WO2021218743A1 PCT/CN2021/088738 CN2021088738W WO2021218743A1 WO 2021218743 A1 WO2021218743 A1 WO 2021218743A1 CN 2021088738 W CN2021088738 W CN 2021088738W WO 2021218743 A1 WO2021218743 A1 WO 2021218743A1
Authority
WO
WIPO (PCT)
Prior art keywords
resource
conversion rate
sender
information
transfer
Prior art date
Application number
PCT/CN2021/088738
Other languages
French (fr)
Chinese (zh)
Inventor
孙健康
Original Assignee
支付宝实验室(新加坡)有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 支付宝实验室(新加坡)有限公司 filed Critical 支付宝实验室(新加坡)有限公司
Publication of WO2021218743A1 publication Critical patent/WO2021218743A1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/38Payment protocols; Details thereof
    • G06Q20/40Authorisation, e.g. identification of payer or payee, verification of customer or shop credentials; Review and approval of payers, e.g. check credit lines or negative lists
    • G06Q20/405Establishing or using transaction specific rules
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/085Payment architectures involving remote charge determination or related payment systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/14Payment architectures specially adapted for billing systems
    • G06Q20/145Payments according to the detected use or quantity
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/38Payment protocols; Details thereof
    • G06Q20/381Currency conversion

Definitions

  • the embodiments of the present application provide a method, device, and device for triggering a resource transfer task, which are used to meet the needs of users for resource processing.
  • FIG. 8 is a schematic structural diagram of a device for triggering a resource transfer task provided in an embodiment of this specification.
  • Step 200 Obtain a resource transfer request; the resource transfer request includes at least first quantity information of the first resource to be transferred and information about the scheduled time for transferring the first resource; the first quantity information is used to indicate expected The first resource quantity of the first resource transferred to the resource receiver.
  • the purchased electricity is usually recharged by the electricity management server to a corresponding electricity management account, such as an electricity card.
  • the resource transfer request can be a request to recharge an electric card
  • the power management account can be the resource receiver, and the user who purchases the power can be the resource sender
  • the first resource can refer to the power
  • the first resource quantity can be the user's expected recharge.
  • the amount of electricity in the power card such as 100 kilowatt-hours
  • the predetermined time information can be the recharge time set by the user, for example, 1 month, assuming that the time for the user to fill in the recharge information in the terminal is April 2, and the user sets 1 If you recharge after a month, on May 2, the server can trigger the recharge task set by the user.
  • Step 204 When the time trigger condition is satisfied, obtain a first resource conversion rate; the first resource conversion rate indicates the resource conversion between the first resource and the second resource when the time trigger condition is satisfied Rate; the resource conversion rate is used to indicate the resource quantity of the second resource corresponding to the unit quantity of the first resource.
  • Step 206 Determine a second resource quantity of the second resource corresponding to the first resource of the first resource quantity based on the first resource conversion rate.
  • Step 208 Trigger a task of adding the first resource of the first amount of resources to the account of the resource receiver.
  • the server receiving the resource transfer request and the server with the resource transfer qualification may be the same server or different servers.
  • the server receiving the resource transfer request has the resource transfer qualification
  • the server receiving the resource transfer request The server and the server with resource transfer qualification may be the same server; for another example, the resource sender sends a resource transfer request through a terminal application, and the server receiving the resource transfer request may be the first server corresponding to the terminal application, and sends it to the resource receiver’s account.
  • the server of the first resource with the increased number of the first resources may be a second server with resource transfer qualification that has contact with the above-mentioned first server.
  • the resource sender when the resource transfer task is performed, the resource sender is allowed to input the scheduled time information for the resource transfer, and based on the scheduled time information, the time trigger condition for triggering the resource transfer task is determined, so that the resource sender can pass Set the time for resource transfer and make reservations for resource transfer tasks to meet the resource sender's demand for non-immediate resource transfer.
  • the transfer between two different resources can be completed according to the resource conversion rate, and the requirements of the resource sender for the transfer of different types of resources can also be met.
  • the server can provide users with conversion services between different types of resources.
  • the server or terminal can also set the default resource type for the user. If the user does not input or select the information indicating the resource type , The server will perform related resource processing with the default resource type.
  • Figure 4 is a schematic diagram of a resource transfer information interface containing predetermined time information provided in an embodiment of this specification.
  • the resource sender can input predetermined time information in the resource transfer operation interface of the terminal, and the predetermined time information can include Time period information.
  • the resource sender can manually enter "5 hours” or select "5 hours” through the drop-down button (the small triangle in Figure 4), which means that the resource sender needs to be within 5 hours Then trigger the resource transfer business.
  • the terminal or server can also provide a default appointment start time.
  • the real-time time corresponding to the appointment time information can be entered as the appointment start time by default, assuming that the resource sender makes an appointment at 9 AM 5 After hours, the resource is transferred, and the actual time to trigger the resource transfer task corresponds to 2 pm.
  • the resource sender can also be allowed to modify the default time, as shown in Figure 4, and the resource sender can also be allowed to set the appointment start time by itself.
  • the time information can also be accurate to the day, hour, minute, second and other levels according to requirements. For example, when the time information is at the day level, the resource transfer task can be triggered by default when the zero point of the scheduled date is reached.
  • the resource sender can also directly enter the predetermined time to trigger the resource transfer task.
  • the resource sender can enter the predetermined time to trigger the resource transfer task in the resource transfer reservation interface, such as 20* On *year**month**, when this time is up, the server triggers the resource transfer task.
  • the server can set a default scheduled time to trigger the resource transfer task, or it can recommend the scheduled time to trigger the resource transfer task for the resource sender based on the historical remittance information of the resource sender.
  • the predetermined time information and the resource transfer information in the embodiment of this specification may be located on the same interface, for example, may be located on the same display interface of the terminal.
  • the method provided in the embodiment of this specification before determining the time trigger condition, may further include: generating resource transfer order information based on the resource transfer request; feeding back the resource transfer order information to the terminal of the resource sender; and obtaining the resource transfer order information; Confirmation information of the terminal for the resource transfer order information.
  • the reducing the second resource of the second resource quantity from the resource sender’s account specifically includes: reducing part or all of the frozen second resources from the resource sender’s account The second resource.
  • part or all of the second resources in the frozen second resources may also be sent to a third-party server with resource transfer authority, so that the third-party server can increase the number of the first resources to the resource recipient’s account
  • the first resource may be a server of a service organization that has the qualification to process resource transfer tasks, for example, a server of a bank.
  • the number of frozen second resources may be greater than the number of second resources corresponding to the first resource when the resource transfer task is triggered due to fluctuations in the resource conversion rate.
  • the remaining frozen resources The second resource can be unfrozen after a preset time and can be returned to the remaining resources of the resource sender's account to facilitate the use of the resource sender.
  • the server may also: deduct the second resource quantity of the second resource corresponding to the first resource from the resource sender’s account; and deduct the second quantity of the second resource from the account
  • the second resource is sent to a third-party server with resource transfer authority, so that the third-party server adds the first resource of the first resource quantity to the account of the resource receiver.
  • the resource receiver’s account before triggering the task of adding the first resource of the first resource amount to the resource receiver’s account, it may further include: querying the second resource on the resource sender’s account. The remaining quantity of resources; determining whether the remaining quantity is greater than or equal to the second resource quantity; if not, generating feedback information for prompting resource transfer failure.
  • the server can first query whether there are sufficient number of second resources in the resource sender’s account.
  • the server can generate feedback information about resource transfer failure and feed it back to the resource sender, and then the resource sender can make corresponding processing based on the feedback information.
  • the resource sender can recharge the account balance and restart Trigger the task.
  • the form of feedback information can include text messages, emails, application messages, etc., and the specific form and content of the feedback information can also be set according to actual needs. This content is not specifically limited here, as long as the resource sender can clearly know the resource The original transfer failure is caused by insufficient remaining resources in the account.
  • the method of the embodiment of the present specification may further include: obtaining user-related information of the resource sender; and judging whether the resource transfer task meets a set rule according to the user-related information.
  • Step 606 Decrease the second resource of the second resource quantity from the account of the resource sender.
  • the method in the embodiment of this specification may also include:
  • Step 608 When the first judgment result indicates that the change value is greater than the preset change value, generate prompt information for asking the resource sender whether to continue the resource transfer;
  • Step 610 After obtaining the confirmation operation that the resource sender confirms to continue to perform the resource transfer, trigger a task of adding the first resource of the first resource amount to the resource receiver's account;
  • the preset change value can be set according to actual needs.
  • the resource sender can set the preset value in the terminal according to personal circumstances
  • the server can also provide the resource sender with the preset value, and so on.
  • the specific data and setting methods of the preset values are not limited here, as long as the actual needs can be met.
  • Step 700 Obtain a second resource conversion rate; the second resource conversion rate is the resource conversion rate between the first resource and the second resource when the resource transfer request is obtained;
  • Step 708 Reduce the number of the second resources of the second resource from the account of the resource sender.
  • Step 710 When the second judgment result indicates that the loss value is greater than the preset value, generate prompt information for asking the resource sender whether to continue to perform resource transfer;
  • Step 712 After obtaining the confirmation operation that the resource sender confirms to continue to perform the resource transfer, trigger the task of adding the first resource of the first resource amount to the resource receiver's account;
  • the resource sender’s account and the resource receiver’s account can belong to the same user, and the corresponding resource sender and resource receiver can belong to the same user.
  • the party can be the same user, and the resource transfer task can be a resource transfer task performed by the same user between different accounts; the resource sender’s account and the resource receiver’s account can belong to different users, the corresponding resource sender and resource receiver They can be different users, and the resource transfer task can be a resource transfer task performed by different users between different accounts.
  • the request obtaining module 800 is configured to obtain a resource transfer request; the resource transfer request includes at least first quantity information of the first resource to be transferred and information about a predetermined time for transferring the first resource; the first quantity information It is used to indicate the first resource quantity of the first resource that is expected to be transferred to the resource receiver;
  • the condition determination module 802 is configured to determine a time trigger condition based on the predetermined time information
  • a resource quantity determining module 806, configured to determine a second resource quantity of the second resource corresponding to the first resource of the first resource quantity based on the first resource conversion rate;
  • the resource management module 810 is configured to reduce the amount of the second resource of the second resource from the account of the resource sender.
  • an information confirmation module may also be included, which is configured to: generate resource transfer order information based on the resource transfer request; feed back the resource transfer order information to the terminal of the resource sender; Confirmation information of the terminal for the resource transfer order information.
  • the device for triggering resource transfer tasks may further include a second judgment module configured to: obtain a second resource conversion rate; The rate is the resource conversion rate between the first resource and the second resource when the resource transfer request is obtained; based on the second resource conversion rate and the first resource conversion rate, the first resource conversion rate is determined 2.
  • the apparatus, equipment, non-volatile computer storage medium and method provided in the embodiments of this specification correspond to each other. Therefore, the apparatus, equipment, and non-volatile computer storage medium also have beneficial technical effects similar to the corresponding method.
  • the beneficial technical effects of the method are described in detail, therefore, the beneficial technical effects of the corresponding device, equipment, and non-volatile computer storage medium are not repeated here.
  • a programmable logic device for example, a Field Programmable Gate Array (Field Programmable Gate Array, FPGA)
  • PLD Programmable Logic Device
  • FPGA Field Programmable Gate Array
  • a typical implementation device is a computer.
  • the computer may be, for example, a personal computer, a laptop computer, a cell phone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email device, a game console, a tablet computer, a wearable device, or Any combination of these devices.
  • the embodiments of the present invention can be provided as a method, a system, or a computer program product. Therefore, the present invention may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
  • computer-usable storage media including but not limited to disk storage, CD-ROM, optical storage, etc.
  • These computer program instructions can also be stored in a computer-readable memory that can guide a computer or other programmable data processing equipment to work in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture including the instruction device.
  • the device implements the functions specified in one process or multiple processes in the flowchart and/or one block or multiple blocks in the block diagram.
  • These computer program instructions can also be loaded on a computer or other programmable data processing equipment, so that a series of operation steps are executed on the computer or other programmable equipment to produce computer-implemented processing, so as to execute on the computer or other programmable equipment.
  • the instructions provide steps for implementing the functions specified in one process or multiple processes in the flowchart and/or one block or multiple blocks in the block diagram.
  • the computing device includes one or more processors (CPUs), input/output interfaces, network interfaces, and memory.
  • processors CPUs
  • input/output interfaces network interfaces
  • memory volatile and non-volatile memory
  • the memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and/or non-volatile memory, such as read-only memory (ROM) or flash memory (flash RAM).
  • RAM random access memory
  • ROM read-only memory
  • flash RAM flash memory
  • This application may be described in the general context of computer-executable instructions executed by a computer, such as a program module.
  • program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types.
  • This application can also be practiced in distributed computing environments. In these distributed computing environments, tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules can be located in local and remote computer storage media including storage devices.

Landscapes

  • Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Computer Security & Cryptography (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

A resource transfer task triggering method and apparatus, and a device. The solution comprises: obtaining a resource transfer request (S200), the resource transfer request at least comprising first quantity information of a first resource to be transferred and time schedule information for transferring the first resource; determining a time-based trigger condition based on the time schedule information (S202); when the time-based trigger condition is met, acquiring a first resource conversion rate (S204); determining, based on the first resource conversion rate, a second resource quantity of a second resource corresponding to the first resource of a first resource quantity (S206); triggering a task that adds the first resource of the first resource quantity to the account of a resource recipient (S208); and subtracting the second resource of the second resource quantity from the account of a resource sender (S210).

Description

资源转移任务的触发Triggering of resource transfer tasks 技术领域Technical field
本申请涉及计算机技术领域,尤其涉及一种资源转移任务的触发方法、装置及设备。This application relates to the field of computer technology, and in particular to a method, device and equipment for triggering resource transfer tasks.
背景技术Background technique
随着计算机技术的发展,移动终端的功能越来越多,也促使越来越多的用户使用移动终端完成事务的处理。With the development of computer technology, mobile terminals have more and more functions, which has also prompted more and more users to use mobile terminals to complete transaction processing.
在实际应用中,用户可以通过移动终端完成资源的处理,例如,通过手机查看用户所拥有的资源,通过终端应用完成资源交换等操作。现有技术中,用户在进行资源处理时,通常是用户发起资源处理的请求后,资源处理方会按照资源处理方的时间尽快完成资源的处理,对于用户来说通常只能请求完成即时性的资源处理请求。但随着用户需求的增多,这种即时性的资源处理服务不能满足需要非即时资源处理的用户的需求,因此需要提供更多的资源处理方式以满足用户的需求。In practical applications, users can complete resource processing through mobile terminals, for example, viewing resources owned by users through mobile phones, and completing resource exchange through terminal applications. In the prior art, when a user performs resource processing, usually after the user initiates a resource processing request, the resource processor will complete the resource processing as soon as possible according to the resource processor’s time. For the user, it is usually only possible to complete an immediate request. Resource processing request. However, with the increase in user needs, such instant resource processing services cannot meet the needs of users who need non-immediate resource processing. Therefore, it is necessary to provide more resource processing methods to meet user needs.
发明内容Summary of the invention
有鉴于此,本申请实施例中提供了一种资源转移任务的触发方法、装置及设备,用于满足用户对资源处理的需求。In view of this, the embodiments of the present application provide a method, device, and device for triggering a resource transfer task, which are used to meet the needs of users for resource processing.
为解决上述技术问题,本说明书实施例是这样实现的:In order to solve the above technical problems, the embodiments of this specification are implemented as follows:
本说明书实施例中提供的一种资源转移任务的触发方法,包括:获取资源转移请求;所述资源转移请求至少包括待转移的第一资源的第一数量信息和对所述第一资源进行转移的预定时间信息;所述第一数量信息用于表示预计转移至资源接收方的第一资源的第一资源数量;基于所述预定时间信息,确定时间触发条件;当所述时间触发条件被满足,获取第一资源转换率;所述第一资源转换率表示所述时间触发条件被满足时,所述第一资源与第二资源之间的资源转换率;所述资源转换率用于表示单位数量的所述第一资源对应的第二资源的资源数量;基于所述第一资源转换率,确定所述第一资源数量的所述第一资源对应的所述第二资源的第二资源数量;触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。A method for triggering a resource transfer task provided in an embodiment of this specification includes: obtaining a resource transfer request; the resource transfer request includes at least first quantity information of a first resource to be transferred and transferring the first resource The predetermined time information; the first quantity information is used to indicate the first resource quantity of the first resource that is expected to be transferred to the resource receiver; based on the predetermined time information, the time trigger condition is determined; when the time trigger condition is satisfied , Obtain the first resource conversion rate; the first resource conversion rate indicates the resource conversion rate between the first resource and the second resource when the time trigger condition is met; the resource conversion rate is used to indicate the unit The resource quantity of the second resource corresponding to the first resource of the quantity; based on the first resource conversion rate, determine the second resource quantity of the second resource corresponding to the first resource of the first resource quantity Triggering the task of adding the first resource of the first resource quantity to the account of the resource receiver; reducing the second resource of the second resource quantity from the account of the resource sender.
本说明书实施例中提供的一种资源转移任务的触发装置,包括:请求获取模块,用于获取资源转移请求;所述资源转移请求至少包括待转移的第一资源的第一数量信息和对所述第一资源进行转移的预定时间信息;所述第一数量信息用于表示预计转移至资源接收方的第一资源的第一资源数量;条件确定模块,用于基于所述预定时间信息,确定时间触发条件;转换率获取模块,用于当所述时间触发条件被满足,获取第一资源转换 率;所述第一资源转换率表示所述时间触发条件被满足时,所述第一资源与第二资源之间的资源转换率;所述资源转换率用于表示单位数量的所述第一资源对应的第二资源的资源数量;资源数量确定模块,用于基于所述第一资源转换率,确定所述第一资源数量的所述第一资源对应的所述第二资源的第二资源数量;任务触发模块,用于触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;资源管理模块,用于从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。An apparatus for triggering a resource transfer task provided in an embodiment of this specification includes: a request obtaining module, configured to obtain a resource transfer request; the resource transfer request includes at least first quantity information of the first resource to be transferred and a reference to the resource transfer request; The predetermined time information for the transfer of the first resource; the first quantity information is used to indicate the first resource quantity of the first resource that is expected to be transferred to the resource receiver; the condition determination module is used to determine based on the predetermined time information Time trigger condition; a conversion rate acquisition module for acquiring a first resource conversion rate when the time trigger condition is met; the first resource conversion rate indicates that when the time trigger condition is met, the first resource and The resource conversion rate between the second resources; the resource conversion rate is used to indicate the resource quantity of the second resource corresponding to the unit quantity of the first resource; the resource quantity determination module is used to based on the first resource conversion rate , Determining the second resource quantity of the second resource corresponding to the first resource of the first resource quantity; a task triggering module for triggering the increase of the first resource quantity to the account of the resource receiver The task of the first resource; a resource management module for reducing the number of the second resources of the second resource from the account of the resource sender.
本说明书实施例中提供的一种资源转移任务的触发设备,包括:至少一个处理器;以及,与所述至少一个处理器通信连接的存储器。其中,所述存储器存储有可被所述至少一个处理器执行的指令,所述指令被所述至少一个处理器执行,以使所述至少一个处理器能够:获取资源转移请求;所述资源转移请求至少包括待转移的第一资源的第一数量信息和对所述第一资源进行转移的预定时间信息;所述第一数量信息用于表示预计转移至资源接收方的第一资源的第一资源数量;基于所述预定时间信息,确定时间触发条件;当所述时间触发条件被满足,获取第一资源转换率;所述第一资源转换率表示所述时间触发条件被满足时,所述第一资源与第二资源之间的资源转换率;所述资源转换率用于表示单位数量的所述第一资源对应的第二资源的资源数量;基于所述第一资源转换率,确定所述第一资源数量的所述第一资源对应的所述第二资源的第二资源数量;触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The device for triggering a resource transfer task provided in an embodiment of this specification includes: at least one processor; and a memory communicatively connected with the at least one processor. Wherein, the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor, so that the at least one processor can: obtain a resource transfer request; the resource transfer The request includes at least first quantity information of the first resource to be transferred and information about the scheduled time for transferring the first resource; the first quantity information is used to indicate the first quantity of the first resource that is expected to be transferred to the resource receiver. Resource quantity; determine a time trigger condition based on the predetermined time information; when the time trigger condition is met, obtain a first resource conversion rate; the first resource conversion rate indicates that the time trigger condition is met, the The resource conversion rate between the first resource and the second resource; the resource conversion rate is used to indicate the resource quantity of the second resource corresponding to the unit quantity of the first resource; and the resource conversion rate is determined based on the first resource conversion rate. The second resource quantity of the second resource corresponding to the first resource of the first resource quantity; trigger the task of adding the first resource of the first resource quantity to the account of the resource receiver; from The second resource in the account of the resource sender that reduces the amount of the second resource.
本说明书实施例中采用的上述至少一个技术方案能够达到以下有益效果:The above at least one technical solution adopted in the embodiments of this specification can achieve the following beneficial effects:
本说明书实施例中在进行资源转移任务时,允许资源发送方输入对资源进行转移的预定时间信息,基于预定时间信息,确定用于触发资源转移任务的时间触发条件,从而可以使资源发送方通过设置资源转移的时间,对资源转移任务进行预约,满足资源发送方对非即时性资源转移的需求。In the embodiment of this specification, when the resource transfer task is performed, the resource sender is allowed to input the scheduled time information for the resource transfer, and based on the scheduled time information, the time trigger condition for triggering the resource transfer task is determined, so that the resource sender can pass Set the time for resource transfer and make reservations for resource transfer tasks to meet the resource sender's demand for non-immediate resource transfer.
并且,本说明书实施例中还可以根据资源转换率完成两种不同资源之间的转移,也可以满足资源发送方对不同种类资源转移的需求。In addition, in the embodiment of the present specification, the transfer between two different resources can be completed according to the resource conversion rate, and the requirements of the resource sender for the transfer of different types of resources can also be met.
附图说明Description of the drawings
此处所说明的附图用来提供对本申请的进一步理解,构成本申请的一部分,本申请的示意性实施例及其说明用于解释本申请,不构成对本申请的不当限定。在附图中:The drawings described here are used to provide a further understanding of the application and constitute a part of the application. The exemplary embodiments and descriptions of the application are used to explain the application, and do not constitute an improper limitation of the application. In the attached picture:
图1为本说明书实施例中提供的一种资源转移任务的触发方法的应用场景的示意图;FIG. 1 is a schematic diagram of an application scenario of a method for triggering a resource transfer task provided in an embodiment of this specification;
图2为本说明书实施例中提供的一种资源转移任务的触发方法的流程示意图;2 is a schematic flowchart of a method for triggering a resource transfer task provided in an embodiment of this specification;
图3为本说明书实施例中提供的一种资源转移信息界面示意图;Figure 3 is a schematic diagram of a resource transfer information interface provided in an embodiment of the specification;
图4为本说明书实施例中提供一种包含预定时间信息的资源转移信息界面示意图;4 is a schematic diagram of a resource transfer information interface including predetermined time information provided in an embodiment of this specification;
图5为本说明书实施例中提供的另一种包含预定时间信息的资源转移信息界面示意图;5 is a schematic diagram of another resource transfer information interface including predetermined time information provided in an embodiment of this specification;
图6为本说明书实施例中提供的一种基于图2的资源转移任务的触发方法的流程示意图;FIG. 6 is a schematic flowchart of a method for triggering resource transfer tasks based on FIG. 2 provided in an embodiment of this specification;
图7为本说明书实施例中提供的另一种基于图2的资源转移任务的触发方法的流程示意图;FIG. 7 is a schematic flowchart of another method for triggering a resource transfer task based on FIG. 2 provided in an embodiment of this specification;
图8为本说明书实施例中提供的一种资源转移任务的触发装置的结构示意图;FIG. 8 is a schematic structural diagram of a device for triggering a resource transfer task provided in an embodiment of this specification;
图9为本说明书实施例中提供的一种资源转移任务的触发设备的结构示意图。FIG. 9 is a schematic structural diagram of a triggering device for a resource transfer task provided in an embodiment of this specification.
具体实施方式Detailed ways
为使本申请的目的、技术方案和优点更加清楚,下面将结合本申请具体实施例及相应的附图对本申请技术方案进行清楚、完整地描述。显然,所描述的实施例仅是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。In order to make the purpose, technical solutions and advantages of the present application clearer, the technical solutions of the present application will be described clearly and completely in conjunction with specific embodiments of the present application and the corresponding drawings. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in this application, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of this application.
目前,传统的资源转移任务中,用户一般只需要设置需要的资源数量信息,然后发起请求,处理资源转移任务的服务器在接收到用户的请求后,及时完成请求任务的处理,而用户不能进行资源转移任务的预约,不能指定资源转移任务的触发时间。例如,在需要汇款时,通常是由汇款人通过金融机构提供的终端应用或者柜台,完成相关单据的填写,服务器或者柜台工作人员根据要求做相应处理,随即完成汇款人的汇款。而本说明书实施例中,用户可以设置资源转移的时间信息,以满足用户对非即时性的资源转移的需求。At present, in traditional resource transfer tasks, users generally only need to set the required resource quantity information, and then initiate a request. After receiving the user's request, the server processing the resource transfer task will complete the processing of the requested task in time, and the user cannot perform the resource. For the reservation of the transfer task, the trigger time of the resource transfer task cannot be specified. For example, when a remittance is required, the remitter usually completes the relevant documents through the terminal application or counter provided by the financial institution, and the server or counter staff perform corresponding processing as required, and then complete the remittance of the remitter. In the embodiment of this specification, the user can set the time information of the resource transfer to meet the user's demand for non-immediate resource transfer.
以下结合附图,详细说明本申请各实施例中提供的技术方案。The technical solutions provided in the embodiments of the present application will be described in detail below with reference to the accompanying drawings.
图1为本说明书实施例中提供的一种资源转移任务的触发方法的应用场景的示意图。如图1所示,整体架构中,主要包括资源发送方1、终端2、服务器3。其中,终端2可以是手机、电脑等移动终端,其可以载有具有资源转移功能的APP(Application,应用程序),服务器3可以是与具有资源转移功能的APP对应的云服务器,同时也可以是具有资源转移资质的机构的后台服务器等等。服务器3可以具有触发资源转移任务的能力,可以用于执行本说明书实施例中的方法的全部或部分步骤。FIG. 1 is a schematic diagram of an application scenario of a method for triggering a resource transfer task provided in an embodiment of this specification. As shown in Figure 1, the overall architecture mainly includes a resource sender 1, a terminal 2, and a server 3. Among them, the terminal 2 may be a mobile terminal such as a mobile phone or a computer, which may carry an APP (Application) with a resource transfer function, and the server 3 may be a cloud server corresponding to the APP with a resource transfer function, or at the same time. Back-end servers of institutions with resource transfer qualifications, etc. The server 3 may have the ability to trigger resource transfer tasks, and may be used to execute all or part of the steps of the method in the embodiment of this specification.
本说明书实施例中资源发送方1通过终端2中的某APP进行资源转移业务,在APP的界面中填写资源转移相关信息,如资源接收方的姓名和账号、资源种类、资源数量等信息,资源发送方1通过终端2将包含资源转移信息的资源转移请求发送给服务器3,服务器3还可以对资源发送方1进行审核,审核通过后返回相应的资源转移确认信息用于资源发送方1对需要转移的资源进行确认,服务器3返回的资源转移确认信息可以在 APP中显示,也可以以短信或者其他形式发送给资源发送方的终端2,资源发送方1在确认资源转移确认信息后可以设置触发汇款的时间,所述资源转移确认信息为触发资源转移任务之前,服务器根据用户填写的资源转移信息生成的,用于用户确认填写过的资源转移信息是否正确的信息。当到达触发资源转移的时间时,服务器3触发基于资源转移请求的资源转移任务。从而可以使用户根据需要来设置资源转移时间,选择进行非即时性的资源转移,满足用户需求提高用户的体验性。In the embodiment of this specification, the resource sender 1 uses an APP in the terminal 2 to perform resource transfer services, and fills in the resource transfer related information in the APP interface, such as the name and account number of the resource receiver, resource type, resource quantity and other information. The sender 1 sends a resource transfer request containing resource transfer information to the server 3 through the terminal 2. The server 3 can also review the resource sender 1, and after the review is passed, the corresponding resource transfer confirmation information will be returned for the resource sender 1 to request The transferred resource is confirmed. The resource transfer confirmation information returned by the server 3 can be displayed in the APP, or sent to the resource sender's terminal 2 in a short message or other form. The resource sender 1 can set a trigger after confirming the resource transfer confirmation information At the time of the remittance, the resource transfer confirmation information is information generated by the server according to the resource transfer information filled in by the user before the resource transfer task is triggered, and used by the user to confirm whether the filled resource transfer information is correct. When the time to trigger the resource transfer is reached, the server 3 triggers the resource transfer task based on the resource transfer request. Thereby, users can set the resource transfer time according to their needs, choose to perform non-immediate resource transfer, and meet user needs and improve user experience.
图2为本说明书实施例中提供的一种资源转移任务的触发方法的流程示意图。从程序角度而言,流程的执行主体可以为搭载于应用服务器的程序或应用客户端。如图2所示,本说明书实施例中提供的资源转移任务的触发方法主要是以服务器为执行主体的触发方法,该流程可以包括以下步骤:FIG. 2 is a schematic flowchart of a method for triggering a resource transfer task provided in an embodiment of this specification. From a program perspective, the execution subject of a process can be a program or an application client loaded on an application server. As shown in Figure 2, the method for triggering resource transfer tasks provided in the embodiment of this specification is mainly a method with a server as the execution subject, and the process may include the following steps:
步骤200:获取资源转移请求;所述资源转移请求至少包括待转移的第一资源的第一数量信息和对所述第一资源进行转移的预定时间信息;所述第一数量信息用于表示预计转移至资源接收方的第一资源的第一资源数量。Step 200: Obtain a resource transfer request; the resource transfer request includes at least first quantity information of the first resource to be transferred and information about the scheduled time for transferring the first resource; the first quantity information is used to indicate expected The first resource quantity of the first resource transferred to the resource receiver.
本说明书实施例中的资源转移可以包括水电卡的充值、话费充值等日常生活中的资源转移,还可以包括境内汇款和境外汇款等汇款类的资源转移。The resource transfer in the embodiments of this specification may include the transfer of resources in daily life such as the recharge of water and electricity cards and the recharge of telephone bills, and may also include the transfer of resources such as domestic remittance and overseas remittance.
服务器获取资源发送方的资源管理设备发送的资源转移请求,其中资源管理设备可以是资源发送方所使用的终端。在实际应用中,资源发送方可以通过操作终端中的用户服务界面输入预计转移至资源接收方的第一资源的第一资源数量、资源种类、以及预计转移的时间等信息,终端生成包括待转移的第一资源的第一数量信息和对第一资源进行转移的预定时间信息的资源转移请求,发送给可以服务器,其中,服务器可以是终端中某应用程序对应的服务器。例如,日常生活中用户在购买电量时,用户可以通过某购买电量的应用程序购买电量,购买的电量通常会由电量管理服务器充值到对应到电量管理账户中,如电卡中。其中,资源转移请求可以是对电卡充值的请求;电量管理账户可以是资源接收方,购买电量的用户可以是资源发送方;第一资源可以是指电量,第一资源数量可以是用户预计充入电卡中的电量数,如100度电;预定时间信息可以是用户设置的充值的时间,如,1个月,假设用户在终端中填写充值信息的时间为4月2号,用户设置1个月后进行充值,则在5月2号时,服务器可以触发用户设定的充值任务。The server obtains the resource transfer request sent by the resource management device of the resource sender, where the resource management device may be a terminal used by the resource sender. In practical applications, the resource sender can input information such as the first resource quantity, resource type, and estimated time of transfer of the first resource that is expected to be transferred to the resource receiver through the user service interface in the operating terminal, and the terminal generates information including the to-be-transferred The resource transfer request of the first quantity information of the first resource and the predetermined time information for transferring the first resource is sent to a server, where the server may be a server corresponding to a certain application in the terminal. For example, when a user purchases electricity in daily life, the user can purchase electricity through an application that purchases electricity. The purchased electricity is usually recharged by the electricity management server to a corresponding electricity management account, such as an electricity card. Among them, the resource transfer request can be a request to recharge an electric card; the power management account can be the resource receiver, and the user who purchases the power can be the resource sender; the first resource can refer to the power, and the first resource quantity can be the user's expected recharge. The amount of electricity in the power card, such as 100 kilowatt-hours; the predetermined time information can be the recharge time set by the user, for example, 1 month, assuming that the time for the user to fill in the recharge information in the terminal is April 2, and the user sets 1 If you recharge after a month, on May 2, the server can trigger the recharge task set by the user.
步骤202:基于所述预定时间信息,确定时间触发条件。Step 202: Determine a time trigger condition based on the predetermined time information.
本说明书实施例中资源发送方在发起资源转移请求时,可以预约触发资源转移的时间,服务器可以根据资源发送方预约的时间触发资源转移的任务,进而可以满足资源发送方对非即时性资源转移服务的需求。In the embodiment of this specification, the resource sender can reserve the time to trigger the resource transfer when it initiates the resource transfer request, and the server can trigger the resource transfer task according to the time reserved by the resource sender, so as to satisfy the non-immediate resource transfer by the resource sender. Service demand.
预约时间信息至少可以包括时间段信息以及时刻信息中至少一种,服务器在接收资源发送方设定的预约时间信息后可以生成时间段触发条件以及时刻触发条件中至少一种,例如,当资源发送方设定的是××小时后触发资源转移,则可以利用定时器计时,时 间到时触发资源转移任务;又如,当资源发送方设定的是×年×月×日×时×分触发资源转移,则可利用资源发送方所属当地的基准时钟进行比对,当到达资源发送方设定的时间时触发资源转移任务。需要说明的是,本说明书实施例对确定的时间触发条件的具体方式不做限定,只要服务器能够准确响应时间触发条件即可。The reservation time information may include at least one of time period information and time information. After receiving the reservation time information set by the resource sender, the server may generate at least one of the time period trigger condition and the time trigger condition, for example, when the resource is sent If the resource transfer is triggered after ××hours, the resource transfer task can be triggered by the timer when the time is up; for example, when the resource sender is set to be ×year×month×day×hour×minute trigger For resource transfer, the local reference clock of the resource sender can be used for comparison, and the resource transfer task is triggered when the time set by the resource sender is reached. It should be noted that the embodiment of this specification does not limit the specific manner of determining the time trigger condition, as long as the server can accurately respond to the time trigger condition.
步骤204:当所述时间触发条件被满足,获取第一资源转换率;所述第一资源转换率表示所述时间触发条件被满足时,所述第一资源与第二资源之间的资源转换率;所述资源转换率用于表示单位数量的所述第一资源对应的第二资源的资源数量。Step 204: When the time trigger condition is satisfied, obtain a first resource conversion rate; the first resource conversion rate indicates the resource conversion between the first resource and the second resource when the time trigger condition is satisfied Rate; the resource conversion rate is used to indicate the resource quantity of the second resource corresponding to the unit quantity of the first resource.
本说明书实施例中的资源转换任务可以是两种不同资源之间的转换,两种资源之间转换时,可以利用资源转换率计算两者之间对应的数量关系。例如,上述购买电量时,第二资源可以是用户购买电量所需的人民币,转换率可以是电量的单价;又如,在进行不同币种之间的跨境汇款时,资源转换率可以是指两个国家或区域之间的汇率。The resource conversion task in the embodiment of this specification may be the conversion between two different resources. When the two resources are converted, the resource conversion rate may be used to calculate the corresponding quantitative relationship between the two. For example, when purchasing electricity, the second resource may be the RMB required by the user to purchase electricity, and the conversion rate may be the unit price of the electricity; for another example, in cross-border remittances between different currencies, the resource conversion rate may refer to The exchange rate between two countries or regions.
考虑到转换率可能会随时间的变化而不同,本说明书实施例中,服务器可以在到达资源发送方设置的资源转移时间时,获取此时第一资源与第二资源对应的第一资源转换率,利用第一资源转换率进行资源转换任务,可避免资源转换的混乱,可有效保证触发的资源转换任务的顺利进行,可提高资源转换任务被执行的概率。Considering that the conversion rate may change over time, in the embodiment of this specification, the server may obtain the first resource conversion rate corresponding to the first resource and the second resource when the resource transfer time set by the resource sender is reached. , Use the first resource conversion rate to perform the resource conversion task, which can avoid the confusion of the resource conversion, can effectively ensure the smooth progress of the triggered resource conversion task, and increase the probability of the resource conversion task being executed.
步骤206:基于所述第一资源转换率,确定所述第一资源数量的所述第一资源对应的所述第二资源的第二资源数量。Step 206: Determine a second resource quantity of the second resource corresponding to the first resource of the first resource quantity based on the first resource conversion rate.
服务器可以根据时间触发条件被满足时的第一转化率计算第一资源对应的第二资源的数量。例如,上述电卡充值时,服务器可以在用户预约的时间到时,获取当前的电量单价,以及用户之前设定的购买的电量数量,可以计算购买这些电量对应的总价。The server may calculate the quantity of the second resource corresponding to the first resource according to the first conversion rate when the time trigger condition is satisfied. For example, when the above-mentioned electric card is recharged, the server can obtain the current unit price of electricity when the time reserved by the user expires, and the amount of electricity purchased by the user previously set, and can calculate the total price corresponding to the purchase of these electricity.
步骤208:触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务。Step 208: Trigger a task of adding the first resource of the first amount of resources to the account of the resource receiver.
本说明书实施例中,资源转移的实施可以由具有资源转移资质的服务器执行,当时间触发条件被满足时接收资源转移请求的服务器可以向具有资源转移资质的服务器发送与资源转移请求对应的转移触发请求,用于触发向资源接收方的账户增加第一资源数量的第一资源的任务。In the embodiment of this specification, the implementation of resource transfer can be performed by a server with resource transfer qualification. When the time trigger condition is met, the server that receives the resource transfer request can send a transfer trigger corresponding to the resource transfer request to the server with resource transfer qualification. The request is used to trigger the task of adding the first resource of the first resource quantity to the account of the resource receiver.
需要说明的是,接收资源转移请求的服务器与具有资源转移资质的服务器可以是同一服务器,也可以是不同的服务器,例如,当接收资源转移请求的服务器具有资源转移资质时,接收资源转移请求的服务器与具有资源转移资质的服务器可以是同一服务器;又如,资源发送方通过终端应用发送资源转移请求,接收资源转移请求的服务器可以是与终端应用对应的第一服务器,向资源接收方的账户增加第一资源数量的第一资源的服务器可以是与上述第一服务器具有联系的具有资源转移资质的第二服务器。It should be noted that the server receiving the resource transfer request and the server with the resource transfer qualification may be the same server or different servers. For example, when the server receiving the resource transfer request has the resource transfer qualification, the server receiving the resource transfer request The server and the server with resource transfer qualification may be the same server; for another example, the resource sender sends a resource transfer request through a terminal application, and the server receiving the resource transfer request may be the first server corresponding to the terminal application, and sends it to the resource receiver’s account. The server of the first resource with the increased number of the first resources may be a second server with resource transfer qualification that has contact with the above-mentioned first server.
步骤210:从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。Step 210: Decrease the second resource of the second resource quantity from the account of the resource sender.
为实现资源的转移,服务器还可以从资源发送方的账户中减少第二资源数量的第二资源。In order to realize the transfer of resources, the server may also reduce the second resource by the second resource quantity from the account of the resource sender.
本说明书实施例中在进行资源转移任务时,允许资源发送方输入对资源进行转移的预定时间信息,基于预定时间信息,确定用于触发资源转移任务的时间触发条件,从而可以使资源发送方通过设置资源转移的时间,对资源转移任务进行预约,满足资源发送方对非即时性资源转移的需求。In the embodiment of this specification, when the resource transfer task is performed, the resource sender is allowed to input the scheduled time information for the resource transfer, and based on the scheduled time information, the time trigger condition for triggering the resource transfer task is determined, so that the resource sender can pass Set the time for resource transfer and make reservations for resource transfer tasks to meet the resource sender's demand for non-immediate resource transfer.
并且,本说明书实施例中还可以根据资源转换率完成两种不同资源之间的转移,也可以满足资源发送方对不同种类资源转移的需求。In addition, in the embodiment of the present specification, the transfer between two different resources can be completed according to the resource conversion rate, and the requirements of the resource sender for the transfer of different types of resources can also be met.
本说明书实施例中,资源发送方可以利用终端进行资源转移任务,在输入资源转移请求对应的资源转移信息时,可以手动输入每项信息,也可以从历史信息中或者建立的联系人清单中选择信息填入,例如,服务器或者终端可以将与资源发送方发生过资源转移的人或者账号记录在历史信息中,资源发送方可以从历史信息中选择资源接收方进行资源转移,无需再重复填写资源接收方的信息,以简化资源发送方的操作。In the embodiment of this specification, the resource sender can use the terminal to perform the resource transfer task. When inputting the resource transfer information corresponding to the resource transfer request, each item of information can be manually input, or it can be selected from the historical information or the established contact list. Fill in the information. For example, the server or terminal can record the person or account that has transferred the resource with the resource sender in the historical information. The resource sender can select the resource receiver from the historical information for resource transfer, and there is no need to fill in the resource again. The receiver's information to simplify the operation of the resource sender.
在实际应用中,服务器可以为用户提供不同种类的资源之间的转换服务,为进一步简化用户操作,服务器或者终端还可以为用户设置默认的资源种类,用户如果不输入或者选择表示资源种类的信息,服务器将以默认的资源种类进行相关的资源处理。In practical applications, the server can provide users with conversion services between different types of resources. In order to further simplify user operations, the server or terminal can also set the default resource type for the user. If the user does not input or select the information indicating the resource type , The server will perform related resource processing with the default resource type.
进一步的,用户还可以根据自身需要设置默认资源种类,以方便后续进行资源转移任务。服务器或客户端还可以根据用户的历史信息为用户推荐资源种类信息,例如可以根据历史信息中使用过的第一资源的种类,按照使用频率进行排序,将使用过的第一资源的种类按照使用频率由高到低的顺序推荐给用户;还可以按照使用时间的先后顺序,将第一资源的种类按照使用时间由近到远的顺序推荐给用户等等。Further, users can also set default resource types according to their own needs to facilitate subsequent resource transfer tasks. The server or client can also recommend resource type information for the user according to the user’s historical information. For example, it can sort the first resource used in the historical information according to the frequency of use, and sort the used first resource according to the type of use. The frequency is recommended to users in descending order of frequency; it is also possible to recommend the type of the first resource to users in descending order of usage time according to the order of usage time, and so on.
本说明书实施例中提供的资源转移任务的触发方法可以应用于涉及不同币种之间汇兑的资源往来的场景,资源转换率可以还包括汇率,资源接收方所属币种兑换相当于上述第一资源,资源发送方所属币种相当于上述第二资源。汇率可以是指一国货币相对于另一国货币的比率,本说明书实施例中的汇率可以表示单位资源接收方所属币种兑换资源发送方所属币种的数量。例如,人民币汇率就是人民币兑换另一国货币的比率,人民币汇率的报价一般指的是美元兑人民币的报价,即1美元兑换多少人民币。The method for triggering resource transfer tasks provided in the embodiments of this specification can be applied to scenarios involving resource exchanges between different currencies. The resource conversion rate can also include exchange rates. The currency conversion of the resource recipient is equivalent to the above-mentioned first resource. , The currency of the resource sender is equivalent to the second resource mentioned above. The exchange rate can refer to the ratio of the currency of one country to the currency of another country. The exchange rate in the embodiment of this specification can represent the amount of the currency of the unit resource receiver to the currency of the resource sender. For example, the renminbi exchange rate is the ratio of renminbi to another country’s currency. The quotation of the renminbi exchange rate generally refers to the quotation of the U.S. dollar to the renminbi, that is, how much renminbi is exchanged for 1 U.S. dollar.
图3为本说明书实施例中提供的一种资源转移信息界面示意图。如图3所示,本说明书实施例中资源发送方输入的资源转移信息可以包括第一资源的种类、数量,资源接收方账号等信息,还可以包括第二资源的种类、数量等信息。在进行资源转移时,需要准确的填写或输入相应的信息,在需要时资源转移信息还可以包括资源发送方对应的姓名、账号等信息。Figure 3 is a schematic diagram of a resource transfer information interface provided in an embodiment of this specification. As shown in FIG. 3, the resource transfer information input by the resource sender in the embodiment of this specification may include information such as the type and quantity of the first resource, and the account number of the resource receiver, and may also include the type and quantity of the second resource. When the resource is transferred, the corresponding information needs to be accurately filled in or input. When necessary, the resource transfer information may also include information such as the name and account number corresponding to the resource sender.
图4为本说明书实施例中提供一种包含预定时间信息的资源转移信息界面示意图,如图4所示,资源发送方可以在终端的资源转移操作界面中输入预定时间信息,预定时 间信息可以包括时间段信息。假设资源发送方预约的是5小时后触发资源转移,资源发送方可以手动输入“5小时”,也可以通过下拉按钮(图4中小三角形)选择“5小时”,表示资源发送方需要在5小时后触发资源转移业务。Figure 4 is a schematic diagram of a resource transfer information interface containing predetermined time information provided in an embodiment of this specification. As shown in Figure 4, the resource sender can input predetermined time information in the resource transfer operation interface of the terminal, and the predetermined time information can include Time period information. Assuming that the resource sender’s appointment is to trigger resource transfer after 5 hours, the resource sender can manually enter "5 hours" or select "5 hours" through the drop-down button (the small triangle in Figure 4), which means that the resource sender needs to be within 5 hours Then trigger the resource transfer business.
在输入时间段信息时,终端或者服务器还可以提供一个默认的预约起始时间,例如,可以默认输入预约时间信息时对应的实时时间为预约起始时间,假设资源发送方在上午9点预约5小时后资源转移,实际的触发资源转移任务的时间对应为下午2点。When inputting time period information, the terminal or server can also provide a default appointment start time. For example, the real-time time corresponding to the appointment time information can be entered as the appointment start time by default, assuming that the resource sender makes an appointment at 9 AM 5 After hours, the resource is transferred, and the actual time to trigger the resource transfer task corresponds to 2 pm.
为满足资源发送方的需求,还可以允许资源发送方对默认时间进行修改,如图4所述,也可以允许资源发送方自行设置预约起始时间。根据需求还可以将时间信息精确到日、时、分、秒等级别,例如,当时间信息是天级的时候,可以默认到达预约日期的零点触发资源转移任务。In order to meet the needs of the resource sender, the resource sender can also be allowed to modify the default time, as shown in Figure 4, and the resource sender can also be allowed to set the appointment start time by itself. The time information can also be accurate to the day, hour, minute, second and other levels according to requirements. For example, when the time information is at the day level, the resource transfer task can be triggered by default when the zero point of the scheduled date is reached.
在实际应用中资源发送方还可以直接输入预定的触发资源转移任务的时间,如图5所示,资源发送方可以在预约资源转移的界面中输入预定的触发资源转移任务的时间,如20**年**月**日,当此时间到后,服务器触发资源转移任务。为简化操作以及提供填写范例,服务器可以设置默认的预定触发资源转移任务的时间,也可以根据资源发送方的历史汇款信息为资源发送方推荐预定触发资源转移任务的时间。为方便资源发送方在同一界面操作,本说明书实施例中预定时间信息与资源转移信息可以位于同一界面,例如,可以位于终端的同一显示界面中。In practical applications, the resource sender can also directly enter the predetermined time to trigger the resource transfer task. As shown in Figure 5, the resource sender can enter the predetermined time to trigger the resource transfer task in the resource transfer reservation interface, such as 20* On *year**month**, when this time is up, the server triggers the resource transfer task. In order to simplify operations and provide filling examples, the server can set a default scheduled time to trigger the resource transfer task, or it can recommend the scheduled time to trigger the resource transfer task for the resource sender based on the historical remittance information of the resource sender. To facilitate the operation of the resource sender on the same interface, the predetermined time information and the resource transfer information in the embodiment of this specification may be located on the same interface, for example, may be located on the same display interface of the terminal.
需要说明的是上述只是举例说明,本说明书中对具体的时间信息形式以及显示位置等均不作限定,只要能够满足用户需求即可。It should be noted that the above are only examples, and the specific time information form and display position are not limited in this specification, as long as the user needs can be met.
在实际应用中,资源转移可以包括有因资源转移和无因资源转移,其中有因资源转移可以指需要填写资源转移原因的资源转移业务,无因资源转移可以指不需要填写资源转移原因的资源转移业务。本说明书实施例中的方法可应用于有因资源转移的资源转移业务,用户在填写资源转移信息时,可以选择填写资源转移原因或者用途,例如留学学费、旅游费、医疗费等等。在实际应用中,用户可以按照实际需求进行填写,例如用户需要为在国外的子女交留学学费时,可以将学费汇入对应的国外的账号,就可以选择填写留学费用。In practical applications, resource transfer can include resource transfer due to resource transfer and resource transfer without cause, among which resource transfer due to resource transfer can refer to the resource transfer business that needs to fill in the reason for resource transfer, and resource transfer without cause can refer to the resource that does not need to fill in the reason for resource transfer. Transfer business. The method in the embodiment of this specification can be applied to the resource transfer service due to resource transfer. When filling in the resource transfer information, the user can choose to fill in the reason or purpose of the resource transfer, such as study abroad tuition, travel expenses, medical expenses, and so on. In practical applications, users can fill in according to actual needs. For example, when users need to pay the tuition for studying abroad for their children abroad, they can remit the tuition to the corresponding overseas account, and then they can choose to fill in the study abroad fee.
本说明书实施例中的方法还可以应用于境内资源转移和境外资源转移,境内资源转移可以指资源发送方与资源接收方在境内同行或跨行的资源往来,境外资源转移可以指资源发送方在境内与境外的资源接收方进行的资源往来,境外资源转移也可以称为国际之间的资源转移,可用于进行跨境资源往来。本说明书实施例中的资源转移可以为在金融领域,涉及不同币种之间汇兑的资源往来。但在实际应用中,本说明书实施例中的方法也可用于不涉及币种汇兑的普通的资源转移任务。The methods in the embodiments of this specification can also be applied to domestic resource transfers and overseas resource transfers. Domestic resource transfers can refer to resource exchanges between resource senders and resource receivers within the country or across banks, and overseas resource transfers can refer to resource senders in China. Resource exchanges with overseas resource recipients, and overseas resource transfers can also be referred to as international resource transfers, which can be used for cross-border resource exchanges. The resource transfer in the embodiments of this specification may be in the financial field, involving the exchange of resources between different currencies. However, in practical applications, the methods in the embodiments of this specification can also be used for common resource transfer tasks that do not involve currency exchange.
本说明书实施例中提供的方法,确定时间触发条件之前,还可以包括:基于所述资源转移请求,生成资源转移订单信息;向所述资源发送方的终端反馈所述资源转移订单 信息;获取所述终端对所述资源转移订单信息的确认信息。The method provided in the embodiment of this specification, before determining the time trigger condition, may further include: generating resource transfer order information based on the resource transfer request; feeding back the resource transfer order information to the terminal of the resource sender; and obtaining the resource transfer order information; Confirmation information of the terminal for the resource transfer order information.
为确保资源转移信息的准确性,服务器在确定时间触发条件之前还可以根据资源转移请求生成用于资源发送方对资源转移信息进行确认的资源转移订单信息,资源转移订单信息可以包括第一资源的数量信息、第一资源的种类信息、与第一资源对应的第二资源的数量信息、资源接收方账户信息、预定时间信息等内容,资源发送方在确认订单信息无误后可以向服务器发送订单确认信息,服务器在获取到订单确认信息后确定时间触发条件。当服务器在预设时间之内未获取到资源发送方发送的确认信息或者获取到了资源发送方发送的表征资源转移订单信息有误的信息时,可终止对本次资源转移任务的触发。In order to ensure the accuracy of the resource transfer information, the server may also generate resource transfer order information for the resource sender to confirm the resource transfer information according to the resource transfer request before determining the time trigger condition. The resource transfer order information may include the information of the first resource. Quantity information, type information of the first resource, quantity information of the second resource corresponding to the first resource, resource receiver account information, scheduled time information, etc. The resource sender can send an order confirmation to the server after confirming that the order information is correct Information, the server determines the time trigger condition after obtaining the order confirmation information. When the server does not obtain the confirmation information sent by the resource sender within the preset time or obtains the information that indicates that the resource transfer order information sent by the resource sender is incorrect, the triggering of this resource transfer task can be terminated.
为提高资源转移的成功率,本说明书实施例中确定时间触发条件之前,还可以包括:获取所述资源发送方的账户中与所述第一资源对应的第二资源的预估第二资源数量;冻结所述预估第二资源数量的所述第二资源,得到冻结的第二资源。所述从所述资源发送方的账户中减少所述第二资源数量的所述第二资源,具体包括:从所述资源发送方的账户中减少所述冻结的第二资源中的部分或全部第二资源。In order to improve the success rate of resource transfer, before determining the time trigger condition in the embodiment of this specification, it may further include: obtaining the estimated second resource quantity of the second resource corresponding to the first resource in the account of the resource sender ; Freeze the second resource of the estimated second resource quantity to obtain the frozen second resource. The reducing the second resource of the second resource quantity from the resource sender’s account specifically includes: reducing part or all of the frozen second resources from the resource sender’s account The second resource.
在实际应用中可在预约资源转移时将资源发送方的账户中与第一资源对应数量的第二资源冻结,可以根据预约资源转移时的资源转换率得到与第一资源对应的第二资源的预估第二资源数量,在触发资源转移任务之后可以采用冻结的预估第二资源数量的第二资源执行资源转移任务,从而可以一定程度上保证在预约的预定时间到,执行资源转移任务时资源发送方可提供出第二资源,可一定程度上避免因资源发送方的第二资源不足造成的资源转移失败的情况,也一定程度减轻了服务器的工作量。In practical applications, the number of second resources corresponding to the first resource in the resource sender’s account can be frozen when the resource is reserved, and the second resource corresponding to the first resource can be obtained according to the resource conversion rate when the resource is reserved. Estimate the second resource quantity. After the resource transfer task is triggered, the second resource with the estimated second resource quantity frozen can be used to execute the resource transfer task, so that it can be guaranteed to a certain extent that the resource transfer task will be executed when the scheduled time is up. The resource sender can provide the second resource, which can avoid resource transfer failure caused by insufficient second resources of the resource sender to a certain extent, and also reduce the workload of the server to a certain extent.
本说明书实施例中,还可以将冻结的第二资源中的部分或全部第二资源发送至具有资源转移权限的第三方服务器,以便第三方服务器向资源接收方的账户增加所述第一资源数量的第一资源。其中,第三方服务器可以为具有资源转移任务处理资质的服务机构的服务器,例如,银行的服务器等。In the embodiment of this specification, part or all of the second resources in the frozen second resources may also be sent to a third-party server with resource transfer authority, so that the third-party server can increase the number of the first resources to the resource recipient’s account The first resource. Among them, the third-party server may be a server of a service organization that has the qualification to process resource transfer tasks, for example, a server of a bank.
在实际应用中,可能由于资源转换率的波动,冻结的第二资源的数量可能会大于资源转移任务被触发时第一资源对应的第二资源的数量,在资源转移任务完成后,剩余的冻结第二资源可以在预设时间后解冻,可以返回资源发送方的账户剩余资源中,方便资源发送方的使用。In practical applications, the number of frozen second resources may be greater than the number of second resources corresponding to the first resource when the resource transfer task is triggered due to fluctuations in the resource conversion rate. After the resource transfer task is completed, the remaining frozen resources The second resource can be unfrozen after a preset time and can be returned to the remaining resources of the resource sender's account to facilitate the use of the resource sender.
相应的,当冻结的第二资源的数量小于资源转移任务被触发时第一资源对应的第二资源的数量时,服务器还可以向资源发送方发送提示资源发送方提供足够第二资源的信息,以便获取与第一资源数量的第一资源对应的第二资源触发资源转移任务。Correspondingly, when the number of frozen second resources is less than the number of second resources corresponding to the first resource when the resource transfer task is triggered, the server may also send information to the resource sender prompting the resource sender to provide sufficient second resources, In order to obtain the second resource corresponding to the first resource of the first resource quantity to trigger the resource transfer task.
在实际应用中,确定时间触发条件之前,服务器还可以:从所述资源发送方的账户上扣除与第一资源对应的第二资源的第二资源数量;将在账户中扣除的第二数量的第二资源发送至具有资源转移权限的第三方服务器,以便所述第三方服务器向资源接收方的 账户增加所述第一资源数量的第一资源。In practical applications, before determining the time trigger condition, the server may also: deduct the second resource quantity of the second resource corresponding to the first resource from the resource sender’s account; and deduct the second quantity of the second resource from the account The second resource is sent to a third-party server with resource transfer authority, so that the third-party server adds the first resource of the first resource quantity to the account of the resource receiver.
本说明书实施例中,所述触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务之前,还可以包括:查询所述资源发送方的账户上的第二资源的剩余数量;判断所述剩余数量是否大于或等于所述第二资源数量;若否,生成用于提示资源转移失败的反馈信息。In the embodiment of this specification, before triggering the task of adding the first resource of the first resource amount to the resource receiver’s account, it may further include: querying the second resource on the resource sender’s account. The remaining quantity of resources; determining whether the remaining quantity is greater than or equal to the second resource quantity; if not, generating feedback information for prompting resource transfer failure.
在实际应用中可能存在当到达预约的预定时间触发资源转移任务时,由于某些原因资源发送方的账户中的剩余资源数量不能满足预计转移的第一资源所需的数量的情况,为保证资源转移任务可以执行,服务器在触发向资源接收方的账户增加第一资源数量的第一资源的任务之前,可以先查询资源发送方的账户中是否有足够数量的第二资源,当资源发送方的账户中剩余数量小于第二资源数量时,服务器可以生成资源转移失败的反馈信息反馈给资源发送方,进而资源发送方可以根据反馈信息作出相应的处理,例如资源发送方可以给账户余额充值,重新触发任务。其中反馈信息的形式可以包括短信、电子邮件、应用程序消息等,还可以根据实际需求设置反馈信息的具体形式以及内容,这里对此内容不作具体限定,只要能够让资源发送方清楚的获知此资源转移失败的原始是账户剩余资源不足造成的即可。In practical applications, when the resource transfer task is triggered by the scheduled time, due to some reasons, the remaining resource amount in the resource sender’s account cannot meet the expected amount of the first resource to be transferred. To ensure resources The transfer task can be executed. Before the server triggers the task of adding the first resource of the first resource quantity to the resource receiver’s account, it can first query whether there are sufficient number of second resources in the resource sender’s account. When the remaining amount in the account is less than the second resource amount, the server can generate feedback information about resource transfer failure and feed it back to the resource sender, and then the resource sender can make corresponding processing based on the feedback information. For example, the resource sender can recharge the account balance and restart Trigger the task. The form of feedback information can include text messages, emails, application messages, etc., and the specific form and content of the feedback information can also be set according to actual needs. This content is not specifically limited here, as long as the resource sender can clearly know the resource The original transfer failure is caused by insufficient remaining resources in the account.
为提高资源转移任务的可行性,本说明书实施例的方法还可以包括:获取所述资源发送方的用户相关信息;根据所述用户相关信息,判断所述资源转移任务是否符合设定规则。In order to improve the feasibility of the resource transfer task, the method of the embodiment of the present specification may further include: obtaining user-related information of the resource sender; and judging whether the resource transfer task meets a set rule according to the user-related information.
在实际应用中,在资源发送方提交资源转移请求后,服务器可以对资源发送方进行审核,判断资源发送方是否具有资源转移的资质,所要办理的资源转移任务是否符合资源转移的相关设定规则等,例如,设定规则可以表示用于判断资源发送方的资源来源是否合法的规则。In practical applications, after the resource sender submits a resource transfer request, the server can review the resource sender to determine whether the resource sender has the qualifications for resource transfer, and whether the resource transfer task to be handled meets the relevant set rules for resource transfer For example, the setting rule may indicate a rule for judging whether the resource source of the resource sender is legal.
本说明书实施例中对资源发送方以及资源转移任务的审核可以在资源发送方发送资源转移请求进行资源转移任务的预约时执行,也可以在到达预定时间后,触发资源转移任务之前执行,也可以分别上述预约时以及触发资源转移任务之前执行,等等。本说明书实施例中对具体的执行时间不作具体限定,只要能够判断资源转移任务是否符合设定规则即可。The review of the resource sender and the resource transfer task in the embodiments of this specification can be performed when the resource sender sends a resource transfer request to schedule the resource transfer task, or it can be performed after the predetermined time is reached, before the resource transfer task is triggered, or it can be Respectively execute the above appointment and before triggering the resource transfer task, and so on. In the embodiments of this specification, the specific execution time is not specifically limited, as long as it can be judged whether the resource transfer task meets the set rules.
本说明书实施例的方法还可以包括:获取所述资源发送方的用户相关信息;获取所述资源发送方的历史资源转移信息;根据所述用户相关信息以及所述历史资源转移信息,判断所述资源转移任务是否具有违规风险。The method of the embodiment of the present specification may further include: obtaining user-related information of the resource sender; obtaining historical resource transfer information of the resource sender; and judging the user-related information and the historical resource transfer information Whether the resource transfer task has the risk of violation.
本说明书实施例中可以根据资源发送方的用户相关信息以及资源发送方的历史交易信息判断所述资源转移任务是否具有违规风险。其中,用户相关信息可以包括资源发送方身份信息、账户信息、资源发送方终端应用中联系人等信息;历史交易信息可以包括历史交易中资源接收方的账户信息、账户所属国家、历史交易频率、历史交易金额等信 息。In the embodiments of this specification, it is possible to determine whether the resource transfer task has a risk of violation according to user-related information of the resource sender and historical transaction information of the resource sender. Among them, user-related information may include information such as the identity information of the resource sender, account information, and contacts in the terminal application of the resource sender; historical transaction information may include the account information of the resource receiver in the historical transaction, the country to which the account belongs, historical transaction frequency, Historical transaction amount and other information.
本说明书实施例中资源转换率可以是变换的,基于上述图2所示的方法,本说明书实施例还提供了一种资源转移任务的触发方法,如图6所示,本说明书实施例中提供的一种资源转移任务的触发方法,还可以包括:The resource conversion rate in the embodiment of this specification can be changed. Based on the method shown in Figure 2 above, the embodiment of this specification also provides a method for triggering resource transfer tasks. As shown in Figure 6, the embodiment of this specification provides A method for triggering a resource transfer task may also include:
步骤600:获取第二资源转换率;所述第二资源转换率为获取到所述资源转移请求时,所述第一资源与所述第二资源之间的资源转换率;Step 600: Obtain a second resource conversion rate; the second resource conversion rate is the resource conversion rate between the first resource and the second resource when the resource transfer request is obtained;
步骤602:基于所述第二资源转换率与所述第一资源转换率,判断所述第二资源转换率与所述第一资源转换率之间的变化值是否大于预设变化值,得到第一判断结果;Step 602: Based on the second resource conversion rate and the first resource conversion rate, determine whether the change value between the second resource conversion rate and the first resource conversion rate is greater than a preset change value to obtain the first resource conversion rate. 1. Judgment result;
步骤604:当所述第一判断结果表示所述变化值不大于所述预设变化值,则触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;Step 604: When the first judgment result indicates that the change value is not greater than the preset change value, trigger a task of adding the first resource of the first resource amount to the resource receiver's account;
步骤606:从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。Step 606: Decrease the second resource of the second resource quantity from the account of the resource sender.
由于资源转换率可以是变化的,在本说明书实施例中可能会存在预约资源转移任务时的资源转换率与触发资源转移任务时的资源转换率不一致,因此,为提高用户的体验性,减少由于资源转换率波动对用户的影响,用户可以根据资源转换率的变化值确定对否继续进行资源转移任务的操作。其中,预设变化值可以根据实际需要进行设定,例如对于资源转移数量不是很大的任务可以将预设变化值设置为5%,其中预设变化值5%=(第二资源转换率b-第一资源转换率a)/第一资源转换率a。Since the resource conversion rate may be variable, in the embodiments of this specification, the resource conversion rate when the resource transfer task is reserved may be inconsistent with the resource conversion rate when the resource transfer task is triggered. Therefore, in order to improve the user experience, reduce the The impact of resource conversion rate fluctuations on users, users can determine whether to continue the operation of resource transfer tasks according to the change value of the resource conversion rate. Among them, the preset change value can be set according to actual needs. For example, for a task with a small number of resource transfers, the preset change value can be set to 5%, where the preset change value 5%=(second resource conversion rate b -First resource conversion rate a)/First resource conversion rate a.
进一步的,本说明书实施例中的方法,还可以包括:Further, the method in the embodiment of this specification may also include:
步骤608:当所述第一判断结果表示所述变化值大于所述预设变化值,则生成用于询问所述资源发送方是否继续执行资源转移的提示信息;Step 608: When the first judgment result indicates that the change value is greater than the preset change value, generate prompt information for asking the resource sender whether to continue the resource transfer;
步骤610:当获取到所述资源发送方确认继续执行资源转移的确认操作后,触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;Step 610: After obtaining the confirmation operation that the resource sender confirms to continue to perform the resource transfer, trigger a task of adding the first resource of the first resource amount to the resource receiver's account;
步骤612:从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。Step 612: Decrease the second resource of the second resource quantity from the account of the resource sender.
在实际应用中,预设变化值可以根据实际需要进行设定,例如,资源发送方可以在终端中根据个人情况设置预设值,服务器也可以为资源发送方提供预设值等等。这里对预设值的具体数据以及设置方式不作限定,可以满足实际需求即可。In practical applications, the preset change value can be set according to actual needs. For example, the resource sender can set the preset value in the terminal according to personal circumstances, the server can also provide the resource sender with the preset value, and so on. The specific data and setting methods of the preset values are not limited here, as long as the actual needs can be met.
与上述资源转换率的变化值相对应的,还可以根据由于资源转换率的变化造成的资源损失值判断是否进行资源转移任务的操作,具体的,基于上述图2所示的方法,本说明书实施例还提供了一种资源转移任务的触发方法,如图7所示,本说明书实施例中提供的一种资源转移任务的触发方法,还可以包括:Corresponding to the change value of the above resource conversion rate, the resource loss value caused by the change of the resource conversion rate can also be used to determine whether to perform the operation of the resource transfer task. Specifically, based on the method shown in Figure 2 above, this specification implements The example also provides a method for triggering a resource transfer task. As shown in FIG. 7, the method for triggering a resource transfer task provided in an embodiment of this specification may further include:
步骤700:获取第二资源转换率;所述第二资源转换率为获取到所述资源转移请求时,所述第一资源与所述第二资源之间的资源转换率;Step 700: Obtain a second resource conversion rate; the second resource conversion rate is the resource conversion rate between the first resource and the second resource when the resource transfer request is obtained;
步骤702:基于所述第二资源转换率与所述第一资源转换率,确定所述第二资源对应的损失值;Step 702: Determine a loss value corresponding to the second resource based on the second resource conversion rate and the first resource conversion rate;
步骤704:判断所述损失值是否大于预设值,得到第二判断结果;Step 704: Determine whether the loss value is greater than a preset value, and obtain a second judgment result;
步骤706:当所述第二判断结果表示所述损失值不大于所述预设值,则触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;Step 706: When the second judgment result indicates that the loss value is not greater than the preset value, trigger a task of adding the first resource of the first resource amount to the resource receiver's account;
步骤708:从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。Step 708: Reduce the number of the second resources of the second resource from the account of the resource sender.
其中,损失值可以表示由于资源转换率的变化,资源发送方的第二资源兑换成资源接收方的第一资源后,资源接收方少收到的第一资源数量或者资源发送方需要多汇出的第一资源数量。例如,资源发送方A在中国向美国的资源接收方B进行资源转移,服务器获取到资源发送方的资源管理设备发送的资源转移请求时的第二转换率为a1,资源发送方A预定的是三个月后触发资源转移任务,在到达三个月后假设此时第一转换率为a2,a2大于a1,假设资源发送方A预计转移给资源接收方B第一资源数量为b的第一资源,此时资源发送方A需要多付出(a2-a1)*b的第二资源,假设办理资源转移任务所需的其他费用相同,则资源发送方A多付出第二资源为资源转移的损失值。Among them, the loss value can indicate that due to the change of the resource conversion rate, after the second resource of the resource sender is converted into the first resource of the resource receiver, the resource receiver has less received the first resource or the resource sender needs to remit more The number of first resources. For example, when resource sender A transfers resources to resource receiver B in the United States in China, and the server obtains the resource transfer request sent by the resource management device of the resource sender, the second conversion rate is a1, and the resource sender A predetermined is Three months later, the resource transfer task is triggered. After three months, it is assumed that the first conversion rate is a2, and a2 is greater than a1. Assume that the resource sender A is expected to transfer to the resource receiver B. The first resource quantity is b. Resources. At this time, the resource sender A needs to pay (a2-a1)*b more of the second resource. Assuming that the other costs required for the resource transfer task are the same, the resource sender A pays the second resource more as the loss of the resource transfer value.
进一步的,本说明书实施例中的方法,还可以包括:Further, the method in the embodiment of this specification may also include:
步骤710:当所述第二判断结果表示所述损失值大于所述预设值,则生成用于询问所述资源发送方是否继续执行资源转移的提示信息;Step 710: When the second judgment result indicates that the loss value is greater than the preset value, generate prompt information for asking the resource sender whether to continue to perform resource transfer;
步骤712:当获取到所述资源发送方确认继续执行资源转移的确认操作后,触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;Step 712: After obtaining the confirmation operation that the resource sender confirms to continue to perform the resource transfer, trigger the task of adding the first resource of the first resource amount to the resource receiver's account;
步骤714:从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。Step 714: Decrease the second resource of the second resource quantity from the account of the resource sender.
在实际应用中,损失值对应的预设值可以根据实际需要进行设定,例如,资源发送方可以在终端中根据个人情况设置预设值,服务器也可以为资源发送方提供预设值等等。这里对预设值的具体数据以及设置方式不作限定,可以满足实际需求即可。In practical applications, the preset value corresponding to the loss value can be set according to actual needs. For example, the resource sender can set the preset value in the terminal according to personal circumstances, the server can also provide the resource sender with preset values, etc. . The specific data and setting methods of the preset values are not limited here, as long as the actual needs can be met.
本说明书实施例中提供的资源转移任务的触发方法中,考虑到转换率波动对用户的影响,可以在不满足预设条件时提示用户是否继续进行汇款业务,可以一定程度上减少因汇率波动对用户造成的损失,保护用户的利益。In the method for triggering the resource transfer task provided in the embodiment of this specification, considering the impact of the fluctuation of the conversion rate on the user, the user can be prompted whether to continue the remittance business when the preset conditions are not met, which can reduce the impact of exchange rate fluctuations to a certain extent. The loss caused by the user protects the interests of the user.
需要说明的是,本说明书实施例中资源发送方与资源接收方仅是在程序角度进行的划分,资源发送方的账户与资源接收方的账户可以属于同一用户,相应的资源发送方与资源接收方可以是相同的用户,资源转移任务可以是同一用户在不同账户之间进行的资源转移任务;资源发送方的账户与资源接收方的账户可以属于不同用户,相应的资源发送方与资源接收方可以分别为不同的用户,资源转移任务可以是不同用户在不同账户之间进行的资源转移任务。It should be noted that the resource sender and resource receiver in the embodiments of this specification are only divided from a program perspective. The resource sender’s account and the resource receiver’s account can belong to the same user, and the corresponding resource sender and resource receiver can belong to the same user. The party can be the same user, and the resource transfer task can be a resource transfer task performed by the same user between different accounts; the resource sender’s account and the resource receiver’s account can belong to different users, the corresponding resource sender and resource receiver They can be different users, and the resource transfer task can be a resource transfer task performed by different users between different accounts.
基于同样的思路,本说明书实施例中还提供了与上述图2所示的方法对应的装置,如图8所示,图8为本说明书实施例中提供的一种资源转移任务的触发装置的结构示意图,该装置可以包括:Based on the same idea, the embodiment of this specification also provides a device corresponding to the method shown in FIG. 2, as shown in FIG. 8, which is an example of a resource transfer task trigger device provided in the embodiment of this specification. Structure diagram, the device may include:
请求获取模块800,用于获取资源转移请求;所述资源转移请求至少包括待转移的第一资源的第一数量信息和对所述第一资源进行转移的预定时间信息;所述第一数量信息用于表示预计转移至资源接收方的第一资源的第一资源数量;The request obtaining module 800 is configured to obtain a resource transfer request; the resource transfer request includes at least first quantity information of the first resource to be transferred and information about a predetermined time for transferring the first resource; the first quantity information It is used to indicate the first resource quantity of the first resource that is expected to be transferred to the resource receiver;
条件确定模块802,用于基于所述预定时间信息,确定时间触发条件;The condition determination module 802 is configured to determine a time trigger condition based on the predetermined time information;
转换率获取模块804,用于当所述时间触发条件被满足,获取第一资源转换率;所述第一资源转换率表示所述时间触发条件被满足时,所述第一资源与第二资源之间的资源转换率;所述资源转换率用于表示单位数量的所述第一资源对应的第二资源的资源数量;The conversion rate obtaining module 804 is configured to obtain a first resource conversion rate when the time trigger condition is satisfied; the first resource conversion rate indicates that when the time trigger condition is satisfied, the first resource and the second resource The resource conversion rate between the two; the resource conversion rate is used to indicate the resource quantity of the second resource corresponding to the unit quantity of the first resource;
资源数量确定模块806,用于基于所述第一资源转换率,确定所述第一资源数量的所述第一资源对应的所述第二资源的第二资源数量;A resource quantity determining module 806, configured to determine a second resource quantity of the second resource corresponding to the first resource of the first resource quantity based on the first resource conversion rate;
任务触发模块808,用于触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;A task triggering module 808, configured to trigger a task of adding the first resource of the first resource amount to the account of the resource receiver;
资源管理模块810,用于从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The resource management module 810 is configured to reduce the amount of the second resource of the second resource from the account of the resource sender.
其中,所述条件确定模块之前,还可以包括信息确认模块,用于:基于所述资源转移请求,生成资源转移订单信息;向所述资源发送方的终端反馈所述资源转移订单信息;获取所述终端对所述资源转移订单信息的确认信息。Wherein, before the condition determination module, an information confirmation module may also be included, which is configured to: generate resource transfer order information based on the resource transfer request; feed back the resource transfer order information to the terminal of the resource sender; Confirmation information of the terminal for the resource transfer order information.
基于上述图8所示的装置,本说明书实施例中提供的资源转移任务的触发装置,还可以包括第一判断模块,用于:获取第二资源转换率;所述第二资源转换率为获取到所述资源转移请求时,所述第一资源与所述第二资源之间的资源转换率;基于所述第二资源转换率与所述第一资源转换率,判断所述第二资源转换率与所述第一资源转换率之间的变化值是否大于预设变化值,得到第一判断结果;当所述第一判断结果表示所述变化值不大于所述预设变化值,则触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。Based on the device shown in FIG. 8 above, the device for triggering resource transfer tasks provided in the embodiments of this specification may further include a first judging module, configured to: obtain a second resource conversion rate; At the time of the resource transfer request, the resource conversion rate between the first resource and the second resource; determine the second resource conversion based on the second resource conversion rate and the first resource conversion rate Whether the change value between the conversion rate and the first resource conversion rate is greater than the preset change value, a first judgment result is obtained; when the first judgment result indicates that the change value is not greater than the preset change value, trigger The task of adding the first resource of the first resource amount to the account of the resource receiver; and reducing the second resource of the second resource amount from the account of the resource sender.
同理,基于上述图8所示的装置,本说明书实施例中提供的资源转移任务的触发装置,还可以包括第二判断模块,用于:获取第二资源转换率;所述第二资源转换率为获取到所述资源转移请求时,所述第一资源与所述第二资源之间的资源转换率;基于所述第二资源转换率与所述第一资源转换率,确定所述第二资源对应的损失值;判断所述损失值是否大于预设值,得到第二判断结果;当所述第二判断结果表示所述损失值不大于所述预设值,则触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的 任务;从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。In the same way, based on the device shown in FIG. 8 above, the device for triggering resource transfer tasks provided in the embodiment of this specification may further include a second judgment module configured to: obtain a second resource conversion rate; The rate is the resource conversion rate between the first resource and the second resource when the resource transfer request is obtained; based on the second resource conversion rate and the first resource conversion rate, the first resource conversion rate is determined 2. The loss value corresponding to the resource; it is determined whether the loss value is greater than the preset value, and the second judgment result is obtained; when the second judgment result indicates that the loss value is not greater than the preset value, a trigger is sent to the resource The account of the receiver increases the task of the first resource of the first resource quantity; and the second resource of the second resource quantity is reduced from the account of the resource sender.
基于同样的思路,本说明书实施例中还提供了与上述图2所示方法对应的一种资源转移任务的触发设备,如图9所示,图9为本说明书实施例中提供的一种资源转移任务的触发设备的结构示意图,设备900可以包括:至少一个处理器910;以及,与所述至少一个处理器通信连接的存储器930。Based on the same idea, the embodiment of this specification also provides a resource transfer task trigger device corresponding to the method shown in FIG. 2, as shown in FIG. 9, which is a resource provided in the embodiment of this specification. A schematic structural diagram of a device for triggering a transfer task. The device 900 may include: at least one processor 910; and a memory 930 communicatively connected to the at least one processor.
其中,所述存储器930存储有可被所述至少一个处理器910执行的指令920,所述指令被所述至少一个处理器910执行,以使所述至少一个处理器910能够:获取资源转移请求;所述资源转移请求至少包括待转移的第一资源的第一数量信息和对所述第一资源进行转移的预定时间信息;所述第一数量信息用于表示预计转移至资源接收方的第一资源的第一资源数量;基于所述预定时间信息,确定时间触发条件;当所述时间触发条件被满足,获取第一资源转换率;所述第一资源转换率表示所述时间触发条件被满足时,所述第一资源与第二资源之间的资源转换率;所述资源转换率用于表示单位数量的所述第一资源对应的第二资源的资源数量;基于所述第一资源转换率,确定所述第一资源数量的所述第一资源对应的所述第二资源的第二资源数量;触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The memory 930 stores instructions 920 that can be executed by the at least one processor 910, and the instructions are executed by the at least one processor 910, so that the at least one processor 910 can: obtain a resource transfer request The resource transfer request includes at least the first quantity information of the first resource to be transferred and the predetermined time information for the transfer of the first resource; the first quantity information is used to indicate the first quantity that is expected to be transferred to the resource receiver A first resource quantity of a resource; determine a time trigger condition based on the predetermined time information; when the time trigger condition is met, obtain a first resource conversion rate; the first resource conversion rate indicates that the time trigger condition is When satisfied, the resource conversion rate between the first resource and the second resource; the resource conversion rate is used to indicate the resource quantity of the second resource corresponding to the unit quantity of the first resource; based on the first resource Conversion rate, determining the second resource quantity of the second resource corresponding to the first resource of the first resource quantity; triggering the increase of the first resource quantity of the first resource to the account of the resource receiver The task of the resource; the second resource that reduces the amount of the second resource from the account of the resource sender.
本说明书实施例中还可以提供一种计算机可读介质,其上存储有计算机可读指令,所述计算机可读指令可被处理器执行以实现上述与图2所示的方法中对应的汇款业务的触发方法。The embodiments of this specification may also provide a computer-readable medium on which computer-readable instructions are stored, and the computer-readable instructions can be executed by the processor to implement the above-mentioned remittance service corresponding to the method shown in FIG. 2 The trigger method.
上述对本说明书特定实施例进行了描述。其它实施例在所附权利要求书的范围内。在一些情况下,在权利要求书中记载的动作或步骤可以按照不同于实施例中的顺序来执行并且仍然可以实现期望的结果。另外,在附图中描绘的过程不一定要求示出的特定顺序或者连续顺序才能实现期望的结果。在某些实施方式中,多任务处理和并行处理也是可以的或者可能是有利的。The foregoing describes specific embodiments of this specification. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps described in the claims can be performed in a different order than in the embodiments and still achieve desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or sequential order shown in order to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
本说明书实施例提供的装置、设备、非易失性计算机存储介质与方法是对应的,因此,装置、设备、非易失性计算机存储介质也具有与对应方法类似的有益技术效果,由于上面已经对方法的有益技术效果进行了详细说明,因此,这里不再赘述对应装置、设备、非易失性计算机存储介质的有益技术效果。The apparatus, equipment, non-volatile computer storage medium and method provided in the embodiments of this specification correspond to each other. Therefore, the apparatus, equipment, and non-volatile computer storage medium also have beneficial technical effects similar to the corresponding method. The beneficial technical effects of the method are described in detail, therefore, the beneficial technical effects of the corresponding device, equipment, and non-volatile computer storage medium are not repeated here.
在20世纪90年代,对于一个技术的改进可以很明显地区分是硬件上的改进(例如,对二极管、晶体管、开关等电路结构的改进)还是软件上的改进(对于方法流程的改进)。然而,随着技术的发展,当今的很多方法流程的改进已经可以视为硬件电路结构的直接改进。设计人员几乎都通过将改进的方法流程编程到硬件电路中来得到相应的硬件电路结构。因此,不能说一个方法流程的改进就不能用硬件实体模块来实现。例如,可编程逻辑器件(Programmable Logic Device,PLD)(例如现场可编程门阵列(Field  Programmable Gate Array,FPGA))就是这样一种集成电路,其逻辑功能由用户对器件编程来确定。由设计人员自行编程来把一个数字系统“集成”在一片PLD上,而不需要请芯片制造厂商来设计和制作专用的集成电路芯片。而且,如今,取代手工地制作集成电路芯片,这种编程也多半改用“逻辑编译器(logic compiler)”软件来实现,它与程序开发撰写时所用的软件编译器相类似,而要编译之前的原始代码也得用特定的编程语言来撰写,此称之为硬件描述语言(Hardware Description Language,HDL),而HDL也并非仅有一种,而是有许多种,如ABEL(Advanced Boolean Expression Language)、AHDL(Altera Hardware Description Language)、Confluence、CUPL(Cornell University Programming Language)、HDCal、JHDL(Java Hardware Description Language)、Lava、Lola、MyHDL、PALASM、RHDL(Ruby Hardware Description Language)等,目前最普遍使用的是VHDL(Very-High-Speed Integrated Circuit Hardware Description Language)与Verilog。本领域技术人员也应该清楚,只需要将方法流程用上述几种硬件描述语言稍作逻辑编程并编程到集成电路中,就可以很容易得到实现该逻辑方法流程的硬件电路。In the 1990s, the improvement of a technology can be clearly distinguished between hardware improvements (for example, improvements in circuit structures such as diodes, transistors, switches, etc.) or software improvements (improvements in method flow). However, with the development of technology, the improvement of many methods and processes of today can be regarded as a direct improvement of the hardware circuit structure. Designers almost always get the corresponding hardware circuit structure by programming the improved method flow into the hardware circuit. Therefore, it cannot be said that the improvement of a method flow cannot be realized by the hardware entity module. For example, a programmable logic device (Programmable Logic Device, PLD) (for example, a Field Programmable Gate Array (Field Programmable Gate Array, FPGA)) is such an integrated circuit whose logic function is determined by the user's programming of the device. It is programmed by the designer to "integrate" a digital system on a piece of PLD, without requiring chip manufacturers to design and manufacture dedicated integrated circuit chips. Moreover, nowadays, instead of manually making integrated circuit chips, this kind of programming is mostly realized with "logic compiler" software, which is similar to the software compiler used in program development and writing, but before compilation The original code must also be written in a specific programming language, which is called Hardware Description Language (HDL), and there is not only one type of HDL, but many types, such as ABEL (Advanced Boolean Expression Language) , AHDL (Altera Hardware Description Language), Confluence, CUPL (Cornell University Programming Language), HDCal, JHDL (Java Hardware Description Language), Lava, Lola, MyHDL, PALASM, RHDL (Ruby Hardware Description), etc., currently most commonly used It is VHDL (Very-High-Speed Integrated Circuit Hardware Description Language) and Verilog. It should also be clear to those skilled in the art that just a little bit of logic programming of the method flow in the above-mentioned hardware description languages and programming into an integrated circuit can easily obtain the hardware circuit that implements the logic method flow.
控制器可以按任何适当的方式实现,例如,控制器可以采取例如微处理器或处理器以及存储可由该(微)处理器执行的计算机可读程序代码(例如软件或固件)的计算机可读介质、逻辑门、开关、专用集成电路(Application Specific Integrated Circuit,ASIC)、可编程逻辑控制器和嵌入微控制器的形式,控制器的例子包括但不限于以下微控制器:ARC 625D、Atmel AT91SAM、Microchip PIC18F26K20以及Silicone Labs C8051F320,存储器控制器还可以被实现为存储器的控制逻辑的一部分。本领域技术人员也知道,除了以纯计算机可读程序代码方式实现控制器以外,完全可以通过将方法步骤进行逻辑编程来使得控制器以逻辑门、开关、专用集成电路、可编程逻辑控制器和嵌入微控制器等的形式来实现相同功能。因此这种控制器可以被认为是一种硬件部件,而对其内包括的用于实现各种功能的装置也可以视为硬件部件内的结构。或者甚至,可以将用于实现各种功能的装置视为既可以是实现方法的软件模块又可以是硬件部件内的结构。The controller can be implemented in any suitable manner. For example, the controller can take the form of, for example, a microprocessor or a processor and a computer-readable medium storing computer-readable program codes (such as software or firmware) executable by the (micro)processor. , Logic gates, switches, application specific integrated circuits (ASICs), programmable logic controllers and embedded microcontrollers. Examples of controllers include but are not limited to the following microcontrollers: ARC625D, Atmel AT91SAM, Microchip PIC18F26K20 and Silicon Labs C8051F320, the memory controller can also be implemented as part of the memory control logic. Those skilled in the art also know that, in addition to implementing the controller in a purely computer-readable program code manner, it is entirely possible to program the method steps to make the controller use logic gates, switches, application specific integrated circuits, programmable logic controllers, and embedded logic. The same function can be realized in the form of a microcontroller or the like. Therefore, such a controller can be regarded as a hardware component, and the devices included in it for realizing various functions can also be regarded as a structure within the hardware component. Or even, the device for realizing various functions can be regarded as both a software module for realizing the method and a structure within a hardware component.
上述实施例阐明的系统、装置、模块或单元,具体可以由计算机芯片或实体实现,或者由具有某种功能的产品来实现。一种典型的实现设备为计算机。具体的,计算机例如可以为个人计算机、膝上型计算机、蜂窝电话、相机电话、智能电话、个人数字助理、媒体播放器、导航设备、电子邮件设备、游戏控制台、平板计算机、可穿戴设备或者这些设备中的任何设备的组合。The systems, devices, modules, or units illustrated in the above embodiments may be specifically implemented by computer chips or entities, or implemented by products with certain functions. A typical implementation device is a computer. Specifically, the computer may be, for example, a personal computer, a laptop computer, a cell phone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email device, a game console, a tablet computer, a wearable device, or Any combination of these devices.
为了描述的方便,描述以上装置时以功能分为各种单元分别描述。当然,在实施本申请时可以把各单元的功能在同一个或多个软件和/或硬件中实现。For the convenience of description, when describing the above device, the functions are divided into various units and described separately. Of course, when implementing this application, the functions of each unit can be implemented in the same or multiple software and/or hardware.
本领域内的技术人员应明白,本发明的实施例可提供为方法、系统、或计算机程序产品。因此,本发明可采用完全硬件实施例、完全软件实施例、或结合软件和硬件方面的实施例的形式。而且,本发明可采用在一个或多个其中包含有计算机可用程序代码的计算机可用存储介质(包括但不限于磁盘存储器、CD-ROM、光学存储器等)上实施的 计算机程序产品的形式。Those skilled in the art should understand that the embodiments of the present invention can be provided as a method, a system, or a computer program product. Therefore, the present invention may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program codes.
本发明是参照根据本发明实施例的方法、设备(系统)、和计算机程序产品的流程图和/或方框图来描述的。应理解可由计算机程序指令实现流程图和/或方框图中的每一流程和/或方框、以及流程图和/或方框图中的流程和/或方框的结合。可提供这些计算机程序指令到通用计算机、专用计算机、嵌入式处理机或其他可编程数据处理设备的处理器以产生一个机器,使得通过计算机或其他可编程数据处理设备的处理器执行的指令产生用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的装置。The present invention is described with reference to flowcharts and/or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and/or block in the flowchart and/or block diagram, and the combination of processes and/or blocks in the flowchart and/or block diagram can be realized by computer program instructions. These computer program instructions can be provided to the processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing equipment to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing equipment are used to generate It is a device that realizes the functions specified in one process or multiple processes in the flowchart and/or one block or multiple blocks in the block diagram.
这些计算机程序指令也可存储在能引导计算机或其他可编程数据处理设备以特定方式工作的计算机可读存储器中,使得存储在该计算机可读存储器中的指令产生包括指令装置的制造品,该指令装置实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能。These computer program instructions can also be stored in a computer-readable memory that can guide a computer or other programmable data processing equipment to work in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture including the instruction device. The device implements the functions specified in one process or multiple processes in the flowchart and/or one block or multiple blocks in the block diagram.
这些计算机程序指令也可装载到计算机或其他可编程数据处理设备上,使得在计算机或其他可编程设备上执行一系列操作步骤以产生计算机实现的处理,从而在计算机或其他可编程设备上执行的指令提供用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的步骤。These computer program instructions can also be loaded on a computer or other programmable data processing equipment, so that a series of operation steps are executed on the computer or other programmable equipment to produce computer-implemented processing, so as to execute on the computer or other programmable equipment. The instructions provide steps for implementing the functions specified in one process or multiple processes in the flowchart and/or one block or multiple blocks in the block diagram.
在一个典型的配置中,计算设备包括一个或多个处理器(CPU)、输入/输出接口、网络接口和内存。In a typical configuration, the computing device includes one or more processors (CPUs), input/output interfaces, network interfaces, and memory.
内存可能包括计算机可读介质中的非永久性存储器,随机存取存储器(RAM)和/或非易失性内存等形式,如只读存储器(ROM)或闪存(flash RAM)。内存是计算机可读介质的示例。The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and/or non-volatile memory, such as read-only memory (ROM) or flash memory (flash RAM). Memory is an example of computer readable media.
计算机可读介质包括永久性和非永久性、可移动和非可移动媒体可以由任何方法或技术来实现信息存储。信息可以是计算机可读指令、数据结构、程序的模块或其他数据。计算机的存储介质的例子包括,但不限于相变内存(PRAM)、静态随机存取存储器(SRAM)、动态随机存取存储器(DRAM)、其他类型的随机存取存储器(RAM)、只读存储器(ROM)、电可擦除可编程只读存储器(EEPROM)、快闪记忆体或其他内存技术、只读光盘只读存储器(CD-ROM)、数字多功能光盘(DVD)或其他光学存储、磁盒式磁带,磁带式磁盘存储或其他磁性存储设备或任何其他非传输介质,可用于存储可以被计算设备访问的信息。按照本文中的界定,计算机可读介质不包括暂存电脑可读媒体(transitory media),如调制的数据信号和载波。Computer-readable media include permanent and non-permanent, removable and non-removable media, and information storage can be realized by any method or technology. The information can be computer-readable instructions, data structures, program modules, or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, CD-ROM, digital versatile disc (DVD) or other optical storage, Magnetic cartridges, magnetic tape storage or other magnetic storage devices or any other non-transmission media can be used to store information that can be accessed by computing devices. According to the definition in this article, computer-readable media does not include transitory media, such as modulated data signals and carrier waves.
还需要说明的是,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、商品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、商品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在 包括所述要素的过程、方法、商品或者设备中还存在另外的相同要素。It should also be noted that the terms "include", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or equipment including a series of elements includes not only those elements, but also Other elements that are not explicitly listed, or also include elements inherent to such processes, methods, commodities, or equipment. If there are no more restrictions, the element defined by the sentence "including a..." does not exclude the existence of other identical elements in the process, method, commodity or equipment that includes the element.
本申请可以在由计算机执行的计算机可执行指令的一般上下文中描述,例如程序模块。一般地,程序模块包括执行特定任务或实现特定抽象数据类型的例程、程序、对象、组件、数据结构等等。也可以在分布式计算环境中实践本申请,在这些分布式计算环境中,由通过通信网络而被连接的远程处理设备来执行任务。在分布式计算环境中,程序模块可以位于包括存储设备在内的本地和远程计算机存储介质中。This application may be described in the general context of computer-executable instructions executed by a computer, such as a program module. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. This application can also be practiced in distributed computing environments. In these distributed computing environments, tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules can be located in local and remote computer storage media including storage devices.
本说明书中的各个实施例均采用递进的方式描述,各个实施例之间相同相似的部分互相参见即可,每个实施例重点说明的都是与其他实施例的不同之处。尤其,对于系统实施例而言,由于其基本相似于方法实施例,所以描述的比较简单,相关之处参见方法实施例的部分说明即可。The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referred to each other, and each embodiment focuses on the difference from other embodiments. In particular, as for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and for related parts, please refer to the part of the description of the method embodiment.
以上所述仅为本申请的实施例而已,并不用于限制本申请。对于本领域技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原理之内所作的任何修改、等同替换、改进等,均应包含在本申请的权利要求范围之内。The above descriptions are only examples of the present application, and are not used to limit the present application. For those skilled in the art, this application can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of this application shall be included in the scope of the claims of this application.

Claims (16)

  1. 一种资源转移任务的触发方法,包括:A method for triggering resource transfer tasks, including:
    获取资源转移请求;所述资源转移请求至少包括待转移的第一资源的第一数量信息和对所述第一资源进行转移的预定时间信息;所述第一数量信息用于表示预计转移至资源接收方的第一资源的第一资源数量;Acquire a resource transfer request; the resource transfer request includes at least first quantity information of the first resource to be transferred and information about the scheduled time for transferring the first resource; the first quantity information is used to indicate the expected transfer to the resource The first resource quantity of the first resource of the receiver;
    基于所述预定时间信息,确定时间触发条件;Determine a time trigger condition based on the predetermined time information;
    当所述时间触发条件被满足,获取第一资源转换率;所述第一资源转换率表示所述时间触发条件被满足时,所述第一资源与第二资源之间的资源转换率;所述资源转换率用于表示单位数量的所述第一资源对应的第二资源的资源数量;When the time trigger condition is met, a first resource conversion rate is obtained; the first resource conversion rate indicates the resource conversion rate between the first resource and the second resource when the time trigger condition is met; The resource conversion rate is used to indicate the resource quantity of the second resource corresponding to the unit quantity of the first resource;
    基于所述第一资源转换率,确定所述第一资源数量的所述第一资源对应的所述第二资源的第二资源数量;Determine, based on the first resource conversion rate, a second resource quantity of the second resource corresponding to the first resource of the first resource quantity;
    触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;Triggering a task of adding the first resource of the first amount of resources to the account of the resource receiver;
    从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The second resource of the second resource quantity is reduced from the resource sender's account.
  2. 根据权利要求1所述的方法,所述确定时间触发条件之前,还包括:The method according to claim 1, before the determining the time trigger condition, further comprising:
    基于所述资源转移请求,生成资源转移订单信息;Based on the resource transfer request, generating resource transfer order information;
    向所述资源发送方的终端反馈所述资源转移订单信息;Feeding back the resource transfer order information to the terminal of the resource sender;
    获取所述终端对所述资源转移订单信息的确认信息。Acquire confirmation information of the terminal for the resource transfer order information.
  3. 根据权利要求1所述的方法,所述确定时间触发条件之前,还包括:The method according to claim 1, before the determining the time trigger condition, further comprising:
    获取所述资源发送方的账户中与所述第一资源对应的第二资源的预估第二资源数量;Acquiring the estimated second resource quantity of the second resource corresponding to the first resource in the account of the resource sender;
    冻结所述预估第二资源数量的所述第二资源,得到冻结的第二资源;Freezing the second resource of the estimated second resource quantity to obtain the frozen second resource;
    所述从所述资源发送方的账户中减少所述第二资源数量的所述第二资源,具体包括:The second resource that reduces the amount of the second resource from the account of the resource sender specifically includes:
    从所述资源发送方的账户中减少所述冻结的第二资源中的部分或全部第二资源。Reduce some or all of the second resources in the frozen second resources from the resource sender's account.
  4. 根据权利要求1所述的方法,所述触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务之前,还包括:The method according to claim 1, before triggering the task of adding the first resource of the first amount of resources to the account of the resource receiver, further comprising:
    查询所述资源发送方的账户上的第二资源的剩余数量;Query the remaining quantity of the second resource in the account of the resource sender;
    判断所述剩余数量是否大于或等于所述第二资源数量;Judging whether the remaining quantity is greater than or equal to the second resource quantity;
    若否,生成用于提示资源转移失败的反馈信息。If not, generate feedback information for prompting resource transfer failure.
  5. 根据权利要求1所述的方法,还包括:The method according to claim 1, further comprising:
    获取所述资源发送方的用户相关信息;Obtaining user-related information of the resource sender;
    根据所述用户相关信息,判断所述资源转移任务是否符合设定规则。According to the user-related information, it is determined whether the resource transfer task complies with a set rule.
  6. 根据权利要求1所述的方法,还包括:The method according to claim 1, further comprising:
    获取所述资源发送方的用户相关信息;Obtaining user-related information of the resource sender;
    获取所述资源发送方的历史资源转移信息;Acquiring historical resource transfer information of the resource sender;
    根据所述用户相关信息以及所述历史资源转移信息,判断所述资源转移任务是否具有违规风险。According to the user-related information and the historical resource transfer information, it is determined whether the resource transfer task has a risk of violation.
  7. 根据权利要求1所述的方法,还包括:The method according to claim 1, further comprising:
    获取第二资源转换率;所述第二资源转换率为获取到所述资源转移请求时,所述第一资源与所述第二资源之间的资源转换率;Acquiring a second resource conversion rate; the second resource conversion rate is the resource conversion rate between the first resource and the second resource when the resource transfer request is acquired;
    基于所述第二资源转换率与所述第一资源转换率,判断所述第二资源转换率与所述第一资源转换率之间的变化值是否大于预设变化值,得到第一判断结果;Based on the second resource conversion rate and the first resource conversion rate, determine whether the change value between the second resource conversion rate and the first resource conversion rate is greater than a preset change value, and obtain a first determination result ;
    当所述第一判断结果表示所述变化值不大于所述预设变化值,则触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;When the first judgment result indicates that the change value is not greater than the preset change value, triggering the task of adding the first resource of the first resource amount to the resource receiver's account;
    从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The second resource of the second resource quantity is reduced from the resource sender's account.
  8. 根据权利要求7所述的方法,还包括:The method according to claim 7, further comprising:
    当所述第一判断结果表示所述变化值大于所述预设变化值,则生成用于询问所述资源发送方是否继续执行资源转移的提示信息;When the first judgment result indicates that the change value is greater than the preset change value, generating prompt information for asking the resource sender whether to continue the resource transfer;
    当获取到所述资源发送方确认继续执行资源转移的确认操作后,触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;After obtaining the confirmation operation of the resource sender confirming to continue to perform the resource transfer, triggering the task of adding the first resource of the first resource amount to the resource receiver's account;
    从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The second resource of the second resource quantity is reduced from the resource sender's account.
  9. 根据权利要求1所述的方法,所述获取资源转移请求之后,还包括:The method according to claim 1, after the obtaining the resource transfer request, further comprising:
    获取第二资源转换率;所述第二资源转换率为获取到所述资源转移请求时,所述第一资源与所述第二资源之间的资源转换率;Acquiring a second resource conversion rate; the second resource conversion rate is the resource conversion rate between the first resource and the second resource when the resource transfer request is acquired;
    基于所述第二资源转换率与所述第一资源转换率,确定所述第二资源对应的损失值;Determine a loss value corresponding to the second resource based on the second resource conversion rate and the first resource conversion rate;
    判断所述损失值是否大于预设值,得到第二判断结果;Judging whether the loss value is greater than a preset value, and obtaining a second judgment result;
    当所述第二判断结果表示所述损失值不大于所述预设值,则触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;When the second judgment result indicates that the loss value is not greater than the preset value, triggering the task of adding the first resource of the first resource amount to the resource receiver's account;
    从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The second resource of the second resource quantity is reduced from the resource sender's account.
  10. 根据权利要求9所述的方法,还包括:The method according to claim 9, further comprising:
    当所述第二判断结果表示所述损失值大于所述预设值,则生成用于询问所述资源发送方是否继续执行资源转移的提示信息;When the second judgment result indicates that the loss value is greater than the preset value, generating prompt information for asking the resource sender whether to continue to perform resource transfer;
    当获取到所述资源发送方确认继续执行资源转移的确认操作后,触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;After obtaining the confirmation operation of the resource sender confirming to continue to perform the resource transfer, triggering the task of adding the first resource of the first resource amount to the resource receiver's account;
    从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The second resource of the second resource quantity is reduced from the resource sender's account.
  11. 一种资源转移任务的触发装置,包括:A triggering device for resource transfer tasks includes:
    请求获取模块,用于获取资源转移请求;所述资源转移请求至少包括待转移的第一资源的第一数量信息和对所述第一资源进行转移的预定时间信息;所述第一数量信息用于表示预计转移至资源接收方的第一资源的第一资源数量;The request acquisition module is configured to acquire a resource transfer request; the resource transfer request includes at least first quantity information of the first resource to be transferred and information about a predetermined time for transferring the first resource; the first quantity information is used Yu represents the first resource quantity of the first resource that is expected to be transferred to the resource receiver;
    条件确定模块,用于基于所述预定时间信息,确定时间触发条件;A condition determination module, configured to determine a time trigger condition based on the predetermined time information;
    转换率获取模块,用于当所述时间触发条件被满足,获取第一资源转换率;所述第一资源转换率表示所述时间触发条件被满足时,所述第一资源与第二资源之间的资源转换率;所述资源转换率用于表示单位数量的所述第一资源对应的第二资源的资源数量;The conversion rate obtaining module is configured to obtain a first resource conversion rate when the time trigger condition is satisfied; the first resource conversion rate indicates that when the time trigger condition is satisfied, the first resource and the second resource The resource conversion rate between the two; the resource conversion rate is used to indicate the resource quantity of the second resource corresponding to the unit quantity of the first resource;
    资源数量确定模块,用于基于所述第一资源转换率,确定所述第一资源数量的所述第一资源对应的所述第二资源的第二资源数量;A resource quantity determining module, configured to determine a second resource quantity of the second resource corresponding to the first resource of the first resource quantity based on the first resource conversion rate;
    任务触发模块,用于触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;A task triggering module, configured to trigger a task of adding the first resource of the first resource amount to the account of the resource receiver;
    资源管理模块,用于从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The resource management module is configured to reduce the second resource of the second resource quantity from the account of the resource sender.
  12. 根据权利要求11所述的装置,还包括信息确认模块,用于:The device according to claim 11, further comprising an information confirmation module, configured to:
    基于所述资源转移请求,生成资源转移订单信息;Based on the resource transfer request, generating resource transfer order information;
    向所述资源发送方的终端反馈所述资源转移订单信息;Feeding back the resource transfer order information to the terminal of the resource sender;
    获取所述终端对所述资源转移订单信息的确认信息。Acquire confirmation information of the terminal for the resource transfer order information.
  13. 根据权利要求11所述的装置,还包括资源冻结模块,用于:The device according to claim 11, further comprising a resource freezing module, configured to:
    获取所述资源发送方的账户中与所述第一资源对应的第二资源的预估第二资源数量;Acquiring the estimated second resource quantity of the second resource corresponding to the first resource in the account of the resource sender;
    冻结所述预估第二资源数量的所述第二资源,得到冻结的第二资源;Freezing the second resource of the estimated second resource quantity to obtain the frozen second resource;
    所述资源管理模块,具体用于:The resource management module is specifically used for:
    从所述资源发送方的账户中减少所述冻结的第二资源中的部分或全部第二资源。Reduce some or all of the second resources in the frozen second resources from the resource sender's account.
  14. 根据权利要求11所述的装置,还包括第一判断模块,用于:The device according to claim 11, further comprising a first judgment module, configured to:
    获取第二资源转换率;所述第二资源转换率为获取到所述资源转移请求时,所述第一资源与所述第二资源之间的资源转换率;Acquiring a second resource conversion rate; the second resource conversion rate is the resource conversion rate between the first resource and the second resource when the resource transfer request is acquired;
    基于所述第二资源转换率与所述第一资源转换率,判断所述第二资源转换率与所述第一资源转换率之间的变化值是否大于预设变化值,得到第一判断结果;Based on the second resource conversion rate and the first resource conversion rate, determine whether the change value between the second resource conversion rate and the first resource conversion rate is greater than a preset change value, and obtain a first determination result ;
    当所述第一判断结果表示所述变化值不大于所述预设变化值,则触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;When the first judgment result indicates that the change value is not greater than the preset change value, triggering the task of adding the first resource of the first resource amount to the resource receiver's account;
    从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The second resource of the second resource quantity is reduced from the resource sender's account.
  15. 根据权利要求11所述的装置,还包括第二判断模块,用于:The device according to claim 11, further comprising a second judgment module, configured to:
    获取第二资源转换率;所述第二资源转换率为获取到所述资源转移请求时,所述第一资源与所述第二资源之间的资源转换率;Acquiring a second resource conversion rate; the second resource conversion rate is the resource conversion rate between the first resource and the second resource when the resource transfer request is acquired;
    基于所述第二资源转换率与所述第一资源转换率,确定所述第二资源对应的损失值;Determine a loss value corresponding to the second resource based on the second resource conversion rate and the first resource conversion rate;
    判断所述损失值是否大于预设值,得到第二判断结果;Judging whether the loss value is greater than a preset value, and obtaining a second judgment result;
    当所述第二判断结果表示所述损失值不大于所述预设值,则触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;When the second judgment result indicates that the loss value is not greater than the preset value, triggering the task of adding the first resource of the first resource amount to the resource receiver's account;
    从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The second resource of the second resource quantity is reduced from the resource sender's account.
  16. 一种资源转移任务的触发设备,包括:A triggering device for resource transfer tasks, including:
    至少一个处理器;以及,At least one processor; and,
    与所述至少一个处理器通信连接的存储器;其中,A memory communicatively connected with the at least one processor; wherein,
    所述存储器存储有可被所述至少一个处理器执行的指令,所述指令被所述至少一个 处理器执行,以使所述至少一个处理器能够:The memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor, so that the at least one processor can:
    获取资源转移请求;所述资源转移请求至少包括待转移的第一资源的第一数量信息和对所述第一资源进行转移的预定时间信息;所述第一数量信息用于表示预计转移至资源接收方的第一资源的第一资源数量;Acquire a resource transfer request; the resource transfer request includes at least first quantity information of the first resource to be transferred and information about the scheduled time for transferring the first resource; the first quantity information is used to indicate the expected transfer to the resource The first resource quantity of the first resource of the receiver;
    基于所述预定时间信息,确定时间触发条件;Determine a time trigger condition based on the predetermined time information;
    当所述时间触发条件被满足,获取第一资源转换率;所述第一资源转换率表示所述时间触发条件被满足时,所述第一资源与第二资源之间的资源转换率;所述资源转换率用于表示单位数量的所述第一资源对应的第二资源的资源数量;When the time trigger condition is met, a first resource conversion rate is obtained; the first resource conversion rate indicates the resource conversion rate between the first resource and the second resource when the time trigger condition is met; The resource conversion rate is used to indicate the resource quantity of the second resource corresponding to the unit quantity of the first resource;
    基于所述第一资源转换率,确定所述第一资源数量的所述第一资源对应的所述第二资源的第二资源数量;Determine, based on the first resource conversion rate, a second resource quantity of the second resource corresponding to the first resource of the first resource quantity;
    触发向所述资源接收方的账户增加所述第一资源数量的所述第一资源的任务;Triggering a task of adding the first resource of the first amount of resources to the account of the resource receiver;
    从所述资源发送方的账户中减少所述第二资源数量的所述第二资源。The second resource of the second resource quantity is reduced from the resource sender's account.
PCT/CN2021/088738 2020-04-26 2021-04-21 Resource transfer task triggering WO2021218743A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202010337633.7A CN111523903A (en) 2020-04-26 2020-04-26 Method, device and equipment for triggering resource transfer task
CN202010337633.7 2020-04-26

Publications (1)

Publication Number Publication Date
WO2021218743A1 true WO2021218743A1 (en) 2021-11-04

Family

ID=71903329

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2021/088738 WO2021218743A1 (en) 2020-04-26 2021-04-21 Resource transfer task triggering

Country Status (2)

Country Link
CN (1) CN111523903A (en)
WO (1) WO2021218743A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115860743A (en) * 2023-02-27 2023-03-28 北京易思汇商务服务有限公司 Method, device and equipment for correcting study-leaving payment information and readable storage medium

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111523903A (en) * 2020-04-26 2020-08-11 支付宝实验室(新加坡)有限公司 Method, device and equipment for triggering resource transfer task
CN112819596A (en) * 2021-01-13 2021-05-18 中国建设银行股份有限公司 Service processing method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160042356A1 (en) * 2014-08-11 2016-02-11 Gabriel Jakobson Biometric Reading Governing Commercial Transactions via Smart Devices
CN106656600A (en) * 2016-12-22 2017-05-10 腾讯科技(深圳)有限公司 Resource transformation method and device
CN106779420A (en) * 2016-12-20 2017-05-31 腾讯科技(深圳)有限公司 A kind of resource conversion method and apparatus
CN107292688A (en) * 2016-03-31 2017-10-24 阿里巴巴集团控股有限公司 A kind of method for processing business and device
CN111523903A (en) * 2020-04-26 2020-08-11 支付宝实验室(新加坡)有限公司 Method, device and equipment for triggering resource transfer task

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108492104B (en) * 2018-02-12 2020-10-02 阿里巴巴集团控股有限公司 Resource transfer monitoring method and device
CN109657890B (en) * 2018-09-14 2023-04-25 蚂蚁金服(杭州)网络技术有限公司 Method and device for determining risk of money transfer fraud

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160042356A1 (en) * 2014-08-11 2016-02-11 Gabriel Jakobson Biometric Reading Governing Commercial Transactions via Smart Devices
CN107292688A (en) * 2016-03-31 2017-10-24 阿里巴巴集团控股有限公司 A kind of method for processing business and device
CN106779420A (en) * 2016-12-20 2017-05-31 腾讯科技(深圳)有限公司 A kind of resource conversion method and apparatus
CN106656600A (en) * 2016-12-22 2017-05-10 腾讯科技(深圳)有限公司 Resource transformation method and device
CN111523903A (en) * 2020-04-26 2020-08-11 支付宝实验室(新加坡)有限公司 Method, device and equipment for triggering resource transfer task

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115860743A (en) * 2023-02-27 2023-03-28 北京易思汇商务服务有限公司 Method, device and equipment for correcting study-leaving payment information and readable storage medium

Also Published As

Publication number Publication date
CN111523903A (en) 2020-08-11

Similar Documents

Publication Publication Date Title
WO2021218743A1 (en) Resource transfer task triggering
TWI696135B (en) Method and device for off-line payment, business processing, and payment processing
WO2021244537A1 (en) Resource transfer
WO2017219874A1 (en) Resource processing method and apparatus
WO2018095308A1 (en) Method and device for predicting traffic
CN108960790A (en) A kind of processing method, device, server and the system of bill business
CN110400072A (en) A kind of authorization method of credit services, device and equipment
CN108352037A (en) Resource conveys
CN110264214A (en) It is a kind of trade bill generation and check and write off method, device and equipment
WO2021239087A1 (en) Data processing method, apparatus and device, and medium
TW202001708A (en) Credit tax refund method, device and system and electronic device
WO2021218667A1 (en) Resource transfer task triggering
WO2023226799A1 (en) Invoice request processing method, apparatus and device
WO2023226847A1 (en) Invoicing delaying request processing methods, apparatuses and device
WO2023151438A1 (en) Payment interaction processing
CN113807888B (en) Marketing processing method and device
CN115423461A (en) Bill processing method and device
CN112184193A (en) Payment processing method and device
WO2021208755A1 (en) Data processing and payment
CN111985919B (en) Payment data processing method and device and electronic equipment
CN112270542B (en) Transaction data processing method, device, equipment and system
CN113159747B (en) Management method, device and equipment for electronic traffic account
CN117422493A (en) Settlement method, settlement device, settlement equipment and computer readable medium
CN118052544A (en) Order payment processing method and device
CN115760093A (en) Data processing method and device

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21797685

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21797685

Country of ref document: EP

Kind code of ref document: A1