WO2022018937A1 - 経路決定装置、経路決定方法、及びプログラム - Google Patents

経路決定装置、経路決定方法、及びプログラム Download PDF

Info

Publication number
WO2022018937A1
WO2022018937A1 PCT/JP2021/018104 JP2021018104W WO2022018937A1 WO 2022018937 A1 WO2022018937 A1 WO 2022018937A1 JP 2021018104 W JP2021018104 W JP 2021018104W WO 2022018937 A1 WO2022018937 A1 WO 2022018937A1
Authority
WO
WIPO (PCT)
Prior art keywords
delivery
power consumption
information
route
destinations
Prior art date
Application number
PCT/JP2021/018104
Other languages
English (en)
French (fr)
Inventor
琢磨 飯田
昌昭 星田
晃佑 山口
Original Assignee
パナソニックIpマネジメント株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニックIpマネジメント株式会社 filed Critical パナソニックIpマネジメント株式会社
Publication of WO2022018937A1 publication Critical patent/WO2022018937A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L15/00Methods, circuits, or devices for controlling the traction-motor speed of electrically-propelled vehicles
    • B60L15/20Methods, circuits, or devices for controlling the traction-motor speed of electrically-propelled vehicles for control of the vehicle or its driving motor to achieve a desired performance, e.g. speed, torque, programmed variation of speed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L50/00Electric propulsion with power supplied within the vehicle
    • B60L50/50Electric propulsion with power supplied within the vehicle using propulsion power supplied by batteries or fuel cells
    • B60L50/60Electric propulsion with power supplied within the vehicle using propulsion power supplied by batteries or fuel cells using power supplied by batteries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/15Preventing overcharging
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C21/00Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
    • G01C21/26Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 specially adapted for navigation in a road network
    • G01C21/34Route searching; Route guidance
    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/72Electric energy management in electromobility
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles

Definitions

  • the present disclosure relates to a routing device, a routing method, and a program.
  • the route determination device is a route determination device for determining the route of collection / delivery or transfer of an electric mobile body used for collection / delivery of luggage or transfer of a person, and is used for power consumption in collection / delivery or transfer of the electric mobile body.
  • An element extraction unit that extracts an element that increases the power consumption from the first information related to the first information and the second information related to the power consumption of the electric mobile body depending on the surrounding conditions, and the element extracted by the element extraction unit. Based on the above, a route determining unit for determining the route connecting a plurality of destinations serving as collection / delivery destinations or pick-up destinations is provided.
  • FIG. 1 is an overall view showing an example of the configuration of the delivery planning system according to the embodiment.
  • FIG. 2 is a diagram showing a configuration example of delivery information stored in the delivery information storage unit according to the embodiment.
  • FIG. 3 is a diagram showing a configuration example of delivery area information stored in the delivery area information storage unit according to the embodiment.
  • FIG. 4 is a diagram showing a configuration example of vehicle performance information stored in the vehicle performance information storage unit according to the embodiment.
  • FIG. 5 is a diagram summarizing the factors that affect the power consumption of the electric vehicle according to the embodiment.
  • FIG. 6 is a block diagram showing an example of the hardware configuration of the delivery planning device according to the embodiment.
  • FIG. 7 is a block diagram showing an example of the functional configuration of the delivery planning device according to the embodiment.
  • FIG. 8 is a diagram showing an example of a delivery plan display screen in the delivery plan output terminal according to the embodiment.
  • FIG. 9 is a flow chart showing an example of the procedure of the route determination process by the delivery planning device according to
  • the technique according to the present disclosure is applied to the delivery of a package such as a parcel delivery service
  • the technique according to the present disclosure may be applied to the collection of packages, or may be applied to the collection and delivery of both delivery and collection of packages.
  • the technique according to the present disclosure can be applied not only to luggage but also to transportation of people such as ride sharing, shared taxi, and shared bus.
  • FIG. 1 is an overall view showing an example of the configuration of the delivery planning system 1 according to the embodiment.
  • the delivery planning system 1 as a route determination system includes a delivery plan output terminal 2, a delivery planning device 3, and a database 8.
  • the delivery plan output terminal 2 and the delivery plan device 3 are connected by wire or wirelessly via a network 9 such as the Internet.
  • the delivery planning device 3 is configured so that the database 8 can be accessed.
  • the delivery planning device 3 as a route determination device is, for example, a personal computer (PC: Personal Computer) of a service company that provides a delivery plan to a delivery company that performs a delivery business.
  • the delivery planning device 3 generates a delivery plan based on various information stored in the database 8, for example.
  • the delivery planning device 3 may be configured as a device for generating a collection plan or a device for generating a collection / delivery plan including delivery and collection / delivery.
  • the delivery plan output terminal 2 outputs the delivery plan generated by the delivery plan device 3.
  • the output method of the delivery plan for example, the display on the display or the like provided in the delivery plan output terminal 2, the output by voice from the speaker provided in the delivery plan output terminal 2, and the connection to the delivery plan output terminal 2. It may be at least one of printouts by a printer or the like.
  • the delivery plan output terminal 2 is, for example, a personal computer of a delivery company, a navigation system mounted on an electric vehicle or the like that is the target of the delivery plan, or a mobile terminal such as a smartphone of a driver of the electric vehicle.
  • the delivery company causes the electric vehicle owned by the delivery company to perform the delivery business of delivering the package to multiple delivery destinations.
  • the business content of the delivery company may include, for example, a collection business of collecting packages from a plurality of collection destinations.
  • the electric vehicle as an electric moving body is, for example, an electric vehicle (EV: Electric Vehicle) driven by using the power of a battery (battery), or a hybrid vehicle (HV:) that uses the power of an internal combustion engine or the like together with the power of the battery. Hybrid Vehicle) and the like.
  • the delivery company may have the electric motor motorcycle as an electric mobile body perform the delivery business.
  • An electric motorbike is a motorcycle that uses part or all of its power as electric power.
  • the delivery company provides various information necessary for generating the delivery plan when receiving the delivery plan from the service company.
  • Various information provided by the delivery company is stored in the delivery information storage unit 4, the delivery area information storage unit 5, and the vehicle performance information storage unit 6 of the database 8.
  • the delivery company may directly access the database 8 to store various information in the database 8.
  • the delivery company may transmit various information to the delivery planning device 3, and the delivery planning device 3 may access the database 8 to store various information.
  • Database 8 is, for example, a computer with a built-in storage device. However, the database 8 may be integrally configured with the delivery planning device 3. That is, the database 8 may be a storage device built in the delivery planning device 3.
  • the delivery information storage unit 4 stores delivery information as the first information.
  • the delivery information includes information on delivery such as the distance to the delivery destination, the number and weight of packages, and the like. This information relates to, for example, power consumption in the delivery of electric vehicles.
  • the delivery area information storage unit 5 stores the delivery area information as the second information.
  • the delivery area information includes information on the surrounding conditions in the delivery business such as map information of the delivery area and traffic information. This information relates to, for example, the power consumption of the electric vehicle due to the surrounding conditions.
  • Vehicle performance information as third information is stored in the vehicle performance information storage unit 6.
  • the vehicle performance information includes information such as the body weight and energy efficiency of the electric vehicle. This information relates to, for example, the power consumption of an electric vehicle due to vehicle performance.
  • FIG. 2 is a diagram showing a configuration example of delivery information stored in the delivery information storage unit 4 according to the embodiment.
  • the delivery information includes, for example, delivery time zone, delivery distance, required time, number and weight of packages delivered to each delivery destination, distance to the delivery destination, stop time at the delivery destination, priorities, and the like. Also includes driver information.
  • Each of the plurality of delivery destinations A to E ... is a delivery destination, and is located in, for example, one delivery area among the plurality of delivery areas.
  • the delivery area is partitioned with the intention of going around all the delivery destinations in the delivery area, for example, in one delivery operation. That is, for example, it is planned to go around these delivery destinations A to E ... in one delivery operation. Therefore, the delivery information storage unit 4 may store a plurality of delivery information for each delivery area and each delivery operation.
  • the delivery weight is 5 kg.
  • the three packages c1 to c2 are delivered to the delivery destination C, the delivery weights thereof are 3 kg, 2 kg, and 3 kg, respectively, and the total delivery weight is 8 kg.
  • the distance to the delivery destination is, for example, the shortest distance from the delivery base, which is the departure point.
  • Delivery bases are provided by delivery companies, for example, in one or more delivery areas.
  • the electric vehicle is loaded with packages at these delivery bases, goes around a plurality of delivery destinations A to E ..., and then returns to the delivery base.
  • the shortest distance from the delivery base to the delivery destination B is 30 km, and it can be seen that the delivery destination B is the farthest delivery destination from the delivery destinations A to E ...
  • the stop time at the delivery destination is the time required for delivery at the delivery destination, which is predicted from the number of packages delivered, the delivery weight, the status of the delivery destination, and the like.
  • the status of the delivery destination includes, for example, whether it is a detached house, an apartment or a condominium, and information such as the presence or absence of a delivery box and the installation floor.
  • priority items such as the delivery time are specified. For example, it can be seen that the package d of the delivery destination D must be delivered at 10 am.
  • driver information information about the driver in charge of the delivery area, for example, information such as the skill of the driver's driving technique is input.
  • the skill of driving technique is shown by, for example, accelerator operation, brake operation, and a rank that comprehensively judges these.
  • the time zone entered in the margin of the delivery information indicates the time zone in which the delivery business is performed.
  • the delivery distance entered in the margin is the total mileage to be traveled in delivery to, for example, delivery destinations A to E.
  • the delivery distance may be, for example, a standard distance when traveling around the delivery destinations A to E ... in one delivery operation, and the shortest distance of the route including these delivery destinations A to E ... It may be the longest distance, or the average distance between the shortest distance and the longest distance.
  • the required time is, for example, the total time of the estimated time required to travel the delivery distance determined as described above and the stop time at each delivery destination.
  • the above-mentioned various information included in the delivery information affects the power consumption in the delivery of the electric vehicle, for example.
  • the number of packages to be delivered that is, the object
  • the power consumption increases as the load weight increases.
  • the amount of power consumption increases as the number of people to be picked up, that is, the object, increases, and the weight of the passenger increases.
  • FIG. 3 is a diagram showing a configuration example of delivery area information stored in the delivery area information storage unit 5 according to the embodiment.
  • the delivery area information includes, for example, map information, traffic information, and environmental information of the delivery area.
  • the delivery area information storage unit 5 may store a plurality of delivery area information for each delivery area. Further various information can be extracted from the above map information, traffic information, and environmental information.
  • the height difference in the delivery area may be calculated from, for example, the altitude at each point in the delivery area included in the map information, the slope of the roadway in the delivery area, and the like.
  • the traffic information includes, for example, information on the degree of congestion for each time zone at each point in the delivery area.
  • the traffic information may include real-time traffic congestion information, accident information, and the like by updating as appropriate. Therefore, for example, from the traffic information, it is possible to extract the vehicle speed of the electric vehicle predicted in the predetermined section, the time required to pass the predetermined section, and the like for each time zone or based on the current traffic conditions. ..
  • the environmental information includes information such as the weather forecast of the area including the delivery area.
  • Environmental information is updated daily or weekly to maintain newer information. Therefore, for example, it is possible to extract information such as the weather, temperature, and wind speed of the delivery area predicted from the regional weather forecast from the environmental information.
  • map information maps information
  • traffic information maps information
  • environmental information affect, for example, the power consumption of an electric vehicle traveling in a delivery area.
  • the larger the height difference of the travel path the higher the power consumption.
  • there are many traffic lights and the power consumption increases as the traffic lights are repeatedly stopped.
  • FIG. 4 is a diagram showing a configuration example of vehicle performance information stored in the vehicle performance information storage unit 6 according to the embodiment.
  • vehicle performance information includes, for example, vehicle weight, vehicle speed, energy efficiency, set temperature, and the like.
  • the vehicle performance information storage unit 6 may store a plurality of vehicle performance information for each electric vehicle owned by the delivery company.
  • the body weight is the net weight of the electric vehicle that does not include the loaded luggage.
  • the vehicle speed is a standard vehicle speed or the like calculated from the performance or the like of the electric vehicle. The vehicle speed may be calculated based not only on the performance of the electric vehicle but also on the standard vehicle speeds available within the delivery area described above.
  • Energy efficiency is the efficiency of converting energy into power in an electric vehicle.
  • the energy efficiency may be calculated based not only on the performance of the electric vehicle but also on the traffic conditions in the above-mentioned delivery area and the like.
  • the energy efficiency of electric vehicles and the like is about 35% even when the conversion efficiency of fossil fuels and the like into electric power is taken into consideration.
  • the set temperature is, for example, the set temperature of the cold insulation equipment when the electric vehicle performing the delivery business is equipped with the cold insulation equipment such as a refrigerator or a refrigerator.
  • the above-mentioned various information included in the vehicle performance information affects the power consumption of the electric vehicle, for example.
  • the heavier the body weight of an electric vehicle the greater the power consumption.
  • the lower the energy efficiency the higher the power consumption.
  • the lower the set temperature of the cold insulation equipment the higher the power consumption.
  • FIG. 5 is a diagram summarizing the factors that affect the power consumption of the electric vehicle according to the embodiment.
  • Auxiliary organizations include, for example, starter motors, alternators, radiators, and the like.
  • the amount of power consumed by the auxiliary organization is affected by, for example, the delivery time zone, the traveling time, the weather, and the like. As mentioned above, depending on the delivery time, there is a possibility of being caught in a traffic jam, which also increases the power consumption of the auxiliary organization. Further, the power consumption can be increased by turning on the light at night and by driving the wiper in the rainy weather. In addition, some of these factors influence each other, for example, the degree of congestion in the morning hours on a rainy day increases.
  • Information on the delivery time zone can be obtained from the above-mentioned delivery information, and the traveling time can be calculated from, for example, the required time and the stop time included in the above-mentioned delivery information.
  • Weather information can be obtained from the above delivery area information.
  • the temperature control equipment includes, for example, an air conditioner for in-house air conditioning, a battery temperature control related to battery temperature control, a refrigerator or a refrigerator, and the like.
  • the power consumption of the air conditioner and the battery temperature control is affected by, for example, the running time and the temperature.
  • the amount of power consumed by a refrigerator or a refrigerator is affected by, for example, the stop time, the set temperature, and the like.
  • the travel time information can be calculated from the above delivery information, and the stop time information can be obtained from the above delivery information.
  • the temperature information can be obtained from the above-mentioned delivery area information, and the set temperature information can be obtained from the above-mentioned vehicle performance information.
  • the drive system includes, for example, a battery, a motor, an inverter, and the like.
  • the amount of power consumed by the drive system is affected by, for example, delivery weight, delivery distance, delivery time zone, height difference and number of traffic lights included in map information, traffic information, vehicle body weight, vehicle speed, energy efficiency, and the like.
  • driving skills by the driver may be included as factors that affect the power consumption of the drive system.
  • Delivery weight, delivery distance, and driving technology can be obtained from the above-mentioned delivery information
  • map information and traffic information can be obtained from the above-mentioned delivery area information
  • vehicle body weight, vehicle speed, and energy efficiency can be obtained from the above-mentioned vehicle performance information. ..
  • FIG. 6 is a block diagram showing an example of the hardware configuration of the delivery planning device 3 according to the embodiment.
  • the delivery planning device 3 is configured as an information terminal such as a computer including a CPU (Central Processing Unit) 31, a ROM (Read Only Memory) 32, a RAM (Random Access Memory) 33, and a communication circuit 34. Will be done.
  • the CPU 31, ROM 32, RAM 33, and communication circuit 34 are configured to be communicable via, for example, an internal bus.
  • the CPU 31 controls the entire delivery planning device 3.
  • the ROM 32 stores various programs used for the operation of the CPU 31, such as a program for generating a delivery plan.
  • the RAM 33 temporarily stores the data being worked on by the CPU 31.
  • the CPU 31 expands and executes, for example, a program for generating a delivery plan stored in the ROM 32 in the RAM, the delivery plan generation function of the delivery planning device 3 and the like are realized.
  • the above program can be provided by being stored in a recording medium or the like so that it can be read by a computer, for example.
  • the recording medium is, for example, a magnetic disk, an optical disk, a magneto-optical disk, a flash memory, or the like.
  • the above program may be downloadable from a server or the like placed in the network 9.
  • the delivery planning device 3 may include other processors such as an ASIC (Application Specific Integrated Circuit) and an FPGA (Field Programmable Gate Array) instead of the CPU 31.
  • ASIC Application Specific Integrated Circuit
  • FPGA Field Programmable Gate Array
  • the communication circuit 34 is a circuit for communicating with an external device of the delivery planning device 3 such as the delivery planning output terminal 2 and the database 8.
  • the communication circuit 34 is, for example, a communication circuit for wired communication, a communication circuit for wireless communication, and a combination thereof.
  • a communication circuit for wireless communication a communication circuit corresponding to various standards such as 3G, 4G, Wi-Fi (registered trademark) and Bluetooth (registered trademark) can be used.
  • the delivery planning device 3 may include an output device such as a display, an input device such as a touch panel integrally configured with a keyboard, a mouse, and a display.
  • FIG. 7 is a block diagram showing an example of the functional configuration of the delivery planning device 3 according to the embodiment.
  • the delivery planning device 3 includes, for example, a communication unit 301, an estimation unit 302, an SOC calculation unit 303, an element extraction unit 304, and a route calculation unit 305 as functional configurations.
  • the estimation unit 302, the SOC calculation unit 303, the element extraction unit 304, and the route calculation unit 305 are realized, for example, by the CPU 31 reading a program from the ROM 32 and executing the program.
  • the communication unit 301 is realized by, for example, a communication circuit 34 under the control of a CPU 31 that executes a program.
  • the communication unit 301 acquires various information from the delivery information storage unit 4, the delivery area information storage unit 5, and the vehicle performance information storage unit 6 of the database 8 and delivers them to the estimation unit 302 and the element extraction unit 304. Further, the communication unit 301 transmits the delivery plan generated by the delivery planning device 3 to the delivery plan output terminal 2.
  • the estimation unit 302 estimates the amount of electric power consumed by the electric vehicle by the delivery business, for example, based on the delivery information stored in the delivery information storage unit 4. Among various information included in the delivery information, the estimation unit 302 may estimate the power consumption of the electric vehicle based on, for example, the delivery distance, the required time, the delivery weight, the stop time, and the like.
  • the estimation unit 302 takes into consideration factors that affect the power consumption of, for example, the auxiliary engine, the temperature control equipment, and the drive system. Factors that affect the power consumption of the auxiliary engine, temperature control equipment, and drive system include, for example, the contents shown in FIG. 5 above. At this time, the estimation unit 302 may add factors for one of the auxiliary engine, the temperature control equipment, and the drive system, or may add factors for two or all of them.
  • the SOC calculation unit 303 is a state of charge (SOC: State Of) when the battery mounted on the electric vehicle is charged so that the electric vehicle can secure the required electric power based on the power consumption estimated by the estimation unit 302. Charge) is calculated.
  • SOC State Of
  • SOC is the percentage of the remaining capacity (Ah) to the full charge capacity (Ah). It is said that it is ideal for the battery to be used in the vicinity of the median SOC value of 50%, and the progress of deterioration can be suppressed.
  • the element extraction unit 304 extracts elements that increase the power consumption of the electric vehicle from, for example, the delivery information stored in the delivery information storage unit 4 and the delivery area information stored in the delivery area information storage unit 5.
  • Factors that increase power consumption that can be extracted from delivery information include, for example, that the total weight of packages delivered to one delivery destination is small, and that the delivery destination is far from the delivery base.
  • Factors that increase power consumption that can be extracted from the delivery area information include, for example, a large height difference due to a steep roadway slope or a terrain with many mountain slopes, and a large number of traffic lights within a predetermined section. , And the degree of congestion during the delivery time zone is high.
  • the element extraction unit 304 extracts an element that reduces the power consumption of the electric vehicle from, for example, the delivery information stored in the delivery information storage unit 4 and the delivery area information stored in the delivery area information storage unit 5. good.
  • the power consumption reduction factors that can be extracted from the delivery information are, for example, that the total weight of the package delivered to one delivery destination is large, and that the delivery destination is close to the delivery base.
  • the power consumption reduction factors that can be extracted from the delivery area information include, for example, a small height difference due to flat terrain, a small number of traffic lights in a predetermined section, and a degree of congestion during the delivery time zone. It is low and so on.
  • the element extraction unit 304 may extract elements that increase or decrease the power consumption of the electric vehicle from the vehicle performance information including information such as the vehicle body weight and energy efficiency of the electric vehicle.
  • the vehicle performance information including information such as the vehicle body weight and energy efficiency of the electric vehicle.
  • the set temperature of the refrigerating equipment such as a refrigerator or a refrigerator provided in the electric vehicle is low.
  • the body weight of the electric vehicle is light.
  • the route calculation unit 305 as a route determination unit, for example, starts from a delivery base, connects a plurality of delivery destinations, and calculates a route returning to the delivery base. At this time, the route calculation unit 305 calculates the route so that the power consumption increasing element is included in the earlier stage of delivery based on the extraction result of the element extraction unit 304. Further, the route calculation unit 305 may calculate the route so that the power consumption reducing element is included in the final stage of delivery.
  • the earlier stage of delivery is, for example, the earlier time of the time required for delivery, that is, the time close to the departure time.
  • the earlier stage of delivery is, for example, a point within the delivery distance where the mileage is shorter, that is, a point closer to the delivery base which is the starting point.
  • the final stage of delivery is, for example, the time when more time has passed, that is, the time close to the return time, among the time required for delivery.
  • the final stage of delivery is, for example, a point within the delivery distance that has a longer mileage, that is, a point closer to the delivery base that is the landing point.
  • the route calculation unit 305 comprehensively determines these and calculates a route by selecting one or a plurality of elements to be adopted or prioritized among the power consumption increasing elements. Further, the route calculation unit 305 may calculate the route by selecting one or a plurality of elements to be adopted or prioritized among the power consumption reduction elements.
  • the route calculation unit 305 selects the power consumption increase factor and the power consumption reduction factor so that the reduction rate of the power consumption increases at an earlier stage of delivery.
  • the delivery route is calculated together with the movement order to a plurality of delivery destinations so that the rate of decrease in power consumption increases at an earlier stage of delivery.
  • the electric vehicle can be equipped with the delivery destination.
  • the weight of the cargo to be loaded is maintained for a long time or a long distance, and the rate of decrease in electric energy increases at an earlier stage of delivery.
  • a section with a large height difference, a section with many traffic lights, a section with a high degree of congestion, etc. passes toward the beginning, and a section with a small height difference, a section with few traffic lights, a section with a low degree of congestion, etc.
  • the route calculation unit 305 may calculate the above route on the premise that the priorities are satisfied.
  • the route calculation unit 305 may perform the above processing when the SOC calculated by the SOC calculation unit 303 is equal to or higher than a predetermined value.
  • the predetermined value of SOC can be, for example, about 80%.
  • the route calculation unit 305 calculates the route so as to be an efficient delivery route regardless of the extraction result of the element extraction unit 304. You may.
  • An efficient delivery route is, for example, a route in which at least one of the delivery distance and the required time is as short as possible.
  • the route calculation unit 305 generates a delivery plan including the route calculated as described above, and transmits the delivery plan to the delivery plan output terminal 2 via the communication unit 301.
  • the delivery plan output terminal 2 is configured as an information terminal such as a computer equipped with a CPU, ROM, RAM, and an output device, for example.
  • the delivery plan output terminal 2 may include another processor such as an ASIC, FPGA, GPU (Graphics Processing Unit) instead of the CPU.
  • the delivery plan output terminal 2 outputs the delivery plan received from the delivery plan device 3 from the output device.
  • FIG. 8 shows an output example of the delivery plan when the output device of the delivery plan output terminal 2 is a display or the like.
  • FIG. 8 is a diagram showing an example of a delivery plan display screen in the delivery plan output terminal 2 according to the embodiment. In the example of FIG. 8, the route information included in the delivery plan is displayed.
  • the route information displayed on the display 21 of the delivery plan output terminal 2 indicates, for example, the delivery base DP and the arrangement of the plurality of delivery destinations A to E on the map. Further, the route information indicates, for example, a delivery base DP and a route connecting a plurality of delivery destinations A to E. From this, the delivery order to a plurality of delivery destinations A to E can be known.
  • the route information may include, for example, a plurality of delivery destinations A to E selection buttons for displaying delivery destination information.
  • delivery destination information for example, there are various types of information included in the delivery information shown in FIG. 2 above.
  • the user or the like who has received the delivery plan can display the detailed information or the like of the selected delivery destination on the display 21 by pressing the selection button of the delivery destination.
  • These display contents may be generated by the delivery planning device 3, or may be generated by the delivery plan output terminal 2 based on the data or the like received from the delivery planning device 3.
  • the traveling position of the electric vehicle on the route calculated by the delivery plan device 3 is added to or instead of the above display.
  • the driver may be guided by voice or the like.
  • the delivery plan output terminal 2 is a personal computer or the like of a delivery company
  • these route information can be printed out from a printer connected to the delivery plan output terminal 2 in addition to or instead of the above display. It may be.
  • FIG. 9 is a flow chart showing an example of the procedure of the route determination process by the delivery planning device 3 according to the embodiment.
  • the estimation unit 302 of the delivery planning device 3 estimates the amount of electric power consumed by the electric vehicle in the delivery based on the delivery information stored in the delivery information storage unit 4, for example (step S101). ).
  • the estimation unit 302 stores, for example, the delivery information stored in the delivery information storage unit 4, the delivery area information stored in the delivery area information storage unit 5, and the vehicle performance information stored in the vehicle performance information storage unit 6. With appropriate reference, factors that affect power consumption in at least one of the auxiliary engine, temperature control equipment, and drive system are taken into consideration.
  • the SOC calculation unit 303 calculates the SOC required for delivery based on the power consumption of the electric vehicle estimated by the estimation unit 302 (step S102).
  • the route calculation unit 305 When the SOC calculated by the SOC calculation unit 303 is less than a predetermined value (step S103: No), the route calculation unit 305 has an efficiency optimized so that at least one of the delivery distance and the required time is as short as possible. Route is calculated (step S104).
  • the element extraction unit 304 may use, for example, the delivery information stored in the delivery information storage unit 4 and the delivery area information storage unit. A power consumption increasing factor is extracted from the delivery area information stored in 5 (step S105).
  • Factors that increase power consumption include, for example, a long distance to the delivery destination, a large weight of the delivery baggage to the delivery destination, a section with a large height difference, a section with many traffic lights, and a congested section. And so on.
  • the element extraction unit 304 may extract the power consumption reducing element.
  • the route calculation unit 305 calculates the order of movement to the delivery destination based on the extraction result by the element extraction unit 304 so that the rate of decrease in power consumption increases at an earlier stage of delivery (step S106).
  • the route calculation unit 305 refers to whether or not there is a priority based on the delivery information stored in the delivery information storage unit 4 (step S107). If there is no priority (step S107: No), the route calculation unit 305 ends the process.
  • step S107: Yes the route calculation unit 305 determines whether or not the movement order to the delivery destination calculated in the process of step S106 satisfies the priority (step S108). If the calculated movement order satisfies the priority (step S108: Yes), the route calculation unit 305 ends the process.
  • step S108 If the calculated movement order does not satisfy the priority (step S108: No), the route calculation unit 305 replaces the movement order to the delivery destination calculated in the process of step S106 to obtain a route that satisfies the priority. (Step S109).
  • the route calculation unit 305 may calculate the route based on the extraction result by the element extraction unit 304 on the premise that the priority is satisfied from the beginning. That is, the process of step S106 and the process of steps S107 to S109 may be performed in parallel.
  • a delivery plan or a transfer plan by an electric vehicle is created based on the restrictions on the movement of the electric vehicle. Further, based on the created plan, the power consumption of each of the electric vehicles is calculated, the charge amount is calculated from the power consumption amount and the remaining power amount, and the charge plan of the electric vehicle is created.
  • the amount of electric power required for delivery becomes close to the full charge capacity, and the battery may be forced to be used in a state where the SOC is high. As a result, there is a concern that the deterioration of the battery will progress.
  • the route is calculated so as to connect the delivery destinations based on the factors that increase the power consumption. As a result, it is possible to formulate an operation plan while extending the life of the battery.
  • the route is calculated so that the power consumption increasing factor is included in the earlier stage. This allows the SOC of the battery to be lowered at an earlier stage of delivery.
  • the route is calculated so that the element for increasing the power consumption is included in the earlier stage and the element for reducing the power consumption is included in the final stage. This makes it possible to more reliably lower the SOC of the battery at an earlier stage of delivery.
  • the order of movement to a plurality of delivery destinations is calculated so that the rate of decrease in power consumption increases at an earlier stage.
  • the time during which the battery is used in a high SOC state can be shortened as much as possible, and deterioration of the battery is suppressed.
  • the power consumption of the electric vehicle by the route is estimated based on the factors affecting the power consumption in at least one of the auxiliary engine of the electric vehicle, the temperature control equipment, and the drive system. do.
  • the accuracy of estimating the power consumption is improved, for example, it is possible to suppress excessive charging of the battery, and it is possible to extend the life of the battery.
  • the delivery planning device 3 of the embodiment when charging is performed based on the estimated power consumption, when the SOC of the battery becomes a predetermined value or more, the reduction rate of the power consumption becomes large at an earlier stage. , Calculate the order of movement to multiple destinations. This allows, for example, a highly efficient route to be calculated and applied to the delivery plan in the case of less than a predetermined value of SOC where battery deterioration is not so significant, with a degree of freedom in generating the delivery plan and efficiency of the delivery plan. It can enhance sex.
  • the route calculation unit 305 calculates the route based on the extraction result by the element extraction unit 304.
  • the route calculation unit selects a route from among several routes prepared in advance so that the rate of decrease in power consumption increases at an earlier stage of delivery based on the extraction result by the element extraction unit. You may do it.
  • the delivery planning device 3 is a personal computer or the like of a service company, but the delivery planning device 3 may be a personal computer or the like owned by the delivery company. Further, the delivery planning device 3 may be mounted on an electric vehicle used by the delivery company for business. In this case, the function of the delivery planning device 3 may be incorporated in, for example, a navigation system of an electric vehicle. Further, the delivery planning device 3 may be a server device or the like placed on a network such as a cloud. In this case, the server device may be composed of one or a plurality of computers and the like.
  • the extraction result by the element extraction unit is partially reversed from the example described in the above-described embodiment. That is, for example, by including the fact that the total weight of the cargo collected from one collection destination is large as a factor for increasing the power consumption in the earlier stage of delivery, the cargo having a large total weight is loaded first and goes around the route. Therefore, it is possible to increase the rate of decrease in power consumption at an earlier stage of delivery.
  • a large number of people board at one boarding destination as a factor for increasing power consumption in the earlier stage of transportation, a large number of people can be boarded first and in the earlier stage of transportation.
  • the total weight can be increased, and the rate of decrease in power consumption can be increased.
  • Delivery planning system 1 Delivery planning system 2 Delivery plan output terminal 3 Delivery planning device 4 Delivery information storage 5 Delivery area information storage 6 Vehicle performance information storage 8 Database 9 Network 21 Display 31 CPU 32 ROM 33 RAM 34 Communication circuit 301 Communication unit 302 Estimating unit 303 SOC calculation unit 304 Element extraction unit 305 Route calculation unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Transportation (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Remote Sensing (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Traffic Control Systems (AREA)
  • Navigation (AREA)

Abstract

本開示にかかる経路決定装置は、荷物の集配または人の送迎に使用する電動移動体の集配または送迎の経路を決定する経路決定装置であって、電動移動体の集配または送迎における消費電力に関わる第1の情報、及び周囲の状況による電動移動体の消費電力に関わる第2の情報から、消費電力量を増大させる要素を抽出する要素抽出部と、要素抽出部が抽出した要素に基づいて、集配先または送迎先となる複数の目的地を結ぶ経路を決定する経路決定部と、を備える。

Description

経路決定装置、経路決定方法、及びプログラム
 本開示は、経路決定装置、経路決定方法、及びプログラムに関する。
 業務用の電動車両において、充電時間や充電拠点の位置を考慮した運行計画を策定する技術が知られている。電動車両に搭載されるバッテリは、充電率が高い状態で使用され続けると劣化が進行しやすい。そこで、実際に電動車両を運用するにあたっては、計画に沿った運行に必要な電力のみを充電する工夫がなされている。
特開2018-064413号公報
 本開示は、バッテリの長寿命化を図りつつ運行計画の策定を行うことが可能な経路決定装置、経路決定方法、及びプログラムを提供することを目的とする。
 本開示にかかる経路決定装置は、荷物の集配または人の送迎に使用する電動移動体の集配または送迎の経路を決定する経路決定装置であって、前記電動移動体の集配または送迎における消費電力に関わる第1の情報、及び周囲の状況による前記電動移動体の消費電力に関わる第2の情報から、消費電力量を増大させる要素を抽出する要素抽出部と、前記要素抽出部が抽出した前記要素に基づいて、集配先または送迎先となる複数の目的地を結ぶ前記経路を決定する経路決定部と、を備える。
図1は、実施形態にかかる配送計画システムの構成の一例を示す全体図である。 図2は、実施形態にかかる配送情報格納部に格納される配送情報の構成例を示す図である。 図3は、実施形態にかかる配送エリア情報格納部に格納される配送エリア情報の構成例を示す図である。 図4は、実施形態にかかる車両性能情報格納部に格納される車両性能情報の構成例を示す図である。 図5は、実施形態にかかる電動車両における消費電力に影響を与える要因を纏めた図である。 図6は、実施形態にかかる配送計画装置のハードウェア構成の一例を示すブロック図である。 図7は、実施形態にかかる配送計画装置の機能構成の一例を示すブロック図である。 図8は、実施形態にかかる配送計画出力端末における配送計画の表示画面の一例を示す図である。 図9は、実施形態にかかる配送計画装置による経路決定処理の手順の一例を示すフロー図である。
 以下、図面を参照しながら、本開示にかかる経路決定装置、経路決定方法、及びプログラムの実施形態について説明する。
 以下の実施形態では、本開示に係る技術が、例えば宅配便などの荷物の配送に適用される場合を例として説明する。ただし、本開示に係る技術は、荷物の集荷に適用されてもよく、荷物の配送と集荷とを共に行う集配に適用されてもよい。また、本開示に係る技術は、例えばライドシェア、乗り合いタクシー、乗り合いバスのように、荷物に限らず、人の送迎を行う場合にも適用することができる。
(配送計画システムの構成例)
 図1は、実施形態にかかる配送計画システム1の構成の一例を示す全体図である。図1に示すように、経路決定システムとしての配送計画システム1は、配送計画出力端末2、配送計画装置3、及びデータベース8を備える。
 配送計画出力端末2と配送計画装置3とは、例えばインターネット等のネットワーク9を介して有線または無線で接続されている。配送計画装置3は、データベース8にアクセス可能に構成される。
 経路決定装置としての配送計画装置3は、例えば、配送業務を行う配送会社に配送計画を提供するサービス会社のパソコン(PC:Personal Conputer)等である。配送計画装置3は、例えばデータベース8に保管された各種情報に基づいて配送計画を生成する。ただし、配送計画装置3が、集荷計画を生成する装置、または配送と集配とを含む集配計画を生成する装置として構成されていてもよい。
 配送計画出力端末2は、配送計画装置3が生成した配送計画を出力する。この場合、配送計画の出力方式としては、例えば配送計画出力端末2が備えるディスプレイ等への表示、配送計画出力端末2が備えるスピーカからの音声等による出力、及び配送計画出力端末2に接続されるプリンタ等によるプリントアウト等の少なくともいずれかであってよい。
 配送計画出力端末2は、例えば配送会社のパソコン、配送計画の対象となる電動車両等に搭載されたナビゲーションシステム、または、電動車両の運転者のスマートフォン等の携帯端末である。
 配送会社は、配送会社が所有する電動車両に、複数の配送先へ荷物を届ける配送業務を行わせる。ただし、上述のように、配送会社の業務内容に、例えば複数の集荷先から荷物を集荷する集荷業務が含まれていてもよい。
 電動移動体としての電動車両は、例えばバッテリ(電池)の電力を使用して駆動する電気自動車(EV:Electric Vehicle)、または、バッテリの電力と共に内燃機関等の動力を使用するハイブリッド車(HV:Hybrid Vehicle)等である。ただし、配送会社が、電動移動体としての電動モータバイクに配送業務を行わせてもよい。電動モータバイクは、動力の一部または全部を電力とするバイクである。
 配送会社は、サービス会社から配送計画の提供を受けるにあたり、配送計画の生成に必要な各種情報を提供する。配送会社から提供された各種情報は、データベース8の配送情報格納部4、配送エリア情報格納部5、及び車両性能情報格納部6に格納される。
 データベース8への各種情報の格納は、配送会社が直接データベース8にアクセスして行ってよい。または、配送会社が配送計画装置3に各種情報を送信し、配送計画装置3がデータベース8にアクセスして各種情報の格納を行ってもよい。
 データベース8は、例えば記憶装置が内蔵されたコンピュータ等である。ただし、データベース8は配送計画装置3と一体に構成されていてもよい。つまり、データベース8が配送計画装置3に内蔵される記憶装置であってもよい。
 配送情報格納部4には、第1の情報としての配送情報が格納される。配送情報には、配送先までの距離、荷物の個数および重量等の配送に関する情報が含まれる。これらの情報は、例えば電動車両の配送における消費電力に関わる。
 配送エリア情報格納部5には、第2の情報としての配送エリア情報が格納される。配送エリア情報には、配送エリアの地図情報、交通情報等の配送業務における周囲の状況に関する情報が含まれる。これらの情報は、例えば周囲の状況による電動車両の消費電力に関わる。
 車両性能情報格納部6には、第3の情報としての車両性能情報が格納される。車両性能情報には、電動車両の車体重量、エネルギ効率等の情報が含まれる。これらの情報は、例えば車両性能による電動車両の消費電力に関わる。
(データベースの情報構成例)
 次に、図2~図5を用いて、データベース8に格納される各種情報の構成例について説明する。
 図2は、実施形態にかかる配送情報格納部4に格納される配送情報の構成例を示す図である。図2に示すように、配送情報は、例えば配送の時間帯、配送距離、所要時間、配送先ごとの荷物の配送数および配送重量、配送先までの距離、配送先における停車時間、優先事項、並びに運転者情報を含む。
 複数の配送先A~E・・・は、それぞれが配送の目的地であり、複数に区画された配送エリアのうち例えば1つの配送エリア内に位置している。配送エリアは、例えば1回の配送業務で、その配送エリア内における全ての配送先を回ることを意図して区画されている。つまり、例えば1回の配送業務で、これらの配送先A~E・・・を回ることが予定されている。したがって、配送情報格納部4には、配送エリアごと、1回あたりの配送業務ごとに複数の配送情報が格納されていてよい。
 また、例えば、配送先Aに届けるのは荷物aの1個のみであり、配送重量は5kgである。また、配送先Cに届けるのは荷物c1~c2の3個であり、それらの配送重量は、それぞれ3kg、2kg、及び3kgであり、合計の配送重量が8kgであることが判る。
 配送先までの距離は、例えば出発地である配送拠点からの最短距離である。配送拠点は、配送会社によって例えば1つ、または複数の配送エリアごとに設けられている。電動車両は、これらの配送拠点で荷物を積載され、複数の配送先A~E・・・を回った後に配送拠点に戻る。例えば、配送拠点から配送先Bまでの最短距離は30kmであり、複数の配送先A~E・・・のうち、配送先Bが配送拠点から最も遠い配送先であることが判る。
 配送先における停車時間は、荷物の配送個数および配送重量、並びに配送先の状況等から予測した、その配送先での配送に要する時間である。配送先の状況には、例えば一戸建てであるか、アパートまたはマンション等であるか、並びに宅配ボックスの有無および設置階等の情報を含む。
 優先事項には、配達の時間が指定されているなど優先すべき事項が入力されている。例えば、配送先Dの荷物dは午前10時に届けなければならないことが判る。
 運転者情報には、その配送エリアを担当する運転者に関する情報であって、例えば運転者の運転技術の巧拙等の情報が入力されている。運転技術の巧拙は、例えばアクセル操作、ブレーキ操作、及びこれらを総合的に判断したランクで示される。
 配送情報の欄外に入力される時間帯は、その配送業務を行う時間帯を示す。同じく欄外に入力される配送距離は、例えば配送先A~E・・・への配送において走行することとなる総走行距離である。配送距離は、例えば1回の配送業務で配送先A~E・・・を回る場合の標準的な距離であってもよく、これらの配送先A~E・・・を含む経路の最短距離、最長距離、または、最短距離と最長距離との平均距離等であってもよい。所要時間は、例えば上記のように割り出された配送距離を走行するのに要する予測時間と、各配送先での停車時間との合計時間である。
 配送情報に含まれる上記の各種情報は、例えば電動車両の配送における消費電力に影響を与える。
 例えば、配送の対象、つまり客体である荷物の個数が多く、積載重量が増加するほど消費電力量は増大する。電動車両が人の送迎業務を行う場合も同様に、送迎の対象、つまり、客体である人の人数が多く、乗車重量が増加するほど消費電力量は増大する。
 また、配送先までの距離および配送距離等に依存する電動車両の走行距離が長くなるほど消費電力量は増大する。また、配送の所要時間が長くなるほど消費電力量は増大する。また、運転者の運転技術の巧拙に関わる急加速および急ブレーキ等が多用されるほど、消費電力量を増大させる。
 図3は、実施形態にかかる配送エリア情報格納部5に格納される配送エリア情報の構成例を示す図である。
 図3に示すように、配送エリア情報は、例えば配送エリアの地図情報、交通情報、及び環境情報を含む。配送エリア情報格納部5には、配送エリアごとに複数の配送エリア情報が格納されていてよい。上記の地図情報、交通情報、及び環境情報からは、更に種々の情報を抽出することが可能である。
 例えば、地図情報からは、配送エリア内における高低差、並びに信号機の設置位置および数等の情報を抽出可能である。配送エリア内の高低差は、例えば地図情報に含まれる配送エリア内の各地点における標高、または配送エリア内の車道の勾配等から算出可能であってもよい。
 また、交通情報は、例えば配送エリア内の各地点における時間帯ごとの混雑度の情報等を含む。また、交通情報は適宜更新されることにより、リアルタイムの渋滞情報および事故情報等を含んでいてもよい。したがって、例えば、交通情報からは、時間帯ごと、または今現在の交通状況に基づいて、所定区間において予測される電動車両の車速、及び所定区間を通過するのに要する時間等を抽出可能である。
 また、環境情報は、例えば配送エリアを含む地域の天気予報等の情報を含む。環境情報は、日ごと、または週ごとに更新されて、より新しい情報を含むよう維持される。したがって、例えば、環境情報からは、地域の天気予報から予測される配送エリアの天候、気温、及び風速等の情報を抽出可能である。
 このように、地図情報、交通情報、及び環境情報から抽出される各種情報は、例えば配送エリア内を走行中の電動車両の消費電力に影響を与える。
 例えば、走行路の高低差が大きいほど消費電力量は増大する。また、信号機が多く、停止を繰り返すほど消費電力量は増大する。また、渋滞に巻き込まれて車速が落ち、また、所定区間を通過するまで長時間を要するほど消費電力は増す。混雑度は、そのときの天候等によっても変化しうるので、環境情報も電動車両の消費電力に影響を与える。
 図4は、実施形態にかかる車両性能情報格納部6に格納される車両性能情報の構成例を示す図である。
 図4に示すように、車両性能情報は、例えば車体重量、車速、エネルギ効率、及び設定温度等を含む。車両性能情報格納部6には、配送会社が所有する電動車両ごとに複数の車両性能情報が格納されていてよい。
 車体重量は、積載される荷物等を含まない電動車両の正味の重量である。車速は、その電動車両が有する性能等から割り出される標準的な車速等である。車速は、電動車両の性能のみならず、上述の配送エリア内において出し得る標準的な車速にも基づいて算出されてもよい。
 また、エネルギ効率は、電動車両におけるエネルギの動力への変換効率である。エネルギ効率は、電動車両の性能のみならず、上述の配送エリア内における交通状況等にも基づいて算出されてもよい。なお、電気自動車等のエネルギ効率は、化石燃料等の電力への変換効率を考慮に入れても35%程度とされる。
 設定温度は、例えば配送業務を行う電動車両が冷蔵機または冷凍機等の保冷設備を備える場合の保冷設備の設定温度である。
 車両性能情報に含まれる上記の各種情報は、例えば電動車両の消費電力に影響を与える。
 例えば、車体重量が大きい電動車両ほど消費電力量が大きい。また、エネルギ効率が低いほど消費電力量が増大する。また、保冷設備の設定温度が低いほど消費電力量は増大する。
 なお、ここで、電動車両における消費電力に影響を与えうる要因を別の観点から図5に纏める。図5は、実施形態にかかる電動車両における消費電力に影響を与える要因を纏めた図である。
 図5に示すように、電動車両の消費電力に影響する要因を考慮するうえで、例えば補助機関、温調装備、及び駆動系等について検討することが望ましい。
 補助機関には、例えばセルモータ、オルタネータ、及びラジエータ等が含まれる。補助機関による消費電力量は、例えば配送時間帯、走行時間、及び天候等により影響される。上述したように、配送時間帯によっては渋滞に巻き込まれる可能性があり、それにより補助機関による消費電力量も増大する。また、夜間であればライトの点灯により、また、雨天であればワイパの駆動等により消費電力量が増大しうる。また、これらの要因の中には、例えば雨の日の朝の時間帯の混雑度が高まる等、互いに影響し合うものもある。
 配送時間帯の情報は上述の配送情報から取得可能であり、走行時間は例えば上述の配送情報に含まれる所要時間と停車時間とから算出できる。天候の情報は上述の配送エリア情報から取得可能である。
 温調装備には、例えば社内空調用のエアコン、バッテリの温度制御に関わる電池温調、及び冷蔵機または冷凍機等が含まれる。エアコン及び電池温調による消費電力量は、例えば走行時間および気温等により影響される。冷蔵機または冷凍機等による消費電力量は、例えば停車時間および設定温度等により影響される。
 走行時間の情報は上述の配送情報から算出でき、停車時間の情報は上述の配送情報から取得可能である。気温の情報は上述の配送エリア情報から取得可能であり、設定温度の情報は上述の車両性能情報から取得可能である。
 駆動系には、例えばバッテリ、モータ、及びインバータ等が含まれる。駆動系による消費電力量は、例えば配送重量、配送距離、配送の時間帯、地図情報に含まれる高低差および信号機数、交通情報、車体重量、車速、並びにエネルギ効率等により影響される。この他、駆動系による消費電力量に影響を与える要因として、運転者による運転技術等を含めてもよい。
 配送重量、配送距離、及び運転技術は上述の配送情報から、地図情報および交通情報は上述の配送エリア情報から、車体重量、車速、及びエネルギ効率は上述の車両性能情報から、それぞれ取得可能である。
(配送計画装置の構成例)
 次に、図6及び図7を用いて、実施形態の配送計画装置3の構成例について説明する。図6は、実施形態にかかる配送計画装置3のハードウェア構成の一例を示すブロック図である。
 図6に示すように、配送計画装置3は、CPU(Central Processing Unit)31、ROM(Read Only Memory)32、RAM(Random Access Memory)33、及び通信回路34を備えるコンピュータ等の情報端末として構成される。CPU31、ROM32、RAM33、及び通信回路34は、例えば内部バスを介して通信可能に構成される。
 CPU31は、配送計画装置3の全体を制御する。ROM32は、例えば配送計画を生成するためのプログラム等のCPU31の動作に使用する各種プログラムを記憶する。RAM33は、CPU31により作業中のデータを一時的に記憶する。CPU31が、例えばROM32に格納される配送計画を生成するためのプログラムをRAMに展開して実行することで、配送計画装置3の配送計画生成機能等が実現される。
 なお、上記のプログラムは、例えばコンピュータでの読み取りが可能なように記録媒体等に格納されて提供されることができる。記録媒体は、例えば磁気ディスク、光ディスク、光磁気ディスク、フラッシュメモリ等である。あるいは、上記のプログラムは、ネットワーク9に置かれたサーバ等からダウンロード可能であってもよい。
 ただし、配送計画装置3が、CPU31の代わりに、ASIC(Applicatiton Specific Integrated Circuit)、FPGA(Field Programmable Gate Array)等の他のプロセッサを備えていてもよい。
 通信回路34は、例えば配送計画出力端末2およびデータベース8等の配送計画装置3の外部機器と通信するための回路である。通信回路34は、例えば有線通信用の通信回路、無線通信用の通信回路及びこれらの組合せ等である。無線通信用の通信回路としては、3G、4G、Wi-Fi(登録商標)やBluetooth(登録商標)等の各種の規格に対応した通信回路が利用可能である。
 なお、配送計画装置3は、上記構成に加えて、ディスプレイ等の出力装置、及びキーボード、マウス、ディスプレイと一体に構成されたタッチパネル等の入力装置等を備えていてもよい。
 図7は、実施形態にかかる配送計画装置3の機能構成の一例を示すブロック図である。
 図7に示すように、配送計画装置3は、機能構成として、例えば通信部301、推定部302、SOC算出部303、要素抽出部304、及び経路算出部305を備える。推定部302、SOC算出部303、要素抽出部304、及び経路算出部305は、例えばCPU31がROM32からプログラムを読み出して実行することにより実現される。通信部301は、例えばプログラムを実行するCPU31の制御下にある通信回路34により実現される。
 通信部301は、データベース8の配送情報格納部4、配送エリア情報格納部5、及び車両性能情報格納部6から各種情報を取得し、推定部302及び要素抽出部304へと受け渡す。また、通信部301は、配送計画装置3が生成した配送計画を配送計画出力端末2へと送信する。
 推定部302は、例えば配送情報格納部4に格納される配送情報に基づいて、その配送業務によって電動車両が消費することとなる電力量を推定する。推定部302は、配送情報に含まれる各種情報のうち、例えば配送距離、所要時間、配送重量、及び停車時間等に基づいて電動車両の消費電力量を推定してよい。
 また、推定部302は、電動車両の消費電力量を推定する場合に、例えば補助機関、温調装備、及び駆動系における消費電力に影響を与える要因を加味する。補助機関、温調装備、及び駆動系における消費電力に影響を与える要因としては、例えば上述の図5に示した内容が挙げられる。このとき、推定部302は、補助機関、温調装備、及び駆動系のうちの1つについての要因を加味してもよく、2つ、または、全部についての要因を加味してもよい。
 SOC算出部303は、推定部302により推定された消費電力量に基づいて、電動車両が必要な電力を確保できるよう、電動車両に搭載されるバッテリを充電した場合の充電状態(SOC:State Of Charge)を算出する。
 SOCは、満充電容量(Ah)に対して残容量(Ah)が占める割合のパーセンテージである。SOCの値が中央値である50%付近で使用されることが、バッテリの使用状態として理想的であり、劣化の進行を抑制できるとされる。
 要素抽出部304は、例えば配送情報格納部4に格納される配送情報、及び配送エリア情報格納部5に格納される配送エリア情報から、電動車両の消費電力量を増大させる要素を抽出する。
 配送情報から抽出され得る消費電力量増大要素としては、例えば1つの配送先に配送される荷物の総重量が小さいこと、及び配送先が配送拠点から遠いこと等である。
 配送エリア情報から抽出され得る消費電力量増大要素としては、例えば車道の勾配が急であったり山坂が多い地形であったりすることで高低差が大きいこと、所定区間内における信号機の数が多いこと、及び配送の時間帯における混雑度が高いこと等である。
 要素抽出部304は、例えば配送情報格納部4に格納される配送情報、及び配送エリア情報格納部5に格納される配送エリア情報から、電動車両の消費電力量を低減させる要素を抽出してもよい。
 配送情報から抽出され得る消費電力量低減要素としては、例えば1つの配送先に配送される荷物の総重量が大きいこと、及び配送先が配送拠点から近いこと等である。
 配送エリア情報から抽出され得る消費電力量低減要素としては、例えば平坦な地形であることなどから高低差が小さいこと、所定区間内における信号機の数が少ないこと、及び配送の時間帯における混雑度が低いこと等である。
 なお、要素抽出部304は、例えば電動車両の車体重量、エネルギ効率等の情報を含む車両性能情報から、電動車両の消費電力量を増大または低減させる要素を抽出してもよい。車両性能情報から抽出され得る消費電力量増大要素としては、例えば電動車両が備える冷蔵機または冷凍機等の保冷設備の設定温度が低いこと等である。車両性能情報から抽出され得る消費電力量低減要素としては、例えば電動車両の車体重量が軽いこと等である。
 経路決定部としての経路算出部305は、例えば配送拠点から出発して、複数の配送先を結び、配送拠点へと戻る経路を算出する。このとき、経路算出部305は、要素抽出部304の抽出結果に基づいて、配送のより早期の段階に消費電力量増大要素が含まれるように経路を算出する。また、経路算出部305は、配送のより終期の段階に消費電力量低減要素が含まれるように経路を算出してもよい。
 配送のより早期の段階とは、例えば配送の所要時間のうち、より早い時間、つまり、出発時刻に近い時刻のことである。または、配送のより早期の段階とは、例えば配送距離のうち、より走行距離の短い地点、つまり、出発地点である配送拠点に近い地点のことである。
 また、配送のより終期の段階とは、例えば配送の所要時間のうち、より時間が経過した時点、つまり、帰着時刻に近い時刻のことである。または、配送のより終期の段階とは、例えば配送距離のうち、より走行距離の長い地点、つまり、着着地点である配送拠点に近い地点のことである。
 経路算出部305は、これらを総合的に判定して、消費電力量増大要素のうち、採用すべき要素または優先すべき要素を1つまたは複数選択して経路を算出する。また、経路算出部305は、消費電力量低減要素のうち、採用すべき要素または優先すべき要素を1つまたは複数選択して経路を算出してもよい。
 このとき、経路算出部305は、配送のより早期の段階に消費電力量の減少速度が大きくなるように、消費電力量増大要素および消費電力量低減要素を取捨選択する。これにより、配送のより早期の段階に消費電力量の減少速度が大きくなるように、複数の配送先への移動順序と共に配送の経路が算出される。
 つまり、例えば配送される荷物の総重量が小さい配送先を配送経路の始めの方に組み込み、配送される荷物の総重量が大きい配送先を配送経路の後の方に組み込むことで、電動車両に積載される荷物の重量が大きいまま長時間あるいは長距離維持されて、配送のより早期の段階に消費電力量の減少速度が大きくなる。
 また例えば、配送拠点から遠い配送先を配送経路の始めの方に組み込み、配送拠点から近い配送先を配送経路の後の方に組み込むことで、配送のより早期の段階に長距離を走行することとなり、消費電力量の減少速度が大きくなる。
 また例えば、高低差が大きい区間、信号機が多い区間、混雑度が高い区間等を始めの方に通り、高低差が小さい区間、信号機が少ない区間、混雑度が低い区間等を後の方に通る経路となるよう、複数の配送先への移動順序を算出することで、配送のより早期の段階に消費電力量の減少速度が大きくなる。
 なお、経路算出部305は、配送情報に時間指定等の優先事項が含まれる場合には、優先事項を満たすことを前提に上記の経路を算出してもよい。
 また、経路算出部305は、SOC算出部303によって算出されたSOCが所定値以上であった場合に、上記の処理を行うこととしてもよい。SOCの所定値は例えば80%程度とすることができる。この場合、経路算出部305は、SOC算出部303によるSOCが所定値未満であった場合には、要素抽出部304の抽出結果には依らず、効率的な配送経路となるよう経路を算出してもよい。効率的な配送経路とは、例えば配送距離および所要時間の少なくともいずれかが極力短くなるような経路である。
 経路算出部305は、以上のように算出した経路を含む配送計画を生成し、通信部301を介して配送計画出力端末2へと送信する。
(配送計画出力端末の構成例)
 次に、配送計画出力端末2の構成例について説明する。
 配送計画出力端末2は、例えばCPU、ROM、RAM、及び出力装置を備えるコンピュータ等の情報端末として構成される。ただし、配送計画出力端末2は、CPUの代わりに、ASIC、FPGA、GPU(Graphics Processing Unit)等の他のプロセッサを備えていてもよい。
 配送計画出力端末2は、配送計画装置3から受信した配送計画を出力装置から出力する。図8に、配送計画出力端末2の出力装置がディスプレイ等であった場合の配送計画の出力例を示す。
 図8は、実施形態にかかる配送計画出力端末2における配送計画の表示画面の一例を示す図である。図8の例では、配送計画に含まれる経路情報が表示されている。
 図8に示すように、配送計画出力端末2のディスプレイ21に表示される経路情報には、例えば配送拠点DP、及び複数の配送先A~Eの地図上における配置が示される。また、経路情報には、例えば配送拠点DP、及び複数の配送先A~Eを結ぶ経路が示される。これにより、複数の配送先A~Eへの配送順が判る。
 また、経路情報には、例えば配送先情報を表示させるための複数の配送先A~Eの選択ボタン等が示されてもよい。配送先情報としては、例えば上述の図2に示した配送情報に含まれる各種情報がある。配送計画の提供を受けた利用者等は、配送先の選択ボタンを押下することで、選択した配送先の詳細情報等をディスプレイ21に表示させることができる。
 これらの表示内容は、配送計画装置3によって生成されてもよく、または、配送計画装置3から受信したデータ等に基づいて、配送計画出力端末2が生成してもよい。
 なお、配送計画出力端末2が、電動車両に搭載されるナビゲーションシステム等である場合には、上記表示に加えて、あるいは代えて、配送計画装置3が算出した経路上の電動車両の走行位置の移動に伴って、運転者に対して音声による案内等を行ってもよい。
 また、配送計画出力端末2が、配送会社のパソコン等である場合には、上記表示に加えて、あるいは代えて、配送計画出力端末2に接続されたプリンタから、これらの経路情報がプリントアウト可能であってもよい。
(配送計画装置の経路決定処理の例)
 次に、図9を用いて、実施形態の配送計画装置3による経路決定処理の例について説明する。図9は、実施形態にかかる配送計画装置3による経路決定処理の手順の一例を示すフロー図である。
 図9に示すように、配送計画装置3の推定部302は、例えば配送情報格納部4に格納される配送情報に基づいて、その配送において電動車両で消費される電力量を推定する(ステップS101)。
 このとき、推定部302は、例えば配送情報格納部4に格納される配送情報、配送エリア情報格納部5に格納される配送エリア情報、及び車両性能情報格納部6に格納される車両性能情報を適宜参照しつつ、補助機関、温調装備、及び駆動系の少なくともいずれかにおける消費電力に影響を与える要因を加味する。
 SOC算出部303は、推定部302により推定された電動車両の消費電力量に基づいて、その配送に必要なSOCを算出する(ステップS102)。
 SOC算出部303が算出したSOCが所定値未満であった場合には(ステップS103:No)、経路算出部305は、配送距離および所要時間の少なくともいずれかが極力短くなるよう適正化された効率的な経路を算出する(ステップS104)。
 SOC算出部303が算出したSOCが所定値以上であった場合には(ステップS103:Yes)、要素抽出部304は、例えば配送情報格納部4に格納される配送情報、及び配送エリア情報格納部5に格納される配送エリア情報から、消費電力量増大要素を抽出する(ステップS105)。
 消費電力量増大要素としては、例えば配送先までの距離が遠いこと、配送先への配送荷物の重量が大きいこと、高低差の大きい区間であること、信号機が多い区間であること、及び渋滞区間であること等である。
 なお、このとき、要素抽出部304は消費電力量低減要素を抽出してもよい。
 経路算出部305は、要素抽出部304による抽出結果に基づいて、配送のより早期の段階に消費電力量の減少速度が大きくなるよう、配送先への移動順序を算出する(ステップS106)。
 経路算出部305は、配送情報格納部4に格納される配送情報に基づいて、優先事項があるかどうかを参照する(ステップS107)。優先事項がなければ(ステップS107:No)、経路算出部305は処理を終了する。
 優先事項があれば(ステップS107:Yes)、経路算出部305は、ステップS106の処理で算出した配送先への移動順序が優先事項を満たしているか否かを判定する(ステップS108)。算出した移動順序が優先事項を満たしていれば(ステップS108:Yes)、経路算出部305は処理を終了する。
 算出した移動順序が優先事項を満たしていなければ(ステップS108:No)、経路算出部305は、ステップS106の処理で算出した配送先への移動順序の入れ替えを行って、優先事項を満たす経路となるよう修正する(ステップS109)。
 以上により、実施形態の配送計画装置3による経路決定処理が終了する。
 なお、経路算出部305は、当初より優先事項を満たすことを前提としつつ、要素抽出部304による抽出結果に基づく経路の算出を行ってもよい。すなわち、ステップS106の処理と、ステップS107~S109の処理とが並行して行われてもよい。
(概括)
 電動車両等に搭載されるバッテリは、一般的にSOCが高い状態で使われ続けると劣化が加速する。このため、例えば策定した配送計画等にしたがって電動車両で配送業務等を行うにあたっては、配送計画による配送を行うのに必要な電力のみを充電するなどの方策が採られることがある。これにより、SOCが高い状態での使用を極力避けて、バッテリの長寿命化を図ることができる。
 例えば、上述の特許文献1の技術では、電動車両の移動に関する制約に基づき、電動車両による配送計画または送迎計画を作成する。また、作成した計画に基づいて、電動車両のそれぞれについて消費電力量を算出し、消費電力量と残電力量とから充電量を算出して、電動車両の充電計画を作成する。
 しかしながら、配送計画によっては、長距離を走行して配送を行わなければならないこともある。この場合、配送に必要な電力量が満充電容量に近くなってしまい、SOCが高い状態でのバッテリの使用を余儀なくされる場合がある。これにより、バッテリの劣化が進行してしまう懸念がある。
 実施形態の配送計画装置3によれば、消費電力量を増大させる要素に基づいて、配送先を結ぶように経路を算出する。これにより、バッテリの長寿命化を図りつつ運行計画の策定を行うことができる。
 実施形態の配送計画装置3によれば、より早期の段階に消費電力量増大要素が含まれるように経路を算出する。これにより、配送のより早期の段階でバッテリのSOCを下げることができる。
 実施形態の配送計画装置3によれば、より早期の段階に消費電力量を増大させる要素が含まれ、より終期の段階に消費電力量を低減させる要素が含まれるように経路を算出する。これにより、配送のより早期の段階で、より確実にバッテリのSOCを下げることができる。
 実施形態の配送計画装置3によれば、より早期の段階に消費電力量の減少速度が大きくなるように、複数の配送先への移動順序を算出する。これにより、SOCが高い状態でバッテリが使用される時間を極力短くすることができ、バッテリの劣化が抑制される。
 実施形態の配送計画装置3によれば、電動車両の補助機関、温調装備、及び駆動系の少なくともいずれかにおける消費電力に影響を与える要因に基づいて、経路による電動車両の消費電力量を推定する。これにより、消費電力量の推定精度が高まり、例えばバッテリを過剰に充電してしまうことを抑制でき、バッテリの長寿命化を図ることができる。
 実施形態の配送計画装置3によれば、推定された消費電力量に基づき充電すると、バッテリのSOCが所定値以上となる場合に、より早期の段階に消費電力量の減少速度が大きくなるように、複数の移動先への移動順序を算出する。これにより、バッテリの劣化がそれほど顕著ではない所定値未満のSOCの場合に、例えば高効率の経路を算出して配送計画に適用することができ、配送計画の生成における自由度および配送計画の効率性を高めることができる。
 なお、上述の実施形態では、経路算出部305は、要素抽出部304による抽出結果に基づいて経路を算出することとした。しかし、複数の配送先を漏れなく結ぶ妥当な経路は、そう多くはないかもしれない。そこで、経路算出部が、予め用意された幾つかの経路の中から、要素抽出部による抽出結果に基づいて、配送のより早期の段階に消費電力量の減少速度が大きくなるような経路を選択することとしてもよい。
 また、上述の実施形態では、配送計画装置3はサービス会社のパソコン等であるとしたが、配送計画装置3が配送会社所有のパソコン等であってもよい。また、配送計画装置3が、配送会社が業務に用いる電動車両に搭載されていてもよい。この場合、配送計画装置3の機能が、例えば電動車両のナビゲーションシステム等に組み込まれていてもよい。また、配送計画装置3が、クラウド等のネットワーク上に置かれたサーバ装置等であってもよい。この場合、サーバ装置は、1つ、または複数のコンピュータ等から構成されていてよい。
 また、上述の実施形態では、主に荷物の配送に関わる場合について説明した。しかし、冒頭に述べたように、荷物の集荷、荷物の配送と集荷とを共に行う集配、及び人の送迎においても本技術を適用することができる。
 ここで、荷物の集荷経路を算出する場合には、要素抽出部による抽出結果は上述の実施形態で説明した例とは一部が反転した結果となることに留意されたい。すなわち、例えば1つの集荷先から集荷される荷物の総重量が大きいことを消費電力量増大要素として配送のより早期の段階に含めることで、総重量が大きい荷物を先に積載して経路を回ることとなり、配送のより早期の段階に消費電力量の減少速度が大きくなるようにすることができる。
 また、人の送迎経路を算出する場合も上記と同様に考えることができる。
 すなわち、例えば1つの乗車先で乗車してくる人数が多いことを消費電力増大要素として送迎のより早期の段階に含めることで、多数の人を先に乗車させて、送迎のより早期の段階に総重量が大きい状態にすることができ、消費電力量の減少速度が大きくなるようにすることができる。
 また、1つの降車先で降車する人数が少ないことを消費電力増大要素として送迎のより早期の段階に含めることで、あまり多数の人が先に降車しないようにして、送迎のより早期の段階に総重量が大きい状態を維持することができ、消費電力量の減少速度が大きくなるようにすることができる。
 本開示のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これらの実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これらの実施形態およびその変形例は、発明の範囲および要旨に含まれると同様に、請求の範囲に記載された発明とその均等の範囲に含まれる。
1 配送計画システム
2 配送計画出力端末
3 配送計画装置
4 配送情報格納部
5 配送エリア情報格納部
6 車両性能情報格納部
8 データベース
9 ネットワーク
21 ディスプレイ
31 CPU
32 ROM
33 RAM
34 通信回路
301 通信部
302 推定部
303 SOC算出部
304 要素抽出部
305 経路算出部

Claims (13)

  1.  荷物の集配または人の送迎に使用する電動移動体の集配または送迎の経路を決定する経路決定装置であって、
     前記電動移動体の集配または送迎における消費電力に関わる第1の情報、及び周囲の状況による前記電動移動体の消費電力に関わる第2の情報から、消費電力量を増大させる要素を抽出する要素抽出部と、
     前記要素抽出部が抽出した前記要素に基づいて、集配先または送迎先となる複数の目的地を結ぶ前記経路を決定する経路決定部と、を備える、
    経路決定装置。
  2.  前記要素抽出部は、
     前記電動移動体の重量、速度、及びエネルギ効率の少なくともいずれかを含む前記電動移動体の性能による消費電力に関わる第3の情報から、前記消費電力量を増大させる前記要素を更に抽出する、
    請求項1に記載の経路決定装置。
  3.  前記経路決定部は、
     より早期の段階に前記要素が含まれるように前記経路を決定する、
    請求項1または請求項2に記載の経路決定装置。
  4.  前記要素抽出部は、
     前記第1の情報および前記第2の情報から、前記消費電力量を低減させる要素を抽出し、
     前記経路決定部は、
     より早期の段階に前記消費電力量を増大させる要素が含まれ、より終期の段階に前記消費電力量を低減させる要素が含まれるように前記経路を決定する、
    請求項1乃至請求項3のいずれか1項に記載の経路決定装置。
  5.  前記経路決定部は、
     より早期の段階に前記消費電力量の減少速度が大きくなるように、前記複数の目的地への移動順序を決定する、
    請求項1乃至請求項4のいずれか1項に記載の経路決定装置。
  6.  前記第1の情報は、
     集配または送迎の対象となる客体の数および重量、集配または送迎における距離、所要時間、及び停車時間、並びに集配または送迎を行う時間帯の少なくともいずれかを含み、
     前記第2の情報は、
     集配または送迎を行うときの天候および気温の少なくともいずれかを含む、
    請求項1乃至請求項5のいずれか1項に記載の経路決定装置。
  7.  前記電動移動体の補助機関、温調装備、及び駆動系の少なくともいずれかにおける消費電力に影響を与える要因に基づいて、前記経路による前記電動移動体の消費電力量を推定する推定部を備え、
     前記経路決定部は、
     推定された前記消費電力量に基づき前記電動移動体に搭載される電池を充電すると、前記電池の満充電容量に対する残容量の割合である充電状態が所定値以上となる場合に、より早期の段階に前記消費電力量の減少速度が大きくなるように、前記複数の目的地への移動順序を決定する、
    請求項6に記載の経路決定装置。
  8.  前記第2の情報は、
     前記経路を含む地図情報および前記経路における交通情報の少なくともいずれかを更に含み、
     前記推定部は、
     前記補助機関における消費電力を推定する場合には、前記第1の情報に含まれる前記時間帯、並びに前記第2の情報に含まれる前記天候および前記気温の少なくともいずれかを参照し、
     前記温調装備における消費電力を推定する場合には、前記第1の情報に含まれる前記距離および前記停車時間、前記第2の情報に含まれる前記気温、並びに温調装備の設定温度の少なくともいずれかを参照し、
     前記駆動系における消費電力を推定する場合には、前記第1の情報に含まれる前記重量、前記距離、及び前記時間帯、前記第2の情報に含まれる前記地図情報および前記交通情報、並びに前記電動移動体の性能の少なくともいずれかを参照する、
    請求項7に記載の経路決定装置。
  9.  前記地図情報は、前記経路に含まれる高低差および信号機の数の少なくともいずれかの情報を含み、
     前記交通情報は、前記経路における時間帯ごとの混雑度を含み、
     前記性能は、前記電動移動体の重量、速度、及びエネルギ効率の少なくともいずれかを含む、
    請求項8に記載の経路決定装置。
  10.  前記第1の情報は、
     前記電動移動体の運転者の情報および前記運転者の運転技術の情報を更に含み、
     前記推定部は、
     前記駆動系における消費電力を推定する場合には、参照候補の項目として前記運転技術も含める、
    請求項7または請求項8に記載の経路決定装置。
  11.  前記運転技術は、前記運転者によるアクセル操作およびブレーキ操作の少なくともいずれかを含む、
    請求項10に記載の経路決定装置。
  12.  荷物の集配または人の送迎に使用する電動移動体の集配または送迎の経路を決定する経路決定方法であって、
     前記電動移動体の集配または送迎における消費電力に関わる第1の情報、及び周囲の状況による前記電動移動体の消費電力に関わる第2の情報から、消費電力量を増大させる要素を抽出し、
     抽出した前記要素に基づいて、集配先または送迎先となる複数の目的地を結ぶ前記経路を決定する、
    経路決定方法。
  13.  コンピュータに、荷物の集配または人の送迎に使用する電動移動体の集配または送迎の経路を決定する処理を実行させるプログラムであって、
     前記電動移動体の集配または送迎における消費電力に関わる第1の情報、及び周囲の状況による前記電動移動体の消費電力に関わる第2の情報から、消費電力量を増大させる要素を抽出する処理と、
     抽出した前記要素に基づいて、集配先または送迎先となる複数の目的地を結ぶ前記経路を決定する処理と、をコンピュータに実行させる、
    プログラム。
PCT/JP2021/018104 2020-07-22 2021-05-12 経路決定装置、経路決定方法、及びプログラム WO2022018937A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020125768A JP2022021896A (ja) 2020-07-22 2020-07-22 経路決定装置、経路決定方法、及びプログラム
JP2020-125768 2020-07-22

Publications (1)

Publication Number Publication Date
WO2022018937A1 true WO2022018937A1 (ja) 2022-01-27

Family

ID=79728617

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/018104 WO2022018937A1 (ja) 2020-07-22 2021-05-12 経路決定装置、経路決定方法、及びプログラム

Country Status (2)

Country Link
JP (1) JP2022021896A (ja)
WO (1) WO2022018937A1 (ja)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011158277A (ja) * 2010-01-29 2011-08-18 Panasonic Corp ナビゲーション装置
JP2013011458A (ja) * 2011-06-28 2013-01-17 Panasonic Corp ナビゲーション装置及びナビゲーション方法
JP2014072932A (ja) * 2012-09-28 2014-04-21 Nissan Motor Co Ltd 電池劣化度推定装置及び方法
JP2014228449A (ja) * 2013-05-24 2014-12-08 株式会社日立製作所 電池劣化予測システムおよび経路探索システム
JP2018017672A (ja) * 2016-07-29 2018-02-01 ダイムラー・アクチェンゲゼルシャフトDaimler AG 電気トラックの走行ルート選定システム、電気トラックの走行ルート選定方法
JP2018025401A (ja) * 2016-08-08 2018-02-15 ダイムラー・アクチェンゲゼルシャフトDaimler AG 電気トラックの走行ルート選定システム、電気トラックの走行ルート選定方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011158277A (ja) * 2010-01-29 2011-08-18 Panasonic Corp ナビゲーション装置
JP2013011458A (ja) * 2011-06-28 2013-01-17 Panasonic Corp ナビゲーション装置及びナビゲーション方法
JP2014072932A (ja) * 2012-09-28 2014-04-21 Nissan Motor Co Ltd 電池劣化度推定装置及び方法
JP2014228449A (ja) * 2013-05-24 2014-12-08 株式会社日立製作所 電池劣化予測システムおよび経路探索システム
JP2018017672A (ja) * 2016-07-29 2018-02-01 ダイムラー・アクチェンゲゼルシャフトDaimler AG 電気トラックの走行ルート選定システム、電気トラックの走行ルート選定方法
JP2018025401A (ja) * 2016-08-08 2018-02-15 ダイムラー・アクチェンゲゼルシャフトDaimler AG 電気トラックの走行ルート選定システム、電気トラックの走行ルート選定方法

Also Published As

Publication number Publication date
JP2022021896A (ja) 2022-02-03

Similar Documents

Publication Publication Date Title
US11703341B2 (en) Methods and systems for generation and utilization of supplemental stored energy for use in transport climate control
JP5439242B2 (ja) エネルギーナビゲーション制御装置、エネルギーナビゲーションシステム、およびエネルギーナビゲータ
US8364388B2 (en) Traveling guidance system, traveling guidance method, and computer program
JP6502294B2 (ja) 電気トラックの走行ルート選定システム、電気トラックの走行ルート選定方法
JP5842348B2 (ja) Evクラウド
US11351981B2 (en) Vehicle control system, vehicle control method, and storage medium
JP6898714B2 (ja) 電気トラックの走行ルート選定システム、電気トラックの走行ルート選定方法
JP5104678B2 (ja) 車両相乗り管理システム、車両相乗り管理方法および車両相乗り管理プログラム
WO2012004898A1 (ja) 情報提供装置
JP7237031B2 (ja) 充電管理システム、充電管理方法および充電管理プログラム
CN116635264A (zh) 用于为即将到来的下坡行驶提供牵引电池中的存储容量储备的方法和设备
JP2008024306A (ja) 駆動制御装置、及びハイブリッド車両
JP2023118305A (ja) 車両データ収集装置、車両データ収集システム、及び車両データ収集方法
JP2014228429A (ja) 目的地情報提供システム及び方法、並びにコンピュータプログラム
WO2022018937A1 (ja) 経路決定装置、経路決定方法、及びプログラム
JP2019135491A (ja) 電気トラックの走行ルート選定システム、電気トラックの走行ルート選定方法
KR20200029941A (ko) 차량 배정 방법, 차량 배정 서버 및 차량 배정 시스템
WO2020250512A1 (ja) 経路計画装置、経路計画方法及び経路計画システム
US20220291003A1 (en) Ridesharing management system
US20200355516A1 (en) Information providing device and information providing program
US11808587B2 (en) Autonomous vehicle multi-modal trips
WO2023047581A1 (ja) 情報処理装置、配送マッチングシステム、情報処理方法及びプログラム
WO2023135789A1 (ja) 警告装置、警告方法及びプログラム
WO2023127099A1 (ja) 輸送計画作成支援装置、輸送計画作成支援方法及びプログラム
US20220120569A1 (en) Autonomous vehicle long distance rides

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21846211

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21846211

Country of ref document: EP

Kind code of ref document: A1