WO2020230553A1 - 配送支援装置、配送支援システム及び配送支援方法 - Google Patents
配送支援装置、配送支援システム及び配送支援方法 Download PDFInfo
- Publication number
- WO2020230553A1 WO2020230553A1 PCT/JP2020/017277 JP2020017277W WO2020230553A1 WO 2020230553 A1 WO2020230553 A1 WO 2020230553A1 JP 2020017277 W JP2020017277 W JP 2020017277W WO 2020230553 A1 WO2020230553 A1 WO 2020230553A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- delivery
- power data
- facility
- timing
- support device
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/083—Shipping
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
Definitions
- This disclosure relates to a delivery support device, a delivery support system, and a delivery support method.
- the first feature is a delivery support device, which is a receiving unit that receives power data of at least one facility included in two or more predetermined facilities existing in a predetermined area, and the two or more based on the power data.
- the control unit includes a control unit that determines a procedure for delivering an article to a predetermined facility, and the control unit is based on the power data that satisfies the first condition with the first timing as a reference at the first timing.
- the first procedure of determining the target area from the two or more delivery areas included in the predetermined area is executed, and in the second timing after the first timing, the second condition is set with reference to the second timing.
- the gist is to carry out a second step of determining a delivery plan for goods to two or more target facilities existing in the target area based on the power data to be satisfied.
- the second feature is a delivery support system, which is a receiving unit that receives power data of at least one facility included in two or more predetermined facilities existing in a predetermined area, and the two or more based on the power data.
- the control unit includes a control unit that determines a procedure for delivering an article to a predetermined facility, and the control unit is based on the power data that satisfies the first condition with the first timing as a reference at the first timing.
- the first procedure of determining the target area from the two or more delivery areas included in the predetermined area is executed, and in the second timing after the first timing, the second condition is set with reference to the second timing.
- the gist is to carry out a second step of determining a delivery plan for goods to two or more target facilities existing in the target area based on the power data to be satisfied.
- the third feature is the delivery support method, in which the step of receiving the power data of at least one facility included in the two or more predetermined facilities existing in the predetermined area and the first timing are based on the first timing.
- the gist is to provide.
- FIG. 1 is a diagram showing a delivery support system 100 according to an embodiment.
- FIG. 2 is a diagram showing a delivery support device 300 according to the embodiment.
- FIG. 3 is a diagram for explaining a predetermined area according to the embodiment.
- FIG. 4 is a diagram showing a delivery support method according to the embodiment.
- FIG. 5 is a diagram showing a delivery support method according to the embodiment.
- FIG. 6 is a diagram showing a delivery support method according to the first modification.
- FIG. 7 is a diagram showing a delivery support system 100 according to the second modification.
- the delivery support system 100 includes a facility 200 and a delivery support device 300.
- the facility 200 and the delivery support device 300 are connected by a network 400.
- the network 400 may include an internet network or a mobile communication network.
- the network 400 may include a VPN (Virtual Private Network).
- Facility 200 is an example of a predetermined facility to which goods are delivered.
- the facility 200 may be a facility of an individual customer of a delivery company or a facility of a corporate customer of a delivery company.
- facility 200A, facility 200B, and facility 200C are exemplified as facility 200.
- Facility 200A has load equipment 210 (load equipment 210A) and EMS220 (EMS220A).
- Facility 200B has load equipment 210 (load equipment 210B) and SM230 (SM230B).
- Facility 200C has load equipment 210 (load equipment 210C), EMS220 (EMS220C) and SM230 (SM230C).
- facility 200 may include facilities that do not have EMS 220 and SM 230.
- the load device 210 is a device that consumes electric power.
- the load device 210 includes an air conditioner, a lighting device, a home electric appliance, and the like.
- the facility 200 may have a distributed power source in addition to the load device 210.
- the distributed power source may include a solar cell device, a fuel cell device, a power storage device, and the like.
- the EMS 220 is a management device (Energy Management System) that manages the electric power of the facility 200.
- the EMS 220 may be provided by a cloud service.
- the EMS 220 has at least a function of communicating with the delivery support device 300 and a function of acquiring electric power of the facility 200.
- the function of acquiring the electric power of the facility 200 is not particularly limited, but the electric power data measured by the CT (Curent Transformer) connected to the main power line before being branched by the distribution board is received from the CT. It may be a function.
- the EMS 220 transmits the electric power data of the facility 200 (hereinafter, the second electric power data) to the delivery support device 300.
- the second electric power data includes data of electric power (power flow electric power) from the electric power system to the facility 200.
- the second electric power data may include data of electric power (reverse power flow electric power) from the facility 200 to the electric power system.
- the SM230 is a smart meter that measures the power of facility 200.
- the SM 230 has at least a function of communicating with the delivery support device 300 and a function of measuring the electric power of the facility 200.
- the SM 230 transmits the electric power data of the facility 200 (hereinafter, the first electric power data) to the delivery support device 300.
- the first electric power data may include data of electric power (power flow electric power) from the electric power system to the facility 200, and includes data of electric power (reverse power flow electric power) from the facility 200 to the electric power system.
- the first electric power data may be transmitted from the SM 230 to the delivery support device 300 at the first interval (for example, 30 minutes).
- the second power data may be transmitted from the EMS 220 to the delivery support device 300 at a second interval (for example, 1 second).
- the second interval may be shorter than the first interval.
- the first power data may be data indicating the integrated power value in the first interval.
- the second power data may be data indicating the integrated power value in the second interval.
- the second power data may be an instantaneous power value.
- facility 200B and facility 200C are examples of the first facility having SM230.
- Facility 200A and facility 200C are examples of a second facility having an EMS 220.
- the EMS 220C may transmit the power data measured by the SM 230C to the delivery support device 300 as the second power data.
- the SM230C may transmit the power data measured by the SM230C to the delivery support device 300 as the first power data.
- the route of the first power data transmitted from the SM230 is sometimes referred to as the A route.
- the route of the second power data transmitted from the EMS 220 is sometimes referred to as route B.
- the delivery support device 300 may determine the route used for one facility 200 based on the route used for the other facility 200.
- the delivery support device 300 is a device that supports the delivery of goods by a delivery company.
- the delivery support device 300 receives the power data of at least one facility 200. Specifically, the delivery support device 300 receives power data from at least one of the EMS 220 and the SM 230. Details of the delivery support device 300 will be described later (see FIG. 2).
- the delivery support device 300 includes a communication unit 310, a management unit 320, and a control unit 330.
- the communication unit 310 is composed of a communication module.
- the communication module may be a wireless communication module compliant with standards such as IEEE802.11a / b / g / n, ZigBee, Wi-SUN, LTE, 5G, and 6G, and may be a wired communication module compliant with standards such as IEEE802.3. It may be a communication module.
- the communication unit 310 receives the power data of at least one facility 200.
- the communication unit 310 may receive the second power data from the EMS 220, or may receive the first power data from the SM 230.
- the management unit 320 is composed of a memory such as a non-volatile memory and / and a storage medium such as an HDD (Hard Disk Drive), and stores various information.
- a memory such as a non-volatile memory and / and a storage medium such as an HDD (Hard Disk Drive), and stores various information.
- HDD Hard Disk Drive
- the management unit 320 may manage the predetermined area 500 shown in FIG.
- the predetermined area 500 includes two or more delivery areas 510 (in FIG. 3, delivery area 510A, delivery area 510B, and delivery area 510C).
- the management unit 320 may manage two or more facilities 200 existing in each delivery area 510.
- the management unit 320 may manage the geographical locations of the delivery area 510 and the facility 200.
- the management unit 320 may manage the geographical position of the facility 200 for each delivery area 510, and manages the geographical position of all the facilities 200 existing in the predetermined area 500.
- the geographical location of the facility 200 may be managed so as to allocate it to the delivery area 510.
- the predetermined area 500 may be considered as an area controlled by the distribution base 610 described later. More specifically, the predetermined area 500 may be considered as an area where goods are delivered by the delivery vehicle 610 described later.
- the management unit 320 may manage the distribution base 610 and the delivery vehicle 620.
- the management unit 320 manages the geographical positions of the distribution base 610 and the delivery vehicle 620.
- the delivery vehicle 620 has a receiving device using GNSS (Global Navigation Satellite System), and data indicating the geographical position of the delivery vehicle 620 may be transmitted from the delivery vehicle 620 to the delivery support device 300.
- GNSS Global Navigation Satellite System
- the management unit 320 may manage the map data and the traffic jam data. According to such a configuration, it is possible to specify the time (movement time) for the delivery vehicle 620 to move from the distribution base 610 to each delivery area 510. The travel time may be corrected by the geographical location of the delivery vehicle 620.
- the control unit 330 may include at least one processor. At least one processor may be composed of a single integrated circuit (IC) or may be composed of a plurality of communicably connected circuits (such as integrated circuits and / or discrete circuits).
- IC integrated circuit
- communicably connected circuits such as integrated circuits and / or discrete circuits.
- the control unit 330 determines the procedure for delivering goods to two or more facilities 200 based on the electric power data. Specifically, at the first timing, the control unit 330 executes the first procedure of determining the target area from the two or more delivery areas 510 included in the predetermined area 500 based on the power data. In such a case, when the delivery vehicle 620 having jurisdiction over the delivery area 510 is predetermined, the determination of the target area may be read as the determination of the delivery vehicle 620. The determination of the delivery vehicle 620 may be made by inputting information identifying the delivery vehicle 620. In determining the delivery vehicle 620, the target area may be read as a delivery priority area.
- the control unit 330 executes the second procedure of determining the delivery plan of the goods to the two or more target facilities existing in the target area based on the electric power data.
- the first timing may be the timing when the delivery vehicle 620 departs from the distribution base 610 or the timing when the goods are loaded into the delivery vehicle 620.
- the second timing may be the timing when the delivery vehicle 620 reaches or approaches the target area.
- the control unit 330 may update the delivery plan of the article based on the electric power data at the third timing after the second timing.
- the third timing may be the timing of visiting the target facility existing in the target area.
- the third timing may be the timing at which the delivery of the goods is completed, or may be the timing at which the delivery of the goods could not be completed due to reasons such as absence.
- control unit 330 may determine the order of visiting two or more target facilities existing in the target area as a delivery plan for the goods.
- the control unit 330 may determine a route for visiting two or more target facilities existing in the target area as a delivery plan for the goods.
- the control unit 330 may determine both the order of visiting two or more target facilities and the route of visiting two or more target facilities as the delivery plan of the goods.
- the facility 200 may include a facility having both EMS 220 and SM 230. Further, the facility 200 may include a facility that does not have both EMS 220 and SM 230.
- the delivery support device 300 executes the first procedure at the first timing based on the first power data received at least at the first interval.
- the first timing may be the timing when the delivery vehicle 620 departs from the distribution base 610.
- the power data referred to in the first procedure is power data that satisfies the first condition with reference to the first timing.
- the first condition may be a condition that guarantees real-time performance.
- the first condition may be a condition of receiving immediately with respect to the first timing, or a condition of receiving within a certain period (for example, 30 minutes) with respect to the first timing. ..
- one power data may be referred to for one facility 200, or two or more power data may be referred to for one facility 200.
- the delivery support device 300 determines whether or not the user is at home at the facility 200 based on the first electric power data. For example, the delivery support device 300 determines that the user is at home at the facility 200 when the power of the facility 200 exceeds the threshold value at the first timing, and the power of the facility 200 exceeds the threshold value at the first timing. If not, it may be determined that the user is not at home at the facility 200. Subsequently, the delivery support device 300 determines the target area based on whether or not the user is at home in the facility 200. For example, the delivery support device 300 determines the delivery area 510, which has the largest number of facilities 200 in which the user is at home, as the target area.
- the delivery support device 300 executes the second procedure based on the second power data received at least in the second interval shorter than the first interval in the second timing after the first timing.
- the second timing may be the timing when the delivery vehicle 620 reaches or approaches the target area.
- the power data referred to in the second procedure is power data that satisfies the second condition with reference to the second timing.
- the second condition may be a condition that guarantees real-time performance.
- the second condition may be a condition that the signal is received immediately with respect to the second timing, or may be a condition that the signal is received within a certain period (for example, 20 minutes) with respect to the second timing. ..
- one power data may be referred to for one facility 200, or two or more power data may be referred to for one facility 200.
- the delivery support device 300 determines whether or not the user is at home at the facility 200 based on the second electric power data. For example, the delivery support device 300 determines that the user is at home at the facility 200 when the power of the facility 200 exceeds the threshold value at the second timing, and the power of the facility 200 exceeds the threshold value at the second timing. If not, it may be determined that the user is not at home at the facility 200. Subsequently, the delivery support device 300 determines the delivery plan of the article based on whether or not the user is at home at the facility 200. For example, the delivery support device 300 determines a delivery plan for delivering goods preferentially to the facility 200 determined to be home to the user, rather than the facility 200 determined to be homeless to the user.
- the delivery support device 300 updates the delivery plan of the article based on the second power data received at the second interval shorter than the first interval at the third timing after the second timing.
- the third timing may be the timing of visiting the target facility existing in the target area.
- the third timing may be a timing that is repeated at arbitrary time intervals after the delivery vehicle 620 reaches the target area.
- the power data referred to in the update of the delivery plan is the power data that satisfies the third condition based on the third timing.
- the third condition may be a condition that guarantees real-time performance.
- the third condition may be a condition of receiving immediately with respect to the third timing, or a condition of receiving within a certain period (for example, 10 minutes) with respect to the third timing. ..
- one power data may be referred to for one facility 200, or two or more power data may be referred to for one facility 200.
- the delivery support device 300 determines whether or not the user is at home at the facility 200 based on the second power data, as in the second procedure. Subsequently, the delivery support device 300 updates the delivery plan of the article based on whether or not the user is at home at the facility 200.
- the method of updating the delivery plan of the goods may be the same as the method of determining the delivery plan of the goods.
- the embodiment is not limited to this.
- the first procedure may be performed based on both the first power data and the second power data.
- the second procedure may be performed based on both the first power data and the second power data.
- the first power data is excellent because the population of facilities 200 capable of transmitting the first power data is large, and the second power data is superior to the first power data because it has higher real-time performance. It should be noted about the point. Therefore, when the second power data is used in the second procedure, the second power data in which the time elapsed from the measurement does not exceed the threshold value is used without using the second power data in which the time elapsed from the measurement exceeds the threshold value. You may.
- the first procedure is a procedure for determining a target area from the remaining delivery areas 510, excluding the delivery area 510 already selected as the target area.
- Delivery support method The delivery support method according to the embodiment will be described below.
- FIG. 4 a case is described in which a facility 200 having SM230 and a facility 200 having EMS220 are mixed, and the number of facilities 200 having SM230 is larger than the number of facilities 200 having EMS220.
- step S11 the delivery support device 300 receives the first power data from the SM 230 at the first interval. After that, the reception of the first power data continues.
- step S12 the delivery support device 300 receives the second power data from the EMS 220 at a second interval shorter than the first interval. After that, the reception of the second power data continues.
- the delivery support device 300 executes the first procedure based on the first power data at the first timing.
- the delivery support device 300 may execute the first procedure based on the first power data and the second power data. That is, the delivery support device 300 determines the target area from the two or more delivery areas 510 included in the predetermined area 500 based on the electric power data.
- step S14 the delivery support device 300 notifies the delivery vehicle 620 of the target area.
- step S15 the delivery support device 300 receives data indicating the geographical position of the delivery vehicle 620 (hereinafter, position data).
- position data data indicating the geographical position of the delivery vehicle 620
- the delivery support device 300 may periodically receive the position data, or may receive the position data at the timing of reaching or approaching the target area.
- step S16 the delivery support device 300 executes the second procedure based on the second power data at the second timing after the first timing.
- the delivery support device 300 may execute the second procedure based on the first power data and the second power data. That is, the delivery support device 300 determines a delivery plan of goods to two or more target facilities existing in the target area based on the electric power data.
- the second timing may be the timing when the delivery vehicle 620 reaches or approaches the target area.
- the delivery support device 300 may specify the second timing based on the position data received from the delivery vehicle 620.
- step S17 the delivery support device 300 transmits the delivery plan determined in step S16 to the delivery vehicle 620.
- the delivery support device 300 receives data indicating the geographical position of the delivery vehicle 620 (hereinafter, position data).
- position data may indicate the geographical position of the delivery vehicle 620 on a regular basis, or may receive the position data at the timing of visiting the target facility.
- the delivery support device 300 updates the delivery plan based on the second power data at the third timing after the second timing.
- the delivery support device 300 may update the delivery plan based on the first power data and the second power data.
- the delivery support device 300 may update the delivery plan based on the power data changed from the power data referred to at the second timing.
- the third timing may be the timing of visiting the target facility existing in the target area.
- the delivery support device 300 may specify the third timing based on the position data received from the delivery vehicle 620.
- the delivery support device 300 may specify the third timing based on the completion notification transmitted from the terminal of the delivery person.
- the completion notification is a notification indicating that the target facility has been visited.
- the completion notification may be a notification that the delivery of the goods has been completed, or may be a notification that the delivery of the goods could not be completed due to reasons such as absence.
- step S23 the delivery support device 300 transmits the delivery plan updated in step S22 to the delivery vehicle 620.
- the delivery support device 300 executes the first procedure of determining the target area based on the electric power data in the first timing, and in the second timing after the first timing, the article is based on the electric power data. Perform the second step of determining the delivery plan for.
- the first procedure for determining the target area and the delivery plan in view of the situation where the electric power data for determining whether or not the user is at home in the facility 200 is getting old every moment.
- the delivery support device 300 updates the delivery plan of the article based on the electric power data at the third timing after the second timing. With such a configuration, it is possible to determine whether or not the user is at home at the facility 200 based on the highly real-time power data, and appropriately update the delivery plan of the goods to the facility 200. Can be done.
- the first procedure may be executed based on the first power data.
- the target area can be appropriately determined.
- the second procedure may be executed based on the second power data in view of the high real-time property of the second power data.
- the delivery support device 300 may transmit the content related to the delivery plan of the goods to at least one of the user terminal and the EMS 220 owned by the user of the facility 200.
- the content may include a scheduled delivery time to the facility 200, may include the geographical location of the delivery vehicle 620, and may include data asking if the user is able to receive the goods. Further, the delivery support device 300 may transmit data inquiring in advance whether or not to use the service for receiving the above-mentioned contents to the user terminal.
- the delivery support device 300 may transmit the content to the user terminal 700. That is, the delivery support device 300 may transmit the content to the user terminal 700 when the target area is determined. Alternatively, the delivery support device 300 may transmit the content to the user terminal 700 when the delivery plan of the article is determined. Alternatively, the delivery support device 300 may transmit the content to the user terminal 700 when the delivery plan of the article is updated.
- the delivery support device 300 in order to clarify the explanation, a case where the delivery support device 300 is realized by one device is illustrated. On the other hand, in the second modification, a case where the delivery support device 300 is realized by two or more devices belonging to two or more entities will be illustrated.
- the delivery support system 100 has a server 300A, a server 300B, and a server 300C in place of the delivery support device 300 shown in FIG.
- the server 300A is a server that belongs to the entity that manages the SM230. Such entities may be power generation companies, power transmission and distribution companies, retailers, and the like.
- the server 300A receives the first power data from the SM 230 at the first interval.
- the server 300A may transmit the first power data to the server 300C at the first interval.
- the server 300B is a server that belongs to the entity that manages the EMS 220. Such entities may be resource aggregators and the like.
- the server 300B receives the second power data from the EMS 220 at a second interval shorter than the first interval.
- the server 300B may transmit the second power data to the server 300C at the second interval.
- the server 300C is a server belonging to an entity that supports a delivery company.
- the server 300C has the same functions as the delivery support device 300 described above, except that the power data is received via the server 300A and the server 300B.
- the server 300C may determine whether or not to use the power data in the first procedure based on the time lag described above. For example, the server 300C may execute the first procedure using the power data having a time lag smaller than the first threshold value without using the power data having a time lag larger than the first threshold value. Similarly, the server 300C may determine whether or not to use the power data in the second procedure based on the time lag described above. For example, the server 300C may execute the second procedure using the power data whose time lag is smaller than the second threshold value without using the power data whose time lag is larger than the second threshold value.
- the first threshold value may be different from the second threshold value.
- the first threshold value may be larger than the second threshold value.
- the server 300C may use the power data in the first procedure regardless of the time lag described above.
- the second modification is not limited to this.
- a server belonging to a delivery company may be provided.
- the server 300A may include a server belonging to each of the power generation business operator, the power transmission and distribution business operator, and the retail business operator.
- the two or more facilities 200 existing in the predetermined area 500 include a third facility where the use of the delivery box is permitted and a fourth facility where the use of the delivery box is not permitted.
- the parcel box is for temporarily storing goods regardless of whether the user is absent or not.
- the third facility may be a facility provided with a delivery box, or may be a facility for which the use of the delivery box is applied when requesting delivery of goods.
- the fourth facility may be a facility that is not provided with a delivery box, or may be a facility that is not applied for the use of the delivery box when requesting delivery of goods.
- the delivery support device 300 manages in advance data indicating whether the facility 200 is the third facility or the fourth facility, and the user stays at the third facility at home. It may be treated as a facility 200.
- the delivery support device 300 executes the first procedure and the second procedure based on the data indicating whether the facility 200 is the third facility or the fourth facility in addition to the electric power data. ..
- the delivery support device 300 may execute the first procedure and the second procedure based on the power data of the fourth facility without using the power data of the third facility. That is, in the first procedure, the number of units in the third facility and the number of units at home based on the power data of the fourth facility are totaled, and the user is at home from two or more delivery areas 510 included in the predetermined area 500.
- the delivery area 510 which has the largest number of facilities 200, is determined as the target area.
- a delivery plan of goods to two or more target facilities including the third facility existing in the target area and the facility at home based on the electric power data of the fourth facility is determined.
- the delivery box is not limited to the box provided on the premises of the facility 200, but includes the box provided outside the premises of the facility 200.
- the box provided outside the premises of the facility 200 may be installed by a delivery company, may be installed by a company affiliated with the delivery company, or may be installed at a station such as a railway.
- the geographical position of the facility 200 is read as the geographical position of the delivery box, and the above-mentioned first and second steps are executed. Will be done.
- the second power data transmitted from the EMS 220 may include the power consumption data for each device provided in the facility 200.
- the delivery support device 300 (control unit 330) executes the second procedure based on the power consumption data for each device.
- the EMS 220 has a function of acquiring power consumption data for each device.
- the EMS 220 may acquire the power consumption data from each device, or may acquire the power consumption data from a CT (Current Transformer) attached to each device.
- the EMS 220 may acquire the power consumption data of all the devices provided in the facility 200, or may acquire the power consumption data of some of the devices provided in the facility 200.
- the delivery support device 300 may determine that the user is at home at the facility 200 when the power consumption of the device used while the user is at home at the facility 200 exceeds the threshold value.
- a device may be a dryer, a television, an air conditioner, a lighting device, or the like.
- the delivery support device 300 may treat that the user is not at home at the facility 200 when the power consumption of the device used in a state where the user cannot receive the article exceeds the threshold value.
- such a device may be a water heater for a bath or the like.
- the delivery support device 300 may send a message regarding the delivery prediction or the delivery result of the goods to the operator of the EC (Electronic Commerce) used for purchasing the goods.
- the message includes the route of the facility 200 visited by the delivery company, the predicted probability of successful delivery of the goods, the actual probability of successful delivery of the goods, and the like.
- the delivery support device 300 is data indicating whether or not a time zone in which the goods are desired to be received (hereinafter referred to as a receipt time zone) is specified. May be received from the EC operator.
- the delivery support device 300 manages the facility 200 in which the pick-up time zone is designated and the pick-up time zone. You may handle it.
- the delivery support device 300 may update the delivery plan based on the power data of the facility 200 when the current time enters the receiving time zone.
- the delivery support device 300 may execute the first procedure and the second procedure based on the data indicating whether or not the receiving time zone is specified in addition to the electric power data. For example, the delivery support device 300 does not use the power data of the facility 200 in which the receiving time zone is specified, but performs the first procedure and the second procedure based on the power data of the facility 200 in which the receiving time is not specified. You may do it. That is, in the first procedure, the number of units of the facility 200 for which the receiving time zone is specified and the number of units staying at home based on the power data of the facility 200 for which the receiving time is not specified are totaled and included in the predetermined area 500.
- the delivery area 510 having the largest number of facilities 200 in which the user is at home is determined as the target area. Then, in the second procedure, for two or more target facilities including the facility 200 that exists in the target area and the receiving time zone is specified and the facility that stays at home based on the power data of the facility 200 that does not specify the receiving time. Determine the delivery plan for the goods. However, when the delivery support device 300 needs to deliver the goods at a time other than the pick-up time zone, the delivery support device 300 uses the power data of the facility 200 for which the pick-up time zone is specified to perform the first procedure and the second procedure. You may do it.
- SM230 is exemplified as a power meter for measuring the power (power flow power or reverse power flow power) of the facility 200.
- the power meter may be a CT (Current Transformer) connected to the main power line before being branched by the distribution board.
- the power meter may be a CT connected to the branched power line after being branched by the distribution board.
- the power meter is a CT
- the CT is connected to a device (for example, EMS220) having a function of communicating with the delivery support device 300, and power data is transmitted to the delivery support device 300 from the device connected to the CT. It may be transmitted.
- the delivery vehicle 620 is exemplified as a means of transporting the goods to the target facility.
- the means of transportation may be a drone or a robot.
- the delivery company does not have to follow the delivery plan of the goods determined or updated by the delivery support device 300.
- the delivery company may change the delivery plan of the goods according to a rule of thumb or the like.
- the delivery support device 300 may provide a UI (User Interface) for changing the delivery plan of the goods.
- the delivery support device 300 may learn the facility 200 whose delivery plan has been changed, and determine the delivery plan based on the learning result when the goods are delivered to the facility 200 in the next delivery.
- the delivery support device 300 determines the loading order of the articles on the delivery vehicle 620 based on the delivery plan of the articles, and notifies the delivery company of the determined loading order. May be good.
- the delivery support device 300 may learn whether or not the user is at home in the facility 200 in association with a predetermined parameter.
- predetermined parameters include a time zone, a day of the week, whether or not a pick-up time is specified, and the power of the facility 200.
- the delivery support device 300 specifies the probability that the user is at home at the facility 200 (hereinafter, the probability of being at home) based on the learning result, and the user is at home at the facility 200 where the specified home probability is higher than the threshold value. It may be treated as a facility 200.
- the electric power may be an instantaneous electric power (kW) or an integrated electric energy (kWh).
- the output power data may include instantaneous power (kW) or integrated electric energy (kWh).
- a program for causing the computer to execute each process performed by the delivery support device 300 may be provided.
- the program may also be recorded on a computer-readable medium.
- Computer-readable media can be used to install programs on a computer.
- the computer-readable medium on which the program is recorded may be a non-transient recording medium.
- the non-transient recording medium is not particularly limited, but may be, for example, a recording medium such as a CD-ROM or a DVD-ROM.
- a chip composed of a memory for storing a program for executing each process performed by the delivery support device 300 and a processor for executing the program stored in the memory may be provided.
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Quality & Reliability (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
配送支援装置は、所定エリアに存在する2以上の所定施設に含まれる少なくとも1つの施設の電力データを受信する受信部と、前記電力データに基づいて、前記2以上の所定施設に対して物品を配送する手順を決定する制御部と、を備える。前記制御部は、第1タイミングにおいて、前記第1タイミングを基準として第1条件を満たす前記電力データに基づいて、前記所定エリアに含まれる2以上の配送エリアの中から対象エリアを決定する第1手順を実行し、前記第1タイミングよりも後の第2タイミングにおいて、前記第2タイミングを基準として第2条件を満たす前記電力データに基づいて、前記対象エリアに存在する2以上の対象施設に対する物品の配送計画を決定する第2手順を実行する。
Description
本開示は、配送支援装置、配送支援システム及び配送支援方法に関する。
施設の消費電力の時間変化に基づいてユーザが在宅しているか否かを判定するシステムが知られている。ユーザが在宅しているか否かに係る情報は、物品の配送サービスに活用される(例えば、特許文献1)。
第1の特徴は、配送支援装置であって、所定エリアに存在する2以上の所定施設に含まれる少なくとも1つの施設の電力データを受信する受信部と、前記電力データに基づいて、前記2以上の所定施設に対して物品を配送する手順を決定する制御部と、を備え、前記制御部は、第1タイミングにおいて、前記第1タイミングを基準として第1条件を満たす前記電力データに基づいて、前記所定エリアに含まれる2以上の配送エリアの中から対象エリアを決定する第1手順を実行し、前記第1タイミングよりも後の第2タイミングにおいて、前記第2タイミングを基準として第2条件を満たす前記電力データに基づいて、前記対象エリアに存在する2以上の対象施設に対する物品の配送計画を決定する第2手順を実行する、ことを要旨とする。
第2の特徴は、配送支援システムであって、所定エリアに存在する2以上の所定施設に含まれる少なくとも1つの施設の電力データを受信する受信部と、前記電力データに基づいて、前記2以上の所定施設に対して物品を配送する手順を決定する制御部と、を備え、前記制御部は、第1タイミングにおいて、前記第1タイミングを基準として第1条件を満たす前記電力データに基づいて、前記所定エリアに含まれる2以上の配送エリアの中から対象エリアを決定する第1手順を実行し、前記第1タイミングよりも後の第2タイミングにおいて、前記第2タイミングを基準として第2条件を満たす前記電力データに基づいて、前記対象エリアに存在する2以上の対象施設に対する物品の配送計画を決定する第2手順を実行する、ことを要旨とする。
第3の特徴は、配送支援方法であって、所定エリアに存在する2以上の所定施設に含まれる少なくとも1つの施設の電力データを受信するステップと、第1タイミングにおいて、前記第1タイミングを基準として第1条件を満たす前記電力データに基づいて、前記所定エリアに含まれる2以上の配送エリアの中から対象エリアを決定する第1手順を実行するステップと、前記第1タイミングよりも後の第2タイミングにおいて、前記第2タイミングを基準として第2条件を満たす前記電力データに基づいて、前記対象エリアに存在する2以上の対象施設に対する物品の配送計画を決定する第2手順を実行するステップと、を備えることを要旨とする。
以下において、実施形態について図面を参照しながら説明する。なお、以下の図面の記載において、同一又は類似の部分には、同一又は類似の符号を付している。但し、図面は模式的なものである。
[実施形態]
(配送支援システム)
以下において、実施形態に係る配送支援システムについて説明する。図1に示すように、配送支援システム100は、施設200と、配送支援装置300と、を有する。施設200及び配送支援装置300は、ネットワーク400によって接続される。ネットワーク400は、インターネット網を含んでもよく、移動体通信網を含んでもよい。ネットワーク400は、VPN(Virtual Private Network)を含んでもよい。
(配送支援システム)
以下において、実施形態に係る配送支援システムについて説明する。図1に示すように、配送支援システム100は、施設200と、配送支援装置300と、を有する。施設200及び配送支援装置300は、ネットワーク400によって接続される。ネットワーク400は、インターネット網を含んでもよく、移動体通信網を含んでもよい。ネットワーク400は、VPN(Virtual Private Network)を含んでもよい。
施設200は、物品が配送される所定施設の一例である。施設200は、配送業者の個人顧客の施設であってもよく、配送業者の法人顧客の施設であってもよい。図1では、施設200として、施設200A、施設200B及び施設200Cが例示されている。施設200Aは、負荷機器210(負荷機器210A)及びEMS220(EMS220A)を有する。施設200Bは、負荷機器210(負荷機器210B)及びSM230(SM230B)を有する。施設200Cは、負荷機器210(負荷機器210C)、EMS220(EMS220C)及びSM230(SM230C)を有する。図1では例示していないが、施設200は、EMS220及びSM230を有していない施設を含んでもよい。
負荷機器210は、電力を消費する機器である。負荷機器210は、空調機器、照明機器、家電機器などを含む。ここで、施設200は、負荷機器210に加えて、分散電源を有していてもよい。分散電源は、太陽電池装置、燃料電池装置、蓄電装置などを含んでもよい。
EMS220は、施設200の電力を管理する管理装置(Energy Management System)である。EMS220は、クラウドサービスによって提供されてもよい。EMS220は、少なくとも配送支援装置300と通信を行う機能及び施設200の電力を取得する機能を有する。施設200の電力を取得する機能は、特に限定されるものではないが、分電盤で分岐される前の主幹電力線に接続されるCT(Current Transformer)によって計測された電力データをCTから受信する機能であってもよい。EMS220は、施設200の電力データ(以下、第2電力データ)を配送支援装置300に送信する。第2電力データは、電力系統から施設200への電力(潮流電力)のデータを含む。施設200が分散電源を含む場合に、第2電力データは、施設200から電力系統への電力(逆潮流電力)のデータを含んでもよい。
SM230は、施設200の電力を測定するスマートメータである。SM230は、少なくとも配送支援装置300と通信を行う機能及び施設200の電力を測定する機能を有する。SM230は、施設200の電力データ(以下、第1電力データ)を配送支援装置300に送信する。第1電力データは、電力系統から施設200への電力(潮流電力)のデータを含んでもよく、施設200から電力系統への電力(逆潮流電力)のデータを含む。
ここで、第1電力データは、SM230から配送支援装置300に第1間隔(例えば、30分)で送信されてもよい。第2電力データは、EMS220から配送支援装置300に第2間隔(例えば、1秒)で送信されてもよい。第2間隔は、第1間隔よりも短くてもよい。このようなケースにおいて、第1電力データは、第1間隔における積算電力値を示すデータであってもよい。同様に、第2電力データは、第2間隔における積算電力値を示すデータであってもよい。但し、第2間隔が非常に短い場合には、第2電力データは瞬時電力値であってもよい。
図1においては、施設200B及び施設200Cは、SM230を有する第1施設の一例である。施設200A及び施設200Cは、EMS220を有する第2施設の一例である。EMS220C及びSM230Cの双方を有する施設200Cにおいては、EMS220Cは、SM230Cによって測定された電力のデータを第2電力データとして配送支援装置300に送信してもよい。このようなケースにおいても、SM230Cは、SM230Cによって測定された電力のデータを第1電力データとして配送支援装置300に送信してもよい。SM230から送信される第1電力データのルートはAルートと称されることもある。EMS220から送信される第2電力データのルートはルートBと称されることもある。このようなケースにおいて、配送支援装置300は、一の施設200について用いるルートを他の施設200について用いるルートに基づいて決定してもよい。
配送支援装置300は、配送業者による物品の配送を支援する装置である。配送支援装置300は、少なくとも1つの施設200の電力データを受信する。具体的には、配送支援装置300は、EMS220及びSM230の少なくともいずれか1つから電力データを受信する。配送支援装置300の詳細については後述する(図2を参照)
(配送支援装置)
以下において、実施形態に係る配送支援装置について説明する。図2に示すように、配送支援装置300は、通信部310と、管理部320と、制御部330と、を有する。
以下において、実施形態に係る配送支援装置について説明する。図2に示すように、配送支援装置300は、通信部310と、管理部320と、制御部330と、を有する。
通信部310は、通信モジュールによって構成される。通信モジュールは、IEEE802.11a/b/g/n、ZigBee、Wi-SUN、LTE、5G、6Gなどの規格に準拠する無線通信モジュールであってもよく、IEEE802.3などの規格に準拠する有線通信モジュールであってもよい。
通信部310は、少なくとも1つの施設200の電力データを受信する。通信部310は、EMS220から第2電力データを受信してもよく、SM230から第1電力データを受信してもよい。
管理部320は、不揮発性メモリなどのメモリ又は/及びHDD(Hard Disc Drive)などの記憶媒体によって構成されており、様々な情報を格納する。
管理部320は、図3に示す所定エリア500を管理してもよい。所定エリア500は、2以上の配送エリア510(図3では、配送エリア510A、配送エリア510B及び配送エリア510C)を含む。管理部320は、各配送エリア510に存在する2以上の施設200を管理してもよい。例えば、管理部320は、配送エリア510及び施設200の地理的な位置を管理してもよい。このようなケースにおいて、管理部320は、配送エリア510毎に施設200の地理的な位置を管理していてもよく、所定エリア500に存在する全ての施設200の地理的な位置を管理しており、配送エリア510に割り振るように施設200の地理的な位置を管理していてもよい。所定エリア500は、後述する物流拠点610によって管轄されるエリアと考えてもよい。さらに具体的には、所定エリア500は、後述する配送車610によって物品が配送されるエリアと考えてもよい。
さらに、管理部320は、物流拠点610及び配送車620を管理してもよい。例えば、管理部320は、物流拠点610及び配送車620の地理的な位置を管理する。GNSS(Global Navigation Satellite System)を用いる受信装置を配送車620が有しており、配送車620の地理的な位置を示すデータが配送車620から配送支援装置300に送信されてもよい。
ここで、管理部320は、地図データ及び渋滞データを管理してもよい。このような構成によれば、物流拠点610から各配送エリア510に配送車620が移動する時間(移動時間)を特定することができる。移動時間は、配送車620の地理的な位置によって補正されてもよい。
制御部330は、少なくとも1つのプロセッサを含んでもよい。少なくとも1つのプロセッサは、単一の集積回路(IC)によって構成されてもよく、通信可能に接続された複数の回路(集積回路及び又はディスクリート回路など)によって構成されてもよい。
制御部330は、電力データに基づいて、2以上の施設200に対して物品を配送する手順を決定する。具体的には、制御部330は、第1タイミングにおいて、電力データに基づいて、所定エリア500に含まれる2以上の配送エリア510の中から対象エリアを決定する第1手順を実行する。このようなケースにおいて、配送エリア510を管轄する配送車620が予め定められている場合には、対象エリアの決定は、配送車620の決定と読み替えてもよい。配送車620の決定は、配送車620を識別する情報の入力によって行われてもよい。配送車620の決定においては、対象エリアは配送優先エリアと読み替えてもよい。制御部330は、第1タイミングよりも後の第2タイミングにおいて、電力データに基づいて、対象エリアに存在する2以上の対象施設に対する物品の配送計画を決定する第2手順を実行する。例えば、第1タイミングは、配送車620が物流拠点610を出発するタイミング或いは配送車620に物品を積み込むタイミングであってもよい。第2タイミングは、配送車620が対象エリアに到達又は近接するタイミングであってもよい。
制御部330は、第2タイミングよりも後の第3タイミングにおいて、電力データに基づいて、物品の配送計画を更新してもよい。第3タイミングは、対象エリアに存在する対象施設を訪問したタイミングであってもよい。第3タイミングは、物品の配送を完了したタイミングでもよく、物品の配送を不在などの理由から完了できなかったタイミングであってもよい。
ここで、制御部330は、物品の配送計画として、対象エリアに存在する2以上の対象施設を訪問する順序を決定してもよい。制御部330は、物品の配送計画として、対象エリアに存在する2以上の対象施設を訪問する経路を決定してもよい。制御部330は、物品の配送計画として、2以上の対象施設を訪問する順序及び2以上の対象施設を訪問する経路の双方を決定してもよい。
(配送手順の決定方法)
以下において、実施形態に係る配送手順の決定方法の一例について説明する。ここでは、SM230を有する施設200の数がEMS220を有する施設200の数よりも多いケースについて説明する。図1に示したように、施設200は、EMS220及びSM230の双方を有する施設を含んでもよい。さらに、施設200は、EMS220及びSM230の双方を有していない施設を含んでもよい。
以下において、実施形態に係る配送手順の決定方法の一例について説明する。ここでは、SM230を有する施設200の数がEMS220を有する施設200の数よりも多いケースについて説明する。図1に示したように、施設200は、EMS220及びSM230の双方を有する施設を含んでもよい。さらに、施設200は、EMS220及びSM230の双方を有していない施設を含んでもよい。
第1に、配送支援装置300は、第1タイミングにおいて、少なくとも第1間隔で受信する第1電力データに基づいて第1手順を実行する。上述したように、第1タイミングは、配送車620が物流拠点610を出発するタイミングであってもよい。ここで、第1手順で参照される電力データは、第1タイミングを基準として第1条件を満たす電力データである。第1条件は、リアルタイム性を担保する条件であればよい。例えば、第1条件は、第1タイミングに対して直近で受信するという条件であってもよく、第1タイミングに対して一定期間(例えば、30分)内に受信するという条件であってもよい。第1手順において、1つの施設200に対して1つの電力データが参照されてもよく、1つの施設200に対して2以上の電力データが参照されてもよい。
具体的には、配送支援装置300は、第1電力データに基づいて施設200にユーザが在宅しているか否かを判定する。例えば、配送支援装置300は、第1タイミングにおいて施設200の電力が閾値を超えている場合に、施設200にユーザが在宅していると判定し、第1タイミングにおいて施設200の電力が閾値を超えていない場合に、施設200にユーザが在宅していないと判定してもよい。続いて、配送支援装置300は、施設200にユーザが在宅しているか否かに基づいて対象エリアを決定する。例えば、配送支援装置300は、ユーザが在宅している施設200の数が最も多い配送エリア510を対象エリアとして決定する。
第2に、配送支援装置300は、第1タイミングよりも後の第2タイミングにおいて、少なくとも第1間隔よりも短い第2間隔で受信する第2電力データに基づいて第2手順を実行する。上述したように、第2タイミングは、配送車620が対象エリアに到達又は近接するタイミングであってもよい。ここで、第2手順で参照される電力データは、第2タイミングを基準として第2条件を満たす電力データである。第2条件は、リアルタイム性を担保する条件であればよい。例えば、第2条件は、第2タイミングに対して直近で受信するという条件であってもよく、第2タイミングに対して一定期間(例えば、20分)内に受信するという条件であってもよい。第2手順において、1つの施設200に対して1つの電力データが参照されてもよく、1つの施設200に対して2以上の電力データが参照されてもよい。
具体的には、配送支援装置300は、第2電力データに基づいて施設200にユーザが在宅しているか否かを判定する。例えば、配送支援装置300は、第2タイミングにおいて施設200の電力が閾値を超えている場合に、施設200にユーザが在宅していると判定し、第2タイミングにおいて施設200の電力が閾値を超えていない場合に、施設200にユーザが在宅していないと判定してもよい。続いて、配送支援装置300は、施設200にユーザが在宅しているか否かに基づいて物品の配送計画を決定する。例えば、配送支援装置300は、ユーザが在宅していないと判定された施設200よりも、ユーザが在宅すると判定された施設200に対して優先的に物品を配送する配送計画を決定する。
第3に、配送支援装置300は、第2タイミングよりも後の第3タイミングにおいて、第1間隔よりも短い第2間隔で受信する第2電力データに基づいて物品の配送計画を更新する。上述したように、第3タイミングは、対象エリアに存在する対象施設を訪問したタイミングであってもよい。或いは、第3タイミングは、対象エリアに配送車620が到達した後において任意の時間間隔で繰り返されるタイミングであってもよい。
ここで、配送計画の更新で参照される電力データは、第3タイミングを基準として第3条件を満たす電力データである。第3条件は、リアルタイム性を担保する条件であればよい。例えば、第3条件は、第3タイミングに対して直近で受信するという条件であってもよく、第3タイミングに対して一定期間(例えば、10分)内に受信するという条件であってもよい。配送計画の更新において、1つの施設200に対して1つの電力データが参照されてもよく、1つの施設200に対して2以上の電力データが参照されてもよい。
具体的には、配送支援装置300は、第2手順と同様に、第2電力データに基づいて施設200にユーザが在宅しているか否かを判定する。続いて、配送支援装置300は、施設200にユーザが在宅しているか否かに基づいて物品の配送計画を更新する。物品の配送計画の更新方法は、物品の配送計画の決定方法と同様であってもよい。
ここでは、第1電力データに基づいて第1手順を実行し、第2電力データに基づいて第2手順を実行するケースを例示した。しかしながら、実施形態はこれに限定されるものではない。第1手順は、第1電力データ及び第2電力データの双方に基づいて実行されてもよい。同様に、第2手順は、第1電力データ及び第2電力データの双方に基づいて実行されてもよい。
但し、第1電力データは、第1電力データを送信可能な施設200の母集団が大きいことで優れており、第2電力データは、第1電力データよりもリアルタイム性が高いことで優れている点について留意すべきである。従って、第2手順で第2電力データを用いる場合において、測定から経過した時間が閾値を超える第2電力データを用いずに、測定から経過した時間が閾値を超えていない第2電力データを用いてもよい。
対象エリアに存在する施設200への訪問が終了した場合には、第1手順及び第2手順が再び実行される。このようなケースにおいて、第1手順は、対象エリアとして既に選択された配送エリア510を除いて、残りの配送エリア510の中から対象エリアを決定する手順である。
(配送支援方法)
以下において、実施形態に係る配送支援方法について説明する。図4では、SM230を有する施設200及びEMS220を有する施設200が混在しており、SM230を有する施設200の数がEMS220を有する施設200の数よりも多いケースについて説明する。
以下において、実施形態に係る配送支援方法について説明する。図4では、SM230を有する施設200及びEMS220を有する施設200が混在しており、SM230を有する施設200の数がEMS220を有する施設200の数よりも多いケースについて説明する。
図4に示すように、ステップS11において、配送支援装置300は、SM230から第1電力データを第1間隔で受信する。これ以降も第1電力データの受信は継続する。
ステップS12において、配送支援装置300は、EMS220から第2電力データを第1間隔よりも短い第2間隔で受信する。これ以降も第2電力データの受信は継続する。
ステップS13において、配送支援装置300は、第1タイミングにおいて、第1電力データに基づいて第1手順を実行する。配送支援装置300は、第1電力データ及び第2電力データに基づいて第1手順を実行してもよい。すなわち、配送支援装置300は、電力データに基づいて、所定エリア500に含まれる2以上の配送エリア510の中から対象エリアを決定する。
ステップS14において、配送支援装置300は、対象エリアを配送車620に通知する。
ステップS15において、配送支援装置300は、配送車620の地理的な位置を示すデータ(以下、位置データ)を受信する。配送支援装置300は、定期的に位置データを受信してもよく、対象エリアに到達又は近接するタイミングで位置データを受信してもよい。
ステップS16において、配送支援装置300は、第1タイミングよりも後の第2タイミングにおいて、第2電力データに基づいて第2手順を実行する。配送支援装置300は、第1電力データ及び第2電力データに基づいて第2手順を実行してもよい。すなわち、配送支援装置300は、電力データに基づいて、対象エリアに存在する2以上の対象施設に対する物品の配送計画を決定する。
上述したように、第2タイミングは、配送車620が対象エリアに到達又は近接するタイミングであってもよい。配送支援装置300は、配送車620から受信する位置データに基づいて第2タイミングを特定してもよい。
ステップS17において、配送支援装置300は、ステップS16で決定された配送計画を配送車620に送信する。
さらには、図5に示すように、ステップS21において、配送支援装置300は、配送車620の地理的な位置を示すデータ(以下、位置データ)を受信する。配送支援装置300は、定期的に位置データを受信してもよく、対象施設を訪問したタイミングで位置データを受信してもよい。
ステップS22において、配送支援装置300は、第2タイミングよりも後の第3タイミングにおいて、第2電力データに基づいて配送計画を更新する。配送支援装置300は、第1電力データ及び第2電力データに基づいて配送計画を更新してもよい。ここで、配送支援装置300は、第2タイミングで参照する電力データから変化した電力データに基づいて配送計画を更新してもよい。
上述したように、第3タイミングは、対象エリアに存在する対象施設を訪問したタイミングであってもよい。配送支援装置300は、配送車620から受信する位置データに基づいて第3タイミングを特定してもよい。或いは、配送支援装置300は、配送員の端末から送信される完了連絡に基づいて第3タイミングを特定してもよい。完了連絡は、対象施設を訪問した旨を示す連絡である。完了連絡は、物品の配送を完了した旨の連絡であってもよく、物品の配送を不在等の理由から完了できなかった旨の連絡であってもよい。
ステップS23において、配送支援装置300は、ステップS22で更新された配送計画を配送車620に送信する。
(作用及び効果)
実施形態では、配送支援装置300は、第1タイミングにおいて、電力データに基づいて対象エリアを決定する第1手順を実行し、第1タイミングよりも後の第2タイミングにおいて、電力データに基づいて物品の配送計画を決定する第2手順を実行する。このような構成によれば、施設200にユーザが在宅しているか否かを判定するための電力データが時々刻々と古くなっていく状況に鑑みて、対象エリアを決定する第1手順及び配送計画を決定する第2手順を2段階で行うことによって、施設200に対する物品の配送計画を適切に決定することができる。
実施形態では、配送支援装置300は、第1タイミングにおいて、電力データに基づいて対象エリアを決定する第1手順を実行し、第1タイミングよりも後の第2タイミングにおいて、電力データに基づいて物品の配送計画を決定する第2手順を実行する。このような構成によれば、施設200にユーザが在宅しているか否かを判定するための電力データが時々刻々と古くなっていく状況に鑑みて、対象エリアを決定する第1手順及び配送計画を決定する第2手順を2段階で行うことによって、施設200に対する物品の配送計画を適切に決定することができる。
実施形態では、配送支援装置300は、第2タイミングよりも後の第3タイミングにおいて、電力データに基づいて物品の配送計画を更新する。このような構成によれば、リアルタイム性の高い電力データに基づいて施設200にユーザが在宅しているか否かを判断することが可能であり、施設200に対する物品の配送計画を適切に更新することができる。
実施形態では、第1電力データを送信可能な施設200の母集団が大きいことに鑑みて、第1電力データに基づいて第1手順が実行されてもよい。このような構成によれば、対象エリアを適切に決定することができる。
実施形態では、第2電力データのリアルタイム性が高いことに鑑みて、第2電力データに基づいて第2手順が実行されてもよい。このような構成によれば、対象エリアにおける配送計画を適切に決定することができる。
[変更例1]
以下において、実施形態の変更例1について説明する。以下においては、実施形態に対する相違点について主として説明する。
以下において、実施形態の変更例1について説明する。以下においては、実施形態に対する相違点について主として説明する。
変更例1では、配送支援装置300は、施設200のユーザが有するユーザ端末及びEMS220の少なくともいずれか一方に対して、物品の配送計画に関するコンテンツを送信してもよい。コンテンツは、施設200に対する配送予定時刻を含んでもよく、配送車620の地理的な位置を含んでもよく、ユーザが物品を受け取ることが可能であるか否かを問い合わせるデータを含んでもよい。さらには、配送支援装置300は、上述したコンテンツを受信するサービスを利用するか否かを問い合わせるデータをユーザ端末に予め送信してもよい。
例えば、図6に示すように、ステップS31において、配送支援装置300は、コンテンツをユーザ端末700に送信してもよい。すなわち、配送支援装置300は、対象エリアを決定した場合に、コンテンツをユーザ端末700に送信してもよい。或いは、配送支援装置300は、物品の配送計画を決定した場合に、コンテンツをユーザ端末700に送信してもよい。或いは、配送支援装置300は、物品の配送計画を更新した場合に、コンテンツをユーザ端末700に送信してもよい。
[変更例2]
以下において、実施形態の変更例2について説明する。以下においては、実施形態に対する相違点について主として説明する。
以下において、実施形態の変更例2について説明する。以下においては、実施形態に対する相違点について主として説明する。
実施形態では、説明を明確化するため、配送支援装置300が1つの装置によって実現されるケースについて例示した。これに対して、変更例2では、2以上のエンティティに属する2以上の装置によって配送支援装置300が実現されるケースについて例示する。
図7に示すように、配送支援システム100は、図1に示す配送支援装置300に代えて、サーバ300A、サーバ300B及びサーバ300Cを有する。
サーバ300Aは、SM230を管理するエンティティに属するサーバである。このようなエンティティは、発電事業者、送配電事業者、小売事業者などであってもよい。サーバ300Aは、SM230から第1間隔で第1電力データを受信する。サーバ300Aは、第1電力データをサーバ300Cに第1間隔で送信してもよい。
サーバ300Bは、EMS220を管理するエンティティに属するサーバである。このようなエンティティは、リソースアグリゲータなどであってもよい。サーバ300Bは、EMS220から第1間隔よりも短い第2間隔で第2電力データを受信する。サーバ300Bは、第2電力データをサーバ300Cに第2間隔で送信してもよい。
サーバ300Cは、配送業者を支援するエンティティに属するサーバである。サーバ300Cは、サーバ300A及びサーバ300Bを経由して電力データを受信する点を除いて、上述した配送支援装置300と同様の機能を有する。
このようなケースにおいて、サーバ300Cに第1電力データが到達した時点で、第1電力データの到達タイミングと第1電力データの測定タイミングとにタイムラグがあることが考えられる。同様に、サーバ300Cに第2電力データが到達した時点で、第2電力データの到達タイミングと第2電力データの測定タイミングとにタイムラグがあることが考えられる。
従って、サーバ300Cは、上述したタイムラグに基づいて、電力データを第1手順で用いるか否かを判定してもよい。例えば、サーバ300Cは、タイムラグが第1閾値よりも大きい電力データを用いずに、タイムラグが第1閾値よりも小さい電力データを用いて第1手順を実行してもよい。同様に、サーバ300Cは、上述したタイムラグに基づいて、電力データを第2手順で用いるか否かを判定してもよい。例えば、サーバ300Cは、タイムラグが第2閾値よりも大きい電力データを用いずに、タイムラグが第2閾値よりも小さい電力データを用いて第2手順を実行してもよい。
第1閾値は、第2閾値と異なっていてもよい。例えば、第1閾値は、第2閾値よりも大きくてもよい。或いは、サーバ300Cは、上述したタイムラグによらずに、電力データを第1手順で用いてもよい。
変更例2においては、3つのサーバが設けられるケースについて例示した。しかしながら、変更例2はこれに限定されるものではない。互いに異なるエンティティによって管理されるサーバは、2つであってもよく、4つであってもよい。例えば、上述したサーバ300A乃至サーバ300Cに加えて、配送業者に属するサーバが設けられてもよい。さらに、サーバ300Aは、発電事業者、送配電事業者及び小売事業者のそれぞれに属するサーバを含んでもよい。
[変更例3]
以下において、実施形態の変更例3について説明する。以下においては、実施形態に対する相違点について主として説明する。
以下において、実施形態の変更例3について説明する。以下においては、実施形態に対する相違点について主として説明する。
変更例3では、所定エリア500に存在する2以上の施設200は、宅配ボックスの利用が許可された第3施設と、宅配ボックスの利用が許可されていない第4施設と、を含む。宅配ボックスは、ユーザが不在であるか否かによらずに、物品を一時的に保管するものである。第3施設は、宅配ボックスが設けられた施設であってもよく、物品の配送を依頼する際に宅配ボックスの利用が申し込まれた施設であってもよい。第4施設は、宅配ボックスが設けられていない施設であってもよく、物品の配送を依頼する際に宅配ボックスの利用が申し込まれなかった施設であってもよい。このようなケースにおいて、配送支援装置300(管理部220)は、施設200が第3施設であるか第4施設であるかを示すデータを予め管理しており、第3施設をユーザが在宅している施設200として扱ってもよい。
このようなケースにおいて、配送支援装置300は、電力データに加えて、施設200が第3施設であるか第4施設であるかを示すデータに基づいて、第1手順及び第2手順を実行する。例えば、配送支援装置300は、第3施設の電力データを用いずに、第4施設の電力データに基づいて、第1手順及び第2手順を実行してもよい。つまり、第1手順においては、第3施設の戸数と、第4施設の電力データに基づいて在宅する戸数を合計し、所定エリア500に含まれる2以上の配送エリア510の中からユーザが在宅している施設200の数が最も多い配送エリア510を対象エリアとして決定する。そして、第2手順において、対象エリアに存在する第3施設と、第4施設の電力データに基づいて在宅する施設を含む2以上の対象施設に対する物品の配送計画を決定する。
ここで、宅配ボックスは、施設200の敷地内に設けられているボックスに限られず、施設200の敷地外に設けられているボックスを含む。施設200の敷地外に設けられるボックスは、配送業者によって設置されてもよく、配送業者と提携する業者によって設置されてもよく、鉄道などの駅に設けられてもよい。このように、宅配ボックスが施設200の敷地外に設けられ場合には、当該施設200の地理的な位置を宅配ボックスの地理的な位置と読み替えて、上述した第1手順及び第2手順が実行される。
[変更例4]
以下において、実施形態の変更例4について説明する。以下においては、実施形態に対する相違点について主として説明する。
以下において、実施形態の変更例4について説明する。以下においては、実施形態に対する相違点について主として説明する。
変更例4では、EMS220から送信される第2電力データは、施設200に設けられる機器毎の消費電力データを含んでもよい。配送支援装置300(制御部330)は、機器毎の消費電力データに基づいて第2手順を実行する。EMS220は、機器毎の消費電力データを取得する機能を有する。EMS220は、消費電力データを各機器から取得してもよく、各機器に併設されるCT(Current Transformer)から消費電力データを取得してもよい。EMS220は、施設200に設けられる全ての機器の消費電力データを取得してもよく、施設200に設けられる一部の機器の消費電力データを取得してもよい。
例えば、配送支援装置300は、施設200にユーザが在宅している状態で使用される機器の消費電力が閾値を超える場合に、施設200にユーザが在宅していると判定してもよい。例えば、このような機器は、ドライヤー、テレビ、空調機器、照明機器などであってもよい。或いは、配送支援装置300は、ユーザが物品を受け取れない状態で使用される機器の消費電力が閾値を超える場合に、施設200にユーザが在宅していないと扱ってもよい。例えば、このような機器は、風呂の給湯器などであってもよい。
[変更例5]
以下において、実施形態の変更例5について説明する。以下においては、実施形態に対する相違点について主として説明する。
以下において、実施形態の変更例5について説明する。以下においては、実施形態に対する相違点について主として説明する。
変更例5では、配送支援装置300は、物品の購入で用いるEC(Electronic Commerce)の運営事業者に対して、物品の配送予測又は配送結果に関するメッセージを送信してもよい。メッセージは、配送業者が訪問する施設200のルート、物品の配達に成功する予測確率、物品の配送に成功した実績確率などを含む。
さらには、ECの運営事業者と配送支援装置300が連携することによって、配送支援装置300は、物品の受取を希望する時間帯(以下、受取時間帯)の指定があるか否かを示すデータをECの運営事業者から受信してもよい。配送支援装置300は、受取時間帯が指定された施設200及び受取時間帯を管理しており、受取時間帯については、受取時間帯が指定された施設200をユーザが在宅している施設200として扱ってもよい。配送支援装置300は、現在時刻が受取時間帯に入った場合に、施設200の電力データに基づいて配送計画を更新してもよい。
このようなケースにおいて、配送支援装置300は、電力データに加えて、受取時間帯が指定されているか否かを示すデータに基づいて、第1手順及び第2手順を実行してもよい。例えば、配送支援装置300は、受取時間帯が指定されている施設200の電力データを用いずに、受取時刻が指定されていない施設200の電力データに基づいて、第1手順及び第2手順を実行してもよい。つまり、第1手順においては、受取時間帯が指定されている施設200の戸数と、受取時刻が指定されていない施設200の電力データに基づいて在宅する戸数を合計し、所定エリア500に含まれる2以上の配送エリア510の中からユーザが在宅している施設200の数が最も多い配送エリア510を対象エリアとして決定する。そして、第2手順において、対象エリアに存在する受取時間帯が指定されている施設200と、受取時刻が指定されていない施設200の電力データに基づいて在宅する施設を含む2以上の対象施設に対する物品の配送計画を決定する。但し、配送支援装置300は、受取時間帯以外の時間に物品を配送する必要がある場合に、受取時間帯が指定されている施設200の電力データを用いて、第1手順及び第2手順を実行してもよい。
[その他の実施形態]
本開示は上述した実施形態によって説明したが、この開示の一部をなす論述及び図面は、この開示を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施形態、実施例及び運用技術が明らかとなろう。
本開示は上述した実施形態によって説明したが、この開示の一部をなす論述及び図面は、この開示を限定するものであると理解すべきではない。この開示から当業者には様々な代替実施形態、実施例及び運用技術が明らかとなろう。
実施形態では、施設200の電力(潮流電力又は逆潮流電力)を計測する電力計としてSM230を例示した。しかしながら、実施形態はこれに限定されるものではない。電力計は、分電盤で分岐される前の主幹電力線に接続されるCT(Current Transformer)であってもよい。電力計は、分電盤で分岐された後の分岐電力線に接続されるCTであってもよい。電力計がCTである場合には、配送支援装置300と通信を行う機能を有する装置(例えば、EMS220)とCTが接続されており、CTと接続された装置から電力データが配送支援装置300に送信されてもよい。
実施形態では、物品を対象施設に運ぶ運搬手段として配送車620を例示した。しかしながら、実施形態はこれに限定されるものではない。運搬手段は、ドローンであってもよく、ロボットであってもよい。
実施形態では特に触れていないが、配送業者は、配送支援装置300によって決定又は更新された物品の配送計画に従わなくてもよい。例えば、配送業者は、経験則等によって物品の配送計画を変更してもよい。このようなケースにおいて、配送支援装置300は、物品の配送計画を変更するためのUI(User Interface)を提供してもよい。配送支援装置300は、配送計画が変更された施設200を学習し、次回の配送において当該施設200に対する物品の配送がある場合に、学習結果に基づいて配送計画を決定してもよい。
実施形態では特に触れていないが、配送支援装置300は、物品の配送計画に基づいて、配送車620への物品の積込順序を決定し、決定された積込順序を配送業者に通知してもよい。
実施形態では特に触れていないが、配送支援装置300は、施設200にユーザが在宅しているか否かを所定パラメータと対応付けて学習してもよい。例えば、所定パラメータは、時間帯、曜日、受取時刻の指定があるか否か、施設200の電力などである。配送支援装置300は、学習結果に基づいて、施設200にユーザが在宅している確率(以下、在宅確率)を特定し、特定された在宅確率が閾値よりも高い施設200をユーザが在宅している施設200として扱ってもよい。
実施形態では特に触れていないが、電力とは、瞬時電力(kW)であってもよく、積算電力量(kWh)であってもよい。例えば、出力電力データは、瞬時電力(kW)を含んでもよく、積算電力量(kWh)を含んでもよい。
実施形態では特に触れていないが、配送支援装置300が行う各処理をコンピュータに実行させるプログラムが提供されてもよい。また、プログラムは、コンピュータ読取り可能媒体に記録されていてもよい。コンピュータ読取り可能媒体を用いれば、コンピュータにプログラムをインストールすることが可能である。ここで、プログラムが記録されたコンピュータ読取り可能媒体は、非一過性の記録媒体であってもよい。非一過性の記録媒体は、特に限定されるものではないが、例えば、CD-ROMやDVD-ROM等の記録媒体であってもよい。
或いは、配送支援装置300が行う各処理を実行するためのプログラムを格納するメモリ及びメモリに格納されたプログラムを実行するプロセッサによって構成されるチップが提供されてもよい。
なお、日本国特許出願第2019-90354号(2019年5月13日出願)の全内容が参照により本願明細書に組み込まれている。
Claims (10)
- 所定エリアに存在する2以上の所定施設に含まれる少なくとも1つの施設の電力データを受信する受信部と、
前記電力データに基づいて、前記2以上の所定施設に対して物品を配送する手順を決定する制御部と、を備え、
前記制御部は、
第1タイミングにおいて、前記第1タイミングを基準として第1条件を満たす前記電力データに基づいて、前記所定エリアに含まれる2以上の配送エリアの中から対象エリアを決定する第1手順を実行し、
前記第1タイミングよりも後の第2タイミングにおいて、前記第2タイミングを基準として第2条件を満たす前記電力データに基づいて、前記対象エリアに存在する2以上の対象施設に対する物品の配送計画を決定する第2手順を実行する、配送支援装置。 - 前記制御部は、前記第2タイミングよりも後の第3タイミングにおいて、前記第3タイミングを基準として第3条件を満たす前記電力データに基づいて、前記物品の配送計画を更新する、請求項1に記載の配送支援装置。
- 前記2以上の所定施設は、スマートメータを有する第1施設を含み、
前記受信部は、前記第1施設の第1電力データを第1間隔で受信し、
前記制御部は、前記第1電力データに基づいて前記第1手順を実行する、請求項1又は請求項2に記載の配送支援装置。 - 前記2以上の所定施設は、前記第1間隔よりも短い間隔で電力データを管理する管理装置を有する第2施設を含み、
前記受信部は、前記第2施設の第2電力データを前記第1間隔よりも短い第2間隔で受信し、
前記制御部は、前記第2電力データに基づいて前記第2手順を実行する、請求項3に記載の配送支援装置。 - 前記制御部は、前記物品の配送計画として、前記2以上の対象施設を訪問する順序及び前記2以上の対象施設を訪問する経路の少なくともいずれか1つを決定する、請求項1乃至請求項4のいずれか1項に記載の配送支援装置。
- 前記2以上の所定施設は、宅配ボックスの利用が許可された第3施設と、前記宅配ボックスの利用が許可されていない第4施設と、を含み、
前記制御部は、前記電力データに加えて、前記施設が前記第3施設であるか前記第4施設であるかを示すデータに基づいて、前記第1手順及び第2手順を実行する、請求項1乃至請求項5のいずれか1項に記載の配送支援装置。 - 前記第2電力データは、前記第2施設に設けられる機器毎の消費電力データを含み、
前記制御部は、前記機器毎の消費電力データに基づいて前記第2手順を実行する、請求項4、請求項4を引用する請求項5及び請求項6のいずれか1項に記載の配送支援装置。 - 前記物品の配送計画に関するコンテンツをユーザ端末に送信する、請求項1乃至請求項7のいずれか1項に記載の配送支援装置。
- 所定エリアに存在する2以上の所定施設に含まれる少なくとも1つの施設の電力データを受信する受信部と、
前記電力データに基づいて、前記2以上の所定施設に対して物品を配送する手順を決定する制御部と、を備え、
前記制御部は、
第1タイミングにおいて、前記第1タイミングを基準として第1条件を満たす前記電力データに基づいて、前記所定エリアに含まれる2以上の配送エリアの中から対象エリアを決定する第1手順を実行し、
前記第1タイミングよりも後の第2タイミングにおいて、前記第2タイミングを基準として第2条件を満たす前記電力データに基づいて、前記対象エリアに存在する2以上の対象施設に対する物品の配送計画を決定する第2手順を実行する、配送支援システム。 - 所定エリアに存在する2以上の所定施設に含まれる少なくとも1つの施設の電力データを受信するステップと、
第1タイミングにおいて、前記第1タイミングを基準として第1条件を満たす前記電力データに基づいて、前記所定エリアに含まれる2以上の配送エリアの中から対象エリアを決定する第1手順を実行するステップと、
前記第1タイミングよりも後の第2タイミングにおいて、前記第2タイミングを基準として第2条件を満たす前記電力データに基づいて、前記対象エリアに存在する2以上の対象施設に対する物品の配送計画を決定する第2手順を実行するステップと、を備える配送支援方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US17/595,242 US12002005B2 (en) | 2019-05-13 | 2020-04-22 | Delivery assist apparatus, delivery assist system, and delivery assist method |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019-090354 | 2019-05-13 | ||
JP2019090354A JP7258645B2 (ja) | 2019-05-13 | 2019-05-13 | 配送支援装置、配送支援システム及び配送支援方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2020230553A1 true WO2020230553A1 (ja) | 2020-11-19 |
Family
ID=73223436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2020/017277 WO2020230553A1 (ja) | 2019-05-13 | 2020-04-22 | 配送支援装置、配送支援システム及び配送支援方法 |
Country Status (3)
Country | Link |
---|---|
US (1) | US12002005B2 (ja) |
JP (1) | JP7258645B2 (ja) |
WO (1) | WO2020230553A1 (ja) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009157890A (ja) * | 2007-12-28 | 2009-07-16 | Nec Corp | 在宅情報取得システム、提供方法、及び、プログラム |
WO2015122196A1 (ja) * | 2014-02-17 | 2015-08-20 | 日本電気株式会社 | 在宅状況判定装置、配送システム、在宅状況判定方法、在宅状況判定プログラム、および配送端末 |
JP2017033341A (ja) * | 2015-08-03 | 2017-02-09 | 株式会社エプコ | 輸送業務支援システムおよび輸送業務支援方法 |
JP2018084891A (ja) * | 2016-11-22 | 2018-05-31 | 中国電力株式会社 | 訪問支援システムおよび訪問支援方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9890677B2 (en) * | 2013-12-16 | 2018-02-13 | Cummins, Inc. | System and method for the monitoring and controlling of emissions for multiple engines |
JP6303230B2 (ja) * | 2016-06-09 | 2018-04-04 | 和則 藤沢 | 商品出荷管理システム及びプログラム |
JP6344661B2 (ja) * | 2016-08-31 | 2018-06-20 | 和則 藤沢 | 商品出荷管理システムにおける商品検索プログラム及び方法 |
US9741010B1 (en) * | 2016-12-02 | 2017-08-22 | Starship Technologies Oü | System and method for securely delivering packages to different delivery recipients with a single vehicle |
JP6966216B2 (ja) | 2017-04-21 | 2021-11-10 | 株式会社日立製作所 | 在宅判定システム |
-
2019
- 2019-05-13 JP JP2019090354A patent/JP7258645B2/ja active Active
-
2020
- 2020-04-22 US US17/595,242 patent/US12002005B2/en active Active
- 2020-04-22 WO PCT/JP2020/017277 patent/WO2020230553A1/ja active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009157890A (ja) * | 2007-12-28 | 2009-07-16 | Nec Corp | 在宅情報取得システム、提供方法、及び、プログラム |
WO2015122196A1 (ja) * | 2014-02-17 | 2015-08-20 | 日本電気株式会社 | 在宅状況判定装置、配送システム、在宅状況判定方法、在宅状況判定プログラム、および配送端末 |
JP2017033341A (ja) * | 2015-08-03 | 2017-02-09 | 株式会社エプコ | 輸送業務支援システムおよび輸送業務支援方法 |
JP2018084891A (ja) * | 2016-11-22 | 2018-05-31 | 中国電力株式会社 | 訪問支援システムおよび訪問支援方法 |
Also Published As
Publication number | Publication date |
---|---|
JP7258645B2 (ja) | 2023-04-17 |
US12002005B2 (en) | 2024-06-04 |
JP2020187454A (ja) | 2020-11-19 |
US20220261739A1 (en) | 2022-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11320837B2 (en) | Federated automated interoperation between premises and autonomous resources | |
US20190124619A1 (en) | Passenger load prediction systems and methods for predicting passenger load | |
KR20140068809A (ko) | 위치 결정 시스템 및 방법과, 계산 장치 어플리케이션들의 위치 기반 수정 | |
US8712595B2 (en) | Dynamic load profiling in a power network | |
KR101693948B1 (ko) | 셀 식별자 정보를 이용하여 이동 단말의 설정을 변경하는 위치 기반 서비스 제공 방법 및 시스템 | |
CN103822638B (zh) | 用户位置信息的处理方法和装置 | |
EP3331119A1 (en) | Management server and management method | |
US11138679B2 (en) | Management method and management apparatus | |
US10418856B2 (en) | Systems and methods for wireless charging | |
CN112348428A (zh) | 集装箱的监控方法、装置、服务器及存储介质 | |
US20190122554A1 (en) | Smart parking management and navigation system | |
TW201939991A (zh) | 通信網路的定位方法和系統 | |
CN110015095B (zh) | 一种对可移动设备进行充电的方法及设备 | |
WO2020230553A1 (ja) | 配送支援装置、配送支援システム及び配送支援方法 | |
JP5262510B2 (ja) | 配信速度制御装置および配信速度制御方法 | |
JP2019213106A (ja) | NB−IoT通信システム | |
KR20130002240A (ko) | 무선랜 신호 세기를 이용한 위치 기반 서비스용 측위 시스템 | |
CN204990397U (zh) | 物流车信息系统 | |
Gabrovšek et al. | Karst show caves–how DTN technology as used in space assists automatic environmental monitoring and tourist protection–experiment in Postojna Cave | |
US10091624B2 (en) | Data providing system | |
CN107124804B (zh) | 基于物联网技术的舞台灯智能网络管理系统和方法 | |
EP2928105A2 (en) | Content delivery architecture | |
JP6818652B2 (ja) | 通信先制御システム、方法およびプログラム | |
JP2013086741A (ja) | 運行管理装置、方法、およびプログラム | |
JP2020032964A (ja) | 運行管理システム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20804832 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20804832 Country of ref document: EP Kind code of ref document: A1 |