WO2021020012A1 - Dispositif de commande de système d'alimentation electrique - Google Patents
Dispositif de commande de système d'alimentation electrique Download PDFInfo
- Publication number
- WO2021020012A1 WO2021020012A1 PCT/JP2020/025868 JP2020025868W WO2021020012A1 WO 2021020012 A1 WO2021020012 A1 WO 2021020012A1 JP 2020025868 W JP2020025868 W JP 2020025868W WO 2021020012 A1 WO2021020012 A1 WO 2021020012A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- fixed
- value
- electric devices
- free
- operation value
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
Definitions
- the present invention relates to a power system control device.
- the entire equipment that produces and consumes electric power such as power generation equipment, power transmission equipment, substation equipment, distribution equipment, and consumer equipment is known.
- an electric power system that produces and consumes electric power
- power generation equipment power transmission equipment
- substation equipment substation equipment
- distribution equipment distribution equipment
- consumer equipment consumer equipment
- the power system operator uses the power system monitoring and control system to measure the voltage, frequency, power, etc. of a specific measurement point in the power system, and with respect to the fluctuating consumer power consumption, the voltage, frequency, Monitor and control system equipment so that the tidal current, etc. will reach the specified appropriate value.
- Patent Document 1 discloses a control method for obtaining an operation amount for an operation target facility of an electric power system by performing an optimum power flow calculation while considering the voltage stability of the entire electric power system.
- the present invention has been made in consideration of the above points, and is a power system monitoring and control technology capable of reducing waste of operations when viewed in chronological order and reducing operating costs during the entire operating time in the power system. It is a suggestion.
- One aspect of the present disclosure is a control device that determines operating values of a plurality of electric devices that change the power flow of the power system, and stores information on the controller and one or more fixed electric devices in the plurality of electric devices. Includes storage devices and.
- the controller acquires the state value in the power system, acquires the fixed operation value which is the operation value immediately before the time when the one or more fixed electric devices are desired to be determined, from the information, and obtains a predetermined index value.
- the free operation values of the plurality of electric devices are determined based on the state values without fixing the operation values of the one or more fixed electric devices, and the fixed operation values and the one or more fixed operation values are fixed. Based on the difference between the free operation value of the electric device and the free operation value, it is determined whether the operation value of each of the one or more fixed electric devices is set as the fixed operation value.
- waste of operation when viewed in chronological order can be reduced, and operation cost in the entire operating time can be reduced.
- FIG. 1 It is a figure which shows the configuration example of the system control system of Example 1. It is a figure which shows the hardware configuration example of the system control apparatus of Example 1.
- FIG. It is a figure which shows an example of the environmental state data of Example 1.
- FIG. It is a figure which shows an example of the device setting data of Example 1.
- FIG. It is a figure which shows an example of the device state data of Example 1.
- FIG. It is a figure which shows an example of the system composition data of Example 1.
- FIG. It is a figure which shows an example of the fixed object data of Example 1.
- FIG. It is a figure which shows an example of the fixed setting data of Example 1.
- FIG. It is a figure which shows an example of the determination data of Example 1.
- FIG. It is a figure which shows an example of the judgment condition data of Example 1.
- FIG. 1 It is a figure which shows an example of the system control data of Example 1.
- FIG. It is a figure which shows an example of the fixed object display screen of Example 1.
- FIG. It is a figure which shows an example of the judgment condition display screen of Example 1.
- FIG. It is a figure which shows the flowchart in the case of performing the control to the optimum power system state of Example 1.
- FIG. It is a figure which shows an example of the judgment condition data of Example 2.
- FIG. 1A shows an overall configuration example of the system control system 1 according to this embodiment.
- the system control system 1 includes a system control device 2 and a power system 3.
- FIG. 1B shows an example of the hardware configuration of the system control device 2.
- the system control device 2 can have a computer configuration.
- the system control device 2 includes a controller 301, a main storage device 302, an auxiliary storage device 303, an output device 304, an input device 305, and a communication device 307.
- the above components are connected to each other by a bus.
- the main storage device 302, the auxiliary storage device 303, or a combination thereof is a storage device and stores programs and data.
- the main storage device 302 is composed of, for example, a semiconductor memory, and is mainly used for holding a program or data being executed.
- the controller 301 executes various processes according to the program stored in the main storage device 302. By operating the controller 301 according to the program, various functional units are realized.
- the auxiliary storage device 303 is composed of a large-capacity storage device such as a hard disk drive or a solid state drive, and is used for holding programs and data for a long period of time.
- the controller 301 can be composed of a single processing unit or a plurality of processing units, and can include a single or a plurality of arithmetic units or a plurality of processing cores. Controller 301 manipulates signals based on one or more central processing units, microprocessors, microprocessors, microcontrollers, digital signal processors, state machines, logic circuits, graphics processing units, chip-on systems, and / or control instructions. It can be implemented as any device.
- the program and data stored in the auxiliary storage device 303 are loaded into the main storage device 302 at startup or when necessary, and the controller 301 executes the program to execute various processes of the system control device 2. Therefore, the process executed by the system control device 2 in the following is the process by the controller 301 or the program.
- the input device 305 is a hardware device for a user to input instructions and information to the system control device 2, and includes, for example, at least one of a pointing device such as a keyboard and a mouse, a touch panel, and a voice instruction device. Will be done.
- the output device 304 is a hardware device that presents various images for input / output, and includes, for example, at least one of a display device, a printer, and an audio output device.
- the communication device 307 is an interface for connecting to a network. The input device 305 and the output device 304 may be omitted, and the user may access the system control device 2 from the terminal via the network.
- the function of the system control device 2 can be implemented in a computer system consisting of one or more computers including one or more controllers and one or more storage devices including a non-transient storage medium. Multiple computers communicate over a network. For example, some of the plurality of functions of the system control device 2 may be mounted on one computer, and some of the other functions may be mounted on another computer.
- each element of the software may be stored in any area in the storage device.
- the controller 301 functions as a functional unit illustrated in FIG. 1A by operating according to a specific program.
- the system control device 2 includes a control unit 10 that performs various controls, a recording unit 20 that records (stores) various information, and an optimum calculation unit that calculates an optimum solution under predetermined conditions.
- 30 includes a communication unit 40 that communicates with various devices via the communication network 4, an input unit 50 that inputs various information, and an output unit 60 that outputs various information.
- the control unit 10 and the optimum calculation unit 30 may be realized (by software) by the controller 301 performing processing according to various programs stored in the storage devices 302 and 303, or the hardware (logic) in the controller 301. It may be realized by a circuit).
- the functions of the control unit 10 and the optimum calculation unit 30 are not limited to those realized by a single device, and may be realized by a plurality of devices that are communicably connected to each other.
- the recording unit 20 is realized by the storage devices 302 and 303.
- the communication unit 40 is realized by the communication device 307.
- the input unit 50 is realized by the input device 305, and the output unit 60 is realized by the output device 304.
- the system control device 2 can acquire measurement data of the power system 3 from each of one or more measuring devices 5 of the power system 3 via the communication network 4 connected to the communication unit 40. Further, the system control device 2 can control the operating state of each of the electric devices 6 by transmitting a control command to each of the plurality of electric devices 6 of the power system 3.
- FIG. 1 shows one measuring device 5 and one electric device 6 as an example, the system control system 1 can include one or a plurality of measuring devices 5 and a plurality of electric devices 6.
- the power system 3 includes a power generation facility (for example, a power plant) that generates power using a power generation device, a consumer facility that consumes the power generated by the power generation facility, and a power distribution facility that transmits power from the power generation facility to the consumer facility. (Transmission equipment, substation equipment, distribution equipment, etc.), etc. are included.
- the power system 3 further includes a measuring device 5 that measures the state of these facilities.
- the power generation device is a device that performs thermal power generation, hydraulic power generation, nuclear power generation, geothermal power generation, solar power generation, wind power generation, etc., but may also be a device that generates power by various power generation methods.
- Power distribution equipment includes overhead transmission lines, underground transmission lines, transformers, circuit breakers, and phase adjustment equipment, but also includes various other equipment related to power transmission and distribution.
- the measuring device 5 measures the state at a specific measurement point of the power system 3.
- measurement items include power items such as voltage, phase, and power of the power system 3, meteorological items such as temperature, wind speed, wind direction, precipitation, and solar radiation, and items of setting state and operating state of electrical equipment 6. , Power distribution equipment, power generation equipment, and other items of the operating state of equipment that changes the power flow state.
- various items can be measurement items.
- the measurement points include the bus of the power generation equipment, the bus of the substation equipment, the power distribution equipment, the consumer equipment, etc., and the number of measuring devices for one measurement point may be singular or plural.
- the value measured by the measuring device 5 is transmitted to the system control device 2 via the communication network 4.
- the measuring device 5 may add and transmit information on the measurement date and time together with the measured value.
- the electric device 6 includes, for example, a device for changing the power flow state of the power system 3 such as a power generation device, a transformer, a circuit breaker, and a phase adjustment facility among the devices constituting the power system 3.
- the electrical device 6 may also include various other devices.
- the system control device 2 receives the control command transmitted via the communication network 4, the electric device 6 can change the operating state according to the control command.
- the control unit 10 of the system control device 2 includes the main control unit 100, the system state acquisition unit 101, the system control generation unit 102, the system control determination unit 103, and the execution unit 104.
- Various data transmitted by the measuring device 5 at the time of instruction from the main control unit 100 is acquired via the communication unit 40, and the system status data of the recording unit 20 is acquired. Record in 201 together with the measurement date and time.
- the system state data 201 includes the environment state data 211, the device setting data 212, and the device state data 213.
- the environmental state data 211 includes information such as active power flowing through a load (a device that consumes electricity in the power system 3), invalid power, and active power generated by a power generation device.
- the environmental state data 211 shows the supply and demand state of electric power in this example.
- FIG. 2 shows an example of the environmental state data 211 at a specific measurement point of the power system 3.
- the environmental state data 211 includes, for example, information on the serial number D101, the measurement date and time D102, the active power D103, and the active power D104.
- the value (measured value) of a specific measurement point is stored in the environmental state data 211 in time series.
- the measurement date and time D102, the active power D103, and the active power D104 are items related to measurement, and the values of the items are appropriately changed according to the measurement at the measurement point.
- the system state acquisition unit 101 separately acquires the predicted values (predicted values) of the specific measurement points of the active power D103 and the reactive power D104 from the storage device of the external server or the like, including the future date and time in the measurement date and time D102. And store it. In this way, the environmental state data 211 stores the state value represented by the actual measured value or the predicted measured value (predicted value).
- the device setting data 212 includes information on the setting state of the electric device 6.
- FIG. 3 shows an example of the device setting data 212 of the electric device 6 included in the power system 3.
- the device setting data 212 includes, for example, serial number D201, measurement date and time D202, input amount D203 of phase adjustment equipment R1, input amount D204 of phase adjustment equipment R2, tap position D205 of transformer T1, and transformer. Includes information on tap position D206 of vessel T2.
- the device setting data 212 stores information (setting value) indicating the setting of the electric device 6 in chronological order.
- the set value is also called an operation value, and includes, for example, the phase adjustment equipment input amount (reactive power adjustment amount), the tap position of the transformer (transformer ratio), the generator output voltage, and the like.
- the input amount D203 of the phase adjustment equipment R1, the input amount D204 of the phase adjustment equipment R2, the tap position D205 of the transformer T1, and the tap position D206 of the transformer T2 are items (set values) related to the setting of the electric device 6.
- the information stored in the device setting data 212 a combination of items that can be acquired from the measuring device 5 can be appropriately adopted.
- the device state data 213 includes information (operating state information) indicating the operating state of the electric device 6 that changes the power flow state of the power distribution facility, the power generation device, and the like.
- FIG. 4 shows an example of the device state data 213 of the electric device 6 connected to the power system 3.
- the device state data 213 includes, for example, the serial number D301, the measurement date and time D302, the operating state D303 of the phase adjusting equipment R1, the operating state D304 of the phase adjusting equipment R2, the operating state D305 of the transformer T1, and the transformer. Contains information on the operating state D306 of the device T2.
- the device status data 213 stores the operating status information of the electrical device 6 in chronological order.
- the operating state D303 of the phase adjusting equipment R1, the operating state D304 of the phase adjusting equipment R2, the operating state D305 of the transformer T1, and the operating state D306 of the transformer T2 are the open / closed states and transmissions of the switching devices such as circuit breakers and switches. It may include items such as the transmission status of the wire.
- the item of the device state data 213 is a combination of the item of the operating state of the electric device 6 that changes the power flow state of the power distribution facility, the power generation device, etc., and the item of the operating state of other devices acquired from the measuring device 5. There may be.
- the system configuration data 202 is stored in advance in the recording unit 20, and includes information related to the configuration of the power system 3.
- FIG. 5 shows an example of the system configuration data 202 of the transmission line in the power system 3.
- the system configuration data 202 includes, for example, information on the serial number D401, the name D402, the rated voltage D403, the reference capacity D404, the line length D405, the resistor D406, and the reactance D407 for each transmission line.
- the system configuration data 202 does not change in a short time, for example, among the information necessary for the analysis of the power system 3, the items (parameter items) of the devices constituting the power system 3, the electrical connection form between the devices, and the like. Contains information about the item.
- FIG. 5 shows an example of a transmission line, other equipment system configuration data may be composed of different items.
- FIG. 6 shows an example of the fixed target data 203 in this embodiment.
- the data to be fixed 203 indicates equipment (fixed equipment) to which the set value (operation value) can be fixed. As will be described later, whether the set value of the fixed equipment is maintained or changed based on the difference between the set value immediately before the time to be determined (fixed set value) and the set value indicated by the optimization operation. It is determined.
- the fixed set value is a set value obtained by a past optimization operation (previous or earlier optimization operation).
- the set value immediately before the time point to be determined is calculated based on the actual measured value or the predicted value.
- columns D501 to D506 indicate whether each facility (electric device) is a fixed target (fixed facility / fixed electrical device) or a non-target (free facility / free electrical device).
- the equipment is a fixed object (fixed equipment)
- the condition that the setting of the equipment is fixed in the state indicated by the fixed setting data 204 and cannot be operated is provided to the optimum calculation unit 30.
- the equipment is fixed non-target (free equipment)
- the condition that the set value of the equipment can be operated is provided to the optimum calculation unit 30.
- Equipment with high operating costs is selected as fixed equipment.
- the operation cost indicates the cost such as maintenance and power that fluctuates according to the operation. For example, when the number of operations reaches a predetermined number, maintenance of the equipment is required, and maintenance costs are incurred. If the maintenance cost is large and other costs are ignored, the operation cost can be expressed by, for example, the maintenance cost cost divided by the predetermined number of times.
- the generator is registered as free equipment, and the transformer and phase adjustment equipment are registered as fixed equipment.
- the operating cost of the transformer and the phase adjusting equipment is higher than the operating cost of the generator. Note that these settings are examples, and for example, one of the transformer and the phase adjustment equipment may be registered as free equipment.
- FIG. 7 shows an example of fixed setting data 204 in this embodiment.
- the fixed setting data 204 indicates a fixed setting value of the fixed equipment.
- columns D601 to D606 indicate fixed setting values of each facility.
- the fixed set value of the fixed equipment is updated according to the change of the set value of the fixed equipment.
- the columns D603 to D604 corresponding to the fixed equipment store the fixed set values of the fixed equipment.
- the columns D601 to D602 corresponding to the fixed non-target free equipment do not store the fixed set value.
- the item of the setting value of the fixed setting data 204 may be the same as that of the device setting data 212.
- FIG. 8 shows an example of determination data 205 in this embodiment.
- the determination data 205 stores, for example, the data type D701 indicating the type of the control plan and the set values D702 to D707 of the equipment of each control plan.
- the item of the setting value may be the same as that of the device setting data 212.
- the determination data 205 shows a fixed control plan and a free control plan, which will be described later.
- the fixed control plan is a control plan generated by the optimum calculation unit 30 under the condition that the set value of the fixed equipment is fixed.
- the free control plan is a control plan generated by the optimum calculation unit 30 without fixing the set value of the fixed equipment.
- the value of the fixed equipment of the fixed control plan matches the fixed setting data 204.
- FIG. 9 shows an example of the determination condition data 206 in this embodiment.
- the determination condition data 206 is recorded in advance in the recording unit 20, and includes, for example, the determination threshold value D801 and the coefficient of determination D802 to D807.
- the item of the determination condition data 206 is referred to for determining whether the set value of the fixed equipment is the fixed set value or the set value of the free control plan (free set value).
- different data combinations such as the installation area and voltage class of the device, the classification of the coefficient of determination according to the climate, and the addition of new items may be used.
- FIG. 10 is an example of system control data 207 for bringing the power system 3 into a predetermined state.
- the system control data 207 stores, for example, an identifiable IDD901, an application date and time D902, and set values D903 to D908 of the equipment to be controlled.
- the item of the setting value may be the same as that of the device setting data 212.
- the set values D903 to D908 are set values of the control target included in the electric device 6, and may be a combination of other devices such as a circuit breaker and a switch.
- the application date and time D902 records the date and time when the system control data is applied.
- FIG. 11 is a diagram showing an example of a fixed target display screen.
- the fixed target display screen is called from the menu screen and displays the contents of the fixed target data 203. Since the content of the fixed target data 203 displayed on the fixed target display screen is the same as that described with reference to FIG. 6, detailed description thereof will be omitted.
- the fixed target display screen On the fixed target display screen, a part of the fixed target data 203 may be displayed, or data not included in the fixed target data 203 may be displayed together.
- the fixed target display screen may include a [Change] button for changing the fixed target and a [Back] button for closing the screen and returning to the menu screen of the caller.
- the fixed target display screen is displayed on the display screen of the information processing device (computer) which is the system control device 2 and the terminal connected to the system control device 2.
- the user of the system control system 1 can set the fixed target by using the fixed target display screen.
- FIG. 12 is a diagram showing an example of a determination condition display screen.
- the judgment condition display screen is called from the menu screen and displays the contents of the judgment condition data 206. Since the content of the determination condition data 206 displayed on the determination condition display screen is the same as that described with reference to FIG. 9, detailed description thereof will be omitted.
- the judgment condition display screen On the judgment condition display screen, a part of the judgment condition data 206 may be displayed, or data not included in the judgment condition data 206 may be displayed together.
- the judgment condition display screen may include a [Change] button for changing the judgment condition and a [Back] button for closing the screen and returning to the menu screen of the caller.
- the judgment condition display screen is displayed on the display screen of the information processing device (computer) which is the system control device 2 and the terminal connected to the system control device 2.
- the user of the system control system 1 can set the judgment condition by using the judgment condition display screen.
- the control unit 10 sequentially generates system control data at consecutive dates and times at specific intervals.
- the execution unit 104 generates a control command that realizes the set value described in the system control data, and transmits the control command to each target electric device 6 of the power system 3.
- the specific interval may be a date and time specified at a constant (for example, 10-minute interval) or an indefinite interval set in advance, or a date and time appropriately specified by an instruction via the input unit 50.
- FIG. 13 is an example of a flowchart in which the control unit 10 controls the power system to a state where the predetermined index is improved.
- the system control generation unit 102 acquires the fixed setting value of the equipment specified in the fixed target data 203 from the fixed setting data 204 (S101).
- the system control generation unit 102 provides the record of the system state data 201 closest to the specified date and time and the fixed setting data 204 to the optimum calculation unit 30.
- the optimum calculation unit 30 calculates the set value of the equipment under the condition that the fixed set value is not changed.
- the system control generation unit 102 acquires the calculated set value (including the fixed set value) of the equipment as a fixed control plan for achieving the optimum power system state, and stores it in the determination data 205 (S102). ..
- the main control unit 100 provides the record of the system state data 201 closest to the specified date and time to the optimum calculation unit 30, and acquires the set value of the equipment from the optimum calculation unit 30.
- the optimum calculation unit 30 calculates the set values of the equipment under the condition that the set values of all the equipment including the fixed equipment are variable.
- the main control unit 100 stores the acquired set value in the determination data 205 as a free control plan for achieving the calculated optimum power system state (S103).
- the system control determination unit 103 compares the fixed control plan and the free control plan of the determination data 205, and determines whether the fixed control plan and the free control plan satisfy the conditions indicated by the judgment condition data 206 ( S104). The details of the determination method will be described later.
- the system control determination unit 103 determines whether the free control plan satisfies the system reliability described later (S105). When the free control plan satisfies the system reliability described later (S105: Y), the system control determination unit 103 stores the free control plan in the system control data 207 (S106). The system control determination unit 103 further updates the fixed setting data 204 according to the set value of the free control plan for the equipment specified in the fixed target data 203 (S107).
- the system control determination unit 103 stores the fixed control plan in the system control data 207 (S108). ..
- step S105 when the free control plan does not satisfy the reliability (S105: N), the system control determination unit 103 notifies the user that an appropriate control plan cannot be generated, and gives a new control plan from the user a new freedom. It is adopted as a control plan (S109). If the user cannot correct it, the system control determination unit 103 may output an error and stop the process. After executing step S109, the system control determination unit 103 executes step S106.
- step S104 for example, if the following inequality is satisfied, it is determined that the condition is satisfied, and the free control plan is adopted.
- N i indicates the number of the fixed equipment, and the number of the fixed equipment is n.
- the phase adjusting equipment R1 is assigned the equipment number 1
- the phase adjusting equipment R2 is assigned the equipment number 2
- N i f indicates the set value in the free control plan for the equipment i
- N i s indicates the set value in the fixed control plan for the equipment i
- w i indicates the coefficient of determination (weight) for the equipment i.
- the system control determination unit 103 compares the value obtained by weighting and integrating the difference (absolute value) of the set values of the fixed equipment of the two control plans for each equipment and the threshold value. Specifically, the system control determination unit 103 selects a free control plan when the sum of products value is larger than the threshold value (not adopting the fixed control plan), and selects a fixed control plan when the value of the sum of products is less than or equal to the threshold value. Select (adopt).
- the equipment with high operation cost is operated when it is necessary to optimize by using the equipment with high operation cost.
- the difference between the set value of the high operation cost equipment (fixed control plan) and the difference (free control plan) of the set value of the high operation cost equipment (set value) When the amount of change) is large, it can be determined that the necessity of changing the set value of the high operation cost equipment has increased, reflecting the large change in the state of the entire system or locally. Therefore, even high-cost equipment is targeted for operation and optimally operated. If the difference is small, the need is small, so high operating cost. Prioritize cost reduction without operating equipment.
- step S104 apart from the condition of the above inequality, even if the reliability of the system realized by the fixed control plan does not satisfy the predetermined standard, it is determined that the condition is satisfied, and the free control plan is adopted.
- the calculation formula of the index for measuring the reliability of the system is set in advance.
- an index for measuring reliability for example, there are various indexes such as voltage stability, transient stability, and N-1 reliability, and the index may be used alone or in combination of a plurality of these. The value of the index is calculated based on the set value of the fixed control plan.
- the determination of the reliability of the system realized by the fixed control plan may be omitted. Further, when the setting value of the free equipment is not required for the determination due to such omission, or when the condition is not satisfied in step S104 for the acquisition and storage of the fixed control plan including the setting value of the free equipment in S102 (S104: N) may be generated before step S108.
- the amount of change in each set value is usually determined appropriately even when it is the smallest unit that can be operated. be able to. Further, by using the coefficient of determination, a more appropriate judgment can be made according to the contribution of the fixed equipment in the electric system.
- the difference absolute value
- the difference is used as a value representing the difference between the set values of each fixed equipment, but other formulas such as ratios may be used.
- system control determination unit 103 may use a statistical value different from the sum of products of the difference between the coefficient of determination (weight) and the set value. For example, the mean value of the difference may be used, or different coefficients of determination may not be used between the fixed facilities, that is, all the coefficients of determination may be the same value.
- the system control determination unit 103 may determine whether or not the set value has been changed for each fixed facility. For example, the system control determination unit 103 calculates a value (for example, a difference or a ratio) representing the difference between the set value (free set value) and the fixed set value in the free control plan of each fixed facility, and sets the value and the threshold value. By comparison, it is determined whether or not to select a fixed setting value. If the difference is less than the threshold, a fixed value is selected. As a result, the number of operations of the fixed equipment can be reduced.
- the calculation method and the threshold value of the value representing the difference may be common or different between the fixed facilities.
- the system control determination unit 103 may specify only the set value of the selected fixed equipment as the fixed setting value and have the optimum calculation unit 30 calculate the control plan. .. This enables more appropriate control.
- the system control determination unit 103 may use the value of the free control plan as a set value of the fixed equipment for which the value is not selected.
- step S105 when the reliability of the system realized by the free control plan satisfies a predetermined standard, it is determined that the control plan is appropriate, and the free control plan is stored in the system control data 207.
- the reliability of the system in step S105 can be calculated by the same index as in step S104. As a result, it is possible to avoid adopting a free control plan with low reliability. Note that step S105 may be omitted.
- the optimum calculation unit 30 calculates the state of the power system 3 optimal for the purpose for a predetermined purpose such as reduction of power loss and improvement of voltage stability.
- the optimum calculation unit 30 determines the variables of the power system 3 so that the index representing the purpose is improved.
- the optimum calculation unit 30 gives an objective function that expresses power loss reduction, and sets constraints on the power flow equation of the power system 3 and other equality constraints and inequality constraints such as voltage range and device controllability. From the combinations of variables that satisfy the above, the combination of variables that minimizes or maximizes the above objective function is calculated.
- variables the voltage of each bus, the input amount of the phase adjustment equipment, the tap position of the transformer, and the like are used.
- the optimum calculation unit 30 can perform a calculation using a known technique.
- the method used by the optimum calculation unit 30 is not limited to the method described in the above document, and any other method can be used as long as it is a method for calculating the optimum state of the power system 3 for a desired purpose. You may use it.
- the system control determination unit 103 determines in step S104 of FIG. 13 by including the system index of the state after the operation in the determination condition.
- the system index indicates a qualitative index of the power system, which is generally known as a transmission loss or a load margin.
- the quality of the state realized by the system control data can be considered and judged at the same time.
- Example 2 In the following, the parts of Example 2 that are different from those of Example 1 will be mainly described.
- the process of generating the determination data and the process of selecting the system control data are different from those of the first embodiment.
- the system control generation unit 102 further has a function of acquiring system state data and a free control plan or a fixed control plan, and calculating a system index when each control plan is applied. ..
- the calculation formula for calculating the index is preset, and its input can include, for example, equipment settings, system configuration information, and / or constraints. The input may be, for example, the same as the optimum operation.
- step S102 in addition to generating the fixed control plan, the system control generation unit 102 calculates the system index when the fixed control plan is applied and stores it in the determination data 205.
- step S103 in addition to generating the free control plan, the system control generation unit 102 calculates the system index when the free control plan is applied and stores it in the determination data 205.
- FIG. 14 is an example of the determination data 205 in this embodiment.
- a transmission loss D708, which is one of the system indicators is added.
- FIG. 15 is an example of the determination condition data 206 in this embodiment.
- a coefficient of determination D808 for transmission loss is added.
- Step S104 of FIG. 13 determines whether to adopt the free control plan based on the difference in the value of the quality index between the fixed control plan and the free control plan. As an example, in step S104, if the following inequality is satisfied, it is determined that the condition is satisfied, and the free control plan is adopted.
- j indicates the number of the system index, and the number of system indicators is m.
- the system index number 1 is assigned to the transmission loss
- the system index number 2 is assigned to the load margin.
- K j f indicates the calculated value in the free control plan for the index j.
- K j s indicates the calculated value in the fixed control plan for the index j.
- u j indicates the coefficient of determination for the index j. When the index is large, u j is a positive value when it indicates a better state, and when it is the opposite, it is a negative value.
- the sum of the integrated value in which the difference in the set values of the control plan is weighted for each device and the integrated value in which the difference in the system index is weighted is compared with the threshold value.
- the calculation of the difference between the control plans of the system index is an example, and if it has the same code, it may be calculated in the form of the improvement rate of the index or the like.
- the reliability determination is also executed as in the first embodiment.
- a value representing the difference between the system indicators of the two control plans is compared with the threshold value separately from the set value, and it is an additional condition for adopting the free control plan that the value is larger than the threshold value. May be.
- the present invention is not limited to the above-mentioned examples, and includes various modifications.
- the above-described embodiment has been described in detail in order to explain the present invention in an easy-to-understand manner, and is not necessarily limited to the one including all the configurations described.
- it is possible to replace a part of the configuration of one embodiment with the configuration of another embodiment and it is also possible to add the configuration of another embodiment to the configuration of one embodiment.
- each of the above configurations, functions, processing units, etc. may be realized by hardware, for example, by designing a part or all of them with an integrated circuit. Further, each of the above configurations, functions, and the like may be realized by software by the processor interpreting and executing a program that realizes each function. Information such as programs, tables, and files that realize each function can be placed in a memory, a hard disk, a recording device such as an SSD (Solid State Drive), or a recording medium such as an IC card or an SD card.
- SSD Solid State Drive
- control lines and information lines indicate what is considered necessary for explanation, and not all control lines and information lines are necessarily shown on the product. In practice, it can be considered that almost all configurations are interconnected.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Ce dispositif de commande comprend un organe de commande et un dispositif de stockage stockant des informations concernant une ou plusieurs pièces d'équipement électrique fixe parmi une pluralité de pièces d'équipement électrique. L'organe de commande acquiert une valeur d'état pour un système d'alimentation électrique; acquiert, à partir des informations, une valeur de fonctionnement fixe qui est une valeur de fonctionnement avant celle du point temporel pour lequel une détermination est souhaitée pour lesdites une ou plusieurs pièces d'équipement électrique fixe; détermine, sur la base de la valeur d'état, une valeur de fonctionnement libre pour la pluralité de pièces d'équipement électrique, sans fixer la valeur de fonctionnement desdites une ou plusieurs pièces d'équipement électrique fixe, de façon à améliorer une valeur d'indice prescrite; et évalue, sur la base de la différence entre la valeur de fonctionnement fixe et la valeur de fonctionnement libre desdites une ou plusieurs pièces d'équipement électrique fixe, s'il faut utiliser les valeurs de fonctionnement respectives desdites une ou plusieurs pièces d'équipement électrique fixe comme valeur de fonctionnement fixe.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019-137462 | 2019-07-26 | ||
JP2019137462A JP7149237B2 (ja) | 2019-07-26 | 2019-07-26 | 電力系統の制御装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2021020012A1 true WO2021020012A1 (fr) | 2021-02-04 |
Family
ID=74230579
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2020/025868 WO2021020012A1 (fr) | 2019-07-26 | 2020-07-01 | Dispositif de commande de système d'alimentation electrique |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP7149237B2 (fr) |
WO (1) | WO2021020012A1 (fr) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021166534A1 (fr) * | 2020-02-21 | 2021-08-26 | 株式会社日立製作所 | Système d'aide à la planification de système et procédé d'aide à la planification de système |
WO2022085553A1 (fr) * | 2020-10-20 | 2022-04-28 | 株式会社日立製作所 | Système d'aide à la création d'un plan de réseau pour changer la structure d'un réseau électrique, et procédé associé |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017046506A (ja) * | 2015-08-28 | 2017-03-02 | 株式会社日立製作所 | 電圧無効電力制御システム |
JP2018078775A (ja) * | 2016-11-11 | 2018-05-17 | 株式会社日立製作所 | 系統制御装置、系統制御システム、および系統制御方法 |
-
2019
- 2019-07-26 JP JP2019137462A patent/JP7149237B2/ja active Active
-
2020
- 2020-07-01 WO PCT/JP2020/025868 patent/WO2021020012A1/fr active Application Filing
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017046506A (ja) * | 2015-08-28 | 2017-03-02 | 株式会社日立製作所 | 電圧無効電力制御システム |
JP2018078775A (ja) * | 2016-11-11 | 2018-05-17 | 株式会社日立製作所 | 系統制御装置、系統制御システム、および系統制御方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021166534A1 (fr) * | 2020-02-21 | 2021-08-26 | 株式会社日立製作所 | Système d'aide à la planification de système et procédé d'aide à la planification de système |
WO2022085553A1 (fr) * | 2020-10-20 | 2022-04-28 | 株式会社日立製作所 | Système d'aide à la création d'un plan de réseau pour changer la structure d'un réseau électrique, et procédé associé |
Also Published As
Publication number | Publication date |
---|---|
JP7149237B2 (ja) | 2022-10-06 |
JP2021023004A (ja) | 2021-02-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6754597B2 (en) | Method and device for assessing the stability of an electric power transmission network | |
US10282687B2 (en) | Systems and methods for managing power generation resources | |
JP6244255B2 (ja) | 電圧安定度監視装置および方法 | |
EP2362978B1 (fr) | Optimisation de puissance réactive | |
JP5872732B2 (ja) | 電力系統制御システムおよびそれに用いる分散コントローラ | |
Amraee et al. | Adaptive under-voltage load shedding scheme using model predictive control | |
WO2021020012A1 (fr) | Dispositif de commande de système d'alimentation electrique | |
JP2008278658A (ja) | 配電系統監視制御システムと方法、およびプログラム | |
JP2019091124A (ja) | 信頼度評価システム、信頼度評価方法、及びプログラム | |
JP5049600B2 (ja) | 配電系統制御システム | |
WO2021166534A1 (fr) | Système d'aide à la planification de système et procédé d'aide à la planification de système | |
Ashpazi et al. | Probabilistic allocation of thyristor-controlled phase shifting transformer for transient stability enhancement of electric power system | |
WO2018100825A1 (fr) | Dispositif de commande de système d'alimentation et procédé de commande de système d'alimentation | |
JP4185835B2 (ja) | 停電作業計画システム、停電作業計画方法、及びプログラム | |
JP2019201505A (ja) | 電力系統監視システム、電力系統監視方法、およびプログラム | |
JP7077176B2 (ja) | 系統制御装置及び系統制御方法 | |
JP6753763B2 (ja) | 系統制御装置、系統制御システム、および系統制御方法 | |
Nguyen et al. | Safety-assured collaborative load management in smart grids | |
JP2019017194A (ja) | 電力系統における系統運用支援装置および方法、並びに広域監視保護制御システム | |
Karuppiah et al. | Optimal placement and sizing of multi-type facts devices using PSO and HSA | |
JP7053403B2 (ja) | 系統運用支援装置 | |
JP2024101289A (ja) | 電力系統データ評価装置、電力系統データ評価方法及び電力系統データ評価プログラム | |
WO2022270249A1 (fr) | Dispositif de commande de réseau électrique, système de commande de réseau électrique et procédé de commande de réseau électrique | |
Hajizadeh et al. | Service restoration framework for distribution networks incorporating switching crew routing | |
US20220029421A1 (en) | Control apparatus, control method, and computer-readable medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20847676 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20847676 Country of ref document: EP Kind code of ref document: A1 |