WO2020235520A1 - 情報処理装置、情報処理システム、および情報処理プログラム - Google Patents
情報処理装置、情報処理システム、および情報処理プログラム Download PDFInfo
- Publication number
- WO2020235520A1 WO2020235520A1 PCT/JP2020/019602 JP2020019602W WO2020235520A1 WO 2020235520 A1 WO2020235520 A1 WO 2020235520A1 JP 2020019602 W JP2020019602 W JP 2020019602W WO 2020235520 A1 WO2020235520 A1 WO 2020235520A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- cumulative loss
- insurance
- information processing
- data
- unknown
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/08—Insurance
Definitions
- the present invention relates to an information processing device, an information processing system, and an information processing program.
- the insurance company reserves reserve requirements such as policy reserves as payment reserves for future insurance claims and benefits.
- reserve requirements such as policy reserves as payment reserves for future insurance claims and benefits.
- the method of estimating the future insurance amount without predicting the reserve requirement is adopted.
- the prediction result will be used in many situations such as estimating the ability to pay future insurance claims and determining the amount of insurance premiums to be collected from policyholders. be able to. For this reason, a technique for accurately predicting future reserve requirements has been desired, but in the past, no study has been made on a mechanism for that purpose.
- the information processing device is an information processing device for predicting the payment reserve of an insurance company by using a neural network, and is based on past insurance claim data.
- the neural network is trained to estimate and output an unknown cumulative loss based on the billing data for which payment of insurance claims has not been completed.
- a payment reserve prediction means that predicts future payment reserves by obtaining an output of unknown cumulative loss by inputting billing data for which insurance claims have not been paid into a neural network that has been trained by And.
- the known cumulative loss calculation for calculating the known cumulative loss based on the past specific year based on the past insurance claim data.
- the training means is provided by a known cumulative loss calculation means. Based on the calculated known cumulative loss and the unknown cumulative loss calculated by the unknown cumulative loss estimation means, the unknown cumulative loss is estimated by inputting the claim data for which the insurance payment has not been completed. Train the neural network to output.
- the training means are estimated by the known cumulative loss calculated by the known cumulative loss calculating means and the unknown cumulative loss estimating means. Train the neural network so that the difference from the unknown cumulative loss is less than or equal to the minimum or preset threshold.
- the known cumulative loss calculation for calculating the known cumulative loss based on the past specific year based on the past insurance claim data.
- the training means is calculated by a known cumulative loss calculation means, further including a means and a cumulative loss rate calculation means for calculating the cumulative loss rate based on a specific past year based on past insurance claim data. Based on the known cumulative loss and the cumulative loss rate calculated by the cumulative loss rate calculation means, if you enter billing data for which insurance claims have not been paid, the unknown cumulative loss will be estimated and output. Train a neural network.
- the training means are the known cumulative loss calculated by the known cumulative loss calculating means and the cumulative loss calculated by the cumulative loss rate calculating means. Train the neural network so that the value of the mean squared error function defined with the loss rate is less than or equal to the minimum or preset threshold.
- the information processing system is an information processing system for predicting the payment reserve of an insurance company using a neural network, and is based on past insurance claim data. By training means and training means that train the neural network to estimate and output an unknown cumulative loss based on the claim data that has not been paid, when the bill data that has not been paid is entered.
- the known cumulative loss calculation for calculating the known cumulative loss based on the past specific year based on the past insurance claim data. Further provided with means and an unknown cumulative loss estimation means for estimating an unknown cumulative loss based on a specific year in the past based on past insurance claim data, the training means is provided by a known cumulative loss calculation means. Based on the calculated known cumulative loss and the unknown cumulative loss estimated by the unknown cumulative loss estimation means, the unknown cumulative loss is estimated by inputting the claim data for which the insurance payment has not been completed.
- the training means are estimated by the known cumulative loss calculated by the known cumulative loss calculating means and the unknown cumulative loss estimating means. Train the neural network so that the difference from the unknown cumulative loss is less than or equal to the minimum or preset threshold.
- the known cumulative loss calculation for calculating the known cumulative loss based on the past specific year based on the past insurance claim data.
- the training means is calculated by a known cumulative loss calculation means, further including a means and a cumulative loss rate calculation means for calculating the cumulative loss rate based on a specific past year based on past insurance claim data.
- the training means are the known cumulative loss calculated by the known cumulative loss calculating means and the cumulative loss calculated by the cumulative loss rate calculating means. Train the neural network so that the value of the mean squared error function defined with the loss rate is less than or equal to the minimum or preset threshold.
- the information processing program has completed the payment of the insurance claim based on the past claim claim data in order to predict the payment reserve of the insurance company using the neural network.
- a training procedure that trains the neural network to estimate and output an unknown cumulative loss based on claim data for which insurance claims have not been paid when no claim data is entered, and a neural that has been trained in the training procedure. Get the output of an unknown cumulative loss by entering billing data for which insurance claims have not been paid into the network, and have the computer execute a payment reserve prediction procedure that predicts future payment reserves. ..
- the known cumulative loss calculation for calculating the known cumulative loss based on the past specific year based on the past insurance claim data.
- the training procedure includes the known cumulative loss calculated by the known cumulative loss calculation procedure and the unknown cumulative loss estimated by the unknown cumulative loss estimation procedure. Train the neural network so that the difference from the cumulative loss is the minimum or less than or equal to the preset threshold.
- the known cumulative loss calculation which calculates the known cumulative loss based on the past specific year based on the past insurance claim data. It also has a procedure and a cumulative loss rate calculation procedure that calculates the cumulative loss rate based on a specific year in the past based on past insurance claim data, and the training procedure is calculated by the known cumulative loss calculation procedure. Based on the known cumulative loss and the cumulative loss rate calculated by the cumulative loss rate calculation procedure, the neural network will estimate and output the unknown cumulative loss when inputting billing data for which insurance claims have not been paid. Train the network.
- the training procedure includes the known cumulative loss calculated by the known cumulative loss calculation procedure and the cumulative loss rate calculated by the cumulative loss rate calculation procedure. Train the neural network so that the value of the mean squared error function defined using and is less than or equal to the minimum or preset threshold.
- FIG. 1 is a block diagram showing a configuration of an embodiment of the information processing apparatus 100 according to the present embodiment.
- the information processing device 100 for example, a computer such as a server device, a personal computer, a smartphone, or a tablet terminal is used.
- FIG. 1 is a block diagram showing a configuration of one embodiment when a personal computer is used as the information processing device 100 in the present embodiment.
- the information processing device 100 includes an operation member 101, a control device 102, a storage medium 103, and a display device 104.
- the operating member 101 includes various devices operated by the operator of the information processing device 100, such as a keyboard and a mouse.
- the control device 102 is composed of a CPU, a memory, and other peripheral circuits, and controls the entire information processing device 100.
- the memory constituting the control device 102 is, for example, a volatile memory such as SDRAM. This memory is used as a work memory for the CPU to expand the program at the time of program execution and as a buffer memory for temporarily recording data. For example, the data read through the connection interface 102 is temporarily recorded in the buffer memory.
- the storage medium 103 is a storage medium for recording various data stored in the information processing device 100, program data for execution by the control device 102, and the like.
- the storage medium 103 for example, an HDD (Hard Disk Drive), an SSD (Solid State Drive), or the like is used.
- the program data recorded on the storage medium 103 may be recorded and provided on a recording medium such as a CD-ROM or DVD-ROM, or provided via a network to store the program data acquired by the operator. By installing it on the medium 103, the control device 102 can execute the program.
- the program and various data used in the processing described below are recorded in the storage medium 103.
- the display device 104 is, for example, a liquid crystal monitor, and various display data output from the control device 102 are displayed.
- the information processing device 100 in the present embodiment performs processing for predicting the payment reserve required by the insurance company in the future based on the past payment history of the insurance money. Insurers generally reserve reserve requirements for future insurance claims and benefits. In the present embodiment, a method for predicting the future payment prospect of the insurance money in the insurance company by predicting the future reserve requirement will be described.
- the reserve requirement must be sufficient for the insurance company to cover all future claims from the currently valid insurance policy.
- Conventionally, methods such as the chain ladder method and the Bournehutter-Ferguson method have been used to estimate the reserve requirement.
- claim data data of the past insurance claim records
- high prediction accuracy cannot be expected.
- these methods cannot capture the changing dynamics of billing data.
- Another problem is that it is difficult to adjust the payment reserve estimate in real time because manual recalibration is required when the business field or policy of the insurance company changes.
- these methods have a problem that multivariate billing data cannot be processed.
- a neural network designed to predict the reserve requirement from the characteristics of the past insurance claim data is used, and the future payment is made based on the past insurance claim record.
- the method of predicting the reserve requirement will be described.
- As the neural network it is assumed that deep learning has been learned in advance so that the reserve requirement can be predicted from the characteristics of the past insurance claim data.
- the present invention covers insurance in which an insurance company reserves payment reserves, and assumes, for example, life insurance, medical insurance, non-life insurance, and the like.
- FIG. 2 is a functional block diagram schematically showing the data flow in the training unit for learning the neural network so that the reserve requirement can be predicted from the characteristics of the past insurance claim data.
- the processing in each function shown in FIG. 2 is executed by the control device 102.
- the billing database 2a is recorded in the storage medium 103.
- past insurance claim data is stored in advance.
- the training unit 2b is a unit for training the prediction model 2d, and includes a preprocessing unit 2c, a cumulative loss aggregation unit 2e, and a loss term unit 2f in addition to the prediction model 2d.
- a neural network is used for the prediction model 2d, and the training unit 2b trains the prediction model 2d so that the reserve requirement can be predicted from the characteristics of the past insurance claim data.
- Billing data c (t) is input to the training unit 2b from the billing database 2a.
- This billing data c (t) is used as a predictive variable for training the predictive model 2d in the training unit 2b.
- the feature c 0 ⁇ c n of billing data for example, the date insurance claims matters are generated or reported, information of date evaluation was made for the claims are included at least. Further, the feature c 0 ⁇ c n of billing data, may be added information for improving the prediction accuracy of the payment reserve.
- the information on the features to be added varies depending on the type of insurance, but may include, for example, information on the amount of bill settlement, additional information such as the insured's occupation, industry, age, gender, ethnicity, and region. It can also include additional information such as diagnostic codes, medications, medical procedures, etc., if covered by medical insurance.
- the information of the added features is used during the training of the prediction model 2d, which can improve the prediction accuracy of the reserve requirement.
- the billing data c (t) when the gender characteristics are represented as male, female, in the new vector data x (t) , the male is mapped to the integer value 0 and the female is mapped to 1.
- a conversion such as The converted billing data x (t) converted by the preprocessing unit 2c is input to the prediction model 2d and the cumulative loss totaling unit 2e.
- the cumulative loss S (y, k) of the bill is calculated by the following equation (1).
- y represents the year in which the accident for which the insurance claim was made occurred.
- k represents the number of years elapsed from the year in which the accident for which the insurance claim is made occurred to the payment of the insurance claim.
- y is a value from the first year in which the accident for which the insurance claim is made occurs to the latest year Y included in the claim data. Further, k takes a value from 0, which means the same year as y, to the maximum value K of the elapsed years included in the billing data.
- loss () is the amount of billing data c per case.
- the cumulative loss aggregation unit 2e uses the past cumulative loss S (y, k), that is, the known cumulative total, using all the claim data for which the insurance payment has already been completed as of the year Y according to the formula (1).
- the loss S (y, k) is calculated.
- the billing data is represented by C in the equation (1), in the present embodiment, the billing data c (t) is converted into new vector data x (t) by the preprocessing unit 2c, so here. Read as x.
- the unknown cumulative loss U is estimated based on the claim data for which the insurance payment has not been completed as of the year Y. Since the unknown cumulative loss U at the time of year Y can be regarded as the amount of reserve requirements to be required in the future based on year Y, if the unknown cumulative loss in year Y is estimated, year Y It is possible to predict the reserve requirements for future payments based on. That is, by calculating the estimated value of the unknown cumulative loss in the year Y as the reserve requirement for the future required based on the year Y, the reserve requirement for the future required based on the year Y is predicted. Is possible.
- FIG. 3 shows the known cumulative loss S (y, k) and the unknown cumulative loss S (y, k) for billing data in which an accident occurred from YK to Y and the number of years elapsed until payment was 0 to K. It is the figure which showed the relationship of the cumulative loss U (y, k) in a tabular form.
- the known cumulative loss S for each year is represented by the following equation (2)
- the unknown cumulative loss U for each year is represented by the following equation (3). ..
- the unknown cumulative loss U (y, k) shown in FIG. 3 is the target of estimation.
- the latest year included in the billing data is Y year.
- all claims for which an accident occurred in YY are known cumulative losses S (y, k) because payment has been completed up to the elapsed years K for claims for which an accident occurred in YY. ) Has been calculated.
- the claims that occurred in YK + 1 years are the cumulative total known up to the elapsed years K-1.
- the loss S (y, k) is calculated, and the elapsed years K is the estimation target of the unknown cumulative loss U (y, k).
- the elapsed years K is the estimation target of the unknown cumulative loss U (y, k).
- the claim in which the accident occurred in the year Y has a known cumulative loss S (y, k) up to the elapsed year 0.
- the calculated and other elapsed years are subject to the estimation of the unknown cumulative loss U (y, k).
- the year YK of the year in which the accident occurred is 2000.
- the year when the number of years elapsed until payment (Development years) of this year is 0 is 2000
- the year when the number of years elapsed is 1 is 2001
- the year when the number of years elapsed is K-1 is 2009.
- the year in which the number of years is K is 2010.
- the year YK + 1 of the year in which the accident occurred is 2001.
- the year in which the elapsed years (Development years) until payment of this year is 0 is 2001
- the year in which the elapsed years is 1 is 2002
- the year in which the elapsed years is K-1 is 2010.
- the year in which the number of years is K is 2011.
- the year Y-1 of the year in which the accident occurred is 2009. Then, the year in which the number of years elapsed until payment (Development years) of this year is 0 is 2009, the year in which the number of years elapsed is 1 is 2010, and the year in which the number of years elapsed is K-1 is 2018. The year in which the number of years is K is 2019.
- the year Y of the year in which the accident occurred is 2010. Then, the year when the number of years elapsed until payment (Development years) of this year is 0 is 2010, the year when the number of years elapsed is 1 is 2011, and the year when the number of years elapsed is K-1 is 2019. The year in which the number of years is K is 2020.
- the prediction model 2d is trained so that the unknown cumulative loss U (y, k) can be estimated with high accuracy based on the past billing data. The training method of the prediction model 2d will be described below.
- the prediction model 2d includes an input layer 4a having one input for each bill x (t) and a hidden layer having a size of several years or more. ) 4b and a neural network consisting of an output layer 4c having a size of K or more years to be predicted.
- the nodes of each layer use the activation function ReLU shown in the following equation (4) in order to consider the non-linearity of the data.
- this prediction model 2d makes an estimation by calculating an unknown cumulative loss U (y, k) based on the claim data for which insurance payment has not been completed at the time of year Y. Then, the known cumulative loss S (y, k) calculated by the cumulative loss aggregation unit 2e and the unknown cumulative loss U (y, k) estimated by the prediction model 2d are input to the loss term unit 2f. ..
- the weight value of the prediction model 2d that is, the neural network, so as to minimize the loss term L (U, S) for calculating the difference between the known cumulative loss S and the unknown cumulative loss U.
- the prediction model 2d is trained by adjusting the weight of.
- the calculation of the known cumulative loss S and the unknown cumulative loss U is repeated while adjusting the weight until the difference between the known cumulative loss S and the unknown cumulative loss U is minimized.
- the training of the prediction model 2d is performed by adopting the weight of the neural network set when the difference between the known cumulative loss S and the unknown cumulative loss U becomes the minimum as the weight value of the prediction model 2d.
- the control device 102 determines that the prediction model 2d has been optimized and the training unit. The training by 2b is completed.
- the weight of the neural network of the prediction model 2d is updated and the process is repeated.
- the loss term L (U, S) indicating the difference between the known cumulative loss S and the unknown cumulative loss U is the standard deviation equation of the Poisson distribution as shown in the following equation (5).
- the weight value of the prediction model 2d can be adjusted by using a known optimization method such as a gradient descent method, a stochastic gradient descent method, or an annealing method.
- the prediction model 2d is used to estimate the unknown cumulative loss U (y, k) for the future years after K + 1, which is necessary in the future. It is possible to predict the reserve requirement. Since the unknown cumulative loss U (y, k) after K + 1 can be regarded as the amount of reserve requirements required after K + 1, it is unknown using the trained and optimized forecast model 2d. By estimating the cumulative loss U (y, k), it is possible to accurately predict the amount of reserve requirements to be required in the future.
- the prediction accuracy of the prediction model 2d can be improved by adding the new data and performing the above-mentioned training, and predicting the reserve requirement amount required in the future. The accuracy can be further improved.
- FIG. 5 is a flowchart showing the flow of training processing of the prediction model 2d according to the first embodiment.
- the process shown in FIG. 5 is executed by the control device 102 as a program that is started when the control device 102 reads the billing data C recorded in the storage medium 103 and inputs it to the training unit 2b.
- the converted billing data is input to the cumulative loss aggregation unit 2e and the prediction model 2d, and the processes of steps S20 and S30 are executed.
- step S20 in the cumulative loss aggregation unit 2e, as described above, the control device 102 uses all the claim data for which the insurance payment has already been completed as of the year Y, and the past cumulative loss S ( y, k), that is, the known cumulative loss S (y, k) is calculated. After that, the process proceeds to step S40.
- step S30 in the prediction model 2d, as described above, the control device 102 determines the future cumulative loss from the year Y based on the claim data for which the insurance payment has not been completed at the time of the year Y. That is, an estimation process for estimating an unknown cumulative loss U (y, k) is executed. After that, the process proceeds to step S40.
- step S40 the control device 102 calculates the loss term L (U, S) in the loss term unit 2f using the equation (5) as described above. After that, the process proceeds to step S50.
- step S50 the control device 102 determines in the loss term unit 2f whether or not the optimization of the prediction model 2d is completed as described above. If an affirmative decision is made in step S50, the weight at that time is adopted as the weight value of the prediction model 2d, and the process ends. On the other hand, if a negative determination is made in step S50, the process proceeds to step S60.
- step S60 the control device 102 adjusts the weight of the prediction model 2d in the loss term unit 2f as described above, and returns to step S10.
- FIG. 6 is a flowchart showing a processing flow for estimating a future cumulative loss in the first embodiment.
- the process shown in FIG. 6 is executed by the control device 102 as a program that is started when the control device 102 inputs the billing data recorded in the storage medium 103 into the prediction model 2d in which training is completed.
- step S110 the control device 102 estimates an unknown cumulative loss U (y, k) based on the billing data by executing the above-mentioned prediction process in the prediction model 2d. After that, the process proceeds to step S120.
- step S120 the control device 102 outputs the estimated unknown cumulative loss U (y, k). It is assumed that the output destination is set in advance. For example, the output destination may be output to the storage medium 103 and the unknown cumulative loss U (y, k) may be recorded on the storage medium 103 or output to the display device 104. The unknown cumulative loss U (y, k) may be displayed. After that, the process ends.
- the control device 102 inputs the claim data for which the insurance claim payment has not been completed based on the past insurance claim data, the unknown cumulative loss based on the claim data for which the insurance claim payment has not been completed
- the output of the unknown cumulative loss can be obtained and required in the future. I tried to predict the payment reserve that will be. This makes it possible to accurately predict the future reserve requirements of insurance companies by using a neural network that has been learned based on past billing data.
- the control device 102 calculates a known cumulative loss based on the past specific year based on the past insurance claim data, and calculates the past specific year based on the past insurance claim data. Estimate the unknown cumulative loss based on the standard, and based on the known cumulative loss and the unknown cumulative loss, if you enter the claim data for which the insurance payment has not been completed, the unknown cumulative loss will be estimated and output. To train a neural network. As a result, the neural network can be trained using the past billing data that has already been determined.
- the control device 102 trains the neural network so that the difference between the known cumulative loss and the unknown cumulative loss is minimized.
- the neural network can be trained until the difference between the output known cumulative loss and the unknown cumulative loss is minimized, so that the accuracy of predicting the reserve requirement by the neural network can be improved.
- FIGS. 1, 2, 3 and 6 are the same as those in the first embodiment, and thus the description thereof will be omitted.
- RNN7a is composed of several recurrent layers, each of which is implemented using Long Short Term Memory (LSTM) or Gated Recurrent Unit (GRU) cells.
- FCN7b takes the output of RNN7a and reduces it to one estimate.
- the prediction model 2d in the second embodiment will be described focusing on the differences from the prediction model 2d described above in the first embodiment.
- data input to the predictive model. 2d it was the billing data having n features of c 0 ⁇ c n
- the cumulative loss rate R (y, k) calculated by ) is input to the prediction model 2d.
- This cumulative loss rate R (y, k) represents the cumulative loss rate for k-1 over y years.
- the output of the prediction model 2d in the second embodiment a single value corresponding to the estimated cumulative loss rate E K of k years.
- the cumulative loss totaling unit 2e calculates the known cumulative loss S (y, k) using all the claim data for which the insurance payment has already been completed as of the year Y.
- the cumulative loss rate R (y, k) is calculated by the equation (6), and the calculation result of the cumulative loss rate R (y, k) is input to the prediction model 2d.
- the loss term L (E, S) is calculated by using the function of the mean square error (MSE) shown in the following equation (7), and the loss term L (E) is calculated.
- S) is trained by adjusting the weight value of the prediction model 2d, that is, the weight of the neural network so that the value of S) is minimized.
- the forecast model 2d is used to estimate an unknown cumulative loss U (y, k) to predict future reserve requirements. Is possible.
- the forecast model 2d in order to obtain the unknown total loss U (y, k), only the multiplication of E K ⁇ S (Y, K -1) is calculated for the year Y and K.
- FIG. 8 is a flowchart showing the flow of training processing of the prediction model 2d according to the second embodiment.
- the process shown in FIG. 8 is executed by the control device 102 as a program that is started when the control device 102 reads the billing data C recorded in the storage medium 103 and inputs it to the training unit 2b.
- the same step number is assigned to the steps having the same processing contents as those in FIG. 5 described above in the first embodiment, and the description thereof will be omitted.
- step S21 in the cumulative loss totaling unit 2e, the control device 102 uses all the claim data for which the insurance payment has already been completed as of the year Y, as described above, and the past cumulative loss S ( y, k), that is, the known cumulative loss S (y, k) is calculated. Further, as described above, the cumulative loss rate R (y, k) is calculated by the equation (6). After that, the process proceeds to step S31.
- step S31 the control unit 102, the prediction model 2d, as described above, executes the prediction process for predicting an estimated cumulative loss rate E K, based on the total loss rate R (y, k). Then, the process proceeds to step S41.
- step S41 the control device 102 calculates the loss term L (E, S) in the loss term unit 2f using the equation (7) as described above. After that, the process proceeds to step S50.
- the control device 102 calculates a known cumulative loss based on the past specific year based on the past insurance claim data, and calculates the past specific year based on the past insurance claim data. Neural to calculate the cumulative loss rate based on the standard, and to estimate and output the unknown cumulative loss when inputting claim data for which insurance payment has not been completed based on the known cumulative loss and cumulative loss rate. I tried to train the network. As a result, the neural network can be trained using the past billing data that has already been determined.
- the control device 102 trains the neural network so that the value of the function of the mean square error defined using the known cumulative loss and the cumulative loss rate is minimized. As a result, it is possible to improve the prediction accuracy of the reserve requirement by the neural network based on the known cumulative loss and the cumulative loss rate output.
- the information processing device of the above-described embodiment can also be modified as follows.
- the billing data in which the billing data is recorded may be used as a separate device, and the device in which the billing data is recorded and the information processing device 100 may be connected via a communication line such as the Internet.
- the information processing device 100 predicts the payment reserve in response to an instruction from the operation terminal and transmits the prediction result to the operation terminal. It may be.
- the information processing device 100 may be used as a stand-alone device as in the first and second embodiments described above, or the device or operation terminal on which billing data is recorded and the information processing device 100 It is also possible to build a client server type or cloud type information processing system in which the information is connected via a communication line.
- the loss term L (U, S) for measuring the difference between the known cumulative loss S and the unknown cumulative loss U is minimized.
- the prediction model 2d is such that the loss term L (U, S) for measuring the difference between the known cumulative loss S and the unknown cumulative loss U is equal to or less than a preset threshold value.
- the prediction model 2d may be trained by adjusting the weight value of, that is, the weight of the neural network.
- the weight value of the prediction model 2d that is, the weight of the neural network is adjusted so that the value of the loss term L (E, S) is minimized.
- the weight value of the prediction model 2d that is, the weight of the neural network is adjusted so that the value of the loss term L (E, S) is equal to or less than the preset threshold value. You may try to train.
- the present invention is not limited to the configuration in the above-described embodiment as long as the characteristic functions of the present invention are not impaired. Further, the configuration may be a combination of the above-described embodiment and a plurality of modified examples.
- Information processing device 101 Operation member 102 Control device 103 Storage medium 104 Display device
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Data Mining & Analysis (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Development Economics (AREA)
- Technology Law (AREA)
- Game Theory and Decision Science (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【課題】保険会社が将来必要となる支払準備金を予測すること。 【解決手段】 情報処理装置100は、ニューラルネットワークを用いて保険会社の支払準備金を予測するために、過去の保険金請求データに基づいて、保険金の支払いが完了していない請求データを入力すると、保険金の支払いが完了していない請求データに基づく未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させるトレーニング手段と、トレーニング手段によって学習が完了したニューラルネットワークに、保険金の支払いが完了していない請求データを入力することにより未知の累計損失の出力を得て、将来必要となる支払準備金を予測する支払準備金予測手段とを備える。
Description
本発明は、情報処理装置、情報処理システム、および情報処理プログラムに関する。
次のような保険会社の資産負債管理装置が知られている。この装置では、保険料、積立金(責任準備金)、配当金といった保険収支項目の金額は推定することが難しいことを考慮して、顧客の保険契約の情報に基づき、既契約の保険金額から未来の保険金額を推定する方法が提案されている(特許文献1参照)。
保険会社は、将来の保険金や給付金を支払うための支払準備金として責任準備金などの準備金を積み立てている。従来の技術では、この積立金の予測が困難なことを加味して、支払準備金の予測を行わずに未来の保険金額を推定する方法をとっていた。しかしながら、支払準備金の予測を精度高く行うことができれば、その予測結果は、未来の保険金の支払い能力の見積もりや、契約者から徴収する保険料の額の決定など、多くの場面で利用することができる。このため、将来の支払準備金の予測を精度高く行うための技術が望まれていたが、従来はそのための仕組みについて何ら検討されていなかった。
本発明の第1の態様によると、情報処理装置は、ニューラルネットワークを用いて保険会社の支払準備金を予測するための情報処理装置であって、過去の保険金請求データに基づいて、保険金の支払いが完了していない請求データを入力すると、保険金の支払いが完了していない請求データに基づく未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させるトレーニング手段と、トレーニング手段によって学習が完了したニューラルネットワークに、保険金の支払いが完了していない請求データを入力することにより未知の累計損失の出力を得て、将来必要となる支払準備金を予測する支払準備金予測手段とを備える。
本発明の第2の態様によると、第1の態様の情報処理装置において、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、過去の保険金請求データに基づいて、過去の特定の年を基準に未知の累計損失を推定する未知の累計損失推定手段とをさらに備え、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、未知の累計損失推定手段によって算出された未知の累計損失とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第3の態様によると、第2の態様の情報処理装置において、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、未知の累計損失推定手段によって推定された未知の累計損失との差が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明の第4の態様によると、第1の態様の情報処理装置において、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、過去の保険金請求データに基づいて、過去の特定の年を基準に累計損失率を算出する累計損失率算出手段とをさらに備え、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、累計損失率算出手段によって算出された累計損失率とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第5の態様によると、第4の態様の情報処理装置において、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、累計損失率算出手段によって算出された累計損失率とを用いて定義された平均二乗誤差の関数の値が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明の第6の態様によると、情報処理システムは、ニューラルネットワークを用いて保険会社の支払準備金を予測するための情報処理システムであって、過去の保険金請求データに基づいて、保険金の支払いが完了していない請求データを入力すると、保険金の支払いが完了していない請求データに基づく未知の累計損失を推定して出力するようにニューラルネットワークを学習させるトレーニング手段と、トレーニング手段によって学習が完了したニューラルネットワークに、保険金の支払いが完了していない請求データを入力することにより未知の累計損失の出力を得て、将来必要となる支払準備金を予測する支払準備金予測手段とを備えることを特徴とする。
本発明の第7の態様によると、第6の態様の情報処理システムにおいて、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、過去の保険金請求データに基づいて、過去の特定の年を基準に未知の累計損失を推定する未知の累計損失推定手段とをさらに備え、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、未知の累計損失推定手段によって推定された未知の累計損失とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第8の態様によると、第7の態様の情報処理システムにおいて、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、未知の累計損失推定手段によって推定された未知の累計損失との差が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明の第9の態様によると、第6の態様の情報処理システムにおいて、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、過去の保険金請求データに基づいて、過去の特定の年を基準に累計損失率を算出する累計損失率算出手段とをさらに備え、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、累計損失率算出手段によって算出された累計損失率とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第10の態様によると、第9の態様の情報処理システムにおいて、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、累計損失率算出手段によって算出された累計損失率とを用いて定義された平均二乗誤差の関数の値が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明の第11の態様によると、情報処理プログラムは、ニューラルネットワークを用いて保険会社の支払準備金を予測するために、過去の保険金請求データに基づいて、保険金の支払いが完了していない請求データを入力すると、保険金の支払いが完了していない請求データに基づく未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させるトレーニング手順と、トレーニング手順で学習が完了したニューラルネットワークに、保険金の支払いが完了していない請求データを入力することにより未知の累計損失の出力を得て、将来必要となる支払準備金を予測する支払準備金予測手順とをコンピュータに実行させる。
本発明の第12の態様によると、第11の態様の情報処理プログラムにおいて、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手順と、過去の保険金請求データに基づいて、過去の特定の年を基準に未知の累計損失を推定する未知の累計損失推定手順とをさらに有し、トレーニング手順は、既知の累計損失算出手順で算出した既知の累計損失と、未知の累計損失推定手順で推定した未知の累計損失とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第13の態様によると、第12の態様の情報処理プログラムにおいて、トレーニング手順は、既知の累計損失算出手順で算出した既知の累計損失と、未知の累計損失推定手順で推定した未知の累計損失との差が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明の第14の態様によると、第11の態様の情報処理プログラムにおいて、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手順と、過去の保険金請求データに基づいて、過去の特定の年を基準に累計損失率を算出する累計損失率算出手順とをさらに有し、トレーニング手順は、既知の累計損失算出手順で算出した既知の累計損失と、累計損失率算出手順で算出した累計損失率とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第15の態様によると、第14の態様の情報処理プログラムにおいて、トレーニング手順は、既知の累計損失算出手順で算出した既知の累計損失と、累計損失率算出手順で算出した累計損失率とを用いて定義された平均二乗誤差の関数の値が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明の第2の態様によると、第1の態様の情報処理装置において、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、過去の保険金請求データに基づいて、過去の特定の年を基準に未知の累計損失を推定する未知の累計損失推定手段とをさらに備え、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、未知の累計損失推定手段によって算出された未知の累計損失とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第3の態様によると、第2の態様の情報処理装置において、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、未知の累計損失推定手段によって推定された未知の累計損失との差が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明の第4の態様によると、第1の態様の情報処理装置において、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、過去の保険金請求データに基づいて、過去の特定の年を基準に累計損失率を算出する累計損失率算出手段とをさらに備え、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、累計損失率算出手段によって算出された累計損失率とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第5の態様によると、第4の態様の情報処理装置において、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、累計損失率算出手段によって算出された累計損失率とを用いて定義された平均二乗誤差の関数の値が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明の第6の態様によると、情報処理システムは、ニューラルネットワークを用いて保険会社の支払準備金を予測するための情報処理システムであって、過去の保険金請求データに基づいて、保険金の支払いが完了していない請求データを入力すると、保険金の支払いが完了していない請求データに基づく未知の累計損失を推定して出力するようにニューラルネットワークを学習させるトレーニング手段と、トレーニング手段によって学習が完了したニューラルネットワークに、保険金の支払いが完了していない請求データを入力することにより未知の累計損失の出力を得て、将来必要となる支払準備金を予測する支払準備金予測手段とを備えることを特徴とする。
本発明の第7の態様によると、第6の態様の情報処理システムにおいて、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、過去の保険金請求データに基づいて、過去の特定の年を基準に未知の累計損失を推定する未知の累計損失推定手段とをさらに備え、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、未知の累計損失推定手段によって推定された未知の累計損失とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第8の態様によると、第7の態様の情報処理システムにおいて、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、未知の累計損失推定手段によって推定された未知の累計損失との差が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明の第9の態様によると、第6の態様の情報処理システムにおいて、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、過去の保険金請求データに基づいて、過去の特定の年を基準に累計損失率を算出する累計損失率算出手段とをさらに備え、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、累計損失率算出手段によって算出された累計損失率とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第10の態様によると、第9の態様の情報処理システムにおいて、トレーニング手段は、既知の累計損失算出手段によって算出された既知の累計損失と、累計損失率算出手段によって算出された累計損失率とを用いて定義された平均二乗誤差の関数の値が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明の第11の態様によると、情報処理プログラムは、ニューラルネットワークを用いて保険会社の支払準備金を予測するために、過去の保険金請求データに基づいて、保険金の支払いが完了していない請求データを入力すると、保険金の支払いが完了していない請求データに基づく未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させるトレーニング手順と、トレーニング手順で学習が完了したニューラルネットワークに、保険金の支払いが完了していない請求データを入力することにより未知の累計損失の出力を得て、将来必要となる支払準備金を予測する支払準備金予測手順とをコンピュータに実行させる。
本発明の第12の態様によると、第11の態様の情報処理プログラムにおいて、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手順と、過去の保険金請求データに基づいて、過去の特定の年を基準に未知の累計損失を推定する未知の累計損失推定手順とをさらに有し、トレーニング手順は、既知の累計損失算出手順で算出した既知の累計損失と、未知の累計損失推定手順で推定した未知の累計損失とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第13の態様によると、第12の態様の情報処理プログラムにおいて、トレーニング手順は、既知の累計損失算出手順で算出した既知の累計損失と、未知の累計損失推定手順で推定した未知の累計損失との差が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明の第14の態様によると、第11の態様の情報処理プログラムにおいて、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手順と、過去の保険金請求データに基づいて、過去の特定の年を基準に累計損失率を算出する累計損失率算出手順とをさらに有し、トレーニング手順は、既知の累計損失算出手順で算出した既知の累計損失と、累計損失率算出手順で算出した累計損失率とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させる。
本発明の第15の態様によると、第14の態様の情報処理プログラムにおいて、トレーニング手順は、既知の累計損失算出手順で算出した既知の累計損失と、累計損失率算出手順で算出した累計損失率とを用いて定義された平均二乗誤差の関数の値が最小またはあらかじめ設定された閾値以下になるようにニューラルネットワークを学習させる。
本発明によれば、学習が完了したニューラルネットワークを利用することによって、保険会社が将来必要とする支払準備金を精度高く予測することができる。
-第1の実施の形態-
図1は、本実施の形態における情報処理装置100の一実施の形態の構成を示すブロック図である。情報処理装置100としては、例えばサーバ装置、パソコン、スマートフォン、タブレット端末などのコンピュータが用いられる。図1は、本実施の形態における情報処理装置100として、パソコンを用いた場合の一実施の形態の構成を示すブロック図である。
図1は、本実施の形態における情報処理装置100の一実施の形態の構成を示すブロック図である。情報処理装置100としては、例えばサーバ装置、パソコン、スマートフォン、タブレット端末などのコンピュータが用いられる。図1は、本実施の形態における情報処理装置100として、パソコンを用いた場合の一実施の形態の構成を示すブロック図である。
情報処理装置100は、操作部材101と、制御装置102と、記憶媒体103と、表示装置104を備えている。
操作部材101は、情報処理装置100の操作者によって操作される種々の装置、例えばキーボードやマウスを含む。
制御装置102は、CPU、メモリ、およびその他の周辺回路によって構成され、情報処理装置100の全体を制御する。なお、制御装置102を構成するメモリは、例えばSDRAM等の揮発性のメモリである。このメモリは、CPUがプログラム実行時にプログラムを展開するためのワークメモリや、データを一時的に記録するためのバッファメモリとして使用される。例えば、接続インターフェース102を介して読み込まれたデータは、バッファメモリに一時的に記録される。
記憶媒体103は、情報処理装置100が蓄える種々のデータや、制御装置102が実行するためのプログラムのデータ等を記録するための記憶媒体である。記憶媒体103は、例えばHDD(Hard Disk Drive)やSSD(Solid State Drive)等が用いられる。なお、記憶媒体103に記録されるプログラムのデータは、CD-ROMやDVD-ROMなどの記録媒体に記録されて提供されたり、ネットワークを介して提供され、操作者が取得したプログラムのデータを記憶媒体103にインストールすることによって、制御装置102がプログラムを実行できるようになる。本実施の形態では、以下に説明する処理で用いるプログラムや種々のデータは、記憶媒体103に記録されている。
表示装置104は、例えば液晶モニタであって、制御装置102から出力される種々の表示用データが表示される。
本実施の形態における情報処理装置100は、過去の保険金の支払い履歴に基づいて、保険会社が将来必要とする支払準備金を予測するための処理を行う。一般的に、保険会社では、将来の保険金や給付金を支払うための支払準備金を積み立てている。本実施の形態では、未来の支払準備金を予測することにより、保険会社における未来の保険金の支払い見込みを予測するための方法について説明する。
支払準備金は、保険会社が現在有効な保険契約からの将来の保険金の請求をすべて満たすだけの金額が必要となる。従来、この支払準備金の見積もりには、チェイン・ラダー法、ボーンヒュッター・ファーガソン法などの手法が用いられていた。しかしながら、過去の保険金の請求記録のデータ(以下「請求データ」と呼ぶ)を用いてこれらの方法で支払準備金の予測を行った場合には、高い予測精度を望むことができないという問題があった。また、これらの方法では請求データの変化するダイナミクスを捉えることができないという問題もあった。さらに、保険会社の事業分野または方針に変更が生じた場合は手動での再校正が必要となるため、支払い準備金の見積もりをリアルタイムで調整することが困難になるという問題もあった。また、これらの方法では、多変量な請求データを処理することができないという問題もあった。
このため、本実施の形態では、過去の保険金の請求データの特徴から支払準備金を予測するように設計されたニューラルネットワークを使用して、過去の保険金の請求記録に基づいて将来の支払準備金を予測する方法について説明する。ニューラルネットワークとしては、あらかじめ過去の保険金の請求データの特徴から支払準備金を予測できるように学習が行われたディープラーニングを用いるものとする。なお、本発明は、保険会社が支払準備金を積み立てる保険を対象とし、例えば、生命保険、医療保険、損害保険などを想定する。
図2は、過去の保険金の請求データの特徴から支払準備金を予測できるようにニューラルネットワークを学習させるためのトレーニングユニットにおけるデータの流れを模式的に示した機能ブロック図である。図2に示す各機能における処理は、制御装置102によって実行される。
図2では、請求データベース2aは記憶媒体103に記録されている。請求データベース2aには、あらかじめ過去の保険金の請求データが格納されている。トレーニングユニット2bは、予測モデル2dを訓練するためのユニットであって、予測モデル2dの他に前処理ユニット2c、累計損失集計ユニット2e、及び損失項ユニット2fを含んでいる。図2に示す例では、予測モデル2dにニューラルネットワークを用い、トレーニングユニット2bが予測モデル2dに過去の保険金の請求データの特徴から支払準備金を予測できるように学習させる。
トレーニングユニット2bには、請求データベース2aから請求データc(t)が入力される。本実施の形態では、請求データc(t)は、c(t)={c0,c1,・・・・cn}のように、c0~cnのn個の特徴をもったベクトルデータである。この請求データc(t)は、トレーニングユニット2bにおいて予測モデル2dを訓練するための予測変数として使用される。
なお、請求データの特徴c0~cnには、例えば、保険金の請求事項が発生または報告された日付、その請求に対する評価が行われた日付の情報が少なくとも含まれる。また、請求データの特徴c0~cnには、支払準備金の予測精度を向上させるための情報を追加するようにしてもよい。追加する特徴の情報は、保険の種類によって異なるが、例えば、請求決済額の情報、被保険者の職種、業種、年齢、性別、民族、地域などの追加の情報を含むことができる。また、医療保険を対象とする場合には、診断コード、薬品、医療処置などの追加の情報を含めることもできる。追加された特徴の情報は、予測モデル2dのトレーニング中に使用され、これによって、支払準備金の予測精度を向上させることができる。
前処理ユニット2cでは、入力された請求データc(t)を予測モデル2dと互換性のある新しいベクトルデータx(t)={x0,x1,・・・・xn}に変換する。例えば、請求データc(t)において性別の特徴がmale,femaleのように表されている場合に、新しいベクトルデータx(t)では、maleは整数値0にマッピングされ、femaleは1にマッピングされるといったような変換が行われる。前処理ユニット2cで変換された変換後の請求データx(t)は、予測モデル2dと累計損失集計ユニット2eに入力される。
式(1)において、yは保険金の請求対象となるアクシデントが発生した年を表す。kは、保険金の請求対象となるアクシデントが発生した年から、保険金が支払われるまでの経過年数を表す。yは、保険金の請求対象となるアクシデントが発生した最初の年から、請求データに含まれる最新の年Yまでの値をとる。また、kは、yと同じ年を意味する0から、請求データに含まれる経過年数の最大値Kまでの値をとる。また、loss()は1件当たりの請求データcの金額である。
累計損失集計ユニット2eは、式(1)により年Yの時点ですでに保険金の支払いが完了しているすべての請求データを用いて過去の累計損失S(y,k)、すなわち既知の累計損失S(y,k)を算出する。なお、式(1)では請求データをCで表しているが、本実施の形態では前処理ユニット2cで請求データc(t)は新しいベクトルデータx(t)に変換されているため、ここではxに読み替える。
例えば、2010年にアクシデントが発生し、2010年に保険金の支払いが行われた場合は、y=2010、k=0となり、2010年にアクシデントが発生し、2011年に保険金の支払いが行われた場合は、y=2010、k=1となる。また、2011年にアクシデントが発生し、2015年に保険金の支払いが行われた場合は、y=2011、k=4となり、2012年にアクシデントが発生し、2018年に保険金の支払いが行われた場合は、y=2012、k=6となる。
予測モデル2dでは、年Yの時点では保険金の支払いが完了していない請求データに基づいて、未知の累計損失Uを推定する。なお、年Yの時点における未知の累計損失Uは、年Yを基準とした将来必要となる支払準備金の額と捉えることができるため、年Yにおける未知の累計損失を推定すれば、年Yを基準とした将来必要となる支払準備金を予測することが可能となる。すなわち、年Yにおける未知の累計損失の推定値を、年Yを基準とした将来必要となる支払準備金として算出することにより、年Yを基準とした将来必要となる支払準備金を予測することが可能となる。
図3は、Y-K年からY年までにアクシデントが発生し、支払いまでの経過年数が0年からK年までの請求データを対象として、既知の累計損失S(y,k)と未知の累計損失U(y,k)の関係を表形式で表した図である。図3において、各年ごとの既知の累計損失Sは、次式(2)に示すように表され、各年ごとの未知の累計損失Uは、次式(3)に示すように表される。
本実施の形態では、図3に示す未知の累計損失U(y,k)が推定の対象となる。図3に示すように、上述したYとKの関係によると請求データに含まれる最新の年はY年となる。このため、Y-K年にアクシデントが発生した請求に対しては経過年数Kまで支払いが完了しているためY-K年にアクシデントが発生した請求は、全て既知の累計損失S(y,k)が算出されている。また、Y-K+1年にアクシデントが発生した請求に対しては経過年数K-1まで支払いが完了しているためY-K+1年にアクシデントが発生した請求は、経過年数K-1まで既知の累計損失S(y,k)が算出され、経過年数Kは未知の累計損失U(y,k)の推定対象となっている。また、Y年にアクシデントが発生した請求に対しては経過年数0まで支払いが完了しているためY年にアクシデントが発生した請求は、経過年数0まで既知の累計損失S(y,k)が算出され、その他の経過年数は未知の累計損失U(y,k)の推定対象となっている。
例えば、2000年から2010年までの請求データを用いる場合、図3においてはYは2010年でKが10となる。この場合、アクシデントが発生した年(Accident years)のY-Kは2000年である。そして、この年の支払いまでの経過年数(Development years)が0の年は2000であり、経過年数が1の年は2001年であり、経過年数がK-1の年は2009年であり、経過年数がKの年は2010年である。
また、アクシデントが発生した年(Accident years)のY-K+1は2001年である。そして、この年の支払いまでの経過年数(Development years)が0の年は2001であり、経過年数が1の年は2002年であり、経過年数がK-1の年は2010年であり、経過年数がKの年は2011年である。
また、アクシデントが発生した年(Accident years)のY-1年は2009年である。そして、この年の支払いまでの経過年数(Development years)が0の年は2009であり、経過年数が1の年は2010年であり、経過年数がK-1の年は2018年であり、経過年数がKの年は2019年である。
また、アクシデントが発生した年(Accident years)のY年は2010年である。そして、この年の支払いまでの経過年数(Development years)が0の年は2010であり、経過年数が1の年は2011年であり、経過年数がK-1の年は2019年であり、経過年数がKの年は2020年である。
このように、Yが2010年でKが10である請求データにおいては、請求データに含まれる最新の年が2010年であるため、支払いまでの経過年数を考慮した年が2011年以降となる場合は、全て未知の累計損失U(y,k)の推定対象となる。
未知の累計損失U(y,k)を推定することができれば、その額を将来必要となる支払準備金の額と予測することができるため、将来必要となる支払準備金の予測精度を向上させるために、本実施の形態におけるトレーニングユニット2bでは、過去の請求データに基づいて未知の累計損失U(y,k)を精度高く推定できるように予測モデル2dをトレーニングする。以下、予測モデル2dのトレーニング方法について説明する。
本実施の形態では、予測モデル2dは、図4に示すように各請求x(t)ごとに一つのインプットを持つ入力層(input layer)4aと、年数K以上のサイズの隠れ層(hidden layer)4bと、予測したい年数K以上サイズの出力層(output layer)4cからなるニューラルネットワークによって構成されている。図4において、各層のノードはデータの非線形性を考慮する為に次式(4)に示す活性化関数ReLUを使用する。
この予測モデル2dによって、上述したように、年Yの時点では保険金の支払いが完了していない請求データに基づいて、未知の累計損失U(y,k)が算出されることにより推定が行われると、累計損失集計ユニット2eで算出された既知の累計損失S(y,k)と予測モデル2dで推定された未知の累計損失U(y,k)は、損失項ユニット2fに入力される。
損失項ユニット2fでは、既知の累計損失Sと未知の累計損失Uとの差を計算するための損失項L(U,S)を最小にするように、予測モデル2dの重み値、すなわちニューラルネットワークの重みを調節することによって予測モデル2dのトレーニングを行う。
本実施の形態では、既知の累計損失Sと未知の累計損失Uとの差が最小になるまで重みを調節を行いながら既知の累計損失Sと未知の累計損失Uの算出を繰り返す。そして、既知の累計損失Sと未知の累計損失Uとの差が最小になったときに設定されていたニューラルネットワークの重みを予測モデル2dの重み値として採用することにより、予測モデル2dのトレーニングを行う。具体的には、既知の累計損失Sの算出と未知の累計損失Uの推定を数回繰り返して差が減少しなければ、制御装置102は、予測モデル2dは最適化されたと判断してトレーニングユニット2bによるトレーニンングを終了する。一方、既知の累計損失Sと未知の累計損失Uとの差が減少し続ける場合は、予測モデル2dのニューラルネットワークの重みを更新して処理を繰り返す。
なお、本実施の形態では、既知の累計損失Sと未知の累計損失Uとの差を示す損失項L(U,S)は、次式(5)に示すようにポアソン分布の標準偏差方程式を用いて算出する。また、予測モデル2dの重み値は、勾配降下法、確率的勾配降下法、焼き鈍し法などの公知の最適化方法を用いて調整することができる。
上述した処理によって予測モデル2dが訓練、最適化されると、予測モデル2dを使用して、K+1年以降の将来の年についても未知の累計損失U(y,k)を推定して、将来必要となる支払準備金を予測することが可能となる。K+1年以降の未知の累計損失U(y,k)は、K+1年以降において必要となる支払準備金の額とみなすことができるため、訓練、最適化された予測モデル2dを使用して未知の累計損失U(y,k)を推定することにより、将来必要となる支払準備金の額を精度高く予測することができる。
請求データに新規のデータが追加された場合は、新規のデータを追加して上述したトレーニングを実施すれば、予測モデル2dの予測精度を向上させることができ、将来必要となる支払準備金額の予測精度もさらに向上させることができる。
図5は、第1の実施の形態における予測モデル2dのトレーニング処理の流れを示すフローチャートである。図5に示す処理は、制御装置102が記憶媒体103に記録されている請求データCを読み出してトレーニングユニット2bに入力すると起動するプログラムとして、制御装置102によって実行される。
ステップS10において、制御装置102は、前処理ユニット2cにおける前処理を実行して、請求データc(t)={c0,c1,・・・・cn}を予測モデル2dと互換性のある新しいベクトルデータx(t)={x0,x1,・・・・xn}に変換する。変換された後の請求データは、累計損失集計ユニット2eと予測モデル2dに入力され、ステップS20とステップS30の処理が実行される。
ステップS20では、制御装置102は、累計損失集計ユニット2eにおいて、上述したように、年Yの時点ですでに保険金の支払いが完了しているすべての請求データを用いて過去の累計損失S(y,k)、すなわち既知の累計損失S(y,k)を算出する。その後、ステップS40へ進む。
また、ステップS30では、制御装置102は、予測モデル2dにおいて、上述したように、年Yの時点では保険金の支払いが完了していない請求データに基づいて、年Yからみた未来の累計損失、すなわち未知の累計損失U(y,k)を推定するための推定処理を実行する。その後、ステップS40へ進む。
ステップS40では、制御装置102は、損失項ユニット2fにおいて、上述したように、式(5)を用いて損失項L(U,S)を算出する。その後、ステップS50へ進む。
ステップS50では、制御装置102は、損失項ユニット2fにおいて、上述したように、予測モデル2dの最適化が完了したか否かを判断する。ステップS50で肯定判断した場合には、そのときの重みを予測モデル2dの重み値として採用して処理を終了する。これに対して、ステップS50で否定判断した場合には、ステップS60へ進む。
ステップS60では、制御装置102は、損失項ユニット2fにおいて、上述したように、予測モデル2dの重みを調整して、ステップS10へ戻る。
図6は、第1の実施の形態における将来の累計損失を推定するための処理の流れを示すフローチャートである。図6に示す処理は、制御装置102が記憶媒体103に記録されている請求データをトレーニングが完了している予測モデル2dに入力すると起動するプログラムとして、制御装置102によって実行される。なお、予測モデル2dに入力される請求データは、上述した前処理ユニット2cによる処理が実行されて、あらかじめ予測モデル2dと互換性のある新しいベクトルデータx(t)={x0,x1,・・・・xn}に変換されているものとする。
ステップS110において、制御装置102は、予測モデル2dにおいて、上述した予測処理を実行することにより、請求データに基づいて、未知の累計損失U(y,k)を推定する。その後、ステップS120へ進む。
ステップS120では、制御装置102は、推定された未知の累計損失U(y,k)を出力する。なお、出力先はあらかじめ設定されているものとし、例えば、記憶媒体103に出力して未知の累計損失U(y,k)を記憶媒体103に記録してもよいし、表示装置104に出力して未知の累計損失U(y,k)を表示するようにしてもよい。その後、処理を終了する。
以上説明した第1の実施の形態によれば、以下のような作用効果を得ることができる。
(1)制御装置102は、過去の保険金請求データに基づいて、保険金の支払いが完了していない請求データを入力すると、保険金の支払いが完了していない請求データに基づく未知の累計損失を推定して出力するようにニューラルネットワークを学習させ、学習が完了したニューラルネットワークに、保険金の支払いが完了していない請求データを入力することにより未知の累計損失の出力を得て、将来必要となる支払準備金を予測するようにした。これによって、過去の請求データに基づいて学習が完了したニューラルネットワークを利用することによって、保険会社が将来必要とする支払準備金を精度高く予測することができる。
(1)制御装置102は、過去の保険金請求データに基づいて、保険金の支払いが完了していない請求データを入力すると、保険金の支払いが完了していない請求データに基づく未知の累計損失を推定して出力するようにニューラルネットワークを学習させ、学習が完了したニューラルネットワークに、保険金の支払いが完了していない請求データを入力することにより未知の累計損失の出力を得て、将来必要となる支払準備金を予測するようにした。これによって、過去の請求データに基づいて学習が完了したニューラルネットワークを利用することによって、保険会社が将来必要とする支払準備金を精度高く予測することができる。
(2)制御装置102は、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出し、過去の保険金請求データに基づいて、過去の特定の年を基準に未知の累計損失を推定して、既知の累計損失と未知の累計損失とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させるようにした。これによって、既に確定している過去の請求データを用いてニューラルネットワークを学習させることができる。
(3)制御装置102は、既知の累計損失と未知の累計損失との差が最小になるようにニューラルネットワークを学習させるようにした。これによって、出力される既知の累計損失と未知の累計損失との差が最小になるまでニューラルネットワークを学習させることができるため、ニューラルネットワークによる支払準備金の予測精度を向上させることができる。
-第2の実施の形態-
第2の実施の形態では、予測モデル2dは、図7に示すように、Recurrent Neural Network (RNN)7aと、Fully Connected Network (FCN)7bを含む場合について説明する。なお、第2の実施の形態において、図1、2、3、6は、第1の実施の形態と同様のため、説明を省略する。
第2の実施の形態では、予測モデル2dは、図7に示すように、Recurrent Neural Network (RNN)7aと、Fully Connected Network (FCN)7bを含む場合について説明する。なお、第2の実施の形態において、図1、2、3、6は、第1の実施の形態と同様のため、説明を省略する。
RNN7aは、いくつかのrecurrent layersで構成され、それぞれはLong Short Term Memory(LSTM)またはGated Recurrent Unit (GRU) cellsを使用して実装される。FCN7bは、RNN7aの出力を取り、それを一つの推定値に減らす。
第2の実施の形態における予測モデル2dについて、第1の実施の形態で上述した予測モデル2dとの相違点を中心に説明する。第1の実施の形態では、予測モデル2dに入力されるデータは、c0~cnのn個の特徴をもった請求データであったが、第2の実施の形態では、次式(6)によって計算された累計損失率R(y,k)が予測モデル2dに入力される。
この累計損失率R(y,k)は、y年にわたるk-1年の累計損失率を表す。また、第2の実施の形態における予測モデル2dからの出力は、k年の推定累積損失率EKに対応する単一の値となる。なお、本実施の形態では、累計損失集計ユニット2eが年Yの時点ですでに保険金の支払いが完了しているすべての請求データを用いて既知の累計損失S(y,k)を算出するとともに、式(6)によって累計損失率R(y,k)を計算し、累計損失率R(y,k)の算出結果が予測モデル2dに入力されるものとする。
また、第2の実施の形態では、損失項ユニット2fにおいて、次式(7)示す平均二乗誤差(MSE)の関数を用いて損失項L(E,S)を算出し、損失項L(E,S)の値が最小になるように、予測モデル2dの重み値、すなわちニューラルネットワークの重みを調節することによって予測モデル2dのトレーニングを行う。
このようにして予測モデル2dが訓練、最適化されると、予測モデル2dを使用して、未知の累計損失U(y,k)を推定して、将来必要となる支払準備金を予測することが可能となる。このとき、第2の実施の形態では、未知の累計損失U(y,k)を得るために、EK×S(Y,K-1)の乗算だけが年YとKについて計算される。
図8は、第2の実施の形態における予測モデル2dのトレーニング処理の流れを示すフローチャートである。図8に示す処理は、制御装置102が記憶媒体103に記録されている請求データCを読み出してトレーニングユニット2bに入力すると起動するプログラムとして、制御装置102によって実行される。なお、図8においては、第1の実施の形態で上述した図5と処理内容が同じステップには同じステップ番号を付与して説明を省略する。
ステップS21において、制御装置102は、累計損失集計ユニット2eにおいて、上述したように、年Yの時点ですでに保険金の支払いが完了しているすべての請求データを用いて過去の累計損失S(y,k)、すなわち既知の累計損失S(y,k)を算出する。また、上述したように、式(6)によって累計損失率R(y,k)を計算する。その後、ステップS31へ進む。
ステップS31では、制御装置102は、予測モデル2dにおいて、上述したように、累計損失率R(y,k)に基づいて推定累積損失率EKを予測するための予測処理を実行する。その後、ステップS41へ進む。
ステップS41では、制御装置102は、損失項ユニット2fにおいて、上述したように、式(7)を用いて、損失項L(E,S)を算出する。その後、ステップS50へ進む。
以上説明した第2の実施の形態によれば、以下のような作用効果を得ることができる。
(1)制御装置102は、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出し、過去の保険金請求データに基づいて、過去の特定の年を基準に累計損失率を算出して、既知の累計損失と累計損失率とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させるようにした。これによって、既に確定している過去の請求データを用いてニューラルネットワークを学習させることができる。
(1)制御装置102は、過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出し、過去の保険金請求データに基づいて、過去の特定の年を基準に累計損失率を算出して、既知の累計損失と累計損失率とに基づいて、保険金の支払いが完了していない請求データを入力すると未知の累計損失を推定して出力するようにニューラルネットワークを学習させるようにした。これによって、既に確定している過去の請求データを用いてニューラルネットワークを学習させることができる。
(2)制御装置102は、既知の累計損失と累計損失率とを用いて定義された平均二乗誤差の関数の値が最小になるようにニューラルネットワークを学習させるようにした。これによって、出力される既知の累計損失と累計損失率とに基づいて、ニューラルネットワークによる支払準備金の予測精度を向上させることができる。
-変形例-
なお、上述した実施の形態の情報処理装置は、以下のように変形することもできる。
(1)上述した第1および第2の実施の形態では、情報処理装置100はパソコンであって、制御装置102が上述した処理を実行する例について説明した。しかしながら、請求データが記録された請求データを別装置として、請求データが記録された装置と情報処理装置100とをインターネットなどの通信回線を介して接続するようにしてもよい。また、ユーザが操作する操作端末と情報処理装置100とを別装置として、情報処理装置100は、操作端末からの指示を受けて支払準備金の予測を行い、予測結果を操作端末へ送信するようにしてもよい。これによって、上述した第1および第2の実施の形態のように、情報処理装置100をスタンドアロン型の装置として用いてもよいし、請求データが記録された装置や操作端末と情報処理装置100とを通信回線を介して接続したクライアントサーバー型やクラウド型の情報処理システムを構築することもできる。
なお、上述した実施の形態の情報処理装置は、以下のように変形することもできる。
(1)上述した第1および第2の実施の形態では、情報処理装置100はパソコンであって、制御装置102が上述した処理を実行する例について説明した。しかしながら、請求データが記録された請求データを別装置として、請求データが記録された装置と情報処理装置100とをインターネットなどの通信回線を介して接続するようにしてもよい。また、ユーザが操作する操作端末と情報処理装置100とを別装置として、情報処理装置100は、操作端末からの指示を受けて支払準備金の予測を行い、予測結果を操作端末へ送信するようにしてもよい。これによって、上述した第1および第2の実施の形態のように、情報処理装置100をスタンドアロン型の装置として用いてもよいし、請求データが記録された装置や操作端末と情報処理装置100とを通信回線を介して接続したクライアントサーバー型やクラウド型の情報処理システムを構築することもできる。
(2)上述した第1の実施の形態では、損失項ユニット2fでは、既知の累計損失Sと未知の累計損失Uとの差を測定するための損失項L(U,S)を最小にするように、予測モデル2dの重み値、すなわちニューラルネットワークの重みを調節することによって予測モデル2dのトレーニングを行う例について説明した。しかしながら、損失項ユニット2fでは、既知の累計損失Sと未知の累計損失Uとの差を測定するための損失項L(U,S)があらかじめ設定された閾値以下になるように、予測モデル2dの重み値、すなわちニューラルネットワークの重みを調節することによって予測モデル2dのトレーニングを行うようにしてもよい。
(3)上述した第2の実施の形態では、損失項ユニット2fでは、損失項L(E,S)の値が最小になるように、予測モデル2dの重み値、すなわちニューラルネットワークの重みを調節することによって予測モデル2dのトレーニングを行う例について説明した。しかしながら、損失項ユニット2fでは、損失項L(E,S)の値があらかじめ設定された閾値以下になるように、予測モデル2dの重み値、すなわちニューラルネットワークの重みを調節することによって予測モデル2dのトレーニングを行うようにしてもよい。
なお、本発明の特徴的な機能を損なわない限り、本発明は、上述した実施の形態における構成に何ら限定されない。また、上述の実施の形態と複数の変形例を組み合わせた構成としてもよい。
次の優先権基礎出願の開示内容は引用文としてここに組み込まれる。
日本国特許出願2019年第96741号(2019年5月23日出願)
日本国特許出願2019年第96741号(2019年5月23日出願)
100 情報処理装置
101 操作部材
102 制御装置
103 記憶媒体
104 表示装置
101 操作部材
102 制御装置
103 記憶媒体
104 表示装置
Claims (15)
- ニューラルネットワークを用いて保険会社の支払準備金を予測するための情報処理装置であって、
過去の保険金請求データに基づいて、保険金の支払いが完了していない請求データを入力すると、保険金の支払いが完了していない請求データに基づく未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させるトレーニング手段と、
前記トレーニング手段によって学習が完了した前記ニューラルネットワークに、保険金の支払いが完了していない請求データを入力することにより前記未知の累計損失の出力を得て、将来必要となる支払準備金を予測する支払準備金予測手段とを備えることを特徴とする情報処理装置。 - 請求項1に記載の情報処理装置において、
過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、
過去の保険金請求データに基づいて、過去の特定の年を基準に未知の累計損失を推定する未知の累計損失推定手段とをさらに備え、
前記トレーニング手段は、前記既知の累計損失算出手段によって算出された前記既知の累計損失と、前記未知の累計損失推定手段によって算出された前記未知の累計損失とに基づいて、保険金の支払いが完了していない請求データを入力すると前記未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させることを特徴とする情報処理装置。 - 請求項2に記載の情報処理装置において、
前記トレーニング手段は、前記既知の累計損失算出手段によって算出された前記既知の累計損失と、前記未知の累計損失推定手段によって推定された前記未知の累計損失との差が最小またはあらかじめ設定された閾値以下になるように前記ニューラルネットワークを学習させることを特徴とする情報処理装置。 - 請求項1に記載の情報処理装置において、
過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、
過去の保険金請求データに基づいて、過去の特定の年を基準に累計損失率を算出する累計損失率算出手段とをさらに備え、
前記トレーニング手段は、前記既知の累計損失算出手段によって算出された前記既知の累計損失と、前記累計損失率算出手段によって算出された前記累計損失率とに基づいて、保険金の支払いが完了していない請求データを入力すると前記未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させることを特徴とする情報処理装置。 - 請求項4に記載の情報処理装置において、
前記トレーニング手段は、前記既知の累計損失算出手段によって算出された前記既知の累計損失と、前記累計損失率算出手段によって算出された前記累計損失率とを用いて定義された平均二乗誤差の関数の値が最小またはあらかじめ設定された閾値以下になるように前記ニューラルネットワークを学習させることを特徴とする情報処理装置。 - ニューラルネットワークを用いて保険会社の支払準備金を予測するための情報処理システムであって、
過去の保険金請求データに基づいて、保険金の支払いが完了していない請求データを入力すると、保険金の支払いが完了していない請求データに基づく未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させるトレーニング手段と、
前記トレーニング手段によって学習が完了した前記ニューラルネットワークに、保険金の支払いが完了していない請求データを入力することにより前記未知の累計損失の出力を得て、将来必要となる支払準備金を予測する支払準備金予測手段とを備えることを特徴とする情報処理システム。 - 請求項6に記載の情報処理システムにおいて、
過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、
過去の保険金請求データに基づいて、過去の特定の年を基準に未知の累計損失を推定する未知の累計損失推定手段とをさらに備え、
前記トレーニング手段は、前記既知の累計損失算出手段によって算出された前記既知の累計損失と、前記未知の累計損失推定手段によって推定された前記未知の累計損失とに基づいて、保険金の支払いが完了していない請求データを入力すると前記未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させることを特徴とする情報処理システム。 - 請求項7に記載の情報処理システムにおいて、
前記トレーニング手段は、前記既知の累計損失算出手段によって算出された前記既知の累計損失と、前記未知の累計損失推定手段によって推定された前記未知の累計損失との差が最小またはあらかじめ設定された閾値以下になるように前記ニューラルネットワークを学習させることを特徴とする情報処理システム。 - 請求項6に記載の情報処理システムにおいて、
過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手段と、
過去の保険金請求データに基づいて、過去の特定の年を基準に累計損失率を算出する累計損失率算出手段とをさらに備え、
前記トレーニング手段は、前記既知の累計損失算出手段によって算出された前記既知の累計損失と、前記累計損失率算出手段によって算出された前記累計損失率とに基づいて、保険金の支払いが完了していない請求データを入力すると前記未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させることを特徴とする情報処理システム。 - 請求項9に記載の情報処理システムにおいて、
前記トレーニング手段は、前記既知の累計損失算出手段によって算出された前記既知の累計損失と、前記累計損失率算出手段によって算出された前記累計損失率とを用いて定義された平均二乗誤差の関数の値が最小またはあらかじめ設定された閾値以下になるように前記ニューラルネットワークを学習させることを特徴とする情報処理システム。 - ニューラルネットワークを用いて保険会社の支払準備金を予測するために、
過去の保険金請求データに基づいて、保険金の支払いが完了していない請求データを入力すると、保険金の支払いが完了していない請求データに基づく未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させるトレーニング手順と、
前記トレーニング手順で学習が完了した前記ニューラルネットワークに、保険金の支払いが完了していない請求データを入力することにより前記未知の累計損失の出力を得て、将来必要となる支払準備金を予測する支払準備金予測手順とをコンピュータに実行させるための情報処理プログラム。 - 請求項11に記載の情報処理プログラムにおいて、
過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手順と、
過去の保険金請求データに基づいて、過去の特定の年を基準に未知の累計損失を推定する未知の累計損失推定手順とをさらに有し、
前記トレーニング手順は、前記既知の累計損失算出手順で算出した前記既知の累計損失と、前記未知の累計損失推定手順で推定した前記未知の累計損失とに基づいて、保険金の支払いが完了していない請求データを入力すると前記未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させることを特徴とする情報処理プログラム。 - 請求項12に記載の情報処理プログラムにおいて、
前記トレーニング手順は、前記既知の累計損失算出手順で算出した前記既知の累計損失と、前記未知の累計損失推定手順で推定した前記未知の累計損失との差が最小またはあらかじめ設定された閾値以下になるように前記ニューラルネットワークを学習させることを特徴とする情報処理プログラム。 - 請求項11に記載の情報処理プログラムにおいて、
過去の保険金請求データに基づいて、過去の特定の年を基準に既知の累計損失を算出する既知の累計損失算出手順と、
過去の保険金請求データに基づいて、過去の特定の年を基準に累計損失率を算出する累計損失率算出手順とをさらに有し、
前記トレーニング手順は、前記既知の累計損失算出手順で算出した前記既知の累計損失と、前記累計損失率算出手順で算出した前記累計損失率とに基づいて、保険金の支払いが完了していない請求データを入力すると前記未知の累計損失を推定して出力するように前記ニューラルネットワークを学習させることを特徴とする情報処理プログラム。 - 請求項14に記載の情報処理プログラムにおいて、
前記トレーニング手順は、前記既知の累計損失算出手順で算出した前記既知の累計損失と、前記累計損失率算出手順で算出した前記累計損失率とを用いて定義された平均二乗誤差の関数の値が最小またはあらかじめ設定された閾値以下になるように前記ニューラルネットワークを学習させることを特徴とする情報処理プログラム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US17/606,237 US20220147938A1 (en) | 2019-05-23 | 2020-05-18 | Information processing device, information processing system, and information processing program |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019096741A JP6813827B2 (ja) | 2019-05-23 | 2019-05-23 | 情報処理装置、情報処理システム、および情報処理プログラム |
JP2019-096741 | 2019-05-23 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2020235520A1 true WO2020235520A1 (ja) | 2020-11-26 |
Family
ID=73453726
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2020/019602 WO2020235520A1 (ja) | 2019-05-23 | 2020-05-18 | 情報処理装置、情報処理システム、および情報処理プログラム |
Country Status (3)
Country | Link |
---|---|
US (1) | US20220147938A1 (ja) |
JP (1) | JP6813827B2 (ja) |
WO (1) | WO2020235520A1 (ja) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20220414495A1 (en) * | 2021-06-24 | 2022-12-29 | The Toronto-Dominion Bank | System and method for determining expected loss using a machine learning framework |
CN116777648B (zh) * | 2023-08-23 | 2023-11-03 | 山东远硕上池健康科技有限公司 | 一种车辆出险的人伤理赔信息智能管理方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006522376A (ja) * | 2003-09-10 | 2006-09-28 | スイス リインシュアランス カンパニー | 自動的な経験料率の設定、及び/又は、損失積立のためのシステム、及び、方法 |
JP2008512798A (ja) * | 2004-09-10 | 2008-04-24 | デロイッテ・ディベロップメント・エルエルシー | 保険証券及びクレームレベル詳細予測モデリングを使用して保険支払備金及び信頼区間を推定するための方法及びシステム |
-
2019
- 2019-05-23 JP JP2019096741A patent/JP6813827B2/ja active Active
-
2020
- 2020-05-18 US US17/606,237 patent/US20220147938A1/en not_active Abandoned
- 2020-05-18 WO PCT/JP2020/019602 patent/WO2020235520A1/ja active Application Filing
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006522376A (ja) * | 2003-09-10 | 2006-09-28 | スイス リインシュアランス カンパニー | 自動的な経験料率の設定、及び/又は、損失積立のためのシステム、及び、方法 |
JP2008512798A (ja) * | 2004-09-10 | 2008-04-24 | デロイッテ・ディベロップメント・エルエルシー | 保険証券及びクレームレベル詳細予測モデリングを使用して保険支払備金及び信頼区間を推定するための方法及びシステム |
Also Published As
Publication number | Publication date |
---|---|
JP2020190983A (ja) | 2020-11-26 |
JP6813827B2 (ja) | 2021-01-13 |
US20220147938A1 (en) | 2022-05-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190042999A1 (en) | Systems and methods for optimizing parallel task completion | |
JP4661250B2 (ja) | 予測方法、予測装置および予測プログラム | |
Pigeon et al. | Individual loss reserving with the multivariate skew normal framework | |
CN111192131A (zh) | 金融风险预测方法、装置和电子设备 | |
US20050055257A1 (en) | Techniques for performing business analysis based on incomplete and/or stage-based data | |
Huang et al. | Medical service demand forecasting using a hybrid model based on ARIMA and self-adaptive filtering method | |
WO2020235520A1 (ja) | 情報処理装置、情報処理システム、および情報処理プログラム | |
WO2016084642A1 (ja) | 与信審査用サーバと与信審査用システム及び与信審査用プログラム | |
US20140149175A1 (en) | Financial Risk Analytics for Service Contracts | |
JP2007215354A (ja) | 電力負荷予測方法、及び電力負荷予測処理プログラム | |
WO2021041061A1 (en) | System and method for recruitment candidate equity modeling | |
JP6049799B2 (ja) | 経営支援プログラム | |
JP2001125962A (ja) | 企業診断及び経営意思決定支援システム | |
JP2019028871A (ja) | プロジェクト管理支援装置、プロジェクト管理支援方法およびプログラム | |
CN110766184A (zh) | 订单量预测方法和装置 | |
CN110310199B (zh) | 借贷风险预测模型的构建方法、系统及借贷风险预测方法 | |
US9544445B1 (en) | Telecommunication price-based routing apparatus, system and method | |
US20220164912A1 (en) | Dynamically adjusting a pool of transportation provider devices in a prioritized-dispatch mode using availability indicators | |
CN116542760A (zh) | 一种用于评估数据的方法和装置 | |
De Jongh et al. | A critical review of the Basel margin of conservatism requirement in a retail credit context | |
CN112418534B (zh) | 揽件量预测方法及装置、电子设备、计算机可读存储介质 | |
US20110078071A1 (en) | Prioritizing loans using customer, product and workflow attributes | |
US20200219622A1 (en) | System and methods for enhanced risk adjustment factor prediction | |
JP3306806B2 (ja) | 退職給付債務管理装置 | |
JP2015103246A (ja) | 価格決定の方法、システム、およびコンピュータ・プログラム(製品およびサービスのためのロバストな価格決定解決法) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20810736 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20810736 Country of ref document: EP Kind code of ref document: A1 |