WO2020237113A1 - Displacement pile and pile driver adapter - Google Patents
Displacement pile and pile driver adapter Download PDFInfo
- Publication number
- WO2020237113A1 WO2020237113A1 PCT/US2020/034122 US2020034122W WO2020237113A1 WO 2020237113 A1 WO2020237113 A1 WO 2020237113A1 US 2020034122 W US2020034122 W US 2020034122W WO 2020237113 A1 WO2020237113 A1 WO 2020237113A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- pile
- shaft
- annulus
- medium
- adapter
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/22—Placing by screwing down
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/10—Follow-blocks of pile-drivers or like devices
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/56—Screw piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/28—Prefabricated piles made of steel or other metals
- E02D5/285—Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/54—Piles with prefabricated supports or anchoring parts; Anchoring piles
Definitions
- Conventional piles are metal tubes having either a circular or a rectangular cross- section. Such piles are mounted in the ground to provide a support structure for the construction of superstructures. The piles are provided in sections that are driven into the ground.
- Figure 1 is a schematic view of one embodiment of an auger grouted displacement pile.
- an auger grouted displacement pile 100 includes an elongated, tubular pipe 102 with a hollow central chamber, a top section 104 and a bottom section 106.
- Bottom section 106 includes a soil (medium) displacement head 108.
- Top section 104 includes a reverse auger 110.
- Soil (medium) displacement head 108 has a cutting blade 112 that has a leading edge 114 and a trailing edge 116.
- the leading edge 114 of cutting blade 112 cuts into the soil (medium) as the pile is rotated and loosens the soil (medium) at such contact point.
- the soil (medium) displacement head 108 may be equipped with a point 118 to promote this cutting.
- the auger grouted displacement pile 100 also includes a deformation structure 120 that cuts into or gouges the wall of the annulus or bore created by the displacement head 108, so as to create a deformation in the wall of the annulus or bore. The deformation in the wall of the annulus or bore assists in preventing shearing between the grout and the soil (medium).
- Figure 1 illustrates a conventional pile
- Figure 2 illustrates an example of a deformed pile for providing gripping contact with grout and resisting grout from shearing
- Figure 3 illustrates another example of a deformed pile for providing gripping contact with grout and resisting grout from shearing
- Figure 4 illustrates a third example of a deformed pile for providing gripping contact with grout and resisting grout from shearing
- Figure 5 illustrates a fourth example of a deformed pile for providing gripping contact with grout and resisting grout from shearing
- Figures 6 and 7 illustrate a bottom section of the pile of Figure 2
- Figures 8 and 9 illustrate a bottom section of the pile of Figure 3;
- Figures 10 and 1 1 illustrate a bottom section of the pile of Figure 4;
- Figures 12 and 13 illustrate a bottom section of the pile of Figure 5;
- Figure 14 illustrates another example of bottom section of the pile of Figure 2
- Figure 15 illustrates another example of bottom section of the pile of Figure 3
- Figure 16 illustrates another example of bottom section of the pile of Figure 4
- Figure 17 illustrates another example of bottom section of the pile of Figure 5;
- Figure 18 illustrates an example of bottom section of a pile wherein the lateral compaction element extends up the pile shaft beyond the cutting blade;
- Figure 19 illustrates a side view of a pile picking adapter with a swivel in a parallel position
- Figure 20 illustrates a side view of a pile picking adapter with a swivel in a 45° position
- Figure 21 illustrates a side view of a pile picking adapter with a swivel in an orthogonal position
- Figure 22 illustrates a side view of a pile picking adapter engaging a pile with a swivel in an orthogonal position
- Figure 23 illustrates a pile picking adapter engaged with a pile with a swivel in an orthogonal position
- Figure 24 illustrates a pile with a vertical flange for supporting excavation members
- Figure 25 illustrates a top view of a pile with a vertical flange for supporting excavation members
- Figure 26 illustrates a pile with a vertical coupling component for supporting excavation members having a mating vertical coupling component
- Figures 27 and 28 illustrate a pile with multiple vertical flanges for supporting excavation members
- Figures 29 and 30 illustrate a pile with a vertical flange for supporting excavation member
- Figure 31 illustrates a pile with a vertical flange for supporting excavation members
- Figure 32 illustrates a pile with a vertical coupling component for supporting excavation members
- Figure 33 illustrates an example of bottom section of a pile wherein a lateral compaction maintenance element extends up the pile shaft beyond the cutting blade;
- Figure 34 illustrates a two-directional swing pile connector
- Figure 35 illustrates a pound driven pile
- Figure 36 illustrates a pound driven pile with fins
- Figure 37 illustrates a micropile with an attached detachable casing having a helix
- Figure 38 illustrates the micropile of Figure 37 with the casing being detached from a displacement head;
- Figure 39 illustrates a micropile with an attached detachable casing without a helix;
- Figure 40 illustrates the micropile of Figure 39 with the casing being detached from a displacement head
- Figure 41 illustrates an engaging interface between a detachable casing and a displacement head
- Figure 42 illustrates a disengaging interface between a detachable casing and a displacement head.
- Figure 2 is a schematic view of one embodiment of a deformed displacement pile.
- a deformed displacement pile 100 is an elongated, tubular pipe with a hollow central chamber having threads 300 on the outer surface.
- a bottom section of the deformed displacement pile 100 includes a soil (medium) displacement head 108.
- Soil (medium) displacement head 108 has a cutting blade 112 that has a leading edge 114 and a trailing edge 116.
- the leading edge 114 of cutting blade 112 cuts into the soil (medium) as the deformed displacement pile 100 is rotated and loosens the soil (medium) at such contact point.
- the soil (medium) displacement head 108 may be equipped with a point 118 to promote this cutting.
- the loosened soil (medium) passes over cutting blade 112 and thereafter past trailing edge 116.
- the soil (medium) is laterally compacted by lateral compaction elements (discussed in more detail below).
- the lateral compaction elements create an annulus having outer wall 500 and void 510.
- the deformed displacement pile 100 also includes a deformation structure 120 that cuts into or gouges the outer wall 500 of the annulus or bore created by the displacement head 108, so as to create a deformation in the outer wall 500 of the annulus or bore or a spiral groove in the outer wall 500 of the annulus or bore.
- the deformation in the outer wall 500 of the annulus or bore assists in preventing shearing between the grout and the soil (medium).
- grout (not shown) is introduced into the void 510 of the annulus.
- the grout can be introduced by means of gravity or pressure into the void 510 of the annulus.
- the deformed displacement pile 100 is a hollow tube
- the grout can be introduced into the void 510 of the annulus through the hollow tube by means of gravity or pressure, wherein the deformed displacement pile 100 would include openings (not shown) that allows the grout to leave the pile and enter into the void 510 of the annulus.
- the introduced grout surrounds the threads 300 of the deformed displacement pile 100 to provide gripping interface between the grout and the deformed displacement pile 100, as well as, providing an interface that resists the grout from shearing along the surface between the grout and the deformed displacement pile 100.
- Figure 3 is a schematic view of one embodiment of a deformed displacement pile.
- a deformed displacement pile 100 is an elongated, tubular pipe 400 with a hollow central chamber having projections 410 on the outer surface.
- the projections 410 may be randomly placed on the outer surface of the deformed displacement pile 100 or be placed in a pattern.
- the projections 410 extend out from the outer surface of the deformed displacement pile 100 into the void 510 of an annulus without coming into contact with an outer wall 500 of the annulus.
- a bottom section of the deformed displacement pile 100 includes a soil (medium) displacement head 108.
- Soil (medium) displacement head 108 has a cutting blade 112 that has a leading edge 114 and a trailing edge 116.
- the leading edge 114 of cutting blade 112 cuts into the soil (medium) as the deformed displacement pile 100 is rotated and loosens the soil (medium) at such contact point.
- the soil (medium) displacement head 108 may be equipped with a point 118 to promote this cutting.
- the loosened soil (medium) passes over cutting blade 112 and thereafter past trailing edge 116.
- the soil (medium) is laterally compacted by lateral compaction elements (discussed in more detail below).
- the lateral compaction elements create an annulus having outer wall 500 and void 510.
- the deformed displacement pile 100 also includes a deformation structure 120 that cuts into or gouges the outer wall 500 of the annulus or bore created by the displacement head 108, so as to create a deformation in the outer wall 500 of the annulus or bore or a spiral groove in the outer wall 500 of the annulus or bore.
- the deformation in the outer wall 500 of the annulus or bore assists in preventing shearing between the grout and the soil (medium).
- grout (not shown) is introduced into the void 510 of the annulus.
- the grout can be introduced by means of gravity or pressure into the void 510 of the annulus.
- the deformed displacement pile 100 is a hollow tube
- the grout can be introduced into the void 510 of the annulus through the hollow tube by means of gravity or pressure, wherein the deformed displacement pile 100 would include openings (not shown) that allows the grout to leave the pile and enter into the void 510 of the annulus.
- the introduced grout surrounds the projections 410 of the deformed displacement pile 100 to provide gripping interface between the grout and the deformed displacement pile 100, as well as, providing an interface that resists the grout from shearing along the surface between the grout and the deformed displacement pile 100.
- Figure 4 is a schematic view of one embodiment of a deformed displacement pile.
- a deformed displacement pile 100 is an elongated, tubular pipe 400 with a hollow central chamber having indentations 420 on the outer surface.
- the indentations 420 may be randomly placed on the outer surface of the deformed displacement pile 100 or be placed in a pattern.
- the indentations 420 extend inwardly from the outer surface of the deformed displacement pile 100 away from the void 510 of an annulus.
- a bottom section of the deformed displacement pile 100 includes a soil (medium) displacement head 108.
- Soil (medium) displacement head 108 has a cutting blade 112 that has a leading edge 114 and a trailing edge 116.
- the leading edge 114 of cutting blade 112 cuts into the soil (medium) as the deformed displacement pile 100 is rotated and loosens the soil (medium) at such contact point.
- the soil (medium) displacement head 108 may be equipped with a point 118 to promote this cutting.
- the loosened soil (medium) passes over cutting blade 112 and thereafter past trailing edge 116.
- the soil (medium) is laterally compacted by lateral compaction elements (discussed in more detail below).
- the lateral compaction elements create an annulus having outer wall 500 and void 510.
- the deformed displacement pile 100 also includes a deformation structure 120 that cuts into or gouges the outer wall 500 of the annulus or bore created by the displacement head 108, so as to create a deformation in the outer wall 500 of the annulus or bore or a spiral groove in the outer wall 500 of the annulus or bore.
- the deformation in the outer wall 500 of the annulus or bore assists in preventing shearing between the grout and the soil (medium).
- grout (not shown) is introduced into the void 510 of the annulus.
- the grout can be introduced by means of gravity or pressure into the void 510 of the annulus.
- the deformed displacement pile 100 is a hollow tube
- the grout can be introduced into the void 510 of the annulus through the hollow tube by means of gravity or pressure, wherein the deformed displacement pile 100 would include openings (not shown) that allows the grout to leave the pile and enter into the void 510 of the annulus.
- the introduced grout surrounds the indentations 420 of the deformed displacement pile 100 to provide gripping interface between the grout and the deformed displacement pile 100, as well as, providing an interface that resists the grout from shearing along the surface between the grout and the deformed displacement pile 100.
- Figure 5 is a schematic view of one embodiment of a deformed displacement pile.
- a deformed displacement pile 100 is an elongated, tubular pipe 400 with a hollow central chamber having indentations 420 and projections 410 on the outer surface.
- the indentations 420 and projections 410 may be randomly placed on the outer surface of the deformed displacement pile 100 or be placed in a pattern.
- the indentations 420 extend inwardly from the outer surface of the deformed displacement pile 100 away from the void 510 of an annulus, and the projections 410 extend out from the outer surface of the deformed displacement pile 100 into the void 510 of an annulus without coming into contact with an outer wall 500 of the annulus.
- a bottom section of the deformed displacement pile 100 includes a soil (medium) displacement head 108.
- Soil (medium) displacement head 108 has a cutting blade 112 that has a leading edge 114 and a trailing edge 116.
- the leading edge 114 of cutting blade 112 cuts into the soil (medium) as the deformed displacement pile 100 is rotated and loosens the soil (medium) at such contact point.
- the soil (medium) displacement head 108 may be equipped with a point 118 to promote this cutting.
- the loosened soil (medium) passes over cutting blade 112 and thereafter past trailing edge 116.
- the soil (medium) is laterally compacted by lateral compaction elements (discussed in more detail below).
- the lateral compaction elements create an annulus having outer wall 500 and void 510.
- the deformed displacement pile 100 also includes a deformation structure 120 that cuts into or gouges the outer wall 500 of the annulus or bore created by the displacement head 108, so as to create a deformation in the outer wall 500 of the annulus or bore or a spiral groove in the outer wall 500 of the annulus or bore.
- the deformation in the outer wall 500 of the annulus or bore assists in preventing shearing between the grout and the soil (medium).
- grout (not shown) is introduced into the void 510 of the annulus.
- the grout can be introduced by means of gravity or pressure into the void 510 of the annulus.
- the deformed displacement pile 100 is a hollow tube
- the grout can be introduced into the void 510 of the annulus through the hollow tube by means of gravity or pressure, wherein the deformed displacement pile 100 would include openings (not shown) that allows the grout to leave the pile and enter into the void 510 of the annulus.
- the introduced grout surrounds the indentations 420 and projections 410 of the deformed displacement pile 100 to provide gripping interface between the grout and the deformed displacement pile 100, as well as, providing an interface that resists the grout from shearing along the surface between the grout and the deformed displacement pile 100.
- Figures 6 and 7 are side and perspective views of the bottom section of the deformed displacement pile of Figure 2.
- the bottom section includes at least one lateral compaction element.
- the lateral compaction element 220 near the end of the deformed displacement pile has a diameter less than the diameter from the lateral compaction element 200 near deformation structure 120.
- the lateral compaction element 210 in the middle has a diameter that is between the diameters of the other two lateral compaction elements.
- the soil is laterally compacted by the first lateral compaction element 220, more compacted by the second lateral compaction element 210 (enlarging the diameter of the bored hole) and even more compacted by the third lateral compaction element 200.
- the cutting blade 112 primarily cuts into the soil and only performs minimal soil compaction.
- the deformation structure 120 is disposed above the lateral compaction elements 200. After the widest compaction element 200 has established an annulus with a regular diameter, deformation structure 120 cuts into the edge of the outer wall 500 of the annulus to leave a spiral pattern in the annulus's perimeter or circumference.
- the deformation structure 120 has a height that changes over the length of the deformation structure 120 from its greatest height at end 206 to a lesser height at end 208 as the deformation structure 120 coils about the deformed displacement pile in a helical configuration.
- Figures 8 and 9 are side and perspective views of the bottom section of the deformed displacement pile of Figure 3.
- the bottom section includes at least one lateral compaction element. In the embodiment shown in Figures 8 and 9, there are three such lateral compaction elements.
- the lateral compaction element 220 near the end of the deformed displacement pile has a diameter less than the diameter from the lateral compaction element 200 near deformation structure 120.
- the lateral compaction element 210 in the middle has a diameter that is between the diameters of the other two lateral compaction elements. In this fashion, the soil is laterally compacted by the first lateral compaction element 220, more compacted by the second lateral compaction element 210 (enlarging the diameter of the bored hole) and even more compacted by the third lateral compaction element 200.
- the cutting blade 112 primarily cuts into the soil and only performs minimal soil compaction.
- the deformation structure 120 is disposed above the lateral compaction elements 200. After the widest compaction element 200 has established an annulus with a regular diameter, deformation structure 120 cuts into the edge of the outer wall 500 of the annulus to leave a spiral pattern in the annulus's perimeter or circumference.
- the deformation structure 120 has a height that changes over the length of the deformation structure 120 from its greatest height at end 206 to a lesser height at end 208 as the deformation structure 120 coils about the deformed displacement pile in a helical configuration.
- Figures 10 and 1 1 are side and perspective views of the bottom section of the deformed displacement pile of Figure 4.
- the bottom section includes at least one lateral compaction element.
- the lateral compaction element 220 near the end of the deformed displacement pile has a diameter less than the diameter from the lateral compaction element 200 near deformation structure 120.
- the lateral compaction element 210 in the middle has a diameter that is between the diameters of the other two lateral compaction elements. In this fashion, the soil is laterally compacted by the first lateral compaction element 220, more compacted by the second lateral compaction element 210 (enlarging the diameter of the bored hole) and even more compacted by the third lateral compaction element 200.
- the cutting blade 112 primarily cuts into the soil and only performs minimal soil compaction.
- the deformation structure 120 is disposed above the lateral compaction elements 200. After the widest compaction element 200 has established an annulus with a regular diameter, deformation structure 120 cuts into the edge of the outer wall 500 of the annulus to leave a spiral pattern in the annulus's perimeter or circumference. [0096] It is noted that, as illustrated in Figure 1 1 , the deformation structure 120 has a height that changes over the length of the deformation structure 120 from its greatest height at end 206 to a lesser height at end 208 as the deformation structure 120 coils about the deformed displacement pile in a helical configuration.
- Figures 12 and 13 are side and perspective views of the bottom section of the deformed displacement pile of Figure 5.
- the bottom section includes at least one lateral compaction element.
- the lateral compaction element 220 near the end of the deformed displacement pile has a diameter less than the diameter from the lateral compaction element 200 near deformation structure 120.
- the lateral compaction element 210 in the middle has a diameter that is between the diameters of the other two lateral compaction elements.
- the soil is laterally compacted by the first lateral compaction element 220, more compacted by the second lateral compaction element 210 (enlarging the diameter of the bored hole) and even more compacted by the third lateral compaction element 200.
- the cutting blade 112 primarily cuts into the soil and only performs minimal soil compaction.
- the deformation structure 120 is disposed above the lateral compaction elements 200.
- deformation structure 120 cuts into the edge of the outer wall 500 of the annulus to leave a spiral pattern in the annulus's perimeter or circumference.
- the deformation structure 120 has a height that changes over the length of the deformation structure 120 from its greatest height at end 206 to a lesser height at end 208 as the deformation structure 120 coils about the deformed displacement pile in a helical configuration.
- Figure 14 illustrates another example of a bottom section of the deformed displacement pile of Figure 2. As illustrated in Figure 14, the deformed displacement pile includes threads 300 on the outer surface of the deformed displacement pile.
- the bottom section of the deformed displacement pile also includes a soil (medium) loosen bit or head 600 to loosen the soil (medium) around the deformed displacement pile as the deformed displacement pile is driven therein.
- the soil (medium) loosen bit or head 600 includes a lateral compaction structure 700 to laterally compact the loosen soil (medium) to create an annulus with an outer wall 500 and a void 510.
- Figure 15 illustrates another example of a bottom section of the deformed displacement pile of Figure 3.
- the deformed displacement pile includes threads 300 on the outer surface of the deformed displacement pile.
- the bottom section of the deformed displacement pile also includes a soil (medium) loosen bit or head 600 to loosen the soil (medium) around the deformed displacement pile as the deformed displacement pile is driven therein.
- the soil (medium) loosen bit or head 600 includes a lateral compaction structure 700 to laterally compact the loosen soil (medium) to create an annulus with an outer wall 500 and a void 510.
- Figure 16 illustrates another example of a bottom section of the deformed displacement pile of Figure 4. As illustrated in Figure 16, the deformed displacement pile includes threads 300 on the outer surface of the deformed displacement pile.
- the bottom section of the deformed displacement pile also includes a soil (medium) loosen bit or head 600 to loosen the soil (medium) around the deformed displacement pile as the deformed displacement pile is driven therein.
- the soil (medium) loosen bit or head 600 includes a lateral compaction structure 700 to laterally compact the loosen soil (medium) to create an annulus with an outer wall 500 and a void 510.
- Figure 17 illustrates another example of a bottom section of the deformed displacement pile of Figure 5. As illustrated in Figure 17, the deformed displacement pile includes threads 300 on the outer surface of the deformed displacement pile.
- the bottom section of the deformed displacement pile also includes a soil (medium) loosen bit or head 600 to loosen the soil (medium) around the deformed displacement pile as the deformed displacement pile is driven therein.
- the soil (medium) loosen bit or head 600 includes a lateral compaction structure 700 to laterally compact the loosen soil (medium) to create an annulus with an outer wall 500 and a void 510.
- Figure 18 illustrates an example of bottom section of a displacement pile wherein the lateral compaction element extends up the pile shaft beyond the cutting blade.
- the soil (medium) displacement head 108 is connected to an elongated, tubular pipe 102 with a hollow central chamber.
- a top section of the elongated, tubular pipe 102 may include a reverse auger (not shown) and/or the top section of the elongated, tubular pipe 102 may include indentations (not shown) and/or projections (not shown) to provide a gripping interface between grout introduced into an annulus produced by the displacement pile and the displacement pile, as well as, providing an interface that resists the grout from shearing along the surface between the grout and the displacement pile.
- the soil (medium) displacement head 108 also includes a cutting blade 112 that has a leading edge 114 and a trailing edge 116.
- the leading edge 114 of cutting blade 112 cuts into the soil (medium) as the displacement pile is rotated and loosens the soil (medium) at such contact point.
- the soil (medium) displacement head 108 may be equipped with a point 118 to promote this cutting.
- the soil (medium) displacement head 108 includes at least one lateral compaction element.
- the lateral compaction element 220 has a diameter less than the diameter of the lateral compaction element 200.
- the lateral compaction element 210 has a diameter that is between the diameters of the lateral compaction element 220 and the lateral compaction element 200. In this fashion, the soil is laterally compacted by the first lateral compaction element 220, more compacted by the second lateral compaction element 210 (enlarging the diameter of the bored hole) and even more compacted by the third lateral compaction element 200.
- the lateral compaction elements (220, 210, and 200) as the displacement head 108 is rotated into the soil (medium), laterally compacts the soil (medium) to create an annulus or bore.
- the lateral compaction element 200 includes, thereon, a deformation structure 120 that cuts into or gouges the wall of the annulus or bore created by lateral compaction elements (220, 210, and 200), so as to create a deformation in the wall of the annulus or bore.
- the deformation in the wall of the annulus or bore assists in preventing shearing between the grout and the soil (medium).
- the annulus or bore created by the lateral compaction is maintained beyond the trailing edge 116 of the cutting blade 112.
- a first lateral retention element 201 and a second lateral retention element 202 extend beyond the trailing edge 116 of the cutting blade 112.
- the first lateral retention element 201 and the second lateral retention element 202 have the same diameter as the lateral compaction element 200.
- the lateral retention elements assist in preventing a portion of the annulus, above the trailing edge 116 of the cutting blade 112, from collapsing before the grout can be introduced into the annulus, thereby enabling an effectively filling of the annulus with grout.
- the lateral retention element or elements extend at least one rotation around the tube 102 beyond the trailing edge 116 of the cutting blade 112.
- any number or fraction thereof of rotations beyond the trailing edge 116 of the cutting blade 112 can be realized in preventing the annulus from collapsing before the grout can be introduced into the annulus, thereby enabling an effectively filling of the annulus with grout.
- the deformation structure 120 may be co-located with the lateral compaction element 200, or alternatively, the deformation structure 120 may be co-located with the first lateral retention element 201 or the second lateral retention element 202. Alternatively, the deformation structure 120 may be continuously co-located with the lateral compaction element 200, the first lateral retention element 201 , and the second lateral retention element 202.
- first lateral compaction element extension 201 and/or the second lateral compaction element extension 202 may be a continuous lateral compaction element of lateral compaction element 200.
- the lateral compaction element may be a continuous lateral compaction element.
- Figure 33 illustrates an example of bottom section of a displacement pile wherein a lateral compaction maintenance element extends up the pile shaft beyond the cutting blade.
- the soil (medium) displacement head 108 is connected to an elongated, tubular pipe 102 with a hollow central chamber.
- a top section of the elongated, tubular pipe 102 may include a reverse auger (not shown) and/or the top section of the elongated, tubular pipe 102 may include indentations (not shown) and/or projections (not shown) to provide a gripping interface between grout introduced into an annulus produced by the displacement pile and the displacement pile, as well as, providing an interface that resists the grout from shearing along the surface between the grout and the displacement pile.
- the soil (medium) displacement head 108 also includes a cutting blade 112 that has a leading edge 114 and a trailing edge 116.
- the leading edge 114 of cutting blade 112 cuts into the soil (medium) as the displacement pile is rotated and loosens the soil (medium) at such contact point.
- the soil (medium) displacement head 108 may be equipped with a point 118 to promote this cutting.
- the loosened soil (medium) passes over cutting blade 112 and thereafter past trailing edge
- the soil (medium) displacement head 108 includes at least one lateral compaction element.
- the lateral compaction element 220 has a diameter less than the diameter of the lateral compaction element 200.
- the lateral compaction element 210 has a diameter that is between the diameters of the lateral compaction element 220 and the lateral compaction element 200.
- the lateral compaction element 201 may have a diameter greater than a diameter of the lateral compaction element 200, or the lateral compaction element 201 may have a diameter equal to the diameter of the lateral compaction element 200.
- the soil is laterally compacted by the first lateral compaction element 220, more compacted by the second lateral compaction element 210 (enlarging the diameter of the bored hole) and even more compacted by the third lateral compaction element 200, and if the lateral compaction element 201 has a diameter greater than a diameter of the lateral compaction element 200, even more compacted by the fourth lateral compaction element 201.
- the lateral compaction element 201 includes a deformation structure 120 that cuts into or gouges the wall of the annulus or bore created by lateral compaction elements (220, 210, 200, 201), so as to create a deformation in the wall of the annulus or bore.
- the deformation in the wall of the annulus or bore assists in preventing shearing between the grout and the soil (medium).
- a lateral compaction maintenance element 2102 is positioned above the trailing edge 116 of the cutting blade 112 and the fourth lateral compaction element 201. As illustrated in Figure 33, the lateral compaction maintenance element 2102 has the same diameter as the lateral compaction element 201. The lateral compaction maintenance element 2102 assists in preventing the annulus from collapsing before the grout can be introduced into the annulus, thereby enabling an effectively filling of the annulus with grout.
- the lateral compaction maintenance element 2102 may be, as illustrated in Figure 33, a hollow cylinder that is connected to the elongated, tubular pipe 102 via spacers 2103.
- the spacers 2103 may be constructed of a metal or metal alloy and welded to the elongated, tubular pipe 102 and the lateral compaction maintenance element 2102.
- the length or extension of the lateral compaction maintenance element 2102 may vary depending upon the nature of the medium (soil). If the medium (soil) is very loose, the length or extension of the lateral compaction maintenance element 2102 will be greater than the length or extension of the lateral compaction maintenance element 2102 when the medium (soil) is hard.
- the deformation structure 120 may be co-located with the lateral compaction element 201 , or alternatively, the deformation structure 120 may be co-located with the lateral compaction maintenance element 2102. Alternatively, the deformation structure 120 may be continuously co-located with the lateral compaction element 201 and the lateral compaction maintenance element 2102.
- the lateral compaction elements may be a continuous lateral compaction element.
- the lateral compaction maintenance element 2102 is located on the elongated, tubular pipe 102 above the cutting blade 112.
- a bottom of the lateral compaction maintenance element 2102 is located in close proximity to the trailing edge 116 of the cutting blade 112 to prevent a collapse of the annulus formed by the lateral compaction element(s).
- FIG 19 illustrates a side view of a pile picking adapter with a swivel in a parallel position.
- a pile picking adapter 1000 includes a driver coupling member 1100 to enable coupling of the pile picking adapter 1000 to a driving unit (not shown) that drives a pile.
- the pile picking adapter 1000 also includes a swivel 1200 and a pile coupling member 1300.
- the swivel 1200 allows the pile coupling member 1300 to swivel (rotate) with respect to the driver coupling member 1100.
- the swivel 1200 provides a rotation of 180°.
- the pile coupling member 1300 includes swivel engagement members 1310 that engage swivel 1200.
- the swivel engagement members 1310 are orthogonal to a pile backing stop plate 1320.
- the pile backing stop plate 1320 provides a stop to enable alignment of a pile (not shown) when attaching a pile to the pile picking adapter 1000.
- the pile coupling member 1300 also includes pile wings 1350, which are orthogonal to the pile backing stop plate 1320.
- the pile wings 1350 include holes 1330 for enabling the bolting or riveting (attaching) of the pile coupling member 1300 to a pile.
- the pile coupling member 1300 also includes pile adapter 1340, which a curved surface for engaging the pile and providing alignment when attaching a pile to the pile picking adapter 1000.
- FIG 20 illustrates a side view of a pile picking adapter with a swivel in a 45° position.
- a pile picking adapter 1000 includes a driver coupling member 1100 to enable coupling of the pile picking adapter 1000 to a driving unit (not shown) that drives a pile.
- the pile picking adapter 1000 also includes a swivel 1200 and a pile coupling member.
- the swivel 1200 allows the pile coupling member 1300 to swivel (rotate) with respect to the driver coupling member 1100. In one embodiment, the swivel 1200 provides a rotation of 180°.
- the pile coupling member includes swivel engagement members 1310 that engage swivel 1200.
- the swivel engagement members 1310 are orthogonal to a pile backing stop plate 1320.
- the pile backing stop plate 1320 provides a stop to enable alignment of a pile (not shown) when attaching a pile to the pile picking adapter 1000.
- the pile coupling member also includes pile wings 1350, which are orthogonal to the pile backing stop plate 1320.
- the pile wings 1350 include holes 1330 for enabling the bolting or riveting (attaching) of the pile coupling member 1300 to a pile.
- FIG. 21 illustrates a side view of a pile picking adapter with a swivel in an orthogonal position.
- a pile picking adapter 1000 includes a driver coupling member 1100 to enable coupling of the pile picking adapter 1000 to a driving unit (not shown) that drives a pile.
- the pile picking adapter 1000 also includes a swivel 1200 and a pile coupling member.
- the swivel 1200 allows the pile coupling member 1300 to swivel (rotate) with respect to the driver coupling member 1100. In one embodiment, the swivel 1200 provides a rotation of 180°.
- the pile coupling member includes swivel engagement members 1310 that engage swivel 1200.
- the swivel engagement members 1310 are orthogonal to a pile backing stop plate 1320.
- the pile backing stop plate 1320 provides a stop to enable alignment of a pile (not shown) when attaching a pile to the pile picking adapter 1000.
- the pile coupling member also includes pile wings 1350, which are orthogonal to the pile backing stop plate 1320.
- the pile wings 1350 include holes 1330 for enabling the bolting or riveting (attaching) of the pile coupling member 1300 to a pile.
- the pile coupling member also includes pile adapter 1340, which a curved surface for engaging the pile and providing alignment when attaching a pile to the pile picking adapter 1000.
- FIG 22 illustrates a side view of a pile picking adapter engaging a pile with a swivel in an orthogonal position.
- a pile picking adapter 1000 includes a driver coupling member 1100 to enable coupling of the pile picking adapter 1000 to a driving unit (not shown) that drives a pile 1400.
- the pile picking adapter 1000 also includes a swivel 1200 and a pile coupling member.
- the swivel 1200 allows the pile coupling member 1300 to swivel (rotate) with respect to the driver coupling member 1100. In one embodiment, the swivel 1200 provides a rotation of 180°.
- the pile coupling member includes swivel engagement members 1310 that engage swivel 1200.
- the swivel engagement members 1310 are orthogonal to a pile backing stop plate 1320.
- the pile backing stop plate 1320 provides a stop to enable alignment of the pile 1400 when attaching a pile to the pile picking adapter 1000.
- the pile coupling member also includes pile wings 1350, which are orthogonal to the pile backing stop plate 1320.
- the pile wings 1350 include holes 1330 for enabling the bolting or riveting (attaching) of the pile coupling member 1300 to the pile 1400.
- pile 1400 includes holes 1410 for enabling the bolting or riveting (attaching) of the pile coupling member 1300 to the pile 1400.
- the pile coupling member also includes pile adapter 1340, which a curved surface for engaging the pile and providing alignment when attaching a pile to the pile picking adapter 1000.
- Figure 23 illustrates a pile picking adapter engaged with a pile with a swivel in an orthogonal position.
- a pile picking adapter 1000 includes a driver coupling member 1100 to enable coupling of the pile picking adapter 1000 to a driving unit (not shown) that drives a pile 1400.
- the pile picking adapter 1000 also includes a swivel 1200 and a pile coupling member.
- the swivel 1200 allows the pile coupling member 1300 to swivel (rotate) with respect to the driver coupling member 1100.
- the swivel 1200 provides a rotation of 180°.
- the pile coupling member includes swivel engagement members 1310 that engage swivel 1200.
- the swivel engagement members 1310 are orthogonal to a pile backing stop plate 1320.
- the pile backing stop plate 1320 provides a stop to enable alignment of the pile 1400 when attaching a pile to the pile picking adapter 1000.
- the pile coupling member also includes pile wings 1350, which are orthogonal to the pile backing stop plate 1320.
- the pile wings 1350 include holes 1330 for enabling the bolting or riveting (attaching) of the pile coupling member 1300 to the pile 1400.
- pile 1400 includes holes 1410 for enabling the bolting or riveting (attaching) of the pile coupling member 1300 to the pile 1400.
- the pile coupling member also includes pile adapter 1340, which a curved surface for engaging the pile and providing alignment when attaching a pile to the pile picking adapter 1000.
- the above described pile picking adapter provides an effective means for coupling a large pile to a drive unit. More specifically, the pile picking adaptor enables attachment to a drive unit.
- the drive unit is able to be lowered over the pile at any angle radially to the machine having the drive unit attached thereto.
- the pile coupling member moving at the swivel to lay down over the pile attachment point and align to the pile attachment points. After being connected, the pile can be lifted to the drive position.
- FIG. 24 illustrates a pile with a vertical flange for supporting excavation members.
- a pile 2000 includes vertical flange(s) 2100 for supporting excavation members 3000.
- the vertical flange(s) 2100 may be further attached to the pile 2000 by braces 2200.
- the vertical flange(s) 2100 includes holes 2110 for enabling the bolting or riveting (attaching) of the supporting excavation members 3000 to the pile 2000, via the vertical flange(s) 2100.
- the vertical flange(s) 2100 are secured (attached) to the pile 2000 prior driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- the positioning of the vertical flange(s) 2100 on the pile 2000 is such that the vertical flange(s) 2100 do not interfere with the driving unit driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- the vertical flange(s) 2100 are secured (attached) to the pile 2000 when constructing the pile 2000.
- the vertical flange(s) 2100 may be welded to the pile
- FIG. 25 illustrates a top view of a pile with a vertical flange for supporting excavation members.
- a pile 2000 includes vertical flange(s) 2100 for supporting excavation members 3000.
- the vertical flange(s) 2100 may be further attached to the pile 2000 by braces 2200.
- the vertical flange(s) 2100 include holes 2110 for enabling the bolting or riveting (attaching) of the supporting excavation members 3000 to the pile 2000, via the vertical flange(s) 2100.
- the vertical flange(s) 2100 are secured (attached) to the pile 2000 prior driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven. Moreover, the positioning of the vertical flange(s) 2100 on the pile 2000 is such that the vertical flange(s) 2100 do not interfere with the driving unit driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- the vertical flange(s) 2100 are secured (attached) to the pile 2000 when constructing the pile 2000.
- the vertical flange(s) 2100 may be welded to the pile
- Figure 26 illustrates a pile with a vertical coupling component for supporting excavation members having a mating vertical coupling component.
- a pile 2000 includes a vertical coupling component 2300 for mating with a vertical coupling component 3100 of a supporting excavation member 3000.
- the vertical coupling component 2300 is secured (attached) to the pile 2000 prior driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven. Moreover, the positioning of the vertical coupling component 2300 on the pile 2000 is such that the vertical coupling component 2300 does not interfere with the driving unit driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- the vertical coupling component 2300 is secured (attached) to the pile 2000 when constructing the pile 2000.
- the vertical coupling component 2300 may be welded to the pile 2000.
- FIGs 27 and 28 illustrate a pile with multiple vertical flanges for supporting excavation members.
- a pile 2000 includes two vertical flanges 2100, located on one side of the pile 2000, for supporting excavation members 3000.
- the vertical flanges 2100 may be further attached to the pile 2000 by braces (not shown).
- the vertical flanges 2100 include holes 2110 for enabling the bolting or riveting (attaching) of the supporting excavation members 3000 to the pile 2000, via the vertical flanges 2100.
- the vertical flanges 2100 are secured (attached) to the pile 2000 prior driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- the positioning of the vertical flanges 2100 on the pile 2000 is such that the vertical flanges 2100 do not interfere with the driving unit driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- the vertical flanges 2100 are secured (attached) to the pile 2000 when constructing the pile 2000.
- the vertical flanges 2100 may be welded to the pile 2000.
- a pile 2000 includes four vertical flanges 2100, tow located on one side of the pile 2000 and two located on an opposite side of the pile 2000, for supporting excavation members 3000.
- the vertical flanges 2100 may be further attached to the pile 2000 by braces (not shown).
- the vertical flanges 2100 include holes 2110 for enabling the bolting or riveting (attaching) of the supporting excavation members 3000 to the pile 2000, via the vertical flanges 2100.
- the vertical flanges 2100 are secured (attached) to the pile 2000 prior driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven. Moreover, the positioning of the vertical flanges 2100 on the pile 2000 is such that the vertical flanges 2100 do not interfere with the driving unit driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- the vertical flanges 2100 are secured (attached) to the pile 2000 when constructing the pile 2000.
- the vertical flanges 2100 may be welded to the pile 2000.
- FIG. 29 and Figure 30 illustrate a pile with a vertical flange for supporting excavation member.
- a pile 2000 includes a vertical flange 2100 for supporting excavation members 3000.
- the vertical flange 2100 may be further attached to the pile 2000 by braces 2200.
- the vertical flange 2100 includes holes 2110 for enabling the bolting or riveting (attaching) of the supporting excavation members 3000 to the pile 2000, via the vertical flange 2100.
- the vertical flange 2100 is secured (attached) to the pile 2000 prior driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven. Moreover, the positioning of the vertical flange 2100 on the pile 2000 is such that the vertical flange 2100 does not interfere with the driving unit driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- the vertical flange 2100 is secured (attached) to the pile 2000 when constructing the pile 2000.
- the vertical flange 2100 may be welded to the pile 2000.
- a pile 2000 includes a vertical flange 2100 for supporting excavation members 3000.
- the vertical flange 2100 may be further attached to the pile 2000 by braces 2200.
- the vertical flange 2100 includes holes 2110 for enabling the bolting or riveting (attaching), via bolt or rivet 4000, of the supporting excavation members 3000 to the pile 2000, via the vertical flange 2100.
- the vertical flange 2100 is secured (attached) to the pile 2000 prior driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven. Moreover, the positioning of the vertical flange 2100 on the pile 2000 is such that the vertical flange 2100 does not interfere with the driving unit driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- the vertical flange 2100 is secured (attached) to the pile 2000 when constructing the pile 2000.
- the vertical flange 2100 may be welded to the pile 2000.
- FIG 31 illustrates a pile with a vertical flange for supporting excavation members.
- a pile 2000 includes a C-shaped vertical flange 2500 for supporting excavation members (not shown).
- the C-shaped vertical flange 2500 includes holes (not shown) for enabling the bolting or riveting (attaching of the supporting excavation members to the pile 2000, via the C-shaped vertical flange 2500.
- the C-shaped vertical flange 2500 is secured (attached) to the pile 2000 prior driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- the positioning of the C-shaped vertical flange 2500 on the pile 2000 is such that the C-shaped vertical flange 2500 does not interfere with the driving unit driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- FIG 32 illustrates a pile with a vertical coupling component for supporting excavation members.
- a pile 2000 includes a vertical hookshaped coupling component 2400 for mating with a vertical coupling component of a supporting excavation member.
- the vertical hook-shaped coupling component 2400 is secured (attached) to the pile 2000 prior driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven. Moreover, the positioning of the vertical hook-shaped coupling component 2400 on the pile 2000 is such that the vertical hook-shaped coupling component 2400 does not interfere with the driving unit driving the pile 2000 into the ground or medium into which the pile 2000 is to be driven.
- the vertical hook-shaped coupling component 2400 is secured (attached) to the pile 2000 when constructing the pile 2000.
- the vertical hook-shaped coupling component 2400 may be welded to the pile 2000.
- Figure 34 illustrates a two-direction swing pile adapter 3400.
- the two-direction swing pile adapter 3400 includes a first ring 3430.
- the first ring 3430 is operatively connected to a first support arm 3410 via a first swivel connector 3450.
- the first ring 3430 is also operatively connected to a second support arm 3418 via a second swivel connector 3455.
- the first swivel connector 3450 is located opposite the second swivel connector 3455, with respect to the first ring 3430, such that a line from a center point of the first ring 3430 to the first swivel connector 3450 and a line from a center point of the first ring 3430 to the second swivel connector 3455 would form an angle substantially equal to 180°.
- the two-direction swing pile adapter 3400 includes a first cylinder 3440 for engaging a pile (not shown).
- the first cylinder 3440 is operatively connected to the first ring 3430 via a third swivel connector 3460.
- the first cylinder 3440 is also operatively connected to the first ring 3430 via a fourth swivel connector 3465.
- the third swivel connector 3460 is located opposite the fourth swivel connector 3465, with respect to the first cylinder 3440, such that a line from a center point of the first cylinder 3440 to the third swivel connector 3460 and a line from a center point of the first cylinder 3440 to the fourth swivel connector 3465 would form an angle substantially equal to 180°.
- a cross support bar 3412 is connected to the first support arm 3410 and the second support arm 3418.
- the two-direction swing pile adapter 3400 includes an attachment member 3420 having attachment mechanisms 3425 for coupling a pile to either a pile driver or supporting excavation members.
- the design and configuration of the attachment mechanisms 3425 would match the interface of the object that is being coupled to the pile.
- the attachment member 3420 is connected to the cross support bar 3412 via a third support arm 3413, a fourth support arm 3415, a fifth support arm 3417, and a sixth support arm 3419.
- connections between the various support arms and the cross support bar and the attachment member may be welds.
- the first swivel connector 3450 and the second swivel connector 3455 provide a minimum swing of 40° between the pile and the object that is being coupled to the pile.
- the third swivel connector 3450 and the fourth swivel connector 3455 provide a minimum swing of 20° between the pile and the object that is being coupled to the pile.
- the swing provided by the first swivel connector 3450 and the second swivel connector 3455 is orthogonal to the swing provided by the third swivel connector 3450 and the fourth swivel connector 3455.
- the two-direction swing pile adapter 3400 provides a minimum swing of 40° in a first direction and a minimum swing of 20° in a second direction, wherein the first direction is orthogonal to the second direction.
- the two-direction swing pile adapter 3400 provides a minimum swing of 40° in a direction orthogonal to the cross support bar 3412 and provides a minimum swing of 20° in a direction parallel to the cross support bar 3412.
- the two-direction swing pile adapter 3400 provides two degrees of adaptability when attempting to couple a pile to supporting excavation members.
- the adaptability enhances the coupling process when the pile is not necessary driven straight into the medium.
- the degrees of freedom, provided by the two-direction swing pile adapter 3400, enable a coupling to a non-plumb pile and erecting plumb supporting excavation members.
- the two-direction swing pile adapter 3400 provides two degrees of adaptability when attempting to couple a pile to pile driver.
- the adaptability enhances the coupling process when the pile driver cannot be positioned directly over the pile, thereby enabling driving the pile from different angles.
- Figure 35 illustrates a pound-driven pile 3500.
- a pound-driven pile is a pile that is driven into the medium (ground) solely by a pile driver that pounds (hammers) the pile. The pile driver applies no rotation to the pile as it is driven.
- the pound-driven pile 3500 includes a shaft 3510 and a displacement head 3530 that includes a head 3525 for transferring the force from the pounding to the medium to break up the medium and a lateral compaction member 3523 for laterally compacting the medium to create an annulus 3520 in the medium.
- the shaft 3510 may be hollow to allow the introduction of grout into the annulus 3520.
- the displacement head 3530 may include an opening to allow the introduction of grout into the annulus 3520.
- Figure 36 illustrates a pound-driven pile 3600 that includes fins (3640 and 3650).
- a pound-driven pile is a pile that is driven into the medium (ground) solely by a pile driver that pounds (hammers) the pile. The pile driver applies no rotation to the pile as it is driven.
- the pound-driven pile 3600 includes a shaft 3610 and a displacement head 3630 that includes a head 3625 for transferring the force from the pounding to the medium to break up the medium and a lateral compaction member 3623 for laterally compacting the medium to create an annulus 3620 in the medium.
- the shaft 3610 has fins (3640 and 3650) orientated at different angles.
- the fins (3640 and 3650) orientated such that when the pound-driven pile 3600 is pounded by the pile driver, the fins (3640 and 3650) cause the pound-driven pile 3600 to rotate.
- the fins (3640 and 3650) are solid projections that extend outwardly from the shaft 3610.
- the fins (3640 and 3650) extend outwardly enough from the shaft 3610 to engage the annulus 3610 and cut continuous grooves 3625 into the wall of the annulus 3610.
- the continuous grooves 3625 prevent shearing at the interface between the grout and the wall of the annulus 3610.
- the shaft 3610 may be hollow to allow the introduction of grout into the annulus 3620.
- the displacement head 3630 may include an opening to allow the introduction of grout into the annulus 3620.
- the shaft 3610 may include threads, projections, and/or indentations, as illustrated in Figures 2, 3, 4, or 5.
- the threads, projections, and/or indentations of shaft 3610 provide a gripping interface between the grout introduced into the annulus 3620 and the shaft 3610, as well as, providing an interface that resists the grout from shearing along the surface between the grout and the shaft 3610.
- Figure 37 illustrates a micropile 4000 that includes a casing 4100.
- a pile shaft 4200 is located within the casing 4100.
- a displacement head 4400 is connected to the pile shaft 4200.
- the displacement head 4400 creates an annulus 500 in a medium (such as soil) as the displacement head 4400 is driven (rotated in direction 4500) into the medium.
- the displacement head 4400 may include a helical blade 4450 having a leading edge and a trailing edge.
- the driving helical blade 4450 is configured to move the displacement head 4400 into the medium.
- the displacement head 4400 also may include a lateral compaction member 4425 to create the annulus 500 within the medium.
- the lateral compaction member 4425 has a diameter equal to or larger than a diameter of the casing 4100.
- the displacement head 4400 may include a displacement head point member 4475.
- the micropile 4000 as illustrated in Figure 37, includes a helical blade 4300 on the casing 4100.
- the helical blade 4300 is configured to drive the casing 4100 out of a medium when the casing 4100 is rotated in the direction 4550, as illustrated in Figure 38.
- FIG 39 illustrates a micropile 4000 that includes a casing 4100.
- a pile shaft 4200 is located within the casing 4100.
- a displacement head 4400 is connected to the pile shaft 4200. The displacement head 4400 creates an annulus 500 in a medium as the displacement head 4400 is driven (rotated in direction 4500) into the medium.
- the displacement head 4400 may include a helical blade 4450 having a leading edge and a trailing edge.
- the driving helical blade 4450 is configured to move the displacement head 4400 into the medium.
- the displacement head 4400 also may include a lateral compaction member 4425 to create the annulus 500 within the medium.
- the lateral compaction member 4425 has a diameter equal to or larger than a diameter of the casing 4100.
- the displacement head 4400 may include a displacement head point member 4475.
- micropile 4000 does not include a helical blade on the casing.
- the casing 4100 is disengaged from the displacement head 4500 when the casing 4100 is rotated in the direction 4550. This allows the displacement head 4500 to remain in place in the medium as the casing 4100 is moved away from the displacement head 4500 or out of the annulus 500.
- the casing 4100 maintains the integrity of the annulus 500 as the micropile 4000 is driven into the medium, and the casing 4100 can be removed after the micropile 4000 has been driven to a desired depth in the medium.
- the casing 4100 can be removed as grout or other filling material is pumped into the annulus 500.
- casing 4100 and displacement head 4400 have an interface 5000. More specifically, casing 4100 has an interface that includes surface 4150 and surface 4155, and displacement head 4400 has an interface that includes surface 4450 and surface 4455.
- the surface 4150 of casing 4100 engages the surface 4450 of displacement head 4400, as shown by the arrows. More specifically, as the casing is rotated in direction 4500, the surface 4150 of casing 4100 engages the surface 4450 of displacement head 4400 so that torque, if desired, can be transferred from the casing 4100 to the displacement head 4500.
- the surfaces 4150 and 4450 are orientated to enable effective transference of torque; preferably, the surfaces 4150 and 4450 are substantially orthogonal to the direction of torque being applied thereto.
- the surface 4150 of casing 4100 disengages the surface 4450 of displacement head 4400, as shown by the arrows.
- the surfaces 4155 and 4455 are orientated so as to enable effective disengagement when the casing is rotated in direction 4550; preferably, the surfaces 4155 and 4455 are substantially parallel or non-orthogonal to the direction of torque being applied thereto when the casing is rotated in direction 4500.
- the interface 5000 of Figures 41 and 42 allows the casing 4100 to be removed from the annulus or moved away from the displacement head 4500, while leaving the displacement head 4500 in place.
- the interface of the casing 4100 is configured to engage the interface of the displacement head 4500 when the casing is rotated in a first direction (4500), and the interface of the casing 4100 is configured to disengage from the interface of the displacement head 4500 when the casing is rotated in a second (opposite) direction (4550).
- the displacement head 4500 may include a deformation structure to form a deformation in a wall of the annulus created by the displacement head 4500.
- the torque needed to drive the displacement head 4500 into the medium can be supplied by rotating the casing 4100 or the pile shaft 4200 or a combination of both.
- a pile picking adapter comprises a driver coupling member to enable coupling of the pile picking adapter to a pile driving unit; a swivel; and a pile coupling member to enable coupling of the pile picking adapter to a pile.
- the swivel may be configured to enable the pile coupling member to swivel 180° with respect to the driver coupling member.
- the pile coupling member may include a pile backing stop plate, swivel engagement members, and pile wings; the swivel engagement members being orthogonal to the pile backing stop plate; the pile wings being orthogonal to the pile backing stop plate.
- the pile coupling member may include a pile adapter surface for providing engagement and alignment when attaching a pile to the pile picking adapter.
- a bi-directional swing pile adapter comprises a first ring; a first support arm; a second support arm; a first swivel connector to operatively connect the first ring to the first support arm in a swivel manner; a second swivel connector to operatively connect the first ring to the second support arm in a swivel manner; a pile coupling member to enable coupling to a pile; a third swivel connector to operatively connect the first ring to the pile coupling member in a swivel manner; and a fourth swivel connector to operatively connect the first ring to the pile coupling member in a swivel manner.
- the bi-directional swing pile adapter may include a cross support bar operatively connected to the first support arm and the second support arm.
- the bi-directional swing pile adapter may include a driver attachment member for coupling a pile to a pile driver.
- the bi directional swing pile adapter may include a supporting excavation member attachment member for coupling a pile to supporting excavation members.
- the first swivel connector and the second swivel connector may provide a swing equal to or greater than 40°.
- the third swivel connector and the fourth swivel connector may provide a swing equal to or greater than 20°.
- the third swivel connector and the fourth swivel connector may provide a swing equal to or greater than 20°.
- the swing provided by the first swivel connector and the second swivel connector may be orthogonal to the swing provided by the third swivel connector and the fourth swivel connector.
- the first swivel connector and the second swivel connector may provide a swing equal to or greater than 40° in a direction orthogonal to the cross support bar.
- the third swivel connector and the fourth swivel connector may provide a swing equal to or greater than 20° in a direction parallel to the cross support bar.
- a pile for use with supporting excavation members comprises a pile shaft; and vertical flanges; the vertical flanges including through-holes to enable attaching supporting excavation members thereto.
- the vertical flanges may be welded to the pile shaft.
- the pile may include braces, the braces being welded to the pile shaft and the vertical flanges.
- a pile for use with supporting excavation members comprises a pile shaft; and a mating vertical coupling component for mating with a vertical coupling component of a supporting excavation member.
- a pile for use with supporting excavation members comprises a pile shaft; and a C-shaped vertical flange; the C-shaped vertical flange including through-holes to enable attaching supporting excavation members thereto.
- the C-shaped vertical flange may be welded to the pile shaft.
- a pile for being placed in a medium comprises a pile shaft; a helical blade, operatively connected to the pile shaft, having a leading edge and a trailing edge and configured to move the pile into the medium; a lateral compaction protrusion to create an annulus, within the medium, having a diameter larger than a diameter of the elongated pile shaft; and a lateral retention element, extending beyond the trailing edge of the helical blade, for preventing a portion of the annulus, above the trailing edge of the helical blade, from collapsing.
- the pile may include a deformation structure to form a deformation in a wall of the annulus created by the lateral compaction protrusion.
- the deformation structure may be formed on the lateral compaction protrusion.
- the deformation structure may be formed on the lateral retention element.
- the pile may include a helical auger, operatively connected to the elongated pile shaft, configured to move material; the helical blade having a first handedness; the helical auger having a second handedness; the first handedness being different than the second handedness.
- the lateral retention element may extend one turn around the pile shaft.
- the lateral retention element may extend more than one turn around the pile shaft.
- the lateral retention element may extend less than one turn around the pile shaft.
- the pile may include a second lateral retention element, extending beyond the trailing edge of the helical blade, for preventing a portion of the annulus, above the trailing edge of the helical blade, from collapsing.
- the deformation structure may be formed on the second lateral retention element.
- the second lateral retention element may extend one turn around the pile shaft.
- the second lateral retention element may extend more than one turn around the pile shaft.
- the second lateral retention element may extend less than one turn around the pile shaft.
- the lateral retention element may be a hollow cylinder extending beyond the trailing edge of the helical blade, for preventing a portion of the annulus, above the trailing edge of the helical blade, from collapsing.
- the lateral retention element may include spacers located within the hollow cylinder.
- a pile for being placed in a medium comprises a pile shaft; soil displacement head, operatively connected to the pile shaft, configured to move the pile into the medium and to create an annulus in the medium; a helical auger, operatively connected to the pile shaft, configured to move material; and a lateral retention element, extending beyond the displacement head, for preventing a portion of the annulus, above the displacement head, from collapsing.
- the pile may include a deformation structure to form a deformation in a wall of the annulus created by the displacement head.
- the deformation structure may be formed on the lateral retention element.
- a pound-driven pile comprises a pile shaft; a displacement head, located at one end of the pile shaft; the displacement head including a head member for transferring a force from pounding the pile to a medium and a lateral compaction member for laterally compacting the medium to create an annulus; and a fin, extending outwardly from the shaft, to cut a continuous groove into a wall of the annulus created by the lateral compaction member.
- the fin may be configured to cause the pile to rotate when driven into the medium from the pounding.
- the displacement head may include an opening to allow grout to be pumped into the annulus.
- the pile shaft may include threads to prevent shearing between the pile shaft and grout; projections to prevent shearing between the pile shaft and grout; and/or indentations to prevent shearing between the pile shaft and grout.
- a pound-driven pile comprises a pile shaft; a displacement head, located at one end of the pile shaft; the displacement head including a head member for transferring a force from pounding the pile to a medium and a lateral compaction member for laterally compacting the medium to create an annulus; and fins, extending outwardly from the shaft, to cut continuous grooves into a wall of the annulus created by the lateral compaction member.
- the fins may be configured to cause the pile to rotate when driven into the medium from the pounding.
- the displacement head may include an opening to allow grout to be pumped into the annulus.
- the pile shaft may include threads to prevent shearing between the pile shaft and grout; projections to prevent shearing between the pile shaft and grout; and/or indentations to prevent shearing between the pile shaft and grout.
- a micropile comprises a casing; a shaft, located within the casing; and a displacement head, connected to the shaft, to create an annulus in a medium; the casing having a casing interface for interfacing with a displacement head interface of the displacement head; the casing interface configured to engaged the displacement head interface when the casing is rotated in a first direction; the casing interface configured to disengaged from the displacement head interface when the casing is rotated in a second direction.
- the displacement head may include a helical blade having a leading edge and a trailing edge and configured to move the displacement head into the medium; and a lateral compaction member to create the annulus, within the medium, having a diameter equal to or larger than a diameter of the casing.
- the casing may include a helical blade, the helical blade configured to drive the casing out of a medium when the casing is rotated in the second direction.
- the casing may include a helical blade, the helical blade configured to create a deformation in a wall of the annulus.
- the displacement head may include a deformation structure to form a deformation in a wall of the annulus created by the displacement head.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AU2020277477A AU2020277477A1 (en) | 2019-05-22 | 2020-05-22 | Displacement pile and pile driver adapter |
CA3140714A CA3140714A1 (en) | 2019-05-22 | 2020-05-22 | Displacement pile and pile driver adapter |
EP20809436.7A EP3973107A4 (en) | 2019-05-22 | 2020-05-22 | Displacement pile and pile driver adapter |
US17/528,642 US20220162822A1 (en) | 2019-05-22 | 2021-11-17 | Displacement pile and pile driver adapter |
Applications Claiming Priority (8)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201962851586P | 2019-05-22 | 2019-05-22 | |
US62/851,586 | 2019-05-22 | ||
US201962915729P | 2019-10-16 | 2019-10-16 | |
US62/915,729 | 2019-10-16 | ||
US202062980352P | 2020-02-23 | 2020-02-23 | |
US202062980371P | 2020-02-23 | 2020-02-23 | |
US62/980,371 | 2020-02-23 | ||
US62/980,352 | 2020-02-23 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US17/528,642 Continuation-In-Part US20220162822A1 (en) | 2019-05-22 | 2021-11-17 | Displacement pile and pile driver adapter |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2020237113A1 true WO2020237113A1 (en) | 2020-11-26 |
Family
ID=73458633
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2020/034122 WO2020237113A1 (en) | 2019-05-22 | 2020-05-22 | Displacement pile and pile driver adapter |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3973107A4 (en) |
AU (1) | AU2020277477A1 (en) |
CA (1) | CA3140714A1 (en) |
WO (1) | WO2020237113A1 (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1566631A (en) * | 1925-12-22 | oe dover | ||
US2501369A (en) * | 1946-10-11 | 1950-03-21 | Frederick F Zavatkay | Folding pile driver lead |
US3149851A (en) * | 1960-12-29 | 1964-09-22 | Vulcan Iron Works | Pulling adapter |
US5145286A (en) * | 1990-09-12 | 1992-09-08 | Summers Eugene R | Earth anchor driving and removing apparatus and method therefore |
JP2002356846A (en) | 2001-06-01 | 2002-12-13 | Giken Seisakusho Co Ltd | Diameter-widened pile and method for forming the same |
US8070391B2 (en) * | 2005-07-20 | 2011-12-06 | American Piledriving Equipment, Inc. | Systems and methods for handling piles |
US20140377011A1 (en) * | 2009-05-27 | 2014-12-25 | American Piledriving Equipment, Inc. | Helmet adapter for pile drivers |
US9284708B2 (en) * | 2005-03-02 | 2016-03-15 | Steve Neville | Screw pile substructure support system |
US20180030681A1 (en) * | 2006-09-08 | 2018-02-01 | Benjamin G. Stroyer | Pile coupling for helical pile/torqued in pile |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1348994A (en) * | 1916-12-07 | 1920-08-10 | George R Heckle | Pile |
GB687592A (en) * | 1950-07-13 | 1953-02-18 | British Steel Piling Co Ltd | Improvements in the driving and formation of cased concrete piles |
GB910089A (en) * | 1960-07-07 | 1962-11-07 | Allan Gordon Tomlin | Improvements in or relating to pile construction and pile driving |
JPS6013118A (en) * | 1983-07-04 | 1985-01-23 | Matsuzawa Kiko:Kk | Pile erection work and excavation head for forming consolidated perforated wall therefor |
BE1009519A3 (en) * | 1995-06-08 | 1997-04-01 | B A Olivier Betonfabriek En Fu | PROCESS FOR PRODUCING soil displacement piles. |
JP2002167759A (en) * | 2000-12-05 | 2002-06-11 | Toyo Asano Found Co Ltd | Execution method of foundation pile |
KR100706976B1 (en) * | 2005-07-14 | 2007-04-12 | 비비엠코리아(주) | Foundation structure using steel tubes |
CN201981535U (en) * | 2011-03-18 | 2011-09-21 | 翟宇思 | Construction device of ramming compaction pile ramming expanded pile |
US9371624B2 (en) * | 2013-07-05 | 2016-06-21 | American Piledriving Equipment, Inc. | Accessory connection systems and methods for use with helical piledriving systems |
KR101640971B1 (en) * | 2013-10-29 | 2016-07-19 | 최현규 | Connecting a sheet pile for retaining wall |
CN106194030B (en) * | 2016-08-30 | 2018-07-03 | 昆明良工桩机制造有限公司 | A kind of double power head long spire rotation drill machine with casing and the method using its bored pile |
KR101761734B1 (en) * | 2016-12-19 | 2017-07-26 | 유한회사 강남이앤씨 | Cutoff wall structure of continuous wall type with hot rolled steel plate, and construction method of cutoff wall of temporary facility using the same |
CN108265708B (en) * | 2018-03-28 | 2024-03-15 | 周兆弟 | Piling equipment |
-
2020
- 2020-05-22 WO PCT/US2020/034122 patent/WO2020237113A1/en unknown
- 2020-05-22 AU AU2020277477A patent/AU2020277477A1/en active Pending
- 2020-05-22 EP EP20809436.7A patent/EP3973107A4/en active Pending
- 2020-05-22 CA CA3140714A patent/CA3140714A1/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1566631A (en) * | 1925-12-22 | oe dover | ||
US2501369A (en) * | 1946-10-11 | 1950-03-21 | Frederick F Zavatkay | Folding pile driver lead |
US3149851A (en) * | 1960-12-29 | 1964-09-22 | Vulcan Iron Works | Pulling adapter |
US5145286A (en) * | 1990-09-12 | 1992-09-08 | Summers Eugene R | Earth anchor driving and removing apparatus and method therefore |
JP2002356846A (en) | 2001-06-01 | 2002-12-13 | Giken Seisakusho Co Ltd | Diameter-widened pile and method for forming the same |
US9284708B2 (en) * | 2005-03-02 | 2016-03-15 | Steve Neville | Screw pile substructure support system |
US8070391B2 (en) * | 2005-07-20 | 2011-12-06 | American Piledriving Equipment, Inc. | Systems and methods for handling piles |
US20180030681A1 (en) * | 2006-09-08 | 2018-02-01 | Benjamin G. Stroyer | Pile coupling for helical pile/torqued in pile |
US20140377011A1 (en) * | 2009-05-27 | 2014-12-25 | American Piledriving Equipment, Inc. | Helmet adapter for pile drivers |
Also Published As
Publication number | Publication date |
---|---|
CA3140714A1 (en) | 2020-11-26 |
EP3973107A4 (en) | 2023-03-22 |
EP3973107A1 (en) | 2022-03-30 |
AU2020277477A1 (en) | 2021-12-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8033757B2 (en) | Auger grouted displacement pile | |
JP4808677B2 (en) | Foundation pile excavator | |
US6540443B2 (en) | Apparatus for and a method of boring the ground | |
JP6234626B1 (en) | Excavation apparatus and excavation method used for burying underground heat exchange pipe | |
US20090285637A1 (en) | Pile mandrel with extendable reaming members | |
JP2008031673A (en) | Method for confirming expanding blade diametrically expanded state of excavator for constructing foundation pile | |
US20220162822A1 (en) | Displacement pile and pile driver adapter | |
WO2020237113A1 (en) | Displacement pile and pile driver adapter | |
US20070286686A1 (en) | Method For Installing A Solidifying Material Pier Anchorage System | |
US20040173383A1 (en) | Apparatus and method for rotary bored drilling | |
JP3533981B2 (en) | Construction method of screwed pile | |
JP4604698B2 (en) | Screwed pile and its construction method | |
JP3806318B2 (en) | Foundation pile construction method and apparatus | |
KR101759879B1 (en) | Rotational penetration pile unit, rotational penetration pile and construction method thereof | |
JPH10195873A (en) | Existing structure recovery method and apparatus in all casing construction method | |
JP2519851B2 (en) | Foundation pile construction method | |
JP6875707B2 (en) | Excavator and excavation method using it | |
CN217976115U (en) | Drill rod square head structure capable of preventing drill head from falling | |
JP2006336408A (en) | Ground excavating device and ground excavating method | |
JP3142586U (en) | Pile crushing head | |
CN220955442U (en) | Drilling tool for rotary-digging filling pile machine | |
CN112878903B (en) | Drilling device for rectangular pile foundation | |
JP3298845B2 (en) | Ground reinforcement method | |
JP5127274B2 (en) | Double-pipe excavator and its construction method | |
JP4612660B2 (en) | Excavation apparatus and excavation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20809436 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 3140714 Country of ref document: CA |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
ENP | Entry into the national phase |
Ref document number: 2020277477 Country of ref document: AU Date of ref document: 20200522 Kind code of ref document: A |
|
ENP | Entry into the national phase |
Ref document number: 2020809436 Country of ref document: EP Effective date: 20211222 |