いてもよい。該RRC再確立要求メッセージに、前回接続していたリレーUEが接続するgNBに関する情報を含めてもよい。gNBに関する情報として、gNBを識別するための情報を用いてもよい。
 このようにすることで、リモートUEと接続するgNBは、リモートUEが前回接続していたリレーUEを認識可能となる。
 前回接続していたリレーUEは1つに限らず、複数であってもよい。最大数を規格等で静的に決めておいてもよい。誤動作を低減でき、設定処理を簡略化できる。
 gNBは、リモートUEから受信した、前回接続していたリレーUEに関する情報 and/or gNBに関する情報を用いて、たとえば、リモートUEに、該リレーUEをメジャメントさせる設定を行うなどしてもよい。
 このようにすることで、RLFなどによるRRC接続のリリースを削減させることが可能となる。また、リレーUEを介したリモートUEとgNB間の通信サービスの連続性をより向上させることが可能となる。
実施の形態5.
 従来、UEが直接gNBと接続する場合、gNBがUEに識別子を提供し、UEとgNB間の直接通信において該識別子を用いてUEを識別する。しかし、リレーUEを介したリモートUEとgNB間の通信においては、リモートUEとgNBとで直接通信が行われなくなる。したがって、UE間でどのようにお互いのUEを識別するか、あるいは、gNBがどのようにリモートUEを識別するかが問題となる。リレーUEを介したリモートUEとgNB間の通信で用いるUEの識別子については、上述の非特許文献1~27および他の文献等に何ら開示されていない。
 本実施の形態5では、このような課題を解決する方法を開示する。
 上述の課題を解決するため、本実施の形態にかかる通信システムでは、リレーUEを介したリモートUEとgNB間の通信において、リモートUEとリレーUE間のPC5接続確立の際に、宛先L2ID(Destination Layer-2 ID)として、デフォルト値を用いる。リレーUEを探索するためのディスカバリー処理において、宛先L2IDとしてデフォルト値を用いてもよい。デフォルト値をリモートUEからリレーUEへのPC5通信用としてもよい。デフォルト値をリレーUEからリモートUEへのPC5通信用としてもよい。デフォルト値を両方向のPC5通信用としてもよい。
 リレー用にデフォルトの宛先L2IDを設けてもよい。U2Nリレー用にデフォルトの宛先L2IDを設けてもよい。U2Uリレー用にデフォルトの宛先L2IDを設けても良い。U2Nリレー用と別にデフォルトの宛先L2IDを設けてもよい。該宛先L2IDはサービスタイプと関連付けられてもよい。サービスタイプとして、リレー用を設けてもよい。UEは、サービスタイプから宛先L2IDを導出する。たとえば、UEは、サービスタイプがリレーの場合、リレー用のデフォルトの宛先L2IDを用いる。
 該宛先L2IDはアプリケーションレイヤIDと関連付けられてもよい。宛先L2IDとアプリケーションレイヤIDをUEが関連付けてもよい。
 リレーUEを介したリモートUEとgNB間の通信において、リモートUEとリレーUE間のPC5接続確立の際に、送信元L2ID(source Layer-2 ID)をUE自身が割当ててもよい。ディスカバリー処理において、送信元L2IDをUE自身が割当ててもよい。送信元L2IDはアプリケーションレイヤIDと関連付けられてもよい。これらはUEが関連付けてもよい。
 gNBはリレーUEを介して接続するリモートUEに対して、UE識別子を割当てる。gNBは、リモートUEに対してセル毎のUE識別子を割当ててもよい。UE識別子は、C-RNTIであってもよい。その他のRNTIであってもよい。gNBはリモートUEに対して、リレーUEを介して、リモートUEに割当てたUE識別子を通知する。
 gNBはリモートUEに対して、リモートUEに割当てたUE識別子を、リレーUEを介してリモートUEとgNBとの間で行われるRRCシグナリングを用いて通知する。gNBは、リレーUEを介してリモートUEとの間で行われるRRC接続確立処理、たとえば、RRCセットアップ処理において、リモートUEに対してUE識別子を通知してもよい。gNbは、該UE識別子をRRCSetupメッセージに含めてリモートUEに対して通知してもよい。gNBは、リレーUEを介してリモートUEとの間で行われるRRC設定変更処理において、リモートUEに対してUE識別子を通知してもよい。gNBは、該UE識別子をRRCReconfigurationメッセージに含めて通知してもよい。gNBは、リレーUEを介してリモートUEとの間で行われる、Inactive状態とActive状態間のRRC接続状態移行処理において、リモートUEに対してUE識別子を通知してもよい。gNBは、該UE識別子をRRCResumeメッセージに含めて通知してもよい。
 gNBはリモートUEに対して、リモートUEに割当てたUE識別子を、リレーUEを介してリモートUEとの間で行われるMACシグナリングを用いて通知してもよい。gNBは該UE識別子をMAC CEに含めて通知してもよい。
 このようにすることで、gNBはリモートUEに対して、リモートUEに割当てたUE識別子を通知可能となる。リモートUEはgNBからUE識別子を受信可能となる。リモートUEはgNBから受信したUE識別子を、リレーUEを介したgNBとの通信に用いることが可能となる。
 たとえば、gNBはリモートUEへのRRCメッセージに、該リモートUEに割当てたUE識別子を含めてもよい。リモートUEは該UE識別子を受信することで、自身へのRRCメッセージであることを認識可能となる。リレーUEが、gNBからリモートUEへのRRCメッセージを受信するような場合、リレーUEは該UE識別子を受信することで、どのリモートUEへのRRCメッセージかを認識可能となる。リレーUEが該RRCメッセージをリモートUEに対してリレーすることが可能となる。
 たとえば、リモートUEからgNBへのRRCメッセージに、該リモートUEに割当てたUE識別子を含めてもよい。gNBは該UE識別子を受信することで、どのUEからのRRCメッセージであるかを認識可能となる。リレーUEが、リモートUEからgNBへのRRCメッセージを受信するような場合、リレーUEは該UE識別子を受信することで、どのリモートUEからのRRCメッセージかを認識可能となる。リレーUEが該RRCメッセージをgNBに対してリレーすることが可能となる。
 たとえば、gNBはリモートUEへのMACシグナリングに、該リモートUEに割当てたUE識別子を含めてもよい。gNBはMACシグナリングとしてMAC CEに該UE識別子を含めてもよい。リモートUEは該UE識別子を受信することで、自身へのMACシグナリングであることを認識可能となる。リレーUEが、gNBからリモートUEへのMACシグナリングを受信するような場合、リレーUEは該UE識別子を受信することで、どのリモートUEへのMACシグナリングかを認識可能となる。リレーUEが該MACシグナリングをリモートUEに対してリレーすることが可能となる。
 たとえば、リモートUEからgNBへのMACシグナリングに、該リモートUEに割当てたUE識別子を含めてもよい。gNBはMACシグナリングとしてMAC CEに該UE識別子を含めてもよい。gNBは該UE識別子を受信することで、どのUEからのMACシグナリングであるかを認識可能となる。リレーUEが、リモートUEからgNBへのMACシグナリングを受信するような場合、リレーUEは該UE識別子を受信することで、どのリモートUEからのMACシグナリングかを認識可能となる。リレーUEが該MACシグナリングをgNBに対してリレーすることが可能となる。
 このようにすることで、リレーUEを介したリモートUEとgNB間の通信において、リモートUEを特定した通信が可能となる。
 HOにおけるUE識別子の割当ておよび通知方法について開示する。T-gNBは、HO対象のリモートUEに対して、該リモートUEとの通信に用いるUE識別子を割当てる。T-gNBは、S-gNBを介して、リモートUEに対して割当てたUE識別子を通知する。リモートUEがリレーUEを介してS-gNBと接続している場合は、T-gNBは、S-gNB、リレーUEを介して、リモートUEに対して割当てたUE識別子を通知する。
 T-gNBからS-gNBへの該UE識別子の通知には、Xnシグナリングを用いてもよい。たとえば、HO要求応答(HO Request Ack)メッセージに該UE識別子を含めて通知してもよい。S-gNBからリモートUEへの該UE識別子の通知には、RRCシグナリングを用いてもよい。たとえば、RRC設定変更(RRCReconfigurationであってもよい)メッセージに該UE識別子を含めて通知してもよい。S-gNBからリモートUEへの該UE識別子の通知にはMACシグナリングを用いてもよい。
 このようにすることで、リモートUEは、HO先のT-gNBで割当てられるUE識別子を早期に取得可能となる。リモートUEとT-gNB間の通信において早期に該UE識別子を用いることが可能となる。
 リモートUEに割当てるUE識別子は、SL-RNTIであってもよい。リモートUEとgNB間の通信においてSL-RNTIを用いてもよい。
 他の方法として、gNBは、前述に開示したリモートUEのUE識別子であるC-RNTIとは別に、SL-RNTIをリモートUEに割当ててもよい。gNBは、リモートUEに対して複数のUE識別子を割当ててもよい。gNBはリモートUEに対して、割当てた複数のUE識別子を通知する。たとえば、C-RNTIはリモートUEとgNB間の通信において使用し、SL-RNTIはリモートUEとリレーUE間の通信において使用してもよい。
 このようにすることで、リモートUEとgNB間の通信において柔軟なUE識別子の運用が可能となる。
 このようにすることで、リレーUEを介したリモートUEとgNBとの通信において、gNBがUEに対して識別子を提供することができる。従来のリモートUEとgNBの直接通信ではRA処理においてUE識別子をgNBからリモートUEに対して通知している。しかし、リレーUEを介したリモートUEとgNBとの通信において、たとえRA処理が実施されないような場合でも、このような方法とすることで、gNBがUEに対してUE識別子を提供することができる。このため、該通信において、リモートUEを特定するため、gNBが提供したリモートUEの識別子を用いることが可能となる。また、リモートUEを特定可能となるため、リレーUEを介したリモートUEとgNB間の通信における誤動作を低減することができる。
 本明細書において、「gNBあるいはセル」と記載して説明を行っているが、特に説明の無い限り、gNBであってもよいしセルであってもよい。たとえば、gNB間のHOとして記載しているが、セル間のHOであってもよい。S-gNBが構成するセルとT-gNBが構成するセル間のHOであってもよい。また、S-gNBとT-gNBは同じであってもよいし、異なっていてもよい。S-gNBとT-gNBが同じ場合として、たとえば、同じgNBが構成する異なるセル間のHOであってもよい。S-gNBとT-gNBが同じ場合、たとえば、本明細書で開示したS-gNBとT-gNBとの間の処理は削除してもよい。
 本明細書で開示した方法を、S-gNBとT-gNBが同じ場合として、たとえば、リレーUEを介したリモートUEとgNBの間接通信へ/からの切替え処理に適宜適用してもよい。たとえば、リモートUEとgNBの直接通信からリレーUEを介したリモートUEとgNBの通信(間接通信)への切替え処理に適宜適用してもよい。たとえば、リレーUEを介したリモートUEとgNBの通信(間接通信)からリモートUEとgNBの直接通信への切替え処理に適宜適用してもよい。
 本明細書において、1つのリレーUEを介してリモートUEとgNBとの間で通信を行う場合について記載しているが、複数のリレーUEを介してリモートUEとgNBとの間で通信を行う場合にも、本明細書において開示した方法を適宜適用してもよい。たとえば、リレーUE#21とリレーUE#22の二つのリレーUEを介してリモートUEとgNBが通信を行うような場合、リモートUEとリレーUE#21間のPC接続、リレーUE#21とリレーUE#22間のPC接続、リレーUE#22とgNB間のUu接続について、前述に開示した方法を適宜適用するとよい。たとえば、実施の形態1で開示した方法においては、リモートUEがT-gNBと、リレーUE#21、リレーUE#22を介して接続するような場合、リモートUEとリレーUE#21間のPC接続に用いる設定、リレーUE#21とリレーUE#22間のPC接続に用いる設定を、T-gNBは、S-gNBを介してリモートUEに通知してもよい。リモートUEは、リレーUE#21に該設定の一部または全部を通知してもよい。リレーUE#21はリレーUE#22に対して該設定の一部または全部を通知してもよい。このようにすることで、複数のリレーUEを介してリモートUEとgNB間で通信を行う場合にも、同様の効果を得ることが可能となる。
 本開示では、サービスデータが発生したUEをUE-TX、サービスデータを受信するUEをUE-RXとした。たとえば、UE-TXをUE1とし、UE-RXをUE2とした場合、UE2でサービスデータが発生し、UE1に対してデータを送信するような場合は、UE2をUE-TXとし、UE1をUE-RXとして本開示の方法を適用するとよい。このことにより、同様の効果を得ることができる。
 前述の各実施の形態およびその変形例は、例示に過ぎず、各実施の形態およびその変形例を自由に組合せることができる。また各実施の形態およびその変形例の任意の構成要素を適宜変更または省略することができる。
 例えば、前述の各実施の形態およびその変形例において、サブフレームは、第5世代通信システムにおける通信の時間単位の一例である。サブフレームはスケジューリング単位であってもよい。前述の各実施の形態およびその変形例において、サブフレーム単位として記載している処理を、TTI単位、スロット単位、サブスロット単位、ミニスロット単位として行ってもよい。
 例えば、前述の各実施の形態およびその変形例において開示した方法は、V2X(Vehicle-to-everything)サービスに限らずSL通信が用いられるサービスに適用してもよい。たとえば、プロキシミティサービス(Proximity-based service)、パブリックセイフティ(Public Safety)、ウェアラブル端末間通信、工場における機器間通信など、多種のサービスで用いられるSL通信に適用してもよい。
 本開示は詳細に説明されたが、上記した説明は、すべての局面において、例示であって、限定的なものではない。例示されていない無数の変形例が、想定され得るものと解される。
 200,210 通信システム、202 通信端末装置(移動端末)、203,207,213,217,223-1,224-1,224-2,226-1,226-2,750 基地局装置(基地局)、204 MME/S-GW部(MME部)、204a MME、214 AMF/SMF/UPF部(5GC部)、218 中央ユニット、219 分散ユニット、301,403 プロトコル処理部、302 アプリケーション部、303,404 送信データバッファ部、304,405 エンコーダー部、305,406 変調部、306,407 周波数変換部、307-1~307-4,408-1~408-4 アンテナ、308,409 復調部、309,410 デコーダー部、310,411,506,526 制御部、401 EPC通信部、402 他基地局通信部、412 5GC通信部、501 PDN GW通信部、502,522 基地局通信部、503,523 ユーザプレイン通信部、504 HeNBGW通信部、505,525 制御プレイン制御部、505-1,525-1 NASセキュリティ部、505-2 SAEベアラコントロール部、505-3,525-3 アイドルステートモビリティ管理部、521 Data Network通信部、525-2 PDUセッションコントロール部、527 セッション管理部、751-1~751-8 ビーム。

Claims (8)

  1.  通信端末同士が直接通信する端末間通信をサポートする第1の通信端末が接続された第1の基地局と、
     前記端末間通信をサポートする第2の通信端末が接続された第2の基地局と、
     を含み、
     前記第2の基地局は、前記第1の通信端末が前記第2の通信端末を介して自基地局に接続するためのハンドオーバの要求を受信した場合、前記第1の通信端末と前記第2の通信端末とが端末間通信を行うための設定内容を示す通信設定情報を、前記第1の通信端末および前記第2の通信端末へ送信する、
     ことを特徴とする通信システム。
  2.  前記第2の基地局は、前記通信設定情報を前記第1の基地局を介して前記第1の通信端末へ送信し、前記通信設定情報を前記第2の通信端末へ直接送信する、
     ことを特徴とする請求項1に記載の通信システム。
  3.  前記通信設定情報は、前記第1の通信端末から前記第2の通信端末に向けた方向の通信に関する設定内容を示す第1設定情報と、前記第2の通信端末から前記第1の通信端末に向けた方向の通信に関する設定内容を示す第2設定情報とを含み、
     前記第2の基地局は、前記第1設定情報を前記第1の基地局を介して前記第1の通信端末へ送信するとともに、前記第2設定情報を前記第2の通信端末へ直接送信し、
     前記第1の通信端末は前記第2の通信端末から前記第2設定情報を取得し、
     前記第2の通信端末は前記第1の通信端末から前記第1設定情報を取得する、
     ことを特徴とする請求項1に記載の通信システム。
  4.  前記第1の通信端末が前記端末間通信をサポートする第3の通信端末を介して前記第1の基地局に接続されており、
     前記第1の基地局は、前記第1の通信端末が前記第2の通信端末を介して前記第2の基地局に接続するためのハンドオーバを実行する場合、前記第1の通信端末との間のデータ通信に関する設定内容を示すデータ通信用設定情報を前記第2の基地局へ送信する、
     ことを特徴とする請求項1から3のいずれか一つに記載の通信システム。
  5.  前記第3の通信端末がハンドオーバを実行して接続先を切り替えた場合、前記第1の通信端末は、前記第3の通信端末のハンドオーバ先の基地局に接続先を切り替える、
     ことを特徴とする請求項4に記載の通信システム。
  6.  前記ハンドオーバをDual Active Protocol Stackハンドオーバとする、
     ことを特徴とする請求項1から4のいずれか一つに記載の通信システム。
  7.  前記ハンドオーバをConditionalハンドオーバとする、
     ことを特徴とする請求項1から4のいずれか一つに記載の通信システム。
  8.  通信端末同士が直接通信する端末間通信をサポートする通信端末と接続可能な基地局であって、
     他の基地局に接続中の通信端末である第1の通信端末が自基地局に接続中の通信端末である第2の通信端末を介して自基地局に接続するためのハンドオーバの要求を受信した場合、前記第1の通信端末と前記第2の通信端末とが端末間通信を行うための設定内容を示す通信設定情報を、前記第1の通信端末および前記第2の通信端末へ送信する、
     ことを特徴とする基地局。
PCT/JP2022/006884 2021-02-25 2022-02-21 通信システムおよび基地局 WO2022181526A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP22759562.6A EP4301045A1 (en) 2021-02-25 2022-02-21 Communication system and base station
US18/546,704 US20240129820A1 (en) 2021-02-25 2022-02-21 Communication system and base station
JP2023502376A JPWO2022181526A1 (ja) 2021-02-25 2022-02-21
CN202280015955.7A CN116868623A (zh) 2021-02-25 2022-02-21 通信系统及基站
KR1020237027272A KR20230147612A (ko) 2021-02-25 2022-02-21 통신 시스템 및 기지국

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021-028744 2021-02-25
JP2021028744 2021-02-25

Publications (1)

Publication Number Publication Date
WO2022181526A1 true WO2022181526A1 (ja) 2022-09-01

Family

ID=83048037

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/006884 WO2022181526A1 (ja) 2021-02-25 2022-02-21 通信システムおよび基地局

Country Status (6)

Country Link
US (1) US20240129820A1 (ja)
EP (1) EP4301045A1 (ja)
JP (1) JPWO2022181526A1 (ja)
KR (1) KR20230147612A (ja)
CN (1) CN116868623A (ja)
WO (1) WO2022181526A1 (ja)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190239132A1 (en) * 2016-09-30 2019-08-01 Telefonaktiebolaget Lm Ericsson (Publ) Relaying Between a User Equipment and a Network
US20200128447A1 (en) * 2017-06-19 2020-04-23 Huawei Technologies Co., Ltd. Handover method, apparatus, and system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190239132A1 (en) * 2016-09-30 2019-08-01 Telefonaktiebolaget Lm Ericsson (Publ) Relaying Between a User Equipment and a Network
US20200128447A1 (en) * 2017-06-19 2020-04-23 Huawei Technologies Co., Ltd. Handover method, apparatus, and system

Non-Patent Citations (28)

* Cited by examiner, † Cited by third party
Title
3GPP R2-2009145
3GPP RP-172115
3GPP S1-083461
3GPP T S23.287
3GPP TR 23.703
3GPP TR 23.799
3GPP TR 36.814
3GPP TR 36.912
3GPP TR 38.801
3GPP TR 38.802
3GPP TR 38.804
3GPP TR 38.836
3GPP TR 38.912
3GPP TS 23.273
3GPP TS 23.287
3GPP TS 23.303
3GPP TS 23.501
3GPP TS 36.300
3GPP TS 37.340
3GPP TS 38.211
3GPP TS 38.212
3GPP TS 38.213
3GPP TS 38.214
3GPP TS 38.300
3GPP TS 38.305
3GPP TS 38.321
3GPP TS 38.331
ERICSSON: "Successful Handover Report for CHO and DAPS", 3GPP DRAFT; R3-210672, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, vol. RAN WG3, no. Online; 20210125 - 20210205, 15 January 2021 (2021-01-15), Mobile Competence Centre ; 650, route des Lucioles ; F-06921 Sophia-Antipolis Cedex ; France , XP051969056 *

Also Published As

Publication number Publication date
KR20230147612A (ko) 2023-10-23
EP4301045A1 (en) 2024-01-03
CN116868623A (zh) 2023-10-10
JPWO2022181526A1 (ja) 2022-09-01
US20240129820A1 (en) 2024-04-18

Similar Documents

Publication Publication Date Title
WO2020031884A1 (ja) 通信システム、通信端末および基地局
JP6968706B2 (ja) 通信システム
WO2018124259A1 (ja) 通信システム
JP7182874B2 (ja) 通信システム
WO2021106761A1 (ja) 通信システム、通信端末および基地局
WO2021161951A1 (ja) 通信システムおよび通信端末
EP4135468A1 (en) Communication system, communication terminal, and base station
WO2022113875A1 (ja) 通信システムおよび通信端末
WO2022030520A1 (ja) 通信システムおよび通信端末
WO2021106769A1 (ja) 通信システム、基地局および通信端末
WO2023153336A1 (ja) 通信システムおよび基地局
WO2022181526A1 (ja) 通信システムおよび基地局
WO2023054394A1 (ja) 通信システム
WO2022210184A1 (ja) 通信システムおよび基地局
WO2023013513A1 (ja) 通信システム
WO2023095804A1 (ja) 通信システム
WO2022181525A1 (ja) 通信システムおよび通信端末
WO2022255133A1 (ja) 通信システムおよび基地局
US20240137826A1 (en) Communication system and communication terminal
WO2021251210A1 (ja) 通信システム、通信端末および管理装置
KR20240068652A (ko) 통신 시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22759562

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2023502376

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 18546704

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 202280015955.7

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2022759562

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2022759562

Country of ref document: EP

Effective date: 20230925