WO2022091421A1 - 産業システム、異常検知システム及び異常検知方法 - Google Patents

産業システム、異常検知システム及び異常検知方法 Download PDF

Info

Publication number
WO2022091421A1
WO2022091421A1 PCT/JP2020/041118 JP2020041118W WO2022091421A1 WO 2022091421 A1 WO2022091421 A1 WO 2022091421A1 JP 2020041118 W JP2020041118 W JP 2020041118W WO 2022091421 A1 WO2022091421 A1 WO 2022091421A1
Authority
WO
WIPO (PCT)
Prior art keywords
industrial
simulation
line
information
result
Prior art date
Application number
PCT/JP2020/041118
Other languages
English (en)
French (fr)
Inventor
修弘 掛布
義輝 勝村
大毅 梶田
隆宏 中野
美帆 新井
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to JP2022558817A priority Critical patent/JPWO2022091421A1/ja
Priority to DE112020007421.8T priority patent/DE112020007421T5/de
Priority to US18/245,557 priority patent/US20230367296A1/en
Priority to CN202080105024.7A priority patent/CN116018237A/zh
Priority to PCT/JP2020/041118 priority patent/WO2022091421A1/ja
Publication of WO2022091421A1 publication Critical patent/WO2022091421A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/4184Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by fault tolerance, reliability of production system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41885Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by modeling, simulation of the manufacturing system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/31From computer integrated manufacturing till monitoring
    • G05B2219/31444Compare actual manufacturing sequence with simulated sequence, correct actual
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32019Dynamic reconfiguration to maintain optimal design, fabrication, assembly
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Definitions

  • the present invention relates to an industrial system, an abnormality detection system and an abnormality detection method.
  • Patent Document 1 includes a simulation result data input process that collects simulation result data of each element of a production line configured on a virtually designed simulator and transmits the simulation result data to the evaluation support device side, and the collected simulation result data.
  • An evaluation rule consisting of a data organization process that captures data and organizes it into a format according to the operating rate, production quantity, and evaluation index, and evaluation items, evaluation standard values, and evaluation flows for the result data for each production line type that are stored in advance.
  • a production line evaluation support method characterized by including a problem analysis process for evaluating simulation result data and extracting problems related to production line components using the above.
  • Patent Document 2 describes a step of constructing a prediction formula that approximately predicts the lead time of each process from the results of simulations performed in the past or production results, and an error between the prediction formula and the simulations performed in the past. Or, based on the step of calculating the error between the prediction formula and the production record for each process and the calculated error information for each process, apply the simplified simulation using the prediction formula in any process. It is characterized by including a step of deciding whether or not to perform a process, and a step of executing a production line simulation to which a process lead time using the prediction formula is applied in the process of deciding to apply the simplified simulation. There is a description of how to build a production line simulation model.
  • an object of the present invention is to provide a system and a method that can be utilized for line operation support and high-resolution abnormality detection by using a line simulator for design verification.
  • one of the representative industrial systems of the present invention is a storage unit for storing design data used when constructing an industrial line, and a simulation of the operation of the industrial line based on the design data. It is characterized by including a simulation execution unit for executing the above, and a detection unit for detecting an abnormality in a component of the industrial line by comparing the result of the simulation with the operation of the industrial line.
  • one of the representative industrial systems of the present invention is an industrial system having a sensor for acquiring information on industrial equipment and a calculation means for performing calculation based on the information acquired by the sensor.
  • the information of the movable part including any one or more of the position information, the speed information or the acceleration information of the movable part of the industrial equipment is acquired, and the calculation means is acquired by the sensor. It is characterized in that a process of comparing the obtained information of the movable portion with the information of the virtual movable portion obtained by simulation of the industrial equipment is performed, and the result of the comparison process is output.
  • one of the representative industrial systems of the present invention is a storage unit that stores design data used when constructing an industrial line including a plurality of processes, and a simulation of the operation of the industrial line based on the design data.
  • An abnormality in the industrial line is detected by comparing the simulation execution unit to be executed with the relationship between the virtual plurality of processes in the result of the simulation and the relationship between the plurality of processes in the operation of the industrial line. It is characterized by having a detection unit.
  • one of the representative industrial systems of the present invention is a simulation execution step for executing a simulation of the operation of the industrial line based on the design data used at the time of constructing the industrial line, and a simulation execution step at the time of operation of the industrial line. It is characterized by including an information acquisition step for acquiring information indicating an operation and a detection step for detecting an abnormality in a component of the industrial line by comparing the result of the simulation with the operation at the time of operation of the industrial line. And.
  • the present invention can be used for line operation support and high-resolution abnormality detection. Issues, configurations and effects other than those described above will be clarified by the following description of the embodiments.
  • Explanatory drawing about an industrial system and abnormality detection which concerns on this invention.
  • Configuration diagram of the industrial system A flowchart showing the processing procedure at the time of executing the simulation.
  • Explanatory drawing about a specific example of sensor data Explanatory diagram about the simulation.
  • a modified example of the configuration of an industrial system An explanatory diagram of a configuration that causes the control system to perform simulation and abnormality detection.
  • the identification number is used as the identification information of various objects, but the identification information of a type other than the identification number (for example, an identifier including an alphabetic character or a code) may be adopted.
  • a reference code (or a common code among reference codes) is used when the same type of element is not distinguished, and when the same type of element is described separately, the element is used.
  • An identification number (or reference code) may be used.
  • FIG. 1 is an explanatory diagram of an industrial system and abnormality detection according to the present invention.
  • the line shown in FIG. 1 is an industrial line for manufacturing goods, transporting goods represented by material handling, and the like.
  • an industrial line is a facility that sequentially executes specified processes to perform object manufacturing and material handling (including processing, assembly, painting, inspection, transportation, sorting, picking, palletizing, storage, etc.).
  • object manufacturing and material handling including processing, assembly, painting, inspection, transportation, sorting, picking, palletizing, storage, etc.
  • an industrial line including not only a production line and a production line but also a line for carrying and the like is called an industrial line.
  • industrial equipment is included as a component of the industrial line.
  • Industrial equipment has a movable part such as an arm, and controls the operation of the movable part to perform manufacturing, material handling, and the like.
  • industrial equipment includes a link mechanism having multiple actuators, a self-propelled means having a chuck and a clamp, a mechanism having a gripping means, a hoist, a transporting means such as a conveyor and a crane, and position control by a linear rail and a ball screw.
  • a link mechanism having multiple actuators
  • a self-propelled means having a chuck and a clamp
  • a mechanism having a gripping means
  • a hoist such as a conveyor and a crane
  • position control by a linear rail and a ball screw includes moving bodies, rotating bodies that control angles and accelerations, and other motors, inverters, compressors, etc.
  • the line builder who is in charge of constructing the line performs engineering such as design based on the requirements from the customer who requested the construction of the line.
  • the customer requirement 10 includes, for example, work information regarding the target article, processing specifications, production capacity, operation plan, and the like.
  • Engineering 11 includes process information, functional design, control design, structural design, computer-aided design (CAD: Computer Aided Design), computer-aided engineering (CAE: Computer Aided Engineering), bill of materials (BOM: Bills Of Materials), etc. included.
  • CAD Computer Aided Design
  • CAE Computer Aided Engineering
  • BOM Bills Of Materials
  • the actual machine production 12 is performed on the industrial line, and then the operation 13 of the industrial line is performed.
  • the actual machine manufacturing 12 includes hardware manufacturing, sensor arrangement, sequence control, and the like.
  • Operation 13 includes production of the target article, maintenance of the line, and the like.
  • a simulation model is constructed from the design information and verified by simulation.
  • This line simulation 21 can virtually obtain the flow of the entire line and the operation of industrial equipment including robots and devices, and verify whether the desired operation can be realized.
  • this simulation model for design verification was mainly used for operation verification in the line build phase by the created line SIer.
  • the present invention develops this simulation and realizes an operation support system 23 to be utilized at the operation stage.
  • the operation support system 23 uses various design information used at the time of line construction (line build phase) as design data, and operates based on the design data and the operation information obtained in production and maintenance. Execute a phase simulation and detect anomalies in the components of the line by comparing the simulation results with the actual operation of the line during operation.
  • the abnormality includes not only the case where something actually occurs in the industrial equipment or the industrial line, but also the sign that the abnormality occurs. Signs of abnormality can be detected or specified by changing the value for identifying or determining the abnormality described later, the threshold value of the difference between the actual machine and the predetermined operation of the simulation, and the like.
  • the operation support system 23 uses the shape of the industrial equipment specified by the design data, and calculates the position information, velocity information, and acceleration information of the movable part of the industrial equipment to provide virtual information on the movable part. Ask for.
  • the simulation not only the shape of the specified industrial equipment but also the data sheet provided by the manufacturer of the industrial equipment can be referred to.
  • the operation support system 23 uses sensors provided on the line and information output by the industrial equipment to calculate the position information, speed information, and acceleration information of the moving parts of the industrial equipment during operation, so that the actual movement is possible. Ask for information about the department.
  • the operation support system 23 detects that an abnormality has occurred and warns. Is output. For example, if the time required for the actual movable part to perform a predetermined operation is longer than the time required for a predetermined operation in the simulation and the difference exceeds the threshold value, it is detected that an abnormality has occurred.
  • a sensor or output for acquiring information on an actual moving part a sensor or output provided for another purpose can be used. Sensors may be added to detect the above-mentioned anomalies. For example, it is preferable to newly arrange a camera and take an image of the movable part to specify the position, speed and acceleration of the movable part. At this time, the state of the movable portion can be accurately detected by identifying the vicinity of the tip of the movable portion.
  • the vicinity of the tip is a region from the tip to the tip to a predetermined position or a region from the tip to the first predetermined position to the second predetermined position without including the tip.
  • the tip itself is effective when it cannot be detected by the camera.
  • the state of the movable portion can be easily identified.
  • the tip position that is difficult to detect with the camera can be specified by calculation, and more accurate information on the moving part can be obtained. be able to.
  • the operation support system 23 can be operated by arranging a camera for detection, an algorithm for detecting a person, and linking with a system that executes production. Build the entire system so that the information to be used can be acquired.
  • FIG. 2 is a block diagram of an industrial system.
  • the industrial system 30 includes a control system 50, an abnormality detection system 60, and a simulation system 70.
  • the control system 50 acquires various information from the industrial line and controls the operation of the industrial line.
  • the simulation system 70 is, for example, a computer and includes an input unit 71, a display unit 72, a communication unit 73, a control unit 74, and a storage unit 75.
  • the input unit 71 is a keyboard, a mouse, or the like.
  • the display unit 72 is a liquid crystal display or the like.
  • the communication unit 73 is a communication interface that communicates with the abnormality detection system 60 and the like.
  • the control unit 74 realizes various functions by executing a predetermined program by an arithmetic unit such as a CPU (Central Processing Unit). In particular, in this embodiment, the control unit 74 realizes a function as a simulation execution unit.
  • the storage unit 75 is a magnetic storage device, a flash memory, or the like, and stores line design data, process plan data, simulation result data, and the like.
  • the control unit 74 obtains a virtual operation of the industrial line 40 by executing a simulation using the line design data and the process planning data stored in the storage unit 75, and generates simulation result data.
  • the control unit 74 stores the simulation result data in the storage unit 75 and transmits it to the abnormality detection system 60.
  • the line design data of the storage unit 75 is updated, the simulation is executed again by the control unit 74, and the storage unit 75 and the abnormality detection system 60 By updating the simulation result data, the simulation result data of the storage unit 75 is updated and transmitted to the abnormality detection system 60 again. Therefore, the simulation result data reflects the latest state of the industrial line 40.
  • the abnormality detection system 60 is, for example, a computer, and has an input unit 61, a display unit 62, a communication unit 63, a control unit 64, and a storage unit 65.
  • the input unit 61 is a keyboard, a mouse, or the like.
  • the display unit 62 is a liquid crystal display or the like. This can be performed on a tablet terminal in which the display unit 62, the input unit 61, and the communication unit 62 are integrated, and input / output and communication can be performed using the touch panel.
  • the control unit 64 and the storage unit 65 are separate bodies for the convenience of calculation processing.
  • the communication unit 63 is a communication interface that communicates with the simulation system 70, the control system 50, and the like.
  • the control unit 64 realizes various functions by executing a predetermined program by an arithmetic unit such as a CPU (Central Processing Unit).
  • the control unit 64 realizes functions as an abnormality detection unit and a failure estimation unit. That is, the control unit 64 corresponds to the calculation means in the claims.
  • the storage unit 65 is a magnetic storage device, a flash memory, or the like, and stores simulation result data, comparison condition data, measurement data, process planning data, and the like.
  • the simulation result data of the storage unit 65 is data received from the simulation system 70.
  • the measurement data of the storage unit 65 is data received from the control system 50, and indicates the output of various sensors of the industrial line 40 and the like.
  • the control unit 64 compares the information of the virtual movable part indicated by the simulation result data with the information of the actual movable part indicated by the measurement data, and warns when the deviation deviates from a predetermined range. As a result, it operates as an abnormality detection unit.
  • the conditions for comparing the simulation result data and the measurement data are shown in the contrast condition data.
  • the control unit 64 operates as a failure factor estimation unit that estimates the cause of the failure by detecting the operation of the component of the industrial line that caused the abnormality when the abnormality is detected by the abnormality detection unit. ..
  • FIG. 3 is a flowchart showing the processing procedure at the time of executing the simulation.
  • the simulation system 70 first acquires line design data and process planning data (step S101), and creates a simulation model (step S102). After that, the simulation system 70 executes a simulation of the industrial line, and calculates a position, a time, and a speed for a predetermined operation, work, or the like on the entire industrial line or the computer of the industrial equipment (step S103). That is, the information of the virtual movable part is calculated, and the calculation result is stored in the storage unit.
  • the control unit 74 stores the simulation result data in the storage unit 75 (step S104), and ends the process.
  • the stored simulation result data is transmitted to the abnormality detection system 60 at an arbitrary timing.
  • a simulation model is created in advance in the storage unit, and may be read from the storage device in step S102.
  • FIG. 4 is a flowchart showing a processing procedure at the time of operation.
  • the control system 50 inputs the production instruction data (step S201), operates the industrial line 40, and starts the abnormality detection by the abnormality detection system 60.
  • the industrial line 40 inputs sensor data while operating the line (step S202), and calculates a position, time, and speed for a predetermined operation, work, or the like (step S203).
  • the calculation result of the industrial line 40 is transmitted to the abnormality detection system 60 as measurement data indicating information on the actual moving part.
  • the abnormality detection system 60 reads the simulation result data (step S204) and compares the measurement data received from the industrial line 40 with the simulation result data (step S205). As a result of the comparison, if the deviation is equal to or greater than the threshold value, the abnormality detection system 60 outputs that an abnormality has occurred (step S206), and ends the process. That is, if there is a difference between the operation of the virtual movable part, which is the ideal operation, and the operation of the movable part of the actual machine, it is considered that some abnormality or a sign of abnormality has occurred in the actual machine. It is possible to notify users and administrators before major troubles occur.
  • FIG. 5 is a flowchart showing a processing procedure for estimating the cause of failure.
  • the failure estimation unit of the abnormality detection system 60 executes the estimation of the cause of the failure. For example, when an abnormality occurs in the entire industrial line 40, such as a decrease in the throughput of the industrial line 40, it is used to estimate the cause.
  • the abnormality detection system 60 receives the input of measurement data acquired from the industrial line 40 (step S301), and aggregates the positions, times, and speeds of predetermined operations, operations, etc. in a plurality of processes (step S302). ). The abnormality detection system 60 compares the calculated information on the actual moving part with the simulation result for each process. Then, the information regarding the process having a large dissociation is output (step S303).
  • the process that caused the abnormality can be estimated by relatively comparing the information of a plurality of processes. For example, when an abnormality is detected in a series of processes involving operations A, B, and C, it corresponds to each operation calculated based on the simulation results of each of operations A, B, and C and the detection value of the sensor. It is possible to compare the operation times to be performed, identify the operation with the largest peeling, and the mode with the largest peeling (the axis corresponding to the operation axis of the robot or the rotation axis of the actuator), and estimate it.
  • FIG. 6 is an explanatory diagram of a specific example of sensor data.
  • the sensor data includes the position data of the robot or work identified by the camera, the encoder output of the robot arm, the torque sensor, the PLC (PLC: Programmable Logic Controller), the IPC (Industrial PC), and the IoT controller.
  • Control sequence data and the like can be used.
  • sequence data a ladder diagram, ST (Structured Text), IL (Instruction List), SFC (Sequential Function Chart), etc. can be read.
  • FIG. 7 is an explanatory diagram of the simulation.
  • Customer requirement data includes work information, processing specifications, production capacity, operating plans, etc.
  • Engineering data includes process information, functional design, control design, structural design, CAD / CAE / BOM and the like.
  • the operating condition data includes sensor set values, sequences, control parameters, production order data, and the like.
  • the coordinates of the tip of the arm may be the position of a marker, another part, or a processed product
  • the predetermined coordinates of the operation A may be obtained by the moving speed of the arm and the like (including processed products and other parts) in the above. Further, for example, the time required for the step B including the operation A is also obtained as a result of the simulation.
  • FIG. 8 is a modified example of the configuration of the industrial system.
  • the industrial system shown in FIG. 8 differs from FIG. 2 in that a network is interposed between the control system 50 and the abnormality detection system 60.
  • the anomaly detection system 60 and the simulation system 70 may be separated from the industrial line 40 or may be realized by a cloud service.
  • FIG. 8 shows a modified example in which a network intervenes between the control system 50 and the abnormality detection system 60, it can also be a modified example in which a network intervenes between the abnormality detection system 60 and the simulation system 70. ..
  • FIG. 9 is an explanatory diagram of a configuration in which the control system performs simulation and abnormality detection.
  • the industrial system 30a has a control system 50a.
  • the control system 50a acquires various information from the industrial line 40 and controls the operation of the industrial line.
  • the control system 50a is, for example, a computer and includes an input unit 51, a display unit 52, a communication unit 53, a control unit 54, and a storage unit 55.
  • the input unit 51 is a keyboard, a mouse, or the like.
  • the display unit 52 is a liquid crystal display or the like.
  • the communication unit 53 is a communication interface for communicating with other devices.
  • the control unit 54 realizes various functions by executing a predetermined program by an arithmetic unit such as a CPU (Central Processing Unit).
  • the control unit 54 realizes functions as a simulation execution unit, a production execution unit, and an abnormality detection unit.
  • the storage unit 55 is a magnetic storage device, a flash memory, or the like, and stores line design data, process plan data, simulation result data, measurement data, and the like.
  • the control unit 54 obtains a virtual operation of the industrial line 40 by executing a simulation using the line design data and the process plan data stored in the storage unit 55, and generates simulation result data to perform the simulation. Operates as an execution unit.
  • control unit 54 operates as a production execution unit by acquiring sensor output from the industrial line 40, generating measurement data, and controlling the operation of the industrial line 40.
  • control unit 54 compares the information of the virtual movable part indicated by the simulation result data with the information of the actual movable part indicated by the measurement data, and warns when the deviation deviates from a predetermined range. By performing, it operates as an abnormality detection unit.
  • FIG. 10 is an explanatory diagram of the entire operation of the industrial system.
  • the industrial system 30 (including the industrial system 30 shown in FIG. 1 and the industrial system 30a shown in FIG. 9) is executed by circulating C1 to C5.
  • the industrial system 30 acquires the operation information of each configuration.
  • the industrial system 30 accumulates operation records and monitors trends.
  • the industrial system 30 compares the operating times and warns when the degree of deviation exceeds the threshold value.
  • the industrial system 30 focuses on the warning points and identifies the cause of the abnormality.
  • the industrial system 30 adjusts the actual machine and returns it to normal operation.
  • FIG. 11 is an explanatory diagram of abnormality detection.
  • the time change of the coordinates of the arm tip obtained by the simulation is displayed as a broken line on the graph.
  • the time change of the coordinates of the tip of the arm identified by imaging with a camera is displayed as a solid line on the graph.
  • the coordinates of the arm are shown only for one dimension.
  • the difference between the simulation result and the identification result by the camera is shown as a shaded area.
  • the industrial system 30 has a storage unit 65 that stores the design data used at the time of constructing the industrial line, and a simulation execution that executes a simulation of the operation of the industrial line based on the design data. It includes a control unit 74 that functions as a unit, and a control unit 64 that functions as a detection unit that compares the result of the simulation with the operation of the industrial line and detects an abnormality in a component of the industrial line. .. With such a configuration and operation, the industrial system 30 can be utilized at the time of line operation support and high-resolution abnormality detection.
  • an industrial system 30 having a sensor for acquiring information on industrial equipment and a calculation means for performing calculation based on the information acquired by the sensor
  • the sensor is used by the industrial equipment when the industrial equipment is operated.
  • the information of the movable part including any one or more of the position information, the speed information, and the acceleration information of the movable part is acquired, and the calculation means obtains the information of the movable part acquired by the sensor and the industrial equipment.
  • the process of comparing with the information of the virtual moving part obtained by the simulation of the above is performed, and the result of the comparison process is output.
  • the simulation is performed based on the design data used for the design of the industrial equipment. With such a configuration and operation, the industrial system 30 can utilize the simulation at the time of line construction at the time of operation, and can perform operation support and abnormality detection.
  • the calculation means determines the operation time of the movable portion.
  • a warning is output when a deviation exceeding the range occurs.
  • the sensor is characterized in that it identifies the vicinity of the tip of the movable portion and acquires the information.
  • the sensor may be an image pickup means, or the marker attached to the movable portion may be identified to acquire the information.
  • the industrial equipment constitutes at least a part of the production line
  • the simulation is a simulation using computer-aided design data at the time of designing the production line. Therefore, the data used for the design of the production line can be directly utilized.
  • a simulation of the operation of the industrial line is executed using the design data used when constructing the industrial line including a plurality of processes, and the virtual relationship between the plurality of processes in the result of the simulation and the operation of the industrial line are performed.
  • the present invention is not limited to the above-described embodiment, and includes various modifications.
  • the above-described embodiment has been described in detail in order to explain the present invention in an easy-to-understand manner, and is not necessarily limited to the one including all the described configurations.
  • the deletion of such a configuration but also the replacement or addition of the configuration is possible.
  • each of the above configurations, functions, processing units, processing means, etc. may be realized by hardware by designing a part or all of them by, for example, an integrated circuit.
  • the present invention can also be realized by a software program code that realizes the functions of the examples.
  • a storage medium in which the program code is recorded is provided to the computer, and the processor included in the computer reads out the program code stored in the storage medium.
  • the program code itself read from the storage medium realizes the function of the above-described embodiment, and the program code itself and the storage medium storing it constitute the present invention.
  • Examples of the storage medium for supplying such a program code include a flexible disk, a CD-ROM, a DVD-ROM, a hard disk, an SSD (Solid State Drive), an optical disk, a magneto-optical disk, a CD-R, and a magnetic tape.
  • Non-volatile memory cards, ROMs, etc. are used.
  • program code that realizes the functions described in this embodiment can be implemented in a wide range of programs or script languages such as assembler, C / C ++, perl, Shell, PHP, and Java (registered trademark).
  • control lines and information lines indicate those considered necessary for explanation, and do not necessarily indicate all the control lines and information lines in the product. All configurations may be interconnected.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

産業システムは、産業ラインの構築の際に用いた設計データを記憶する記憶部と、前記設計データに基づいて前記産業ラインの動作のシミュレーションを実行するシミュレーション実行部と、前記シミュレーションの結果と前記産業ラインの運用の際の動作とを比較して前記産業ラインの構成要素の異常を検知する検知部とを備えたことを特徴とする。かかる構成や動作により、ラインの運用支援や高分解能な異常検知時に活用することができる。

Description

産業システム、異常検知システム及び異常検知方法
 本発明は、産業システム、異常検知システム及び異常検知方法に関する。
 特許文献1には、仮想的に設計したシミュレータ上に構成した製造ラインの各要素のシミュレーション結果データを収集し、評価支援装置側に伝達するシミュレーション結果データ入力工程と、前記収集されたシミュレーション結果データを取り込み、稼働率、生産数、評価指標に沿った形式に整理するデータ整理工程と、予め記憶されている、製造ライン種別毎の結果データに対する評価項目と評価基準値及び評価フローから成る評価ルールを用いて、シミュレーション結果データの評価を行い、製造ライン構成要素に関する問題点を抽出する問題点解析工程と、を含むことを特徴する製造ライン評価支援方法について記載がある。
 特許文献2には、過去に実施されたシミュレーションの結果または生産実績から、各工程のリードタイムを近似的に予測する予測式を構築するステップと、前記予測式と過去に実施したシミュレーションとの誤差、または、前記予測式と生産実績との誤差を、各工程別に算出するステップと、算出された工程別の誤差の情報に基づき、いずれの工程において、前記予測式を使用した簡略化シミュレーションを適用するかを決定するステップと、前記簡略化シミュレーションを適用することを決定した工程においては、前記予測式を使用した工程リードタイムを適用した製造ラインシミュレーションを実行するステップと、を備えることを特徴とする製造ラインシミュレーションモデル構築方法について記載がある。
特開2003-280730号公報 特許5775803号公報
 従来のラインシミュレーションモデルは、生産性評価やライン構成評価等よりも詳細な情報が必要な用途への適用やそのためのモデル構築が困難だった。
 そこで、本発明は、設計検証用のラインシミュレータを用いることで、ラインの運用支援や高分解能な異常検知に活用することのできるシステム及び方法を提供することを目的とする。
 上記目的を達成するために、代表的な本発明の産業システムの一つは、産業ラインの構築時に用いた設計データを記憶する記憶部と、前記設計データに基づいて前記産業ラインの動作のシミュレーションを実行するシミュレーション実行部と、前記シミュレーションの結果と前記産業ラインの運用の際の動作とを比較して前記産業ラインの構成要素の異常を検知する検知部とを備えたことを特徴とする。
 また、代表的な本発明の産業システムの一つは、産業機器の情報を取得するセンサと、前記センサにより取得した情報に基づく計算を行う計算手段とを有する産業システムにおいて、前記センサは、前記産業機器の運用の際に、前記産業機器が有する可動部の位置情報、速度情報または加速度情報のいずれか一つ以上を含む前記可動部の情報を取得し、前記計算手段は、前記センサにより取得された前記可動部の情報と、前記産業機器についてのシミュレーションにより求められた仮想的な可動部の情報とを比較する処理を行い、該比較処理の結果を出力することを特徴とする。
 また、代表的な本発明の産業システムの一つは、複数の工程を含む産業ラインの構築時に用いた設計データを記憶する記憶部と、前記設計データに基づいて前記産業ラインの動作のシミュレーションを実行するシミュレーション実行部と、前記シミュレーションの結果における仮想的な複数の工程間の関係と前記産業ラインの運用の際における前記複数の工程間の関係とを比較して前記産業ラインの異常を検知する検知部とを備えたことを特徴とする。
 また、代表的な本発明の産業システムの一つは、産業ラインの構築時に用いた設計データに基づいて前記産業ラインの動作のシミュレーションを実行するシミュレーション実行ステップと、前記産業ラインの運用の際の動作を示す情報を取得する情報取得ステップと、前記シミュレーションの結果と前記産業ラインの運用の際の動作とを比較して前記産業ラインの構成要素の異常を検知する検知ステップとを含むことを特徴とする。
 本発明によれば、ラインの運用支援や高分解能な異常検知時に活用することができる。上記した以外の課題、構成及び効果は以下の実施の形態の説明により明らかにされる。
本発明に係る産業システムと異常検知についての説明図。 産業システムの構成図。 シミュレーションの実行時の処理手順を示すフローチャート。 運用の際の処理手順を示すフローチャート。 故障要因の推定の処理手順を示すフローチャート。 センサデータの具体例についての説明図。 シミュレーションについての説明図。 産業システムの構成の変形例。 制御システムにシミュレーションと異常検知を行わせる構成の説明図。 産業システムの動作全体の説明図。 異常検出の説明図である。
 以下、本発明の実施形態について、図面を参照して説明する。なお、以下に説明する実施形態は特許請求の範囲に係る発明を限定するものではなく、また実施形態の中で説明されている諸要素及びその組み合わせの全てが発明の解決手段に必須であるとは限らない。
 以下の説明において、種々の対象の識別情報として、識別番号が使用されるが、識別番号以外の種類の識別情報(例えば、英字や符号を含んだ識別子)が採用されてもよい。
 また、以下の説明において、同種の要素を区別しないで説明する場合には、参照符号(又は、参照符号のうちの共通符号)を使用し、同種の要素を区別して説明する場合は、要素の識別番号(又は参照符号)を使用することがある。
 図1は、本発明に係る産業システムと異常検知についての説明図である。図1に示すラインは、物品の製造、マテリアルハンドリングを代表とする物品の搬送等を行う産業ラインである。ここで、産業ラインとは、規定の工程を順次実行して、対象物の製造、マテリアルハンドリング(加工、組付け、塗装、検査、搬送、ソート、ピッキング、パレタイズ、格納などを含む)を行う設備をいう。つまり、製造ライン、生産ラインだけでなく搬送等を行うラインを含めたラインを産業ラインと呼ぶ。また、本実施例では、産業ラインの構成要素として、産業機器を含む。産業機器は、例えばアームなどの可動部を有し、可動部の動作を制御することで製造、マテリアルハンドリング等を実行する。その他、産業機器には、複数のアクチュエータを有するリンク機構、チャックやクランプを有する自走手段と把持手段を有する機構、ホイスト、コンベアやクレーン等の搬送手段、リニアレールやボールねじによる位置制御を行うや可動体、角度や加速度制御を行う回転体、その他、モータ、インバータ、圧縮機等を含む。
 産業ラインを構築する場合には、ラインの構築を担うラインビルダーは、ラインの構築を依頼した顧客からの要件に基づき、設計などのエンジニアリングを行う。顧客要件10には、例えば、対象の物品に関するワーク情報、加工仕様、生産能力、運転方案などが含まれる。エンジニアリング11には、プロセス情報、機能設計、制御設計、構造設計、コンピュータ支援設計(CAD:Computer Aided Design)、コンピュータ支援エンジニアリング(CAE:Computer Aided Engineering)、部品表(BOM:Bills Of Materials)などが含まれる。
 エンジニアリング11の後、産業ラインでは実機製作12が行われ、その後、産業ラインの運用13が行われる。実機製作12には、ハード製作、センサ配置、シーケンス制御等が含まれる。運用13は、対象の物品の生産と、ラインの保守等が含まれる。
 これらのうち、エンジニアリング11と実機製作12をラインビルドフェーズといい、運用13を運用フェーズという。
 ラインビルドフェーズのエンジニアリング11では、設計情報からシミュレーションモデルが構築され、シミュレーションによる検証が行われる。このラインシミュレーション21は、ライン全体のフロー、ロボットや装置等を含む産業機器の動作を仮想的に求め、所望の動作を実現できるかを検証することができる。
 従来この設計検証用のシミュレーションモデルは、作成したラインSIerにより、主にシミュレーションはラインビルドフェーズで動作検証に利用されていた。本発明は、このシミュレーションを発展させ、運用段階で活用する運用支援システム23を実現するものである。
 具体的には、運用支援システム23は、ラインの構築時(ラインビルドフェーズ)に用いた各種設計情報を設計データとし、設計データと生産や保守において得られた運用の際の情報に基づいて運用フェーズのシミュレーションを実行し、シミュレーションの結果と運用の際のラインの実際の動作と比較して、ラインの構成要素の異常を検知する。ここで、異常とは、産業機器や産業ラインに実際に何らかが生じている場合だけでなく、異常が生じる兆候を含む。後述の異常を特定または判定する値や実機とシミュレーションの所定動作の差分の閾値等を変化させることで異常が生じる兆候を検出または特定することができる。
 シミュレーションでは、運用支援システム23は、設計データにより特定される産業機器の形状等を用い、産業機器が有する可動部の位置情報、速度情報、加速度情報を算出することで仮想的な可動部の情報を求める。シミュレーションには、特定される産業機器の形状等だけでなく、産業機器のメーカから提供されるデータシート等を参考にすることができる。
 一方、運用支援システム23は、ラインに設けたセンサや、産業機器が出力する情報を用い、運用の際の産業機器の可動部の位置情報、速度情報、加速度情報を算出することで現実の可動部の情報を求める。
 現実の可動部の情報と仮想的な可動部の情報とを比較した結果、所定の範囲を超える乖離が発生している場合、運用支援システム23は、異常が発生していると検知し、警告の出力を行う。例えば、現実の可動部が所定の動作に要した時間がシミュレーション上の所定の動作に要する時間よりも長く、その差が閾値を超えているならば、異常が発生していると検知する。
 現実の可動部の情報を取得するためのセンサや出力としては、他の用途のために設けられたセンサや出力を用いることができる。上述した異常の検知のためにセンサを追加してもよい。例えば、カメラを新規に配置し、可動部を撮像して可動部の位置、速度や加速度を特定することが好適である。このとき、可動部のうち、先端近傍を識別することで可動部の状態を精度よく検知可能である。先端近傍とは、先端から先端から所定位置までの領域や先端を含まず先端から第一の所定位置から第二の所定位置までの領域である。先端そのものはカメラで検出できない場合に有効である。また、可動部にマーカーを添付しておき、マーカーを識別する構成とすれば、可動部の状態を簡易に識別できる。マーカーを添付することでマーカーから実際の先端位置までの距離を記憶手段に記憶させることで、カメラで検出が困難な先端位置を計算によって特定することができ、より精確な可動部の情報を得ることができる。カメラによる先端近傍の直接の検出とマーカーの検出を組み合わせることもできる。この場合は、回転体でマーカーが隠れるような可動体を検出する際に有効である。
 システム開発22では、ラインビルド用のラインシミュレーション21をベースとして、検知用のカメラの配置や、人を検知するアルゴリズム、生産を実行するシステムとの連携を行うことで、運用支援システム23の動作に用いる情報を取得できるよう、システム全体を構築する。
 図2は、産業システムの構成図である。図2に示すように、産業システム30は、制御システム50、異常検知システム60及びシミュレーションシステム70を有する。制御システム50は、産業ラインから各種情報を取得し、産業ラインの動作制御を行う。
 シミュレーションシステム70は、例えばコンピュータであり、入力部71、表示部72、通信部73、制御部74及び記憶部75を有する。
 入力部71は、キーボードやマウスなどである。
 表示部72は、液晶ディスプレイなどである。
 通信部73は、異常検知システム60などとの通信を行う通信インタフェースである。
 制御部74は、CPU(Central Processing Unit)などの演算装置が、所定のプログラムを実行することで、各種の機能を実現する。特に、本実施例では、制御部74は、シミュレーション実行部としての機能を実現する。
 記憶部75は、磁気記憶装置やフラッシュメモリなどであり、ライン設計データ、工程計画データ、シミュレーション結果データなどを記憶する。
 制御部74は、記憶部75に格納されたライン設計データ及び工程計画データを用いてシミュレーションを実行することで、産業ライン40の仮想的な動作を求め、シミュレーション結果データを生成する。
 制御部74は、シミュレーション結果データを記憶部75に格納するとともに、異常検知システム60に送信する。
 なお、産業ライン40上の産業機器について設計変更が行われた場合には、記憶部75のライン設計データを更新し、制御部74で再度シミュレーションを実行し、記憶部75および異常検知システム60のシミュレーション結果データを更新することで、記憶部75のシミュレーション結果データが更新され、異常検知システム60に再度送信される。このため、シミュレーション結果データは、産業ライン40の最新の状態を反映することになる。
 異常検知システム60は、例えばコンピュータであり、入力部61、表示部62、通信部63、制御部64及び記憶部65を有する。
 入力部61は、キーボードやマウスなどである。
 表示部62は、液晶ディスプレイなどである。表示部62と入力部61と通信部62が一体となったタブレット端末で実施でき、タッチパネルによる入出力や通信を行うことができる。この場合、制御部64と記憶部65は計算処理の都合、別体となっていると好適である。
 通信部63は、シミュレーションシステム70や制御システム50などとの通信を行う通信インタフェースである。
 制御部64は、CPU(Central Processing Unit)などの演算装置が、所定のプログラムを実行することで、各種の機能を実現する。特に、本実施例では、制御部64は、異常検知部及び故障推定部としての機能を実現する。すなわち、制御部64は、請求の範囲における計算手段に対応する。
 記憶部65は、磁気記憶装置やフラッシュメモリなどであり、シミュレーション結果データ、対比条件データ、計測データ、工程計画データなどを記憶する。記憶部65のシミュレーション結果データは、シミュレーションシステム70から受信したデータである。記憶部65の計測データは、制御システム50から受信したデータであり、産業ライン40の各種センサの出力などを示す。
 制御部64は、シミュレーション結果データにより示される仮想的な可動部の情報と、計測データにより示される現実の可動部の情報とを比較し、その乖離が所定の範囲を逸脱する場合に警告を行うことで、異常検知部として動作する。シミュレーション結果データと計測データとを比較する際の条件は、対比条件データに示されている。
 また、制御部64は、異常検知部により異常が検知された際に、その要因となった産業ラインの構成要素の動作を検出することで、故障の要因を推定する故障要因推定部として動作する。
 図3は、シミュレーションの実行時の処理手順を示すフローチャートである。シミュレーションシステム70は、まずライン設計データ及び工程計画データを取得し(ステップS101)、シミュレーションモデルを作成する(ステップS102)。その後、シミュレーションシステム70は、産業ラインのシミュレーションを実行し、産業ライン全体または産業機器のコンピュータ上の所定の動作や作業等について、位置、時間、速度を算出する(ステップS103)。つまり仮想の可動部の情報を演算し、演算結果を記憶部に記憶する。制御部74は、シミュレーション結果データを記憶部75に格納し(ステップS104)、処理を終了する。なお、記憶したシミュレーション結果データは、任意のタイミングで異常検知システム60に送信される。なお、記憶部にシミュレーションモデルはあらかじめ作成されており、ステップS102では記憶装置から読み込む形でもよい。
 図4は、運用の際の処理手順を示すフローチャートである。運用の際には、まず、制御システム50が、生産指図データの入力を行い(ステップS201)、産業ライン40を稼働させ、異常検知システム60による異常検知を開始させる。
 産業ライン40は、ラインを稼働させつつセンサデータを入力し(ステップS202)、所定の動作や作業等について、位置、時間、速度を算出する(ステップS203)。産業ライン40の算出結果は、現実の可動部の情報を示す計測データとして異常検知システム60に送信される。
 異常検知システム60は、シミュレーション結果データを読み込み(ステップS204)、産業ライン40から受信した計測データとシミュレーション結果データとを比較する(ステップS205)。比較の結果、乖離が閾値以上であれば、異常検知システム60は、異常が発生した旨の出力を行い(ステップS206)、処理を終了する。すなわち、理想的な動作である仮想の可動部の動作と実機の可動部の動作に差が生じている場合は、実機に何らかの異常や異常の兆候が生じていると考えられるため、産業ラインの大きなトラブルが生じる前にユーザや管理者に通知することが可能となる。
 図5は、故障要因の推定の処理手順を示すフローチャートである。この故障要因の推定は、異常検知システム60の異常検知部によって異常が検知されたとき、異常検知システム60の故障推定部が実行する。例えば産業ライン40のスループットが低下するなど、産業ライン40全体に異常が生じた場合に、その要因を推定する場合に用いられる。
 具体的には、異常検知システム60は、産業ライン40から取得した計測データの入力を受け(ステップS301)、複数の工程における所定の動作や作業等について位置、時間、速度を集計する(ステップS302)。異常検知システム60は、算出した現実の可動部の情報とシミュレーション結果との比較を、工程ごとに行う。そして、乖離が大きい工程に関する情報を出力する(ステップS303)。
 この故障要因の推定によれば、シミュレーション結果との乖離が閾値を超えていない場合でも、複数の工程の情報を相対的に比較することで異常の要因となった工程を推定することができる。例えば動作A、B、Cを伴う一連の工程において異常が検知された際に、動作A、動作B、動作Cのそれぞれにおけるシミュレーション結果とセンサーでの検出値に基づき算出されたそれぞれの動作に対応する動作時間を比較し、最も剥離が大きい動作、および剥離が大きいモード(ロボットの動作軸やアクチュエータの回転軸に対応する軸)を特定し、推定することができる。
 図6は、センサデータの具体例についての説明図である。図6に示すように、センサデータとしては、カメラにより識別したロボットやワークの位置データ、ロボットアームのエンコーダ出力、トルクセンサ、PLC(PLC:Programmable Logic Controller)やIPC(Industrial PC)やIoTコントローラの制御シーケンスデータなどを用いることができる。シーケンスデータはラダー図、ST(Structured Text)、IL(Instruction List)、SFC(Sequential Function Chart )等を読み込むことができる。
 図7は、シミュレーションについての説明図である。シミュレーションの構成部品には、顧客要件のデータ、エンジニアリングのデータ、動作条件のデータなどを用いる。顧客要件のデータには、ワーク情報、加工仕様、生産能力、運転方案等が含まれる。エンジニアリングのデータには、プロセス情報、機能設計、制御設計、構造設計、CAD/CAE/BOM等が含まれる。動作条件のデータには、センサ設定値、シーケンス、制御パラメータ、生産指図データなどが含まれる。
 これらのデータを構成部品として行われるシミュレーションは、所定の動作Aの期間、動作Aの所定タイミングでのアーム先端の座標(マーカや他部位、加工品の位置でもよい)、動作Aの所定の座標におけるアーム等(加工品、他部位を含む)の移動速度などを得ることができる。また、例えば動作Aを包含する工程Bの所要時間もシミュレーションの結果として得られる。
 図8は、産業システムの構成の変形例である。図8に示した産業システムは、制御システム50と異常検知システム60との間にネットワークが介在する点において、図2と相違する。この構成では、異常検知システム60とシミュレーションシステム70は、産業ライン40から離隔してもよく、クラウドサービスで実現してもよい。
 図8では、制御システム50と異常検知システム60との間にネットワークが介在する変形例を示したが、異常検知システム60とシミュレーションシステム70との間にネットワークが介在する変形例とすることもできる。
 図9は、制御システムにシミュレーションと異常検知を行わせる構成の説明図である。図9では、産業システム30aは、制御システム50aを有する。制御システム50aは、産業ライン40から各種情報を取得し、産業ラインの動作制御を行う。
 制御システム50aは、例えばコンピュータであり、入力部51、表示部52、通信部53、制御部54及び記憶部55を有する。
 入力部51は、キーボードやマウスなどである。
 表示部52は、液晶ディスプレイなどである。
 通信部53は、他の装置との通信を行う通信インタフェースである。
 制御部54は、CPU(Central Processing Unit)などの演算装置が、所定のプログラムを実行することで、各種の機能を実現する。特に、本実施例では、制御部54は、シミュレーション実行部、生産実行部、異常検知部としての機能を実現する。
 記憶部55は、磁気記憶装置やフラッシュメモリなどであり、ライン設計データ、工程計画データ、シミュレーション結果データ、計測データなどを記憶する。
 制御部54は、記憶部55に格納されたライン設計データ及び工程計画データを用いてシミュレーションを実行することで、産業ライン40の仮想的な動作を求め、シミュレーション結果データを生成することで、シミュレーション実行部として動作する。
 また、制御部54は、産業ライン40からセンサ出力を取得して計測データを生成し、産業ライン40の動作を制御することで生産実行部として動作する。
 さらに、制御部54は、シミュレーション結果データにより示される仮想的な可動部の情報と、計測データにより示される現実の可動部の情報とを比較し、その乖離が所定の範囲を逸脱する場合に警告を行うことで、異常検知部として動作する。
 図10は、産業システムの動作全体の説明図である。図10に示すように、産業システム30(図1等に示した産業システム30と図9に示した産業システム30aを含む)は、C1~C5を循環させて実行する。C1では、産業システム30は、各構成の稼働情報を取得する。C2では、産業システム30は、稼働実績を蓄積し、傾向を監視する。C3では、産業システム30は、動作時間を比較し、乖離度が閾値を超えたら警告する。C4では、産業システム30は、警告箇所を重点調査し、異常の原因を特定する。C5では、産業システム30は、実機を調整し、正常稼働に復帰させる。
 図11は、異常検出の説明図である。図11では、シミュレーションにより得られたアーム先端の座標の時間変化をグラフ上で破線として表示している。また、カメラで撮像して識別したアーム先端の座標の時間変化をグラフ上で実線として表示している。なお、説明の便宜上、アームの座標は1次元分のみ示している。さらに、図11では、シミュレーションの結果とカメラによる識別の結果と乖離を網掛け領域として示している。
 このように、シミュレーションの結果と識別の結果を同一のグラフ上に重畳表示することで、その乖離を簡明に示すことが可能である。
 対比条件データとして記録される異常検出の基準としては、アームの所定の部位がシミュレーション結果と実機で所定動作をした際に到達した座標の距離で比較することもできる。また、所定の動作途中における移動速度で比較することもできる。また、例えばロボットアームAが物品に対して所定の動作を開始してから完了し、その後物品が搬送され、さらにロボットアームBが所定の動作を完了するまでの一連の工程について、加工や搬送対象である物品の位置や到達時間で比較することもできる。
 上述してきたように、本実施例において産業システム30は、産業ラインの構築時に用いた設計データを記憶する記憶部65と、前記設計データに基づいて前記産業ラインの動作のシミュレーションを実行するシミュレーション実行部として機能する制御部74と、前記シミュレーションの結果と前記産業ラインの運用の際の動作とを比較して前記産業ラインの構成要素の異常を検知する検知部として機能する制御部64とを備える。
 かかる構成及び動作により、産業システム30は、ラインの運用支援や高分解能な異常検知時に活用することができる。
 また、産業機器の情報を取得するセンサと、前記センサにより取得した情報に基づく計算を行う計算手段とを有する産業システム30において、前記センサは、前記産業機器の運用の際に、前記産業機器が有する可動部の位置情報、速度情報または加速度情報のいずれか一つ以上を含む前記可動部の情報を取得し、前記計算手段は、前記センサにより取得された前記可動部の情報と、前記産業機器についてのシミュレーションにより求められた仮想的な可動部の情報とを比較する処理を行い、該比較処理の結果を出力する。
 また、産業システム30において、前記シミュレーションは、前記産業機器の設計に用いた設計データに基づいて行われる。
 かかる構成や動作により、産業システム30は、ライン構築時のシミュレーションを運用の際に活用し、運用支援や異常検知を行うことができる。
 また、産業システム30において、前記計算手段は、前記センサにより取得された前記可動部の情報と、前記仮想的な可動部の情報とを比較した結果、前記可動部の動作の時間について、所定の範囲を超える乖離が発生している場合に、警告の出力を行う。
 また、前記センサは、前記可動部の先端近傍を識別して前記情報の取得を行うことを特徴とする。
 前記センサは撮像手段であってもよく、前記可動部に貼付されたマーカーを識別して前記情報の取得を行ってもよい。
 これらの構成や動作により、簡易的に可動部の情報を取得することができ、また、従来利用されていなかったシミュレーションとの比較により実際の装置の異常や異常の兆候を取得することができる。
 また、前記産業機器は製造ラインの少なくとも一部を構成し、前記シミュレーションは、前記製造ラインの設計時のコンピュータ支援設計データを用いたシミュレーションである。このため、製造ラインの設計に使用したデータを直接的に活用可能である。
 また、産業機器について設計変更が行われた場合には、前記シミュレーション結果データが更新されるので、最新の状態に適応して精度よく異常検知が可能である。
 さらに、複数の工程を含む産業ラインの構築時に用いた設計データを用いて産業ラインの動作のシミュレーションを実行し、前記シミュレーションの結果における仮想的な複数の工程間の関係と前記産業ラインの運用の際における前記複数の工程間の関係とを比較して前記産業ラインの異常を検知することで、相対的に異常の要因である可能性が高い箇所とを推定することができる。
 なお、本発明は上述の実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、かかる構成の削除に限らず、構成の置き換えや追加も可能である。
 また、上記の各構成、機能、処理部、処理手段等は、それらの一部又は全部を、例えば集積回路で設計する等によりハードウェアで実現してもよい。また、本発明は、実施例の機能を実現するソフトウェアのプログラムコードによっても実現できる。この場合、プログラムコードを記録した記憶媒体をコンピュータに提供し、そのコンピュータが備えるプロセッサが記憶媒体に格納されたプログラムコードを読み出す。この場合、記憶媒体から読み出されたプログラムコード自体が前述した実施例の機能を実現することになり、そのプログラムコード自体、及びそれを記憶した記憶媒体は本発明を構成することになる。このようなプログラムコードを供給するための記憶媒体としては、例えば、フレキシブルディスク、CD-ROM、DVD-ROM、ハードディスク、SSD(Solid State Drive)、光ディスク、光磁気ディスク、CD-R、磁気テープ、不揮発性のメモリカード、ROMなどが用いられる。
 また、本実施例に記載の機能を実現するプログラムコードは、例えば、アセンブラ、C/C++、perl、Shell、PHP、Java(登録商標)等の広範囲のプログラム又はスクリプト言語で実装できる。
 上述の実施例において、制御線や情報線は、説明上必要と考えられるものを示しており、製品上必ずしも全ての制御線や情報線を示しているとは限らない。全ての構成が相互に接続されていてもよい。
 30:産業システム、40:産業ライン、50:制御システム、60:異常検知システム、61,71:入力部、62,72:表示部、63,73:通信部、64,74:制御部、65,75:記憶部、70:シミュレーションシステム

Claims (16)

  1.  産業ラインの構築に用いた設計データを記憶する記憶部と、
     前記設計データに基づいて前記産業ラインの動作のシミュレーションを実行するシミュレーション実行部と、
     前記シミュレーションの結果と前記産業ラインの運用の際の動作とを比較して前記産業ラインの構成要素の異常を検知する検知部と
     を備えたことを特徴とする産業システム。
  2.  請求項1に記載の産業システムであって、 前記産業ラインは複数の産業機器を備え、
     前記シミュレーション実行部は、前記複数の産業機器による一連の工程のシミュレーションを実行し、
     前記検知部は、前記産業ラインに設置されたセンサの計測結果に基づくデータと、前記一連の工程のシミュレーションの結果に基づくデータとを比較して、比較結果を出力することを特徴とする産業システム。
  3.  請求項1に記載の産業システムであって、
     前記産業ラインのシミュレーションの結果を示すデータと、前記産業ラインに設置されたセンサの計測結果に基づくデータとを比較し、異常と判定された際に、その要因となった前記産業ラインの構成要素の動作を検出する故障要因推定部を備えることを特徴とする産業システム。
  4.  産業機器の情報を取得するセンサと、前記センサにより取得した情報に基づく計算を行う計算手段とを有する産業システムにおいて、
     前記センサは、前記産業機器の運用の際に、前記産業機器が有する可動部の位置情報、速度情報または加速度情報のいずれか一つ以上を含む前記可動部の情報を取得し、
     前記計算手段は、
     前記センサにより取得された前記可動部の情報と、前記産業機器についてのシミュレーションにより求められた仮想的な可動部の情報とを比較する処理を行い、該比較処理の結果を出力する
     ことを特徴とする産業システム。
  5.  請求項4に記載の産業システムであって、
     前記シミュレーションは、前記産業機器の設計に用いた設計データに基づいて行われることを特徴とする産業システム。
  6.  請求項4に記載の産業システムであって、
     前記計算手段は、前記センサにより取得された前記可動部の情報と、前記仮想的な可動部の情報とを比較した結果、前記可動部の動作の時間について、所定の範囲を超える乖離が発生している場合に、警告の出力を行うことを特徴とする産業システム。
  7.  請求項4に記載の産業システムであって、
     前記センサは、前記可動部の先端近傍を識別して前記情報の取得を行うことを特徴とする産業システム。
  8.  請求項4に記載の産業システムであって、
     前記センサは撮像手段であり、前記可動部に貼付されたマーカーを識別して前記情報の取得を行うことを特徴とする産業システム。
  9.  請求項4に記載の産業システムであって、
     前記産業機器は製造ラインの少なくとも一部を構成し、
     前記シミュレーションは、前記製造ラインの設計時のコンピュータ支援設計データを用いたシミュレーションであることを特徴とする産業システム。
  10.  請求項4に記載の産業システムであって、
     前記計算手段は、前記仮想的な可動部の情報を示すシミュレーション結果データを所定の記憶部から読み出して前記比較を行い、
     前記産業機器または前記産業機器の動作について設計変更が行われた場合には、前記記憶部の前記シミュレーション結果データが更新される
     ことを特徴とする産業システム。
  11.  請求項4に記載の産業システムであって、
     複数の前記産業機器が産業ラインに設けられ、
     前記計算手段は、
     前記複数の産業機器による一連の工程のシミュレーションを実行し、前記産業ラインに設置されたセンサの計測結果に基づくデータと、前記一連の工程のシミュレーションの結果に基づくデータとを比較して、比較結果を出力することを特徴とする産業システム。
  12.  請求項4に記載の産業システムであって、
     複数の前記産業機器が産業ラインに設けられ、
     前記計算手段は、前記産業ラインのシミュレーションの結果を示すデータと、前記産業ラインに設置されたセンサの計測結果に基づくデータとを比較し、異常と判定された際に、その要因となった前記産業ラインの構成要素の動作を検出することを特徴とする産業システム。
  13.  複数の工程を含む産業ラインの構築時に用いた設計データを記憶する記憶部と、
     前記設計データに基づいて前記産業ラインの動作のシミュレーションを実行するシミュレーション実行部と、
     前記シミュレーションの結果における仮想的な複数の工程間の関係と前記産業ラインの運用の際における前記複数の工程間の関係とを比較して前記産業ラインの異常を検知する検知部と
     を備えたことを特徴とする異常検知システム。
  14.  産業ラインの構築時に用いた設計データに基づいて前記産業ラインの動作のシミュレーションを実行するシミュレーション実行ステップと、
     前記産業ラインの運用の際の動作を示す情報を取得する情報取得ステップと、
     前記シミュレーションの結果と前記産業ラインの運用の際の動作とを比較して前記産業ラインの構成要素の異常を検知する検知ステップと
     を含むことを特徴とする異常検知方法。
  15.  産業ラインについて要求された要件を示す設計データに基づいてシミュレーションモデルを作成するステップと、
     前記シミュレーションモデルによりシミュレーションを実行するステップと、
     前記シミュレーションの結果を示す結果データを記憶するステップと、
     前記シミュレーションの結果に基づいて構築された産業ラインにおける運用の際の動作を取得する情報取得ステップと、
     前記結果データと前記産業ラインの運用の際の動作とを比較して前記産業ラインの構成要素の異常を検知する検知ステップと
     を含むことを特徴とする異常検知方法。
  16.  請求項15に記載の異常検知方法であって、
     前記産業ラインの構成の変更に伴い、前記シミュレーションを再実行して前記結果データの更新を行うステップと、
     前記更新が行われた結果データと前記構成の変更が行われた産業ラインの運用の際の動作とを比較して前記産業ラインの構成要素の異常を検知するステップと
     をさらに含むことを特徴とする異常検知方法。
PCT/JP2020/041118 2020-11-02 2020-11-02 産業システム、異常検知システム及び異常検知方法 WO2022091421A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2022558817A JPWO2022091421A1 (ja) 2020-11-02 2020-11-02
DE112020007421.8T DE112020007421T5 (de) 2020-11-02 2020-11-02 Industriesystem, störungserfassungssystem und störungserfassungsverfahren
US18/245,557 US20230367296A1 (en) 2020-11-02 2020-11-02 Industrial system, abnormality detection system, and abnormality detection method
CN202080105024.7A CN116018237A (zh) 2020-11-02 2020-11-02 工业系统、异常检测系统和异常检测方法
PCT/JP2020/041118 WO2022091421A1 (ja) 2020-11-02 2020-11-02 産業システム、異常検知システム及び異常検知方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2020/041118 WO2022091421A1 (ja) 2020-11-02 2020-11-02 産業システム、異常検知システム及び異常検知方法

Publications (1)

Publication Number Publication Date
WO2022091421A1 true WO2022091421A1 (ja) 2022-05-05

Family

ID=81382223

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/041118 WO2022091421A1 (ja) 2020-11-02 2020-11-02 産業システム、異常検知システム及び異常検知方法

Country Status (5)

Country Link
US (1) US20230367296A1 (ja)
JP (1) JPWO2022091421A1 (ja)
CN (1) CN116018237A (ja)
DE (1) DE112020007421T5 (ja)
WO (1) WO2022091421A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114826885A (zh) * 2022-06-30 2022-07-29 南京海汇装备科技有限公司 一种基于数据分析的设备故障监测系统及方法
CN117155881A (zh) * 2023-10-31 2023-12-01 深圳市吉彼特通信技术有限公司 一种具有循环散热结构的工业交换机性能评估方法及系统
WO2024043337A1 (ja) * 2022-08-25 2024-02-29 国立研究開発法人理化学研究所 推定装置、推定方法、及び推定プログラム

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62282850A (ja) * 1986-05-30 1987-12-08 Toshiba Corp 生産ライン管理制御装置
JP2003280730A (ja) * 2002-03-20 2003-10-02 Toshiba Corp 製造ライン評価支援方法及びその装置
JP2005032029A (ja) * 2003-07-07 2005-02-03 Toyota Motor Corp 生産ライン解析装置
JP2013073519A (ja) * 2011-09-28 2013-04-22 Denso Wave Inc データ構造、コンピュータプログラム、及びデータ取得装置
JP5775803B2 (ja) * 2011-12-06 2015-09-09 株式会社日立製作所 製造ラインシミュレーションモデル構築方法、製造ラインシミュレーションモデル構築装置、及び製造ラインシミュレーションモデル構築プログラム
JP2016177682A (ja) * 2015-03-20 2016-10-06 株式会社東芝 設備評価装置、設備評価方法、コンピュータプログラム

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62282850A (ja) * 1986-05-30 1987-12-08 Toshiba Corp 生産ライン管理制御装置
JP2003280730A (ja) * 2002-03-20 2003-10-02 Toshiba Corp 製造ライン評価支援方法及びその装置
JP2005032029A (ja) * 2003-07-07 2005-02-03 Toyota Motor Corp 生産ライン解析装置
JP2013073519A (ja) * 2011-09-28 2013-04-22 Denso Wave Inc データ構造、コンピュータプログラム、及びデータ取得装置
JP5775803B2 (ja) * 2011-12-06 2015-09-09 株式会社日立製作所 製造ラインシミュレーションモデル構築方法、製造ラインシミュレーションモデル構築装置、及び製造ラインシミュレーションモデル構築プログラム
JP2016177682A (ja) * 2015-03-20 2016-10-06 株式会社東芝 設備評価装置、設備評価方法、コンピュータプログラム

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114826885A (zh) * 2022-06-30 2022-07-29 南京海汇装备科技有限公司 一种基于数据分析的设备故障监测系统及方法
CN114826885B (zh) * 2022-06-30 2022-09-23 南京海汇装备科技有限公司 一种基于数据分析的设备故障监测系统及方法
WO2024043337A1 (ja) * 2022-08-25 2024-02-29 国立研究開発法人理化学研究所 推定装置、推定方法、及び推定プログラム
CN117155881A (zh) * 2023-10-31 2023-12-01 深圳市吉彼特通信技术有限公司 一种具有循环散热结构的工业交换机性能评估方法及系统
CN117155881B (zh) * 2023-10-31 2024-01-30 深圳市吉彼特通信技术有限公司 一种具有循环散热结构的工业交换机性能评估方法及系统

Also Published As

Publication number Publication date
JPWO2022091421A1 (ja) 2022-05-05
DE112020007421T5 (de) 2023-05-04
US20230367296A1 (en) 2023-11-16
CN116018237A (zh) 2023-04-25

Similar Documents

Publication Publication Date Title
WO2022091421A1 (ja) 産業システム、異常検知システム及び異常検知方法
CN108628595B (zh) 开发用于自动化系统的控制器的控制应用的系统和方法
US20190258945A1 (en) Fault diagnosis apparatus and machine learning device
CN110187694B (zh) 故障预测装置以及机器学习装置
EP1967334B1 (en) Detection of condition changes in an industrial robot system
CN109693146B (zh) 寿命推定装置以及机器学习装置
CN113252371B (zh) 状态估计装置、系统和制造方法
CN112673327A (zh) 控制装置及程序
US10678231B2 (en) Production controller equipped with function of identifying cause upon operation stop of production facility including manufacturing facilities
JP7036261B1 (ja) 異常検知装置、プログラム、異常検知方法、及び製造方法
US11803178B2 (en) Event estimation system and event estimation method
CN116755416A (zh) 半导体生产制造的生产系统虚拟调试方法、装置和产品
JPH08272844A (ja) 生産設備設計運用支援装置および方法
US20210129331A1 (en) Control method, control apparatus, robot apparatus, method of manufacturing an article, motion program creation method, motion program creation apparatus, display apparatus, and control program recording medium
JP2021086219A (ja) 協調作業システム、解析収集装置および解析プログラム
CN112384337A (zh) 用于分析和/或配置工业设备的方法和系统
JP2020149301A (ja) 解析装置、解析方法、及び解析プログラム
CN112955832B (zh) 用于自动化系统的模拟过程中计算机实现的确定传感器位置的方法
US20210382467A1 (en) Inspection system, terminal device, inspection method, and non-transitory computer readable storage medium
JP7457601B2 (ja) 要因推定装置、要因推定システムおよびプログラム
US20230359182A1 (en) Work management apparatus
WO2023047588A1 (ja) ロボットシステム
WO2024089884A1 (ja) ロボットコントローラ、及び、アップデート前後の制御ソフトウェアの比較方法
EP4109190A1 (en) Method of and apparatus for maintaining a transport system
Davrajh et al. Modular research equipment for on-line inspection in advanced manufacturing systems

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20959936

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2022558817

Country of ref document: JP

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 20959936

Country of ref document: EP

Kind code of ref document: A1