WO2022032403A1 - Method for making an interlocking joint (shear key) between prefabricated elements to build a concrete wind turbine tower or similar - Google Patents

Method for making an interlocking joint (shear key) between prefabricated elements to build a concrete wind turbine tower or similar Download PDF

Info

Publication number
WO2022032403A1
WO2022032403A1 PCT/CL2020/050091 CL2020050091W WO2022032403A1 WO 2022032403 A1 WO2022032403 A1 WO 2022032403A1 CL 2020050091 W CL2020050091 W CL 2020050091W WO 2022032403 A1 WO2022032403 A1 WO 2022032403A1
Authority
WO
WIPO (PCT)
Prior art keywords
joint
shear
shear key
wind turbine
tower
Prior art date
Application number
PCT/CL2020/050091
Other languages
Spanish (es)
French (fr)
Inventor
Mark WOERING
Original Assignee
Mecal Intellectual Property And Standards B.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mecal Intellectual Property And Standards B.V. filed Critical Mecal Intellectual Property And Standards B.V.
Priority to PCT/CL2020/050091 priority Critical patent/WO2022032403A1/en
Publication of WO2022032403A1 publication Critical patent/WO2022032403A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/12Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/16Prestressed structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/50Manufacturing or production processes characterised by the final manufactured product

Definitions

  • the present invention patent application is directed to a method for carrying out a locking joint (Shear Key) between the prefabricated elements for the construction of a wind tower (e.g. advanced tower system (ATS)). Specifically, it addresses a method that provides interlocking joints by means of a grout that separates from precast concrete, causing a smooth crack to form in the shape of a predefined interlocking joint. When the wall is in tension and the smooth crack opens a few millimeters, this is where the locking joint will provide shear transfer with no negative tensile stress effects on the wall.
  • ATS advanced tower system
  • precast concrete towers are being promoted to overcome the high cost and limitations of traditional steel as a means of tower construction.
  • the precast segment construction method requires the presence of segment joints to transfer loads between neighboring segments, stressing the importance of ensuring structural safety and serviceability.
  • research has been carried out dedicated to the behavior of joints by segments.
  • the shear behavior of the joints in segmented precast samples with shear keys has been studied considering different types of joints and levels of lateral force to develop high-strength precast concrete wind towers. This is how there are analyzes to examine the load-displacement relationship according to the type of shear keys and, in case of failure, the modes that the locking joints adopt according to the crack pattern in case of failure.
  • Locking joints could transfer shear and twisting forces across a horizontal joint, even when it is pulling apart a bit. That would result in a transfer of shear and torque through the entire joint, not just the compression portion.
  • ATS towers among other types of segmented concrete towers use ganged joints. These joints are in the form of standard toothed locking joints. If the joint were to crack in a load box with vertical stress on the wall, it would logically crack as illustrated in Figure 5.
  • Locking joint configurations are tongue and groove configurations, cam and socket configurations, or others commonly used in structural members.
  • Figure 1 shows how the transverse joint faces 13 can include a locking joint configuration that increases the shear and bending stress transmission capacity between the annular sections.
  • figure 2 shows the incorporation of bicones by means of mounting positioners 40 that allow centering the position of the wall pieces 10 when they are superimposed, where the vertical joining faces of two adjacent wall pieces (10) of the same annular section are arranged opposite each other and lack structural screws, structural bolts, local post-tensioning, annular post-tensioning around an annular section, interlocking joint configurations of the opposing vertical joint faces or concrete accessories cast in in situ that act as structural connectors for the transmission of structural stresses during the service life of the structure.
  • the difference that this publication presents with respect to the present invention is that the publication does not provide that the grouped interlocking joints be separated from the adjacent concrete by a release agent or a thin material that is placed in the joint on one side of the joint. locking union.
  • segmented elements of precast concrete are used.
  • the use of concrete in the publication allows very small tolerances.
  • FIG. 1 Publication US8307593 (B2), as illustrated in Figure 3 (Prior Art), describes an adapter section (270) that can be used to join an upper section (112) to the lower concrete section (214).
  • the adapter section 270 may comprise a prefabricated member in the form of a slab, ring, or cylinder.
  • Adapter section 270 may also have any suitable shape as desired in the specific application.
  • the adapter section (270) is configured to substantially align the loading forces
  • Publication WO2018193281 defines that the respective geometries of the upper face of the first segment and of the lower face of the second segment define at least one shear key when they cooperate with each other.
  • the locking joint is defined by a mortise and a tenon, respectively, defined within an element between the upper face of the first segment and the lower face of the second segment.
  • the respective geometries of the upper face (UFi-1) of the first segment (Si-1) and of the lower face (LFi) of the second segment (Si) define at least one locking joint (K) by cooperating with some and others.
  • the difference with respect to the invention lies in the fact that the locking union is carried out with a mortise and a tenon and not by means of a locking union that is filled with a grout, achieving that the union adopts the shape of each locking union and thus increase resistance to stress.
  • Patent registration CL55121 describes a vertical precast concrete stepped tower adapted to support a wind turbine, comprising a foundation base member positioned to support the tower, a first plurality of substantially identical precast concrete cylindrical or annular lower tower segments and lower tower segments
  • the invention differs from the other solutions by the use of a grout that allows large prefabricated elements with reasonable tolerances.
  • Figure 1 corresponds to a prior art shear key joint scheme.
  • Figure 2 corresponds to a prior art shear key joint scheme.
  • Figure 3 corresponds to a prior art shear key joint scheme.
  • Figure 4 corresponds to a prior art shear key joint scheme.
  • Figure 5 Corresponds to a front section view that exemplifies if a joint cracked in a load box with vertical stress on a wall.
  • Figure 6 Corresponds to a side sectional view exemplifying if a joint were to crack in a load box with vertical stress on a wall
  • Figure 7 corresponds to a top section view of a horizontal section through the joints.
  • the invention consists of a method for carrying out a Shear Key joint between precast concrete segments for wind turbine construction (for example, but not limited to an advanced tower system (ATS)).
  • the method consists of providing interlocking joints that are filled by a grout that is placed on only one side of a precast segment, causing a smooth crack to form in the shape of a predefined interlocking joint.
  • ATS advanced tower system
  • the wall is in tension and the smooth crack opens, this is where the locking joint will provide shear transfer and allow for significantly higher locking and shear stress.
  • the method comprises having grouped locking joints with a predefined shape.
  • the method also comprises preventing the bonding of the grout to a section of precast concrete (of the two that are joined and that between them forms a shear key), by means of a release agent or a thin layer of material. unbonded, so as to prevent adhesion between prefabricated segments of the tower and to predefine the shape that the actual crack will take when subjected to stress, that is, the shape of a default shear key joint.
  • the method is suitable for a total of extreme combinations of bending, shear and torsion, where its application is given in a system consisting of:
  • this Bredt shear flow diagram has lever arms the size of the full cross-section. It offers much more torsional strength than a horizontally cracked joint with a smooth crack. In case of a smooth horizontal crack the lever arms reduce the compression section to the size of the wall thickness.
  • a non-stick material (4) that forms a thin layer that allows each prefabricated segment to be kept separate and not joined. So when the grout (2) is incorporated, it only adheres to one of the faces of the prefabricated segments.
  • the non-stick material used is oil. In this way, the grout (2) adheres only to one of the faces of the prefabricated segments.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Sustainable Energy (AREA)
  • Sustainable Development (AREA)
  • Wind Motors (AREA)

Abstract

Disclosed is a method that provides interlocking joints by means of a bed that separates prefabricated concrete, causing a slight crack to form with the shape of a predefined interlocking joint. When a wall is in tension and the slight crack opens a few millimetres, the interlocking joint will provide shear transfer without negative effects of tensile stress in the wall.

Description

TÍTULO QUALIFICATION
“Método para llevar a cabo una unión de trabado (Shear Key) entre elementos prefabricados para la construcción de una torre de turbina eólica de concreto o similar “ “Method to carry out a locking joint (Shear Key) between prefabricated elements for the construction of a concrete wind turbine tower or similar”
M E M O RI A D ES C RI P TIVA DESCRIPTIVE MEMORY
La presente solicitud de patente de invención se dirige a un método para llevar a cabo una unión de trabado (Shear Key) entre los elementos prefabricados para la construcción de una torre eólica (e.g. sistema de torre avanzado (ATS)). Específicamente, se dirige a un método que proporciona uniones de trabado por medio de una lechada que separa del hormigón prefabricado, logrando que se forme una grieta suave con la forma de una unión de trabado predefinida. Cuando la pared está en tensión y la grieta suave se abre unos pocos milímetros, es donde la unión de trabado proporcionará una transferencia de corte sin efectos negativos de estrés de tensión en la pared. The present invention patent application is directed to a method for carrying out a locking joint (Shear Key) between the prefabricated elements for the construction of a wind tower (e.g. advanced tower system (ATS)). Specifically, it addresses a method that provides interlocking joints by means of a grout that separates from precast concrete, causing a smooth crack to form in the shape of a predefined interlocking joint. When the wall is in tension and the smooth crack opens a few millimeters, this is where the locking joint will provide shear transfer with no negative tensile stress effects on the wall.
ARTE PREVIO PREVIOUS ART
Las uniones de trabado o shear keys son ampliamente utilizadas para la unión de un elemento prefabricado en hormigón con la fundación y muros en donde se instalará el elemento. En construcción estas uniones de trabado también se conocen como zarpas o uniones dentadas. Estas uniones de trabado se utilizan para resistir fuerzas horizontales y verticales en la estructura, causadas por Locking joints or shear keys are widely used to join a prefabricated concrete element with the foundation and walls where the element will be installed. In construction these interlocking joints are also known as claw or toothed joints. These latch joints are used to resist horizontal and vertical forces on the structure caused by
2 efectos de carga tales como la tierra y las presiones del agua, los terremotos y el viento. two loading effects such as earth and water pressures, earthquakes and wind.
En respuesta a la necesidad de desarrollar grandes torres eólicas, las torres de hormigón prefabricado están siendo promovidas para superar el alto costo y las limitaciones del acero tradicional como medio de construcción de las torres. El método de construcción por segmentos prefabricados requiere la presencia de juntas por segmentos para transferir las cargas entre segmentos vecinos, lo que estresa la importancia de garantizar la seguridad estructural y la facilidad de servicio. De esta forma, se ha llevado a cabo investigación dedicada al comportamiento de las juntas por segmentos. Se ha estudiado el comportamiento de corte de las juntas en muestras segmentadas prefabricadas con uniones de trabado (shear keys) considerando diferentes tipos de juntas y niveles de fuerza lateral para desarrollar torres de viento con hormigón prefabricado de alta resistencia. Es así como existen análisis para examinar la relación carga-desplazamiento según el tipo de uniones de trabado (shear keys) y en caso de falla, los modos que adoptan las uniones de trabado de acuerdo con el patrón de grietas en caso de falla. In response to the need to develop large wind towers, precast concrete towers are being promoted to overcome the high cost and limitations of traditional steel as a means of tower construction. The precast segment construction method requires the presence of segment joints to transfer loads between neighboring segments, stressing the importance of ensuring structural safety and serviceability. In this way, research has been carried out dedicated to the behavior of joints by segments. The shear behavior of the joints in segmented precast samples with shear keys has been studied considering different types of joints and levels of lateral force to develop high-strength precast concrete wind towers. This is how there are analyzes to examine the load-displacement relationship according to the type of shear keys and, in case of failure, the modes that the locking joints adopt according to the crack pattern in case of failure.
En los últimos años, las cargas en las torres aumentan debido a turbinas más fuertes y rotores más grandes. El aumento de los diámetros del rotor tiene dos efectos: In recent years, the loads on the towers have increased due to stronger turbines and larger rotors. Increasing rotor diameters has two effects:
• cargas torsionales más altas en las torres en los procedimientos de ruptura; • higher torsional loads on towers in rupture procedures;
3 • Disminución del diámetro permitido de la torre a un nivel bajo en la torre, porque una gran pala del rotor llega más abajo y se desvía más hacia la torre. En un diseño conceptual reciente para torres ATS y torres de concreto segmentadas similares, las combinaciones extremas de flexión simultánea, cizallamiento y torsión no se podían resolver con las juntas horizontales convencionales. Especialmente la alta torsión en una junta de apertura (unión agrietada) fue problemática. La solución alternativa con cargas de corte perpendiculares a las paredes de la torre en la zona comprimida creó momentos de flexión extremadamente altos en estas paredes. La literatura (Betonkalender "Estructuras de hormigón para aerogeneradores" 2013) señala el uso de uniones de trabado (shear keys) en las cubiertas de puentes segmentados en esos casos. Las uniones de trabado podrían transferir fuerzas de corte y torsión a través de una junta horizontal, incluso cuando se está separando un poco. Eso daría como resultado una transferencia de corte y torsión a través de toda la junta, no solo la parte comprimida. Sin embargo, debido a las tolerancias en grandes secciones prefabricadas, las torres ATS entre otros tipos de torres de concreto segmentadas usan juntas agrupadas. Estas juntas tienen la forma de las uniones de trabado dentadas normativas. Si la junta se agrietara en una caja de carga con tensión vertical en la pared, lógicamente se agrietaría como se ¡lustra en la figura 5. 3 • Decreased allowable tower diameter at a low level in the tower, because a large rotor blade reaches lower and deflects further into the tower. In a recent conceptual design for ATS towers and similar segmented concrete towers, the extreme combinations of simultaneous bending, shearing, and torsion could not be resolved with conventional horizontal joints. Especially the high torque at an opening joint (cracked joint) was problematic. The alternative solution with shear loads perpendicular to the tower walls in the compression zone created extremely high bending moments in these walls. The literature (Betonkalender "Concrete structures for wind turbines" 2013) points out the use of shear keys in segmented bridge decks in these cases. Locking joints could transfer shear and twisting forces across a horizontal joint, even when it is pulling apart a bit. That would result in a transfer of shear and torque through the entire joint, not just the compression portion. However, due to tolerances in large precast sections, ATS towers among other types of segmented concrete towers use ganged joints. These joints are in the form of standard toothed locking joints. If the joint were to crack in a load box with vertical stress on the wall, it would logically crack as illustrated in Figure 5.
Los estudios sobre juntas agrupadas de la misma forma (ref .: Informe del instituto de transporte de Pensilvania, FHWA-PA-2010-014-PSU 014) muestran Studies on joints grouped in the same way (ref .: Pennsylvania Institute of Transportation Report, FHWA-PA-2010-014-PSU 014) show
4 la aparición de grietas rectas, incluso si las juntas están hechas solo para transferencia por corte. Las grietas rectas ya no transfieren cortante y torsión cuando se abren más que el tamaño de grano del agregado de concreto. Aunque las juntas horizontales tienen forma de uniones de trabado (shear keys), no funcionan como tales. Toda transferencia de cizallamiento y torsión se concentra en la parte comprimida de la pared de la torre. Aunque las juntas horizontales tienen forma de uniones de trabado, no funcionan como tales. Toda transferencia de cizallamiento y torsión se concentra en la parte comprimida de la pared de la torre. 4 the appearance of straight cracks, even if the joints are made only for shear transfer. Straight cracks no longer transfer shear and torque when they open larger than the grain size of the concrete aggregate. Although horizontal joints are in the form of shear keys, they do not function as such. All shear and torsion transfer is concentrated in the compression portion of the tower wall. Although horizontal joints are in the form of lock joints, they do not function as such. All shear and torsion transfer is concentrated in the compression portion of the tower wall.
Existen diferentes tipos de soluciones para llevar a cabo la unión de trabado en torres prefabricadas de hormigón. Por ejemplo, la publicación WO2019026056 A1 describe las configuraciones de uniones de trabado (shear Key) de las caras de unión vertical enfrentadas, los accesorios de mortero o de hormigón colado in situ que actúan por medio de conectares estructurales para la transmisión de tensiones estructurales durante la vida útil de la estructura. There are different types of solutions to carry out the interlocking joint in precast concrete towers. For example, publication WO2019026056 A1 describes the shear key joint configurations of the facing vertical joint faces, the mortar or cast-in-place concrete accessories that act by means of structural connectors for the transmission of structural stresses during the useful life of the structure.
Las configuraciones de la unión de trabado son configuraciones de lengüeta y ranura, configuraciones de levas y cavidades u otras comúnmente utilizadas en elementos estructurales. Locking joint configurations are tongue and groove configurations, cam and socket configurations, or others commonly used in structural members.
La figura 1 (Arte Previo) muestra cómo las caras de unión transversal 13 pueden incluir una configuración de unión de trabado que aumenta la capacidad de transmisión de esfuerzos de corte y flexión entre las secciones anulares Figure 1 (Prior Art) shows how the transverse joint faces 13 can include a locking joint configuration that increases the shear and bending stress transmission capacity between the annular sections.
5 superpuestas. De manera similar, la figura 2 muestra la incorporación de biconos por medio de posicionadores de montaje 40 que permiten centrar la posición de las piezas de pared 10 cuando están superpuestas, en donde las caras de unión vertical de dos piezas de pared adyacentes (10) de una misma sección anular están dispuestas una frente a la otra y carecen de tomillos estructurales, pernos estructurales , postensado local, postensado anular alrededor de una sección anular, configuraciones de uniones de trabado de las caras de unión verticales enfrentadas o accesorios de hormigón colado in situ que actúan como conectares estructurales para la transmisión de tensiones estructurales durante la vida útil de servicio la estructura. La diferencia que presenta esta publicación respecto de la presente invención radica en que en la publicación no proporciona que las uniones de trabado agrupadas sean separadas del concreto adyacente por un agente de liberación o un material delgado que se dispone en la unión en un lado de la unión de trabado. En la publicación se utiliza elementos segmentados de hormigón prefabricado. Al contrario, el uso de hormigón en la publicación permite tolerancias muy pequeñas. 5 overlapping. Similarly, figure 2 shows the incorporation of bicones by means of mounting positioners 40 that allow centering the position of the wall pieces 10 when they are superimposed, where the vertical joining faces of two adjacent wall pieces (10) of the same annular section are arranged opposite each other and lack structural screws, structural bolts, local post-tensioning, annular post-tensioning around an annular section, interlocking joint configurations of the opposing vertical joint faces or concrete accessories cast in in situ that act as structural connectors for the transmission of structural stresses during the service life of the structure. The difference that this publication presents with respect to the present invention is that the publication does not provide that the grouped interlocking joints be separated from the adjacent concrete by a release agent or a thin material that is placed in the joint on one side of the joint. locking union. In the publication segmented elements of precast concrete are used. On the contrary, the use of concrete in the publication allows very small tolerances.
La publicación US8307593 (B2), como se ¡lustra en la figura 3 (Arte Previo), describe una sección de adaptador (270) que puede usarse para unir una sección superior (112) a la sección de hormigón inferior (214). La sección de adaptador (270) puede comprender un miembro prefabricado en forma de losa, anillo o cilindro. La sección (270) del adaptador también puede tener cualquier forma adecuada como se desee en la aplicación específica. La sección (270) del adaptador está configurada para alinear sustancialmente las fuerzas de carga Publication US8307593 (B2), as illustrated in Figure 3 (Prior Art), describes an adapter section (270) that can be used to join an upper section (112) to the lower concrete section (214). The adapter section 270 may comprise a prefabricated member in the form of a slab, ring, or cylinder. Adapter section 270 may also have any suitable shape as desired in the specific application. The adapter section (270) is configured to substantially align the loading forces
6 de la torre de manera que se reducen las fuerzas de tracción y corte. La diferencia que presenta esta publicación respecto a la presente invención está dada en que no se utiliza un método para configurar la unión de trabado mediante el relleno con una lechada entre las caras de las uniones de trabado. 6 of the tower in such a way that the tensile and shear forces are reduced. The difference that this publication presents with respect to the present invention is given that a method is not used to configure the interlocking joint by filling with a grout between the faces of the interlocking joints.
La publicación WO2018193281 define que las geometrías respectivas de la cara superior del primer segmento y de la cara inferior del segundo segmento definen al menos una unión de trabado (shear key) cuando cooperan entre sí. Según se aprecia en la figura 4 (Arte Previo), la unión de trabado está definida por una mortaja y una espiga, respectivamente, definidas dentro de un elemento entre la cara superior del primer segmento y la cara inferior del segundo segmento. Específicamente, las geometrías respectivas de la cara superior (UFi-1 ) del primer segmento (Si-1 ) y de la cara inferior (LFi) del segundo segmento (Si) definen al menos una unión de trabado (K) al cooperar con unos y otros. La diferencia respecto de la invención radica que la unión de trabado se lleva a cabo con una mortaja y una espiga y no por medio una unión de trabado que es rellenada con una lechada logrando que la unión adopte la forma de cada unión de trabado y así aumentar la resistencia al esfuerzo. Publication WO2018193281 defines that the respective geometries of the upper face of the first segment and of the lower face of the second segment define at least one shear key when they cooperate with each other. As can be seen in Figure 4 (Prior Art), the locking joint is defined by a mortise and a tenon, respectively, defined within an element between the upper face of the first segment and the lower face of the second segment. Specifically, the respective geometries of the upper face (UFi-1) of the first segment (Si-1) and of the lower face (LFi) of the second segment (Si) define at least one locking joint (K) by cooperating with some and others. The difference with respect to the invention lies in the fact that the locking union is carried out with a mortise and a tenon and not by means of a locking union that is filled with a grout, achieving that the union adopts the shape of each locking union and thus increase resistance to stress.
El registro de patente CL55121 describe una torre escalonada de hormigón prefabricado vertical adaptada para soportar una turbina eólica, que comprende un miembro de base de cimentación colocado para soportar la torre, una primera pluralidad de segmentos de torre inferiores anulares o cilindricos de hormigón prefabricado sustancialmente idénticos y segmentos de torre inferiores Patent registration CL55121 describes a vertical precast concrete stepped tower adapted to support a wind turbine, comprising a foundation base member positioned to support the tower, a first plurality of substantially identical precast concrete cylindrical or annular lower tower segments and lower tower segments
7 cilindricos que tienen el mismo diámetro y se soportan por el miembro de base y se disponen para formar una primera pila vertical de segmentos de torre inferiores sucesivos, un primer segmento de transición anular o circular, una segunda pluralidad de segmentos de torre intermedios anulares y cilindricos de hormigón, una tercera pluralidad de segmentos de torre superiores anulares y cilindricos de hormigón prefabricado sustancialmente idénticos y con los segmentos de torre superiores cilindricos que tienen un diámetro más pequeño que el diámetro de los segmentos de torre intermedios, con los segmentos de torre superiores estando dispuestos para formar una tercera pila vertical de segmentos de torre superiores sucesivos en la parte superior del segundo segmento de transición de hormigón prefabricado, y una serie de tendones de pos-tensado que se extienden verticalmente colocados dentro de una cámara definida por la primera, segunda y tercera pluralidades de segmentos de torre anularos y que conectan todos los segmentos de torre anulares y los segmentos de transición anulares juntos. La diferencia con la presente invención radica en que nos se describe un método para realizar la unión de trabado utilizando una lechada en la unión propiamente tal. 7 cylindrical having the same diameter and supported by the base member and arranged to form a first vertical stack of successive lower tower segments, a first annular or circular transition segment, a second plurality of intermediate annular and cylindrical tower segments of concrete, a third plurality of precast concrete cylindrical and annular upper tower segments substantially identical and with the cylindrical upper tower segments having a diameter smaller than the diameter of the intermediate tower segments, with the upper tower segments being arranged to form a third vertical stack of successive upper tower segments on top of the second precast concrete transition segment, and a series of vertically extending post-tensioning tendons positioned within a chamber defined by the first, second and third pluralities of annular tower segments and connecting all annular tower segments and annular transition segments together. The difference with the present invention lies in the fact that a method for making the locking joint using a grout in the joint itself is described.
En resumen, la invención difiere de las otras soluciones por el uso de una lechada que permite grandes elementos prefabricados con tolerancias razonables. In short, the invention differs from the other solutions by the use of a grout that allows large prefabricated elements with reasonable tolerances.
Las otras soluciones mencionadas son juntas secas trituradas, con elementos superpuestos. Esa solución funciona bien, pero solo permite tolerancias muy pequeñas. The other solutions mentioned are crushed dry joints, with overlapping elements. That solution works fine, but only allows very small tolerances.
8 BREVE DESCRIPCION DE LAS FIGURAS 8 BRIEF DESCRIPTION OF THE FIGURES
Figura 1 : corresponde a un esquema de unión de trabado (shear key) del arte previo. Figure 1: corresponds to a prior art shear key joint scheme.
Figura 2: corresponde a un esquema de unión de trabado (shear key) del arte previo. Figure 2: corresponds to a prior art shear key joint scheme.
Figura 3: corresponde a un esquema de unión de trabado (shear key) del arte previo. Figure 3: corresponds to a prior art shear key joint scheme.
Figura 4: corresponde a un esquema de unión de trabado (shear key) del arte previo. Figure 4: corresponds to a prior art shear key joint scheme.
Figura 5: corresponde a una vista en corte frontal que ejemplifica si una junta se agrietara en una caja de carga con tensión vertical en una pared. Figure 5: Corresponds to a front section view that exemplifies if a joint cracked in a load box with vertical stress on a wall.
Figura 6: corresponde a una vista en corte lateral que ejemplifica si una junta se agrietara en una caja de carga con tensión vertical en una pared Figure 6: Corresponds to a side sectional view exemplifying if a joint were to crack in a load box with vertical stress on a wall
Figura 7: corresponde a una vista en corte superior de una sección horizontal a través de las juntas. Figure 7: corresponds to a top section view of a horizontal section through the joints.
Figura 8: corresponde a una vista en corte frontal que ¡lustra el grupo de elementos de trabado en que se ha dispuesto la lechada (5) y el material antiadherente (4). Figure 8: corresponds to a front section view that illustrates the group of locking elements in which the grout (5) and the non-stick material (4) have been arranged.
Figura 9: corresponde a una vista en corte lateral que ¡lustra que se ha dispuesto la lechada (5) y el material antiadherente (4) entre elementos de trabado. Figure 9: corresponds to a side sectional view that illustrates that the grout (5) and the non-stick material (4) have been placed between the locking elements.
Figura 10: corresponde a un diagrama de flujo de corte de Bredt. DESCRIPCION DE LA INVENCION Figure 10: Corresponds to a Bredt cut flow diagram. DESCRIPTION OF THE INVENTION
La invención consiste en un método para llevar a cabo una unión de trabado (Shear Key) entre segmentos de concreto prefabricados para la construcción de turbina eólica (por ejemplo, pero no limitado a un sistema de torre avanzado (ATS)). Específicamente, el método consiste en disponer uniones de trabado que son rellenadas por una lechada que se dispone en un solo lado de un segmento prefabricado, logrando que se forme una grieta suave con la forma de una unión de trabado predefinida. Cuando la pared está en tensión y la grieta suave se abre, es donde la unión de trabado proporcionará una transferencia de corte y permitirá un esfuerzo de corte y trabado significativamente mayor. The invention consists of a method for carrying out a Shear Key joint between precast concrete segments for wind turbine construction (for example, but not limited to an advanced tower system (ATS)). Specifically, the method consists of providing interlocking joints that are filled by a grout that is placed on only one side of a precast segment, causing a smooth crack to form in the shape of a predefined interlocking joint. When the wall is in tension and the smooth crack opens, this is where the locking joint will provide shear transfer and allow for significantly higher locking and shear stress.
De esta forma, el método comprende disponer de uniones de trabado agrupadas con una forma predefinida. El método también comprende evitar la unión de la lechada a una sección de hormigón prefabricado (de las dos que se unen y que entre ellas se conforma unión de trabado o shear key), por medio de un agente de liberación o un delgada capa de material no adherido, de modo de impedir la adhesión entre segmentos prefabricados de la torre y predifinir la forma que adoptará la grieta real cuando es sometida a esfuerzo, esto es, la forma de una unión de trabado (shear key) por defecto. In this way, the method comprises having grouped locking joints with a predefined shape. The method also comprises preventing the bonding of the grout to a section of precast concrete (of the two that are joined and that between them forms a shear key), by means of a release agent or a thin layer of material. unbonded, so as to prevent adhesion between prefabricated segments of the tower and to predefine the shape that the actual crack will take when subjected to stress, that is, the shape of a default shear key joint.
El método comprende que la unión entre los segmentos de torre de hormigón prefabricado y la lechada no se adhiere mediante la ejecución de cualquiera de las siguientes etapas: The method comprises making the joint between the precast concrete tower segments and the grout non-stick by performing any of the following steps:
• aceitar o pintar una de las superficies de la unión de trabado; • oil or paint one of the locking joint surfaces;
10 • disponer una capa delgada de material plástico en una de las superficies de la unión de trabado; 10 • place a thin layer of plastic material on one of the surfaces of the locking joint;
• disponer cualquier otro material que se adhiera a la superficie prefabricada de hormigón, como por ejemplo resinas antiadherentes y no se deforme mucho cuando se carga en corte • provide any other material that adheres to the precast concrete surface, such as non-stick resins, and does not deform much when loaded in shear
El resultado es una serie o conjunto de uniones de trabado (shear keys) en concreto no reforzado y lechada. The result is a series or set of shear keys in unreinforced concrete and grout.
El método es adecuado para un total de combinaciones extremas de flexión, corte y torsión, en que su aplicación está dada en un sistema que consiste en: The method is suitable for a total of extreme combinations of bending, shear and torsion, where its application is given in a system consisting of:
• Paredes de una torre prefabricadas; • Prefabricated tower walls;
• El postesado de la torre; • Post-tensioning of the tower;
• Barras de refuerzo verticales a través de las juntas horizontales; • Vertical reinforcing bars across horizontal joints;
• Uniones de trabado (shear keys). • Locking joints (shear keys).
Este sistema total debe transferir corte y torsión a través de toda la sección transversal de la junta conformada por las uniones de trabado. This total system must transfer shear and torque through the entire cross section of the joint formed by the locking joints.
Por lo tanto, se produce un flujo de corte de Bredt a través de las juntas, como en el resto de la torre. En la figura 8 se observa que este diagrama de flujo de corte de Bredt tiene brazos de palanca del tamaño de la sección transversal total. Ofrece mucha más resistencia a la torsión que una juntura agrietada horizontalmente con una grieta suave. En caso de una grieta suave horizontal los brazos de palanca reducen al tamaño del grosor del muro la sección comprimida. Therefore, a Bredt shear flow occurs through the joints, as in the rest of the tower. It is seen from Figure 8 that this Bredt shear flow diagram has lever arms the size of the full cross-section. It offers much more torsional strength than a horizontally cracked joint with a smooth crack. In case of a smooth horizontal crack the lever arms reduce the compression section to the size of the wall thickness.
11 DESCRIPCION DE LA MODALIDAD PREFERIDA eleven DESCRIPTION OF THE PREFERRED MODE
El método de la invención consiste en conformar una serie o un conjunto de uniones de trabado (Shear Keys) (1 ) a lo largo de todo el segmento (5) de pared de cada sección que conforma una torre prefabricada de hormigón de cara externa (7) y cara interna (8). Cada unión de trabado (1 ) es rellenada por una lechada (2) que se dispone en cada unión de trabado (1 ) en la cara (11 ). De esta forma, cuando la torre se somete a esfuerzo, se forma una grieta suave (3) con la forma de una unión de trabado (1 ) predefinida. Con esto se logra la grieta suave (3) se abra unos pocos milímetros, es donde la unión de trabado proporcionará una transferencia de corte y torsión mayor. Las junturas horizontales son reforzadas por barras verticales (10) para proveer las fuerzas de tensión para los movimientos de doblado junto al flujo de corte a través de la juntura. The method of the invention consists of forming a series or a set of locking joints (Shear Keys) (1) along the entire wall segment (5) of each section that forms a prefabricated concrete tower with an external face ( 7) and internal face (8). Each locking joint (1) is filled by a grout (2) that is placed in each locking joint (1) on the face (11). In this way, when the tower is subjected to stress, a smooth crack (3) is formed in the shape of a predefined locking joint (1). This allows the smooth crack (3) to open a few millimeters, this is where the locking joint will provide greater shear and torque transfer. The horizontal joints are reinforced by vertical bars (10) to provide the tensile forces for bending movements along with shear flow through the joint.
Previo a la etapa de rellenar con lechada la unión de trabado (1 ), se incorpora en la cara opuesta (12) a la cara (11 ) que se rellena con la lechada (2) de los segmentos prefabricados de cada sección de la torre, un material antiadherente (4) que conforma una capa delgada que permite mantener separados y no unidos cada segmento prefabricado. Entonces cuando la lechada (2) es incorporada, sólo se adhiere a una de las caras de los segmentos prefabricados. En esta modalidad preferida el material antiadherente utilizado es aceite. De esta forma, la lechada (2) se adhiere sólo a una de las caras de los segmentos prefabricados. La elección de un material especifico para la capa delgada, o para el agente de liberación entre la lechada y el concreto define la posibilidad de fricción en las Prior to the stage of filling the interlocking joint (1) with grout, it is incorporated on the opposite face (12) to the face (11) that is filled with the grout (2) of the prefabricated segments of each section of the tower , a non-stick material (4) that forms a thin layer that allows each prefabricated segment to be kept separate and not joined. So when the grout (2) is incorporated, it only adheres to one of the faces of the prefabricated segments. In this preferred embodiment, the non-stick material used is oil. In this way, the grout (2) adheres only to one of the faces of the prefabricated segments. The choice of a specific material for the thin layer, or for the release agent between the grout and the concrete defines the possibility of friction in the concrete.
12 caras diagonales de las uniones de trabado. Esto permite al diseñador de la conexión posibilidades para ajustar el comportamiento de la unión. 12 diagonal faces of the locking joints. This allows the connection designer possibilities to adjust the behavior of the connection.
En la cara externa (7) de cada segmento prefabricado, en la zona donde se encuentra la unión de trabado, se incorpora un sello (9) que impide tanto la salida de lechada (2) cuando es incorporada y la entrada de elementos externos. On the external face (7) of each prefabricated segment, in the area where the locking joint is located, a seal (9) is incorporated that prevents both the exit of grout (2) when it is incorporated and the entry of external elements.
13 13

Claims

R E I V I N D I CAC I O N E S Método para llevar a cabo una unión de trabado (Shear Key) entre elementos prefabricados para la construcción de una torre de turbina eólica de concreto o similar, el cual permite mayores esfuerzos de corte y torsión cuando la torre es sometida a altas cargas externas, CARACTERIZADO porque comprende disponer un conjunto de uniones de trabado, en cada unión de trabado es rellenada por una lechada, logrando que, cuando la torre se somete a esfuerzo, se forme una grieta suave con la forma de una unión de trabado predefinida; en que para evitar la unión de dicha lechada a una sección de hormigón prefabricado y consecuentemente con una de las superficies que conforman la unión de trabado (de las dos que se unen y que entre ellas se conforma el conjunto de uniones de trabado o shear key), se dispone, en la cara opuesta a donde se rellena con dicha lechada, de un material delgado o agente de liberación, de modo de conformar un conjunto de uniones de trabado (shear keys) en concreto no reforzado y lechada. Método para llevar a cabo una unión de trabado (Shear Key) entre elementos prefabricados para la construcción de una torre de turbina eólica de concreto o similar de acuerdo a la reivindicación 1 , CARACTERIZADO porque dicho material delgado es aceite o pintura. Método para llevar a cabo una unión de trabado (Shear Key) entre elementos prefabricados para la construcción de una torre de turbina eólica de concreto o similar de acuerdo a la reivindicación 1 , CARACTERIZADO porque dicho material delgado es material plástico. Método para llevar a cabo una unión de trabado (Shear Key) entre elementos prefabricados para la construcción de una torre de turbina eólica de concreto o similar de acuerdo a la reivindicación 1 , CARACTERIZADO porque dicho material delgado es una resina antiadherente. Método para llevar a cabo una unión de trabado (Shear Key) entre elementos prefabricados para la construcción de una torre de turbina eólica de concreto o similar de acuerdo a la reivindicación 1 , CARACTERIZADO porque cada segmento prefabricado posee una barra vertical y elementos de conexión entre segmentos. Método para llevar a cabo una unión de trabado (Shear Key) entre elementos prefabricados para la construcción de una torre de turbina eólica de concreto o similar de acuerdo a la reivindicación 1 , CARACTERIZADO porque en la cara externa de cada segmento prefabricado, en la zona donde se encuentra la unión de trabado, se incorpora un sello que impide la salida de lechada cuando es incorporada y la entrada de elementos externos. CLAIMS Method for carrying out a locking joint (Shear Key) between prefabricated elements for the construction of a concrete wind turbine tower or similar, which allows greater shear and torsion efforts when the tower is subjected to high loads external, CHARACTERIZED because it comprises arranging a set of interlocking joints, in each interlocking joint it is filled with a grout, achieving that, when the tower is subjected to stress, a smooth crack is formed in the shape of a predefined interlocking joint; in that to avoid the union of said grout to a section of prefabricated concrete and consequently with one of the surfaces that make up the interlocking joint (of the two that are joined and that between them the set of interlocking joints or shear key is formed ), there is a thin material or release agent on the opposite side to where it is filled with said grout, so as to form a set of shear keys in non-reinforced concrete and grout. Method for carrying out a locking joint (Shear Key) between prefabricated elements for the construction of a concrete wind turbine tower or the like according to claim 1, CHARACTERIZED in that said thin material is oil or paint. Method to carry out a locking joint (Shear Key) between prefabricated elements for the construction of a turbine tower concrete wind turbine or similar according to claim 1, CHARACTERIZED in that said thin material is plastic material. Method for carrying out a locking joint (Shear Key) between prefabricated elements for the construction of a concrete wind turbine tower or the like according to claim 1, CHARACTERIZED in that said thin material is a non-stick resin. Method for carrying out a locking joint (Shear Key) between prefabricated elements for the construction of a concrete wind turbine tower or similar according to claim 1, CHARACTERIZED because each prefabricated segment has a vertical bar and connection elements between segments. Method for carrying out a locking joint (Shear Key) between prefabricated elements for the construction of a concrete wind turbine tower or similar according to claim 1, CHARACTERIZED because on the external face of each prefabricated segment, in the area where the locking union is located, a seal is incorporated that prevents the exit of grout when it is incorporated and the entry of external elements.
PCT/CL2020/050091 2020-08-13 2020-08-13 Method for making an interlocking joint (shear key) between prefabricated elements to build a concrete wind turbine tower or similar WO2022032403A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CL2020/050091 WO2022032403A1 (en) 2020-08-13 2020-08-13 Method for making an interlocking joint (shear key) between prefabricated elements to build a concrete wind turbine tower or similar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CL2020/050091 WO2022032403A1 (en) 2020-08-13 2020-08-13 Method for making an interlocking joint (shear key) between prefabricated elements to build a concrete wind turbine tower or similar

Publications (1)

Publication Number Publication Date
WO2022032403A1 true WO2022032403A1 (en) 2022-02-17

Family

ID=80246880

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CL2020/050091 WO2022032403A1 (en) 2020-08-13 2020-08-13 Method for making an interlocking joint (shear key) between prefabricated elements to build a concrete wind turbine tower or similar

Country Status (1)

Country Link
WO (1) WO2022032403A1 (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES1060629U (en) * 2005-06-20 2005-10-16 Inneo21, S.L. Perfected structure of joints between modular tower plates for wind turbines and other applications (Machine-translation by Google Translate, not legally binding)
US20090025304A1 (en) * 2005-09-23 2009-01-29 Sika Technology Ag Tower Construction
KR20130012106A (en) * 2012-05-18 2013-02-01 동부건설 주식회사 Transition piece and momopile connection structure of offshore wind turbine
WO2017039923A2 (en) * 2015-08-31 2017-03-09 Siemens Energy, Inc. Equipment tower having a concrete plinth
US20180128246A1 (en) * 2012-04-04 2018-05-10 Forida Development A/S Wind turbine comprising a tower part of an ultra-high performance fiber reinforced composite
CN108412704A (en) * 2018-05-17 2018-08-17 三重能有限公司 Wind power generating set and its tower
US20190106856A1 (en) * 2012-08-03 2019-04-11 Wind Tower Technologies, Llc Precast concrete post tensioned segmented wind turbine tower
US20200040541A1 (en) * 2016-10-10 2020-02-06 Delft Offshore Turbine B.V. Offshore structure comprising a coated slip joint and method for forming the same
WO2020106146A1 (en) * 2018-11-20 2020-05-28 Sif Holding N.V. Tp-free monopile and method for forming the same
CN210918430U (en) * 2019-08-16 2020-07-03 上海市机电设计研究院有限公司 Vertical seam post-pouring stressed key of prefabricated ring piece of wind power tower cylinder
WO2020160857A1 (en) * 2019-02-07 2020-08-13 Innogy Se Method for forming a connection between two tubular segments of different widths and correspondingly produced connection

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES1060629U (en) * 2005-06-20 2005-10-16 Inneo21, S.L. Perfected structure of joints between modular tower plates for wind turbines and other applications (Machine-translation by Google Translate, not legally binding)
US20090025304A1 (en) * 2005-09-23 2009-01-29 Sika Technology Ag Tower Construction
US20180128246A1 (en) * 2012-04-04 2018-05-10 Forida Development A/S Wind turbine comprising a tower part of an ultra-high performance fiber reinforced composite
KR20130012106A (en) * 2012-05-18 2013-02-01 동부건설 주식회사 Transition piece and momopile connection structure of offshore wind turbine
US20190106856A1 (en) * 2012-08-03 2019-04-11 Wind Tower Technologies, Llc Precast concrete post tensioned segmented wind turbine tower
WO2017039923A2 (en) * 2015-08-31 2017-03-09 Siemens Energy, Inc. Equipment tower having a concrete plinth
US20200040541A1 (en) * 2016-10-10 2020-02-06 Delft Offshore Turbine B.V. Offshore structure comprising a coated slip joint and method for forming the same
CN108412704A (en) * 2018-05-17 2018-08-17 三重能有限公司 Wind power generating set and its tower
WO2020106146A1 (en) * 2018-11-20 2020-05-28 Sif Holding N.V. Tp-free monopile and method for forming the same
WO2020160857A1 (en) * 2019-02-07 2020-08-13 Innogy Se Method for forming a connection between two tubular segments of different widths and correspondingly produced connection
CN210918430U (en) * 2019-08-16 2020-07-03 上海市机电设计研究院有限公司 Vertical seam post-pouring stressed key of prefabricated ring piece of wind power tower cylinder

Similar Documents

Publication Publication Date Title
AU2011209381B2 (en) Wind power plant and wind power plant tower segment
US11680401B2 (en) Precast wall panels and method of erecting a high-rise building using the panels
US8256174B2 (en) Tower construction
US8074414B2 (en) Precast wall panels and method of erecting a high-rise building using the panels
JP2010508453A (en) Super-unitized post-tension block system for high-strength masonry structures with ultra-high strength blocks
KR100969586B1 (en) Rhamen bridge and construction method there of
KR101325245B1 (en) Bridge Post which is assembled by precasted units
US20180209134A1 (en) Construction arrangement and detachable connection assembly for this construction arrangement
US9359763B2 (en) Light-weight load-bearing structures reinforced by core elements made of segments and a method of casting such structures
JPH08333714A (en) Constructing method of columnar structure used with hybrid prefabricated segments
WO2022032403A1 (en) Method for making an interlocking joint (shear key) between prefabricated elements to build a concrete wind turbine tower or similar
KR100949828B1 (en) Steel beam and hybrid beam of steel concrete for slim floor
CN111155643A (en) Assembly type mixed frame structure and construction method
CN111173129A (en) Prestress assembling frame structure and construction method
KR102140167B1 (en) Strengthening method of concrete structures by pretensioning
GB2427891A (en) Pile connection
JP5152689B2 (en) Structure and method for joining pier and footing
JP2005042480A (en) Temporary cutoff structure and temporary cutoff method
AU2021352083A1 (en) Foundation for a wind turbine
JP2000336945A (en) Construction method for non-reinforced and non-anchor earthquake-resistant reinforced wall
CN110725439A (en) Assembled steel concrete shear wall and construction method thereof
ES2928275B2 (en) Structure connection method
KR102318867B1 (en) Bracing composite precast deckplate and Slab construction method using it
KR102414847B1 (en) Pier girder joint structure and construction method of the same
CN117345743A (en) Tower section of thick bamboo flange, assembled cavity intermediate layer steel-concrete combination tower section of thick bamboo and wind power generation structure

Legal Events

Date Code Title Description
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20948903

Country of ref document: EP

Kind code of ref document: A1