WO2022176515A1 - 作業機モーメントを推定する方法 - Google Patents

作業機モーメントを推定する方法 Download PDF

Info

Publication number
WO2022176515A1
WO2022176515A1 PCT/JP2022/002401 JP2022002401W WO2022176515A1 WO 2022176515 A1 WO2022176515 A1 WO 2022176515A1 JP 2022002401 W JP2022002401 W JP 2022002401W WO 2022176515 A1 WO2022176515 A1 WO 2022176515A1
Authority
WO
WIPO (PCT)
Prior art keywords
posture
calculation value
boom
arm
payload
Prior art date
Application number
PCT/JP2022/002401
Other languages
English (en)
French (fr)
Inventor
賢佑 藤井
年晃 熊谷
幹 小山
Original Assignee
株式会社小松製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社小松製作所 filed Critical 株式会社小松製作所
Priority to US18/008,261 priority Critical patent/US20230212839A1/en
Priority to CN202280004837.6A priority patent/CN115698436A/zh
Priority to KR1020227040899A priority patent/KR20230002980A/ko
Priority to DE112022000038.4T priority patent/DE112022000038T5/de
Publication of WO2022176515A1 publication Critical patent/WO2022176515A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/264Sensors and their calibration for indicating the position of the work tool
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01GWEIGHING
    • G01G19/00Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups
    • G01G19/08Weighing apparatus or methods adapted for special purposes not provided for in the preceding groups for incorporation in vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60YINDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY
    • B60Y2200/00Type of vehicle
    • B60Y2200/40Special vehicles
    • B60Y2200/41Construction vehicles, e.g. graders, excavators
    • B60Y2200/412Excavators
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/431Control of dipper or bucket position; Control of sequence of drive operations for bucket-arms, front-end loaders, dumpers or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2203Arrangements for controlling the attitude of actuators, e.g. speed, floating function

Definitions

  • the present disclosure relates to a method for estimating a working machine moment in a working vehicle.
  • Patent Document 1 discloses a technique for calculating the weight of a load from a moment balance formula centering on a boom rotation fulcrum.
  • This disclosure proposes a technique for more accurately calculating the amount of cargo.
  • a working machine includes a vehicle body and a working machine that is relatively movable with respect to the vehicle body.
  • the working machine has a first link member supported by a vehicle body by a pivot shaft, and a second link member attached to the tip of the first link member.
  • the work machine moment is the moment of the work machine with the pivot axis as the center of balance.
  • the above method comprises the following steps.
  • the first step is to place the working machine in the first posture.
  • a second step is a step of acquiring a first payload calculation value that is the weight of the load loaded on the work machine in the first posture.
  • a third step is a step of placing the working machine in the second posture.
  • a fourth step is a step of acquiring a second payload calculation value, which is the weight of the load loaded on the work machine in the second posture.
  • a fifth step is comparing the first payload calculation value and the second payload calculation value. In the above method, if a comparison of the first payload computation value and the second payload computation value determines that the first payload computation value and the second payload computation value are different, then the second link It further comprises a step of repeating the first to fifth steps while changing the weight of the member.
  • FIG. 1 is a diagram that schematically illustrates a configuration of a work machine according to an embodiment of the present disclosure
  • FIG. 2 is a block diagram showing a schematic configuration of a system of the working machine shown in FIG. 1
  • FIG. 3 is a diagram showing functional blocks within the controller shown in FIG. 2
  • FIG. It is a flow diagram showing a method of adjusting the weight of the work implement based on the embodiment.
  • FIG. 4 is a diagram schematically showing a boom center-of-gravity position and an arm center-of-gravity position
  • FIG. 4 is a diagram schematically showing a posture for adjusting the mass of an arm
  • 4 is a chart showing a comparison of the accuracy of calculated load values before and after adjustment of the working machine weight;
  • the present disclosure is applicable to any work machine other than the hydraulic excavator, provided that the work machine includes a work machine and the work machine has a plurality of link members.
  • “up”, “down”, “front”, “rear”, “left”, and “right” are directions based on the operator seated in the driver's seat 2b in the operator's cab 2a. .
  • FIG. 1 is a side view schematically showing the configuration of a hydraulic excavator 100 as an example of a work machine based on an embodiment of the present disclosure.
  • a hydraulic excavator 100 of the present embodiment mainly has a traveling body 1, a revolving body 2, and a working machine 3.
  • the traveling body 1 and the revolving body 2 constitute the vehicle body of the working machine.
  • the traveling body 1 has a pair of left and right crawler belt devices 1a. Each of the pair of left and right crawler belt devices 1a has a crawler belt.
  • the hydraulic excavator 100 is self-propelled by rotating the pair of left and right crawler belts.
  • the revolving body 2 is installed so as to be rotatable with respect to the traveling body 1.
  • the revolving body 2 mainly has an operator's cab (cab) 2a, an operator's seat 2b, an engine room 2c, and a counterweight 2d.
  • the driver's cab 2a is arranged, for example, on the front left side of the revolving body 2 (vehicle front side).
  • a driver's seat 2b for an operator to sit on is arranged in the inner space of the driver's cab 2a.
  • the engine room 2c and the counterweight 2d are arranged on the rear side of the revolving body 2 (vehicle rear side) with respect to the driver's cab 2a.
  • the engine room 2c accommodates an engine unit (engine, exhaust treatment structure, etc.).
  • the upper part of the engine room 2c is covered with an engine hood.
  • the counterweight 2d is arranged behind the engine room 2c.
  • the working machine 3 is pivotally supported on the front side of the revolving body 2 and, for example, on the right side of the operator's cab 2a.
  • the working machine 3 has, for example, a boom 3a, an arm 3b, a bucket 3c, a boom cylinder 4a, an arm cylinder 4b, a bucket cylinder 4c, and the like.
  • a base end of the boom 3a is rotatably connected to the revolving body 2 by a boom foot pin 5a.
  • the boom foot pin 5a is a pivot shaft of the boom 3a.
  • the base end of the arm 3b is rotatably connected to the tip of the boom 3a by an arm connecting pin 5b.
  • the bucket 3c is rotatably connected to the tip of the arm 3b by an attachment connecting pin 5c.
  • the boom 3a can be driven by the boom cylinder 4a. By this driving, the boom 3a can be rotated vertically with respect to the revolving body 2 around the boom foot pin 5a.
  • the arm 3b can be driven by an arm cylinder 4b. By this driving, the arm 3b can be rotated vertically with respect to the boom 3a about the arm connecting pin 5b.
  • the bucket 3c can be driven by a bucket cylinder 4c. By this driving, the bucket 3c can be rotated vertically with respect to the arm 3b around the attachment connecting pin 5c.
  • the working machine 3 can be driven in this way.
  • the working machine 3 has a bucket link 3d.
  • the bucket link 3d has a first member 3da and a second member 3db.
  • the tip of the first member 3da and the tip of the second member 3db are connected via a bucket cylinder top pin 3dc so as to be relatively rotatable.
  • the bucket cylinder top pin 3dc is connected to the tip of the bucket cylinder 4c. Therefore, the first member 3da and the second member 3db are pin-connected to the bucket cylinder 4c.
  • the proximal end of the first member 3da is rotatably connected to the arm 3b by a first link pin 3dd.
  • a base end of the second member 3db is rotatably connected to a bracket at the root portion of the bucket 3c by a second link pin 3de.
  • a pressure sensor 6a is attached to the head side of the boom cylinder 4a.
  • the pressure sensor 6a can detect the pressure (head pressure) of hydraulic fluid in the cylinder head side oil chamber 40A of the boom cylinder 4a.
  • a pressure sensor 6b is attached to the bottom side of the boom cylinder 4a. The pressure sensor 6b can detect the pressure (bottom pressure) of the working oil in the cylinder bottom side oil chamber 40B of the boom cylinder 4a.
  • a stroke sensor 7a is attached to the boom cylinder 4a.
  • the stroke sensor 7a detects the amount of displacement of the cylinder rod 4ab with respect to the cylinder 4aa in the boom cylinder 4a.
  • a stroke sensor 7b is attached to the arm cylinder 4b.
  • the stroke sensor 7b detects the amount of displacement of the cylinder rod in the arm cylinder 4b.
  • a stroke sensor 7c is attached to the bucket cylinder 4c.
  • the stroke sensor 7c detects the amount of displacement of the cylinder rod in the bucket cylinder 4c.
  • An angle sensor 9a is attached around the boom foot pin 5a.
  • An angle sensor 9b is attached around the arm connecting pin 5b.
  • An angle sensor 9c is attached around the attachment connecting pin 5c.
  • the angle sensors 9a, 9b, 9c may be potentiometers or rotary encoders.
  • a straight line passing through the boom foot pin 5a and the arm connecting pin 5b (indicated by a two-dot chain line in FIG. 1) and a straight line extending in the vertical direction (indicated by a two-dot chain line in FIG. 1) 1) is defined as the boom angle ⁇ b.
  • the boom angle ⁇ b represents the angle of the boom 3a with respect to the revolving body 2. As shown in FIG.
  • the boom angle ⁇ b can be calculated from the detection result of the stroke sensor 7a, or can be calculated from the measurement value of the angle sensor 9a.
  • a straight line passing through the boom foot pin 5a and the arm connecting pin 5b (shown by a two-dot chain line in FIG. 1) and a straight line passing through the arm connecting pin 5b and the attachment connecting pin 5c (shown in FIG. 1) are shown. 1) is defined as an arm angle ⁇ a.
  • the arm angle ⁇ a represents the angle of the arm 3b with respect to the boom 3a.
  • the arm angle ⁇ a can be calculated from the detection result of the stroke sensor 7b, or can be calculated from the measurement value of the angle sensor 9b.
  • a straight line passing through the arm connecting pin 5b and the attachment connecting pin 5c (indicated by a two-dot chain line in FIG. 1) and a straight line passing through the attachment connecting pin 5c and the cutting edge of the bucket 3c (shown in FIG. 1) are shown.
  • 1) is the bucket angle ⁇ k.
  • Bucket angle ⁇ k represents the angle of bucket 3c with respect to arm 3b.
  • the bucket angle ⁇ k can be calculated from the detection result of the stroke sensor 7c, or can be calculated from the measurement value of the angle sensor 9c.
  • IMUs 8a, 8b, 8c, and 8d are attached to the revolving body 2, the boom 3a, the arm 3b, and the first member 3da, respectively.
  • the IMU 8a measures the acceleration of the revolving structure 2 in the longitudinal direction, the lateral direction and the vertical direction, and the angular velocity of the revolving structure 2 in the longitudinal direction, the lateral direction and the vertical direction.
  • Each of the IMUs 8b, 8c, and 8d detects the acceleration of the boom 3a, the arm 3b, and the bucket 3c in the longitudinal, lateral, and vertical directions, and the angular velocity of the boom 3a, the arm 3b, and the bucket 3c in the longitudinal, lateral, and vertical directions.
  • Acceleration of expansion and contraction of the boom cylinder 4a (amount of change in expansion and contraction speed of the boom cylinder 4a) based on the difference between the acceleration measured by the IMU 8a attached to the revolving structure 2 and the acceleration measured by the IMU 8b attached to the boom 3a can be obtained.
  • the boom angle ⁇ b, arm angle ⁇ a, and bucket angle ⁇ k may be calculated by the IMU.
  • FIG. 2 is a block diagram showing a schematic configuration of the system of the work machine shown in FIG. 1. As shown in FIG.
  • the system in this embodiment is a system for determining load values.
  • the system in this embodiment includes a hydraulic excavator 100 as an example of a working machine shown in FIG. 1 and a controller 10 shown in FIG.
  • the controller 10 may be mounted on the hydraulic excavator 100 .
  • the controller 10 may be installed outside the excavator 100 .
  • the controller 10 may be placed at the work site of the excavator 100 or at a remote location away from the work site of the excavator 100 .
  • the engine 31 is, for example, a diesel engine.
  • the output of the engine 31 is controlled by controlling the injection amount of fuel to the engine 31 by the controller 10 .
  • the hydraulic pump 33 is connected to the engine 31.
  • the hydraulic pump 33 is driven by the rotational driving force of the engine 31 being transmitted to the hydraulic pump 33 .
  • the hydraulic pump 33 is, for example, a variable displacement hydraulic pump that has a swash plate and changes the displacement by changing the tilt angle of the swash plate.
  • a part of the oil discharged from the hydraulic pump 33 is supplied to the direction control valve 34 as hydraulic oil.
  • a part of the oil discharged from the hydraulic pump 33 is decompressed to a constant pressure by a decompression valve and used as pilot oil.
  • the direction control valve 34 is, for example, a spool-type valve that moves a rod-shaped spool to switch the direction in which hydraulic oil flows. Axial movement of the spool adjusts the amount of hydraulic fluid supplied to the hydraulic actuator 40 .
  • the directional control valve 34 is provided with a spool stroke sensor that detects the movement distance (spool stroke) of the spool.
  • the hydraulic actuator 40 includes a boom cylinder 4a, an arm cylinder 4b, a bucket cylinder 4c, and a swing motor (not shown) shown in FIG.
  • the oil supplied to the hydraulic actuator 40 in order to operate the hydraulic actuator 40 is referred to as hydraulic oil.
  • the oil supplied to the directional control valve 34 to operate the directional control valve 34 is called pilot oil.
  • the pressure of the pilot oil is called pilot oil pressure.
  • the hydraulic pump 33 may deliver both hydraulic oil and pilot oil as described above.
  • the hydraulic pump 33 may separately have a hydraulic pump (main hydraulic pump) that delivers hydraulic oil and a hydraulic pump (pilot hydraulic pump) that delivers pilot oil.
  • the operation device 25 is arranged in the driver's cab 2a.
  • the operating device 25 is operated by an operator.
  • the operation device 25 receives an operator's operation for driving the work machine 3 .
  • the operating device 25 also receives an operator's operation for turning the revolving body 2 .
  • the operation device 25 outputs an operation signal according to an operator's operation.
  • the operating device 25 is, for example, a pilot hydraulic operating device, but may be an electric operating device.
  • the operating device 25 has a first operating lever 25R and a second operating lever 25L.
  • the first control lever 25R is arranged, for example, on the right side of the driver's seat 2b.
  • the second control lever 25L is arranged, for example, on the left side of the driver's seat 2b.
  • the forward, backward, leftward, and rightward motions correspond to the motions of the two axes.
  • the boom 3a and the bucket 3c are operated by the first operating lever 25R.
  • Operation of the first control lever 25R in the front-rear direction corresponds to, for example, operation of the boom 3a, and the boom 3a is lowered and raised in response to the operation in the front-rear direction.
  • Operation of the first control lever 25R in the horizontal direction corresponds to, for example, operation of the bucket 3c, and the operation of the bucket 3c in the digging direction (upward) and the dumping direction (downward) is executed according to the horizontal direction operation.
  • the arm 3b and the revolving body 2 are operated by the second operating lever 25L.
  • the operation of the second control lever 25L in the front-rear direction corresponds to, for example, turning of the revolving body 2, and the revolving body 2 is turned to the right and left in response to the operation in the front-rear direction.
  • the lateral operation of the second control lever 25L corresponds to, for example, the operation of the arm 3b, and the arm 3b is moved in the dumping direction (upward) and the excavating direction (downward) in accordance with the lateral operation.
  • the pilot oil sent from the hydraulic pump 33 and decompressed by the decompression valve is supplied to the operating device 25 .
  • the pilot hydraulic pressure is adjusted based on the amount of operation of the operating device 25 .
  • the operating device 25 and the directional control valve 34 are connected via a pilot oil passage 450 . Pilot oil is supplied to the directional control valve 34 via a pilot oil passage 450 . As a result, the spool of the directional control valve 34 moves in the axial direction to adjust the flow direction and flow rate of hydraulic oil supplied to the boom cylinder 4a, the arm cylinder 4b and the bucket cylinder 4c. The vertical movement of 3c is executed.
  • a pressure sensor 36 is arranged in the pilot oil passage 450 .
  • a pressure sensor 36 detects the pilot oil pressure.
  • a detection result of the pressure sensor 36 is output to the controller 10 .
  • the amount of increase in the pilot hydraulic pressure varies depending on the angle at which each of the control levers 25L and 25R is tilted from the neutral position. The details of the operation of the operating device 25 can be determined based on the result of detection of the pilot oil pressure by the pressure sensor 36 .
  • Detection signals of the stroke sensors 7a-7c, IMUs 8a-8d, angle sensors 9a-9c, and pressure sensors 6a and 6b are also input to the controller 10.
  • the controller 10 may be electrically connected to each of the stroke sensors 7a to 7c, IMUs 8a to 8d, angle sensors 9a to 9c, and pressure sensors 6a, 6b, and 36 by wire, and can communicate wirelessly.
  • the controller 10 is, for example, a computer, server, mobile terminal, or the like, and may be a CPU (Central Processing Unit).
  • the operating device 25 may be of the electric type.
  • the amount of operation of each of the first operating lever 25R and the second operating lever 25L is detected by, for example, a potentiometer.
  • a potentiometer is a displacement sensor that produces an electrical (voltage) output proportional to mechanical position.
  • a detection result of the potentiometer is output to the controller 10 .
  • the content of the operation of the operation device 25 can be determined based on the detection result of the potentiometer.
  • FIG. 3 is a diagram showing functional blocks within the controller 10 shown in FIG.
  • the controller 10 has an operation command value acquisition unit 11, a boom cylinder telescopic speed acquisition unit 12, a load calculation value calculation unit 13, and a storage unit 14.
  • a signal of the pilot oil pressure detected by the pressure sensor 36 is input to the operation command value acquisition unit 11 .
  • the operation command value acquisition unit 11 detects an operation command value for operating the boom cylinder 4a, for example, from the signal of the pilot oil pressure detected by the pressure sensor 36 .
  • the operation command value acquired by the operation command value acquisition unit 11 is output to the storage unit 14 and stored in the storage unit 14 .
  • Signals such as acceleration detected by each of the IMUs 8a to 8d are input to the boom cylinder telescopic speed acquisition unit 12.
  • the boom cylinder extension/retraction speed acquisition unit 12 obtains the extension/retraction acceleration of the boom cylinder 4a based on the difference between the acceleration detected by the IMU 8a attached to the revolving structure 2 and the acceleration detected by the IMU 8b attached to the boom 3a, for example. (Amount of change in telescopic speed of boom cylinder 4a) is detected.
  • the boom cylinder extension/retraction speed acquisition unit 12 receives input of the displacement amount signal of the cylinder rod detected by the stroke sensors 7a to 7c.
  • the boom cylinder extension/retraction speed acquiring unit 12 is also supplied with signals of the working machine angles (boom angle ⁇ b, arm angle ⁇ a, bucket angle ⁇ k) detected by the angle sensors 9a to 9c.
  • the boom cylinder extension/retraction speed acquisition unit 12 determines the extension/retraction speed of the boom cylinder 4a based on, for example, the amount of displacement of the cylinder rod detected by the stroke sensor 7a or the angle of the working machine (boom angle ⁇ b) detected by the angle sensor 9a. to detect
  • the telescoping speed of the boom cylinder 4a (or the amount of change in the telescoping speed) detected by the boom cylinder telescoping speed acquisition unit 12 is output to and stored in the storage unit 14.
  • Signals of the head pressure and bottom pressure of the boom cylinder 4a detected by the pressure sensors 6a and 6b are input to the load calculation value calculation unit 13. Further, the load calculation value calculation unit 13 receives input of the displacement amount signals of the cylinder rod detected by the stroke sensors 7a to 7c. The load calculation value calculator 13 is also supplied with signals of the working machine angles (boom angle ⁇ b, arm angle ⁇ a, bucket angle ⁇ k) detected by the angle sensors 9a to 9c.
  • the working machine angles boom angle ⁇ b, arm angle ⁇ a, bucket angle ⁇ k
  • the load calculation value calculation unit 13 calculates the load calculation value from the input signal.
  • the load calculation value calculated by the load calculation value calculation unit 13 is output to the storage unit 14 and stored in the storage unit 14 .
  • the current load calculation value (CalcuPayload) in the bucket 3c is calculated from the balance of each moment about the boom footpin 5a.
  • the calculated load value (CalcuPayload) is calculated by the calculated load value calculator 13 shown in FIG.
  • Mboom is the weight of the boom 3a.
  • MboomC is the weight of the cylinder portion of the boom cylinder 4a.
  • MboomCR is the weight of the cylinder rod portion of the boom cylinder 4a.
  • Marm is the weight of arm 3b.
  • MarmC is the weight of the cylinder portion of the arm cylinder 4b.
  • MarmCR is the weight of the cylinder rod portion of the arm cylinder 4b.
  • Mbucket is the weight of the bucket 3c.
  • weights Mboom, MboomC, MboomCR, Marm, MarmC, MarmCR and Mbucket is stored in storage unit 14 by performing an input operation to storage unit 14 through input operation unit 21 shown in FIG. It is
  • Xboom_c is the horizontal distance from (the central axis of rotation of) the boom foot pin 5a to the center of gravity of the boom 3a.
  • XboomC_c is the horizontal distance from the boom foot pin 5a to the center of gravity of the cylinder portion of the boom cylinder 4a.
  • XboomCR_c is the horizontal distance from the boom foot pin 5a to the center of gravity of the cylinder rod portion of the boom cylinder 4a.
  • Xarm_c is the horizontal distance from the boom footpin 5a to the center of gravity of the arm 3b.
  • XarmC_c is the horizontal distance from the boom foot pin 5a to the center of gravity of the cylinder portion of the arm cylinder 4b.
  • XarmCR_c is the horizontal distance from the boom foot pin 5a to the center of gravity of the cylinder rod portion of the arm cylinder 4b.
  • Xbucket_c is the horizontal distance from the boom footpin 5a to the center of gravity of the bucket 3c.
  • Each of these distances Xboom_c, XboomC_c, XboomCR_c, Xarm_c, XarmC_c, XarmCR_c and Xbucket_c can be calculated from the detection results of stroke sensors 7a-7c and angle sensors 9a-9c.
  • F is the load (pushing force) of the boom cylinder 4a, which is obtained from the head pressure and bottom pressure of the boom cylinder 4a. Therefore, F is obtained from the pressure (head pressure) detected by the pressure sensor 6a and the pressure (bottom pressure) detected by the pressure sensor 6b.
  • h is the shortest distance between the boom foot pin 5a and the boom cylinder 4a (the distance in the direction perpendicular to the extending direction of the boom cylinder 4a) (see also FIG. 1). h can be calculated from the values detected by the stroke sensor 7a and the angle sensor 9a. By F ⁇ h, the load F of the boom cylinder 4a is adjusted to the load of the boom with different extending directions.
  • Xpayload_c is the distance between the boom footpin 5a and the center of gravity of the load in the bucket 3c.
  • the center-of-gravity position of the load in the bucket 3c may be the center-of-gravity position of a full load that can be held in the bucket 3c.
  • Xpayload_c can be calculated from the detection values of the stroke sensors 7a-7c and the angle sensors 9a-9c.
  • the load calculation value (CalcuPayload) is expressed by the following formula (3).
  • the load calculation value is obtained by calculation based on the moment balance.
  • the moment of a work machine component is indicated by the product of the weight (more precisely, mass) of the component and the distance from the rotation center axis to the center of gravity position. Therefore, if the weight Mboom and the center of gravity of the boom 3a and the weight Marm of the arm 3b and the center of gravity of the arm 3b, which are used to calculate the load calculation value, deviate from true values, the moment around the boom foot pin 5a cannot be calculated correctly.
  • the calculated value of the load calculation value differs depending on the posture of the working machine 3 . In order to increase the accuracy of the load calculation value, it is required to be able to accurately estimate the moment of the boom 3a and the arm 3b even when the design values of the weight and the position of the center of gravity of the boom 3a and the arm 3b are unknown.
  • FIG. 4 is a flow diagram showing a method for adjusting the weight of work implement 3 based on the embodiment.
  • a method for adjusting the weight of the work implement 3 based on the embodiment will be described with reference to FIGS. 4 and 5-6 as appropriate.
  • a first posture for adjusting the mass of the arm 3b (hereinafter referred to as posture (1)) and a second posture for adjusting the mass of the arm 3b (hereinafter referred to as posture (2) ) are selected as described below.
  • FIG. 5 is a diagram schematically showing the boom center-of-gravity position Ga and the arm center-of-gravity position Gb.
  • a boom center-of-gravity position Ga shown in FIG. 5 indicates the position of the center of gravity of the boom 3a.
  • An arm center-of-gravity position Gb shown in FIG. 5 indicates the position of the center of gravity of the arm 3b.
  • the "boom moment distance” shown in FIG. 5 indicates the horizontal distance from the moment balance center (boom foot pin 5a) to the boom center of gravity position Ga, that is, the distance Xboom_c described above.
  • the "arm moment distance” shown in FIG. 5 indicates the horizontal distance from the moment balance center (boom foot pin 5a) to the arm center of gravity position Gb, that is, the distance Xarm_c described above.
  • FIG. 6 is a diagram schematically showing a posture for adjusting the mass of the arm 3b.
  • a distance Xpayload shown in FIG. 6 indicates a horizontal distance from the center of gravity position Gp of the load loaded on the work implement 3 (bucket 3c) to the center of moment balance (boom footpin 5a).
  • the moment around the boom foot pin 5a for this mass deviation is obtained by multiplying the mass deviation ⁇ Mboom and the above-mentioned moment distance Xboom_c of the boom 3a.
  • Formula (5) is obtained by transforming formula (4).
  • the error ⁇ CalcuPayload in the load calculation value varies depending on the ratio between the distance Xboom_c and the distance Xpayload.
  • the load calculation values are compared in two postures in which the value of (Xboom_c/Xpayload) is the same, the error ⁇ CalcuPayload in the load calculation values due to the difference in the mass of the boom 3a is the same, so the difference in the mass of the boom 3a is The effect on the load calculation value can be eliminated.
  • the calculated load values are calculated with no load in the two postures, different calculated load values are calculated for the two postures, and the error is due only to the deviation of the mass of the arm 3b. Therefore, two postures are selected in which the ratio of the distance Xboom_c to the distance Xpayload and the ratio of the distance X'boom_c to the distance X'payload are the same as shown in FIG. ) and attitude (2).
  • a third posture for adjusting the mass of the boom 3a (hereinafter referred to as posture (3)) and a fourth posture for adjusting the mass of the boom 3a (hereinafter, posture ( 4)) are selected as described below.
  • two attitudes are selected that can eliminate the influence of the mass deviation of the arm 3b on the load calculation value.
  • two postures with the same ratio between the distance Xarm_c and the distance Xpayload are selected, and these two postures are defined as posture (3) and posture (4), respectively.
  • the working machine 3 is operated to change the posture of the working machine 3 to the posture (1).
  • step S3 it is determined whether or not the posture of the working machine 3 has changed to posture (1). If it is determined that the posture of work implement 3 is not posture (1) (NO in step S3), the determination in step S3 is repeated. The determination in step S3 is repeated until the posture of the working machine 3 becomes the posture (1).
  • step S3 When it is determined that the posture of the working machine 3 has changed to posture (1) (YES in step S3), the process proceeds to step S4, and calculation of the load calculation value in posture (1) is performed. If there is no information on the design values of the boom center-of-gravity position Ga and the arm center-of-gravity position Gb when calculating the load calculation value, the design of the known boom center-of-gravity position Ga and the arm center-of-gravity position Gb for a working machine of the same size is used. Assuming that the values are the boom center-of-gravity position Ga and the arm center-of-gravity position Gb, the calculated load value can be calculated according to Equation (3).
  • the working machine 3 is operated to change the posture of the working machine 3 to the posture (2).
  • step S5 it is determined whether or not the posture of the working machine 3 has changed to the posture (2). If it is determined that the posture of work implement 3 is not posture (2) (NO in step S5), the determination in step S5 is repeated. The determination in step S5 is repeated until the posture of the working machine 3 becomes the posture (2).
  • step S5 When it is determined that the posture of the working machine 3 has changed to posture (2) (YES in step S5), the process proceeds to step S6, and calculation of the load calculation value in posture (2) is performed.
  • step S7 the load calculation value for posture (1) calculated in step S4 and the load calculation value for posture (2) calculated in step S6 are compared.
  • step S7 if it is determined that the load calculation value calculated for posture (1) and the load calculation value calculated for posture (2) are different (step NO in S7), the process proceeds to step S8, and the weight of the arm 3b is adjusted. Specifically, the difference in the mass of the arm 3b is calculated by back-calculating from the different load calculation values in the posture (1) and the posture (2). In order to reduce this mass deviation, the mass of the arm 3b used for the load calculation value is changed. After that, the process returns to the determination of step S3, and the processes from step S3 to step S7 are repeated.
  • step S7 if it is determined that the load calculation value calculated for the attitude (1) is equal to the load calculation value calculated for the attitude (2), then Let the mass of the arm 3b be the mass for the moment calculation of the arm 3b. The mass of the arm 3b is output to the storage unit 14 and stored in the storage unit 14.
  • step S9 it is determined whether or not the posture of the working machine 3 has changed to the posture (3). If it is determined that the posture of work implement 3 is not posture (3) (NO in step S9), the determination in step S9 is repeated. The determination in step S9 is repeated until the posture of the working machine 3 becomes the posture (3).
  • step S9 When it is determined that the posture of the working machine 3 has changed to posture (3) (YES in step S9), the process proceeds to step S10, and calculation of the load calculation value in posture (3) is performed.
  • step S11 it is determined whether or not the posture of the working machine 3 has changed to the posture (4). If it is determined that the posture of work implement 3 is not posture (4) (NO in step S11), the determination in step S11 is repeated. The determination in step S11 is repeated until the posture of the working machine 3 becomes the posture (4).
  • step S11 When it is determined that the posture of the working machine 3 has changed to the posture (4) (YES in step S11), the process proceeds to step S12, and calculation of the load calculation value in the posture (4) is performed.
  • step S13 the load calculation value for posture (3) calculated in step S10 and the load calculation value for posture (4) calculated in step S12 are compared.
  • step S13 if it is determined that the load calculation value calculated for the posture (3) and the load calculation value calculated for the posture (4) are different (step NO in S13), the process proceeds to step S14, and the weight of the boom 3a is adjusted. Specifically, the difference in the mass of the boom 3a is calculated by back-calculating from the different load calculation values in the attitude (3) and the attitude (4). In order to reduce this mass deviation, the mass of the boom 3a used for the load calculation value is changed. After that, the process returns to the determination of step S9, and the processes from step S9 to step S13 are repeated.
  • step S13 if it is determined that the load calculation value calculated for the posture (3) is equal to the load calculation value calculated for the posture (4), then Let the mass of the boom 3a be the mass for the moment calculation of the boom 3a. The mass of the boom 3 a is output to the storage unit 14 and stored in the storage unit 14 .
  • step S3 the posture of the working machine 3 is set to posture (1).
  • step S4 a first payload calculation value, which is the weight of the load loaded on the working machine 3 in the attitude (1), is acquired.
  • step S5 the posture of the working machine 3 is changed to the posture (2).
  • step S6 a second payload calculation value, which is the weight of the load loaded on the working machine 3 in the attitude (2), is obtained.
  • step S7 the first payload calculation value and the second payload calculation value are compared.
  • step S8 the mass of arm 3b used for payload calculation is changed. Then, the processing from step S3 to step S7 is repeated.
  • the moment of the arm 3b can be more accurately calculated. can be estimated. Even if the work machine does not have design information on the mass of the arm 3b, the load calculation value can be calculated using the accurate moment of the arm 3b, so the value of the load can be calculated with high accuracy.
  • step S7 when it is determined that the first payload calculation value and the second payload calculation value are equal, the mass of the arm 3b at that time is taken as the mass for the moment calculation of the arm 3b. By doing so, it becomes possible to accurately estimate the moment of the arm 3b.
  • step S2 two poses with mutually equal ratios of distance Xarm_c and distance Xpayload are selected as pose (3) and pose (4).
  • step S9 the posture of the working machine 3 is changed to the posture (3).
  • step S10 a third payload calculation value, which is the weight of the load loaded on the working machine 3 in the posture (3), is obtained.
  • step S11 the posture of the working machine 3 is changed to the posture (4).
  • step S12 a fourth payload calculation value, which is the weight of the load loaded on the working machine 3 in the posture (4), is obtained.
  • step S13 the third payload calculation value and the fourth payload calculation value are compared.
  • step S14 the mass of boom 3a used for payload calculation is changed. Then, the processing from step S3 to step S7 is repeated.
  • the moment of the boom 3a can be more accurately calculated. can be estimated. Even if the working machine does not have the design information of the mass of the boom 3a, the load calculation value can be calculated using the accurate moment of the boom 3a, so the value of the load can be calculated with high accuracy.
  • step S13 when it is determined that the third payload calculation value and the fourth payload calculation value are equal, the mass of the boom 3a at that time is used as the mass for the moment calculation of the boom 3a. By doing so, it becomes possible to accurately estimate the moment of the boom 3a.
  • step S9 As shown in FIG. 4, after a series of processes from step S3 to step S7, a series of processes from step S9 to step S13 are executed.
  • the mass of the arm 3b is adjusted in two postures in which the effect of the mass deviation of the boom 3a on the moment is the same, and then the mass of the boom 3a is adjusted in two postures in which the effect of the mass deviation of the arm 3b on the moment is the same.
  • the masses of both the arm 3b and the boom 3a can be accurately adjusted.
  • the mass of the boom 3a is adjusted after adjusting the mass of the arm 3b, but the order of mass adjustment is not limited to this. After adjusting the mass of the boom 3a in a posture that is not affected by the mass deviation of the arm 3b, the mass of the arm 3b may be adjusted in a posture that is not affected by the mass deviation of the boom 3a.
  • the remaining one mass is placed in a posture free from the influence of any two of the masses of the boom 3a, the arm 3b, and the bucket 3c. can be adjusted. Also in this case, the adjustment of the masses of the boom 3a, the arm 3b and the bucket 3c may be performed in any of the six orders.
  • Verification examples are described below.
  • the load calculation values are calculated in multiple postures by changing the posture of the work equipment, and the boom and After adjusting the mass of the arm, the posture of the working machine was changed, and the load calculation values were calculated in the same multiple postures, and the load calculation values before and after the adjustment were compared.
  • FIG. 7 is a chart showing a comparison of accuracy of calculated load values before and after adjustment of the work machine weight.
  • the boom 3a has three postures with boom angles ⁇ b of 30°, 50° and 70°, and the boom 3a in each posture has three postures with arm angles ⁇ a of 40°, 95° and 150°
  • the load calculation value was calculated in a total of nine postures.
  • the thick line of the regular octagon shown in FIG. 7 indicates the actual load value.
  • Thin lines of a plurality of regular octagons shown in FIG. 7 indicate the magnitude of the deviation from the actual load value.
  • Numerical values of +3 to -4 appended to the regular octagon indicate the direction and magnitude of deviation of the calculated load value from the actual load value.
  • the vertices of the regular octagon each represent one of the nine poses described above.
  • the dashed line chart shown in FIG. 7 shows the calculated load value in each posture before adjusting the weight of the working machine.
  • the solid-line chart shown in FIG. 7 indicates the calculated load value in each posture after adjusting the weight of the work implement.
  • the error in the load calculation value for each posture was larger before adjusting the weight of the work equipment and smaller after adjusting the weight of the work equipment. Even if the design value of the work equipment is unknown, it was shown that the calculation accuracy of the load calculation value can be improved by adjusting the weight of the boom and arm and estimating the moment of the boom and arm more accurately. was done.

Abstract

作業機のモーメントを正確に推定する。作業機を第1の姿勢にする。第1の姿勢にある作業機に積載された荷の重量である第1のペイロード演算値を取得する。作業機を第2の姿勢にする。第1リンク部材の重心位置から第1リンク部材の基端までの水平方向の距離と、作業機に積載された荷の重心位置から基端までの水平方向の距離と、の比が、第1の姿勢と第2の姿勢とで等しくなっている。第2の姿勢にある作業機に積載された荷の重量である第2のペイロード演算値を取得する。第1のペイロード演算値と、第2のペイロード演算値とを比較する。第1のペイロード演算値と第2のペイロード演算値との比較の結果、第1のペイロード演算値と第2のペイロード演算値とが異なっていると判断されると、第2リンク部材の重量を変更して、上記の処理を繰り返す。

Description

作業機モーメントを推定する方法
 本開示は、作業車両における作業機モーメントを推定する方法に関する。
 作業機に積載された荷の重量は、作業機械の仕事量を知る上で重要である。特開昭60-102436号公報(特許文献1)には、ブーム回動支点を中心とするモーメントの釣り合い式から積荷の重量を演算する技術が開示されている。
特開昭60-102436号公報
 作業機を構成する各リンク部材の重量および重心位置の設計値が不明な場合、実測も困難であるため、積荷重量の演算の精度を高くすることができない。
 本開示では、積荷重量をより精度よく演算するための技術が提案される。
 本開示に従うと、作業機械における、作業機モーメントを推定する方法が提案される。作業機械は、車体と、車体に対して相対移動可能な作業機とを備えている。作業機は、車体に回動支点軸により支持された第1リンク部材と、第1リンク部材の先端に取り付けられた第2リンク部材とを有している。作業機モーメントは、回動支点軸をつり合い中心とする作業機のモーメントである。上記方法は、以下のステップを備えている。第1ステップは、作業機を第1の姿勢にするステップである。第2ステップは、第1の姿勢にある作業機に積載された荷の重量である第1のペイロード演算値を取得するステップである。第3ステップは、作業機を第2の姿勢にするステップである。第1リンク部材の重心位置から第1リンク部材の基端までの水平方向の距離と、作業機に積載された荷の重心位置から基端までの水平方向の距離と、の比が、第1の姿勢と第2の姿勢とで等しくなっている。第4ステップは、第2の姿勢にある作業機に積載された荷の重量である第2のペイロード演算値を取得するステップである。第5ステップは、第1のペイロード演算値と、第2のペイロード演算値とを比較するステップである。上記方法は、第1のペイロード演算値と第2のペイロード演算値との比較の結果、第1のペイロード演算値と第2のペイロード演算値とが異なっていると判断されると、第2リンク部材の重量を変更して、第1ステップから第5ステップまでの処理を繰り返すステップをさらに備えている。
 本開示に係る方法によれば、作業機モーメントを正確に推定することで、精度のよい積荷重量の値を算出することができる。
本開示の実施形態に基づく作業機械の構成を概略的に示す図である。 図1に示される作業機械のシステムの概略構成を示すブロック図である。 図2に示されるコントローラ内の機能ブロックを示す図である。 実施形態に基づく作業機の重量を調整する方法を示すフロー図である。 ブーム重心位置とアーム重心位置とを模式的に示す図である。 アームの質量を調整するための姿勢を模式的に示す図である。 作業機重量の調整前後の荷重計算値の精度の比較を示すチャートである。
 以下、実施形態について図面に基づいて説明する。以下の説明では、同一部品には、同一の符号を付している。それらの名称および機能も同じである。したがって、それらについての詳細な説明は繰り返さない。
 本開示は、油圧ショベル以外に、作業機を備え、作業機は複数のリンク部材を有する作業機械であれば、適用可能である。以下の説明において、「上」、「下」、「前」、「後」、「左」、「右」とは、運転室2a内の運転席2bに着座したオペレータを基準とした方向である。
 <作業機械の構成>
 図1は、本開示の実施形態に基づく作業機械の一例としての油圧ショベル100の構成を概略的に示す側面図である。図1に示されるように、本実施の形態の油圧ショベル100は、走行体1と、旋回体2と、作業機3とを主に有している。走行体1と旋回体2とにより作業機械の車体が構成されている。
 走行体1は左右一対の履帯装置1aを有している。この左右一対の履帯装置1aの各々は履帯を有している。左右一対の履帯が回転駆動されることにより油圧ショベル100が自走する。
 旋回体2は走行体1に対して旋回自在に設置されている。この旋回体2は、運転室(キャブ)2aと、運転席2bと、エンジンルーム2cと、カウンタウェイト2dとを主に有している。運転室2aは、旋回体2のたとえば前方左側(車両前側)に配置されている。運転室2aの内部空間には、オペレータが着座するための運転席2bが配置されている。
 エンジンルーム2cおよびカウンタウェイト2dの各々は、運転室2aに対して旋回体2の後方側(車両後側)に配置されている。エンジンルーム2cは、エンジンユニット(エンジン、排気処理構造体など)を収納している。エンジンルーム2cの上方はエンジンフードにより覆われている。カウンタウェイト2dは、エンジンルーム2cの後方に配置されている。
 作業機3は、旋回体2の前方側であって運転室2aのたとえば右側にて軸支されている。作業機3は、たとえばブーム3a、アーム3b、バケット3c、ブームシリンダ4a、アームシリンダ4b、バケットシリンダ4cなどを有している。ブーム3aの基端部は、ブームフートピン5aにより旋回体2に回転可能に連結されている。ブームフートピン5aは、ブーム3aの回動支点軸である。アーム3bの基端部は、アーム連結ピン5bによりブーム3aの先端部に回転可能に連結されている。バケット3cは、アタッチメント連結ピン5cによりアーム3bの先端部に回転可能に連結されている。
 ブーム3aは、ブームシリンダ4aにより駆動可能である。この駆動により、ブーム3aは、ブームフートピン5aを中心に旋回体2に対して上下方向に回動可能である。アーム3bは、アームシリンダ4bにより駆動可能である。この駆動により、アーム3bは、アーム連結ピン5bを中心にブーム3aに対して上下方向に回動可能である。バケット3cは、バケットシリンダ4cにより駆動可能である。この駆動によりバケット3cは、アタッチメント連結ピン5cを中心にアーム3bに対して上下方向に回動可能である。このように作業機3は駆動可能である。
 作業機3は、バケットリンク3dを有している。バケットリンク3dは、第1部材3daと、第2部材3dbとを有している。第1部材3daの先端と第2部材3dbの先端とは、バケットシリンダトップピン3dcを介して、相対回転可能に連結されている。バケットシリンダトップピン3dcは、バケットシリンダ4cの先端に連結されている。したがって第1部材3daおよび第2部材3dbは、バケットシリンダ4cにピン連結されている。
 第1部材3daの基端は、第1リンクピン3ddによりアーム3bに回転可能に連結されている。第2部材3dbの基端は、第2リンクピン3deによりバケット3cの根元部分のブラケットに回転可能に連結されている。
 ブームシリンダ4aのヘッド側には、圧力センサ6aが取り付けられている。圧力センサ6aは、ブームシリンダ4aのシリンダヘッド側油室40A内の作動油の圧力(ヘッド圧)を検出することができる。ブームシリンダ4aのボトム側には、圧力センサ6bが取り付けられている。圧力センサ6bは、ブームシリンダ4aのシリンダボトム側油室40B内の作動油の圧力(ボトム圧)を検出することができる。
 ブームシリンダ4aには、ストロークセンサ7aが取り付けられている。ストロークセンサ7aは、ブームシリンダ4aにおけるシリンダ4aaに対するシリンダロッド4abの変位量を検出する。アームシリンダ4bには、ストロークセンサ7bが取り付けられている。ストロークセンサ7bは、アームシリンダ4bにおけるシリンダロッドの変位量を検出する。バケットシリンダ4cには、ストロークセンサ7cが取り付けられている。ストロークセンサ7cは、バケットシリンダ4cにおけるシリンダロッドの変位量を検出する。
 ブームフートピン5aの周囲には、角度センサ9aが取り付けられている。アーム連結ピン5bの周囲には、角度センサ9bが取り付けられている。アタッチメント連結ピン5cの周囲には、角度センサ9cが取り付けられている。角度センサ9a,9b,9cは、ポテンショメータであってもよく、ロータリーエンコーダであってもよい。
 図1に示されるように、側方視のブーム動作領域において、ブームフートピン5aとアーム連結ピン5bとを通る直線(図1中に二点鎖線で図示)と、上下方向に延びる直線(図1中に破線で図示)とのなす角度を、ブーム角θbとする。ブーム角θbは、旋回体2に対するブーム3aの角度を表す。ブーム角θbは、ストロークセンサ7aの検出結果から算出することができ、または角度センサ9aの測定値から算出することができる。
 側方視のアーム動作領域において、ブームフートピン5aとアーム連結ピン5bとを通る直線(図1中に二点鎖線で図示)と、アーム連結ピン5bとアタッチメント連結ピン5cとを通る直線(図1中に二点鎖線で図示)とのなす角度を、アーム角θaとする。アーム角θaは、ブーム3aに対するアーム3bの角度を表す。アーム角θaは、ストロークセンサ7bの検出結果から算出することができ、または角度センサ9bの測定値から算出することができる。
 側方視のバケット動作領域において、アーム連結ピン5bとアタッチメント連結ピン5cとを通る直線(図1中に二点鎖線で図示)と、アタッチメント連結ピン5cとバケット3cの刃先とを通る直線(図1中に二点鎖線で図示)とのなす角度を、バケット角θkとする。バケット角θkは、アーム3bに対するバケット3cの角度を表す。バケット角θkは、ストロークセンサ7cの検出結果から算出することができ、または角度センサ9cの測定値から算出することができる。
 旋回体2、ブーム3a、アーム3bおよび第1部材3daのそれぞれには、IMU(Inertial Measurement Unit:慣性計測装置)8a,8b,8c,8dが取り付けられている。IMU8aは、前後方向、左右方向および上下方向における旋回体2の加速度と、前後方向、左右方向および上下方向まわりの旋回体2の角速度とを計測する。IMU8b,8c,8dのそれぞれは、前後方向、左右方向および上下方向におけるブーム3a、アーム3b、バケット3cの加速度と、前後方向、左右方向および上下方向まわりのブーム3a、アーム3b、バケット3cの角速度とを計測する。
 旋回体2に取り付けられたIMU8aで測定された加速度とブーム3aに取り付けられたIMU8bで測定された加速度との差分に基づいてブームシリンダ4aの伸縮の加速度(ブームシリンダ4aの伸縮速度の変化量)を取得することができる。ブーム角θb、アーム角θa、バケット角θkは、IMUで算出されてもよい。
 <作業機械のシステムの概略構成>
 次に、作業機械のシステムの概略構成について図2を用いて説明する。図2は、図1に示される作業機械のシステムの概略構成を示すブロック図である。
 図2に示されるように、本実施形態におけるシステムは、荷重値を決定するためのシステムである。本実施形態におけるシステムは、図1に示す作業機械の一例としての油圧ショベル100と、図2に示されるコントローラ10とを含んでいる。コントローラ10は、油圧ショベル100に搭載されていてもよい。コントローラ10は、油圧ショベル100の外部に設置されていてもよい。コントローラ10は、油圧ショベル100の作業現場に配置されてもよく、油圧ショベル100の作業現場から離れた遠隔地に配置されてもよい。
 エンジン31は、たとえばディーゼルエンジンである。エンジン31への燃料の噴射量がコントローラ10によって制御されることにより、エンジン31の出力が制御される。
 油圧ポンプ33は、エンジン31に連結されている。エンジン31の回転駆動力が油圧ポンプ33に伝達されることにより、油圧ポンプ33が駆動される。油圧ポンプ33は、たとえば斜板を有し、斜板の傾転角が変更されることにより吐出容量を変化させる可変容量型の油圧ポンプである。油圧ポンプ33から吐出された油の一部は、作動油として方向制御弁34に供給される。油圧ポンプ33から吐出された油の一部は、減圧弁によって一定の圧力に減圧されて、パイロット油として使用される。
 方向制御弁34は、たとえばロッド状のスプールを動かして作動油が流れる方向を切り換えるスプール方式の弁である。スプールが軸方向に移動することにより、油圧アクチュエータ40に対する作動油の供給量が調整される。方向制御弁34には、スプールの移動距離(スプールストローク)を検出するスプールストロークセンサが設けられる。
 油圧アクチュエータ40への油圧の供給および排出が制御されることにより、作業機3の動作、旋回体2の旋回、および走行体1の走行動作が制御される。上記油圧アクチュエータ40は、図1に示されるブームシリンダ4a、アームシリンダ4b、バケットシリンダ4c、図示しない旋回モータなどを含んでいる。
 なお、本例においては、油圧アクチュエータ40を作動するために、その油圧アクチュエータ40に供給される油は作動油と称される。また、方向制御弁34を作動するためにその方向制御弁34に供給される油はパイロット油と称される。また、パイロット油の圧力はパイロット油圧と称される。
 油圧ポンプ33は、上記のように作動油とパイロット油との両方を送出するものであってもよい。油圧ポンプ33は、作動油を送出する油圧ポンプ(メイン油圧ポンプ)と、パイロット油を送出する油圧ポンプ(パイロット油圧ポンプ)とを別々に有してもよい。
 操作装置25は、運転室2a内に配置されている。操作装置25は、オペレータにより操作される。操作装置25は、作業機3を駆動するオペレータ操作を受け付ける。また操作装置25は、旋回体2を旋回させるオペレータ操作を受け付ける。操作装置25は、オペレータ操作に応じた操作信号を出力する。本例においては、操作装置25は、たとえばパイロット油圧方式の操作装置であるが、電気方式の操作装置であってもよい。
 操作装置25は、第1操作レバー25Rと、第2操作レバー25Lとを有している。第1操作レバー25Rは、たとえば運転席2bの右側に配置されている。第2操作レバー25Lは、たとえば運転席2bの左側に配置されている。第1操作レバー25Rおよび第2操作レバー25Lでは、前後左右の動作が2軸の動作に対応する。
 第1操作レバー25Rにより、たとえばブーム3aおよびバケット3cが操作される。第1操作レバー25Rの前後方向の操作は、たとえばブーム3aの操作に対応し、前後方向の操作に応じてブーム3aが下降する動作および上昇する動作が実行される。第1操作レバー25Rの左右方向の操作は、たとえばバケット3cの操作に対応し、左右方向の操作に応じてバケット3cの掘削方向(上向き)およびダンプ方向(下向き)への動作が実行される。
 第2操作レバー25Lにより、たとえばアーム3bおよび旋回体2が操作される。第2操作レバー25Lの前後方向の操作は、たとえば旋回体2の旋回に対応し、前後方向の操作に応じて旋回体2の右旋回動作および左旋回動作が実行される。第2操作レバー25Lの左右方向の操作は、たとえばアーム3bの操作に対応し、左右方向の操作に応じてアーム3bのダンプ方向(上向き)および掘削方向(下向き)への動作が実行される。
 油圧ポンプ33から送出され、減圧弁によって減圧されたパイロット油が、操作装置25に供給される。操作装置25の操作量に基づいて、パイロット油圧が調整される。
 操作装置25と方向制御弁34とは、パイロット油路450を介して接続されている。パイロット油は、パイロット油路450を介して方向制御弁34に供給される。これにより、方向制御弁34のスプールが軸方向に移動して、ブームシリンダ4a、アームシリンダ4bおよびバケットシリンダ4cに供給される作動油の流れ方向および流量が調整され、ブーム3a、アーム3b、バケット3cの上下方向への動作が実行される。
 パイロット油路450には、圧力センサ36が配置されている。圧力センサ36は、パイロット油圧を検出する。圧力センサ36の検出結果は、コントローラ10に出力される。パイロット油圧の増加量は、操作レバー25L,25Rの各々を中立位置から傾倒させる角度によって異なる。圧力センサ36によるパイロット油圧の検出結果によって、操作装置25の操作内容を判断することができる。
 コントローラ10には、ストロークセンサ7a~7c、IMU8a~8d、角度センサ9a~9cおよび圧力センサ6a、6bの検出信号も入力される。
 コントローラ10は、ストロークセンサ7a~7c、IMU8a~8d、角度センサ9a~9cおよび圧力センサ6a、6b、36の各々と有線で電気的に接続されていてもよく、また無線で通信可能とされていてもよい。コントローラ10は、たとえばコンピュータ、サーバー、携帯端末などであり、CPU(Central Processing Unit)であってもよい。
 上記においては操作装置25がパイロット油圧方式である場合について説明したが、操作装置25は電気方式であってもよい。操作装置25が電気方式である場合、第1操作レバー25Rおよび第2操作レバー25Lの各々の操作量は、たとえばポテンショメータにより検出される。ポテンショメータとは、機械的な位置に比例した電気(電圧)出力を得る変位センサである。ポテンショメータの検出結果は、コントローラ10に出力される。ポテンショメータの検出結果によって、操作装置25の操作内容を判断することができる。
 <コントローラ10内の機能ブロック>
 次に、コントローラ10内の機能ブロックについて図3を用いて説明する。図3は、図2に示されるコントローラ10内の機能ブロックを示す図である。
 図3に示されるように、コントローラ10は、操作指令値取得部11と、ブームシリンダ伸縮速度取得部12と、荷重計算値演算部13と、記憶部14とを有している。
 操作指令値取得部11には、圧力センサ36により検出されたパイロット油圧の信号が入力される。操作指令値取得部11は、圧力センサ36により検出されたパイロット油圧の信号から、たとえばブームシリンダ4aを動作させる操作指令値を検出する。操作指令値取得部11により取得された操作指令値は、記憶部14へ出力され、記憶部14に記憶される。
 ブームシリンダ伸縮速度取得部12には、IMU8a~8dの各々により検出された加速度などの信号が入力される。ブームシリンダ伸縮速度取得部12は、たとえば旋回体2に取り付けられたIMU8aで検出された加速度とブーム3aに取り付けられたIMU8bで検出された加速度との差分に基づいて、ブームシリンダ4aの伸縮の加速度(ブームシリンダ4aの伸縮速度の変化量)を検出する。
 ブームシリンダ伸縮速度取得部12には、ストロークセンサ7a~7cにより検出されたシリンダロッドの変位量の信号が入力される。またブームシリンダ伸縮速度取得部12には、角度センサ9a~9cにより検出された作業機の角度(ブーム角θb、アーム角θa、バケット角θk)の信号が入力される。ブームシリンダ伸縮速度取得部12は、たとえばストロークセンサ7aにより検出されたシリンダロッドの変位量または角度センサ9aにより検出された作業機の角度(ブーム角θb)に基づいて、ブームシリンダ4aの伸縮の速度を検出する。
 ブームシリンダ伸縮速度取得部12により検出されたブームシリンダ4aの伸縮速度(またはその伸縮速度の変化量)は、記憶部14へ出力され、記憶部14に記憶される。
 荷重計算値演算部13には、圧力センサ6a、6bにより検出されたブームシリンダ4aのヘッド圧およびボトム圧の信号が入力される。また荷重計算値演算部13には、ストロークセンサ7a~7cにより検出されたシリンダロッドの変位量の信号が入力される。また荷重計算値演算部13には、角度センサ9a~9cにより検出された作業機の角度(ブーム角θb、アーム角θa、バケット角θk)の信号が入力される。
 荷重計算値演算部13は、入力された上記信号から荷重計算値を演算する。荷重計算値演算部13により演算された荷重計算値は、記憶部14へ出力され、記憶部14に記憶される。
 <荷重計算>
 実施形態においては、ブームフートピン5a回りの各モーメントの釣り合いから、バケット3c内の現在の荷重計算値(CalcuPayload)が演算される。荷重計算値(CalcuPayload)の演算は、図3に示される荷重計算値演算部13により行われる。
 まず作業機3の自重によるモーメントMXweは、以下の式(1)により算出される。
Figure JPOXMLDOC01-appb-M000001
 式(1)において、Mboomは、ブーム3aの重量である。MboomCは、ブームシリンダ4aのシリンダ部分の重量である。MboomCRは、ブームシリンダ4aのシリンダロッド部分の重量である。Marmは、アーム3bの重量である。MarmCは、アームシリンダ4bのシリンダ部分の重量である。MarmCRは、アームシリンダ4bのシリンダロッド部分の重量である。Mbucketは、バケット3cの重量である。
 これらの重量Mboom、MboomC、MboomCR、Marm、MarmC、MarmCRおよびMbucketの各々は、たとえば、図3に示される入力操作部21にて記憶部14への入力操作を行なうことにより、記憶部14に記憶されている。
 式(1)において、Xboom_cは、ブームフートピン5a(の回動中心軸)からブーム3aの重心までの水平方向の距離である。XboomC_cは、ブームフートピン5aからブームシリンダ4aのシリンダ部分の重心までの水平方向の距離である。XboomCR_cは、ブームフートピン5aからブームシリンダ4aのシリンダロッド部分の重心までの水平方向の距離である。Xarm_cは、ブームフートピン5aからアーム3bの重心までの水平方向の距離である。XarmC_cは、ブームフートピン5aからアームシリンダ4bのシリンダ部分の重心までの水平方向の距離である。XarmCR_cは、ブームフートピン5aからアームシリンダ4bのシリンダロッド部分の重心までの水平方向の距離である。Xbucket_cは、ブームフートピン5aからバケット3cの重心までの水平方向の距離である。
 これらの距離Xboom_c、XboomC_c、XboomCR_c、Xarm_c、XarmC_c、XarmCR_cおよびXbucket_cの各々は、ストロークセンサ7a~7c、角度センサ9a~9cの検出結果などから算出することができる。
 次に、ブームフートピン5a周りのモーメントの釣り合いは、以下の式(2)により表される。
Figure JPOXMLDOC01-appb-M000002
 式(2)において、Fは、ブームシリンダ4aの負荷(押す力)であり、ブームシリンダ4aのヘッド圧とボトム圧とから得られる。このためFは、圧力センサ6aにより検出された圧力(ヘッド圧)と、圧力センサ6bにより検出された圧力(ボトム圧)とから得られる。
 式(2)において、hは、ブームフートピン5aとブームシリンダ4aとの間の最短距離(ブームシリンダ4aの延在方向に対する直交方向の距離)である(図1も併せて参照)。hは、ストロークセンサ7a、角度センサ9aの検出値などから算出することができる。F×hにより、ブームシリンダ4aの負荷Fを、延在方向の異なるブームの負荷に調整している。
 式(2)において、Xpayload_cは、ブームフートピン5aとバケット3c内の荷の重心との間の距離である。バケット3c内の荷の重心位置は、バケット3cに保持可能な満杯の荷の重心位置としてよい。Xpayload_cは、ストロークセンサ7a~7c、角度センサ9a~9cの検出値などから算出することができる。
 式(2)から、荷重計算値(CalcuPayload)は以下の式(3)により表される。
Figure JPOXMLDOC01-appb-M000003
 <作業機重量の推定>
 作業機3を構成する各リンク部材、たとえばブーム3aおよびアーム3b、の重量および重心位置は、実測が困難である。ブーム3aの重心位置は、距離Xboom_cを算出するために用いられ、アーム3bの重心位置は、距離Xarm_cを算出するために用いられる。上記のとおり、ブーム3aの重量Mboom、アーム3bの重量Marm、距離Xboom_cおよび距離Xarm_cは、荷重計算値の演算に用いられる。
 上記のとおり、荷重計算値はモーメントの釣り合いによる計算で求める。作業機構成部材のモーメントは、構成部材の重量(正確には質量)と、回転中心軸から重心位置までの距離との積で示される。そのため、荷重計算値の演算に用いられるブーム3aの重量Mboomおよび重心位置、ならびにアーム3bの重量Marmおよび重心位置が真値から外れていると、ブームフートピン5a回りのモーメントの計算が正しく行えず、作業機3の姿勢によって荷重計算値の演算値が異なることになる。荷重計算値の精度を高くするには、ブーム3aおよびアーム3bの重量および重心位置の設計値が不明な場合においても、ブーム3aおよびアーム3bのモーメントを精度よく推定できることが求められる。
 本開示の方法によると、構成部材の重心位置を仮定して複数の作業機姿勢で荷重計算値を取得し、取得された複数の作業機姿勢での荷重計算値が等しくなるように構成部材の重量を調整することにより、従来より正確に構成部材のモーメントを取得できる。図4は、実施形態に基づく作業機3の重量を調整する方法を示すフロー図である。以下、図4および図5-6を適宜参照して、実施形態に基づく作業機3の重量の調整方法について説明する。
 まず、ステップS1において、アーム3bの質量を調整するための第1の姿勢(以下、姿勢(1)と称する)と、アーム3bの質量を調整するための第2の姿勢(以下、姿勢(2)と称する)とを後述のように選定する。
 図5は、ブーム重心位置Gaとアーム重心位置Gbとを模式的に示す図である。図5に示されるブーム重心位置Gaは、ブーム3aの重心の位置を示す。図5に示されるアーム重心位置Gbは、アーム3bの重心の位置を示す。図5に示される「ブームのモーメント距離」は、モーメントつり合い中心(ブームフートピン5a)からブーム重心位置Gaまでの水平方向の距離、すなわち、上述した距離Xboom_cを示す。図5に示される「アームのモーメント距離」は、モーメントつり合い中心(ブームフートピン5a)からアーム重心位置Gbまでの水平方向の距離、すなわち、上述した距離Xarm_cを示す。
 図6は、アーム3bの質量を調整するための姿勢を模式的に示す図である。図6に示される距離Xpayloadは、作業機3(バケット3c)に積載された荷の重心位置Gpからモーメントつり合い中心(ブームフートピン5a)までの水平方向の距離を示す。
 ブーム3aの質量の真値に対するずれをΔMboomとすると、この質量のずれ分のブームフートピン5a回りのモーメントは、質量のずれΔMboomと、上述したブーム3aのモーメント距離Xboom_cとの積で求められる。
 ブーム3aの質量のずれに起因して、荷重計算値に誤差が生じる。この荷重計算値の誤差によるブームフートピン5a回りのモーメントは、荷重計算値の誤差ΔCalcuPayloadと、距離Xpayloadとの積で求められる。
 ブーム3aの質量のずれにより発生するブームフートピン5a回りのモーメントは釣り合うはずであるので、以下の式(4)が成立する。
Figure JPOXMLDOC01-appb-M000004
 式(4)を変形して、式(5)が得られる。
Figure JPOXMLDOC01-appb-M000005
 式(5)より、荷重計算値の誤差ΔCalcuPayloadは、距離Xboom_cと距離Xpayloadとの比によって変動する。一方、(Xboom_c/Xpayload)の値が同じになる2つの姿勢で荷重計算値を比較すると、ブーム3aの質量のずれによる荷重計算値の誤差ΔCalcuPayloadが同じになるので、ブーム3aの質量のずれが荷重計算値に及ぼす影響を無くすことができる。その2つの姿勢で、空荷で荷重計算値の演算を行なうと、2つの姿勢で異なる荷重計算値が算出され、その誤差はアーム3bの質量のずれのみが要因である。したがって、図6に示される、距離Xboom_cと距離Xpayloadとの比と距離X’boom_cと距離X’payloadとの比とが同じになる2つの姿勢を選定し、これら2つの姿勢をそれぞれ姿勢(1)、姿勢(2)とする。
 次に、ステップS2において、ブーム3aの質量を調整するための第3の姿勢(以下、姿勢(3)と称する)と、ブーム3aの質量を調整するための第4の姿勢(以下、姿勢(4)と称する)とを後述のように選定する。
 上述した姿勢(1)および姿勢(2)の選定と同じように、アーム3bの質量のずれが荷重計算値に及ぼす影響をなくせる2つの姿勢を選定する。具体的には、距離Xarm_cと距離Xpayloadとの比が等しくなる2つの姿勢を選定し、これら2つの姿勢をそれぞれ姿勢(3)、姿勢(4)とする。
 作業機3を動作させ、作業機3の姿勢を姿勢(1)にする。ステップS3で、作業機3の姿勢が姿勢(1)になったか否かの判断が行われる。作業機3の姿勢が姿勢(1)ではないと判断されると(ステップS3においてNO)、ステップS3の判断が繰り返される。作業機3の姿勢が姿勢(1)になるまで、ステップS3の判断が繰り返される。
 作業機3の姿勢が姿勢(1)になったと判断されると(ステップS3においてYES)、ステップS4に進み、姿勢(1)における荷重計算値の演算が行われる。荷重計算値を演算する際に、ブーム重心位置Gaおよびアーム重心位置Gbの設計値の情報がない場合には、同じ体格の作業機械についての、既知のブーム重心位置Gaおよびアーム重心位置Gbの設計値を、ブーム重心位置Gaとアーム重心位置Gbとして仮定して、式(3)に従って荷重計算値を演算することができる。
 作業機3を動作させ、作業機3の姿勢を姿勢(2)にする。ステップS5で、作業機3の姿勢が姿勢(2)になったか否かの判断が行われる。作業機3の姿勢が姿勢(2)ではないと判断されると(ステップS5においてNO)、ステップS5の判断が繰り返される。作業機3の姿勢が姿勢(2)になるまで、ステップS5の判断が繰り返される。
 作業機3の姿勢が姿勢(2)になったと判断されると(ステップS5においてYES)、ステップS6に進み、姿勢(2)における荷重計算値の演算が行われる。
 ステップS7において、ステップS4で演算された姿勢(1)のときの荷重計算値と、ステップS6で演算された姿勢(2)のときの荷重計算値との比較が行われる。
 ステップS7の荷重計算値の比較の結果、姿勢(1)のときに演算された荷重計算値と姿勢(2)のときに演算された荷重計算値とが異なっていると判断されると(ステップS7においてNO)、ステップS8に進み、アーム3bの重量が調整される。具体的には、姿勢(1)および姿勢(2)における異なる荷重計算値から逆算して、アーム3bの質量のずれを算出する。この質量のずれを低減するように、荷重計算値に用いられるアーム3bの質量を変更する。その後ステップS3の判断に戻り、ステップS3からステップS7までの処理が繰り返される。
 ステップS7の荷重計算値の比較の結果、姿勢(1)のときに演算された荷重計算値と姿勢(2)のときに演算された荷重計算値とが等しいと判断されると、そのときのアーム3bの質量を、アーム3bのモーメント計算のための質量とする。アーム3bの質量は、記憶部14へ出力され、記憶部14に記憶される。
 続いて、作業機3を動作させ、作業機3の姿勢を姿勢(3)にする。ステップS9で、作業機3の姿勢が姿勢(3)になったか否かの判断が行われる。作業機3の姿勢が姿勢(3)ではないと判断されると(ステップS9においてNO)、ステップS9の判断が繰り返される。作業機3の姿勢が姿勢(3)になるまで、ステップS9の判断が繰り返される。
 作業機3の姿勢が姿勢(3)になったと判断されると(ステップS9においてYES)、ステップS10に進み、姿勢(3)における荷重計算値の演算が行われる。
 作業機3を動作させ、作業機3の姿勢を姿勢(4)にする。ステップS11で、作業機3の姿勢が姿勢(4)になったか否かの判断が行われる。作業機3の姿勢が姿勢(4)ではないと判断されると(ステップS11においてNO)、ステップS11の判断が繰り返される。作業機3の姿勢が姿勢(4)になるまで、ステップS11の判断が繰り返される。
 作業機3の姿勢が姿勢(4)になったと判断されると(ステップS11においてYES)、ステップS12に進み、姿勢(4)における荷重計算値の演算が行われる。
 ステップS13において、ステップS10で演算された姿勢(3)のときの荷重計算値と、ステップS12で演算された姿勢(4)のときの荷重計算値との比較が行われる。
 ステップS13の荷重計算値の比較の結果、姿勢(3)のときに演算された荷重計算値と姿勢(4)のときに演算された荷重計算値とが異なっていると判断されると(ステップS13においてNO)、ステップS14に進み、ブーム3aの重量が調整される。具体的には、姿勢(3)および姿勢(4)における異なる荷重計算値から逆算して、ブーム3aの質量のずれを算出する。この質量のずれを低減するように、荷重計算値に用いられるブーム3aの質量を変更する。その後ステップS9の判断に戻り、ステップS9からステップS13までの処理が繰り返される。
 ステップS13の荷重計算値の比較の結果、姿勢(3)のときに演算された荷重計算値と姿勢(4)のときに演算された荷重計算値とが等しいと判断されると、そのときのブーム3aの質量を、ブーム3aのモーメント計算のための質量とする。ブーム3aの質量は、記憶部14へ出力され、記憶部14に記憶される。
 そして、処理を終了する(図4のエンド)。
 <作用および効果>
 上述した説明と一部重複する記載もあるが、本実施形態の特徴的な構成および作用効果についてまとめて記載すると、以下の通りである。
 実施形態に係る、作業機のモーメントを推定する方法では、図4に示されるように、ステップS1において、距離Xboom_cと距離Xpayloadとの比が互いに等しい2つの姿勢が、姿勢(1)および姿勢(2)として選定される。ステップS3において、作業機3の姿勢を姿勢(1)にする。ステップS4において、姿勢(1)の姿勢にある作業機3に積載された荷の重量である第1のペイロード演算値が取得される。ステップS5において、作業機3の姿勢を姿勢(2)にする。ステップS6において、姿勢(2)の姿勢にある作業機3に積載された荷の重量である第2のペイロード演算値が取得される。ステップS7において、第1のペイロード演算値と第2のペイロード演算値とが比較される。ステップS7の比較の結果、第1のペイロード演算値と第2のペイロード演算値とが異なっていると判断されると、ステップS8において、ペイロード演算に使用されるアーム3bの質量が変更される。そして、ステップS3からステップS7までの処理が繰り返される。
 ブーム3aの質量のずれの影響の無い複数の姿勢で荷重計算値を演算し、姿勢毎の荷重計算値の誤差がなくなるまでアーム3bの質量を調整することで、アーム3bのモーメントをより正確に推定することができる。アーム3bの質量の設計情報がない作業機械であっても、アーム3bの正確なモーメントを使って荷重計算値を演算することができるので、精度のよい積荷重量の値を算出することができる。
 ステップS7の比較の結果、第1のペイロード演算値と第2のペイロード演算値とが等しいと判断されると、そのときのアーム3bの質量を、アーム3bのモーメント計算のための質量とする。このようにすることで、アーム3bのモーメントを正確に推定することが可能になる。
 図4に示されるように、ステップS2において、距離Xarm_cと距離Xpayloadとの比が互いに等しい2つの姿勢が、姿勢(3)および姿勢(4)として選定される。ステップS9において、作業機3の姿勢を姿勢(3)にする。ステップS10において、姿勢(3)の姿勢にある作業機3に積載された荷の重量である第3のペイロード演算値が取得される。ステップS11において、作業機3の姿勢を姿勢(4)にする。ステップS12において、姿勢(4)の姿勢にある作業機3に積載された荷の重量である第4のペイロード演算値が取得される。ステップS13において、第3のペイロード演算値と第4のペイロード演算値とが比較される。ステップS13の比較の結果、第3のペイロード演算値と第4のペイロード演算値とが異なっていると判断されると、ステップS14において、ペイロード演算に使用されるブーム3aの質量が変更される。そして、ステップS3からステップS7までの処理が繰り返される。
 アーム3bの質量のずれの影響の無い複数の姿勢で荷重計算値を演算し、姿勢毎の荷重計算値の誤差がなくなるまでブーム3aの質量を調整することで、ブーム3aのモーメントをより正確に推定することができる。ブーム3aの質量の設計情報がない作業機械であっても、ブーム3aの正確なモーメントを使って荷重計算値を演算することができるので、精度のよい積荷重量の値を算出することができる。
 ステップS13の比較の結果、第3のペイロード演算値と第4のペイロード演算値とが等しいと判断されると、そのときのブーム3aの質量を、ブーム3aのモーメント計算のための質量とする。このようにすることで、ブーム3aのモーメントを正確に推定することが可能になる。
 図4に示されるように、ステップS3からステップS7までの一連の処理の後に、ステップS9からステップS13までの一連の処理が実行される。
 ブーム3aの質量のずれがモーメントに及ぼす影響が同じ2姿勢でアーム3bの質量を調整し、その後、アーム3bの質量のずれがモーメントに及ぼす影響が同じ2姿勢でブーム3aの質量を調整する、というように、順番に調整することで、アーム3bおよびブーム3aの両方の質量を的確に調整することができる。
 なお、上記の実施形態の説明では、アーム3bの質量を調整した後にブーム3aの質量を調整したが、質量調整の順序はこれに限られない。アーム3bの質量のずれの影響のない姿勢でブーム3aの質量を調整した後に、ブーム3aの質量のずれの影響のない姿勢でアーム3bの質量を調整してもよい。
 ブーム3aおよびアーム3bに加えて、バケット3cの設計値が不明な場合には、ブーム3a、アーム3bおよびバケット3cのうちいずれか2つの質量のずれの影響のない姿勢で残りの1つの質量を調整することができる。この場合においても、ブーム3a、アーム3bおよびバケット3cの質量の調整を、6通りの順序のうちどの順序で行ってもよい。
検証例
 以下、検証例について説明する。ブームおよびアームの重量および重心位置が未知の油圧ショベルについて、ブームおよびアームの質量を調整する前に作業機の姿勢を変えて複数の姿勢で荷重計算値を演算し、実施形態の方法でブームおよびアームの質量を調整した後に作業機の姿勢を変えて同じ複数の姿勢で荷重演算値を演算し、調整の前後での荷重計算値の比較を行った。
 図7は、作業機重量の調整前後の荷重計算値の精度の比較を示すチャートである。ブーム3aを、ブーム角θbが30°、50°、70°となる3通りの姿勢とし、各姿勢のブーム3aについて、アーム角θaが40°、95°、150°となる3通りの姿勢とする合計9つの姿勢で、荷重計算値を演算した。図7に示される正9角形の太線は、実荷重値を示す。図7に示される複数の正9角形の細線は、実荷重値からのずれの大きさを示す。正9角形に付記される+3~-4の数値は、荷重演算値の実荷重値からのずれの方向と大きさの指標を示す。正9角形の頂点は、それぞれ上述の9つの姿勢の一つを示す。
 図7に示される破線のチャートは、作業機の重量の調整前の各姿勢における荷重演算値を示す。図7に示される実線のチャートは、作業機の重量の調整後の各姿勢における荷重演算値を示す。
 図7に示されるように、姿勢毎の荷重計算値の誤差は、作業機の重量の調整前においてより大きく、作業機の重量の調整後においてより小さかった。作業機の設計値が不明な作業機械であっても、ブームおよびアームの重量を調整してブームおよびアームのモーメントをより正確に推定することで、荷重計算値の演算の精度を向上できることが示された。
 以上のように実施形態および実施例について説明を行ったが、今回開示された実施形態および実施例はすべての点で例示であって、制限的なものではないと考えられるべきである。本発明の範囲は上記した説明ではなくて請求の範囲によって示され、請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。
 1 走行体、1a 履帯装置、2 旋回体、2a 運転室、2b 運転席、3 作業機、3a ブーム(第1リンク部材)、3b アーム(第2リンク部材)、3c バケット、4a ブームシリンダ、4aa シリンダ、4ab シリンダロッド、4b アームシリンダ、4c バケットシリンダ、5a ブームフートピン(回動支点軸)、5b アーム連結ピン、5c アタッチメント連結ピン、6a,6b,36 圧力センサ、7a,7b,7c ストロークセンサ、9a,9b,9c 角度センサ、10 コントローラ、11 操作指令値取得部、12 ブームシリンダ伸縮速度取得部、13 荷重計算値演算部、14 記憶部、21 入力操作部、25 操作装置、25L 第2操作レバー、25R 第1操作レバー、100 油圧ショベル(作業機械)。

Claims (5)

  1.  車体と、前記車体に対して相対移動可能な作業機とを備え、前記作業機は、前記車体に回動支点軸により支持された第1リンク部材と、前記第1リンク部材の先端に取り付けられた第2リンク部材とを有する、作業機械における、前記回動支点軸をつり合い中心とする前記作業機のモーメントを推定する方法であって、
     前記作業機を第1の姿勢にする第1ステップと、
     前記第1の姿勢にある前記作業機に積載された荷の重量である第1のペイロード演算値を取得する第2ステップと、
     前記作業機を、前記第1リンク部材の重心位置から前記第1リンク部材の基端までの水平方向の距離と前記作業機に積載された荷の重心位置から前記基端までの前記水平方向の距離との比が前記第1の姿勢と等しい、第2の姿勢にする第3ステップと、
     前記第2の姿勢にある前記作業機に積載された荷の重量である第2のペイロード演算値を取得する第4ステップと、
     前記第1のペイロード演算値と、前記第2のペイロード演算値とを比較する第5ステップと、
     前記第1のペイロード演算値と前記第2のペイロード演算値との比較の結果、前記第1のペイロード演算値と前記第2のペイロード演算値とが異なっていると判断されると、前記第2リンク部材の重量を変更して、前記第1ステップから前記第5ステップまでの処理を繰り返す、方法。
  2.  前記第1のペイロード演算値と前記第2のペイロード演算値との比較の結果、前記第1のペイロード演算値と前記第2のペイロード演算値とが等しいと判断されたときの前記第2リンク部材の重量を、前記モーメントを推定するための前記第2リンク部材の重量とする、請求項1に記載の方法。
  3.  前記作業機を第3の姿勢にする第6ステップと、
     前記第3の姿勢にある前記作業機に積載された荷の重量である第3のペイロード演算値を取得する第7ステップと、
     前記作業機を、前記第2リンク部材の重心位置から前記基端までの前記水平方向の距離と前記作業機に積載された荷の重心位置から前記基端までの前記水平方向の距離との比が前記第3の姿勢と等しい、第4の姿勢にする第8ステップと、
     前記第4の姿勢にある前記作業機に積載された荷の重量である第4のペイロード演算値を取得する第9ステップと、
     前記第3のペイロード演算値と、前記第4のペイロード演算値とを比較する第10ステップと、
     前記第3のペイロード演算値と前記第4のペイロード演算値との比較の結果、前記第3のペイロード演算値と前記第4のペイロード演算値とが異なっていると判断されると、前記第1リンク部材の重量を変更して、前記第6ステップから前記第10ステップまでの処理を繰り返す、請求項1または請求項2に記載の方法。
  4.  前記第3のペイロード演算値と前記第4のペイロード演算値との比較の結果、前記第3のペイロード演算値と前記第4のペイロード演算値とが等しいと判断されたときの前記第1リンク部材の重量を、前記モーメントを推定するための前記第1リンク部材の重量とする、請求項3に記載の方法。
  5.  前記第1ステップから前記第5ステップまでの一連の処理の後に、前記第6ステップから前記第10ステップまでの一連の処理を実行する、請求項3または請求項4に記載の方法。
PCT/JP2022/002401 2021-02-22 2022-01-24 作業機モーメントを推定する方法 WO2022176515A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US18/008,261 US20230212839A1 (en) 2021-02-22 2022-01-24 Method of estimating moment of work implement
CN202280004837.6A CN115698436A (zh) 2021-02-22 2022-01-24 推断工作装置力矩的方法
KR1020227040899A KR20230002980A (ko) 2021-02-22 2022-01-24 작업기 모멘트를 추정하는 방법
DE112022000038.4T DE112022000038T5 (de) 2021-02-22 2022-01-24 Verfahren zur Schätzung eines Moments eines Arbeitsgerätes

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021-026407 2021-02-22
JP2021026407A JP2022128084A (ja) 2021-02-22 2021-02-22 作業機モーメントを推定する方法

Publications (1)

Publication Number Publication Date
WO2022176515A1 true WO2022176515A1 (ja) 2022-08-25

Family

ID=82931394

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/002401 WO2022176515A1 (ja) 2021-02-22 2022-01-24 作業機モーメントを推定する方法

Country Status (6)

Country Link
US (1) US20230212839A1 (ja)
JP (1) JP2022128084A (ja)
KR (1) KR20230002980A (ja)
CN (1) CN115698436A (ja)
DE (1) DE112022000038T5 (ja)
WO (1) WO2022176515A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7316052B2 (ja) * 2019-01-29 2023-07-27 株式会社小松製作所 作業機械を含むシステム、およびコンピュータによって実行される方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07252091A (ja) * 1994-03-15 1995-10-03 Sumitomo Constr Mach Co Ltd クレーン仕様ショベルの吊り荷重量演算装置
JP2019065655A (ja) * 2017-10-04 2019-04-25 株式会社小松製作所 作業機械、作業機械を含むシステムおよび作業機械の制御方法
JP2020158961A (ja) * 2019-03-25 2020-10-01 株式会社小松製作所 作業機械、システムおよび作業機械の制御方法
JP2020165253A (ja) * 2019-03-29 2020-10-08 住友重機械工業株式会社 ショベル
JP2020165256A (ja) * 2019-03-29 2020-10-08 住友重機械工業株式会社 ショベル

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60102436A (ja) 1984-06-23 1985-06-06 Hitachi Constr Mach Co Ltd 油圧シヨベルの積荷重量表示装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07252091A (ja) * 1994-03-15 1995-10-03 Sumitomo Constr Mach Co Ltd クレーン仕様ショベルの吊り荷重量演算装置
JP2019065655A (ja) * 2017-10-04 2019-04-25 株式会社小松製作所 作業機械、作業機械を含むシステムおよび作業機械の制御方法
JP2020158961A (ja) * 2019-03-25 2020-10-01 株式会社小松製作所 作業機械、システムおよび作業機械の制御方法
JP2020165253A (ja) * 2019-03-29 2020-10-08 住友重機械工業株式会社 ショベル
JP2020165256A (ja) * 2019-03-29 2020-10-08 住友重機械工業株式会社 ショベル

Also Published As

Publication number Publication date
KR20230002980A (ko) 2023-01-05
JP2022128084A (ja) 2022-09-01
CN115698436A (zh) 2023-02-03
DE112022000038T5 (de) 2023-01-19
US20230212839A1 (en) 2023-07-06

Similar Documents

Publication Publication Date Title
US11149413B2 (en) Construction machine
US11530920B2 (en) Controlling movement of a machine using sensor fusion
KR101907938B1 (ko) 건설 기계의 제어 장치 및 건설 기계의 제어 방법
CN111441401B (zh) 挖土机
WO2019187659A1 (ja) 建設機械
JPWO2015173920A1 (ja) 油圧ショベルの較正システム及び較正方法
JP6867398B2 (ja) 作業機械の制御システム及び作業機械の制御方法
CN113167054B (zh) 包括作业机械的系统、由计算机执行的方法及学习用数据
KR102479701B1 (ko) 작업 기계
WO2022176515A1 (ja) 作業機モーメントを推定する方法
WO2020195880A1 (ja) 作業機械、システムおよび作業機械の制御方法
CN115917088A (zh) 工程机械
WO2022209214A1 (ja) 演算装置および演算方法
WO2018123470A1 (ja) 建設機械の制御装置及び建設機械の制御方法
WO2024057846A1 (ja) 作業機械における車体座標系を設定するためのシステムおよび方法
WO2023068154A1 (ja) 作業機械制御システム、作業機械、管理装置及び作業機械の制御方法
WO2024090014A1 (ja) スイング角度較正方法、姿勢検出方法、スイング角度較正システムおよび姿勢検出システム
JP7143117B2 (ja) ショベル
CN116892224A (zh) 施工设备
CN117836489A (zh) 用于控制作业机械的系统以及方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22755839

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20227040899

Country of ref document: KR

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 22755839

Country of ref document: EP

Kind code of ref document: A1