WO2021082005A1 - Rail structure - Google Patents

Rail structure Download PDF

Info

Publication number
WO2021082005A1
WO2021082005A1 PCT/CN2019/115137 CN2019115137W WO2021082005A1 WO 2021082005 A1 WO2021082005 A1 WO 2021082005A1 CN 2019115137 W CN2019115137 W CN 2019115137W WO 2021082005 A1 WO2021082005 A1 WO 2021082005A1
Authority
WO
WIPO (PCT)
Prior art keywords
track
precast
track bed
assembly
bed
Prior art date
Application number
PCT/CN2019/115137
Other languages
French (fr)
Chinese (zh)
Inventor
肖俊恒
王红
郄录朝
徐旸
许永贤
杜香刚
刘海涛
赵磊
Original Assignee
中国铁道科学研究院铁道建筑研究所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中国铁道科学研究院铁道建筑研究所 filed Critical 中国铁道科学研究院铁道建筑研究所
Priority to PCT/CN2019/115137 priority Critical patent/WO2021082005A1/en
Publication of WO2021082005A1 publication Critical patent/WO2021082005A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way

Definitions

  • the invention relates to the field of train tracks, in particular to a track structure.
  • High-speed passenger transportation and heavy freight transportation are the main directions for the development of railway technology, and the track structure is directly in contact with the train in operation, and its service status will directly affect the operational safety of the train.
  • Ballastless track has the advantages of strong integrity, good stability, easy maintenance of track geometry, small track deformation, and less maintenance work.
  • the project investment cost is high, the on-site construction is complicated and the technical requirements are high, and the wheel and rail noise is large and the The impact of environmental vibration is prominent, and the ballastless track is mostly laid on the foundation of the bridge. Under the action of temperature load, the ballastless track and the underlying foundation will interact significantly, and it is extremely difficult to repair once a problem occurs.
  • ballast bed In order to maintain the geometric state and elasticity of the ballasted track, it is necessary to carry out continuous maintenance and repair work (tamping and cleaning operations), and the maintenance work itself will bring about the ballast bed. Certain side effects, such as the crushing of ballast particles caused by tamping, will further aggravate the degradation of the ballast bed.
  • the main purpose of the present invention is to provide a track structure to solve the problem of difficult maintenance of the track structure in the prior art.
  • the present invention provides a track structure, including: precast ballast bed assemblies, the number of precast ballast bed assemblies is multiple, the plurality of precast ballast bed assemblies are arranged at intervals along a first predetermined direction; the steel rails are fixedly arranged in a plurality of Prefabricated track bed components.
  • the prefabricated track bed assembly includes: a curing track bed, two curing track beds, the two curing track beds are spaced apart along a second predetermined direction, the first predetermined direction and the second predetermined direction are perpendicular to each other; sleepers, the first ends of the sleepers are provided On one curing track bed, the second end of the sleeper is arranged on the other curing track bed, and the steel rail is arranged on the sleeper.
  • the cured track bed is a polyurethane cured track bed.
  • the prefabricated track bed assembly further includes a fastener, at least part of the fastener passes through the rail and the sleeper to fix the rail to the sleeper.
  • the track structure further includes a packing layer, and a packing layer is arranged between each two adjacent precast track bed components, so as to fill the gap between each adjacent two precast track bed components through the packing layer.
  • the filling layer includes ballast.
  • the track structure further includes: a drainage assembly, the drainage assembly is arranged on the side of the precast track bed assembly, and the water inlet end of the drainage assembly is connected with the precast track bed assembly to drain the water in the precast track bed assembly through the drainage assembly.
  • the track structure further includes: an adjustment layer, the adjustment layer is arranged on the base surface, the adjustment layer is arranged under the precast track bed assembly and connected with the precast track bed assembly, and the height of the adjustment layer relative to the base surface is adjustable. To adjust the height of the precast track bed component relative to the base surface.
  • the drainage assembly includes a drainage groove, the drainage groove is arranged on the surface of the adjustment layer away from the base surface, the drainage groove extends along a second predetermined direction, and the first predetermined direction is perpendicular to the second predetermined direction.
  • the track structure further includes a protective layer, the protective layer is arranged on the outer side of the precast track bed assembly, and the drainage groove extends to the surface of the protective layer along the second predetermined direction.
  • the track structure includes a precast track bed assembly and a steel rail.
  • There are multiple precast track bed assemblies the plurality of precast track bed assemblies are arranged at intervals along a first predetermined direction, and the steel rails are fixedly arranged on the plurality of precast track bed assemblies, wherein
  • the prefabricated track bed components are prefabricated in the workshop before laying on site. The cleanliness and compactness of the ballast can be accurately controlled.
  • the multiple prefabricated track bed components are arranged at intervals to facilitate the maintenance and repair of the prefabricated track bed components. The maintenance solves the problem of difficult maintenance and repair of the track structure in the prior art.
  • Figure 1 shows a schematic structural diagram of an embodiment of a track structure according to the present invention
  • Figure 2 shows a schematic structural view of the track structure according to the present invention from a first perspective
  • Figure 3 shows a schematic structural view of the track structure according to the present invention from a second perspective
  • Fig. 4 shows a schematic structural view of an embodiment of a precast track bed assembly of the track structure according to the present invention.
  • the present invention provides a track structure, please refer to Figures 1 to 4, including: precast ballast bed assembly 10, there are multiple precast ballast bed assemblies 10, the plurality of precast ballast bed assemblies 10 are arranged at intervals along a first predetermined direction; steel rail 20 , The steel rail 20 is fixedly arranged on a plurality of precast track bed assemblies 10.
  • the track structure provided according to the present invention includes a precast track bed assembly 10 and a steel rail 20.
  • a precast track bed assembly 10 There are multiple precast track bed assemblies 10, the plurality of precast track bed assemblies 10 are arranged at intervals along a first predetermined direction, and the steel rails 20 are fixedly arranged on the plurality of precast track beds.
  • the prefabricated track bed assembly is prefabricated in the workshop before the site is laid. The cleanliness and compactness of the ballast can be accurately controlled.
  • the multiple precast track bed assemblies 10 are arranged at intervals to facilitate subsequent alignment. The maintenance and maintenance of the precast track bed assembly 10 solves the problem of difficult maintenance and maintenance of the track structure in the prior art.
  • the prefabricated track bed assembly 10 includes: a curing track bed 11, two curing track beds 11, the two curing track beds 11 are spaced apart along a second predetermined direction, the first predetermined direction and the second predetermined direction are perpendicular to each other; sleepers 12, sleepers The first end of 12 is set on one solidified track bed 11, the second end of the sleeper 12 is set on another solidified track bed 11, and the steel rail 20 is set on the sleeper 12.
  • the cured track bed 11 is formed by bonding the ballast with a cured material.
  • the cured material includes materials such as polyurethane, modified asphalt, and cement-based composite materials. Under the load of train shock and vibration, the cured material can reduce the ballast particles. The ballast deterioration caused by the mutual displacement between the ballasts. At the same time, because the gaps between the gravel particles in the ballast are filled by the solidified material, the contact stress between the various gravel particles is reduced, and the ballast is slowed down. Broken and pulverized, extending the service life of the track structure.
  • the cured track bed 11 is a polyurethane cured track bed.
  • the prefabricated track bed assembly 10 further includes a fastener 13, at least part of which passes through the rail 20 and the sleeper 12 to fix the rail 20 to the sleeper 12.
  • a fastener 13 at least part of which passes through the rail 20 and the sleeper 12 to fix the rail 20 to the sleeper 12.
  • the track structure further includes: a packing layer 30, and a packing layer 30 is arranged between each two adjacent precast track bed assemblies 10, so as to fill each adjacent two precast track bed assemblies through the packing layer 30
  • the distance between each adjacent two precast track bed assemblies 10 is 5 cm to 20 cm, so as to replace and maintain each precast track bed assembly 10 to avoid interference and extrusion between two adjacent precast track bed assemblies 10 , Resulting in deformation of the track.
  • the filling layer 30 includes ballast.
  • the track structure further includes: a drainage assembly 40, which is arranged on the side of the precast track bed assembly 10, and the water inlet end of the drainage assembly 40 is in communication with the precast track bed assembly 10 to pass through the drainage assembly 40
  • the water in the precast ballast bed assembly 10 is discharged.
  • the drainage performance of the track structure is increased to prevent the precast ballast bed assembly 10 from being deformed by the accumulation of water. At the same time, it can also prevent the traditional ballast bed from intruding dust from the outside.
  • the drainage assembly 40 does not require daily maintenance such as tamping and cleaning. The operation saves the maintenance and repair costs of the track, and also avoids the secondary damage to the ballast particles caused by the tamping and cleaning operations, and prolongs the service life of the track structure.
  • the track structure further includes: an adjustment layer 50, which is arranged on the base surface, and the adjustment layer 50 is arranged below the precast track bed assembly 10 and connected to the precast track bed assembly 10, and the adjustment layer 50 is relative to the base.
  • the height of the surface is adjustable to adjust the height of the precast track bed assembly 10 relative to the base surface. Such a setting can facilitate the later maintenance of the precast track bed assembly 10, and the adjustment layer 50 ensures that each precast track bed assembly 10 is at the same height.
  • the drainage assembly 40 includes a drainage groove 41 disposed on the surface of the adjustment layer 50 away from the base surface, and the drainage groove 41 extends along a second predetermined direction.
  • the direction is vertical. Specifically, there is a predetermined angle between the drainage groove 41 and the horizontal surface, so that the accumulated water is discharged along the drainage groove 41.
  • the track structure further includes a protective layer 60 arranged on the outer side of the precast track bed assembly 10, and the drainage groove 41 extends to the surface of the protective layer 60 in the second predetermined direction. It should be noted here that, as shown in FIG. 3, the protective layer 60 surrounds at least part of the precast track bed assembly 10 to protect the precast track bed assembly 10 and enhance the stability of the track structure.
  • the track structure provided according to the present invention includes a precast track bed assembly 10 and a steel rail 20.
  • a precast track bed assembly 10 There are multiple precast track bed assemblies 10, the plurality of precast track bed assemblies 10 are arranged at intervals along a first predetermined direction, and the steel rails 20 are fixedly arranged on the plurality of precast track beds.
  • the prefabricated track bed assembly is prefabricated in the workshop before the site is laid. The cleanliness and compactness of the ballast can be accurately controlled.
  • the multiple precast track bed assemblies 10 are arranged at intervals to facilitate subsequent alignment. The maintenance and maintenance of the precast track bed assembly 10 solves the problem of difficult maintenance and maintenance of the track structure in the prior art.
  • spatially relative terms can be used here, such as “above”, “above”, “above the surface”, “above”, etc., to describe as shown in the figure Shows the spatial positional relationship between one device or feature and other devices or features. It should be understood that the spatially relative terms are intended to encompass different orientations in use or operation in addition to the orientation of the device described in the figure. For example, if the device in the drawing is turned upside down, then a device described as “above other devices or structures” or “above other devices or structures” will then be positioned as “below the other devices or structures” or “on Under other devices or structures”. Thus, the exemplary term “above” can include both orientations “above” and “below”. The device can also be positioned in other different ways (rotated by 90 degrees or in other orientations), and the relative description of the space used here will be explained accordingly.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

Provided is a rail structure. The rail structure comprises: prefabricated ballast bed assemblies, a plurality of prefabricated ballast bed assemblies being provided and arranged at intervals in a first predetermined direction; and a steel rail, the steel rail being fixedly arranged on the plurality of prefabricated ballast bed assemblies. Therefore, the problem in the prior art of a rail structure being difficult to maintain and repair is thus solved.

Description

轨道结构Track structure 技术领域Technical field
本发明涉及列车轨道领域,具体而言,涉及一种轨道结构。The invention relates to the field of train tracks, in particular to a track structure.
背景技术Background technique
客运高速、货运重载是铁路技术发展的主要方向,而轨道结构直接与运营中的列车相接触,其服役状态会直接影响列车的运营安全。High-speed passenger transportation and heavy freight transportation are the main directions for the development of railway technology, and the track structure is directly in contact with the train in operation, and its service status will directly affect the operational safety of the train.
无砟轨道具有整体性强,稳定性好,轨道几何形位易于保持,轨道变形小,维修工作量少等优点,但是工程投资费用高,现场施工繁杂且技术要求高,轮轨噪声大、对环境振动影响突出,且无砟轨道多铺设于桥梁基础之上,在温度荷载作用下,无砟轨道与下部基础会发生显著的相互作用,一旦出现问题维修极为困难。Ballastless track has the advantages of strong integrity, good stability, easy maintenance of track geometry, small track deformation, and less maintenance work. However, the project investment cost is high, the on-site construction is complicated and the technical requirements are high, and the wheel and rail noise is large and the The impact of environmental vibration is prominent, and the ballastless track is mostly laid on the foundation of the bridge. Under the action of temperature load, the ballastless track and the underlying foundation will interact significantly, and it is extremely difficult to repair once a problem occurs.
有砟轨道在服役过程中会发生自然的劣化问题,为保持有砟轨道的几何状态和弹性,需不断进行养护维修工作(捣固和清筛作业),而养护作业本身又会对道床带来一定的副作用,如捣固引起的道砟颗粒破碎等,会进一步加剧道床的劣化。In order to maintain the geometric state and elasticity of the ballasted track, it is necessary to carry out continuous maintenance and repair work (tamping and cleaning operations), and the maintenance work itself will bring about the ballast bed. Certain side effects, such as the crushing of ballast particles caused by tamping, will further aggravate the degradation of the ballast bed.
发明内容Summary of the invention
本发明的主要目的在于提供一种轨道结构,以解决现有技术中的轨道结构养护维修困难的问题。The main purpose of the present invention is to provide a track structure to solve the problem of difficult maintenance of the track structure in the prior art.
为了实现上述目的,本发明提供了一种轨道结构,包括:预制道床组件,预制道床组件为多个,多个预制道床组件沿第一预定方向相间隔地布置;钢轨,钢轨固定设置在多个预制道床组件上。In order to achieve the above-mentioned object, the present invention provides a track structure, including: precast ballast bed assemblies, the number of precast ballast bed assemblies is multiple, the plurality of precast ballast bed assemblies are arranged at intervals along a first predetermined direction; the steel rails are fixedly arranged in a plurality of Prefabricated track bed components.
进一步地,预制道床组件包括:固化道床,固化道床为两个,两个固化道床沿第二预定方向相间隔设置,第一预定方向与第二预定方向相互垂直;轨枕,轨枕的第一端设置在一个固化道床上,轨枕的第二端设置在另一个固化道床上,钢轨设置在轨枕上。Further, the prefabricated track bed assembly includes: a curing track bed, two curing track beds, the two curing track beds are spaced apart along a second predetermined direction, the first predetermined direction and the second predetermined direction are perpendicular to each other; sleepers, the first ends of the sleepers are provided On one curing track bed, the second end of the sleeper is arranged on the other curing track bed, and the steel rail is arranged on the sleeper.
进一步地,固化道床为聚氨酯固化道床。Further, the cured track bed is a polyurethane cured track bed.
进一步地,预制道床组件还包括:扣件,扣件的至少部分穿过钢轨和轨枕,以将钢轨固定连接在轨枕上。Further, the prefabricated track bed assembly further includes a fastener, at least part of the fastener passes through the rail and the sleeper to fix the rail to the sleeper.
进一步地,轨道结构还包括:填充层,各相邻的两个预制道床组件之间均设置有填充层,以通过填充层填充各相邻的两个预制道床组件之间的间隙。Further, the track structure further includes a packing layer, and a packing layer is arranged between each two adjacent precast track bed components, so as to fill the gap between each adjacent two precast track bed components through the packing layer.
进一步地,填充层包括道砟。Further, the filling layer includes ballast.
进一步地,轨道结构还包括:排水组件,排水组件设置在预制道床组件的侧方,排水组件的进水端与预制道床组件连通,以通过排水组件排出预制道床组件中的水分。Further, the track structure further includes: a drainage assembly, the drainage assembly is arranged on the side of the precast track bed assembly, and the water inlet end of the drainage assembly is connected with the precast track bed assembly to drain the water in the precast track bed assembly through the drainage assembly.
进一步地,轨道结构还包括:调整层,调整层设置在基面上,调整层设置在预制道床组件的下方并与预制道床组件连接,调整层相对于基面的高度可调节地设置,以用于调整预制道床组件相对于基面的高度。Further, the track structure further includes: an adjustment layer, the adjustment layer is arranged on the base surface, the adjustment layer is arranged under the precast track bed assembly and connected with the precast track bed assembly, and the height of the adjustment layer relative to the base surface is adjustable. To adjust the height of the precast track bed component relative to the base surface.
进一步地,排水组件包括排水槽,排水槽设置在调整层远离基面的表面上,排水槽沿第二预定方向延伸,第一预定方向与第二预定方向垂直。Further, the drainage assembly includes a drainage groove, the drainage groove is arranged on the surface of the adjustment layer away from the base surface, the drainage groove extends along a second predetermined direction, and the first predetermined direction is perpendicular to the second predetermined direction.
进一步地,轨道结构还包括:防护层,防护层设置在预制道床组件的外侧,排水槽沿第二预定方向延伸至防护层的表面上。Further, the track structure further includes a protective layer, the protective layer is arranged on the outer side of the precast track bed assembly, and the drainage groove extends to the surface of the protective layer along the second predetermined direction.
应用本发明的技术方案,轨道结构包括预制道床组件和钢轨,预制道床组件为多个,多个预制道床组件沿第一预定方向相间隔地布置,钢轨固定设置在多个预制道床组件上,其中,预制道床组件为在现场铺设之前在车间预制而成,道砟的清洁度和密实度风参数能够得到精确控制,将多个预制道床组件相间隔地布置,便于后期对预制道床组件的维修与养护,解决了现有技术中的轨道结构养护维修困难的问题。Applying the technical solution of the present invention, the track structure includes a precast track bed assembly and a steel rail. There are multiple precast track bed assemblies, the plurality of precast track bed assemblies are arranged at intervals along a first predetermined direction, and the steel rails are fixedly arranged on the plurality of precast track bed assemblies, wherein The prefabricated track bed components are prefabricated in the workshop before laying on site. The cleanliness and compactness of the ballast can be accurately controlled. The multiple prefabricated track bed components are arranged at intervals to facilitate the maintenance and repair of the prefabricated track bed components. The maintenance solves the problem of difficult maintenance and repair of the track structure in the prior art.
附图说明Description of the drawings
构成本申请的一部分的说明书附图用来提供对本发明的进一步理解,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The drawings of the specification constituting a part of the application are used to provide a further understanding of the present invention, and the exemplary embodiments and descriptions of the present invention are used to explain the present invention, and do not constitute an improper limitation of the present invention. In the attached picture:
图1示出了根据本发明的轨道结构的实施例的结构示意图;Figure 1 shows a schematic structural diagram of an embodiment of a track structure according to the present invention;
图2示出了根据本发明的轨道结构的第一视角的结构示意图;Figure 2 shows a schematic structural view of the track structure according to the present invention from a first perspective;
图3示出了根据本发明的轨道结构的第二视角的结构示意图;以及Figure 3 shows a schematic structural view of the track structure according to the present invention from a second perspective; and
图4示出了根据本发明的轨道结构的预制道床组件的实施例的结构示意图。Fig. 4 shows a schematic structural view of an embodiment of a precast track bed assembly of the track structure according to the present invention.
其中,上述附图包括以下附图标记:The above drawings include the following reference signs:
10、预制道床组件;20、钢轨;11、固化道床;12、轨枕;13、扣件;30、填充层;40、排水组件;41、排水槽;50、调整层;60、防护层。10. Prefabricated track bed components; 20. Steel rails; 11. Cured track beds; 12. Sleepers; 13. Fasteners; 30. Filling layer; 40. Drainage components; 41. Drainage groove; 50. Adjustment layer; 60. Protective layer.
具体实施方式Detailed ways
需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本发明。It should be noted that the embodiments in this application and the features in the embodiments can be combined with each other if there is no conflict. Hereinafter, the present invention will be described in detail with reference to the drawings and in conjunction with the embodiments.
需要注意的是,这里所使用的术语仅是为了描述具体实施方式,而非意图限制根据本申请的示例性实施方式。如在这里所使用的,除非上下文另外明确指出,否则单数形式也意图包括复数形式,此外,还应当理解的是,当在本说明书中使用术语“包含”和/或“包括” 时,其指明存在特征、步骤、操作、器件、组件和/或它们的组合。It should be noted that the terms used here are only for describing specific embodiments, and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should also be understood that when the terms "comprising" and/or "including" are used in this specification, they indicate There are features, steps, operations, devices, components, and/or combinations thereof.
本发明提供了一种轨道结构,请参考图1至图4,包括:预制道床组件10,预制道床组件10为多个,多个预制道床组件10沿第一预定方向相间隔地布置;钢轨20,钢轨20固定设置在多个预制道床组件10上。The present invention provides a track structure, please refer to Figures 1 to 4, including: precast ballast bed assembly 10, there are multiple precast ballast bed assemblies 10, the plurality of precast ballast bed assemblies 10 are arranged at intervals along a first predetermined direction; steel rail 20 , The steel rail 20 is fixedly arranged on a plurality of precast track bed assemblies 10.
根据本发明提供的轨道结构,包括预制道床组件10和钢轨20,预制道床组件10为多个,多个预制道床组件10沿第一预定方向相间隔地布置,钢轨20固定设置在多个预制道床组件10上,其中,预制道床组件为在现场铺设之前在车间预制而成,道砟的清洁度和密实度风参数能够得到精确控制,将多个预制道床组件10相间隔地布置,便于后期对预制道床组件10的维修与养护,解决了现有技术中的轨道结构养护维修困难的问题。The track structure provided according to the present invention includes a precast track bed assembly 10 and a steel rail 20. There are multiple precast track bed assemblies 10, the plurality of precast track bed assemblies 10 are arranged at intervals along a first predetermined direction, and the steel rails 20 are fixedly arranged on the plurality of precast track beds. On the assembly 10, the prefabricated track bed assembly is prefabricated in the workshop before the site is laid. The cleanliness and compactness of the ballast can be accurately controlled. The multiple precast track bed assemblies 10 are arranged at intervals to facilitate subsequent alignment. The maintenance and maintenance of the precast track bed assembly 10 solves the problem of difficult maintenance and maintenance of the track structure in the prior art.
具体地,预制道床组件10包括:固化道床11,固化道床11为两个,两个固化道床11沿第二预定方向相间隔设置,第一预定方向与第二预定方向相互垂直;轨枕12,轨枕12的第一端设置在一个固化道床11上,轨枕12的第二端设置在另一个固化道床11上,钢轨20设置在轨枕12上。Specifically, the prefabricated track bed assembly 10 includes: a curing track bed 11, two curing track beds 11, the two curing track beds 11 are spaced apart along a second predetermined direction, the first predetermined direction and the second predetermined direction are perpendicular to each other; sleepers 12, sleepers The first end of 12 is set on one solidified track bed 11, the second end of the sleeper 12 is set on another solidified track bed 11, and the steel rail 20 is set on the sleeper 12.
优选地,固化道床11是通过固化材料粘结道砟形成,固化材料包括聚氨酯、改性沥青和水泥基复合材料等材料,在列车冲击和振动的荷载作用下,固化材料能够减少由道砟颗粒之间的相互错动引起的道砟劣化,同时,由于道砟中碎石颗粒之间的空隙被固化材料所填充,减小了各个碎石颗粒之间相互接触的应力,减缓了道砟的破碎和粉化,延长了轨道结构的使用寿命。在本发明提供的实施例中,固化道床11为聚氨酯固化道床。Preferably, the cured track bed 11 is formed by bonding the ballast with a cured material. The cured material includes materials such as polyurethane, modified asphalt, and cement-based composite materials. Under the load of train shock and vibration, the cured material can reduce the ballast particles. The ballast deterioration caused by the mutual displacement between the ballasts. At the same time, because the gaps between the gravel particles in the ballast are filled by the solidified material, the contact stress between the various gravel particles is reduced, and the ballast is slowed down. Broken and pulverized, extending the service life of the track structure. In the embodiment provided by the present invention, the cured track bed 11 is a polyurethane cured track bed.
为了便于连接钢轨20和轨枕12,预制道床组件10还包括:扣件13,扣件13的至少部分穿过钢轨20和轨枕12,以将钢轨20固定连接在轨枕12上。在对轨道进行维修与养护时,首先通过扣件13对钢轨20或轨枕12进行养护与维修。In order to facilitate the connection between the rail 20 and the sleeper 12, the prefabricated track bed assembly 10 further includes a fastener 13, at least part of which passes through the rail 20 and the sleeper 12 to fix the rail 20 to the sleeper 12. When repairing and maintaining the track, firstly, the rail 20 or sleeper 12 is maintained and repaired through the fastener 13.
在具体实施的过程中,轨道结构还包括:填充层30,各相邻的两个预制道床组件10之间均设置有填充层30,以通过填充层30填充各相邻的两个预制道床组件10之间的间隙。优选地,各相邻的两个预制道床组件10之间的距离为5cm至20cm,以便与各预制道床组件10的更换与养护,避免相邻的两个预制道床组件10之间相互干涉挤压,导致轨道变形。此外,还要避免相邻的两个预制道床组件10之间的间距过大,避免导致对钢轨20的承载力降低,降低轨道的使用寿命。In the process of specific implementation, the track structure further includes: a packing layer 30, and a packing layer 30 is arranged between each two adjacent precast track bed assemblies 10, so as to fill each adjacent two precast track bed assemblies through the packing layer 30 The gap between 10. Preferably, the distance between each adjacent two precast track bed assemblies 10 is 5 cm to 20 cm, so as to replace and maintain each precast track bed assembly 10 to avoid interference and extrusion between two adjacent precast track bed assemblies 10 , Resulting in deformation of the track. In addition, it is necessary to avoid too large a distance between two adjacent precast track bed assemblies 10, so as to avoid reducing the bearing capacity of the steel rail 20 and reducing the service life of the rail.
优选地,填充层30包括道砟。Preferably, the filling layer 30 includes ballast.
在本发明提供的实施例中,轨道结构还包括:排水组件40,排水组件40设置在预制道床组件10的侧方,排水组件40的进水端与预制道床组件10连通,以通过排水组件40排出预制道床组件10中的水分。增加了轨道结构的排水性能,防止积水使预制道床组件10产生形变,同时还能够杜绝传统道床由外部侵入粉尘所引发的道床赃物,通过设置排水组件40无需日常进行捣固和清筛等维修作业,节省了轨道的养护维修经费,还避免了捣固和清筛作业对道砟颗粒带来的二次损伤,延长了轨道结构的使用寿命。In the embodiment provided by the present invention, the track structure further includes: a drainage assembly 40, which is arranged on the side of the precast track bed assembly 10, and the water inlet end of the drainage assembly 40 is in communication with the precast track bed assembly 10 to pass through the drainage assembly 40 The water in the precast ballast bed assembly 10 is discharged. The drainage performance of the track structure is increased to prevent the precast ballast bed assembly 10 from being deformed by the accumulation of water. At the same time, it can also prevent the traditional ballast bed from intruding dust from the outside. The drainage assembly 40 does not require daily maintenance such as tamping and cleaning. The operation saves the maintenance and repair costs of the track, and also avoids the secondary damage to the ballast particles caused by the tamping and cleaning operations, and prolongs the service life of the track structure.
在具体实施的过程中,轨道结构还包括:调整层50,调整层50设置在基面上,调整层50设置在预制道床组件10的下方并与预制道床组件10连接,调整层50相对于基面的高度可调节地设置,以用于调整预制道床组件10相对于基面的高度。这样设置能够方便对预制道床组件10后期的养护,通过调整层50保证各个预制道床组件10在同一高度上。In the process of specific implementation, the track structure further includes: an adjustment layer 50, which is arranged on the base surface, and the adjustment layer 50 is arranged below the precast track bed assembly 10 and connected to the precast track bed assembly 10, and the adjustment layer 50 is relative to the base. The height of the surface is adjustable to adjust the height of the precast track bed assembly 10 relative to the base surface. Such a setting can facilitate the later maintenance of the precast track bed assembly 10, and the adjustment layer 50 ensures that each precast track bed assembly 10 is at the same height.
在本发明提供的实施例中,排水组件40包括排水槽41,排水槽41设置在调整层50远离基面的表面上,排水槽41沿第二预定方向延伸,第一预定方向与第二预定方向垂直。具体地,排水槽41与水平面之间具有预定夹角,以使积水沿排水槽41排出。In the embodiment provided by the present invention, the drainage assembly 40 includes a drainage groove 41 disposed on the surface of the adjustment layer 50 away from the base surface, and the drainage groove 41 extends along a second predetermined direction. The direction is vertical. Specifically, there is a predetermined angle between the drainage groove 41 and the horizontal surface, so that the accumulated water is discharged along the drainage groove 41.
轨道结构还包括:防护层60,防护层60设置在预制道床组件10的外侧,排水槽41沿第二预定方向延伸至防护层60的表面上。在这里需要说明的是,如图3所示,防护层60是将预制道床组件10的至少部分进行包围,以对预制道床组件10进行保护,增强了轨道结构的稳定性。The track structure further includes a protective layer 60 arranged on the outer side of the precast track bed assembly 10, and the drainage groove 41 extends to the surface of the protective layer 60 in the second predetermined direction. It should be noted here that, as shown in FIG. 3, the protective layer 60 surrounds at least part of the precast track bed assembly 10 to protect the precast track bed assembly 10 and enhance the stability of the track structure.
从以上的描述中,可以看出,本发明上述的实施例实现了如下技术效果:From the above description, it can be seen that the above-mentioned embodiments of the present invention achieve the following technical effects:
根据本发明提供的轨道结构,包括预制道床组件10和钢轨20,预制道床组件10为多个,多个预制道床组件10沿第一预定方向相间隔地布置,钢轨20固定设置在多个预制道床组件10上,其中,预制道床组件为在现场铺设之前在车间预制而成,道砟的清洁度和密实度风参数能够得到精确控制,将多个预制道床组件10相间隔地布置,便于后期对预制道床组件10的维修与养护,解决了现有技术中的轨道结构养护维修困难的问题。The track structure provided according to the present invention includes a precast track bed assembly 10 and a steel rail 20. There are multiple precast track bed assemblies 10, the plurality of precast track bed assemblies 10 are arranged at intervals along a first predetermined direction, and the steel rails 20 are fixedly arranged on the plurality of precast track beds. On the assembly 10, the prefabricated track bed assembly is prefabricated in the workshop before the site is laid. The cleanliness and compactness of the ballast can be accurately controlled. The multiple precast track bed assemblies 10 are arranged at intervals to facilitate subsequent alignment. The maintenance and maintenance of the precast track bed assembly 10 solves the problem of difficult maintenance and maintenance of the track structure in the prior art.
需要说明的是,本申请的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本申请的实施方式例如能够以除了在这里图示或描述的那些以外的顺序实施。此外,术语“包括”和“具有”以及他们的任何变形,意图在于覆盖不排他的包含,例如,包含了一系列步骤或单元的过程、方法、系统、产品或设备不必限于清楚地列出的那些步骤或单元,而是可包括没有清楚地列出的或对于这些过程、方法、产品或设备固有的其它步骤或单元。It should be noted that the terms "first" and "second" in the specification and claims of the application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific sequence or sequence. It should be understood that the data used in this way can be interchanged under appropriate circumstances, so that the embodiments of the present application described herein can be implemented in a sequence other than those illustrated or described herein, for example. In addition, the terms "including" and "having" and any variations of them are intended to cover non-exclusive inclusions. For example, a process, method, system, product, or device that includes a series of steps or units is not necessarily limited to those clearly listed. Those steps or units may include other steps or units that are not clearly listed or are inherent to these processes, methods, products, or equipment.
为了便于描述,在这里可以使用空间相对术语,如“在……之上”、“在……上方”、“在……上表面”、“上面的”等,用来描述如在图中所示的一个器件或特征与其他器件或特征的空间位置关系。应当理解的是,空间相对术语旨在包含除了器件在图中所描述的方位之外的在使用或操作中的不同方位。例如,如果附图中的器件被倒置,则描述为“在其他器件或构造上方”或“在其他器件或构造之上”的器件之后将被定位为“在其他器件或构造下方”或“在其他器件或构造之下”。因而,示例性术语“在……上方”可以包括“在……上方”和“在……下方”两种方位。该器件也可以其他不同方式定位(旋转90度或处于其他方位),并且对这里所使用的空间相对描述作出相应解释。For ease of description, spatially relative terms can be used here, such as "above", "above", "above the surface", "above", etc., to describe as shown in the figure Shows the spatial positional relationship between one device or feature and other devices or features. It should be understood that the spatially relative terms are intended to encompass different orientations in use or operation in addition to the orientation of the device described in the figure. For example, if the device in the drawing is turned upside down, then a device described as "above other devices or structures" or "above other devices or structures" will then be positioned as "below the other devices or structures" or "on Under other devices or structures". Thus, the exemplary term "above" can include both orientations "above" and "below". The device can also be positioned in other different ways (rotated by 90 degrees or in other orientations), and the relative description of the space used here will be explained accordingly.
以上仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention and are not used to limit the present invention. For those skilled in the art, the present invention can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

  1. 一种轨道结构,其特征在于,包括:A track structure, characterized in that it comprises:
    预制道床组件(10),所述预制道床组件(10)为多个,多个所述预制道床组件(10)沿第一预定方向相间隔地布置;Precast ballast bed assemblies (10), the precast ballast bed assemblies (10) are multiple, and the multiple precast track bed assemblies (10) are arranged at intervals along a first predetermined direction;
    钢轨(20),所述钢轨(20)固定设置在所述多个预制道床组件(10)上。A steel rail (20), the steel rail (20) is fixedly arranged on the plurality of precast track bed assemblies (10).
  2. 根据权利要求1所述的轨道结构,其特征在于,所述预制道床组件(10)包括:The track structure according to claim 1, wherein the precast track bed assembly (10) comprises:
    固化道床(11),所述固化道床(11)为两个,两个所述固化道床(11)沿第二预定方向相间隔设置,所述第一预定方向与所述第二预定方向相互垂直;The curing track bed (11), the curing track bed (11) is two, the two curing track beds (11) are spaced apart along a second predetermined direction, and the first predetermined direction and the second predetermined direction are perpendicular to each other ;
    轨枕(12),所述轨枕(12)的第一端设置在一个所述固化道床(11)上,所述轨枕(12)的第二端设置在另一个所述固化道床(11)上,所述钢轨(20)设置在所述轨枕(12)上。A sleeper (12), the first end of the sleeper (12) is set on one of the curing track beds (11), and the second end of the sleeper (12) is set on the other curing track bed (11), The steel rail (20) is arranged on the sleeper (12).
  3. 根据权利要求2所述的轨道结构,其特征在于,所述固化道床(11)为聚氨酯固化道床。The track structure according to claim 2, wherein the cured track bed (11) is a polyurethane cured track bed.
  4. 根据权利要求2所述的轨道结构,其特征在于,所述预制道床组件(10)还包括:The track structure according to claim 2, wherein the precast track bed assembly (10) further comprises:
    扣件(13),所述扣件(13)的至少部分穿过所述钢轨(20)和所述轨枕(12),以将所述钢轨(20)固定连接在所述轨枕(12)上。Fastener (13), at least part of the fastener (13) passes through the rail (20) and the sleeper (12) to fix the rail (20) to the sleeper (12) .
  5. 根据权利要求1至4中任一项所述的轨道结构,其特征在于,所述轨道结构还包括:The track structure according to any one of claims 1 to 4, wherein the track structure further comprises:
    填充层(30),各相邻的两个所述预制道床组件(10)之间均设置有所述填充层(30),以通过所述填充层(30)填充各相邻的两个所述预制道床组件(10)之间的间隙。The packing layer (30) is provided with the packing layer (30) between each of the two adjacent precast track bed assemblies (10), so as to fill the two adjacent holes through the packing layer (30). The gap between the precast track bed components (10) is described.
  6. 根据权利要求5所述的轨道结构,其特征在于,所述填充层(30)包括道砟。The track structure according to claim 5, wherein the filling layer (30) comprises ballast.
  7. 根据权利要求1至4中任一项所述的轨道结构,其特征在于,所述轨道结构还包括:The track structure according to any one of claims 1 to 4, wherein the track structure further comprises:
    排水组件(40),所述排水组件(40)设置在所述预制道床组件(10)的侧方,所述排水组件(40)的进水端与所述预制道床组件(10)连通,以通过所述排水组件(40)排出所述预制道床组件(10)中的水分。The drainage assembly (40), the drainage assembly (40) is arranged on the side of the precast track bed assembly (10), and the water inlet end of the drainage assembly (40) is in communication with the precast track bed assembly (10) to The water in the precast track bed assembly (10) is drained through the drainage assembly (40).
  8. 根据权利要求7所述的轨道结构,其特征在于,所述轨道结构还包括:The track structure according to claim 7, wherein the track structure further comprises:
    调整层(50),所述调整层(50)设置在基面上,所述调整层(50)设置在所述预制道床组件(10)的下方并与所述预制道床组件(10)连接,所述调整层(50)相对于所述基面的高度可调节地设置,以用于调整所述预制道床组件(10)相对于所述基面的高度。An adjustment layer (50), the adjustment layer (50) is arranged on the base surface, the adjustment layer (50) is arranged under the precast track bed assembly (10) and connected with the precast track bed assembly (10), The height of the adjustment layer (50) relative to the base surface is adjustable to adjust the height of the precast track bed assembly (10) relative to the base surface.
  9. 根据权利要求8所述的轨道结构,其特征在于,所述排水组件(40)包括排水槽(41),所述排水槽(41)设置在所述调整层(50)远离所述基面的表面上,所述排水槽(41)沿第二预定方向延伸,所述第一预定方向与所述第二预定方向垂直。The track structure according to claim 8, characterized in that the drainage assembly (40) comprises a drainage groove (41), and the drainage groove (41) is arranged on the adjustment layer (50) away from the base surface. On the surface, the drainage groove (41) extends along a second predetermined direction, and the first predetermined direction is perpendicular to the second predetermined direction.
  10. 根据权利要求9所述的轨道结构,其特征在于,所述轨道结构还包括:The track structure according to claim 9, wherein the track structure further comprises:
    防护层(60),所述防护层(60)设置在所述预制道床组件(10)的外侧,所述排水槽(41)沿所述第二预定方向延伸至所述防护层(60)的表面上。A protective layer (60), the protective layer (60) is arranged on the outer side of the prefabricated track bed assembly (10), and the drainage groove (41) extends along the second predetermined direction to the protective layer (60) On the surface.
PCT/CN2019/115137 2019-11-01 2019-11-01 Rail structure WO2021082005A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/CN2019/115137 WO2021082005A1 (en) 2019-11-01 2019-11-01 Rail structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2019/115137 WO2021082005A1 (en) 2019-11-01 2019-11-01 Rail structure

Publications (1)

Publication Number Publication Date
WO2021082005A1 true WO2021082005A1 (en) 2021-05-06

Family

ID=75715725

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2019/115137 WO2021082005A1 (en) 2019-11-01 2019-11-01 Rail structure

Country Status (1)

Country Link
WO (1) WO2021082005A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086434A (en) * 2021-11-29 2022-02-25 中铁第四勘察设计院集团有限公司 Longitudinally-assembled prefabricated plate type track

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561114A (en) * 2010-12-16 2012-07-11 拜耳材料科技(中国)有限公司 Polyurethane railway track bed and its production method and application
CN204959479U (en) * 2015-09-25 2016-01-13 中铁二十三局集团轨道交通工程有限公司 Embedded frame track board and track structure thereof
CN205934593U (en) * 2016-08-23 2017-02-08 吴永芳 Assemble board -like track structure
CN107190583A (en) * 2017-05-25 2017-09-22 中国铁道科学研究院铁道建筑研究所 Urethane cures railway roadbed and preparation method thereof
CN208072093U (en) * 2018-04-15 2018-11-09 中铁二院(成都)建设发展有限责任公司 Yard-and-station roadbed non-fragment orbit shallow embedding aileron formula pile slab structure constructs
EP3486369A1 (en) * 2017-11-21 2019-05-22 Sateba Systeme Vagneux Prefabricated slab for railway, associated sleeper and installation method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561114A (en) * 2010-12-16 2012-07-11 拜耳材料科技(中国)有限公司 Polyurethane railway track bed and its production method and application
CN204959479U (en) * 2015-09-25 2016-01-13 中铁二十三局集团轨道交通工程有限公司 Embedded frame track board and track structure thereof
CN205934593U (en) * 2016-08-23 2017-02-08 吴永芳 Assemble board -like track structure
CN107190583A (en) * 2017-05-25 2017-09-22 中国铁道科学研究院铁道建筑研究所 Urethane cures railway roadbed and preparation method thereof
EP3486369A1 (en) * 2017-11-21 2019-05-22 Sateba Systeme Vagneux Prefabricated slab for railway, associated sleeper and installation method
CN208072093U (en) * 2018-04-15 2018-11-09 中铁二院(成都)建设发展有限责任公司 Yard-and-station roadbed non-fragment orbit shallow embedding aileron formula pile slab structure constructs

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114086434A (en) * 2021-11-29 2022-02-25 中铁第四勘察设计院集团有限公司 Longitudinally-assembled prefabricated plate type track
CN114086434B (en) * 2021-11-29 2023-11-28 中铁第四勘察设计院集团有限公司 Prefabricated plate type rail longitudinally assembled

Similar Documents

Publication Publication Date Title
AU2016231474B2 (en) Rail Track Sleeper Support
US20140001667A1 (en) Method for manufacturing solid three-dimensional concrete block and method for laying concrete tracks using concrete block manufactured using the method
CN109183530B (en) Line temporary overhead device and method for ballastless track disease remediation
CN104532690B (en) Separate type track structure is prefabricated and construction method
CN106049209A (en) Temporary steel rail supporting device for disassembling and replacing railway ballastless track supporting layers
CN102653931A (en) Elastic supporting vibration isolation member ballast bed
CN206800105U (en) A kind of level crossing fork track plates
WO2021082005A1 (en) Rail structure
CN203890866U (en) Construction auxiliary beam
KR20120039429A (en) Precast rail slab for rail track and embedded railway track structure using the rail slab
CN106192620A (en) A kind of railway ballastless track supporting layer and substructure change method
JP2002227101A (en) Sleeper-integrated concrete ballast structure for railway line
CN107905046A (en) The magnetic railway track of track deformation adjusting apparatus and application described device
KR101405468B1 (en) Method for manufacturing concrete block for railway track and method for laying railway track using concrete block manufactured by the same method
US3643864A (en) Railroad grade crossing
CN106702821A (en) Novel prefabricated track slab and manufacturing method thereof
CN106592345A (en) Buried ballastless track structure
JP3510824B2 (en) Sleeper laying structure
RU2700996C1 (en) Railway crossing and method of making reverberative plates for it
KR102413972B1 (en) Interlocking precast concrete rail track
US8870129B1 (en) Flange bearing frog crossing
CN202298390U (en) Ballastless track rush repair device
CN203096534U (en) Dust-blocking ballast covering layer
KR102394194B1 (en) Railroad crossing board device with guide rail
JP2014095229A (en) Height adjustment method for rail

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19951037

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19951037

Country of ref document: EP

Kind code of ref document: A1