WO2020225861A1 - プロジェクト管理システム - Google Patents

プロジェクト管理システム Download PDF

Info

Publication number
WO2020225861A1
WO2020225861A1 PCT/JP2019/018308 JP2019018308W WO2020225861A1 WO 2020225861 A1 WO2020225861 A1 WO 2020225861A1 JP 2019018308 W JP2019018308 W JP 2019018308W WO 2020225861 A1 WO2020225861 A1 WO 2020225861A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
risk
project management
task
project
Prior art date
Application number
PCT/JP2019/018308
Other languages
English (en)
French (fr)
Inventor
高橋信也
後藤年成
Original Assignee
株式会社マネジメントソリューションズ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社マネジメントソリューションズ filed Critical 株式会社マネジメントソリューションズ
Priority to JP2020532062A priority Critical patent/JP6946612B2/ja
Priority to PCT/JP2019/018308 priority patent/WO2020225861A1/ja
Priority to CN201980096147.6A priority patent/CN113795855A/zh
Publication of WO2020225861A1 publication Critical patent/WO2020225861A1/ja
Priority to JP2021083253A priority patent/JP2021184250A/ja
Priority to US17/520,564 priority patent/US20220058552A1/en

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • the present invention provides a mechanism for relatively labor-saving achievement of a relatively large-scale single or multiple projects, and a mechanism for inputting and managing information for efficient use of resources. It is about a system that can enhance the project achievement ability of the members involved in the project.
  • the above-mentioned system has existed as a system for sharing the progress of a so-called project.
  • the content was, so to speak, sharing the memos of each person in charge on the cloud, it is said that it is based on the subjectivity of each person in charge and that it is left to the discretion of each person in charge.
  • Patent Document 1 is mentioned as an attempt to solve a part of the above problems.
  • Patent Document 1 is a risk management tool that manages a plurality of risks of a project, and updates the degree of impact of risk, the probability of occurrence, and the weight of risk countermeasures as the project progresses, and creates a priority of risk countermeasures. It is a characteristic risk management system.
  • Patent Document 1 does disclose a function intended to calculate the risk in consideration of the potential potential and the degree of impact, the specific content thereof is not disclosed. , And when looking at the project as a whole, it is important to take measures based on the progress rather than managing only the risk. Therefore, in terms of managing only the risk, the degree of contribution to the success of the project is It wasn't necessarily big. Risk management is also important for the success of the project, but accurate understanding of risks and issues, progress management based on accurate understanding, and project delays and actualization of risks occur. It is also important to accurately grasp the dynamic correction of tasks and the expected impact of the correction.
  • the present invention provides a project management system for centrally managing information on issues, tasks, and risks.
  • the present invention is a project management information, and a project information input receiving unit that accepts one or more inputs of project information, which is information indicating a problem that must be solved in order to achieve the goal of the project.
  • the project information holding unit that holds one or more project information in association with the issue identification information, and the issue solution that acquires the issue resolution status information that is the information indicating the status that the retained issue has been resolved in association with the issue identification information.
  • the status information acquisition unit, the problem resolution status information output unit that outputs the retained problem information and the problem solution status information in association with each other, and the project management information under predetermined conditions when achieving the project goal.
  • a risk information input receiving unit that accepts one or more inputs of risk information, which is information indicating an assumed risk, and a risk information holding unit that retains one or more input risk information in association with risk identification information. It is held by the Risk Realization Risk High Risk Information Acquisition Department, which acquires risk realization risk high risk information in association with risk identification information, which is information indicating that the risk has become apparent or the risk has increased.
  • the risk manifestation risk high risk status output unit that outputs the existing risk information and the risk manifestation risk high risk information in association with each other, and the project management information that must be processed when achieving the project goals.
  • a task information input receiving unit that accepts one or more input of task information, which is information indicating the above, a task information holding unit that holds one or more input task information in association with task identification information, and processing of the held task.
  • a task processing status information acquisition unit that acquires task processing status information indicating the status in association with task identification information, a task processing status information output unit that outputs the retained task information and task processing status information in association with each other, and a project.
  • the project management information change request reception department that accepts the input of the project management information change request, which is the management information change request, and the project management information change request that holds the received project management information change request in association with the project management information change request identification information.
  • Project management information change request implementation information acquisition that acquires the project management information change request implementation information that is information indicating that the holding unit and the held project management information change request are executed in association with the project management information change request identification information.
  • Project management information change request implementation information Provide a project management system having a project management information change department that changes project management information based on the above.
  • the present invention has a project management information premise information acquisition unit that acquires premise information, which is premise information that can identify project management information, in association with the project management information, and a project that acquires the acquired premise information.
  • a project management system that further has a project management information prerequisite information holding unit that is held in association with management information.
  • the present invention has become manifest when the risk manifestation risk high risk information, which is information indicating that the retained risk has manifested, is acquired in association with the risk identification information.
  • a project management system having a generation task recording section that generates task information that must be solved based on a risk, associates it with task identification information, and records it in the task information holding section.
  • the present invention provides a project management system further including a new task corresponding task information input unit for inputting task information associated with newly generated and held task information in association with the task information in addition to the above-mentioned features. ..
  • the present invention includes success experience information which is information indicating a success experience in association with project identification information which identifies a project, and / and experience information which is failure experience information which is information indicating a failure experience.
  • An experience information input reception unit that accepts input, an experience information storage unit that stores the input experience information in association with the project identification information, and an experience information viewing request reception unit that accepts a viewing request for the accumulated experience information.
  • a project management system having an experience information browsing unit that allows the experience information to be browsed according to the received browsing request.
  • the experience information provides a project management system including any one or more of text information, video information, attached document information, still image information, and audio information.
  • the present invention provides an experience information input receiving means for each project management information, in which the experience information input receiving unit receives input in association with the project management information.
  • the present invention further provides a project management system in which the project management information change request reception unit further has a reception completion means for completing reception by embedding information in a template for specifying the content of the change request. provide.
  • the project management information change request implementation information acquisition unit changes the project management information by embedding the information in a template for specifying the information necessary for executing the change request.
  • Provide a project management system further having an implementation information generation means for generating project management information change request implementation information which is information to be implemented.
  • the present invention provides a risk template input receiving means in which the risk information input receiving unit accepts the input of risk information according to the risk navigation template that prompts the input of information to be clarified in order to make the risk objective. It also provides a project management system to have.
  • the risk information input receiving unit accepts the input of risk information according to the risk quantification navigation template that prompts the input of information for quantifying the risk.
  • the present invention provides a project management system in which the risk manifestation risk high risk status output unit further has a risk information mapping means for mapping the held risk information.
  • the present invention has an interrelationship information acquisition unit that acquires interrelationship information, which is information indicating mutual association of problem information, risk information, task information, and premise information, and the acquired interrelationship information.
  • an interrelationship information acquisition unit that acquires interrelationship information, which is information indicating mutual association of problem information, risk information, task information, and premise information, and the acquired interrelationship information.
  • Provide a project management system that further has an interrelated information holding unit that holds the information.
  • the present invention is associated with problem-solving status information, which is information indicating that the held problem has been solved, when the problem information and the task information are associated with each other. It provides a project management system that further has a problem-solving status information generation unit that is generated based on the task processing status information of task information and passed to the problem-solving status information acquisition unit.
  • the present invention has a premise change input receiving unit that accepts an input for a change in the premise information associated with the project management information, and a modification that prompts the correction of the project management information associated with the premise information.
  • a premise change input receiving unit that accepts an input for a change in the premise information associated with the project management information, and a modification that prompts the correction of the project management information associated with the premise information.
  • the present invention has a stakeholder input reception unit that receives input of a stakeholder related to achievement of a project goal in association with an index value indicating the attribute of the stakeholder, and an index value received in association with the stakeholder.
  • a project management system that further has a stakeholder map generation unit that generates a stakeholder map using and, and a map output unit that outputs the generated map.
  • the present invention further includes a situation information map acquisition unit that acquires a situation information map that is information obtained by mapping situation information, and a situation information map output unit that outputs the acquired situation information map.
  • a situation information map acquisition unit that acquires a situation information map that is information obtained by mapping situation information
  • a situation information map output unit that outputs the acquired situation information map.
  • the present invention also includes a member team identification information holding unit that holds member team identification information that identifies members or teams composed of members for achieving the goals of the project, and member team identification information.
  • Member team project management information related to the project management information that the member team is involved in and the member team project management information relationship holding part that holds the relationship, and the member team project management information relationship output that is held Provide a project management system with additional departments.
  • Diagram showing an example of mapped risk information (risk map) Diagram showing an example of a stakeholder map
  • Diagram showing the processing flow when the project management system in Example 1 is used (problem information related) Diagram showing the flow of processing when the project management system in Example 1 is used (risk information related) Diagram showing the processing flow when the project management system in Example 1 is used (task information related) Diagram showing the flow of processing when the project management system in Example 1 is used (project content change relationship) Process flow related to output of each information Functional configuration of the project management system in Example 2
  • the figure which shows the functional structure of the project management system in Example 3. The figure which shows the hardware configuration of the project management system in Example 3. The figure which shows the flow of the process when the project management system in Example 3 is used.
  • the figure which shows the functional structure of the project management system in Example 4. The figure which shows the hardware configuration of the project management system in Example 4.
  • the figure which shows the functional structure of the project management system in Example 5. The figure which shows the hardware configuration of the project management system in Example 5.
  • the figure which shows the flow of the process when the project management system in Example 5 is used.
  • the figure which shows the functional structure of the project management system in Example 6. The figure which shows the hardware configuration of the project management system in Example 6.
  • the figure which shows the functional structure of the project management system in Example 7. The figure which shows the hardware configuration of the project management system in Example 7. The figure which shows the flow of the process when the project management system in Example 7 is used.
  • the figure which shows the functional structure of the project management system in Example 8. The figure which shows the hardware configuration of the project management system in Example 8.
  • the figure which shows the flow of the process when the project management system in Example 8 is used.
  • the figure which shows the hardware configuration of the project management system in Example 9. The figure which shows the flow of the process when the project management system in Example 9 is used.
  • the figure which shows the functional structure of the project management system in Example 10. The figure which shows the hardware configuration of the project management system in Example 10.
  • the figure which shows the flow of the process when the project management system in the 10th implementation example is used.
  • the figure which shows the functional structure of the project management system in Example 11. The figure which shows the hardware configuration of the project management system in Example 11.
  • the figure which shows the flow of processing (limited to the point about output) when the project management system in Example 11 is used.
  • the figure which shows the functional structure of the project management system in Example 12. The figure which shows the hardware configuration of the project management system in Example 12.
  • the figure which shows the flow of the process when the project management system in Example 12 is used.
  • the figure which shows the functional structure of the project management system in Example 13. The figure which shows the hardware configuration of the project management system in Example 13.
  • the figure which shows the flow of the process when the project management system in Example 13 is used.
  • the figure which shows the functional structure of the project management system in Example 14 The figure which shows the hardware configuration of the project management system in Example 14. The figure which shows the flow of the process when the project management system in Example 14 is used.
  • the figure which shows the functional structure of the project management system in Example 15. The figure which shows the hardware configuration of the project management system in Example 15.
  • the figure which shows the flow of the process when the project management system in Example 15 is used.
  • the figure which shows the hardware configuration of the project management system in Example 16. The figure which shows the flow of the process when the project management system in Example 16 is used.
  • the figure which shows the hardware configuration of the project management system in Example 17. The figure which shows the flow of the process when the project management system in Example 17 is used.
  • Example 1 relates to claim 1, claim 19, and claim 20, the description of Example 2 relates to claim 2, the description of Example 3 relates to claim 3, and the description of Example 4 Regarding claim 4, the description of Example 5 relates to claims 5 and 6, the description of Example 6 relates to claim 7, the description of Example 7 relates to claim 8, and the description of Example 8 relates to claim 8.
  • the description of Example 9 relates to claim 10, the description of Example 10 relates to claim 11, the description of Example 11 relates to claim 12, the description of Example 12 relates to claim 13, and the description of Example 13 relates to claim 13.
  • Example 14 relates to claim 15, the description of Example 15 relates to claim 16, the description of Example 16 relates to claim 17, and the description of Example 17 relates to claim 18. is there.
  • the present invention should not be limited to these examples, and may be implemented in various aspects without departing from the gist thereof.
  • the present invention is an invention that uses a computer in principle, but it is realized by software, by hardware, and also by collaboration between software and hardware.
  • the hardware that realizes all or part of each configuration requirement of the present invention is composed of a CPU, memory, bus, input / output device, various peripheral devices, user interface, etc., which are the basic configurations of a computer.
  • Various peripheral devices include storage devices, interfaces such as the Internet, devices such as the Internet, displays, keyboards, mice, speakers, cameras, videos, televisions, and various sensors (flow sensors) for grasping the production status in laboratories or factories.
  • Temperature sensor Temperature sensor, Weight sensor, Liquid volume sensor, Infrared sensor, Shipment quantity counter, Packed quantity counter, Foreign matter inspection device, Defective product counter, Radiation inspection device, Surface condition inspection device, Circuit inspection device, Human sensor, Worker work status grasping device (based on video, ID, PC work volume, etc.), CD device, DVD device, Blu-ray device, USB memory, USB memory interface, removable hard disk, general hard disk, projector device, Includes SSDs, telephones, fax machines, copiers, printing devices, movie editing devices, various sensor devices, etc. Further, this system does not necessarily have to be configured by one chassis, and may be configured by combining a plurality of chassis by communication.
  • the communication may be a LAN, WANWifi, Bluetooth (registered trademark), infrared communication, ultrasonic communication, and a part thereof may be installed across national borders.
  • each of the plurality of housings may be operated by a different entity, or may be operated by one entity.
  • the operating entity of the system of the present invention may be singular or plural.
  • the invention can also be configured as a system including a terminal used by a third party and a terminal used by another third party. In addition, these terminals may be installed across national borders. Furthermore, in addition to this system and the terminal, even if related information of a third party, a device used for registering related persons, a device used for a database for recording the registered contents, etc. are prepared. Good.
  • the present invention functions in collaboration with a computer, communication equipment, and software.
  • ICT In addition to making it possible to process the processing that was conventionally performed by interviews by project participants using ICT, many complicated information exchanges, procedures, authentication, and settlement effects related to the project can be determined by ICT.
  • ICT Established as a so-called business model patent because it includes processing unique to ICT, such as supporting the accumulation, retention, and exchange of effective information that meets all the necessary items that cannot be created without skill, through ICT. Is what you do.
  • the effect of the invention is only if there is a possibility of providing a predetermined usefulness to the user who uses the invention, and how the user feels or thinks about the usefulness. It should not be seen from the perspective of. Therefore, even if the effect obtained by the user by this system is a psychological effect, the effect itself is an event that is not subject to the required usability of the laws of nature.
  • task information which is information indicating the problem to be solved in order to achieve the goal of the project, and information indicating the risk assumed under predetermined conditions when achieving the goal of the project.
  • “Risk information”, “task information” that indicates tasks that must be processed to achieve the project goals (problem information, risk information, and task information are all "project management information”) Also accepts one or more inputs, holds them in association with each identification information, acquires the issue resolution status information in association with the issue identification information, outputs it in association with the issue information, and increases the risk of actualization of risk. The information is acquired in association with the risk identification information and output in association with the risk information, the task processing status information is acquired in association with the task identification information and output in association with the task information, and then the necessary project management information is obtained.
  • Project management information that accepts input of change request, holds the accepted project management information change request in association with the project management information change request identification information, and indicates that the project management information change request is executed.
  • Project management information change request implementation information Is acquired in association with the project management information change request identification information, and a project management system having a function of changing the project management information based on the acquired project management information change request implementation information is provided.
  • FIG. 1 is a diagram showing hierarchical situations such as “project”, “problem”, “task”, “risk”, and “premise” in the present invention.
  • project there is a project concept
  • problem as its subconcept
  • task as its subconcept
  • task as its subconcept
  • risk and “premise” are linked in relation to “project”
  • issue is linked in relation to each "issue” and each "task”.
  • both "tasks” and “tasks” may have a hierarchical structure between tasks and tasks.
  • there may be task A, task B, task C, and task D as subordinate concepts of the project and task D1, task D2, and task D3 as subordinate concepts of the task D. It depends. This applies not only to "issues” but also to "premise", “risk” and “task”.
  • superordinate concept rather than “project”
  • FIG. 2 is a conceptual diagram of an example of a portal screen for inputting various information in the present invention.
  • selection parts such as "project”, “issue”, “task”, “risk”, “premise”, “group”, “member”, and “experience”, and by selecting them, the next screen is displayed. .. Since it is a conceptual diagram, it is not limited to such a design (hereinafter, the same applies to each drawing).
  • the feature of the present invention is that the input of information is accepted by the individual form in the identification unit of the information in this way. By forcing input using individual forms in the information identification unit, the interface requires the input person to input the required information specified in the individual form without fail, so it is possible to prevent omission of input of necessary information and identify the information. It has the effect of being accurate in units.
  • FIG. 28 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a problem information input reception unit (2801), a problem information holding unit (2802), a problem solution status information acquisition unit (2803), a problem solution status information output unit (2804), and a risk information input reception unit.
  • FIG. 3 is a conceptual diagram of an example of an input screen for the “project management information”.
  • “New project input” and “project content modification” will be described later.
  • “Modify the scope of project disclosure” modifies the scope of persons who have viewing authority.
  • “Modify the project manager” is to modify the person in charge of the project.
  • Project division is for dividing one project into two or more
  • project integration is for combining a plurality of projects into one.
  • FIG. 4 is a conceptual diagram of an example of a new project input screen using individual forms.
  • items such as input person, title, ID, deadline, achievement details, group name, budget, delivery destination, etc.
  • register the project by inputting them. After inputting, select "Done” to register, select “Back” to return to the previous screen without registration, select “Next” to move to the second input of the project input, etc.
  • select "Next" to move to the second input of the project input etc.
  • the word "individual form” is an information input format prepared for each unit that identifies information, and is not a word that can be interpreted only on one sheet on the screen.
  • each blank is shown in the free format input format for input to the input person, title, ID, deadline, achievement content, group name, budget, delivery destination, and other items, it is not a free format and is pulled down. It may be a format that can be selected by a menu or the like, or it may be an input format that seems to be a free format and actually accepts only registered character strings. It is preferable that the input information is retained in association with the input time based on the time information provided separately from the timekeeping unit, and measures are taken to prevent tampering with the input information. ..
  • the measures to prevent falsification are processing such as holding the input information non-rewritable, acquiring the hash value of the input information, associating it with the project ID, and holding it in a safe area.
  • the face image of the input person is acquired from the camera provided in the input terminal, and the authority is checked in the authority database associated with the face recognition data. You may. In that case, it may be configured to determine whether the value entered as the text input as the input person and the input person associated with the title database match. Alternatively, the input person may be configured to be automatically input based on the check contents in the authority database.
  • FIG. 5 is a conceptual diagram of an example of the project content correction screen.
  • items such as input person, project name, task name, task name, risk name, premise name, etc.
  • it is conceivable to modify the project contents by inputting them since it is assumed that the project contents have already been registered here, it is basically conceivable to select each item from the pull-down menu. After inputting, if you select "Done", you will be registered, if you select "Back”, you will return to the previous screen without registering, and if you select "Next", you will be taken to a screen such as task input. Can be considered. Since the modification of the project contents is an important matter regarding the achievement of the project, it is desirable to have the same title check as when inputting the project.
  • FIG. 6 is a conceptual diagram of an example of the member input screen.
  • items such as the name, ID, authority, affiliation, qualification, and work location of the input person, and it is conceivable to register member information by inputting them.
  • the content candidates to be input in advance can be predicted, it is conceivable to basically select each item from the pull-down menu.
  • selections such as career input, experience project input, experience task input, and experience task input are made, a configuration is conceivable in which the screen transitions to the detailed input screen.
  • the screen after the transition may be a free entry or a pull-down method.
  • the background, experience project, experience task, and experience task entered here are stored in a database so that they can be searched and viewed from outside the people involved in this project.
  • the name may be configured to be searched face down, or the name may be displayed and searched. Even if the name is not displayed, it is possible to configure the person who inputs the background, etc. to disclose himself / herself only to the searcher, according to the request of the searcher. By doing so, when launching a new project, it will be possible to gather suitable members for that project, and the range of use will be expanded so that searchers can be informed of information for achieving the next project. ..
  • the "problem information input reception unit” has a function of accepting one or more inputs of problem information, which is project management information and is information indicating a problem that must be solved in order to achieve the goal of the project.
  • problem information here and the "task information”, “risk information”, and “premise information” described later are all included in the "project management information”.
  • the present invention may be provided with a function for providing compatibility for the automatic migration. The same applies hereinafter.
  • FIG. 7 is a conceptual diagram of an example of a portal screen for inputting / correcting task information. For example, there are selection parts such as “new task setting”, “progress report by task”, “correction of task content”, “correction of charge”, “correction of delivery date”, “correction of task attribute”, and by selecting them, the next screen is displayed. It is like doing.
  • a "problem” is an element that must be solved in order to achieve the purpose of the project. Conversely, the purpose of the project is automatically achieved by solving all the planned problems. It will be done.
  • the task should be set by a person who can grasp the project in a higher-level concept, and the system should be designed so that the person whose predetermined qualification is authenticated by the input ID can set the task. It is also conceivable to design so that the tasks are associated with a predetermined category in advance in the system and the project attributes are set before the task is input to encourage the input to the required task category.
  • the categories of issues include procuring a budget for sales promotion activities, selecting the sales promotion format to be adopted in sales promotion activities, and optimizing media applied to the selected sales promotion format.
  • selection of activities drafting of a plan of magazine composition to be proposed to the magazine production side in sales promotion activities, and attachment of consent from the magazine production side to the plan.
  • the project is the development of a new model vehicle, it is preferable to prepare a category of tasks corresponding to it and design it so that the input person can input upwards with failsafe without noticing it. It is preferable that the input is configured so as to be input using the individual form of a predetermined format.
  • FIG. 8 is a conceptual diagram of an example of a new task input screen.
  • items such as input person, project, solution content, solution deadline, configuration task (there may be multiple), solution group, risk, premise as problem details, and you can register the project by inputting them. Conceivable. Since it is assumed that the project contents have already been registered here, it is basically conceivable to select each item from the pull-down menu. The deadline may be selectable from the calendar. It is assumed that the button “Details” will transition to the screen for entering details by selecting it. In addition, the button “hierarchy” allows you to select the hierarchy of each task when there is a hierarchy between tasks. After inputting, if you select "Done”, you will be registered, if you select "Back”, you will return to the previous screen without registering, and if you select "Next", you will be taken to a screen such as task input. Can be considered.
  • the "problem information holding unit” has a function of holding one or more task information in association with the task identification information. It is preferable that the task identification information is configured so that it can be recognized as the lower identification information of the upper project identification information. This is because the information management of the computer becomes easy. In addition, although it is the deadline for retaining the issue information, it is preferable to retain it as history information even after the project is completed. This is because it is possible to learn from historical information in the future. Furthermore, it is also possible to configure AI to learn this history information and the final project result to propose the optimum task setting method. This task identification information is associated with all information about the entered task.
  • the "problem-solving status information acquisition unit” has a function of acquiring the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information.
  • FIG. 9 is a conceptual diagram of an example of the progress report input screen for each task.
  • the button "Auto” is selected, the registered information in the task is referred to, and the cleared task is automatically entered there.
  • buttons such as “automatic progress calculation”, “manual progress input”, “progress correction”, and “progress disclosure range”. In that case, for example, when "Automatic progress calculation” is selected, the progress of the task itself is automatically calculated by referring to the status of the entered clear task and the registered task.
  • the "problem solving status information output unit” has a function of associating and outputting the held problem information and the problem solving status information. It is preferable to configure it so that it can be viewed by project participants, project orderers, and project managers in order to know the progress of the project.
  • the information of each issue itself may be highly confidential information, and not all project participants can view the resolution status of all issues, and one authorized person is limited to that authorized person.
  • it may be designed so that the problem-solving status of the specified range can be viewed.
  • the problem-solving status information may be divided into several information layers and can be viewed.
  • the system so as to optimize the method of disclosure according to the information access authority of the viewer by adopting various disclosure methods such as when publishing roughly.
  • a person who intends to browse inquires to a project leader who has the disclosure authority regarding the browsing at the time of requesting browsing, and if approval is obtained, the information in a predetermined range can be browsed based on the access authority given by the approval. It can also be designed as.
  • the output may be automatically transferred to Excel, Word data, etc. through the present invention.
  • the present invention may be provided with a function for providing compatibility for the automatic migration. The same applies hereinafter.
  • the "risk information input reception unit” has a function of accepting one or more inputs of risk information, which is project management information and is information indicating risks assumed under predetermined conditions when achieving a project goal. ..
  • “Risk information” is an event that does not affect the progress of the project unless it is manifested, but that it has some effect on the project. For example, in the case of construction of a large facility, soaring material costs, occurrence of natural disasters, failure to secure workers, management crisis of the ordering party, occurrence of legal problems (environmental problems, pollution, resident movement, scandal), under construction Occurrence of serious accidents, shortage of construction equipment (for example, tunnel shield machines, dump trucks, trailers, excavators, etc.), suspension / cancellation of construction due to political reasons (cancellation of dam construction, suspension of highway construction, etc.), labor costs Soaring prices, large fluctuations in exchange rates when the project is affected by exchange rates, etc. are possible.
  • FIG. 14 is a conceptual diagram of an example of a portal screen for inputting / correcting risk information. For example, selection parts such as “new risk input”, “risk-specific status report input”, “risk content correction”, “risk cause correction”, “risk occurrence prediction timing correction”, “risk manifestation impact correction”, and “risk attribute correction” There is, and by selecting it, the next screen is displayed.
  • FIG. 15 is a conceptual diagram of an example of a new risk input screen.
  • items such as input person, project name, impact issue, impact task, possibility of manifestation, related stakeholders, predictive event, scale of impact, budget, personnel, period, project delay prediction as necessary resources when manifestation occurs. It is conceivable to register risk information by inputting into them. Here, since it is assumed that the project contents have already been registered, it is conceivable to basically select each item from the pull-down menu. The time may be selectable from the calendar. After inputting, if you select "Done”, you will be registered, if you select "Back”, you will return to the previous screen without registering, and if you select "Next", you will be taken to a screen such as task input. Can be considered.
  • the risk information input reception unit is configured so that it can also input information as an index of the attribute of the acquired information and the index of the risk judgment level in the risk actualization risk high risk information acquisition department described later.
  • a high risk state occurs when the price rises by 10% or more from the initially set amount, and a risk becomes apparent when the price rises by 20%.
  • unanticipated work is intervened, such as when it is defined as a state or when a natural disaster occurs, the period required to return to normal work exceeds 5% of the total project period, which is a high-risk state, which exceeds 10%.
  • the high risk state is when the shortfall exceeds 5% of the planned number of personnel.
  • the management crisis on the ordering side of the project such as when the risk exceeds 10%, the risk becomes apparent, or when the ordering side of the project has a management crisis, one default is a high risk state and two defaults are a risk.
  • a high-risk state or a risk manifestation state can be set according to the amount and rate of negative writing on the Internet.
  • the risk information input reception unit also inputs the definition information of what kind of event occurs and how much of the risk item will be in the high risk state or the risk manifestation state. Is preferable.
  • These definition information are used by the risk manifestation risk high risk information acquisition unit to automatically generate a display in a predetermined format.
  • the input screen may include an instruction such as "Enter the percentage that has risen relative to the initially set amount", a pull-down menu, or a bar indicator. Generates and presents a screen that allows you to enter a percentage by moving the bar.
  • high risk and risk manifestation performed in the risk definition are often indicated by quantity or percentage, so in the case of such input, the above-mentioned thing is used as a general-purpose interface to make risk manifestation risk high risk.
  • Risk manifestation risk high risk so that it is automatically generated by the information acquisition department It is configured to pass the definition information of this risk to the information acquisition department. In addition, it is preferable to configure all the input information related to the risk that is necessary for generating the interface of the risk manifestation risk high risk information acquisition section to be handed over to the risk manifestation risk high risk information acquisition section.
  • the sign information can be defined in the risk definition, the input of the sign information is accepted and this information is also configured to be passed to the risk manifestation risk high risk information acquisition department.
  • the “typhoon information” can be used as the predictive information. As predictive information, the prediction that a large typhoon will pass through the construction site of this large facility can be used as predictive information.
  • the "risk information holding unit” has a function of holding one or more input risk information in association with the risk identification information. This risk identification information is associated with all information about the task entered.
  • the "risk manifestation risk high risk information acquisition department" is information indicating that the held risk has become actual or the risk has increased.
  • the risk manifestation risk high risk information is associated with the risk identification information. Has a function to acquire.
  • FIG. 16 is a conceptual diagram of an example of a risk-specific status report input screen.
  • the degree to which a predictive event occurs may be entered numerically, or as shown in the figure, a risk quantification navigation template (indicated by placing an arrow where 0% to 100% exists on the axis, etc.)
  • the degree of occurrence of the predictive event may be determined by automatic calculation by individually inputting the answers to the questions related to the degree of occurrence of the predictive event. It is also possible that there are buttons such as "automatic calculation of risk manifestation possibility”, “automatic calculation of impact scale when risk manifestation”, and “automatic calculation of project delay prediction”. In that case, for example, when "Automatic calculation of risk manifestation possibility” is selected, the risk manifestation possibility is automatically calculated by referring to the input predictive event content and the degree of occurrence.
  • the acquisition of risk manifestation risk high-risk information may be acquired using a communication network without relying on human input if it can be acquired externally via the Internet or the like.
  • material price market conditions for example, material price market conditions, worker wage market conditions, exchange rates, forecast information of natural disasters such as typhoons, heavy snowfalls, and gusts.
  • This information can be obtained by having the risk information input receiving unit select the definition when accepting the input and the method of accepting the input of the index value of the item in the definition.
  • the price market condition of materials can be set so that a predetermined item on the Internet website is specified during the definition input of risk information and the value is periodically obtained.
  • the "risk manifestation risk high risk status information output unit” has a function of associating the held risk information with the risk manifestation risk high risk information output unit.
  • Risk manifestation Risk high risk status information also referred to as risk status information; the same shall apply hereinafter
  • the output information from the output section is used by project participants, project orderers, and project managers to know the risk status. It is preferable to configure it so that it can be viewed by.
  • the information of each risk may be highly confidential information, and not all project participants can view the status of all risks, and one authorized person is limited to that authorized person. It may be designed so that a wide range of risk situations can be viewed.
  • the risk status information may be divided into several information layers and can be viewed.
  • the system so as to optimize the method of disclosure according to the information access authority of the viewer by adopting various disclosure methods such as when publishing roughly.
  • a person who intends to browse inquires to a project leader who has the disclosure authority regarding the browsing at the time of requesting browsing, and if approval is obtained, the information in a predetermined range can be browsed based on the access authority given by the approval. It can also be designed as.
  • the "task information input reception unit” has a function of accepting one or more inputs of task information, which is project management information and is information indicating a task that must be processed when achieving the goal of the project.
  • Task information refers to work that must be digested in small group units or individual units in principle. It is configured to generally refer to the work required to solve the problem indicated by the problem information. Therefore, when all the tasks associated with the task are completed, the task indicated by the task information is determined and recorded as a solved task. Therefore, the task information is information that clearly defines what, how, when, where, and when the person who executes the task should do it. However, depending on the project, it is possible to define tasks in association with issues, arrange tasks in a hierarchical structure, and define issues that are not associated with tasks.
  • FIG. 10 is a conceptual diagram of an example of a portal screen for inputting / correcting task information.
  • selection parts such as "New task input”, “Progress report input for each task”, “Task content correction”, “Responsible correction”, “Delivery date correction”, and "Task attribute correction”. It is a transition.
  • task input it is preferable to design so that the title of the input person is restricted and only a person having a predetermined title is allowed to input the task.
  • Each attribute of the entered task is associated with the task identification information. If the task is associated with another task or the task indicated by the task information, the task identification information of the associated task and the task identification information of the associated task are also entered in association with each other. Must.
  • the input of this information is an interface that automatically requests the input person when the identification information of the other associated task is input. It is also necessary to input the person in charge, but if there is a business instruction relationship between the persons in charge, it is preferable to input the business instruction relationship as well.
  • the section chief in charge of the regenerative brake circuit, the chief in charge of the regenerative brake circuit, and the person in charge of the regenerative brake circuit since the completion and achievement of tasks are closely related to the ability of the person in charge to execute duties, it is preferable that the member ID registered in the project member registration database is also associated with the person in charge.
  • the person who wants to view the progress status of the task and the task execution plan can see the past project execution history of the person in charge stored in the project member registration database for the person in charge and the specialized field of the person in charge.
  • It is desirable to make this input so that the information registered in the database regarding the person in charge, such as the past task in charge and the result of evaluation of task performance ability, can be viewed.
  • the task attribute information peculiar to this person in charge may be stored in the database by using the task attribute information described later, and may be configured so that a third party can view it.
  • FIG. 11 is a conceptual diagram of an example of a new task input screen.
  • items such as task content, task hierarchy, processing group, and person in charge (multiple names are possible) as input person, project name, influence, and task details, and task information is registered by inputting them. Is possible. Since it is assumed that the project contents have already been registered here, it is basically conceivable to select each item from the pull-down menu. The processing deadline may be selectable from the calendar. It is assumed that the button “Details" will transition to the screen for entering details by selecting it.
  • the "task hierarchy” is a relationship with a task, that is, which task is associated with it, or if there is a hierarchy between tasks, the hierarchy with the task can be selected. After inputting, select "Done” to register, select “Back” to return to the previous screen without registration, and select "Next” to move to the next screen. Can be considered. Further, the task attribute may be further selected.
  • FIG. 12 is a conceptual diagram of an example of a screen when selecting a task attribute. For example, select from labor-intensive type, solution discovery type, creative type, presentation type, PR type, influence type, fund-injection type, law-solving type, network-dependent type, survey-dependent type, etc. (multiple selections may be possible. ), And these attributes are neither mandatory nor conversely limited.
  • the "task information holding unit” has a function of holding one or more input task information in association with the task identification information. This task identification information is associated with all information about the entered task.
  • the "task processing status information acquisition unit” has a function of acquiring task processing status information indicating the processing status of a held task in association with task identification information.
  • FIG. 13 is a conceptual diagram of an example of the progress report input screen for each task. For example, it is conceivable to enter%, quality, quantity, etc. as the input person, project name, task name, task name, and achievement amount. Since it is assumed that the project contents have already been registered here, it is basically conceivable to select each item from the pull-down menu.
  • the achievement amount may be entered numerically, or the task achievement amount may be determined by automatic calculation by individually inputting the answers to the questions related to the task achievement amount. It is also possible that there are buttons such as "Other achievement index”, “Achievement correction”, “Achievement disclosure range”, “Task content correction", and “Task attribute correction”.
  • the achievement amount is not indicated by a number, but is indicated by a specific completion process, or "Waiting for approval, the approval period is ⁇ year-month-day".
  • Input may be accepted in the form of indicating the remaining process or period, such as "expected”. This may be compatible with indicating the achievement amount numerically and accepting input.
  • each registered content may be corrected.
  • the "achievement amount disclosure range” is a registration regarding the range of persons who have viewing authority regarding the achievement level.
  • the system can be configured to automatically acquire the task processing status information from the outside.
  • a production management system such as a factory
  • it is generally configured to sequentially grasp the production status of products in the factory, but management data in these production management systems can be periodically acquired by communication. It can be configured to generate or retain task processing status information using the management data.
  • the production control system includes various sensors for grasping the production status in a laboratory or factory, such as a flow rate sensor, a temperature sensor, a weight sensor, a liquid amount sensor, an infrared sensor, a shipping quantity counter, and packaging.
  • the data processed or edited by the production control system can be acquired to generate the task processing status information, and in some cases, the sensor data in the production factory can be directly acquired by this system. It can also be configured to generate task processing status information.
  • the task processing status information is not limited to data on products such as products, and data on humans such as human movements can also be acquired as task processing status information.
  • Human-related data includes information on human movements, how people interact with devices, and data on human-human relationships.
  • the task processing status information acquisition unit is an SNS information acquisition means capable of Internet communication for acquiring information from an SNS or the like, and an SNS task processing status information generation that analyzes the SNS information and generates task processing status information. It may have a means (a rule that analyzes SNS information and generates task processing status information is inherent).
  • the "task processing status information output unit” has a function of associating and outputting the held task information and the task processing status information. It is preferable to configure the task processing status information so that it can be output in various output formats.
  • a graph may be configured so that a desired display format can be selected from a plurality of graphs such as bar graphs, line graphs, pie graphs, band graphs, histograms, radar charts, scatter graphs, box plots, triangle graphs, and candle charts.
  • the output can be configured to include not only the current task processing status information but also the past history.
  • the output of the task processing status information may be an output including all or a part of the task information or the task information, or may be configured so that a part of the task information can be selected according to the wishes of the viewer. ..
  • a comparable task may be selected so that you can compare the completed task with the task currently being processed. ..
  • the elapsed time and the progress of the task can be compared between the completed task and the currently in progress task.
  • the task execution member and the member who manages the task may be provided with a communication tool means capable of writing a comment on the output of the progress of the task and responding to the comment.
  • this system may have a comparable task recommendation means that recommends a comparable task to the user using task attribute information. The progress comparison between the recommended task and the running task becomes possible by the user selecting the comparable task recommended by the recommended means.
  • AI analyzes the information of the completed task, holds the problem process in task execution, and has a warning advice output means that outputs warnings and advice to the task executor based on past task analysis cases. You may be. It is preferable to configure the warning advice means to give warning advice when it is determined that the task processing is behind schedule based on the task processing status information. While receiving warning advice when no problem has occurred is psychologically stressful, if there is a delay in task processing, there may be some problem, so the warning advice is given by the executor. This is because there is a high possibility that a situation that is easy to accept is fostered.
  • the achievement amount disclosure range is a registration regarding the range of persons who have viewing authority regarding the achievement level.
  • the "project management information change request reception unit” has a function of accepting input of a project management information change request, which is a project management information change request.
  • FIG. 17 is a conceptual diagram of an example of a change (correction) content definition input screen received by the project management information change request reception unit.
  • there are items such as input person, project name, correction project management information, correction occurrence factor, customer request content conformity check, etc., and it is conceivable to configure to accept change request of project management information by inputting them. Be done. Since it is assumed that the project contents have already been registered here, it is basically conceivable to select each item from the pull-down menu. For example, "risk manifestation" and "customer request” can be considered as the cause of correction.
  • the "customer request content conformity check” is to achieve the change (correction) request from the customer if the change content matches the change (correction) request from the customer, in other words, if the corresponding response is taken. It is to check whether or not it can be done. If there are multiple customer requests, it may be possible to check each one and finally make a comprehensive decision. If the judgment result is "customer request content non-conformity", the redefinition is started by pressing the "redefinition” button. After inputting, select “Done” to register, select “Back” to return to the previous screen without registration, and select “Next” to transition to a screen such as task input. Is possible.
  • FIG. 18 is a diagram showing an example of “customer request content conformity check”.
  • the content of the request is "I want the project completion to be one month ahead of schedule”
  • the method of "By moving the longest task 13a one month ahead of schedule, the project completion is one month ahead of schedule” is taken.
  • the request content "I want the project to be completed one month ahead of schedule” can be achieved, so the judgment is considered to be "customer request content match”.
  • stakeholder information, personnel in charge, team information, and budget It may be configured so that it can be judged whether or not it is considered that the request content "I want you to complete the project one month ahead of schedule” can be achieved by taking into consideration the overall task schedule and the like.
  • the analysis means can be configured to analyze. For example, if the materials consumed to execute a task are highly seasonally variable, the quality of the input raw materials may fluctuate by moving the task forward, which may cause fluctuations in the quality of the final product. .. Therefore, in such a case, a warning is given to the effect that the quality of the final product may fluctuate.
  • the project management information change department calculates that four financial experts can be put in if the task 8c, which is the other task, is advanced by one week, and the project information is changed by advancing the task 8c by one week. It can also be configured to determine that it is possible and output a conclusion that includes such recommendations. In this way, the task information holds all the factors that can affect the result of the task in association with the task identification information, and also holds the information about the events that affect the factors.
  • the effect can be output qualitatively and / and quantitatively.
  • the event is related to other tasks or risk situations, the factors contained in the related task or risk information are analyzed and the project change is bad for the final result of the project. It is preferable to configure it so as to derive a solution that does not affect it.
  • the "project management information change request holding unit” has a function of holding the received project management information change request in association with the project management information change request identification information.
  • the "project management information change request implementation information acquisition department" is information indicating that the held project management information change request is executed.
  • the project management information change request implementation information is associated with the project management information change request identification information. Has the function to acquire.
  • the "project management information change department” has a function of changing the project management information based on the acquired project management information change request implementation information.
  • “Project management information” is one or more of problem information, risk information, and task information. Changing this means changing or adding one or more of task information, risk information, and task information. In addition, changes and additions may change the interdependence of task information, risk information, and task information, which are interrelated relationships.
  • Interdependence refers to a relationship in which multiple tasks affect each other or in one direction, and is mainly used in the preceding task when the result of the preceding task is used by the succeeding task (result usage relationship). This is a relationship that occurs when a resource is also used in a subsequent task (resource reuse relationship). Basically, it is a function that indicates a value with an attribute that a task requests and must be satisfied in order to execute the task, and one of the variables is time. Basically, the value must satisfy a predetermined range or a predetermined value (satisfaction condition) within a predetermined time.
  • the change in the project is achieved by adjusting the value changed according to the change so that it falls within the range required by the task. If the task alone cannot be achieved, it may be possible to change the project as a whole by adjusting the values of other tasks.
  • interdependence information is task interdependence information
  • task-task interdependence information is task interdependence information
  • task-task interdependence information of a task different from that task is used.
  • Certain task task interdependence information can be configured to be held in the interdependence information holding section, and the section that handles changes in project management information is the information held in this interdependence information holding section. Can be used, and the function to judge whether the change of project management information is appropriate can also be made by using the information held in this interdependence information holding unit.
  • the interdependence information and the project management information change request are also part of the project management information.
  • Project management information change request implementation information is information indicating the content of changing the project management information based on the project management information change request, and is one or more of problem information, risk information, and task information. Changing this is information that includes instructions for changing or adding one or more of task information, risk information, and task information. Issue information, risk information, task information, and other project management information are configured to be identified by identification information, and in the case of a change, the identification information is specified and the content of the change is described. The contents of the change include deletion of some information, change of some information, addition of some information, deletion of all information, change of all information, etc., and new in case of addition. Add new project management information by associating identification information with and showing interdependencies.
  • the change pattern identification information indicating the change pattern in the identification information may be associated with the project management information change request execution information.
  • the reasons for the change are "1. Fund amount, stock price, bond, loan amount, investment amount", "2. Cooperation, alliance, joint development, joint business, merger", "3. President, officer, leader, developer, sales”.
  • the cost, target achievement speed, etc. may be represented by identification information to indicate what kind of change it is. It is also possible to configure the search results to be extracted from the huge amount of data stored in the project management system using these identification information as a key.
  • FIG. 29 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)" (2901) and a “main memory” (2902) that perform various arithmetic processes.
  • the "network / I / F (interface)” (2904) that transmits / receives information to / from the "HDD” (2903) that holds predetermined information and the user terminal device (2906) associated with a plurality of user identification information It has. Then, they are connected to each other by a data communication path such as "system bus” (2905) to transmit / receive and process information.
  • system bus system bus
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • Program and risk manifestation risk high risk information acquisition program and risk manifestation risk high risk status output program and task information input reception program and task information retention program and task processing status information acquisition program and task processing status information output program and project The management information change request reception program, the project management information change request retention program, the project management information change request implementation information acquisition program, and the project management information change program.
  • problem information, problem identification information, problem resolution status information, risk information, risk identification information, risk manifestation risk high risk information, task information, task processing status information, project Management information change request, project management information change request identification information, project management information change request implementation information, etc. are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • ⁇ Processing flow> 30 to 33 are diagrams showing a processing flow when the project management system in this embodiment is used. Although it is a series of processes as a whole, the process flow is explained by dividing it into processing related to problem information, processing related to risk information, processing related to task information, and processing related to project management information. There is no pre-existing relationship between each flow, and the same applies thereafter.
  • S3102 risk manifestation risk high risk information acquisition step (S3103), task information input reception step (S3201), task information retention step (S3202), task processing status information acquisition step (S3203),
  • a processing method consisting of a project management information change request acceptance step (S3301), a project management information change request holding step (S3302), a project management information change request implementation information acquisition step (S3303), and a project management information change step (S3304).
  • FIG. 34 shows a processing flow related to the output of each information.
  • the order does not matter, but first ask whether to output status information (including, but not limited to, information indicating the progress of each information such as problem information, risk information, and task information).
  • status information including, but not limited to, information indicating the progress of each information such as problem information, risk information, and task information.
  • When outputting it asks whether to output the problem-solving status information next.
  • it outputs the problem-solving status information. If it does not end, it returns to the beginning.
  • the problem-solving status information is not output, ask whether to output the risk-revealed high-risk information, and if output, ask whether to output the risk-revealed high-risk information and then end. , If not finished, return to the beginning.
  • the question is asked whether to output the task processing status information, and if it is output, the task processing status information is output, and then the task processing status information is output. If so, go back to the beginning.
  • the flow is as described above as a whole, but in short, it has a problem-solving status information output step, a risk manifestation risk high-risk status output step, and a task processing status information output step as output steps. Since it may be configured, it will be explained simply as such an example.
  • the “problem information input reception step” is a stage of accepting one or more inputs of problem information, which is project management information and is information indicating a problem that must be solved in order to achieve the goal of the project.
  • the “task information retention step” is a stage in which one or more task information is retained in association with the task identification information.
  • the “problem-solving status information acquisition step” is a step of acquiring the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information.
  • the “problem solving status information output step” is a stage in which the held problem information and the problem solving status information are associated and output.
  • the "risk information input acceptance step" is a stage of accepting one or more inputs of risk information, which is project management information and is information indicating risks assumed under predetermined conditions when achieving a project goal. ..
  • the “risk information retention step” is a step of retaining one or more input risk information in association with the risk identification information.
  • “Risk manifestation risk high risk information acquisition step” is information indicating that the held risk has become actual or the risk has increased.
  • the risk manifestation risk high risk information is associated with the risk identification information. It is the stage to acquire.
  • the “risk manifestation risk high risk status output step” is a stage in which the held risk information and the risk manifestation risk high risk information are output in association with each other.
  • the "task information input acceptance step” is a stage of accepting one or more inputs of task information, which is project management information and is information indicating a task that must be processed when achieving the goal of the project.
  • the “task information retention step” is a step of retaining one or more input task information in association with task identification information.
  • the “task processing status information acquisition step” is a stage in which task processing status information indicating the processing status of a held task is acquired in association with task identification information.
  • the "task processing status information output step” is a stage in which the held task information and the task processing status information are associated and output.
  • the “project management information change request acceptance step” is a stage of accepting the input of the project management information change request, which is the project management information change request.
  • the “project management information change request holding step” is a stage in which the received project management information change request is held in association with the project management information change request identification information.
  • the "project management information change request implementation information acquisition step" is information indicating that the held project management information change request is executed.
  • the project management information change request implementation information is associated with the project management information change request identification information. It is the stage to acquire.
  • the “project management information change step” is a stage in which the project management information is changed based on the acquired project management information change request implementation information.
  • the prerequisite information which is the prerequisite information for identifying the project management information, is acquired in association with the project management information, and the prerequisite information is retained in association with the project management information.
  • FIG. 35 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a problem information input receiving unit (3501), a problem information holding unit (3502), a problem solving status information acquisition unit (3503), a problem solving status information output unit (3504), and a risk information input reception unit.
  • Department 3505
  • risk information holding department 3506
  • risk manifestation risk high risk information acquisition department 3507
  • risk manifestation risk high risk status output department 3508)
  • task information input reception department 3509
  • It has a project management information change request implementation information acquisition unit (3515), a project management information change unit (3516), a project management information prerequisite information acquisition unit (3517), and a project management information prerequisite information holding unit (3518).
  • the contents of each function will be specifically described below. Since each function except the project management information prerequisite information acquisition unit and the project management information prerequisite information holding unit is the same as in the first embodiment, the functions of the project management information prerequisite information acquisition unit and the project management information prerequisite information holding unit The explanation will be limited to.
  • the "project management information prerequisite information acquisition unit” is the prerequisite information that can identify the project management information (the information or / and each information that is the prerequisite for defining each information (issue, task, risk) of the project management information). It has a function to acquire the prerequisite information (information that is the prerequisite for determining the conditions to be satisfied) (issues, tasks, risks) in association with the project management information.
  • FIG. 19 is a conceptual diagram of an example of a portal screen for inputting / correcting prerequisite information.
  • there are selection parts such as "Enter new prerequisite information”, “Modify prerequisite information”, “Prerequisite information ⁇ Change task”, “Prerequisite information ⁇ Change task”, “Prerequisite information ⁇ Change risk”, and by selecting them, the following It is a transition to the screen.
  • "prerequisite information-> task change”, “prerequisite information-> task change”, and “prerequisite information-> risk change” are input because the task information, task information, and risk information may need to be changed if the premise changes.
  • the task information, task information, and risk information are automatically changed based on the prerequisite information.
  • FIG. 20 is a conceptual diagram of an example of a new prerequisite information input screen.
  • items such as input person, project name, related issues (multiple issues are possible), and element attributes as prerequisites (multiple items are possible), and it is conceivable to register the prerequisite information by inputting them. .. Since it is assumed that the project contents have already been registered here, it is basically conceivable to select each item from the pull-down menu. It is conceivable that the button "task” will transition to the input screen of the task associated with the task by selecting it. The "element attribute” is as described later. After inputting, select “Done” to register, select “Back” to return to the previous screen without registration, and select "Next” to move to the next screen. Can be considered. Further, the task attribute may be further selected.
  • FIG. 21 is a diagram showing an example of a list of element attributes.
  • the element attributes are, for example, "1. Fund amount, stock price, bond, loan amount, investment amount", "2. Cooperation relationship, partnership relationship, joint development, joint business, merger", "3. President, officer, leader, developer, business operator”.
  • the "project management information premise information holding unit” has a function of associating the acquired premise information with the project management information and holding it. If there is a change in the prerequisite information, it is likely that the project management information associated with the prerequisite information will need to be changed. Therefore, it is necessary to check whether the prerequisite information is changed regularly or irregularly.
  • the prerequisite information change warning output which is a warning to that effect, is configured to be output from the prerequisite information change warning output unit.
  • the change of the prerequisite information may be configured to be acquired manually, or it may be configured to be acquired automatically.
  • a response guidance means may be provided for requesting a response from the project manager or the like on a regular basis as to whether or not the prerequisite information is changed.
  • Prerequisite information may also be expressed in free form in a language, or it may be obtained numerically, such as the information that can be obtained on the Internet.
  • the premise range is specified by a numerical value, so that the warning information can be output when the value is out of the range.
  • FIG. 36 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)" (3601) and a “main memory” (3602) that perform various arithmetic processes.
  • a "network / I / F (interface)” (3604) that transmits / receives information to / from an "HDD” (3603) that holds predetermined information and a user terminal device (3606) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (3605) to transmit / receive and process information.
  • a data communication path such as a "system bus” (3605) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored. Further, in this embodiment, prerequisite information is stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information prerequisite information acquisition program stored in the "main memory", and projects the prerequisite information, which is the prerequisite information that can identify the project management information through the "network interface”. Obtained in association with management information. Then, the project management information prerequisite information retention program is executed to retain the acquired prerequisite information in association with the project management information.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • FIG. 37 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists.
  • this embodiment in addition to the processing of the first embodiment, there are a project management information prerequisite information acquisition step and a project management information prerequisite information retention step in any order. The following describes the project management information prerequisite information acquisition step and the project management information prerequisite information retention step.
  • the “project management information prerequisite information acquisition step” is a stage in which the prerequisite information, which is the prerequisite information for identifying the project management information, is acquired in association with the project management information.
  • the “project management information prerequisite information retention step” is a stage in which the acquired prerequisite information is retained in association with the project management information.
  • the risk manifestation risk high risk information which is information indicating that the retained risk has manifested, is acquired in association with the risk identification information. It provides a project management system that is configured to generate issue information that must be resolved based on the identified risks and record it in association with the issue identification information.
  • FIG. 38 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a task information input receiving unit (3801), a task information holding unit (3802), a problem solving status information acquisition unit (3803), a problem solving status information output unit (3804), and a risk information input reception unit.
  • risks include the inability to procure resources or the loss of resources, the loss of infrastructure for processing tasks and issues, and the loss of demand for goals achieved by executing projects.
  • the inability to procure resources means that a war broke out in the oil field area and the crude oil used as the raw material could not be imported.
  • a case or loss of infrastructure is a case in which a large earthquake occurs and the transportation route for raw materials collapses, or the factory that was trying to execute the project collapses in the first place. Replacing these with issues, “procurement of stocked crude oil” is an issue for "cannot import crude oil”, and “early procurement of valuable raw materials” is an issue for "burning of stored precious raw materials”. Therefore, “establishment of another transportation route” is an issue for "collapse of raw material transportation route”, and “contract with alternative factory” is an issue for "factory collapse”.
  • the issue may be automatically registered even in the case of high risk. For example, if "a war broke out in the oil field area” but the crude oil used as a raw material is still importable, the issue of "importing crude oil ahead of schedule” is registered in advance to increase the risk. Automatically register for assignments with. In addition, if there is a weather forecast that a large typhoon may occur and cause serious damage to the raw material production area, the issue is "to bring the raw material to the site while the large typhoon is over the South Sea. "Transportation" becomes a new issue.
  • the "generation task recording unit” is based on the risk that has become apparent when the risk realization risk high-risk information, which is information indicating that the retained risk has become apparent, is acquired in association with the risk identification information. It has a function to generate problem information that must be solved or to acquire information held in advance and record it in the problem information holding unit in association with the problem identification information.
  • the task information held in the task information holding section is output from the task solving status information output section in the same way as normal task information. At first, the problem solving status is generally output as zero.
  • FIG. 22 is a flowchart relating to the processing content performed in the generation task recording unit.
  • “risk high risk” is judged whether or not the risk is increasing, and if it is not increasing, there is no problem, but if it is increasing, it is judged whether the risk is actualized next. If it is judged that the risk is actualized here, the risk is changed to a task, and then it is judged whether or not the task has a task, and if there is a task, the task is subordinated to the task. Resources are assigned to tasks and targeted for task management, and when there are no tasks, resources are assigned to tasks and targeted for task management.
  • FIG. 39 is a diagram showing a hardware configuration of the project management system in this embodiment. Although the part overlapping with Example 1 in this figure is not shown, it is premised that the processing flow in Example 1 exists.
  • the project management system in this embodiment includes a "CPU (central processing unit)" (3901) and a “main memory” (3902) that perform various arithmetic processes. There is. Further, a "network / I / F (interface)” (3904) that transmits / receives information to / from a "HDD” (3903) that holds predetermined information and a user terminal device (3906) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (3905) to transmit / receive and process information.
  • a data communication path such as a "system bus” (3905) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information.
  • the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface” with the risk manifestation risk high risk information. And output.
  • the "CPU” executes the generation task recording program stored in the "main memory” to indicate that the held risk has become apparent.
  • the risk realization risk high risk information is the risk identification information. Generate task information that must be resolved based on the actualized risk when acquired in association with each other (for example, generate a task by artificial intelligence) or / and acquire pre-registered task information. , Additional recording in the task information holding section in association with the task identification information. If this newly recorded task information is hierarchically positioned in relation to other task information, information indicating the hierarchical relationship with other task information is also recorded. The information indicating this hierarchical relationship is configured so that it can be referred to even when all the task information having a direct relationship is accessed.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface” is associated with the task processing status information and output. Risk manifestation When a new issue is additionally recorded due to the acquisition of risk high-risk information, a warning is output to prompt the authorized project participants to input a task for solving the issue according to the issue. It is preferable to do so.
  • the problem information that should be newly added in advance when the risk that has become apparent or high risk is registered by the risk realization risk high risk information, and the tasks that must be processed to solve this problem. It is also preferable as a configuration to pre-register. When there is a task registered in advance in this way, it is preferable to configure it so that the task information is newly automatically added and recorded together with the additional record of the problem information generated in response to the risk manifestation risk high risk information. .. It is not necessary to fully automatically record all newly added task information and task information that must be processed accordingly. For elements that must be dynamically considered, such as personnel allocation. It is preferable to configure the project participants who have title to input.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface". Accept in some cases.
  • Risk manifestation When risk high risk information is acquired, there is additional recorded issue information and additional recorded task information, so this department is made to function and the project management information is changed from the authorized project participants. It is preferable to configure the request to be input.
  • project management information There are two cases of project management information in this case, one is to refer to newly added task information and task information, and the other is to change the project management information in order to make changes to the previous project management information.
  • the former may be done automatically and the latter may be left to the project participants who have the title.
  • the change request processing of the project management information may be skipped and the project management information may be added. It may be configured to be completed by recording.
  • the project management information change request retention program is used. Execute and retain the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • FIG. 40 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists. First, determine whether or not the risk is high. If it is not, there is no problem, but if it is judged that the risk is high, then the risk manifestation is judged. If the risk is actual, change the risk to an issue. Then, it is judged whether or not the task has a task, and if the task has a task and is subordinated, the resource is allocated to the task. On the other hand, if the task does not have a task, resources are allocated to the task. In any case, it is subject to issue management and task management.
  • the risk mitigation task is not generated, the process itself ends, while when the risk mitigation task is generated, it is judged whether or not the task has a task, and if the task has a task and is subordinated. Allocates resources to the task. On the other hand, if the task does not have a task, resources are allocated to the task. In any case, it is subject to issue management and task management.
  • the flow is as described above as a whole, but in short, a configuration having a generation task recording step may be used, so a simple example will be described.
  • the “generation task recording step” is based on the actualized risk when the risk actualization risk high-risk information, which is information indicating that the retained risk has become apparent, is acquired in association with the risk identification information. This is the stage where the task information that must be resolved is generated, associated with the task identification information, and recorded in the task information holding unit.
  • the present embodiment provides a project management system configured to input task information associated with the newly generated and held task information in association with the task information.
  • FIG. 41 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a task information input receiving unit (4101), a task information holding unit (4102), a problem solving status information acquisition unit (4103), a problem solving status information output unit (4104), and a risk information input reception unit.
  • each function has a project management information change request implementation information acquisition unit (4115), a project management information change unit (4116), and a new task response task information input unit (4117).
  • the contents of each function will be specifically described below. Since each function excluding the task information input unit for new tasks is the same as in the third embodiment, the functions of the task information input unit for new tasks will be described only.
  • the "new task response task information input unit” has a function of inputting task information associated with newly generated and held task information in association with the task information.
  • FIG. 42 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (Central Processing Unit)” (4201) and a “main memory” (4202) that perform various arithmetic processes.
  • the "network / I / F (interface)” (4204) that transmits / receives information to / from the "HDD” (4203) that holds predetermined information and the user terminal device (4206) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (4205) to transmit / receive and process information.
  • a data communication path such as a "system bus” (4205) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information.
  • the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface” with the risk manifestation risk high risk information. And output.
  • the "CPU” executes the generation task recording program stored in the "main memory” to indicate that the held risk has become apparent.
  • the risk realization risk high risk information is the risk identification information. When acquired in association with each other, problem information that must be resolved based on the actualized risk is generated (for example, using artificial intelligence) or / and registered in advance at the time of registration of risk information. The data is acquired, associated with the task identification information, and recorded in the task information holding unit.
  • the "CPU” executes the new task response task information input program stored in the "main memory”, and associates the task information associated with the newly generated and held task information with the task information. Let me enter.
  • the task information may be prepared and registered in advance, and the task information may be automatically registered after waking up.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • the "new task response task information input step” is a stage in which task information associated with newly generated and held task information is input in association with the task information.
  • this embodiment is configured to accept input of success experience information which is information indicating a success experience and / and experience information which is information indicating a failure experience.
  • success experience information which is information indicating a success experience and / and experience information which is information indicating a failure experience.
  • experience information which is information indicating a failure experience.
  • FIG. 43 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a problem information input receiving unit (4301), a problem information holding unit (4302), a problem solving status information acquisition unit (4303), a problem solving status information output unit (4304), and a risk information input reception unit.
  • the experience information input reception unit Since each function except the experience information input reception unit, the experience information storage unit, the experience information viewing request reception unit, and the experience information viewing unit is the same as in the first embodiment, the experience information input reception unit and the experience information storage unit The explanation will be limited to the functions of the experience information browsing request reception section and the experience information browsing section.
  • the "experience information input reception unit” is the input of success experience information or / or experience information which is information indicating a failure experience in association with the project identification information which identifies the project and indicates a success experience. Has a function to accept. It is desirable that the experience information here includes any one or more of text information, video information, attached document information, still image information, and audio information.
  • FIG. 23 is a conceptual diagram of an example of a portal screen for inputting / correcting experience information.
  • selection parts such as “Experience information input”, “Existing experience information modification”, “Existing experience merge”, “Existing experience division”, and “Experience viewing authority modification” as items related to experience viewing, and “Experience viewing” as an item related to experience viewing.
  • selection part such as “new experience browsing”, and by selecting it, the next screen is displayed.
  • “correction of experience viewing authority” is to modify the range of persons who have viewing authority regarding experience information.
  • FIG. 24 is a conceptual diagram of an example of a new experience information input screen.
  • items such as input person, project name, related issues (multiple issues are possible), element attributes as prerequisites (multiple items are possible), and experience information can be entered by entering them.
  • register Since it is assumed that the project contents have already been registered here, it is basically conceivable to select each item from the pull-down menu.
  • the button "task” will transition to the input screen of the task associated with the task by selecting it.
  • the "element attribute” is as described above in the explanation of the prerequisite information.
  • the range of persons who have the authority to view the experience information may be specified.
  • select "Done” to register After inputting, select "Done” to register, select “Back” to return to the previous screen without registration, and select "Next” to move to the next screen. Can be considered. Further, the task attribute may be further selected.
  • the experience information is an example of free-format text.
  • FIG. 25 is a diagram showing an example in which the input of experience information is accepted by an audio file, a moving image / video file, a text file, a photo file, a WEB URL, a storage ID, or the like. Save the files suitable for telling the experience from audio files, video files, text files, photo files, WEB URLs, storage IDs, etc. by dragging and dropping, and select "Done" to get the experience information. Is registered. In addition, there are items such as input person, project name, related issues (multiple issues are possible), element attributes as prerequisites (multiple items are possible), and it is the same as above that it is a story after inputting them. Is.
  • the audio file is often the audio that the experiencer talks about the experience, but it is deeply involved in the execution of the project, such as recording the meeting where other important decisions were made and recording the negotiations that influenced the project.
  • a memo to better understand the voice such as who the speaker is, what the term refers to, and the moment when the flow changes.
  • a video file in addition to the above scenes, for example, it is a video that explains the success cases of experiments and thinking sites in an easy-to-understand manner, and conversely, introduces the failure cases.
  • the data analysis program may be held and available together with the text data, or the link information to the data analysis program may be recorded so as to be available together with the text data.
  • the photographic file may include various objects such as a micrograph, a meeting scene, and a scene at the time of negotiation.
  • various photographs such as disassembled photographs of products for the stomach for competition and photographs of data collections obtained in secret can be considered.
  • the "experience information storage unit” has a function of associating the input experience information with the project identification information and accumulating it.
  • the "experience information viewing request reception unit” has a function of receiving a viewing request for accumulated experience information.
  • the "experience information browsing unit” has a function of browsing experience information in response to a received browsing request.
  • FIG. 44 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)” (4401) and a “main memory” (4402) that perform various arithmetic processes.
  • a "network / I / F (interface)” (4404) that transmits / receives information to / from an "HDD” (4403) that holds predetermined information and a user terminal device (4406) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (4405) to transmit / receive and process information.
  • a data communication path such as a "system bus” (4405) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored. Further, in this embodiment, experience information and browsing request are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the experience information input reception program stored in the "main memory” and associates it with the project identification information that identifies the project through the "network interface" to indicate a successful experience. It accepts input of experience information and / and experience information which is failure experience information which is information indicating failure experience. Then, the experience information storage program is executed to store the input experience information in association with the project identification information.
  • the experience information browsing request reception program stored in the "main memory” is executed to receive the browsing request of the stored experience information. Execute the experience information browsing program stored in the "main memory” to browse the experience information in response to the received browsing request.
  • the "CPU" executes the project management information change request reception program stored in the "main memory” and receives the input of the project management information change request which is the project management information change request through the "network interface". Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • FIG. 45 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists.
  • this embodiment in addition to the processing of the first embodiment, there are an experience information input reception step, an experience information storage step, an experience information browsing request reception step, and an experience information browsing step, regardless of the order.
  • the experience information input reception step, the experience information storage step, the experience information browsing request reception step, and the experience information browsing step will be described.
  • the "experience information input reception step” is the input of the success experience information or / or the failure experience information which is the information indicating the failure experience in association with the project identification information for identifying the project. Is at the stage of accepting.
  • the "experience information accumulation step” is a stage in which the input experience information is associated with the project identification information and accumulated.
  • the "experience information browsing request acceptance step” is a stage of accepting an experience information browsing request that has been accumulated.
  • the "experience information browsing step” is a stage in which the experience information is browsed in response to the received browsing request.
  • the present embodiment provides a project management system configured to accept input of experience information in association with the project management information.
  • FIG. 46 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a task information input receiving unit (4601), a task information holding unit (4602), a problem solving status information acquisition unit (4603), a problem solving status information output unit (4604), and a risk information input reception unit.
  • the contents of each function will be specifically described below. Since each function of the experience information input reception unit except for the experience information input reception means for each project management information is the same as that of the first embodiment, the explanation is limited to the function of the experience information input reception means for each project management information. To do.
  • the "experience information input receiving means according to project management information" has a function of accepting input in association with project management information.
  • FIG. 47 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)” (4701) and a “main memory” (4702) that perform various arithmetic processes.
  • the "network / I / F (interface)” (4704) that transmits / receives information to / from the "HDD” (4703) that holds predetermined information and the user terminal device (4706) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (4705) to transmit / receive and process information.
  • a data communication path such as a "system bus” (4705) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • the experience information input reception program includes an experience information input reception subprogram for each project management information.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request implementation information, experience information and browsing request are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the experience information input reception program stored in the "main memory” and shows a successful experience by associating it with the project identification information and the project management information that identify the project through the "network interface". It accepts the input of success experience information or / and experience information which is information indicating failure experience. Then, the experience information storage program is executed to store the input experience information in association with the project identification information.
  • the experience information browsing request reception program stored in the "main memory” is executed to receive the browsing request of the stored experience information. Execute the experience information browsing program stored in the "main memory” to browse the experience information in response to the received browsing request.
  • the "CPU” then executes the project management information change request reception program stored in the "main memory", and the project that is the project management information change request through the "network interface". Accepts input of management information change request. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information. Since this project management information change request is also a type of project management information, experience information may be input in association with the project management information change request. This is because the project management information change request is important information in project management, and the experience is valuable.
  • FIG. 48 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists.
  • this embodiment in addition to the processing of the first embodiment, there are an experience information input reception step, an experience information accumulation step, an experience information browsing request reception step, and an experience information browsing step, although the order does not matter.
  • the input reception step there is an experience information input reception substep for each project management information. In the following, the experience information input reception substeps for each project management information will be explained.
  • the "experience information input acceptance substep by project management information” is a stage in which input is accepted in association with project management information.
  • the present embodiment provides a project management system configured to complete the reception by embedding information in a template for specifying the content of the change request.
  • FIG. 49 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a task information input receiving unit (4901), a problem information holding unit (4902), a problem solving status information acquisition unit (4903), a problem solving status information output unit (4904), and a risk information input reception unit.
  • the project management information change request implementation information acquisition department (4915), the project management information change department (4916), and the project management information change request reception department have a reception completion means (4917). The contents of each function will be specifically described below. Since each function excluding the reception completion means is the same as that in the first embodiment, the function of the reception completion means will be limited to the description.
  • the "reception completion means” has a function of completing reception by embedding information in a template for specifying the content of the change request.
  • FIG. 50 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)” (5001) and a “main memory” (5002) that perform various arithmetic processes.
  • a "network / I / F (interface)” (5004) that transmits / receives information to / from a "HDD” (5003) that holds predetermined information and a user terminal device (5006) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (5005) to transmit / receive and process information.
  • a data communication path such as a "system bus” (5005) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory" are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • Program and risk manifestation risk high risk information acquisition program and risk manifestation risk high risk status output program and task information input reception program and task information retention program and task processing status information acquisition program and task processing status information output program and project The management information change request reception program, the project management information change request retention program, the project management information change request implementation information acquisition program, and the project management information change program.
  • the project management information change request reception program includes a reception completion subprogram.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface". Accept.
  • the content here is completed by embedding the information in the template for specifying the content of the change request.
  • the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information.
  • the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information.
  • the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • FIG. 51 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists.
  • the flow of processing related to the change of the project management information is the project management information change request acceptance step (S5101), the project management information change request holding step (S5102), and the project management information change request implementation information acquisition step (S5102). It is composed of S5103) and a project management information change step (S5104), and in addition to the processing, the project management information change request reception step has a reception completion substep. The reception completion substep will be described below.
  • the "reception completion substep” is a stage in which reception is completed by embedding information in a template for specifying the content of the change request.
  • the project management information is changed by embedding the information in the template for specifying the information necessary for executing the change request.
  • FIG. 52 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a problem information input reception unit (5201), a problem information holding unit (5202), a problem solution status information acquisition unit (5203), a problem solution status information output unit (5204), and a risk information input reception unit.
  • each function has a project management information change request implementation information acquisition unit (5215) and a project management information change unit (5216), and the project management information change request implementation information acquisition unit has an implementation information generation means (5217).
  • the contents of each function will be specifically described below. Since each function excluding the implementation information generation means is the same as that in the first embodiment, the description will be limited to the function of the implementation information generation means.
  • “Implementation information generation means” means that the project management information change request implementation information acquisition department implements the project management information change by embedding the information in the template for specifying the information necessary for executing the change request. It has a function to generate project management information change request implementation information which is the information of. "Project management information change request implementation information" is
  • FIG. 53 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)” (5301) and a “main memory” (5302) that perform various arithmetic processes.
  • the "network / I / F (interface)” (5304) that transmits / receives information to / from the "HDD” (5303) that holds predetermined information and the user terminal device (5306) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (5305) to transmit / receive and process information.
  • a data communication path such as a "system bus” (5305) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • Program and risk manifestation risk high risk information acquisition program and risk manifestation risk high risk status output program and task information input reception program and task information retention program and task processing status information acquisition program and task processing status information output program and project The management information change request reception program, the project management information change request retention program, the project management information change request implementation information acquisition program, and the project management information change program.
  • the project management information change request implementation information acquisition program includes the implementation information generation subprogram.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. The content here is to change the project management information by embedding the information in the template for specifying the information necessary for executing the change request. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • FIG. 54 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists.
  • the flow of processing related to the change of project management information is the project management information change request acceptance step (S5401), the project management information change request holding step (S5402), and the project management information change request implementation information acquisition step (S5401). It consists of S540 03) and a project management information change step (S5404), and in addition to the processing, the project management information change step has an implementation information generation substep. The implementation information generation substeps are described below.
  • Examplementation information generation sub-step is the information to implement the project management information change by embedding the information in the template to specify the information necessary to execute the change request. This is the stage of generating information.
  • this embodiment provides a project management system configured to accept input of risk information according to a risk navigation template that prompts input of information that should be clarified in order to make the risk objective. To do.
  • FIG. 55 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a problem information input reception unit (5501), a problem information holding unit (5502), a problem solution status information acquisition unit (5503), a problem solution status information output unit (5504), and a risk information input reception unit.
  • the contents of each function will be specifically described below. Since each function excluding the risk template input receiving means is the same as in the first embodiment, the description will be limited to the function of the risk template input receiving means.
  • the "risk template input receiving means" has a function of accepting the input of risk information according to the risk navigation template that prompts the input of information that should be clarified in order to make the risk objective. It is preferable to configure the template so that the input of risk information is not completed when even one input is not performed.
  • the risk template may be configured to have a guide information button and guide the user who has difficulty in understanding the content to be input to what the input field should be described. .. Further, it is preferable that the input field is provided with an input example example button for showing an input example so as to show an input example.
  • artificial intelligence learn various project management information and past cases such as project progress and project completion results, and temporarily describe the risk information in the risk template by default, and the user edits it. It can also be configured to complete the input with.
  • FIG. 56 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)" (5601) and a “main memory” (5602) that perform various arithmetic processes.
  • the "network / I / F (interface)” (5604) that transmits / receives information to / from the "HDD” (5603) that holds predetermined information and the user terminal device (5606) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (5605) to transmit / receive and process information.
  • a data communication path such as a "system bus” (5605) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • Program and risk manifestation risk high risk information acquisition program and risk manifestation risk high risk status output program and task information input reception program and task information retention program and task processing status information acquisition program and task processing status information output program and project The management information change request reception program, the project management information change request retention program, the project management information change request implementation information acquisition program, and the project management information change program.
  • the risk information input reception program includes a risk template input reception subprogram.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal.
  • Accepts one or more inputs of risk information which is information indicating the risk assumed in.
  • the content here accepts the input of risk information according to the risk navigation template that prompts the input of information that should be clarified in order to make the risk objective.
  • the risk information retention program is executed to retain one or more input risk information in association with the risk identification information.
  • the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased.
  • the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • FIG. 57 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists.
  • the flow of processing related to the change of project management information consists of a risk information input reception step (S5701), a risk information retention step (S5702), and a risk manifestation risk high risk information acquisition step (S5703).
  • the risk information input acceptance step has a risk template input acceptance substep. The risk template input acceptance substep will be described below.
  • the “risk template input acceptance substep” is a stage in which risk information input is accepted according to a risk navigation template that prompts the input of information that should be clarified in order to make the risk objective.
  • the present embodiment provides a project management system configured to accept input of risk information according to a risk quantification navigation template that prompts input of information for quantifying risk. ..
  • FIG. 58 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a problem information input reception unit (5801), a problem information holding unit (5802), a problem solution status information acquisition unit (5803), a problem solution status information output unit (5804), and a risk information input reception unit.
  • the contents of each function will be specifically described below. Since each function excluding the risk quantification template input receiving means is the same as in the first embodiment, the function of the risk quantification template input receiving means will be limited to the description.
  • the "risk quantification template input receiving means” has a function of accepting the input of risk information according to the risk quantification navigation template that prompts the input of information for quantifying the risk.
  • FIG. 59 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)" (5901) and a “main memory” (5902) that perform various arithmetic processes.
  • a "network / I / F (interface)” (5904) that transmits / receives information to / from a "HDD” (5903) that holds predetermined information
  • a user terminal device (5906) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (5905) to transmit / receive and process information.
  • a data communication path such as a "system bus” (5905) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • Program and risk manifestation risk high risk information acquisition program and risk manifestation risk high risk status output program and task information input reception program and task information retention program and task processing status information acquisition program and task processing status information output program and project The management information change request reception program, the project management information change request retention program, the project management information change request implementation information acquisition program, and the project management information change program.
  • the risk information input reception program includes a risk quantification template input reception subprogram.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal.
  • Accepts one or more inputs of risk information which is information indicating the risk assumed in.
  • the content here accepts the input of risk information according to the risk quantification navigation template that prompts the input of information for quantifying the risk.
  • the risk information retention program is executed to retain one or more input risk information in association with the risk identification information.
  • the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased.
  • the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • FIG. 60 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists.
  • the flow of processing related to the change of project management information consists of a risk information input reception step (S6001), a risk information retention step (S6002), and a risk manifestation risk high risk information acquisition step (S6003).
  • the risk information input acceptance step has a risk quantification template input acceptance substep. The risk quantification template input acceptance substep will be described below.
  • the “risk quantification template input acceptance substep” is a stage in which risk information input is accepted according to the risk quantification navigation template that prompts the input of information for quantifying risk.
  • Example 1 In addition to the features of Example 1, the present embodiment provides a project management system configured to map retained risk information.
  • FIG. 61 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a problem information input reception unit (6101), a problem information holding unit (6102), a problem solution status information acquisition unit (6103), a problem solution status information output unit (6104), and a risk information input reception unit.
  • the contents of each function will be specifically described below. Since each function excluding the risk information mapping means is the same as that in the first embodiment, the description will be limited to the function of the risk information mapping means.
  • the “risk information mapping means” has a function of mapping the held risk information.
  • FIG. 26 is a diagram showing an example of mapped risk information (risk map).
  • the degree of impact on the project and the possibility of manifestation are shown as the basic axes.
  • the positional relationship does not matter, but in the case of the example in the figure, the rapid rapid yen (R0211) has a high probability of manifestation, but the impact on the project is small, and the labor shortage (R0308) has a relatively high probability of manifestation. Although it is high, it has a relatively large impact on the project, and the key person's retirement (R1181) has a moderate probability of manifestation and a moderate impact on the project.
  • Quality accident (R0311) Cancellation of order (R0101) Although the probability of manifestation is low, it has a large impact on the project. In this way, words have to be expressed as "large” or "small”, but by making a map, the position of each risk can be concretely imagined.
  • FIG. 62 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)" (6201) and a “main memory” (6202) that perform various arithmetic processes.
  • the "network / I / F (interface)” (6204) that transmits / receives information to / from the "HDD” (6203) that holds predetermined information and the user terminal device (6206) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (6205) to transmit / receive and process information.
  • a data communication path such as a "system bus” (6205) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory" are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • Program and risk manifestation risk high risk information acquisition program and risk manifestation risk high risk status output program and task information input reception program and task information retention program and task processing status information acquisition program and task processing status information output program and project The management information change request reception program, the project management information change request retention program, the project management information change request implementation information acquisition program, and the project management information change program.
  • the risk manifestation risk high risk status output program includes a risk information mapping subprogram.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output. The output here is output with the retained risk information mapped.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • FIG. 63 is a diagram showing a processing flow (limited to points related to output) when the project management system in this embodiment is used.
  • the order of output of each information does not matter, but first asks whether or not to output status information (including, but not limited to, information indicating the progress of each information such as problem information, risk information, and task information), and then output. If so, the next question is whether to output the problem-solving status information, if it is output, the problem-solving status information is output, and if it is not finished, the process returns to the beginning.
  • status information including, but not limited to, information indicating the progress of each information such as problem information, risk information, and task information
  • the “risk information mapping substep” is the stage of mapping the held risk information.
  • interrelationship information (interdependence information in the present specification is also a kind of this information) which is information indicating mutual association of problem information, risk information, task information, and premise information.
  • interrelationship information is also a kind of this information
  • a project management system that is configured to capture (treat as) and retain its interrelated information.
  • FIG. 64 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a problem information input reception unit (6401), a problem information holding unit (6402), a problem solution status information acquisition unit (6403), a problem solution status information output unit (6404), and a risk information input reception unit.
  • the "interrelationship information acquisition unit” has a function of acquiring interrelationship information, which is information indicating mutual association of problem information, risk information, task information, and premise information.
  • interrelationship information between "task information” and "task information” is that the task information associated with the task information is the task information when the task indicated by all the associated task information is completed.
  • Information indicating the relationship that the indicated problem has been solved, or the relationship between "risk information” and "issue information” is the issue indicated by the issue information when the risk indicated by the risk information becomes apparent.
  • the relationship with the project management information of is the information indicating that the other project management information is changed when the prerequisite information is broken. It may also show relationships between the same categories. For example, the relationship between "problem information" and other "problem information” is such that when a problem indicated by one task information is solved, it is not necessary to solve the problem indicated by other task information. Or, "task information” and other "task information” are information indicating the relationship that the task indicated by the other task information must be started only after the task indicated by one task information is completed. Or something like that.
  • Various instructions based on these relationship information and information indicating the progress of the project (comprehensive progress information composed based on the progress information of tasks and tasks in addition to the progress information of tasks and tasks). And advice may be configured so that the system gives advice based on the instructions and advice rules held in the system (project progress work instruction unit).
  • the "interrelationship information holding unit” has a function of holding the acquired interrelationship information.
  • FIG. 65 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)" (6501) and a “main memory” (6502) that perform various arithmetic processes.
  • a "network / I / F (interface)” (6504) that transmits / receives information to / from a "HDD” (6503) that holds predetermined information and a user terminal device (6506) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (6505) to transmit / receive and process information.
  • a data communication path such as a "system bus” (6505) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored. Further, in this embodiment, interrelated information is stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the correlation information acquisition program stored in the "main memory” to generate the correlation information, which is the information indicating the mutual association of the task information, the risk information, the task information, and the premise information. get.
  • the interrelationship information retention program is executed to retain the acquired interrelationship information.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • FIG. 66 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists. In this embodiment, in addition to the processing of the first embodiment, there are an interrelated information acquisition step and an interrelated information holding step in any order. The interrelationship information acquisition step and the interrelationship information retention step will be described below.
  • the “interrelationship information acquisition step” is a stage of acquiring interrelationship information, which is information indicating the mutual association of task information, risk information, task information, and premise information.
  • the “interrelationship information retention step” is a stage in which the acquired interrelationship information is retained.
  • the task resolution status information which is information indicating that the held issue has been resolved, is associated with the task information. It provides a project management system that is configured to be generated based on the task processing status information of the task information and passed to the problem resolution status information acquisition unit.
  • FIG. 67 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a problem information input reception unit (6701), a problem information holding unit (6702), a problem solution status information acquisition unit (6703), a problem solution status information output unit (6704), and a risk information input reception unit.
  • the contents of each function will be specifically described below. Since each function excluding the problem-solving status information generation unit is the same as in the twelfth embodiment, the description will be limited to the function of the problem-solving status information generation unit.
  • the "problem solving status information generation unit” is a task associated with the problem solving status information, which is information indicating that the held problem has been solved when the problem information and the task information are associated with each other. It has a function to generate information based on task processing status information and pass it to the problem resolution status information acquisition unit.
  • FIG. 68 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)" (6801) and a “main memory” (6802) that perform various arithmetic processes.
  • a "network / I / F (interface)” (6804) that transmits / receives information to / from a "HDD” (6803) that holds predetermined information and a user terminal device (6806) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (6805) to transmit / receive and process information.
  • a data communication path such as a "system bus” (6805) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request implementation information, interrelated information, etc. are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the correlation information acquisition program stored in the "main memory” to generate the correlation information, which is the information indicating the mutual association of the task information, the risk information, the task information, and the premise information. get.
  • the interrelationship information retention program is executed to retain the acquired interrelationship information.
  • the problem-solving status information which is the information indicating the above, is generated based on the task processing status information of the associated task information, and is passed to the problem-solving status information acquisition unit.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • FIG. 69 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists.
  • the processing flow related to the task information includes the task information input receiving step (S6901), the task information holding step (S6902), the task processing status information acquisition step (S6903), and the problem solving status information.
  • the "problem solving status information generation step” is a task associated with the problem solving status information, which is information indicating that the held problem has been solved when the problem information and the task information are associated with each other. This is the stage where the information is generated based on the task processing status information and passed to the problem resolution status information acquisition unit.
  • this embodiment is configured to accept input for changes in the prerequisite information associated with the project management information and prompt the correction of the project management information associated with the prerequisite information.
  • this embodiment is configured to accept input for changes in the prerequisite information associated with the project management information and prompt the correction of the project management information associated with the prerequisite information.
  • FIG. 70 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a task information input receiving unit (7001), a problem information holding unit (7002), a problem solving status information acquisition unit (7003), a problem solving status information output unit (7004), and a risk information input reception unit.
  • It has a project management information change request implementation information acquisition unit (7015), a project management information change unit (7016), a premise change input reception unit (7017), and a correction promotion unit (7018).
  • the contents of each function will be specifically described below. Since each function except the premise change input reception unit and the correction promotion unit is the same as in the first embodiment, the functions of the premise change input reception unit and the correction promotion unit will be described only.
  • the "premise change input reception unit” has a function of accepting input of changes in the premise information associated with the project management information.
  • the prerequisite information may be written in free format, or may be created by inputting a part of the information according to a template or the like. In the latter case, each blank to be input is configured to identify what kind of premise is meaningful and to add premise element attribute identification information to the input content.
  • element attribute list for example, "1 fund amount, stock price, bond, loan amount, investment amount", "2 cooperation relationship, alliance relationship, joint development, joint business, merger", “3 president, officer, leader, developer” , Business operator, programmer, SE “" 4 Land, building, research facility, development equipment "" 5 Interest rate, dividend, redemption deadline "" 6 Business conditions, price index, industrial index "" 7 Number of employees, number of seconded employees, number of part-time workers , Number of consignees "" 8 Communication law, Transportation law, Finance law “” 9 Communication technology progress, Computational technology progress, Transportation technology progress, Biotechnology progress "” 10 Administrative approval, bill enactment, test success / failure, performance test pass "11 climate, weather, disaster (earthquake, tsunami, volcano, flood), pollution", etc., but there is a rule that instructs to modify any of the project management information according to the changed other attributes of the premise.
  • each project management information is managed in association with the premise element attribute identification information of the premise law that may affect the project management information.
  • This may configure the system to enter associations when registering, entering, or modifying project management information, or it may include prerequisite attribute identification information that may affect the system based on the input of project management information. It may be configured to be recorded and retained in each holding unit in association with the project management information identification information.
  • the "correction promotion department” has a function of promoting correction of the project management information associated with the prerequisite information.
  • FIG. 71 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (Central Processing Unit)” (7101) and a “main memory” (7102) that perform various arithmetic processes.
  • the "network / I / F (interface)” (7104) that transmits / receives information to / from the "HDD” (7103) that holds predetermined information and the user terminal device (7106) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus" (7105) to transmit / receive and process information.
  • a data communication path such as a "system bus” (7105) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory" are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored. Further, in this embodiment, prerequisite information is stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • the "CPU” executes the premise change input reception program stored in the "main memory” and receives the input of the change of the premise information associated with the project management information through the "network interface”. Then, the correction promotion program is executed to prompt the correction of the project management information associated with the prerequisite information through the "network interface".
  • FIG. 72 is a diagram showing a processing flow when the project management system in this embodiment is used.
  • this embodiment in addition to the processing of the second embodiment, there are a premise change input acceptance step and a correction promotion step in any order.
  • the premise change input acceptance step and the correction promotion step will be described.
  • the "premise change input acceptance step” is a stage of accepting the input of the change of the prerequisite information associated with the project management information.
  • the “correction promotion step” is a stage for promoting correction of the project management information associated with the prerequisite information.
  • the input of the stakeholder related to the achievement of the project goal is accepted by associating the index value indicating the attribute of the stakeholder, and the stakeholder and the index value received in association with the stakeholder are used.
  • FIG. 73 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a problem information input receiving unit (7301), a problem information holding unit (7302), a problem solving status information acquisition unit (7303), a problem solving status information output unit (7304), and a risk information input receiving unit.
  • It has a project management information change request implementation information acquisition unit (7315), a project management information change unit (7316), a stakeholder input reception unit (7317), a stakeholder map generation unit (7318), and a map output unit (7319).
  • the contents of each function will be specifically described below. Since each function except the stakeholder input reception unit, the stakeholder map generation unit, and the map output unit is the same as in the first embodiment, the functions are limited to the stakeholder input reception unit, the stakeholder map generation unit, and the map output unit. explain.
  • the “stakeholder input reception unit” has a function of accepting input of stakeholders related to achievement of project goals by associating index values indicating the attributes of the stakeholders.
  • the “stakeholder map generation unit” has a function of generating a stakeholder map using the stakeholder and the index value received in association with the stakeholder. As shown in FIG. 27, for example, one axis has a high influence on the project, and the other axis has a degree of action on the project (unawareness, resistance, neutrality, support, guidance, etc.), and the space created by these two axes Place stakeholder identification information.
  • the stakeholder identification information can be configured to be movable in the map with a mouse, keyboard, etc., and it can be configured to create new issues in the project or eliminate the issues by moving. it can.
  • the system can be configured to automatically execute the task change prepared in advance (automatic task change section).
  • it may be configured to change a task instead of a task (task change suggestion unit, automatic task change unit).
  • it can be configured to change risks and assumptions. These are also automatically changed by associating with the predetermined position of the stakeholder and preparing the risks that should exist there and the prerequisite information that should be there in advance (risk / premise information change department, risk / premise information change suggestion). It is also possible to do part).
  • the "map output unit” has a function of outputting the generated map. This output can be controlled not only on paper but also on a display such as a touch panel with a mouse or cursor.
  • the map editorial department is set up to provide a position change means for changing the position of stakeholders, the map editorial department accepts the deletion of existing stakeholders (existing stakeholder deletion acceptance means), and the map editorial department is new. It is also preferable to accept stakeholder input (new stakeholder input reception means).
  • FIG. 74 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)” (7401) and a “main memory” (7402) that perform various arithmetic processes.
  • a "network / I / F (interface)” (7404) that transmits / receives information to / from a "HDD” (7403) that holds predetermined information and a user terminal device (7406) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (7405) to transmit / receive and process information.
  • a data communication path such as a "system bus” (7405) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored. Furthermore, in this embodiment, stakeholder information is stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • the "CPU” executes the stakeholder input reception program stored in the “main memory” and inputs the stakeholder's input related to the achievement of the project goal through the "network interface” as an index value indicating the attribute of the stakeholder. Accept in association.
  • the "CPU” executes the stakeholder map generation program stored in the “main memory” and generates a stakeholder map using the stakeholder and the index value received in association with the stakeholder.
  • the "CPU” executes the map output program stored in the "main memory” and outputs the map generated through the "network interface”.
  • FIG. 75 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists.
  • a stakeholder input reception step S7501
  • a stakeholder map generation step S7502
  • a map output step S7503
  • the stakeholder input acceptance step, stakeholder map generation step, and map output step are described below.
  • the “stakeholder input acceptance step” is a stage in which stakeholder inputs related to the achievement of project goals are accepted in association with index values indicating the attributes of the stakeholders.
  • the “stakeholder map generation step” is a stage in which a stakeholder map is generated using the stakeholders and the index values received in association with the stakeholders.
  • the "map output step” is the stage where the generated map is output.
  • the present embodiment provides a project management system configured to acquire a situation information map, which is information obtained by mapping the situation information, and output the acquired situation information map. ..
  • FIG. 76 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a problem information input reception unit (7601), a problem information holding unit (7602), a problem solution status information acquisition unit (7603), a problem solution status information output unit (7604), and a risk information input reception unit.
  • the "situation information map acquisition unit” has a function of acquiring a situation information map, which is information obtained by mapping the situation information.
  • the "situation information map output unit” has a function of outputting the acquired situation information map.
  • the achievement rate for 100% completion is displayed by using a pie chart or the like for each task and each task (by identification information) shown in the hierarchical structure. Then, when you click the pie chart, task, or task identification information with the cursor or mouse, the task information, task information, achievement status, and other information related to that information will be displayed in a pop-up. It's convenient. For example, it is convenient to display the member identifier related to the task and click the member identifier to open the mail composition screen for the member or to make a call to the member.
  • the communication may be configured so that the SNS is opened.
  • the SNS is a member of the task member, and may be configured to be shared by all members.
  • the delay cause report by the member is recorded so that it can be viewed, or the measures to eliminate the delay are recorded and viewed. It may be configured so that it can be viewed (report viewing means). Furthermore, it may be configured (support application means) so that other task members can apply for support by clicking.
  • FIG. 77 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)” (7701) and a “main memory” (7702) that perform various arithmetic processes.
  • the "network / I / F (interface)” (7704) that transmits / receives information to / from the "HDD” (7703) that holds predetermined information and the user terminal device (7706) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (7705) to transmit / receive and process information.
  • a data communication path such as a "system bus” (7705) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory” are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information , Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored. Further, in this embodiment, the situation information map is stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • the "CPU” executes a status information map acquisition program stored in the “main memory” to acquire a status information map, which is information obtained by mapping the status information. Then, the "CPU” executes the status information map output program stored in the "main memory” and outputs the acquired status information map.
  • FIG. 78 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists. In this embodiment, in addition to the processing of the first embodiment, there are a status information map acquisition step (S7801) and a status information map output step (S7802) in any order. The status information map acquisition step and the status information map output step are described below.
  • the “situation information map acquisition step” is a stage of acquiring a situation information map, which is information obtained by mapping the situation information.
  • the “situation information map output step” is a stage in which the acquired status information map is output.
  • the member team identification information for identifying the members or the team composed of the members for achieving the goal of the project is retained, and the member team identification information and the member teams are used.
  • FIG. 79 is a diagram showing a functional configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a task information input receiving unit (7901), a task information holding unit (7902), a problem solving status information acquisition unit (7903), a problem solving status information output unit (7904), and a risk information input reception unit.
  • the member team identification information holding unit Since each function except for the member team identification information holding unit, the member team project management information relationship holding unit, and the member team project management related output unit is the same as in the first embodiment, the member team identification information holding unit and the member team The explanation is limited to the functions of the project management information relationship holding section and the member team project management related output section.
  • the "member team identification information holding unit” has a function of holding member team identification information that identifies a member or a team composed of members in order to achieve the goal of the project.
  • the "member team project management information relationship holding unit” has a function of holding a member team project management information relationship that associates the member team identification information with the project management information in which the member team is involved.
  • the "member team project management-related output unit” has a function of outputting the held member team project management information-related information.
  • FIG. 80 is a diagram showing a hardware configuration of the project management system in this embodiment.
  • the project management system in this embodiment includes a "CPU (central processing unit)" (8001) and a “main memory” (8002) that perform various arithmetic processes.
  • the "network / I / F (interface)” (8004) that transmits / receives information to / from the "HDD” (8003) that holds predetermined information and the user terminal device (8006) that is associated with a plurality of user identification information. It has. Then, they are connected to each other by a data communication path such as a "system bus” (8005) to transmit / receive and process information.
  • a data communication path such as a "system bus” (8005) to transmit / receive and process information.
  • the "main memory” reads a program for performing various processes to be executed by the "CPU”, and at the same time, provides a work area which is also a work area of the program.
  • multiple addresses are assigned to each of the "main memory” and “HDD”, and the program executed by the "CPU” exchanges data with each other by specifying and accessing the addresses. It is possible to perform processing.
  • the programs stored in the "main memory" are the problem information input reception program, the problem information holding program, the problem solving status information acquisition program, the problem solving status information output program, the risk information input receiving program, and the risk information holding.
  • Program and risk manifestation risk high risk information acquisition program and risk manifestation risk high risk status output program and task information input reception program and task information retention program and task processing status information acquisition program and task processing status information output program and project Management information change request reception program and project management information change request retention program and project management information change request implementation information acquisition program and project management information change program and member team identification information retention program and member team project management information relationship retention program and member team project This is a management-related output program.
  • the problem information, the problem identification information, the problem solving status information, the risk information, the risk identification information, the risk manifestation risk high risk information, and the task information Task processing status information, project management information change request, project management information change request identification information, project management information change request execution information, etc. are stored. Further, in this embodiment, the member team identification information and the member team project management information relationship are stored.
  • the "CPU” must execute the issue information input reception program stored in the "main memory” to solve the project management information through the "network interface” in order to achieve the project goal. Accepts one or more inputs of task information, which is information indicating a task. Then, the task information holding program is executed to store one or more task information in association with the task identification information. Then, the problem-solving status information acquisition program stored in the "main memory” is executed to acquire the problem-solving status information, which is information indicating the status in which the held problem has been solved, in association with the problem identification information. Then, the problem-solving status information output program stored in the "main memory” is executed, and the problem-solving status information held through the "network interface” is associated and output.
  • the "CPU” executes the risk information input reception program stored in the "main memory”, and is the project management information through the "network interface", which is the project management information under predetermined conditions when achieving the project goal. Accepts one or more inputs of risk information, which is information indicating the risk assumed in. Then, the risk information retention program is executed to retain one or more input risk information in association with the risk identification information. Then, the risk manifestation risk high risk information acquisition program stored in the "main memory” is executed, and the risk manifestation risk is information indicating that the retained risk has manifested or the risk has increased. Obtain high-risk information in association with risk identification information. Then, the risk manifestation risk high risk status output program stored in the "main memory” is executed to associate the risk information held through the "network interface" with the risk manifestation risk high risk information. And output.
  • the "CPU” must execute the task information input reception program stored in the “main memory” and process the project management information through the "network interface” when achieving the project goals. Accepts one or more inputs of task information, which is information indicating a task that must not be done. Then, the task information holding program is executed to store one or more input task information in association with the task identification information. Then, the task processing status information acquisition program stored in the “main memory” is executed to acquire the task processing status information indicating the processing status of the held task in association with the task identification information. Then, the task processing status information output program stored in the "main memory” is executed, and the task information held through the "network interface" is associated with the task processing status information and output.
  • the "CPU” executes the project management information change request reception program stored in the "main memory”, and inputs the project management information change request, which is a project management information change request, through the "network interface”. Accept. Then, the project management information change request holding program is executed to hold the received project management information change request in association with the project management information change request identification information. Then, the project management information change request implementation information that is information indicating that the project management information change request implementation information acquisition program stored in the "main memory” is executed to execute the project management information change request that is held is executed. Is associated with the project management information change request identification information. Then, the project management information change program stored in the "main memory” is executed to change the project management information based on the acquired project management information change request execution information.
  • the "CPU” executes the member team identification information holding program stored in the "main memory” to identify the members or the team composed of the members to achieve the goal of the project. To hold.
  • the "CPU” executes the member team project management information relationship holding program stored in the "main memory”, and associates the member team identification information with the project management information in which the member team is involved. Hold the relationship.
  • the "CPU” executes the member team project management-related output program stored in the "main memory” and outputs the held member team project management information-related information.
  • FIG. 81 is a diagram showing a processing flow when the project management system in this embodiment is used. Although the part overlapping with the first embodiment is not shown, it is premised that the processing flow in the first embodiment exists.
  • this embodiment in addition to the processing of the first embodiment, there are a member team identification information holding step, a member team project management information relation holding step, and a member team project management relation output step in any order.
  • the member team identification information retention step, the member team project management information relationship retention step, and the member team project management relationship output step are described below.
  • the “member team identification information retention step” is a step of retaining member team identification information that identifies a member or a team composed of members in order to achieve the goal of the project.
  • the “member team project management information relationship holding step” is a stage of holding a member team project management information relationship that associates the member team identification information with the project management information in which the member team is involved.
  • the "member team project management relation output step” is a stage of outputting the held member team project management information relation.

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

【課題】プロジェクト管理システムを実現できるプロジェクト管理システムを提供しようとするものである。更には,課題・タスク・リスクの情報を入力させて一元的に管理・閲覧可能とすることにより,教育的な効果をも意図するものである。特に変更における記入項目では,テンプレートを用いた記入をさせれば,記入する者に対して「考えなければならないこと」「確認しなければならないこと」を検討させる契機になるため,いわば自由度を低くすることによる教育的な効果を図るものである。 【解決手段】「課題情報」,「リスク情報」,「タスク情報」(課題情報,リスク情報,タスク情報,のいずれも「プロジェクト管理情報」である。)いずれも一以上の入力を受け付け,それらを各識別情報と関連付けて保持した上で,課題解決状況情報を課題識別情報と関連付けて取得して課題情報と関連付けて出力する機能を有するプロジェクト管理システムを提供する。

Description

プロジェクト管理システム
本発明は,比較的大規模な単数又は複数のプロジェクトの達成を相対的に省人化して行う仕組みや,リソースを効率的に活用するための情報の入力及び管理の仕組みを提供し,併せてプロジェクトにかかわるメンバーのプロジェクト達成能力を高めることができるシステムに関するものである。
上記のようなシステムは,いわゆるプロジェクトの進捗状況を共有するためのシステムとしては,従来から存在していた。しかし,その内容は,いわば各担当者のメモをクラウド上で共有するという程度のものであったことから,各担当者の主観に基づいていること,及び各担当者の裁量に任せているという点においては担当者の成長に結びつかない(ヒントを得る機会がない)という点において,課題を抱えていた。
そこで,上記の課題の一部を解決することを図るものとして,特許文献1が挙げられる。
特開2013-061694
特許文献1は,プロジェクトの複数のリスクを管理するリスク管理ツールであって,リスクの影響度と発生確率およびリスク対策の重みをプロジェクトの進行と共に更新し,リスク対策の優先順位を作成することを特徴とするリスク管理システムである。
しかし,特許文献1では,確かにリスクについては潜在化可能性と影響度などを考慮して算出することを意図した機能が開示されてはいるものの,その具体的な内容が開示されていないこと,及びプロジェクト全体で見た場合にはリスクのみの管理ではなくて進捗状況を踏まえての対策等が重要であることから,リスクのみの管理という点では,プロジェクト成功への貢献の度合いとしては,必ずしも大きいものではなかった。プロジェクト成功に導くためには,リスクの管理も重要ではあるが,リスクや課題の正確な把握,正確な把握に基づいた進捗管理,並びに進捗の遅延やリスクの顕在化が発生した場合のプロジェクトのタスクなどのダイナミックな修正及び修正に応じて予想される影響の把握を正確に行うことも重要である。
本発明は,そのような問題を踏まえて,課題・タスク・リスクの情報を一元的に管理するためのプロジェクト管理システムを提供するものである。
具体的には,本発明は,プロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける課題情報入力受付部と,一以上の課題情報を課題識別情報と関連付けて保持する課題情報保持部と,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する課題解決状況情報取得部と,保持されている課題情報と課題解決状況情報とを関連付けて出力する課題解決状況情報出力部と,プロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付けるリスク情報入力受付部と,入力された一以上のリスク情報をリスク識別情報と関連付けて保持するリスク情報保持部と,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得するリスク顕在化リスクハイリスク化情報取得部と,保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力するリスク顕在化リスクハイリスク化状況出力部と,プロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付けるタスク情報入力受付部と,入力された一以上のタスク情報をタスク識別情報と関連付けて保持するタスク情報保持部と,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得するタスク処理状況情報取得部と,保持されているタスク情報とタスク処理状況情報とを関連付けて出力するタスク処理状況情報出力部と,プロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付けるプロジェクト管理情報変更要請受付部と,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持するプロジェクト管理情報変更要請保持部と,保持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得するプロジェクト管理情報変更要請実施情報取得部と,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更するプロジェクト管理情報変更部とを有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,プロジェクト管理情報を特定できる前提となる情報である前提情報をプロジェクト管理情報と関連付けて取得するプロジェクト管理情報前提情報取得部と,取得した前提情報をプロジェクト管理情報と関連付けて保持するプロジェクト管理情報前提情報保持部とをさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,保持されたリスクが顕在化した旨を示す情報であるリスク顕在化リスクハイリスク化情報がリスク識別情報と関連付けて取得された場合に,顕在化したリスクに基づいて解決しなければならないこととなった課題情報を生成し,課題識別情報と関連付けて課題情報保持部に記録する生成課題記録部をさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,新たに生成され保持された課題情報に関連付けるタスク情報をその課題情報と関連付けて入力する新規課題対応タスク情報入力部をさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,プロジェクトを識別するプロジェクト識別情報と関連付けて成功体験を示す情報である成功体験情報又は/及び失敗体験を示す情報である失敗体験情報である体験情報の入力を受け付ける体験情報入力受付部と,入力を受け付けた体験情報をプロジェクト識別情報と関連付けて蓄積する体験情報蓄積部と,蓄積されている体験情報の閲覧要求を受け付ける体験情報閲覧要求受付部と,受けつけた閲覧要求に応じて体験情報を閲覧させる体験情報閲覧部をさらに有するプロジェクト管理システムを提供する。また,その体験情報は,テキスト情報,動画情報,添付書類情報,静止画情報,音声情報のいずれか一以上を含むプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,体験情報入力受付部は,プロジェクト管理情報と関連付けて入力を受け付けるプロジェクト管理情報別体験情報入力受付手段を提供する。
また,本発明は,前記特徴に加えて,プロジェクト管理情報変更要請受付部は,変更要請内容を特定するためのテンプレートに情報を埋め込むことによって受付完了とする受付完了手段をさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,プロジェクト管理情報変更要請実施情報取得部は,変更要請を実施するために必要な情報を特定するためのテンプレートに情報を埋め込むことによってプロジェクト管理情報変更を実施する旨の情報であるプロジェクト管理情報変更要請実施情報を生成する実施情報生成手段をさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,リスク情報入力受付部は,リスクを客観化するために明確化すべき情報の入力を促すリスクナビゲーションテンプレートに従ってリスク情報の入力を受け付けるリスクテンプレート入力受付手段をさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,リスク情報入力受付部は,リスクを定量化するための情報の入力を促すリスク定量化ナビゲーションテンプレートに従ってリスク情報の入力を受け付けるリスク定量化テンプレート入力受付手段をさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,リスク顕在化リスクハイリスク化状況出力部は,保持されているリスク情報をマッピングするリスク情報マッピング手段をさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,課題情報,リスク情報,タスク情報,前提情報の相互に関連付けを示す情報である相互関連情報を取得する相互関連情報取得部と,取得した相互関連情報を保持する相互関連情報保持部とをさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,課題情報とタスク情報が関連付けられている場合には,保持された課題が解決された旨を示す情報である課題解決状況情報を,関連付けられているタスク情報のタスク処理状況情報に基づいて生成し,課題解決状況情報取得部に渡す課題解決状況情報生成部をさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,プロジェクト管理情報に関連付けられている前提情報の変更の入力を受け付ける前提変更入力受付部と,前提情報と関連付けられているプロジェクト管理情報の修正を促す修正促進部をさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,プロジェクト目標達成に関連するステークホルダーの入力をそのステークホルダーの属性を示す指標値を関連付けて受け付けるステークホルダー入力受付部と,ステークホルダーとそれに関連付けて受け付けられた指標値とを用いてステークホルダーのマップを生成するステークホルダーマップ生成部と,生成されたマップを出力するマップ出力部をさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,状況情報をマップ化した情報である状況情報マップを取得する状況情報マップ取得部と,取得した状況情報マップを出力する状況情報マップ出力部をさらに有するプロジェクト管理システムを提供する。
また,本発明は,前記特徴に加えて,プロジェクトの目標を達成するためのメンバー又はメンバーから構成されるチームを識別するメンバーチーム識別情報を保持するメンバーチーム識別情報保持部と,メンバーチーム識別情報とそのメンバーチームが携わるプロジェクト管理情報を関連付けたメンバーチームプロジェクト管理情報関係を保持するメンバーチームプロジェクト管理情報関係保持部と,保持されているメンバーチームプロジェクト管理情報関係を出力するメンバーチームプロジェクト管理関係出力部をさらに有するプロジェクト管理システムを提供する。
また,それらのプロジェクト管理システムの動作方法,及び計算機であるプロジェクト管理システムに読取実行可能に記述したプロジェクト管理プログラムをも提供する。
以上により,プロジェクト管理システムを実現できるプロジェクト管理システムを提供しようとするものである。更には,課題・タスク・リスクの情報を入力させて一元的に管理・閲覧可能とすることにより,教育的な効果をも意図するものである。特に変更における記入項目では,テンプレートを用いた記入をさせれば,記入する者に対して「考えなければならないこと」「確認しなければならないこと」を検討させる契機になるため,いわば自由度を低くすることによる教育的な効果を図るものである。
本発明における「プロジェクト」「課題」「タスク」「リスク」「前提」などの階層状況を示す図 本発明において各種情報を入力するに当たってのポータル画面の一例の概念図 「プロジェクト管理情報」についての入力画面の一例の概念図 個票を用いた新規プロジェクト入力画面の一例の概念図 プロジェクト内容修正画面の一例の概念図 メンバー入力画面の一例の概念図 課題情報を入力・修正するに当たってのポータル画面の一例の概念図 新規での課題入力画面の一例の概念図 課題別進捗レポート入力画面の一例の概念図 タスク情報を入力・修正するに当たってのポータル画面の一例の概念図 新規でのタスク入力画面の一例の概念図 タスク属性を選択する際の画面の一例の概念図 タスク別進捗レポート入力画面の一例の概念図 リスク情報を入力・修正するに当たってのポータル画面の一例の概念図 新規でのリスク入力画面の一例の概念図 リスク別状況レポート入力画面の一例の概念図 プロジェクト管理情報変更要請受付部にて受け付ける変更(修正)内容定義入力画面の一例の概念図 顧客依頼内容合致性チェックの一例を示す図 前提情報を入力・修正するに当たってのポータル画面の一例の概念図 新規での前提情報入力画面の一例の概念図 要素属性一覧の一例を示す図 生成課題記録部においてなされる処理内容に関するフローチャート 体験情報を入力・修正するに当たってのポータル画面の一例の概念図 新規体験情報入力画面の一例の概念図 体験情報の入力について,音声ファイル,動画映像ファイル,テキストファイル,写真ファイル,WEBのURL,ストレージIDなどで受け付ける場合の一例を示す図 マッピングされたリスク情報(リスクマップ)の一例を示す図 ステークホルダーマップの一例を示す図 実施例1におけるプロジェクト管理システムの機能的構成を示す図 実施例1におけるプロジェクト管理システムのハードウェア構成を示す図 実施例1におけるプロジェクト管理システムを利用した場合の処理の流れを示す図(課題情報関係) 実施例1におけるプロジェクト管理システムを利用した場合の処理の流れを示す図(リスク情報関係) 実施例1におけるプロジェクト管理システムを利用した場合の処理の流れを示す図(タスク情報関係) 実施例1におけるプロジェクト管理システムを利用した場合の処理の流れを示す図(プロジェクト内容変更関係) 各情報の出力に関する処理の流れ 実施例2におけるプロジェクト管理システムの機能的構成 実施例2におけるプロジェクト管理システムのハードウェア構成を示す図 実施例2におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例3におけるプロジェクト管理システムの機能的構成を示す図 実施例3におけるプロジェクト管理システムのハードウェア構成を示す図 実施例3におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例4におけるプロジェクト管理システムの機能的構成を示す図 実施例4におけるプロジェクト管理システムのハードウェア構成を示す図 実施例5におけるプロジェクト管理システムの機能的構成を示す図 実施例5におけるプロジェクト管理システムのハードウェア構成を示す図 実施例5におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例6におけるプロジェクト管理システムの機能的構成を示す図 実施例6におけるプロジェクト管理システムのハードウェア構成を示す図 実施例6におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例7におけるプロジェクト管理システムの機能的構成を示す図 実施例7におけるプロジェクト管理システムのハードウェア構成を示す図 実施例7におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例8におけるプロジェクト管理システムの機能的構成を示す図 実施例8におけるプロジェクト管理システムのハードウェア構成を示す図 実施例8におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例9におけるプロジェクト管理システムの機能的構成を示す図 実施例9におけるプロジェクト管理システムのハードウェア構成を示す図 実施例9におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例10におけるプロジェクト管理システムの機能的構成を示す図 実施例10におけるプロジェクト管理システムのハードウェア構成を示す図 実施10例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例11におけるプロジェクト管理システムの機能的構成を示す図 実施例11におけるプロジェクト管理システムのハードウェア構成を示す図 実施例11におけるプロジェクト管理システムを利用した場合の処理の流れ(出力に関する点に限る。)を示す図 実施例12におけるプロジェクト管理システムの機能的構成を示す図 実施例12におけるプロジェクト管理システムのハードウェア構成を示す図 実施例12におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例13におけるプロジェクト管理システムの機能的構成を示す図 実施例13におけるプロジェクト管理システムのハードウェア構成を示す図 実施例13におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例14におけるプロジェクト管理システムの機能的構成を示す図 実施例14におけるプロジェクト管理システムのハードウェア構成を示す図 実施例14におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例15におけるプロジェクト管理システムの機能的構成を示す図 実施例15におけるプロジェクト管理システムのハードウェア構成を示す図 実施例15におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例16におけるプロジェクト管理システムの機能的構成を示す図 実施例16におけるプロジェクト管理システムのハードウェア構成を示す図 実施例16におけるプロジェクト管理システムを利用した場合の処理の流れを示す図 実施例17におけるプロジェクト管理システムの機能的構成を示す図 実施例17におけるプロジェクト管理システムのハードウェア構成を示す図 実施例17におけるプロジェクト管理システムを利用した場合の処理の流れを示す図
以下,本件発明の実施の形態について,添付図面を用いて説明する。なお,実施例と請求項の相互の関係は以下の通りである。主として,実施例1の説明は請求項1,請求項19,及び請求項20に関し,実施例2の説明は請求項2に関し,実施例3の説明は請求項3に関し,実施例4の説明は請求項4に関し,実施例5の説明は請求項5及び請求項6に関し,実施例6の説明は請求項7に関し,実施例7の説明は請求項8に関し,実施例8の説明は請求項9に関し.実施例9の説明は請求項10に関し,実施例10の説明は請求項11に関し,実施例11の説明は請求項12に関し,実施例12の説明は請求項13に関し,実施例13の説明は請求項14に関し,実施例14の説明は請求項15に関し,実施例15の説明は請求項16に関し,実施例16の説明は請求項17に関し,実施例17の説明は請求項18に関するものである。本件発明は,これら実施例に何ら限定されるべきものではなく,その要旨を逸脱しない範囲において,種々なる態様で実施し得る。
 <本発明を構成しうるハードウエアについて>
本件発明は,原則的に電子計算機を利用する発明であるが,ソフトウエアによって実現され,ハードウエアによっても実現され,ソフトウエアとハードウエアの協働によっても実現される。本件発明の各構成要件の全部又は一部を実現するハードウエアでは,コンピュータの基本的構成であるCPU,メモリ,バス,入出力装置,各種周辺機器,ユーザーインターフェイスなどによって構成される。各種周辺機器には,記憶装置,インターネット等インターフェイス,インターネット等機器,ディスプレイ,キーボード,マウス,スピーカー,カメラ,ビデオ,テレビ,実験室又は工場などでの生産状態を把握するための各種センサ(流量センサ,温度センサ,重量センサ,液量センサ,赤外線センサ,出荷個数計数機,梱包個数計数機,異物検査装置,不良品計数機,放射線検査装置,表面状態検査装置,回路検査装置,人感センサー,作業者作業状況把握装置(映像,ID,PC作業量などで)等),CD装置,DVD装置,ブルーレイ装置,USBメモリ,USBメモリインターフェイス,着脱可能タイプのハードディスク,一般的なハードディスク,プロジェクタ装置,SSD,電話,ファックス,コピー機,印刷装置,ムービー編集装置,各種センサー装置などが含まれる。 また,本システムは,必ずしも一つの筐体によって構成されている必要はなく,複数の筐体を通信で結合して構成されるものであってもよい。また,通信は,LANであってもWANWifi,ブルートゥース(登録商標),赤外線通信,超音波通信であってもよく,さらに,一部が国境を跨いで設置されていてもよい。さらに,複数の筐体のそれぞれが異なる主体によって運営されていてもよく,一の主体によって運営されていてもよい。本件発明のシステムの運用主体は,単数であるか複数であるかは問わない。また,本システムの他に第三者の利用する端末,さらに他の第三者の利用する端末を含むシステムとしても発明を構成することができる。また,これらの端末は国境を越えて設置されていてもよい。さらに,本システムや前記端末の他に第三者の関連情報や,関連人物の登録のために利用される装置,登録の内容を記録するためのデータベースに利用される装置などが用意されてもよい。これらは,本システムに備えてもよいし,本システム外に備えてこれらの情報を利用可能に本システムを構成してもよい。
 <本発明の自然法則の利用性の充足>
本発明は,コンピュータと通信設備とソフトウエアとの協働で機能するものである。従来,プロジェクト参加者が面談で行っていた処理を単にICTを用いて処理可能にしただけでなく,プロジェクトにまつわる多くの複雑な情報交換や手続きや認証,決済の効果をICTによって確定させたり,本来熟練しないと作成できないような必要事項がすべて満たされた有効な情報の蓄積,保持,交換をICTを介して支援したりするなど,ICTならではの処理が含まれているのでいわゆるビジネスモデル特許として成立するものである。また,各種識別情報やリスク情報,課題情報,タスク情報が各部で保持されたり,処理されたりしており,この観点からも本願発明はコンピュータなどのリソースを請求項や明細書に記載された事項と,それらの事項に関係する技術常識に基づいて判断すれば,本願発明は自然法則を利用したものであることとなる。
 <特許法で求められる自然法則の利用の意義>
 特許法で求められる自然法則の利用とは,法目的に基づいて,発明が産業上利用性を有し,産業の発達に寄与するものでなければならないとの観点から,産業上有用に利用することができる発明であることを担保するために求められるものである。つまり,産業上有用であること,すなわち出願に際して宣言した発明の効果がその発明の実施によってある一定の確実性の下再現できることを求めるものである。この観点から自然法則利用性とは,発明の効果を発揮するための発明の構成である発明特定事項(発明構成要件)のそれぞれが発揮する機能が自然法則を利用して発揮されるものであればよい,と解釈される。さらに言えば,発明の効果とはその発明を利用する利用者に所定の有用性を提供できる可能性があればよいのであって,その有用性を利用者がどのように感じたり,考えたりするかという観点で見るべきではない。したがって,利用者が本システムによって得る効果が心理的な効果であったとしても,その効果自体は求められる自然法則の利用性の対象外の事象である。

 本実施例は,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である「課題情報」,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報である「リスク情報」,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報である「タスク情報」(課題情報,リスク情報,タスク情報,のいずれも「プロジェクト管理情報」である。)いずれも一以上の入力を受け付け,それらを各識別情報と関連付けて保持した上で,課題解決状況情報を課題識別情報と関連付けて取得して課題情報と関連付けて出力し,リスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得してリスク情報と関連付けて出力し,タスク処理状況情報をタスク識別情報と関連付けて取得してタスク情報と関連付けて出力し,その上で,必要なプロジェクト管理情報変更要請の入力を受け付け,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持し,そのプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得し,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する機能を有するプロジェクト管理システムを提供する。
図1は,本発明における「プロジェクト」「課題」「タスク」「リスク」「前提」などの階層状況を示す図である。図面にあるように,プロジェクトの概念があり,その下位概念として「課題」があり,更にその下位概念として「タスク」がある。そして,「リスク」と「前提」は,終局的には「プロジェクト」との関係で紐づけられているものであるが,これが各「課題」や各「タスク」との関係で紐づけられていても良い。また,「課題」も「タスク」も,いずれも課題同士やタスク同士が階層構造になっていても良い。具体的には,図面にあるように,プロジェクトの下位概念として課題A・課題B・課題C・課題Dがあり,その課題Dの下位概念として課題D1・課題D2・課題D3があっても良いという次第である。これは,「課題」に限らず,「前提」や「リスク」や「タスク」においても同様である。さらに,「プロジェクト」よりも上位概念として,複数のプロジェクトを総称した上位概念があっても良い。
図2は,本発明において各種情報を入力するに当たってのポータル画面の一例の概念図である。例えば,「プロジェクト」「課題」「タスク」「リスク」「前提」「グループ」「メンバー」「体験」などの選択部分があり,それを選択することにより,次の画面に遷移するという具合である。なお,あくまで概念図であるので,このようなデザインに限定されない(以下,各図面につき同様である。)。本発明の特徴は,このように情報の識別単位で個票によって情報の入力を受け付ける点にある。情報の識別単位で個票を用いた入力を強制させることにより,入力者に対して個票で定められる要求情報に確実に入力を求めるインターフェイスなので,必要な情報の入力漏れが防げて情報が識別単位で正確になるという作用をもたらす。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図28は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(2801)と課題情報保持部(2802)と課題解決状況情報取得部(2803)と課題解決状況情報出力部(2804)とリスク情報入力受付部(2805)とリスク情報保持部(2806)とリスク顕在化リスクハイリスク化情報取得部(2807)とリスク顕在化リスクハイリスク化状況出力部(2808)とタスク情報入力受付部(2809)とタスク情報保持部(2810)とタスク処理状況情報取得部(2811)とタスク処理状況情報出力部(2812)とプロジェクト管理情報変更要請受付部(2813)とプロジェクト管理情報変更要請保持部(2814)とプロジェクト管理情報変更要請実施情報取得部(2815)とプロジェクト管理情報変更部(2816)とを有する。以下,まず本発明の全体に通じる基本的な事項について説明した上で,具体的に各機能の内容につき説明する。
図3は,その「プロジェクト管理情報」についての入力画面の一例の概念図である。「新規プロジェクト入力」「プロジェクト内容修正」「プロジェクト開示範囲修正」「プロジェクト統括者修正」「プロジェクト分割」「プロジェクト統合」などの項目がある。これらを選択することにより,それに対応する画面に遷移するという具合である。「新規プロジェクト入力」「プロジェクト内容修正」については後述する。「プロジェクト開示範囲修正」は,閲覧権限がある者の範囲を修正するものである。「プロジェクト統括者修正」は,当該プロジェクトの責任者を修正するものである。「プロジェクト分割」は1つのプロジェクトを2つ以上に分けるためのものであり,「プロジェクト統合」は複数のプロジェクトを1つにまとめるものである。
図4は,個票を用いた新規プロジェクト入力画面の一例の概念図である。例えば,入力者,タイトル,ID,期限,達成内容,グループ名,予算,納入先,その他などの項目があり,それらに入力することでプロジェクトを登録することが考えられる。そして,入力後には,「完了」を選択すれば登録,「戻る」を選択すれば登録せずに前画面に戻る,「次」を選択すればプロジェクト入力の二枚目の入力に移ったり,課題入力などの画面に遷移するなどの構成にすることが考えられる。なお,「個票」という言葉は,情報を識別する単位ごとに準備されている情報入力フォーマットであり,画面上1枚に限定して解釈される言葉ではない。また,入力者,タイトル,ID,期限,達成内容,グループ名,予算,納入先,その他の項目への入力は各空欄が自由フォーマット入力の形式で図示しているが,自由フォーマットでなく,プルダウンメニューなどによって選択できる形式でもよいし,自由フォーマットのようで,実際には登録されている文字列しか受け付けないような入力形式でもよい。なお,入力された情報は,別途設けられている計時部からの時刻情報に基づいて入力時刻と関連付けて保持され,さらに入力された情報に対して改ざん防止のための措置が取られることが好ましい。改ざん防止ための措置とは,入力情報を書き換え不能に保持したり,入力情報のハッシュ値を取得してプロジェクトIDと関連付けて安全な領域に保持する等の処理である。また,プロジェクト入力の際には,入力端末に備えられているカメラなどからその入力者の顔画像を取得し,その権限を顔認識データと紐づけられた権限データベースにてチェックするように構成してもよい。その際には,入力者としてテキスト入力された値と権原データベースに紐づけられている入力者とが合致するかを判定するように構成してもよい。あるいは,権限データベースでのチェック内容に基づいて入力者は自動入力となるように構成してもよい。
図5は,プロジェクト内容修正画面の一例の概念図である。例えば,入力者,プロジェクト名,課題名,タスク名,リスク名,前提名,その他などの項目があり,それらに入力することでプロジェクト内容を修正することが考えられる。ここでは既にプロジェクト内容などが登録されていることが想定されているので,基本的に各項目はプルダウンにて選択するという方式にすることが考えられる。そして,入力後には,「完了」を選択すれば登録,「戻る」を選択すれば登録せずに前画面に戻る,「次」を選択すれば例えば課題入力などの画面に遷移するなどの構成にすることが考えられる。なお,プロジェクト内容修正はプロジェクトの達成に関して重要事項であるのでプロジェクト入力の際と同様の権原チェックがあることが望ましい。
図6は,メンバー入力画面の一例の概念図である。例えば,入力者の氏名,ID,権限,所属,資格,勤務地などの項目があり,それらに入力することでメンバー情報を登録することが考えられる。ここでは,予め入力される内容候補が予測できることから,基本的に各項目はプルダウンにて選択するという方式にすることが考えられる。また,経歴入力,経験プロジェクト入力,経験課題入力,経験タスク入力などの選択をした場合には,それらの詳細入力画面に遷移するという構成が考えられる。遷移後の画面については,自由記入であっても良いし,プルダウン方式であっても良い。そして,入力後には,「完了」を選択すれば登録,「戻る」を選択すれば登録せずに前画面に戻る,「次」を選択すれば例えば課題入力などの画面に遷移するなどの構成にすることが考えられる。なお,ここで入力される経歴や経験プロジェクト,経験課題,経験タスクは,データベース化されて当プロジェクト関係者外から検索して閲覧可能に構成することが好ましい。その際には氏名は伏せて検索するように構成することもできるし,氏名を表示して検索できるように構成してもよい。氏名を表示していなくても,検索者の要望に応じて,経歴等の入力者が自身をその検索者限りで開示するように構成することも可能である。そうすることによって新プロジェクトの立ち上げの際にそのプロジェクトに適したメンバーを集めることができたり,検索者が次に手掛けるプロジェクトの達成のための情報を教示してもらえる,という利用の幅が広がる。
「課題情報入力受付部」とは,プロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける機能を有する。ここにおける「課題情報」と後述する「タスク情報」「リスク情報」「前提情報」とは,いずれも「プロジェクト管理情報」に含まれるものである。なお,入力の受付については,本発明を通して,エクセルやワードデータなどから自動移行できるようにしても良い。本発明は,その自動移行のための互換性をもたせるための機能を備えていても良い。以下同様である。
図7は,課題情報を入力・修正するに当たってのポータル画面の一例の概念図である。例えば,「新規課題設定」「課題別進捗レポート」「課題内容修正」「担当修正」「納期修正」「課題属性修正」などの選択部分があり,それを選択することにより,次の画面に遷移するという具合である。
 「課題」とは,プロジェクトの目的を達成するために解決しなければならないと考えられる要素であり,逆に言えば,予定されている課題をすべて解決することによって自動的にプロジェクトの目的が達成されることになるものである。課題はこのようにプロジェクトを上位概念的に把握できる者が設定すべきものであり,課題の設定は所定の資格が入力IDで認証される者に認めるように本システムを設計すべきである。また,課題をシステム内で予め所定のカテゴリーに関連付けておき,プロジェクトの属性を課題の入力前に設定しておくことで必要な課題のカテゴリへの入力を促すように設計することも考えられる。
例えばプロジェクトの属性が雑誌の販売促進であれば,課題のカテゴリとしては,販促活動への予算の調達,販促活動で採用する販促形式の選定,選定された販促形式に適用最適化な媒体や,活動の選定,販促活動に際して雑誌制作サイドに対して提案する雑誌構成の企画案の立案,その企画案に対する雑誌制作サイドからの了解の取り付けなど,各種のものがある。あるいは,プロジェクトが新型車の開発であれば,それに即した課題のカテゴリを準備しておき入力者が気づかなくてもフェイルセイフで上方の入力をさせるように設計することが好ましい。なお,入力は予め定められたフォーマットの個票を利用して入力させるように構成することが好ましい。
図8は,新規での課題入力画面の一例の概念図である。例えば,入力者,プロジェクト,課題詳細として解決内容,解決期限,構成タスク(複数あっても良い),解決グループ,リスク,前提などの項目があり,それらに入力することでプロジェクトを登録することが考えられる。ここでは既にプロジェクト内容などが登録されていることが想定されているので,基本的に各項目はプルダウンにて選択するという方式にすることが考えられる。期限については,カレンダーから選択できるようにしても良い。「詳細」というボタンは,それを選択することにより,詳細を入力する画面に遷移するということが想定されている。また「階層」というボタンは,タスク同士に階層がある場合に,各タスクの階層を選択できるという具合である。そして,入力後には,「完了」を選択すれば登録,「戻る」を選択すれば登録せずに前画面に戻る,「次」を選択すれば例えばタスク入力などの画面に遷移するなどの構成にすることが考えられる。
「課題情報保持部」とは,一以上の課題情報を課題識別情報と関連付けて保持する機能を有する。課題識別情報は,上位のプロジェクト識別情報の下位識別情報として認識できるように構成することが好ましい。コンピュータの情報管理が容易となるからである。また課題情報を保持する期限であるがプロジェクトの終了後も履歴情報として残しておくことが好ましい。履歴情報から将来学習することが可能だからである。さらに,この履歴情報と最終的なプロジェクト結果とをAIに学習させて最適な課題の設定方法を提案させるように構成することも可能である。この課題識別情報は,入力されたタスクに関するすべての情報と関連付けられる。
「課題解決状況情報取得部」とは,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する機能を有する。
図9は,課題別進捗レポート入力画面の一例の概念図である。例えば,入力者,プロジェクト名,課題名,クリアタスク(複数あっても良い)などを入力することが考えられる。ここでは既にプロジェクト内容などが登録されていることが想定されているので,基本的に各項目はプルダウンにて選択するという方式にすることが考えられる。「オート」というボタンは,それを選択するとタスクにおける登録情報を参照して,そこにおいてクリアされているタスクが自動的に入力されるという具合である。また,「進捗度自動計算」「進捗度手動入力」「進捗度修正」「進捗度開示範囲」などのボタンが存在していることも考えられる。その場合,例えば「進捗度自動計算」を選択した場合には,入力されているクリアタスクと登録されているタスクの状況などを参照して,課題自体の進捗度を自動的に計算する。その際には,単純に全体タスク量とクリアタスク量の数による計算に限らず,例えば各タスクのクリアに要する時間や人員などの重み付けをも加味して,より精度の高い進捗度の自動計算をできるようにしても良い。次に,「進捗度手動入力」や「進捗度修正」については,入力者が入力することにより登録するというものである。その場合には,入力者の主観に依存してしまうことから,権限者であることの確認要求があっても良い。次に,「進捗度開示範囲」は,進捗度に関する閲覧権限がある者の範囲に関する登録である。
「課題解決状況情報出力部」とは,保持されている課題情報と課題解決状況情報とを関連付けて出力する機能を有する。プロジェクトの進行状況を知るためにプロジェクトの参加者や,プロジェクトの発注者,プロジェクトの管理者が閲覧することができるように構成することが好ましい。ただし,プロジェクトによっては,各課題そのものの情報が高度な機密情報である場合があり,全てのプロジェクト参加者がすべての課題の解決状況を閲覧可能としないで,ある権限者はその権限者に限定された範囲の課題解決状況を閲覧することができるように設計する場合もある。さらに,課題解決状況情報は,いくつかの情報階層に分けて閲覧可能にしてもよい。例えば課題名称に代えて課題IDのみを公開したり,課題の内容を公開する場合と,課題の内容を公開しない場合,課題の進捗度合を正確に緻密に公開する場合と,3段階や5段階など大まかに公開する場合など,各種の公開方式を取り入れて,閲覧者の情報アクセス権限に応じて公開の仕方を最適化するようにシステムを設計することが考えられる。さらにはリアルタイムで閲覧できる場合と,所定のタイムラグをもって閲覧することができる場合を閲覧者の情報アクセス権原に応じて最適化するように構成することも考えられる。また,閲覧しようとする者が閲覧請求時にその閲覧に関して公開権限を有するプロジェクトリーダーなどに問合せ,承認を得られた場合にその承認によって与えられたアクセス権限に基づいて所定の範囲の情報を閲覧できるように設計することもできる。なお,出力については,本発明を通して,エクセルやワードデータなどへと自動移行できるようにしても良い。本発明は,その自動移行のための互換性をもたせるための機能を備えていても良い。以下同様である。
「リスク情報入力受付部」とは,プロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける機能を有する。
 「リスク情報」とは,顕在化しない限りプロジェクトの進行に影響を与えないが,顕在化することでプロジェクトに何らかの影響を及ぼす事象である。例えば大型施設の建設であれば,資材費の高騰,天災の発生,作業者確保の失敗,発注主の経営危機,法的問題(環境問題,公害,住民運動,スキャンダル)の発生,建設中の重大事故の発生,建設機材(例えばトンネルシールドマシーン,ダンプカー,トレーラー,掘削機等)の不足,政治的理由(ダム建設の中止,高速道路建設の中止等)による建設の中断・中止,人件費の高騰,為替に影響を受けるプロジェクトである場合の為替の大きな変動,などが考えられる。
図14は,リスク情報を入力・修正するに当たってのポータル画面の一例の概念図である。例えば,「新規リスク入力」「リスク別状況レポート入力」「リスクの内容修正」「リスク原因修正」「リスク発生予測時期修正」「リスク顕在化時影響度修正」「リスク属性修正」などの選択部分があり,それを選択することにより,次の画面に遷移するという具合である。
図15は,新規でのリスク入力画面の一例の概念図である。例えば,入力者,プロジェクト名,影響課題,影響タスク,顕在化可能性時期,関係ステークホルダー,予兆事象,影響規模,顕在化した場合の必要リソースとしての予算・人員・期間・プロジェクト遅延予測などの項目があり,それらに入力することでリスク情報を登録することが考えられる。ここでは,既にプロジェクト内容などが登録されていることが想定されているので,基本的に各項目はプルダウンにて選択するという方式にすることが考えられる。時期については,カレンダーから選択できるようにしても良い。そして,入力後には,「完了」を選択すれば登録,「戻る」を選択すれば登録せずに前画面に戻る,「次」を選択すれば例えばタスク入力などの画面に遷移するなどの構成にすることが考えられる。
 リスク情報入力受付部では,後述するリスク顕在化リスクハイリスク化情報取得部での取得情報の属性やリスク判断レベルの指標としての情報も併せて入力受付できるように構成することが好ましい。先ほどの大型施設の例に合わせて説明すると,「資材費の高騰」などの必要予算関係では当初設定額に対して10%以上高騰した場合をハイリスク状態,20%高騰した場合をリスク顕在化状態と定義したり,「天災の発生」の場合など,非想定作業が間に入り込む場合には通常作業復帰に要する期間が全プロジェクト期間の5%を超える場合がハイリスク状態,10%を超える場合をリスク顕在化状態としたり,「作業者確保の失敗」の場合など必要人員の確保ができない場合には,その人員の予定数に対して不足分が5%を超える場合がハイリスク状態,10%を超える場合がリスク顕在化状態としたり,「発注主の経営危機」の場合などプロジェクトの発注側の経営危機に関しては,債務不履行1回がハイリスク状態,債務不履行2回がリスク顕在化状態としたり,「法的問題(環境問題,公害,住民運動,スキャンダル)の発生」の場合には,インターネットの否定的書き込みの量や割合に応じてハイリスク状態,リスク顕在化状態としたり,「建設中の重大事故の発生」などプロジェクト中の事故に関しては,重傷を上回る場合にハイリスク状態,重体を上回る場合にリスク顕在化状態としたり,「建設機材(例えばトンネルシールドマシーン,ダンプカー,トレーラー,掘削機等)の不足」に関しては充足見込時までの遅延が全プロジェクト期間の5%を超える場合にハイリスク状態,10%を超える場合にリスク顕在化状態としたり,「政治的理由(ダム建設の中止,高速道路建設の中止等)による建設の中断・中止」の場合にはマスコミで取り上げられた状態でハイリスク状態,実際の意思表示があった段階でリスク顕在化状態としたり,「為替に影響を受けるプロジェクトである場合の為替の大きな変動」に関しては,為替変動による損失がプロジェクト予算の5%を超える場合にハイリスク状態,10%を超える場合にリスク顕在化状態などとすることが考えられる。このようにリスク情報入力受付部では,リスク項目についてどのような事象がどの程度の量発生した場合に,ハイリスク状態となるか,またはリスク顕在化状態となるかの定義情報を合わせて入力することが好ましい。これらの定義情報は,リスク顕在化リスクハイリスク化情報取得部で所定形式での表示を自動生成するのに利用される。例えば,リスク情報が「資材費の高騰」などの必要予算関係では,入力画面として「当初設定額に対して高騰したパーセンテージを入力してください。」というような指示や,プルダウンメニューや,バーインジケーターのバーを動かすことによってパーセンテージを入力させるような画面を生成して提示する。一般的にはリスク定義で行われたハイリスク化,リスク顕在化は量やパーセンテージで示されることが多いのでそのような入力の場合には汎用インターフェイスとして上記の物をリスク顕在化リスクハイリスク化情報取得部で自動生成するようにリスク顕在化リスクハイリスク化情報取得部にこのリスクの定義情報を渡すように構成する。また,入力されたリスクに関する情報でリスク顕在化リスクハイリスク化情報取得部のインターフェイス生成に必要な情報は全てリスク顕在化リスクハイリスク化情報取得部に引き渡すように構成することが好ましい。なお,リスクの定義で予兆情報を定義できる場合には予兆情報の入力を受け付けこの情報もリスク顕在化リスクハイリスク化情報取得部に渡すように構成する。予兆情報とは,例えばリスク情報が天災の発生である場合には,例えば「台風情報」は予兆情報として利用できる。予兆情報として,この大型施設の建設現場を大型の台風が通過する予測を予兆情報として利用することができる。
「リスク情報保持部」とは,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する機能を有する。このリスク識別情報は,入力されたタスクに関するすべての情報と関連付けられる。
「リスク顕在化リスクハイリスク化情報取得部」とは,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する機能を有する。
図16は,リスク別状況レポート入力画面の一例の概念図である。例えば,入力者,プロジェクト名,リスク名,予兆事象(複数あっても良い)などを入力することが考えられる。ここでは既にプロジェクト内容,課題情報,リスク情報などが登録されていることが想定されているので,基本的に各項目はプルダウンにて選択するという方式にすることが考えられる。また,予兆事象については,事象を選択(プルダウンとしても良い。)した上で,その事象が発生する程度を選択するという具合である。予兆事象が発生する程度については,数字で入力しても良いし,図のようにリスク定量化ナビゲーションテンプレート(軸に0%から100%までが存在するところに矢印を配置することで示すなど)による入力でも良いし,あるいは予兆事象が発生する程度に関わる質問事項への回答を個別に入力させて自動計算にて予兆事象が発生する程度が決められても良い。また,「リスク顕在化可能性自動計算」「リスク顕在化時の影響規模自動計算」「プロジェクト遅延予測自動計算」などのボタンが存在していることも考えられる。その場合,例えば「リスク顕在化可能性自動計算」を選択した場合には,入力されている予兆事象内容及び発生程度などを参照して,リスク顕在化可能性を自動的に計算する。次に,「リスク顕在化時の影響規模自動計算」については,リスク顕在化時における課題やタスク自体あるいはプロジェクト全体に対する影響の度合いを自動計算するものである。そこでは,例えば各予兆事象の重みづけ(リスクが発生する場合に対応に要する時間やお金や人員など)をすることにより,より精度の高い影響度自動計算をできるようにしても良い。次に,「プロジェクト遅延予測自動計算」は,リスクが顕在化した場合に,どの程度プロジェクト全体が遅延するかを自動計算するものである。他にも,図にはないが,リスク別状況レポートに関する閲覧権限がある者の範囲に関する登録をすることができても良い。
 また,リスク顕在化リスクハイリスク化情報の取得は,インターネット等を通じて外部取得できるたぐいのものである場合には人の入力に頼らずに通信網を利用して取得してもよい。例えば資材の価格市況,作業者の賃金市況,為替相場,台風や大雪,突風などの天災の予報情報,などである。これらの情報はリスク情報入力受付部にて入力を受け付ける際の定義とその定義中の項目の指標の値の入力を受け付ける方法を選択させるなどによって可能である。例えば資材の価格市況は,インターネットウエブサイトの所定の項目をリスク情報の定義入力中に指定して定期的にその値をとりに行くようにセットすることができる。
「リスク顕在化リスクハイリスク化状況情報出力部」とは,保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する機能を有する。リスク顕在化リスクハイリスク化状況情報(リスク状況情報ともいう。以下同じ。)出力部からの出力情報は,リスクの状況を知るためにプロジェクトの参加者や,プロジェクトの発注者,プロジェクトの管理者が閲覧することができるように構成することが好ましい。ただし,プロジェクトによっては,各リスクそのものの情報が高度な機密情報である場合があり,全てのプロジェクト参加者がすべてのリスクの状況を閲覧可能としないで,ある権限者はその権限者に限定された範囲のリスク状況を閲覧することができるように設計する場合もある。さらに,リスク状況情報は,いくつかの情報階層に分けて閲覧可能にしてもよい。例えばリスク名称に代えてリスクIDのみを公開したり,リスクの内容を公開する場合と,リスクの内容を公開しない場合,リスクの状況を正確に緻密に公開する場合と,3段階や5段階など大まかに公開する場合など,各種の公開方式を取り入れて,閲覧者の情報アクセス権限に応じて公開の仕方を最適化するようにシステムを設計することが考えられる。さらにはリアルタイムで閲覧できる場合と,所定のタイムラグをもって閲覧することができる場合を閲覧者の情報アクセス権原に応じて最適化するように構成することも考えられる。また,閲覧しようとする者が閲覧請求時にその閲覧に関して公開権限を有するプロジェクトリーダーなどに問合せ,承認を得られた場合にその承認によって与えられたアクセス権限に基づいて所定の範囲の情報を閲覧できるように設計することもできる。
「タスク情報入力受付部」とは,プロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける機能を有する。
 「タスク情報」とは,原則的には小集団単位ないしは個人単位で消化しなければならない作業を言う。課題情報で示される課題を解決するために必要な作業を一般に指すように構成する。従って課題に関連付けられており,課題に関連付けられているタスクがすべて完了した場合にはその課題情報で示される課題は解決済の課題と確定して記録する。従って,タスク情報とは,そのタスクを実行する者が何をどのようにいつどこでいつまでにすればよいのかが明確に定義されている情報である。ただし,プロジェクトによっては,タスクを課題と関連付けて定義したり,タスクを階層構造に配置したり,タスクと関連付けられていない課題を定義することも可能である。
図10は,タスク情報を入力・修正するに当たってのポータル画面の一例の概念図である。例えば,「新規タスク入力」「タスク別進捗レポート入力」「タスク内容修正」「担当修正」「納期修正」「タスク属性修正」などの選択部分があり,それを選択することにより,次の画面に遷移するという具合である。タスクの入力に関しても入力者の権原を制限して所定の権原を有する者にしかタスクの入力を許さないように設計することが好ましい。入力されるタスクの各属性はタスク識別情報と関連付けられる。また,そのタスクが他のタスクや,課題情報で示される課題と関連付けられている場合にはその関連付けられているタスクのタスク識別情報,関連付けられている課題の課題識別情報も併せて関連付けて入力しなければならない。また,他のタスクや他の課題情報で示される課題と関連付けられていない場合でもプロジェクトIDと関連付けて入力されなければならない。また他のタスクと関連付けられている場合には,他のタスクとの階層順位を入れなければならない。例えば関連付けられているタスクの上位に位置するタスクである場合にはその旨を示す情報を下位に位置する場合にはその旨を示す情報の入力を必要とする。この情報の入力は関連付けられている他のタスクの識別情報が入力された時点で自動的に入力者に対して要求するようなインターフェイスであることが好ましい。また担当者の入力も必要であるが,担当者間の業務指示関係がある場合にはその業務指示関係も入力することが好ましい。例えば回生ブレーキ回路担当課長,回生ブレーキ回路担当主任,回生ブレーキ回路担当などである。また,タスクの完了,達成は担当者の職務執行能力と密接な関係があるので,プロジェクトメンバー登録データベースで登録されているメンバーIDも担当者に関連付けられていることが好ましい。この場合に,タスクの進行状況や,タスク遂行計画を閲覧したい者は,その担当者に関してのプロジェクトメンバー登録データベースに蓄積されているその担当者の過去のプロジェクト遂行履歴や,その担当者の専門分野,過去の担当タスク,タスク遂行能力評価結果など,その担当者に関してデータベースに登録されている情報を閲覧可能となるようにこの入力を行うことが望ましい。なお,後述するタスク属性情報を利用して,この担当者の特異なタスク属性がデータベースに保存されており,これを第三者が閲覧できるように構成してもよい。
図11は,新規でのタスク入力画面の一例の概念図である。例えば,入力者,プロジェクト名,影響,タスク詳細としてタスク内容・タスク階層・処理グループ・担当者(複数名でも可能。)処理期限などの項目があり,それらに入力することでタスク情報を登録することが考えられる。ここでは既にプロジェクト内容などが登録されていることが想定されているので,基本的に各項目はプルダウンにて選択するという方式にすることが考えられる。処理期限については,カレンダーから選択できるようにしても良い。「詳細」というボタンは,それを選択することにより,詳細を入力する画面に遷移するということが想定されている。また「タスク階層」は,課題との関係つまりいずれの課題に紐づいているのか,あるいはタスク同士に階層がある場合には当該タスクとの階層を選択できるという具合である。そして,入力後には,「完了」を選択すれば登録,「戻る」を選択すれば登録せずに前画面に戻る,「次」を選択すれば次の画面に遷移するなどの構成にすることが考えられる。また,更にタスク属性を選択できるようにしても良い。
図12は,タスク属性を選択する際の画面の一例の概念図である。例えば,労働集約型,ソリューション発見型,クリエイティブ型,プレゼンテーション型,PR型,インフルエンス型,資金投入型,法律解決型,人脈依存型,調査依存型などから選択(複数選択を可能としても良い。)するように構成しても良いし,これらの属性が必須でもなければ,逆に限定もされない。
「タスク情報保持部」とは,入力された一以上のタスク情報をタスク識別情報と関連付けて保持する機能を有する。このタスク識別情報は,入力されたタスクに関するすべての情報と関連付けられる。
「タスク処理状況情報取得部」とは,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する機能を有する。
図13は,タスク別進捗レポート入力画面の一例の概念図である。例えば,入力者,プロジェクト名,課題名,タスク名,達成量として%やクオリティー,量などを入力することが考えられる。ここでは既にプロジェクト内容などが登録されていることが想定されているので,基本的に各項目はプルダウンにて選択するという方式にすることが考えられる。達成量については,数字で入力しても良いし,タスク達成量に関わる質問事項への回答を個別に入力させて自動計算にてタスク達成量が決められても良い。また,「その他の達成量指標」「達成量修正」「達成量開示範囲」「タスク内容修正」「タスク属性修正」などのボタンが存在していることも考えられる。その場合,例えば「その他の達成量指標」を選択した場合には,達成量を数字で示すのではなく,具体的な完了工程で示したり,「決裁待ちで決裁時期は~年~月~日見込」などのように残存工程や期間を示す形で入力を受け付けるようにしても良い。これは,達成量を数字で示すことと両立して入力を受け付けても良い。次に,「達成量修正」「タスク内容修正」「タスク属性修正」を選択した場合には,それぞれの登録内容を修正するようにしても良い。次に,「達成量開示範囲」は,達成度に関する閲覧権限がある者の範囲に関する登録である。
 また,タスク処理状況情報は,人が手入力する場合の他にシステムが外部から自動取得するように構成することもできる。例えば工場等の生産管理システムでは,工場内での製品の生産状況を逐次把握するように構成されるのが一般であるが,これらの生産管理システムでの管理データを通信によって定期的に取得できるように構成して,その管理データを用いてタスク処理状況情報を生成し又は保持するように構成できる。具体的には生産管理システムは,実験室又は工場などでの生産状態を把握するための各種センサ,例えば,流量センサ,温度センサ,重量センサ,液量センサ,赤外線センサ,出荷個数計数機,梱包個数計数機,異物検査装置,不良品計数機,放射線検査装置,表面状態検査装置,回路検査装置,人感センサー,作業者作業状況把握装置(映像,ID,PC作業量などで)等を用いて生産管理をしているので,これらを生産管理システムが加工又は編集したデータをタスク処理状況情報を生成するために取得できるし,場合によっては生産工場内のセンサーのデータを直接本システムが取得してタスク処理状況情報を生成するように構成することもできる。なお,タスク処理状況情報は,生産物などの物のデータのみに限定されるものでなく,人の動きなど,人間に関するデータをもタスク処理状況情報として取得しうる。人間に関するデータとは,人の動きや,人と装置のかかわり方に関する情報,人と人とのかかわりに関するデータなどである。人間に関するデータとは,人の動き,人の発言,人の発した情報などであり,人と装置とのかかわり方に関する情報としては,人がどの装置を操作したか,人がどの装置のどのような機能を利用したかなどである。さらに人と人とかかわりに関するデータとは,人と人の接触による会話に関する情報,人と人との接触機会の量などである。なお,人と人との接触に関するデータはオフィスや工場などの外部ではSNSなどから情報を取得することも可能である。従って,タスク処理状況情報取得部は,SNSなどから情報を取得するためのインターネット通信が可能なSNS情報取得手段や,そのSNS情報を解析してタスク処理状況情報を生成するSNSタスク処理状況情報生成手段(SNS情報を解析してタスク処理状況情報を生成するルールを内在している。)を有していてもよい。
「タスク処理状況情報出力部」とは,保持されているタスク情報とタスク処理状況情報とを関連付けて出力する機能を有する。タスク処理状況情報は多様な出力形式で出力可能なように構成することが好ましい。例えばグラフでも棒グラフ,折れ線グラフ,円グラフ,帯グラフ,ヒストグラム,レーダーチャート,散布図,箱ひげ図,三角グラフ,ろうそくチャートなどの複数の中から希望する表示形式を選択できるように構成するとよい。また,出力は現時点でのタスク処理状況情報のみでなく,過去の履歴を含めて出力するように構成することもできる。さらに,複数のタスクや課題の処理状況情報を重畳したり,比較可能に出力するように構成することも好ましい。またタスク処理状況情報の出力は,タスク情報や,課題情報の全部または一部を含む出力としてもよいし,閲覧者の希望によってその一部をどの情報にするか選択可能に構成することもできる。
 また,他のプロジェクトですでに終了しているものがある場合には,比較可能なタスクを選択して,完了済みのタスクと,現在処理中のタスクの比較ができるように構成してもよい。例えば経過時間とタスクの進捗が終了済みのタスクと現在進行中のタスクとで比較できるようにする。また,タスクの実行メンバーや,タスクを管理しているメンバーは,タスクの進捗の出力についてコメントを書き込んだり,そのコメントに回答したりすることができるコミュニケーションツール手段を備えていてもよい。さらに本システムは,タスク属性情報を用いて比較可能なタスクを利用者に推奨するような比較可能タスク推奨手段を有していてもよい。推奨手段が推奨した比較可能タスクを利用者が選択することによって推奨されたタスクと実行中のタスクの進捗比較が可能となる。また,終了したタスクの情報をAIが分析して,タスク実行上の問題プロセスを保持し,タスク実行者に対して過去のタスク分析事例に基づいた警告やアドバイスを出力する警告アドバイス出力手段が備わっていてもよい。これは,タスク処理状況情報に基づくとタスクの処理が予定よりも遅れていると判断される場合に,警告アドバイス手段が警告アドバイスをするように構成することが好ましい。何ら問題が発生していない段階で警告アドバイスを受けるのは心理的に圧迫される一方,タスク処理に遅延が生じた場合には何らかの問題が発生している可能性もあり,警告アドバイスを実行者が受け入れやすい状況が醸成されている可能性が高いからである。達成量開示範囲は,達成度に関する閲覧権限がある者の範囲に関する登録である。
「プロジェクト管理情報変更要請受付部」とは,プロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける機能を有する。
図17は,プロジェクト管理情報変更要請受付部にて受け付ける変更(修正)内容定義入力画面の一例の概念図である。例えば,入力者,プロジェクト名,修正プロジェクト管理情報,修正発生要因,顧客依頼内容合致性チェックなどの項目があり,それらに入力することでプロジェクト管理情報の変更要請を受け付けるように構成することが考えられる。ここでは既にプロジェクト内容などが登録されていることが想定されているので,基本的に各項目はプルダウンにて選択するという方式にすることが考えられる。修正発生要因は,例えば,「リスク顕在化」,「顧客依頼」などが考えられる。また,「顧客依頼内容合致性チェック」は,変更内容が顧客からの変更(修正)依頼に合致しているか否か,言い換えれば当該対応をとれば顧客からの変更(修正)依頼を達成することができるか否かをチェックするものである。顧客の依頼が複数ある場合には,それぞれについてチェックした上で,最終的には総合判断をするように構成することも考えられる。判断結果が「顧客依頼内容非合致」の場合には,「再定義」のボタンを押すことにより,再定義に移るという具合である。入力後には,「完了」を選択すれば登録,「戻る」を選択すれば登録せずに前画面に戻る,「次」を選択すれば例えばタスク入力などの画面に遷移するなどの構成にすることが考えられる。
図18は,「顧客依頼内容合致性チェック」の一例を示す図である。依頼内容が「プロジェクト完了を1か月前倒しにして欲しい」というときに,対応として「最長タスク13aを1か月前倒しにすることにより,プロジェクト完了を1か月前倒しとする。」という方法をとる場合には,基本的には,依頼内容「プロジェクト完了を1か月前倒しにして欲しい」が達成できると考えられるので,判断としては「顧客依頼内容合致」になると考えられる。ただ,ここでも例えば単純に1つのタスクが1か月前倒しになれば全体の完了も1か月前倒しにできるかという点は一概にはいえないことから,ステークホルダー情報や担当者及びチーム情報や予算や全体のタスクスケジュールなどをも勘案して,それで本当に依頼内容「プロジェクト完了を1か月前倒しにして欲しい」が達成できると考えられるのか否かが判断されるように構成しても良い。
 例えば,タスク13aは,そのタスク情報によって内容が定義されているが,1か月前倒しにすることによって,タスクの実行結果が変動しないか,また要求されるリソースを確保できるか,などを図17の判断ボタンを押下することで分析手段が分析するように構成することができる。例えばタスクの実行に消費される材料が季節変動性の大きなものである場合には,タスクを前倒しすることによって投入原材料に質の変動が起こり,最終生産物の品質に変動を来す恐れがある。従って,このような場合には最終生産物の品質に変動が生じる恐れがある旨の警告を出すように構成する。また,リソースとして,金融の専門家が4人必要であるところ,前倒しした期間では,他のタスクに従事していることから3人しか投入できない場合には,判断はプロジェクト管理情報の変更は困難という結論となり,そのような結果が出力される。あるいは,プロジェクト管理情報変更部は,前記他のタスクであるタスク8cを1週間前倒しすれば金融の専門家を4人投入できる,と計算して,タスク8cを1週間前倒しすることでプロジェクト情報変更可能である,と判断し,そのような推奨を含む結論を出力するように構成することもできる。
 このように,タスク情報は,そのタスクの結果に影響を及ぼしうる因子をすべてタスク識別情報に関連付けて保持しており,かつ,その因子に影響を与える事象に関しても情報を保持しており,さらにその事象を質的又は/及び量的に特定することでその影響を質的又は/及び量的に出力可能に構成する。また,その事象が他のタスクや,リスクの状況に関連性を有する場合には,その関連性を有するタスクやリスクの情報に含まれる因子を解析してプロジェクトの変更がプロジェクトの最終結果に悪い影響を与えないような解を導き出すように構成することが好ましい。
「プロジェクト管理情報変更要請保持部」とは,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する機能を有する。
「プロジェクト管理情報変更要請実施情報取得部」とは,保持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する機能を有する。
「プロジェクト管理情報変更部」とは,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する機能を有する。
 「プロジェクト管理情報」は,課題情報,リスク情報,タスク情報のいずれか一以上である。これを変更するとは,課題情報,リスク情報,タスク情報のいずれか一以上を変更したり追加したりすることをいう。また,変更,追加によって,課題情報,リスク情報,タスク情報の相互に関連付けられた関係である相互依存性が変更される場合もある。
 「相互依存性」とは,複数のタスク間で相互に又は一方向に影響を及ぼす関係を言い,主に先行タスクの結果を後続タスクが利用する場合(結果利用関係),先行タスクで利用するリソースを後続タスク(リソース再利用関係)でも利用する場合,などに発生する関係である。基本的にはタスクが要求し,タスクの実行のために満たされなければならない属性を付された値を示す関数であり,変数の一つは時間である。基本的には所定の時間内でその値が所定の範囲又は所定の値(満足条件)を満たさなければならない。従って,プロジェクト管理情報の変更があった場合には,その変更に応じて変更された値がタスクが要求する範囲内に入るように調整することでプロジェクトの変更は達成される。タスク単独で達成できない場合には他のタスクの値を調整することで全体としてプロジェクトの変更が可能となる場合もある。
 これらの相互依存性は,プロジェクト管理情報が課題の場合にも異なる課題間で発生しうる。また課題配下のタスクではないが,異なる課題配下のタスクと課題間でも発生しうるものである。これらのタスク-タスク相互依存性の情報であるタスク相互依存性情報,課題-課題相互依存性の情報である課題相互依存性情報,課題-その課題と異なる課題のタスク間相互依存性の情報である課題タスク相互依存性情報は,相互依存性情報保持部に保持されるように構成することができ,プロジェクト管理情報の変更を扱う部は,この相互依存性情報保持部に保持されている情報を利用することができ,プロジェクト管理情報の変更が適正であるか判断する機能もこの相互依存性情報保持部に保持されている情報を利用して判断を行うことができる。なお,相互依存情報と,プロジェクト管理情報変更要請もプロジェクト管理情報の一部である。
 「プロジェクト管理情報変更要請実施情報」とは,プロジェクト管理情報の変更要請に基づいてプロジェクト管理情報を変更する内容を示す情報であり,課題情報,リスク情報,タスク情報のいずれか一以上である。これを変更するとは,課題情報,リスク情報,タスク情報のいずれか一以上を変更したり追加したりすることの指示を含む情報である。課題情報,リスク情報,タスク情報,その他のプロジェクト管理情報は識別情報で識別されるように構成されており,変更の場合には,その識別情報を特定して変更の内容を記述する。変更の内容としては,一部の情報の削除,一部の情報の変更,一部の情報の追加,又は全部の情報の削除,全部の情報の変更,などがあり,追加の場合には新たに識別情報を関連付けて相互依存関係を示して新たなプロジェクト管理情報を追加する。また変更のパターンを識別情報で示した変更パターン識別情報をそのプロジェクト管理情報変更要請実施情報に関連付けてもよい。例えば,変更が生じる理由として「1 資金量,株価,債券,融資額,投資額」「2 協力関係,提携関係,共同開発,共同事業,合併」「3 社長,役員,リーダー,開発者,営業者,プログラマー,SE」「4 土地,建物,研究施設,開発設備」「5 利率,配当,償還期限」「6 景気動向,物価指数,工業指数」「7 雇用人数,出向人数,バイト人数,委託人数」「8 通信に関する法律,交通に関する法律,金融に関する法律」「9 通信技術進歩,計算技術進歩,交通技術進歩,バイオ技術進歩」「10 行政認可,法案成立,試験成否,性能試験合格」「11 気候,天候,災害(地震,津波,火山,洪水),公害」などを変更発生理由識別情報として付加したり,変更の内容として,施工時期,終了時期,生産,販売数値目標,投入人員,予算,原材料種別,原材料価格,原材料品質,達成目標性能,達成目標品質,売上達成目標,販売達成数量,反応目標人数,目標フォロワー人数,目標視聴人数,目標シェア,目標売値,目標卸値,目標製造コスト,目標達成速度,などを識別情報で表し,何の変更であるかを示すようにしてもよい。またこれらの識別情報をキーとしてプロジェクト管理システム内に蓄積されている膨大なデータから検索結果を引き出せるように構成することもできる。
<ハードウェア構成>
本実施例におけるプロジェクト管理システムのハードウェア構成について,図を用いて説明する。
図29は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(2901)と,「主メモリ」(2902)と,を備えている。また,所定の情報を保持する「HDD」(2903)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(2906)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(2904)を備えている。そして,それらが「システムバス」(2905)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムである。また,「主メモリ」と「HDD」には,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
図30から図33は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。全体としては一連の流れであるが,課題情報に関する処理,リスク情報に関する処理,タスク情報に関する処理,プロジェクト管理情報に関する処理に分けて処理の流れを説明するものである。各フロー間に先後関係はなく,以後も同様である。
図にあるように,課題情報入力受付ステップ(S3001)と,課題情報保持ステップ(S3002)と,課題解決状況情報取得ステップ(S3003)と,リスク情報入力受付ステップ(S3101)と,リスク情報保持ステップ(S3102)と,リスク顕在化リスクハイリスク化情報取得ステップ(S3103)と,タスク情報入力受付ステップ(S3201)と,タスク情報保持ステップ(S3202)と,タスク処理状況情報取得ステップ(S3203)と,プロジェクト管理情報変更要請受付ステップ(S3301)と,プロジェクト管理情報変更要請保持ステップ(S3302)と,プロジェクト管理情報変更要請実施情報取得ステップ(S3303)と,プロジェクト管理情報変更ステップ(S3304)からなる処理方法である。
そして,図34は,各情報の出力に関する処理の流れである。各情報の出力に関しては,順番は問わないが,まず状況情報(課題情報,リスク情報,タスク情報の各情報の進行を示す情報を含み,それに限定されない。)出力をするか否かを問い,出力する場合には次に課題解決状況情報を出力するかを問い,出力する場合には課題解決状況情報を出力し,それで終了するかを問うて終了でない場合には最初に戻る。次に課題解決状況情報を出力しない場合には,リスク顕在化ハイリスク化情報を出力するかを問い,出力する場合にはリスク顕在化ハイリスク化情報を出力し,それで終了するかを問うて,終了でない場合には最初に戻る。次にリスク顕在化ハイリスク化情報を出力しない場合には,タスク処理状況情報を出力するかを問い,出力する場合にはタスク処理状況情報を出力し,それで終了するかを問うて,終了でない場合には最初に戻る。全体としては上記のような流れであるが,端的に,出力ステップとして課題解決状況情報出力ステップと,リスク顕在化リスクハイリスク化状況出力ステップと,タスク処理状況情報出力ステップとを有している構成でも良いので,シンプルにそのような例として説明する。
「課題情報入力受付ステップ」とは,プロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける段階である。
「課題情報保持ステップ」とは,一以上の課題情報を課題識別情報と関連付けて保持する段階である。
「課題解決状況情報取得ステップ」とは,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する段階である。
「課題解決状況情報出力ステップ」とは,保持されている課題情報と課題解決状況情報とを関連付けて出力する段階である。
「リスク情報入力受付ステップ」とは,プロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける段階である。
「リスク情報保持ステップ」とは,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する段階である。
「リスク顕在化リスクハイリスク化情報取得ステップ」とは,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する段階である。
「リスク顕在化リスクハイリスク化状況出力ステップ」とは,保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する段階である。
「タスク情報入力受付ステップ」とは,プロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける段階である。
「タスク情報保持ステップ」とは,入力された一以上のタスク情報をタスク識別情報と関連付けて保持する段階である。
「タスク処理状況情報取得ステップ」とは,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する段階である。
「タスク処理状況情報出力ステップ」とは,保持されているタスク情報とタスク処理状況情報とを関連付けて出力する段階である。
「プロジェクト管理情報変更要請受付ステップ」とは,プロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける段階である。
「プロジェクト管理情報変更要請保持ステップ」とは,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する段階である。
「プロジェクト管理情報変更要請実施情報取得ステップ」とは,保持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する段階である。
「プロジェクト管理情報変更ステップ」とは,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する段階である。
<まとめ>
以上により,プロジェクト管理システムを実現できるプロジェクト管理システムを提供することができる。

本実施例は,実施例1の特徴に加えて,プロジェクト管理情報を特定できる前提となる情報である前提情報をプロジェクト管理情報と関連付けて取得して,前提情報をプロジェクト管理情報と関連付けて保持するように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図35は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(3501)と課題情報保持部(3502)と課題解決状況情報取得部(3503)と課題解決状況情報出力部(3504)とリスク情報入力受付部(3505)とリスク情報保持部(3506)とリスク顕在化リスクハイリスク化情報取得部(3507)とリスク顕在化リスクハイリスク化状況出力部(3508)とタスク情報入力受付部(3509)とタスク情報保持部(3510)とタスク処理状況情報取得部(3511)とタスク処理状況情報出力部(3512)とプロジェクト管理情報変更要請受付部(3513)とプロジェクト管理情報変更要請保持部(3514)とプロジェクト管理情報変更要請実施情報取得部(3515)とプロジェクト管理情報変更部(3516)とプロジェクト管理情報前提情報取得部(3517)とプロジェクト管理情報前提情報保持部(3518)を有する。以下,具体的に各機能の内容につき説明する。なお,プロジェクト管理情報前提情報取得部とプロジェクト管理情報前提情報保持部を除く各機能については,実施例1と同様であるため,プロジェクト管理情報前提情報取得部とプロジェクト管理情報前提情報保持部の機能に限定して説明する。
「プロジェクト管理情報前提情報取得部」とは,プロジェクト管理情報を特定できる前提となる情報(プロジェクト管理情報の各情報(課題,タスク,リスク)を定義するための前提となる情報又は/及び各情報(課題,タスク,リスク)の満たすべき条件を定めるための前提となる情報)である前提情報をプロジェクト管理情報と関連付けて取得する機能を有する。
図19は,前提情報を入力・修正するに当たってのポータル画面の一例の概念図である。例えば,「新規前提情報入力」「前提情報修正」「前提情報→課題変更」「前提情報→タスク変更」「前提情報→リスク変更」などの選択部分があり,それを選択することにより,次の画面に遷移するという具合である。ここでいう「前提情報→課題変更」「前提情報→タスク変更」「前提情報→リスク変更」とは,前提が変われば課題情報もタスク情報もリスク情報も変更すべき場合があることから,入力された前提情報に基づいて,自動的に課題情報・タスク情報・リスク情報を変更するというものである。
図20は,新規での前提情報入力画面の一例の概念図である。例えば,入力者,プロジェクト名,関連課題(複数でも可能。),前提内容としての要素属性(複数でも可能。)などの項目があり,それらに入力することで前提情報を登録することが考えられる。ここでは既にプロジェクト内容などが登録されていることが想定されているので,基本的に各項目はプルダウンにて選択するという方式にすることが考えられる。「タスク」というボタンは,それを選択することにより,当該課題に紐づけられているタスクの入力画面に遷移するということが考えられる。「要素属性」とは,後述するとおりである。そして,入力後には,「完了」を選択すれば登録,「戻る」を選択すれば登録せずに前画面に戻る,「次」を選択すれば次の画面に遷移するなどの構成にすることが考えられる。また,更にタスク属性を選択できるようにしても良い。
図21は,要素属性一覧の一例を示す図である。要素属性は,例えば,「1 資金量,株価,債券,融資額,投資額」「2 協力関係,提携関係,共同開発,共同事業,合併」「3 社長,役員,リーダー,開発者,営業者,プログラマー,SE」「4 土地,建物,研究施設,開発設備」「5 利率,配当,償還期限」「6 景気動向,物価指数,工業指数」「7 雇用人数,出向人数,バイト人数,委託人数」「8 通信に関する法律,交通に関する法律,金融に関する法律」「9 通信技術進歩,計算技術進歩,交通技術進歩,バイオ技術進歩」「10 行政認可,法案成立,試験成否,性能試験合格」「11 気候,天候,災害(地震,津波,火山,洪水),公害」などがあり得る。
「プロジェクト管理情報前提情報保持部」とは,取得した前提情報をプロジェクト管理情報と関連付けて保持する機能を有する。前提情報に変更があった場合にはその前提情報と関連付けられているプロジェクト管理情報の変更が必要となる可能性が高い。従って定期的に又は不定期に前提情報に変更がないかチェックする必要がある。前提情報に変更があった場合にはその旨の警告である前提情報変更警告出力を前提情報変更警告出力部から出力するように構成する。また,前提情報の変更は手動にて取得するように構成してもよいし,自動にて取得するように構成することも可能である。またプロジェクト管理者等に対して,定期的に前提情報の変更があるか,ないかについて回答を求めるための回答誘導手段を設けていてもよい。自動で前提情報の変更を取得する場合とは,株価や債券などの金融情報,景気動向,物価指数などの景気情報,法律などの法的情報,気候などの天候情報等をインターネットを介して取得することができる。なお,前提情報も自由形式で言語によって表現される場合と,前記インターネットで取得できる情報のように数値で取得できるものとがある。数値で取得できるものの場合には,その前提範囲が数値で特定されているので,その値の範囲から外れた場合に前記警告情報を出力するように構成することができる。
<ハードウェア構成>
図36は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(3601)と,「主メモリ」(3602)と,を備えている。また,所定の情報を保持する「HDD」(3603)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(3606)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(3604)を備えている。そして,それらが「システムバス」(3605)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムとプロジェクト管理情報前提情報取得プログラムとプロジェクト管理情報前提情報保持プログラムである。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。さらに,本実施例では,前提情報が格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報前提情報取得プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報を特定できる前提となる情報である前提情報をプロジェクト管理情報と関連付けて取得する。そして,プロジェクト管理情報前提情報保持プログラムを実行して,取得した前提情報をプロジェクト管理情報と関連付けて保持する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
図37は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,実施例1の処理に加えて,順番は問わないが,プロジェクト管理情報前提情報取得ステップとプロジェクト管理情報前提情報保持ステップが存在する。以下では,プロジェクト管理情報前提情報取得ステップとプロジェクト管理情報前提情報保持ステップについて説明する。
「プロジェクト管理情報前提情報取得ステップ」とは,プロジェクト管理情報を特定できる前提となる情報である前提情報をプロジェクト管理情報と関連付けて取得する段階である。
「プロジェクト管理情報前提情報保持ステップ」とは,取得した前提情報をプロジェクト管理情報と関連付けて保持する段階である。
<まとめ>
これらにより,プロジェクトの前提と合わせて,プロジェクトを管理することができるプロジェクト管理システムを提供することができる。

本実施例は,実施例1の特徴に加えて,保持されたリスクが顕在化した旨を示す情報であるリスク顕在化リスクハイリスク化情報がリスク識別情報と関連付けて取得された場合に,顕在化したリスクに基づいて解決しなければならないこととなった課題情報を生成し,課題識別情報と関連付けて記録するように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図38は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(3801)と課題情報保持部(3802)と課題解決状況情報取得部(3803)と課題解決状況情報出力部(3804)とリスク情報入力受付部(3805)とリスク情報保持部(3806)とリスク顕在化リスクハイリスク化情報取得部(3807)とリスク顕在化リスクハイリスク化状況出力部(3808)とタスク情報入力受付部(3809)とタスク情報保持部(3810)とタスク処理状況情報取得部(3811)とタスク処理状況情報出力部(3812)とプロジェクト管理情報変更要請受付部(3813)とプロジェクト管理情報変更要請保持部(3814)とプロジェクト管理情報変更要請実施情報取得部(3815)とプロジェクト管理情報変更部(3816)と生成課題記録部(3817)を有する。以下,具体的に各機能の内容につき説明する。なお,生成課題記録部を除く各機能については,実施例1と同様であるため,生成課題記録部の機能に限定して説明する。
 なお,「リスク」としては,リソースの調達不可能化又はリソースの喪失,タスクや課題を処理するためのインフラの喪失,プロジェクトの実行によって達成される目標に対する需要の喪失などである。例えばリソースの調達不可能とは,油田地帯で戦争が勃発し,原料となる原油が輸入できなくなるようなケース,リソースの喪失とは,保管してあった貴重な原料が火災によって焼失したようなケース,インフラの喪失とは,大地震が起こって原材料の輸送ルートが崩壊したり,そもそもプロジェクトを実行しようとしていた工場が崩壊したようなケースである。これらを課題に置き換えると「原油が輸入できない」に関しては「備蓄原油の調達をする」が課題となり,「保管してあった貴重な原料の焼失」に関しては「貴重な原料の早期調達」が課題となり,「原材料の輸送ルートが崩壊」に関しては,「別の輸送ルートの確立」が課題となり,「工場が崩壊」に関しては「代替工場との契約」が課題となる。
 このようにリスクが顕在化したような場合には,そのリスクがどのような課題に変化するかをリスク情報の登録時に,あるいはリスク情報の登録後にリスク識別情報に関連付けて記録し,リスクが顕在化したときにプロジェクト管理情報である課題として自動登録するように構成(課題自動登録手段)することが好ましい。
 なお,リスクのハイリスク化の場合にも課題を自動登録させるように構成してもよい。例えば「油田地帯で戦争が勃発」したが,まだ原料となる原油が輸入可能な状態の場合には,課題として「原油を前倒しで輸入」という課題を予め登録しておき,ハイリスク化の状態で課題に自動登録する。また大型台風が発生し,原料の生産地域に重大な被害を及ぼす可能性がある,との天気予報があった場合には,課題として,「大型台風が南洋上にある間に原料を現場に輸送」が新たな課題となる。
「生成課題記録部」とは,保持されたリスクが顕在化した旨を示す情報であるリスク顕在化リスクハイリスク化情報がリスク識別情報と関連付けて取得された場合に,顕在化したリスクに基づいて解決しなければならないこととなった課題情報を生成し又は予め保持されている情報を取得し,課題識別情報と関連付けて課題情報保持部に記録する機能を有する。課題情報保持部に保持された課題情報は,通常の課題情報と同様に課題解決状況情報出力部から出力される。最初は課題解決状況はゼロとして出力されるのが一般である。
図22は,生成課題記録部においてなされる処理内容に関するフローチャートである。まず「リスクハイリスク化」ついましリスクが高まっているか否かが判断され,高まっていなければ問題ないのであるが,高まっている場合には次にリスクが顕在化しているかが判断される。ここでリスクが顕在化していると判断される場合には,リスクを課題に変更し,その上で当該課題にタスクがあるか否かが判断され,タスクがあるときには課題にタスクを従属してタスクにリソースを割り当ててタスク管理の対象とされ,タスクがないときには課題にリソースを割り当てて課題管理の対象とされる。他方,ここでリスクが顕在化していると判断されない場合には,次にリスク低減課題を発生させるか否かが判断され,もし発生させる必要がなければリスクが顕在化しているか否かを判断する前の工程まで戻るのであるが,他方,もし発生させる必要がある場合には,リスク低減化課題を生成する。その上で,タスクの有無が判断され,タスクがあるときには課題にタスクを従属してタスクにリソースを割り当ててタスク管理の対象とされ,タスクがないときには課題にリソースを割り当てて課題管理の対象とされる。なお,これは一例であって,このような処理手順に限定されるものではない。
<ハードウェア構成>
図39は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(3901)と,「主メモリ」(3902)と,を備えている。また,所定の情報を保持する「HDD」(3903)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(3906)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(3904)を備えている。そして,それらが「システムバス」(3905)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムと生成課題記録プログラムである。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。「CPU」は,「主メモリ」に格納されている生成課題記録プログラムを実行して,保持されたリスクが顕在化した旨を示す情報であるリスク顕在化リスクハイリスク化情報がリスク識別情報と関連付けて取得された場合に,顕在化したリスクに基づいて解決しなければならないこととなった課題情報を生成(例えば人工知能によって課題を生成)又は/及び予め登録されている課題情報を取得し,課題識別情報と関連付けて課題情報保持部に追加記録する。この新規に記録される課題情報が他の課題情報との関係で階層的に位置付けられる場合には,その他の課題情報との階層関係を示す情報も併せて記録する。この階層関係を示す情報は直接的な関係性を有するすべての課題情報にアクセスした場合にも参照できるように構成する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。リスク顕在化リスクハイリスク化情報の取得によって新たな課題が追加記録された場合には権限を有するプロジェクト参加者に対してその課題に応じた課題解決のためのタスクの入力を促す警告等を出力するのが好ましい。
また,リスク顕在化リスクハイリスク化情報によって顕在化,ないしはハイリスク化したリスクが登録される際に予め新規に追加すべき課題情報と,この課題を解決するために処理しなければならないタスクとを事前登録しておくことも構成としては好ましい。このように事前登録されているタスクがある場合にはリスク顕在化リスクハイリスク化情報に応じて発生した課題情報の追加記録とともにタスク情報も新規に自動追加記録されるように構成するのが好ましい。なお,すべての新規に追加される課題情報や,それに応じて処理しなければならないタスク情報が全自動で記録される必要はなく,例えば人員の割り当てなどのダイナミックに検討しなければならない要素に関しては権原を有するプロジェクト参加者に入力を促すように構成することが好ましい。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を場合によっては受け付ける。リスク顕在化リスクハイリスク化情報が取得された場合には追加記録される課題情報や追加記録されるタスク情報があるためにこの部を機能させて権限のあるプロジェクト参加者からプロジェクトの管理情報変更要請を入力させるように構成することが好ましい。この場合のプロジェクト管理情報とは,二つのケースがあり,一つは新たに追記された課題情報やタスク情報を指す場合と,従前のプロジェクト管理情報に変更を加えるためにプロジェクト管理情報に変更を加える場合である。システムの設計としては,前者は自動で行い,後者は権原を有するプロジェクト参加者にゆだねるように構成してもよいし,前者についてはプロジェクト管理情報の変更要請処理をスキップしてプロジェクト管理情報の追加記録で完了させるように構成してもよい。いずれにしても,リスク顕在化リスクハイリスク化情報が取得されるほとんどの場合にはプロジェクト管理情報であって従前のものの変更が必要となる場合がほとんどであり,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
図40は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。まず,リスクハイリスク化しているかどうかを判断する。否であれば問題ないが,ハイリスク化との判断の場合には,次にリスク顕在化を判断する。リスク顕在化している場合には,リスクを課題に変更する。その上で,その課題にタスクがあるか否かを判断し,課題にタスクがあり従属させる場合には,当該タスクにリソースを割り当てる。他方,課題にタスクがない場合には,当該課題にリソースを割り当てる。いずれにしても,課題管理やタスク管理の対象となる。これに対して,(リスクハイリスク化はしているけれども)リスク顕在化していない場合には,リスク軽減課題を発生させるか否かを判断する。リスク軽減課題を発生させない場合には処理自体は終了し,他方,リスク軽減課題を発生させる場際には,その課題にタスクがあるか否かを判断し,課題にタスクがあり従属させる場合には,当該タスクにリソースを割り当てる。他方,課題にタスクがない場合には,当該課題にリソースを割り当てる。いずれにしても,課題管理やタスク管理の対象となる。全体としては上記のような流れであるが,端的に,生成課題記録ステップを有している構成でも良いので,シンプルにそのような例として説明する。
「生成課題記録ステップ」とは,保持されたリスクが顕在化した旨を示す情報であるリスク顕在化リスクハイリスク化情報がリスク識別情報と関連付けて取得された場合に,顕在化したリスクに基づいて解決しなければならないこととなった課題情報を生成し,課題識別情報と関連付けて課題情報保持部に記録する段階である。
<まとめ>
これらにより,リスクが顕在化又はハイリスク化した場合に,自動的に対策を提示することができるプロジェクト管理システムを提供することができる。

本実施例は,実施例3の特徴に加えて,新たに生成され保持された課題情報に関連付けるタスク情報をその課題情報と関連付けて入力するように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図41は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(4101)と課題情報保持部(4102)と課題解決状況情報取得部(4103)と課題解決状況情報出力部(4104)とリスク情報入力受付部(4105)とリスク情報保持部(4106)とリスク顕在化リスクハイリスク化情報取得部(4107)とリスク顕在化リスクハイリスク化状況出力部(4108)とタスク情報入力受付部(4109)とタスク情報保持部(4110)とタスク処理状況情報取得部(4111)とタスク処理状況情報出力部(4112)とプロジェクト管理情報変更要請受付部(4113)とプロジェクト管理情報変更要請保持部(4114)とプロジェクト管理情報変更要請実施情報取得部(4115)とプロジェクト管理情報変更部(4116)と新規課題対応タスク情報入力部(4117)を有する。以下,具体的に各機能の内容につき説明する。なお,新規課題対応タスク情報入力部を除く各機能については,実施例3と同様であるため,新規課題対応タスク情報入力部の機能に限定して説明する。
「新規課題対応タスク情報入力部」とは,新たに生成され保持された課題情報に関連付けるタスク情報をその課題情報と関連付けて入力する機能を有する。
<ハードウェア構成>
図42は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(4201)と,「主メモリ」(4202)と,を備えている。また,所定の情報を保持する「HDD」(4203)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(4206)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(4204)を備えている。そして,それらが「システムバス」(4205)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムと新規課題対応タスク情報入力プログラムである。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。「CPU」は,「主メモリ」に格納されている生成課題記録プログラムを実行して,保持されたリスクが顕在化した旨を示す情報であるリスク顕在化リスクハイリスク化情報がリスク識別情報と関連付けて取得された場合に,顕在化したリスクに基づいて解決しなければならないこととなった課題情報を生成(例えば人工知能を利用する。)又は/及び予めリスク情報の登録時に併せて登録されたものを取得し,課題識別情報と関連付けて課題情報保持部に記録する。その上で,「CPU」は,「主メモリ」に格納されている新規課題対応タスク情報入力プログラムを実行して,新たに生成され保持された課題情報に関連付けるタスク情報をその課題情報と関連付けて入力させる。もちろん前述のようにすべて予めタスク情報を準備登録して起き自動的にタスク情報を登録するように構成してもよい。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
本実施例におけるプロジェクト管理システムを利用した場合の処理の流れは,図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,実施例1の処理に加えて,順番は問わないが,新規課題対応タスク情報入力ステップが存在する。以下では,新規課題対応タスク情報入力ステップについて説明する。
「新規課題対応タスク情報入力ステップ」とは,新たに生成され保持された課題情報に関連付けるタスク情報をその課題情報と関連付けて入力する段階である。
<まとめ>
これらにより,生成された課題の下位に位置づけられるタスク含めてプロジェクトを管理することができるプロジェクト管理システムを提供することができる。

本実施例は,実施例1の特徴に加えて,成功体験を示す情報である成功体験情報又は/及び失敗体験を示す情報である失敗体験情報である体験情報の入力を受け付けるように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図43は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(4301)と課題情報保持部(4302)と課題解決状況情報取得部(4303)と課題解決状況情報出力部(4304)とリスク情報入力受付部(4305)とリスク情報保持部(4306)とリスク顕在化リスクハイリスク化情報取得部(4307)とリスク顕在化リスクハイリスク化状況出力部(4308)とタスク情報入力受付部(4309)とタスク情報保持部(4310)とタスク処理状況情報取得部(4311)とタスク処理状況情報出力部(4312)とプロジェクト管理情報変更要請受付部(4313)とプロジェクト管理情報変更要請保持部(4314)とプロジェクト管理情報変更要請実施情報取得部(4315)とプロジェクト管理情報変更部(4316)と体験情報入力受付部(4317)と体験情報蓄積部(4318)と体験情報閲覧要求受付部(4319)と体験情報閲覧部(4320)を有する。以下,具体的に各機能の内容につき説明する。なお,体験情報入力受付部と体験情報蓄積部と体験情報閲覧要求受付部と体験情報閲覧部を除く各機能については,実施例1と同様であるため,体験情報入力受付部と体験情報蓄積部と体験情報閲覧要求受付部と体験情報閲覧部の機能に限定して説明する。
「体験情報入力受付部」とは,プロジェクトを識別するプロジェクト識別情報と関連付けて成功体験を示す情報である成功体験情報又は/及び,失敗体験を示す情報である失敗体験情報である体験情報の入力を受け付ける機能を有する。ここにおける体験情報は,テキスト情報,動画情報,添付書類情報,静止画情報,音声情報のいずれか一以上を含むことが望ましい。
図23は,体験情報を入力・修正するに当たってのポータル画面の一例の概念図である。例えば,体験入力に関する項目として「体験情報入力」「既存体験情報修正」「既存体験マージ」「既存体験分割」「体験閲覧権限修正」などの選択部分があり,体験閲覧に関する項目として「体験閲覧」「新規体験閲覧」などの選択部分があり,それを選択することにより,次の画面に遷移するという具合である。このうちの「体験閲覧権限修正」とは,体験情報に関する閲覧権限がある者の範囲を修正するものである。
図24は,新規体験情報入力画面の一例の概念図である。例えば,入力者,プロジェクト名,関連課題(複数でも可能。),前提内容としての要素属性(複数でも可能。)などの項目があり,それらに入力した上で体験情報を入力することで体験情報を登録することが考えられる。ここでは既にプロジェクト内容などが登録されていることが想定されているので,基本的に各項目はプルダウンにて選択するという方式にすることが考えられる。「タスク」というボタンは,それを選択することにより,当該課題に紐づけられているタスクの入力画面に遷移するということが考えられる。「要素属性」とは,前提情報の説明にて前述したとおりである。図示しないが,体験情報に関する閲覧権限がある者の範囲を指定しても良い。そして,入力後には,「完了」を選択すれば登録,「戻る」を選択すれば登録せずに前画面に戻る,「次」を選択すれば次の画面に遷移するなどの構成にすることが考えられる。また,更にタスク属性を選択できるようにしても良い。ここでは,体験情報としては,フリーフォーマットテキストである例である。
図25は,体験情報の入力について,音声ファイル,動画映像ファイル,テキストファイル,写真ファイル,WEBのURL,ストレージIDなどで受け付ける場合の一例を示す図である。音声ファイル,動画映像ファイル,テキストファイル,写真ファイル,WEBのURL,ストレージIDなどのうち,体験を伝えるのに適したファイルをドラッグ・ドロップにて保存し,「完了」を選択することにより体験情報が登録されるという具合である。なお,入力者,プロジェクト名,関連課題(複数でも可能。),前提内容としての要素属性(複数でも可能。)などの項目があり,それらに入力した上での話であることは前記と同様である。ここで音声ファイルとは,その体験者が体験を語った音声である場合が多いが,その他に重要な決定が行われた会議の録音,プロジェクトを左右した交渉の録音,などプロジェクトの実行に深くかかわりがある音声情報を入力することができる。入力者は,音声情報と同期して解説情報などをテキスト入力可能に設計しておくと便利である。例えば,発言者が誰であるか,その用語は何を指しているのか,流れが変わった瞬間はここである,のような音声をより理解するためのメモなどである。動画映像ファイルの場合には上記のようなシーンの他に,例えば実験や,思索現場の成功事例をわかりやすく解説するものや,逆に失敗事例を紹介するような動画である。実験の場合には動画併せて解説をテキスト入力して同期して閲覧できるように構成することも考えられる。動画はできるだけ高精細の物を利用し,拡大によっても画質がはっきりしているものを利用することがこのましい。例えば4K,8K映像のものである。テキストファイルには各種の情報の物が考えられる。そのプロジェクトに関しての自伝的なテキスト文章や,ノウハウ,実践して成功した考え方,分析に利用したビックデータなど読むことや分析することで要点がはっきり伝わるように記載させ,保持させる。ビックデータなど,そのものだけでは参考にしにくいものは関連付けたデータ解析プログラムを利用可能としてその情報の有効活用を図る。データ解析プログラムをそのテキストデータともに保持して利用可能としてもよいし,あるいはそのデータ解析プログラムへのリンク情報をそのテキストデータともに利用可能に記録しておいてもよい。そのためにはテンプレートなどを利用して入力させるように構成することが考えられる。写真ファイルは,例えば顕微鏡写真や,会議風景,交渉時の風景など,各種の物があってもよい。また,競争あて胃の商品の分解写真や,秘密裏に入手したデータ集の写真など各種のものが考えられる。
「体験情報蓄積部」とは,入力を受け付けた体験情報をプロジェクト識別情報と関連付けて蓄積する機能を有する。
「体験情報閲覧要求受付部」とは,蓄積されている体験情報の閲覧要求を受け付ける機能を有する。
「体験情報閲覧部」とは,受けつけた閲覧要求に応じて体験情報を閲覧させる機能を有する。
<ハードウェア構成>
図44は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(4401)と,「主メモリ」(4402)と,を備えている。また,所定の情報を保持する「HDD」(4403)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(4406)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(4404)を備えている。そして,それらが「システムバス」(4405)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムと体験情報入力受付プログラムと体験情報蓄積プログラムと体験情報閲覧要求受付プログラムと体験情報閲覧プログラムである。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。さらに,本実施例では,体験情報と閲覧要求が格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されている体験情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクトを識別するプロジェクト識別情報と関連付けて成功体験を示す情報である成功体験情報又は/及び,失敗体験を示す情報である失敗体験情報である体験情報の入力を受け付ける。そして,体験情報蓄積プログラムを実行して,入力を受け付けた体験情報をプロジェクト識別情報と関連付けて蓄積する。「主メモリ」に格納されている体験情報閲覧要求受付プログラムを実行して,蓄積されている体験情報の閲覧要求を受け付ける。「主メモリ」に格納されている体験情報閲覧プログラムを実行して,受けつけた閲覧要求に応じて体験情報を閲覧させる。
 他のプロジェクトの体験情報の閲覧に基づいて自プロジェクトの改善を考える場合がある。その場合にはプロジェクト管理情報の変更要請をすることとなる。「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
図45は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,実施例1の処理に加えて,順番は問わないが,体験情報入力受付ステップと体験情報蓄積ステップと体験情報閲覧要求受付ステップと体験情報閲覧ステップが存在する。以下では,体験情報入力受付ステップと体験情報蓄積ステップと体験情報閲覧要求受付ステップと体験情報閲覧ステップについて説明する。
「体験情報入力受付ステップ」とは,プロジェクトを識別するプロジェクト識別情報と関連付けて成功体験を示す情報である成功体験情報又は/及び,失敗体験を示す情報である失敗体験情報である体験情報の入力を受け付ける段階である。
「体験情報蓄積ステップ」とは,入力を受け付けた体験情報をプロジェクト識別情報と関連付けて蓄積する段階である。
「体験情報閲覧要求受付ステップ」とは,蓄積されている体験情報の閲覧要求を受け付ける段階である。
「体験情報閲覧ステップ」とは,受けつけた閲覧要求に応じて体験情報を閲覧させる段階である。
<まとめ>
これらにより,過去の体験情報を参考にして現在進行しているプロジェクトに活かすことができるプロジェクト管理システムを提供することができる。

本実施例は,実施例5の特徴に加えて,プロジェクト管理情報と関連付けて体験情報の入力を受け付けるように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図46は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(4601)と課題情報保持部(4602)と課題解決状況情報取得部(4603)と課題解決状況情報出力部(4604)とリスク情報入力受付部(4605)とリスク情報保持部(4606)とリスク顕在化リスクハイリスク化情報取得部(4607)とリスク顕在化リスクハイリスク化状況出力部(4608)とタスク情報入力受付部(4609)とタスク情報保持部(4610)とタスク処理状況情報取得部(4611)とタスク処理状況情報出力部(4612)とプロジェクト管理情報変更要請受付部(4613)とプロジェクト管理情報変更要請保持部(4614)とプロジェクト管理情報変更要請実施情報取得部(4615)とプロジェクト管理情報変更部(4616)と体験情報入力受付部(4617)を有する。そして,体験情報入力受付部が,プロジェクト管理情報別体験情報入力受付手段(4618)を有している。以下,具体的に各機能の内容につき説明する。なお,体験情報入力受付部が有するプロジェクト管理情報別体験情報入力受付手段を除く各機能については,実施例1と同様であるため,プロジェクト管理情報別体験情報入力受付手段の機能に限定して説明する。
「プロジェクト管理情報別体験情報入力受付手段」とは,プロジェクト管理情報と関連付けて入力を受け付ける機能を有する。
<ハードウェア構成>
図47は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(4701)と,「主メモリ」(4702)と,を備えている。また,所定の情報を保持する「HDD」(4703)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(4706)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(4704)を備えている。そして,それらが「システムバス」(4705)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムと体験情報入力受付プログラムである。体験情報入力受付プログラムは,プロジェクト管理情報別体験情報入力受付サブプログラムを含んでいる。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報,体験情報と閲覧要求などが格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されている体験情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクトを識別するプロジェクト識別情報とプロジェクト管理情報と関連付けて成功体験を示す情報である成功体験情報又は/及び,失敗体験を示す情報である失敗体験情報である体験情報の入力を受け付ける。そして,体験情報蓄積プログラムを実行して,入力を受け付けた体験情報をプロジェクト識別情報と関連付けて蓄積する。「主メモリ」に格納されている体験情報閲覧要求受付プログラムを実行して,蓄積されている体験情報の閲覧要求を受け付ける。「主メモリ」に格納されている体験情報閲覧プログラムを実行して,受けつけた閲覧要求に応じて体験情報を閲覧させる。
必要がある場合には,次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。なお,このプロジェクト管理情報変更要請もプロジェクト管理情報の一種であることから,プロジェクト管理情報変更要請に関連付けられて体験情報の入力が行われる場合がある。プロジェクト管理情報変更要請はプロジェクト管理の中でも重要な情報であり,その体験は貴重なものだからである。
<処理の流れ>
図48は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,実施例1の処理に加えて,順番は問わないが,体験情報入力受付ステップと体験情報蓄積ステップと体験情報閲覧要求受付ステップと体験情報閲覧ステップが存在し,このうち体験情報入力受付ステップにはプロジェクト管理情報別体験情報入力受付サブステップが存在する。以下では,プロジェクト管理情報別体験情報入力受付サブステップについて説明する。
「プロジェクト管理情報別体験情報入力受付サブステップ」とは,プロジェクト管理情報と関連付けて入力を受け付ける段階である。
<まとめ>
これらにより,過去のプロジェクトから知りたい体験情報を検索することができるプロジェクト管理システムを提供することができる。


本実施例は,実施例1の特徴に加えて,変更要請内容を特定するためのテンプレートに情報を埋め込むことによって受付完了とするように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図49は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(4901)と課題情報保持部(4902)と課題解決状況情報取得部(4903)と課題解決状況情報出力部(4904)とリスク情報入力受付部(4905)とリスク情報保持部(4906)とリスク顕在化リスクハイリスク化情報取得部(4907)とリスク顕在化リスクハイリスク化状況出力部(4908)とタスク情報入力受付部(4909)とタスク情報保持部(4910)とタスク処理状況情報取得部(4911)とタスク処理状況情報出力部(4912)とプロジェクト管理情報変更要請受付部(4913)とプロジェクト管理情報変更要請保持部(4914)とプロジェクト管理情報変更要請実施情報取得部(4915)とプロジェクト管理情報変更部(4916)とプロジェクト管理情報変更要請受付部が受付完了手段(4917)を有する。以下,具体的に各機能の内容につき説明する。なお,受付完了手段を除く各機能については,実施例1と同様であるため,受付完了手段の機能に限定して説明する。
「受付完了手段」とは,変更要請内容を特定するためのテンプレートに情報を埋め込むことによって受付完了とする機能を有する。
<ハードウェア構成>
図50は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(5001)と,「主メモリ」(5002)と,を備えている。また,所定の情報を保持する「HDD」(5003)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(5006)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(5004)を備えている。そして,それらが「システムバス」(5005)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムである。プロジェクト管理情報変更要請受付プログラムは,受付完了サブプログラムを含んでいる。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。ここでの内容は,変更要請内容を特定するためのテンプレートに情報を埋め込むことによって受付完了とする。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
図51は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,プロジェクト管理情報の変更に関する処理の流れは,プロジェクト管理情報変更要請受付ステップ(S5101)と,プロジェクト管理情報変更要請保持ステップ(S5102)と,プロジェクト管理 情報変更要請実施情報取得ステップ(S5103)と,プロジェクト管理情報変更ステップ(S5104)からなり,その処理に加えて,プロジェクト管理情報変更要請受付ステップには受付完了サブステップが存在する。以下では,受付完了サブステップについて説明する。
「受付完了サブステップ」とは,変更要請内容を特定するためのテンプレートに情報を埋め込むことによって受付完了とする段階である。
<まとめ>
これらにより,変更要請内容の漏れを防ぐことができるプロジェクト管理システムを提供することができる。

本実施例は,実施例1の特徴に加えて,変更要請を実施するために必要な情報を特定するためのテンプレートに情報を埋め込むことによってプロジェクト管理情報変更を実施する旨の情報であるプロジェクト管理情報変更要請実施情報を生成するように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図52は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(5201)と課題情報保持部(5202)と課題解決状況情報取得部(5203)と課題解決状況情報出力部(5204)とリスク情報入力受付部(5205)とリスク情報保持部(5206)とリスク顕在化リスクハイリスク化情報取得部(5207)とリスク顕在化リスクハイリスク化状況出力部(5208)とタスク情報入力受付部(5209)とタスク情報保持部(5210)とタスク処理状況情報取得部(5211)とタスク処理状況情報出力部(5212)とプロジェクト管理情報変更要請受付部(5213)とプロジェクト管理情報変更要請保持部(5214)とプロジェクト管理情報変更要請実施情報取得部(5215)とプロジェクト管理情報変更部(5216)とを有し,プロジェクト管理情報変更要請実施情報取得部が,実施情報生成手段(5217)を有する。以下,具体的に各機能の内容につき説明する。なお,実施情報生成手段を除く各機能については,実施例1と同様であるため,実施情報生成手段の機能に限定して説明する。
「実施情報生成手段」とは,プロジェクト管理情報変更要請実施情報取得部は,変更要請を実施するために必要な情報を特定するためのテンプレートに情報を埋め込むことによってプロジェクト管理情報変更を実施する旨の情報であるプロジェクト管理情報変更要請実施情報を生成する機能を有する。
「プロジェクト管理情報変更要請実施情報」とは,
<ハードウェア構成>
図53は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(5301)と,「主メモリ」(5302)と,を備えている。また,所定の情報を保持する「HDD」(5303)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(5306)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(5304)を備えている。そして,それらが「システムバス」(5305)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムである。プロジェクト管理情報変更要請実施情報取得プログラムは,実施情報生成サブプログラムを含んでいる。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。ここでの内容は,変更要請を実施するために必要な情報を特定するためのテンプレートに情報を埋め込むことによってプロジェクト管理情報変更を実施する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
図54は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,プロジェクト管理情報の変更に関する処理の流れは,プロジェクト管理情報変更要請受付ステップ(S5401)と,プロジェクト管理情報変更要請保持ステップ(S5402)と,プロジェクト管理 情報変更要請実施情報取得ステップ(S54 03)と,プロジェクト管理情報変更ステップ(S5404)からなり,その処理に加えて,プロジェクト管理情報変更ステップには実施情報生成サブステップが存在する。以下では,実施情報生成サブステップについて説明する。
「実施情報生成サブステップ」とは,変更要請を実施するために必要な情報を特定するためのテンプレートに情報を埋め込むことによってプロジェクト管理情報変更を実施する旨の情報であるプロジェクト管理情報変更要請実施情報を生成する段階である。
<まとめ>
これらにより,変更要請の内容をある程度誘導することにより,自由度は低くなるものの,経験が浅い者であっても検討すべきことを漏れなく検討して入力することができるプロジェクト管理システムを提供することができる。

本実施例は,実施例1の特徴に加えて,リスクを客観化するために明確化すべき情報の入力を促すリスクナビゲーションテンプレートに従ってリスク情報の入力を受け付けるように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図55は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(5501)と課題情報保持部(5502)と課題解決状況情報取得部(5503)と課題解決状況情報出力部(5504)とリスク情報入力受付部(5505)とリスク情報保持部(5506)とリスク顕在化リスクハイリスク化情報取得部(5507)とリスク顕在化リスクハイリスク化状況出力部(5508)とタスク情報入力受付部(5509)とタスク情報保持部(5510)とタスク処理状況情報取得部(5511)とタスク処理状況情報出力部(5512)とプロジェクト管理情報変更要請受付部(5513)とプロジェクト管理情報変更要請保持部(5514)とプロジェクト管理情報変更要請実施情報取得部(5515)とプロジェクト管理情報変更部(5516)とを有し,リスク情報入力受付部が,リスクテンプレート入力受付手段(5517)を有する。以下,具体的に各機能の内容につき説明する。なお,リスクテンプレート入力受付手段を除く各機能については,実施例1と同様であるため,リスクテンプレート入力受付手段の機能に限定して説明する。
「リスクテンプレート入力受付手段」とは,リスクを客観化するために明確化すべき情報の入力を促すリスクナビゲーションテンプレートに従ってリスク情報の入力を受け付ける機能を有する。このテンプレートに入力一つでもされない場合にはリスク情報の入力が終了しないように構成するのが好ましい。またリスクテンプレートは,ガイド情報ボタンを有していて,入力すべき内容が理解しがたい利用者に対して,その入力欄は何について記載すればよいかを案内するように構成してもよい。また,入力欄には,入力例を示すための入力例例示ボタンを設けて入力の例を示すように構成することが好ましい。また,種々のプロジェクト管理情報とプロジェクトの進捗状況,プロジェクトの終了結果など過去の事例を人工知能に学習させて,リスクテンプレートにデフォルトでリスク情報を仮記載しておき利用者がそれを編集することで入力が完了するように構成することもできる。
<ハードウェア構成>
図56は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(5601)と,「主メモリ」(5602)と,を備えている。また,所定の情報を保持する「HDD」(5603)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(5606)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(5604)を備えている。そして,それらが「システムバス」(5605)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムである。リスク情報入力受付プログラムは,リスクテンプレート入力受付サブプログラムを含んでいる。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。ここでの内容は,リスクを客観化するために明確化すべき情報の入力を促すリスクナビゲーションテンプレートに従ってリスク情報の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
図57は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,プロジェクト管理情報の変更に関する処理の流れは,リスク情報入力受付ステップ(S5701)と,リスク情報保持ステップ(S5702)と,リスク顕在化リスクハイリスク化情報取得ステップ(S5703)からなり,その処理に加えて,
リスク情報入力受付ステップにはリスクテンプレート入力受付サブステップが存在する。以下では,リスクテンプレート入力受付サブステップについて説明する。
「リスクテンプレート入力受付サブステップ」とは,リスクを客観化するために明確化すべき情報の入力を促すリスクナビゲーションテンプレートに従ってリスク情報の入力を受け付ける段階である。
<まとめ>
これらにより,リスクに関する検討事項をある程度誘導することにより,自由度は低くなるものの,経験が浅い者であっても検討すべきことを漏れなく検討してリスクに関する情報を入力することができるプロジェクト管理システムを提供することができる。

本実施例は,実施例1の特徴に加えて,リスクを定量化するための情報の入力を促すリスク定量化ナビゲーションテンプレートに従ってリスク情報の入力を受け付けるように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図58は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(5801)と課題情報保持部(5802)と課題解決状況情報取得部(5803)と課題解決状況情報出力部(5804)とリスク情報入力受付部(5805)とリスク情報保持部(5806)とリスク顕在化リスクハイリスク化情報取得部(5807)とリスク顕在化リスクハイリスク化状況出力部(5808)とタスク情報入力受付部(5809)とタスク情報保持部(5810)とタスク処理状況情報取得部(5811)とタスク処理状況情報出力部(5812)とプロジェクト管理情報変更要請受付部(5813)とプロジェクト管理情報変更要請保持部(5814)とプロジェクト管理情報変更要請実施情報取得部(5815)とプロジェクト管理情報変更部(5816)とを有し,リスク情報入力受付部が,リスク定量化テンプレート入力受付手段(5817)を有する。以下,具体的に各機能の内容につき説明する。なお,リスク定量化テンプレート入力受付手段を除く各機能については,実施例1と同様であるため,リスク定量化テンプレート入力受付手段の機能に限定して説明する。
「リスク定量化テンプレート入力受付手段」とは,リスクを定量化するための情報の入力を促すリスク定量化ナビゲーションテンプレートに従ってリスク情報の入力を受け付ける機能を有する。
<ハードウェア構成>
図59は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(5901)と,「主メモリ」(5902)と,を備えている。また,所定の情報を保持する「HDD」(5903)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(5906)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(5904)を備えている。そして,それらが「システムバス」(5905)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムである。リスク情報入力受付プログラムは,リスク定量化テンプレート入力受付サブプログラムを含んでいる。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。ここでの内容は,リスクを定量化するための情報の入力を促すリスク定量化ナビゲーションテンプレートに従ってリスク情報の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
図60は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,プロジェクト管理情報の変更に関する処理の流れは,リスク情報入力受付ステップ(S6001)と,リスク情報保持ステップ(S6002)と,リスク顕在化リスクハイリスク化情報取得ステップ(S6003)からなり,その処理に加えて,リスク情報入力受付ステップにはリスク定量化テンプレート入力受付サブステップが存在する。以下では,リスク定量化テンプレート入力受付サブステップについて説明する。
「リスク定量化テンプレート入力受付サブステップ」とは,リスクを定量化するための情報の入力を促すリスク定量化ナビゲーションテンプレートに従ってリスク情報の入力を受け付ける段階である。

本実施例は,実施例1の特徴に加えて,保持されているリスク情報をマッピングするように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図61は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(6101)と課題情報保持部(6102)と課題解決状況情報取得部(6103)と課題解決状況情報出力部(6104)とリスク情報入力受付部(6105)とリスク情報保持部(6106)とリスク顕在化リスクハイリスク化情報取得部(6107)とリスク顕在化リスクハイリスク化状況出力部(6108)とタスク情報入力受付部(6109)とタスク情報保持部(6110)とタスク処理状況情報取得部(6111)とタスク処理状況情報出力部(6112)とプロジェクト管理情報変更要請受付部(6113)とプロジェクト管理情報変更要請保持部(6114)とプロジェクト管理情報変更要請実施情報取得部(6115)とプロジェクト管理情報変更部(6116)とを有し,リスク顕在化リスクハイリスク化状況出力部が,リスク情報マッピング手段(6117)を有する。以下,具体的に各機能の内容につき説明する。なお,リスク情報マッピング手段を除く各機能については,実施例1と同様であるため,リスク情報マッピング手段の機能に限定して説明する。
「リスク情報マッピング手段」とは,保持されているリスク情報をマッピングする機能を有する。
図26は,マッピングされたリスク情報(リスクマップ)の一例を示す図である。図にあるように,プロジェクトへの影響度と顕在化可能性が基本軸として示されている。大小の位置関係は問わないが,図の一例の場合には,円高急進(R0211)は顕在化確率が高いがプロジェクトに与える影響は小さく,労働力不足(R0308)は顕在化確率が比較的高いがプロジェクトに与える影響も比較的大きく,キーパーソンの退職(R1181)は顕在化確率が中程度であってプロジェクトに与える影響も中程度であり,品質事故(R0311)発注の取消(R0101)いずれも顕在化確率が低いがプロジェクトに与える影響も大きいという具合である。このように言葉では「大きい」「小さい」などで表現せざるを得ないが,マップにすることにより,各リスクの位置づけを具体的にイメージすることができる。
<ハードウェア構成>
図62は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(6201)と,「主メモリ」(6202)と,を備えている。また,所定の情報を保持する「HDD」(6203)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(6206)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(6204)を備えている。そして,それらが「システムバス」(6205)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムである。リスク顕在化リスクハイリスク化状況出力プログラムは,リスク情報マッピングサブプログラムを含んでいる。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。ここでの出力は,保持されているリスク情報がマッピングされた状態にて出力される。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
図63は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れ(出力に関する点に限る。)を示す図である。各情報の出力に関しては順番は問わないが,まず状況情報(課題情報,リスク情報,タスク情報の各情報の進行を示す情報を含み,それに限定されない。)出力をするか否かを問い,出力する場合には次に課題解決状況情報を出力するかを問い,出力する場合には課題解決状況情報を出力し,それで終了するかを問うて終了でない場合には最初に戻る。次に課題解決状況情報を出力しない場合には,リスク顕在化ハイリスク化情報を出力するかを問い,出力する場合にはリスク顕在化ハイリスク化情報を出力し,それで終了するかを問うて,終了でない場合には最初に戻る。次にリスク顕在化ハイリスク化情報を出力しない場合には,タスク処理状況情報を出力するかを問い,出力する場合にはタスク処理状況情報を出力し,それで終了するかを問うて,終了でない場合には最初に戻る。全体としては上記のような流れであるが,実施例1の特徴に加えて,リスク顕在化リスクハイリスク化情報を出力するに際して,リスク情報マッピングサブステップとを有している構成となっているので,リスク情報マッピングサブステップについて説明する。
「リスク情報マッピングサブステップ」とは,保持されているリスク情報をマッピングする段階である。
<まとめ>
これらにより,リスク情報が一目で把握することができるプロジェクト管理システムを提供することができる。

本実施例は,実施例1の特徴に加えて,課題情報,リスク情報,タスク情報,前提情報の相互に関連付けを示す情報である相互関連情報(本明細書では相互依存情報もこの情報の一種として扱う)を取得して,その相互関連情報を保持するように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図64は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(6401)と課題情報保持部(6402)と課題解決状況情報取得部(6403)と課題解決状況情報出力部(6404)とリスク情報入力受付部(6405)とリスク情報保持部(6406)とリスク顕在化リスクハイリスク化情報取得部(6407)とリスク顕在化リスクハイリスク化状況出力部(6408)とタスク情報入力受付部(6409)とタスク情報保持部(6410)とタスク処理状況情報取得部(6411)とタスク処理状況情報出力部(6412)とプロジェクト管理情報変更要請受付部(6413)とプロジェクト管理情報変更要請保持部(6414)とプロジェクト管理情報変更要請実施情報取得部(6415)とプロジェクト管理情報変更部(6416)と相互関連情報取得部(6417)と相互関連情報保持部(6418)を有する。以下,具体的に各機能の内容につき説明する。なお,相互関連情報取得部と相互関連情報保持部を除く各機能については,実施例1と同様であるため,相互関連情報取得部と相互関連情報保持部の機能に限定して説明する。
「相互関連情報取得部」とは,課題情報,リスク情報,タスク情報,前提情報の相互に関連付けを示す情報である相互関連情報を取得する機能を有する。例えば「課題情報」と「タスク情報」との相互関連情報とは,課題情報に関連付けられているタスク情報は,関連付けられているすべてのタスク情報で示されるタスクが完了することによってその課題情報で示される課題が解決したとする関係性を示す情報であったり,「リスク情報」と「課題情報」との関係はリスク情報で示されるリスクが顕在化した場合に,その課題情報で示される課題の解決が不可能となる関係や,リスクが顕在化したばあに新たな課題として解決しなければならない課題を示す課題情報であるとの関係を示す情報であったり,「前提情報」と他のプロジェクト管理情報との関係は前提情報が崩れた場合に他のプロジェクト管理情報に変更が生じる関係であることを示す情報であったりする。また同じカテゴリー間での関係性を示す場合もある。例えば「課題情報」と他の「課題情報」との関係は,一つの課題情報で示される課題が解決した場合には他の課題情報で示される課題の解決が不要になるような関係であったり,「タスク情報」と他の「タスク情報」とは,まず一のタスク情報で示されるタスクを完了してからでないと他のタスク情報で示されるタスクを開始してはならない関係を示す情報であったりする。これらの関係情報とプロジェクトの進行度合いを示す情報(課題とタスクの進行状況情報の他に,課題とタスクの進行状況情報に基づいて構成される総合的な進行状況情報)に基づいて各種の指示やアドバイスをシステム内に保持されている指示・アドバイスルールに基づいてシステムがするように構成されていてもよい(プロジェクト進行作業指示部)
「相互関連情報保持部」とは,取得した相互関連情報を保持する機能を有する。
<ハードウェア構成>
図65は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(6501)と,「主メモリ」(6502)と,を備えている。また,所定の情報を保持する「HDD」(6503)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(6506)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(6504)を備えている。そして,それらが「システムバス」(6505)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムと相互関連情報取得プログラムと相互関連情報保持プログラムである。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。さらに,本実施例では,相互関連情報が格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されている相互関連情報取得プログラムを実行して,課題情報,リスク情報,タスク情報,前提情報の相互に関連付けを示す情報である相互関連情報を取得する。そして,相互関連情報保持プログラムを実行して,取得した相互関連情報を保持する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
図66は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,実施例1の処理に加えて,順番は問わないが,相互関連情報取得ステップと相互関連情報保持ステップが存在する。以下では,相互関連情報取得ステップと相互関連情報保持ステップについて説明する。
「相互関連情報取得ステップ」とは,課題情報,リスク情報,タスク情報,前提情報の相互に関連付けを示す情報である相互関連情報を取得する段階である。
「相互関連情報保持ステップ」とは,取得した相互関連情報を保持する段階である。

本実施例は,実施例12の特徴に加えて,課題情報とタスク情報が関連付けられている場合には,保持された課題が解決された旨を示す情報である課題解決状況情報を,関連付けられているタスク情報のタスク処理状況情報に基づいて生成し,課題解決状況情報取得部に渡すように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図67は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(6701)と課題情報保持部(6702)と課題解決状況情報取得部(6703)と課題解決状況情報出力部(6704)とリスク情報入力受付部(6705)とリスク情報保持部(6706)とリスク顕在化リスクハイリスク化情報取得部(6707)とリスク顕在化リスクハイリスク化状況出力部(6708)とタスク情報入力受付部(6709)とタスク情報保持部(6710)とタスク処理状況情報取得部(6711)とタスク処理状況情報出力部(6712)とプロジェクト管理情報変更要請受付部(6713)とプロジェクト管理情報変更要請保持部(6714)とプロジェクト管理情報変更要請実施情報取得部(6715)とプロジェクト管理情報変更部(6716)と相互関連情報取得部(6717)と相互関連情報保持部(6718)と課題解決状況情報生成部(6717)を有する。以下,具体的に各機能の内容につき説明する。なお,課題解決状況情報生成部を除く各機能については,実施例12と同様であるため,課題解決状況情報生成部の機能に限定して説明する。
「課題解決状況情報生成部」とは,課題情報とタスク情報が関連付けられている場合には,保持された課題が解決された旨を示す情報である課題解決状況情報を,関連付けられているタスク情報のタスク処理状況情報に基づいて生成し,課題解決状況情報取得部に渡す機能を有する。
<ハードウェア構成>
図68は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(6801)と,「主メモリ」(6802)と,を備えている。また,所定の情報を保持する「HDD」(6803)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(6806)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(6804)を備えている。そして,それらが「システムバス」(6805)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムと相互関連情報取得プログラムと相互関連情報保持プログラムと課題解決状況情報生成プログラムである。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報,相互関連情報などが格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されている相互関連情報取得プログラムを実行して,課題情報,リスク情報,タスク情報,前提情報の相互に関連付けを示す情報である相互関連情報を取得する。そして,相互関連情報保持プログラムを実行して,取得した相互関連情報を保持する。
次に「CPU」は,「主メモリ」に格納されている課題解決状況情報生成プログラムを実行して,課題情報とタスク情報が関連付けられている場合には,保持された課題が解決された旨を示す情報である課題解決状況情報を,関連付けられているタスク情報のタスク処理状況情報に基づいて生成し,課題解決状況情報取得部に渡す。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
<処理の流れ>
図69は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,タスク情報に関する処理の流れは,タスク情報入力受付ステップ(S6901)と,タスク情報保持ステップ(S6902)と,タスク処理状況情報取得ステップ(S6903)とに加えて,課題解決状況情報生成ステップ(S06904)が存在する。以下では,課題解決状況情報生成ステップについて説明する。
「課題解決状況情報生成ステップ」とは,課題情報とタスク情報が関連付けられている場合には,保持された課題が解決された旨を示す情報である課題解決状況情報を,関連付けられているタスク情報のタスク処理状況情報に基づいて生成し,課題解決状況情報取得部に渡す段階である。
<まとめ>
これらにより,課題解決状況に関する検討事項をある程度誘導することにより,自由度は低くなるものの,経験が浅い者であってもタスク処理に関する内容を誘導に従って入力すれば,自動的に課題解決状況が導かれるプロジェクト管理システムを提供することができる。

本実施例は,実施例2の特徴に加えて,プロジェクト管理情報に関連付けられている前提情報の変更の入力を受け付け,前提情報と関連付けられているプロジェクト管理情報の修正を促すように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図70は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(7001)と課題情報保持部(7002)と課題解決状況情報取得部(7003)と課題解決状況情報出力部(7004)とリスク情報入力受付部(7005)とリスク情報保持部(7006)とリスク顕在化リスクハイリスク化情報取得部(7007)とリスク顕在化リスクハイリスク化状況出力部(7008)とタスク情報入力受付部(7009)とタスク情報保持部(7010)とタスク処理状況情報取得部(7011)とタスク処理状況情報出力部(7012)とプロジェクト管理情報変更要請受付部(7013)とプロジェクト管理情報変更要請保持部(7014)とプロジェクト管理情報変更要請実施情報取得部(7015)とプロジェクト管理情報変更部(7016)と前提変更入力受付部(7017)と修正促進部(7018)を有する。以下,具体的に各機能の内容につき説明する。なお,前提変更入力受付部と修正促進部を除く各機能については,実施例1と同様であるため,前提変更入力受付部と修正促進部の機能に限定して説明する。
「前提変更入力受付部」とは,プロジェクト管理情報に関連付けられている前提情報の変更の入力を受け付ける機能を有する。前提情報は自由形式で作文されたものであってもよいし,テンプレートなどに一部従って入力され,作成されたものであってもよい。後者の場合には入力される空欄ごとに,どのような意味のある前提であるかを識別し,入力内容に関して前提要素属性識別情報を付すように構成する。要素属性一覧の一例として,例えば,「1 資金量,株価,債券,融資額,投資額」「2 協力関係,提携関係,共同開発,共同事業,合併」「3 社長,役員,リーダー,開発者,営業者,プログラマー,SE」「4 土地,建物,研究施設,開発設備」「5 利率,配当,償還期限」「6 景気動向,物価指数,工業指数」「7 雇用人数,出向人数,バイト人数,委託人数」「8 通信に関する法律,交通に関する法律,金融に関する法律」「9 通信技術進歩,計算技術進歩,交通技術進歩,バイオ技術進歩」「10 行政認可,法案成立,試験成否,性能試験合格」「11 気候,天候,災害(地震,津波,火山,洪水),公害」などがあり得るが,前提の変更されたよそ属性に応じてプロジェクト管理情報のいずれを修正するように指示するルールがシステムに格納されていることが好ましい(前提要素属性毎プロジェクト管理情報修正指示部)。例えば上記の「1」についての前提が崩れた場合には,コストや売上,利益に影響を及ぼしえるプロジェクト管理情報に対する修正指示を出力するように構成する。従って,各プロジェクト管理情報は,そのプロジェクト管理情報が影響を受ける可能性がある前提所法の前提要素属性識別情報と関連付けられて管理されていることが好ましい。これはプロジェクト管理情報の登録,入力,修正の際に関連付けを入力させるようにシステムを構成してもよいし,プロジェクト管理情報の入力に基づいてシステムが影響を受けうる前提要素属性識別情報をそのプロジェクト管理情報識別情報と関連付けて各保持部に記録,保持するように構成してもよい。
「修正促進部」とは,前提情報と関連付けられているプロジェクト管理情報の修正を促す機能を有する。
<ハードウェア構成>
図71は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(7101)と,「主メモリ」(7102)と,を備えている。また,所定の情報を保持する「HDD」(7103)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(7106)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(7104)を備えている。そして,それらが「システムバス」(7105)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムと前提変更入力受付プログラムと修正促進プログラムである。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。さらに,本実施例では,前提情報が格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
次に,「CPU」は,「主メモリ」に格納されている前提変更入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報に関連付けられている前提情報の変更の入力を受け付ける。そして,修正促進プログラムを実行して,「ネットワーク・インターフェース」を通じて前提情報と関連付けられているプロジェクト管理情報の修正を促す。
<処理の流れ>
図72は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。本実施例では,実施例2の処理に加えて,順番は問わないが,前提変更入力受付ステップと修正促進ステップが存在する。以下では,前提変更入力受付ステップと修正促進ステップについて説明する。
「前提変更入力受付ステップ」とは,プロジェクト管理情報に関連付けられている前提情報の変更の入力を受け付ける段階である。
「修正促進ステップ」とは,前提情報と関連付けられているプロジェクト管理情報の修正を促す段階である。
<まとめ>
これらにより,前提情報の変更に応じてプロジェクト管理情報の修正の必要性が生じた場合に,その修正を促すことができるプロジェクト管理システムを提供することができる。

本実施例は,実施例1の特徴に加えて,プロジェクト目標達成に関連するステークホルダーの入力をそのステークホルダーの属性を示す指標値を関連付けて受け付け,ステークホルダーとそれに関連付けて受け付けられた指標値とを用いてステークホルダーのマップを生成し,生成されたマップを出力するように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図73は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(7301)と課題情報保持部(7302)と課題解決状況情報取得部(7303)と課題解決状況情報出力部(7304)とリスク情報入力受付部(7305)とリスク情報保持部(7306)とリスク顕在化リスクハイリスク化情報取得部(7307)とリスク顕在化リスクハイリスク化状況出力部(7308)とタスク情報入力受付部(7309)とタスク情報保持部(7310)とタスク処理状況情報取得部(7311)とタスク処理状況情報出力部(7312)とプロジェクト管理情報変更要請受付部(7313)とプロジェクト管理情報変更要請保持部(7314)とプロジェクト管理情報変更要請実施情報取得部(7315)とプロジェクト管理情報変更部(7316)とステークホルダー入力受付部(7317)とステークホルダーマップ生成部(7318)とマップ出力部(7319)を有する。以下,具体的に各機能の内容につき説明する。なお,ステークホルダー入力受付部とステークホルダーマップ生成部とマップ出力部を除く各機能については,実施例1と同様であるため,ステークホルダー入力受付部とステークホルダーマップ生成部とマップ出力部の機能に限定して説明する。
「ステークホルダー入力受付部」とは,プロジェクト目標達成に関連するステークホルダーの入力をそのステークホルダーの属性を示す指標値を関連付けて受け付ける機能を有する。
「ステークホルダーマップ生成部」とは,ステークホルダーとそれに関連付けて受け付けられた指標値とを用いてステークホルダーのマップを生成する機能を有する。図27に示すように,例えば一軸がプロジェクトに対する影響力の高さ,他の一軸がプロジェクトに対する作用度合(不認識,抵抗,中立,支持,指導など)をし,この二軸で作られる空間にステークホルダーの識別情報を配置する。ステークホルダーの識別情報は,マウスやキーボード等でマップ中を移動可能に構成することができ,移動することによってプロジェクトに新たに課題を発生させたり,あるいは課題を消滅させたりするように構成することができる。従って,システムでは,ステークホルダーの配置と,その配置で存在しなければならない課題やタスクを予め準備して起き,配置の変更に伴って課題の変更を利用者に示唆して課題変更を実行させるか(課題変更示唆部),自動的にシステムが予め準備されていた課題変更を実行するように構成(自動課題変更部)することができる。また課題でなくタスクを変更するように構成(タスク変更示唆部,自動タスク変更部)してもよい。さらに,リスクや前提情報を変更するように構成することもできる。これらも予め定められたステークホルダーの位置と関連付けてそこに存在すべきリスクやその際にあるべき前提情報を予め準備することで自動的に変更(リスク・前提情報変更部,リスク・前提情報変更示唆部)することも可能となる。
「マップ出力部」とは,生成されたマップを出力する機能を有する。この出力は紙はもちろん,タッチパネルなどのディスプレイにマウスやカーソルで制御可能に出力することもできる。なお,マップ編集部を設けてステークホルダーの位置の変更をする位置変更手段を設けたり,マップ編集部にて既存のステークホルダーの削除を受け付けたり(既存ステークホルダー削除受付手段),マップ編集部にて新規のステークホルダーの入力を受け付けたり(新規ステークホルダー入力受付手段)を設けることも好ましい。
<ハードウェア構成>
図74は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(7401)と,「主メモリ」(7402)と,を備えている。また,所定の情報を保持する「HDD」(7403)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(7406)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(7404)を備えている。そして,それらが「システムバス」(7405)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムとステークホルダー入力受付プログラムとステークホルダーマップ生成プログラムとマップ出力プログラムである。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。さらに,本実施例では,ステークホルダーの情報が格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
次に「CPU」は,「主メモリ」に格納されているステークホルダー入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト目標達成に関連するステークホルダーの入力をそのステークホルダーの属性を示す指標値を関連付けて受け付ける。次に「CPU」は,「主メモリ」に格納されているステークホルダーマップ生成プログラムを実行して,ステークホルダーとそれに関連付けて受け付けられた指標値とを用いてステークホルダーのマップを生成する。次に「CPU」は,「主メモリ」に格納されているマップ出力プログラムを実行して,「ネットワーク・インターフェース」を通じて生成されたマップを出力する。
<処理の流れ>
図75は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,実施例1の処理に加えて,順番は問わないが,ステークホルダー入力受付ステップ(S7501)とステークホルダーマップ生成ステップ(S7502)とマップ出力ステップ(S7503)が存在する。以下では,ステークホルダー入力受付ステップとステークホルダーマップ生成ステップとマップ出力ステップについて説明する。
「ステークホルダー入力受付ステップ」とは,プロジェクト目標達成に関連するステークホルダーの入力をそのステークホルダーの属性を示す指標値を関連付けて受け付ける段階である。
「ステークホルダーマップ生成ステップ」とは,ステークホルダーとそれに関連付けて受け付けられた指標値とを用いてステークホルダーのマップを生成する段階である。
「マップ出力ステップ」とは,生成されたマップを出力する段階である。
<まとめ>
これらにより,プロジェクトを達成する上でキーマンとなっている者の属性を一目で把握することができ,プロジェクトを順調に進めることができるプロジェクト管理システムを提供することができる。

本実施例は,実施例1の特徴に加えて,状況情報をマップ化した情報である状況情報マップを取得し,取得した状況情報マップを出力するように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図76は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(7601)と課題情報保持部(7602)と課題解決状況情報取得部(7603)と課題解決状況情報出力部(7604)とリスク情報入力受付部(7605)とリスク情報保持部(7606)とリスク顕在化リスクハイリスク化情報取得部(7607)とリスク顕在化リスクハイリスク化状況出力部(7608)とタスク情報入力受付部(7609)とタスク情報保持部(7610)とタスク処理状況情報取得部(7611)とタスク処理状況情報出力部(7612)とプロジェクト管理情報変更要請受付部(7613)とプロジェクト管理情報変更要請保持部(7614)とプロジェクト管理情報変更要請実施情報取得部(7615)とプロジェクト管理情報変更部(7616)と状況情報マップ取得部(7617)と状況情報マップ出力部(7618)を有する。以下,具体的に各機能の内容につき説明する。なお,状況情報マップ取得部と状況情報マップ出力部を除く各機能については,実施例1と同様であるため,状況情報マップ取得部と状況情報マップ出力部の機能に限定して説明する。
「状況情報マップ取得部」とは,状況情報をマップ化した情報である状況情報マップを取得する機能を有する。
「状況情報マップ出力部」とは,取得した状況情報マップを出力する機能を有する。階層構造などで示された各課題別,各タスク別(識別情報別)に円グラフなどを用いて100%終了に対する達成割合を表示する。そして,カーソルやマウスなどで,その円グラフや,課題,タスクの識別情報をクリックすると,課題情報,タスク情報,達成状況,その他その情報に関連する情報がポップアップなどで表示されるように構成すると便利である。例えば,そのタスクに関するメンバー識別子が表示され,そのメンバー識別子をクリックすることで,そのメンバーに対するメール作成画面が開いたり,そのメンバーに対する電話が可能となるように構成すると便利である。また,その連絡はSNSを開いてされるように構成してもよい。そのSNSはそのタスクメンバーが構成員となっているもので,メンバー全員で共有できるように構成されていてもよい。また,作業遅延が発生している場合には,メンバーによる遅延原因レポートが記録されていて,それを閲覧できるようになっていたり,遅延を解消するための策が記録されていて,それを閲覧できるように構成(レポート閲覧手段)されていてもよい。さらには,クリックすることによって他のタスクメンバーが支援を申し入れることができるように構成(支援申入手段)されていてもよい。
<ハードウェア構成>
図77は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(7701)と,「主メモリ」(7702)と,を備えている。また,所定の情報を保持する「HDD」(7703)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(7706)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(7704)を備えている。そして,それらが「システムバス」(7705)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムと状況情報マップ取得プログラムと状況情報マップ出力プログラムである。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。さらに,本実施例では,状況情報マップが格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
「CPU」は,「主メモリ」に格納されている状況情報マップ取得プログラムを実行して,状況情報をマップ化した情報である状況情報マップを取得する。そして,「CPU」は,「主メモリ」に格納されている状況情報マップ出力プログラムを実行して,取得した状況情報マップを出力する。
<処理の流れ>
図78は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,実施例1の処理に加えて,順番は問わないが,状況情報マップ取得ステップ(S7801)と状況情報マップ出力ステップ(S7802)が存在する。以下では,状況情報マップ取得ステップと状況情報マップ出力ステップについて説明する。
「状況情報マップ取得ステップ」とは,状況情報をマップ化した情報である状況情報マップを取得する段階である。
「状況情報マップ出力ステップ」とは,取得した状況情報マップを出力する段階である。
<まとめ>
これらにより,一目でプロジェクト情報である課題情報,タスク情報,リスク情報の進捗を把握することができるプロジェクト管理システムを提供することができる。

本実施例は,実施例1の特徴に加えて,プロジェクトの目標を達成するためのメンバー又はメンバーから構成されるチームを識別するメンバーチーム識別情報を保持し,メンバーチーム識別情報とそのメンバーチームが携わるプロジェクト管理情報を関連付けたメンバーチームプロジェクト管理情報関係を保持し,保持されているメンバーチームプロジェクト管理情報関係を出力するように構成されているプロジェクト管理システムを提供する。
以下,本実施例におけるプロジェクト管理システムについて,機能的構成,ハードウェア構成及び処理の流れについて,順に説明する。
<機能的構成>
図79は,本実施例におけるプロジェクト管理システムの機能的構成を示す図である。本実施例におけるプロジェクト管理システムは,課題情報入力受付部(7901)と課題情報保持部(7902)と課題解決状況情報取得部(7903)と課題解決状況情報出力部(7904)とリスク情報入力受付部(7905)とリスク情報保持部(7906)とリスク顕在化リスクハイリスク化情報取得部(7907)とリスク顕在化リスクハイリスク化状況出力部(7908)とタスク情報入力受付部(7909)とタスク情報保持部(7910)とタスク処理状況情報取得部(7911)とタスク処理状況情報出力部(7912)とプロジェクト管理情報変更要請受付部(7913)とプロジェクト管理情報変更要請保持部(7914)とプロジェクト管理情報変更要請実施情報取得部(7915)とプロジェクト管理情報変更部(7916)とメンバーチーム識別情報保持部(7917)とメンバーチームプロジェクト管理情報関係保持部(7918)とメンバーチームプロジェクト管理関係出力部(7919)を有する。以下,具体的に各機能の内容につき説明する。なお,メンバーチーム識別情報保持部とメンバーチームプロジェクト管理情報関係保持部とメンバーチームプロジェクト管理関係出力部を除く各機能については,実施例1と同様であるため,メンバーチーム識別情報保持部とメンバーチームプロジェクト管理情報関係保持部とメンバーチームプロジェクト管理関係出力部の機能に限定して説明する。
「メンバーチーム識別情報保持部」とは,プロジェクトの目標を達成するためのメンバー又はメンバーから構成されるチームを識別するメンバーチーム識別情報を保持する機能を有する。
「メンバーチームプロジェクト管理情報関係保持部」とは,メンバーチーム識別情報とそのメンバーチームが携わるプロジェクト管理情報を関連付けたメンバーチームプロジェクト管理情報関係を保持する機能を有する。
「メンバーチームプロジェクト管理関係出力部」とは,保持されているメンバーチームプロジェクト管理情報関係を出力する機能を有する。
<ハードウェア構成>
図80は,本実施例におけるプロジェクト管理システムのハードウェア構成を示す図である。この図にあるように,本実施例におけるプロジェクト管理システムは,各種演算処理を行う「CPU(中央演算装置)」(8001)と,「主メモリ」(8002)と,を備えている。また,所定の情報を保持する「HDD」(8003)や,複数のユーザ識別情報と関連付けられたユーザ端末装置(8006)と情報の送受信を行う「ネットワーク・I/F(インターフェース)」(8004)を備えている。そして,それらが「システムバス」(8005)などのデータ通信経路によって相互に接続され,情報の送受信や処理を行う。
ここに「主メモリ」は,各種処理を行うプログラムを「CPU」に実行させるために読み出すと同時に,そのプログラムの作業領域でもあるワーク領域を提供する。また,この「主メモリ」や「HDD」にはそれぞれ複数のアドレスが割り当てられており,「CPU」で実行されるプログラムは,そのアドレスを特定しアクセスすることで相互にデータのやりとりを行い,処理を行うことが可能になっている。
本実施例において「主メモリ」に格納されているプログラムは,課題情報入力受付プログラムと課題情報保持プログラムと課題解決状況情報取得プログラムと課題解決状況情報出力プログラムとリスク情報入力受付プログラムとリスク情報保持プログラムとリスク顕在化リスクハイリスク化情報取得プログラムとリスク顕在化リスクハイリスク化状況出力プログラムとタスク情報入力受付プログラムとタスク情報保持プログラムとタスク処理状況情報取得プログラムとタスク処理状況情報出力プログラムとプロジェクト管理情報変更要請受付プログラムとプロジェクト管理情報変更要請保持プログラムとプロジェクト管理情報変更要請実施情報取得プログラムとプロジェクト管理情報変更プログラムとンバーチーム識別情報保持プログラムとメンバーチームプロジェクト管理情報関係保持プログラムとメンバーチームプロジェクト管理関係出力プログラムである。
また,「主メモリ」と「HDD」には,実施例1と同様に,課題情報,課題識別情報,課題解決状況情報,リスク情報,リスク識別情報,リスク顕在化リスクハイリスク化情報,タスク情報,タスク処理状況情報,プロジェクト管理情報変更要請,プロジェクト管理情報変更要請識別情報,プロジェクト管理情報変更要請実施情報などが格納されている。さらに,本実施例では,メンバーチーム識別情報とメンバーチームプロジェクト管理情報関係が格納されている。
「CPU」は,「主メモリ」に格納されている課題情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける。そして,課題情報保持プログラムを実行して,一以上の課題情報を課題識別情報と関連付けて格納する。そして,「主メモリ」に格納されている課題解決状況情報取得プログラムを実行して,保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する。そして,「主メモリ」に格納されている課題解決状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されている課題情報と課題解決状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているリスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付ける。そして,リスク情報保持プログラムを実行して,入力された一以上のリスク情報をリスク識別情報と関連付けて保持する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化情報取得プログラムを実行して,保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているリスク顕在化リスクハイリスク化状況出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているタスク情報入力受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報であって,プロジェクトの目標を達成するに際して処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付ける。そして,タスク情報保持プログラムを実行して,入力された一以上のタスク情報をタスク識別情報と関連付けて格納する。そして,「主メモリ」に格納されているタスク処理状況情報取得プログラムを実行して,保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得する。そして,「主メモリ」に格納されているタスク処理状況情報出力プログラムを実行して,「ネットワーク・インターフェース」を通じて保持されているタスク情報とタスク処理状況情報とを関連付けて出力する。
次に「CPU」は,「主メモリ」に格納されているプロジェクト管理情報変更要請受付プログラムを実行して,「ネットワーク・インターフェース」を通じてプロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付ける。そして,プロジェクト管理情報変更要請保持プログラムを実行して,受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持する。そして,「主メモリ」に格納されているプロジェクト管理情報変更要請実施情報取得プログラムを実行して,持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得する。そして,「主メモリ」に格納されているプロジェクト管理情報変更プログラムを実行して,取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更する。
次に「CPU」は,「主メモリ」に格納されているメンバーチーム識別情報保持プログラムを実行して,プロジェクトの目標を達成するためのメンバー又はメンバーから構成されるチームを識別するメンバーチーム識別情報を保持する。次に「CPU」は,「主メモリ」に格納されているメンバーチームプロジェクト管理情報関係保持プログラムを実行して,メンバーチーム識別情報とそのメンバーチームが携わるプロジェクト管理情報を関連付けたメンバーチームプロジェクト管理情報関係を保持する。次に「CPU」は,「主メモリ」に格納されているメンバーチームプロジェクト管理関係出力プログラムを実行して,保持されているメンバーチームプロジェクト管理情報関係を出力する。
<処理の流れ>
図81は,本実施例におけるプロジェクト管理システムを利用した場合の処理の流れを示す図である。実施例1と重複する部分は図示しないが,実施例1における処理の流れが存在することが前提となっている。本実施例では,実施例1の処理に加えて,順番は問わないが,メンバーチーム識別情報保持ステップとメンバーチームプロジェクト管理情報関係保持ステップとメンバーチームプロジェクト管理関係出力ステップが存在する。以下では,メンバーチーム識別情報保持ステップとメンバーチームプロジェクト管理情報関係保持ステップとメンバーチームプロジェクト管理関係出力ステップについて説明する。
「メンバーチーム識別情報保持ステップ」とは,プロジェクトの目標を達成するためのメンバー又はメンバーから構成されるチームを識別するメンバーチーム識別情報を保持する段階である。
「メンバーチームプロジェクト管理情報関係保持ステップ」とは,メンバーチーム識別情報とそのメンバーチームが携わるプロジェクト管理情報を関連付けたメンバーチームプロジェクト管理情報関係を保持する段階である。
「メンバーチームプロジェクト管理関係出力ステップ」とは,保持されているメンバーチームプロジェクト管理情報関係を出力する段階である。
<まとめ>
これらにより,プロジェクト単位に限らず,チーム単位にてプロジェクトの進捗管理(リスク状況や,ステークホルダー等を含む。)をすることができるプロジェクト管理システムを提供することができる。

CPU: 2901
主メモリ:2902
HDD:2903
ネットワークI/F: 2904
システムバス: 2905
ユーザ端末装置:2906

Claims (20)

  1.  プロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける課題情報入力受付部と,
     一以上の課題情報を課題識別情報と関連付けて保持する課題情報保持部と,
     保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する課題解決状況情報取得部と,
     保持されている課題情報と課題解決状況情報とを関連付けて出力する課題解決状況情報出力部と,
     プロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付けるリスク情報入力受付部と,
     入力された一以上のリスク情報をリスク識別情報と関連付けて保持するリスク情報保持部と,
     保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得するリスク顕在化リスクハイリスク化情報取得部と,
     保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力するリスク顕在化リスクハイリスク化状況出力部と,
     プロジェクト管理情報であって,プロジェクトの目標を達成するに際して少なくとも一部は,前記課題を解決するために処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付けるタスク情報入力受付部と,
     入力された一以上のタスク情報をタスク識別情報と関連付けて保持するタスク情報保持部と,
     保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得するタスク処理状況情報取得部と,
     保持されているタスク情報とタスク処理状況情報とを関連付けて出力するタスク処理状況情報出力部と,
     プロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付けるプロジェクト管理情報変更要請受付部と,
     受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持するプロジェクト管理情報変更要請保持部と,
     保持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得するプロジェクト管理情報変更要請実施情報取得部と,
     取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更するプロジェクト管理情報変更部と,
    を有するプロジェクト管理システム。
  2.  プロジェクト管理情報を特定できる前提となる情報である前提情報をプロジェクト管理情報と関連付けて取得するプロジェクト管理情報前提情報取得部と
     取得した前提情報をプロジェクト管理情報と関連付けて保持するプロジェクト管理情報前提情報保持部と,
    を有する請求項1に記載のプロジェクト管理システム。
  3.  保持されたリスクが顕在化した旨を示す情報であるリスク顕在化リスクハイリスク化情報がリスク識別情報と関連付けて取得された場合に,顕在化したリスクに基づいて解決しなければならないこととなった課題情報を生成し,課題識別情報と関連付けて課題情報保持部に記録する生成課題記録部をさらに有する請求項1又は請求項2に記載のプロジェクト管理システム。
  4.  新たに生成され保持された課題情報に関連付けるタスク情報をその課題情報と関連付けて入力する新規課題対応タスク情報入力部をさらに有する請求項3に記載のプロジェクト管理システム。
  5.  プロジェクトを識別するプロジェクト識別情報と関連付けて成功体験を示す情報である成功体験情報又は/及び,失敗体験を示す情報である失敗体験情報である体験情報の入力を受け付ける体験情報入力受付部と,
     入力を受け付けた体験情報をプロジェクト識別情報と関連付けて蓄積する体験情報蓄積部と,
     蓄積されている体験情報の閲覧要求を受け付ける体験情報閲覧要求受付部と,
     受けつけた閲覧要求に応じて体験情報を閲覧させる体験情報閲覧部と,
    をさらに有する請求項1から請求項4のいずれか一に記載のプロジェクト管理システム。
  6.  体験情報は,テキスト情報,動画情報,添付書類情報,静止画情報,音声情報のいずれか一以上を含む請求項5に記載のプロジェクト管理システム。
  7.  体験情報入力受付部は,プロジェクト管理情報と関連付けて入力を受け付けるプロジェクト管理情報別体験情報入力受付手段を有する請求項5又は請求項6に記載のプロジェクト管理システム。
  8.  プロジェクト管理情報変更要請受付部は,変更要請内容を特定するためのテンプレートに情報を埋め込むことによって受付完了とする受付完了手段を有する請求項1から請求項7のいずれか一に記載のプロジェクト管理システム。
  9. プロジェクト管理情報変更要請実施情報取得部は,変更要請を実施するために必要な情報を特定するためのテンプレートに情報を埋め込むことによってプロジェクト管理情報変更を実施する旨の情報であるプロジェクト管理情報変更要請実施情報を生成する実施情報生成手段を有する請求項1から請求項8のいずれか一に記載のプロジェクト管理システム。
  10.  リスク情報入力受付部は,リスクを客観化するために明確化すべき情報の入力を促すリスクナビゲーションテンプレートに従ってリスク情報の入力を受け付けるリスクテンプレート入力受付手段を有する請求項1から請求項9のいずれか一に記載のプロジェクト管理システム。
  11.  リスク情報入力受付部は,リスクを定量化するための情報の入力を促すリスク定量化ナビゲーションテンプレートに従ってリスク情報の入力を受け付けるリスク定量化テンプレート入力受付手段を有する請求項1から請求項10のいずれか一に記載のプロジェクト管理システム。
  12.  リスク顕在化リスクハイリスク化状況出力部は,保持されているリスク情報をマッピングするリスク情報マッピング手段を有する請求項1から請求項11のいずれか一に記載のプロジェクト管理システム。
  13.  課題情報,リスク情報,タスク情報,前提情報の相互に関連付けを示す情報である相互関連情報を取得するて相互関連情報取得部と,
     取得した相互関連情報を保持する相互関連情報保持部と,
    をさらに有する請求項1から請求項12のいずれか一に記載のプロジェクト管理システム。
  14.  課題情報とタスク情報が関連付けられている場合には,保持された課題が解決された旨を示す情報である課題解決状況情報を,関連付けられているタスク情報のタスク処理状況情報に基づいて生成し,課題解決状況情報取得部に渡す課題解決状況情報生成部を有する請求項13に記載のプロジェクト管理システム。
  15.  プロジェクト管理情報に関連付けられている前提情報の変更の入力を受け付ける前提変更入力受付部と,
     前提情報と関連付けられているプロジェクト管理情報の修正を促す修正促進部と,
    をさらに有する請求項1から請求項14に記載のプロジェクト管理システム。
  16.  プロジェクト目標達成に関連するステークホルダーの入力をそのステークホルダーの属性を示す指標値を関連付けて受け付けるステークホルダー入力受付部と,
     ステークホルダーとそれに関連付けて受け付けられた指標値とを用いてステークホルダーのマップを生成するステークホルダーマップ生成部と,
     生成されたマップを出力するマップ出力部と,
    を有する請求項1から請求項15のいずれか一に記載のプロジェクト管理システム。
  17.  状況情報をマップ化した情報である状況情報マップを取得する状況情報マップ取得部と,
     取得した状況情報マップを出力する状況情報マップ出力部と,
    を有する請求項1から請求項16のいずれか一に記載のプロジェクト管理システム。
  18.  プロジェクトの目標を達成するためのメンバー又はメンバーから構成されるチームを識別するメンバーチーム識別情報を保持するメンバーチーム識別情報保持部と,
     メンバーチーム識別情報とそのメンバーチームが携わるプロジェクト管理情報を関連付けたメンバーチームプロジェクト管理情報関係を保持するメンバーチームプロジェクト管理情報関係保持部と,
     保持されているメンバーチームプロジェクト管理情報関係を出力するメンバーチームプロジェクト管理関係出力部と,
    をさらに有する請求項1から請求項17のいずれか一に記載のプロジェクト管理システム。
  19.  プロジェクト管理システムの動作方法であって,
     プロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける課題情報入力受付ステップと,
     一以上の課題情報を課題識別情報と関連付けて保持する課題情報保持ステップと,
     保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する課題解決状況情報取得ステップと,
     保持されている課題情報と課題解決状況情報とを関連付けて出力する課題解決状況情報出力ステップ部と,
     プロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付けるリスク情報入力受付ステップと,
     入力された一以上のリスク情報をリスク識別情報と関連付けて保持するリスク情報保持ステップと,
     保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得するリスク顕在化リスクハイリスク化情報取得ステップと,
     保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力するリスク顕在化リスクハイリスク化状況出力ステップと,
     プロジェクト管理情報であって,プロジェクトの目標を達成するに際して少なくとも一部は,前記課題を解決するために処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付けるタスク情報入力受付ステップと,
     入力された一以上のタスク情報をタスク識別情報と関連付けて保持するタスク情報保持ステップと,
     保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得するタスク処理状況情報取得ステップと,
     保持されているタスク情報とタスク処理状況情報とを関連付けて出力するタスク処理状況情報出力ステップと,
     プロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付けるプロジェクト管理情報変更要請受付ステップと,
     受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持するプロジェクト管理情報変更要請保持ステップと,
     保持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得するプロジェクト管理情報変更要請実施情報取得部と,
     取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更するプロジェクト管理情報変更ステップと,
    を有するプロジェクト管理システムの動作方法。
  20.  プロジェクト管理情報であって,プロジェクトの目標を達成するために解決しなければならない課題を示す情報である課題情報の一以上の入力を受け付ける課題情報入力受付ステップと,
     一以上の課題情報を課題識別情報と関連付けて保持する課題情報保持ステップと,
     保持された課題が解決された状況を示す情報である課題解決状況情報を課題識別情報と関連付けて取得する課題解決状況情報取得ステップと,
     保持されている課題情報と課題解決状況情報とを関連付けて出力する課題解決状況情報出力ステップ部と,
     プロジェクト管理情報であって,プロジェクトの目標を達成するに際して所定の条件下で想定されるリスクを示す情報であるリスク情報の一以上の入力を受け付けるリスク情報入力受付ステップと,
     入力された一以上のリスク情報をリスク識別情報と関連付けて保持するリスク情報保持ステップと,
     保持されたリスクが顕在化した旨又はリスクが高まった旨を示す情報であるリスク顕在化リスクハイリスク化情報をリスク識別情報と関連付けて取得するリスク顕在化リスクハイリスク化情報取得ステップと,
     保持されているリスク情報とリスク顕在化リスクハイリスク化情報とを関連付けて出力するリスク顕在化リスクハイリスク化状況出力ステップと,
     プロジェクト管理情報であって,プロジェクトの目標を達成するに際して少なくとも一部は,前記課題を解決するために処理しなければならないタスクを示す情報であるタスク情報の一以上の入力を受け付けるタスク情報入力受付ステップと,
     入力された一以上のタスク情報をタスク識別情報と関連付けて保持するタスク情報保持ステップと,
     保持されたタスクの処理状況を示すタスク処理状況情報をタスク識別情報と関連付けて取得するタスク処理状況情報取得ステップと,
     保持されているタスク情報とタスク処理状況情報とを関連付けて出力するタスク処理状況情報出力ステップと,
     プロジェクト管理情報の変更要請であるプロジェクト管理情報変更要請の入力を受け付けるプロジェクト管理情報変更要請受付ステップと,
     受け付けたプロジェクト管理情報変更要請をプロジェクト管理情報変更要請識別情報と関連付けて保持するプロジェクト管理情報変更要請保持ステップと,
     保持されているプロジェクト管理情報変更要請を実施する旨を示す情報であるプロジェクト管理情報変更要請実施情報をプロジェクト管理情報変更要請識別情報と関連付けて取得するプロジェクト管理情報変更要請実施情報取得部と,
     取得されたプロジェクト管理情報変更要請実施情報に基づいてプロジェクト管理情報を変更するプロジェクト管理情報変更ステップと,
    を有する計算機であるプロジェクト管理システム装置に読取実行可能に記述したプロジェクト管理プログラム。
PCT/JP2019/018308 2019-05-07 2019-05-07 プロジェクト管理システム WO2020225861A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2020532062A JP6946612B2 (ja) 2019-05-07 2019-05-07 プロジェクト管理システム
PCT/JP2019/018308 WO2020225861A1 (ja) 2019-05-07 2019-05-07 プロジェクト管理システム
CN201980096147.6A CN113795855A (zh) 2019-05-07 2019-05-07 项目管理系统
JP2021083253A JP2021184250A (ja) 2019-05-07 2021-05-17 プロジェクト管理システム
US17/520,564 US20220058552A1 (en) 2019-05-07 2021-11-05 Project management system, method of operating project management system, and non-transitory computer-readable medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/018308 WO2020225861A1 (ja) 2019-05-07 2019-05-07 プロジェクト管理システム

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US17/520,564 Continuation US20220058552A1 (en) 2019-05-07 2021-11-05 Project management system, method of operating project management system, and non-transitory computer-readable medium

Publications (1)

Publication Number Publication Date
WO2020225861A1 true WO2020225861A1 (ja) 2020-11-12

Family

ID=73051590

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/018308 WO2020225861A1 (ja) 2019-05-07 2019-05-07 プロジェクト管理システム

Country Status (4)

Country Link
US (1) US20220058552A1 (ja)
JP (2) JP6946612B2 (ja)
CN (1) CN113795855A (ja)
WO (1) WO2020225861A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024062964A1 (ja) * 2022-09-22 2024-03-28 株式会社Vaiable プロジェクト遂行支援装置、方法、及びプログラム

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4040354A4 (en) * 2019-10-01 2023-06-14 JGC Corporation WORK MANAGEMENT DEVICE, WORK MANAGEMENT METHOD AND RECORDING MEDIA
WO2022108458A1 (en) * 2020-11-19 2022-05-27 Ailteir Limited A project tool
US11997425B1 (en) 2022-02-17 2024-05-28 Asana, Inc. Systems and methods to generate correspondences between portions of recorded audio content and records of a collaboration environment
CN117094665B (zh) * 2023-07-28 2024-02-09 成都智慧企业发展研究院有限公司 一种数字化企业管理系统及方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004240486A (ja) * 2003-02-03 2004-08-26 Hitachi Ltd プロジェクトの変更管理方法および装置
JP2006085277A (ja) * 2004-09-14 2006-03-30 Ricoh Co Ltd プロジェクト管理装置
JP2006099751A (ja) * 2004-08-31 2006-04-13 Internatl Business Mach Corp <Ibm> プロジェクトを構成するタスクに人員を割当てるための方法、プログラムおよびコンピュータ
JP2006260112A (ja) * 2005-03-16 2006-09-28 Ricoh Co Ltd プロジェクト管理システム、プロジェクト管理方法、プログラム及び記憶媒体
JP2007249572A (ja) * 2006-03-15 2007-09-27 Mitsubishi Electric Corp プロジェクト管理支援装置、プロジェクト管理支援方法、およびプロジェクト管理支援プログラム
JP2011175593A (ja) * 2010-02-25 2011-09-08 Ricoh Co Ltd プロジェクト管理装置、プロジェクト管理方法、プロジェクト管理プログラム及び記録媒体
JP2013101532A (ja) * 2011-11-09 2013-05-23 Canon Marketing Japan Inc プロジェクト管理装置、プロジェクト管理方法、プログラム及び記憶媒体
WO2017009888A1 (ja) * 2015-07-10 2017-01-19 株式会社野村総合研究所 プロジェクトリスク管理システムおよびプロジェクトリスク管理方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7546248B2 (en) * 2004-02-24 2009-06-09 Asa Sales Systems, Llc Sales management system and method
US20090037241A1 (en) * 2007-07-31 2009-02-05 M3 Planning, Inc. Automated strategic planning system and method
US11017335B1 (en) * 2013-03-05 2021-05-25 Pma Technologies, Llc Graphical schedule risk analyzer
US20160148133A1 (en) * 2014-11-26 2016-05-26 International Business Machines Corporation Risk assessment through contextual analysis
US20180211195A1 (en) * 2017-01-24 2018-07-26 Khorus Software, LLC Method of predicting project outcomes

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004240486A (ja) * 2003-02-03 2004-08-26 Hitachi Ltd プロジェクトの変更管理方法および装置
JP2006099751A (ja) * 2004-08-31 2006-04-13 Internatl Business Mach Corp <Ibm> プロジェクトを構成するタスクに人員を割当てるための方法、プログラムおよびコンピュータ
JP2006085277A (ja) * 2004-09-14 2006-03-30 Ricoh Co Ltd プロジェクト管理装置
JP2006260112A (ja) * 2005-03-16 2006-09-28 Ricoh Co Ltd プロジェクト管理システム、プロジェクト管理方法、プログラム及び記憶媒体
JP2007249572A (ja) * 2006-03-15 2007-09-27 Mitsubishi Electric Corp プロジェクト管理支援装置、プロジェクト管理支援方法、およびプロジェクト管理支援プログラム
JP2011175593A (ja) * 2010-02-25 2011-09-08 Ricoh Co Ltd プロジェクト管理装置、プロジェクト管理方法、プロジェクト管理プログラム及び記録媒体
JP2013101532A (ja) * 2011-11-09 2013-05-23 Canon Marketing Japan Inc プロジェクト管理装置、プロジェクト管理方法、プログラム及び記憶媒体
WO2017009888A1 (ja) * 2015-07-10 2017-01-19 株式会社野村総合研究所 プロジェクトリスク管理システムおよびプロジェクトリスク管理方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024062964A1 (ja) * 2022-09-22 2024-03-28 株式会社Vaiable プロジェクト遂行支援装置、方法、及びプログラム

Also Published As

Publication number Publication date
CN113795855A (zh) 2021-12-14
JPWO2020225861A1 (ja) 2021-05-20
JP2021184250A (ja) 2021-12-02
US20220058552A1 (en) 2022-02-24
JP6946612B2 (ja) 2021-10-06

Similar Documents

Publication Publication Date Title
JP6946612B2 (ja) プロジェクト管理システム
Koseoglu et al. Mobile BIM implementation and lean interaction on construction site: A case study of a complex airport project
US20060044307A1 (en) System and method for visually representing project metrics on 3-dimensional building models
Wesz et al. Planning and controlling design in engineered-to-order prefabricated building systems
US20090030711A1 (en) Project Management System and Method
US11941560B2 (en) Systems and methods for generating construction models for construction projects
US20170169392A1 (en) Automatic bill of talent generation
Villadsen The relation between executive succession and corporate capacity
US20030105657A1 (en) Personal resource management tool
Schafler et al. Insights into the Introduction of Digital Interventions at the shop floor
Roberti et al. Increasing Autodesk Revit Productivity for BIM Projects: A practical guide to using Revit workflows to improve productivity and efficiency in BIM projects
US20190266544A1 (en) Techniques for managing process-flows across an enterprise
WO2000063824A9 (en) System and method for developing and managing a financial services product
Faraji Lahijani BIM in construction management: leaning the design-bid-build (DBB) project delivery system by using BIM in design phase
Zhang Integrating Lean Construction, BIM and Quality: A New Paradigm for the Improvement of Chinese Construction Quality
McHugh et al. Conducting onboard transit rider surveys with electronic handheld tablets: An agencywide consolidated approach
Burguete Project optimization through the combination of BIM and last planner system
Wach et al. Improvement of investment processes in mining company by implementation of project management system
US20240193515A1 (en) Systems and methods for generating construction models for construction projects
Feng Causes and effects of rework on the delivery of healthcare facilities in California
Harris Planning and Control Using Microsoft Project 2013
Kerttula Wasted time and its causes in electrical and HVAC work
Karapetian Development of the Russian construction industry in the context of transition to a digital economy
Babanina Improving construction takt production efficiency by using digitalization
Soosaimuthu et al. Industry Best Practices and Business Recommendations

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2020532062

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19928099

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19928099

Country of ref document: EP

Kind code of ref document: A1