WO2022113555A1 - 冷凍装置、及び冷凍装置の冷媒量判定方法 - Google Patents

冷凍装置、及び冷凍装置の冷媒量判定方法 Download PDF

Info

Publication number
WO2022113555A1
WO2022113555A1 PCT/JP2021/037999 JP2021037999W WO2022113555A1 WO 2022113555 A1 WO2022113555 A1 WO 2022113555A1 JP 2021037999 W JP2021037999 W JP 2021037999W WO 2022113555 A1 WO2022113555 A1 WO 2022113555A1
Authority
WO
WIPO (PCT)
Prior art keywords
refrigerant
pressure
amount
receiver
heat source
Prior art date
Application number
PCT/JP2021/037999
Other languages
English (en)
French (fr)
Inventor
秀一 田口
雅章 竹上
Original Assignee
ダイキン工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ダイキン工業株式会社 filed Critical ダイキン工業株式会社
Priority to CN202180078738.8A priority Critical patent/CN116568975B/zh
Priority to EP21897533.2A priority patent/EP4227611A4/en
Publication of WO2022113555A1 publication Critical patent/WO2022113555A1/ja
Priority to US18/137,006 priority patent/US11788781B2/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • F25B49/022Compressor control arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B1/00Compression machines, plants or systems with non-reversible cycle
    • F25B1/10Compression machines, plants or systems with non-reversible cycle with multi-stage compression
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B43/00Arrangements for separating or purifying gases or liquids; Arrangements for vaporising the residuum of liquid refrigerant, e.g. by heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B9/00Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point
    • F25B9/002Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point characterised by the refrigerant
    • F25B9/008Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point characterised by the refrigerant the refrigerant being carbon dioxide
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2309/00Gas cycle refrigeration machines
    • F25B2309/06Compression machines, plants or systems characterised by the refrigerant being carbon dioxide
    • F25B2309/061Compression machines, plants or systems characterised by the refrigerant being carbon dioxide with cycle highest pressure above the supercritical pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/023Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units
    • F25B2313/0233Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units in parallel arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/025Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units
    • F25B2313/0253Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units in parallel arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/029Control issues
    • F25B2313/0293Control issues related to the indoor fan, e.g. controlling speed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/029Control issues
    • F25B2313/0294Control issues related to the outdoor fan, e.g. controlling speed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/031Sensor arrangements
    • F25B2313/0313Pressure sensors near the outdoor heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/07Details of compressors or related parts
    • F25B2400/075Details of compressors or related parts with parallel compressors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/23High amount of refrigerant in the system
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/24Low amount of refrigerant in the system
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/025Compressor control by controlling speed
    • F25B2600/0251Compressor control by controlling speed with on-off operation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/05Refrigerant levels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/25Control of valves
    • F25B2600/2523Receiver valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/04Refrigerant level
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • F25B2700/1931Discharge pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • F25B2700/1933Suction pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/195Pressures of the condenser

Definitions

  • the present disclosure relates to a refrigerating apparatus and a method for determining the amount of refrigerant in the refrigerating apparatus.
  • a refrigerating device that performs a refrigerating cycle has been known.
  • a refrigerating cycle in which the high pressure is equal to or higher than the critical pressure is performed.
  • the amount of refrigerant in the refrigerant circuit is determined based on the high pressure side pressure of the refrigerating refrigerant circuit so that the amount of refrigerant in the refrigerant circuit can be appropriately managed.
  • the object of the present disclosure is to enable accurate determination of excess or deficiency of the amount of refrigerant in a refrigerating apparatus using a refrigerant operating in a supercritical region.
  • the first aspect is a refrigerating device (1) provided with a heat source unit (10) that uses a refrigerant that operates in a supercritical region.
  • the heat source unit (10) includes a compression element (20) for compressing the refrigerant, a heat source heat exchanger (24), and an expansion valve (26) provided downstream of the heat source heat exchanger (24).
  • a receiver (25) provided downstream of the expansion valve (26) and a control unit (101) are provided.
  • the control unit (101) performs a first operation of determining the amount of refrigerant based on the high pressure under the first condition that the internal pressure of the receiver (25) is equal to or lower than the supercritical pressure.
  • the amount of refrigerant is determined based on the high pressure under the first condition that the internal pressure of the receiver (25) is equal to or less than the supercritical pressure. Therefore, the amount of the refrigerant can be determined based on the high pressure in consideration of the refrigerant that is expected to be stored in the receiver (25) in a two-phase state during actual operation, so that the accuracy of the determination result can be improved. can.
  • the "high pressure” means the “high pressure of the refrigerant circuit (6)" in the refrigerating apparatus (1), and specifically, the “discharge pressure of the compression element (20)".
  • “condensation pressure of heat source heat exchanger (24)”, “saturation pressure equivalent to temperature of heat source heat exchanger (24)”, or “liquid tube from heat source heat exchanger (24) to expansion valve (26) ( The “pressure of the upstream part of the first pipe (40a))” may be referred to as “high pressure”.
  • the second aspect is that in the first aspect, the first condition is that the internal pressure of the receiver (25) is within the first pressure range of the supercritical pressure or less.
  • the amount of refrigerant is determined based on the high pressure under the condition that the internal pressure of the receiver (25) is within the first pressure range equal to or lower than the supercritical pressure. Therefore, the amount of the refrigerant can be determined more accurately by more accurately considering the state of the refrigerant that is expected to be stored in the receiver (25) in a two-phase state during actual operation, and the accuracy of the determination result is further improved. Can be made to.
  • the third aspect is the gas vent pipe (41) for venting the gas refrigerant from the receiver (25) and the gas vent valve (42) provided in the gas vent pipe (41) in the second aspect. Further prepare.
  • the control unit (101) adjusts the opening degree of the degassing valve (42) so that the internal pressure of the receiver (25) is within the first pressure range in the first operation.
  • the internal pressure of the receiver (25) can be adjusted within the first pressure range by using the degassing valve (42).
  • the heat source unit (10) is connected to the utilization unit (60,70).
  • the compression element (20) includes a low-stage compressor (21,22) and a high-stage compressor (23) that compresses the refrigerant compressed by the low-stage compressor (21,22). ..
  • the heat source unit (10) further includes a degassing pipe (41) that introduces the gas refrigerant of the receiver (25) into the suction pipe (23a) of the high-stage compressor (23).
  • the control unit (101) stops the low-stage compressor (21,22) and operates the high-stage compressor (23) to compress the refrigerant on the high-stage side.
  • the machine (23), the heat source heat exchanger (24), the expansion valve (26), the receiver (25), the degassing pipe (41), and the high-stage compressor (23) are circulated in this order.
  • the low-stage compressor (21,22) corresponding to the utilization unit (60,70) is stopped and the high-stage compressor (23) is operated. Therefore, it is possible to stop the circulation of the refrigerant in the utilization unit (60,70) and circulate the refrigerant in the heat source unit (10) to determine the amount of the refrigerant. Therefore, since the fluctuation of the refrigerant state in the utilization unit (60, 70) or the like at the time of determining the amount of the refrigerant can be suppressed, the error in the determination result can be reduced.
  • control unit (101) determines that the amount of refrigerant is insufficient if the high pressure pressure is smaller than the first predetermined value in the first operation. If the high-pressure pressure is equal to or higher than the second predetermined value, it is determined that the amount of refrigerant is overfilled.
  • control unit (101) determines the first predetermined value and the second predetermined value based on the outside air temperature.
  • the amount of refrigerant can be determined more accurately in consideration of the outside air temperature.
  • the heat source unit (10) is connected to the utilization unit (60,70).
  • the control unit (101) is attached to the gas refrigerant pipe (3) on the utilization unit (60) side.
  • the amount of refrigerant is determined after the excess refrigerant is released for a predetermined time.
  • the protective pressure value and the protective temperature are the pressure and temperature at which the compression element (20) is stopped to ensure safety, respectively.
  • the compression element (20) can be operated to determine the amount of the refrigerant while avoiding the situation where the high pressure pressure becomes too high and the components of the refrigerant circuit are damaged.
  • the compression element (20) compresses the low-stage side compressor (21,22) and the refrigerant compressed by the low-stage side compressor (21,22).
  • the control unit (101) has a target value of the suction pressure of the high-stage compressor (23) when the high-pressure pressure is larger than the protective pressure value and the outside air temperature is equal to or higher than the protective temperature in the first operation. Is reduced and then the amount of refrigerant is determined.
  • the compression element (20) can be operated to determine the amount of the refrigerant while avoiding the situation where the high pressure pressure becomes too high and the components of the refrigerant circuit are damaged.
  • control unit (101) performs the first operation when the high pressure pressure is equal to or higher than the supercritical pressure, and the high pressure pressure is reduced.
  • the second operation of determining the amount of the refrigerant is performed under the second condition that the internal pressure of the receiver (25) and the high pressure are substantially equal.
  • control unit (101) determines that the amount of the refrigerant is insufficient if the high pressure pressure is smaller than the third predetermined value in the second operation, and the high pressure pressure is the fourth. If it is equal to or more than a predetermined value, it is determined that the amount of refrigerant is overfilled.
  • the third predetermined value and the fourth predetermined value may be determined based on the outside air temperature. By doing so, the amount of the refrigerant can be determined more accurately in consideration of the outside air temperature.
  • control unit (101) adjusts the opening degree of the expansion valve (26) so that the second condition is satisfied.
  • the expansion valve (26) can be used to bring the internal pressure of the receiver (25) closer to the high pressure.
  • the refrigerant is carbon dioxide.
  • the refrigerating cycle in which the refrigerant operates in the supercritical region can be performed.
  • the thirteenth aspect is a method for determining the amount of refrigerant in a refrigerating apparatus (1) provided with a heat source unit (10) that uses a refrigerant that operates in a supercritical region.
  • the heat source unit (10) includes a compression element (20) for compressing the refrigerant, a heat source heat exchanger (24), and an expansion valve (26) provided downstream of the heat source heat exchanger (24). It is provided with a receiver (25) provided downstream of the expansion valve (26).
  • the method for determining the amount of refrigerant in the refrigerating apparatus (1) determines the amount of refrigerant based on the high pressure under the first condition that the internal pressure of the receiver (25) is equal to or lower than the supercritical pressure.
  • the amount of the refrigerant is determined based on the high pressure under the first condition that the internal pressure of the receiver (25) is equal to or less than the supercritical pressure. Therefore, the amount of the refrigerant can be determined based on the high pressure in consideration of the refrigerant that is expected to be stored in the receiver (25) in a two-phase state during actual operation, so that the accuracy of the determination result can be improved. can.
  • FIG. 1 is a piping system diagram of the refrigerating apparatus according to the embodiment.
  • FIG. 2 is a block diagram showing a relationship between a controller, various sensors, and various devices in the refrigerating apparatus according to the embodiment.
  • FIG. 3 is a diagram showing the flow of the refrigerant in the cold operation in the refrigerating apparatus shown in FIG.
  • FIG. 4 is a diagram showing the flow of the refrigerant in the cooling operation in the refrigerating apparatus shown in FIG.
  • FIG. 5 is a diagram showing the flow of the refrigerant in the cooling / cooling operation in the refrigerating apparatus shown in FIG.
  • FIG. 6 is a diagram showing the flow of the refrigerant in the heating operation in the refrigerating apparatus shown in FIG.
  • FIG. 1 is a piping system diagram of the refrigerating apparatus according to the embodiment.
  • FIG. 2 is a block diagram showing a relationship between a controller, various sensors, and various devices in the refrigerating apparatus according to the embodiment
  • FIG. 7 is a diagram showing the flow of the refrigerant in the heating / cooling operation in the refrigerating apparatus shown in FIG.
  • FIG. 8 is a diagram showing a flow of the refrigerant at the time of determining the amount of the refrigerant in the refrigerating apparatus shown in FIG.
  • FIG. 9 is a first flowchart showing a method for determining the amount of refrigerant in the refrigerating apparatus according to the embodiment.
  • FIG. 10 is a second flowchart showing a method for determining the amount of refrigerant in the refrigerating apparatus according to the embodiment.
  • FIG. 11 is a third flowchart showing a method for determining the amount of refrigerant in the refrigerating apparatus according to the embodiment.
  • FIG. 12 is a fourth flowchart showing a method for determining the amount of refrigerant in the refrigerating apparatus according to the embodiment.
  • FIG. 13 is a schematic diagram showing an example of a determination standard in the method for determining the amount of refrigerant in the refrigerating apparatus according to the embodiment.
  • Embodiment >> ⁇ overall structure>
  • the refrigerating apparatus (1) according to the embodiment cools the object to be cooled and air-conditions the room at the same time.
  • the cooling target here includes air in equipment such as refrigerators, freezers, and showcases. Hereinafter, such equipment will be referred to as cold installation.
  • the refrigerating device (1) includes a heat source unit (10) installed outdoors, an air conditioning unit (60) that air-conditions the room, and a cooling unit (70) that cools the air inside the refrigerator. And.
  • the refrigerating apparatus (1) includes a controller (100) for controlling the refrigerant circuit (6).
  • FIG. 1 illustrates one air conditioning unit (60).
  • the refrigerating device (1) may have two or more air conditioning units (60) connected in parallel.
  • FIG. 1 illustrates one cooling unit (70).
  • the refrigerating apparatus (1) may have two or more cooling units (70) connected in parallel.
  • the refrigerant circuit (6) is configured by connecting these units (10,60,70) by four connecting pipes (2,3,4,5).
  • the four connecting pipes (2,3,4,5) are the first liquid connecting pipe (2), the first gas connecting pipe (3), the second liquid connecting pipe (4), and the second gas connecting pipe (2). It consists of 5).
  • the first liquid connecting pipe (2) and the first gas connecting pipe (3) correspond to the air conditioning unit (60).
  • the second liquid connecting pipe (4) and the second gas connecting pipe (5) correspond to the cooling unit (70).
  • the refrigerant circuit (6) contains the filled refrigerant.
  • the refrigerant circuit (6) circulates the refrigerant to perform a refrigeration cycle.
  • a refrigerant operating in the supercritical region for example, carbon dioxide is used.
  • the refrigerant circuit (6) performs a refrigeration cycle in which the refrigerant exceeds the critical pressure.
  • the heat source unit (10) has a heat source circuit (11) and an outdoor fan (12).
  • the heat source circuit (11) has a compression element (20), a heat source heat exchanger (outdoor heat exchanger) (24), and a refrigerant container (receiver) (25).
  • the heat source circuit (11) has a first outdoor expansion valve (26) and a second outdoor expansion valve (27).
  • the heat source circuit (11) further includes a cooling heat exchanger (28) and an intercooler (29).
  • the heat source circuit (11) has four closed valves (13,14,15,16).
  • the four shutoff valves are composed of a first gas shutoff valve (13), a first liquid shutoff valve (14), a second gas shutoff valve (15), and a second liquid shutoff valve (16).
  • the first gas connecting pipe (3) is connected to the first gas shutoff valve (13).
  • the first liquid connecting pipe (2) is connected to the first liquid closing valve (14).
  • a second gas connecting pipe (5) is connected to the second gas shutoff valve (15).
  • the second liquid connecting pipe (4) is connected to the second liquid closing valve (16).
  • the compression element (20) compresses the refrigerant.
  • the compression element (20) has a first compressor (21), a second compressor (22), and a third compressor (23).
  • the compression element (20) performs an operation of compressing the refrigerant in a single stage and an operation of compressing the refrigerant in two stages.
  • the first compressor (21) is an air conditioning compressor corresponding to the air conditioning unit (60).
  • the second compressor (22) is a cold compressor corresponding to the cold unit (70).
  • the first compressor (21) and the second compressor (22) are compressors on the lower stage side.
  • the first compressor (21) and the second compressor (22) are connected in parallel.
  • the first compressor (21) and the second compressor (22) may be referred to as a low-stage compressor (21,22).
  • the third compressor (23) is a compressor on the higher stage side.
  • the third compressor (23) is connected in series with the first compressor (21).
  • the third compressor (23) is connected in series with the second compressor (22).
  • the third compressor (23) may be referred to as a high-stage compressor (23).
  • the first compressor (21), the second compressor (22), and the third compressor (23) are rotary compressors in which the compression mechanism is driven by a motor.
  • the first compressor (21), the second compressor (22), and the third compressor (23) are variable capacitance type.
  • the rotation speed of the first compressor (21), the second compressor (22), and the third compressor (23) is adjusted by the inverter device.
  • the first suction pipe (21a) and the first discharge pipe (21b) are connected to the first compressor (21).
  • a second suction pipe (22a) and a second discharge pipe (22b) are connected to the second compressor (22).
  • a third suction pipe (23a) and a third discharge pipe (23b) are connected to the third compressor (23).
  • the heat source circuit (11) includes an intermediate flow path (18).
  • the intermediate flow path (18) connects the discharge portion of the first compressor (21) and the second compressor (22) to the suction portion of the third compressor (23).
  • the intermediate flow path (18) includes a first discharge pipe (21b), a second discharge pipe (22b), and a third suction pipe (23a).
  • the flow path switching mechanism (30) switches the flow path of the refrigerant.
  • the flow path switching mechanism (30) includes a first flow path (C1), a second flow path (C2), a third flow path (C3), and a fourth flow path (C4).
  • the first flow path (C1), the second flow path (C2), the third flow path (C3), and the fourth flow path (C4) are connected in a bridge shape.
  • One end of the first flow path (C1) and one end of the third flow path (C3) are connected to the discharge portion of the third compressor (23) via the third discharge pipe (23b).
  • One end of the second flow path (C2) and one end of the fourth flow path (C4) are connected to the suction portion of the first compressor (21) via the first suction pipe (21a).
  • the other end of the first flow path (C1) and the other end of the second flow path (C2) are connected to the air conditioning unit (60) via the first gas connecting pipe (3).
  • the other end of the third flow path (C3) and the other end of the fourth flow path (C4) are connected to the gas side end of the outdoor heat exchanger (24).
  • the flow path switching mechanism (30) has a first on-off valve (31), a second on-off valve (32), a third on-off valve (33), and a fourth on-off valve (34).
  • the first on-off valve (31) opens and closes the first flow path (C1).
  • the second on-off valve (32) opens and closes the second flow path (C2).
  • the third on-off valve (33) opens and closes the third flow path (C3).
  • the fourth on-off valve (34) opens and closes the fourth flow path (C4).
  • Each on-off valve (31,32,33,34) is composed of an electromagnetic on-off valve.
  • Each on-off valve (31,32,33,34) may be an electronic expansion valve that adjusts the opening degree based on a pulse signal.
  • a fifth on-off valve (35) composed of an electronic expansion valve is provided in parallel with the first on-off valve (31) composed of an electromagnetic on-off valve. May be good.
  • a sixth on-off valve (36) composed of an electronic expansion valve is provided in parallel with the third on-off valve (33) composed of an electromagnetic on-off valve. May be good.
  • the outdoor heat exchanger (24) is a fin-and-tube type air heat exchanger.
  • the outdoor fan (12) is located in the vicinity of the outdoor heat exchanger (24).
  • the outdoor fan (12) carries outdoor air.
  • the outdoor heat exchanger (24) exchanges heat between the refrigerant flowing inside the outdoor heat exchanger (24) and the outdoor air carried by the outdoor fan (12).
  • the outdoor heat exchanger (24) may be referred to as a heat source heat exchanger (24).
  • the heat source circuit (11) includes a liquid side flow path (40).
  • the liquid side flow path (40) is provided between the liquid side end of the outdoor heat exchanger (24) and the two liquid closing valves (14, 16).
  • the liquid side flow path (40) includes the first to fifth pipes (40a, 40b, 40c, 40d, 40e).
  • One end of the first pipe (40a) is connected to the liquid side end of the outdoor heat exchanger (24).
  • the other end of the first tube (40a) connects to the top of the receiver (25).
  • One end of the second tube (40b) connects to the bottom of the receiver (25).
  • the other end of the second pipe (40b) is connected to the second liquid closing valve (16).
  • One end of the third pipe (40c) is connected to the middle part of the second pipe (40b).
  • the other end of the third pipe (40c) is connected to the first liquid closing valve (14).
  • One end of the fourth tube (40d) is connected between the first outdoor expansion valve (26) and the receiver (25) in the first tube (40a).
  • the other end of the fourth pipe (40d) is connected to the middle part of the third pipe (40c).
  • One end of the fifth pipe (40e) is connected between the outdoor heat exchanger (24) in the first pipe (40a) and the first outdoor expansion valve (26).
  • the other end of the fifth tube (40e) is connected between the receiver (25) in the second tube (40b) and the connection portion of the third tube (40c).
  • the first outdoor expansion valve (26) is provided in the first pipe (40a).
  • the first outdoor expansion valve (26) is provided in the first pipe (40a) between the liquid side end of the outdoor heat exchanger (24) and the connection portion of the fourth pipe (40d).
  • the second outdoor expansion valve (27) is provided in the fifth pipe (40e).
  • the first outdoor expansion valve (26) and the second outdoor expansion valve (27) are expansion valves whose opening degree can be adjusted.
  • the first outdoor expansion valve (26) and the second outdoor expansion valve (27) may be electronic expansion valves that adjust the opening degree based on a pulse signal.
  • the receiver (25) is a closed refrigerant container that stores the refrigerant.
  • the receiver (25) separates the refrigerant into a gas refrigerant and a liquid refrigerant.
  • a gas layer and a liquid layer are formed inside the receiver (25).
  • the gas layer is formed on the top side of the receiver (25).
  • the liquid layer is formed on the bottom side of the receiver (25).
  • the heat source circuit (11) has a degassing tube (41). One end of the degassing tube (41) connects to the top of the receiver (25). The other end of the degassing pipe (41) is connected to the intermediate flow path (18).
  • the degassing pipe (41) introduces the gas refrigerant in the receiver (25) into the intermediate flow path (18), that is, the suction pipe (23a) of the high-stage compressor (third compressor) (23).
  • the degassing pipe (41) connects the pipe (first pipe) (40a) on the downstream side of the first outdoor expansion valve (26) and the third suction pipe (23a) via the receiver (25). It is a connection pipe.
  • the degassing pipe (41) may be referred to as a connecting pipe (41).
  • the degassing pipe (41) is provided with a degassing valve (42).
  • the degassing pipe (41) is an expansion valve whose opening degree can be adjusted.
  • the degassing valve (42) may be an electronic expansion valve that adjusts the opening degree based on a pulse signal.
  • the cooling heat exchanger (28) has a high pressure side flow path (28a) and a low pressure side flow path (28b).
  • the cooling heat exchanger (28) exchanges heat between the refrigerant in the high pressure side flow path (28a) and the refrigerant in the low pressure side flow path (28b). In other words, the cooling heat exchanger (28) cools the refrigerant flowing in the high pressure side flow path (28a) by the refrigerant flowing in the low pressure side flow path (28b).
  • the low pressure side flow path (28b) constitutes a part of the injection flow path (43).
  • the injection flow path (43) includes an upstream flow path (44) and a downstream flow path (45).
  • One end of the upstream flow path (44) is connected to the upstream side by the connection portion of the fifth pipe (40e) in the second pipe (40b).
  • the other end of the upstream flow path (44) is connected to the inflow end of the low pressure side flow path (28b).
  • An injection valve (46) is provided in the upstream flow path (44).
  • the injection valve (46) is an expansion valve whose opening degree can be adjusted.
  • the injection valve (46) may be an electronic expansion valve that adjusts the opening degree based on a pulse signal.
  • downstream flow path (45) One end of the downstream flow path (45) is connected to the outflow end of the low pressure side flow path (28b). The other end of the downstream flow path (45) is connected to the degassing pipe (connection pipe) (41).
  • the intercooler (29) is provided in the intermediate flow path (18).
  • the intercooler (29) is a fin-and-tube type air heat exchanger.
  • a cooling fan (29a) is arranged in the vicinity of the intercooler (29). The intercooler (29) exchanges heat between the refrigerant flowing inside the intercooler (29) and the outdoor air carried by the cooling fan (29a).
  • the heat source circuit (11) includes an oil separation circuit.
  • the oil separation circuit includes an oil separator (50), a first oil return pipe (51), and a second oil return pipe (52).
  • the oil separator (50) is connected to the third discharge pipe (23b).
  • the oil separator (50) separates oil from the refrigerant discharged from the compression element (20).
  • the inflow ends of the first oil return pipe (51) and the second oil return pipe (52) communicate with the oil separator (50).
  • the outflow end of the first oil return pipe (51) is connected to the intermediate flow path (18).
  • the first oil return pipe (51) is provided with a first oil amount control valve (53).
  • the outflow side of the second oil return pipe (52) is separated into a first branch pipe (52a) and a second branch pipe (52b).
  • the first branch pipe (52a) is connected to the oil storage portion of the first compressor (21).
  • the second branch pipe (52b) is connected to the oil storage portion of the second compressor (22).
  • the first branch pipe (52a) is provided with a second oil amount control valve (54).
  • the second branch pipe (52b) is provided with a third oil amount control valve (55).
  • the heat source circuit (11) has a first bypass tube (56), a second bypass tube (57), and a third bypass tube (58).
  • the first bypass tube (56) corresponds to the first compressor (21).
  • the second bypass tube (57) corresponds to the second compressor (22).
  • the third bypass tube (58) corresponds to the third compressor (23).
  • first bypass pipe (56) directly connects the first suction pipe (21a) and the first discharge pipe (21b).
  • the second bypass pipe (57) directly connects the second suction pipe (22a) and the second discharge pipe (22b).
  • the third bypass pipe (58) directly connects the third suction pipe (23a) and the third discharge pipe (23b).
  • the heat source circuit (11) has a plurality of check valves.
  • the plurality of check valves include the first to tenth check valves (CV1 to CV10). These check valves (CV1 to CV10) allow the flow of the refrigerant in the direction of the arrow in FIG. 1 and prohibit the flow of the refrigerant in the opposite direction.
  • the first check valve (CV1) is provided in the first discharge pipe (21b).
  • the second check valve (CV2) is provided in the second discharge pipe (22b).
  • the third check valve (CV3) is provided in the third discharge pipe (23b).
  • the fourth check valve (CV4) is provided in the first pipe (40a).
  • the fifth check valve (CV5) is provided in the third pipe (40c).
  • the sixth check valve (CV6) is provided in the fourth pipe (40d).
  • the seventh check valve (CV7) is provided in the fifth pipe (40e).
  • the eighth check valve (CV8) is provided in the first bypass pipe (56).
  • the ninth check valve (CV9) is provided in the second bypass pipe (57).
  • the tenth check valve (CV10) is provided in the third bypass pipe (58).
  • the air conditioning unit (60) is a first-use unit installed indoors.
  • the air conditioning unit (60) has a higher evaporation temperature of the refrigerant than the cooling unit (70).
  • the air conditioning unit (60) has an indoor circuit (61) and an indoor fan (62).
  • the first liquid connecting pipe (2) is connected to the liquid side end of the indoor circuit (61).
  • the first gas connecting pipe (3) is connected to the gas side end of the indoor circuit (61).
  • the indoor circuit (61) has an indoor expansion valve (63) and an indoor heat exchanger (64) in order from the liquid side end to the gas side end.
  • the indoor expansion valve (63) is provided at the inlet of the indoor heat exchanger (64).
  • the indoor expansion valve (63) is an expansion valve whose opening degree can be adjusted.
  • the indoor expansion valve (63) may be an electronic expansion valve that adjusts the opening degree based on a pulse signal.
  • the indoor heat exchanger (64) is a fin-and-tube type air heat exchanger.
  • the indoor fan (62) is located in the vicinity of the indoor heat exchanger (64).
  • the indoor fan (62) carries indoor air.
  • the indoor heat exchanger (64) exchanges heat between the refrigerant flowing inside the indoor heat exchanger (64) and the indoor air carried by the indoor fan (62).
  • the cooling unit (70) is a second-use unit that cools the inside of the refrigerator.
  • the cooling unit (70) has a cooling circuit (71) and a cooling fan (72).
  • a second liquid connecting pipe (4) is connected to the liquid side end of the cooling circuit (71).
  • a second gas connecting pipe (5) is connected to the gas side end of the cooling circuit (71).
  • the cold circuit (71) has a cold expansion valve (73) and a cold heat exchanger (74) in order from the liquid side end to the gas side end.
  • the cold expansion valve (73) is provided at the inlet of the cold heat exchanger (74).
  • the cold expansion valve (73) is an expansion valve whose opening degree can be adjusted.
  • the cold expansion valve (73) may be an electronic expansion valve that adjusts the opening degree based on a pulse signal.
  • the cold heat exchanger (74) is a fin-and-tube type air heat exchanger.
  • the cold fan (72) is located in the vicinity of the cold heat exchanger (74).
  • the cooling fan (72) conveys the air inside the refrigerator.
  • the cold heat exchanger (74) exchanges heat between the refrigerant flowing inside the cold heat exchanger (74) and the air inside the refrigerator carried by the cold fan (72).
  • the air conditioning unit (60) and the cooling unit (70) may be referred to as the utilization unit (60,70).
  • the indoor expansion valve (63) and the cold expansion valve (73) are called the utilization expansion valve (63,73), and the indoor heat exchanger (64) and the cold heat exchanger (74) are used. 64,74).
  • the refrigerating device (1) has a plurality of sensors.
  • the plurality of sensors include a first pressure sensor (81), a second pressure sensor (82), a third pressure sensor (83), a fourth pressure sensor (84), and a fifth pressure sensor (85).
  • the first pressure sensor (81) detects the pressure of the refrigerant sucked into the first compressor (21).
  • the second pressure sensor (82) detects the pressure of the refrigerant sucked into the second compressor (22).
  • the third pressure sensor (83) detects the pressure of the refrigerant in the intermediate flow path (18) (hereinafter, also referred to as intermediate pressure (MP)), that is, the pressure of the refrigerant sucked into the third compressor (23). do.
  • the fourth pressure sensor (84) detects the pressure of the refrigerant discharged from the third compressor (23) (hereinafter, may be referred to as high pressure pressure (HP)).
  • the fifth pressure sensor (85) detects the pressure of the refrigerant flowing out from the receiver (25). From the pressure detected by the fifth pressure sensor (85), the internal pressure (RP) of the receiver (25) can be known.
  • the refrigerating device (1) detects sensors other than the pressure sensor, for example, a temperature sensor that detects the outside air temperature, a refrigerant temperature at each location in the refrigerant circuit (6), and the like. Includes temperature sensor, etc.
  • the controller (100) includes a microcomputer mounted on a control board and a memory device (specifically, a semiconductor memory) for storing software for operating the microcomputer.
  • the controller (100) controls various devices of the refrigerating device (1) based on the detection signals of various sensors.
  • the controller (100) has an outdoor controller (101), an indoor controller (102), and a cold controller (103).
  • the outdoor controller (101) is provided in the heat source unit (10).
  • the indoor controller (102) is provided in the air conditioning unit (60).
  • the cooling controller (103) is provided in the cooling unit (70).
  • the outdoor controller (101) can communicate with the indoor controller (102) and the cold controller (103).
  • the amount of refrigerant in the refrigerating device (1) is determined by the outdoor controller (101) provided in the heat source unit (10).
  • the outdoor controller (101) may be simply referred to as a control unit (101).
  • the operating operation of the refrigerating device (1) will be described.
  • the operation of the refrigerating apparatus (1) includes a cooling operation, a cooling operation, a cooling cooling operation, a heating operation, and a heating / cooling operation.
  • the cooling unit (70) cools the air inside the refrigerator, and the air conditioning unit (60) stops.
  • the cooling unit (70) is stopped and the air conditioning unit (60) cools the room.
  • the cooling unit (70) cools the air in the refrigerator, and the air conditioning unit (60) cools the room.
  • the heating operation the cooling unit (70) is stopped and the air conditioning unit (60) heats the room.
  • the heating / cooling operation the cooling unit (70) cools the air in the refrigerator, and the air conditioning unit (60) heats the room.
  • the controller (100) closes the first on-off valve (31), the second on-off valve (32), the fourth on-off valve (34), and the fifth on-off valve (35). 3 Open the on-off valve (33) and / or the sixth on-off valve (36).
  • the controller (100) stops the first compressor (21) and operates the second compressor (22) and the third compressor (23).
  • the controller (100) opens the first outdoor expansion valve (26) and the injection valve (46) at a predetermined opening degree, and closes the second outdoor expansion valve (27).
  • the controller (100) closes the indoor expansion valve (63) and adjusts the opening degree of the cold expansion valve (73).
  • the controller (100) operates the outdoor fan (12) and the cooling fan (72), and stops the indoor fan (62).
  • the outdoor heat exchanger (24) functions as a radiator
  • the indoor heat exchanger (64) substantially stops functioning
  • the cold heat exchanger (74) functions as an evaporator. The cycle takes place.
  • the refrigerant compressed by the second compressor (22) is cooled by the intercooler (29) and then sucked into the third compressor (23).
  • the refrigerant compressed to a critical pressure or higher by the third compressor (23) dissipates heat in the outdoor heat exchanger (24) and then passes through the first outdoor expansion valve (26).
  • the first outdoor expansion valve (26) depressurizes the refrigerant to a pressure lower than the critical pressure.
  • the refrigerant in the subcritical state flows into the receiver (25).
  • the receiver (25) separates the refrigerant into a gas refrigerant and a liquid refrigerant.
  • the liquid refrigerant separated by the receiver (25) is cooled by the refrigerant flowing through the injection flow path (43) in the cooling heat exchanger (28).
  • the refrigerant in the injection flow path (43) is sent to the intermediate flow path (18).
  • the refrigerant cooled by the cooling heat exchanger (28) is sent to the cooling unit (70).
  • the refrigerant sent to the cooling unit (70) is decompressed by the cooling expansion valve (73) and then evaporated in the cooling heat exchanger (74).
  • the refrigerant evaporated in the cooling heat exchanger (28) is sucked into the second compressor (22) and compressed again.
  • the controller (100) closes the first on-off valve (31), the fourth on-off valve (34), and the fifth on-off valve (35), the second on-off valve (32), and the second on-off valve (32). 3 Open the on-off valve (33) and / or the sixth on-off valve (36).
  • the controller (100) stops the second compressor (22) and operates the first compressor (21) and the third compressor (23).
  • the controller (100) opens the first outdoor expansion valve (26) and the injection valve (46) at a predetermined opening degree, and closes the second outdoor expansion valve (27).
  • the controller (100) closes the cold expansion valve (73) and adjusts the opening degree of the indoor expansion valve (63).
  • the controller (100) operates the outdoor fan (12) and the indoor fan (62), and stops the cooling fan (72).
  • the outdoor heat exchanger (24) functions as a radiator
  • the indoor heat exchanger (64) functions as an evaporator
  • the refrigerant compressed by the first compressor (21) is cooled by the intercooler (29) and then sucked into the third compressor (23).
  • the refrigerant compressed to a critical pressure or higher by the third compressor (23) dissipates heat in the outdoor heat exchanger (24) and then passes through the first outdoor expansion valve (26).
  • the first outdoor expansion valve (26) depressurizes the refrigerant to a pressure lower than the critical pressure.
  • the refrigerant in the subcritical state flows into the receiver (25).
  • the receiver (25) separates the refrigerant into a gas refrigerant and a liquid refrigerant.
  • the liquid refrigerant separated by the receiver (25) is cooled by the refrigerant flowing through the injection flow path (43) in the cooling heat exchanger (28).
  • the refrigerant in the injection flow path (43) is sent to the intermediate flow path (18).
  • the refrigerant cooled by the cooling heat exchanger (28) is sent to the air conditioning unit (60).
  • the refrigerant sent to the air conditioning unit (60) is decompressed by the indoor expansion valve (63) and then evaporated by the indoor heat exchanger (64). As a result, the air in the room is cooled.
  • the refrigerant evaporated in the indoor heat exchanger (64) is sucked into the first compressor (21) and compressed again.
  • the controller (100) closes the first on-off valve (31), the fourth on-off valve (34), and the fifth on-off valve (35), and the second on-off valve (32), And open the 3rd on-off valve (33) and / or the 6th on-off valve (36).
  • the controller (100) operates the first compressor (21), the second compressor (22), and the third compressor (23).
  • the controller (100) opens the first outdoor expansion valve (26) and the injection valve (46) at a predetermined opening degree, and closes the second outdoor expansion valve (27).
  • the controller (100) adjusts the opening degree of the indoor expansion valve (63) and the cold expansion valve (73).
  • the controller (100) operates an outdoor fan (12), an indoor fan (62), and a cooling fan (72).
  • a refrigeration cycle is performed in which the outdoor heat exchanger (24) functions as a radiator, and the indoor heat exchanger (64) and the cold heat exchanger (74) function as an evaporator.
  • the refrigerant compressed by the first compressor (21) and the second compressor (22) is cooled by the intercooler (29) and then sucked into the third compressor (23). ..
  • the refrigerant compressed to a critical pressure or higher by the third compressor (23) dissipates heat in the outdoor heat exchanger (24) and then passes through the first outdoor expansion valve (26).
  • the first outdoor expansion valve (26) depressurizes the refrigerant to a pressure lower than the critical pressure.
  • the refrigerant in the subcritical state flows into the receiver (25).
  • the receiver (25) separates the refrigerant into a gas refrigerant and a liquid refrigerant.
  • the liquid refrigerant separated by the receiver (25) is cooled by the refrigerant flowing through the injection flow path (43) in the cooling heat exchanger (28).
  • the refrigerant in the injection flow path (43) is sent to the intermediate flow path (18).
  • the refrigerant cooled by the cooling heat exchanger (28) is sent to the air conditioning unit (60) and the cooling unit (70).
  • the refrigerant sent to the air conditioning unit (60) is decompressed by the indoor expansion valve (63) and then evaporated by the indoor heat exchanger (64). As a result, the air in the room is cooled.
  • the refrigerant evaporated in the indoor heat exchanger (64) is sucked into the first compressor (21) and compressed again.
  • the refrigerant sent to the cooling unit (70) is decompressed by the cooling expansion valve (73) and then evaporated by the cooling heat exchanger (74). As a result, the air inside the refrigerator is cooled.
  • the refrigerant evaporated in the cooling heat exchanger (28) is sucked into the second compressor (22) and compressed again.
  • the controller (100) closes the second on-off valve (32), the third on-off valve (33), and the sixth on-off valve (36), and the first on-off valve (31) and / or Open the fifth on-off valve (35) and the fourth on-off valve (34).
  • the controller (100) stops the second compressor (22) and operates the first compressor (21) and the third compressor (23).
  • the controller (100) opens the second outdoor expansion valve (27) and the injection valve (46) at a predetermined opening degree, and closes the first outdoor expansion valve (26).
  • the controller (100) closes the cold expansion valve (73) and adjusts the opening degree of the indoor expansion valve (63).
  • the controller (100) operates the outdoor fan (12) and the indoor fan (62), and stops the cooling fan (72).
  • the indoor heat exchanger (64) functions as a radiator
  • the outdoor heat exchanger (24) functions as an evaporator
  • the refrigerant compressed by the first compressor (21) is cooled by the intercooler (29) and then sucked into the third compressor (23).
  • the refrigerant compressed by the third compressor (23) is sent to the air conditioning unit (60).
  • the refrigerant sent to the air conditioning unit (60) is dissipated by the indoor heat exchanger (64). As a result, the air in the room is heated.
  • the refrigerant dissipated by the indoor heat exchanger (64) flows into the receiver (25).
  • the receiver (25) separates the refrigerant into a gas refrigerant and a liquid refrigerant.
  • the liquid refrigerant separated by the receiver (25) is cooled by the refrigerant flowing through the injection flow path (43) in the cooling heat exchanger (28).
  • the refrigerant in the injection flow path (43) is sent to the intermediate flow path (18).
  • the refrigerant cooled by the cooling heat exchanger (28) is decompressed by the second outdoor expansion valve (27) and then evaporated by the outdoor heat exchanger (24).
  • the refrigerant evaporated in the outdoor heat exchanger (24) is sucked into the first compressor (21) and compressed again.
  • the controller (100) closes the second on-off valve (32), the third on-off valve (33), and the sixth on-off valve (36), and the first on-off valve (31) and the first on-off valve (31). / Or open the 5th on-off valve (35) and the 4th on-off valve (34).
  • the controller (100) operates the first compressor (21), the second compressor (22), and the third compressor (23).
  • the controller (100) opens the second outdoor expansion valve (27) and the injection valve (46) at a predetermined opening degree, and closes the first outdoor expansion valve (26).
  • the controller (100) adjusts the opening degree of the indoor expansion valve (63) and the cold expansion valve (73).
  • the controller (100) operates an outdoor fan (12), an indoor fan (62), and a cooling fan (72).
  • a refrigeration cycle is performed in which the indoor heat exchanger (64) functions as a radiator, and the outdoor heat exchanger (24) and the cooling heat exchanger (74) function as an evaporator.
  • the refrigerant compressed by the first compressor (21) and the second compressor (22) is cooled by the intercooler (29) and then sucked into the third compressor (23). ..
  • the refrigerant compressed by the third compressor (23) is sent to the air conditioning unit (60).
  • the refrigerant sent to the air conditioning unit (60) is dissipated by the indoor heat exchanger (64). As a result, the air in the room is heated.
  • the refrigerant dissipated by the indoor heat exchanger (64) flows into the receiver (25).
  • the receiver (25) separates the refrigerant into a gas refrigerant and a liquid refrigerant.
  • the liquid refrigerant separated by the receiver (25) is cooled by the refrigerant flowing through the injection flow path (43) in the cooling heat exchanger (28).
  • the refrigerant in the injection flow path (43) is sent to the intermediate flow path (18).
  • a part of the refrigerant cooled by the cooling heat exchanger (28) is decompressed by the second outdoor expansion valve (27) and then evaporated by the outdoor heat exchanger (24).
  • the refrigerant evaporated in the outdoor heat exchanger (24) is sucked into the first compressor (21) and compressed again.
  • the rest of the refrigerant cooled by the cooling heat exchanger (28) is sent to the cooling unit (70).
  • the refrigerant sent to the cooling unit (70) is decompressed by the cooling expansion valve (73) and then evaporated in the cooling heat exchanger (74).
  • the refrigerant evaporated in the cooling heat exchanger (28) is sucked into the second compressor (22) and compressed again.
  • the operation of the refrigerating apparatus (1) includes an operation for determining the amount of refrigerant (hereinafter referred to as an operation for determining the amount of refrigerant).
  • the refrigerant amount determination operation is performed.
  • the compression element (20) is operated to send the refrigerant to the utilization unit (60,70), while in the refrigerant amount determination operation, the compression element (60,70) is stopped while the circulation of the refrigerant in the utilization unit (60,70) is stopped. 20) is operated to circulate the refrigerant in the heat source unit (10) to determine the amount of refrigerant.
  • the outdoor controller (101) uses the first gas shutoff valve (13) and the first gas shutoff valve (13). Close the liquid shutoff valve (14), the second gas shutoff valve (15), and the second liquid shutoff valve (16). Further, the outdoor controller (101) fully closes the indoor expansion valve (63) and the cold expansion valve (73), that is, the utilization expansion valve (63,73) through the indoor controller (102) and the cooling controller (103). At the same time, the indoor fan (62) and the cooling fan (72) may be stopped.
  • the outdoor controller (101) closes the first on-off valve (31), the second on-off valve (32), the fourth on-off valve (34), and the fifth on-off valve (35), and closes the third on-off valve (33) and the third on-off valve (33). / Or open the sixth on-off valve (36).
  • the outdoor controller (101) stops the first compressor (21) and the second compressor (22), that is, the low-stage compressor (21,22), and stops the third compressor (23), that is, the high-stage compressor. Drive (23).
  • the outdoor controller (101) opens the first outdoor expansion valve (26) and the degassing valve (42) at a predetermined opening degree, and closes the second outdoor expansion valve (27).
  • the outdoor controller (101) operates the outdoor fan (12).
  • the outdoor heat exchanger (24) functions as a radiator, and the functions of the indoor heat exchanger (64) and the cold heat exchanger (74) are substantially stopped.
  • the refrigerant compressed to a critical pressure or higher by the third compressor (23) dissipates heat in the outdoor heat exchanger (24) and then passes through the first outdoor expansion valve (26).
  • the first outdoor expansion valve (26) depressurizes the refrigerant.
  • the decompressed refrigerant flows into the receiver (25).
  • the receiver (25) separates the refrigerant into a gas refrigerant and a liquid refrigerant.
  • the gas refrigerant separated by the receiver (25) flows through the degassing pipe (41) and is sent to the intermediate flow path (18), that is, the third suction pipe (23a) of the third compressor (23), and is sent to the third compression pipe (23a). It is inhaled into the machine (23) and compressed again.
  • the refrigerant is transferred to the high-stage compressor (23), the outdoor heat exchanger (heat source heat exchanger) (24), and the first outdoor expansion valve (26) in the heat source unit (10). ),
  • the degassing pipe (connection pipe) (41), and the high-stage compressor (23) are circulated in this order, and the amount of refrigerant is determined by the method described later.
  • the temperature of the refrigerant flowing into the receiver (25) gradually decreases due to the heat radiation of the refrigerant in the outdoor heat exchanger (24). do.
  • step S101 the outdoor controller (control unit) (101) determines whether or not the refrigerant amount excess / deficiency detection switch is turned on.
  • the refrigerant excess / deficiency detection switch may be configured as an input device such as a touch panel constituting the controller (100).
  • step S102 the control unit (101) determines whether or not the trial run is completed and the elapsed time after the trial run is completed is within a predetermined time (for example, 30 minutes). If the refrigerant excess / deficiency detection switch is not turned on, the process returns to step S101.
  • the control unit (101) may end the test run when it is determined that the state of the refrigerant in the test run is stable.
  • the conditions for judging that the state of the refrigerant is stable in the trial run are, for example, "whether a predetermined time has passed since the trial run was started” and “whether the blowout temperature of the utilization unit (60,70) is below the predetermined temperature”. (In the case of cooling. If it is heating, whether it is above the specified temperature), "whether there is an abnormality code", "whether the suction pipe temperature of the compression element (20) is within the specified range", etc. may be used. ..
  • the heat source unit (10) is further provided with means for detecting the state amount of the refrigerant, and even if the control unit (101) determines whether or not the above-mentioned conditions are satisfied from the values obtained by the means. good. By doing so, it can be easily determined that the state of the refrigerant in the refrigerant circuit (6) is stable by the means for detecting the state amount of the refrigerant.
  • step S102 When it is determined in step S102 that the trial run is completed and the elapsed time after the trial run is completed is within a predetermined time, in step S103, the control unit (101) stops the circulation of the refrigerant in the utilization unit (60,70). Let me. On the other hand, if it is determined in step S102 that the test run has not been completed or the elapsed time after the test run has exceeded a predetermined time, the process returns to step S101.
  • the control unit (101) is a first gas shutoff valve (13), a first liquid shutoff valve (14), a second gas shutoff valve (15), and a second liquid shutoff valve ( 16) Close. Further, the control unit (101) fully closes the indoor expansion valve (63) and the cold expansion valve (73), that is, the utilization expansion valve (63,73) through the indoor controller (102) and the cooling controller (103). At the same time, stop the indoor fan (62) and the cooling fan (72). As a result, the circulation of the refrigerant in the utilization unit (60,70) is stopped.
  • step S104 the control unit (101) operates the compression element (20) while stopping the circulation of the refrigerant in the utilization unit (60, 70), and circulates the refrigerant in the heat source unit (10). Let me. As a result, the refrigerant amount determination operation is started.
  • step S104 the control unit (101) closes the first on-off valve (31), the second on-off valve (32), the fourth on-off valve (34), and the fifth on-off valve (35). , Open the third on-off valve (33) and / or the sixth on-off valve (36). Further, the control unit (101) stops the first compressor (21) and the second compressor (22), that is, the low-stage side compressor (21,22), and stops the third compressor (23), that is, the high-stage side. Operate the compressor (23). Further, the control unit (101) opens the first outdoor expansion valve (26) and the degassing valve (42) at a predetermined opening degree, and closes the second outdoor expansion valve (27). Further, the control unit (101) operates the outdoor fan (12).
  • the refrigerant in the heat source unit (10) is the high-stage compressor (23), the outdoor heat exchanger (heat source heat exchanger) (24), the first outdoor expansion valve (26), and the gas vent pipe (connection pipe). ) (41) and the high-stage compressor (23) circulate in this order.
  • step S105 the control unit (101) determines whether the high pressure pressure (HP), for example, whether the discharge pressure of the compression element (20) is in the subcritical region, in other words, the high pressure pressure (HP) is supercritical. Determine if it is below the pressure or above the supercritical pressure.
  • the high pressure pressure (HP) is detected by the fourth pressure sensor (84), and the detection result is transmitted to the control unit (101).
  • step S105 When it is determined in step S105 that the high pressure pressure (HP) is in the subcritical region (less than the supercritical pressure), the first determination operation of steps S106 to S112 described later is performed.
  • step S105 When it is determined in step S105 that the high pressure pressure (HP) is not in the subcritical region (greater than or equal to the supercritical pressure), the second determination operation after step S201 (see FIGS. 10 to 12) described later is performed.
  • the first determination operation may be referred to as "second operation”
  • the second determination operation may be referred to as "first operation”.
  • step S106 the control unit (101) determines whether the high pressure (HP) and the internal pressure (RP) of the receiver (25) are substantially equal.
  • the internal pressure (RP) of the receiver (25) is detected by the fifth pressure sensor (85), and the detection result is transmitted to the control unit (101).
  • step S107 the control unit (101) controls the internal pressure of the receiver (25).
  • the opening degree of the first outdoor expansion valve (26) is adjusted stepwise so that (RP) approaches the high pressure (HP). Step S107 is repeated until it is determined in step S106 that the high pressure (HP) and the internal pressure (RP) of the receiver (25) are substantially equal.
  • the receiver (25) Open the first outdoor expansion valve (26) until the internal pressure (RP) of the is substantially equal to the high pressure (HP), and if necessary, fully open the first outdoor expansion valve (26). ..
  • step S108 the control unit (101) has a predetermined high pressure (HP). Determine if it is less than the lower limit.
  • step S109 the control unit (101) determines that the amount of refrigerant is insufficient.
  • step S110 the control unit (101) determines whether the high pressure pressure (HP) is equal to or higher than the predetermined upper limit value. judge.
  • step S111 the control unit (101) determines that the amount of refrigerant is overfilled.
  • step S110 When it is determined in step S110 that the high pressure pressure (HP) is not equal to or higher than a predetermined upper limit value, in step S112, the control unit (101) determines that the amount of refrigerant is an appropriate amount.
  • the above-mentioned predetermined lower limit value and predetermined upper limit value may be determined based on the outside air temperature (Ta), respectively. By doing so, the amount of the refrigerant can be determined more accurately in consideration of the outside air temperature (Ta).
  • FIG. 13 shows the criteria for determining the amount of refrigerant in the first determination operation described above.
  • the horizontal axis of FIG. 13 indicates the outside air temperature (Ta), and the vertical axis of FIG. 13 indicates the pressure such as the high pressure pressure (HP) and the internal pressure (RP) of the receiver (25).
  • HP high pressure pressure
  • RP internal pressure
  • the amount of refrigerant is determined to be an appropriate amount, if HP is larger than a predetermined range, it is determined that the amount of refrigerant is overfilled, and if HP is smaller than a predetermined range, it is determined that the amount of refrigerant is insufficient.
  • step S113 the control unit (101) stops the heat source unit (10), that is, the high-stage compressor (23). The refrigerant amount determination operation is terminated.
  • ⁇ Second judgment operation> In the second determination operation when it is determined in step S105 that the HP is equal to or higher than the supercritical pressure, first, in step S201, in the control unit (101), the RP is equal to or lower than the supercritical pressure, as shown in FIG. Whether or not the RP is present, specifically, whether or not the RP is within the first pressure range below the supercritical pressure (for example, 6.5 MPa ⁇ RP ⁇ 7.0 MPa) is determined.
  • step S202 the control unit (101) adjusts the opening degree of the degassing valve (42) and / or the third compressor (high stage). Adjust the RP by adjusting the rotation speed of the side compressor) (23). Subsequently, in step S203, the control unit (101) redetermines whether or not the RP is within the first pressure range. Step S202 is repeated until it is determined in step S203 that the RP is within the first pressure range.
  • step S204 the control unit (101) limits the droop control performed in the normal operation.
  • the droop control means that the temperature of the discharge pipe of the compression element (20) is adjusted so that the operation of the compression element (20) is not continued for a long time while the motor of the compression element (20) is overheated.
  • a control that forcibly reduces the rotation speed of the compression element (20) while continuing the operation when the predetermined drooping temperature is reached.
  • step S205 the control unit (101) determines whether the HP is smaller than the predetermined lower limit value.
  • step S206 the control unit (101) determines that the amount of refrigerant is insufficient.
  • step S207 the control unit (101) determines that the HP is equal to or higher than the predetermined upper limit value and the outside air temperature (Ta) is higher than the protection temperature. Determine if it is small.
  • the protection temperature is the temperature at which the compression element (20) is stopped to ensure safety.
  • the predetermined lower limit value and the predetermined upper limit value may be determined based on the outside air temperature (Ta), respectively. By doing so, the amount of the refrigerant can be determined more accurately in consideration of the outside air temperature (Ta).
  • step S208 the control unit (101) determines that the amount of refrigerant is overfilled.
  • step S207 When it is determined in step S207 that HP is not equal to or higher than a predetermined upper limit value or Ta is not smaller than the protection temperature, in step S209, the control unit (101) determines that HP is a predetermined condition as a first condition determination. It is determined whether or not it is equal to or more than the lower limit value and less than the predetermined upper limit value, and Ta is smaller than the protection temperature.
  • step S209 When it is determined in the first condition determination in step S209 that HP is equal to or more than a predetermined lower limit value and less than a predetermined upper limit value, and Ta is smaller than the protection temperature, the control unit (101) is determined in step S210. It is determined that the amount of refrigerant is an appropriate amount.
  • step S209 the control unit (101) determines, as the second condition determination, whether HP is equal to or less than the protective pressure value and Ta is equal to or higher than the protective temperature.
  • the protective pressure value is a pressure for stopping the compression element (20) (high-stage compressor (23)) for ensuring safety, and is, for example, 10.8 MPa.
  • step S210 the control unit (101) determines that the amount of refrigerant is an appropriate amount. do.
  • FIG. 13 shows the criteria for determining the amount of refrigerant in the second determination operation described above.
  • the horizontal axis of FIG. 13 indicates Ta, and the vertical axis of FIG. 13 indicates pressures such as HP and RP.
  • HP when HP is in the supercritical region, HP is predetermined under the condition that RP is within the first pressure range below the supercritical pressure (for example, 6.5 MPa ⁇ RP ⁇ 7.0 MPa). If it is smaller than the range (greater than or equal to the lower limit of HP and less than the upper limit of HP), it is determined that the amount of refrigerant is insufficient, and Ta is the protection temperature (specifically, the upper limit of HP is equal to the protection pressure value (HP protection value)).
  • the amount of refrigerant is determined to be an appropriate amount.
  • Ta is at least the protection temperature
  • HP is at least a predetermined lower limit value and at least a protection pressure value (HP protection value)
  • the amount of refrigerant is determined to be an appropriate amount.
  • control unit (101) After determining the amount of refrigerant in steps S206, S208 or S210, the control unit (101) releases the restriction on the droop control in step S211. Subsequently, in step S212, the control unit (101) stops the heat source unit (10), that is, the high-stage compressor (23), and ends the refrigerant amount determination operation.
  • step S301 when neither of the first and second condition determination conditions is satisfied in step S209, in other words, when HP is larger than the protective pressure value and Ta is equal to or higher than the protective temperature, step S301 and subsequent steps (described later) will be described later.
  • the first high-pressure suppression operation see FIG. 11
  • the second high-pressure suppression operation after step S401 see FIG. 12
  • step S301 the control unit (101) resets the counter (K) held in the memory or the like to 0.
  • step S302 the control unit (101) opens the fifth on-off valve (35) in the operating state shown in FIG. 8, and passes through the first flow path (C1) to the air conditioning unit (utilization unit) (60) side. Excess refrigerant is released to the first gas connecting pipe (3). This lowers HP.
  • step S303 the control unit (101) closes the fifth on-off valve (35) after a predetermined time (for example, 5 seconds) has elapsed. As a result, the transfer of the refrigerant to the first gas connecting pipe (3) on the air conditioning unit (60) side is stopped.
  • a predetermined time for example, 5 seconds
  • step S304 the control unit (101) increments the value of the counter (K) by one and stores it in a memory or the like.
  • step S305 the control unit (101) determines whether the HP is larger than the protective pressure value.
  • step S305 If it is determined in step S305 that HP is larger than the protective pressure value, the process returns to step S302.
  • step S306 the control unit (101) determines whether or not the counter (K) is a predetermined number (for example, 3) or more.
  • step S306 When it is determined in step S306 that the number of counters (K) is equal to or greater than a predetermined number, in step S307, the control unit (101) determines that the amount of refrigerant is overfilled.
  • step S306 If it is determined in step S306 that the number of counters (K) is not equal to or greater than a predetermined number, the control unit (101) determines in step S308 that the amount of refrigerant is an appropriate amount.
  • FIG. 13 shows the criteria for determining the amount of refrigerant in the first high pressure suppression operation described above.
  • HP is larger than the protective pressure value and Ta is equal to or higher than the protective temperature
  • excess refrigerant is released to the first gas connecting pipe (3) on the air conditioning unit (60) side to protect the HP.
  • the pressure value is set to be equal to or lower, if the surplus amount of the refrigerant is small, the amount of the refrigerant is determined to be an appropriate amount, and in other cases, the amount of the refrigerant is determined to be overfilled.
  • step S309 the control unit (101) releases the restriction on the droop control. Subsequently, in step S310, the control unit (101) stops the heat source unit (10), that is, the high-stage compressor (23), and ends the refrigerant amount determination operation.
  • step S401 the control unit (101) resets the counter (K) held in the memory or the like to 0.
  • step S402 the control unit (101) determines the suction pressure (intermediate pressure (MP)) of the high-stage compressor (23) by, for example, lowering the rotation speed of the high-stage compressor (23).
  • the target value is lowered by a predetermined value (for example, 0.5 MPa). This lowers HP.
  • step S403 the control unit (101) increments the value of the counter (K) by one and stores it in a memory or the like.
  • step S404 the control unit (101) determines whether the HP is larger than the protective pressure value.
  • step S404 If it is determined in step S404 that HP is larger than the protective pressure value, the process returns to step S402.
  • step S404 When it is determined in step S404 that the HP is equal to or less than the protective pressure value, in step S405, the control unit (101) determines whether or not the counter (K) is a predetermined number (for example, 3) or more.
  • step S405 When it is determined in step S405 that the number of counters (K) is equal to or greater than a predetermined number, in step S406, the control unit (101) determines that the amount of refrigerant is overfilled.
  • step S405 If it is determined in step S405 that the number of counters (K) is not equal to or greater than a predetermined number, the control unit (101) determines in step S407 that the amount of refrigerant is an appropriate amount.
  • FIG. 13 shows the criteria for determining the amount of refrigerant in the second high pressure suppression operation described above.
  • the target value of the suction pressure (MP) of the high-stage compressor (23) is lowered to protect the HP.
  • MP suction pressure
  • step S408 the control unit (101) releases the restriction on the droop control. Subsequently, in step S409, the control unit (101) stops the heat source unit (10), that is, the high-stage compressor (23), and ends the refrigerant amount determination operation.
  • the refrigerating apparatus (1) of the present embodiment includes a heat source unit (10) that uses a refrigerant that operates in a supercritical region.
  • the heat source unit (10) includes a compression element (20) for compressing the refrigerant, a heat source heat exchanger (24), and an expansion valve (first outdoor expansion valve) provided downstream of the heat source heat exchanger (24). It includes a 26), a receiver (25) provided downstream of the expansion valve (26), and a control unit (outdoor controller) (101).
  • the control unit (101) determines the amount of refrigerant based on the high pressure (HP) under the first condition that the internal pressure (RP) of the receiver (25) is equal to or lower than the supercritical pressure (first). Driving).
  • the amount of refrigerant is determined based on the high pressure under the first condition that the internal pressure of the receiver (25) is equal to or less than the supercritical pressure. Therefore, the amount of the refrigerant can be determined based on the high pressure in consideration of the refrigerant that is assumed to be stored in the receiver (25) in a two-phase state during actual operation. Therefore, the accuracy of the determination result can be improved.
  • the intermediate pressure and the receiver pressure also have a dominant influence on the operation of the refrigerant circuit (6). do. Therefore, even if the HP value is the same, the result of determining the excess or deficiency of the amount of the refrigerant differs depending on the state of the refrigerant in the receiver according to the operating conditions. However, in the present embodiment, since the refrigerant amount is determined based on the HP under the first condition that the internal pressure of the receiver (25) is equal to or less than the supercritical pressure, the determination accuracy is improved.
  • the first condition is that the internal pressure (RP) of the receiver (25) is within the first pressure range (for example, 6.5 MPa ⁇ RP ⁇ 7.0 MPa) of the supercritical pressure or less. It may be a condition that there is.
  • the amount of refrigerant is determined based on HP under the condition that the RP is within the first pressure range, the state of the refrigerant that is assumed to be stored in the receiver (25) in a two-phase state during actual operation. Can be determined more accurately by considering the above. Therefore, the accuracy of the determination result is further improved.
  • the heat source unit (10) has a gas vent pipe (41) for venting the gas refrigerant from the receiver (25) and a gas vent valve provided in the gas vent pipe (41). (42) may be further provided.
  • the control unit (101) may adjust the opening degree of the degassing valve (42) so that the RP is within the first pressure range in the second determination operation.
  • the RP can be adjusted within the first pressure range using the degassing valve (42).
  • the heat source unit (10) may be connected to the utilization unit (60,70).
  • the compression element (20) may include a low-stage compressor (21,22) and a high-stage compressor (23) that compresses the refrigerant compressed by the low-stage compressor (21,22).
  • the heat source unit (10) may further include a degassing pipe (41) that introduces the gas refrigerant of the receiver (25) into the suction pipe (23a) of the high-stage compressor (23).
  • the control unit (101) stops the low-stage compressor (21,22) and operates the high-stage compressor (23) to charge the refrigerant to the high-stage compressor (23).
  • the heat source heat exchanger (24), expansion valve (26), receiver (25), degassing pipe (41), and high-stage compressor (23) may be circulated in this order.
  • the low-stage compressor (21,22) corresponding to the utilization unit (60,70) is stopped and the high-stage compressor (23) is operated, so that the utilization unit is operated.
  • the amount of the refrigerant can be determined by stopping the circulation of the refrigerant at (60,70) and circulating the refrigerant in the heat source unit (10). Therefore, since the fluctuation of the refrigerant state in the utilization unit (60, 70) or the like at the time of determining the amount of the refrigerant can be suppressed, the error in the determination result can be reduced.
  • the amount of refrigerant remaining in the heat source unit (10) is used for excess / deficiency determination in a state where the refrigerant is circulated throughout the system and the content-integrated refrigerant is retained in the connecting pipe. Therefore, it is possible to suppress errors caused by the influence of the surrounding environment such as the length of the connecting pipe and the installation environment of the unit (60,70) used. In addition, it is possible to determine the excess or deficiency of the amount of refrigerant regardless of the local installation status (specifications of connecting pipes, etc.).
  • control unit (101) determines that the amount of refrigerant is insufficient if the HP is smaller than the predetermined lower limit value (first predetermined value) in the second determination operation, and the HP is predetermined. If it is equal to or higher than the upper limit value (second predetermined value), it may be determined that the amount of refrigerant is overfilled.
  • control unit (101) may determine the first predetermined value and the second predetermined value based on the outside air temperature (Ta).
  • the amount of refrigerant can be determined more accurately in consideration of Ta.
  • the heat source unit (10) may be connected to the utilization unit (60,70).
  • the control unit (101) puts excess refrigerant in the first gas connecting pipe (3) on the air conditioning unit (60) side.
  • the amount of the refrigerant may be determined after allowing it to escape for a predetermined time (first high pressure suppression operation).
  • the compression element (20) is a low-stage side compressor (21,22) and a high-stage side that compresses the refrigerant compressed by the low-stage side compressor (21,22). It may include a compressor (23).
  • the control unit (101) lowers the target value of the suction pressure (MP) of the high-stage compressor (23). Then, the amount of the refrigerant may be determined (second high pressure suppression operation).
  • the control unit (101) performs the second determination operation (first operation) when the HP is equal to or higher than the supercritical pressure, and when the HP is lower than the supercritical pressure, the receiver (
  • the first determination operation (second operation) for determining the amount of the refrigerant may be performed under the condition that the internal pressure (RP) of 25) and the HP are substantially equal to each other.
  • control unit (101) determines that the amount of refrigerant is insufficient if the HP is smaller than the predetermined lower limit value (third predetermined value) in the first determination operation, and the HP is predetermined. If it is equal to or higher than the upper limit value (fourth predetermined value), it may be determined that the amount of refrigerant is overfilled.
  • the third predetermined value and the fourth predetermined value may be determined based on the outside air temperature (Ta). By doing so, the amount of the refrigerant can be determined more accurately in consideration of Ta.
  • control unit (101) is an expansion valve (first outdoor expansion valve) so that the "condition that RP and HP are substantially equal" is satisfied in the first determination operation.
  • the opening degree of (26) may be adjusted.
  • the expansion valve (26) can be used to bring the RP closer to the HP.
  • the refrigerant may be carbon dioxide.
  • the method for determining the amount of refrigerant in the refrigerating apparatus (1) of the present embodiment is a method for determining the amount of refrigerant in the refrigerating apparatus (1) provided with a heat source unit (10) that uses a refrigerant operating in a supercritical region.
  • the heat source unit (10) includes a compression element (20) for compressing the refrigerant, a heat source heat exchanger (24), and an expansion valve (first outdoor expansion valve) provided downstream of the heat source heat exchanger (24). It includes a 26) and a receiver (25) provided downstream of the expansion valve (26).
  • the amount of refrigerant is determined based on HP under the first condition that the RP is equal to or lower than the supercritical pressure.
  • the amount of refrigerant is determined based on HP under the first condition that the RP is equal to or lower than the supercritical pressure. Therefore, the amount of the refrigerant can be determined based on the HP in consideration of the refrigerant that is expected to be stored in the receiver (25) in a two-phase state during actual operation, so that the accuracy of the determination result can be improved. ..
  • the excess / deficiency detection of the refrigerant filling amount in the refrigerating apparatus has been performed as described in (1) or (2) below.
  • a local worker makes a judgment based on the sealed state of the sight glass attached to the liquid pipe.
  • the local worker determines that the suction pipe temperature, suction superheat degree, and discharge pressure (high pressure) of the compressor are within the target ranges.
  • the judgment result depends on the viewpoint of the operator, and for example, unnecessary overfilling of the refrigerant may be performed.
  • the amount of the refrigerant is determined more accurately. Can be done.
  • control unit (101) stops the circulation of the refrigerant in the utilization unit (60,70) and performs the refrigerant amount determination operation.
  • the refrigerant amount determination operation may be performed while circulating the refrigerant in the utilization unit (60,70).
  • the “compression element (20) discharge pressure of the high-stage compressor (23))
  • the “high pressure high pressure of the refrigerant circuit (6) in the refrigerating device (1)”
  • the "pressure of the liquid pipe (upstream portion of the first pipe (40a)) up to the outdoor expansion valve) (26)” may be used as the "high pressure”.
  • the heat source unit (10) has the configuration shown in FIG.
  • the configuration of the heat source unit (10) includes a compression element that compresses the refrigerant, a heat source heat exchanger, an expansion valve provided downstream of the heat source heat exchanger, and a receiver provided downstream of the expansion valve.
  • the configuration is not particularly limited as long as it includes a control unit.
  • the compression element (20) instead of the two-stage compression configuration of the above embodiment composed of the low-stage side compressor (21,22) and the high-stage side compressor (23), a single stage or three or more stages are used.
  • the compression configuration of may be used.
  • the present disclosure is useful for the refrigerating apparatus and the method for determining the amount of refrigerant in the refrigerating apparatus.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Analytical Chemistry (AREA)
  • Power Engineering (AREA)
  • Air Conditioning Control Device (AREA)
  • Compression-Type Refrigeration Machines With Reversible Cycles (AREA)

Abstract

冷凍装置(1)は、超臨界域で作動する冷媒を使用する熱源ユニット(10)を備える。熱源ユニット(10)は、冷媒を圧縮する圧縮要素(20)と、熱源熱交換器(24)と、熱源熱交換器(24)の下流に設けられた膨張弁(26)と、膨張弁(26)の下流に設けられたレシーバ(25)と、制御部(101)とを備える。制御部(101)は、レシーバ(25)の内部圧力が超臨界圧力以下であるという第1条件において高圧圧力に基づいて冷媒量を判定する第1運転を行う。

Description

冷凍装置、及び冷凍装置の冷媒量判定方法
 本開示は、冷凍装置、及び冷凍装置の冷媒量判定方法に関する。
 従来より、冷凍サイクルを行う冷凍装置が知られている。特許文献1の冷凍装置では、高圧圧力が臨界圧力以上となる冷凍サイクルが行われる。この冷凍装置においては、冷媒回路内の冷媒量を適切に管理することができるように、冷蔵用冷媒回路の高圧側圧力に基づき、冷媒回路内の冷媒量を判定している。
特開2012-117713号公報
 しかしながら、特許文献1に記載の冷凍装置は、レシーバの内部圧力を考慮していないため、レシーバ内部が適切な状態で冷媒量判定を行えているのか不明である。
 本開示の目的は、超臨界域で作動する冷媒を用いた冷凍装置における冷媒量の過不足判定を精度良く行えるようにすることである。
 第1の態様は、超臨界域で作動する冷媒を使用する熱源ユニット(10)を備えた冷凍装置(1)である。前記熱源ユニット(10)は、前記冷媒を圧縮する圧縮要素(20)と、熱源熱交換器(24)と、前記熱源熱交換器(24)の下流に設けられた膨張弁(26)と、前記膨張弁(26)の下流に設けられたレシーバ(25)と、制御部(101)とを備える。前記制御部(101)は、前記レシーバ(25)の内部圧力が超臨界圧力以下であるという第1条件において高圧圧力に基づいて冷媒量を判定する第1運転を行う。
 第1の態様では、レシーバ(25)の内部圧力が超臨界圧力以下であるという第1条件において高圧圧力に基づいて冷媒量を判定する。このため、実運転時にレシーバ(25)内に二相状態で貯留されると想定される冷媒を考慮して、高圧圧力に基づき冷媒量の判定を行えるので、判定結果の精度を向上させることができる。
 尚、本開示において、「高圧圧力」とは、冷凍装置(1)における「冷媒回路(6)の高圧圧力」を意味し、具体的には、「圧縮要素(20)の吐出圧力」であるが、「熱源熱交換器(24)の凝縮圧力」、「熱源熱交換器(24)の温度相当飽和圧力」、又は「熱源熱交換器(24)から膨張弁(26)までの液管(第1管(40a)の上流部分)の圧力」等を「高圧圧力」とすることもある。
 第2の態様は、第1の態様において、前記第1条件は、前記レシーバ(25)の内部圧力が超臨界圧力以下の第1圧力範囲内にあるという条件であるである。
 第2の態様では、レシーバ(25)の内部圧力が超臨界圧力以下の第1圧力範囲内にあるという条件において高圧圧力に基づいて冷媒量を判定する。このため、実運転時にレシーバ(25)内に二相状態で貯留されると想定される冷媒の状態をより正確に考慮して、冷媒量の判定を行えるので、判定結果の精度をより一層向上させることができる。
 第3の態様は、第2の態様において、前記レシーバ(25)からガス冷媒を抜くためのガス抜き管(41)と、前記ガス抜き管(41)に設けられたガス抜き弁(42)とをさらに備える。前記制御部(101)は、前記第1運転において前記レシーバ(25)の内部圧力が前記第1圧力範囲内にあるように前記ガス抜き弁(42)の開度を調整する。
 第3の態様では、ガス抜き弁(42)を用いて、レシーバ(25)の内部圧力を第1圧力範囲内に調整できる。
 第4の態様は、第1又は第2の態様において、前記熱源ユニット(10)は利用ユニット(60,70)に接続される。前記圧縮要素(20)は、低段側圧縮機(21,22)と、前記低段側圧縮機(21,22)が圧縮した前記冷媒を圧縮する高段側圧縮機(23)とを含む。前記熱源ユニット(10)は、前記レシーバ(25)のガス冷媒を前記高段側圧縮機(23)の吸入管(23a)に導入するガス抜き管(41)をさらに備える。前記制御部(101)は、前記第1運転では、前記低段側圧縮機(21,22)を停止し前記高段側圧縮機(23)を運転して、前記冷媒を前記高段側圧縮機(23)、前記熱源熱交換器(24)、前記膨張弁(26)、前記レシーバ(25)、前記ガス抜き管(41)、前記高段側圧縮機(23)の順に循環させる。
 第4の態様では、第1運転で、利用ユニット(60,70)に対応する低段側圧縮機(21,22)を停止して高段側圧縮機(23)を運転する。このため、利用ユニット(60,70)での冷媒の循環を停止して、熱源ユニット(10)内で冷媒を循環させて冷媒量を判定できる。従って、冷媒量判定時における利用ユニット(60,70)等での冷媒状態の変動を抑制できるので、判定結果における誤差を小さくできる。
 第5の態様は、第1~第4の態様のいずれか1つにおいて、前記制御部(101)は、前記第1運転において前記高圧圧力が第1所定値よりも小さければ冷媒量不足と判定し、前記高圧圧力が第2所定値以上であれば冷媒量過充填と判定する。
 第5の態様では、高圧圧力に基づいて、冷媒量の不足/過充填を判断できる。
 第6の態様は、第5の態様において、前記制御部(101)は、前記第1所定値及び前記第2所定値を外気温度に基づいて決定する。
 第6の態様では、外気温度を考慮して、冷媒量判定をより正確に行うことができる。
 第7の態様は、第6の態様において、前記熱源ユニット(10)は利用ユニット(60,70)に接続される。前記制御部(101)は、前記第1運転において前記高圧圧力が保護圧力値よりも大きく且つ前記外気温度が保護温度以上である場合、前記利用ユニット(60)側のガス冷媒管(3)に余剰の冷媒を所定時間逃がしてから冷媒量を判定する。尚、保護圧力値及び保護温度とはそれぞれ、安全確保のために圧縮要素(20)を停止させる圧力及び温度である。
 第7の態様では、高圧圧力が高くなりすぎて、冷媒回路の構成部品が損傷する事態を回避しながら、圧縮要素(20)を動作させて冷媒量判定を行うことができる。
 第8の態様は、第6の態様において、前記圧縮要素(20)は、低段側圧縮機(21,22)と、前記低段側圧縮機(21,22)が圧縮した前記冷媒を圧縮する高段側圧縮機(23)とを含む。前記制御部(101)は、前記第1運転において前記高圧圧力が保護圧力値よりも大きく且つ前記外気温度が保護温度以上である場合、前記高段側圧縮機(23)の吸入圧力の目標値を低下させてから冷媒量を判定する。
 第8の態様では、高圧圧力が高くなりすぎて、冷媒回路の構成部品が損傷する事態を回避しながら、圧縮要素(20)を動作させて冷媒量判定を行うことができる。
 第9の態様は、第1~第8の態様のいずれか1つにおいて、前記制御部(101)は、前記高圧圧力が超臨界圧力以上のときには、前記第1運転を行い、前記高圧圧力が超臨界圧力未満のときには、前記レシーバ(25)の内部圧力と前記高圧圧力とが実質的に等しいという第2条件において冷媒量を判定する第2運転を行う。
 第9の態様では、高圧圧力に応じて適切な冷媒量の判定を行うことができる。尚、第2条件とは、基本的には「レシーバの内部圧力=高圧圧力」であるが、実際上は測定誤差や冷媒状態の変動を考慮して「レシーバの内部圧力≒高圧圧力」を含むものとする。
 第10の態様は、第9の態様において、前記制御部(101)は、前記第2運転において前記高圧圧力が第3所定値よりも小さければ冷媒量不足と判定し、前記高圧圧力が第4所定値以上であれば冷媒量過充填と判定する。
 第10の態様では、高圧圧力に基づいて、冷媒量の不足/過充填を判断できる。尚、第3所定値及び第4所定値を外気温度に基づいて決定してもよい。このようにすると、外気温度を考慮して、冷媒量判定をより正確に行うことができる。
 第11の態様は、第9又は第10の態様において、前記制御部(101)は、前記第2条件が満たされるように前記膨張弁(26)の開度を調整する。
 第11の態様では、膨張弁(26)を用いて、レシーバ(25)の内部圧力を高圧圧力に近づけることができる。
 第12の態様は、第1~第11の態様のいずれか1つにおいて、前記冷媒は、二酸化炭素である。
 第12の態様では、冷媒が超臨界域で作動する冷凍サイクルを行うことができる。
 第13の態様は、超臨界域で作動する冷媒を使用する熱源ユニット(10)を備えた冷凍装置(1)の冷媒量判定方法である。前記熱源ユニット(10)は、前記冷媒を圧縮する圧縮要素(20)と、熱源熱交換器(24)と、前記熱源熱交換器(24)の下流に設けられた膨張弁(26)と、前記膨張弁(26)の下流に設けられたレシーバ(25)とを備える。冷凍装置(1)の冷媒量判定方法は、前記レシーバ(25)の内部圧力が超臨界圧力以下であるという第1条件において高圧圧力に基づいて冷媒量を判定する。
 第13の態様では、レシーバ(25)の内部圧力が超臨界圧力以下であるという第1条件において高圧圧力に基づき冷媒量を判定する。このため、実運転時にレシーバ(25)内に二相状態で貯留されると想定される冷媒を考慮して、高圧圧力に基づき冷媒量の判定を行えるので、判定結果の精度を向上させることができる。
図1は、実施形態に係る冷凍装置の配管系統図である。 図2は、実施形態に係る冷凍装置におけるコントローラと各種のセンサと各種の機器との関係を示すブロック図である。 図3は、図1に示す冷凍装置における冷設運転の冷媒の流れを示した図である。 図4は、図1に示す冷凍装置における冷房運転の冷媒の流れを示した図である。 図5は、図1に示す冷凍装置における冷房冷設運転の冷媒の流れを示した図である。 図6は、図1に示す冷凍装置における暖房運転の冷媒の流れを示した図である。 図7は、図1に示す冷凍装置における暖房冷設運転の冷媒の流れを示した図である。 図8は、図1に示す冷凍装置における冷媒量判定時の冷媒の流れを付した図である。 図9は、実施形態に係る冷凍装置の冷媒量判定方法を示す第1のフローチャートである。 図10は、実施形態に係る冷凍装置の冷媒量判定方法を示す第2のフローチャートである。 図11は、実施形態に係る冷凍装置の冷媒量判定方法を示す第3のフローチャートである。 図12は、実施形態に係る冷凍装置の冷媒量判定方法を示す第4のフローチャートである。 図13は、実施形態に係る冷凍装置の冷媒量判定方法における判定基準の一例を示す模式図である。
 以下、実施形態について図面を参照しながら説明する。尚、以下の実施形態は、本質的に好ましい例示であって、本発明、その適用物、あるいはその用途の範囲を制限することを意図するものではない。
 《実施形態》
 〈全体構成〉
 実施形態に係る冷凍装置(1)は、冷却対象の冷却と、室内の空調とを同時に行う。ここでいう冷却対象は、冷蔵庫、冷凍庫、ショーケースなどの設備内の空気を含む。以下では、このような設備を冷設と称する。
 図1に示すように、冷凍装置(1)は、室外に設置される熱源ユニット(10)と、室内を空調する空調ユニット(60)と、庫内の空気を冷却する冷設ユニット(70)とを備える。図2に示すように、冷凍装置(1)は、冷媒回路(6)を制御するコントローラ(100)を備える。図1では、1つの空調ユニット(60)を図示している。冷凍装置(1)は、並列に接続される2つ以上の空調ユニット(60)を有してもよい。図1では、1つの冷設ユニット(70)を図示している。冷凍装置(1)は、並列に接続される2つ以上の冷設ユニット(70)を有してもよい。これらのユニット(10,60,70)が4本の連絡配管(2,3,4,5)によって接続されることで、冷媒回路(6)が構成される。
 4本の連絡配管(2,3,4,5)は、第1液連絡配管(2)、第1ガス連絡配管(3)、第2液連絡配管(4)、及び第2ガス連絡配管(5)で構成される。第1液連絡配管(2)及び第1ガス連絡配管(3)は、空調ユニット(60)に対応する。第2液連絡配管(4)及び第2ガス連絡配管(5)は、冷設ユニット(70)に対応する。
 冷媒回路(6)は、充填された冷媒を含む。冷媒回路(6)は、冷媒を循環させて冷凍サイクルを行う。本実施形態の冷媒としては、超臨界域で作動する冷媒、例えば二酸化炭素を用いる。冷媒回路(6)は、冷媒が臨界圧力以上となる冷凍サイクルを行う。
 〈熱源ユニットの概要〉
 熱源ユニット(10)は、熱源回路(11)と室外ファン(12)とを有する。熱源回路(11)は、圧縮要素(20)、熱源熱交換器(室外熱交換器)(24)、及び冷媒容器(レシーバ)(25)を有する。熱源回路(11)は、第1室外膨張弁(26)及び第2室外膨張弁(27)を有する。熱源回路(11)は、さらに冷却熱交換器(28)及び中間冷却器(29)を有する。
 熱源回路(11)は、4つの閉鎖弁(13,14,15,16)を有する。4つの閉鎖弁は、第1ガス閉鎖弁(13)、第1液閉鎖弁(14)、第2ガス閉鎖弁(15)、及び第2液閉鎖弁(16)で構成される。
 第1ガス閉鎖弁(13)には、第1ガス連絡配管(3)が接続される。第1液閉鎖弁(14)には、第1液連絡配管(2)が接続される。第2ガス閉鎖弁(15)には、第2ガス連絡配管(5)が接続される。第2液閉鎖弁(16)には、第2液連絡配管(4)が接続される。
 〈圧縮要素〉
 圧縮要素(20)は、冷媒を圧縮する。圧縮要素(20)は、第1圧縮機(21)、第2圧縮機(22)、及び第3圧縮機(23)を有する。圧縮要素(20)は、冷媒を単段で圧縮する運転と、冷媒を二段で圧縮する運転とを行う。
 第1圧縮機(21)は、空調ユニット(60)に対応する空調圧縮機である。第2圧縮機(22)は、冷設ユニット(70)に対応する冷設圧縮機である。第1圧縮機(21)及び第2圧縮機(22)は、低段側の圧縮機である。第1圧縮機(21)及び第2圧縮機(22)は、並列に接続される。本開示では、第1圧縮機(21)及び第2圧縮機(22)を低段側圧縮機(21,22)ということもある。
 第3圧縮機(23)は、高段側の圧縮機である。第3圧縮機(23)は、第1圧縮機(21)と直列に接続される。第3圧縮機(23)は、第2圧縮機(22)と直列に接続される。本開示では、第3圧縮機(23)を高段側圧縮機(23)ということもある。
 第1圧縮機(21)、第2圧縮機(22)、及び第3圧縮機(23)は、モータによって圧縮機構が駆動される回転式圧縮機である。第1圧縮機(21)、第2圧縮機(22)、及び第3圧縮機(23)は、可変容量式である。第1圧縮機(21)、第2圧縮機(22)、及び第3圧縮機(23)は、インバータ装置によって回転数が調節される。
 第1圧縮機(21)には、第1吸入管(21a)及び第1吐出管(21b)が接続される。第2圧縮機(22)には、第2吸入管(22a)及び第2吐出管(22b)が接続される。第3圧縮機(23)には、第3吸入管(23a)及び第3吐出管(23b)が接続される。
 〈中間流路〉
 熱源回路(11)は、中間流路(18)を含む。中間流路(18)は、第1圧縮機(21)及び第2圧縮機(22)の吐出部と、第3圧縮機(23)の吸入部とを繋ぐ。中間流路(18)は、第1吐出管(21b)、第2吐出管(22b)、及び第3吸入管(23a)を含む。
 〈流路切換機構〉
 流路切換機構(30)は、冷媒の流路を切り換える。流路切換機構(30)は、第1流路(C1)、第2流路(C2)、第3流路(C3)、及び第4流路(C4)を含む。第1流路(C1)、第2流路(C2)、第3流路(C3)、及び第4流路(C4)は、ブリッジ状に接続される。
 第1流路(C1)の一端と第3流路(C3)の一端とは、第3吐出管(23b)を介して第3圧縮機(23)の吐出部に接続する。第2流路(C2)の一端と第4流路(C4)の一端とは、第1吸入管(21a)を介して第1圧縮機(21)の吸入部に接続する。第1流路(C1)の他端と第2流路(C2)の他端とは、第1ガス連絡配管(3)を介して空調ユニット(60)と接続する。第3流路(C3)の他端と第4流路(C4)の他端とは、室外熱交換器(24)のガス側端と接続する。
 流路切換機構(30)は、第1開閉弁(31)、第2開閉弁(32)、第3開閉弁(33)、及び第4開閉弁(34)を有する。第1開閉弁(31)は、第1流路(C1)を開閉する。第2開閉弁(32)は、第2流路(C2)を開閉する。第3開閉弁(33)は、第3流路(C3)を開閉する。第4開閉弁(34)は、第4流路(C4)を開閉する。各開閉弁(31,32,33,34)は、電磁開閉弁で構成される。各開閉弁(31,32,33,34)は、パルス信号に基づき開度を調節する電子膨張弁であってもよい。或いは、第1流路(C1)を開閉するために、電磁開閉弁で構成された第1開閉弁(31)と並列に、電子膨張弁で構成された第5開閉弁(35)を設けてもよい。また、第3流路(C3)を開閉するために、電磁開閉弁で構成された第3開閉弁(33)と並列に、電子膨張弁で構成された第6開閉弁(36)を設けてもよい。
 〈室外熱交換器及び室外ファン〉
 室外熱交換器(24)は、フィン・アンド・チューブ型の空気熱交換器である。室外ファン(12)は、室外熱交換器(24)の近傍に配置される。室外ファン(12)は、室外空気を搬送する。室外熱交換器(24)は、その内部を流れる冷媒と、室外ファン(12)が搬送する室外空気とを熱交換させる。本開示では、室外熱交換器(24)を熱源熱交換器(24)ということもある。
 〈液側流路〉
 熱源回路(11)は、液側流路(40)を含む。液側流路(40)は、室外熱交換器(24)の液側端と、2つの液閉鎖弁(14,16)との間に設けられる。液側流路(40)は、第1から第5管(40a,40b,40c,40d,40e)を含む。
 第1管(40a)の一端は、室外熱交換器(24)の液側端に接続する。第1管(40a)の他端は、レシーバ(25)の頂部に接続する。第2管(40b)の一端は、レシーバ(25)の底部に接続する。第2管(40b)の他端は、第2液閉鎖弁(16)に接続する。第3管(40c)の一端は、第2管(40b)の中途部に接続する。第3管(40c)の他端は、第1液閉鎖弁(14)に接続する。第4管(40d)の一端は、第1管(40a)における第1室外膨張弁(26)とレシーバ(25)の間に接続する。第4管(40d)の他端は、第3管(40c)の中途部に接続する。第5管(40e)の一端は、第1管(40a)における室外熱交換器(24)と第1室外膨張弁(26)の間に接続する。第5管(40e)の他端は、第2管(40b)におけるレシーバ(25)と第3管(40c)の接続部との間に接続する。
 〈室外膨張弁〉
 第1室外膨張弁(26)は、第1管(40a)に設けられる。第1室外膨張弁(26)は、第1管(40a)において、室外熱交換器(24)の液側端と、第4管(40d)の接続部との間に設けられる。第2室外膨張弁(27)は、第5管(40e)に設けられる。第1室外膨張弁(26)及び第2室外膨張弁(27)は、その開度が調節可能な膨張弁である。第1室外膨張弁(26)及び第2室外膨張弁(27)は、パルス信号に基づき開度を調節する電子膨張弁であってもよい。
 〈レシーバ〉
 レシーバ(25)は、冷媒を貯留する密閉冷媒容器である。レシーバ(25)は、冷媒をガス冷媒と液冷媒とに気液分離する。レシーバ(25)の内部には、ガス層と液層とが形成される。ガス層は、レシーバ(25)の頂部側に形成される。液層はレシーバ(25)の底部側に形成される。
 〈ガス抜き管〉
 熱源回路(11)は、ガス抜き管(41)を有する。ガス抜き管(41)の一端は、レシーバ(25)の頂部に接続する。ガス抜き管(41)の他端は、中間流路(18)に接続する。ガス抜き管(41)は、レシーバ(25)内のガス冷媒を中間流路(18)つまり高段側圧縮機(第3圧縮機)(23)の吸入管(23a)に導入する。言い換えると、ガス抜き管(41)は、第1室外膨張弁(26)の下流側の配管(第1管)(40a)と第3吸入管(23a)とをレシーバ(25)を介して繋ぐ接続配管である。本開示では、ガス抜き管(41)を接続配管(41)ということもある。
 ガス抜き管(41)には、ガス抜き弁(42)が設けられる。ガス抜き管(41)は、その開度が調節可能な膨張弁である。ガス抜き弁(42)は、パルス信号に基づき開度を調節する電子膨張弁であってもよい。
 〈冷却熱交換器〉
 冷却熱交換器(28)は、高圧側流路(28a)と低圧側流路(28b)とを有する。冷却熱交換器(28)は、高圧側流路(28a)の冷媒と、低圧側流路(28b)の冷媒とを熱交換する。言い換えると、冷却熱交換器(28)は、低圧側流路(28b)を流れる冷媒により、高圧側流路(28a)を流れる冷媒を冷却する。
 低圧側流路(28b)は、インジェクション流路(43)の一部を構成する。インジェクション流路(43)は、上流流路(44)と下流流路(45)とを含む。
 上流流路(44)の一端は、第2管(40b)における第5管(40e)の接続部によりも上流側に接続する。上流流路(44)の他端は、低圧側流路(28b)の流入端に接続する。上流流路(44)には、インジェクション弁(46)が設けられる。インジェクション弁(46)は、その開度が調節可能な膨張弁である。インジェクション弁(46)は、パルス信号に基づき開度を調節する電子膨張弁であってもよい。
 下流流路(45)の一端は、低圧側流路(28b)の流出端に接続する。下流流路(45)の他端は、ガス抜き管(接続配管)(41)に接続する。
 〈中間冷却器〉
 中間冷却器(29)は、中間流路(18)に設けられる。中間冷却器(29)は、フィン・アンド・チューブ型の空気熱交換器である。中間冷却器(29)の近傍には、冷却ファン(29a)が配置される。中間冷却器(29)は、その内部を流れる冷媒と、冷却ファン(29a)が搬送する室外空気とを熱交換させる。
 〈油分離回路〉
 熱源回路(11)は、油分離回路を含む。油分離回路は、油分離器(50)と、第1油戻し管(51)と、第2油戻し管(52)とを有する。
 油分離器(50)は、第3吐出管(23b)に接続される。油分離器(50)は、圧縮要素(20)から吐出された冷媒中から油を分離する。第1油戻し管(51)及び第2油戻し管(52)の流入端は、油分離器(50)に連通する。第1油戻し管(51)の流出端は、中間流路(18)に接続する。第1油戻し管(51)には、第1油量調節弁(53)が設けられる。
 第2油戻し管(52)の流出側は、第1分岐管(52a)と第2分岐管(52b)とに分離する。第1分岐管(52a)は、第1圧縮機(21)の油貯留部に接続する。第2分岐管(52b)は、第2圧縮機(22)の油貯留部に接続する。第1分岐管(52a)には、第2油量調節弁(54)が設けられる。第2分岐管(52b)には、第3油量調節弁(55)が設けられる。
 〈バイパス管〉
 熱源回路(11)は、第1バイパス管(56)、第2バイパス管(57)、及び第3バイパス管(58)を有する。第1バイパス管(56)は、第1圧縮機(21)に対応する。第2バイパス管(57)は、第2圧縮機(22)に対応する。第3バイパス管(58)は、第3圧縮機(23)に対応する。
 具体的には、第1バイパス管(56)は、第1吸入管(21a)と第1吐出管(21b)とを直に繋ぐ。第2バイパス管(57)は、第2吸入管(22a)と第2吐出管(22b)とを直に繋ぐ。第3バイパス管(58)は、第3吸入管(23a)と第3吐出管(23b)とを直に繋ぐ。
 〈逆止弁〉
 熱源回路(11)は、複数の逆止弁を有する。複数の逆止弁は、第1から第10までの逆止弁(CV1~CV10)を含む。これらの逆止弁(CV1~CV10)は、図1の矢印方向の冷媒の流れを許容し、その逆方向の冷媒の流れを禁止する。
 第1逆止弁(CV1)は、第1吐出管(21b)に設けられる。第2逆止弁(CV2)は、第2吐出管(22b)に設けられる。第3逆止弁(CV3)は、第3吐出管(23b)に設けられる。第4逆止弁(CV4)は、第1管(40a)に設けられる。第5逆止弁(CV5)は、第3管(40c)に設けられる。第6逆止弁(CV6)は、第4管(40d)に設けられる。第7逆止弁(CV7)は、第5管(40e)に設けられる。第8逆止弁(CV8)は、第1バイパス管(56)に設けられる。第9逆止弁(CV9)は、第2バイパス管(57)に設けられる。第10逆止弁(CV10)は、第3バイパス管(58)に設けられる。
 〈空調ユニット〉
 空調ユニット(60)は、室内に設置される第1利用ユニットである。空調ユニット(60)は、冷設ユニット(70)よりも冷媒の蒸発温度が高い。空調ユニット(60)は、室内回路(61)と室内ファン(62)とを有する。室内回路(61)の液側端には、第1液連絡配管(2)が接続される。室内回路(61)のガス側端には、第1ガス連絡配管(3)が接続される。
 室内回路(61)は、液側端からガス側端に向かって順に、室内膨張弁(63)及び室内熱交換器(64)を有する。言い換えると、室内膨張弁(63)は、室内熱交換器(64)の入口に設けられる。室内膨張弁(63)は、その開度が調節可能な膨張弁である。室内膨張弁(63)は、パルス信号に基づき開度を調節する電子膨張弁であってもよい。
 室内熱交換器(64)は、フィン・アンド・チューブ型の空気熱交換器である。室内ファン(62)は、室内熱交換器(64)の近傍に配置される。室内ファン(62)は、室内空気を搬送する。室内熱交換器(64)は、その内部を流れる冷媒と、室内ファン(62)が搬送する室内空気とを熱交換させる。
 〈冷設ユニット〉
 冷設ユニット(70)は、庫内を冷却する第2利用ユニットである。冷設ユニット(70)は、冷設回路(71)と冷設ファン(72)とを有する。冷設回路(71)の液側端には、第2液連絡配管(4)が接続される。冷設回路(71)のガス側端には、第2ガス連絡配管(5)が接続される。
 冷設回路(71)は、液側端からガス側端に向かって順に、冷設膨張弁(73)及び冷設熱交換器(74)を有する。言い換えると、冷設膨張弁(73)は、冷設熱交換器(74)の入口に設けられる。冷設膨張弁(73)は、その開度が調節可能な膨張弁である。冷設膨張弁(73)は、パルス信号に基づき開度を調節する電子膨張弁であってもよい。
 冷設熱交換器(74)は、フィン・アンド・チューブ型の空気熱交換器である。冷設ファン(72)は、冷設熱交換器(74)の近傍に配置される。冷設ファン(72)は、庫内空気を搬送する。冷設熱交換器(74)は、その内部を流れる冷媒と、冷設ファン(72)が搬送する庫内空気とを熱交換させる。
 尚、本開示では、空調ユニット(60)及び冷設ユニット(70)を利用ユニット(60,70)ということもある。また、室内膨張弁(63)及び冷設膨張弁(73)を利用膨張弁(63,73)といい、室内熱交換器(64)及び冷設熱交換器(74)を利用熱交換器(64,74)ということもある。
 〈センサ〉
 冷凍装置(1)は、複数のセンサを有する。複数のセンサは、第1圧力センサ(81)、第2圧力センサ(82)、第3圧力センサ(83)、第4圧力センサ(84)、第5圧力センサ(85)を含む。
 第1圧力センサ(81)は、第1圧縮機(21)に吸入される冷媒の圧力を検出する。第2圧力センサ(82)は、第2圧縮機(22)に吸入される冷媒の圧力を検出する。第3圧力センサ(83)は、中間流路(18)の冷媒の圧力(以下、中間圧力(MP)ということもある)、つまり第3圧縮機(23)に吸入される冷媒の圧力を検出する。第4圧力センサ(84)は、第3圧縮機(23)から吐出された冷媒の圧力(以下、高圧圧力(HP)ということもある)を検出する。第5圧力センサ(85)は、レシーバ(25)から流出した冷媒の圧力を検出する。第5圧力センサ(85)により検出された圧力から、レシーバ(25)の内部圧力(RP)が分かる。
 図示は省略しているが、冷凍装置(1)は、圧力センサ以外の他のセンサ、例えば、外気温度を検出する温度センサや、冷媒回路(6)中の各箇所の冷媒温度などを検出する温度センサ等を含む。
 〈コントローラ〉
 コントローラ(100)は、制御基板上に搭載されたマイクロコンピュータと、該マイクロコンピュータを動作させるためのソフトウエアを格納するメモリデバイス(具体的には半導体メモリ)とを含む。コントローラ(100)は、各種のセンサの検出信号に基づいて、冷凍装置(1)の各種の機器を制御する。
 図2に示すように、コントローラ(100)は、室外コントローラ(101)と、室内コントローラ(102)と、冷設コントローラ(103)とを有する。図1に示すように、室外コントローラ(101)は、熱源ユニット(10)に設けられる。室内コントローラ(102)は、空調ユニット(60)に設けられる。冷設コントローラ(103)は、冷設ユニット(70)に設けられる。室外コントローラ(101)は、室内コントローラ(102)及び冷設コントローラ(103)と通信可能である。
 後述するように、本実施形態では、熱源ユニット(10)に設けられる室外コントローラ(101)によって、冷凍装置(1)の冷媒量判定が行われる。本開示では、室外コントローラ(101)を単に制御部(101)ということもある。
 -運転動作-
 冷凍装置(1)の運転動作について説明する。冷凍装置(1)の運転は、冷設運転、冷房運転、冷房冷設運転、暖房運転、暖房冷設運転を含む。
 冷設運転では、冷設ユニット(70)が庫内の空気を冷却し、空調ユニット(60)は停止する。冷房運転では、冷設ユニット(70)が停止し、空調ユニット(60)が室内を冷房する。冷房冷設運転では、冷設ユニット(70)が庫内の空気を冷却し、空調ユニット(60)が室内を冷房する。暖房運転では、冷設ユニット(70)が停止し、空調ユニット(60)が室内を暖房する。暖房冷設運転では、冷設ユニット(70)が庫内の空気を冷却し、空調ユニット(60)が室内を暖房する。
 各運転の概要について図3~図7を参照しながら説明する。尚、図中において、冷媒が流れる方向を破線矢印で示すとともに冷媒の流れる流路を太くしている。図中において、放熱器として機能する熱交換器にハッチングを付し、蒸発器として機能する熱交換器にドットを付している。
 〈冷設運転〉
 図3に示す冷設運転では、コントローラ(100)が第1開閉弁(31)、第2開閉弁(32)、第4開閉弁(34)、及び第5開閉弁(35)を閉じ、第3開閉弁(33)及び/又は第6開閉弁(36)を開ける。コントローラ(100)は、第1圧縮機(21)を停止し、第2圧縮機(22)及び第3圧縮機(23)を運転する。コントローラ(100)は、第1室外膨張弁(26)及びインジェクション弁(46)を所定開度で開放し、第2室外膨張弁(27)を閉じる。コントローラ(100)は、室内膨張弁(63)を閉じ、冷設膨張弁(73)の開度を調節する。コントローラ(100)は、室外ファン(12)及び冷設ファン(72)を運転し、室内ファン(62)を停止する。
 冷設運転では、室外熱交換器(24)が放熱器として機能し、室内熱交換器(64)の機能が実質的に停止し、冷設熱交換器(74)が蒸発器として機能する冷凍サイクルが行われる。
 具体的には、第2圧縮機(22)によって圧縮された冷媒は、中間冷却器(29)で冷却された後、第3圧縮機(23)に吸入される。第3圧縮機(23)によって臨界圧力以上まで圧縮された冷媒は、室外熱交換器(24)で放熱した後、第1室外膨張弁(26)を通過する。第1室外膨張弁(26)は、冷媒を臨界圧力より低い圧力まで減圧する。
 亜臨界状態となった冷媒は、レシーバ(25)に流入する。レシーバ(25)は、冷媒をガス冷媒と液冷媒とに分離する。
 レシーバ(25)で分離された液冷媒は、冷却熱交換器(28)において、インジェクション流路(43)を流れる冷媒によって冷却される。インジェクション流路(43)の冷媒は、中間流路(18)に送られる。
 冷却熱交換器(28)によって冷却された冷媒は、冷設ユニット(70)に送られる。冷設ユニット(70)に送られた冷媒は、冷設膨張弁(73)によって減圧された後、冷設熱交換器(74)で蒸発する。この結果、庫内の空気が冷却される。冷却熱交換器(28)で蒸発した冷媒は、第2圧縮機(22)に吸入され、再び圧縮される。
 〈冷房運転〉
 図4に示す冷房運転では、コントローラ(100)が第1開閉弁(31)、第4開閉弁(34)、及び第5開閉弁(35)を閉じ、第2開閉弁(32)、並びに第3開閉弁(33)及び/又は第6開閉弁(36)を開ける。コントローラ(100)は、第2圧縮機(22)を停止し、第1圧縮機(21)及び第3圧縮機(23)を運転する。コントローラ(100)は、第1室外膨張弁(26)及びインジェクション弁(46)を所定開度で開放し、第2室外膨張弁(27)を閉じる。コントローラ(100)は、冷設膨張弁(73)を閉じ、室内膨張弁(63)の開度を調節する。コントローラ(100)は、室外ファン(12)及び室内ファン(62)を運転し、冷設ファン(72)を停止する。
 冷房運転では、室外熱交換器(24)が放熱器として機能し、室内熱交換器(64)が蒸発器として機能し、冷設熱交換器(74)の機能が実質的に停止する冷凍サイクルが行われる。
 具体的には、第1圧縮機(21)によって圧縮された冷媒は、中間冷却器(29)で冷却された後、第3圧縮機(23)に吸入される。第3圧縮機(23)によって臨界圧力以上まで圧縮された冷媒は、室外熱交換器(24)で放熱した後、第1室外膨張弁(26)を通過する。第1室外膨張弁(26)は、冷媒を臨界圧力より低い圧力まで減圧する。
 亜臨界状態となった冷媒は、レシーバ(25)に流入する。レシーバ(25)は、冷媒をガス冷媒と液冷媒とに分離する。
 レシーバ(25)で分離された液冷媒は、冷却熱交換器(28)において、インジェクション流路(43)を流れる冷媒によって冷却される。インジェクション流路(43)の冷媒は、中間流路(18)に送られる。
 冷却熱交換器(28)によって冷却された冷媒は、空調ユニット(60)に送られる。空調ユニット(60)に送られた冷媒は、室内膨張弁(63)によって減圧された後、室内熱交換器(64)で蒸発する。この結果、室内の空気が冷却される。室内熱交換器(64)で蒸発した冷媒は、第1圧縮機(21)に吸入され、再び圧縮される。
 〈冷房冷設運転〉
 図5に示す冷房冷設運転では、コントローラ(100)が第1開閉弁(31)、第4開閉弁(34)、及び第5開閉弁(35)を閉じ、第2開閉弁(32)、並びに第3開閉弁(33)及び/又は第6開閉弁(36)を開ける。コントローラ(100)は、第1圧縮機(21)、第2圧縮機(22)、及び第3圧縮機(23)を運転する。コントローラ(100)は、第1室外膨張弁(26)及びインジェクション弁(46)を所定開度で開放し、第2室外膨張弁(27)を閉じる。コントローラ(100)は、室内膨張弁(63)及び冷設膨張弁(73)の開度を調節する。コントローラ(100)は、室外ファン(12)、室内ファン(62)、及び冷設ファン(72)を運転する。
 冷設冷設運転では、室外熱交換器(24)が放熱器として機能し、室内熱交換器(64)及び冷設熱交換器(74)が蒸発器として機能する冷凍サイクルが行われる。
 具体的には、第1圧縮機(21)及び第2圧縮機(22)によって圧縮された冷媒は、中間冷却器(29)で冷却された後、第3圧縮機(23)に吸入される。第3圧縮機(23)によって臨界圧力以上まで圧縮された冷媒は、室外熱交換器(24)で放熱した後、第1室外膨張弁(26)を通過する。第1室外膨張弁(26)は、冷媒を臨界圧力より低い圧力まで減圧する。
 亜臨界状態となった冷媒は、レシーバ(25)に流入する。レシーバ(25)は、冷媒をガス冷媒と液冷媒とに分離する。
 レシーバ(25)で分離された液冷媒は、冷却熱交換器(28)において、インジェクション流路(43)を流れる冷媒によって冷却される。インジェクション流路(43)の冷媒は、中間流路(18)に送られる。
 冷却熱交換器(28)によって冷却された冷媒は、空調ユニット(60)及び冷設ユニット(70)に送られる。
 空調ユニット(60)に送られた冷媒は、室内膨張弁(63)によって減圧された後、室内熱交換器(64)で蒸発する。この結果、室内の空気が冷却される。室内熱交換器(64)で蒸発した冷媒は、第1圧縮機(21)に吸入され、再び圧縮される。
 冷設ユニット(70)に送られた冷媒は、冷設膨張弁(73)によって減圧された後、冷設熱交換器(74)で蒸発する。この結果、庫内の空気が冷却される。冷却熱交換器(28)で蒸発した冷媒は、第2圧縮機(22)に吸入され、再び圧縮される。
 〈暖房運転〉
 図6に示す暖房運転では、コントローラ(100)が第2開閉弁(32)、第3開閉弁(33)、及び第6開閉弁(36)を閉じ、第1開閉弁(31)及び/又は第5開閉弁(35)、並びに第4開閉弁(34)を開ける。コントローラ(100)は、第2圧縮機(22)を停止し、第1圧縮機(21)及び第3圧縮機(23)を運転する。コントローラ(100)は、第2室外膨張弁(27)及びインジェクション弁(46)を所定開度で開放し、第1室外膨張弁(26)を閉じる。コントローラ(100)は、冷設膨張弁(73)を閉じ、室内膨張弁(63)の開度を調節する。コントローラ(100)は、室外ファン(12)及び室内ファン(62)を運転し、冷設ファン(72)を停止する。
 暖房運転では、室内熱交換器(64)が放熱器として機能し、室外熱交換器(24)が蒸発器として機能し、冷設熱交換器(74)の機能が実質的に停止する冷凍サイクルが行われる。
 具体的には、第1圧縮機(21)によって圧縮された冷媒は、中間冷却器(29)で冷却された後、第3圧縮機(23)に吸入される。第3圧縮機(23)によって圧縮された冷媒は、空調ユニット(60)に送られる。
 空調ユニット(60)に送られた冷媒は、室内熱交換器(64)で放熱する。この結果、室内の空気が加熱される。室内熱交換器(64)で放熱した冷媒は、レシーバ(25)に流入する。レシーバ(25)は、冷媒をガス冷媒と液冷媒とに分離する。
 レシーバ(25)で分離された液冷媒は、冷却熱交換器(28)において、インジェクション流路(43)を流れる冷媒によって冷却される。インジェクション流路(43)の冷媒は、中間流路(18)に送られる。
 冷却熱交換器(28)によって冷却された冷媒は、第2室外膨張弁(27)によって減圧された後、室外熱交換器(24)で蒸発する。室外熱交換器(24)で蒸発した冷媒は、第1圧縮機(21)に吸入され、再び圧縮される。
 〈暖房冷設運転〉
 図7に示す暖房冷設運転では、コントローラ(100)が第2開閉弁(32)、第3開閉弁(33)、及び第6開閉弁(36)を閉じ、第1開閉弁(31)及び/又は第5開閉弁(35)、並びに第4開閉弁(34)を開ける。コントローラ(100)は、第1圧縮機(21)、第2圧縮機(22)、及び第3圧縮機(23)を運転する。コントローラ(100)は、第2室外膨張弁(27)及びインジェクション弁(46)を所定開度で開放し、第1室外膨張弁(26)を閉じる。コントローラ(100)は、室内膨張弁(63)及び冷設膨張弁(73)の開度を調節する。コントローラ(100)は、室外ファン(12)、室内ファン(62)、及び冷設ファン(72)を運転する。
 暖房冷設運転では、室内熱交換器(64)が放熱器として機能し、室外熱交換器(24)及び冷設熱交換器(74)が蒸発器として機能する冷凍サイクルが行われる。
 具体的には、第1圧縮機(21)及び第2圧縮機(22)によって圧縮された冷媒は、中間冷却器(29)で冷却された後、第3圧縮機(23)に吸入される。第3圧縮機(23)によって圧縮された冷媒は、空調ユニット(60)に送られる。
 空調ユニット(60)に送られた冷媒は、室内熱交換器(64)で放熱する。この結果、室内の空気が加熱される。室内熱交換器(64)で放熱した冷媒は、レシーバ(25)に流入する。レシーバ(25)は、冷媒をガス冷媒と液冷媒とに分離する。
 レシーバ(25)で分離された液冷媒は、冷却熱交換器(28)において、インジェクション流路(43)を流れる冷媒によって冷却される。インジェクション流路(43)の冷媒は、中間流路(18)に送られる。
 冷却熱交換器(28)によって冷却された冷媒の一部は、第2室外膨張弁(27)によって減圧された後、室外熱交換器(24)で蒸発する。室外熱交換器(24)で蒸発した冷媒は、第1圧縮機(21)に吸入され、再び圧縮される。
 冷却熱交換器(28)によって冷却された冷媒の残部は、冷設ユニット(70)に送られる。冷設ユニット(70)に送られた冷媒は、冷設膨張弁(73)によって減圧された後、冷設熱交換器(74)で蒸発する。この結果、庫内の空気が冷却される。冷却熱交換器(28)で蒸発した冷媒は、第2圧縮機(22)に吸入され、再び圧縮される。
 -冷媒量判定のための運転動作-
 冷凍装置(1)の運転は、冷媒量判定のための運転(以下、冷媒量判定運転という)を含む。本実施形態では、前述の冷設運転、冷房運転、冷房冷設運転、暖房運転、又は暖房冷設運転の試運転を行った後、冷媒量判定運転を実施する。試運転では、圧縮要素(20)を運転して利用ユニット(60,70)へ冷媒を送る一方、冷媒量判定運転では、利用ユニット(60,70)における冷媒の循環を停止しつつ、圧縮要素(20)を運転して、冷媒を熱源ユニット(10)内で循環させて冷媒量を判定する。
 冷媒量判定運転の概要について図8を参照しながら説明する。尚、図中において、冷媒が流れる方向を破線矢印で示すとともに冷媒の流れる流路を太くしている。また、図中において、放熱器として機能する熱交換器にハッチングを付している。
 図8に示す冷媒量判定運転では、試運転の終了後、利用ユニット(60,70)における冷媒の循環を停止させるために、室外コントローラ(101)は、第1ガス閉鎖弁(13)、第1液閉鎖弁(14)、第2ガス閉鎖弁(15)、及び第2液閉鎖弁(16)を閉じる。さらに、室外コントローラ(101)は、室内コントローラ(102)及び冷設コントローラ(103)を通じて、室内膨張弁(63)及び冷設膨張弁(73)つまり利用膨張弁(63,73)を全閉にするとともに、室内ファン(62)及び冷設ファン(72)を停止してもよい。
 室外コントローラ(101)は、第1開閉弁(31)、第2開閉弁(32)、第4開閉弁(34)、及び第5開閉弁(35)を閉じ、第3開閉弁(33)及び/又は第6開閉弁(36)を開ける。室外コントローラ(101)は、第1圧縮機(21)及び第2圧縮機(22)つまり低段側圧縮機(21,22)を停止し、第3圧縮機(23)つまり高段側圧縮機(23)を運転する。室外コントローラ(101)は、第1室外膨張弁(26)及びガス抜き弁(42)を所定開度で開放し、第2室外膨張弁(27)を閉じる。室外コントローラ(101)は、室外ファン(12)を運転する。
 冷媒量判定運転では、室外熱交換器(24)が放熱器として機能し、室内熱交換器(64)及び冷設熱交換器(74)の機能が実質的に停止する。
 具体的には、第3圧縮機(23)によって臨界圧力以上まで圧縮された冷媒は、室外熱交換器(24)で放熱した後、第1室外膨張弁(26)を通過する。第1室外膨張弁(26)は、冷媒を減圧する。
 減圧された冷媒は、レシーバ(25)に流入する。レシーバ(25)は、冷媒をガス冷媒と液冷媒とに分離する。
 レシーバ(25)で分離されたガス冷媒は、ガス抜き管(41)を流れ、中間流路(18)つまり第3圧縮機(23)の第3吸入管(23a)に送られ、第3圧縮機(23)に吸入され、再び圧縮される。
 以上のように、冷媒量判定運転では、熱源ユニット(10)内で冷媒を高段側圧縮機(23)、室外熱交換器(熱源熱交換器)(24)、第1室外膨張弁(26)、ガス抜き管(接続配管)(41)、高段側圧縮機(23)の順に循環させながら、後述する方法によって冷媒量判定を行う。尚、冷媒量判定運転における熱源ユニット(10)内での冷媒の循環の際に、室外熱交換器(24)での冷媒の放熱によって、レシーバ(25)に流入する冷媒の温度は徐々に低下する。
 -冷媒量判定方法-
 以下、図9~図13を参照しながら、本実施形態に係る冷凍装置の冷媒量判定方法について説明する。
 図9に示すように、まず、ステップS101において、室外コントローラ(制御部)(101)は、冷媒量過不足検知スイッチがONされたかどうか判定する。冷媒量過不足検知スイッチは、コントローラ(100)を構成するタッチパネル等の入力機器として構成されてもよい。
 冷媒量過不足検知スイッチがONされた場合、ステップS102において、制御部(101)は、試運転が完了し且つ試運転終了後の経過時間が所定時間(例えば30分)以内かどうかを判定する。冷媒量過不足検知スイッチがONされていない場合は、ステップS101に戻る。
 尚、制御部(101)は、試運転での冷媒の状態が安定したと判断したときに試運転を終了させてよい。試運転で冷媒の状態が安定したと判断する条件としては、例えば、「試運転を開始してから所定時間が経過したかどうか」、「利用ユニット(60,70)の吹き出し温度が所定温度以下かどうか(冷房の場合。暖房なら所定温度以上かどうか)」、「異常コードが出ていないかどうか」、「圧縮要素(20)の吸入管温度が所定の範囲内かどうか」などを用いてもよい。また、熱源ユニット(10)は、冷媒の状態量を検知する手段をさらに備え、当該手段により得られた値から、制御部(101)が前記のような条件を満たしたかどうかを判定してもよい。このようにすると、冷媒の状態量を検知する手段によって、冷媒回路(6)における冷媒の状態が安定したことを容易に判定できる。
 試運転が完了し且つ試運転終了後の経過時間が所定時間以内であるとステップS102で判定された場合、ステップS103において、制御部(101)は、利用ユニット(60,70)における冷媒の循環を停止させる。一方、試運転が完了していないか、又は、試運転終了後の経過時間が所定時間を超えているとステップS102で判定された場合、ステップS101に戻る。
 具体的には、ステップS103において、制御部(101)は、第1ガス閉鎖弁(13)、第1液閉鎖弁(14)、第2ガス閉鎖弁(15)、及び第2液閉鎖弁(16)を閉じる。また、制御部(101)は、室内コントローラ(102)及び冷設コントローラ(103)を通じて、室内膨張弁(63)及び冷設膨張弁(73)つまり利用膨張弁(63,73)を全閉にするとともに、室内ファン(62)及び冷設ファン(72)を停止する。これにより、利用ユニット(60,70)における冷媒の循環が停止する。
 次に、ステップS104において、制御部(101)は、利用ユニット(60,70)における冷媒の循環を停止しつつ、圧縮要素(20)を運転して、冷媒を熱源ユニット(10)内で循環させる。これにより、冷媒量判定運転が開始される。
 具体的には、ステップS104において、制御部(101)は、第1開閉弁(31)、第2開閉弁(32)、第4開閉弁(34)、及び第5開閉弁(35)を閉じ、第3開閉弁(33)及び/又は第6開閉弁(36)を開ける。また、制御部(101)は、第1圧縮機(21)及び第2圧縮機(22)つまり低段側圧縮機(21,22)を停止し、第3圧縮機(23)つまり高段側圧縮機(23)を運転する。また、制御部(101)は、第1室外膨張弁(26)及びガス抜き弁(42)を所定開度で開放し、第2室外膨張弁(27)を閉じる。さらに、制御部(101)は、室外ファン(12)を運転する。これにより、熱源ユニット(10)内で冷媒が高段側圧縮機(23)、室外熱交換器(熱源熱交換器)(24)、第1室外膨張弁(26)、ガス抜き管(接続配管)(41)、高段側圧縮機(23)の順に循環する。
 次に、ステップS105において、制御部(101)は、高圧圧力(HP)、例えば、圧縮要素(20)の吐出圧力が亜臨界域にあるかどうか、言い換えると、高圧圧力(HP)が超臨界圧力未満であるか、又は超臨界圧力以上であるかを判定する。高圧圧力(HP)は、第4圧力センサ(84)により検出され、当該検出結果は、制御部(101)に送信される。
 高圧圧力(HP)が亜臨界域にある(超臨界圧力未満である)とステップS105で判定された場合、後述するステップS106~S112の第1判定動作を行う。高圧圧力(HP)が亜臨界域にない(超臨界圧力以上である)とステップS105で判定された場合、後述するステップS201以降(図10~図12参照)の第2判定動作を行う。本開示では、第1判定動作を「第2運転」、第2判定動作を「第1運転」ということもある。
 <第1判定動作>
 第1判定動作では、まず、ステップS106において、制御部(101)は、高圧圧力(HP)とレシーバ(25)の内部圧力(RP)とが実質的に等しいかどうかを判定する。レシーバ(25)の内部圧力(RP)は、第5圧力センサ(85)により検出され、当該検出結果は、制御部(101)に送信される。ステップS106での判定条件は、基本的には「レシーバ(25)の内部圧力(RP)=高圧圧力(HP)」であるが、実際上は測定誤差や冷媒状態の変動を考慮して「レシーバ(25)の内部圧力(RP)≒高圧圧力(HP)」を含むものとする。
 高圧圧力(HP)とレシーバ(25)の内部圧力(RP)とが実質的に等しくないとステップS106で判定された場合、ステップS107において、制御部(101)は、レシーバ(25)の内部圧力(RP)が高圧圧力(HP)に近づくように、第1室外膨張弁(26)の開度を段階的に調整する。ステップS107は、高圧圧力(HP)とレシーバ(25)の内部圧力(RP)とが実質的に等しいとステップS106で判定されるまで、繰り返し実施される。例えば、冷媒量判定運転の開始時点でレシーバ(25)の内部圧力(RP)の過度な上昇を防止するために、第1室外膨張弁(26)を絞り気味にしていた場合、レシーバ(25)の内部圧力(RP)が高圧圧力(HP)と実質的に等しくなるまで、第1室外膨張弁(26)を開いていき、必要があれば、第1室外膨張弁(26)を全開にする。
 高圧圧力(HP)とレシーバ(25)の内部圧力(RP)とが実質的に等しいとステップS107で判定された場合、ステップS108において、制御部(101)は、高圧圧力(HP)が所定の下限値よりも小さいかどうかを判定する。
 高圧圧力(HP)が所定の下限値よりも小さいとステップS108で判定された場合、ステップS109において、制御部(101)は、冷媒量は不足であると判定する。
 高圧圧力(HP)が所定の下限値よりも小さくないとステップS108で判定された場合、ステップS110において、制御部(101)は、高圧圧力(HP)が所定の上限値以上であるかどうかを判定する。
 高圧圧力(HP)が所定の上限値以上であるとステップS110で判定された場合、ステップS111において、制御部(101)は、冷媒量は過充填であると判定する。
 高圧圧力(HP)が所定の上限値以上ではないとステップS110で判定された場合、ステップS112において、制御部(101)は、冷媒量は適正量であると判定する。
 尚、前述の所定の下限値及び所定の上限値はそれぞれ、外気温度(Ta)に基づいて決定してもよい。このようにすると、外気温度(Ta)を考慮して、冷媒量判定をより正確に行うことができる。
 図13に、以上に説明した第1判定動作における冷媒量判定の基準を示す。図13の横軸は、外気温度(Ta)を示し、図13の縦軸は、高圧圧力(HP)、レシーバ(25)の内部圧力(RP)などの圧力を示す。図13に示すように、HPが亜臨界域にある場合、HPとRPとが実質的に等しいという条件において、HPが所定の範囲(HP下限値以上で且つHP上限値未満)内にあれば冷媒量が適正量と判定され、HPが所定の範囲よりも大きければ冷媒量が過充填と判定され、HPが所定の範囲よりも小さければ冷媒量が不足と判定される。
 ステップS109、S111又はS112で冷媒量判定(第1判定動作)を行った後、ステップS113において、制御部(101)は、熱源ユニット(10)つまり高段側圧縮機(23)を停止させて冷媒量判定運転を終了させる。
 <第2判定動作>
 HPが超臨界圧力以上であるとステップS105で判定された場合の第2判定動作では、図10に示すように、まず、ステップS201において、制御部(101)は、RPが超臨界圧力以下であるかどうか、具体的には、RPが超臨界圧力以下の第1圧力範囲内(例えば6.5MPa<RP<7.0MPa)にあるかどうかを判定する。
 RPが第1圧力範囲内にないとステップS201で判定された場合、ステップS202において、制御部(101)は、ガス抜き弁(42)の開度調整、及び/又は第3圧縮機(高段側圧縮機)(23)の回転数調整等によって、RPの調整を行う。続いて、ステップS203において、制御部(101)は、RPが第1圧力範囲内にあるかどうかを再判定する。ステップS202は、RPが第1圧力範囲内にあるとステップS203で判定されるまで、繰り返し実施される。
 RPが第1圧力範囲内にあるとステップS201又はS203で判定された場合、ステップS204において、制御部(101)は、通常運転で実施される垂下制御を制限する。ここで、垂下制御とは、圧縮要素(20)のモータが過熱されている状態のまま、圧縮要素(20)の運転を長時間継続しないように、圧縮要素(20)の吐出管の温度が所定の垂下温度になると、運転を継続したまま圧縮要素(20)の回転数を強制的に減少させる制御をいう。
 次に、ステップS205において、制御部(101)は、HPが所定の下限値よりも小さいかどうかを判定する。
 HPが所定の下限値よりも小さいとステップS205で判定された場合、ステップS206において、制御部(101)は、冷媒量は不足であると判定する。
 HPが所定の下限値よりも小さくないとステップS205で判定された場合、ステップS207において、制御部(101)は、HPが所定の上限値以上であり且つ外気温度(Ta)が保護温度よりも小さいかどうかを判定する。保護温度とは、安全確保のために圧縮要素(20)を停止させる温度である。所定の下限値及び所定の上限値はそれぞれ、外気温度(Ta)に基づいて決定してもよい。このようにすると、外気温度(Ta)を考慮して、冷媒量判定をより正確に行うことができる。
 HPが所定の上限値以上であり且つTaが保護温度よりも小さいとステップS207で判定された場合、ステップS208において、制御部(101)は、冷媒量は過充填であると判定する。
 HPが所定の上限値以上ではないか、又はTaが保護温度よりも小さくないとステップS207で判定された場合、ステップS209において、制御部(101)は、第1条件判定として、HPが所定の下限値以上で且つ所定の上限値未満であり、且つTaが保護温度よりも小さいかどうかを判定する。
 HPが所定の下限値以上で且つ所定の上限値未満であり、且つTaが保護温度よりも小さいとステップS209の第1条件判定で判定された場合、ステップS210において、制御部(101)は、冷媒量は適正量であると判定する。
 また、ステップS209において、制御部(101)は、第2条件判定として、HPが保護圧力値以下であり且つTaが保護温度以上であるかどうかを判定する。保護圧力値とは、安全確保のために圧縮要素(20)(高段側圧縮機(23))を停止させる圧力であり、例えば10.8MPaである。
 HPが保護圧力値以下であり且つTaが保護温度以上であるとステップS209の第2条件判定で判定された場合、ステップS210において、制御部(101)は、冷媒量は適正量であると判定する。
 図13に、以上に説明した第2判定動作における冷媒量判定の基準を示す。図13の横軸は、Taを示し、図13の縦軸は、HP、RPなどの圧力を示す。図13に示すように、HPが超臨界域にある場合、RPが超臨界圧力以下の第1圧力範囲内(例えば6.5MPa<RP<7.0MPa)にあるという条件において、HPが所定の範囲(HP下限値以上で且つHP上限値未満)よりも小さければ冷媒量が不足と判定され、Taが保護温度(具体的にはHP上限値が保護圧力値(HP保護値)に等しくなる保護上限温度)よりも低く且つHPが所定の範囲よりも大きければ冷媒量が過充填と判定され、Taが保護温度よりも低く且つHPが所定の範囲内にあれば冷媒量が適正量と判定される。また、Taが保護温度以上であっても、HPが所定の下限値以上で且つ保護圧力値(HP保護値)以下であれば冷媒量が適正量と判定される。
 ステップS206、S208又はS210で冷媒量判定を行った後、ステップS211において、制御部(101)は、垂下制御の制限を解除する。続いて、ステップS212において、制御部(101)は、熱源ユニット(10)つまり高段側圧縮機(23)を停止させて冷媒量判定運転を終了させる。
 また、ステップS209で第1及び第2条件判定のいずれの条件も満たされなかった場合、言い換えると、HPが保護圧力値よりも大きく且つTaが保護温度以上である場合、後述するステップS301以降(図11参照)の第1高圧抑制動作、又は後述するステップS401以降(図12参照)の第2高圧抑制動作を行う。
 <第1高圧抑制動作>
 第1高圧抑制動作では、図11に示すように、まず、ステップS301において、制御部(101)は、メモリ等に保持するカウンタ(K)を0にリセットする。
 次に、ステップS302において、制御部(101)は、図8に示す運転状態で第5開閉弁(35)を開き、第1流路(C1)を通じて、空調ユニット(利用ユニット)(60)側の第1ガス連絡配管(3)に余剰の冷媒を逃がす。これにより、HPが低下する。
 次に、ステップS303において、制御部(101)は、所定の時間(例えば5秒間)の経過後、第5開閉弁(35)を閉じる。これにより、空調ユニット(60)側の第1ガス連絡配管(3)への冷媒の移送が停止する。
 次に、ステップS304において、制御部(101)は、カウンタ(K)の値を1つ増やしてメモリ等に記憶する。
 次に、ステップS305において、制御部(101)は、HPが保護圧力値よりも大きいかどうかを判定する。
 HPが保護圧力値よりも大きいとステップS305で判定された場合、ステップS302に戻る。
 HPが保護圧力値以下であるとステップS305で判定された場合、ステップS306において、制御部(101)は、カウンタ(K)が所定数(例えば3)以上であるかどうかを判定する。
 カウンタ(K)が所定数以上であるとステップS306で判定された場合、ステップS307において、制御部(101)は、冷媒量は過充填であると判定する。
 カウンタ(K)が所定数以上ではないとステップS306で判定された場合、ステップS308において、制御部(101)は、冷媒量は適正量であると判定する。
 図13に、以上に説明した第1高圧抑制動作における冷媒量判定の基準を示す。図13に示すように、HPが保護圧力値よりも大きく且つTaが保護温度以上である場合、空調ユニット(60)側の第1ガス連絡配管(3)に余剰の冷媒を逃がしてHPを保護圧力値以下とした上で、冷媒の余剰量が少なかった場合は冷媒量を適正量と判定し、それ以外は、冷媒量を過充填と判定する。
 ステップS307又はS308で冷媒量判定を行った後、ステップS309において、制御部(101)は、垂下制御の制限を解除する。続いて、ステップS310において、制御部(101)は、熱源ユニット(10)つまり高段側圧縮機(23)を停止させて冷媒量判定運転を終了させる。
 <第2高圧抑制動作>
 第2高圧抑制動作では、図12に示すように、まず、ステップS401において、制御部(101)は、メモリ等に保持するカウンタ(K)を0にリセットする。
 次に、ステップS402において、制御部(101)は、例えば高段側圧縮機(23)の回転数を下げることによって、高段側圧縮機(23)の吸入圧力(中間圧力(MP))の目標値を所定の値(例えば0.5MPa)だけ低下させる。これにより、HPが低下する。
 次に、ステップS403において、制御部(101)は、カウンタ(K)の値を1つ増やしてメモリ等に記憶する。
 次に、ステップS404において、制御部(101)は、HPが保護圧力値よりも大きいかどうかを判定する。
 HPが保護圧力値よりも大きいとステップS404で判定された場合、ステップS402に戻る。
 HPが保護圧力値以下であるとステップS404で判定された場合、ステップS405において、制御部(101)は、カウンタ(K)が所定数(例えば3)以上であるかどうかを判定する。
 カウンタ(K)が所定数以上であるとステップS405で判定された場合、ステップS406において、制御部(101)は、冷媒量は過充填であると判定する。
 カウンタ(K)が所定数以上ではないとステップS405で判定された場合、ステップS407において、制御部(101)は、冷媒量は適正量であると判定する。
 図13に、以上に説明した第2高圧抑制動作における冷媒量判定の基準を示す。図13に示すように、HPが保護圧力値よりも大きく且つTaが保護温度以上である場合、高段側圧縮機(23)の吸入圧力(MP)の目標値を低下させてHPを保護圧力値以下とした上で、MPの目標値の低下分が少ない場合は冷媒量を適正量と判定し、それ以外は、冷媒量を過充填と判定する。
 ステップS406又はS407で冷媒量判定を行った後、ステップS408において、制御部(101)は、垂下制御の制限を解除する。続いて、ステップS409において、制御部(101)は、熱源ユニット(10)つまり高段側圧縮機(23)を停止させて冷媒量判定運転を終了させる。
 -実施形態の特徴-
 本実施形態の冷凍装置(1)は、超臨界域で作動する冷媒を使用する熱源ユニット(10)を備える。熱源ユニット(10)は、冷媒を圧縮する圧縮要素(20)と、熱源熱交換器(24)と、熱源熱交換器(24)の下流に設けられた膨張弁(第1室外膨張弁)(26)と、膨張弁(26)の下流に設けられたレシーバ(25)と、制御部(室外コントローラ)(101)とを備える。制御部(101)は、レシーバ(25)の内部圧力(RP)が超臨界圧力以下であるという第1条件において、高圧圧力(HP)に基づいて冷媒量を判定する第2判定動作(第1運転)を行う。
 本実施形態の冷凍装置(1)によると、レシーバ(25)の内部圧力が超臨界圧力以下であるという第1条件において高圧圧力に基づいて冷媒量を判定する。このため、実運転時にレシーバ(25)内に二相状態で貯留されると想定される冷媒を考慮して、高圧圧力に基づき冷媒量の判定を行える。従って、判定結果の精度を向上させることができる。
 例えば二酸化炭素のような超臨界域で作動する冷媒を用いると、冷媒回路(6)の動作において、高圧圧力(HP)及び低圧圧力に加えて、中間圧力及び受液器圧も支配的に影響する。このため、同じHP値であっても、運転条件に応じた受液器内の冷媒状態に依存して冷媒量の過不足判断結果が異なってしまう。しかし、本実施形態では、レシーバ(25)の内部圧力が超臨界圧力以下であるという第1条件でHPに基づき冷媒量判定を行うため、判定精度が向上する。
 本実施形態の冷凍装置(1)において、第1条件は、レシーバ(25)の内部圧力(RP)が超臨界圧力以下の第1圧力範囲内(例えば6.5MPa<RP<7.0MPa)にあるという条件であってもよい。
 このようにすると、RPが第1圧力範囲内にあるという条件でHPに基づき冷媒量を判定するため、実運転時にレシーバ(25)内に二相状態で貯留されると想定される冷媒の状態をより正確に考慮して、冷媒量判定を行える。従って、判定結果の精度がより一層向上する。
 本実施形態の冷凍装置(1)において、熱源ユニット(10)は、レシーバ(25)からガス冷媒を抜くためのガス抜き管(41)と、ガス抜き管(41)に設けられたガス抜き弁(42)とをさらに備えてもよい。制御部(101)は、第2判定動作においてRPが第1圧力範囲内にあるようにガス抜き弁(42)の開度を調整してもよい。
 このようにすると、ガス抜き弁(42)を用いて、RPを第1圧力範囲内に調整できる。
 本実施形態の冷凍装置(1)において、熱源ユニット(10)は利用ユニット(60,70)に接続されてもよい。圧縮要素(20)は、低段側圧縮機(21,22)と、低段側圧縮機(21,22)が圧縮した冷媒を圧縮する高段側圧縮機(23)とを含んでもよい。熱源ユニット(10)は、レシーバ(25)のガス冷媒を高段側圧縮機(23)の吸入管(23a)に導入するガス抜き管(41)をさらに備えてもよい。制御部(101)は、第2判定動作では、低段側圧縮機(21,22)を停止し高段側圧縮機(23)を運転して、冷媒を高段側圧縮機(23)、熱源熱交換器(24)、膨張弁(26)、レシーバ(25)、ガス抜き管(41)、高段側圧縮機(23)の順に循環させてもよい。
 このようにすると、第2判定動作で、利用ユニット(60,70)に対応する低段側圧縮機(21,22)を停止して高段側圧縮機(23)を運転するため、利用ユニット(60,70)での冷媒の循環を停止して、熱源ユニット(10)内で冷媒を循環させて冷媒量を判定できる。従って、冷媒量判定時における利用ユニット(60,70)等での冷媒状態の変動を抑制できるので、判定結果における誤差を小さくできる。言い換えると、システム全体に冷媒を循環させて連絡配管内に内容積分の冷媒をとどめた状態で、熱源ユニット(10)内に残る冷媒量を過不足判定に用いる。このため、連絡配管の長さや利用ユニット(60,70)の設置環境などの周囲環境の影響に起因する誤差を抑制できる。また、現地の据付状況(連絡配管の仕様等)に関係無く、冷媒量の過不足判定を行うことができる。
 本実施形態の冷凍装置(1)において、制御部(101)は、第2判定動作においてHPが所定の下限値(第1所定値)よりも小さければ冷媒量不足と判定し、HPが所定の上限値(第2所定値)以上であれば冷媒量過充填と判定してもよい。
 このようにすると、HPに基づいて、冷媒量の不足/過充填を判断できる。
 本実施形態の冷凍装置(1)において、制御部(101)は、第1所定値及び第2所定値を外気温度(Ta)に基づいて決定してもよい。
 このようにすると、Taを考慮して、冷媒量判定をより正確に行うことができる。
 本実施形態の冷凍装置(1)において、熱源ユニット(10)は利用ユニット(60,70)に接続されてもよい。制御部(101)は、第2判定動作においてHPが保護圧力値よりも大きく且つTaが保護温度以上である場合、空調ユニット(60)側の第1ガス連絡配管(3)に余剰の冷媒を所定時間逃がしてから冷媒量を判定してもよい(第1高圧抑制動作)。
 このようにすると、HPが高くなりすぎて、冷媒回路の構成部品が損傷する事態を回避しながら、圧縮要素(20)を動作させて冷媒量判定を行うことができる。
 本実施形態の冷凍装置(1)において、圧縮要素(20)は、低段側圧縮機(21,22)と、低段側圧縮機(21,22)が圧縮した冷媒を圧縮する高段側圧縮機(23)とを含んでもよい。制御部(101)は、第2判定動作においてHPが保護圧力値よりも大きく且つTaが保護温度以上である場合、高段側圧縮機(23)の吸入圧力(MP)の目標値を低下させてから冷媒量を判定してもよい(第2高圧抑制動作)。
 このようにすると、HPが高くなりすぎて、冷媒回路の構成部品が損傷する事態を回避しながら、圧縮要素(20)を動作させて冷媒量判定を行うことができる。
 本実施形態の冷凍装置(1)において、制御部(101)は、HPが超臨界圧力以上のときには、第2判定動作(第1運転)を行い、HPが超臨界圧力未満のときには、レシーバ(25)の内部圧力(RP)とHPとが実質的に等しいという条件において冷媒量を判定する第1判定動作(第2運転)を行ってもよい。
 このようにすると、HPに応じて適切な冷媒量の判定を行うことができる。
 本実施形態の冷凍装置(1)において、制御部(101)は、第1判定動作においてHPが所定の下限値(第3所定値)よりも小さければ冷媒量不足と判定し、HPが所定の上限値(第4所定値)以上であれば冷媒量過充填と判定してもよい。
 このようにすると、HPに基づいて、冷媒量の不足/過充填を判断できる。尚、第3所定値及び第4所定値を外気温度(Ta)に基づいて決定してもよい。このようにすると、Taを考慮して、冷媒量判定をより正確に行うことができる。
 本実施形態の冷凍装置(1)において、制御部(101)は、第1判定動作で「RPとHPとが実質的に等しいという条件」が満たされるように膨張弁(第1室外膨張弁)(26)の開度を調整してもよい。
 このようにすると、膨張弁(26)を用いて、RPをHPに近づけることができる。
 本実施形態の冷凍装置(1)において、冷媒は、二酸化炭素であってもよい。
 このようにすると、冷媒が超臨界域で作動する冷凍サイクルを行うことができる。
 本実施形態の冷凍装置(1)の冷媒量判定方法は、超臨界域で作動する冷媒を使用する熱源ユニット(10)を備えた冷凍装置(1)の冷媒量判定方法である。熱源ユニット(10)は、冷媒を圧縮する圧縮要素(20)と、熱源熱交換器(24)と、熱源熱交換器(24)の下流に設けられた膨張弁(第1室外膨張弁)(26)と、膨張弁(26)の下流に設けられたレシーバ(25)とを備える。冷凍装置(1)の冷媒量判定方法は、RPが超臨界圧力以下であるという第1条件においてHPに基づいて冷媒量を判定する。
 本実施形態の冷凍装置(1)の冷媒量判定方法によると、RPが超臨界圧力以下であるという第1条件においてHPに基づき冷媒量を判定する。このため、実運転時にレシーバ(25)内に二相状態で貯留されると想定される冷媒を考慮して、HPに基づき冷媒量の判定を行えるので、判定結果の精度を向上させることができる。
 ところで、従来、冷凍装置における冷媒充填量の過不足検知は、下記(1)又は(2)のように行われてきた。
(1)液配管に取付けたサイトグラスのシール状態に基づいて現地作業者が判断する。
(2)圧縮機の吸入管温度、吸入過熱度、吐出圧力(高圧圧力)がそれぞれ目標範囲に入っていることを現地作業者が見極める。
 しかしながら、(1)のサイトグラスを通じた目視による判断方法では、作業者の見方によって判定結果が左右され、例えば、不必要な冷媒の過充填が行われることがある。
 また、(2)の判断方法では、CO冷媒のように超臨界域で作動する冷媒を使用する場合、同じ高圧HP値であっても、運転条件に応じた受液器(レシーバ)内の冷媒状態に依存して冷媒量の過不足判断結果が異なってしまう。
 それに対して、以上に述べた本開示の冷凍装置においては、レシーバの圧力が超臨界以下であるという第1条件において冷媒量を判定する運転を行うため、より精度良く冷媒量の判定を行うことができる。
 《その他の実施形態》
 前記実施形態では、制御部(101)は、利用ユニット(60,70)における冷媒の循環を停止させて、冷媒量判定運転を行った。しかし、これに代えて、利用ユニット(60,70)において冷媒を循環させながら、冷媒量判定運転を行ってもよい。
 また、前記実施形態では、「高圧圧力(冷凍装置(1)における冷媒回路(6)の高圧圧力)」として、「圧縮要素(20)(高段側圧縮機(23))の吐出圧力」を用いた。しかし、これに代えて、「熱源熱交換器(24)の凝縮圧力」、「熱源熱交換器(24)の温度相当飽和圧力」、又は「熱源熱交換器(24)から膨張弁(第1室外膨張弁)(26)までの液管(第1管(40a)の上流部分)の圧力」等を「高圧圧力」として用いてもよい。
 また、前記実施形態では、熱源ユニット(10)は、図1に示す構成を有した。しかし、熱源ユニット(10)の構成は、冷媒を圧縮する圧縮要素と、熱源熱交換器と、熱源熱交換器の下流に設けられた膨張弁と、膨張弁の下流に設けられたレシーバと、制御部とを備える構成であれば、特に限定されない。例えば、圧縮要素(20)として、低段側圧縮機(21,22)及び高段側圧縮機(23)で構成された前記実施形態の2段圧縮構成に代えて、単段または3段以上の圧縮構成を用いてもよい。
 以上、実施形態を説明したが、特許請求の範囲の趣旨及び範囲から逸脱することなく、形態や詳細の多様な変更が可能なことが理解されるであろう。また、以上の実施形態は、適宜組み合わせたり、置換したりしてもよい。以上に述べた「第1」、「第2」、・・・という記載は、これらの記載が付与された語句を区別するために用いられており、その語句の数や順序までも限定するものではない。
 以上説明したように、本開示は、冷凍装置、及び冷凍装置の冷媒量判定方法について有用である。
   1  冷凍装置
   3  ガス冷媒管(第1ガス連絡配管)
  10  熱源ユニット
  20  圧縮要素
  21  低段側圧縮機(第1圧縮機)
  22  低段側圧縮機(第2圧縮機)
  23  高段側圧縮機(第3圧縮機)
  23a  吸入管(第3吸入管)
  24  熱源熱交換器(室外熱交換器)
  25  レシーバ
  26  膨張弁(第1室外膨張弁)
  41  ガス抜き管(接続配管)
  42  ガス抜き弁
  60  利用ユニット(空調ユニット)
  70  利用ユニット(冷設ユニット)
 101  制御部(室外コントローラ)

Claims (13)

  1.  超臨界域で作動する冷媒を使用する熱源ユニット(10)を備えた冷凍装置(1)であって、
     前記熱源ユニット(10)は、前記冷媒を圧縮する圧縮要素(20)と、熱源熱交換器(24)と、前記熱源熱交換器(24)の下流に設けられた膨張弁(26)と、前記膨張弁(26)の下流に設けられたレシーバ(25)と、制御部(101)とを備え、
     前記制御部(101)は、前記レシーバ(25)の内部圧力が超臨界圧力以下であるという第1条件において高圧圧力に基づいて冷媒量を判定する第1運転を行うことを特徴とする冷凍装置。
  2.  請求項1の冷凍装置において、
     前記第1条件は、前記レシーバ(25)の内部圧力が超臨界圧力以下の第1圧力範囲内にあるという条件であることを特徴とする冷凍装置。
  3.  請求項2の冷凍装置において、
     前記熱源ユニット(10)は、前記レシーバ(25)からガス冷媒を抜くためのガス抜き管(41)と、前記ガス抜き管(41)に設けられたガス抜き弁(42)とをさらに備え、
     前記制御部(101)は、前記第1運転において前記レシーバ(25)の内部圧力が前記第1圧力範囲内にあるように前記ガス抜き弁(42)の開度を調整することを特徴とする冷凍装置。
  4.  請求項1又は2の冷凍装置において、
     前記熱源ユニット(10)は利用ユニット(60,70)に接続され、
     前記圧縮要素(20)は、低段側圧縮機(21,22)と、前記低段側圧縮機(21,22)が圧縮した前記冷媒を圧縮する高段側圧縮機(23)とを含み、
     前記熱源ユニット(10)は、前記レシーバ(25)のガス冷媒を前記高段側圧縮機(23)の吸入管(23a)に導入するガス抜き管(41)をさらに備え、
     前記制御部(101)は、前記第1運転では、前記低段側圧縮機(21,22)を停止し前記高段側圧縮機(23)を運転して、前記冷媒を前記高段側圧縮機(23)、前記熱源熱交換器(24)、前記膨張弁(26)、前記レシーバ(25)、前記ガス抜き管(41)、前記高段側圧縮機(23)の順に循環させることを特徴とする冷凍装置。
  5.  請求項1~4のいずれか1項の冷凍装置において、
     前記制御部(101)は、前記第1運転において前記高圧圧力が第1所定値よりも小さければ冷媒量不足と判定し、前記高圧圧力が第2所定値以上であれば冷媒量過充填と判定することを特徴とする冷凍装置。
  6.  請求項5の冷凍装置において、
     前記制御部(101)は、前記第1所定値及び前記第2所定値を外気温度に基づいて決定することを特徴とする冷凍装置。
  7.  請求項6の冷凍装置において、
     前記熱源ユニット(10)は利用ユニット(60,70)に接続され、
     前記制御部(101)は、前記第1運転において前記高圧圧力が保護圧力値よりも大きく且つ前記外気温度が保護温度以上である場合、前記利用ユニット(60)側のガス冷媒管(3)に余剰の冷媒を所定時間逃がしてから冷媒量を判定することを特徴とする冷凍装置。
  8.  請求項6の冷凍装置において、
     前記圧縮要素(20)は、低段側圧縮機(21,22)と、前記低段側圧縮機(21,22)が圧縮した前記冷媒を圧縮する高段側圧縮機(23)とを含み、
     前記制御部(101)は、前記第1運転において前記高圧圧力が保護圧力値よりも大きく且つ前記外気温度が保護温度以上である場合、前記高段側圧縮機(23)の吸入圧力の目標値を低下させてから冷媒量を判定することを特徴とする冷凍装置。
  9.  請求項1~8のいずれか1項の冷凍装置において、
     前記制御部(101)は、前記高圧圧力が超臨界圧力以上のときには、前記第1運転を行い、前記高圧圧力が超臨界圧力未満のときには、前記レシーバ(25)の内部圧力と前記高圧圧力とが実質的に等しいという第2条件において冷媒量を判定する第2運転を行うことを特徴とする冷凍装置。
  10.  請求項9の冷凍装置において、
     前記制御部(101)は、前記第2運転において前記高圧圧力が第3所定値よりも小さければ冷媒量不足と判定し、前記高圧圧力が第4所定値以上であれば冷媒量過充填と判定することを特徴とする冷凍装置。
  11.  請求項9又は10の冷凍装置において、
     前記制御部(101)は、前記第2条件が満たされるように前記膨張弁(26)の開度を調整することを特徴とする冷凍装置。
  12.  請求項1~11のいずれか1項の冷凍装置において、
     前記冷媒は、二酸化炭素であることを特徴とする冷凍装置。
  13.  超臨界域で作動する冷媒を使用する熱源ユニット(10)を備えた冷凍装置(1)の冷媒量判定方法であって、
     前記熱源ユニット(10)は、前記冷媒を圧縮する圧縮要素(20)と、熱源熱交換器(24)と、前記熱源熱交換器(24)の下流に設けられた膨張弁(26)と、前記膨張弁(26)の下流に設けられたレシーバ(25)とを備え、
     前記レシーバ(25)の内部圧力が超臨界圧力以下であるという第1条件において高圧圧力に基づいて冷媒量を判定することを特徴とする冷凍装置の冷媒量判定方法。
PCT/JP2021/037999 2020-11-24 2021-10-14 冷凍装置、及び冷凍装置の冷媒量判定方法 WO2022113555A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN202180078738.8A CN116568975B (zh) 2020-11-24 2021-10-14 制冷装置及制冷装置的制冷剂量判断方法
EP21897533.2A EP4227611A4 (en) 2020-11-24 2021-10-14 REFRIGERATION DEVICE AND METHOD FOR DETERMINING THE QUANTITY OF A REFRIGERANT IN A REFRIGERATION DEVICE
US18/137,006 US11788781B2 (en) 2020-11-24 2023-04-20 Refrigeration device and method for determining amount of refrigerant in refrigeration device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020194568A JP6989808B1 (ja) 2020-11-24 2020-11-24 冷凍装置、及び冷凍装置の冷媒量判定方法
JP2020-194568 2020-11-24

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US18/137,006 Continuation US11788781B2 (en) 2020-11-24 2023-04-20 Refrigeration device and method for determining amount of refrigerant in refrigeration device

Publications (1)

Publication Number Publication Date
WO2022113555A1 true WO2022113555A1 (ja) 2022-06-02

Family

ID=80185438

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/037999 WO2022113555A1 (ja) 2020-11-24 2021-10-14 冷凍装置、及び冷凍装置の冷媒量判定方法

Country Status (5)

Country Link
US (1) US11788781B2 (ja)
EP (1) EP4227611A4 (ja)
JP (1) JP6989808B1 (ja)
CN (1) CN116568975B (ja)
WO (1) WO2022113555A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7485995B1 (ja) * 2023-02-15 2024-05-17 ダイキン工業株式会社 熱源ユニットおよび冷凍装置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012117713A (ja) 2010-11-30 2012-06-21 Sanyo Electric Co Ltd 冷凍装置
JP2014102008A (ja) * 2012-11-16 2014-06-05 Panasonic Corp 冷凍装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003028516A (ja) * 2001-07-17 2003-01-29 Zexel Valeo Climate Control Corp 冷凍サイクル制御装置
US7891201B1 (en) * 2006-09-29 2011-02-22 Carrier Corporation Refrigerant vapor compression system with flash tank receiver
EP2491317B1 (en) * 2009-10-23 2018-06-27 Carrier Corporation Refrigerant vapor compression system operation
CN201954865U (zh) * 2011-02-21 2011-08-31 大连三洋冷链有限公司 超临界co2制冷机组储液罐的压力控制设计
JP2015148406A (ja) * 2014-02-07 2015-08-20 パナソニックIpマネジメント株式会社 冷凍装置
JP2015148407A (ja) * 2014-02-07 2015-08-20 パナソニックIpマネジメント株式会社 冷凍装置
JP6895434B2 (ja) * 2015-11-17 2021-06-30 キャリア コーポレイションCarrier Corporation 冷却システムの冷媒充填量のロスを検出する方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012117713A (ja) 2010-11-30 2012-06-21 Sanyo Electric Co Ltd 冷凍装置
JP2014102008A (ja) * 2012-11-16 2014-06-05 Panasonic Corp 冷凍装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4227611A4

Also Published As

Publication number Publication date
CN116568975A (zh) 2023-08-08
US11788781B2 (en) 2023-10-17
EP4227611A1 (en) 2023-08-16
JP6989808B1 (ja) 2022-01-12
JP2022083237A (ja) 2022-06-03
US20230272954A1 (en) 2023-08-31
EP4227611A4 (en) 2024-04-03
CN116568975B (zh) 2024-02-02

Similar Documents

Publication Publication Date Title
US20090158764A1 (en) Air conditioning system
KR101336564B1 (ko) 열원 유닛
US8171747B2 (en) Refrigeration device
US10976090B2 (en) Air conditioner
US20220205680A1 (en) Heat source unit and refrigeration apparatus
CN116097049B (zh) 热源机组及制冷装置
JP2022083236A (ja) 熱源ユニット、冷凍装置、及び冷凍装置の冷媒量判定方法
US20220221200A1 (en) Refrigeration apparatus
WO2022113555A1 (ja) 冷凍装置、及び冷凍装置の冷媒量判定方法
WO2008069265A1 (ja) 空気調和装置
US11573039B2 (en) Heat source unit and refrigeration apparatus
CN114341569A (zh) 热源机组及制冷装置
US20220268498A1 (en) Intermediate unit for refrigeration apparatus, and refrigeration apparatus
CN113614469B (zh) 空调装置
JP5098987B2 (ja) 空気調和装置
JP7485995B1 (ja) 熱源ユニットおよび冷凍装置
US11686518B2 (en) Refrigeration apparatus that operates a utilization unit based on drivability of a compressor in a heat source unit
CN112771321A (zh) 空调装置
JP7553833B2 (ja) 熱源ユニット、および冷凍装置
WO2024171704A1 (ja) 熱源ユニットおよび冷凍装置
JP2022083173A (ja) 熱源システムおよび冷凍装置
JP2022083089A (ja) 熱源システムおよび冷凍装置
KR20190000584A (ko) 공기 조화기

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21897533

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021897533

Country of ref document: EP

Effective date: 20230510

WWE Wipo information: entry into national phase

Ref document number: 202180078738.8

Country of ref document: CN

NENP Non-entry into the national phase

Ref country code: DE