WO2021124789A1 - 海底装置、通電方法及び記録媒体 - Google Patents

海底装置、通電方法及び記録媒体 Download PDF

Info

Publication number
WO2021124789A1
WO2021124789A1 PCT/JP2020/043258 JP2020043258W WO2021124789A1 WO 2021124789 A1 WO2021124789 A1 WO 2021124789A1 JP 2020043258 W JP2020043258 W JP 2020043258W WO 2021124789 A1 WO2021124789 A1 WO 2021124789A1
Authority
WO
WIPO (PCT)
Prior art keywords
energization
submarine
unit
control switch
short
Prior art date
Application number
PCT/JP2020/043258
Other languages
English (en)
French (fr)
Inventor
成浩 新井
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to US17/783,108 priority Critical patent/US20220416538A1/en
Priority to EP20902357.1A priority patent/EP4080776A4/en
Priority to JP2021565391A priority patent/JP7251661B2/ja
Priority to CN202080086947.2A priority patent/CN114846746A/zh
Publication of WO2021124789A1 publication Critical patent/WO2021124789A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B3/00Line transmission systems
    • H04B3/02Details
    • H04B3/36Repeater circuits
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/10Parallel operation of dc sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H1/00Details of emergency protective circuit arrangements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/14Balancing the load in a network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/54The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads according to a pre-established time schedule

Definitions

  • the present invention relates to a submarine cable system.
  • the submarine cable system is a communication system in which the total length of the cable including the land-side device on land and the submarine device laid on the seabed may be 10,000 km or more.
  • the submarine cable system serves as a core infrastructure that connects countries. Therefore, the submarine cable system is required to have high reliability that keeps operating continuously for about 25 years without failure.
  • Patent Document 1 the current flows through the drive voltage generating means prepared according to the load, depending on the detection result of whether or not each of the loads is connected to the submarine device. Discloses submarine equipment that controls so that it does not flow.
  • An object of the present invention is to provide a submarine device or the like that can suppress the occurrence of component failure.
  • power is supplied to one or more temporary energization units that are temporarily energized during use and at least one temporary energization unit when a predetermined operation is performed. It is used in a submarine cable system, including an energization switching unit that supplies power and stops the supply of electric power to at least one temporary energization unit when the operation is completed.
  • the submarine device or the like of the present invention can suppress the occurrence of component failures.
  • the first embodiment is an embodiment relating to a submarine device including parts and the like that energize when performing an operation of a predetermined function and stop energization otherwise.
  • FIG. 1 is a conceptual diagram showing the configuration of the submarine device 100, which is an example of the submarine device of the first embodiment.
  • FIG. 1 shows only the configuration related to energization of the submarine device 100.
  • the submarine device 100 includes optical components, a housing, a mold, and a mechanism-related configuration.
  • the submarine device 100 is typically an amplification relay device that connects a submarine cable and amplifies and relays an optical signal propagating in an optical fiber in the submarine cable.
  • the submarine device 100 includes n Zener diodes 11 to 1n, a voltage supply unit 86, m energization control switches 31 to 3 m, and m temporary energization units. It is provided with a current-carrying unit 41 to 4 m.
  • the energization control switch is a switch for switching on / off of power supply to the temporary energization unit.
  • the submarine device 100 also includes a processing unit 51 and p constantly energized units 61 to 6p.
  • the Zener diodes 11 to 1n are connected and inserted in series between the input feeder line 81 and the output feeder line 82 in the direction opposite to the direction of the system current Is.
  • the input feed line 81 is a feeder that is directly or indirectly connected to the land device via another device and supplies electric power to the submarine device 100.
  • the output feed line 82 is a feeder that supplies electric power from the submarine device 100 to other submarine devices and the like.
  • the system current Is is a current flowing from the input feeder line 81 to the output feeder line 82.
  • the Zener diodes 11 to 1n set the primary voltage V1, which is the voltage between the terminals 91 and the terminals 92, to the sum of the yield voltages of the Zener diodes.
  • the primary voltage V1 is an input voltage supplied to the voltage supply unit 86.
  • the yield voltage of each Zener diode does not necessarily have to be the same value. When the yield voltage of each Zener diode is the same value, the sum voltage is n times the yield voltage of one Zener diode.
  • the voltage supply unit 86 supplies the secondary voltage V2 generated from the primary voltage V1 between the wiring 83 and the wiring 84.
  • the voltage supply unit 86 is, for example, a DC / DC converter that generates another DC voltage from a DC voltage.
  • DC is an abbreviation for Direct Current.
  • the voltage supply unit 86 may generate and output a voltage having the same value as the input voltage.
  • Each of the temporary energization units 41 to 4 m is a portion to be supplied with power only when the submarine device performs a predetermined function operation.
  • Each of the temporary energization units 41 to 41 m is connected in series with each of the energization control switches 31 to 3 m. Each of those series connections is connected to wiring 83 and wiring 84.
  • the wiring 83 and the wiring 84 may be simple conductors instead of wires.
  • Each of the energization control switches 31 to 3 m is connected to each control line of the control line group 71 of the processing unit 51.
  • Each of the energization control switches 31 to 3 m is turned on to short-circuit one terminal and the other terminal by the energization control signal input through the control line, or is turned off to insulate one terminal and the other terminal. I do.
  • Each energization control switch is, for example, a field effect transistor.
  • the processing unit 51 selects an energization control switch to be turned on when the submarine device 100 performs an operation of a predetermined function, and turns on the energization control switch. There may be multiple energization control switches that are turned on at one time.
  • the processing unit also turns off the energization control switch that energizes the temporarily energized unit when it ends the operation of a predetermined function that energizes the temporarily energized unit. As a result, the processing unit 51 causes the operation of the predetermined function to supply power to the temporary energization unit used for the operation only while the energization control switch is turned on.
  • Each of the constantly energized units 61 to 6p is a portion that is constantly supplied with power regardless of the operation performed by the submarine device 100.
  • Each of the constantly energized units 61 to 6p is connected to the wirings 83 and 84 without using an energization control switch. As a result, each of the constantly energized units 61 to 6p is constantly supplied with power regardless of the operation performed by the submarine device 100.
  • the temporary energization unit for example, a part or a group of parts energized when the submarine device operates a function of responding to remote control from the land side device to the submarine device is assumed.
  • the submarine device In order for the submarine device to respond to remote control from the land-side device to the submarine device, it is assumed that the submarine device is equipped with a laser module, and the laser module is modulated to respond to the land device with an optical signal.
  • the laser module or the like that performs the operation of the function is set in the temporary energization unit.
  • FIG. 2 is a conceptual diagram showing a configuration example of the processing unit 51 shown in FIG.
  • the processing unit 51 includes a first control unit 52, a storage unit 53, and an operation processing unit 54.
  • the operation processing unit 54 performs processing related to the operation performed by the submarine device 100 of FIG.
  • the operation includes an operation related to amplification and relay of an optical signal.
  • the operation processing unit 54 may perform an operation (specific function operation) related to some predetermined functions.
  • the specific function operation is a predetermined operation as an operation using the temporarily energized unit.
  • the operation is, for example, a response to communication from the above-mentioned land-side device.
  • Information for specifying the specific function operation is stored in the storage unit 53.
  • the operation processing unit 54 stores in advance an execution operation ID indicating which specific function operation is to be performed next in the execution operation ID storage unit 531 of the storage unit 53.
  • the ID is an abbreviation for Identifier and means identification information.
  • the operation processing unit 54 also deletes the stored execution operation ID from the execution operation ID storage unit 531 when the executed specific function operation is completed.
  • the first control unit 52 monitors the information stored in the execution operation ID storage unit 531 described above. Then, it is assumed that the first control unit 52 determines that the new execution operation ID is stored in the execution operation ID storage unit 531. In that case, the first control unit 52 identifies the energization control switch ID, which is the identification information of the energization control switch that is turned on to energize the temporary energization unit used for executing the specific function operation represented by the execution operation ID.
  • the first correspondence information which is the correspondence information between the execution operation ID and the energization control switch ID of the energization control switch to be turned on when the specific function operation represented by the execution operation ID is executed, is the first of the storage unit 53.
  • the first control unit 52 excludes the energization control switch associated with the execution operation ID already stored when the new execution operation ID is stored at the specific time from the specific target. Then, the first control unit 52 switches the specified energization control switch from off to on.
  • the first control unit 52 determines that the stored execution operation ID has been deleted from the execution operation ID storage unit 531. In that case, the first control unit 52 specifies the energization control switch ID of the energization control switch to be turned off in order to release the energization of the temporary energization unit used for executing the specific function operation represented by the execution operation ID.
  • the first control unit 52 sets the energization control switch ID to be turned on for the execution of the operation represented by the other execution operation ID stored in the execution operation ID storage unit 531 from the specified energization control switch ID. exclude. Then, the first control unit 52 turns off the energization control switch of the energization control switch ID after exclusion.
  • the storage unit 53 holds in advance programs and information used for operations performed by the operation processing unit 54 and the first control unit 52.
  • the storage unit 53 also stores information instructed by the operation processing unit 54 and the first control unit 52.
  • the storage unit 53 also sends the information instructed by the operation processing unit 54 and the first control unit 52 to the destination among the operation processing unit 54 and the first control unit 52.
  • the storage unit 53 stores and holds the above-mentioned execution operation ID in the execution operation ID storage unit 531.
  • the storage unit 53 also holds the above-mentioned first correspondence information in the first correspondence information storage unit 532.
  • the storage unit 53 holds other information and programs in other parts of the storage unit 53.
  • the processing unit 51 is, for example, a computer or a processor. In that case, the processing unit 51 may be executed by the program stored in the storage unit 53.
  • FIG. 3 is a conceptual diagram showing an example of a processing flow of a process of turning on the energization control switch performed by the first control unit 52 shown in FIG.
  • the first control unit 52 starts the processing shown in FIG. 3, for example, when the processing unit 51 has been activated.
  • the first control unit 52 determines whether or not a new execution operation ID is stored in the execution operation ID storage unit 531 of FIG.
  • the first control unit 52 performs the process of S102 when the determination result by the process of S101 is yes. On the other hand, when the determination result by the processing of S101 is no, the first control unit 52 performs the processing of S101 again and waits for the new execution operation ID to be stored in the execution operation ID storage unit 531.
  • the first control unit 52 When the first control unit 52 performs the process of S102, the first control unit 52 specifies the energization control switch ID of the energization control switch to be turned on as the process. When performing the specification, the first control unit 52 first performs the first specification described below. That is, in the first identification, the energization control switch ID of the energization control switch corresponding to the execution operation ID newly determined to be stored by the process of S101 is stored in the first correspondence information storage unit 532 for the first correspondence. It is specified by information.
  • the newly stored execution operation ID is the ID for the reply operation for the information sent from the land side device.
  • the temporary energization unit required for the reply operation is the temporary energization unit 41 which is the transmission laser module and the temporary energization unit 42 which is the control circuit of the laser module.
  • the execution operation ID corresponds to the energization control switch ID of the energization control switch 31 connected in series with the temporary energization unit 41 and the energization control switch 32 connected in series with the temporary energization unit 42. It is assumed that it is attached. In that case, the first control unit 52 makes the first identification to specify the energization control switches 31 and 32.
  • the first control unit 52 performs the second identification of specifying the energization control switch ID corresponding to the execution operation ID previously stored in the execution operation ID storage unit by the first correspondence information.
  • the execution operation ID that has been stored for a long time includes an execution operation related to temperature measurement by a temperature sensor.
  • the temporary energization unit 42 which is a control circuit, is used for the execution operation.
  • the energization control switch 32 is associated with the execution operation ID of the temperature measurement. In that case, the first control unit 52 performs the second identification to specify the energization control switch 32.
  • the first control unit 52 deletes the one that overlaps with the energization control switch ID that has been second specified from the energization control switch ID that has been first specified, and specifies the energization control switch ID after the deletion in S102. Specify as an energization control switch.
  • the deletion of this duplication is the deletion of the energization control switch ID of the second specified energization control switch 32 from the energization control switch ID of the first specified energization control switch 31 and 32. Then, the energization control switch ID of the energization control switch 31 is the energization control switch ID specified by the process of S102.
  • the first control unit 52 turns on the energization control switch of the energization control switch ID specified by the process of S102 as the process of S103.
  • the first control unit 52 determines whether to end the process of FIG. 3 as the process of S104.
  • the first control unit 52 makes the determination, for example, by determining whether or not the end information is input from the outside.
  • the first control unit 52 performs the process shown in FIG. 4 in parallel with the process shown in FIG.
  • FIG. 4 is a conceptual diagram showing an example of a processing flow of a process of turning off the energization control switch performed by the first control unit 52 shown in FIG.
  • the first control unit 52 starts the processing shown in FIG. 4, for example, when the processing unit 51 has been activated.
  • the first control unit 52 determines whether or not the execution operation ID has been newly deleted from the execution operation ID storage unit 531.
  • the first control unit 52 performs the process of S106 when the determination result by the process of S105 is yes. On the other hand, when the determination result by the process of S105 is no, the first control unit 52 performs the process of S105 again.
  • the first control unit 52 When the first control unit 52 performs the process of S106, the first control unit 52 specifies the energization control switch to be turned off as the process.
  • the first control unit 52 When the first control unit 52 performs the identification, the first control unit 52 first performs the third identification described below. That is, in the third specification, the energization control switch ID of the energization control switch to be turned off corresponding to the execution operation ID determined to be newly deleted by the process of S105 is stored in the first correspondence information storage unit 532. It is specified by the first correspondence information provided.
  • the execution operation ID determined to be deleted by the processing of S105 is the ID for the reply operation for the information sent from the above-mentioned land side device.
  • the temporary energization unit required for the reply operation is the temporary energization unit 41 which is the transmission laser module and the temporary energization unit 42 which is the control circuit of the laser module.
  • the execution operation ID corresponds to the energization control switch ID of the energization control switch 31 connected in series with the temporary energization unit 41 and the energization control switch 32 connected in series with the temporary energization unit 42. It is assumed that it is attached. In that case, the first control unit 52 makes a third identification to specify the energization control switches 31 and 32.
  • the fourth identification is performed to specify the energization control switch ID that should be kept on corresponding to the execution operation ID still stored in the execution operation ID storage unit 531 by the first correspondence information.
  • the fourth specification is, for example, as follows.
  • the execution operation ID still stored in the execution operation ID storage unit 531 includes an execution operation related to temperature measurement by the temperature sensor.
  • the temporary energization unit 42 which is a control circuit, is used for the execution operation.
  • the energization control switch 32 is associated with the execution operation ID of the temperature measurement. In that case, the first control unit 52 performs the fourth specification to specify the energization control switch 32.
  • the first control unit 52 excludes the energization control switch ID that has been specified fourth from the energization control switch ID that has been specified third.
  • the energization control switch identified by the energization control switch ID after this exclusion is the energization control switch specified by the process of S106.
  • this deletion is the deletion of the energization control switch ID of the second specified energization control switch 32 from the energization control switch ID of the first specified energization control switch 31 and 32. Then, the energization control switch ID of the energization control switch 31 is the energization control switch ID specified by the process of S106.
  • the first control unit 52 turns off the energization control switch specified by the process of S106 as the process of S107.
  • the first control unit 52 determines whether to end the process of FIG. 4 as the process of S108.
  • the first control unit 52 makes the determination, for example, by determining whether or not the end information is input from the outside.
  • the first control unit 52 ends the process shown in FIG. On the other hand, when the determination result by the process of S108 is no, the first control unit 52 performs the process of S105 again.
  • the temporary energizing portion which is a portion that is energized when it is used and is not energized otherwise, is energized only when the operation of a predetermined function is performed. Therefore, the submarine device can suppress the operating time of the temporarily energized portion. Therefore, the submarine device can suppress the occurrence of failure due to the operation of the temporarily energized unit. The submarine device can suppress the occurrence of failure by that amount.
  • FIG. 5 is a conceptual diagram showing the configuration of the seabed device 100, which is an example of the seabed device of the second embodiment.
  • the submarine device 100 shown in FIG. 5 differs from the submarine device 100 shown in FIG. 1 in the following points.
  • the differences between the submarine device 100 shown in FIG. 5 and those shown in FIG. 1 will be mainly described.
  • the submarine device 100 shown in FIG. 5 includes voltage control switches 21 to 2n, which are n switches, in addition to the configuration of the submarine device 100 shown in FIG. Further, a control line group 72 composed of control lines connected to each voltage control switch is connected to the processing unit 51 shown in FIG.
  • Each voltage control switch is connected in parallel with each of the Zener diodes 11 to 1n. Each switch is turned on or off by a signal applied by each control line of the control line group 72. Each switch is, for example, a field effect transistor.
  • the processing unit 51 controls on or off of each voltage control switch.
  • the processing unit 51 adjusts the voltage level of the primary voltage V1 applied between the terminal 91 and the terminal 92 by the control.
  • the yield voltage of each Zener diode is the voltage Vsr.
  • the primary voltage V1 is q ⁇ Vsr.
  • q is a number for turning off the voltage control switch, and is an integer of 1 or more and n or less. Therefore, the processing unit 51 can adjust the primary voltage V1, which is the input voltage of the voltage supply unit 86, by the number of times the switch is turned off.
  • the voltage control switch does not necessarily have to be parallel to all Zener diodes.
  • the voltage control switch may be connected in parallel to only some Zener diodes.
  • the processing unit 51 controls so that some voltage control switches are turned on and other voltage control switches are turned off. This is so that there is room for suppressing the decrease in the primary voltage V1 that may occur when the temporarily energized portion is energized by turning off the on voltage control switch.
  • the processing unit 51 specifies a voltage control switch that switches from on to off when the energization control switch is switched on to energize the temporarily energized unit that is not energized.
  • the second correspondence information is correspondence information that associates the voltage control switch ID, which is the identification information of the voltage control switch, with the energization switch ID.
  • the association is a voltage control switch that is switched off to compensate for a voltage drop of the primary voltage V1 that occurs when the energization control switch is switched on, and an energization control switch ID of the energization control switch.
  • the processing unit 51 makes the above identification based on the second correspondence information.
  • the processing unit 51 switches the specified voltage control switch off and raises the primary voltage V1. As a result, the processing unit 51 suppresses a decrease in the primary voltage V1 caused by energizing the temporarily energized unit.
  • FIG. 6 is a conceptual diagram showing a configuration example of the processing unit 51 shown in FIG.
  • the processing unit 51 shown in FIG. 6 includes a second control unit 55 in addition to the configuration provided by the processing unit 51 shown in FIG.
  • the second control unit 55 is connected to each voltage control switch by each control line of the control line group 72.
  • the energization control switch ID of the energization control switch is stored in the energization control switch ID storage unit of the storage unit 53. Store in 533.
  • the energization control switch ID of the energization control switch is transmitted from the energization control switch ID storage unit 533. delete.
  • the second control unit 55 monitors the energization control switch ID storage unit 533. Then, it is assumed that the second control unit 55 determines that the new energization control switch ID is stored in the energization control switch ID storage unit 533. In that case, the second control unit 55 identifies the voltage control switch ID corresponding to the newly stored energization control switch ID from the above-mentioned second correspondence information stored in the second correspondence information storage unit 534.
  • the second control unit 55 turns off the specified voltage control switch.
  • the second control unit 55 determines that the energization control switch ID has been deleted from the energization control switch ID storage unit 533. In that case, the second control unit 55 identifies the voltage control switch ID corresponding to the deleted energization control switch ID from the second correspondence information stored in the second correspondence information storage unit 534.
  • the second control unit 55 turns on the specified voltage control switch.
  • the second control unit 55 suppresses an increase in the primary voltage V1 caused by turning off the energization control switch and not energizing the corresponding temporary energization unit.
  • FIG. 7 is a conceptual diagram showing an example of a processing flow of a process of turning off the voltage control switch performed by the second control unit 55 shown in FIG.
  • the second control unit 55 starts the process shown in FIG. 7, for example, when the processing unit 51 has been activated.
  • the second control unit 55 determines whether or not a new energization control switch ID is stored in the energization control switch ID storage unit 533 of FIG.
  • the second control unit 55 performs the process of S202 when the determination result by the process of S201 is yes. On the other hand, when the determination result by the processing of S201 is no, the second control unit 55 performs the processing of S201 again and waits for the new energization control switch ID to be stored in the energization control switch ID storage unit 533.
  • the second control unit 55 specifies the voltage control switch to be turned off as the same processing.
  • the second control unit 55 performs the identification by specifying the voltage control switch ID corresponding to the energization control switch ID newly determined to be stored by the process of S201 by the above-mentioned second correspondence information.
  • the second control unit 55 turns off the voltage control switch specified by the process of S202 as the process of S203.
  • the second control unit 55 determines whether to end the process of FIG. 7 as the process of S204.
  • the second control unit 55 makes the determination, for example, by determining whether or not the end information is input from the outside.
  • the second control unit 55 ends the process shown in FIG. 7 when the determination result by the process of S204 is yes. On the other hand, when the determination result by the process of S204 is no, the second control unit 55 performs the process of S201 again.
  • the second control unit 55 performs the process shown in FIG. 8 in parallel with the process shown in FIG.
  • FIG. 8 is a conceptual diagram showing an example of a processing flow of a process for turning on the voltage control switch, which is performed by the second control unit 55 shown in FIG.
  • the second control unit 55 starts the process shown in FIG. 8, for example, when the processing unit 51 has been activated.
  • the second control unit 55 determines whether or not the energization control switch ID has been newly deleted from the energization control switch ID storage unit 533.
  • the second control unit 55 performs the processing of S206 when the determination result by the processing of S205 is yes. On the other hand, when the determination result by the process of S205 is no, the second control unit 55 performs the process of S205 again.
  • the second control unit 55 specifies the voltage control switch to be turned on as the same processing.
  • the second control unit 55 performs the identification, first, the voltage control switch to be turned on corresponding to the energization control switch ID determined to be newly deleted by the process of S205 is stored in the second correspondence information. It is specified by the second correspondence information stored in the part 534.
  • the second control unit 55 turns on the voltage control switch specified by the process of S206 as the process of S207.
  • the second control unit 55 determines whether to end the process of FIG. 8 as the process of S208.
  • the second control unit 55 makes the determination, for example, by determining whether or not the end information is input from the outside.
  • the submarine device of the second embodiment has a configuration included in the submarine device of the first embodiment, and first has the same effect as the submarine device of the first embodiment.
  • the submarine device of the second embodiment increases the number of Zener diodes connected in series on the input side for setting the input voltage when energizing the temporary energization unit. Further, when the energization is stopped, the number of the Zener diodes is reduced. As a result, the submarine device can suppress a decrease in the input voltage due to energization of the temporary energization unit, and can suppress an increase in the input voltage that occurs when the energization is released.
  • FIG. 9 is a conceptual diagram showing the configuration of the submarine device 100x, which is the minimum configuration of the submarine device of the embodiment.
  • the submarine device 100x is a device used for a submarine cable system.
  • the submarine device 100x includes an energization switching unit 3x and one or more temporary energization units 4x.
  • the temporary energization unit 4x is a part that is temporarily energized during use.
  • the energization switching unit 3x supplies electric power to at least one temporary energizing unit 4x when a predetermined operation is performed, and supplies electric power to at least one temporary energizing unit 4x when the operation is completed. Make a stop.
  • the submarine device 100x shortens the operating time of the temporary energization unit 4x by supplying electric power to the temporary energization unit 4x only when it is used. Due to this shortening, the occurrence of failure due to the operation of the temporarily energized unit 4x can be suppressed. Therefore, the submarine device 100x can suppress the occurrence of failure.
  • the submarine device 100x exhibits the effects described in the section of [Effects of the Invention] according to the above configuration.
  • Appendix 1 One or more temporarily energized parts that are temporarily energized during use, When a predetermined operation is performed, power is supplied to at least one temporary energizing unit, and when the operation is completed, power supply to at least one temporary energizing unit is stopped.
  • Appendix 2 The submarine device according to Appendix 1, wherein the energization switching unit is an energization control switch.
  • the submarine device described in Appendix 7. (Appendix 9) The submarine device according to Appendix 8, wherein the short-circuit switching unit is a short-circuit switching switch. (Appendix 10) The submarine device according to Appendix 8 or Appendix 9, further comprising a second processing unit that causes the short-circuit switching unit to perform the short-circuit and the short-circuit release. (Appendix 11) The submarine device according to any one of Supplementary note 1 to Supplementary note 10, further comprising a constantly energized portion that is a portion that is constantly energized. (Appendix 12) The submarine device according to any one of Supplementary note 1 to Supplementary note 11, which is an amplification relay device that amplifies and relays an optical signal transmitted via a cable.
  • the submarine cable system of Appendix 1 is, for example, a submarine cable system in which the submarine device 100 of FIG. 1 or FIG. 5 is installed.
  • the temporary energization unit is, for example, the temporary energization unit 41 to 4 m in FIG. 1 or FIG.
  • the predetermined operation is, for example, the above-mentioned specific function operation.
  • the energization switching unit is, for example, the energization control switch 31 to 3 m of FIG. 1 or FIG.
  • the submarine device is, for example, the submarine device 100 of FIG. 1 or FIG.
  • the energization control switch of Appendix 2 is, for example, the energization control switch 31 to 3 m of FIG. 1 or FIG.
  • the first control unit of Appendix 3 is, for example, the first control unit 52 of FIG. 2 or FIG.
  • the current in Appendix 4 is, for example, the system current Is in FIG. 1 or FIG.
  • the input feeder is, for example, the input feeder 81 of FIG. 1 or FIG.
  • the output feeder is, for example, the output feeder 82 of FIG. 1 or FIG.
  • the other device is, for example, another submarine device to which the output feed line 82 of FIG. 1 or FIG. 5 is connected.
  • the voltage setting unit of Appendix 5 is, for example, the voltage control switches 21 to 2n in FIG.
  • the suppression operation is, for example, an operation of turning off any of the voltage control switches 21 to 2n that are turned on.
  • the suppression operation release of Appendix 6 is, for example, an operation of turning on any of the voltage control switches 21 to 2n that are turned off.
  • the Zener diode of Appendix 7 is, for example, the Zener diode 11 to 1n of FIG. 1 or FIG.
  • the short-circuit switching unit of Appendix 8 is, for example, the voltage control switches 21 to 2n in FIG.
  • the short-circuit release is, for example, an operation of turning off any of the voltage control switches 21 to 2n that are turned on.
  • the short-circuit changeover switch in Appendix 9 is, for example, the voltage control switches 21 to 2n in FIG.
  • the second control unit of Appendix 10 is, for example, the second control unit 55 of FIG.
  • the constantly energized portion of Appendix 11 is, for example, the constantly energized portion 61 to 6p of FIG. 1 or FIG.
  • the amplification relay device of Appendix 12 is, for example, the seabed device 100 of FIG. 1 or FIG.
  • the submarine device of Appendix 13 is, for example, the submarine device 100 of FIG. 1 or FIG.
  • the submarine device of Appendix 14 and Appendix 15 is, for example, the submarine device 100 of FIG. 1 or FIG.
  • the computer of Appendix 15 is, for example, the processing unit 51 of FIGS. 1, 2, 5, or 6.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Direct Current Feeding And Distribution (AREA)
  • Cable Transmission Systems, Equalization Of Radio And Reduction Of Echo (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

部品の故障の発生を抑えるために、海底装置は、一つ以上の、使用の際に一時的に通電される部分である一時通電部と、所定の動作が行われる際に、少なくとも一つの前記一時通電部への電力の供給を行い、前記動作の完了の際に、少なくとも一つの前記一時通電部への電力の供給停止を行う、通電切替部とを備える。

Description

海底装置、通電方法及び記録媒体
 本発明は、海底ケーブルシステムに関する。
 海底ケーブルシステムは、陸地にある陸側装置と海底に敷設される海底装置を含むケーブルの総長が1万km以上になることもある通信システムである。海底ケーブルシステムは、国と国を結ぶ基幹インフラストラクチャとしての役割を有する。そのため、海底ケーブルシステムには、25年間程度は故障せずに継続的に稼働し続ける高い信頼性が要求される。
 海底ケーブルシステムは、昨今の高機能化の要請により、新しい高機能な部品の採用が容易に行われ得る陸上の通信装置に用いられる部品の採用が必要になっている。しかしながら、これらの部品の多くは、海底装置に要求される高い信頼性を有するものではない。そのため、それらの部品を海底装置に用いる場合は、まず、追加スクリーニングの実施による初期不良の排除が行われる。それに加えて、ディレーティングを考慮し、部品が過負荷状態で長期間稼働しないようにする回路設計や、部品の故障発生を前提とした冗長回路設計が行われる。
 ここで、特許文献1は、負荷の各々が当該海底機器に接続されているか否かの検知結果に応じて、負荷に応じてそれぞれ用意された駆動電圧生成手段に前記電流が流れるように、又は、流れないように制御する海底機器を開示する。
国際公開第2017/159648号
 しかしながら、背景技術の項で説明した初期不良の排除は、行ったとしても偶発的に発生する故障を抑えることはできない。また、背景技術の項で説明した回路設計には、多大なコストや設計の制約が発生する。
 また、特許文献1が開示する海底機器は、負荷が海底機器に接続されている場合には、必ずその負荷に電流を流すので、負荷の稼動時間を短縮するものではない。そのため、当該海底機器は、当該負荷の稼動時間の短縮により、当該負荷が長期間故障しないようにすることはできない。
 本発明は、部品の故障の発生を抑え得る海底装置等の提供を目的とする。
 本発明の海底装置は、一つ以上の、使用の際に一時的に通電される部分である一時通電部と、所定の動作が行われる際に、少なくとも一つの前記一時通電部への電力の供給を行い、前記動作の完了の際に、少なくとも一つの前記一時通電部への電力の供給停止を行う、通電切替部とを備え、海底ケーブルシステムに用いられる。
 本発明の海底装置等は、部品の故障の発生を抑え得る。
第一実施形態の海底装置の構成例を表す概念図である。 第一実施形態の処理部の構成例を表す概念図である。 通電制御スイッチをオンにする処理の処理フロー例を表す概念図である。 通電制御スイッチをオフにする処理の処理フロー例を表す概念図である。 第二実施形態の海底装置の構成例を表す概念図である。 第二実施形態の処理部の構成例を表す概念図である。 第二制御部が行う、電圧制御スイッチをオフにする処理の処理フロー例を表す概念図である。 第二制御部が行う、電圧制御スイッチをオンにする処理の処理フロー例を表す概念図である。 実施形態の海底装置の最小限の構成を表す概念図である。
<第一実施形態>
 第一実施形態は、所定の機能の動作を実行するときに通電し、それ以外は通電を停止する部品等を備える海底装置に関する実施形態である。
[構成と動作]
 図1は、第一実施形態の海底装置の例である海底装置100の構成を表す概念図である。図1には、海底装置100の、通電に関する構成のみを表してある。海底装置100は、図1に表す構成の他、光学部品や、筐体、モールド及び機構関連の構成を備える。
 海底装置100は、典型的には、海底ケーブルを接続し、海底ケーブル中の光ファイバを伝搬する光信号を増幅中継する、増幅中継装置である。
 海底装置100は、n個のツェナーダイオードであるツェナーダイオード11乃至1nと、電圧供給部86と、m個の通電制御スイッチである通電制御スイッチ31乃至3mと、m個の一時通電部である一時通電部41乃至4mとを備える。ここで、通電制御スイッチは、一時通電部への電力の供給のオンオフを切り替えるスイッチである。海底装置100は、また、処理部51と、p個の常時通電部である常時通電部61乃至6pとを備える。
 ツェナーダイオード11乃至1nは、入力給電線81と出力給電線82との間に、システム電流Isの向きの逆向きに直列に接続され、挿入されている。ここで、入力給電線81は、陸上の装置から直接又は他の装置を介して間接的に接続され、海底装置100に電力を供給する給電線である。一方、出力給電線82は、海底装置100から他の海底装置等に電力を供給する給電線である。また、システム電流Isは、入力給電線81から出力給電線82に流れる電流である。
 ツェナーダイオード11乃至1nは、端子91と端子92との間の電圧である一次電圧V1を、それらのツェナーダイオードの降伏電圧の和の電圧に設定する。一次電圧V1は、電圧供給部86に供給される入力電圧である。各ツェナーダイオードの降伏電圧は必ずしも同じ値である必要はない。各ツェナーダイオードの降伏電圧が同じ値の場合は、当該和の電圧は、一つのツェナーダイオードの降伏電圧のn倍である。
 電圧供給部86は、一次電圧V1から生成した二次電圧V2を、配線83と配線84との間に供給する。電圧供給部86は、例えば、直流電圧から他の直流電圧を生成するDC/DCコンバータである。ここで、DCは、Direct Currentの略である。電圧供給部86は、入力電圧と同じ値の電圧を生成し、出力するものであっても構わない。
 一時通電部41乃至4mの各々は、海底装置が所定の機能の動作を行うときのみ給電される部分である。一時通電部41乃至41mの各々は、通電制御スイッチ31乃至3mの各々と直列に接続されている。それらの直列接続の各々は、配線83及び配線84に接続されている。なお、配線83及び配線84は、線ではなく、単なる導体であっても構わない。
 通電制御スイッチ31乃至3mの各々は、処理部51の制御線群71の各々の制御線に接続されている。通電制御スイッチ31乃至3mの各々は、制御線を通じて入力される通電制御信号により、その一方の端子と他方の端子を短絡させるオンを行い、又は、その一方の端子と他方の端子を絶縁させるオフを行う。各通電制御スイッチは、例えば、電界効果トランジスタである。
 処理部51は、海底装置100が所定の機能の動作を行う際に、通電制御スイッチのうちのオンさせるものを選択し、その通電制御スイッチをオンさせる。一度にオンさせる通電制御スイッチは複数の場合もあり得る。処理部は、また、一時通電部を通電させて行う所定の機能の動作を終了するときは、その一時通電部に通電させている通電制御スイッチをオフさせる。処理部51は、これらにより、所定の機能の動作については、その動作に用いられる一時通電部への給電を、その通電制御スイッチをオンにしている間だけを行わせる。
 常時通電部61乃至6pの各々は、海底装置100が行う動作に関係なく常に給電される部分である。常時通電部61乃至6pの各々は、配線83及び84に通電制御スイッチを介さずに接続されている。これにより、常時通電部61乃至6pの各々は、海底装置100が行う動作に関係なく常に給電される。
 なお、一時通電部としては、例えば、陸側装置から海底装置への遠隔制御に海底装置が応答する機能の動作を行う際に通電される部品又は部品群が想定される。陸側装置から海底装置への遠隔制御に海底装置が応答するためには、海底装置がレーザモジュールを備え、そのレーザモジュールを変調して光の信号で陸上装置に応答することが想定される。通常、このような遠隔制御は、高い頻度で日常的に行われるものではなく、また、そのようなレーザモジュールは一般的に、長期稼働に耐えうる信頼性が担保された部品ではない。そのため、使用時にのみ通電することが、部品の延命の観点から望ましい。従い、当該機能の動作を行うレーザモジュール等は、一時通電部に設定されることが適当である。
 一方、光信号の増幅中継に用いられる電気部品等は、常時使用されるものであるため、常時通電部に設定されることが適当である。
 図2は、図1に表される処理部51の構成例を表す概念図である。処理部51は、第一制御部52と、記憶部53と、動作処理部54とを備える。
 動作処理部54は、図1の海底装置100が行う動作に関する処理を行う。当該動作は、海底装置100が中継装置の場合には、光信号の増幅中継に関する動作が含まれる。
 動作処理部54は、予め定められたいくつかの機能に関する動作(特定機能動作)を行う場合がある。特定機能動作は、一時通電部を利用する動作として予め定められている動作である。当該動作は、例えば、前述の陸側装置からの通信への応答である。特定機能動作を特定する情報は、記憶部53に格納されている。
 動作処理部54は、特定機能動作を行う場合は、予め、どの特定機能動作を次に行うかを表す実行動作IDを、記憶部53の実行動作ID格納部531に格納する。ここで、IDは、Identifierの略であり、識別情報を意味する。
 動作処理部54は、また、実行した特定機能動作が完了した場合は、実行動作ID格納部531から、格納されているその実行動作IDを削除する。
 第一制御部52は、前述の実行動作ID格納部531に格納された情報を監視する。そして、第一制御部52は、実行動作ID格納部531に新たな実行動作IDが格納されたことを判定したとする。その場合、第一制御部52は、その実行動作IDが表す特定機能動作の実行に用いられる一時通電部に通電するためにオンする通電制御スイッチの識別情報である通電制御スイッチIDを特定する。ここで、実行動作IDと、その実行動作IDが表す特定機能動作の実行の際にオンさせる通電制御スイッチの通電制御スイッチIDとの対応情報である第一対応情報が、記憶部53の第一対応情報格納部532に格納されているものとする。第一制御部52は、当該特定の際に、新たな実行動作IDが格納された際に既に格納されている実行動作IDと対応付けられている通電制御スイッチは、特定対象から除外する。そして、第一制御部52は、特定した通電制御スイッチをオフからオンに切り替える。
 一方、第一制御部52は、実行動作ID格納部531から、格納されている実行動作IDが削除されたことを判定したとする。その場合、第一制御部52は、その実行動作IDが表す特定機能動作の実行に用いられる一時通電部への通電を解除するためにオフにする通電制御スイッチの通電制御スイッチIDを特定する。
 そして、第一制御部52は、特定された通電制御スイッチIDから、実行動作ID格納部531に格納されている他の実行動作IDが表す動作の実行のためにオンにする通電制御スイッチIDを除外する。そして、第一制御部52は、除外後の通電制御スイッチIDの通電制御スイッチをオフにさせる。
 なお、記憶部53は、動作処理部54や第一制御部52が行う動作に用いられるプログラムや情報を予め保持する。記憶部53は、また、動作処理部54や第一制御部52が指示する情報を格納する。記憶部53は、また、動作処理部54や第一制御部52が指示する情報を、動作処理部54及び第一制御部52のうちの送付先に送付する。
 なお、記憶部53は、前述の実行動作IDを、実行動作ID格納部531に格納し、保持する。記憶部53は、また、前述の第一対応情報を、第一対応情報格納部532に保持する。記憶部53は、その他の情報やプログラムを、記憶部53のその他の部分に保持する。
 なお、処理部51は、例えば、コンピュータやプロセッサである。その場合、処理部51は、記憶部53に格納されたプログラムにより実行させられるものであっても構わない。
 図3は、図2に表される第一制御部52が行う通電制御スイッチをオンにする処理の処理フロー例を表す概念図である。第一制御部52は、例えば、処理部51の起動完了により、図3に表される処理を開始する。
 第一制御部52は、まず、S101の処理として、図2の実行動作ID格納部531に新たな実行動作IDが格納されたかについての判定を行う。
 第一制御部52は、S101の処理による判定結果がyesの場合は、S102の処理を行う。一方、第一制御部52は、S101の処理による判定結果がnoの場合は、S101の処理を再度行い、実行動作ID格納部531に新たな実行動作IDが格納されるのを待つ。
 第一制御部52は、S102の処理を行う場合は、同処理として、オンにする通電制御スイッチの通電制御スイッチIDを特定する。第一制御部52は、当該特定を行う場合は、まず、次に説明する第一特定を行う。すなわち、第一特定は、S101の処理により新たに格納されたことを判定した実行動作IDに対応する通電制御スイッチの通電制御スイッチIDを、第一対応情報格納部532に格納された第一対応情報により特定するものである。
 例えば、新たに格納された実行動作IDが、陸側装置から送付された情報についての返信動作についてのIDであるとする。そして、返信動作に必要な一時通電部が送信用レーザモジュールである一時通電部41及びレーザモジュールの制御回路である一時通電部42であるとする。そして、第一対応情報において、その実行動作IDに、一時通電部41に直列に接続された通電制御スイッチ31及び一時通電部42に直列に接続された通電制御スイッチ32の通電制御スイッチIDが対応付けられているとする。その場合、第一制御部52は、通電制御スイッチ31及び32を特定する第一特定を行う。
 第一制御部52は、次に、実行動作ID格納部に以前から格納されている実行動作IDに対応する通電制御スイッチIDを、第一対応情報により特定する第二特定を行う。
 例えば、以前から格納されている実行動作IDに、温度センサによる温度の測定に関する実行動作が含まれているとする。そして、当該実行動作には、制御回路である一時通電部42が用いられているとする。そして、第一対応情報において、温度の測定の実行動作IDに通電制御スイッチ32が対応付けられているとする。その場合、第一制御部52は、通電制御スイッチ32を特定する第二特定を行う。
 そして、第一制御部52は、第一特定を行った通電制御スイッチIDから第二特定を行った通電制御スイッチIDと重複するものを削除し、削除後の通電制御スイッチIDを、S102で特定する通電制御スイッチとして特定する。
 上述の例では、この重複の削除は、第一特定された通電制御スイッチ31及び32の通電制御スイッチIDからの、第二特定された通電制御スイッチ32の通電制御スイッチIDの削除である。そして、通電制御スイッチ31の通電制御スイッチIDが、S102の処理により特定された通電制御スイッチIDである。
 そして、第一制御部52は、S103の処理として、S102の処理により特定した通電制御スイッチIDの通電制御スイッチをオンにする。
 そして、第一制御部52は、S104の処理として、図3の処理を終了するかについて判定する。第一制御部52は、当該判定を、例えば、外部からの終了情報の入力の有無を判定することにより行う。
 第一制御部52は、図3に表される処理と並行して、図4に表される処理を行う。図4は、図2に表される第一制御部52が行う通電制御スイッチをオフにする処理の処理フロー例を表す概念図である。第一制御部52は、例えば、処理部51の起動完了により、図4に表される処理を開始する。
 第一制御部52は、まず、S105の処理として、実行動作IDの実行動作ID格納部531からの削除が新たにあったかについての判定を行う。
 第一制御部52は、S105の処理による判定結果がyesの場合は、S106の処理を行う。一方、第一制御部52は、S105の処理による判定結果がnoの場合は、S105の処理を再度行う。
 第一制御部52は、S106の処理を行う場合は、同処理として、オフにする通電制御スイッチの特定を行う。第一制御部52は、当該特定を行う場合は、まず、次に説明する第三特定を行う。すなわち、当該第三特定は、S105の処理により新たに削除されたことを判定した実行動作IDに対応するオフにすべき通電制御スイッチの通電制御スイッチIDを、第一対応情報格納部532に格納された第一対応情報により特定するものである。
 例えば、S105の処理により削除されたことが判定された実行動作IDが、前述の陸側装置から送付された情報についての返信動作についてのIDであるとする。そして、返信動作に必要な一時通電部が送信用レーザモジュールである一時通電部41及びレーザモジュールの制御回路である一時通電部42であるとする。そして、第一対応情報において、その実行動作IDに、一時通電部41に直列に接続された通電制御スイッチ31及び一時通電部42に直列に接続された通電制御スイッチ32の通電制御スイッチIDが対応付けられているとする。その場合、第一制御部52は、通電制御スイッチ31及び32を特定する第三特定を行う。
 次に、実行動作ID格納部531にまだ格納されている実行動作IDに対応するオンを維持するべき通電制御スイッチIDを、第一対応情報により特定する第四の特定を行う。
 第四特定は、例えば、次のようなものである。例えば、実行動作ID格納部531にまだ格納されている実行動作IDに、温度センサによる温度の測定に関する実行動作が含まれているとする。そして、当該実行動作には、制御回路である一時通電部42が用いられているとする。そして、第一対応情報において、温度の測定の実行動作IDに通電制御スイッチ32が対応付けられているとする。その場合、第一制御部52は、通電制御スイッチ32を特定する第四特定を行う。
 そして、第一制御部52は、第三の特定を行った通電制御スイッチIDから第四の特定を行った通電制御スイッチIDを除外する。この除外後の通電制御スイッチIDにより識別される通電制御スイッチが、S106の処理により特定された通電制御スイッチである。
 上述の例では、この当該削除は、第一特定された通電制御スイッチ31及び32の通電制御スイッチIDからの、第二特定された通電制御スイッチ32の通電制御スイッチIDの削除である。そして、通電制御スイッチ31の通電制御スイッチIDが、S106の処理により特定された通電制御スイッチIDである。
 そして、第一制御部52は、S107の処理として、S106の処理により特定した通電制御スイッチをオフにする。
 そして、第一制御部52は、S108の処理として、図4の処理を終了するかについて判定する。第一制御部52は、当該判定を、例えば、外部からの終了情報の入力の有無を判定することにより行う。
 第一制御部52は、S108の処理による判定結果がyesの場合は、図4に表される処理を終了する。一方、第一制御部52は、S108の処理による判定結果がnoの場合は、S105の処理を再度行う。
[効果]
 第一実施形態の海底装置は、使用するときに通電しそれ以外は通電しない部分である一時通電部については、所定の機能の動作を行うときにのみ通電する。そのため、前記海底装置は、一時通電部の稼動時間を抑えることができる。従い、前記海底装置は、一時通電部の稼働による故障の発生を抑えることができる。前記海底装置は、その分、故障の発生を抑えることができる。
<第二実施形態>
 第一実施形態の海底装置において、通電により一時通電部で消費される電流により海底装置の消費電力が増加する。その場合において、一時通電部において消費される電流が大きいと、システム電流を一次電圧に変換するツェナーダイオードを流れる電流が減少して降伏電圧を維持できなくなり、一次電圧が低下する場合がある。本実施形態は、一時通電部への通電による一次電圧の低下が生じる可能性がある場合に、その低下を抑え得る海底装置に関する実施形態である。
[構成と動作]
 図5は、第二実施形態の海底装置の例である海底装置100の構成を表す概念図である。
 図5に表される海底装置100は、以下の点が、図1に表される海底装置100と異なる。以下、図5に表される海底装置100の図1に表されるものとの相違点を主に説明する。
 図5に表される海底装置100は、図1に表される海底装置100が備える構成に加えて、n個のスイッチである電圧制御スイッチ21乃至2nを備える。また、図5に表される処理部51には、各電圧制御スイッチと接続される制御線からなる制御線群72が接続されている。
 各電圧制御スイッチは、ツェナーダイオード11乃至1nの各々と並列に接続されている。各スイッチは、制御線群72の各制御線により印加される信号によりオン又はオフする。各スイッチは、例えば、電界効果トランジスタである。
 処理部51は、各電圧制御スイッチのオン又はオフを制御する。処理部51は、当該制御により、端子91と端子92との間に印加される一次電圧V1の電圧レベルを調整する。ここで、各ツェナーダイオードの降伏電圧が電圧Vsrであるとする。その場合、一次電圧V1は、q×Vsrである。ここで、qは、電圧制御スイッチをオフにする数であり、1以上n以下の整数である。従い、処理部51は、スイッチをオフにする数により、電圧供給部86の入力電圧である一次電圧V1を調整することができる。
 なお、電圧制御スイッチは、必ずしも、すべてのツェナーダイオードに並列されている必要はない。電圧制御スイッチは、一部のツェナーダイオードのみに並列接続されていても構わない。
 処理部51は、初期状態においては、一部の電圧制御スイッチはオンになり他の電圧制御スイッチはオフになるように制御している。これは、一時通電部に通電する際に生じる可能性がある一次電圧V1の低下を、オンの電圧制御スイッチをオフにすることにより抑える余地があるようにするためである。
 そして、処理部51は、通電されていない一時通電部への通電のために通電制御スイッチをオンに切り替える際に、オンからオフに切り替える電圧制御スイッチを特定する。ここで、処理部51は、第二対応情報を予め保持しているものとする。当該第二対応情報は、電圧制御スイッチの識別情報である電圧制御スイッチIDと通電スイッチIDとを対応付ける対応情報である。当該対応付けは、通電制御スイッチをオンに切り替える際に生じる一次電圧V1の電圧降下を補償するためにオフに切り替える電圧制御スイッチとその通電制御スイッチの通電制御スイッチIDとのものである。処理部51は、第二対応情報により、前記特定を行う。
 そして、処理部51は、特定した電圧制御スイッチをオフに切り替え、一次電圧V1を上昇させる。これにより、処理部51は、一時通電部に通電することにより生じる一次電圧V1の低下を抑える。
 図6は、図5に表される処理部51の構成例を表す概念図である。図6に表される処理部51は、図2に表される処理部51が備える構成に加えて第二制御部55を備える。第二制御部55は、制御線群72の各制御線により、各電圧制御スイッチに接続されている。
 第一制御部52は、図3に表されるS102の処理によりオンにする通電制御スイッチを特定した場合は、その通電制御スイッチの通電制御スイッチIDを、記憶部53の通電制御スイッチID格納部533に格納する。
 第一制御部52は、また、図3に表されるS105の処理によりオフにする通電制御スイッチを特定した場合は、その通電制御スイッチの通電制御スイッチIDを、通電制御スイッチID格納部533から削除する。
 第二制御部55は、通電制御スイッチID格納部533を監視する。そして、第二制御部55は、通電制御スイッチID格納部533に新たな通電制御スイッチIDが格納されたことを判定したとする。その場合、第二制御部55は、第二対応情報格納部534に格納された前述の第二対応情報により、新たに格納された通電制御スイッチIDに対応する電圧制御スイッチIDを特定する。
 そして、第二制御部55は、特定した電圧制御スイッチをオフにする。
 一方、第二制御部55は、通電制御スイッチID格納部533から通電制御スイッチIDが削除されたことを判定したとする。その場合、第二制御部55は、第二対応情報格納部534に格納された第二対応情報により、削除された通電制御スイッチIDに対応する電圧制御スイッチIDを特定する。
 そして、第二制御部55は、特定した電圧制御スイッチをオンにする。第二制御部55は、これにより、通電制御スイッチをオフにし対応する一時通電部に通電されなくなることにより生じる一次電圧V1の上昇を抑える。
 図7は、図6に表される第二制御部55が行う、電圧制御スイッチをオフにする処理の処理フロー例を表す概念図である。第二制御部55は、例えば、処理部51の起動完了により、図7に表される処理を開始する。
 第二制御部55は、まず、S201の処理として、図6の通電制御スイッチID格納部533に新たな通電制御スイッチIDが格納されたかについての判定を行う。
 第二制御部55は、S201の処理による判定結果がyesの場合は、S202の処理を行う。一方、第二制御部55は、S201の処理による判定結果がnoの場合は、S201の処理を再度行い、通電制御スイッチID格納部533に新たな通電制御スイッチIDが格納されるのを待つ。
 第二制御部55は、S202の処理を行う場合は、同処理として、オフにする電圧制御スイッチを特定する。第二制御部55は、当該特定を、S201の処理により新たに格納されたことを判定した通電制御スイッチIDに対応する電圧制御スイッチIDを、前述の第二対応情報により特定することにより行う。
 そして、第二制御部55は、S203の処理として、S202の処理により特定した電圧制御スイッチをオフにする。
 そして、第二制御部55は、S204の処理として、図7の処理を終了するかを判定する。第二制御部55は、当該判定を、例えば、外部からの終了情報の入力の有無を判定することにより行う。
 第二制御部55は、S204の処理による判定結果がyesの場合は、図7に表される処理を終了する。一方、第二制御部55は、S204の処理による判定結果がnoの場合は、S201の処理を再度行う。
 第二制御部55は、図7に表される処理と並行して、図8に表される処理を行う。図8は、図6に表される第二制御部55が行う、電圧制御スイッチをオンにする処理の処理フロー例を表す概念図である。第二制御部55は、例えば、処理部51の起動完了により、図8に表される処理を開始する。
 第二制御部55は、まず、S205の処理として、通電制御スイッチIDの通電制御スイッチID格納部533からの削除が新たにあったかについての判定を行う。
 第二制御部55は、S205の処理による判定結果がyesの場合は、S206の処理を行う。一方、第二制御部55は、S205の処理による判定結果がnoの場合は、S205の処理を再度行う。
 第二制御部55は、S206の処理を行う場合は、同処理として、オンにする電圧制御スイッチの特定を行う。第二制御部55は、当該特定を行う場合は、まず、S205の処理により新たに削除されたことを判定した通電制御スイッチIDに対応するオンにすべき電圧制御スイッチを、第二対応情報格納部534に格納された第二対応情報により特定する。
 そして、第二制御部55は、S207の処理として、S206の処理により特定した電圧制御スイッチをオンにする。
 そして、第二制御部55は、S208の処理として、図8の処理を終了するかを判定する。第二制御部55は、当該判定を、例えば、外部からの終了情報の入力の有無を判定することにより行う。
 第二制御部55は、S208の処理による判定結果がyesの場合は、図8に表される処理を終了する。一方、第二制御部55は、S208の処理による判定結果がnoの場合は、S205の処理を再度行う。
[効果]
 第二実施形態の海底装置は、第一実施形態の海底装置が備える構成を備え、まず、第一実施形態の海底装置と同様の効果を奏する。
 それに加え、第二実施形態の海底装置は、一時通電部への通電を行う際に、入力電圧を設定するための、入力側で直列接続されるツェナーダイオードの数を増やす。また、当該通電を停止する際には、当該ツェナーダイオードの数を減らす。これにより、前記海底装置は、一時通電部への通電を行うことによる入力電圧の低下を抑え、また、当該通電を解除する際に生じる入力電圧の上昇を抑え得る。
 図9は、実施形態の海底装置の最小限の構成である海底装置100xの構成を表す概念図である。海底装置100xは、海底ケーブルシステムに用いられる装置である。海底装置100xは、通電切替部3xと一つ以上の一時通電部4xとを備える。
 一時通電部4xは、使用の際に一時的に通電される部分である。通電切替部3xは、所定の動作が行われる際に、少なくとも一つの一時通電部4xへの電力の供給を行い、前記動作の完了の際に、少なくとも一つの一時通電部4xへの電力の供給停止を行う。
 海底装置100xは、一時通電部4xへの電力の供給を使用の際にのみ行うことにより、一時通電部4xの稼動時間を短縮する。当該短縮により、一時通電部4xの稼働による故障の発生が抑えられる。その分、海底装置100xは、故障の発生を抑えることができる。
 そのため、海底装置100xは、前記構成により、[発明の効果]の項に記載した効果を奏する。
 以上、本発明の各実施形態を説明したが、本発明は、前記した実施形態に限定されるものではなく、本発明の基本的技術的思想を逸脱しない範囲で更なる変形、置換、調整を加えることができる。例えば、各図面に示した要素の構成は、本発明の理解を助けるための一例であり、これらの図面に示した構成に限定されるものではない。
 また、前記の実施形態の一部又は全部は、以下の付記のようにも記述され得るが、以下には限られない。
(付記1)
 一つ以上の、使用の際に一時的に通電される部分である一時通電部と、
 所定の動作が行われる際に、少なくとも一つの前記一時通電部への電力の供給を行い、前記動作の完了の際に、少なくとも一つの前記一時通電部への電力の供給停止を行う、通電切替部と、
 を備え、海底ケーブルシステムに用いられる、海底装置。
(付記2)
 前記通電切替部は通電制御スイッチである、付記1に記載された海底装置。
(付記3)
 前記通電切替部に前記供給及び前記供給停止を行わせる第一制御部をさらに備える、付記1又は付記2に記載された海底装置。
(付記4)
 陸側装置を供給源とする電流を受けるための入力給電線と、前記電流を他の装置に送付するための出力給電線との間に、前記入力給電線と前記出力給電線との間を流れる前記電流により供給電圧を設定する電圧設定部をさらに備える、付記1乃至付記3のうちのいずれか一に記載された海底装置。
(付記5)
 前記電圧設定部は、前記供給を行う際に、前記供給による前記供給電圧の低下を抑制するための抑制動作を行う、付記4に記載された海底装置。
(付記6)
 前記電圧設定部は、前記供給停止を行う際に、前記抑制動作の抑制動作解除を行う、付記5に記載された海底装置。
(付記7)
 前記電圧設定部は、前記電流に対し逆向きに直列に接続される複数のツェナーダイオードを備える、付記4乃至付記6のうちのいずれか一に記載された海底装置。
(付記8)
 前記複数のツェナーダイオードのうちの少なくとも一部のツェナーダイオードの各々には、そのツェナーダイオードの両端子を短絡し又は前記短絡の短絡解除を行う短絡切替部が接続されており、
 前記動作が行われる際に、前記短絡を行っている所定の前記短絡切替部は前記短絡解除を行い、前記完了の際に、前記短絡切替部は前記短絡を行う、
 付記7に記載された海底装置。
(付記9)
 前記短絡切替部は短絡切替スイッチである、付記8に記載された海底装置。
(付記10)
 前記短絡切替部に前記短絡及び前記短絡解除を行わせる第二処理部をさらに備える、付記8又は付記9に記載された海底装置。
(付記11)
 常時通電される部分である常時通電部をさらに備える、付記1乃至付記10のうちのいずれか一に記載された海底装置。
(付記12)
 ケーブルを介して伝送された光信号を増幅し、中継する、増幅中継装置である、付記1乃至付記11のうちのいずれか一に記載された海底装置。
(付記13)
 海底に設置される海底装置である、付記1乃至付記12のうちのいずれか一に記載された海底装置。
(付記14)
 海底ケーブルシステム用の海底装置において、所定の動作が行われる際に、少なくとも一つの、使用の際に一時的に通電される部分である一時通電部への電力の供給を行い、前記動作の完了の際に、少なくとも一つの前記一時通電部への電力の供給停止を行う、
 通電方法。
(付記15)
 所定の動作が行われる際に、少なくとも一つの、使用の際に一時的に通電される部分である一時通電部への電力の供給と、
 前記動作の完了の際に、少なくとも一つの前記一時通電部への電力の供給停止と、を、
 海底ケーブルシステム用の海底装置のコンピュータに実行させる通電プログラム。
 なお、付記1の海底ケーブルシステムは、例えば、図1又は図5の海底装置100が設置される海底ケーブルシステムである。また、一時通電部は、例えば、図1又は図5の一時通電部41乃至4mである。また、所定の動作は、例えば、前述の特定機能動作である。
 また、通電切替部は、例えば、図1又は図5の通電制御スイッチ31乃至3mである。また、海底装置は、例えば、図1又は図5の海底装置100である。また、付記2の通電制御スイッチは、例えば、図1又は図5の通電制御スイッチ31乃至3mである。また、付記3の第一制御部は、例えば、図2又は図6の第一制御部52である。
 また、付記4の電流は、例えば、図1又は図5のシステム電流Isである。また、入力給電線は、例えば、図1又は図5の入力給電線81である。また、出力給電線は、例えば、図1又は図5の出力給電線82である。また、他の装置は、例えば、図1又は図5の出力給電線82の接続先の他の海底装置である。
 また、付記5の電圧設定部は、例えば、図5の電圧制御スイッチ21乃至2nである。また、抑制動作は、例えば、オンになっている電圧制御スイッチ21乃至2nのいずれかをオフにする動作である。また、付記6の抑制動作解除は、例えば、オフになっている電圧制御スイッチ21乃至2nのいずれかをオンにする動作である。
 また、付記7のツェナーダイオードは、例えば、図1又は図5のツェナーダイオード11乃至1nである。また、付記8の短絡切替部は、例えば、図5の電圧制御スイッチ21乃至2nである。また、短絡解除は、例えば、オンになっている電圧制御スイッチ21乃至2nのいずれかをオフにする動作である。
 また、付記9の短絡切替スイッチは、例えば、図5の電圧制御スイッチ21乃至2nである。また、付記10の第二制御部は、例えば、図6の第二制御部55である。また、付記11の常時通電部は、例えば、図1又は図5の常時通電部61乃至6pである。また、付記12の増幅中継装置は、例えば、図1又は図5の海底装置100である。
 また、付記13の海底装置は、例えば、図1又は図5の海底装置100である。また、付記14及び付記15の海底装置は、例えば、図1又は図5の海底装置100である。また、付記15のコンピュータは、例えば、図1、図2、図5又は図6の処理部51である。
 以上、上述した実施形態を模範的な例として本発明を説明した。しかしながら、本発明は、上述した実施形態には限定されない。即ち、本発明は、本発明のスコープ内において、当業者が理解し得る様々な態様を適用することができる。
 この出願は、2019年12月20日に出願された日本出願特願2019-230364を基礎とする優先権を主張し、その開示の全てをここに取り込む。
 100、100x  海底装置
 11、12、1n  ツェナーダイオード
 31、32、3m  通電制御スイッチ
 3x  通電切替部
 41、42、4m、4x  一時通電部
 51  処理部
 52  第一制御部
 53  記憶部
 531  実行動作ID格納部
 532  第一対応情報格納部
 533  通電制御スイッチID格納部
 534  第二対応情報格納部
 54  動作処理部
 61、62、6p  常時通電部
 71、72  制御線群
 86  電圧供給部
 91、92  端子

Claims (15)

  1.  一つ以上の、使用の際に一時的に通電される部分である一時通電手段と、
     所定の動作が行われる際に、少なくとも一つの前記一時通電手段への電力の供給を行い、前記動作の完了の際に、少なくとも一つの前記一時通電手段への電力の供給停止を行う、通電切替手段と、
     を備え、海底ケーブルシステムに用いられる、海底装置。
  2.  前記通電切替手段は通電制御スイッチである、請求項1に記載された海底装置。
  3.  前記通電切替手段に前記供給及び前記供給停止を行わせる第一制御手段をさらに備える、請求項1又は請求項2に記載された海底装置。
  4.  陸側装置を供給源とする電流を受けるための入力給電線と、前記電流を他の装置に送付するための出力給電線との間に、前記入力給電線と前記出力給電線との間を流れる前記電流により供給電圧を設定する電圧設定手段をさらに備える、請求項1乃至請求項3のうちのいずれか一に記載された海底装置。
  5.  前記電圧設定手段は、前記供給を行う際に、前記供給による前記供給電圧の低下を抑制するための抑制動作を行う、請求項4に記載された海底装置。
  6.  前記電圧設定手段は、前記供給停止を行う際に、前記抑制動作の抑制動作解除を行う、請求項5に記載された海底装置。
  7.  前記電圧設定手段は、前記電流に対し逆向きに直列に接続される複数のツェナーダイオードを備える、請求項4乃至請求項6のうちのいずれか一に記載された海底装置。
  8.  前記複数のツェナーダイオードのうちの少なくとも一部のツェナーダイオードの各々には、そのツェナーダイオードの両端子を短絡し又は前記短絡の短絡解除を行う短絡切替手段が接続されており、
     前記動作が行われる際に、前記短絡を行っている所定の前記短絡切替手段は前記短絡解除を行い、前記完了の際に、前記短絡切替手段は前記短絡を行う、
     請求項7に記載された海底装置。
  9.  前記短絡切替手段は短絡切替スイッチである、請求項8に記載された海底装置。
  10.  前記短絡切替手段に前記短絡及び前記短絡解除を行わせる第二処理手段をさらに備える、請求項8又は請求項9に記載された海底装置。
  11.  常時通電される部分である常時通電手段をさらに備える、請求項1乃至請求項10のうちのいずれか一に記載された海底装置。
  12.  ケーブルを介して伝送された光信号を増幅し、中継する、増幅中継装置である、請求項1乃至請求項11のうちのいずれか一に記載された海底装置。
  13.  海底に設置される海底装置である、請求項1乃至請求項12のうちのいずれか一に記載された海底装置。
  14.  海底ケーブルシステム用の海底装置において、所定の動作が行われる際に、少なくとも一つの、使用の際に一時的に通電される部分である一時通電手段への電力の供給を行い、前記動作の完了の際に、少なくとも一つの前記一時通電手段への電力の供給停止を行う、
     通電方法。
  15.  所定の動作が行われる際に、少なくとも一つの、使用の際に一時的に通電される部分である一時通電手段への電力の供給と、
     前記動作の完了の際に、少なくとも一つの前記一時通電手段への電力の供給停止と、を、
     海底ケーブルシステム用の海底装置のコンピュータに実行させる通電プログラムを記録した記録媒体。
PCT/JP2020/043258 2019-12-20 2020-11-19 海底装置、通電方法及び記録媒体 WO2021124789A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
US17/783,108 US20220416538A1 (en) 2019-12-20 2020-11-19 Undersea device, energization method, and recording medium
EP20902357.1A EP4080776A4 (en) 2019-12-20 2020-11-19 COSMETIC DEVICE, ELECTRICAL METHOD AND RECORDING MEDIUM
JP2021565391A JP7251661B2 (ja) 2019-12-20 2020-11-19 海底装置、通電方法及び通電プログラム
CN202080086947.2A CN114846746A (zh) 2019-12-20 2020-11-19 海底设备、通电方法和记录介质

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019230364 2019-12-20
JP2019-230364 2019-12-20

Publications (1)

Publication Number Publication Date
WO2021124789A1 true WO2021124789A1 (ja) 2021-06-24

Family

ID=76477269

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/043258 WO2021124789A1 (ja) 2019-12-20 2020-11-19 海底装置、通電方法及び記録媒体

Country Status (5)

Country Link
US (1) US20220416538A1 (ja)
EP (1) EP4080776A4 (ja)
JP (1) JP7251661B2 (ja)
CN (1) CN114846746A (ja)
WO (1) WO2021124789A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220131460A1 (en) * 2019-02-15 2022-04-28 Nec Corporation Power supply circuit and method for controlling power supply circuit

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001230707A (ja) * 2000-02-18 2001-08-24 Kdd Submarine Cable Systems Inc 給電線接続装置
WO2013094266A1 (ja) * 2011-12-22 2013-06-27 日本電気株式会社 分岐装置および給電路監視方法
WO2017159648A1 (ja) 2016-03-18 2017-09-21 日本電気株式会社 海底機器、海底ケーブルシステム、海底機器の制御方法および海底機器のプログラムが記憶された記憶媒体

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5202632B2 (ja) * 2007-07-23 2013-06-05 タイコ エレクトロニクス サブシー コミュニケーションズ エルエルシー 海底光通信システムの要素間における信号伝達
KR100967211B1 (ko) * 2009-06-24 2010-07-07 주식회사 세스코리아절전기 대기전력 차단 해제 방법 및 시스템
EP2393222B1 (en) * 2010-06-03 2014-10-01 Alcatel Lucent System and method for transporting electric power and providing optical fiber communications under sea water
EP2525491B1 (en) * 2011-05-16 2021-03-10 Vincotech GmbH Switching loss reduction in converter modules
JP6493539B2 (ja) * 2015-08-24 2019-04-03 日本電気株式会社 定電流供給装置、定電流供給システムおよび定電流供給方法
JP2021517399A (ja) * 2018-03-06 2021-07-15 ネプチューン サブシー アイピー リミテッド 改善されたリピータ給電

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001230707A (ja) * 2000-02-18 2001-08-24 Kdd Submarine Cable Systems Inc 給電線接続装置
WO2013094266A1 (ja) * 2011-12-22 2013-06-27 日本電気株式会社 分岐装置および給電路監視方法
WO2017159648A1 (ja) 2016-03-18 2017-09-21 日本電気株式会社 海底機器、海底ケーブルシステム、海底機器の制御方法および海底機器のプログラムが記憶された記憶媒体

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4080776A4

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220131460A1 (en) * 2019-02-15 2022-04-28 Nec Corporation Power supply circuit and method for controlling power supply circuit
US11966244B2 (en) * 2019-02-15 2024-04-23 Nec Corporation Power supply circuit with cascade-connected diodes and method for controlling power supply circuit

Also Published As

Publication number Publication date
JP7251661B2 (ja) 2023-04-04
JPWO2021124789A1 (ja) 2021-06-24
EP4080776A1 (en) 2022-10-26
EP4080776A4 (en) 2023-01-11
CN114846746A (zh) 2022-08-02
US20220416538A1 (en) 2022-12-29

Similar Documents

Publication Publication Date Title
CN100438297C (zh) 电流平衡电路
US6489748B1 (en) Split backplane power system
US6815843B1 (en) Power supply device
US4661879A (en) Overcurrent protection circuit for line circuits in a switching system
EP3822714B1 (en) Fan fault detection device
WO2021124789A1 (ja) 海底装置、通電方法及び記録媒体
EP0491378A2 (en) A power feeding system for an optical transmission system
JPWO2020022303A1 (ja) 通信システム
US20210336474A1 (en) Power backup circuit and method of operating the same
CN111255438B (zh) 一种马笼头的控制系统及方法
CN105373176B (zh) 用于给现场设备自身可靠地、冗余地供电的方法和系统
EP1294113B1 (en) Branching unit for an optical transmission system
EP1437840B1 (en) Submarine cable branching unit
CN104160602A (zh) 用于电力转换器模块的远程控制的方法和设备
US11588510B2 (en) Network communication power supply with digital signal isolation
CN100525043C (zh) 用于供电单元的保护电路和具有相应保护电路的供电单元
CN220122788U (zh) 供电系统及lcu屏柜
JP2022120990A (ja) 電力変換装置
CN114204832A (zh) 一种开关电源及闸流开关组件
JP3234782B2 (ja) 監視制御方式
JP2021158758A (ja) 電力装置
CN112714990A (zh) 提供电力的系统和方法
CN115459214A (zh) 电压保护电路及电子设备
JP2024044279A (ja) 分岐装置、光海底ケーブルシステム及び給電方法
CN117818718A (zh) 一种信号传输电路

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20902357

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021565391

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020902357

Country of ref document: EP

Effective date: 20220720