WO2021014967A1 - 地盤調査データ転送システム、無線通信モジュール、移動型情報処理端末及び地盤改良施工データ転送システム - Google Patents

地盤調査データ転送システム、無線通信モジュール、移動型情報処理端末及び地盤改良施工データ転送システム Download PDF

Info

Publication number
WO2021014967A1
WO2021014967A1 PCT/JP2020/026627 JP2020026627W WO2021014967A1 WO 2021014967 A1 WO2021014967 A1 WO 2021014967A1 JP 2020026627 W JP2020026627 W JP 2020026627W WO 2021014967 A1 WO2021014967 A1 WO 2021014967A1
Authority
WO
WIPO (PCT)
Prior art keywords
ground survey
survey data
wireless communication
communication module
information processing
Prior art date
Application number
PCT/JP2020/026627
Other languages
English (en)
French (fr)
Inventor
芳文 成田
Original Assignee
ジオサイン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ジオサイン株式会社 filed Critical ジオサイン株式会社
Priority to NZ776633A priority Critical patent/NZ776633A/en
Publication of WO2021014967A1 publication Critical patent/WO2021014967A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F13/00Interconnection of, or transfer of information or other signals between, memories, input/output devices or central processing units
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Definitions

  • An embodiment of the present invention relates to a ground survey data transfer system, a wireless communication module, a mobile information processing terminal, and a ground improvement construction data transfer system.
  • the penetration resistance of the ground at the in-situ is measured using a ground survey machine such as a Swedish sounding tester, and the hardness or tightness of the ground and the composition of the soil layer are measured to estimate the bearing capacity.
  • the foundation of the building is selected according to the results of this ground survey. For example, when it is judged that the ground is soft, the cement-based solidifying agent is put into a slurry state, and the ground soil is solidified into columns and strengthened by mechanically mixing and stirring while injecting it into the target ground. Ground improvement work is being carried out. In order to build a safe and secure building in the future, the reliability of the ground survey results is more important than anything else, and falsification of the ground survey data should be eliminated as a matter of course.
  • the ground survey data generated by the ground survey machine is once collected in the data center (server device) via the USB memory or via the Internet line, and distributed to personal computers as appropriate, and the ground survey report is reported for each survey property. Is created and submitted to the client. In this data flow, data falsification can occur at various stages such as the data generation stage in the ground survey machine, the upload stage from the ground survey machine to the server device, and the preparation stage of the ground survey report.
  • the ground survey data is uploaded to the server device by relaying the mobile information processing terminal. Since the mobile information processing terminal has a function capable of copying the ground survey data and editing / processing the data, the possibility of data tampering on the mobile information processing terminal is compared. It can be said that it is highly targeted.
  • the purpose is to suppress data tampering when uploading the ground survey data file and construction data file generated by the ground survey machine and the ground improvement construction machine to the server device.
  • the ground survey data transfer system transfers the ground survey data generated by the external ground survey machine to the external server device.
  • the ground survey data transfer system is a mobile information processing system that is connected to the wireless communication module installed in the ground survey machine under the short-range wireless communication standard and connected to the server device via the Internet line. It is equipped with a terminal.
  • Wireless communication module An input unit for inputting the ground survey data from the ground survey machine, An in-module storage unit that stores the input ground survey data as multiple ground survey data files in units of measurement points.
  • a management unit that manages multiple stored ground survey data files individually according to whether or not they are sent to a mobile information processing terminal, distinguishing between unimported and imported data files.
  • a receiver that receives a command to import a ground survey data file from a mobile information processing terminal, When the capture command is received, the captured ground survey data files are excluded from the multiple stored ground survey data files, and an uncaptured list is created for only the uncaptured ground survey data files.
  • Unimported list creation department and A wireless communication module transmission that transmits the created uncaptured list to the mobile information processing terminal and also transmits the ground survey data file selected on the uncaptured list in the mobile information processing terminal to the mobile information processing terminal. Has a part.
  • Mobile information processing terminals The operation unit operated by the operator and A display unit that displays the unimported list received from the wireless communication module, and The capture command input via the operation unit is sent to the wireless communication module, and the captured ground survey data file cannot be imported again on the unimported list displayed via the operation unit. Only the first transmitter that transmits the identification information about the ground survey data file selected as the import target from the wireless communication module to the wireless communication module together with the transmission request. A receiver that receives the uncaptured list and the ground survey data file selected on the uncaptured list from the wireless communication module. It has a second transmission unit that transmits the ground survey data file received from the wireless communication module to the server device.
  • FIG. 1 is a diagram showing the configuration of the entire system including the ground survey data transfer system according to the present embodiment.
  • FIG. 2 is a functional configuration diagram of the wireless communication module of FIG.
  • FIG. 3 is a functional configuration diagram of the mobile information processing terminal of FIG.
  • FIG. 4 is a flowchart showing the flow of the ground survey data acquisition and upload processing according to the present embodiment.
  • FIG. 5 is a diagram showing a management table updated by the unacquired / imported management unit of FIG.
  • FIG. 6 is a diagram showing an initial screen of the ground survey data transfer process displayed on the display unit of the mobile information processing terminal of FIG. FIG.
  • FIG. 7 is a diagram showing a list display screen of unimported data files that automatically transitions when the unimported list acquisition process is completed by tapping the “Survey import” button in FIG.
  • FIG. 8 is a diagram showing an operation of selecting a data file to be imported on the list of unimported data files of FIG. 7.
  • FIG. 9 is a diagram showing a capture data file list display screen that automatically transitions when the capture process is completed by tapping the “capture” button in FIG.
  • FIG. 10 is a diagram showing an initial screen that transitions with the tapping of the “back” button in FIG.
  • FIG. 11 is a diagram showing a captured data file list display screen that automatically transitions when the transfer process (upload process) by tapping the “transfer” button in FIG. 10 is completed.
  • FIG. 12 is a diagram showing an initial screen that transitions with the tapping of the “back” button in FIG.
  • FIG. 13 shows the unimported data file list screen that automatically transitions when the unimported list acquisition process is completed by tapping the “Survey import” button in FIG. 12, and the operation of selecting the data file to be imported on the list. It is a figure which shows.
  • FIG. 14 is a diagram showing a capture data file list display screen that automatically transitions when the capture process is completed by tapping the “capture” button in FIG. 13.
  • FIG. 15 is a diagram showing an initial screen that transitions with the tapping of the “back” button in FIG.
  • FIG. 16 is a diagram showing an initial screen after the transfer process (upload process) by tapping the “transfer” button of FIG. 15 is completed.
  • FIG. 17 is a diagram showing a cross-sectional view display example of the captured data file displayed by tapping the “cross-sectional view” button of FIG.
  • FIG. 18 is a diagram showing a data display example of the captured data file displayed by tapping the “display” button in FIG.
  • the ground survey data transfer system is a system that transfers the ground survey data generated by the external ground survey machine 1 to the external server device 7, and is a system of the ground survey machine 1.
  • the wireless communication module 3 provided in the control device (control box) 13 is connected to the wireless communication module 3 under a short-range wireless communication standard such as Bluetooth (registered trademark), and is connected to the server device 7 via the Internet line 10. It is provided with a mobile information processing terminal 5 connected to the device.
  • the ground survey machine 1 measures the penetration resistance in order to investigate the hardness, tightness, soil quality and soil layer structure of the soil in the in-situ position.
  • the Swedish sounding automatic penetration tester main body ground survey machine main body 11, ground survey. It is composed of a control device 13 that controls the machine body 11.
  • the ground investigation machine main body 11 detects a rod, a stand that supports the rod perpendicularly to the ground, a weight for applying a load of 50 kg, 75 kg, 100 kg, etc. to the rod, a rotation mechanism that drives the rod to rotate around its axis, and a penetration depth. It consists of sensors and the like.
  • the load WSW required for the rod to penetrate and the half rotation speed Na are measured as the penetration resistance together with the depth.
  • the control device 13 controls the ground survey machine main body 11 and generates ground survey data showing the correspondence between the depth and the penetration resistance based on the sensor output.
  • the wireless communication module 3 is directly connected to the serial port of the control device 13 by wire, and the ground survey data is sequentially input under this serial interface.
  • the mobile information processing terminal 5 represented by a laptop computer, a smartphone, or a tablet terminal receives ground survey data from the control device 13 of the ground survey machine 1 via the wireless communication module 3, and receives the received ground survey data as ground. It is transmitted to the server device 7 as a survey data file.
  • the server device 7 receives the ground survey data files from the plurality of mobile information processing terminals 5, stores them centrally, and distributes the ground survey data files in response to a request from the information processing terminals 9 such as an external personal computer.
  • the information processing terminal 9 creates a ground survey report for each survey property.
  • the ground survey report is provided to client terminals (not shown).
  • the ground survey data transfer system is a system that is arranged between the ground survey machine 1 and the server device 7 and relays the ground survey data, and the mobile information processing terminal 5 independently intervenes between them. Rather than doing so, the wireless communication module 3 and the mobile information processing terminal 5 are functionally differentiated and complemented to realize relay processing, and the details will be described later, but there is an opportunity for data falsification by setting functional restrictions. Is eliminated or reduced as much as possible, and the date and time (import date and time) of transmission / reception (acquisition) of the ground survey data file between the wireless communication module 3 and the mobile information processing terminal 5 and the server from the mobile information processing terminal 5. The purpose is to psychologically reduce the willingness to falsify the data by recording the date and time (transfer date and time) of transmission (transfer, upload) of the ground survey data to the device 7.
  • capture means that the mobile information processing terminal 5 requests the wireless communication module 3 to receive the ground survey data file.
  • transfer means that the mobile information processing terminal 5 transmits the ground survey data taken in from the wireless communication module 3 to the server device 7 as a ground survey data file.
  • the wireless communication module 3 is not equipped with a display device such as a liquid crystal display and an input device for a keyboard or a mouse, and controls the control unit 31 via the control / data bus 32 to create the file creation unit 33.
  • a storage unit (storage unit in the module) 34, a table management unit 35, an unimported list creation unit 36, a data input unit 37 that functions as a serial interface, and a short-range wireless communication unit 38 such as Bluetooth (registered trademark) are connected. Become.
  • the file creation unit 33 creates a ground survey data file having a predetermined data structure, for example, in units of measurement points, from the ground survey data input from the data input unit 37.
  • the ground survey data file is a data body in which the penetration resistance value is associated with the depth, and attribute information such as the file identification number, the position information of the measurement point (GPS positioning information), the measurement date and time, and the ID of the person in charge of the measurement survey. Is attached.
  • the storage unit 34 records a ground survey data file, a management table described later, and the like. As illustrated in Fig.
  • the management table has a "survey property name” item, a “data file identification number” item that identifies the ground survey data file, and a “untaken” item that distinguishes between unacquired / imported ground survey data files.
  • the table management unit 35 is responsible for updating the management table, and mainly manages the ground survey data files individually by distinguishing between unimported and imported according to whether or not they have been imported into the mobile information processing terminal 5. Specifically, the table management unit 35 receives the receipt confirmation (acquisition confirmation) of the ground survey data file from the mobile information processing terminal 5, and the "unacquired / imported flag” item and "incorporated / imported flag” item of the management table. Update the "Import date and time” item at any time. The table management unit 35 updates the "transfer date and time” item of the management table at any time, triggered by the reception of the transfer log of the ground survey data file from the mobile information processing terminal 5 to the server device 7.
  • the unacquired list creation unit 36 inquires of the management table when the mobile information processing terminal 5 inputs an import command for the ground investigation data file, and a plurality of ground investigation data stored in the storage unit 34.
  • the unimported ground survey data file is specified from the files, and an uncaptured list consisting of attribute information such as the survey property name, identification number, and measurement date and time related to the identified unimported ground survey data file is created.
  • the short-range wireless communication unit 38 transmits the uncaptured list created by the uncaptured list creation unit 36 to the mobile information processing terminal 5, and the mobile information processing terminal 5
  • the ground survey data file selected on the unimported list is transmitted to the mobile information processing terminal 5.
  • the mobile information processing terminal 5 is a storage unit (in-terminal storage unit) that stores the ground survey data file captured from the wireless communication module 3 with respect to the control unit 51 via the control / data bus 52. ) 53, Display unit 54 such as a liquid crystal panel, Display control unit 55 that generates a display screen and supplies it to the display unit 54, Operation unit 56 such as a touch panel for tapping a command button displayed on the display unit 54, Data The processing unit 57, the short-range wireless communication unit 58 such as Bluetooth (registered trademark), and the mobile wireless communication unit 59 are connected. The data processing unit 57 develops the ground survey data of the ground survey data file in a text format or processes it into a columnar diagram or the like.
  • the data processing unit 57 develops the ground survey data of the ground survey data file in a text format or processes it into a columnar diagram or the like.
  • the data processing unit 57 does not have a processing function for changing, overwriting, or copying the contents of the ground survey data file.
  • the display control unit 55 generates a plurality of types of display screens related to the processing of importing and uploading the ground survey data file according to the control of the control unit 51, and these display screens can be changed, overwritten, or copied. Such command buttons are not shown.
  • the short-range wireless communication unit 58 transmits to the wireless communication module 3 that the capture command has been input via the operation unit 56 under the control of the control unit 51, and has not captured the data via the operation unit 56. It functions as a transmission unit (first transmission unit) that transmits identification information about the ground survey data file to be imported selected on the list to the wireless communication module 3, and also receives an unimported list from the wireless communication module 3. At the same time, it functions as a receiving unit that receives the ground survey data file to be imported selected on the unacquired list from the wireless communication module 3. Under the control of the control unit 51, the mobile wireless communication unit 59 receives from the wireless communication module 3 and collectively transmits (transfers) all the ground investigation data files stored in the storage unit 53 to the server device 7. ) Functions as a transmitter (second transmitter).
  • FIG. 4 shows the flow of the ground survey data acquisition process and transfer process (upload process) according to this embodiment.
  • ground survey data (sometimes simply referred to as survey data) is generated at any time (process S2).
  • the load WSW required for the rod to penetrate and half rotation speed Na were measured together with the depth as penetration resistance.
  • the data body is included.
  • the ground survey data generated by the processor of the control device 13 of the ground survey machine 1 is transmitted and stored in the internal storage unit via the internal transmission line in the serial format of, for example, Serial ATA.
  • the data is input to the data input unit 37 of the wireless communication module 3 in the serial format via the transmission line branched from the internal transmission line, the serial port, and the serial cable.
  • the input ground survey data is edited by the file creation unit 33 into a ground survey data file in units of measurement positions (step S3), and is stored in the storage unit 34 (step S4).
  • the ground survey data file consists of a data body in which a plurality of penetration resistances are associated with each depth, and attribute information such as a measurement number, a measurement position, and a measurement date and time is attached. That is, all the ground survey data generated by the control device 13 of the ground survey machine 1 is input to the wireless communication module 3 and stored as a ground survey data file.
  • the table management unit 35 updates the management table (process S5).
  • the management table has a "survey property name” item, a “data file identification number” item that identifies the ground survey data file, and a “non-imported” item that distinguishes between unimported / imported ground survey data files.
  • the survey property name item and data file identification number item are extracted from the attribute information of the ground survey data file and newly written to the management table.
  • the identification numbers a1 to a8 of the eight ground survey data files having the same survey property but different measurement positions and the names of the respective survey properties are newly added.
  • the non-captured / captured flag is set to a value "0" indicating the uncaptured state, and the capture date and time and the transfer date and time (update date and time) are not described.
  • FIG. 6 illustrates the initial screen.
  • the geotechnical investigation data file described as "investigation import” is transmitted from the wireless communication module 3 to the mobile information processing terminal 5 together with the bibliographic items such as the investigation number and the investigation name.
  • An import processing command button for the person in charge of investigation to input an execution instruction of the import process, a process of transferring the ground investigation data file described as "transfer (upload)" from the mobile information processing terminal 5 to the server device 7. Includes a survey capture command button for the investigator to enter an execution instruction.
  • the number of imported files, the number of imported files transferred to the server device 7, and the number of untransferred files that have not yet been transferred are also written.
  • a photography command button for the investigator to input an execution instruction of the photography process described as "photographing” is included, and a "checklist” is also included.
  • the information indicating that the import processing command has been input is transmitted by short-range wireless communication. It is transmitted to the wireless communication module 3 via the communication unit 58.
  • the table management unit 35 inquires about the management table of the storage unit 34 under the control of the control unit 31 in response to the reception of the information that the import processing command has been input, and the data has not been imported.
  • the identification number of the ground survey data file is specified (step S12).
  • the unimported list (list of unimported ground survey data files) that describes the identification number of each identified unimported ground survey data file and its measurement date and time is from the management table.
  • step S13 An unimported list of eight ground survey data files specified by identification numbers a1 to a8 is created.
  • the created uncaptured list is transmitted to the mobile information processing terminal 5 via the short-range wireless communication unit 38 (step S14).
  • the uncaptured list received by the mobile information processing terminal 5 is displayed as a list of uncaptured data files on the display unit 54 (step S15).
  • the investigator operates the operation unit 56 to import one or more grounds from the displayed unimported list from the wireless communication module 3 to the mobile information processing terminal 5.
  • the survey data file is selected (step S16).
  • three ground survey data files specified by the identification numbers a5, a6, and a7 are selected as import targets.
  • an import command for importing the selected ground survey data file from the wireless communication module 3 into the mobile information processing terminal 5 is input.
  • Identification numbers a5, a6, and a7 that identify the ground survey data files to be imported are transmitted from the mobile information processing terminal 5 to the wireless communication module 3 together with a transmission request.
  • the wireless communication module 3 When the wireless communication module 3 receives the identification numbers a5, a6, and a7 together with the transmission request of those files, in response to the reception, the three grounds specified by the identification numbers a5, a6, and a7 under the control of the control unit 31.
  • the survey data file is read from the storage unit 34 and transmitted to the mobile information processing terminal 5 via the short-range wireless communication unit 38 (step S17).
  • the control unit 51 of the mobile information processing terminal 5 stores the received ground survey data files (a5, a6, a7) in the storage unit 53, and the identification numbers a5, a6, a7 of the received ground survey data file. And send the date and time of their import with confirmation of receipt.
  • the display unit 54 displays a list of imported data files as illustrated in FIG.
  • the management table is updated by the table management unit 35 under the control of the control unit 31 in response to the receipt confirmation (step S19). ).
  • the uncaptured / captured flags related to the three ground survey data files of the identification numbers a5, a6, and a7 are rewritten to the flag “1” indicating that they have been captured, and the flags are fetched. The date and time of inclusion is described.
  • the person in charge of the investigation returns to the initial screen illustrated in FIG. 10 by tapping the "Back" command on the screen of the imported data file list illustrated in FIG.
  • the number of imported files is 3
  • the number of imported files transferred to the server device 7 is 0, and the files have not been transferred yet. It is displayed that the number of untransferred files is 3.
  • a file transfer instruction is input (step S21).
  • all the untransferred ground survey data files (a5, a6, a7) are read from the storage unit 53 under the control of the control unit 51, and the mobile wireless communication unit 59 is read. It is transmitted (transferred) to the server device 7 all at once via the above (step S22).
  • a list of captured data files whose statuses of these three ground survey data files (a5, a6, a7) are updated to "transferred” is displayed as illustrated in FIG.
  • the screen returns to the initial screen illustrated in FIG. On this initial screen, the number of imported files is 3, the number of imported files transferred to the server device 7 is 3, and the number of untransferred files that have not yet been transferred is 0. Is displayed.
  • the transfer confirmation is transmitted from the mobile information processing terminal 5 to the wireless communication module 3 together with the identification numbers a5, a6, and a7 of the ground survey data file and their transfer dates and times.
  • the management table is updated by the table management unit 35 under the control of the control unit 31 in response to the reception of the transfer confirmation (step S23). As illustrated in the lower part of FIG. 5, the transfer date and time for the three ground survey data files of the identification numbers a5, a6, and a7 are described.
  • the fetching processing command is further issued by the surveyor to the mobile information processing terminal 5.
  • Three ground survey data files (identification numbers a5 and a6) in which the imported flag "1" is set in the mobile information processing terminal 5 from the wireless communication module 3 when the data is input via the operation unit 56 of the above. , A7) are excluded, and the unimported list of the five ground survey data files of the identification numbers a1 to a4 and a8 is transmitted.
  • the unimported list as shown in FIG. 13, only the identification numbers a1 to a4, a8 and the measurement date and time related to the five unimported ground survey data files are displayed on the display unit 54 of the mobile information processing terminal 5. Is listed.
  • the selection range of the files to be imported by the investigator is limited to these unimported data files listed. That is, in the ground survey data transfer system according to the present embodiment, the ground survey data file that has already been imported cannot be imported into the mobile information processing terminal 5 again, in other words, the ground investigation data file is imported only once. Limited.
  • the ground survey data file having the identification number a8 is selected, its import is instructed, and the import displayed on the display unit 54 when the import of the ground survey data file (a8) is completed.
  • the status of the other imported ground survey data files (a5 to a7) is "transferred", that is, the status has been uploaded to the server device 7.
  • the number of imported files is “4” in this initial screen, and the number of imported files transferred to the server device 7 Is "3", and it is displayed that the number of untransferred files that have not been transferred is "1".
  • the untransferred ground survey data file (a8) is read from the storage unit 53. It is transmitted (transferred) to the server device 7 via the mobile wireless communication unit 59.
  • the number of transferred files including the ground survey data file (a8) is updated to "4" and the number of untransferred files is updated to "0" as illustrated in FIG.
  • the data processing unit 57 of the mobile wireless communication unit 59 is equipped with only a function of executing display-related processing on the ground survey data file, and the attribute information of the ground survey data file and their contents with respect to the data body. Does not have the ability to modify, overwrite, and even copy.
  • the data processing unit 57 generates a columnar diagram from the ground survey data file and displays it as illustrated in FIG. 17, and expands the attribute information and the data body of the ground survey data file into a text format and illustrates it in FIG. Display to do.
  • the ground survey data transfer system is interposed between the ground survey machine 1 and the server device 7, but is divided into a wireless communication module 3 and a mobile information processing terminal 5.
  • the wireless communication module 3 is equipped in the ground survey machine 1, and the wireless communication module 3 stores all the ground survey data files generated by the ground survey machine 1, while the mobile information processing terminal 5 stores wireless communication.
  • Information about the unimported ground survey data file (uncaptured list) is provided from module 3, and the ground survey data file to be imported from the wireless communication module 3 to the mobile information processing terminal 5 is selected only on the unimported list. be able to.
  • the mobile information processing terminal 5 cannot re-import the ground survey data file that has already been imported.
  • the mobile information processing terminal 5 can capture the ground survey data file only once. Therefore, the ground survey data file at a certain measurement position is used as that of another measurement position, and the data is forcibly altered by some means, and the ground survey data file at a certain measurement position is used as the ground survey data file at another measurement position. Even if the person in charge of the investigation neglects the ground investigation work of another measurement position by diversion, the ground investigation data file of a certain measurement position cannot be re-imported, so the ground investigation data file of a certain measurement position exists. It disappears, and it becomes impossible to transfer to the server device 7. As a result, the ground survey work at a certain measurement position is forced to be carried out again. Therefore, such falsification of the measurement position is suppressed.
  • the wireless communication module 3 since the wireless communication module 3 is not equipped with an operation unit or a display unit, it is impossible for the person in charge of investigation to check the ground investigation data file or falsify the data with the wireless communication module 3.
  • the storage unit 34 of the wireless communication module 3 stores the original ground survey data input from the ground survey machine 1 simply as a file. Therefore, the work manager or the like extracts the original ground survey data file from the storage unit 34 of the wireless communication module 3 under special authority, and collates it with the ground survey data file transferred to the server device 7 and stored. Therefore, it is possible to easily verify whether or not the data has been tampered with. Therefore, the motivation of the investigator to falsify the data can be diminished, and as a result, the falsification of the data itself can be suppressed.
  • ground survey machine is read as “ground improvement construction machine”
  • ground survey machine body is read as “ground improvement construction machine body”
  • ground survey data is read as “construction data”.
  • Measurement position is read as “working position”
  • investigator is read as "ground improvement construction person”.
  • ground improvement columnar improvement, steel pipe pile method, etc.
  • Various construction data such as torque, cement milk injection amount, cumulative rotation speed, press-fitting pressure, excavation depth, excavation speed, and excavation load are generated by various sensors installed in the ground improvement construction machine.
  • construction data are stored in the data center (server device) in the same way as the ground survey data.
  • the construction data generated by the ground improvement construction machine is transferred to the server device via the ground improvement construction data transfer system, and the procedure is that the ground survey data generated by the ground survey machine described above is the ground survey data transfer system.
  • the procedure is the same as the procedure for transferring data to the server device via the above, and the configuration of the ground improvement construction data transfer system is also the same as that of the above-mentioned ground survey data transfer system.

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Soil Sciences (AREA)
  • Primary Health Care (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Tourism & Hospitality (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Information Transfer Between Computers (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

目的は地盤調査機からサーバ装置への調査データのアップロードに際してデータ改ざんを抑制することにある。 地盤調査データ転送システムは、地盤調査機1に装備される無線通信モジュール3と、移動型情報処理端末5とを具備する。無線通信モジュールは地盤調査機から入力した地盤調査データファイルの未取込/取込済を管理するテーブル管理部35と、未取込リストを作成する未取込リスト作成部36と、未取込リスト及び未取込ファイルを移動型情報処理端末に送信する通信部38とを有する。移動型情報処理端末は操作部56と、未取込リストを表示する表示部54と、未取込リスト上で選択されたファイルの識別情報を無線通信モジュールに送信し、未取込リスト上で選択されたファイルを無線通信モジュールから受信する通信部58と、地盤調査データファイルをサーバ装置に送信する通信部59とを有する。

Description

地盤調査データ転送システム、無線通信モジュール、移動型情報処理端末及び地盤改良施工データ転送システム
 本発明の実施形態は、地盤調査データ転送システム、無線通信モジュール、移動型情報処理端末及び地盤改良施工データ転送システムに関する。
 地盤調査は、例えばスウェーデン式サウンディング試験機などの地盤調査機を用いて原位置における地盤の貫入抵抗を測定し、その硬軟または締まり具合、さらに土層の構成を測定し、地耐力を推定するものである。この地盤調査の結果に応じて、建物の基礎が選定される。例えば、軟弱な地盤であると判断された場合には、セメント系固化剤をスラリー状態にし、対象となる地盤に注入しながら機械混合攪拌することによって、地盤土を柱状固化して地盤強化を図る地盤改良工事が行なわれている。将来にわたって安全・安心な建物を建築するためには何よりも地盤調査結果に対する信頼性が重要であり、地盤調査データの改ざんは当然にして排除されるべきである。
 地盤調査機で発生された地盤調査データはUSBメモリを媒介させて、あるいはインターネット回線を介してデータセンタ(サーバ装置)に一旦集められ、適宜パソコン等に配信され、調査物件ごとに地盤調査報告書が作成され、クライアントに提出される。このデータの流れの中でデータ改ざんは、地盤調査機におけるデータ発生段階、地盤調査機からサーバ装置へのアップロード段階、地盤調査報告書の作成段階などの様々な段階で起こり得る。
 地盤調査機の全自動化が進み、データ発生段階でデータが改ざんされる可能性は低くなってきている。地盤調査報告書の作成段階は地盤調査データの編集処理、加工処理等が必要とされることからデータ改ざんが最も起こり易い状況ではあるが、データセンタにはオリジナルデータが保存されており、このオリジナルデータと整合確認することによりデータ改ざんの有無を簡単に検証することができ、またその改ざん者の特定が比較的容易であることから、現実的には当該段階でデータが改ざんされる可能性は低い。
 一方、地盤調査機で発生された地盤調査データをサーバ装置にアップロードする前に地盤調査データを確認し、測点の位置ずれ、地盤調査機の誤動作、データ欠損等の基本的には不責事由による調査作業のやり直しの必要性をその場で判断することができることから、ノートパソコンやスマートフォン等の移動型情報処理端末を調査現場に持ち込むことが多い。この場合、移動型情報処理端末を中継して地盤調査データをサーバ装置にアップロードすることになる。当該移動型情報処理端末は地盤調査データの複写処理、さらにデータの編集・加工処理等が可能な機能を備えていることから、この移動型情報処理端末上でデータが改ざんされる可能性が比較的高いと言える。
 しかし移動型情報処理端末上でのデータ改ざんは調査現場で行われること、改ざんされた地盤調査データがそのままオリジナルデータとしてサーバ装置に保管されてしまうことから、その改ざんを発見できる可能性は決して高くはなく、またそれを検証する手段がないのが現状である。
 同様の課題が地盤改良施工によるトルク、セメントミルク注入量、積算回転数、圧入圧、掘削深度、掘削速度、掘削荷重など様々な施工データをサーバ装置にアップロードする段階でも起こりうる。
 目的は、地盤調査機や地盤改良施工機で発生した地盤調査データファイルや施工データファイルをサーバ装置へアップロードするに際してデータ改ざんを抑制することにある。
 本実施形態に係る地盤調査データ転送システムは、外部の地盤調査機で発生された地盤調査データを外部のサーバ装置に転送する。地盤調査データ転送システムは、地盤調査機に装備される無線通信モジュールと、無線通信モジュールに近距離無線通信規格のもとで接続され、サーバ装置にインターネット回線を介して接続される移動型情報処理端末とを具備する。 
 無線通信モジュールは、
  地盤調査機から前記地盤調査データを入力する入力部と、
  入力された地盤調査データを測定地点を単位とする複数の地盤調査データファイルとして記憶するモジュール内記憶部と、
  記憶された複数の地盤調査データファイルを個別に移動型情報処理端末への送信有無に従って未取込/取込済を区別して管理する管理部と、
  移動型情報処理端末から地盤調査データファイルの取込コマンドを受信する受信部と、
  取込コマンドの受信を契機として、記憶された複数の地盤調査データファイルのうち取込済の地盤調査データファイルを除外し、、未取込の地盤調査データファイルのみに関する未取込リストを作成する未取込リスト作成部と、
  作成された未取込リストを移動型情報処理端末に送信するとともに、移動型情報処理端末において未取込リスト上で選択された地盤調査データファイルを移動型情報処理端末に送信する無線通信モジュール送信部とを有する。
 移動型情報処理端末は、
  操作者により操作される操作部と、
  無線通信モジュールから受信した未取込リストを表示する表示部と、
  操作部を介して入力された取込コマンドを無線通信モジュールに送信するとともに、取込済の地盤調査データファイルを再度取り込むことができないように操作部を介して表示された未取込リスト上でのみ無線通信モジュールからの取り込み対象として選択された地盤調査データファイルに関する識別情報を送信要求とともに無線通信モジュールに送信する第1送信部と、
  未取込リストを受信するとともに未取込リスト上で選択された地盤調査データファイルを無線通信モジュールから受信する受信部と、
  無線通信モジュールから受信した地盤調査データファイルをサーバ装置に送信する第2送信部とを有する。
図1は、本実施形態に係る地盤調査データ転送システムを含むシステム全体の構成を示す図である。 図2は、図1の無線通信モジュールの機能構成図である。 図3は、図1の移動型情報処理端末の機能構成図である。 図4は、本実施形態による地盤調査データの取込及びアップロード処理の流れを示すフローチャートである。 図5は、図2の未取込/取込済管理部により更新される管理テーブルを示す図である。 図6は、図2の移動型情報処理端末の表示部に表示される地盤調査データ転送処理の初期画面を示す図である。 図7は、図6の“調査取込”ボタンのタップによる未取込リスト取得処理の完了により自動遷移する未取込データファイルの一覧表示画面を示す図である。 図8は、図7の未取込データファイルの一覧上での取込対象のデータファイルの選択操作を示す図である。 図9は、図8の“取込”ボタンのタップによる取込処理の完了により自動遷移する取込データファイル一覧表示画面を示す図である。 図10は、図9の“戻る”ボタンのタップにともなって遷移する初期画面を示す図である。 図11は、図10の“転送”ボタンのタップによる転送処理(アップロード処理)の完了により自動遷移する取込データファイル一覧表示画面を示す図である。 図12は、図11の“戻る”ボタンのタップにともなって遷移する初期画面を示す図である。 図13は、図12の“調査取込”ボタンのタップによる未取込リスト取得処理の完了により自動遷移する未取込データファイル一覧画面及び当該一覧上での取込対象のデータファイルの選択操作を示す図である。 図14は、図13の“取込”ボタンのタップによる取込処理の完了により自動遷移する取込データファイル一覧表示画面を示す図である。 図15は、図14の“戻る”ボタンのタップにともなって遷移する初期画面を示す図である。 図16は、図15の“転送”ボタンのタップによる転送処理(アップロード処理)の完了後の初期画面を示す図である。 図17は、図14の“断面図”ボタンのタップにより表示される取込データファイルの断面図表示例を示す図である。 図18は、図14の“表示”ボタンのタップにより表示される取込データファイルのデータ表示例を示す図である。
 以下、図面を参照しながら、本実施形態に係る地盤調査データ転送システムについて説明する。
 図1に示すように、本実施形態に係る地盤調査データ転送システムは、外部の地盤調査機1で発生された地盤調査データを外部のサーバ装置7に転送するシステムであり、地盤調査機1の制御装置(コントロールボックス)13に装備される無線通信モジュール3と、無線通信モジュール3にBluetooth(登録商標)等の近距離無線通信規格のもとで接続され、サーバ装置7にインターネット回線10を介して接続される移動型情報処理端末5とを具備する。
 地盤調査機1は、原位置における土の硬軟、締まり具合、土質及び土層構造を調査するために貫入抵抗を測定する例えばスウェーデン式サウンディング自動貫入試験機本体(地盤調査機本体)11、地盤調査機本体11を制御する制御装置13とから構成される。地盤調査機本体11は、ロッド、ロッドを地面に対して垂直に支持するスタンド、ロッドに50kg、75kg、100kg等の荷重をかけるための重り、ロッドを軸回転駆動する回転機構、貫入深度を検出するセンサ等からなる。ロッドが貫入するために必要な荷重WSW、半回転数Naが貫入抵抗として深度とともに測定される。制御装置13は、地盤調査機本体11を制御するとともに、センサ出力に基づいて深度と貫入抵抗との対応関係を表す地盤調査データを発生する。無線通信モジュール3は制御装置13のシリアルポートに直接有線で接続され、このシリアルインタフェースのもとで当該地盤調査データを逐次入力する。
 ノートパソコン、スマートフォン、タブレット端末に代表される移動型情報処理端末5は、地盤調査機1の制御装置13から無線通信モジュール3を介して地盤調査データを受信するとともに、受信した地盤調査データを地盤調査データファイルとしてサーバ装置7に送信する。サーバ装置7は、複数の移動型情報処理端末5から地盤調査データファイルを受け取り、一元的に保管するとともに、外部のパソコン等の情報処理端末9からの要請に従って地盤調査データファイルを配信する。情報処理端末9では調査物件ごとに地盤調査報告書が作成される。地盤調査報告書は図示しないクライアント端末に提供される。
 本実施形態に係る地盤調査データ転送システムは、地盤調査機1とサーバ装置7との間に配置され、地盤調査データを中継するシステムであり、移動型情報処理端末5が単独でこれら間に介在するのではなく、無線通信モジュール3と移動型情報処理端末5とに機能分化して相補し合って中継処理を実現するとともに、詳細は後述するが機能上の制約を設けることによりデータ改ざんの機会を解消し又はできるだけ減少させ、また無線通信モジュール3と移動型情報処理端末5との間の地盤調査データファイルの送受信(取込)の日時(取込日時)及び移動型情報処理端末5からサーバ装置7への地盤調査データの送信(転送、アップロード)の日時(転送日時)を記録することによりデータ改ざんの意欲を心理的に減退させることを目的としたものである。
 ここで、「取込」とは移動型情報処理端末5が無線通信モジュール3に要求して地盤調査データファイルを受信することをいう。また「転送」とは移動型情報処理端末5が無線通信モジュール3から取り込んだ地盤調査データを地盤調査データファイルとしてサーバ装置7に送信することをいう。
 図2に示すように無線通信モジュール3は、液晶等の表示デバイス及びキーボードやマウス用の入力デバイスを装備せず、制御部31に対して制御/データバス32を介して、ファイル作成部33、記憶部(モジュール内記憶部)34、テーブル管理部35、未取込リスト作成部36、シリアルインタフェースとして機能するデータ入力部37、Bluetooth(登録商標)等の近距離無線通信部38が接続されてなる。
 ファイル作成部33は、データ入力部37から入力された地盤調査データから例えば測定地点を単位として所定のデータ構造からなる地盤調査データファイルを作成する。地盤調査データファイルは、貫入抵抗値が深さに対応付けられてなるデータ本体に、ファイル識別番号、測定地点の位置情報(GPS測位情報)、測定日時、測定調査担当者のID等の属性情報が付帯してなる。記憶部34は地盤調査データファイル、後述する管理テーブル等を記録する。管理テーブルは図5に例示したように“調査物件名称”項目、地盤調査データファイルを特定する“データファイル識別番号”項目、地盤調査データファイルの未取込/取込済を区別する“未取込/取込済フラグ”項目、地盤調査データファイルを移動型情報処理端末5に取り込んだ日時を表す“取込日時”項目、地盤調査データファイルをサーバ装置7に転送(アップデート)した日時を表す“転送日時(アップデート日時)”項目からなる。
 テーブル管理部35は、管理テーブルの更新を担うものであり、主として地盤調査データファイルを個別に移動型情報処理端末5への取込有無に従って未取込/取込済を区別して管理する。具体的にはテーブル管理部35は移動型情報処理端末5からの地盤調査データファイルの受領確認(取込確認)の受信を契機として管理テーブルの“未取込/取込済フラグ”項目及び“取込日時”項目を随時更新する。テーブル管理部35は移動型情報処理端末5からの地盤調査データファイルのサーバ装置7への転送ログの受信を契機として管理テーブルの“転送日時”項目を随時更新する。
 未取込リスト作成部36は、移動型情報処理端末5での地盤調査データファイルの取込コマンドの入力を契機として、管理テーブルを照会して、記憶部34に記憶された複数の地盤調査データファイルのうち未取込の地盤調査データファイルを特定し、特定した未取込の地盤調査データファイルに関する調査物件名称、識別番号及び測定日時等の属性情報からなる未取込リストを作成する。
 近距離無線通信部38は制御部31の制御のもとで、未取込リスト作成部36で作成された未取込リストを移動型情報処理端末5に送信するとともに、移動型情報処理端末5において未取込リスト上で選択された地盤調査データファイルを移動型情報処理端末5に送信する。
 図3に示すように移動型情報処理端末5は、制御部51に対して制御/データバス52を介して、無線通信モジュール3から取り込んだ地盤調査データファイルを記憶する記憶部(端末内記憶部)53、液晶パネル等の表示部54、表示画面を生成し表示部54に供給する表示制御部55、表示部54に表示されたコマンドボタンをタップ操作するためのタッチパネル等の操作部56、データ処理部57、Bluetooth(登録商標)等の近距離無線通信部58、移動体無線通信部59が接続されてなる。データ処理部57は地盤調査データファイルの地盤調査データをテキスト形式に展開し、又は柱状図等に加工する。データ処理部57は地盤調査データファイルの内容変更、上書き、複写に関する処理機能を備えていない。それとともに表示制御部55は地盤調査データファイルの取込及びアップロードの処理に関する複数種類の表示画面を制御部51の制御に従って生成するものであるが、これら表示画面には内容変更、上書き、複写に係るコマンドボタンは表記されない。
 近距離無線通信部58は、制御部51の制御のもとで操作部56を介して取込コマンドが入力された旨を無線通信モジュール3に送信するとともに、操作部56を介して未取込リスト上で選択された取込対象の地盤調査データファイルに関する識別情報を無線通信モジュール3に送信する送信部(第1送信部)として機能し、また無線通信モジュール3から未取込リストを受信するとともに未取込リスト上で選択された取込対象の地盤調査データファイルを無線通信モジュール3から受信する受信部として機能する。移動体無線通信部59は、制御部51の制御のもとで、無線通信モジュール3から受信し、記憶部53に記憶された全ての地盤調査データファイルを一括してサーバ装置7に送信(転送)する送信部(第2送信部)として機能する。
 図4には本実施形態による地盤調査データの取込処理及び転送処理(アップロード処理)の流れを示している。地盤調査機1で地盤調査が実施されると(工程S1)、地盤調査データ(単に調査データということもある)が随時発生される(工程S2)。地盤調査データには図18に例示するように測定番号、測定日時、測定位置等の属性事項とともに、ロッドが貫入するために必要な荷重WSW、半回転数Naが貫入抵抗として深度とともに測定されたデータ本体が含まれる。なお、ロッドが荷重だけで貫入するときは「自沈」と表記される。また貫入速度が比較的遅いときには「オソイ」と表記され、比較的速いときには「ハヤイ」と表記される。
 地盤調査機1の制御装置13のプロセッサで発生された地盤調査データは例えばSerial ATAのシリアル形式で内部伝送路を介して内部記憶部に伝送され記憶される。この動作と並行して内部伝送路から分岐した伝送路、シリアルポート、シリアルケーブルを介してシリアル形式のままで無線通信モジュール3のデータ入力部37に入力される。入力された地盤調査データはファイル作成部33により測定位置単位で地盤調査データファイルに編集され(工程S3)、記憶部34に記憶される(工程S4)。地盤調査データファイルは複数の貫入抵抗がそれぞれ深度に対応付けられてなるデータ本体に、測定番号、測定位置、測定日時等の属性情報が付帯されてなる。つまり地盤調査機1の制御装置13で発生された全ての地盤調査データが無線通信モジュール3に入力され、地盤調査データファイルとして記憶される。
 地盤調査データファイルを新規に記憶部34に記憶するに際して、テーブル管理部35により管理テーブルが更新される(工程S5)。管理テーブルは図5に示すように“調査物件名称”項目、地盤調査データファイルを特定する“データファイル識別番号”項目、地盤調査データファイルの未取込/取込済を区別する“未取込/取込済フラグ”項目、地盤調査データファイルを移動型情報処理端末5に取り込んだ日時を表す“取込日時”項目、地盤調査データファイルをサーバ装置7に転送(アップデート)した日時を表す“転送日時(アップデート日時)”項目からなる。新規な地盤調査データファイルに関する情報を管理テーブルに追加するに際して、地盤調査データファイルの属性情報から調査物件名称項目、データファイル識別番号項目が抽出され、管理テーブルに新たに書き込まれる。図5の例では、調査物件が同じであって測定位置が異なる8つの地盤調査データファイルの識別番号a1~a8とそれぞれの調査物件名称が新たに追加される。初期的には未取込/取込済フラグとしては未取込状態を表す値“0”に設定され、取込日時及び転送日時(アップデート日時)は無記載の状態とされる。
 無線通信モジュール3から移動型情報処理端末5に地盤調査データファイルの取込・転送処理を実行するには、移動型情報処理端末5において取込・転送プログラムが起動される。図6にはその初期画面を例示する。表示制御部55により生成される初期画面には調査番号、調査名称等の書誌的事項とともに、「調査取込」と表記された地盤調査データファイルを無線通信モジュール3から移動型情報処理端末5に取り込む処理の実行指示を調査担当者が入力するための取込処理コマンドボタン、「転送(アップロード)」と表記された地盤調査データファイルを移動型情報処理端末5からサーバ装置7へ転送する処理の実行指示を調査担当者が入力するための調査取込コマンドボタンが含まれる。調査取込コマンドボタンには、取込ファイル数、取込ファイルのうちのサーバ装置7に転送したファイルの数、未だ転送していない未転送のファイルの数が併記される。また移動型情報処理端末5が撮影手段を備えているときには「写真撮影」と表記された写真撮影処理の実行指示を調査担当者が入力するための写真撮影コマンドボタンが含まれ、また「チェックリスト」と表記された測定位置の周辺状況や敷地状況を調査担当者がチェックするためのチェックシートの表示及びチェックの実行指示を調査担当者が入力するためのチェックリストコマンドボタンが含まれる。
 操作部56を介して初期画面上の取込処理コマンドボタンがタップされ、それにより取込処理コマンドが入力されたとき(工程S11)、取込処理コマンドが入力された旨の情報が近距離無線通信部58を介して無線通信モジュール3に送信される。無線通信モジュール3では取込処理コマンドが入力された旨の情報の受信を契機として、制御部31の制御のもとでテーブル管理部35により記憶部34の管理テーブルが照会され、未取込の地盤調査データファイルの識別番号が特定される(工程S12)。特定された未取込の地盤調査データファイル各々の識別番号とその測定日時とが記載された未取込リスト(未取込の地盤調査データファイルの一覧)が管理テーブルから未取込リスト作成部36により作成される(工程S13)。具体例として識別番号a1~a8で特定される8つの地盤調査データファイルに関する未取込リストが作成される。作成された未取込リストは近距離無線通信部38を介して移動型情報処理端末5に送信される(工程S14)。
 図7に例示するように、移動型情報処理端末5で受信された未取込リストはその表示部54に未取込データファイル一覧として表示される(工程S15)。図8に例示するように、調査担当者は、操作部56を操作して、表示された未取込リストの中から、無線通信モジュール3から移動型情報処理端末5に取り込む1又は複数の地盤調査データファイルを選択する(工程S16)。図8の例では識別番号a5,a6,a7で特定される3つの地盤調査データファイルが取込対象として選択される。当該画面上の「取込」コマンドボタンがタップされると、選択された地盤調査データファイルを対象として無線通信モジュール3から移動型情報処理端末5に取り込む取込コマンドが入力される。これら取込対象の地盤調査データファイルを特定する識別番号a5,a6,a7が送信要求とともに移動型情報処理端末5から無線通信モジュール3に送信される。
 無線通信モジュール3では識別番号a5,a6,a7をそれらファイルの送信要求とともに受信すると、それに呼応して、制御部31の制御のもとで識別番号a5,a6,a7で特定される3つの地盤調査データファイルが記憶部34から読み出され、近距離無線通信部38を介して移動型情報処理端末5に送信される(工程S17)。移動型情報処理端末5の制御部51は、受信されたこれら地盤調査データファイル(a5,a6,a7)を記憶部53に記憶させるとともに、受信した地盤調査データファイルの識別番号a5,a6,a7とそれらの取込日時を受領確認とともに送信する。取込完了とともに表示部54には図9に例示するように取込データファイル一覧が表示される。
 無線通信モジュール3では識別番号a5,a6,a7をそれらファイルの受領確認とともに受信すると、それに呼応して、制御部31の制御のもとでテーブル管理部35により管理テーブルが更新される(工程S19)。図5の中段に例示するように、これら識別番号a5,a6,a7の3つの地盤調査データファイルに関する未取込/取込済フラグが取込済を示すフラグ“1”に書き換えられ、また取込日時が記載される。
 調査担当者は図9に例示した取込データファイル一覧の画面上で「戻る」コマンドをタップすることにより、図10に例示する初期画面に戻る。この初期画面には調査取込コマンドボタンの隣に、取込ファイル数が3であること、取込ファイルのうちのサーバ装置7に転送したファイルの数が0であること、未だ転送していない未転送のファイルの数が3であることが表示される。
 図10の初期画面上の「転送(アップロード)」と表記されたコマンドボタンが調査担当者により操作部56を介してタップされると、ファイル転送指示が入力される(工程S21)。ファイル転送指示が入力されると、制御部51の制御のもとで未転送の全ての地盤調査データファイル(a5,a6,a7)が記憶部53から読み出され、移動体無線通信部59を介して一斉にサーバ装置7に送信(転送)される(工程S22)。転送が完了すると、図11に例示するようにこれら3つの地盤調査データファイル(a5,a6,a7)の状態が“転送済み”に更新された取込データファイル一覧が表示される。図11の「戻る」コマンドボタンのタップに伴って図12に例示する初期画面に戻る。この初期画面では取込ファイル数が3であること、取込ファイルのうちのサーバ装置7に転送したファイルの数が3であること、未だ転送していない未転送のファイルの数が0であることが表示される。
 転送完了とともに当該地盤調査データファイルの識別番号a5,a6,a7とそれらの転送日時とともに転送確認が移動型情報処理端末5から無線通信モジュール3に送信される。無線通信モジュール3では転送確認の受信に呼応して、制御部31の制御のもとでテーブル管理部35により管理テーブルが更新される(工程S23)。図5の下段に例示するように、これら識別番号a5,a6,a7の3つの地盤調査データファイルに関する転送日時が記載される。
 ここで、識別番号a5,a6,a7の3つの地盤調査データファイルを無線通信モジュール3から移動型情報処理端末5に取り込んだ後に、さらに取込処理コマンドが調査担当者により移動型情報処理端末5の操作部56を介して入力されたとき、無線通信モジュール3から移動型情報処理端末5には、取込済みのフラグ“1”が立っている3つの地盤調査データファイル(識別番号a5,a6,a7)が除外された識別番号a1~a4、a8の5つの地盤調査データファイルに関する未取込リストが送信される。当該未取込リストに従って、移動型情報処理端末5の表示部54には、図13に示すように、未取込である5つの地盤調査データファイルに関する識別番号a1~a4、a8と測定日時だけが一覧表示される。
 従って調査担当者による取込対象ファイルの選択範囲は、これら一覧表示された未取込のデータファイルだけに制限される。つまり本実施形態に係る地盤調査データ転送システムでは、取込済みの地盤調査データファイルを移動型情報処理端末5に再度取り込むことはできず、換言すると地盤調査データファイルの取込は、1回に限定される。
 図14には、例えば識別番号a8の地盤調査データファイルが選択され、その取込が指示され、その地盤調査データファイル(a8)の取込が完了したときに表示部54に表示される取込データファイル一覧を示している。この一覧は地盤調査データファイル(a8)が図7の一覧に追加され、そのステータスは“未転送”の状態にある。他の取込済みの地盤調査データファイル(a5~a7)のステータスは“転送済み”、つまりサーバ装置7にアップロード済みの状態である。図14の表示画面から初期画面に戻ると、図15に示すように、この初期画面では取込ファイル数が“4”であること、取込ファイルのうちのサーバ装置7に転送したファイルの数が“3”であること、未だ転送していない未転送のファイルの数が“1”であることが表示される。
 この初期画面上の「転送(アップロード)」と表記されたコマンドボタンがタップされ、ファイル転送指示が入力されると、未転送である地盤調査データファイル(a8)が記憶部53から読み出され、移動体無線通信部59を介してサーバ装置7に送信(転送)される。転送が完了すると、図16に例示するように、この地盤調査データファイル(a8)を含めて、転送済みファイルの数が“4”、未転送のファイルの数が“0”に更新される。
 なお移動体無線通信部59のデータ処理部57は、地盤調査データファイルに対して表示に係る処理を実行する機能のみを装備し、地盤調査データファイルの属性情報及びデータ本体に対してそれらの内容を変更し、それを上書きし、さらに複写する処理を実行する機能を備えていない。例えばデータ処理部57は、地盤調査データファイルから柱状図を生成し、図17に例示するように表示し、また地盤調査データファイルの属性情報及びデータ本体をテキスト形式に展開して図18に例示するように表示する。
 以上のように本実施形態に係る地盤調査データ転送システムは地盤調査機1とサーバ装置7との間に介在されるものであるが、無線通信モジュール3と移動型情報処理端末5とに分化され、無線通信モジュール3は地盤調査機1に装備され、この無線通信モジュール3には地盤調査機1で発生した全ての地盤調査データファイルが記憶される一方、移動型情報処理端末5には無線通信モジュール3から未取込の地盤調査データファイルに関する情報(未取込リスト)が提供され、未取込リスト上でのみ無線通信モジュール3から移動型情報処理端末5に取り込む地盤調査データファイルを選択することができる。移動型情報処理端末5は取込済みの地盤調査データファイルを再度取り込むことはできない。つまり移動型情報処理端末5には地盤調査データファイルを1回だけ取り込むことができる。従って、ある測定位置の地盤調査データファイルを他の測定位置のものとして何らかの手段を使って強制的にデータ改ざんして、ある測定位置の地盤調査データファイルを他の測定位置の地盤調査データファイルとして流用して、調査担当者が他の測定位置の地盤調査作業を怠ったとしても、ある測定位置の地盤調査データファイルを再取り込みすることはできないので、ある測定位置の地盤調査データファイルが存在しなくなり、サーバ装置7に転送することができなくなってしまう。結果的にある測定位置の地盤調査作業を再実施することが余儀なくされる。そのためにこのような測定位置の改ざんは抑制される。またデータ改ざんとして、地盤改良を不当にクライアントから請け負うために、あるいは地盤改良が不要であることをクライアントに提示するために、何らかの手段を使って強制的に地盤調査データファイルのデータ本体を書き換える事態も想定されなくはない。移動型情報処理端末5に地盤調査データファイルを1回しか取り込むことができないので、データ本体の書き換え処理や上書き処理に際して地盤調査データファイルが遺失する可能性がゼロではない。その場合、やはり地盤調査データファイルを再取り込みすることはできないので、再調査が必要とされる。従って調査担当者のデータ改ざんに対する意欲を減退させることができ、結果的にデータ本体の改ざんを抑制することがきる。
 また無線通信モジュール3は操作部も表示部も装備していないので、調査担当者は無線通信モジュール3で地盤調査データファイルを確認することも、データ改ざんすることも不可能である。無線通信モジュール3の記憶部34には地盤調査機1から入力したオリジナルの地盤調査データを単にファイル化しただけのものが保存されることになる。従って作業管理者等が特別な権限のもとで無線通信モジュール3の記憶部34からオリジナルの地盤調査データファイルを吸い出して、サーバ装置7に転送され保管されている地盤調査データファイルと照合することにより、データ改ざんが行われたか否かを容易に検証することができる。従って調査担当者のデータ改ざんに対する意欲を減退させることができ、結果的にデータ本体の改ざんを抑制することがきる。
 さらに無線通信モジュール3の記憶部34に、無線通信モジュール3から移動型情報処理端末5への地盤調査データファイルの送信日時(取込日時)、さらに移動型情報処理端末5からサーバ装置7への地盤調査データの転送(アップロード)の日時(転送日時)が記録されるので、調査担当者は取込日時及び転送日時を変更することができず、管理者としては取込日時から転送日時までの時間間隔が過度に長い等の理由からデータ改ざんの可能性を比較的容易に疑うことができ、従って調査担当者のデータ改ざんに対する意欲を減退させることができる。
 なお、上述では地盤調査データ転送システムについて説明したが、本実施形態は地盤改良施工データ転送システムにも適用され得る。この場合、「地盤調査機」は「地盤改良施工機」に読み替えられ、「地盤調査機本体」は「地盤改良施工機本体」に読み替えられ、「地盤調査データ」は「施工データ」に読み替えられ、「測定位置」は「作業位置」に読み替えられ、「調査担当者」は「地盤改良施工担当者」に読み替えられる。地盤改良としては柱状改良、鋼管杭工法などが一般的である。地盤改良施工機に装備された各種センサによりトルク、セメントミルク注入量、積算回転数、圧入圧、掘削深度、掘削速度、掘削荷重など様々な施工データが発生する。これら施工データは地盤調査データと同様にデータセンタ(サーバ装置)に保管される。地盤改良施工機で発生された施工データが地盤改良施工データ転送システムを経由してサーバ装置に転送されるが、その手順は上述した地盤調査機で発生された地盤調査データが地盤調査データ転送システムを経由してサーバ装置に転送される手順と同じであり、地盤改良施工データ転送システムの構成も上述した地盤調査データ転送システムのそれと同じである。
 本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。
 1…地盤調査機、7…サーバ装置、3…無線通信モジュール、5…移動型情報処理端末、31…制御部、32…制御/データバス32、33…ファイル作成部、34…記憶部(モジュール内記憶部)、35…テーブル管理部、36…未取込リスト作成部、37…データ入力部、38…近距離無線通信部、51…制御部、52…制御/データバス、53…記憶部(端末内記憶部)、54…表示部、55…表示制御部、56…操作部、57…データ処理部、58…近距離無線通信部、59…移動体無線通信部。

Claims (10)

  1.  外部の地盤調査機で発生された地盤調査データを外部のサーバ装置に転送する地盤調査データ転送システムにおいて、
     前記地盤調査機に装備される無線通信モジュールと、
     前記無線通信モジュールに近距離無線通信規格のもとで接続され、前記サーバ装置にインターネット回線を介して接続される移動型情報処理端末とを具備し、
     前記無線通信モジュールは、
      前記地盤調査機から前記地盤調査データを入力する入力部と、
      前記入力された地盤調査データを測定地点を単位とする複数の地盤調査データファイルとして記憶するモジュール内記憶部と、
      前記記憶された複数の地盤調査データファイルを個別に前記移動型情報処理端末への送信有無に従って未取込/取込済を区別して管理する管理部と、
      前記移動型情報処理端末から前記地盤調査データファイルの取込コマンドを受信する受信部と、
      前記取込コマンドの受信を契機として、前記記憶された複数の地盤調査データファイルのうち取込済の地盤調査データファイルを除外し、、未取込の地盤調査データファイルのみに関する未取込リストを作成する未取込リスト作成部と、
      前記作成された未取込リストを前記移動型情報処理端末に送信するとともに、前記移動型情報処理端末において前記未取込リスト上で選択された地盤調査データファイルを前記移動型情報処理端末に送信する無線通信モジュール送信部とを有し、
     前記移動型情報処理端末は、
      操作者により操作される操作部と、
      前記無線通信モジュールから受信した前記未取込リストを表示する表示部と、
      前記操作部を介して入力された前記取込コマンドを前記無線通信モジュールに送信するとともに、前記取込済の地盤調査データファイルを再度取り込むことができないように前記操作部を介して前記表示された未取込リスト上でのみ前記無線通信モジュールからの取り込み対象として選択された前記地盤調査データファイルに関する識別情報を送信要求とともに前記無線通信モジュールに送信する第1送信部と、
      前記未取込リストを受信するとともに前記未取込リスト上で選択された地盤調査データファイルを前記無線通信モジュールから受信する受信部と、
      前記無線通信モジュールから受信した前記地盤調査データファイルを前記サーバ装置に送信する第2送信部とを有する、
    地盤調査データ転送システム。
  2.  前記管理部は、前記記憶された複数の地盤調査データファイルに関して、前記未取込/取込済の区別とともに、前記地盤調査データファイルが前記無線通信モジュールから前記移動型情報処理端末に取り込まれた取込日時を管理する、請求項1記載の地盤調査データ転送システム。
  3.  前記管理部は、前記記憶された複数の地盤調査データファイルに関して、前記未取込/取込済の区別とともに、前記地盤調査データファイルを前記移動型情報処理端末から前記サーバ装置へ送信した送信日時を管理する、請求項1又は2記載の地盤調査データ転送システム。
  4.  前記第2送信部は、前記無線通信モジュールから受信した前記地盤調査データファイルを一括して前記サーバ装置に送信する、請求項1記載の地盤調査データ転送システム。
  5.  前記第2送信部は、前記無線通信モジュールから受信した前記地盤調査データファイルの全てを前記サーバ装置に送信する、請求項1記載の地盤調査データ転送システム。
  6.  前記移動型情報処理端末は、前記無線通信モジュールから取り込んだ前記地盤調査データファイルを記憶する端末内記憶部をさらに有する、請求項1記載の地盤調査データ転送システム。
  7.  前記移動型情報処理端末は、前記端末内記憶部に記憶された前記地盤調査データファイルの地盤調査データをテキスト形式に展開し、又は柱状図に加工して、前記表示部に表示させるデータ処理部をさらに有し、
     前記データ処理部は前記地盤調査データファイルの内容変更機能、上書き機能、複写機能を有さない、請求項6記載の地盤調査データ転送システム。
  8.  外部の地盤調査機に装備され、外部の情報処理装置に無線接続され、前記地盤調査機で発生した地盤調査データを前記外部の情報処理装置に無線送信する無線通信モジュールにおいて、
     前記地盤調査機から前記地盤調査データを入力する入力部と、
     前記入力された地盤調査データを測定地点を単位とする複数の地盤調査データファイルとして記憶するモジュール内記憶部と、
     前記記憶された複数の地盤調査データファイルを個別に前記外部の情報処理装置への送信有無に従って未取込/取込済を区別して管理する管理部と、
     前記外部の情報処理装置からの取込コマンドの入力を契機として、前記記憶された複数の地盤調査データファイルのうち取込済の地盤調査データファイルを除外し、未取込の地盤調査データファイルのみに関する未取込リストを作成する未取込リスト作成部と、
     前記作成された未取込リストを前記外部の情報処理装置に送信するとともに、前記取込済の地盤調査データファイルを前記外部の情報処理装置で再度取り込むことができないように前記外部の情報処理装置からの前記未取込リスト上でのみ取り込み対象として選択された地盤調査データファイルの送信要求に従って前記外部の情報処理装置に送信する送信部とを具備する、無線通信モジュール。
  9.  外部の地盤調査機で発生された地盤調査データを複数の地盤調査データファイルとして前記外部の地盤調査機に装備された無線通信モジュールから無線受信し、外部のサーバ装置にインターネット回線を介して転送する移動型情報処理端末において、
     操作者により操作される操作部と、
     前記操作部を介して入力された取込コマンドを前記無線通信モジュールに送信する送信部と、
     前記取込コマンドの受信に呼応して前記無線通信モジュールから送信された、前記地盤調査データファイルのうち取込済の地盤調査データファイルを除外され、未取込の地盤調査データファイルのみに関する未取込リストを表示する表示部と、
     前記操作部を介して前記取込コマンドが入力された旨を前記無線通信モジュールに送信するとともに、前記取込済の地盤調査データファイルを再度取り込むことができないように前記操作部を介して前記表示された未取込リスト上でのみ前記無線通信モジュールからの取り込み対象として選択された前記地盤調査データファイルに関する識別情報を送信要求とともに前記無線通信モジュールに送信する第1送信部と、
     前記未取込リストを受信するとともに前記未取込リスト上で選択された地盤調査データファイルを前記無線通信モジュールから受信する受信部と、
     前記無線通信モジュールから受信した前記地盤調査データファイルを前記サーバ装置に送信する第2送信部とを具備する、移動型情報処理端末。
  10.  外部の地盤改良施工機で発生された施工データを外部のサーバ装置に転送する地盤改良施工データ転送システムにおいて、
     前記地盤改良施工機に装備される無線通信モジュールと、
     前記無線通信モジュールに近距離無線通信規格のもとで接続され、前記サーバ装置にインターネット回線を介して接続される移動型情報処理端末とを具備し、
     前記無線通信モジュールは、
      前記地盤改良施工機から前記施工データを入力する入力部と、
      前記入力された施工データを作業地点を単位とする複数の施工データファイルとして記憶するモジュール内記憶部と、
      前記記憶された複数の施工データファイルを個別に前記移動型情報処理端末への送信有無に従って未取込/取込済を区別して管理する管理部と、
      前記移動型情報処理端末での前記施工データファイルの取込コマンドの入力を契機として、前記記憶された複数の施工データファイルのうち取込済の施工データファイルを除外し、未取込の施工データファイルのみに関する未取込リストを作成する未取込リスト作成部と、
      前記作成された未取込リストを前記移動型情報処理端末に送信するとともに、前記移動型情報処理端末において前記未取込リスト上で選択された施工データファイルを前記移動型情報処理端末に送信する無線通信モジュール送信部とを有し、
     前記移動型情報処理端末は、
      操作者により操作される操作部と、
      前記無線通信モジュールから受信した前記未取込リストを表示する表示部と、
      前記操作部を介して前記取込コマンドが入力された旨を前記無線通信モジュールに送信するとともに、前記取込済の施工データファイルを再度取り込むことができないように前記操作部を介して前記表示された未取込リスト上でのみ前記無線通信モジュールからの取り込み対象として選択された前記施工データファイルに関する識別情報を送信要求とともに前記無線通信モジュールに送信する第1送信部と、
      前記未取込リストを受信するとともに前記未取込リスト上で選択された施工データファイルを前記無線通信モジュールから受信する受信部と、
      前記無線通信モジュールから受信した前記施工データファイルを前記サーバ装置に送信する第2送信部とを有する、
    地盤改良施工データ転送システム。
PCT/JP2020/026627 2019-07-24 2020-07-08 地盤調査データ転送システム、無線通信モジュール、移動型情報処理端末及び地盤改良施工データ転送システム WO2021014967A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
NZ776633A NZ776633A (en) 2019-07-24 2020-07-08 Ground investigation data transfer system, wireless communication module, mobile information processing terminal, and soil improvement execution data transfer system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019-135797 2019-07-24
JP2019135797A JP6692554B1 (ja) 2019-07-24 2019-07-24 地盤調査データ転送システム、無線通信モジュール、移動型情報処理端末及び地盤改良施工データ転送システム

Publications (1)

Publication Number Publication Date
WO2021014967A1 true WO2021014967A1 (ja) 2021-01-28

Family

ID=70549744

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/026627 WO2021014967A1 (ja) 2019-07-24 2020-07-08 地盤調査データ転送システム、無線通信モジュール、移動型情報処理端末及び地盤改良施工データ転送システム

Country Status (3)

Country Link
JP (1) JP6692554B1 (ja)
NZ (1) NZ776633A (ja)
WO (1) WO2021014967A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW202243583A (zh) 2021-02-09 2022-11-01 日商保德科技股份有限公司 磁性複合體

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008283235A (ja) * 2007-05-08 2008-11-20 Something Holdings Co Ltd 地盤調査データ、調査位置及び調査時刻を証明する方法
JP2009151610A (ja) * 2007-12-21 2009-07-09 Alive:Kk 地盤情報転送装置および地盤情報転送プログラム
JP2016218826A (ja) * 2015-05-22 2016-12-22 富士ゼロックス株式会社 データ管理システム、情報管理装置、及びプログラム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002163266A (ja) * 2000-11-27 2002-06-07 Nagai Geological Survey Inc 地図の表示方法、システム、プログラム及び記憶媒体
JP2005027139A (ja) * 2003-07-04 2005-01-27 Ricoh Co Ltd 画像通信装置、通信履歴可視化方法、画像通信システム、プログラムおよび記録媒体

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008283235A (ja) * 2007-05-08 2008-11-20 Something Holdings Co Ltd 地盤調査データ、調査位置及び調査時刻を証明する方法
JP2009151610A (ja) * 2007-12-21 2009-07-09 Alive:Kk 地盤情報転送装置および地盤情報転送プログラム
JP2016218826A (ja) * 2015-05-22 2016-12-22 富士ゼロックス株式会社 データ管理システム、情報管理装置、及びプログラム

Also Published As

Publication number Publication date
NZ776633A (en) 2022-10-28
JP2021018761A (ja) 2021-02-15
JP6692554B1 (ja) 2020-05-13

Similar Documents

Publication Publication Date Title
JP6934223B2 (ja) 被害調査システム
JP5954369B2 (ja) 情報処理装置、情報処理システム、制御方法、及びプログラム
CN111582729B (zh) 一种土地质量地质调查野外数据采集系统及方法
US20210125150A1 (en) Work order placement/receiving system, server, and work order placement/receiving method
KR101675034B1 (ko) 건물에 대한 실시간 공사 감리를 지원하기 위한 방법, 장치 및 컴퓨터 판독 가능한 기록 매체
EP3786863A1 (en) Construction management system and construction management method
WO2021014967A1 (ja) 地盤調査データ転送システム、無線通信モジュール、移動型情報処理端末及び地盤改良施工データ転送システム
WO2021256455A1 (ja) 情報記録媒体の破壊装置の管理方法
JP7360107B2 (ja) 地盤調査データ転送システム及び地盤改良施工データ転送システム
JP2009193407A (ja) 工事管理システム
JP2019193062A (ja) 映像による杭施工現場監視システム
JP7277912B2 (ja) ハッシュチェーン利用データ非改ざん証明システム及びそのためのデータ管理装置
JP7181559B2 (ja) サーバ装置及びプログラム
JP7157504B1 (ja) 工事管理プログラム、及び、工事管理システム
JP2020020208A (ja) 施工データ管理装置、施工データ管理方法、遠隔立会システム、及び遠隔立会方法
JP2011060089A (ja) プラント計装品の試験システムおよび試験方法
JP6721914B2 (ja) サーバ装置及びプログラム
US20080281514A1 (en) System and method for notice posting and verification
Wessels et al. Geotechnical data aggregation and visualisation supporting informed risk management: the one-stop geotech shop
JP2018010542A (ja) 工事データ管理方法およびプログラム
JP2020140617A (ja) 地物管理システム
KR20170106602A (ko) 공종별 실시간 공사 감리를 지원하기 위한 방법, 장치 및 컴퓨터 판독 가능한 기록 매체
JP6691992B1 (ja) 業務システム並びにそれに用いられるサーバ及び端末装置
JP2011248800A (ja) コンテンツマネジメントシステム
JP6048860B1 (ja) 杭孔掘削の施工管理方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20843657

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20843657

Country of ref document: EP

Kind code of ref document: A1