WO2022097549A1 - Dispositif, système et procédé de gestion d'informations de travail, et support d'enregistrement - Google Patents

Dispositif, système et procédé de gestion d'informations de travail, et support d'enregistrement Download PDF

Info

Publication number
WO2022097549A1
WO2022097549A1 PCT/JP2021/039649 JP2021039649W WO2022097549A1 WO 2022097549 A1 WO2022097549 A1 WO 2022097549A1 JP 2021039649 W JP2021039649 W JP 2021039649W WO 2022097549 A1 WO2022097549 A1 WO 2022097549A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
information
group
type
information management
Prior art date
Application number
PCT/JP2021/039649
Other languages
English (en)
Japanese (ja)
Inventor
俊輔 宮内
拓海 吉峰
拓也 近藤
Original Assignee
ヤンマーホールディングス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ヤンマーホールディングス株式会社 filed Critical ヤンマーホールディングス株式会社
Priority to KR1020237009745A priority Critical patent/KR20230104860A/ko
Priority to CN202180071591.XA priority patent/CN116420156A/zh
Publication of WO2022097549A1 publication Critical patent/WO2022097549A1/fr

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Definitions

  • the present invention relates to a work information management device, a work information management system, a storage medium, and a work information management method.
  • Patent Document 1 Japanese Unexamined Patent Publication No. 2018-190292 discloses a technique for receiving position information and operation information from an agricultural machine used for agricultural work in a field and recording the work information in the field. There is. The recorded work information is used for analysis of cultivation management.
  • the type of work such as tillage, leveling, sprinkling of original fertilizer, and planting, is determined for each work area based on the position information and the operation information. If this determined work type is incorrect, the user changes it for each work area. Further, since the work area is set according to the period during which the agricultural machine is started, it is divided according to the work period. For example, even if the same work is performed, the work area where the work was performed in the afternoon may be divided into the work area where the work was performed in the morning.
  • one of the purposes of the present disclosure is to provide a work information management device capable of efficiently managing work information by grouping a plurality of work areas.
  • Other purposes can be understood from the following description and description of embodiments.
  • the work information management device includes a storage device and an arithmetic unit.
  • the storage device stores a plurality of work area information representing the work area of the field where the work is performed.
  • the arithmetic unit groups one or more works satisfying a predetermined condition from a plurality of works corresponding to a plurality of work area information as a work group.
  • the arithmetic unit estimates the work type of the work based on the operation information of the work vehicle when the work is being performed. Further, the arithmetic unit corresponds to the first work type information and the second work included in the work group based on the change request signal for changing the first work type information corresponding to the first work included in the work group. 2 Change the work type information.
  • the work information management system includes the above-mentioned work information management device and a terminal for displaying work area information.
  • the terminal displays an image that distinguishes the work area information included in the work group from other work. Further, the terminal accepts an operation of changing the first work type information corresponding to the first work included in the work group.
  • the storage medium stores the work information management program.
  • the work information management program causes the arithmetic unit to hold a plurality of work area information representing the work area of the field where the work is performed. Further, the work information management program causes the arithmetic unit to group one or more works satisfying a predetermined condition as a work group among a plurality of works corresponding to the plurality of work area information. Further, the work information management program causes the arithmetic unit to estimate the work type of the work based on the operation information of the work vehicle when the work is being performed.
  • the work information management program corresponds to the first work type information and the second work included in the work group based on the change request signal for changing the first work type information corresponding to the first work included in the work group.
  • the arithmetic unit is made to change the second work type information to be performed.
  • the work information management method includes the arithmetic unit holding a plurality of work area information representing the work area of the field where the work is performed. Further, the work information management method includes that the arithmetic unit groups one or more works satisfying a predetermined condition as a work group among a plurality of works corresponding to a plurality of work area information. Further, the work information management method estimates the work type of the work based on the operation information of the work vehicle when the work is being performed. Further, in the work information management method, the arithmetic unit includes the first work type information and the first work type information included in the work group based on the change request signal for changing the first work type information corresponding to the first work included in the work group. 2 Includes changing the second work type information corresponding to the work.
  • the user can efficiently manage the work information registered in the work information management device.
  • FIG. 1 is a schematic diagram of a work information management system according to an embodiment.
  • FIG. 2 is a diagram showing the structure of work data in one embodiment.
  • FIG. 3 is a diagram showing a work area in one embodiment.
  • FIG. 4 is a diagram showing a functional block executed by the work information management system in one embodiment.
  • FIG. 5 is a flowchart showing processing by the work information management program in one embodiment.
  • FIG. 6 is a diagram showing a structure of work data when processing by the work information management program in one embodiment is performed.
  • FIG. 7 is a flowchart showing processing by the work information management program and the display program in one embodiment.
  • FIG. 8 is a diagram showing an image displayed by the display unit in one embodiment.
  • FIG. 9 is a diagram showing the structure of work data after changing the work type in one embodiment.
  • the work information management system 1000 includes a work information management device 100 and a terminal 200.
  • the work information management device 100 is communicably connected to the terminal 200 and the work vehicle 30 via a network 20, for example, the Internet.
  • the work information management device 100 acquires operation information in the field from the work vehicle 30, and stores information indicating a work type, work time, work area, etc. in one work unit based on the acquired operation information.
  • This work unit represents work in one work period in the operation information from the work vehicle 30, and represents, for example, the work from the start to the stop of the engine of the work vehicle 30.
  • the work type represents the type of work performed in the field, such as tillage, leveling, sprinkling of original fertilizer, and planting.
  • the operation information includes information indicating the state of the work vehicle 30 when working in the field, for example, the speed of the work vehicle 30, the steering angle, the engine speed, the ON / OFF status of various clutches, and the work vehicle 30.
  • the operation information includes the PTO (power take-off) rotation speed when transmitting power to the work machine, the hitch height indicating the attitude of the work machine, and the like.
  • Information such as the lift arm angle may be included.
  • the work information management device 100 groups works that are presumed to have performed the same work based on the information representing the stored work area, so that the work types of the work included in the same group are the same work type. Hold the work type. For example, when the work type is changed, the work information management device 100 changes the work type of the work included in the same group as the work whose work type is changed to the same work type.
  • the user can change the work type of one or more works included in the same group by changing the work type of one work.
  • the work information management device 100 includes an input / output device 110, an arithmetic unit 120, a communication device 130, and a storage device 140.
  • the work information management device 100 is, for example, a computer.
  • Information for the arithmetic unit 120 to execute the process is input to the input / output device 110.
  • the input / output device 110 outputs the result of the processing executed by the arithmetic unit 120.
  • the input / output device 110 includes various input devices and output devices, and includes, for example, a keyboard, a mouse, a microphone, a display, a speaker, a touch panel, and the like.
  • the input / output device 110 may be omitted.
  • the communication device 130 is electrically connected to the network 20 and communicates with each device via the network 20.
  • the communication device 130 transfers the operation information acquired from the work vehicle 30 to the arithmetic unit 120. Further, the signal generated by the arithmetic unit 120 is transferred to the terminal 200.
  • the communication device 130 includes various interfaces such as NIC (Network Interface Card) and USB (Universal Serial Bus).
  • the storage device 140 stores various data for grouping work, for example, work data 300 and work information management program 400.
  • the storage device 140 is used as a non-transitory tangible storage medium for storing the work information management program 400.
  • the work information management program 400 may be provided as a computer program product recorded on a computer-readable storage medium 1, or may be provided as a computer program product that can be downloaded from a server.
  • the work data 300 includes data related to field work, for example, data calculated from operation information from the work vehicle 30.
  • the work data 300 includes a work ID 310, work period information representing a work period 320, work area information representing a work area 330, work type information representing a work type 340, and a work group. Includes work group information representing 350.
  • the work ID 310, the work period information, the work area information, the work type information, and the work group information are registered in association with the work data 300.
  • the work ID 310 represents an identifier used to distinguish units of work performed in the field, and different values are assigned to each work.
  • the work period 320 represents the time when the work in the field was started and the time when the work was finished.
  • the work period 320 represents, for example, the time when the work vehicle 30 enters the field and the time when the work vehicle 30 leaves the field. Further, the work period 320 may represent a time when the work vehicle 30 starts, for example, the engine starts, and a time when the work vehicle 30 stops, for example, the engine stops.
  • any format may be selected that represents the period during which the work in the field was performed.
  • the work area 330 represents the area where the work in the field was performed, for example, the position and shape.
  • "A” whose work ID 310 is indicated by “OP01” represents a work area 330A as shown in FIG.
  • the work area 330A is an area where the work whose work ID 310 is “OP01” is performed, and is an area where the work is performed during the work period 320 indicated by “OP01”.
  • “B” whose work ID 310 is indicated by “OP02” represents the work area 330B in FIG.
  • “C” indicated by “OP03” represents a work area 330C
  • "D” indicated by “OP04” represents a work area 330D
  • "E” indicated by "OP05” represents a work area.
  • a part of the work area 330 may overlap with a part of another work area 330.
  • a part of the work area 330B overlaps a part of the work area 330A
  • another part of the work area 330B overlaps a part of the work area 330C.
  • Part of three or more work areas 330 may overlap each other.
  • Work type 340 represents the type of work performed in the field, such as tillage, leveling, fertilization, and planting.
  • the work type 340 of the work data 300 in FIG. 2 indicates that the work whose work ID 310 is indicated by "OP01" is "plow". Therefore, the work data 300 indicates that "plowing” was performed in the work area 330A shown in FIG. 3 during the period represented by the work period 320 shown in "OP01". Similarly, the work data 300 indicates that “plowing” was performed in the work area 330B during the period represented by the work period 320 indicated by “OP02”, and is represented by the work period 320 indicated by “OP03”. Indicates that "plowing” was performed in the work area 330C during the period.
  • the work data 300 indicates that "plowing” was performed in the work area 330D during the period represented by the work period 320 shown in "OP04", and the period represented by the work period 320 shown in "OP05". Indicates that "weeding” was performed in the work area 330E.
  • the work group 350 is an identifier that represents a group of work that is presumed to have performed the same work.
  • the same identifier is set in the work group 350 corresponding to the work in which the same work is presumed to have been performed.
  • the work group 350 corresponding to the work shown in "OP01" to "OP04" represents the same value "1"
  • the work shown in "OP01” to "OP04" is in the same group. Belong.
  • one or more works belonging to the same group may be referred to as a work group.
  • the work data 300 is read out by the arithmetic unit 120 shown in FIG. 1 and used for various data processing for grouping the work.
  • the arithmetic unit 120 reads and executes the work information management program 400 from the storage device 140, and groups the work based on the work data 300.
  • the arithmetic unit 120 includes a central processing unit (CPU; Central Processing Unit) and the like.
  • the arithmetic unit 120 has a work registration unit 150 and a work type estimation unit 160 that execute various data processes for grouping the work by reading and executing the work information management program 400.
  • the group determination unit 170 and the response unit 180 are realized.
  • the work registration unit 150 calculates the work area 330 based on the operation information obtained from the work vehicle 30, and registers the work area information representing the calculated work area 330 in the work data 300 as new work.
  • the work type estimation unit 160 estimates the work type 340 based on the operation information obtained from the work vehicle 30, and registers the work type information representing the estimated work type 340 in the work data 300 in association with the registered work. do.
  • the group determination unit 170 groups the works registered in the work data 300 based on the work data 300.
  • the response unit 180 transmits or changes the work data 300 in response to a request from the display unit 250 of the terminal 200.
  • the terminal 200 includes an input / output device 210, an arithmetic unit 220, a communication device 230, and a storage device 240.
  • the terminal 200 includes, for example, a computer, a tablet, a mobile phone, and the like.
  • Information for the arithmetic unit 220 to execute the process is input to the input / output device 210.
  • the input / output device 210 outputs the result of the processing executed by the arithmetic unit 220.
  • the input / output device 210 includes various input devices and output devices, and includes, for example, a keyboard, a mouse, a microphone, a display, a speaker, a touch panel, and the like.
  • the communication device 230 is electrically connected to the network 20 and communicates with each device via the network 20.
  • the communication device 230 transfers the information included in the work data 300 acquired from the work information management device 100 to the arithmetic unit 220. Further, the signal generated by the arithmetic unit 220 is transferred to the work information management device 100.
  • the communication device 230 includes various interfaces such as NIC (Network Interface Card) and USB (Universal Serial Bus).
  • the storage device 240 stores various data for changing the work data 300 registered in the work information management device 100, for example, a display program 500.
  • the storage device 240 is used as a non-transitory tangible storage medium for storing the display program 500.
  • the display program 500 may be provided as a computer program product recorded on a computer-readable storage medium 2, or may be provided as a computer program product that can be downloaded from a server.
  • the display program 500 may be recorded and provided on the storage medium 1.
  • the arithmetic unit 220 realizes the display unit 250 that displays the information of the work data 300 stored in the work information management device 100, as shown in FIG. 4, by reading and executing the display program 500.
  • the display unit 250 acquires the information of the work data 300 stored in the work information management device 100 and displays the information registered in the work data 300. Further, the display unit 250 updates the information registered in the work data 300 by the operation of the user.
  • the arithmetic unit 120 of the work information management device 100 receives the operation information from the work vehicle 30, the arithmetic unit 120 reads and executes the work information management program 400. By executing the work information management program 400, the arithmetic unit 120 executes the process shown in FIG. 5 by the work registration unit 150, the work type estimation unit 160, and the group determination unit 170.
  • the work registration unit 150 determines the work period 320 based on the operation information received from the work vehicle 30. For example, the work registration unit 150 determines the work period 320 from the time when the work vehicle 30 is started to the time when the work vehicle 30 is stopped. Further, the work registration unit 150 determines the work period 320 based on the time when the work of the work vehicle 30 starts and ends, and the time when the work machine towed by the work vehicle 30 is driven and stopped, for example. You may. The work registration unit 150 assigns a new work ID 310 to the work corresponding to the received operation information, and registers it in the work data 300 as a new work in association with the work ID 310 to which the determined work period 320 is assigned.
  • the work registration unit 150 determines the work area 330 based on the position information of the work vehicle 30 in the determined work period 320.
  • the work vehicle 30 is equipped with a positioning device, for example, a receiver of a GNSS (Global Navigation Satellite System), and acquires position information indicating the position at each time when the work period 320 is reached.
  • the acquired position information is transmitted from the work vehicle 30 to the arithmetic unit 120 of the work information management device 100.
  • the work registration unit 150 realized by the arithmetic unit 120 determines the work area 330 based on the acquired position information.
  • the work area 330 is represented by an arbitrary closed figure including a position represented by the acquired position information, such as a polygon or a rectangle.
  • the work area 330 is represented by a figure that surrounds all the positions represented by the acquired position information.
  • the work registration unit 150 associates the determined work area 330 with the work ID 310 and registers it in the work data 300. As a result, the work area 330 is associated with the work period 320 determined in step S100.
  • the work type estimation unit 160 estimates the work type 340 based on the operation information received from the work vehicle 30. For example, the work type estimation unit 160 may calculate the work type 340 based on the model of the work vehicle 30. In this case, the storage device 140 stores work correspondence data associating the model of the work vehicle 30 with the work represented by the work type 340. The work type estimation unit 160 estimates the work type 340 based on the work correspondence data. Further, the work type estimation unit 160 may estimate the work type 340 using the trained model obtained by machine learning. In this case, the trained model is trained to estimate the work type 340 from the operation information.
  • the work type estimation unit 160 associates the estimated work type 340 with the work ID 310 and registers it in the work data 300.
  • the work type 340 is associated with the work period 320 determined in step S100 and the work area 330 determined in step S110.
  • the work data 300 holds the work period 320, the work area 330, and the work type 340 in association with each other for each work.
  • the group determination unit 170 calculates the degree of similarity between the new work and the work registered in the work data 300 based on the determined work area 330.
  • the group determination unit 170 extracts a work group which is a set of one or more works satisfying the extraction condition from the work data 300.
  • the group determination unit 170 extracts a work group which is a set of one or more works representing the same work type 340 as the new work from the work data 300.
  • the group determination unit 170 calculates the similarity using the distance from the work area 330 of the new work to the work area 330 of each work.
  • the similarity may be the reciprocal of the distance.
  • the method of calculating the distance between the two work areas 330 can be arbitrarily selected.
  • this distance may be the smallest of the distances between arbitrary positions of the two work areas 330, or may be the distance between the geometric centers of the two work areas 330. Further, for this distance, any method for calculating the distance between two points, for example, the Euclidean distance, the Manhattan distance, or the like may be selected.
  • step S140 the group determination unit 170 determines a new work group based on the calculated similarity.
  • the group determination unit 170 selects the work having the highest similarity calculated from the work data 300 from the work group. When the similarity of the selected work is greater than a predetermined threshold, the new work is determined to belong to the group of work selected from the work data 300.
  • the group determination unit 170 registers the same value as the selected work group in the work group 350 of the work data 300 shown in FIG.
  • the similarity of the selected work is equal to or less than a predetermined threshold value, the group determination unit 170 determines that the new work does not belong to the group registered in the work data 300. In this case, the group determination unit 170 registers a new value not used in the group registered in the work data 300 in the work group 350.
  • the work area 330B since the work area 330B has a small distance from the nearest work area 330A, it is registered in the work data 300 as the same group as the work area 330A. Since the work area 330C has a small distance from the nearest work area 330B, it is registered in the work data 300 as the same group as the work area 330B. Since the work area 330D has a small distance from the nearest work area 330B, it is registered in the work data 300 as the same group as the work area 330B. The work area 330E is registered in the work data 300 as a new group because the work representing the same work type 340 is not included in the work data 300. As described above, as shown in FIG.
  • the group determination unit 170 registers the same value "1" in the work group 350 of "OP01” to "OP04" representing the work corresponding to the work area 330A to the work area 330D. .. Further, the group determination unit 170 registers a value "2" different from the work group 350 of "OP01” to "OP04" in "OP05" representing the work corresponding to the work area 330E.
  • the work information management device 100 can group work based on the operation information received from the work vehicle 30.
  • the arithmetic unit 220 of the terminal 200 changes the work data 300 registered in the work information management device 100 according to the operation of the user.
  • the arithmetic unit 220 reads out and executes the display program 500 according to the operation of the user.
  • the arithmetic unit 220 executes step S200 shown in FIG. 7 by the display unit 250.
  • the arithmetic unit 120 of the work information management device 100 executes the work information management program 400 in response to a request from the display unit 250, and the response unit 180 executes step S210.
  • step S200 the display unit 250 of the terminal 200 acquires the work data 300 from the work information management device 100 and displays the acquired work data 300.
  • the display unit 250 generates a data request signal requesting the work data 300 from the work information management device 100 in response to the user's operation.
  • the response unit 180 of the work information management device 100 generates a data output signal representing the work data 300 based on the data request signal.
  • the display unit 250 of the terminal 200 extracts the work data 300 from the data output signal and displays the work data 300 on the input / output device 110 of the terminal 200.
  • the display unit 250 displays an image showing an area representing the work area 330 included in the work data 300 on a map.
  • the display unit 250 displays the work period information of the work period 320 corresponding to the selected work area 330 and the work type information of the work type 340. And are displayed.
  • the display unit 250 displays an image that distinguishes the work belonging to the same group as the selected work area 330 from other work.
  • the display unit 250 displays an image that emphasizes an area representing a work area 330 that belongs to the same group as the selected work area 330.
  • the display unit 250 highlights the areas representing the work areas 330A to the work area 330D that belong to the same group as the work area 330A.
  • the user can change the work type information of the work type 340 corresponding to one work area 330.
  • the display unit 250 When the input / output device 210 receives an operation for changing the work type information, the display unit 250 generates a change request signal representing the work ID 310 corresponding to the work type information for which the change has been accepted and the changed work type information. ..
  • the user performs an operation of changing the work type information corresponding to the work area 330B to "leveling”.
  • the display unit 250 generates a change request signal representing "OP02" indicating the work ID 310 corresponding to the work area 330B and "leveling" indicating the changed work type information.
  • step S210 the response unit 180 of the work information management device 100 changes the work type information registered in the work type 340 of the work data 300 based on the change request signal.
  • the response unit 180 extracts the value of the work ID 310 and the work type information of the work type 340 from the change request signal received from the display unit 250 of the terminal 200.
  • the response unit 180 changes the work type information corresponding to the value of the extracted work ID 310 to the work type information extracted from the change request signal. For example, when the response unit 180 receives the change request signal representing "OP02" of the work ID 310 and "leveling" of the work type 340, the response unit 180 corresponds to "OP02" represented by the change request signal as shown in FIG.
  • the work type information of the work type 340 to be performed is changed to "leveling".
  • the response unit 180 changes the work type information of the work belonging to the same group as the work ID 310 represented by the change request signal. Specifically, the response unit 180 extracts the work group 350 corresponding to the work ID 310 represented by the change request signal from the work data 300. The response unit 180 extracts the work ID 310 having the work group 350 having the same value as the extracted work group 350. The response unit 180 changes the extracted work type information of the work ID 310 to the work type information represented by the change request signal. For example, as shown in FIG. 9, the response unit 180 acquires the value “1” of the work group 350 corresponding to “OP02”. The response unit 180 extracts the work ID 310 to which the work group 350 is "1" and acquires "OP01" to "OP04" to which the same group belongs. The response unit 180 changes the acquired work type information of "OP01" to "OP04" to "leveling" represented by the change request signal.
  • the user can also change the work type information of the work to which the same group belongs by changing the work type information of one of the grouped work.
  • the configuration described in the embodiment is an example, and the configuration can be changed as long as the function is not impaired.
  • the work information management device 100 may change the work group 350 once determined by the operation of the user. For example, the user inputs to the input / output device 210 that the input / output device 210 of the terminal 200 selects one work area 330 and changes the work group 350 of the selected work area 330. Based on the input of the user, the display unit 250 generates a change request signal representing the work ID 310 corresponding to the work group 350 that has received the change and the value of the work group 350 after the change. For example, the user performs an operation of changing the work group 350 corresponding to the work area 330D to “2”. At this time, the display unit 250 generates a change request signal representing "OP04" indicating the work ID 310 corresponding to the work area 330D and "2" indicating the changed work group 350.
  • the response unit 180 of the work information management device 100 receives the change request signal from the display unit 250 of the terminal 200, and changes the work group 350 of the work ID 310 for which the change is requested. Specifically, the response unit 180 extracts the value of the work ID 310 and the value of the work group 350 from the change request signal. The response unit 180 changes the work group 350 corresponding to the value of the extracted work ID 310 to the value of the extracted work group 350. For example, when the response unit 180 receives the change request signal representing "OP04" of the work ID 310 and "2" of the work group 350, the response unit 180 sets the work group 350 corresponding to "OP04" represented by the change request signal to "2". To change to.
  • the group determination unit 170 of the work information management device 100 has shown an example of calculating the similarity based on the distance between the two work areas 330, but the present invention is not limited to this.
  • the group determination unit 170 may select an arbitrary index value indicating whether the same work is being performed.
  • the similarity may be calculated based on one work area 330 and a work area 330 of a work group that is a group of work belonging to the same group.
  • the group determination unit 170 may use the Mahalanobis distance between the work group and the other work area 330 as the degree of similarity.
  • the group determination unit 170 calculates the average position and the variance value of the work group.
  • the group determination unit 170 calculates the Mahalanobis distance between the work group and the geometric center of the other work area 330 based on the calculated average position and dispersion value of the work group, and uses the calculated Mahalanobis distance as the similarity.
  • the group determination unit 170 may use other information registered in the work data 300 for calculating the similarity. For example, the group determination unit 170 may calculate the similarity between two works based on the work area 330 and the work period 320. The group determination unit 170 may use the time between the work periods 320 corresponding to the two works, for example, the time from the work end time of the earlier work to the work start time of the later work. good. In this case, the group determination unit 170 adds one dimension of time during the work period 320 to the number of dimensions representing the work area 330, for example, two dimensions, to obtain a multidimensional distance, for example, a three-dimensional distance. It may be used to calculate the similarity between two operations.
  • the group determination unit 170 may calculate the similarity by using the two-dimensional distance between the distance of the work area 330 and the time during the work period 320. Further, the similarity may be calculated by using the working period 320 without using the distance of the working area 330.
  • the group determination unit 170 may calculate the similarity based on the work area 330 corresponding between the two works and the work type 340. For example, when the work type estimation unit 160 estimates the work type 340 using the certainty, the similarity may be calculated using the calculated certainty. The group determination unit 170 adds one dimension representing the difference in certainty to the number of dimensions representing the work area 330, and calculates the similarity between the two tasks using the multidimensional distance. Further, the storage device 140 stores a similarity table showing the similarity between two different work types 340, and the group determination unit 170 uses the similarity table of the work type 340 by using the similarity table stored in the storage device 140. And the degree of similarity may be calculated. By calculating the similarity using the certainty that represents the certainty of the estimated work type 340, the group determination unit 170 can group the work that is likely to be changed. The degree of certainty may be included in the work type information.
  • the group determination unit 170 may exclude the work with high certainty from the group. For example, in step S130 shown in FIG. 5, when the certainty of new work to be classified into a group is greater than a predetermined threshold value, the group determination unit 170 first ends step S130 and performs step S140. Omit. This excludes tasks with high confidence from the group. Further, when the certainty of the grouping work is equal to or less than a predetermined threshold value, the process shown in step S130 described above is started. Here, the group determination unit 170 extracts the work of calculating the similarity with the new work based on the extraction conditions. This extraction condition includes that the certainty of work is equal to or less than a predetermined threshold. In this way, the group determination unit 170 excludes the work with high certainty from the group, so that the user changes the work type 340 of other work, thereby reducing the change of the work with high certainty. be able to.
  • the similarity calculated in step S140 of FIG. 5 may have a plurality of dimensions.
  • the similarity may have three dimensions: the distance between the work areas 330, the time between the work periods 320, and the difference in certainty when estimating the work type 340.
  • the group determination unit 170 groups the work when each dimension of similarity is greater than a predetermined value.
  • the extraction conditions in step S130 of FIG. 5 can be arbitrarily selected as long as similar operations can be extracted.
  • the extraction condition may include that the working period 320 is included in a predetermined period.
  • the group determination unit 170 extracts the work period 320 of the work for determining the group and the work performed within one week from the work data 300.
  • the group determination unit 170 calculates the degree of similarity between the extracted work and the work of determining the group, and determines the group.
  • the group determination unit 170 may omit steps S130 and S140 in FIG. 5 when the certainty of the determined work type 340 is smaller than a predetermined value.
  • the group determination unit 170 can avoid grouping based on the work type 340 when the estimated probability of the work type 340 is low.
  • the group determination unit 170 of the work information management device 100 may select any method that can classify the work that can be presumed that the same work has been performed. For example, the group determination unit 170 determines that one or more works satisfying a predetermined condition belong to the same group. For example, as shown in the embodiment, the predetermined condition includes that the work type information is the same and the similarity is larger than the predetermined value. Further, under the predetermined conditions, the similarity may be larger than the predetermined value regardless of the work type information.
  • the range of one work included in the work data 300 can be arbitrarily selected as long as the work is a unit representing the same work type 340.
  • one work may represent a unit of work determined based on information such as an arbitrary period and area, or may represent one work managed on data.
  • step S120 in FIG. 5 may be omitted.
  • the work type 340 may be input by the user using the terminal 200.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Mining & Mineral Resources (AREA)
  • Animal Husbandry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Agronomy & Crop Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Dispositif de gestion d'informations de travail pourvu d'un dispositif d'enregistrement et d'un dispositif informatique. Le dispositif d'enregistrement enregistre une pluralité d'éléments d'informations de région de travail représentant des régions de travail dans un champ agricole dans lequel un travail a été réalisé. Le dispositif informatique regroupe un ou plusieurs éléments de travail satisfaisant une condition prédéterminée, parmi une pluralité d'éléments de travail correspondant à la pluralité d'informations de région de travail, en tant que groupe de travail. Le dispositif informatique estime également le type de travail du travail sur la base d'informations de fonctionnement lorsqu'un véhicule de travail utilisé pour le travail a réalisé le travail. De plus, le dispositif informatique change de premières informations de type de travail correspondant à un premier travail inclus dans le groupe de travail et de secondes informations de type de travail correspondant à un second travail inclus dans le groupe de travail, sur la base d'un signal de demande de changement pour changer les informations de premier type de travail.
PCT/JP2021/039649 2020-11-09 2021-10-27 Dispositif, système et procédé de gestion d'informations de travail, et support d'enregistrement WO2022097549A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020237009745A KR20230104860A (ko) 2020-11-09 2021-10-27 작업 정보 관리 장치, 작업 정보 관리 시스템, 기억 매체, 및 작업 정보 관리 방법
CN202180071591.XA CN116420156A (zh) 2020-11-09 2021-10-27 作业信息管理装置、作业信息管理系统、存储介质以及作业信息管理方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020-186265 2020-11-09
JP2020186265A JP7480025B2 (ja) 2020-11-09 2020-11-09 作業情報管理装置、作業情報管理システム、作業情報管理プログラム、及び作業情報管理方法

Publications (1)

Publication Number Publication Date
WO2022097549A1 true WO2022097549A1 (fr) 2022-05-12

Family

ID=81457806

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/039649 WO2022097549A1 (fr) 2020-11-09 2021-10-27 Dispositif, système et procédé de gestion d'informations de travail, et support d'enregistrement

Country Status (4)

Country Link
JP (1) JP7480025B2 (fr)
KR (1) KR20230104860A (fr)
CN (1) CN116420156A (fr)
WO (1) WO2022097549A1 (fr)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010161991A (ja) * 2009-01-16 2010-07-29 Fujitsu Ltd 作業記録装置、作業記録システムおよび作業記録プログラム
JP2019117514A (ja) * 2017-12-27 2019-07-18 井関農機株式会社 農作業情報管理システム
JP2019126268A (ja) * 2018-01-22 2019-08-01 株式会社クボタ 農業支援装置及び農業支援システム
WO2020054876A1 (fr) * 2018-09-14 2020-03-19 株式会社ナイルワークス Système, dispositif, procédé et programme de gestion de travail

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018190292A (ja) 2017-05-10 2018-11-29 株式会社クボタ 農業支援システム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010161991A (ja) * 2009-01-16 2010-07-29 Fujitsu Ltd 作業記録装置、作業記録システムおよび作業記録プログラム
JP2019117514A (ja) * 2017-12-27 2019-07-18 井関農機株式会社 農作業情報管理システム
JP2019126268A (ja) * 2018-01-22 2019-08-01 株式会社クボタ 農業支援装置及び農業支援システム
WO2020054876A1 (fr) * 2018-09-14 2020-03-19 株式会社ナイルワークス Système, dispositif, procédé et programme de gestion de travail

Also Published As

Publication number Publication date
JP2022076056A (ja) 2022-05-19
JP7480025B2 (ja) 2024-05-09
CN116420156A (zh) 2023-07-11
KR20230104860A (ko) 2023-07-11

Similar Documents

Publication Publication Date Title
US20240118083A1 (en) Localisation of mobile device using image and non-image sensor data in server processing
CN110263209B (zh) 用于生成信息的方法和装置
CN111788606A (zh) 位置估计装置,跟踪器,位置估计方法和程序
WO2022097549A1 (fr) Dispositif, système et procédé de gestion d'informations de travail, et support d'enregistrement
WO2022176539A1 (fr) Procédé de gestion de champs, dispositif de gestion de champs, système de gestion de champs et support d'enregistrement
US20230060662A1 (en) Work management method, work management system, and work management program
JP7482061B2 (ja) 作業計画管理方法、作業計画管理装置、作業計画管理システム、及びプログラム
EP3804485A1 (fr) Transfert et synchronisation des paramètres sur des machines de travail mobiles
JP7495889B2 (ja) 軌跡情報出力システム、軌跡情報出力プログラム、及び軌跡情報出力方法
JP2023141280A (ja) 圃場管理方法、圃場管理システムおよび圃場管理プログラム
WO2022168605A1 (fr) Système de gestion de travail, support de stockage et procédé de gestion de travail
WO2022176601A1 (fr) Procédé de gestion de travail, système de gestion de travail et support de stockage
JP2024061105A (ja) 作業管理方法、作業管理システム、及び作業管理プログラム
WO2022196380A1 (fr) Procédé d'estimation de zone de travail, système d'estimation de zone de travail et support d'enregistrement stockant un programme d'estimation de zone de travail
JP2024061099A (ja) 作業管理方法、作業管理システム、及び作業管理プログラム
KR20230089545A (ko) 가동 정보 관리 방법, 가동 정보 관리 시스템, 및 가동 정보 관리 프로그램
JP2023037741A (ja) 圃場管理方法、圃場管理システム、及び圃場管理プログラム
JP2023102334A (ja) 作業管理方法、作業管理システム、及び作業管理プログラム
JP2022146349A (ja) 作業管理方法、作業管理システム、及び作業管理プログラム
JP2022076075A (ja) 作業情報管理装置、作業情報管理プログラム、及び作業情報管理方法
JP2024043168A (ja) 畝管理方法、畝管理システム、及び畝管理プログラム
JP2024010746A (ja) 作業管理方法、作業管理システム、及び、プログラム
CA3237713A1 (fr) Systeme de distribution de donnees agricoles en temps reel et historiques
CN111158012A (zh) 弧形墙面互动识别系统和识别方法
JP2022036522A (ja) 作業管理システム、作業管理方法及び作業管理プログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21889102

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21889102

Country of ref document: EP

Kind code of ref document: A1