WO2020241148A1 - 改質システム - Google Patents

改質システム Download PDF

Info

Publication number
WO2020241148A1
WO2020241148A1 PCT/JP2020/017920 JP2020017920W WO2020241148A1 WO 2020241148 A1 WO2020241148 A1 WO 2020241148A1 JP 2020017920 W JP2020017920 W JP 2020017920W WO 2020241148 A1 WO2020241148 A1 WO 2020241148A1
Authority
WO
WIPO (PCT)
Prior art keywords
air
flow rate
fuel gas
reformer
value
Prior art date
Application number
PCT/JP2020/017920
Other languages
English (en)
French (fr)
Inventor
中谷規之介
松本祥平
水野峻史
Original Assignee
株式会社豊田自動織機
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社豊田自動織機 filed Critical 株式会社豊田自動織機
Publication of WO2020241148A1 publication Critical patent/WO2020241148A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01JCHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
    • B01J23/00Catalysts comprising metals or metal oxides or hydroxides, not provided for in group B01J21/00
    • B01J23/38Catalysts comprising metals or metal oxides or hydroxides, not provided for in group B01J21/00 of noble metals
    • B01J23/40Catalysts comprising metals or metal oxides or hydroxides, not provided for in group B01J21/00 of noble metals of the platinum group metals
    • CCHEMISTRY; METALLURGY
    • C01INORGANIC CHEMISTRY
    • C01BNON-METALLIC ELEMENTS; COMPOUNDS THEREOF; METALLOIDS OR COMPOUNDS THEREOF NOT COVERED BY SUBCLASS C01C
    • C01B3/00Hydrogen; Gaseous mixtures containing hydrogen; Separation of hydrogen from mixtures containing it; Purification of hydrogen
    • C01B3/02Production of hydrogen or of gaseous mixtures containing a substantial proportion of hydrogen
    • C01B3/04Production of hydrogen or of gaseous mixtures containing a substantial proportion of hydrogen by decomposition of inorganic compounds, e.g. ammonia
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M8/00Fuel cells; Manufacture thereof
    • H01M8/04Auxiliary arrangements, e.g. for control of pressure or for circulation of fluids
    • H01M8/04298Processes for controlling fuel cells or fuel cell systems
    • H01M8/04313Processes for controlling fuel cells or fuel cell systems characterised by the detection or assessment of variables; characterised by the detection or assessment of failure or abnormal function
    • H01M8/0438Pressure; Ambient pressure; Flow
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M8/00Fuel cells; Manufacture thereof
    • H01M8/04Auxiliary arrangements, e.g. for control of pressure or for circulation of fluids
    • H01M8/04298Processes for controlling fuel cells or fuel cell systems
    • H01M8/04694Processes for controlling fuel cells or fuel cell systems characterised by variables to be controlled
    • H01M8/04746Pressure; Flow
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M8/00Fuel cells; Manufacture thereof
    • H01M8/06Combination of fuel cells with means for production of reactants or for treatment of residues
    • H01M8/0606Combination of fuel cells with means for production of reactants or for treatment of residues with means for production of gaseous reactants
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/36Hydrogen production from non-carbon containing sources, e.g. by water electrolysis
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/50Fuel cells

Definitions

  • the present invention relates to a reforming system.
  • Patent Document 1 As a conventional reforming system, for example, the technique described in Patent Document 1 is known.
  • the reforming system described in Patent Document 1 has a reformer that reforms ammonia into hydrogen and nitrogen, generates a reforming gas, a storage tank that stores ammonia in a liquid state, and a liquid state.
  • a heat exchanger that vaporizes ammonia, an ammonia pump that supplies the ammonia stored in the storage tank to the reformer, a valve located between the storage tank and the ammonia pump, and air is supplied to the reformer. It is equipped with an air pump to control the ammonia pump, a valve, and a control device for controlling the supply amount ratio of ammonia and air to the reformer by controlling the air pump.
  • An object of the present invention is to provide a reforming system capable of preventing deterioration of catalyst performance due to abnormal oxidation of the catalyst of the reformer.
  • the reforming system includes a reformer having a catalyst for decomposing the fuel gas into hydrogen and reforming the fuel gas to generate a reformed gas containing hydrogen, and a reformer.
  • a second flow control unit that controls the flow rate of air flowing through the path, a first detection unit that detects the flow rate of fuel gas flowing through the fuel gas flow path, and a second detection unit that detects the flow rate of air flowing through the air flow path.
  • the control unit includes a first flow control unit and a control unit that controls the second flow control unit, and the control unit includes a measured fuel gas flow rate detected by the first detection unit and air detected by the second detection unit. Based on the measured flow rate value of, the measured value air fuel ratio, which is the ratio of the measured flow rate value of air to the measured flow rate value of fuel gas, is obtained, and when the measured air fuel ratio is larger than the predetermined threshold value for measured value. It has a first control processing unit that controls a second flow control unit so as to reduce the flow rate of air supplied to the reformer.
  • the flow rate of the fuel gas supplied to the reformer is detected by the first detection unit as the measured flow rate of the fuel gas, and the flow rate of the air supplied to the reformer is air. It is detected by the second detection unit as the measured flow rate value of. Then, based on the measured flow rate value of the fuel gas and the measured flow rate value of the air, the measured air-fuel ratio, which is the ratio of the measured flow rate value of the air to the measured flow rate value of the fuel gas, is obtained. Then, when the measured air-fuel ratio is larger than the measured value threshold value, the second flow rate control unit is controlled so that the flow rate of the air supplied to the reformer decreases. Therefore, it is prevented that air is excessively supplied to the reformer with respect to the fuel gas. Therefore, abnormal oxidation of the reformer catalyst due to the oxygen component contained in the air is prevented. This prevents deterioration of the catalyst performance due to abnormal oxidation of the reformer catalyst.
  • the reforming system further includes an input unit for setting and inputting the flow rates of fuel gas and air supplied to the reformer, and the control unit is based on the flow rate setting values of fuel gas and air set and input by the input unit.
  • the set value air fuel ratio which is the ratio of the air flow rate set value to the fuel gas flow rate set value, is obtained, and when the set value air fuel ratio is larger than the preset value threshold value, the fuel gas to the reformer And if the air supply has not started, the supply of fuel gas and air to the reformer is prohibited, and if the supply of fuel gas and air to the reformer has started, the reformer It may have a second control processing unit that controls the second flow control unit so as to reduce the flow rate of the supplied air.
  • the reformer when the set value air-fuel ratio, which is the ratio of the air flow rate set value to the fuel gas flow rate set value, is larger than the set value threshold at the start of operation of the reforming system, the reformer is supplied. Since the supply of fuel gas and air is prohibited, abnormal oxidation of the reformer catalyst is prevented.
  • the flow rates of fuel gas and air are set and input by the input unit, and when the set value air-fuel ratio becomes larger than the set value threshold, it is supplied to the reformer. Since the second flow rate control unit is controlled so that the flow rate of the air is reduced, abnormal oxidation of the catalyst of the reformer is prevented. Therefore, even if there is an input error in setting the flow rate of the fuel gas or air by the input unit, it is possible to prevent the air from being excessively supplied to the reformer with respect to the fuel gas.
  • the reforming system further includes an input unit for setting and inputting the flow rates of the fuel gas and air supplied to the reformer, and the control unit is based on the measured flow rate value of the fuel gas detected by the first detection unit and the input unit. Find the difference from the input fuel gas flow rate set value, and when the difference between the fuel gas flow rate measured value and the fuel gas flow rate set value is larger than the predetermined fuel gas flow rate set value, the reformer The second flow rate control unit is controlled so as to reduce the flow rate of the air supplied to the device, and the measured value of the flow rate of the air detected by the second detection unit and the set value of the flow rate of the air set and input by the input unit are used. The second flow rate is calculated so that the flow rate of air supplied to the reformer is reduced when the difference between the measured air flow rate value and the air flow rate set value is larger than the predetermined air flow rate threshold. It may have a third control processing unit which controls the control unit.
  • the flow rate of the air supplied to the reformer is reduced.
  • the second is that the flow rate control unit is controlled and the flow rate of the air supplied to the reformer is reduced when the difference between the measured air flow rate value and the air flow rate set value is larger than the air flow rate threshold.
  • the flow control unit is controlled. Therefore, even if a failure of the first flow rate control unit and the second flow rate control unit occurs, it is possible to prevent the air from being excessively supplied to the reformer with respect to the fuel gas.
  • the first detection unit may be a flow meter that measures the flow rate of fuel gas flowing through the fuel gas flow path
  • the second detection unit may be a flow meter that measures the flow rate of air flowing through the air flow path.
  • the first detection unit is a pressure gauge that measures the pressure of the fuel gas flow path corresponding to the flow rate of the fuel gas flowing through the fuel gas flow path, and the second detection unit corresponds to the flow rate of the air flowing through the air flow path. It may be a pressure gauge that measures the pressure in the air flow path.
  • the flow rates of fuel gas and air supplied to the reformer are indirectly detected by the pressure gauge.
  • the pressure gauge is smaller than the flow meter. Therefore, the first detection unit and the second detection unit can be mounted in a space-efficient manner. Moreover, the pressure gauge is cheaper than the flow meter.
  • control unit controls the second flow rate control unit so as to reduce the flow rate of the air supplied to the reformer
  • the control unit sets the second flow rate control unit so as to stop the supply of air to the reformer. You may control it.
  • FIG. 1 It is a schematic block diagram which shows the modification system which concerns on 1st Embodiment of this invention. It is a flowchart which shows the detail of the procedure of the activation control processing executed by the activation control processing unit shown in FIG. It is a flowchart which shows the detail of the procedure of the air control processing executed by the 1st air control processing unit shown in FIG. It is a flowchart which shows the detail of the procedure of the air control processing executed by the 2nd air control processing unit shown in FIG. It is a flowchart which shows the detail of the procedure of the air control processing executed by the 3rd air control processing unit shown in FIG.
  • 6 (a) and 6 (b) are graphs showing an example of a time change between the flow rates of ammonia gas and air supplied to the reformer and the air-fuel ratio (AFR). It is a schematic block diagram which shows the modification system which concerns on 2nd Embodiment of this invention. It is a flowchart which shows the detail of the procedure of the air control processing executed by the 1st air control processing unit shown in FIG. It is a flowchart which shows the detail of the procedure of the air control processing executed by the 3rd air control processing unit shown in FIG.
  • FIG. 1 is a schematic configuration diagram showing a reforming system according to the first embodiment of the present invention.
  • the reforming system 1 of the present embodiment includes an ammonia tank 2, a vaporizer 3, an air supply unit 4, and a reformer 5.
  • the ammonia tank 2 is a tank that stores ammonia (NH 3 ) as a fuel in a liquid state.
  • the vaporizer 3 is connected to the ammonia tank 2 via the ammonia flow path 6.
  • the vaporizer 3 vaporizes the liquid ammonia derived from the ammonia tank 2 by a pump (not shown) to generate ammonia gas (fuel gas).
  • the air supply unit 4 supplies air to the reformer 5.
  • a blower or the like is used as the air supply unit 4.
  • the reformer 5 reforms the ammonia gas generated by the vaporizer 3 to generate a reformed gas containing hydrogen.
  • the reformer 5 has an electric heater 7 and a combustion reformer 8.
  • the electric heater 7 is arranged on the upstream side of the combustion reforming catalyst 8.
  • the electric heater 7 heats the combustion reforming catalyst 8 by heating the ammonia gas and air supplied to the reformer 5. At this time, the combustion reforming catalyst 8 is heated by the heat of ammonia gas and air warmed by the electric heater 7.
  • the combustion reforming catalyst 8 has a combustion catalyst function for burning ammonia gas and a reforming catalyst function for decomposing ammonia gas into hydrogen.
  • ruthenium, rhodium, platinum, or the like is used as the combustion reforming catalyst 8.
  • the reformer 5 is connected to the vaporizer 3 via the ammonia gas flow path 9, and is also connected to the air supply unit 4 via the air flow path 10.
  • the ammonia gas flow path 9 is a fuel gas flow path through which the ammonia gas supplied to the reformer 5 flows.
  • the air flow path 10 is a flow path through which the air supplied to the reformer 5 flows.
  • An electromagnetic ammonia flow rate control valve 11 is provided in the ammonia gas flow path 9.
  • the ammonia flow rate control valve 11 constitutes a first flow rate control unit that controls the flow rate of ammonia gas flowing through the ammonia gas flow path 9.
  • the air flow path 10 is connected to a portion of the ammonia gas flow path 9 between the ammonia flow rate control valve 11 and the reformer 5.
  • An electromagnetic air flow rate control valve 12 is provided in the air flow path 10.
  • the air flow rate control valve 12 constitutes a second flow rate control unit that controls the flow rate of air flowing through the air flow path 10.
  • An ammonia flow meter 13 is arranged between the ammonia flow rate control valve 11 and the reformer 5 in the ammonia gas flow path 9.
  • the ammonia flow meter 13 is a sensor that measures the flow rate of ammonia gas flowing through the ammonia gas flow path 9.
  • the ammonia flow meter 13 constitutes a first detection unit that detects the flow rate of ammonia gas flowing through the ammonia gas flow path 9.
  • An air flow meter 14 is arranged between the air flow rate control valve 12 and the reformer 5 in the air flow path 10.
  • the air flow meter 14 is a sensor that measures the flow rate of air flowing through the air flow path 10.
  • the air flow meter 14 constitutes a second detection unit that detects the flow rate of air flowing through the air flow path 10.
  • a hydrogen utilization device 16 is connected to the reformer 5 via a reforming gas flow path 15.
  • the reformed gas flow path 15 is a flow path through which the reformed gas generated by the reformer 5 flows.
  • the hydrogen utilization device 16 is an apparatus that utilizes hydrogen contained in the reforming gas. Examples of the hydrogen utilization device 16 include a fuel cell that chemically reacts hydrogen with oxygen in the air to generate power, an ammonia engine using ammonia as a fuel, an ammonia gas turbine, and the like.
  • the reforming system 1 includes a control unit 17.
  • An input device 18 and a display device 19 are connected to the control unit 17.
  • the input device 18 is a device for the operator to set and input data related to the operation of the reforming system 1. Examples of the data related to the operation of the reforming system 1 include the flow rates of ammonia gas and air supplied to the reformer 5.
  • the input device 18 constitutes an input unit for setting and inputting the flow rates of ammonia gas and air supplied to the reformer 5.
  • the display 19 is a device for displaying when there is a possibility that air is excessively supplied to the reformer 5 with respect to ammonia gas.
  • the display 19 displays a screen or a lamp.
  • the display 19 may emit a warning sound at the same time as displaying.
  • the control unit 17 is composed of a CPU, RAM, ROM, an input / output interface, and the like.
  • the control unit 17 acquires the data set and input by the input device 18, the measured values of the ammonia flow meter 13 and the air flow meter 14, performs predetermined processing, and performs the electric heater 7, the ammonia flow control valve 11, and the air flow control. Controls the valve 12 and the indicator 19.
  • the control unit 17 includes a start control processing unit 20, a first air control processing unit 21 (first control processing unit), a second air control processing unit 22 (second control processing unit), and a third air control processing unit. It has 23 (third control processing unit).
  • the start control processing unit 20 controls the electric heater 7, the ammonia flow rate control valve 11, and the air flow rate control valve 12 so as to start the reforming system 1 when the start of operation of the reforming system 1 is instructed.
  • the first air control processing unit 21 obtains the measured value air-fuel ratio based on the measured value of the flow rate of ammonia gas detected by the ammonia flow meter 13 and the measured value of the flow rate of air detected by the air flow meter 14, and the measured value.
  • the air flow control valve 12 is controlled so as to stop the supply of air to the reformer 5.
  • the second air control processing unit 22 obtains a set value air-fuel ratio based on the flow rate set values of ammonia gas and air set and input by the input device 18, and sets the set value air-fuel ratio and a predetermined set value threshold value. And control the air flow rate control valve 12 according to the comparison result.
  • the second air control processing unit 22 determines that the supply of ammonia gas and air to the reformer 5 has not been started.
  • the air flow rate is controlled so as to stop the supply of air to the reformer 5. Control the valve 12.
  • the third air control processing unit 23 obtains a difference between the measured value of the flow rate of ammonia gas detected by the ammonia flow meter 13 and the set value of the flow rate of ammonia gas set and input by the input device 18, and the difference is predetermined.
  • the air flow control valve 12 is controlled so as to stop the supply of air to the reformer 5 when it is larger than the flow threshold for ammonia gas.
  • the third air control processing unit 23 obtains a difference between the measured air flow rate value detected by the air flow meter 14 and the air flow rate set value set and input by the input device 18, and the difference is predetermined.
  • the air flow rate control valve 12 is controlled so as to stop the supply of air to the reformer 5 when it is larger than the air flow rate threshold.
  • FIG. 2 is a flowchart showing the details of the procedure of the start control process executed by the start control process unit 20. This process is executed when the start operation of the reforming system 1 is instructed by a start switch (not shown) or the like. Further, before the execution of this process, both the ammonia flow rate control valve 11 and the air flow rate control valve 12 are in a fully closed state.
  • the start control processing unit 20 first turns on the electric heater 7 (procedure S101). Subsequently, the start control processing unit 20 acquires the flow rate set value of ammonia gas (ammonia flow rate set value) and the air flow rate set value (air flow rate set value) set and input by the input device 18 (procedure S102).
  • ammonia flow rate set value ammonia flow rate set value
  • air flow rate set value air flow rate set value
  • the start control processing unit 20 controls to open the ammonia flow rate control valve 11 according to the ammonia flow rate set value, and also controls to open the air flow rate control valve 12 according to the air flow rate set value (procedure). S103). Specifically, the start control processing unit 20 controls the ammonia flow rate control valve 11 to open at an opening degree corresponding to the ammonia flow rate set value, and opens the air flow rate control valve 12 according to the air flow rate set value. Control to open with.
  • the start control processing unit 20 determines whether or not a predetermined time has elapsed after controlling the ammonia flow rate control valve 11 and the air flow rate control valve 12 to open (procedure S104). When the start control processing unit 20 determines that the predetermined time has elapsed, the start control processing unit 20 turns off the electric heater 7 (procedure S105).
  • the start control process by the start control processing unit 20 is not particularly limited to the above procedure, and can be changed as appropriate.
  • the start control processing unit 20 may first control to open only the ammonia flow rate control valve 11, and then control to open the air flow rate control valve 12.
  • the combustion reforming catalyst 8 is heated by the heat of the ammonia gas warmed by the electric heater 7.
  • the start control processing unit 20 may turn off the electric heater 7 when the temperature of the combustion reforming catalyst 8 becomes equal to or higher than a predetermined temperature.
  • FIG. 3 is a flowchart showing the details of the procedure of the air control process executed by the first air control process unit 21. Similar to the start control processing unit 20, this process is also executed when the start of operation of the reforming system 1 is instructed. The closed flag (described later) is set to 0.
  • the first air control processing unit 21 first measures the flow rate of ammonia gas measured by the ammonia flow meter 13 (measured value of ammonia flow rate) and the measured value of air flow rate measured by the air flow meter 14 (air). The measured flow rate value) is acquired (procedure S111).
  • the first air control processing unit 21 calculates the measured air-fuel ratio (measured value AFR) based on the measured value of the ammonia flow rate and the measured value of the air flow rate (procedure S112).
  • the measured value AFR is the ratio of the measured air flow rate to the measured ammonia flow rate (measured air flow rate / measured ammonia flow rate).
  • the first air control processing unit 21 determines whether or not the measured value AFR is larger than the predetermined measured value threshold value (procedure S113).
  • the first air control processing unit 21 controls to close the air flow rate control valve 12 when it is determined that the measured value AFR is larger than the measured value threshold value (procedure S114).
  • the first air control processing unit 21 controls the air flow rate control valve 12 in a fully closed state so as to stop the supply of air to the reformer 5.
  • the first air control processing unit 21 controls the display 19 so as to display that the supply of air to the reformer 5 is stopped (procedure S115). As a result, the operator can know that the display 19 has stopped the supply of air to the reformer 5. Then, the first air control processing unit 21 sets the closing flag to 1 (procedure S116), and executes the above procedure S111 again.
  • the first air control processing unit 21 determines in the procedure S113 that the measured value AFR is equal to or less than the threshold value for the measured value, it determines whether or not the closing flag is 0 (procedure S117). When the first air control processing unit 21 determines that the closing flag is 0, the first air control processing unit 21 re-executes the above-mentioned procedure S111 without executing the above-mentioned procedures S114 to S116.
  • the first air control processing unit 21 determines that the closing flag is 1, it acquires the air flow rate set value set and input by the input device 18 (procedure S118). Then, the first air control processing unit 21 controls to open the air flow rate control valve 12 according to the air flow rate set value (procedure S119).
  • the first air control processing unit 21 resets the display and close flags of the display 19 (procedure S120), and executes the above procedure S111 again. Specifically, the first air control processing unit 21 controls the display 19 so as to cancel the display indicating that the air supply to the reformer 5 is stopped, and sets the close flag to 0. set.
  • FIG. 4 is a flowchart showing the details of the procedure of the air control process executed by the second air control process unit 22. Similar to the start control processing unit 20, this process is also executed when the start of operation of the reforming system 1 is instructed. The closed flag (described later) is set to 0.
  • the second air control processing unit 22 first acquires the ammonia flow rate set value and the air flow rate set value set and input by the input device 18 (procedure S121). Subsequently, the second air control processing unit 22 calculates the set value air-fuel ratio (set value AFR) based on the ammonia flow rate set value and the air flow rate set value (procedure S122).
  • the set value AFR is the ratio of the air flow rate set value to the ammonia flow rate set value (air flow rate set value / ammonia flow rate set value).
  • the second air control processing unit 22 determines whether or not the set value AFR is larger than the predetermined set value threshold value (procedure S123).
  • the second air control processing unit 22 determines whether or not the reforming system 1 is in operation (procedure S124).
  • the state in which the reforming system 1 is in operation is a state in which the supply of ammonia gas and air to the reformer 5 is started.
  • the second air control processing unit 22 determines that the reforming system 1 is not in operation but before operation, that is, when it is determined that the supply of ammonia gas and air to the reformer 5 has not started.
  • the display 19 is controlled so as to display a warning to the effect that the operation of the reforming system 1 is prohibited by prohibiting the supply of ammonia gas and air to the reformer 5 (procedure S125).
  • the ammonia flow rate control valve 11 and the air flow rate control valve 12 are kept in a fully closed state. Further, the operator can see that the display 19 prohibits the operation of the reforming system 1.
  • the second air control processing unit 22 sets the closing flag to 1 (procedure S126), and executes the above procedure S121 again.
  • the air flow rate control valve 12 Is controlled to be closed (procedure S127). At this time, the second air control processing unit 22 controls the air flow rate control valve 12 in a fully closed state so as to stop the supply of air to the reformer 5. Then, the second air control processing unit 22 controls the display 19 so as to display that the supply of air to the reformer 5 is stopped (procedure S128). Then, the second air control processing unit 22 sets the closing flag to 1 (procedure S129), and executes the above procedure S121 again.
  • the second air control processing unit 22 determines in the procedure S123 that the set value AFR is equal to or less than the set value threshold value, it determines whether or not the closing flag is 0 (procedure S130). When the second air control processing unit 22 determines that the closing flag is 0, the second air control processing unit 22 re-executes the above-mentioned procedure S121 without executing the above-mentioned procedures S124 to S129.
  • the second air control processing unit 22 determines that the closing flag is 1, it controls to open the air flow rate control valve 12 according to the air flow rate set value (procedure S131). Then, the second air control processing unit 22 resets the display and close flags of the display 19 (procedure S132), and executes the above procedure S121 again. Specifically, the second air control processing unit 22 displays a display so as to cancel the display indicating that the supply of air to the reformer 5 is stopped or that the operation of the reforming system 1 is prohibited. 19 is controlled and the closed flag is set to 0.
  • the ammonia flow rate set value and the air are set by the input device 18 when the operation start of the reforming system 1 is instructed and after the operation of the reforming system 1 is started. It may be executed when the flow rate set value is reset and input.
  • FIG. 5 is a flowchart showing the details of the air control processing procedure executed by the third air control processing unit 23. This process is also executed when the start of operation of the reforming system 1 is instructed, similarly to the start control processing unit 20.
  • the third air control processing unit 23 first acquires the measured ammonia flow rate measured by the ammonia flow meter 13 and the measured air flow rate measured by the air flow meter 14 (procedure S141). Further, the third air control processing unit 23 acquires the ammonia flow rate set value and the air flow rate set value set and input by the input device 18 (procedure S142).
  • the third air control processing unit 23 sets the difference between the measured ammonia flow rate value and the set ammonia flow rate value (measured value of ammonia flow rate-absolute value of the set value of ammonia flow rate), the measured value of air flow rate, and the set value of air flow rate.
  • the difference (measured value of air flow rate-absolute value of set value of air flow rate) is calculated (procedure S143).
  • the third air control processing unit 23 determines whether or not the difference between the measured ammonia flow rate value and the ammonia flow rate set value is larger than the predetermined ammonia flow rate threshold value (fuel gas threshold value) (procedure S144). ..
  • the third air control processing unit 23 determines that the difference between the measured ammonia flow rate value and the ammonia flow rate set value is larger than the ammonia flow rate threshold value, the third air control processing unit 23 closes the ammonia flow rate control valve 11 and the air flow rate control valve 12. Control (procedure S145). At this time, the third air control processing unit 23 controls the ammonia flow rate control valve 11 and the air flow rate control valve 12 in a fully closed state so as to stop the supply of ammonia gas and air to the reformer 5. As a result, the operation of the reforming system 1 is forcibly stopped. In this procedure, only the air flow rate control valve 12 may be controlled to be closed.
  • the third air control processing unit 23 controls the display 19 so as to display that the operation of the reforming system 1 is stopped (procedure S146), and executes the above procedure S141 again.
  • step S144 When the third air control processing unit 23 determines in step S144 that the difference between the measured ammonia flow rate value and the set ammonia flow rate value is equal to or less than the flow rate threshold for ammonia, the difference between the measured air flow rate value and the set air flow rate value. Is larger than a predetermined air flow rate threshold (air threshold) (procedure S147).
  • air threshold air threshold
  • the electric heater 7 of the reformer 5 is turned on. Then, the ammonia flow rate control valve 11 opens according to the ammonia flow rate set value set and input by the input device 18, and the air flow rate control valve 12 opens according to the air flow rate set value set and input by the input device 18. To speak. Then, ammonia gas and air are supplied to the reformer 5. At this time, the ammonia gas and air are heated by the electric heater 7, and the combustion reforming catalyst 8 of the reformer 5 is heated by the heat of the warmed ammonia gas and air, and the temperature of the combustion reforming catalyst 8 rises.
  • the temperature of the combustion reforming catalyst 8 reaches the combustible temperature (for example, about 200 ° C.)
  • the ammonia gas is oxidized by the combustion reforming catalyst 8 to generate combustion heat.
  • a combustion reaction in which ammonia burns occurs due to a chemical reaction between a part of ammonia and oxygen in the air (exothermic reaction).
  • the temperature of the combustion reforming catalyst 8 is further raised by the heat of combustion. Then, when the temperature of the combustion reforming catalyst 8 reaches the reformable temperature (for example, about 300 ° C. to 400 ° C.), the ammonia gas is reformed by the combustion reforming catalyst 8 to generate the reformed gas. Specifically, as shown in the following formula, a reforming reaction occurs in which ammonia is decomposed into hydrogen and nitrogen by the heat of combustion, and a reformed gas in a hydrogen-rich state is generated (endothermic reaction). The reforming gas is supplied to the hydrogen utilization device 16. NH 3 ⁇ 3 / 2H 2 + 1 / 2N 2- Q
  • the air-fuel ratio (AFR) becomes excessive due to the excess air flow rate with respect to the ammonia gas flow rate.
  • the combustion reforming catalyst 8 is oxidized by the oxygen component contained in the air.
  • the solid line P indicates the flow rate of ammonia gas
  • the broken line Q indicates the flow rate of air
  • the thick solid line R indicates the air-fuel ratio (AFR). ..
  • the air-fuel ratio may become larger than the threshold value due to the excessive flow rate of the air itself, and as shown in FIG. 6B, ammonia gas.
  • the air-fuel ratio may become larger than the threshold value due to the excessive flow rate of. If abnormal oxidation of the combustion reforming catalyst 8 occurs, the performance of the combustion reforming catalyst 8 deteriorates.
  • the flow rate of the ammonia gas supplied to the reformer 5 is detected by the ammonia flow meter 13 as the measured value of the ammonia flow rate, and the flow rate of the air supplied to the reformer 5 is measured. It is detected by the air flow meter 14 as the measured value of the air flow rate. Then, based on the measured ammonia flow rate value and the measured air flow rate value, the measured air-fuel ratio, which is the ratio of the measured air flow rate value to the measured ammonia flow rate value, is obtained. Then, when the measured air-fuel ratio is larger than the measured value threshold value, the air flow rate control valve 12 is controlled so that the supply of air to the reformer 5 is stopped. At this time, as shown in FIG.
  • the ammonia flow rate control valve 11 or the air flow rate control valve 12 Since the opening degree is deviated, the measured value of ammonia flow rate or the measured value of air flow rate is deviated, and as a result, the measured value air-fuel ratio may become higher than necessary. Further, the setting input of the flow rates of ammonia gas and air by the input device 18 may be performed not only before the start of operation of the reforming system 1 but also during the operation of the reforming system 1.
  • the set value air-fuel ratio which is the ratio of the air flow rate set value to the ammonia flow rate set value
  • the set value threshold at the start of operation of the reforming system 1
  • the ammonia gas to the reformer 5 And since the supply of air is prohibited, abnormal oxidation of the combustion reforming catalyst 8 is prevented.
  • the set value air-fuel ratio becomes larger than the set value threshold by setting and inputting the flow rates of ammonia gas and air by the input device 18 after the start of the operation of the reforming system 1, the reformer 5 Since the air flow rate control valve 12 is controlled so that the supply of air to the combustion reforming catalyst 8 is stopped, abnormal oxidation of the combustion reforming catalyst 8 is prevented. Therefore, even if there is an input error in setting the flow rate of ammonia or air by the input device 18, it is possible to prevent the air from being excessively supplied to the reformer 5 with respect to the ammonia gas.
  • the operation of the reforming system 1 is prohibited by the display 19 or the supply of air to the reformer 5 is stopped. It is displayed that the state is in the state. Therefore, the operator can see by looking at the display 19 that the numerical value of the flow rate of ammonia or air set and input by the input device 18 is incorrect. Therefore, the operator can set and input the flow rate of ammonia or air again by the input device 18.
  • the ammonia flow rate control valve 11 or the air flow rate control valve 12 fails, the measured ammonia flow rate value or the measured air flow rate value may deviate, and as a result, the measured air-fuel ratio may become higher than necessary.
  • the air flow rate control valve 12 is controlled so that the supply of air to the reformer 5 is stopped when the difference between the measured value of the ammonia flow rate and the set value of the ammonia flow rate is larger than the threshold for ammonia.
  • the air flow rate control valve 12 is controlled so that the supply of air to the reformer 5 is stopped. Therefore, even if the ammonia flow rate control valve 11 or the air flow rate control valve 12 fails, it is possible to prevent the air from being excessively supplied to the reformer with respect to the ammonia gas.
  • the flow rate of the ammonia gas supplied to the reformer 5 is directly detected by the ammonia flow meter 13, and the flow rate of the air supplied to the reformer 5 is directly detected by the air flow meter 14. Will be done. Therefore, the calculation process by the control unit 17 can be simplified.
  • the air is supplied to the reformer 5.
  • the air flow rate control valve 12 is controlled so as to stop. Therefore, abnormal oxidation of the combustion reforming catalyst 8 is surely prevented.
  • FIG. 7 is a schematic configuration diagram showing a reforming system according to a second embodiment of the present invention.
  • the reforming system 1 of the present embodiment includes an ammonia pressure gauge 31 and an air pressure gauge 32 in place of the ammonia flow meter 13 and the air flow meter 14 of the first embodiment.
  • the ammonia pressure gauge 31 is arranged in the ammonia gas flow path 9.
  • the ammonia pressure gauge 31 is a sensor that measures the pressure of the ammonia gas flow path 9 corresponding to the flow rate of the ammonia gas flowing through the ammonia gas flow path 9.
  • the ammonia pressure gauge 31 constitutes a first detection unit that detects the flow rate of ammonia gas flowing through the ammonia gas flow path 9.
  • the air pressure gauge 32 is arranged in the air flow path 10.
  • the air pressure gauge 32 is a sensor that measures the pressure of the air flow path 10 corresponding to the flow rate of the air flowing through the air flow path 10.
  • the air pressure gauge 32 constitutes a second detection unit that detects the flow rate of air flowing through the air flow path 10.
  • the reforming system 1 includes a control unit 17 as in the first embodiment described above.
  • the control unit 17 acquires the data set and input by the input device 18, the measured values of the ammonia pressure gauge 31 and the air pressure gauge 32, performs a predetermined process, and performs the electric heater 7, the ammonia flow control valve 11, and the air flow control. Controls the valve 12 and the indicator 19.
  • the control unit 17 includes the above-mentioned start control processing unit 20, the first air control processing unit 21A (first control processing unit), the above-mentioned second air control processing unit 22, and the third air control processing unit 23A (first). 3 control processing unit).
  • FIG. 8 is a flowchart showing the details of the procedure of the air control processing executed by the first air control processing unit 21A, and corresponds to FIG.
  • the first air control processing unit 21A first measures the pressure of the ammonia gas flow path 9 (measured value of ammonia pressure) measured by the ammonia pressure gauge 31 and the air flow path measured by the air pressure gauge 32. Acquire the measured pressure value (measured air pressure value) (procedure S111A).
  • the first air control processing unit 21A calculates the measured air-fuel ratio (measured value AFR) based on the measured ammonia pressure value and the measured air pressure value (procedure S112A).
  • the measured value AFR is the ratio of the measured air flow rate to the measured ammonia flow rate.
  • the measured value of ammonia pressure corresponds to the measured value of ammonia flow rate
  • the relationship between the ammonia pressure and the ammonia flow rate and the relationship between the air pressure and the air flow rate are acquired in advance by experiments or the like and stored in a memory (not shown) as a map.
  • the first air control processing unit 21A sequentially executes the procedures S113 to S120 in the same manner as the flowchart shown in FIG.
  • FIG. 9 is a flowchart showing the details of the procedure of the air control processing executed by the third air control processing unit 23A, and corresponds to FIG.
  • the third air control processing unit 23A first acquires the measured ammonia pressure value measured by the ammonia pressure gauge 31 and the measured air pressure value measured by the air pressure gauge 32 (procedure S141A). Further, the third air control processing unit 23A acquires the ammonia flow rate set value and the air flow rate set value set and input by the input device 18 as in the flowchart shown in FIG. 5 (procedure S142).
  • the third air control processing unit 23A calculates the ammonia pressure set value from the ammonia flow rate set value by using the map (described above) showing the relationship between the ammonia pressure and the ammonia flow rate, and the air pressure and the air flow rate.
  • the air pressure set value is calculated from the air flow rate set value using the map (described above) showing the relationship with (Procedure S142A).
  • the third air control processing unit 23A sets the difference between the measured ammonia pressure value and the set ammonia pressure value (measured ammonia pressure value-absolute value of the set ammonia pressure value), the measured air pressure value, and the set air pressure value. (Measured air pressure value-absolute value of air pressure set value) and the difference (procedure S143A).
  • the measured ammonia pressure value corresponds to the measured ammonia flow rate value
  • the ammonia pressure set value corresponds to the ammonia flow rate set value. Therefore, the difference between the measured ammonia pressure value and the set ammonia pressure value corresponds to the difference between the measured ammonia flow rate value and the set ammonia flow rate value.
  • the measured air pressure value corresponds to the measured air flow rate value
  • the air pressure set value corresponds to the air flow rate set value. Therefore, the difference between the measured air pressure value and the set air pressure value corresponds to the difference between the measured air flow rate value and the set air flow rate value.
  • the third air control processing unit 23A determines whether or not the difference between the measured ammonia pressure value and the set ammonia pressure value is larger than the predetermined ammonia pressure threshold value (fuel gas threshold value) (procedure S144A). ..
  • the third air control processing unit 23A determines that the difference between the measured ammonia pressure value and the set ammonia pressure value is equal to or less than the pressure threshold value for ammonia, the difference between the measured air pressure value and the set air pressure value is determined in advance. It is determined whether or not it is larger than the pressure threshold for air (threshold for air) (procedure S147A).
  • the steps S145 and S146 are sequentially executed.
  • the third air control processing unit 23A determines that the difference between the measured air pressure value and the set air pressure value is equal to or less than the air pressure threshold value, the third air control processing unit 23A re-executes the procedure S141A without executing the procedures S145 and S146. To do.
  • the flow rate of the ammonia gas supplied to the reformer 5 is detected by the ammonia pressure gauge 31 as the measured value of the ammonia pressure corresponding to the measured value of the ammonia flow rate, and is detected by the reformer 5.
  • the flow rate of the supplied air is detected by the air pressure gauge 32 as an measured air pressure value corresponding to the measured air flow rate value.
  • the measured air-fuel ratio which is the ratio of the measured air flow rate value to the measured ammonia flow rate value, is obtained.
  • the air flow rate control valve 12 is controlled so that the supply of air to the reformer 5 is stopped.
  • the performance deterioration of the combustion reforming catalyst 8 due to the abnormal oxidation of the combustion reforming catalyst 8 of the reformer 5 is prevented as in the first embodiment described above.
  • the flow rate of ammonia gas flowing through the ammonia gas flow path 9 is indirectly detected by the ammonia pressure gauge 31, and the flow rate of air flowing through the air flow path 10 is indirectly detected by the air pressure gauge 32. It will be detected.
  • the ammonia pressure gauge 31 and the air pressure gauge 32 are smaller than the ammonia flow meter 13 and the air flow meter 14. Therefore, the ammonia pressure gauge 31 and the air pressure gauge 32 can be mounted in a space-efficient manner. Further, the ammonia pressure gauge 31 and the air pressure gauge 32 are cheaper than the ammonia flow meter 13 and the air flow meter 14.
  • the control unit 17 goes to the reformer 5 when there is a possibility that air is excessively supplied to the reformer 5 with respect to ammonia gas during the operation of the reforming system 1.
  • the air flow rate control valve 12 is controlled to be in a fully closed state so that the supply of air is stopped, but the form is not particularly limited.
  • the control unit 17 reduces the opening degree of the air flow rate control valve 12 when there is a possibility that air is excessively supplied to the reformer 5 with respect to ammonia gas during the operation of the reforming system 1.
  • the air flow rate control valve 12 may be controlled so as to reduce the flow rate of the air supplied to the reformer 5. Even in this case, deterioration of the performance of the combustion reforming catalyst 8 due to abnormal oxidation of the combustion reforming catalyst 8 of the reformer 5 is prevented.
  • the first air control processing unit 21 controls to immediately close the air flow rate control valve 12 when the measured air-fuel ratio becomes larger than the measured value threshold value.
  • the form is not limited to this, and the air flow rate control valve 12 may be controlled to be closed when the state in which the measured air-fuel ratio is larger than the measured value threshold value continues for a predetermined time.
  • the ammonia flow rate control valve 11, the air flow rate control valve 12, the ammonia flow meter 13, the air flow meter 14, and the control unit 17 are each composed of a single unit. It may be composed of a mass flow controller including an ammonia flow rate control valve, an air flow rate control valve, an ammonia flow meter, an air flow meter and a control unit. The same applies to the second embodiment described above.
  • the reformer 5 has a combustion reforming catalyst 8 that burns ammonia gas and decomposes ammonia gas into hydrogen, but the form is not particularly limited.
  • the reformer 5 may separately have a combustion catalyst for burning ammonia gas and a reforming catalyst for decomposing ammonia gas into hydrogen.
  • the combustion reforming catalyst 8 of the reformer 5 is heated by utilizing the heat of the ammonia gas and air heated by the electric heater 7, but the modification is not particularly limited to that embodiment.
  • the catalyst of the pawnbroker 5 may be directly heated by an electric heater.
  • ammonia gas is used as the fuel gas, but the present invention can also be applied to a reforming system using a hydrocarbon gas or the like as the fuel gas.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Sustainable Development (AREA)
  • Manufacturing & Machinery (AREA)
  • Electrochemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Energy (AREA)
  • General Health & Medical Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Inorganic Chemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Materials Engineering (AREA)
  • Hydrogen, Water And Hydrids (AREA)
  • Catalysts (AREA)
  • Fuel Cell (AREA)

Abstract

改質システム(1)は、改質器(5)に供給される燃料ガスの流量を制御する第1流量制御部(11)と、改質器(5)に供給される空気の流量を制御する第2流量制御部(12)と、燃料ガスの流量を検出する第1検出部(13,31)と、空気の流量を検出する第2検出部(14,32)と、第1流量制御部(11)及び第2流量制御部(12)を制御する制御ユニット(17)とを備え、制御ユニット(17)は、燃料ガス流量実測値及び空気流量実測値に基づいて、燃料ガス流量実測値に対する空気流量実測値の比率である実測値空燃比を求め、実測値空燃比が予め決められた実測値用閾値よりも大きいときに、改質器(5)に供給される空気の流量を減少させるように第2流量制御部(12)を制御する第1制御処理部(21,21A)を有する。

Description

改質システム
 本発明は、改質システムに関する。
 従来の改質システムとしては、例えば特許文献1に記載されている技術が知られている。特許文献1に記載の改質システムは、アンモニアを水素と窒素とに改質する触媒を有し、改質ガスを発生する改質器と、液体状態のアンモニアを貯留する貯留タンクと、液体状態のアンモニアを気化させる熱交換器と、貯留タンクに貯留されたアンモニアを改質器に供給するアンモニアポンプと、貯留タンクとアンモニアポンプとの間に配置された弁と、エアーを改質器に供給するエアーポンプと、アンモニアポンプ、弁及びエアーポンプを制御することにより、改質器へのアンモニアとエアーとの供給量比を制御する制御装置とを備えている。
特開2011-146174号公報
 しかしながら、上記従来技術においては、改質システムの運転時に、アンモニアの流量に対してエアーの流量が過剰になると、エアーに含まれる酸素成分によって改質器の触媒が酸化しやすくなる。触媒の異常酸化が起こると、触媒の性能が劣化してしまう。
 本発明の目的は、改質器の触媒の異常酸化による触媒の性能劣化を防止することができる改質システムを提供することである。
 本発明の一態様に係る改質システムは、燃料ガスを水素に分解する触媒を有し、燃料ガスを改質して水素を含有した改質ガスを生成する改質器と、改質器に供給される燃料ガスが流れる燃料ガス流路と、改質器に供給される空気が流れる空気流路と、燃料ガス流路を流れる燃料ガスの流量を制御する第1流量制御部と、空気流路を流れる空気の流量を制御する第2流量制御部と、燃料ガス流路を流れる燃料ガスの流量を検出する第1検出部と、空気流路を流れる空気の流量を検出する第2検出部と、第1流量制御部及び第2流量制御部を制御する制御ユニットとを備え、制御ユニットは、第1検出部により検出された燃料ガスの流量実測値及び第2検出部により検出された空気の流量実測値に基づいて、燃料ガスの流量実測値に対する空気の流量実測値の比率である実測値空燃比を求め、実測値空燃比が予め決められた実測値用閾値よりも大きいときに、改質器に供給される空気の流量を減少させるように第2流量制御部を制御する第1制御処理部を有する。
 このような改質システムにおいては、改質器に供給される燃料ガスの流量が燃料ガスの流量実測値として第1検出部により検出されると共に、改質器に供給される空気の流量が空気の流量実測値として第2検出部により検出される。そして、燃料ガスの流量実測値及び空気の流量実測値に基づいて、燃料ガスの流量実測値に対する空気の流量実測値の比率である実測値空燃比が求められる。そして、実測値空燃比が実測値用閾値よりも大きいときに、改質器に供給される空気の流量が減少するように第2流量制御部が制御される。このため、空気が燃料ガスに対して過剰に改質器に供給されることが防止される。従って、空気に含まれる酸素成分による改質器の触媒の異常酸化が防止される。これにより、改質器の触媒の異常酸化による触媒の性能劣化が防止される。
 改質システムは、改質器に供給される燃料ガス及び空気の流量を設定入力する入力部を更に備え、制御ユニットは、入力部により設定入力された燃料ガス及び空気の流量設定値に基づいて、燃料ガスの流量設定値に対する空気の流量設定値の比率である設定値空燃比を求め、設定値空燃比が予め決められた設定値用閾値よりも大きいときに、改質器への燃料ガス及び空気の供給が開始されていない場合は、改質器への燃料ガス及び空気の供給を禁止し、改質器への燃料ガス及び空気の供給が開始されている場合は、改質器に供給される空気の流量を減少させるように第2流量制御部を制御する第2制御処理部を有してもよい。
 このような構成では、改質システムの運転開始時に、燃料ガスの流量設定値に対する空気の流量設定値の比率である設定値空燃比が設定値用閾値よりも大きいときは、改質器への燃料ガス及び空気の供給が禁止されるので、改質器の触媒の異常酸化が未然に防止される。また、改質システムの運転開始後に、入力部により燃料ガス及び空気の流量が設定入力されることで、設定値空燃比が設定値用閾値よりも大きくなったときは、改質器に供給される空気の流量が減少するように第2流量制御部が制御されるので、改質器の触媒の異常酸化が防止される。従って、入力部による燃料ガスまたは空気の流量の設定入力ミスがあっても、空気が燃料ガスに対して過剰に改質器に供給されることが防止される。
 改質システムは、改質器に供給される燃料ガス及び空気の流量を設定入力する入力部を更に備え、制御ユニットは、第1検出部により検出された燃料ガスの流量実測値と入力部により設定入力された燃料ガスの流量設定値との差分を求め、燃料ガスの流量実測値と燃料ガスの流量設定値との差分が予め決められた燃料ガス用閾値よりも大きいときに、改質器に供給される空気の流量を減少させるように第2流量制御部を制御すると共に、第2検出部により検出された空気の流量実測値と入力部により設定入力された空気の流量設定値との差分を求め、空気の流量実測値と空気の流量設定値との差分が予め決められた空気用閾値よりも大きいときに、改質器に供給される空気の流量を減少させるように第2流量制御部を制御する第3制御処理部を有してもよい。
 このような構成では、燃料ガスの流量実測値と燃料ガスの流量設定値との差分が燃料ガス用閾値よりも大きいときに、改質器に供給される空気の流量が減少するように第2流量制御部が制御されると共に、空気の流量実測値と空気の流量設定値との差分が空気用閾値よりも大きいときに、改質器に供給される空気の流量が減少するように第2流量制御部が制御される。従って、第1流量制御部及び第2流量制御部の故障等が発生しても、空気が燃料ガスに対して過剰に改質器に供給されることが防止される。
 第1検出部は、燃料ガス流路を流れる燃料ガスの流量を計測する流量計であり、第2検出部は、空気流路を流れる空気の流量を計測する流量計であってもよい。
 このような構成では、改質器に供給される燃料ガス及び空気の流量が流量計により直接検出される。従って、制御ユニットによる計算処理を簡素化することができる。
 第1検出部は、燃料ガス流路を流れる燃料ガスの流量に相当する燃料ガス流路の圧力を計測する圧力計であり、第2検出部は、空気流路を流れる空気の流量に相当する空気流路の圧力を計測する圧力計であってもよい。
 このような構成では、改質器に供給される燃料ガス及び空気の流量が圧力計により間接的に検出されることとなる。圧力計は、流量計に比べて小型である。従って、第1検出部及び第2検出部をスペース効率良く搭載することができる。また、圧力計は、流量計に比べて安価で済む。
 制御ユニットは、改質器に供給される空気の流量を減少させるように第2流量制御部を制御する際には、改質器への空気の供給を停止させるように第2流量制御部を制御してもよい。
 このような構成では、改質システムの運転中に、空気が燃料ガスに対して過剰に改質器に供給される可能性がある場合には、改質器への空気の供給が停止するように第2流量制御部が制御される。従って、改質器の触媒の異常酸化が確実に防止される。
 本発明によれば、改質器の触媒の異常酸化による触媒の性能劣化を防止することができる。
本発明の第1実施形態に係る改質システムを示す概略構成図である。 図1に示された起動制御処理部により実行される起動制御処理の手順の詳細を示すフローチャートである。 図1に示された第1空気制御処理部により実行される空気制御処理の手順の詳細を示すフローチャートである。 図1に示された第2空気制御処理部により実行される空気制御処理の手順の詳細を示すフローチャートである。 図1に示された第3空気制御処理部により実行される空気制御処理の手順の詳細を示すフローチャートである。 図6(a)及び図6(b)は、改質器に供給されるアンモニアガス及び空気の流量と空燃比(AFR)との時間変化の一例を示すグラフである。 本発明の第2実施形態に係る改質システムを示す概略構成図である。 図7に示された第1空気制御処理部により実行される空気制御処理の手順の詳細を示すフローチャートである。 図7に示された第3空気制御処理部により実行される空気制御処理の手順の詳細を示すフローチャートである。
 以下、本発明の実施形態について、図面を参照して詳細に説明する。なお、図面において、同一または同等の要素には同じ符号を付し、重複する説明を省略する。
 図1は、本発明の第1実施形態に係る改質システムを示す概略構成図である。図1において、本実施形態の改質システム1は、アンモニアタンク2と、気化器3と、空気供給部4と、改質器5とを備えている。
 アンモニアタンク2は、燃料であるアンモニア(NH)を液体状態で貯蔵するタンクである。気化器3は、アンモニア流路6を介してアンモニアタンク2と接続されている。気化器3は、ポンプ(図示せず)によりアンモニアタンク2から導出された液体状態のアンモニアを気化させて、アンモニアガス(燃料ガス)を生成する。空気供給部4は、空気を改質器5に供給する。空気供給部4としては、例えば送風機等が用いられる。
 改質器5は、気化器3により生成されたアンモニアガスを改質して、水素を含有した改質ガスを生成する。改質器5は、電気ヒータ7と、燃焼改質触媒8とを有している。電気ヒータ7は、燃焼改質触媒8の上流側に配置されている。
 電気ヒータ7は、改質器5に供給されるアンモニアガス及び空気を加熱することにより、燃焼改質触媒8を加熱する。このとき、燃焼改質触媒8は、電気ヒータ7により暖められたアンモニアガス及び空気の熱により加熱される。
 燃焼改質触媒8は、アンモニアガスを燃焼させる燃焼触媒機能と、アンモニアガスを水素に分解する改質触媒機能とを有している。燃焼改質触媒8としては、例えばルテニウム、ロジウムまたは白金等が用いられる。
 改質器5は、アンモニアガス流路9を介して気化器3と接続されていると共に、空気流路10を介して空気供給部4と接続されている。アンモニアガス流路9は、改質器5に供給されるアンモニアガスが流れる燃料ガス流路である。空気流路10は、改質器5に供給される空気が流れる流路である。
 アンモニアガス流路9には、電磁式のアンモニア流量制御弁11が配設されている。アンモニア流量制御弁11は、アンモニアガス流路9を流れるアンモニアガスの流量を制御する第1流量制御部を構成している。
 空気流路10は、アンモニアガス流路9におけるアンモニア流量制御弁11と改質器5との間の部分に接続されている。空気流路10には、電磁式の空気流量制御弁12が配設されている。空気流量制御弁12は、空気流路10を流れる空気の流量を制御する第2流量制御部を構成している。
 アンモニアガス流路9におけるアンモニア流量制御弁11と改質器5との間には、アンモニア流量計13が配設されている。アンモニア流量計13は、アンモニアガス流路9を流れるアンモニアガスの流量を計測するセンサである。アンモニア流量計13は、アンモニアガス流路9を流れるアンモニアガスの流量を検出する第1検出部を構成している。
 空気流路10における空気流量制御弁12と改質器5との間には、空気流量計14が配設されている。空気流量計14は、空気流路10を流れる空気の流量を計測するセンサである。空気流量計14は、空気流路10を流れる空気の流量を検出する第2検出部を構成している。
 改質器5には、改質ガス流路15を介して水素利用装置16が接続されている。改質ガス流路15は、改質器5により生成された改質ガスが流れる流路である。水素利用装置16は、改質ガスに含有された水素を利用する装置である。水素利用装置16としては、例えば水素と空気中の酸素とを化学反応させて発電を行う燃料電池、アンモニアを燃料としたアンモニアエンジンまたはアンモニアガスタービン等が挙げられる。
 また、改質システム1は、制御ユニット17を備えている。制御ユニット17には、入力器18と表示器19とが接続されている。
 入力器18は、オペレータが改質システム1の運転に関するデータの設定入力を行うための機器である。改質システム1の運転に関するデータとしては、改質器5に供給されるアンモニアガス及び空気の流量等が挙げられる。入力器18は、改質器5に供給されるアンモニアガス及び空気の流量を設定入力する入力部を構成している。
 表示器19は、空気がアンモニアガスに対して過剰に改質器5に供給される可能性がある場合に、その旨の表示を行うための機器である。表示器19は、画面表示またはランプ表示を行う。表示器19は、表示を行うと同時に警告音を発してもよい。
 制御ユニット17は、CPU、RAM、ROM及び入出力インターフェース等により構成されている。制御ユニット17は、入力器18により設定入力されたデータ、アンモニア流量計13及び空気流量計14の計測値を取得し、所定の処理を行い、電気ヒータ7、アンモニア流量制御弁11、空気流量制御弁12及び表示器19を制御する。
 制御ユニット17は、起動制御処理部20と、第1空気制御処理部21(第1制御処理部)と、第2空気制御処理部22(第2制御処理部)と、第3空気制御処理部23(第3制御処理部)とを有している。
 起動制御処理部20は、改質システム1の運転開始が指示されたときに、改質システム1を起動させるように電気ヒータ7、アンモニア流量制御弁11及び空気流量制御弁12を制御する。
 第1空気制御処理部21は、アンモニア流量計13により検出されたアンモニアガスの流量実測値及び空気流量計14により検出された空気の流量実測値に基づいて実測値空燃比を求め、その実測値空燃比が予め決められた実測値用閾値よりも大きいときに、改質器5への空気の供給を停止させるように空気流量制御弁12を制御する。
 第2空気制御処理部22は、入力器18により設定入力されたアンモニアガス及び空気の流量設定値に基づいて設定値空燃比を求め、その設定値空燃比と予め決められた設定値用閾値とを比較し、その比較結果に応じて空気流量制御弁12を制御する。
 このとき、第2空気制御処理部22は、設定値空燃比が設定値用閾値よりも大きいときに、改質器5へのアンモニアガス及び空気の供給が開始されていない場合は、改質器5へのアンモニアガス及び空気の供給を禁止し、改質器5へのアンモニアガス及び空気の供給が開始されている場合は、改質器5への空気の供給を停止させるように空気流量制御弁12を制御する。
 第3空気制御処理部23は、アンモニア流量計13により検出されたアンモニアガスの流量実測値と入力器18により設定入力されたアンモニアガスの流量設定値との差分を求め、その差分が予め決められたアンモニアガス用流量閾値よりも大きいときに、改質器5への空気の供給を停止させるように空気流量制御弁12を制御する。また、第3空気制御処理部23は、空気流量計14により検出された空気の流量実測値と入力器18により設定入力された空気の流量設定値との差分を求め、その差分が予め決められた空気用流量閾値よりも大きいときに、改質器5への空気の供給を停止させるように空気流量制御弁12を制御する。
 図2は、起動制御処理部20により実行される起動制御処理の手順の詳細を示すフローチャートである。本処理は、始動スイッチ(図示せず)等により改質システム1の運転開始が指示されると実行される。また、本処理の実行前は、アンモニア流量制御弁11及び空気流量制御弁12は、何れも全閉状態となっている。
 図2において、起動制御処理部20は、まず電気ヒータ7をONにする(手順S101)。続いて、起動制御処理部20は、入力器18により設定入力されたアンモニアガスの流量設定値(アンモニア流量設定値)及び空気の流量設定値(空気流量設定値)を取得する(手順S102)。
 続いて、起動制御処理部20は、アンモニア流量設定値に応じてアンモニア流量制御弁11を開くように制御すると共に、空気流量設定値に応じて空気流量制御弁12を開くように制御する(手順S103)。具体的には、起動制御処理部20は、アンモニア流量制御弁11をアンモニア流量設定値に応じた開度で開くように制御すると共に、空気流量制御弁12を空気流量設定値に応じた開度で開くように制御する。
 続いて、起動制御処理部20は、アンモニア流量制御弁11及び空気流量制御弁12を開くように制御してから所定時間が経過したかどうかを判断する(手順S104)。起動制御処理部20は、所定時間が経過したと判断したときは、電気ヒータ7をOFFにする(手順S105)。
 なお、起動制御処理部20による起動制御処理としては、特に上記の手順には限られず、適宜変更可能である。例えば、起動制御処理部20は、まずアンモニア流量制御弁11のみを開くように制御し、その後で空気流量制御弁12を開くように制御してもよい。この場合には、燃焼改質触媒8は、電気ヒータ7により暖められたアンモニアガスの熱により加熱されることになる。また、起動制御処理部20は、燃焼改質触媒8の温度が所定温度以上になった時点で、電気ヒータ7をOFFにしてもよい。
 図3は、第1空気制御処理部21により実行される空気制御処理の手順の詳細を示すフローチャートである。本処理も、起動制御処理部20と同様に、改質システム1の運転開始が指示されると実行される。また、閉フラグ(後述)は、0にセットされている。
 図3において、第1空気制御処理部21は、まずアンモニア流量計13により計測されたアンモニアガスの流量実測値(アンモニア流量実測値)及び空気流量計14により計測された空気の流量実測値(空気流量実測値)を取得する(手順S111)。
 続いて、第1空気制御処理部21は、アンモニア流量実測値及び空気流量実測値に基づいて実測値空燃比(実測値AFR)を計算する(手順S112)。実測値AFRは、アンモニア流量実測値に対する空気流量実測値の比率(空気流量実測値/アンモニア流量実測値)である。
 続いて、第1空気制御処理部21は、実測値AFRが予め決められた実測値用閾値よりも大きいかどうかを判断する(手順S113)。第1空気制御処理部21は、実測値AFRが実測値用閾値よりも大きいと判断したときは、空気流量制御弁12を閉じるように制御する(手順S114)。このとき、第1空気制御処理部21は、改質器5への空気の供給を停止させるように空気流量制御弁12を全閉状態に制御する。
 そして、第1空気制御処理部21は、改質器5への空気の供給が停止した状態である旨の表示を行うように表示器19を制御する(手順S115)。これにより、オペレータは、表示器19によって改質器5への空気の供給が停止した状態であることが分かる。そして、第1空気制御処理部21は、閉フラグを1にセットし(手順S116)、上記の手順S111を再度実行する。
 第1空気制御処理部21は、手順S113において実測値AFRが実測値用閾値以下であると判断したときは、閉フラグが0であるかどうかを判断する(手順S117)。第1空気制御処理部21は、閉フラグが0であると判断したときは、上記の手順S114~S116を実行することなく、上記の手順S111を再度実行する。
 第1空気制御処理部21は、閉フラグが1であると判断したときは、入力器18により設定入力された空気流量設定値を取得する(手順S118)。そして、第1空気制御処理部21は、空気流量設定値に応じて空気流量制御弁12を開くように制御する(手順S119)。
 そして、第1空気制御処理部21は、表示器19の表示及び閉フラグをリセットし(手順S120)、上記の手順S111を再度実行する。具体的には、第1空気制御処理部21は、改質器5への空気の供給が停止した状態である旨の表示を解除するように表示器19を制御すると共に、閉フラグを0にセットする。
 図4は、第2空気制御処理部22により実行される空気制御処理の手順の詳細を示すフローチャートである。本処理も、起動制御処理部20と同様に、改質システム1の運転開始が指示されると実行される。また、閉フラグ(後述)は、0にセットされている。
 図4において、第2空気制御処理部22は、まず入力器18により設定入力されたアンモニア流量設定値及び空気流量設定値を取得する(手順S121)。続いて、第2空気制御処理部22は、アンモニア流量設定値及び空気流量設定値に基づいて設定値空燃比(設定値AFR)を計算する(手順S122)。設定値AFRは、アンモニア流量設定値に対する空気流量設定値の比率(空気流量設定値/アンモニア流量設定値)である。
 続いて、第2空気制御処理部22は、設定値AFRが予め決められた設定値用閾値よりも大きいかどうかを判断する(手順S123)。第2空気制御処理部22は、設定値AFRが設定値用閾値よりも大きいと判断したときは、改質システム1が運転中であるかどうかを判断する(手順S124)。改質システム1が運転中である状態は、改質器5へのアンモニアガス及び空気の供給が開始された状態である。
 第2空気制御処理部22は、改質システム1が運転中ではなく運転前であると判断したとき、つまり改質器5へのアンモニアガス及び空気の供給が開始されていないと判断したときは、改質器5へのアンモニアガス及び空気の供給を禁止することで改質システム1の運転を禁止する旨の警告表示を行うように表示器19を制御する(手順S125)。これにより、アンモニア流量制御弁11及び空気流量制御弁12は、全閉状態に保たれる。また、オペレータは、表示器19によって改質システム1の運転が禁止された状態であることが分かる。そして、第2空気制御処理部22は、閉フラグを1にセットし(手順S126)、上記の手順S121を再度実行する。
 第2空気制御処理部22は、改質システム1が運転中であると判断したとき、つまり改質器5へのアンモニアガス及び空気の供給が開始されたと判断したときは、空気流量制御弁12を閉じるように制御する(手順S127)。このとき、第2空気制御処理部22は、改質器5への空気の供給を停止させるように空気流量制御弁12を全閉状態に制御する。そして、第2空気制御処理部22は、改質器5への空気の供給が停止した状態である旨の表示を行うように表示器19を制御する(手順S128)。そして、第2空気制御処理部22は、閉フラグを1にセットし(手順S129)、上記の手順S121を再度実行する。
 第2空気制御処理部22は、手順S123において設定値AFRが設定値用閾値以下であると判断したときは、閉フラグが0であるかどうかを判断する(手順S130)。第2空気制御処理部22は、閉フラグが0であると判断したときは、上記の手順S124~S129を実行することなく、上記の手順S121を再度実行する。
 第2空気制御処理部22は、閉フラグが1であると判断したときは、空気流量設定値に応じて空気流量制御弁12を開くように制御する(手順S131)。そして、第2空気制御処理部22は、表示器19の表示及び閉フラグをリセットし(手順S132)、上記の手順S121を再度実行する。具体的には、第2空気制御処理部22は、改質器5への空気の供給が停止した状態である旨または改質システム1の運転を禁止する旨の表示を解除するように表示器19を制御すると共に、閉フラグを0にセットする。
 なお、第2空気制御処理部22による空気制御処理は、改質システム1の運転開始が指示されたときと、改質システム1の運転が開始されてから入力器18によりアンモニア流量設定値及び空気流量設定値が再設定入力されたときに、実行されてもよい。
 図5は、第3空気制御処理部23により実行される空気制御処理の手順の詳細を示すフローチャートである。本処理も、起動制御処理部20と同様に、改質システム1の運転開始が指示されると実行される。
 図5において、第3空気制御処理部23は、まずアンモニア流量計13により計測されたアンモニア流量実測値及び空気流量計14により計測された空気流量実測値を取得する(手順S141)。また、第3空気制御処理部23は、入力器18により設定入力されたアンモニア流量設定値及び空気流量設定値を取得する(手順S142)。
 続いて、第3空気制御処理部23は、アンモニア流量実測値とアンモニア流量設定値との差分(アンモニア流量実測値-アンモニア流量設定値の絶対値)と、空気流量実測値と空気流量設定値との差分(空気流量実測値-空気流量設定値の絶対値)とを計算する(手順S143)。
 そして、第3空気制御処理部23は、アンモニア流量実測値とアンモニア流量設定値との差分が予め決められたアンモニア用流量閾値(燃料ガス用閾値)よりも大きいかどうかを判断する(手順S144)。
 第3空気制御処理部23は、アンモニア流量実測値とアンモニア流量設定値との差分がアンモニア用流量閾値よりも大きいと判断したときは、アンモニア流量制御弁11及び空気流量制御弁12を閉じるように制御する(手順S145)。このとき、第3空気制御処理部23は、改質器5へのアンモニアガス及び空気の供給を停止させるようにアンモニア流量制御弁11及び空気流量制御弁12を全閉状態に制御する。これにより、改質システム1の運転が強制的に停止されることとなる。なお、本手順では、空気流量制御弁12のみを閉じるように制御してもよい。
 そして、第3空気制御処理部23は、改質システム1の運転が停止した状態である旨の表示を行うように表示器19を制御し(手順S146)、上記の手順S141を再度実行する。
 第3空気制御処理部23は、手順S144においてアンモニア流量実測値とアンモニア流量設定値との差分がアンモニア用流量閾値以下であると判断したときは、空気流量実測値と空気流量設定値との差分が予め決められた空気用流量閾値(空気用閾値)よりも大きいかどうかを判断する(手順S147)。
 第3空気制御処理部23は、空気流量実測値と空気流量設定値との差分が空気用流量閾値よりも大きいと判断したときは、上記の手順S145,S146を順次実行し、その後上記の手順S141を再度実行する。
 第3空気制御処理部23は、空気流量実測値と空気流量設定値との差分が空気用流量閾値以下であると判断したときは、上記の手順S145,S146を実行することなく、上記の手順S141を再度実行する。
 以上において、改質システム1の運転開始が指示されると、改質器5の電気ヒータ7がONになる。そして、入力器18により設定入力されたアンモニア流量設定値に応じてアンモニア流量制御弁11が開弁すると共に、入力器18により設定入力された空気流量設定値に応じて空気流量制御弁12が開弁する。すると、アンモニアガス及び空気が改質器5に供給される。このとき、電気ヒータ7によりアンモニアガス及び空気が加熱され、暖められたアンモニアガス及び空気の熱によって改質器5の燃焼改質触媒8が加熱され、燃焼改質触媒8の温度が上昇する。
 そして、燃焼改質触媒8の温度が燃焼可能温度(例えば200℃程度)に達すると、燃焼改質触媒8によってアンモニアガスが酸化されて燃焼熱が発生する。具体的には、下記式のように、一部のアンモニアと空気中の酸素とが化学反応することで、アンモニアが燃焼する燃焼反応が起こる(発熱反応)。
    NH+3/4O→1/2N+3/2HO+Q
 アンモニアガスの燃焼熱が発生すると、その燃焼熱によって燃焼改質触媒8の温度が更に上昇する。そして、燃焼改質触媒8の温度が改質可能温度(例えば300℃~400℃程度)に達すると、燃焼改質触媒8によってアンモニアガスが改質されて改質ガスが生成される。具体的には、下記式のように、燃焼熱によってアンモニアが水素と窒素とに分解される改質反応が起こり、水素がリッチな状態の改質ガスが生成される(吸熱反応)。改質ガスは、水素利用装置16に供給される。
    NH→3/2H+1/2N-Q
 ところで、改質システム1の運転時に、図6(a)及び図6(b)に示されるように、アンモニアガスの流量に対して空気の流量が過剰になることで、空燃比(AFR)が高くなると、空気に含まれる酸素成分によって燃焼改質触媒8が酸化する。なお、図6(a)及び図6(b)では、実線Pは、アンモニアガスの流量を示し、破線Qは、空気の流量を示し、太実線Rは、空燃比(AFR)を示している。このとき、図6(a)に示されるように、空気自体の流量が過多になることで空燃比が閾値よりも大きくなることもあるし、図6(b)に示されるように、アンモニアガスの流量が過少になることで空燃比が閾値よりも大きくなることもある。燃焼改質触媒8の異常酸化が発生すると、燃焼改質触媒8の性能が低下してしまう。
 しかし、本実施形態にあっては、改質器5に供給されるアンモニアガスの流量がアンモニア流量実測値としてアンモニア流量計13により検出されると共に、改質器5に供給される空気の流量が空気流量実測値として空気流量計14により検出される。そして、アンモニア流量実測値及び空気流量実測値に基づいて、アンモニア流量実測値に対する空気流量実測値の比率である実測値空燃比が求められる。そして、実測値空燃比が実測値用閾値よりも大きいときに、改質器5への空気の供給が停止するように空気流量制御弁12が制御される。このとき、図6(a)に示されるように、空気自体の流量が過多になることで実測値空燃比が実測値用閾値よりも大きくなっても、図6(b)に示されるように、アンモニアガスの流量が過少になることで実測値空燃比が実測値用閾値よりも大きくなっても、改質器5への空気の供給が停止する。このため、空気がアンモニアガスに対して過剰に改質器5に供給されることが防止される。従って、空気に含まれる酸素成分による改質器5の燃焼改質触媒8の異常酸化が防止される。これにより、燃焼改質触媒8の異常酸化による燃焼改質触媒8の性能劣化が防止される。
 また、オペレータが入力器18によりアンモニアガス及び空気の流量を設定入力する際に、アンモニアガスまたは空気の流量の数値が誤って設定入力されると、アンモニア流量制御弁11または空気流量制御弁12の開度がずれるため、アンモニア流量実測値または空気流量実測値がずれてしまい、結果的に実測値空燃比が必要以上に高くなることがある。また、入力器18によるアンモニアガス及び空気の流量の設定入力は、改質システム1の運転開始前だけでなく、改質システム1の運転中にも行われることがある。
 本実施形態では、改質システム1の運転開始時に、アンモニア流量設定値に対する空気流量設定値の比率である設定値空燃比が設定値用閾値よりも大きいときは、改質器5へのアンモニアガス及び空気の供給が禁止されるので、燃焼改質触媒8の異常酸化が未然に防止される。また、改質システム1の運転開始後に、入力器18によりアンモニアガス及び空気の流量が設定入力されることで、設定値空燃比が設定値用閾値よりも大きくなったときは、改質器5への空気の供給が停止するように空気流量制御弁12が制御されるので、燃焼改質触媒8の異常酸化が防止される。従って、入力器18によるアンモニアまたは空気の流量の設定入力ミスがあっても、空気がアンモニアガスに対して過剰に改質器5に供給されることが防止される。
 また、本実施形態では、設定値空燃比が設定値用閾値よりも大きいときは、表示器19によって改質システム1の運転が禁止された状態または改質器5への空気の供給が停止された状態である旨の表示が行われる。このため、オペレータは、表示器19を見ることで、入力器18により設定入力されたアンモニアまたは空気の流量の数値が誤っていることが分かる。従って、オペレータは、入力器18によりアンモニアまたは空気の流量を設定入力し直すことが可能となる。
 さらに、アンモニア流量制御弁11または空気流量制御弁12が故障すると、アンモニア流量実測値または空気流量実測値がずれてしまい、結果的に実測値空燃比が必要以上に高くなることもある。
 本実施形態では、アンモニア流量実測値とアンモニア流量設定値との差分がアンモニア用閾値よりも大きいときに、改質器5への空気の供給が停止するように空気流量制御弁12が制御されると共に、空気流量実測値と空気流量設定値との差分が空気用閾値よりも大きいときに、改質器5への空気の供給が停止するように空気流量制御弁12が制御される。従って、アンモニア流量制御弁11または空気流量制御弁12の故障等が発生しても、空気がアンモニアガスに対して過剰に改質器に供給されることが防止される。
 また、本実施形態では、改質器5に供給されるアンモニアガスの流量がアンモニア流量計13により直接検出されると共に、改質器5に供給される空気の流量が空気流量計14により直接検出される。従って、制御ユニット17による計算処理を簡素化することができる。
 また、本実施形態では、改質システム1の運転中に、空気がアンモニアガスに対して過剰に改質器5に供給される可能性がある場合には、改質器5への空気の供給が停止するように空気流量制御弁12が制御される。従って、燃焼改質触媒8の異常酸化が確実に防止される。
 図7は、本発明の第2実施形態に係る改質システムを示す概略構成図である。図7において、本実施形態の改質システム1は、上記の第1実施形態におけるアンモニア流量計13及び空気流量計14に代えて、アンモニア圧力計31及び空気圧力計32を備えている。
 アンモニア圧力計31は、アンモニアガス流路9に配設されている。アンモニア圧力計31は、アンモニアガス流路9を流れるアンモニアガスの流量に相当するアンモニアガス流路9の圧力を計測するセンサである。アンモニア圧力計31は、アンモニアガス流路9を流れるアンモニアガスの流量を検出する第1検出部を構成している。
 空気圧力計32は、空気流路10に配設されている。空気圧力計32は、空気流路10を流れる空気の流量に相当する空気流路10の圧力を計測するセンサである。空気圧力計32は、空気流路10を流れる空気の流量を検出する第2検出部を構成している。
 また、改質システム1は、上記の第1実施形態と同様に、制御ユニット17を備えている。制御ユニット17は、入力器18により設定入力されたデータ、アンモニア圧力計31及び空気圧力計32の計測値を取得し、所定の処理を行い、電気ヒータ7、アンモニア流量制御弁11、空気流量制御弁12及び表示器19を制御する。
 制御ユニット17は、上記の起動制御処理部20と、第1空気制御処理部21A(第1制御処理部)と、上記の第2空気制御処理部22と、第3空気制御処理部23A(第3制御処理部)とを有している。
 図8は、第1空気制御処理部21Aにより実行される空気制御処理の手順の詳細を示すフローチャートであり、図3に対応している。
 図8において、第1空気制御処理部21Aは、まずアンモニア圧力計31により計測されたアンモニアガス流路9の圧力実測値(アンモニア圧力実測値)及び空気圧力計32により計測された空気流路の圧力実測値(空気圧力実測値)を取得する(手順S111A)。
 続いて、第1空気制御処理部21Aは、アンモニア圧力実測値及び空気圧力実測値に基づいて実測値空燃比(実測値AFR)を計算する(手順S112A)。実測値AFRは、アンモニア流量実測値に対する空気流量実測値の比率である。このとき、アンモニア圧力実測値はアンモニア流量実測値に相当し、空気圧力実測値は空気流量実測値に相当する。このため、実測値AFRは、空気圧力実測値/アンモニア圧力実測値(=空気流量実測値/アンモニア流量実測値)から算出される。なお、アンモニア圧力とアンモニア流量との関係、及び空気圧力と空気流量との関係は、予め実験等により取得されてマップとしてメモリ(図示せず)に記憶されている。
 その後、第1空気制御処理部21Aは、図3に示されたフローチャートと同様に、手順S113~S120を順次実行する。
 図9は、第3空気制御処理部23Aにより実行される空気制御処理の手順の詳細を示すフローチャートであり、図5に対応している。
 図9において、第3空気制御処理部23Aは、まずアンモニア圧力計31により計測されたアンモニア圧力実測値及び空気圧力計32により計測された空気圧力実測値を取得する(手順S141A)。また、第3空気制御処理部23Aは、図5に示されたフローチャートと同様に、入力器18により設定入力されたアンモニア流量設定値及び空気流量設定値を取得する(手順S142)。
 続いて、第3空気制御処理部23Aは、アンモニア圧力とアンモニア流量との関係を表したマップ(前述)を用いて、アンモニア流量設定値からアンモニア圧力設定値を計算すると共に、空気圧力と空気流量との関係を表したマップ(前述)を用いて、空気流量設定値から空気圧力設定値を計算する(手順S142A)。
 続いて、第3空気制御処理部23Aは、アンモニア圧力実測値とアンモニア圧力設定値との差分(アンモニア圧力実測値-アンモニア圧力設定値の絶対値)と、空気圧力実測値と空気圧力設定値との差分(空気圧力実測値-空気圧力設定値の絶対値)とを計算する(手順S143A)。このとき、アンモニア圧力実測値はアンモニア流量実測値に相当し、アンモニア圧力設定値はアンモニア流量設定値に相当する。このため、アンモニア圧力実測値とアンモニア圧力設定値との差分は、アンモニア流量実測値とアンモニア流量設定値との差分に相当する。また、空気圧力実測値は空気流量実測値に相当し、空気圧力設定値は空気流量設定値に相当する。このため、空気圧力実測値と空気圧力設定値との差分は、空気流量実測値と空気流量設定値との差分に相当する。
 そして、第3空気制御処理部23Aは、アンモニア圧力実測値とアンモニア圧力設定値との差分が予め決められたアンモニア用圧力閾値(燃料ガス用閾値)よりも大きいかどうかを判断する(手順S144A)。
 第3空気制御処理部23Aは、アンモニア圧力実測値とアンモニア圧力設定値との差分がアンモニア用圧力閾値よりも大きいと判断したときは、図5に示されたフローチャートと同様に、手順S145,S146を順次実行する。
 第3空気制御処理部23Aは、アンモニア圧力実測値とアンモニア圧力設定値との差分がアンモニア用圧力閾値以下であると判断したときは、空気圧力実測値と空気圧力設定値との差分が予め決められた空気用圧力閾値(空気用閾値)よりも大きいかどうかを判断する(手順S147A)。
 第3空気制御処理部23Aは、空気圧力実測値と空気圧力設定値との差分が空気用圧力閾値よりも大きいと判断したときは、手順S145,S146を順次実行する。
 第3空気制御処理部23Aは、空気圧力実測値と空気圧力設定値との差分が空気用圧力閾値以下であると判断したときは、手順S145,S146を実行することなく、手順S141Aを再度実行する。
 以上のように本実施形態においては、改質器5に供給されるアンモニアガスの流量がアンモニア流量実測値に相当するアンモニア圧力実測値としてアンモニア圧力計31により検出されると共に、改質器5に供給される空気の流量が空気流量実測値に相当する空気圧力実測値として空気圧力計32により検出される。そして、アンモニア圧力実測値及び空気圧力実測値に基づいて、アンモニア流量実測値に対する空気流量実測値の比率である実測値空燃比が求められる。そして、実測値空燃比が実測値用閾値よりも大きいときに、改質器5への空気の供給が停止するように空気流量制御弁12が制御される。これにより、上記の第1実施形態と同様に、改質器5の燃焼改質触媒8の異常酸化による燃焼改質触媒8の性能劣化が防止される。
 また、本実施形態では、アンモニア圧力計31によってアンモニアガス流路9を流れるアンモニアガスの流量が間接的に検出されると共に、空気圧力計32によって空気流路10を流れる空気の流量が間接的に検出されることとなる。アンモニア圧力計31及び空気圧力計32は、アンモニア流量計13及び空気流量計14に比べて小型である。従って、アンモニア圧力計31及び空気圧力計32をスペース効率良く搭載することができる。また、アンモニア圧力計31及び空気圧力計32は、アンモニア流量計13及び空気流量計14に比べて安価である。
 なお、本発明は、上記実施形態には限定されない。例えば上記実施形態では、制御ユニット17は、改質システム1の運転中に、空気がアンモニアガスに対して過剰に改質器5に供給される可能性がある場合には、改質器5への空気の供給が停止するように空気流量制御弁12を全閉状態に制御しているが、特にその形態には限られない。制御ユニット17は、改質システム1の運転中に、空気がアンモニアガスに対して過剰に改質器5に供給される可能性がある場合には、空気流量制御弁12の開度を小さくすることで、改質器5に供給される空気の流量を減少させるように空気流量制御弁12を制御してもよい。この場合でも、改質器5の燃焼改質触媒8の異常酸化による燃焼改質触媒8の性能劣化が防止される。
 また、上記の第1実施形態では、第1空気制御処理部21は、実測値空燃比が実測値用閾値よりも大きくなると、空気流量制御弁12を直ちに閉じるように制御しているが、特にその形態には限られず、実測値空燃比が実測値用閾値よりも大きい状態が所定時間継続したときに、空気流量制御弁12を閉じるように制御してもよい。第2空気制御処理部22及び第3空気制御処理部23においても同様である。また、上記の第2実施形態においても同様である。
 また、上記の第1実施形態では、アンモニア流量制御弁11、空気流量制御弁12、アンモニア流量計13、空気流量計14及び制御ユニット17がそれぞれ単体のユニットから構成されているが、特にその形態には限られず、アンモニア流量制御弁、空気流量制御弁、アンモニア流量計、空気流量計及び制御ユニットを備えたマスフローコントローラにより構成してもよい。上記の第2実施形態においても同様である。
 また、上記実施形態では、改質器5は、アンモニアガスを燃焼させると共にアンモニアガスを水素に分解する燃焼改質触媒8を有しているが、特にその形態には限られない。改質器5は、アンモニアガスを燃焼させる燃焼触媒と、アンモニアガスを水素に分解する改質触媒とを別々に有していてもよい。
 また、上記実施形態では、電気ヒータ7により加熱されたアンモニアガス及び空気の熱を利用して改質器5の燃焼改質触媒8が加熱されているが、特にその形態には限られず、改質器5の触媒を電気ヒータにより直接加熱してもよい。
 また、上記実施形態では、燃料ガスとしてアンモニアガスを使用しているが、本発明は、燃料ガスとして炭化水素ガス等を使用した改質システムにも適用可能である。
 1  改質システム
 5  改質器
 8  燃焼改質触媒(触媒)
 9  アンモニアガス流路(燃料ガス流路)
 10  空気流路
 11  アンモニア流量制御弁(第1流量制御部)
 12  空気流量制御弁(第2流量制御部)
 13  アンモニア流量計(第1検出部)
 14  空気流量計(第2検出部)
 17  制御ユニット
 18  入力器(入力部)
 21,21A  第1空気制御処理部(第1制御処理部)
 22  第2空気制御処理部(第2制御処理部)
 23,23A  第3空気制御処理部(第3制御処理部)
 31  アンモニア圧力計(第1検出部)
 32  空気圧力計(第2検出部)

Claims (6)

  1.  燃料ガスを水素に分解する触媒を有し、前記燃料ガスを改質して前記水素を含有した改質ガスを生成する改質器と、
     前記改質器に供給される前記燃料ガスが流れる燃料ガス流路と、
     前記改質器に供給される空気が流れる空気流路と、
     前記燃料ガス流路を流れる前記燃料ガスの流量を制御する第1流量制御部と、
     前記空気流路を流れる前記空気の流量を制御する第2流量制御部と、
     前記燃料ガス流路を流れる前記燃料ガスの流量を検出する第1検出部と、
     前記空気流路を流れる前記空気の流量を検出する第2検出部と、
     前記第1流量制御部及び前記第2流量制御部を制御する制御ユニットとを備え、
     前記制御ユニットは、前記第1検出部により検出された前記燃料ガスの流量実測値及び前記第2検出部により検出された前記空気の流量実測値に基づいて、前記燃料ガスの流量実測値に対する前記空気の流量実測値の比率である実測値空燃比を求め、前記実測値空燃比が予め決められた実測値用閾値よりも大きいときに、前記改質器に供給される前記空気の流量を減少させるように前記第2流量制御部を制御する第1制御処理部を有する改質システム。
  2.  前記改質器に供給される前記燃料ガス及び前記空気の流量を設定入力する入力部を更に備え、
     前記制御ユニットは、前記入力部により設定入力された前記燃料ガス及び前記空気の流量設定値に基づいて、前記燃料ガスの流量設定値に対する前記空気の流量設定値の比率である設定値空燃比を求め、前記設定値空燃比が予め決められた設定値用閾値よりも大きいときに、前記改質器への前記燃料ガス及び前記空気の供給が開始されていない場合は、前記改質器への前記燃料ガス及び前記空気の供給を禁止し、前記改質器への前記燃料ガス及び前記空気の供給が開始されている場合は、前記改質器に供給される前記空気の流量を減少させるように前記第2流量制御部を制御する第2制御処理部を有する請求項1記載の改質システム。
  3.  前記改質器に供給される前記燃料ガス及び前記空気の流量を設定入力する入力部を更に備え、
     前記制御ユニットは、前記第1検出部により検出された前記燃料ガスの流量実測値と前記入力部により設定入力された前記燃料ガスの流量設定値との差分を求め、前記燃料ガスの流量実測値と前記燃料ガスの流量設定値との差分が予め決められた燃料ガス用閾値よりも大きいときに、前記改質器に供給される前記空気の流量を減少させるように前記第2流量制御部を制御すると共に、前記第2検出部により検出された前記空気の流量実測値と前記入力部により設定入力された前記空気の流量設定値との差分を求め、前記空気の流量実測値と前記空気の流量設定値との差分が予め決められた空気用閾値よりも大きいときに、前記改質器に供給される前記空気の流量を減少させるように前記第2流量制御部を制御する第3制御処理部を有する請求項1記載の改質システム。
  4.  前記第1検出部は、前記燃料ガス流路を流れる前記燃料ガスの流量を計測する流量計であり、
     前記第2検出部は、前記空気流路を流れる前記空気の流量を計測する流量計である請求項1~3の何れか一項記載の改質システム。
  5.  前記第1検出部は、前記燃料ガス流路を流れる前記燃料ガスの流量に相当する前記燃料ガス流路の圧力を計測する圧力計であり、
     前記第2検出部は、前記空気流路を流れる前記空気の流量に相当する前記空気流路の圧力を計測する圧力計である請求項1~3の何れか一項記載の改質システム。
  6.  前記制御ユニットは、前記改質器に供給される前記空気の流量を減少させるように前記第2流量制御部を制御する際には、前記改質器への前記空気の供給を停止させるように前記第2流量制御部を制御する請求項1~5の何れか一項記載の改質システム。
PCT/JP2020/017920 2019-05-24 2020-04-27 改質システム WO2020241148A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019-097822 2019-05-24
JP2019097822A JP2020193112A (ja) 2019-05-24 2019-05-24 改質システム

Publications (1)

Publication Number Publication Date
WO2020241148A1 true WO2020241148A1 (ja) 2020-12-03

Family

ID=73546242

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/017920 WO2020241148A1 (ja) 2019-05-24 2020-04-27 改質システム

Country Status (2)

Country Link
JP (1) JP2020193112A (ja)
WO (1) WO2020241148A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004251273A (ja) * 2003-01-28 2004-09-09 Toyota Motor Corp 内燃機関および内燃機関の運転方法
WO2010107065A1 (ja) * 2009-03-17 2010-09-23 株式会社日本触媒 水素製造触媒およびそれを用いた水素製造方法、並びに、アンモニア燃焼用触媒、その製造方法およびこの触媒を用いたアンモニア燃焼方法
WO2012090739A1 (ja) * 2010-12-30 2012-07-05 株式会社豊田中央研究所 水素発生装置および水素発生装置を備える内燃機関
JP2015010581A (ja) * 2013-07-01 2015-01-19 株式会社豊田中央研究所 エンジンシステム
JP2016134278A (ja) * 2015-01-19 2016-07-25 株式会社豊田自動織機 燃料電池システム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004251273A (ja) * 2003-01-28 2004-09-09 Toyota Motor Corp 内燃機関および内燃機関の運転方法
WO2010107065A1 (ja) * 2009-03-17 2010-09-23 株式会社日本触媒 水素製造触媒およびそれを用いた水素製造方法、並びに、アンモニア燃焼用触媒、その製造方法およびこの触媒を用いたアンモニア燃焼方法
WO2012090739A1 (ja) * 2010-12-30 2012-07-05 株式会社豊田中央研究所 水素発生装置および水素発生装置を備える内燃機関
JP2015010581A (ja) * 2013-07-01 2015-01-19 株式会社豊田中央研究所 エンジンシステム
JP2016134278A (ja) * 2015-01-19 2016-07-25 株式会社豊田自動織機 燃料電池システム

Also Published As

Publication number Publication date
JP2020193112A (ja) 2020-12-03

Similar Documents

Publication Publication Date Title
JP7298535B2 (ja) エンジンシステム
JP3885479B2 (ja) 燃料電池の改質装置
JP5194373B2 (ja) 改質装置
JP4866967B2 (ja) 燃料電池システム及びその運転方法
JP4105758B2 (ja) 燃料電池システム
US20220205415A1 (en) Engine system
US9685672B2 (en) Hydrogen generation apparatus, fuel cell system including the same, method of operating hydrogen generation apparatus and method of operating fuel cell system
JP4988590B2 (ja) 燃料電池ヒーター用バーナーの空気比決定方法並びに燃料電池ヒーター
WO2006041185A1 (ja) 燃料電池システム及びその運転方法
JP2008108546A (ja) 燃料電池システム
JP2008273763A (ja) 改質装置および燃料電池システム
JP4647195B2 (ja) 燃料電池システム及び燃料電池システムの運転方法
WO2020241148A1 (ja) 改質システム
EP2413411A1 (en) Fuel cell system
JP4030322B2 (ja) 燃料処理装置、燃料電池発電システム、燃料処理方法及び燃料電池発電方法
JP2021017389A (ja) 改質システム
EP3309887B1 (en) Fuel cell system and method of running fuel cell system
JP7259654B2 (ja) 水素利用システム
JP2008004414A (ja) 流体供給量推定装置および燃料電池システム
JP4800174B2 (ja) 改質装置及びその運転方法
JP6777238B2 (ja) 燃料電池システムおよび燃料電池システムの制御方法
JP5236554B2 (ja) 燃料電池システム
JP5094202B2 (ja) 流体送出装置、改質器および燃料電池システム
JP5309799B2 (ja) 改質装置および燃料電池システム
JP2008105861A (ja) 改質装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20813803

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20813803

Country of ref document: EP

Kind code of ref document: A1